HomeMy WebLinkAboutPermit 6086 - Segale Busienss Park - Building 781 - ReroofAPPROVED FOR /./ / BUILDING
ISSUANCE BY: ; " ,. _ ' � � OFFICIAL
DATE:
I hereby certify that I have read a • : amined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating const ction or the performance or work. I am authorized to sign for and obtain this building permit.
SIGNATURE: ,i ■
DATE: "' - 90
//
PRINT NAME: C
�'�
6 ' « 1e �ir i -_, p ii c-
PROPERTY OWNER Segale Business Park
PHONE 575 -3200
ADDRESS P.O. Box 88050, Tukwila, WA
ZIP 98188
CONTRACTOR Segal a Business Park
PHONE 575 -3200
ADDRESS P.O. Box 88050, Tukwila, WA
ZIP 98188
WA. ST. CONTRACTOR'S LICENSE P SEGALBP151M5
EXP DATE 7_09_90
ARCHITECT NSA lb
PHONE
ADDRESS
ZIP
TYPE OF CONSTRUCTION: UBC EDITION (year)
SETBACKS: N - S - E -
UTILITY PERMITS REQUIRED?b Yes ® No
W -
i p bl works) 9
FIRE PROTECTION: 0Sprinklers 0 Detectors ® N/A
ZONING: BAR /LAND USE CONDITIONSOyes ®No
1
'
CONDITIONS (other than those noted on or attached to permit/plans):
FL
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
USE i
/
1
COnt r:Or.1I'LI/lrl(
/
I
/
1
'
FL
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
TOTAL
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
BUILDING (00 �b PERMIT NO.
DATE ISSUED:
BUILDINq PERMIT
(POST WITH INSPEC i!Jri CARD AND PLANS
IN A CONSPICUOUS LOCATION)
PLAN CHECK #90 -242
FEES <E1a
DESCRIPTION
BUILDING PERMIT FEE
PLAN CHECK FEE
572.00
BUILDING SURCHARGE
ENERGY SURCHARGE
OTHER:
TOTAL -
AMOUNT RCPT I
4.50
576.50
-286 5 -30 -90
DATE
286s7 5 -30 -90
18300 Southcenter Py - - 85,025.00
PROJECT NAME /TENANT ASSESSOR ACCOUNT
Segal Busine s Park, Building 781 352304 -9112
TYPE OF 0 New Building 0 Addition U Tenant Improvement (commercial) U Demolition (building) Li Grading/Fill
WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) ® Other: Roof repai r
DESCRIBE WORK TO BE DONE:
Repair existing roof membrane.
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
CERTIFICATE OF
OCCUPANCY NO.
A I U
1.101111111
PERMIT NO.
CONTACTED
v Y-
1 W.
`--
DATE READY
DATE NOTIFIED
�^
\___ q
BY:
(snit.) .-
PERMIT EXPIRES
2nd NOTIFICATION
3RD NOTIFICATION
BY:
(init.)
BY:
(init.)
AMOUNT OWING
PLAN CHECK
NUMBER
9
REVIEW COMPLETED
BUILDING PERMIT APPLICATION TRACKING
PROJECT NAME
c�c� DA-2 Par lam. 6 143 'MI
SUITE NO.
SITE ADDRESS
1 %300
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be tilled out by Plan Checker)
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL OCCU-
PANCY LOAD
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
w ► ; : A ►p D ::
f . BUILDING - 5-3o-93
initial review
O FIRE
O PLANNING
O PUBLIC
WORKS
O OTHER
U BUILDING -
final review
ROUTED
INIT:
CONSULTANT: Date Sent -
•
Date Approved -
pr n ere ' etectore
FIRE DEPT. LETTER DATED:
INSPECTOR:
ZONING:
IBAWLAND USE CONDITIONS? fives [X) No
INIT:
REFERENCE FILE NOS.:
MINIMUM SETBACKS: N- S. E- W-
INIT:
INIT:
INIT: )94
UTILITY PERMITS REQUIRED? (1 Yes 94 No
PUBLIC WORKS LETTER DATED:
TYPE OF CONSTRUCTION:
UBC EDITION (year):
0 =MP
SITE ADDRESS SUITE #
18300 Southcenter Parkway
VALUE OF CONSTRUCTION - $
85,025.00
PROJECT NAME/TENANT
SBP building 781
ASSESSOR ACCOUNT #
352304 - 9112
TYPE OF Li New Building Li Addition Li Tenant Improvement (commercial) U Demolition (building)
WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) ® Other roof repair
DESCRIBE WORK TO BE DONE:
Repair exi sting rnnf mPmhranP
BUILDING USE (office, warehouse, etc.)
Warehouse
NATURE OF BUSINESS:
WILL THERE BE A CHANGE IN USE? L No Li Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: Tenant Space: Area of Construction:
458 OF
15 '"
WILL THERE BE STORAGE OR USE FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? ® No 0 Yes IF YES, EXPLAIN:
BUILDING SURCHARGE
PROPERTY OWNER Segale Business Park
PHONE 575 -3200
ADDRESS PO Box 88050 Tukwila
ZIP 98188
CONTRACTO Segale Business Park
PHONE 5753200
ADDRESS
ZIP
WA. ST. CONTRACTOR'S LICENSE # SEGALBP151m5
EXP. DATE 7 -09 -90
ARCHITECT
PHONE
ADDRESS
ZIP
I HEREBY CERTIFY THAT I: HAVE READ AND EXAMINED.; THIS APPLICATION AND ; :KNOW THE :SAME <TO BE
TRUE AND CORRECT, AND I AM AU HORIZED•TO APPLY FO IS PERMIT
BUILDING OWNER
OR
AUTHORIZED
AGENT
RCPT #
DATE 6 -3o -470
SIGNATURE
PRINT NAME Steve miller
PHONE 575 -3200
ADDRESS PO Box 88050 Tukwila
CITY /ZIP 98188
CONTACT PERSON Steve miller
PHONE 575 -3200
DESCRIPTION
AMOUNT
RCPT #
DATE
BUILDING PERMIT FEE
t
o? � 1
5- ,
j-qn
PLAN CHECK FEE
BUILDING SURCHARGE
11,53
'
ENERGY SURCHARGE
OTHER:
TOTAL -
7 (A.00
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
APPLICATION MUST BE
FILLED OUT COMPLETELY
DATE APPLICATION ACCEPTED
r � o0
BUILDIN) PERMIT
APPLICATION
FEES (for staff use only)
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 433 -1851 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER I AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit Is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 433 -1849.
DATE APPLICATION EXPIRES
IV 3o- 90
I .,: •
COMMERCIAL
NEW WMMERC AL:E+!JILDINGS/ADCNT
std buII np permitappiicaaon
drawl ga, oath ped;hy`a Waebi
*imitator, stew ... .......:...:...................
............... tt fio .............
sensor Account`
............................
.............................
..............................
(2) i te'ot 'OAS
sor'Account:Numb.
lv'd«bir;gxu
al aalr;a'
Y07E A **den letter s
,fl of rmit
IN TENNA(SATEL iiCt 15H
IA Pism she
..(... wing buifdmp 00:00a.. ..kotantenna/eatellite:d
Riped by a Washing State Ncens
it struct work is: to; be done?(? ae
R ti,tt.1 ~'submit:se ' rat uti to
rior to final Inspection and a
lnc/t Ell diteiOaon
; and #.1t. Y !a •on p laf
; Sttuotur :ciwiatlatidea
sneer (rad stprage..W and over
RESIDENTIAL
NEW ; ;INr4LErFAI L,Y: DWELLW.GB/A)
bdilding permit application;
SUBMITTAL CHECi.LIST
Completed bullring permit application (one for each structure
Assessor •Account:Number a.
Narrative describing existng roo
.matedal being • instal
NOTE;: A corsfcation letterl
oil of drr ptrtnilt
allvieWS
Vide utility permit application:
material being removed, an
to final . Inspection and
October 24,.1990
COMMINCIAL INDUSTRIAL ROOFING INC.
17506 BOTHELL WAY NORTHEAST BOTHELL, WASHINGTON 98011 • (206) 3674011
RECEIVED
PITY OF 11lKWILA
NOV 2 1990
PERMIT CENTER
City of ' Tukwila
Department of Community Development
Building Division
6200 Southcenter Boulevard, Tukwila, WA 98188
(4,e6
' Approved Applicator. IRMA Systems
American Tar
Gilsonite
Kelly Energy Systems
Oro Seal
RECEIVED
OCT 3 1 1990
RE: Building # 781 of Segale Business Park, 18300 Southcenter
Parkway, Tukwila, Washington
To whom it may concern;
We, as Commercial Industrial Roofing, Inc., installed a roof
membrane assembly, which did not include insulation, consisting
of Malarkey Specification # NS 3 Heavy Duty, data sheet enclosed, .
which meets or exceeds the requirements for Class A or Class B
roofs. This roof was installed at above building # 781, under
city of Tukwila building permit number # -5-7-r9.
6084
President C.I.R., Inc..
4
Malarkey
BUILT-UP ROOFING
P.M.R. SYSTEM
RECEIVED
rrrV OFTUKWILA
NOV 2 1990
PERMIT CENTER
PREMIUM 1
SBS BASE SHEET NO. 501
NS3 HEAVY DUTY
NAILABLE
12 YEAR WARRANTY
P.M.R. TYPE
NAILABLE
DECK
ROOFING ASPHALT III
ALL ZONES
CLASS "A" with Ballast
Materials
• Rosin Sheathing Paper (it required)
SBS Premium 1 Base Sheet No. 501
Asphalt between plies
Flood Coating type 3
- Polyfilm cover
General requirements are
specification.
APPLICATION:
applicable
Per 100 Square Feet
1 ply 5 lbs.
3 plies 90 lbs.
75 lbs.
60 lbs.
1 ply
as part of this
Over wood boards only, lay one ply of rosin sheathing
paper. Lap each sheet at least 2" and nail sufficiently
to hold in place.
Apply Malarkey Premium 1 SBS Base Sheet so flow
of water is over or parallel to the laps. Lap each sheet
2" on sides and 4" on ends. Nail each sheet 9" on
center through the laps and 18" on center along line
12" distance from each edge. Turn up 2" above cant at
all vertical surfaces.
PREMIUM 1 SBS ,601.BS. FLOOD- COATING:P(PE-S
BASE SHEET NO. 501 COVERED WITH POLYFILM
• FOR•P.M.ArSYST•EM-
At a uniform rate, solid mop in hot asphalt three plies
of Premium 1 SBS Base Sheet in shingle fashion lap-
ping each ply 19" with a 17" exposure. Sheets shall be
applied so flow of water is over or parallel to but never
against the laps. End laps shall be at least 4" and
adjacent end laps shall be at least 12" apart. Each ply
shall be lightly broomed as it is applied. All plies shall
be turned up 2" above the top of the cant and shall be
solid mopped to the cant and vertical wall.
Coat entire surface with a uniform solid mopping of
Type 3 grade hot asphalt.
See attached Dow literature for installation of insula-
tion and ballast application.
Malarkey recommends the use of its SBS Mineral
Cap Sheet No. 601 or SBS 3 -Way Type Mineral
No. 917 as a base flashing material.
Malarkey recommends the use of its SBS Walk Board
No. 916 for all traffic areas.
2M6167J1
MAY 16 '89 14:22
Roof covering material:
" #501 PREMIUM r
Manufactured by:
` 'sp ar k Eier
(IT OFltl A
NOV 2 1990
PERMIT CENTER
THE HERBERT MALPortlARKEY ROOFING O R COMPANY
and,
1. Description: The roof covering material identified as " #501 Premium 1" is an SBS
modified glass fibered base sheet The product is furnished in rolls 36•inches wide and
108 feet long.; Materials are to be installed according to the manufacturers instructions.
in the following system:
'
i
1. Combustible deck at 1/2' to 12' slop..
2. One ply 41501 Premium Islets fibered base sheet, mechanically fastened.
3. Two piles *501 Premium 1 glees flbared bus sheet fully adhered with cold promos*
adhesive at 1•1/2 gal. /sq. each ply.
4. Manufacturer spshiflad nonflbered emulsion cos** at 3 gat /sq. . '
5. 3M Brand Roofing Granules embedded at 80 lbs. /sq.
11. Evaluation Criteria: Test Standard 'for Determining the Fire Retardancy of Roof
Covering Materials, Uniform Building Code Standard No. 32.7 88, Standard Methods of
Fire Tests'of Roof Coverings ASTM E 10843, Standard Methods of Fire Tests of Roof
Coverings, NFPA 256 and Tests for Fire Resistance of Roof Covering Materiels, UL
Ili. Findings: The materials described above, installed according to the manufacturers
instructions, achieve a C1asA 'R' external fire performance classification,, as determined
by the evaluation criteria.
Loa Anor+u►.o, r:iti .•rots
X ( 412-0379 •
San Pmnclite, Csllfonrla
(415) 432.7344 •
' FA.X (415) 432.3671
Issue Date: May 1989
Report Number: WH1- 495- R•0508.02
(2201) 847.0773
4,X(301)04744.52 .'
•Tct+onta, Ontario
(418) 678.7820
• FAX (415)873.0262
r'44',4:4n el S4 :t►i�ttt
(tees:► b b.44d0
FAX (600) 8114279
aurfslo, Now %fork
(716) 8759773
MX (716) 8758775
•
Vanuoinrat, rlrltlsh Cnlutnbia '
(604) 520.3321 .
FAX (604) 524.9185 .
Montreal, Cambia
(51 a) W63100
PAX (514) 3664360
This ripen is hnitsd to the spears products) wbmatsd by the m8nutaaurE This report loos not imply ocn ification. in ogler tot* a esrtifad proillaot, MGh
inaividuaI pro4„ot must be label:d with M , Vwrn...1► H s u wy C w r . ti G O i k g n Mask V , * 1 thw �+Wnt of murw ri„4ws,, 04.* w 111:41, c W mac $ % r WON wok
for turther 1n10rm15pn On wit*: producxs. '
ype of Inspectio ! �►� �
ite Address I
equestor
CITY OF TUKWILA
Bui ldinl•artment
6300 So �snter Boulevard
Tukwila, A 98188
(206) 431 -3670
INSPECTION RECORD
w gr
- CQ 9 o
PERMIT #
Date
Date Wan
Project
Phone #
G2
i s"
nsnector /'�, �i /Jlh. Date Y/ — 7 --4I/)
Q a.m. p.
pecial Instructions
-- "b V
nspection Results /Commen s: CAL /i0 7.1.P
Type of Inspection ter— viDa
Site Address
Requestor
Special Instructions
Inspection Results /Comments:
Inspector
CITY 01 TUKWILA ` .. ...
Building Division
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
P-1P T i M G P
PERMIT # ) ' - A
Date 4?1 1►-yU
Date Wanted 7/.. -$01E)
Project 0 0O3414
Phone #
P440.7
Date 7..- - ,4/ (- 1 7 e
.t
"X"
REQUIRED INSPECTIONS
PHONE
_
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
X
11 Pre reroof
431 - 36/Q_
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC, WORKS FINAL
431 -3670
_
X
17 BUILDING FINAL
431 -3670
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
SITE ADDRESS:
BUILDNG PERMIT
INSPECTION RECORD
(Post with Building Permit In conspicuous place)
SUITE NO.:
BUILDING
PERMIT NO.
DATE ISSUED:
PROJECT:
Ciopico
1R300 SnuthrPnter Py Segale Business Park. Building 7E1
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
(INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION PROCEDURES AND REQUIREMENTS
Alt approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - II structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
05/17190
May 23, 1990.
SEGA L E B US /NESS PARK:
Duane Griffin
City of Tukwila
6300 Ssouthcenter Boulevard
Tukwila, MA 98188
Re: Segale Business Park Building 781
18300 Southcenter Parkway
Dear Duane:
The existing roof membrane is a class "B" built -up roof with
a smooth cap sheet. The roof will be repaired with Malarky
specification #NS3 Heavy Duty system with ceramic granules.
Enclosed is a letter from the engineering firm of Engineers
Northwest Inc.,P.S. regarding the additional dead load and
the existing roof structure.
If you need any additional information, please call me at
575 -3200.
Sin erely,
i Alf
/' /,(/
1�. .
`- eve Miller
enc
PA BOX 88050 • TELEPHONE: (206) 575.3200 • TUKWILA, WASHINGTON 98138
NORTHWEST
HWEST
1\
y 25, 1990
Segale Corporation
P.O. Box 88050
Tukwila, WA 98188
Attention: Steve Miller
Reference: 781 Reroof
Steve:
A close examination of the actual loads reveals a surplus
sufficient to carry the new roofing. Original calculations
allowed for a dead load of 10 psf plus the glu -lam. Actual
loads vary from 5.8 psf to 8.1 psf (CO 6" main). Adding
roofing weighing 2.0 psf will bring the total to 10.1 which
when considered with a full snow load of 25 psf results in a
0.3% overstress, well within normal tolerance.
One area has an excessive overload. This being the
intersection of two 6" mains with a heat unit nearby. The
roofing in this area should be stripped for a 16 ft. width x
the truss length. Thus, the new roofing will not cause an
overload in this area.
Sincerely,
obert`"Raichle, P.E.
Vice President
ENGINEERS NORTHWEST, INC. P.S. - CONSULTING ENGINEERS
8889 WOODLAWN AVENUE N.E. SEATTLE, WA 98115 (208) 525.7580 FAX (208) 522.8898