HomeMy WebLinkAboutPermit 6083 - Project 294 - Building E - Reroof',.. ,:_,: 1 ;.: ::,17:: - L'''''. _ Z.i.',.:;',7,-;:',7,7'L
APPROVED FOR
ISSUANCE BY:
�,t BUILDING
, / 0 OFFICIAL
DATE:
j -, C — 5V)
I hereby certify that have read and exa d this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. I am authorized to sign for and obtain this building permit.
SIGNATURE: 4f , L/ ^-4`-el-t--'1
DATE: -" - a D - i
AP
PRINT NAME: jr" , //, (, c. H s G ="1
COMPANY: C ,,,, „. z e ,esa rl(.
PROPERTY OWNER William E. Boeing, Jr.
PHONE 624 -4494
ADDRESS 1325 Fourth Avenue. Suite 1940. Seattle. WA
PHONE 762
ZIP 98101
-0170
CONTRACTOR Custom Roofing. Inc.
ADDRESS 8001 Fifth Avenue South, Seattle, WA
ZIP 98108
WA. ST. CONTRACTOR'S LICENSE CUSTOR *291M9
EXP. DATE 9 -30 -90
ARCHITECT N/A
PHONE
ADDRESS
ZIP
. TYPE OF CONSTRUCTION: UBC EDITION (year) 88
SETBACKS: N — _ E —
W -
FIRE PROTECTION: ❑S prinklers ❑Detectors ®N /A
UTILITY PERMITS REQUIRED ?❑ Yes ®N o
(through Public
Public Works)
ZONING: BAR /LAND USE CONDITIONSOYes ®No
F cce
CONDITIONS (other than those noted on or attached to permit/plans):
r OCC.
LOAD
* SQUARE
FEET
CCC.
LOAD
SQUARE
FEET
OCC.
LOAD
USE 4
/
cmc)E_ CO►.iPL
inric;E.
F cce
SQUARE
FEET
r OCC.
LOAD
* SQUARE
FEET
CCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
- SQUARE
FEET
OCC. '
LOAD _
TOTAL
SQUARE FEET .
TOTAL
OCC. LQAD
I
1
•
TOTAL
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING
PERMIT NO.
Coo
DATE ISSUED:
5a 10
CERTIFICATE OF
OCCUPANCY NO.
BUILDINR PERMIT
(POST WITH INSPEC o oON CARD AND PLANS
IN A CONSPICUOUS LOCATION)
FEES % a
BUILDING PERMIT FEE
PLAN CHECK FEE
BUILDING SURCHARGE
ENERGY SURCHARGE
OTHER:
TOTAL
Install new built up roofing and related sheet metal.
752 00
4,50
756.50
2R9
A
-29 -90
21- 5 -29 -90
1105 - 1121 Andover Pk W 132,000.00
PROJECT NAME/TENANT ASSESSOR ACCOUNT M
ro 294 Buildin E 352304 -9 10 -O5
TYPE OF ❑ New Building Addition l) ❑ Tenant Improvement (commercia Demolition (building) U Grading/Fill
WORK: ❑ Rack Storage ® Reroof ❑ Remodel (residential) ❑ Other
DESCRIBE WORK TO BE DONE:
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
_ "'DA Is U :
PERMIT NO
QG LI ) f31 E
CONTACTED
�1 „
�.U■
Q'
DATE READY
DATE NOTIFIED
5-
o' Q o
( ,--l43
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
g
l,(�
3RD NOTIFICATION
BY:
(init.)
PROJECT NAME
arc -P CC
QG LI ) f31 E
SITE ADDRESS
L LO 5 ^ 11a I
Nati Uve r ?k li
SUITE NO.
�-.„-'"
PLAN CHECK
NUMBER
30 & 3 )
F
BUILDING PERMIT APPLICATION TRACKING
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL OCCU-
PANCY LOAD
DEPARTMENTAL REVIEW
"X" In box indicates which departments need to review the project.
. BUILDING -
initial review
O FIRE
O PLANNING
O PUBLIC
WORKS
O OTHER
BUILDING -
final review
AATE {IN.:::
INIT:
GROUTED A^
PROTECTION: l�J
[) Sprinklers [] Detectors N/A
INSPECTOR:
INIT:
INIT:
INIT:
INIT:
CONSlJLTANT:Date Sent
Date Approved -
FIRE DEPT. LETTER DATED:
ZONING: IBAR/LAND USE CONDITIONS? f Yes /) No
REFERENCE FILE NOS.:
MINIMUM SETBACKS: N-
UTILITY PERMITS REQUIRED?
S-
[1 Yes isol No
E- W-
PUBLIC WORKS LETTER DATED:
TYPE OF CONSTRUCTION:
UBC EDITION (year):
I GUS
REVIEW COMPLETED
ucvv vwu►winvI wuiavaiu, I unnna ►rte w 1 vv
(206) 433 -1849
DESCRIPTION .
AMOUNT:.:
RCPT #.
DATE •
BUILDING PERMIT FEE
`�'
PLAN CHECK
NUMBER
n l' l' l I (: !1 T I C� N n u �� r cj E
l FD OUT CC)AIPLE TEL V
PLAN CHECK' •FEE •••
BUILDING SURCHARGE
. 4..50
ENERGY SURCHARGE
OTHER :•;::::.":::::::
..TOTAL:
:756
v
,. .
SITE ADDRESS SUITE #
1105 - 1121 Andover Park West
VALUE OF CONSTRUCTION - $
132,000
PROJECT NAME/TENANT .Building "E"
Project 294 / Multi Tenant Facility
ASSESSOR ACCOUNT #
352304 - 9110 - 06
TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building)
WORK: Q Rack Storage a Reroof Q Remodel (residential) 0 Other
DESCRIBE WORK TO BE DONE:
Install new built up roofing and related sheet metal.
BUILDING USE (office, warehouse, etc.)
Office & Warehouse Facility
NATURE OF BUSINESS: Warehouse Distribution
WILL THERE BE A CHANGE IN USE? (L No Li Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: 100, 000 Tenant Space: SAME Area of Construction: SAME
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? ® No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER William E. Boeing, Jr.
PHONE 624 -4494
ADDRESS 1325 Fourth Avenue, Suite 1940, Seattle, Washington
ZIP 98101
'CONTRACTOR Custom Roofing, Inc.
PHONE 762 -0170
ADDRESS 8001 Fifth Avenue South, Seattle, Washington
ZIP 98108
WA. ST. CONTRACTOR'S LICENSE # CUSTOR *291M9
EXP. DATE 9/30/90
ARCHITECT N/A
PHONE
ADDRESS
ZIP
F .XGERTII:Y:TI�Is«T HAV ' 1R.AN �:' .MINED THIS AP PLCATION A ND KNQW TH E SA TQ BE
TR UE AND CORRECT AND I :AiiM AU THORIZED 13) AP Y FORT .IS PERMIT
BUILDING OWNER
OR
AUTHORIZED
AGENT
SIGNATURE Z
DATE 5/16/90
PRINT NAME E.L. Larson
PHONE 762 -0170
ADDRESS 8001 - 5th Avenue So.
CITY /ZIP Seattle 98108
CONTACT PERSON Ed Larson
PHONE 762 - 0170
CITY OF TUKWILA
Department of Community Development - Building Division
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 433 -1851 prior to
submitting application. In all cases, a valuation amount snould be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 433 -1849.
DATE APPLICATION ACCEPTED
Q -l" 'l
BUILDINJ PERMIT
APPLICATION
FEES (for staff use only)
DATE APPLICATION EXPIRES
03/30/89
COMMERCIAL
Conipletsd buikng permit application (one for each ibuct
..... ficst tcns:....
..••
en—
.....
Topographkt survey
eiuglnaer or architect
Legal description
by a Washington State II
tido ••••:‘,
irel drawing
'wil drawings
Completed utiHty permit apploabon (on. for sntin
Six (6) sets of csvri drawings
• • .:••.••••
NOTE 8.. uitIrj' permit application aid checkbat
. .
. . .
RACK
Completed building permit application
• • s ' s ;
IWo (2) sets of plans, which Induds
] 8ullding floor plan showing
• Exit doors
• Dimensions of alt sislet
Tenant space floor plan showing rack sterage Ia
NOTE' Inckl dimenakns of and w4'a on plan
• racks ( wj
....... .
lottiet(iiitit'alotatie IY and ovqf )
RESIDENTIAL
.......................................................................................
NEW IlitiCiLE•fAt4ILY. DWELUNG91ADD .
Completed bulking permit application (one for each attwoture )
" '" • • •
• . • • ••: : . . .
••• • •
Sitn: plan : .
• Foundation plan
• Floor 'plan
• Bultlng elevations (alt 'views)
• Building cross suction
Stsuctund !raining pur
• ■40S+1..*FI: Sti te Energy Code data
Completed utility permit ap plication
SIx (6) sets 0 si plans showing utili
• " ." ••• • " • :„. „ .;
NOTE and u t i lit y may*,
•••• men
04 POOFP!!
" • • • • •
* • lag and soils be requk,
Two *els (2);ot.w?Otking drawings which inch •
SUBMITTAL CHECKLIST
• . .. .
...
. . . . ..„:„ .
... ............... ..... .
COMMERCIAL TENANT IMPROVEM .
Completed bulMng permit application (one for ea
....
4*,; PP"
Site t
pla
• • • ...
proposed
1. ...
•
•
••• . •
attachment for floor and ceiling
El Sbuctlral calculations pidinw tu r4te
Li F1 Floor °r lab • a Washington State licensed
wall, and waifs to bs.dem
consmiction details
• Cross seIons showing wait 0aitbs:•:tictuirad if' tWo
con struction
• •••••••.:•-•:.•••••:,•:::::::::::.:
0# plans
• .
at
•:...::RE
„.'.....,.... .,•%,";..,.,....:,.,
C
*d°91 ... permit x iisi. i :.,::::.,::•.:•..6; for 1
: ,. ....: fi : il ;• i. •••:•• • " : "": 71 " . "•' : ' , " . •" 0, '"• ° : ," • . ; .., :: ,...,,,,.., ' .......... ..s.. each
:•• •„....,
•••*aiiiitici(*i.../1'1
4 Accou ,...., ti''...iiig'141err•••••:••............., roo . mat . ..., 7..,,::,...n....ano,,,,...,:,...,...
off of iiiiii)eiiiit...!:"':.:!::..'"'"'''''''"::'
descr itallod iiitdpfio
NOTE : i''. : i.... ; : ,..... ! " :.. ..1 .1 . ... N :,! . ..... : : :. 75 .i.::. : .. ... '...: . : .. . : . .. , : . : . ... : ::„' . ,... ........ :::::::::::,'.:::::::::....:::::‘,...::::::::?':.::::!:::::::::::;:..::::: . : ‘ : .. ,: , :. : : : . ; .. ..: ' ; ' , ': :. : : ' : : :: . :: • : : : ';: : : : : . : i i . "E . ::: " ... " ....: . " . ..."" : : . " . . ' . :" . : ,. ... • . " ! . .:•; .. ...."..:" : ::' . : ! : .. 1 ' . ...." . " ... • : : " . .: . ..": : " ...i • : .. ;:i . ."" .. ...." . .. : ] : ,. .. , "": .....,. .. ; • ,. .• ..i.. '... i ..." .. '.... , , i,. ., i....,:........ ... :..........
ij4
..........•.,........:,,,.:.:.., ,.
::',.:•• 1, ! =iii 4 :: t .'....:. ..,:„ : : " .,„ . .... 00 .„ . .......: ' ,: :: ::::: : ::::::: , : .
N
.... :: . ..: 4' .......:..7::„.............. 6 :: , „:„.... „ ...,..:::::::::„.„ : „„ H ..., ,.„ ,... „::::.....„...
„ ,,,,,,:: ::........,....
..::::::,:::„.::::::,...:.,.......... ......
•
•
O
ructural calculations stamped by a Washington State lieenss
- engineer may be requIred
...
. .
•
..„:
:„.
fl Completed building permit application (one for each structure)
Two (2) setI of working raw ngs which • .•
. .
........
Foundation plan
• Floor plan
-BUildrio:ileWations'(all
. . „ .
win. w cross-section .:::::: .„:::::::::,:. • .. ::„......:::::::::::::........
..
. p l a ns " ::,...
....„ NOTE ;..,k 4..04,i0...
and pl ans :niust.:.:49:a
Narrative descnblng existing root, material being removed atx
material being Instilled
NOTE A certification litter Is requi . prior to final Inspection sad
off of tie
... .. pe
....
. • ,.„ . ..... • ... . .
CITY OF TUKWILA
Build' Department
6300 iicenter Boulevard
Tukwila, WA 98188 -
(206) 431 -3670
Type of Inspectio
Site Address 1 1O'� 1 /
Requestor l( ,4-• r"? 1
Special Instructions
Inspection Results /Comments: (5 'its
INSPECT RECORD
PERMIT # 7O
Date - -I ) C7
�I Date Wanted -
�!- .,V" - Project — ' cf
Phone # �(� C 7
(1:?■ c ^()( ,ur) (I. /(( Cc—f -v'
J
Inspector .�'C, c Data Si M f C t.?►
p.m•
Sub j : Reroofing
Gentlemen:.
Custom Roofing has installed a new built up roofing
membrane in compliance with the following specifications:
Owens - Corning Specification # 31 -IC
Insulation - 3/4" Fiberglass
Per Owens - Corning specofications this roof:has:a
Class ° "A!" ,rating over 3/4" fiberglass: insulation Please, •
see copy, of `UL Specification indextattached.
Sincerely,
Custom Roof in Inc.
E.L. Larson, President
Interply/
Surfacing/
Slope
Bitumen
Type
Materials
per 100 ft
interply
Felts
3 plies
Bitumen
0-'/
II, III
75 lbs
%2 -3"
HI
75 lbs
0 -3"
Perma Mop
75 lbs
3 -6"
IV
60 lbs
3 -6"
Perma Mop
60 lbs
Surfacing
Asphalt
0 -3"
III
25 lbs
0 -3"
Perma Mop
25 lbs
3 -6"
IV
20 lbs
3 -6"
Perma Mop
20 ibs
PERMA CAP
75 lbs
I1W1 N`,
FIBERGLAS
Roof
Insulation
InsulC 'd' /Cap Sheet
Asphalt
Perms Mop
33 -IC
33E -IC
PERMA PLY R
2
2" sidelep
PERMA CAP
Nominal Installed Weight -202 lb /100 ft
Weights exclude roof insulation and are provided for system
design consideration.
Application of Insulation
Apply roof insulation In accordance with specification requirements,
Insulation joints should be staggered in one direction.
For multiple -layer applications, offset joints of each layer a minimum
of 6" from all joints of the preceding layer.
Application of Plies'
Embed three plies of PERMA PLY in shingle fashion (starter sheets
required), lapping 243/4" into uniform solid moppings of hot bitumen,
using 23 -46 lb /100 ft' per ply. Plies may be left exposed up to six
months without surfacing.
Application of Mineral Surface
Embed 12 -ft. lengths of PERMA CAP (18 -ft. in Area III) with 2"
(min. 11 side and end laps into a uniform solid mopping of hot
bitumen, using 20 -30 lb/100 ft' PERMA CAP end laps should be
staggered minimum 3 ft.
t NOTE OWENS- CORNING DOES NOT RECOMMEND THIS SPECIFICA-
TION OVER POLYISOCYANURATE OR POI (URETHANE INSULATIONS:
In support of RIC /TIMA and NRCA, Owens- Corning recommends that an
overlay of Fiberglas Roof Insulation, Perlite or wood fiber roof insulation
be used to reduce any tendency for blisters to form. OWENS - CORNING
WILL NOT BE RESPONSIBLE FOR MEMBRANE BLISTERS THAT MAY
OCCUR OVER POLYURETHANE OR ISOCYANURATE FOAM ROOF
INSULATIONS.
32- IC 1 -IC
32E -IC 31E -IC
PERMA PLY-6 PERMA PLY-IV
All Areas
General
Note
All general instructions contained In the General Requirements
section of Owens - Corning Built -Up Roofing Products Reference and
Application Guide, Pub. No. 5 -RW -13121 shall be considered part of
this specification.
Drainage
Roof decks must be graded to drain all water freely, Drains shall be
sufficient in number and size to assure rapid elimination of water
from the roof surface.
Nailing
'T Bated wood nailers are required on inclines exceeding 2" per foot
to help secure insulation and roof membranes to non- naiiable decks
or to decks with insulation. Nailers should be the same thickness
as the insulation and should be installed perpendicular to the slope
on approximate 8 foot face -to -face for slopes up to 3" per foot and
approximate 4 foot face-to-face for slopes greater than 3" per foot.
Felts are to run parallel to the incline and must be secured at each
nailer, a maximum 12" in from the back edge of the felt. Each nail
must be covered by succeeding plies. High temperature areas may
require nailing on lower slopes.
Pty f dg.. ro
PERMA PLY
_�,,,,.,.,, ^...ua w ^^•wf r.. f• r. u . ,.....�j^ Plies
"'^ '•3...,. ��_..� :L�.. ^ ..,y - ..!! ry .. '�....y ...!�... Back of Ply
lo Ned
Pl 1:due
Flashing.
See Flashing Section of Owens - Corning Built -Up Roofing Products
Reference and Application Guide, Pub. No, 5- RW- 13121.
PERMA PLY-R, PERMA PLY-6 & PERMA PLY-IV
UL Specification Index
Class A
Gravel
PERMA PLY R
43-7G
43E-TO
43P -TO
43.10
43E -IG
43P -IG
33 TO
33E-TO
33P-TG
33•IG
33E•IG
33P-1G
23 TO
23E-7G
23P-7G
43 -NO
43E -NG
43P-NG
33 -NG
33E•NG
33P•NG
43 -X0
43E -XO
43P•XG
33 -X0
33E•XG
33P -XG
Minwel Cep 43.10 42-TO 41-O 2"
43E-TC 42ETC 41ETC
43.IC 42 -IC 41.10
43E -IC
33-TC
33
23•TC
23ETC
43 -NC
43E -NC
PERMA PLY-8 PERMA PLY -IV Slop*
4270 41-TO 3'
42E-7G 41ET0 3"
42P-TG 41PTO /I"
42 -I0 41 -IG 3'
42E -IG 41E -IG 3"
42P -IO 41P -IG h'
32 -TO 31TG 3"
32E-TG 31E•T0 3"
32P-TO 31P -TG 4,"
32.10 31.1G 3"
32E -IG 31E•IG 3"
32P-1G 31P -IG X'
2270 21T0 3"
22E-TO 21ETG 3"
22P-TO 21P-7G '/
42 -NO 41 -NO 3"
42E -NG 41E -NG 3'
42P -NG 41P -NO '/."
32 -NG 31 -NO 3'
32E -NG 31E -NG 3"
32P -NO 31P -NG /."
42 -XG 41 -X0 3'
42E-X0 41E -XG 3"
42P -X13 41P -XO 4"
32 -XO 31 -XG 3"
32E -XG 31E -X0 3'
32P -XG 31P -XO 'Al"
42E -IC 41E -IC 2'
32-TC 31TC 2"
32E-TC 31E-TC
32 -IC 31-1C 1'
32E -IC 31E -IC 2"
22TC 21TC 2"
22ETC 21ETC
Deck MIn.Thickness
NC,C,PL '/" FG
43 -NC 41 -NC 1" NC,C,PL NA
43E -NC 41E-NC 2" NC
Roof Insulation
Max. Thickness
Unlimited
NC,C,PL .%" FG, 4" P, 3 4" W on NC deck only Unlimited
NC,C,PL AC Foam (1" max. slope for PLI 4' max.
NC,C,PL
NC,C,PL 3/4" FO Unlimited
NC,C,PL
NC,C,PL
NC,C,PL 'A' FG, P, .4" W on NC dock only Unlimited
NC,C,PL
NC,C,PL
NC,C,PL v." FG Unlimited
NC,C,PL
NC,C,PL
NC,C,PL NA
NC,C,PL
NC,C,PL
NC,C,PL NA
NC,C,PL
NC,C,PL
NC,C,PL NA
NC,C,PL
NC,C,PL
NC,C,PL NA
NC,C,PL
NC,C,PL
NC,C,PL '." f0 Unlbldtud
Unlimited
NC,C,PL 3;" FG, 1" P max. 1" slope A max,
1" slope Unlimited
NC % "P, '/," W Unlimited
NC,C,PL %" FO Unlimited
NC.C,PL FG, P, W, A max. 1' slope Unlimited
NC,C,PL °/4" P Unlimited
NC,C,PL '1." FG Unlimited
33 -NC 32 -NC 31 -NC 1" NC,C,PL NA
33E -NC 32E -NC 31E -NC 2" NC
43 -XC 42 -XC 41 -XC 1" NC,C,PL NA
43E -XC 42E -XC 41E -XC 2" NC
33-XC 32 -XC 31 -XC 2' NC,C,PL NA
33E -XC 32E -XC 31E -XC . 2" NC
Emulsion 43.75 42 -TS 41-TS 3" NC %" FO,'" P 1" max,
43E-TS 42E-TS 41E-TS / NC %• FO,'" P %" W, A 4' max.
43 -IS 42 -IS 41 -IS . 3" NC %" FO,'/." P 1" max,
43E -IS 42E -IS 41E -IS 14" NC y." Fa, Y." P,'/." W, A 4" max,
33-TS 32TS 31 -TS 3" NC f4' FG, %" P 1" max.
33E-TS 32E-TS 31E-TS ' /r" NC V FG, 'V P,¶4" W, A 4' max.
33 -IS 32 -IS 31.IS 3" NC '4" FG, 'V P 1" max.
33E -IS 32E -IS 31E -IS /r" NC V FO,'/." P. %" W A 4" max.
43 -NS 42 -NS 41 -NS 3" NC NA
43E -NS 42E -NS 41E -NS
43 -XS 42 -XS 41-XS 3" NC NA
43E -XS 42E -XS 41E -XS
Aluminum and 43TS 42 -TS 41-TS 2' NC FG 1" max.
Acrylic 43ETS 42ETS 41E-TS /." NC FO Unlimited
&" NC PG 4" mnx.
43 -IS 42 -IS 41 -IS 2" NC FG, P 1' max,
43E -IS 42EdS 41E -IS '/ NC F0, F, W, ISO Unlimited
/r NC FG, P, W, AC 4" max.
33-TS 32-TS 3176 2" NC FG 1" max,
33E-TS 32E-TS 31E-TS 1 4' NC FG Unlimited
¶4" NC FG 4" max.
33 -IS 32 -IS 31 -IS 2" NC F0, P 4" max,
33E -IS 32E -IS 31E -IS ' /." NC FG, P, W, ISO Unlimited
'4" NC FO, P, W, AC 4" max.
43 -NS 42 -NS 41 -NS '/ NC NA
43E -NS 42E -NS 41E -NS 'h" NC
43 -XS 42 -XS 41 -XS ' /." NC NA
43E -XS 42E -XS 41E -XS ¶4" NC
n r
I T�V1 Date Wanted t5 ,IM
C�� �`Z. r - 11/ Project v"Z I t
/ Phone # 7lvv� 1j �7(
Type of InspectionL — 5
Site Address
Requestor prn
Special Instructions
Inspector - e,
CITY OF TUKWILA
Building
6300 Sou , nter Boulevard
Tukwila, � 01 98188
(206) 433 -3670
Inspection Results /Comments: P-0V.% F i s Gtfi, K) G�1oT F 2
rn �L n 8J c.r . q n1!%) S''NA4■I101
w A-'t.e' , ww13 S
A /2.� PO Q_ fL-c^� -acct r-V;
__ &- 5 J u.
INSPECTI , N RECORD
PERMIT #
Date
r r 8c ( c nJ
5
p .m•
ILE
• - - S
;,.
i dn•
Date s ,4 /PO
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
X
11 Pre - reroof
431 - 3670
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC, WORKS FINAL
431 -3670
•
X 17
BUILDING FINAL
431 -3670
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
SITE ADDRESS:
OTHER AGENCIES:
BUILD1G PERMIT
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
SUITE NO.:
BUILDING
PERMIT NO.
DATE ISSUED:
PROJECT:
1105 - 1121 Andover Pk W Project 294, Building E
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
(INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
06117 /YO
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
'Attn: Duane Griffin
Re: Building Permits
Project 293 - Building "D"
Project 294 - Building "E"
Subj: Reroofing
TII
ea
6OO t STN AVENUE SOUTH • SEATTLE, WASH. 98 108
PHONE 762 -0170
Sincerely,
Cuet Roof ng,
P.V2
RECEIVED
CITY OF TUKWILA
MAY 291990
PERMIT CENTER
May 29, 1990
Gentlemen:
Per your request, as part of the applications.for reroofing
the above referenced buildings, we have attached a statement from a
Washington state licensed engineer. Also, the following information
pertains to both buildings.
1. Having been the original roofing contractor, we know the
,
original roofs weighed approximately l4 # per square foot.
The new roof covering will weigh approximately; 3/4 # per
square foot. Please see attached letter from Aatti.Swenson
Perbix & Clark.
2. Having maintained the roofs on both buildings, .we can certify
that there is only one roof on each building.
3. The new roof assembly will be mechanically fastened through
the existing roof to the deck..
4. To our knowledge, the roof deck is structuraliy..sound.
5. There is no insulation involved in the original roofing
system.
The existing roofs are a smooth surfaced. We will be installing
a new built up roof per Owens- Corning specification # 31 -IC ( spec-
ification sheet attached ). Per Owens- Corning specifications, this
roof has a Class A rating. Please see copy of UL specification
index attached. If you have any questions or need further information,
please call our office at 762 -0170.
•
E.L. Larson, President
e ' -1�'J 1fJ ;.82 F1i:1 H" rtYM;1e:1t1cti
May 24, 1990
William I Boeing, Jr.
1325 Fourth Avenue
Suite 1940
Seattle, WA 98101.2510
Attention: Jack Oink
Dear Jack:
At your request, I have reviewed the original calculations and
structural members to determine the feasibility of adding a
It is my opinion that the structure can safely suitain the
system within the allowable stresses of the materials used.
The analysis was based on the original roof weighing 1.25 oaf
2.75 psi, as has been reported to me,
If I can be of any further assistance in this matter, pleas.
Very truly yours,
RA'T"TI SWENSON PRRBIX & CLARK, P.S.
Consulting • Engineers
Reform* Building 293/294 Reroofing
Tukwila, Washington
Dean B. Ratd
RA T T•I
SWENSON
PERBIX
•
1 '. t'.
et the referenoed project's
r at ermbs- system.
might of the proposed roofing
psosfruodou at. the bu lldiags.
' Lt new root system welshing
, ,M1•■■••••••■•■•■••••■■■•■••■•■•••••■■■•••••■■•••■■•■••=11=•■■•■■•••■•••=1
• Inter" ly/ .
Surfacing/
' Slope :. :
Bitumen
Type
Materials
per 100 ft
Inter*
Felts ,
. Bitumen
• '.
'' Ve.3" .•
" . • 341"
Surfacing
" 1 ''.• .
.., . .
, ..
:. PERmA '
.
:ill; III .
. ., ill
iV
• ;., . .
.
4;,.....1: ."
IV, :
•
3 plies
75 lbs
75 lbs
6011,s
26 lbs
20 lbs
• 78 lbs
—
gs:25.i99e t4t43 FROM CUSTOM ROOFING, INC..
Insulatird( ) Sheet
33.1C /.- '214 •••
PERMA PLY-R PERM& Ptv-lif
• • 33-IC.
314C
em•••••••■•••••••■•••••••■•••■•••••••••■■••■••••■••••■•••■•.•••••••••••••••••••••••••••••••■••••
. .
'Application of Insulation
,Appiy tont insulation In accordance witn specification rerIchlmsfilt '•
InSulation joints shotitd be staggered in one direction.
For inultiple•loyer apOlications. Joints of each layer ehouki be offset a
minimum of 6 inches from ell joints of the preceding layer.
Application of Plias
Embed three plies of ?ERMA PLY in shingle fashion Wafter sheet required), lapping 244/3 inches into uniform mappings of het esphelt,
using a nominal 25 lb/100 ftl per ply. Plies may be left exposed up to
INN Months without surfacing, . .
Application of Mineral Surface
Embed 12-ft. lengths of PERMA CAP (18-ft, In Area ID) with 2 inch tide .
;end end laps into a uniform solid mopping of hot steep asphalt, using e
morning! 25 lb/100 ftl. PERMA CAP end laps stiould be staggered 3 ft.
1.111.••••■
202
202
•
•••••••11
Nominal Installed
lb/100 fts
iBelow weights exclude roof
Insulation and are provided for
system design consideration)
•
•
•
TO •
334tAli Areas
31-IC All Antis
P. 04
, •
Npte,
Ali general inatnittions contained in the General Requirements
Section shell ir coneldsred part of this specification.
• Orainistie ' • : •
Roof decks mUst prigraded to drain ell water freely. Dneins shall be
sidficient In ntriyiber, and site to assure rapid elimination of weter from
,thtt,roof atirfrif.,
TieSted Wood riiijets are' required on inclines exceeding 2 inches per
foot to help Noureinsulation and roof membranes to non-mailable
• decks or to decks with insulation. Nader s should be the sums thickness .
ea the insUlatiOn .. end should be installed perpendicular to the slope on
,... Isce-Welle 1I Popes up to 3 inches per foot and 4 foot face-to fete forslcbee Voile than 3 inches per foot. Felt. eta to run perellel
to the inane end Must be secured at each nailer, 12" in from the back
. edge of the lilt hob mil must be Covered by succeeding plies. Nigh
• , trtIpeflAtt! "Mg a require nailing on tower 3300111.
.: ' . . . - . •I'-',411011014:#4 # #',;,:: , . .
.1 ".4.1 • 1:4 " * . ". i - I I i Ifor tip To
...----........... ... PlIhMA PLY
2 - ''''''''' . .." 7: - ''- _ t .• 4 ...... - "l^ ra n
To NW
33
. •
•S.-29i19911 14144 FROM CUSTOM_ROOR . NC.
- •
PERMA PL1ti1V
UL Specification Index •
ChM • tutfwca
.4 • Gravel
5
Mince CiP
emulsion
Aluminum end
Acrylic
M:nurnl Cep
' Emulsion
Legend
{Nick
NC •Non•Comou■bte
C • Comovu bti
PL i+lyrood ('Sr" Mini
NA Apt Appl/cublo
Stow Mme^'
Maximum , OoOk*e 1Mi4,T14oktrn Mu.Thlokneee
41.10 3' NC:C;PL _ 1110.03•11NC Deck Only) . Unlimltod
3' NC;C;PL 1,9+A 4
3140 3' NC:C;PL ' • WP0 UnRmlted
31.10 3' ' NC :C Pt g'Pb,PWINC Deck Only) UnNmited
3" NC;C;PtL 1,3 4'
2143 3" NC;C;PL : RIO unlimited
411410 4 •.NC1;PL 111'PO,PW(NCOuch Onlyl Unt,Mitte
V," NC :C;PL , . . L3rA 4'
31P40 14' fIC;C:P!•, "'N'EO,P,W(NC Ouch Only! UnilmlIed
to NC,t:PI 1.3 "A 4"
31,40 11' . NC;C)*L' ; ' . M a 1r0,RWINC Dee* On(y) Unlimited
w" NC;C;PL . • 1,3 4'
ENO 3' NCiC :PL" ;1414 NA
31•NG 3' NC:C;PL N /A N/A
411 '4" NC;C;Pi •. NIA . NA
31P.NO %• NC;C;PL NIA ' N/A
4140 a' NC C:ML t�IA WA
)1•xG 3' . :N C • C:PL ..,
41Nxt1 4' NCIC :M. • 5• s!p'! ' llr.s.A ft4. A' •
31P•XG I6• • NC;C;K ,, NA
5ee4$Neellene
PfNMA PtY•IY
31 TO
41.149
41•X6
41.10 2' NCGPL • E :, . 1'tb ?e) Unlimited
NC 1.0 ". 4'
'4' NC;C;PL • 1 , 3 " A 4'
31TC 2' Nr";C ;PL ' .11113 Unlimited
31•I0 2• NC;C;PL N'i¢;1'PIMex, 1'$loptl Unllrnind
2 " NC .1,3'A 4',
11' NC ;C ;PL M u (.i'A 4•
21 2" NCt4i1'L . • K•P Urtlirttited
41.14 0 2" NC.' N!A N/A
vi• CA
• IIIAr';. ' N/A
N
31.NC 2' NC ; : NIA A
'A' ' • C;1 ... .. NA. , N/A
41•x0 2' NC . ... • NIA NIA
N" C4•L NIA •. N/A
31•XC 2" NC. . •• NIA•' N/A
411$ 3" NC . • " . ;11` 1'
)r" . NC. 11/ et 1'>t A ♦•
31.15 3' NC 1< ,14 1"
1i' NC ` Ni fIW 4•
3" NC • X• 4'
3" NC. ` NA N/A
3" NC • .'''NIA NIA
41•14
3110
;ilt$
41.1E
31•TC
11 :C
41•NC
31.NC
41•XC
31.xC
41.15
31.ta
31T$
41•N5
41•X9
Root (n*utettov
PO t•Pitvrulas
.+RMno
W •, Wood Pity
A -Met Foam
(Allot (tooling Cn, i
3• NC' . , • Ii'MQ.P 1•
11' NC . '• %'RO,RW or 1.3'4 a•
2" NC . •.I110.'•• 1'
tt' NO K1i,, PFQpRN 4•
2' NC ..5t'P0 _ 4'
P .05
3' NC ;C . t4•PO' - Unlimited
unlimited
3' NC . 1.0'A 4'
12'
12'
12•
12'
12'
12'
12'
' ' NC;C;PL
NC;C ;PL
NC;C ;PL
NC,C;PL
NC ;Cd
NC :C;PL'
NCICIPI
•
3 • NC:C:►L
3' . • NCICiPl. :
3' NC,CPt
3' NC;C;PL
Mn
NA
footnotes • .
1. UL UuhInas must be retorted to obt4lMt ,DI$h ets' ttpe, thieknasies. atooee erd ecotpt•
able appl c1tron methods tot 4y111nt .
2• ►W /*POI reterdei epprovnts we!. *VON* to kt+ivbwl UL lilting.
•
Unlimited
4'
unlimtted
N/A
N/A
N/A
Unlmited
Unlimited
Unlimited
N/A
NA
27
TOTAL P.05
DESCMPTION
AMOUNT
RCPT i
DATE
BUILDING PERMIT FEE
752.00
Pf y-
5 -29 -90
PLAN CHECK FEE
EXP. DATE 9 -30 -90
PHONE
ARCHITECT N/A
ADDRESS
BUILDING SURCHARGE
4.50
283-7-
5 -29 -90 i,
ENERGY SURCHARGE
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
OTHER:
TOTAL -
756.50
PROPERTY OWNER William E. Boeing. Jr.
PHONE 624 -4494
ADDRESS 1325 Fourth Avenue. Suite 1940. Seattle. WA
PHONE 62-
ZIP 98101
171
CONTRACTOR toll f '
ADDRESS 8111 Fi h , v- - 5 . I - t 1 •
ZIP 9:118
WA. ST. CONTRACTOR'S LICENSE # CUSTOR *2911vt9
EXP. DATE 9 -30 -90
PHONE
ARCHITECT N/A
ADDRESS
ZIP
JSE -)
/
/
CODE COMPLIANCE
• /
l
/
-ONDITIONS (other than those noted on or attached to permit/plans):
:wag
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
CCC.
LOAD
SQUARE
. FEET
CCC.
LOAD .
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
__QCC.LQ D
TOTAL
TYPE OF CONSTRUCTION: UBC EDITION (year) 8t
SETBACKS: k _ .
L.
:IRE PROTECTION: OSprinklers 0 Detectors Q N/A
UTILITY PERMITS REOUIRED?0yes QNo (throe works
'- ONING: BAR/LAND USE CONDITIONSEyes ® No
RiNT N f� ; 1/. h u . o �i
-ONDITIONS (other than those noted on or attached to permit/plans):
PPHOVED FOR ' . BUILDING
OFFICIAL
3SUANCE BY: ii0 v
DATE: _
i� - 30 . _ 96)
I hereby certify that have read and exa d this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. I am authorized to sign for and obtain this budding permit.
;IGNATURE: L' , (/
DATE: - - 3 0 - Y0
RiNT N f� ; 1/. h u . o �i
COMPANY: C ,,, c e c� e. ed e =„ o _�
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING
PERMIT NO.
(oo g3
ler
DATE ISSUED:
CUILUILIV rttiMI
(POST WITH INSPE SON CARD AND PLANS
IN A CONSPICUOUS LOCATION)
FEES c,
-237
•
PROJECT
INFORMATION
1105 112.1 Andover Pk W UI S U 07e 132 000.
PROJECT NAME/TENANT ro ' ec t 294 Bui d ASSESSOR ACCOUNT S
TYPE OF • New Building ■ Addition • Tenant Improvement (commercial) • Demolition (building)
WORK: 0 Rack Storage Q Reroof 0 Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
Install new built up roofing and related sheet metal.
Grading/Fill
E
A
This permit shall become null and void if the work is not commenced within 180 days from the �1ate of
issuance, or if the work is suspended or abandoned for a period 01 180 days from the last inspection.
RTIFICATE OF l DATE ISSUED:
Cl UPANCY NO.