Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6026 - Omni Properties - Tenant Improvement
QM\ PgcpEyles BP# LiYko API'HOVED FOR ( / ISSUANCE BY: ! . ii, A 7 ; ,,t_ „ ) BUILDING OFFICIAL DATE: L/ //j - ('Q I hereby certify that I have rea "nd = amined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constructiorr r the performance opvork. I am authorized to sign for and obtain this building permit. SIGNATUR _ - -/ DATE: 4 i ri/ i () _ ____,---..>"., PRINT N AME: -(- �,,r, , , i, COMPANY: ,: ,' ,, ,r, 44- ,rr. , :._:_. PROPERTY OWNER Michael L. Moodenbaugh PHONE 431 -7900 ADDRESS 130 Andover Park East #200, Tukwila, WA ZIP 9$188 CONTRACTOR Sterling Homes Inc. PHONE 946 EXP DATE -5116 ZIP 98003 12 - 24 - 90 ADDRESS 31919 First Avenue South #100, Federal Way, WA WA. ST. CONTRACTOR'S LICENSE # STERLHI132R4 ARCHITECT Len Heather & Assoc. PHONE 565 -5191 ADDRESS 3009 Bridgeport Way West, Tacoma, WA ZIP 98466 TYPE OF CONSTRUCTION: UBC EDITION (year) 88 SETBACKS: N - S - E - W - FIRE FIRE PROTECTION: OSprinklers ® Detectors C) N/A UTILITY PERMITS REC�UIRED? Yes (through (through throe Public Works) ZONING: BAR /LAND USE CONDITIONSDYes Q No 76.00 6111 BUILDING SURCHARGE CONDITIONS (other than those noted on or attached to permit/plans): 6111 2 - 26 - 90 ENERGY SURCHARGE OCC. LOAD SQUARE FEET OCC. LOAD OTHER: TOTAL OCC. LOAD DESCRIPTION AMOUNT RCPT • DATE BUILDING PERMIT FEE 117.00 6111 2 -26 -90 2 -26 -90 PLAN CHECK FEE 76.00 6111 BUILDING SURCHARGE 4.50 6111 2 - 26 - 90 ENERGY SURCHARGE OCC. LOAD SQUARE FEET OCC. LOAD OTHER: TOTAL OCC. LOAD TOTAL - 197.hn USE / / CODE COMPLIANCE / / / arm N i o SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET CCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD TOTAL CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. Ol DATE ISSUED: PROJECT INFORMATION ES 130 Andover Pk E PROJECT NAME/TENANT Omni Proerties ASSESSOR ACCOUNT 022310 - 0040 -01 TYPE OF Li New Building ■ Addition Cl Tenant Improvement (commercial) • Demolition (building) ■ Grading/Fill WORK: 0 Rack Storage O Reroof O Remodel (residential) O Other: DESCRIBE WORK TO BE DONE: CERTIFICATE OF OCCUPANCY NO. Remodel. BUILDIFV3 PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) PLAN C SUI 200 VALU DATE ISSUED: FEES U ON-3 10,000.00 This permit shall become null and void if the work is not commenced within 18trdays from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. v31 1 &IV PERMIT NO. _ • CONTACTED � y �,� L- ? - r 1 �5j0L DATE READY DATE NOTIFIED [ � L t . � i o - -1 0 BY: (init.) - BY: (init.) PERMIT EXPIRES 2nd NOTIFICATION AMOUNT OWING 0 3RD NOTIFICATION BY: (init.) PLAN CHECK NUMBER 9o- ocs INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD T, DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. 'BUILDING - initial review P. cO FIRE 0 PLANNING I PUBLIC WORKS CU OTHER DO BUILDING - final review BUILDING PERMIT APPLICATION TRACKING REVIEW COMPLETED PROJECT NAME 0mn‘i Pro perk SITE ADDRESS a5 O Arriow r f SUITE NO. 6200 11'4 3 / 2 rd ( ROU T ED ) 1/- -() INIT: INIT: INIT: INIT:K (V4 ZONING: REFERENCE FILE NOS.: MINIMUM SETBACKS: QUIREME N- PUBLIC WORKS LETTER DATED: TYPE OF UTILITY PERMITS REQUIRED Yes NSULTANT: Date Sent Date Approved - Sprinklers /IIIIME S- etectors"n N/A FIRE DEPT. LETTER DATED: 1/-L/ - id INSPECTOR: 5/2- (BARILAND USE CONDITIONS? fYes UBC EDITION (year): DESCRIPTION. AMOUNT - RCPT # DATE BUILDING PERMIT. FEE • • • 111, O n (. (i ( •• O PLAN CHECK FEE - 7 . o L� BUILDING SURCHARGE '. I .sc, ADDRESS `'1 > )4 i 1 tU(,'Ri ///2( F/, -T- L- . D c -. ) ZIP, ie s ;-- CONTRACTOR ` . <_- i'/ / A. f- i !) ,_ L.,� ,. -- ENERGY .SURCHARGE ADDRESS j 'F 1(1 / Kj / ift, e'; 1 /1C) A:C' /it.h Z IP elv: - t0 WA. ST. CONTRACTOR'S LICENSE # 5- -1;_-- l', A/ / 72,;) p4 EXP. DATE / _. _ ./ �; 7 OTHER: PHONE c,6� _ ', . � = ADDRESS - , (.'C , C " '! 27,;2,,,, ,. l -:ZIPc 'TOTAL • - (CI") .5c.) \,/ ■4 PRINT NAME /171,./ � ,4 is i - /r�•; /^ �,/)1:_4,// //PHONE C � L C � r SITE ADDRESS , - -- 7 , ( / +1 {Cn?J -' Y -t,- ; 1, - , - -? tL- VALUE OF CONSTRUCTION - $ IC> (:r .) ASSESSOR A CCOUNT # PROJECT NAME/TENANT .. Li Addition TYPE OF U New Building lJ Tenant Improvement (commercial) U Demolition (building) WORK: U Rack Storage U Reroof 0 Remodel (residential) U Other DESCRIBE WORK TO BE DONE: Is. BUILDING USE (office, warehouse, etc.) NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? No No U Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: ,. /; ( - , - Tenant Space: ,.� :� 4 ? Area of Construction: ), -:, c - L . WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? [,No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER l / i ',/1/7) /y 2 , / '/ I e,),I) = 7:),411 J PHONE, 7/_ c- 2 -) ADDRESS `'1 > )4 i 1 tU(,'Ri ///2( F/, -T- L- . D c -. ) ZIP, ie s ;-- CONTRACTOR ` . <_- i'/ / A. f- i !) ,_ L.,� ,. -- PHONE = �„iJ / ' ! / ADDRESS j 'F 1(1 / Kj / ift, e'; 1 /1C) A:C' /it.h Z IP elv: - t0 WA. ST. CONTRACTOR'S LICENSE # 5- -1;_-- l', A/ / 72,;) p4 EXP. DATE / _. _ ./ �; 7 ARCHITECT / EA) /- -!F' -fr ,- i.- r A ‘ <ir e' � PHONE c,6� _ ', . � = ADDRESS - , (.'C , C " '! 27,;2,,,, ,. l -:ZIPc 1;<HE BY CERTIFY;T fATt' MINED THIS APPLICATI D KNOW THESA TQ BE • ; •TRUE AND CORRECT AND i.. 'AUT. RI Tf.? PLY FOR:: 1'S : R . BUILDING OWNER OR AUTHORIZED AGENT / //� /, DATE _ f _ ;% .2 PRINT NAME /171,./ � ,4 is i - /r�•; /^ �,/)1:_4,// //PHONE C � L C � r c/3/ _ , c I) ADDRESS / 3' '' ! . - ., - .4> , , 7h , ; , CITY/ZIP--t- 3 CONTACT PERSON ' PHONE CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 PLAN CHECK NUMBER APPLICATION M U S T BE FILLED OUT COMPLETELY DATE APPLICATION ACCEPTED BUILDIF3 PERMIT APPLICATION FEES (for staff use only) APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of f:ommunity neveloprent prior to application submittal. Contact the Permit Coordinator at 1 133 - 1851 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION EXPIRES COMMERCIAL NEW COMMERCIAL BUILDINGS/ADDITIONS C Completed building permit application (one for each structure) C Assessor Account Number Two sets (2) of the following C Specifications Topographical survey Energy calculations stamped by a Washington State licensed engineer or architect Cl Legal description Woildng drawings, stamped by a Was architect, which include: • Site plan • Architectural drawings • Structural drawings • Mechanical drawings • Elevations . • Civil drawings • Landscape plan .: • Completed utility permit application C Six (6) sets of civil drawings NOTE See utility permit application and checklist for specific utill submittal requirements RACK STORAGE C Completed building permit application .: H Assessor Account Number::: Two (2) sets of plans, which include,:; C Building floor plan showing • Entire space where racks: will be r Exit doors • Dlmmensione of ati ai ..... Structural calculations stamped by a Washington State licensed engineer . Soils report stamped by a Washington State licensed engineer . RESIDENTIAL SVdMITTAL CHECKLIST Tenant space floor plan showing rack storage layout, ;aisles exits NOTE. Inclvds dimensions Of nicks (h and exit ways. on plan C St calculations stamped by a Washington State licensed engineer (radii storage 8' and over) NEW SINGLE-FAMILY DWELLINGS/ADDITIONS C Completed building permit application (one for each structure Legal description E] Assessor Account Number D Two sets (2) of working drawings, which incl • Site plan • Foundation plan • Floor plan • Roof plan • Building elevations (all views • Building cross - section • Structural framing plans C Washington State Energy Code data C Completed utility permit application ❑ Six (6) sets of site plans showing utilities NOTE: Building site plan and utility site plan may be combi See utiiity permit application and checklist for specific submittal requirements. Additanal topographical and soils information may required if unique • site conditions COMMERCIAL TENANT IMPROVEMENTS C Completed building permit application (one for each structure or tenant) Assessor Account Number Two. (2) sets of construction plans, which include C . Site plan Location of tenant space: • Existing and proposed. parking C Overall building plan • Tenant location • Use of adjacent. (common wall) tenant : • Overall dimensions of building or square footage Floor plan of proposed tenant space • Tenant space plan with use of each room labelled: • Exit doors, egress patterns • New walls, existing wall, and walls to be demolished..: C Construction details •.Cress sections showing wall construction and method of attachment for floor and. ceiling.: Structural calculations :stamped by a Washington State engineer may be required if structural work is to be done (2 sets);;: NOTE If any utility work is to be done, submit separate utility permit application and plans • REROOF: • , :.... .. _.... ..... .. ....... . . C Completed t uilding permit application (one for each structure Assessor Account Number Narrative describing existing roof, material being removed, an material being. installed NOTE A C e r t i f i c a t i o n l e t t e r i s r e q u i r e d prior to final i n s p e c t i o n and sign- off of the Permit :A NTENNA/SATELLITE DISHES Completed building. permit application Assessor Account Number Two (2) Sets of include; Site Plan. (showing building and location of antenna/satellite dis • Details antenna/sateilite dish and method of attachment Structural calculations stamped by a Washington Stateiicens engineer may be RESIDENTIAL REMODELS Completed building permit application (one for each structure C Assessor Account Number C Two (2) sets,of working drawings, which include • Site plan • Foundation plan • Floorpr4n • Roof plan • Building .elevationa'(ail views • Building cross :section : 'Structural framing plans : NOTE: if any utility work Is to be done provide utility permit and plans: must besubmitted REROOFS:: . C Completed building permit application (one for each structure C Assessor Account Number Narrativedescnbing existing roof, material being removed, an material being installed NOTE. A :certification letter Is requiredprtor'to final Inspection and `sign- oil of the permit Pr Pr I> ( „ Type of Ins n� r : 1 9K � I\ Date Called: Special Instructions: Date Wanted: I —. (.� '_ am. .m. Requester( Phone No.: /7 cr. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. ■ t Inspector: I Recept No.: Date: I v Date: :..a42Q 31 - 3670 ❑ Corrections required prior to approval. COMMENTS: 01(. 1 /Vii - i ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Pr ct: j .. ? 1,1 7.1 Type of Inspectoor�..� d ess Date Called: Special Instructions: a • vr1 • Date Wanted Requester: '� cLcA___ Phone No.: LA:31 _ 7q0 INSPECTION RECORD } Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ❑ Approved per applicable codes. PERMIT NO. e Corrections required prior to approval. COMMENTS: N .► E C.en)A –. IP NJ • Inspector: Date: / g – 2— ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PROJECT: OM /1 � ( - - Sr T r . 7(Zl..6 od d O PERMIT NO. o� (P SITE ADDRESS: on L DATE CALLED: 0 c) P. TYPE OF INSPECTION: _ t - - / , DATE WANTED: / ,� I , _ SPECIAL INSTRUCTIONS: REQUESTER: PHONE NO.: / = - 2 9oo INSPECTION RESULTS/COMMENTS: ) _ C / `- " D5 Cam. �f o.c'\-tl r 4J.& - c- f r' ec v L c • i p_. --. .,a I t• L . ' -L Ors a r rn. � C( ' � �,.." & 4 ( 240 5 O . ,v,„-^, . L A ,S� vv.<3P -e c.-t.or. c oo-te 2- q "1 0 . _ • . cc) r c Le ds rv..01- Q r. (■St cs r -rv, \ .r- k.J, • "c-2" INSPECTOR: C , --- Le____ DATE: Co - 2_43 -q CITY OF TUKW/u Dept. of Community Development - Building Division Phone: (206) 4314670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 Permit No. 6 02-6 Date CITY OF TUKWILA Building Division 6200 Southcentor Blvd. Tukwila, WA 98188 433 -1845 (.0- Job Address , 3 - o C oLf-t►-e Pk- .6: CORRECTION NOTICE Th following items are found to be in violation of Ordinance (.U6 and shall be corrected. DE) N ELF S - 1 - 0 Ft Nkt-. . b rz-- 5,..3‘06 Frra w. ex) (s Toe" .b I t.r c.- 3 iJ a C" i " watE PO (NTH ()Cr o .D u it( r0 "THE 'f (2-u190 /NSPErTta A N.o 5T1 /2.Eau, utES Cmg a ►•� (=r1 Co ►n r LI A nlGc 3) ey, (T X>b-o g.S___'c-s- A- L L.. ,-g- 4 * s o ■E'31 . M �A tl% YM t. -Dins w>t i ct3 AN( As r-RtGHi Fear" c 1 stfl) A 14 cIL P * ) G 1"IA I S t N SP n1 . H o s W o 11 Pe TO CA) F-4 vW 1Tbt WA • ST- /lam Ic-a- 2ttreZ --. ►2e S An/P Nol S . `t) pelt_ G - n- Now 46 8 f ct e-g4 a a (1 Snn. D -$ FKAm A LE Lite) ELeV F (2 ? e) nil o I M 0L.1iz. • P toe" A CCESS - ( - o z tL Pt Pa - Tv e P 1 K-cr- - o"r Signed '-- iilding Official /Inspector 1.et; • • • " " " • • -- -"••• irca-p-E--eflow CITY OF TUKWILA Building Department 6300 5dr:enter Boulevard TukwilMALA 98188 (206) 431-3670 6, 4' Inspection Results/Comments: 1,skkA PERMIT # Date Inspector CO Date Type of Inspection ce - u-e Date Wanted (d - 30 --ec'd a.m. p.n Site Address /30 (3L,A.A.c.our )" E'_. . Project ni-A,y...A. Requestor Phone # Special Instructions CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433-1849 Type of Inspection Site Address Requestor 30 2tK/V INSPECTION RECORD PERMIT # 0 7—C Date /Z Date Wanted 1 1 -- ct4 (1) p.m. 20()Project (0) r yl n Phone # Special Instructions Inspection Results/Comments: r-u.r\e i pe c..sotf A NW Inspector 9 Pvt.— Date CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433-1849 Type of Inspection - VCalP1,61 Site Address I *3 0 ,71 CLOVtV Requestor CKA/ Special Instructions Inspection Results/Comments: a Inspector t INSPECTION RECORD PERMIT # c) .2-(p 7 -, Date ( Date Wanted 6 Project ()ti Ce:Xf 00 Phone # 70 9 0 n spe—e- ,4Z- 4 Date 4- -- P.m. City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Project Name ()11 P1 5 Co Address ,R( )47/1/ 01./ AV:" Suite # ." current inspection schedule Needs shift inspection ..."Approved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire: Permits: Gary L. VanDusen, Mayor k/ / / Control No. Permit No. 5 g? Authorized ig4Aeure Date FINALAPP.FRM T.F.D. Form F.P. 85 Plan Check #90 -083: Omni Properties 130 Andover Pk E #200 THE FOLLOWING COMMENTS APPLY Tcy AND B COME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER _ ,��Q__ 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872 - 6363). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. Any exposed insulations backing material to have Flame Spread Rating of 2 3 or less, and material shall bear identification showing the fire performance rating thereof.' 5. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 'Edition), Washignton State Energy Code (1989 Edition), and. Washington State Regulations for Barrier Free Facility (1989 Edition). 6. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 433 -1849 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433-1849 4 Shear Wall Nailing 433 -1849 5 Roof Sheathing Nailing 433 -1849 6 Masonry Chimney 433-1849 7 Framing 433 -1849 8 Insulation 433-1849 9 Suspended Ceiling 433 -1849 10 Wall Board Fastening 433-1849 X1 2 11 13 14 FIRE FINAL Insp: 575 -4404 15 PLANNING FINAL 433 -1849 16 PUBLIC WORKS FINAL 433-0179 X 17 BUILDING FINAL 433 -1849 (INSPECTOR COMMENT SECTION ON REVERSE) BUILDAG PERMIT CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 SITE ADDRESS: 130 Andover Pk E INSPECTION RECORD (Post with Building Permit In conspicuous place) 200 BUILDING PERMIT NO. DATE ISSUED: (Pcs, Omni Properties CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if undersiab Insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 3. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 04/26BD City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Fire Department Review Control Number 90 -083 Dear Sir: April 4, 1990 Re: Omni Properties - 130 Andover Park East, #200 Gary L. Van ayor The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. The total number of fire extinguishers required for your establishment is calculated at one extinguisher for each 3000 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 10 B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (NFPA 10, 3 -1.1) (UFC 10 -1 (3 -1)) 2. Exit doors shall swing in the direction of exit travel when serving an occupant load of 50 or more. (UBC 3304(b)) Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. (UFC 12.104b) Exit hardware and marking must meet the requirements of Uniform Fire Code Sections 12.104 & 10.402(a). Exits shall be illuminated at any time the building is occupied. An emergency system shall automatically provide exit illumination upon failure of the main power supply. (UFC 12.107(a)(b)) 3. All modifications to fire alarm systems shall have the written approval of the Tukwila Fire Department. No work shall commence without approved drawings. (City Ordinance #1327) (UFC 10.301) Remote indicator lights are required on all above ceiling smoke detectors. (UFC 10.301) Yours truly, City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575 -4404 Page number 2 ,t04-40- The Tukwila Fire Prevention Bureau cc: T.F.D. file ncd Gary L. VanDusen, Mayor Local UL Central Station supervision is required. (City Ordinance #1327) The above items are a general synopsis of requirements for Fire Alarm Systems required by City Ordinance #1327, and are not intended to detail all requirements of NFPA #71 or #72. Final approval is subject to the fulfillment of requirements of NFPA #71 or #72 and a successful functional test accomplished by the installer (witnessed by the Fire Department) upon completion of the system. (UFC 10.301) 4. All electrical wiring is to be inspected by the State Electrical Inspector, Washington State Department of Labor & Industries. (NEC 70) 5. All interior wall covering materials shall be fire - resistive or shall be treated to be fire - resistive, so as to result in a flame- spread rating as required by UFC. Appendix VI -C tables 42A and 42B. A certificate of the flame spread rating is required to be delivered to the Tukwila Fire Department. (UBC 4204) (UFC 10.401) This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. 'X• REQUIRED INSPECTIONS ' 1 Footings 2 Foundation 3 Slab and/or Slab Insulation 4 Shear Wall Nailing 5 Root Sheathing Nailing 6 Masonry Chimney X 7 l Framing 8 Insulation 9 Suspended Ceiling X 10 Wall Board Fastening 11 12 13 X 14 FIRE FINAL Imp: 15 PLANNING FINAL 16 PUBLIC WORKS FINAL X 17 BUILDING FINAL PLAN CHECK NUMBER 90 -0E33 O..� PROJECT: ..In; _- THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER a[�l No changes 1011 be Bade to the plans unless approved by the 'C1 Architect and the Tukwila Building Division. • �2 Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4732). dlir permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872 - 6363). 0 All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be i tJ posted at the job site prior to the start at the job site pror to the start of any construction. a When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. O All structural concrete to be special inspected (Sec. 306, UBC). (8 All structural melding .to be done by W.A.8.0. certified welder and special inspected (Sec. 306, UDC). V All high - strength bolting to be special inspected (Sec. 306, UBC). t0 Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Ione 3. 11 Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12 Readily accessible access to roof mounted equipment is required. l3 Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 23 or less, and material shall bear identification showing the fire performance rating thereof. IS Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure.). 16 A statement from the roofing contractor verifying fire retardancy of rook will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1908 Edition), Washignton State Energy Code (1989 Edition), and Washington Stae Regulations for Barrier Free Facility 11909 Edition). 18 All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4707, at least three working days prior to desire inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. t9 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. ZO Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. Zl All spray applied fireproofing as required by U.B.C. Standard No. 43-0, shall be special inspected. 22 All wood to remain in placed concrete shall be treated wood. 23 All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of . plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. t• Plan '-.vie PROJECT C,irn 1 � , 1 ADDRESS ,Q, k gf„: t30 A>n ov er lam. god DATE 3 ,/Z. q1. d OCCUPANCY GROUP 2 0 f47c e TYPE OF CONSTRUCTION ' - 1 LOCATION ON PROPERTY_ _� � E a s Bui lA∎v�5 2" rl��o r So0� � 17 2- BUILDING HT. / NO. STORIES N1 c _. FLOOR AREA _ Te t'1 a j S 9LSSIra e .,.. OCCUPANT LOAD ._. \ 04 ' 2 hd F�c. r d o Lcx,. ? EXITING REQUIREMENTS _ ._ �s- oc_ u ......arrow FT P rn vs 1 1Pr11 C x DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION. PART V, CHAPTER 23, U.Q.C. I.S. E. C . . CHAPTER 51 -10, W.A.C.— © IC IC NOTES: CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: t. PLAN CHECK NUMBER IIMMIMMIMMOR ■ Plan Review PROJECT l /1 �l r\ - ADDRESS par o f core DATE ..3 2 ?/9 - . CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING DIVISION PLAN CHECK NUMBER prepared by: , V\ . 0410741 .. r 2 . r 1 r ` v , r')c LL I_ c- r L) • • _. ' Id. M Pi I l ? - v\ n o v P. k-- k • G —L_ - • 3 2, /9 a , .�. C) 1\1 n r-{-V, ,S t c a c -P ) fiev\ c o v i r B Y15 C Q . .� 4 folic_ L o _ a • - . - +; V l ._D 0 ' - M 4. -+ - . . x\4--, • . •r id- I Eel _ 't r - i `` • rI s (2) M�h14 I re 1 . 1 - - c 4 .P�..4 n1 . -" I vA f-4( - 4 IiPc-1 n 5 Pew- 1 ri.. t) t.,p+ . rec i r vr, e .v, -I- S 3 .) E + .. r • \ > c . - L�1 e)( t i v r- k'r c i c11, - x- Q i c P S / Plan Review PROJECT l /1 �l r\ - ADDRESS par o f core DATE ..3 2 ?/9 - . CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING DIVISION PLAN CHECK NUMBER prepared by: , V\ . 0410741 Plan Review PROJECT . n m 1 ► ADDRESS TIE Y (� DATE PLAN CHECK NUMBER e10-0(a3 2 h � __ r ioore._ OWNS CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: 4 _ PLANNING DIVISION 1 r U? -S (� ) area USP -tor C")CC \0G I `t' e V\ (A v‘ ._. ? (2) J C-".. 4r, i 1 't- (o o , - • • S - L- c (( il '1 k t- 33 (9 q : 3c. A M I e-r-I- rae? .sa -fin re- - r v-,, ✓ . t/ C' c I 1 Mike re - Vorn e � ' Yi cc v. iv. 3,2o 9.'00 AM li Dick w ( I( c-1 47 r t Mi e 3 _23 I (W AM ..-I 4 _(ihf - J- 4- ..- 3-7 M ' ►1< (' Uu,rue + o. c\ c y - c c f `4' e v v, gr. c S% p aylt- • f..c_i . -- ,A 44 Plan Review PROJECT . n m 1 ► ADDRESS TIE Y (� DATE PLAN CHECK NUMBER e10-0(a3 2 h � __ r ioore._ OWNS CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: 4 _ PLANNING DIVISION PROPERTY OWNER M ichael L. Moodenbaugh 'PHONE 431 -7900 ZIP 98188 ADDRESS 130 Andover Park East #200, Tukwila, WA CONTRACTOR Sterling Homes Inc. PHONE 946 -5116 ADDRESS 31919 First Avenue South #100, Federal Way, WA ZIP 98003 WA. ST. CONTRACTOR'S LICENSE # STERLHI132R4 EXP DATE 12 -24 -90 ARCHITECT Len Heather & Assoc. PHONE 565 -5191 ADDRESS 3009 Bridgeport Way West, Tacoma, WA ZIP 98466 USE I / CODE. COMPLIANCE I / I Yes ®N o (through Public Worits1 FLOOR SQUARE FEET CCC. LOAD SQUARE FEET OCC. LOAD . SQUARE FEET OGG. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD , TOTAL TY PE OF CONSTRUCTION: UBC EDITION (year) 88 SETBACKS: N — S — E — W — FIRE PROTECTION' 'OSprinklers Lg Detectors O N/A UTILITY PERMITS REQUIRED. Yes ®N o (through Public Worits1 ZONING: BAR/LAND USE CONDITIONSO ( No COMPANY :`�':7 : r. • , , (...1 +r ' CO NDITIONS (other than those noted on or attached to permit/plans): APPROVED FOR BUILDING OFFICIAL ISSUANCE BY: 01171111 DATE: 9-/C - } , I hereby certify that I have rea nd amined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constructi • • r the performance or Work. I am authorized to sign for and obtain this building permit. SIGNATUR . 5 M i " DATE: ' ,' '2 1 PRINT NAME: �. •,, . \�� R . r'% r `., �, , , �, COMPANY :`�':7 : r. • , , (...1 +r ' BUILDING PERMIT NO. DATE ISSUED: CERTIFICATE OF OCCUPANCY NO. CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 (40 q PROJECT INFORMATION 130 Andover Pk E PROJECT NAME/TENANT Omni Proerties Remodel. �UiLVlt.a PEMMIT (POST WITH INSPR. I ION CARD AND PLANS IN A CONSPICUOUS LOCATION) DESCRIPTION BUILDING PERMIT FEE PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: TOTAL - AMOUNT ;RCPT s 117. 76.00 00 6111 2 -26 -90 6111 3 -26 -90 4.zp 197.5(1 6111 DATE 2 -26 -90 PLAN CHECK #90 -083 SUI 200 V. U 0 FEES U 1 ASSESSOR ACCOUNT 022310- OQ40 -01 TYPE OF U New Building Addition Tenant Improvement (commercial) Li Demolition (building) UGrading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: This permit shall become null and void if the work is not commenced within 180'days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last Inspection. DATE ISSUED: 4 , • r ' I 1 ! 0 to MS WC/4 1 3 - 1" t d . r1FIcr. % PAAft iikftrr Ot — tfirktanlitC1t443. 120.: R$ C . OC 6Z 8 LZ 9Z SZ 1 /Z ' CZ ZZ tZ OZ 61 9L LI 9L St 1 71. El al Li 01, 6 9 , 9 S +7 C Z I vivio I II I I II IIIIIIIIIII!LI I II II IIIIII III IIIIII I IIIII6 11111111111111 0 1 . 1 1/ 11111 0jill. 11 iVIIIIIIIIIIPIIIIIIIIIIIIIIIInlinblifillillibillill1111111111.1111111111 1 11111b1 . 14011■1111411!IIIIIIIIIIII . h1111 . 111101h1,01111IIII , 1111111111111!1011111111111111111111 1 .111111111111111 .2 ......7rZ1.1111"= AN. g , ":'.'14''' .`7, ''"t A ; ; 2*-. ' r ': — : :". '';',.: '". " 'A:■....i.i 11111111111111111111111111 IIIIIIIII 1 I 111111111111 krill Illililkl111111111111111 4 5 6 7 8 9 I 10 11 mADE,N0ERmA. 12 NOTE: If the microfilmed document is less clear than this notice, it is due to the quality of the -original document. 1 . , - ,1 4=1-dUt thWabacceostsia=eta4c*bettmostialUrs,d SITE PLAN 1 icAta,w virfoiso'. -rstand ec i ‚ II. Qf Date Permit - • ............ ,11 i t LEN PIRATIOR.ill A 00 3009 afloompiniwAY TAgerialk IWA 9644 5#4441#1 • w cD .p romic l e afar A 4 Palk WZIC, 3 )/ 3 14 11) A I 1 DooRs `... .N.,.. 1 '0 U t 4 premie rok.4vAs s S ic. braci ■15 LE; CO : »r " " )L 1 4 1 0 MeV* iter CITY FF.B 2 6 PERMIT CENTER 0,3,c. See. 33oq the Plan Ch.ck ap ar .od 4p1. 111., of Q$ Qrti acKi 4i& CITY OF TUKWit.ia APPROVED APR 0 1990 -.- BtfllDNG els., DIVITOI\F oft b.(' I cor% • Par4ilioe N u,s6.(.1*. bU SOgteett\asft ce. t h • PROPOSED TENANTS: comNi ivirtinft:sorrof: e f 4F► .. Hi 4 C1' h: t r . •, "• •'; . �++ :] `M Y. '13:. d t "" i/ A �s -+ 4 ' �c�;;.'ii' �' ay;�i 421--Aopt rook iro.+6 6 • " ......�. �,.... -. .a.... .. -.... rorarrYerahl c 1 . . e'k!cfi'S4!►r.?as,,t:" - . t ry. _- — • y L:b+y= c�.+�M .. ..._ .:+ 1�5�4,! ��?s- �.�Cx.3r�,..».�<.�:!ev+wr, .rr�3ylt�1''•.�.w.+ -�-w: �: . r. �, .::ter.. AfiedoMA.- cztOrisY u Orryyrr • On? IA treil i 7 l y � t .: •!' ">'.. : -, y �pY ' .... �.a ., ��Sl}' _ }" }.., � a*'.',h it i,! i4 F' t- ..J ,•t; {iffy II II �IIIJIII�IIIIIII III I II II 1' S I rn�t %I4iL•:.. — •i. AS 'P!: g. --__ 44T% ■/EL . I " w c 1 Ill .11! Iii�I!Ii.III.iI1 {III III, I!III!IIIIIIIII QE 6Z SC LZ 9Z SZ CZ Z LZ OZ 61 81 Lt 9L St "I. et Zt It 01, 6 8 L 9 9 +i C Z I L ww Q (f11I�IIIIIIIiiiiiii It!I�iii !II!!!!I l�llllIII1 t III IIII�ld.1�111l 1111 11111! II Ii!l IJIIJIII I!!IIlIIIIIIIIitIIIIIIIIIhJIIII IIIIIIIIIIIIIIIII11 11111! I11111III1I11111IIIIIIIl II! I! IIIII IIIIIIIII!!I_li!Iil!ILhildII! �! ill )!fJ�l!IlilHitii ilI!!!�Ili!IIIII�!iliI !Iiiii,iliTII�i ii TII!�!III� ^r.:..y�'C10�^^�'..s•?wl:. C+ A�"'. tir .. .<•biv .Kr+K- ...+:.- ........a.. «.' s-. ..W.a'w.+- w+i.k:.»+�w:.+,'.. -.. �. a.,l....... « • . _. .._..._ ...__.,. ......... _ III 1 1191111111 II IIIIII III I I IIL IIIiII! If i .1 1I I 0 16 THS INCH 1 > 3 4 5 6 7 _ 8 9 ! 10 11 "DE IN GERMANY 1 2 NOTE: If the microfilmed document is lesr, clear than this notice, it is due to the quality of the original document. tit+ / V4 w71,IPQ ttXXO, ■ -•1 " /l { 1 I" L U 2 3 PERMIT CENTER (I) CITY OF TUKWILK APPROVED' APR 9 1990 Ut!!LDING DIVISION - rer't . —r 4211-C 61 ._ __ . ivietki E>E4'.44 US KE54.4AAKA, ' - 12. 3- irti PACS ,... frfkre,„ Gilien 41 KPH ■ w ' .0 4161 0 ftIC 641 0 44 1L-- --74 LAd-C4 razts,/ z �2W i Att.c0. ...,- • fr • LI ... I 'ta51.4z1114101 I 4' REFLECTIVE C,ELI iirstret ,4*-• • .4 *or ■ aENEFIAL NOTES 4.011.4K14, E-KK-1116ki ';azdit1; 661 tk ‘?Yo Z M n. eLECTRICAL LEGEND rtspo t-46.0-frh-.14 •-••■ A A.,' ; 4 ; „L.!. , 1 111111111•111111111111111111111111111111111111111111111r1WP 1111 11111111111 1111111111 11 I/1111111111 11 1111111111111 1111 111111 / 111 1 111 1 111 1 111 1 8 9 10 12 0 1 2 • 3 4 5 6 7 MADE lt4 GERMANI 16 THS INCH NOTE: If the microfilmed document is less clear than this notice, it is due to the quality of the vriginal document. 410 OC 63 86 L.Z. 9Z ge 4 7Z CZ 33 1,3 OZ 9t 9t St ' Cl Zt U 0L 6 8 L S , C 3 Irwi() 'III! _ • ,„ • • • . . • -.---. ' , . . ALL MATERIA0 ARO tetummovrvotALL CONFORA TO 'NE +W - lk.- Tyfit*:alrrAit.s WHERE NO SINOIFIDOET04.0- uNIFORM- BUILDING. , NECIICAL AND ELECTRICAL po0:9 A I N: e15: L:L O ADDITION. .. ., .,. , . . ....._ 3..... THE OONTROATOR SMALL WITIFY4U. OINENGIONO 046NATIoN$ 00 cORDITT004 PRroft TO'DONSTROOTIK ' . ALL:DINONSIONS eoW TO TAKE pmemEtic0 OR SCALE SNOW ON4ILANS. EELIVATIONS. S‘CTIONS AND DETAILS. ALt. EXIT DOORS TO S OPERABLE FROM INSIDE BUILDING WITH OUT KEYS OR SPED/AL KNOWLEDGE. WORK RELATED- ta TENANT mOROVEMENT Ak REQUIRED COOR- DINATION TO EMELL CONSTRUCTION - SMALL DE DETERmINED SY Twe moot .coNTRAOTOR FOR,DIDDING AND OONTRACTURAL AGREEMENT. • ' WALLS ARE TO BE FIRESTOPPED PER USD SECT 2Si8( f ). • ALL CORRIDOR DOORS AND,FRAME0 TO BE Z MIN LABEL. ALL STAIRWAY ENCLOWA9 DOORS AND • FRAMES TO.BE t HOUR LAREL. , .21.tell4,400 4.41:4~.04,4 - .1644444 --. .earzoopont - wr - :27= 4 4 a 4 444 11r 444 $0•14..tp.S .111,4,1C 4 44 4,40 442 44 VW $4 4140.4 4444 Pa° 4b44, . .471.444494 A194 ezeoesit. dmeAere4K-L Ago 47,-"4,4444 7K44*,‘-odieteler.,/se • Jo Afig 044.42•4. • HOUR DOOR MAMA TORIIITIONI METAL itzNumm4 tirus AT COURT " 4 • ... • PARTMON DETAIL. AT EXT. OgROLLitite s GEN. NOTES bOOR SCHEDULE S. FIRE ormetosi4ER eisALL venxn LOCATIONS . wornfic tt. THIS EXIST/NG BUILDING MARPIT PURE platy CITY ORDINANCE COSI. HAS Rah Mum TO COMPLY WITH AM AWN STANDARDS PER tUKOWA nuigE PR *Inc sutioe II. ALL INTERIOR WA4.1. COVERING MATERIALS SHALL ec PIM AUS* ISTWE „OR SNALL. GE TREATED TO SE FIRE MOIST . � AS TO RESK.T 114 A FLAME SPREAD RATING OF AT LEAST mots* FOR GENERAL AREAS. CLASS II FOR EXIT WAYS AND 01,ABS I ' FOR EscLosce vane& EXITWAY (*Lyon writztari um cif* OEPTARNENT 1 3, ALI. CORR /DOR AND SHAFT CONSTRUCT/ON TO BE I NOVA BE S I STAVE I 3 . FiLk. EOVALS TO BE SUBMITTED FOR APPROVAL PRIOR TO CO* 9TRuCTION. 14, BID- DESIGN WORK TO OE APPROVED PRIOR TO CONSTRUCT IOC 1E. ALL OARPMICE AND BMW PER BLDG. STANDARD, 1 . EXISTING BUILDING CONSTRUCTION TYPE: TYPE IU 1 NA UNDER 1998 USO CORRESPONDS TO TYPE III 1 HR 1902 14$0, ""0,wr 41444 4reitistrJ174447 4$ RAPP 44 der ""="tettl,40111,S.,*_.... ff. vow Iwo /A X. ZO4 WA as mg ,s4- Of PROMO PfR NFPA 04#. KAGSMAL4, ;0 1-; 71) 2 6 la:30 PERMIT CENTER CITY OF TUKVviLA APPR VFD APR !it 1990 A BUiLDING a r .14 ' •• „ , 1