HomeMy WebLinkAboutPermit 6056 - Reliance Electric - Storage RacksAPPHOVED FOR Y _ BUILDING
ISSUANCE BY: / �4 < :?, _,,1,_, OFFICIAL
DATE:
/--/Y-&
4i
I hereby certify ttiat I have read a 4, amined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. I am authorized to sign for and obtain this building permit.
SIGNATURE: ! o
DATE: 5
PRINT NAME: A -K,, c ____I p c , r.,C_.( -
COMPANY; el- / i . i ,., C T►Lio___
PROPERTY OWNER
Bedford Pro artias
PHONE
241
PHONE 357
-1103
ZIP 98158
-9393
ADDRESS 12720 Gateway Drive Suite 107, Tukwila, WA
CONTRACTOR SSG Corporation
ADDRESS P.O. Box 33970, Seattle, WA
ZIP 98125
WA. ST. CONTRACTOR'S LICENSE # SSGCO *249J8
EXP DATE 5 -28 -90
ARCHITECT David Kehle, Architect
PHONE 433_8997
ZIP 98168
ADDRESS 12878 Interurban Avenue South, Seattle, WA
TYPE OF CONSTRUCTION: UBC EDITION (year)
SETBACKS: N - S - E -
RCPT N
W -
FIRE PROTECTION: ®S rinklers 0 Detectors 0 N/A
p
UTILITY PERMITS REOUIRED?0 Yes (
N 0
(throu
Public gh works)
ZONING: BAR /LAND USE CONDITIONSOYes 0No
( - 90
PLAN CHECK FEE
CONDITIONS (other than those noted on or attached to permit/plans):
BUILDING SURCHARGE
4.50
DESCRIPTION
AMOUNT
RCPT N
DATE
BUILDING PERMIT FEE
1.60
I3OQ
5-
( - 90
PLAN CHECK FEE
BUILDING SURCHARGE
4.50
ENERGY SURCHARGE
OTHER:
TOTAL -
6.10
\I
\/
CITY OF TUKWILA -
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING C � /
PERMIT NO. `lJ lU
DATE ISSUED:
5- ct o
CERTIFICATE OF
OCCUPANCY NO.
Install pallet rack in sotrage area.
BUILDIN'3 PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
PLAN CHECK #90 -165
FEES
PROJFCT INFORMATION
• •T•`
3215 S 116 St 133 2,500.00
PROJECT NAME/TENANT ASSESSOR ACCOUNT r
Rellarce Elect c
TYPE OF 0 New Building L Addition Tenant Improvement (commercial) U Demolition (building) C] Grading/Fill
WORK: ® Rack Storage 0 Reroof 0 Remodel (residential) 0 Other
DESCRIBE WORK TO BE DONE:
CODE COMN IANCE
USE -)
FLOOR 4
SQUARE
FEET
TOTAL
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
/
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
DATE ISSUED:
' DESCRIPTION
AMOUNT
RCPT $
DATE
BUILDING PERMIT FEE
1,60
4;341
I ( -90
PLAN CHECK FEE
(through
Fub wQrk.>
.�
ZONING: BAR /LAND USE CONDITIONSEyes ii No
PHONE - •
ADDRESS P.O. Box 33971 _ - ,:
BUILDING SURCHARGE
4.50
ZIP •:
WA. ST. CONTRACTOR'S LICENSE # * Js :
ENERGY SURCHARGE
ARCHITECT David Kehl a Architect
PHONE , 3 - • •
ADDRESS 12878 Interurban Avenue South
OTHER:
W'
- • • •
TOTAL •
6.10
l
V ,
PROPERTY OWNER Bedford Prnparti-
SETBACKS: N - . -
E -
PHONE -
ADDRESS 1 720 Ga -wa D 'v- -
., ' .
„
� ; .:
CONTRACTOR SSG Corso atio
(through
Fub wQrk.>
.�
ZONING: BAR /LAND USE CONDITIONSEyes ii No
PHONE - •
ADDRESS P.O. Box 33971 _ - ,:
ZIP •:
WA. ST. CONTRACTOR'S LICENSE # * Js :
EXP. DATE 5-28-90
ARCHITECT David Kehl a Architect
PHONE , 3 - • •
ADDRESS 12878 Interurban Avenue South
S -attl a
W'
- • • •
TYPE OF CONSTRUCTION: UBC EDITION (year)
SETBACKS: N - . -
E -
SIGNATUR • o 4 . ` / I DATE: 5
W —
FIAE PROTECTION
®Sp r i n k l ers Detectors (�N /A
UTILITY PERMITS REQUIRED
Y es
No o
(through
Fub wQrk.>
.�
ZONING: BAR /LAND USE CONDITIONSEyes ii No
ONDITIONS (other than those noted on or attached to permit/plans):
WPHOVEDFOR I / / _ BUILDING
SSUANCE BY: i ' ...,U OFFICIAL.
DATE:
!/
I hereby certify t at I have read a ., ,g amined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. I am authorized to sign for and obtain this building permit.
SIGNATUR • o 4 . ` / I DATE: 5
PRINT NAME: .. -K Al c J etSC.C)L.C` -... 1 COMPANY:
ji/.v., t+ - Cc_Cec'I'RjC._
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433-1849
BUILDING (_ OS PERMIT NO. U�
DATE ISSUED:
sre
SI - • •D S
PROJECT NAME /TENANT 1 e t r c ASSESSOR ACCOUNT 0
Retiarice_E, 092304 - 9066
TYPE OF 0 New Building lJ Addition U Tenant Improvement (commercial) (i Demolition (building) 0
WORK: ® Rack Storage 0 Reroof 0 Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
CODE COMPLIANCE
!..� "�3 !�• ;a • P.4
• •
i3 .
!. •
•••
L
SQUARE OCC. SQUARE
occ.
SQUARE OCC.
OCC.
SQUARE
OCC.
TOTAL
TOTAL
C.
USE
1.00R
s"OTA
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
CERTIFICATE OF
OCCUPANCY NO.
1V 9
PLAN CHECK #90 -165
3215 S 116 St
N
BUILDING PERMIT \/
(POST WITH INSPEt: i1ON CARD AND PLANS
IN A CONSPICUOUS LOCATION)
PROJECT INFORMATIOr
UI I 133
Install pallet rack in sotrage area.
V
DATE ISSUED:
FEES
• $2,500_Il(l
CITY OF TUKWILA
duilding'Olvision
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
Type of Inspecti
Site Address
Requestor
Special Instructions
Inspection Results /Comments:
Inspector
INSPECTION RECORD
i I ,�
PERMIT # CO L5 lU
Date -- l- a O
Date .51 -- 9e)
Date Wanted 5 - p.m,
Project R.e l 1 kncJa. ESC_ r I c
Phone # Q %" 131 t.D
it '2-7 A /(
Project Name 1< /j 1jj f,eh
Address ? /S S. //e,-7 `' /33
Type of Permit(s)
project is nearing completion. Please investigate your area of responsibility and indicate
below either your final approval or necessary corrections.
If no response is received within one week, it will be assumed that the project is of no concern
to your department and a certificate of occupancy may be issued.
C This project_ is NOT approved by this department; the following corrections are necessary:
CITY OF TUKt. LA
Central Permit System
TO: ❑ Building
❑ Planning
Authorized Signature Date
This project is approved by this department:
Authorized Signature
FINAL APPROVAL FORM
❑ Public Works
Fire Dept.
_ontrol No. C /6 "'/6S -----'r/
Permit No.
❑ Police
❑ Parks/Recreation
r--/- /2_ 6
Date
CPS Form 3
1
rtCV1'1 11Ut'.I I1t_ ,11 J I L L1.,
Elements of an 0 -30 System
SHELF BEAMS
SAFETY
LOAD
LOCK
■
STARTER HAY
UPR10HT FFlAMES
FLUSH TOP BEAM DESIGN
Beams lock -in flush with top of col-
umn to provide a flat surface at top
of rack for greater storage flexibility.
Shelf ledges on beams are recessed to
allow shelf to fit flush with top of
beams, and offer ease of accessory
installation,
OPTIONAL SAFETY SNAP LOCK
Snaps into place automatically when
beam is attached to column. Unlocks
ea>iily and quickly. Sli pperd in peoNnr
Position for use as integral part of
beam.
• PAT, APPL, FOR
010 4 Inlerluke, Inc
ADD ON SAY
SHELF BEAMS
RECEIVED
CITY OF TUK`A'ILA
APR 1 1 Snz;
PERMIT CENTER
NEW KEYHOLE DESIGN
Interacts-30 features a narrow, wedge -
shaped keyhole' requiring minimal
column metal removal. its shape
guides stud and beam smoothly into
position.
EASY REARRANGEMENT
Interack -30 components assemble and
disassemble easily to change beam ele-
vations. Studs" are tapered on all sides
for smooth insertion and removal,
with no projections to "hang up."
Keyholes' are wedge.shaped to guide
studs and beams into exact position.
11'nt .riaKe
gr 6(767
SAFETY LOAD LOCK
Industry accepted as the finest of all
rack locking devices. Lock is an inte-
gral part of the beam, not a loose part.
Locks and unlocks with one hand in
a second, yet keeps beam secure even
under toughest jolts. Standard on all
flush top beams.
SLOTTED BEAM
For locking in decking and crossbars,
optional! available in most beam sizes,
STUD'S WEDGING ACTION
Interack•30's new wedging stud" in.
sorts smoothly, engages the column
more deeply, and employs wedging
action to draw the beam end plate
firmly against the new column center
rib for greatest rigidity.
MAXIMUM RIGIDITY
AND STRENGTH
Placement of reinforcing struts Is
computer calculated to meet itidivid•
ual upright section requirements. All
struts are Inserted into and fillet weld.
ed directly to the columns for greater
strength and reliability
Pegs J
rater is le
Wider lad Handlir� Dtv' ion
U21B"
18200 L
g 18000
OM II
NIL MN
Mr
wc1111
LU258 *"
23000
22800
22500
22100
21200
18200
17100
16000
14900
Maximum
Unsupported
Length•
38"
42"
48"
54"
80"
66"
72"
78"
84"
90"
1
276 " LU77
RC II JIlE 48 II
117 ill I Mar JIM
7 .
�r t' 00 IL' 11117 100
W IT Tani ;00 E • I 000
Vi ,' 0 NC , r J 000 IIE
IIIII 111111 11111Z,111112111111111111
010.Il "111 Mill m1:11
r 1880'. If ' 600 lir ttr if on
17500 24700 8506 11 32 •
• 11
LU95B
FROM NORTHERN STEEL, SEA.
M •
98"
Upright Frame Capacity Chart For Use In Step 5
2000
Floor to top of first beam or maximum beam spacing (whichever Is greater).
Contact Engineering Department for usage limitations at these shelf heights.
For beam lengths over 108" reduce frame capacity by 7% (0.93 multiplier).
It is recommended that LU21 B uprights not be used with beams subjected to ledge loading In excess of 7500 lbs. per pair.
LU•2lB
• 1 LU•25B + %
LU•278
LOU
LU•77B
LU•79B
LU•65B
4.11.1990 14:47
UPRIGHT FRAMES
There are seven basic Interlake
upright frame models In various
Blies and gauges. vista Green
paint is standard.
L.1.1-215, LU25B and LU278 era
3 "x1.516 "; LU7513, LU77B and
LU798 aro 3 "x3 "; and LU95B
le 4 "x3 ",
HORIZONTAL AND
DIAGONAL BRACING
Frames with 3" x 3" columns use
1.1/2" x 1.1/2" channels. Frames
with 1.5/8" x 3" columns have
1.1/2" x 1.1/4" channels. Extra
deep racks and larger size uprights
have heavier bracing computer '
calculated to carry heavier loads.
UPRIGHT FRAME FEATURES
There are absolutely no dead spots
along full height of column, per.
mitting beam placement freedom.
Each column has a foot plate
pre•punched for lagging to floor,
COLUMN FACTOR OF SAFETY
Based on minimum yield point:
1,82. All columns are high strength
low alloy steel with 60,000 P.S.I.
minimum yield strength.
F. 4
9
FROM 14ORTHERII STEEL/SEA.
r
Beam Capacity
Number of pellet$
x load weight - required capacity per pair
Baum capacity- lbs. for length - IH
Beams have a safety factor of 1.67 as required In A.I.S.I. Specifications, Beams are formed
from high strength, low alloy steal with 50,000 P.S.I. min, yield strength. Baked Safety
Signal Orange paint is standard. Other colors era available,
MA X_UNIFORMLY DISTRIBUTED W LOAD CAPACITY (LBS. PER PAIR)
0.711
0.733
560 0.756
520 0 800
1430 1.
1340 1.
1350 1.
1290 1
1
4.11.1990 14:45
38
44
46
54
Co
ee
70
72
74
78
78
no
•
297
2470
2060
1680 0.
17011 0
1700 0.41
1620 0.4
1660 0.433
1480 0.444
oeb.
0 0.143
cop,
4310
0.244 3150
300 3020
2750
7 2590
2
22
21
21
1420 0.456
1380 0.487
1300 0.478
1250 0.489
1200 0.500
1150 0.511
1110 0.522
1010 0.533
88
100
102
104
108
144
110
112
114
114
118
1030 0.544
1000 0
960 0.56
930 0 6
900 0.
870 0
640 0
810
790
780
74
44
658
7
1570 1
1550 1
1530 1.
1
1
1780
1730
1700
1670
1050
1020 1
1500 1.
71
4800
417 4390
525 4250
,• 1
.1:
203 5020
10 4600
53
3 4
2680
2830
393
0.413
0434
0450
0.478
0.501
0 524
0.572
0.590
0822
0.641
0.074
0 701
0 720
0.156
4700
4690
4490
4390
4250
4000
3010
3010
3470
3340
3210
3100
2990
2660
2780
0
0
0.
0.4
0.
0 47
0.500
0.511
0 522
0.
0.
0.
0.
0
ate
.353 4940
.373 4820
045, Cp.
0.000 solo
0.142 7480
0.100 0910
0.206 6220
.253
.303
3311
77 47
.4
33
22 327
633
644
054
667
0.049
0.711
0.733
0.756
0 800
3220
3110
3120
3000
2950 1
2910 1.
2510 1
2760 1.2
2630 1.
2
00
08
.253
.303
339
0.358
0.377
0341
0.417
0.438
0,459
0.480
20 0 503
040 0.525
0 540
3800 0.572
10 0590
740 0.621
70 0.644
10 0.071
0 097
0 724
0 751
0.778
0.600
834
603
83
Denect.,n• *181"
oft sp4c
C1p 005. Co. 048.
10820 0 057 10820 0.007
9040 0.126 0440 0.126
11350 0 149 6300 0.149
7520 0.105 7520 0.165
5630 0.226 6630 0.220
6270 0.271 0270 0.271
5950 0.303 59$0 0 203
5800 0.320 5800 0.320
5050 0.337 5050 0.337
5520 0.355 5520 0.365
5390 0.373 5390 0.373
5270 0.391 5270 0.391
5150 0.410 5160 0 410
5040 0.430 5040 0.430
4940 0 449 4040 0.149
4
4 40 / 71� 40
4850 .511 4850 0 512
4470 0.522 • 4560 0.533 •
4300 0.533 4470 0.555
4140 0.544
3990 0.556
3850 0.567
3720 0.570
3590 0.589 •
3470 0.600
3300 0.011
3250 0.622
4390 0 576
4310 0 600
4240 0.624
4110 0.640
41C0 0.672 •
4030 0.508
3900 0.722
3900 0.747
3540 0.773
3780 0 799
3720 0 528
7
1
13
53
781
6970
N10
6440
6280 0.
6130 0.
5900 0 .
5850 0.38
5720 0.355
5600 0 .403
5400 0.422
70 0.441
5290 0.460
5100 0.480
$060 O.
4960 0.52
4870 0
4710 0
4550 0.
4390 0
4240 0
4000
3960
3830
3710
35
3
3150 0 033
3030 0 614
2950 0.558
,111 .7
0
0. 110
0.139
0.174
1.,
12000
10000
0.37
18
47
47
4810
4530
4460
4390
4320 0
4250 0
4150 0
4120 0
0
Y1
11.
J
fjt
1
•
•
d
124
126
132
136
144
q'.
o.n1ctio1,•
SW
0.680
1
1.112010
Sax.
1400 1
x .55,1
562
0011
0041
0.072
0.704
0.736
0 0.709
0.003
0 .838
0.573
1. 000
945
983
1900
10140
1040
171'0
haactbn'
6peo.
Own
2240 0.
2180 0.
2090 0.
2020 0.
0.101
0.147
0.173
0.210
4140 0
4040 0 .'.�
3940 Q.
3700 0
3590 0.4
3440 0.
3290 0 478
3150 0 489
300 0500
2910 0.511
2700 0522
26000533
2590 0544
2490 0.556
2490 0.501
2120 0.57
1.112110
4
7
let 609
1 . ' 1.711
14 0.733
1 0758
0 800
F'
*151"
0�.
5000 0.
6870 0
0550
5530
2700
4740
2700
704
113
842
72
2550 1. .
2610 1.1
2440 1 1
2370 t 2
2260 1 12
2000
2520
2440
2360
22
Iw
2000 0
LH3118
r4ri1 ,1• /151"
Swu. Spec.
5 2700 0.689
255-0 0 711
2410 0.733
2280 0.756
2060 0.800
LH321 B
3560 0 .908
3460 0 987
3370 1.026
3200 1 037
3120 1.214
31 0.889
0.711
0.733
0.756
0.600
•
I
2 30
18 44
3 40
54
00
0.254 e6
0.264 70
0.300 72
0.310 74
174
212
0,233
0.310
0.357
0.235
0.403
0.122
0 0.441
0.460
0.480
0.500 •
0
0.542
1.
555
000
7
3940 0.
3130 0 008
3720 0 963
3630 1021
• 3440 11404
7e
16
50
$2
/4
66
ea
90
92
94
8e
00
100
102
104
106
106
110
112
114
I IO
124
120
132
130
144
• Deflection Spec, le the allowable distributed load per pelr of beams based on maximum deflection of L/100 (1!180 of
beam span).
• • A.1.S.1, Spec. I9 the allowable distributed A4
load per pair of beams based on .1.0.1, allowable stress governing cepaclty.
In both columns the safety factor Is 1.87 based on the minimum yield point of the steel,
• "Quick Ship" Items.
NOTE: For beams longer than 00" that support decking. we ouggeei the use of Onep•in cross bars for ytotled boeme
to r•duce the pr+ "ity of boame Spreading apart.
F. 2
a
FROM NORTHERN STEEL,SEA.
Upright
Frame Depth
Frame depth (A) should be
4" to 6" loss than pallet stringer dimension (II 6)
(Must be in 2" increments)
Upright
Frame Height
Starting at floor level:
(Normal practice of bottom load on floor Illustrated.)
Add height of pallet and load (II D)
Upright
Frame Capacity
Add clearance between top of
load and bottom of beam (B)
Add thickness of support beam
(use beam data on page 6 and 7 or 6 ") (C)
Total [(B) plus (C) or use 10"j
Multiply this total times the number of shelf C y .$)
bairns equal upright frame height f._
Rack is required to go only as high as is necessary to support
top pallet, Frames supplied in 6" height increments, Height
may also be limited by the extent of fork elevation of lift
truck. Provide a minimum of 6" between top load and ceiling
obstructions. Check local fire codes,
Add total weight of loads supported „ �� �� ' fps
by shelf beams. (11 F)
Determine maximum first shelf spacing (S)_.. 3D rt It) 'T '
Rafts to capacity chart, page 9, for frame type.
After determining height end depth, specify catalog
number as follows:
The prefix, LU (for Interlake upright) la followed by eight
digits. The prefix And the first three digits designate tho
model (LU21B, LU256, LU27B, LU75B, LW778, LU7913,
L1195$). The lest five digits are the depth from Step 3
and height from Step 4.
5
`wP
L w CC
4.11.1990 14:47
vIRTICAL
SPACINO
INNYNONNumatimummusasmaiimaideismummiyagr
CEILING
CLAARANCI
A
FRAME 100 '”
DEPTH
10 '
v imlAaa
P. 3
AIONT
IQ T
LOAD
H6IMO
1 WWI 1 1
) 1 1 1 = 1 1 . 4 . 1 I
LOAD
N met
iiiiiiiimsmal
I e
�� .
r---ii
LOAD
NNONr
I ,
1Am= „jIMr.
a
FROM NORTHERN STEEL,SEA.
Upright
Frame Depth
Frame depth (A) should be
4" to 6" loss than pallet stringer dimension (II 6)
(Must be in 2" increments)
Upright
Frame Height
Starting at floor level:
(Normal practice of bottom load on floor Illustrated.)
Add height of pallet and load (II D)
Upright
Frame Capacity
Add clearance between top of
load and bottom of beam (B)
Add thickness of support beam
(use beam data on page 6 and 7 or 6 ") (C)
Total [(B) plus (C) or use 10"j
Multiply this total times the number of shelf C y .$)
bairns equal upright frame height f._
Rack is required to go only as high as is necessary to support
top pallet, Frames supplied in 6" height increments, Height
may also be limited by the extent of fork elevation of lift
truck. Provide a minimum of 6" between top load and ceiling
obstructions. Check local fire codes,
Add total weight of loads supported „ �� �� ' fps
by shelf beams. (11 F)
Determine maximum first shelf spacing (S)_.. 3D rt It) 'T '
Rafts to capacity chart, page 9, for frame type.
After determining height end depth, specify catalog
number as follows:
The prefix, LU (for Interlake upright) la followed by eight
digits. The prefix And the first three digits designate tho
model (LU21B, LU256, LU27B, LU75B, LW778, LU7913,
L1195$). The lest five digits are the depth from Step 3
and height from Step 4.
5
`wP
L w CC
4.11.1990 14:47
vIRTICAL
SPACINO
INNYNONNumatimummusasmaiimaideismummiyagr
CEILING
CLAARANCI
A
FRAME 100 '”
DEPTH
10 '
v imlAaa
P. 3
AIONT
IQ T
Plan Check #90 -165a Reliance Electric
3215 S 116 St #133
THE FOLLOWING COMMENTS APPLY TO AND B COME PART OF THE APPROVED PLANS UNDER
TUKWILA BUILDING PERMIT NUMBER 4 (D
1. No .changes will be made to the plans unless approved by the
Architect..and the Tukwila Building Division.
2. All permits, inspection records, and approved plans shall be
posted at the job site prior to the start of any construction.
3, All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (19B8 Edition), Uniform
Mechanical Code (1988 Edition), Washignton State Energy Code (1989
Edition), and Washington State Regulations for Barrier Free
Facility (1989 Edition).
4. Validity of Permit. The issuance of a permit or approval of
plans, specifications and computations shall not be construed to
be a permit for , or an approval of; any violation any of the
provisions of this code or of any. -other ordinance of. the
jurisdiction. No permit presuming to. give 'authority or' violate or
cancel the provisions of this code shall be valid.
"X"
REQUIRED INSPECTIONS
PHONE
AP DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
433 -1849
2 Foundation
433 -1849
3 Slab and/or Slab Insulation
433 -1849
■
4 Shear Wall Nailing
433 -1849
5 Roof Sheathing Nailing
433 -1849
6 Masonry Chimney
433 -1849
7 Framing
433 -1849
8 Insulation
433 -1849
9 Suspended Ceiling
433 -1849
10 Wall Board Fastening
433 -1849
11
12
■ 13
14 FIRE FINAL Insp:
575 -4404
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
433 -1849
433 -0179
_
X
17 BUILDING FINAL
433 -1849
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
SITE ADDRESS:
OTHER AGENCIES:
BUILDG PERMIT
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
SUITE NO.:
BUILDING
PERMIT NO.
DATE ISSUED:
PROJECT:
3215 S 116 St 133 Reliance Electric
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
(INSPECTOR COMMENT SECTION ON REFER
INSPECTION PROCEDURES AND REQUIREMENTS
(r)0<ic__
5 l I-90
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 872 -6363
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 433 -1849. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
04/21/60
•X•
REQUIRED INSPECTIONS
1 Footings
2 Foundation
3 Slab and/or Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
7 Framing
8 Insulation
9 Suspended Ceiling
— 10
Wall Board Fastening
11
12
13
14 FIRE FINAL Insp:
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
X 7 BUILDING FINAL
PLAN CHECK -
NUMBER
cto- !l,5
ir
PROJECT: R*L: ELEC.T I�IC.
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER
TT.UUKWWILLA BUILDING PERMIT NUMBER
No changes will be Bade to the plans unless approved by the
Architect and the Tukwila Building Division.
O 2 Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency,
including all gas piping (296 - 4732).
O Electrical permit shall be obtained through the Washington State
Division of Labor and Industries and all electrical work will be
inspected by that agency (872- 6363),
O All mechanical work shall be under separate permit through the
City of Tukwila,
� 11 permits, inspection records, and approved plans shalt be
posted at the job site prior to the start of any construction.
O When special inspection is required either the owner, architect or
engineer shall notify the Tukwila building Division of appointment
of the inspection agencies prior to the first building inspection.
Copies of all special inspection reports shall be submitted to the
Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being
inspected.
O All structural concrete to be special inspected (Sec. 306, UDC).
(8 All structural welding to be done by W.A.D.O. certified welder and
special inspected (Sec. 306, UDC).
0 All high •strength bolting to be special inspected (Sec. 306, UDC).
10 Any new ceiling grid and light fixture installation is required to
meet lateral bracing requirements for Seismic lone 3.
(ED Partition walls attached to ceiling grid must be laterally braced
if over eight (81 feet in length.
12 Readily accessible access to roof counted equipment is required.
13 Engineereed truss drawings and calculations shall be on site and
available to the building inspector for inspection purposes.
Documents shall bear the seal and signature of a Washington State
Professional Engineer.
1/ Any exposed insulations backing material to have Flame Spread
Rating of 23 or less, and material shall bear identification
showing the fire performance rating thereof.
IS Subgrade preparation including drainage, excavation, compaction,
and fill requirements shall conform strictly with recommendations
given in the soils report prior to final inspection (see attached
procedure.).
10 A statement from the roofing contractor verifying fire retardancy
of rook will be required prior to final inspection )see attached
procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code 11988 Edition), Washignton State Energy Code (1989
Edition), and Washington Stas Regulations for Barrier Free
Facility (1909 Edition).
t8 All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Wealth Department inspection should be eade
by calling King County Health Department, 296-4707, at least three
working days prior to desire inspection date. On work requiring
Health Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
t9 Fire retardant treated wood shall have • flame spread of not over
25. All materials shall bear identification showing the fire
performance rating thereof. Such identification shall be issued
by an approved agency having a service for inspection at the
factory.
20 Notify the City of Tukwila Building Division prior to placing any
concrete. This procedure is in addition to any requirements for
special inspection.
2l All spray applied fireproofing as required by U.B.C. Standard No.
43 -0, shall be special inspected.
All wood to remain in placed concrete shall be treated wood.
All structural masonry shall be special inspected per U.B.C.
tlon 306 la) 7.
Validity of Permit. The issuance of a permit or approval of
plans, specifications and computations shall not be construed to
be a permit for , or an approval of, any violation of any of the
provisions of this code or of any other ordinance of the
jurisdiction. No permit prssuaing to give authority or violate or
cancel the provisions of this code shall be valid.
1908
Fire Department Review
Control Number 90 -165
(513)
Re: Reliance Electric - 3215 South 116th Street
Dear Sir:
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Gary L. VanDusen, Mayor
April 17, 1990
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. No point in a sprinklered building may be more than
200 feet from an exit, measured along the path of travel.
(UBC 3302(d))
2. Maintain sprinkler protection for all enclosed areas.
(NFPA 13, 4- 1.1.1) (UFC 10.302)
All sprinkler drawings shall be prepared by companies
licensed to perform this type of work. Drawings shall
first be approved by the Washington Survey & Rating
Bureau, Factory Mutual Engineering or Industrial Risk
Insurers, then by the Tukwila Fire Department. No
sprinkler work shall commence without approved
drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1)
(UFC 10.305)
Storage of Class V combustible material in racks over
6 feet high generally requires additional fire
protection as directed in the appropriate national
standard.
3. If the building is to be used for the storage of
high -piled combustible material (as defined in UFC, Sec.
9.110); automatic fire - extinguishing systems, smoke - removal
systems, fire protection and fire separations are required
per Uniform Fire Code - Article 81.
All required occupancy separations, area separation
Yours truly,
r
cc: T.F.D. file
ncd
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575-4404
Page number 2
walls, and draft -stop partitions shall be maintained
and shall be properly repaired, restored or replaced
when damaged, altered, breached, penetrated, removed
or improperly installed. (UFC 10.401)
The Tukwila Fire Prevention Bureau
Gary L. VanDusen, Mayor
1-
Plan Review
PROJECT . ( R. t.1 A k C e.
ADDRESS 32.1 5 5
DATE 1 1 -__ - .D
I A c..\( S'TO R A GE
EXIT .
r PLAN CHECK
NUMBER
-- (7S .
AND FA 5 r kJ "G'r
P.MGERip:b F- FROM POR:rwel2.►.1 STEEL
CITY OF TUKWILA '
DEPARTMENT OF COMMUNITY DEVELOPMENT . prepared by: , _ v l
PLANNING DIVISION
Ot2.1 1060. 121 OM
.; \t■./M0116■■■ I Ar'�'r.001111.......■••an r\ 'moo . \�■•■••dsoem. -.
II i! II I •j III
aw\f-��►��.1
•:■■•-•innolicir.././.0-...r.eardr."..•.:4...ww.•••..r.Karer.r.e..Arareakir....ap:ouramortdroweRre
r a iiiisa►M . srs _iiu ti."i.eiti isi41..iin+:CAa:4/ Sri arigrs.aris410•115ao
e
d
i
0
r - Y
r
4-
2 1 -0 1 1
•
4 dd4(c 77
•
pig mil 20614.33. -899
RECEIVED
CITY OF TUKWILA
APR 0 9 1990
PERMIT CENTER
DATE DESCRIPTION
4-01,1 I -5.t IBNII�TC'J r• C .
MM/DoO,t
attr�«tz
coo/(
1 g=
It)
11 4 1 ID II
. 1
PERMIT NO.
CONTACTED L
�� &t 6S-1 Corp
DATE READY
DATE NOTIFIED 1 1 ) _ I r 9.0
'' _ _t
( �k �
PERMIT EXPIRES
2nd NOTIFICATION
) t r a�
C- �QOrg'
BY:
os
AMOUNT OWING
r ^
�k ,
3RD NOTIFICATION
B
(init.)
PLAN CHECK
NUMBER
9 0 4)5
it
BUILDING PERMIT APPLICATION TRACKING
PROJECT NAME
R.21 ; ostc€__
SITE ADDRESS SUITE NO.
"30Is .s 11(o 51
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
1 33
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL OCCU-
PANCY LOAD
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
r BUILDING - u _ 01_4 O
initial review
,t FIRE
O PLANNING
O PUBLIC
WORKS
O OTHER
EZ BUILDING -
final review Yz qi)
/ 9
ROUTED)
�I -0 - ifo
INIT: -A6
INIT:
INIT:
INIT:
4 / 5�
INIT: 5 L 'l
8 S
ME
PERMITS REQUIRED? (1 Yes 51 No
PUBLIC WORKS LETTER DATED:
CONSULTANT: Date Sent -
Date Approved -
FIRE PROTECTION: (.Sprinklers ( ) Detectors ( ] N/A
FIRE DEPT. LETTER DATED: ' - i3- JD INSPECTOR:,) 3
ZONING: [BAR/LAND USE CONDITIONS? () Yes Di No
REFERENCE FILE NOS.:
MINIMUM SETBACKS: N- S-
E- W-
OF CONSTRUCT
DITION (year):
REVIEW COMPLETED
09770/80
2B 3-89 b ECITO MUT RP AE
ULIG PRI E LN CEK FE •
UBR PA HC _ ( ULIG C>(
UCAG i APIAIN l .; 1 H EEG UCAG OHR f 1 I F) OT CMLTL OA r .0
IE ADES SIE # VLE O OSRCIN - 3 71 6‘C N le/5. 33 S s
RJC AETNN SESR AON UT # /E // 4tc tAT / ..40∎ / p L C d ' ) i — ?0
YE O Nw Bidn diin Tnn mrvmn cmeca) L eoiin (ulig
OK 4 Rc trg eof 0 Rmdl (eieta) 0 Ohr DSRB K T E DN: I/7t- /.44F 4 A " --. E9
ULIG UE (fie aeos, ec) 0 1 l E /4 c - - NTR F BSNS: Fe cf L .oe G ,*
IL TEE B HNE I S? Id N e F YS XLI: SUR OTG ulig 3 ' Tnn o osrcin 2/. F WL HR E SOAE O S F FAMBE OBSIL R ZROS MTRAS I H
ULIG 0 Ys I E, EPAN
.s 5 7/w iv. Tuo P / cr / &6 Gr$ Oc q v
la
- A( G F 'O.-g T,� ') POET WE _ it- J O ,�_(3 ADES (- 6 - C ..d 1 . ._ _ _... - - ZF 06 5
CNRCO (i x,- //. POE 3 . 3 3 ADESD F- G S. CNRCO' IES e zi c X. DT . a_� ACIET D v '/ J , POE � .. i ADES . e .-/e, 14g44/, S .-,
. E Z7 S/ .. .,�..� E'I *: ii:�;.i�; l~ . :4 �ID EhI E::1$ .. .. / Ii t' '* >�C : :< BIDN WE INTR ?, J
R /��� PIT NM HN
UHRZD , L ) ” a y -/3
GN DRS 70 � rv ∎ / 17 IY ZPea , f/e CNAT PRO 66 7 /0�.b,•iv O/c Ps�F,c S�
6200 Southcenter Boulevard
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please r a s6i lo II
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
nommunity DAuelopmQnt prior to application submittal. Contact the Permit Coordinator at 433-1851 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Divisbn at 433.1849.
DATE APPLICATION ACCEPTED
t-f- °I - 90
DATE APPLICATION EXPIRES
10 ° - o
COMMERCIAL
NEW COMMERCIAL BUILDINGS /ADDITIONS
D Completed building permit application (one for each structure)
Assessor Account Number
Two sets (2) of the following:
• Sppsdfications
C Structural calculations stamped by a Washington State Iic nsed
. engineer
• Soils report stamped by a Washington State Honied engineer
C Topographical survey
C Energy calculations stamped by a Washington State licensed
engineer or architect .
• Legal description
Worfcing drawings, stamped by a Washington State licensed `!
erdiilect, which include:
• Site plan
• Architectural drawings
Structural drawings
• Mechanical drawings
• Elevations
• Civil drawings
Landscape ' plan ;
El Completed utility permit application
Six (6) sets of civil drawings
permit application end fora submittal requirements.
RACK STORAGE
Compls building permit application
Assessor Account Number -
TWO (?.}:seta of pl ns; which fh Ind uuit •
Guiding floor plan showing
• Entire specs where realm will be.:
• Exit doors `.: >.;::;::?:. .............
• Dimensions of d
Tenant space floor plait
sidle:: •:... • ; >
NOTE: :Inc+iiids of Fac*i
matt ways of! plan
Slhadraal udoulationa stamped. bY'a : M
(iadtstdragu► fr and over),;;;
.... ......
RESIDENTIAL
NEW, III iLEfAMILY DWELl,B GSIA
Computed bttldng permit application (one for
L
Six (6) sets of site plans showing utilise "
NOTE: Sulking site plant end wilily site plan nray
usd r permit application end checklist for spec* submittal requirements.
S( BMITTAL CHECLJST
ild�on.t apopisprtloal soils inAamat tit may be rwatrinedtu lqup NOTE A i
oohorrorta off of Mris
tNa _
COMMERCIAL TENANT IMPROVEMENTS
E Completed building permit application (one for each structure or
tenant):
C Assessor Account Number
Two (2) sets of construction plans, which include:
C Site plan
Construction :deWk
RE
RESIOOmAI. R0
f
NOTE: if SOY titi ywdrrt'Mrlo:
:and plan;: br +ar6/n
HE R
: • Location of tenant specs
Existing and proposed parkin
C Dy arau build ng plan
• Tenant local on
• Use of adjacent (common wall) tenant .:.
• Overall dimensions of building or square footage
Floor plan of proposed tenant specs
Tenant space plan with use of each room labelled.
Exit doors: eweea pollens
• New walls, existing wall, and walls to be demolished.
one for each structure)
material being removed, and
Completed bullpkp permit:
sessorAccount N
air dive describing x i
• Cross sections showing wall : construction and method of
attachment for floor:and ceiling:
Structural calculations stamped by a: Washington State licensed
engineer may be required if work . is to be done (2 sets) :
•
NOTE: If any udMPy work Ti to be done, submit separate udrity permit :
application and purrs.
Compl.wd buildup permit appN
C • Assessor Account Number
C Narf'ative describing existing roof,
material being Installed:
: NOTE:: cerVVTcation lalteris squired pnor to final inspection and sign
::off of. dte l � ::
...............
State licensed
ptetnit application:
to lnpecdar ana,r�r-
TO:
FROM:
RATS:
SUSJICT:
(10 /T2.MEMO)
City of Tukwila
6200 Southcenter Boulevard
Tukwila Washington 98188
(208) 433 -1800
Gary L. Vanousen, Mayor
MEMORANDUM
i l 2 c ip -1(5
5 \ AxiP_ �
M q, Igc0
Roc eft roy. Fe
Q 7 ' L.1329 h i = ) (DD
1too o IC)o - I.(t0
t .So
6,10
5
-4x
tit 1441144
9
45
L
I
9 .1
1 '.0' , ara` v 2 To" 1-0
-let it it
!
s:
ii
0 &p afp,
rb6r1 pe
04 m r2om
elbttA
Verr LWOW—
Xti
&ff 3O. rt49I4
L. V2:;
4xvi-e162
rmg
io
V
-E
i
i fryi. 4 .4:1 1 2./i •
■1`
0 1-?, it I
V V
-g*Ar-
--r4 A
Fif Lit-i00•7 RaT-T
frL
' T!
v-f7" 1 0 L
I i
t 1
-,o- 1-
1
1 , 1 1 4 11
-
-
V
:7 r
Ij
ie7 iC24Lp 2Arc eau
—6—
rA11 L-VAGtg..-6
1
k3/Ai
I
;1 •
-
'
642 , 41 g 1,1.0
4-
12.
, 3 Ii
4 12
•
N 7?
x
4
SCALE; if Ur= v o
- r-fAL
1rs!AL-t.....•
hrt1101-1.
TOTAL BUILDING AREA—NET= 28,420 &F.
0 i
•., f ii I.‘es'ol II 1 I 1 1 1 .11
t/
I / I
uPker
V V . iV I
*km
===774.74
-8-
\ •
I )(
. Z4.
-o,"
No. • 7 ....An
eD4NO 3 etrZW)Lk... 121161
' • -
1 1 .0 11.2126 1-o ll 2, 1 3
II
II - f r
71
4
t
ea4P1...41,14.13:As
pip
12.241,1
■
- "?4 , 1 1 - 2
al I -69' i
(1)
NOT If the rniercfiln)ed document is less elect thtn this
I
ii.ctice, it is CUE tc the, coality ce the cripir.21 e'ocunent. 1
k,. _ ., _ . . ..... ...... . ... .......
. ... . .. . .
ok.; 1 ii,: I.,:.. 1, ( ..:.ie.. 9c: Ce: (.7.(..:: LC O ()i. 81. LI. 91 gl *4 Cl ZI. 1.1. (L 6 9 L ,....) ( ; 'i
I 11'111.11111 1 I 1 I ;
'I ll'I l l I'll 'ill' IIIl II,IIIii I I 1
11 11 ' H 1
! 'iTI!!WHY,WII!HI nilHHH HIWN11!■!IP.WIllilll!HIHHHIIIIIWiiiiMilli l lirl!iiiiMIIIIi!IHIWIIIIII ilifil,111 HIIIIIII IMMIIIMIMITIWIIMIIIHIHIih!IIIHHHki■I
1 1 1
, .474 - •I4 --v • - ••• - .
IIII!!' I !I; 1 111111111111111
I I I
I I I I 1
1 1111 , 11 1 1 .
I I
0 II. III` ■■•:,•• ' 5
7 8 9 (-) 11 P , t1 triv 12
t
•
7e
LEC4END
STOREPRONT MANDOOR
3'X8'-6' 111 MANDOOR 3
, A DOCK HIGH DOOR 9*xiog
DRIVE-IN DOOR io X I
DRIVEAN DOOR.trxio'
FILE COPY
I uriderstancl• that the Plan Check approvals are
'subject to errors and omissions and approval of
plans does not authorize the violation of a:I
isyttpteci code or ordinance. Rqc,e;c:if of contractor'S
op y of approved plan:3 acknoviledg0.
Rate /i •
Permit No
CITY OF TUKWILA
APPROVED
APR 1.7 1999
DIVISIC5171
RECEIVED
CITY OF TukWILA
APR--O 9 1990
PERMIT cENUR
(Nmit,h-f-i °kiwi
() e=^=. 2
////////////////.////////////////////././/////'/// �.//'././////./..////////////`/`/.
// /|//'//////|///| / ! / |/// / /| // ///| /|///// | /|/ | / | /| /|/|/ | /| /| / |/� / |/| / |/ |/!/'/|/// | / | / | /| / | / | /| /|/| /!/|/|/| /|/ | /|/| / |/ |�� / | /|/ | / | /| / |/|/!'| /| / | / / / /| /|� 1/|� | / | / | / |/|/|/|�\/ |�| /|/\/\/ |/|/ \/\/
' / ' ' ' / ' / ' / ' / ' / ' ' / / / ' | ' / ' / ' / ' / ' | ' | ' / ' / ' i ' / ' / '
6 7 8 9 10 11 w��, 12
3 4 5
�� the microfilmed document is less de
n�' is due to the coa|ity cr the orip|nn| dnounnent'
- __-_-__-__'_ _- ' - . - ._--�--__________
()C o.� ye L e 9 so *u Ca ou v (),� o � a� �� e� � � �� C� �� u {�[ 6 3 L * s � c � L.. "" L)
1 | i | i| | |� � | | | | | ' | | | | !| || | } | ' | | | | | | |\ | | | | /i | |
UN|N|U|iU|U|U||||||�U!|||UhU U|V|! | UJUU� UU.|!|i.{/U!U|�!|| |UUUU|i�|�iUUN|�|U||
. . . '�'^ ~ ~ '._ '' ... .- ^ ' ~ ~—'~~ ., ~ ' .
. � p' � �} � ` '`'� �� ,''-'' ����
� � .` � � � �`�,�x� '� ������1� /��
`�-`.. `��^ ' ._ -
. -
FROM HORTHERH STEEL. SEA.
•
47142416.102. ..
- fat 00 4
IrtrY,
liar .1111
10 fir) ( I:tt4. EJ-td .rtL.)
RECEIVED
CI1Y OF TUKWILA
APR 1 1 1990
PERMIT CENTER
3
4.11.1990 14:49
r
P. 7
`cam •
7 ••4 1 tor D ►rGrc•
I Ili l l l l l l l I I I l
1 C) 1 11 MADE INGEPuArUU 12
'I I { I I I I III I 111 1 111 1 111 1 I I ! ( I I 1 { I ' 11 I 111 I I I I I 111 I I I I I I I I I I I I I I I
i, 5 6 7 8 9
1
NOT":::: If the microfilmed document is less clear then this
4 notice, it is due to the quailty of the oririnel document.
pc; ue Le y,' SG 9e cZ ZZ lG OG Ul 8l LL 9l SL *rl el zl ll 01 6 8 L 9
II
�;I! Il�i! I�I!!i {!!!1111!1 {111111111 {1111 W111W111 11111111111!1{!111 1!1111 II111111111 1111111!!11111111 li�1111111111111111111 Ilil1l11! 111111111 111111!1! 111{i!1
1111I1I111111111111 i � I I
S 4 t. Z L
I111iil1IllifI1 111111 1111111111 !l1111111111111lll!III)