HomeMy WebLinkAboutPermit 6181 - GE / RCA Service Center - ReroofPROPERTY OWNER MBG Company
PHONE 623 -2700
ADDRESS Third Avenue, Suite 1205, Seattle, WA
�P
98101
CONTRACTOR Architectural Metal Roofing Systems, Inc.
PHONE 226 -8141
ADDRESS S.E. Renton -Maple Valley Highway, Renton, WA
ZI P
98055
WA. ST. CONTRACTOR'S LICENSE # ARCHIMR101CH
EXP. DATE 2 - 08 - 91
ARCHITECT Alliance Inc.
PHONE 467 -9341
CITY OF TUKWILA
Dept. of Community Development- Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDING
PERMIT NO.
DATE ISSUED:
SIT
PROJECT NAME/TENANT
ADDRESS
7Q0 Andover Pk W
Remove existing roof and install new roof.
BUILDI PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
GE /RCA Service Center
TYPE OF J New Building Li Addition LI Tenant Improvement (commercial) (__) Demolition (building) U Grading/Fill
WORK: 0 Rack Storage ® Reroof 0 Remodel Sresidential) 0 Other:
DESCRIBE WORK TO BE DONE:
1218 Third Avenue, Suite 1900, Seattle, WA
PLAN':CHECK FEE; > ><::<>
BUILDING
BUILDING :SURCHARGE
l PLAN CHECK NO.:
90 -348
1
ASSESSOR ACCOUNT # 262304- 9124 -01
98101
CODE COMPI IAt ( I
U,Sgg ,.�
FLOOR r SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. TOTAL TOTAL
• FEET LOAD FEET LOAD FEET LOAD FEET LOAD FEET LOAD SQUARE FEET OCC. LOAD
TOTAL'
.............. .
TYPE OF CONST.: UBC EDITION (year] 1988
FIRE PROTECTION: OSprinklers 0 Detectors
N/A
ZONING:
SETBACKS: N- S- E- W-
UTILITY PERMITS REQUIRED? 0 (Public
Yes ®No Public Works)
BAR/LAND USE CONDITIONS?
0 Yes in No
CONDITIONS (other than those noted on or attached to permiuplans)
APPROTED R
ISSUANCE BY:
BUILDING
OFFICIAL
DATE: 5' V_ 70
/ 1
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lave
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
SI - MO2& V2 _ Oh
PRINT NAME: MRRSNA .S/ ,?)/ &JD
DATE: -4- yD
�1s permit s hal l become null and void �f the work is not commence
:nuance, or if the workis suspended or abandoned for a period o'
'CERTIFICATE OF DATE ISSUED:
OCCUPANCY NO.
COMPANY: a d k/CL(. 4
'ays r om:.....,..
the li i n .
Uud ,
PERMIT NO.
CONTACTED
r(`nQYC
DATE READY
DATE NOTIFIED
f j 9
��� — 1
BY: ,-�Q
(init.) -'CJ\ I
PERMIT EXPIRES
2nd NOTIFICATION
3RD NOTIFICATION
BY:
(init.)
BY:
(init.)
AMOUNT OWING
PLAN CHECK
NUMBER
go--• -
•
BUILDING PERMIT APPLICATION TRACKING
PROJECT NAME
a E I RCPT Iry < « UrnPer
SITE ADDRESS
`1QC) f r r PK
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
SQUARE
FEET
OCC.
LOAD
SQUARE OCC. SQUARE OCC. SQUARE
FEET LOAD FEET LOAD FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL OCCU-
PANCY LOAD
DEPARTMENTAL REVIEW
"X" In box Indicates which
REVIEW COMPLETED
departments need to review the project.
BUILDING -
initial review
O FIRE
ZONING: ISAR/LAND USE CONDITIONS? f Yes NJ No
O PLANNING
O PUBLIC
WORKS
g BUILDING -
final review
(ROUTED)
INIT:
INIT:
INIT:
INIT:
CONSULTANT: Date Sent -
Date Approved -
IIR€PROTECTION: r I Sprinklers (1 Detectors N/A
INSPECTOR:
FIRE DEPT. LETTER DATED:
REFERENCE FILE NOS.:
MINIMUM SETBACKS: N- S- E- W -
LI PE WS REQUIRED Yes N o
PUBLIC WORKS LETTER DATED:
TYPE OF CONSTRUCTION:
UBC EDITION (year):
03/30116
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
AI'f'L ICA 1 /ON I110`: l HI
III.I ED OUT C011lf'I f Tf.l 1'
VALUE OF CONSTRUCTION - $
PROJECT NAME/TENANT ASSESSOR ACCOUNT #
a 5 Se rce Cisi.nte 41.2364— 9/ a`d'o
TYPE 0 New Building Li Addition Li Tenant Improvement (commerc al) Demolition (building)
WORK: ❑ Rack Storage gReroof ❑ Remodel (residential) ❑ Other
DESCRIBE WORK TO BE DONE:
t� r oe x (p App! y net ieetsy sfi€ •
BUILDING USE (office, warehouse, etc.
lCe
NATURE OF USINESS:
WILL THERE BE A CHANGE IN USE? No ❑ Yes IF YES, EXPLAIN:
SITE ADDRESS SUITE #
7 022_,A, - ncv� r Palle
Area of Construction: 36cze S.F.
SQUARE FOOTAGE - Building: 34:, •f'. Tenant Space:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? No ❑ Yes IF YES, EXPLAIN:
PROPERTY OVNA Kg..1 e�/ tv% B G
S ce_t / -Z
ADDRESS /2 71 /);. Ave C3 ,5� .,
/4Z
'PHONE 22 - 2/ Z/
CONTRACTOR kech;re.G't►l,aaa ineticQ i r i •J systrr1s, c
0.0 �y » ,
WA. ST. CONTRACTOR'S LICENSE # piRC/1 /n72 CN
ADDRESS, B 825 5.g. ✓1 „n,o,,/,,
ARCHITECT A v , G h , fe Gt Ltm 71///a-. -c 7)1 C. ��/,,��
ADDRESS /a /2 /A:4j /}�°• fad /r f d: 1
CGS •
PHONE 6 3 .27o
titm, . ZIP e g. o /
ZIP 4 SS'
EXP. DATE 2.8 -,ct1
PHONE 4 q3 ;l1
ZiP,s /
BUILDING OWNER
OR
AUTHORIZED
AGENT
CONTACT PERSON
Ti
SIGNATURE
DATE APPLICATION ACCEPTED
PRINT NAME /27 72E 6 ».�42•
ADDRESS Z5 f a -// .84444
/egr (,M- 29A1Mi/J) eV j A}enQ (-z7€,
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Comm•'r''•:,n ^r• ° prim ^ - ^'"nt the Perxit Coordinator at 431 -3670 prior to
submitting + application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
BUILDIN PERMIT
APPLICATION
c ;d�
INERVIMENEENEHMEI
UILDING PERMIT: FEE
MISIMMINIEBEE EMS
MUNIONENNIMIUM
IMINTUATABIENMEIMSME
DATE
PHONE Z r „Mi/
CITY /ZIP !fQ5f"
PHONE 224,g !L f
DATE APPLICATION EXPIRES
-)L(-9)
MONO
COMMERCIAL
NEW COMMERCIAL BUILDINGS /ADDITIONS
Q Completed building permit application (one for each structure
Assessor A000unt Number
Two sets (2) Of the following
lions ...:
NOTh /rxluab diirtwralons ofra (hertpht; wldlri
and 0.0t,:wpya on
�` 81rticIura) cakaJladons by a Wsshln
tgineer (reds =forage :8.!:;and oust);
RESIDENTIAL
Soils report stamped by Washington Stale licensed anp
Topographloal surv
Enemy calculations stamped by a yoethiogtokStiiiiiiiiin
e ngineer or :architect ••i:•
legal dasdiptlon
Working drawrnps, stamped by a Wishitptan5tate IICen
ar Ilea, which indude
gip
Archlsctural drawings
Structural. drawings
Mechanical drawings
'. Elevations
Ci vil drawings
Cdn utili permit a o
Six (8) sets. f C is
oiyil drawings
MDTE Sao utDRy permh appl cation and checld'at
. au6rrrltfal rec rlrementa
RACK STORAGE 1>
Completed building permit applica
Ass••sor'Accoura Num
NEW.SINGLEFAWLY DWELLUNGS/ADDI
Md buNdng pormlt application
State. Energy'Code,,
s led utilfyr permit application
Six (6) sets. of site plans showing util tie
NO TE. ; BuNdhp site plan and ut r k ty site plan nay be conk ad Sae
uOVkjr permit application and checki for apeciNo aubadttal swgr cements
'idllorwlf Ivpograph and soils ini►amatlon miry be requlrrtf d
sits o
cndYdons
StiBMITTAL CHECKLIST
CITY OF TUKWILA
pa t9nt
6300 , hcenter Boulevard
Tukwila, WA 98188
(206) 431 -3670 A
/ ,i• 1
Type of Inspection T C_miAjZ
Site Address '701)
Requestor
Special Instructions
Inspection Results /Comments
INSPECTION RECORD
PERMIT # (p 1 E �
Date
Date Wanted it /36/9
Project 6-6.
Phone #
Inspector
6
1iC "." Data 11 30'1 Q A
a .m. p.m.
Special Instructions
Inspector
Type of Inspection
CITY TUKMIIA
Buil Department
6300 ;thcenter Boul
Tukwila, WA 98188
(206) 431 -3670
�K ,aui on„t�,z, smr r::V.nY MAelggas6 P '
Site Address ` Ito D Poi ov.er PR W
Requestor '
INSPECiON RECORD
PERMIT # (PI v
Date
q
Date Wanted ( E - 15-10 p.m
Project eir Rc t r' rv k€,
Phone # CD.r (D (
Inspection Results /Comments: D A--k_ A c j 4
(4 , 6 ' — x j : 4 ` 4 r 4 1 (L uJ-1::),A
6N1:1.
Date • - -- 414
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
•
10 Wall Board Fastening
431 -3670
X
11 Pre - reroof
431 - 3670
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
X
17 BUILDING FINAL
431 -3670
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
SITE ADDRESS:
7Q0 Andover Pk W
OTHER AGENCIES:
liil=rim11 I
INSPEC1ON RECORD
(Post with Building Permit in conspicuous place
SUITE NO.:
BUILDING �Q l�
PERMIT NO.
DATE ISSUED: % 9�
PROJECT:
GE /RCA Service Center
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
(INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
06/17/90
RECEIVED
• CITY OF TUnV/t.A
AUG 1 1990
!TWIT CENTER
'To Who.r, .r mar Corn ctti t..
aeeAeVeeird44411 ~di tfo# 4
a.veet h e ,e. 3 zei 42 /9 it/,'r tr.{ PaePutlate
4e,(4 P. 44, v e 7 /Lk. luz<-L. , c ( '
a'neTI ,e4ed fru zfiesAt Ator derA,
„ al a sacs .„,„„ -hrxe4 and
/4,00-fro 4 )re r /24.00e' 4