Loading...
HomeMy WebLinkAboutPermit 6103 - RJ Hallisey and Company - WallsAPPROVED FOR ISSUANCE BY: f �`� BUILDING k �L( Y✓� ( � � 1 A, , OFFICIAL DATE: 5 l6 -?0 I hereby certify t I have read and exami d this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating const ction or the rformance or work. I am authorized to sign for and obtain this building permit. SIGNATURE: ,.rs 600s.,., , DATE: I!9 -- I LI -- O. ) O PRINT NA hit E: M - F _ c _ �na CO , , . . ) , . 3 `T! PROPERTY OWNER R. J. Hal l issey & Co. Inc. PHONE 455 -9292 ADDRESS 12835 Bel -Red Road, Bellevue. WA ZIP 98005 CONTRACTOR Johnson Tenant improvement PHONE 462 -5648 ADDRESS 11715 S.E Fifth, Bellevue, WA ZIP 98005 WA. ST. CONTRACTOR'S LICENSE # 11(IHNSTT114R() • EXP DATE 7 - 27 - 90 ARCHITECT N/A PHONE ADDRESS ZIP TYPE OF CONSTRUCTION: - UBC EDITION (year) SETBACKS: _ _ _ A _ FIRE PROTECTION: 0 Detectors ®N /A UTILITY UTILITY PERMITS REQUIRED �❑ Y es ( Q No rouq Public Worial ZONING: BAR /LAND USE CONDITIONS—, OD No CONDITIONS (other than those noted on or attached to permit/plans): CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. `Q ) DATE ISSUED: DESCRIBE WORK TO BE DONE: (D- 14- go Demo walls and build new walls. BUILDU!'3 PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) DESCRIPTION BUILDING PERMIT FEE PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: TOTAL - AMOUNT RCPT N 90,00 59.00 4.50 153.50 7288 7288 7288 DATE 4 -05 -90 4 -05 -90 4 -05 -90 PLAN CHECK #90 -159 FEES PROJECT INFOFlI.1/1TIO 1 .• Ji` I r,-r 7,386.00 12608E Interurhrn Au S PROJECT NAME/TENANT ASSESSOR ACCOUNT # R. J. Hallisev & Co. 000480- 0003 -06 TYPE OF ❑ New Building Li Addition ( � Tenant Improvement (commercial) Li Demolition (building) Li Grading/Fill WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other: COW CO T.11)1 IA TIC F USE -} FLT+, TOTAL SQUARE OCC. SQUARE OCC. FEET LOAD FEET LOAD OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CERTIFICATE OF • , DATE ISSUED: OCCUPANCY N. N vm,a� 1132 BLDG #38 1134 BLDG #38 1136 BLDG #38 1138 BLDG #40 1140 BLDG #40 1142 BLDG #40 1144 BLDG #40 1146 BLDG #40 1148 BLDG #40 1150 BLDG #40 1152 BLDG #40 1154 BLDG #40 1156 BLDG #40 1158 BLDG #42 1160 BLDG #42 1164 BLDG #42 12600 12600 12600 #1/2 12602 BLDG #A 12604 12604 #1/2 12606 12606 #1/2 12608 12608 #1/2 12610 12614 12618 12620 12622 12624 12626 12628 12642 12644 BLDG #3 12660 12830 12830 BLDG #1 12832 12834 BLDG #1 12842 12856 BLDG #2 12860 12864 12866 12870 12874 12878 12886 13028 13028 #201 INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INDUSTRY DR INTERURBAN AV S INTERURBAN AV S 'INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN: AV'- S' INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S INTERURBAN AV S t INSTITUTE OF TRICHOLOGY 575 -3893 *TELEX COMPUTER PRODUCTS, INC QUANTUM COMPUTER RENTALS, INC 575 -0770 APV- CREPACO, INC. 575 -8900 *SOUND SOLUTION, THE SPEIDEL INTERNATIONAL, INC. 575 -4285 BROCKWAY DISK TECHNOLGY 575 -8234 PUGET SOUND BANK (GENERAL SER 223 -7005 *COUNTRY CLUB SALES 575 -3828 *HARLOW, G.H. 575 -3108 *PRINTONIX COMMUNICATION, INC 575 -1085 WARNER - ELECTRA- ATLANTIC DIST. 575 -0190 WARNER - ELECTRA- ATLANTIC DIST. 575 -0190 ENGINEERED FIRE SYSTEMS 575 -3637 PACIFIC ELECTRONICS 575 -1050 *C.V.S. ENTERTAINMENT, LTD. 575 -1139 A.S.I. SIGN SYSTEMS 243 -2020 TUKWILA BUSINESS CENTER BUILD A.& D. CERAMIC & DOLL SHOP 243 -1445 CAMPBELL, H.D. COMPANY 433 -1900 HILL REFRIGERATION CORP. 433 -0983 STAR SERVICES, INC. 241 -8454 OMNITECH 241 -0708 WESTERN GRAPHICS 241 -2526 CO IN , MACHINE ;'SALES” S ;SERVICE.' ;:248 - 2500 A.C.E. SEATTLE WAREHOUSE 241 -6665 GOOD, D.R. DISTRIBUTION SVCS. 433 -0383 DIERICKX, WILLIAM COMPANY 241 -7700 CARRIAGE HOUSE 244 -1512 U.S. BEARINGS & DRIVES 241 -1171 *MEASUREMENT SYSTEMS INT'L., 433 -0199 *MEASUREMENT SYSTEMS INT'L., 433 -0199 WILD WEST SHIRT WORKS 243 -7545 RACON, INC. 241 -1110 SUBURBAN PROPANE CORPORATION 244 -1530 GATEWAY CORPORATE CENTER BLDG WALKER & ASSOCIATES, INC. AEROLIST PHOTOGRAPHERS, INC. 246 -5900 GATEWAY CORPORATE CENTER BLDG GATEWAY DELI 246 -1248 SCHENKERS INT'L. FORWARDERS 328 -5373 WITTCO SYSTEMS, INC. 241-5401 KUEHNE & NAGEL, INC. 244 -5315 PIZZA HAVEN 241 -2990 BOSCH POWER TOOLS (FACTORY SV 241 -2302 J.T. TOOLING SERVICES, INC. 242 -7000 UNIVERSAL HOSPITAL SERVICES 244 -1615 BULL WORLDWIDE INFORMATION SY 431 -0404 KEHLE, DAVID, ARCHITECT 433 -8997 KIDDER, MATHEWS & SEGNER, INC 248 -7300 FIRST INTERSTATE BANK OF WA. 431 -3305 *BOEING CO. (ADVANCED SYSTEMS. 393 -2016 N i c_K o;A d -tc, a i vpa_ 1 a Q ocE)e u r born e \i S -For an (1d(lre. S• M PERMIT NO. • CONTACTED Le w DATE READY DATE NOTIFIED I I __ Q0 lII ! BY: init.) — PERMIT EXPIRES 2nd NOTIFICATION BY: (snit.) AMOUNT OWING 3RD NOTIFICATION BY: (init.) PLAN CHECK NUMBER C I O - 159 BUILDING PERMIT APPLICATION TRACKING PROJECT NAME et CD SITE ADDRESS (a (DoS - Ir Y u rban SUITE.NO. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. BUILDING - q� initial review I i g FIRE Vz- O PLANNING O PUBLIC WORKS O OTHER 04 BUILDING - final review INIT: 4a (R UTED) INIT: INIT: INIT: x , /1 r � INIT:K NSULTANT: Date Sent - a FIFE PROTECTION: ■ FIRE DEPT. LETTER DATED: S • tinkle s Detectors Date Approved - UTILITY PERMITS REQUIRED? [ ] Yes JXNo PUBLIC WORKS LETTER DATED: N/A INSPECTOR: 57 • ZONING: MAR/LAND USE CONDITIONS? f Yes [ No REFERENCE FILE NOS.: MINIMUM SETBACKS: N- S- E- W- TYPE OF CONSTRUCTION: UBC EDITION (year): REVIEW COMPLETED __.._ __ ............... �.,....,......, . ,............. .,., ..,.. (206) 433 -1849 DESCRIPTION" AMOUNT RCPT # DATE BUILDING PERMIT FEE: co. 00 iQw L t . " - `10 - • APPLICATION n -�u T QE FILL ED OUT COMPLETELY PLAN CHECK FEE ' 59.00 BUILDING SURCHARGE L1. ENERGY SURCHARGE OTHER: :TOTAL '1F:rij" \J ' . `..l SITE ADDRESS SUITE It 1''o � j1rr+QrLtC b n n Hue . S, ?)Idg,0 VALUE OF CONSTRUCTION - $ 7 3 `d ( , 00 ASSESSOR ACCOUNT # 000L/ ?0-rpoo '3 * 0& PROJECT NAME/TENANT R,, \- n(1j•,c\I t Co.InC, sod 0150-, _ TYPE F New Buil ing Li Addition Tenant Impro ment (commercial) U Demolition (building) WORK: ❑ Rack Storage 0 Reroof ❑ Remodel (residential) ❑ Other DESCRIBE WORK TO BE DONE: _ \���Yr\o ,�c V1«i ICI )VeGO 1A)caI1,3 BUILDING USE (office, warehouse, etc.) C c1CN_ (,Oel re kOC,15C'- NATURE OF BUS / i .� no C C . L C� S Q CF � I .t 4ct f �. R {' r '� �', l WILL THERE BE A CHANGE IN USE? ( U Ye& IF Y S, EXPLAIN: SQUARE FOOTAGE - Building: LI G 5 -00 Tenant Space: y6 Area of Construction: /6. R S WILL THERE BE STORAGE OR USE 6F FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? YNo ❑ Yes IF YES, EXPLAIN: PROPERTY OWNER \ , O 1 1 c .)e� ,&- Co 1, (lc , PHONE Lis _ 9 ADDRESS '�2i ' I � 2d ZIP c ?oo CONTRACTOR ,)nh , nsoA "C.0 , -, rx,1� - 1 - yi U P Ill ev'l� PHONE e-- 169 - 56/ - ADDRESS ) 1 5 5 5 `__ l 1 e.Vu e ZIPS 00s WA. ST. CONTRACTOR'S LICENSE # Jok 1'\ I ! LI 0 EXP. DATE - _ cz _ 90 ARCHITECT PHONE .,._ ADDRESS ZIP I HEREBY CERTIFY THAT I HAV D AND EXA E1 IS APPLICATION AND KNOW THE: SAME TO BE TR UE AND • AND) ; .AU; ORiZED /" P - Y OR is PERMIT BUILDING OWNER OR AUTHORIZED AGENT Ar ` " �� �, Or fT►1014//p/;1 �� DATE Ll ^ - �� 13 ' ' ' ME a _ PHONE L>'Lo���(641'8' S d igairlar - CITY /ZIP 1 1e Uu PHONEL/ a _5.6L /u CONTACT PERSON II I C.- P .. N. l »;r?Y1 CITY OF TUKWILA Department of Community Development - Building Division DATE APPLICATION ACCEPTED BUILDW a PERMIT APPLICATION FEES (for staff use only) APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 433 - 1851 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will he reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION EXPIRES 03'30/89 $p�aNiattlo��' l3truotu►af ::cedailations! ate . u dl>!yparch • submltW requlrerrrsnta RACK STORAGE:: NOTE: Include dimensions: of racks (het wldd and exit ways on plan Structural calculations stamped by a V1(ashin engineer (rack storage ; S and over); :::::;;. ; >: RESIDENTIAL NEW : . SINGLE•FAMILY; DWELLINOS/ADDITIONS Completed building permit application (one for each structure Leg descript on Assessor Account Number Two sets (2) waking drawings, which incii • Site plan •.Foundation plan • Floor ;'. Roof plan • Building. elevations (all, views • Building Cross-section":::.:. :• Structural framing plant Washington State Energy Code data Completed utility permit application Six. (6) sets of site plans showing utilities NOTE: Building site plan and utility site plan may be combined See': utilky permit application and checklist for specific submittal requirements.: Addbonal topographical and soils information may be required if unique • site . condi/ons.: Sly- 3MITTAL CHECKLIST Washkipton eon State:.lioa mn Stata structure COMMERCiAL TENANT IMPROVEIA Compfafetl building permit appiica removed, an HER omple Jed. buildinp p t+ppgcstion • Assessor Account Number • - Namttive describing existing: roof, m ateriel being • • - mater being : insta l led, NOTE 'A certification letter le rsqui prior ro final Tri oll.of th. RESIDENTIAL REMODEL Completed building permit application Assessor Account Number Two (2) sets of working drawings,which incl r°43•"5 : s, s showing wall construction an meth . attaeh for' foam ai ce trudurei calculsdans stam by a Washing State gors ng ineer mad: b regUwed if stru work. # .to be gone (2 se rill any uti lrty work is ks bane, sub it s eparate utiilty pe ri idon artd r -- •. Site plan Foundation plan .Floor plan ': Root plan Building : elevations (all views Building cross section • Structural freming NOTE: If any utility work is to be, d one provide :util* permit application and plans must be submitted : REROOFS Completed building permit application (one for each structure)- Assessor: Account Number.: Narrative describing existing roof material being removed, and material being installed NOTE. A certification letter Is required prior to final Inspection and sign Off of the mlt P . . ,,,.. u_,,,,...,.. w............ .,.._n.w...aeaunurcaaxxw.a,„,.. ai,.,t...mv :s +rte.... ......... ....•d r.. wn....,............. a. ....krtatFtYFS:IYSR:.".58YtSL'k C'C't 4% INSPECTION RECORD PERMIT # CA: l 0 Date In — r `_' 9 O Type of Inspection rag] i nC t (0 Date Wante;� �: I /— l a a.m. Site Address -� V U.�,(./� /'I` Project � i 1 e. Requestor 1 rn J(W n SQY7 Phone # ` D C - WIMPY Special Instructions Inspection Results /Comments: CITY OF TUKWILA Buildin opartment 6300 So ►nter Boul Tukwila N 98188 (206) 431 -3670 Date /6-'- CITY OF TUKWILA 6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check 090 -159$ R. J. Hallisey & Co. Inc. 126088 Interurban Av 8 PHONE # (2061433.18(10 Gary L. VanDusen, Mayor THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER (plQ9 • 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4732). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872- 6363). 4. All mechanical work shall be under separate permit through the City of Tukwila. S. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 7. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 8. Validity of Permit. The issuance of • permit or approval of plans, specifications and computations shall not be construed to be • permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. "X" REQUIRED INSPECTIONS PHONE AP DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 433 -1849 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433 -1849 4 Shear Wall Nailing 433 -1849 5 Roof Sheathing Nailing 433 -1849 8 Masonry Chimney 433 -1849 x 7 Framing 433 -1849 8 Insulation 433 -1849 9 Suspended Ceiling 433 -1849 x 10 Wall Board Fastening 433 -1849 11 12 13 14 FIRE FINAL Insp: 575 -4404 15 PLANNING FINAL 433 -1849 18 PUBLIC WORKS FINAL 433 -0179 X 17 BUILDING FINAL 433 -1849 (INSPECTOR COMMENT SECTION ON REVERSE) ITY OF TUKWILA BUILD; G PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 SITE ADDRESS: 12608B Interurban Av S SUITE NO.: BUILDING CO ERMIT NO. l,i� I O�J DATE ISSUED: (0-1 - Rti PROJECT: R. J. Hallisev & Co. Inc. CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - Atter framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17, FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. ,4,2.,.. 'X• REQUIRED INSPECTIONS '. 1 Footings � 2 Foundation 3 Slab andlor Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 8 Masonry Chimney Z 7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening 11 12 13 14 FIRE FINAL Imp: . 15 PLANNING FINAL 18 PUBLIC WORKS FINAL )(1 7 BUILDING FINAL PLAN CHECK NUMBER C tb - (Sc PROJECT: 4- A I s 1141 FOLLOWINS COMMENTS APPLY TO AND INCOME PART OF THE APPROVED PLANS UNDER TUKWILA SUIL01111 PERMIT NUMBER f[ yf No changes will be lade to the plans unless approved by the i�.� Architect and the Tukwila Pudding Division. 'V Plucking permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including ail gas piping 1216- 4732). Electrical permit shall be obtained through the Washington State Division of Labor and industries and all electrical work will De inspected by that agency 1872- 6363). mechanical work shall be under separate permit through the City of Tukwila. 0 O All structural concrete to be special inspected (Sec. 306, UDC). O Alt structural welding to be done by 11.4.8.0. certified welder and special inspected (Sec. 306, UDC). 0 All high - strength bolting to be special inspected (Sec. 306, UDC). 8 Any new ceiling grid and light fixture installation is required to seat lateral bracing requirements for Seismic lone 3. t1 Partition walls attache.. to ceiling grid must be laterally braced if over eight 101 feet im length. 12 Readily accessible access to roof counted equipment is required. 13 Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. An y exposed insulations backing satertel to have Fleet Spread Rating of 23 or lees, and material shall bear identification showing the fire performance rating thereof. 1' Subgradi preparation including drainage, excavation, compaction, and fill requirements shall confers strictly with recossendetions given in the soils report prior to final inspection Isee attached procedure.). le to A11 food preparation establishments must have King County Health Department sign ■off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by cailing King County Health Departeent, 296 -4717, at least three working days prior to desire inspection date. On work requiring health Watson! approval, it is the contractor's responsibility to have a set of plans approved by that agency on the Job site. 1 9 Fire retardant treated wood shall have a flare spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. ZO • Notify the City of Tukwila Building Division prior to placing any comcrets. This procedure is in addition to any requirements for special inspection. 21 Il permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely canner. Reports shall contain address, project name and permit nuaber of the project being inspected. A statesent from the roofing contractor verifying fire retardancy of rook will be required prior to final inspection (see attached procedure). Al l construction to be done in conformance with approved plans and requirements of the Unifors Sui doing Code 11988 Edition), Uniform Mechanical Code 11918 Editionl, Washiggton State Energy Code 11989 tdit$onl, and Washington Stool Regulations for barrier Free Facility 11989 Edition). All spray applied fireproofing as required by U.S.C. Standard No. 43 -0, shall be special inspected. 22 All rood to regain in placed concrete shall be treated wood. CO All structural sasenry shall be special inspected per U.B.C. Section 306 tai 7. Validity of Permit. The issuance of a permit or approval 01 . plans, specifications and computations shell not be construed to be' a perch for , or as approval of, any violation of any of the provisions of this code se of any other ordinance of the juvis$etlen. No permit premising to give authority or violate or tilneff the pegvlslpnm Of this sea, shall be valid. Plan Revkw PROJECT ADDRESS DATE OCCUPANCY GROUP _ 2_ ©FF(c.e. WA2x TYPE OF CONSTRUCTION _. - ' �pCt.t 1/47 den LOCATION ON PROPERTY BUILDING HT. / NO. STORIES ----LIP FLOOR AREA S000 G OCCUPANT LOAD .MR_.__•• EXITING REQUIREMENT5 TQ B. E E�'E4�M /llE� I.SIT 1 C R.' . 04)l.LLsEy l 2. IN-ct- rQ..6 4Q_ S. DETAILED REQUIREMENTS 1 OCCUPANCY._.,..,.._ ■ /A TYPE OF CONSTRUCTION._...._._. Q �........___.. PART V, CHAPTER 23, U.B.C. U,L _. _WS_E.C. CHAPTER 51 -10, W.A.C. NOTES: __,,,, C ∎ Ca =!-} t S 1 • CITY OF TUKWILA DEPARTMENT OF C OF.VE'L()I'M/' NT nrcanarecl by! PLAN CHECK NUMBER • `ru�L IL C tUAnN»Y2 G . 1� �1 D I( /) sv� 4- PROPERTY OWNER R ,l . Hal l i ssey & Co. Inc. PHONE 455 - 929 2 ADDRESS - ZIP .. CONTRACTOR Jnhnson Tenant improvement PHONE 46 -5648 ADDRESS 1171__5 S-.E� Fifth B 1levue- WA �Z1P 981405 WA. ST. CONTRACTOR'S LICENSE # (ll]HNSTI114Rf1 EXP. DATE 7 - 27 - 90 PHONE ARCHITECT N/A ADDRESS ZIP TYPE OF CONSTRUCTION: I I a UBC EDITION (year) SETBACKS: N - 4_ E - W - of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of FIRE PROTECTION' '� S • rinklers 0 Detectors M N/A UTILITY PERMITS REQUIRED Yes it7 N o (through ... , • ,_ ZONING: BAR /LAND USE CONDITIONSOyes Q No CONDITIONS (other than those noted on or attached to • rmit/plans): APPROVED FOR ISSUANCE BY: _ ,�_, I BUILDING OFFICIAL DATE: r . I hereby certify that I have read and exami this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws ' regulating const ction or the rformance or work. I am authorized to sign for and obtain this building permit. SIGNATURE: .t,-i I DATE: LD -- I LI — ° 1 U PRINT NAME: �M►tLaS �(14)->;c413 COMPANY: ..__c., 14k.):c3,._ - CITY OF TUKWILA Department of Community Development • Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING (C r � PERMIT NO. DATE ISSUED: (n- I u go PROJECT NAME/TENANT TYPE OF Ii New Building WORK: 0 Rack Storage 12608B Intern DESCRIBE WORK TO BE DONE: USE CERTIFICATE OF OCCUPANCY NO. Addition 0 Reroot rhan Av S BUILDII a PERMIT (POST WITH INSPEI. t ION CARD AND PLANS IN A CONSPICUOUS LOCATION) 90.00 59.00 4.50 7288 72$$ 7288 4 -05 -90 4 -05 -90 4 -05 -20 DESCRIPTION BUILDING PERMIT FEE PLAN CHECK FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: TOTAL - PLAN CHECK #90 -159 U I V I. ■ FEES AMOUNT RCPT • 153.50 PROJECT INFORMATIOr 7,386.00 ASSESSOR ACCOUNT 1 000480-0003-06 DATE Q3 Tenant Improvement (commercial) ■ Demolition (building) ❑ Grading/Fill ❑ Remodel (residential) 0 Other Demo walls and build new walls. CODE COMPLIANCE 4 FLd7XA 4 SQUARE FEET TOTAL SQUARE FEET SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD I OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEZ TOTAL OCC. LOL1p This permit shalt become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. A ISSU 0: valitdow R.: HALLisEy $Co. 5PCoiD3 \ ) •',.• • 7", \ f 1 )II , • I II I ••••., . ',/ ` I / C. r 1 LAI [Irk! I BG 12 9Z GZ 4 7Z CZ ZZ OZ 6L t i ' Pt I " I (IV;!, /rii,q I , ... 1'fl'1IrF I' 'r 1 ...... ,,,,1,,,,„ o ,III THS INCH 1 2 3 4 5 6 7 8 i FLEXIBLE RULER -302 AWaanmANY_ H oc 6 Z 01. o I I [ In 11, V I /1.r/\'' r7 1;2 (cr.. 1 ,11 <7/ 1/1A1-1/ 14-) 11/ 60(10 61, MAL117/2/2K --- FILE COPY I. •••■■•■• Ice)& iddiCuMALI 0 c\.1,e -nil coreploec. 61,r2c 1\c5•t.a 1 I understand that the Plan Check approvals are subteci to errors and omissions and approval of plans does not authorize the violation of an adopted code or ordinance. Receipt of con- tractor's copy of 4ipproved plris acknowledged. By Date Permit No # - - (1) \ 03 1\ln,1 n I--, t k • r N;In:;‘ (;• , ri,re/.1.•:,.. 4 HAIL II iV iKk7011 IOC) r7 c eaTi Pt CO TS" PP de-cc-IPA c LtLL _ Nal a•ts lsL) 4DfL "rt+ks I ;"- IF THIS MICROFILMED DOCUMENT IS LESS CLEAR THAN THIS NOTICE, IT IS DUE TO THE QUALITY OF THE ORIGINAL DOCUMENT Yr! I; r tir r/ 7 or /i IT] 1,i; 011 I (III I I1' \[1,, rIrld 1\1 r:I ff r/.1- I I: r -revs Mat - eLEIGTEtc.tiL- 1 ,Aecii It \CAL pLwAskt-A - I I , I , I. TAI C ats 4A) it ri:Nte / c RECEIVED CITY OF TUKWILA APR 0 5 1990 PERMIT CENTER