Loading...
HomeMy WebLinkAboutPermit 6181 - GE / RCA Service Center - ReroofPROPERTY OWNER MBG Company PHONE 623 -2700 ADDRESS Third Avenue, Suite 1205, Seattle, WA �P 98101 CONTRACTOR Architectural Metal Roofing Systems, Inc. PHONE 226 -8141 ADDRESS S.E. Renton -Maple Valley Highway, Renton, WA ZI P 98055 WA. ST. CONTRACTOR'S LICENSE # ARCHIMR101CH EXP. DATE 2 - 08 - 91 ARCHITECT Alliance Inc. PHONE 467 -9341 CITY OF TUKWILA Dept. of Community Development- Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BUILDING PERMIT NO. DATE ISSUED: SIT PROJECT NAME/TENANT ADDRESS 7Q0 Andover Pk W Remove existing roof and install new roof. BUILDI PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) GE /RCA Service Center TYPE OF J New Building Li Addition LI Tenant Improvement (commercial) (__) Demolition (building) U Grading/Fill WORK: 0 Rack Storage ® Reroof 0 Remodel Sresidential) 0 Other: DESCRIBE WORK TO BE DONE: 1218 Third Avenue, Suite 1900, Seattle, WA PLAN':CHECK FEE; > ><::<> BUILDING BUILDING :SURCHARGE l PLAN CHECK NO.: 90 -348 1 ASSESSOR ACCOUNT # 262304- 9124 -01 98101 CODE COMPI IAt ( I U,Sgg ,.� FLOOR r SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC. TOTAL TOTAL • FEET LOAD FEET LOAD FEET LOAD FEET LOAD FEET LOAD SQUARE FEET OCC. LOAD TOTAL' .............. . TYPE OF CONST.: UBC EDITION (year] 1988 FIRE PROTECTION: OSprinklers 0 Detectors N/A ZONING: SETBACKS: N- S- E- W- UTILITY PERMITS REQUIRED? 0 (Public Yes ®No Public Works) BAR/LAND USE CONDITIONS? 0 Yes in No CONDITIONS (other than those noted on or attached to permiuplans) APPROTED R ISSUANCE BY: BUILDING OFFICIAL DATE: 5' V_ 70 / 1 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lave and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. SI - MO2& V2 _ Oh PRINT NAME: MRRSNA .S/ ,?)/ &JD DATE: -4- yD �1s permit s hal l become null and void �f the work is not commence :nuance, or if the workis suspended or abandoned for a period o' 'CERTIFICATE OF DATE ISSUED: OCCUPANCY NO. COMPANY: a d k/CL(. 4 'ays r om:.....,.. the li i n . Uud , PERMIT NO. CONTACTED r(`nQYC DATE READY DATE NOTIFIED f j 9 ��� — 1 BY: ,-�Q (init.) -'CJ\ I PERMIT EXPIRES 2nd NOTIFICATION 3RD NOTIFICATION BY: (init.) BY: (init.) AMOUNT OWING PLAN CHECK NUMBER go--• - • BUILDING PERMIT APPLICATION TRACKING PROJECT NAME a E I RCPT Iry < « UrnPer SITE ADDRESS `1QC) f r r PK SUITE NO. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE FEET OCC. LOAD SQUARE OCC. SQUARE OCC. SQUARE FEET LOAD FEET LOAD FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU- PANCY LOAD DEPARTMENTAL REVIEW "X" In box Indicates which REVIEW COMPLETED departments need to review the project. BUILDING - initial review O FIRE ZONING: ISAR/LAND USE CONDITIONS? f Yes NJ No O PLANNING O PUBLIC WORKS g BUILDING - final review (ROUTED) INIT: INIT: INIT: INIT: CONSULTANT: Date Sent - Date Approved - IIR€PROTECTION: r I Sprinklers (1 Detectors N/A INSPECTOR: FIRE DEPT. LETTER DATED: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- S- E- W - LI PE WS REQUIRED Yes N o PUBLIC WORKS LETTER DATED: TYPE OF CONSTRUCTION: UBC EDITION (year): 03/30116 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 AI'f'L ICA 1 /ON I110`: l HI III.I ED OUT C011lf'I f Tf.l 1' VALUE OF CONSTRUCTION - $ PROJECT NAME/TENANT ASSESSOR ACCOUNT # a 5 Se rce Cisi.nte 41.2364— 9/ a`d'o TYPE 0 New Building Li Addition Li Tenant Improvement (commerc al) Demolition (building) WORK: ❑ Rack Storage gReroof ❑ Remodel (residential) ❑ Other DESCRIBE WORK TO BE DONE: t� r oe x (p App! y net ieetsy sfi€ • BUILDING USE (office, warehouse, etc. lCe NATURE OF USINESS: WILL THERE BE A CHANGE IN USE? No ❑ Yes IF YES, EXPLAIN: SITE ADDRESS SUITE # 7 022_,A, - ncv� r Palle Area of Construction: 36cze S.F. SQUARE FOOTAGE - Building: 34:, •f'. Tenant Space: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No ❑ Yes IF YES, EXPLAIN: PROPERTY OVNA Kg..1 e�/ tv% B G S ce_t / -Z ADDRESS /2 71 /);. Ave C3 ,5� ., /4Z 'PHONE 22 - 2/ Z/ CONTRACTOR kech;re.G't►l,aaa ineticQ i r i •J systrr1s, c 0.0 �y » , WA. ST. CONTRACTOR'S LICENSE # piRC/1 /n72 CN ADDRESS, B 825 5.g. ✓1 „n,o,,/,, ARCHITECT A v , G h , fe Gt Ltm 71///a-. -c 7)1 C. ��/,,�� ADDRESS /a /2 /A:4j /}�°• fad /r f d: 1 CGS • PHONE 6 3 .27o titm, . ZIP e g. o / ZIP 4 SS' EXP. DATE 2.8 -,ct1 PHONE 4 q3 ;l1 ZiP,s / BUILDING OWNER OR AUTHORIZED AGENT CONTACT PERSON Ti SIGNATURE DATE APPLICATION ACCEPTED PRINT NAME /27 72E 6 ».�42• ADDRESS Z5 f a -// .84444 /egr (,M- 29A1Mi/J) eV j A}enQ (-z7€, APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Comm•'r''•:,n ^r• ° prim ^ - ^'"nt the Perxit Coordinator at 431 -3670 prior to submitting + application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. BUILDIN PERMIT APPLICATION c ;d� INERVIMENEENEHMEI UILDING PERMIT: FEE MISIMMINIEBEE EMS MUNIONENNIMIUM IMINTUATABIENMEIMSME DATE PHONE Z r „Mi/ CITY /ZIP !fQ5f" PHONE 224,g !L f DATE APPLICATION EXPIRES -)L(-9) MONO COMMERCIAL NEW COMMERCIAL BUILDINGS /ADDITIONS Q Completed building permit application (one for each structure Assessor A000unt Number Two sets (2) Of the following lions ...: NOTh /rxluab diirtwralons ofra (hertpht; wldlri and 0.0t,:wpya on �` 81rticIura) cakaJladons by a Wsshln tgineer (reds =forage :8.!:;and oust); RESIDENTIAL Soils report stamped by Washington Stale licensed anp Topographloal surv Enemy calculations stamped by a yoethiogtokStiiiiiiiiin e ngineer or :architect ••i:• legal dasdiptlon Working drawrnps, stamped by a Wishitptan5tate IICen ar Ilea, which indude gip Archlsctural drawings Structural. drawings Mechanical drawings '. Elevations Ci vil drawings Cdn utili permit a o Six (8) sets. f C is oiyil drawings MDTE Sao utDRy permh appl cation and checld'at . au6rrrltfal rec rlrementa RACK STORAGE 1> Completed building permit applica Ass••sor'Accoura Num NEW.SINGLEFAWLY DWELLUNGS/ADDI Md buNdng pormlt application State. Energy'Code,, s led utilfyr permit application Six (6) sets. of site plans showing util tie NO TE. ; BuNdhp site plan and ut r k ty site plan nay be conk ad Sae uOVkjr permit application and checki for apeciNo aubadttal swgr cements 'idllorwlf Ivpograph and soils ini►amatlon miry be requlrrtf d sits o cndYdons StiBMITTAL CHECKLIST CITY OF TUKWILA pa t9nt 6300 , hcenter Boulevard Tukwila, WA 98188 (206) 431 -3670 A / ,i• 1 Type of Inspection T C_miAjZ Site Address '701) Requestor Special Instructions Inspection Results /Comments INSPECTION RECORD PERMIT # (p 1 E � Date Date Wanted it /36/9 Project 6-6. Phone # Inspector 6 1iC "." Data 11 30'1 Q A a .m. p.m. Special Instructions Inspector Type of Inspection CITY TUKMIIA Buil Department 6300 ;thcenter Boul Tukwila, WA 98188 (206) 431 -3670 �K ,aui on„t�,z, smr r::V.nY MAelggas6 P ' Site Address ` Ito D Poi ov.er PR W Requestor ' INSPECiON RECORD PERMIT # (PI v Date q Date Wanted ( E - 15-10 p.m Project eir Rc t r' rv k€, Phone # CD.r (D ( Inspection Results /Comments: D A--k_ A c j 4 (4 , 6 ' — x j : 4 ` 4 r 4 1 (L uJ-1::),A 6N1:1. Date • - -- 414 "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 • 10 Wall Board Fastening 431 -3670 X 11 Pre - reroof 431 - 3670 12 13 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 7Q0 Andover Pk W OTHER AGENCIES: liil=rim11 I INSPEC1ON RECORD (Post with Building Permit in conspicuous place SUITE NO.: BUILDING �Q l� PERMIT NO. DATE ISSUED: % 9� PROJECT: GE /RCA Service Center CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 06/17/90 RECEIVED • CITY OF TUnV/t.A AUG 1 1990 !TWIT CENTER 'To Who.r, .r mar Corn ctti t.. aeeAeVeeird44411 ~di tfo# 4 a.veet h e ,e. 3 zei 42 /9 it/,'r tr.{ PaePutlate 4e,(4 P. 44, v e 7 /Lk. luz<-L. , c ( ' a'neTI ,e4ed fru zfiesAt Ator derA, „ al a sacs .„,„„ -hrxe4 and /4,00-fro 4 )re r /24.00e' 4