HomeMy WebLinkAboutPermit 6160 - Stockton Residence - GarageRobin Stockton (PHONE 243 -0880
ADDRESS 14435 42nd Av S Tukwila
ZIP 98168
CONTRACTOR Owner
`PHONE
I
ADDRESS
ZIP
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT
PHONE
ADDRESS
ZIP
CITY OF TUKWILA
Dept. of Community Development- Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDIt'3 PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
B. ILDIN C :PERMIT<
PLAN .CHECK
UILDING UR HARGE D
BUILDING � / / ^
PERMIT NO. �v (J
DATE ISSUED:
8/- -qe)
SIT
14435 42nd Av S
PROJECT NAME/TENANT Robin Stockton
PLAN CHECK NO.: 90 -300
i
4,562.00
ASSESSOR ACCOUNT # 004000 - 0231 -
TYPE OF O New Building U Addition U Tenant Improvement (commercial) U Demolition (building) U Grading/Fill
WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
Construct 24 x 24 Garage
( :o[)f c'c>UII'I'AAmd('f
USE
TOTAL
SQUARE
FEET
SQUARE
FEET
OCC.
LOAD
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC, LOAD
TYPE OF CONST.: VN USC EDITION (year 1988
FIRE PROTECTION: OSprinklers 0 Detectors n N/A
ZONING:
CONDITIONS (other than those noted on or attached to permit/plans)
I APPROVED FOR
ISSUANCE BY:
SIGNATURE: 1�
PRINT NAME:
DATE: / 0
\ o.P r Al � . nk i c► c1 COMPANY: OCl) l F
This �ermit shall become null andvoid if the: wo !s not;conmeiced filth n
issuance, orif thework is suspended or abandoned for a period of 180 days fro
..... : :..
I CERTIFICATE OF DATE ISSUED:
OCCUPANCY NO. Al LA
A A._)
SETBACKS: N - 43.5 S 7.5
BUILDING
OFFICIAL
DATE:
- y()
E— 84' w— 10'
UTILITY PERMITS REQUIRED? oyes ®No (through
BAR/LAND USE CONDITIONS? Pubtia orksl
N
0 Yes 0 No
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lave
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
X Olt . • . • e l
PERMIT NO.
CONTACTED 1n -
ltrn r
D ATE READY
,'
DATE NOTIFIED
BY:
(init.)
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(Init.)
AMOUNT OWING
( JZ
3RD NOTIFICATION
BY:
(init.)
PLAN CHECK
NUMBER
BUILDING PERMIT APPLICATION TRACKING
PROJECT NAME
Rmbi n
SITE ADDRESS
149 �.� � { � P i S
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker) eX Ni/4.
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL OCCU-
PANCY LOAD
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
.....SPA
R' .t'M►IEH: •
. T:..
AM BUILDING -
initial review
,FIRE
PLAN ING
kit
O PUBLIC
WORKS
O OTHER
7 -
inal review
TE.
1-11-90
`7-27 -1D
- 7-27-90
'7-V7-90
(ROUTED)
1 o--*u
INIT: 1.
7-07-
INIT:
INIT:
INIT:
- 81 -1v 7 - 31 )
Vi"
INITr
CONSULTANT: Date Sent -
Date Approved -
FiRE PROTECTION: (] Sprinklers f 1 Detectors (1 N/A
FIRE DEPT. LETTER DATED:
/f n Latc c: ),43 v) Ue)n /ht gi
ZONING:
INSPECTOR:
1BAR/tAND USE CONDITIONS? f Yes fJ No
REFERENCE FILE NOS.:
UTILITY PERMITS REQUIRED? Yes
PUBLIC WORKS LETTER DATED:
"TYPE OF CONSTRUCTION:
QBC EDITION (year):
/968
REVIEW COMPLETED
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
/11'l'L IC/' TION 111(1,`:;T EH
HI I F- T) OUT COIIiRL E TEL
SITE ADDRESS
PROJECT NAME/TENANT
Tors on/
TYPE OF New Building Addition
WORK: Rack Storage 0 Reroof
DESCRIBE WORK TO BE DONE:
SUITE #
PROPERTY OWNER fc oR !i Kr , S 77,0.-1<1.---e)
ADDRESS RP/3S' e/aNn 41/6 S.
DATE APPLICATION ACCEPTED
- 90
BUILDIN PERMIT
APPLICATION
AMOUNT.
? ot •
. •DESCRIPTION
UILDING' PERMITFEE
PLAN CHECK ;FEE
UILDING'!•SURCHARGE
ENERGY.
TOTAL»
RCPT:; 0
DATE :;: •
. `8 8'
ASSESSOR ACCOUNT #
ooy/000. o ;f —n3
U Tenant Improvement (commercial) U Demolition (building)
O Remodel (residential) 0 Other
Cr��s; Rtlr ,
o v - a y X i9
BUILDING USE (office, warehouse, etc.)
1 � R1 1JArt - 6.4,PA(; E'
NATURE OF BUSINESS:
WILL THERE BE A CHANGE IN USE? GICIO Yes IF YES, EXPLAIN:
FEES (for staff use only)
VALUE OF CONSTRUCTION - $
/ op
SQUARE FOOTAGE - Building: 9. q f' T . Tenant Space: Area of Construction:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? 0 No 0 Yes IF YES, EXPLAIN:
(PHONE ,z¢3 _ ff so
°CONTRACTOR OW (QY"
ADDRESS
TUK JitiA- / 1i).4 .
WA. ST. CONTRACTOR'S LICENSE #
ARCHITECT
PHONE
ADDRESS
ZIP / �
ZIP
EXP. DATE
PHONE
ZIP
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete In order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
nommunity Developm9nt prior to application submittal. Contact the Permit Coordinator at *133 - 1851 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of W ,shl; igton, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations: The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 433 -1849.
DATE APPLICATION EXPIRES
1 - 1-90
BUILDING OWNER
OR
AUTHORIZED
AGENT
CONTACT PERSON
SIGNATURE
0319/19
COMMERCIAL
ng t H r 03d1on
SUS:00 Nuni
ear Account .NO
Ot
a unt Numb�i
CO uctlOf
........:.:...... .
truotlonatyb;
attNdi
a:Aocaunt'a.___..
initdlled. ><`
On Steto N con
RACKS
'end
RESIDENTIAL
QLEfAMILY DWELUNGSIA
f _
SUBMITTAL CHECKLIST
.C.o..hP k.Is:cI
GonlN`i;
nxa. <ai
'oft :Of
pla
i.000.ei.0.0000 I
a Inittigv
TO:
PROM:
DATE:
SUBJECT:
City �f Tukwila
6200 Southcenter Boulevard
Tukwila Washington 98188
(20$) 433 -1500
Gary 1. VanOusen, Mayor
MEMORANDUM
vn ) I °
V e e _ e . , Col C
U al v.2._ c* b d
on S■vetvc for Qpri1, 1°'0.
6 m
PLan Chuc.1e,
(10 /T2.MEM0)
PROJECT: , / 2� ` 5/O r ,, k 7�,:--
PERMIT NO.
6 /6-'0
SITE ADDRESS: /4'e, ,� ,S - dr .ie sp
DATE CALLED:
TYPE OF INSPECTION: //'�5 -, e
DATE WANTED:
-- 2 7 1:5
SPECIAL INSTRUCTIONS: 4.�',L< 2 : c z)
REQUESTER:
PHONE NO.:
INSPECTION RESULTS /COMMENTS 0 k
c
! -
INSPECTOR: /( (,(.,,c..rP . -- 2,, -4'4-0-)
DATE: (
.-- 27—
5 /
MT OF TUKWIu
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
V
PROJECT: 54 C.G `) ) ( b 1 L
PERMIT NO. 6 / Ca Q
SITE ADDRESS: /4 3S 4 7 A t/E__ S
DATE CALLED: 0 7 — 7 - 91
TYPE OF INSPECTION: F -tt f `11 t
d
DATE WANTED: -- i — C l/ W
SPECIAL INSTRUCTIONS:
J
REQUESTER: I + A/
PHONE NO.: c:2 3 'HO
INSPECTION RESULTS /COMMENTS:
.,.. -, / ...2, r r "(,. , r,,K �.-„� ,, -.
,�
, ,
/ —
._ P177 DATE: '" _/ --
fs`i'G9:dA.1'. del'• uNCSnantn !KC>nru.:a.,:*+�r.s.RV,;,: van .s. w. xan»:. �. u. w�...» �.... «....,.,..........�,...........
CITY OF TUKWILA
Dept. of Community Development - Building DhMision
Phone: (206) 431 -3670
INSPECTION RECORD
6300 Southcenter Boulevard - #100
Tukwila Washington 98188
CITY OF TUKWILA
Buil Department
6300 .hcenter Boulevard
Tukwila, WA 98188
(206) 431 -3670
IV
Type of Inspection -6 1 Ft, -load(/` Date Wanted 1i- qo
Site Address /K4 ?, ? i jA/ 5. Project 41 D
Requestor '' 6 6/L47j1`., , Phone # 2 3 -aggO
Special Instr ctions
+o V
Inspection Results /Comments:
Inspector .0/24 —
INSPECTION RECORD
PERMIT # � .1 / (. O
........... .�............n•vr.Hr.+w.rnw.n. wcr.in aet. ins.' 1' tifYiT,. Y: biFF. AiJx.`. atVd.' CY% ttSYirL4C��S..+ atLVifYd :{4xR+.U.'Yat�C.tiyfSYL-h
Date - / -qo
A /2‘ii
Date
.m.
pR rev 5c D
RA r L -
.�1
Aftrffic
D
cLE METcR
l ei` {E rviY
CITY OF TUKWILA
APPROVED
r .
I
Yq
rEp10E AiAJE
BUIL ING DIVISION
•
"X"
REQUIRED INSPECTIONS
PHONE
AP DATE
PROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
X
1 Footings
431 -3670
X
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
I
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
X
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
•
10 Wall Board Fastening
431 -3670
11
12
13
14 FIRE FINAL insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
X
17 BUILDING FINAL
431 -3670
!INSPECTOR COMMENT SECTION ON REVERSE)
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
SITE ADDRESS:
14435 42nd Av S
SUITE NO.:
BUILDING
PERMIT NO. Is ((00
/�,
U
DATE ISSUED:
DATE ISSUED:
PROJECT:
Robin Stockton
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION • When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
3. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
3. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11,
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
BUILD'1G PERMIT
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
INSPECTION PROCEDURES AND REQUIREMENTS
Plumbing (including gas piping) - King County Health Department - 296 -4732
Electrical Washington State Department of Labor and Industries - 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses. 0S117,90
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 911188
Plan Check #90 -300: Stockton, Robin
14435 42nd Av S
PHONE # (206) 437.1800 Cary L. VanI)usen, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME FART61VTHE APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER Ly
1. No changes will be made to the plane unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and
all electrical work will be inspected by that agency
(872- 6363).
3. All permits, inspection records, and approved plans
shall be posted at the job site prior to the start of
any construction.
4. Engineereed truss drawings and calculations shall be on
site and available to the building inspector for
inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer.
5. All construction to be done in conformance with
approved plans and requirements of the Uniform Building
Code (1988 Edition), Uniform Mechanical Code (1988
Edition), Washignton State Energy Code (1989 Edition),
and Washington State Regulations for Barrier Free
Facility (1989 Edition).
6. Notify the City of Tukwila Building Division prior to
placing any concrete. This procedure is in addition to
any requirements for special inspection.
7. Validity of Permit. The issuance of a permit or
approval of plans, specifications and computations
shall not be construed to be a permit for , or an
approval of, any violation of any of the provisions of
this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or
violate or cancel the provisions of this code shall be
valid.
"X"
REQUIRED INSPECTIONS
0
1 Footings
2 Foundation
3 Slab and/or Slab Insulation
4 Shear Wall Nailing
X 5
Roof Sheathing Nailing
8 Masonry Chimney
X 7
Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
11
12
13
14 FIRE FINAL Insp:
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
>17 BUILDING FINAL
PLAN CHECK
NUMBER
( PROJECT: - 0431k1 STUGt
THE FOLLOWING COMMENTS APPLY TO - ND BLCOO PART OF THE APPROVED PLANS UNDER
TUKWILA BUILDING PERMIT NUMBER__
No changes will be made to the plans unless approved by the
ItLLV+'''���- ///+"'��� ---/// Tukwila Building Division.
O 2 Plumbing permit shall be obtained through the King County Health
Department and plumbing will be Inspected by that agency,
including all gas piping (296 - 4732).
0
Electrical permit shall be obtained through the Washington State
Division of Labor and Industries and all electrical work will be
inspected by that agency (872- 6363).
O 4 All mechanical work shall be under separate permit through the
City of Tukwila.
All permits, inspection records, and approved plans shall be
posted at the job site prior to the start of any construction.
O 6 When special inspection is required either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment
of the inspection agencies prior to the first building inspection.
Copies of all special inspection reports shall be submitted to the
Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being
inspected.
O All structural concrete to be special inspected (Sec. 306, UBC).
O All structural welding to be done by W.A.B.O. certified welder and
special inspected (Sec. 306, UBC).
O 9 All high - strength bolting to be special inspected (Sec. 306, UBC).
O Any new ceiling grid and light fixture installation is required to
meet lateral bracing requirements for Seismic Zone 3.
11 Partition walls attached to ceiling grid must be laterally braced
if over eight (8) feet in length.
Readily accessible access to roof mounted equipment is required.
0 Engineereed truss drawings and calculations shall be on site and
available to the building inspector for inspection purposes.
Documents shall bear the seal and signature of a Washington State
Professional Engineer.
14 Any exposed insulations backing material to have Flame Spread
Rating of 25 or less, and material shall bear identification
showing the fire performance rating thereof.
O Subgrade preparation including drainage, excavation, compaction,
and fill requirements shall conform strictly with recommendations
given in the soils report prior to final inspection (see attached
procedure.).
16 A statement from the roofing contractor verifying fire retardancy
of root will be required prior to final inspection (see attached
rocedure).
Aar
II construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washignton State Energy Code (1989
Edition),
F -aei'i i t-y 4
O All food preparation establishments oust have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made
by calling King County Health Department, 296-4787, at least three
working days prior to desire inspection date. On work requiring
Health Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
19 Fire retardant treated wood shall have a flame spread of not over
25. All materials shall bear identification showing the fire
performance rating thereof. Such identification shall be issued
by an approved agency having a service for inspection at the
factory.
lAerf Notify the City of Tukwila Building Division prior to placing any
concrete. This procedure is in addition to any requirements for
special inspection.
21 All spray applied fireproofing as required by U.B.C. Standard No.
43-8, shall be special inspected.
O All wood to remain in placed concrete shall be treated wood.
23 All structural masonry shall be special inspected per U.B.C.
Section 306 (a) 7.
Validity of Permit. The issuance of a permit or approval of
plans, specifications and computations shall not be construed to
be a permit for , or an approval of, any violation of any of the
provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or
cancel the provisions of this code shall be valid.
Plan Review
PROJECT
ADDRESS 144
DATE Z £t IU
OCCUPANCY GROUP
TYPE OF CONSTRUCTION UN
LOCATION ON PROPERTY Ot K t aCi, 5A tiDta WAIL F R n pC�S
BUILDING HT. / NO. STORIES
FLOOR AREA 37(o `J
OCCUPANT LOAD "Y
EXITING REQUIREMENTS L - 10 C7,1 -tf roza nc..
_ CQL( t,2 6-444 ` (91*
DETAILED REQUIREMENTS
OCCUPANCY
TYPE OF CONSTRUCTION 01 K.
PART V, CHAPTER 23, U.B.C. (Di K
W.S.E.C. A UN
CHAPTER 51 -10, W.A.C. IVA
PLAN CHECK
NUMBER
9o-- - 5oo
CITY OF TUKWILA
DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by:
PLANNING DIVISION
Study the plan thoroughly. Be sure.tu check your local building code
requirements and, if required, obtain"a building permit.
Plan the placement of the garage un your lot to conform to local code
requirements :arch es side and rear tut sal- hacks. Allow enough room for
easy entrance, axit, or if possible a turn - around.
We do not suggest
p ouring the concrete yourself. If concrete is poured by
a contractor, omit steps below and Start project at "Frame construction.
Stakruul the area '1s., ill.u.,!rated. -'•e sure 'all corners are square.
Remember that On 'plan are' to Outside of concrete and t'i face
of stud. foundation Plan.) Usr., details for either NO FROST OR FROST
CONSTRUCTION depenitiny on your geographical area.
Build form:, tor the concrete ,Sing 2" lumoer. Set the tup';of 2" firm
buard desired tient. height level it • bride J, ace f,f form boards
lines" must fine 'Up"extretly with "string set it proper biiildiny iJimen:,iens.
`
•
Urace securely. This is very tnpurtant to koep forms from pushing out
When concrete - is poured.
Use a gravel till and coniliai:t "to within 4" Of the to of forrn boards.
LET IN 1X4 CORNER BRACING:
HEADER:
• Call l ui ldinq inspector to chCck lucat ion and trenches bet Ore pouring
"Caner'et
NutE• At'Lae�ttwo :l %2 "diameter Jr )4y reinforcing' bars u1 perimeter
makas'a better fuuirdation. Use wire mesh to flour slab to minimize
"cracking.
Have leca1 electrical ccetra
ctur install conduit under slab for electrical
sere ice.
Your e jh Ike` Ur - x nicer rt: t r• to a...mp h:l e l y I i 1 1 l h,: (ui ii s. ';re take and
level with a luny straight Lu„td .,n•1 t t owes its i i t:i.+lit.
Set am Beet bOI s 4. 1.. f IJhd.4 t. lac. j. ( i' 1 t,. t t . w ,Lp: e:i 1) It t _te and
eA1t.r ■1 11::0.1.4t 2 112" auOv r- .'I CCtt: JurJ .n.ta.
FRAht`Cl1NS IRON iION:
After Concrete has .et, place it ••led 2.4 buttam plate un lop of bolts with
edge uI 2:.4 flush with l "Il.'tale I.u,• of i 4fld till H'i tri %, t.inmier over
each bolt to : n',te ;,ubitiun ut .i;,lt u,h l.. I:r i tt d 1 2" hull: in bottom
Plate to tit ei'.ei belts. 1'h,ck i: "placing " +,4 plate over bolt:: and be ecru
that edge: of 2x4 is t I%;.t+ with t:i:•e •,t (:• :te.
NUit: the warts may Le laid out i :i als least two 'panels each. This hos been
dune tut• ease of handling the pre- assenlEtcd walls.
Let -lt, - 1 +4 br.., t at•o tJCat ..( :a aj t end: uf the u 1l Iri t'•4 is
placed un the face et 'the wig) : 01 .,t+Nru >i.r.,ert +, ' ije..{rce
and may be held ut' Locked (railed le :riparar,l,.! in pl:,te while )ui,mark
t:, IJCetfons . each stud race. xiriel plates. the rafts is made 6,'
e),utttur
i .. into the studs and plates eith y 'w
our i Jrci,lar puer a.1a. Cut
intu +:tud 5,/4•' ,,t .oath murk. A Chisel and hammer knock tat the
litete u: wood leaving 4/4" ri 1).10 . you putt: Ile l ••r"
CO[uer brulx•. `eat( .,ith two b',Aso nails at each -.tad and plates.
Repeal ;wile proceJure for all , .,i11 panels.
Now that inu have the wall pinels assembled you can start the erection
of the r.ati't lilt up panel and '„1ace 1t in position user the anchor
bolts. Brace poi securely with 2"x4" 's• Nail brace to a "stake secured
to the gioun'. . "lace .+asher and out on anchor bolts and tighten down panel.
Follow sane: procedur: fur air r' ia,
As panel) ;re- erected you can add the 2 " panel tie plate as shown on
wall fraintny :level tens. stall tit: Plates with 16 penny nails 16" U.C.
C' y door header to lima:(. (Header is posit Tuned after w<,il is
Nall 2 "x A
4" cripples et each side of door c•pening• Lift tt header
position, rest it" :on the cripples; and nail its to studs
nails. Noil the:.hurdware surround to face of cciliipr e
door jamb detail). '
Add 2 "x4" tie plate to top of remoining wall panels.
RAFTERS:
lay rafter ties approximately 4' -0" O.C. across top platlat
nail in place.
into
using 16 penny
Date
1 SEPARATE
____PERMIT AND
APPROVAL
REQUIRED
0 penny nails,
�iemporarily place 2x4 bracing under center liuint of tie:, 6 secure
stable platform on whit :h'lu work to install tatters wid1(1 ri;lgr•
(Cutting rafter:; is simplified by following the rafter J diagram provided
n the plan. Layout and cut tau ratters to size and sett to pla„.„ to
check tneir accuracy.. (Oft sure to use the same rafter a: as a ptirn to
ntakeall additional rafters).
Erect and "tank -unit" the end rut ters in place and bra_ ire tpropnrart1y. About
ten ur;lwelve' feet from tha •.)able end tract d Fecund et of rafters.'Sltp
the 'ridge' bo: :rd into posit i o n 'ani support it at each enr, nd.with a 2 "x4" stud.
,.• ..ore rid t: board is level :l ;and the t•aFter , are
P lumb ' The t remainin .,,.
be
ratters: can now be put in place, before nailing the ratt fter ties in place,
we suygesl that you etteck your dour hardware, mant nufataurers instruc-
tiun as well i. y aului.atic garage door opener uist! truction' for
the minimum clept'ance required from the top of the y door opening
"la the bottom of the rafter firs• It may requite. that ti the fires two
rafter lies at the front of the garage be set above the p top plate in order
to yuin the clearance: required.
Nail 2x4 outriggers st 48" 0.C. per details stfown on altln
ail ei:antc hurricane ,1 flocs to ti end bottom piate:• 9t 5 " n.C.
iur :.paci:d as required by c with r -i l':• pruv idea It t .1 AU'`•
Add 2x4 gable stud:., :)atria end bluckine, "2x4 nailer, anrtd an
v ether
!rummy necc:+:.ary, d5 shown un plan. '
'Jit,ly 1,'2" r 1ywuod sh eath[ng over root ratter .starting that
'',joints on
lit rho cut ter. �t:,yyer the ,joints of rout sheathing so 4 no at the bottom
"adjoining .,l not occur on the same rafter. Exten ;henthing 8"
at e tor gable Nike.
Apply roof I' t in
II ) i and rout shingles. fo llow manul.ifur
to bundle. l xten 1 ,.hi.nillcs 1/4 "� beyond t utu of trim t boar inr;t oration.
\
Crum inside “illy in .,riser to maintain i.kat a ppearuneeard• Trim shingles
e along the edge.
When nailing shinnies over eaves and rakes; use shurtel
r nails (7/8 lung,
eo the nails du not penetrate the plywood_
trim -out dune wpt:niny with jambs and casing.
It desired, ❑,,ply F.raf t paper' over uut:.ide stud nail • [ Start T71
• ::.drug ubuut'1" below t rat „ eundatit'rt. lop (dye ut
Start,
n ern p nailed
into 2x4 t , pl.,te. Null stein' with tl penny nun- cur CO: l It y 'w
easing nett pace) 6” on center at panel cdrje:, and 12'?.." s or
on rent at
tntcrmediate L.
1 t'tm cave: ii ,- cot're r:1 and rakes.
Inaall :�cvttc dour •e1J wlnduw.
!ti >t.all iia aye dour retluwiny the manufacturer's i'nstrt'
uctione
included with door package.
Paint 'or s tain siding and trine, applrtny according to 'manufncturpr's
. tnstruct ions provided on product. •
NAILING SCHEDULE
Connection
Bo ;It -up girders and bet".
of 3 niecrrx,ers
Bridging to j o i ,t, each earl
Top plate to stir:)
Double studs
Built -op manic studs
Doubled top plates
Top plates, laps, enJ intersections
Continuous headers, Z pieces
2 16d
16d @
Iod @
lea @ 16^ O.c.
L Ipd '
la 1b^ o.c.
ltong each edge
Continuous header to SCUD 4 tad
Rafter to plate 3 till
1" brace to each stud and plate dd
t by 8 sheathing or less, ° each "be:Jr• ing 2Nd
Wider than 1 by 8 sheathing, each beariry tie
Number end Slze of
CO;; Nn Nall
x;
2Od 32- o.c a* too
and Dott,yn ctaQger.n1
2 8i
i understand that t#e Flan Check approvals are
subject t0 erro S and °Missions and approval Of
boast Gioes not authorize the violation of any
adopted code or ordinance. 'Receipt of contractor's
copy of approved plans acknowkdaed,
How Nailed
End , :4 i 1
U •lcena11
F.iCnnd i Z
Faren,1 i 1
FILE
........ ..,.... :•
:Aft
52 1,.7.
52 1... .
52.r,.F.
21 LFS 80
15(1
H
n r ; al
1/ 4"
;.•,'L, 7;•rl^
rr' F' ' 0r15'r tR:r1' +r
1 lf.Z Cu w,h:
Cu Yis
' Cu Yds
1 '� L•r' .l:
l F. .:'J
+..
.F.
Q')NITTT'( SITE
• 6 rx 5 2X4 -12'
1 1':: l: <4 •P.
( irS
1 1•r: 1Y 14 19'
1.0Z
a 1`•. S
4 Iva
3r ,(S XH 16
1 F:
2:0.1.14
1 1` ..}..i- I2
4 8 P! :'R•( - 1 4 1"
d 1vS '\'1
. [NS
6 1vt::
,- - 5 4 Yes " -l�z•
26 Fr'S s "xe- -r %B`• ..t+ )
50 L.F.
:3 1. S 1.X:-b
4 1`. :R 1X6'•14'
!YS 1X6 -1r
4 t'::3 1X2 --16
it LL; I' :E
,1 113 : us
1 !. \ tp ' I ' .i i 1 i.:'
11 t ;: F)t-ll
ftict ';.
Ftiorruu
C It 8r' ^F TOP MOB
:`c":' :1'[•rC. writ! BITS n }:A :i1Fps
l "" N! re. SLAB PGMOATTt1N AND F 1 !;R
W1T.ry ell .1
I4.'PS
DESCF IPTI(?FI BD. E'".
r yr c TiEiii'D SILL PthT ; ' r - 48 -"
rr r1_t'a ; ?ti. \;ED S T LL pr.\ E' 5
'�P :4;ii t. MATE • 4;j
' '.1 I' WAT,L'Pi,\T.E, CZUT ' 5
I.I' WA'.(. PLATE, ,1141, CUT . 64
£ P . CIJ I 'aAI t. sIt1DS (92 5/8 ") 304
!WADER f GARAGE DCGR _ 84
`8EAIEP O EP SASH & iXZ-R, cur +•32
CRIPPi,E')R TRIMMER 5.'I!I)S,` "C(T ,37
GARAGE l *:OR.I1AI+DW\RE ; ;JR,Rou JD ; 32
RAFTER ( CEILIt1G TIE
56
RAFTER 01 CF.[I.ING TIE ri 41'
RAFTERS 911
32
r 1: (i: la `'t :,I i n
? :J G . :r -:7'. 1 IA
1 1' I) ". • •' i,k:F 6.1
r.11 ' 1 L M 1 1,"r
l ti.. ety - :rev � ,'
aHFA'f •3T"':
1 .•., sXl�ftltt ' . , � ' ' it31'S':Ft; i
:E "ch 28
eel <F: ! ;t'. - 32
'1I ?i
ELF [•F - ,x l Jlr r r i
IJ
S :•.CCI( Up . cv i pNAC F r• 1' :IIrT!' TPA(:K
A!4) \i.[.,IE EScAPY HI 5.4APF, ;. Rcr•TT1r1 r:t![lBEp
: -, t 1 SEAL
r: ar ? F ii.iRih - it [I<JC1R •� a a` r,zr r.•*" flee Tr4
lt.'- `L :k 4(7 w UNIT, 4 112' .1 MB ry
L14 T187..!k;
1'3 C1V 1
1332 S.F.
o :4' i f,',t1 ;ru3 C A.en, FRAMING
Q:t: -r ,,!1• ^•(f ti MATED, YLYtdC'D
(.t:/N1 y : ;ift'X; trA1[S
xr,F•rtX_: HAILS
Pt' :)J': NAILS
T C" R •t,` PAK£
''RSI+i: r:A:LS. :1?(Pl
.,,•.( rli 3• l Lft:i' (i• r ie:e rx:)R1
• P ru'■r,• i11 t E' ;; 1 ri; ,i :it *'•
'REAL.:;;;*:1741C U!1.4( t:,3 1. 't I i; EX ;'•1 :',
' e ; ,y lee ,,D 4ITY - OF TUKWILA
RECEIVED
CITY OF l•i!:clA)li•A
JUL - 111990
[y . Crr:iF i;ra'PES 11\:'F,n t.,'••1 ! '.Li. ,•!T£ CoTIFiITONS wiiH GRAVEL, BASE
PERMIT CEM1)TFR
NOTE: All lumber listed. she). rf7 c ay he either Redwood or Pressure Treated in accor-
dancn with govnrntni'•11'l to( . +ni i:pccffir atir,r•s. C.+bfornia Redwood: Use construction heart or
construction common. Pri'•,a ti,' ?re aced: Ii :e Douglas -Fir or equivalent.
SHEET N
PROJ . ° PLAN #
DATE: j2:4 . 1
DRAWN: IS.
11i11 '!I1II111111111iJ11111111111
2 T 3'
1II
1`111 ! 1 1 1 1 1 1 1 1 1 11 1 1 111 I I I I I 1 I I I 1 1 111 = 1 1 I 1 I 1 I f i I 1 1 1 1 1 I1I 111 I1I 111 111 111 111
I�I�Iillifil!I�► Iif ililll , iIi�i,��lili�ilil�� 111 IiliI � � � .� I C I
6 8 y i n 11 : MADE IN GFRUAW 10
'for of
• UNEXCAVATE
4" I2 Ir012-cE12 c01-1G26-1 J/
" 4J t,..6) 2 .' W%IZ L 1.41
F! !-i
p> etzE Toe of F
8 ". APPLIv6 vr1LY ,IJ AL1
ez, N 4- fit06- (lo1-t O f
120 1'10 11-1 1-11-1E- h1 Ic&h 1061c
�ss�l� OF FoGiwczek i t - 1 4- ID,�L- Af 2 LISih
of-1LY 1N AL'f• F��'� co1 -1y� vFTA.IL.
Tar of 02'—\
t.IOIJ - FR424-1 • p•
F ' Q06-r 4.1.-f f-IZA,;ff :i
slva'tlolJ E.L
UILDING DIVISION
f'L k-e. iIH(s1 1116
{ 1 - roto. v"1 - f H
17H ,9r
pLY;,J0017 �I V1f`1Gt
ea/2
w Q t7e.:TP• 14. beat.
44-4 5Fun.TED
1 1 199t
PEAMIT CrLIT:p
o- rt2� FCIV'rIJL1.
`t 4I 2'. sJ
PC' -rtc t7 I sJ • •
La 4.1 CA
PROJ. PLAN*
P -3019
IN" t-- ? 0)
L IF1G• o� A I.IG►-4og,
c A (jA 01;
,
ROIJN ®AT ION PL'At
SCALE: 1 /4 =
4•• • 06- foRG— cv.Icr OE 6 L4.g, W/
6osatpi -16.49 ¢osJULAd FIL
NO° FROST
CONSTRUCTION
1'
2 -Gv1 - j itc}>6 lq 5.1341.12, •
02049 a¢,01-11 -10 64911.14e0,
L- p ia`
1.52g g 1 c7IJ 2J
pocJtJ TI oIJ lf.l n.LL- , E--
I7E - fAl l- I o-.1 - r;4 Sri �� °�•
II
NOTE: If the microfilmed document is less clear than this
11.4 "fa -A tboA.12 p
II x 6).
!I>t4'
'yam "1 - I--II rLYI4100t7 &Iv1
II ,< t. 0 .! 2 n
6,
II cog.ogg.
It ol -A. !OW L1011-11
Iti q " I2" Lat- 1 A1-14446 r
I x4 wl� r7vkJ - rz , ► -fi
' - (I- II PL'l LfJoop >i171 J1l
I 4 5 6 7 8 9
t r
REAR ELEVAT ION .
SCALE 1; 3" = 1' - 0"
y�I�F -ti�a.L s►�tfIc- L� '
SCALIE-: '
it,
I I I i i I I i
�► ��� ��� ��� ��� ��� ��, � � ���I��r�l�i►��i��►Is�� r�� ��� ��� ��� ���I�, ��i��► I���I���I���I���I���,►. ��h����i���i����ii��I, ��I���I���I���i���l:► ���I�i�I����I��: �i��j�I�i��I����I�I� 'i�����i-�i'I
O 16 THS INCH 1 1 o - 11 MADC 0£RMANY 12
\/E1 -11
FLa4 1IrJi 1 Q,ETwE ..1
TAP .t- 1oLi
hN Eg.'fs G=p
Pt ? Joot2 sIL7I IG�
2
4;6 -rn.IL
4v4. 4 e-ANW 4
1)4o_ f c - pe'-11IJC
SIDE ELEVATION
1 / 8 „ - 1 , - 0 ..
- 4 r '' VI' &I- ICI 1 -1 CA (Ai 11-11200,
n+! -11. 1.y Qy ;1- G V.z_ rioi--4J.
4f� kS to sel> 513
. DAR
c7 .- �atLia 6F.G 2 .f
/, o il i3N641 r
be roc ct "fal l
i T---- 6E \fIGg i7
SIDE • ELEVATION
SCALE 1 /8 "- 1 --0
- I' t - r a I'otfft. OF IUKWIL A
APPROVED
JUL jUll ' 19
gumtiLit
ti
13"
t.Aer , FTE¢
t o % i 1Uf J I
RIGHT SIDE FRAMING
SCALE 1/4" = 1 , - 0"
�AN r
-.LT SIDE FRAMING
SCALE: 1/4' = 1 - U
Kt': IC4' t& Its- z_
—_. _1 -- I — == =
J.
E 0 o i
REAR
SCALE :
Ito"
PA -FJE. L 'A
,FRAMING
1 J4" -= 1' – 0
Co
1•111111111111 _ I IMO 1
L f..
—= b == _ - = = -= - -_
1Ca
it"
�ICi'L I!:'
1(
! E L I :
12 -p"
111: , j• Ito" (.14. & i3.•
�
;
fbo/1-0. 0
1i(4 t-JA.1
- 2x' Pc.:10
b aAN. 6
14." O.G.
N
tl)
z. $B 104E
13o4, p
2�c t5gAFTcet6
se.." c.
2.04 T
2'4 for
xq .5Tuoh cr
I(v•• o.G. A
N iO4 w1■JpSto2A•G►44e.f. -10
5 ° 4gG.try Aftra, v .
Asto
4•T i.-16P
1► �1L.4. pi rL
2 8 g.A.F1E4i VA•. G. __.._
204 GIA -61..E. E.1v «TUFF
1 G.
Z' 4 - Tic
2 .4 rT°to P1 -4
- I K 9 bJt��6?6�I tc irJ
e 45• U1.c e - rye)
/., 61tJOs ICI 0.G.
2 4 Loc.IC I61 U. ' 1.4. 1
G� X1 w Eg. •G'(U Uy -- --
—z.4 T1ZT �lor7�v
1[
5E E v1;-TA1L 5
r> J SNEE'( 4t"(YP)
24=
PLAN
SCALE: 1 / 4'° - 1 -- p"
I I I I I IIIII/IIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111111iIIIIIIIIII IIIIIIIIiIIIIIII IIiIIIIIIIlIIIIIIII IIIIIIIIIIIIiiIIIIIIiIjIIII I
it ' THSINCH 1 2 , 3- 4 5 6 7 8
r : _w
t ( NOTE: If the microfilmed document is less clear than this
s 1 nntirn it ie A»o t., 4 .,211.t411 ..F af... .......t.- o....t a,.......... -,*
•
z,62 Rp-FTe-R e 413"
O.G. i4/ iv( 4 1-IA - 1616125
2 e# hvQpvut�p
/d i'7 Okla Q /E146 D66
IC!
4tr 3
Z X e 0.04- g.0
Zd4
OA i'. -
1 1(j ICI 1 1 Li;
1(r
I 1' 14 1Je.Apeg
rbu Fbl-f. 2-4
G 0 ook
Foe. ex,1E(CH4.t7 st u
' TAIL.. - ` r'gret1 -
t z•NI:r_. 5-
{ X12 iicnu�+?1
Ji
FRONT FRAMING
SCALE: 1/4" 1- O"
I1I11I I I1I1I1I1I� , IIII1I1 I 1 I1I1I1i1llI1l1llIIi
9 , ;{ 10 11 MADE IN GERMANY 12
=t
= N
t
ss�tr1� .
CM OF TUKWILA
APPROVED
JULY 1199.0
1,1
Ir r !1®
BUILDING DIVISION
a
REE1'!ED
CITY 0 ' TU'KJV?LA
AIL 1 1 i 90
PERMIT UM TER
1
L
z
0
z z<
2
<-1
c [:
cL
4 I P
� r
PROJ PLAN4
P-3019
DATE:
r
6X - f 4 oc A z
r
I >.= 4 W I;..I r7
.6.-T I..c.T - teal
a-T 4 5` /0-46 & ?)
FruN4, 15.16 EI.E Vd: �iorJ�
o1 J yt-a f S.
19& I (
T� e 4+4E41 tTcep)
24 Q, P-�F rgiz
2_ -rive
2xq s - ra p
f-1 %.
0
eLA
) SCALE: SEISMIC / HURRICANE DETAILS
I NONE
ix& �pL,G� p��� ? -'-v" 1. Oro
6,117E 47F rzA f i�c5
Z x Cr g-ix F--re- g - 11'. , 6 41-a"
SECTION A °. •
NO-FROST CONSTRUCTION
SCALE : 1/ 2" = 1' - 0"
Fog co (LE - E peri A.1.19
ve--T II:6, 4E,a
C oAQ6G.4 Tr• 01674L.
of e.g I ou,L -0 aJGt• F ELT ''4 I?
c;ig b.Vg. I�L`r'irJcoO
>NE brTI- 11061 --
—P
ht. 2 1,..1ex
la4tt,149
Ne..0 FP- I A
OVERHANG DETAIL
SCALE: 1 1/2"= 1' - 0"
(L
2x4 T r+ -a
t4 - roe
n
■ TI- II rL4s
e ¢ tc'c . P>oA40
it S i rf; IU "O.G.
zc 4 Tl I l e1/4 - f6
tx 4 Tel° ATE
4" ¢tarp col.e.. LA,I'
o s.
L as... • '.1 ......... 42YO11.1a,
{1 �1 {1
i ia. {jfl {I - II .-.•:..: �i
1 111111 {
0 IO THL INCH 1 2 f 3' 4 5 6 7 8
NOTE: If the microfilmed document is less clear than this
rzF tk. 2« q '' I L t.
t
2r 13Lox -V-ItJe:l -cca-
To
beT1.-I e.g.m
- '
L�q p Lack�tJ� vo" t- c'IJG
1JA..11-6r P T11E:E.a`!
GpR !�'�UrS &-r
- roe , rbo'1"ToM 9oN G
-- - Zr4 &-rut7 Ieo 0.6.
I. . WrhIvoA6_1IJ6 e. 6,7 e.
F .w!ttJGr v .TicK NF.E.T .s.
( LLloo7 b-fur7 ieo" e &.
CORNER DETAIL
SCALE: 1 1 /2' = 1' - 0"
c o RRerG 1 D mar4
via: �t
I p 4.;-1G I,.. Ex'f�s ;off
G � P t T Jvo17 44 T'1-I tt
111 {I +I{11't{III{111{ III {III{III{III{I1111111111111I {II
9 10 11 MADE IH GERMANY 12
g e' - rHtr- '-'fr -I PI,Yt,Jovo
.1011461
i $ 4 C, 7rl ;.J (L got..g
+sue«^ a+' n..m s __ ::. �.., . •
I -- xflyJ000 ,Lotic.hJct
a.Iatl.I:o
g151
e.aGN 12Ar'TER
�a.L rr OI"
STuc�
'Iile6 SraE - 1
trir
C,g
ix2 TetL'I &c
"6" 'TI -it el. YW000
CITY OF TUKWILA
APPROVED
JUL 190
Buil ING DIVISION
PROD. PLAN*
R -'3019
DATE:
DRAWN: I S.
R :.Cwl\IE )
1
t
PEr- Mi cr U (EI
i
2 .4 6fua
I0. . - ? ) -
4 4 -rte. inks-tE
GALE END ISOMETRIC
SCALE NONE
I
I
I
I
2 3 i;
-
2 x4 t- LNLE.fL
RAFTER TEMPLATE
FULL ,GALE
a .,
2' -I
��LF -hEO.L SHI1- 1�,Lr�s
c. # gx_mt- i -4 EL=t_
/-1-4 (7 IZ' e-x'TE- io(z liirL a P'1 L? .J a
I AG, FD�sGi u —
7 .i 1 -II pLyt...L
I4" F._gtq"
14" SH it-1 b
1)(4-1 Jooa �'� iH✓(
I ><4 - s' PPa'g-p - r - v
411,ewive.
•
I x� T¢.1N1 '�n.rl
l;-H 4, 911J4.
t
Z:r 4 .*-11_1 e 2.6
Fb 044•04r see
GABLE DETAIL
SCALE: 1 1/2 1' - 0
11-16.
OVERHEAD
DOOR HEADER
SCALE: 1 1/2 "= 1 - 0"
. +
334 ,.
1116,eve:, 4 f7 "L26--
_J c7
z.4q FJts 1Ls-
7
4A i4 NEV.p .
2' 9 zbvgri. c1JI-Ia—
( . /4p -- - --
i ricc Q I pP1_r? ° rc ,
k 4 oc. rRi.4 --
3 4 5 6 7 8
NOTE: If the microfilmed document is less clear than this
('05..1..,1 L;es
GG
LP -- 1 . -4.1 c d F r PJLJ; .5 (= E L r
/ -,v I 2: 101Z C12f >-r . !'I-- `etJx;Q F 541' -.tcq
1 714 Fl (.E
H ;o TR
yF rN1(F r7"+7
I Cr t- iPPs:t? - fa
1
�II��III�III�II� lII1�IIIIIIIIIIIIIII, i �, IIII�III�II111I1III1l 1IIIIII�IIIIIII�III�III�II�LLIIi�II�IILIIIiIIIIIIIIIIII�IIiII ` VIIIL 11111111 11111111111 IIII1;I:IIiI`I'IIIIIILILIILI 'Ili1 1
0 16TH5INCH 2 I ! i 9 10 I 11 MADEINMRMAM 12
SERVICE
DOOR HEADER
SCALE: 1 1/2" = 1'- 0"
R'_.0 711 � .`?
CITY 1 1
JAI
PERMIT cA i rCt3
cA uLK61 Jot -i-1-/
OVERHEAD SERVICE
DOOR JAMB DOOR JAMB
SCAIE• 1 1/2" 1' -0., L SCALE: 1 1/2 "= 1'
CHNIIMMIMPRINOISk
J
RROJ.PLAN*
P - 3019
DATE:
DRAWN : J.S.
CI
A
i
,1
Y OF TUMILA
PPROVED
'11990
B'r LI Ut D 4 /wlSION