Loading...
HomeMy WebLinkAboutPermit 6274 - Looney Residence - Pre-Move InspectionPROPERTY OWNER Bill Looney PHONE 242 - 8151 ADDRESS P.O. Box 66098, Seattle, WA ZIP 98166 CONTRACTOR PHONE ADDRESS _J WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT PHONE ADDRESS ZIP USE ,:� / / ( ODE COL11'I / . IArJCI / ;. / FLOOR_r_ SQUARE FEET OCC. LQAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD . TOTAL TYPE OF CONST:: N/A UBC EDITION (year) 1988 SETBACKS: N - S - E- W— (through Public Works) FIRE PROTECTION: ❑Sprinklers ❑Detectors NA UTIL ITY PERMITS REQUIRED? ❑Yes [x] No ZONING: BAR /LAND USE CONDITIONS? ❑ Yes ❑X No CONDITIONS (other than those noted on or attached to . ermit/•Ians) CITY OF TUKWILA Dept. of Community Development- Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BUILDING PERMIT NO. DATE ISSUED: SIT A 1627 S 130 PROJECT NAMElfENANT Looney, Bill N/A ASSESSOR ACCOUNT # N/A TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ® Other: Pre - Move Inspection DESCRIBE WORK TO BE DONE: House to be moved to 13028 32nd Avenue South. APPROVED FO ISSUANCE BY: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. PRINT NAME: , / / f CC/VPL SIGNATURE: (pD In is �o C BUILDIN3 PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) BUILDING PERMIT FEE PLAN CHECK.FEE ; BUILDING SURCHARGE 25.00 25.00 OTHER: ::::: TOTAL- 2455 • 10_119 I PLAN CHECK NO.: 90 -421 BUILDING OFFICIAL DATE: COMPANY: DATE: /0 cta /a 11l0 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. I CERTIFICATE OF DATE ISSUED: OCCUPANCY NO. , V 1 A urrtoiw PERMIT NO. CONTACTED Sill DATE READY DATE NOTIFIED I o- i a qo BY: ` On ,[� ,.-{a PERMIT EXPIRES 2nd NOTIFICATION BY: (mu) AMOUNT OWING Cb 3RD NOTIFICATION BY: (inf.) BUILDINCOPERMIT APPLICATION TRACKING PLAN CHECK NUMBER q PROJECT NAME SITE ADDRESS INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) LOAD SQUARE FEET occ. LOAD soul FEET oc4. LOAD bow FIST ode. LOAD FEET 060. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD DEPARTMENTAL REVIEW "X" In box indicates which departments need to review the project. .■•"t , 1' BUILDING - initial review O FIRE O PLANNING O PUBLIC WORKS O OTHER 1BUILDING - final review Ior 1 1 REVIEW COMPLETED INIT: INIT: INIT: INIT: (ROUTED) (ill I low] 5 ) 3D rn•:: x:: r. .:y::• fir.: x:: ,.;•, :;.: }:• all FIRE PROTECTION: L FIRE DEPT. LETTER DATED: ZONING: REFERENCE FLE NOS.: all MINIMUM SETBACKS: N- 8- DTILITY REWIRED? rj Yes ( PUBLIC WORKS LETTER DATED: SUITE NO. ciders ❑ Detectors od N/A INSPECTOR: LIAR/LAND USE CONDITIONS? n Yss J No W I : CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER • 0 Q S NATURE OF BU (NESS: WILL THERE BE A CHANGE IN USE? ' No U Yes IF YES, EXPLAIN: PROPERTY OWNER /\J2 ADDRESS I o? In for CONTRACTOR �fl ADDRESS �/ _-- WA. ST. CONTRACTOR'S LICENSE # ARCHITECT ADDRESS BUILDING OWNER OR AUTHORIZED AGENT CONTACT PERSON DATE APPLICATION ACCEPTED SUITE # SIGNATURE nn PRINT NAME '� 1 k , ox) lei ADDRESS eo gcx 0(9 BUILDING PERMIT APPLICATION /1l'Pl IC/'l IIcON nici.; I lil 1 Il l E D Y UILDING: PERMIT<FEE'> UILDINGi! S RCHARGE VALUE OF CONSTRUCTION - $ N(A SITE ADDRESS PROJECT NAME/TENANT J ' > C/ '- TYPE OF U New Building i<J Addition U Tenant Improvement (commercial) U Demolition (buitaing) WORK: O Rack Storage O Reroof O Remodel (residential) O Other ASSESSOR ACCOUNT # „.• ' DESCRIBE WORK TO BE DONE: B BUILDING USE (office, warehouse, etc.) SQUARE FOOTAGE - Building: i no 1 Tenant Space: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? (kNo O Yes IF YES, EXPLAIN: Area of Construction: 'PHONE PHONE , 2& s I ' EXP. DATE PHONE DATE DATE APPLICATION EXPIRES t-I -I l -91 ZIP y ZIP ZIP ti // )c'5? PHONE c<(L - &I E./ CITY/ZIP c ?( to PHONE j3 Id 7D 3 APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete In order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. COMMERCIAL COMMERCUIL BUILWFIO$/A oorsbuo%o RESIDENTIAL NEW WNQ L0AMILY :RMI LLNKi.. f Coma t p.MNt wr Account Nu wo[Wnp dnwn np� which ino udp: sit. plug +!�1 {Q►t piuR NowddrM +t Foundadon plan A! lud oNAN *.Roof pauti. Buillding oNiadfon : (wil Building Cross- aeotlon >: 9ttuclun�l framing WashMpbn Star 4Y,Cod.. Compiawd udlity pwmlt Six :(8)..at+ of site plant • uhowi NOTE Bu,Vdhp sit. plan **(IOW s O. plan may b u lq! pNm lt nppifcation and ahp fkiNir br M>r! • AdafUonat apog►aphioal.And io11d.infbrma0o0.. SlSBMITTAL CHECKLIST 2).* to Inspection Results /Comments: CITY OF TUKWILA Builds nepartment 6300 S :enter Boulevard Tukwila, A 98188 (206) 431 -3670 Type of Inspection ( Site Address 110a1 130 Requestor Si Lk Lao Special Instructions plQ .Q2 L11 �ys�aurxuu /c. gran+ rv. xnv% l+ v�;: ttraen�ake.. wtrv. rtrp+ rxvsninwamur�uatf x' I��t1'"•.:; i. t4:;{;.l fif tGLL. tOINt�'• c1' l+ fyiat�+? a/: mrnr... w.. �... r... �. w ,.,........,,. >.,,..:.d�..... _ • 0" ag /30 ?'Y / / cam $� INSPECTION RECORD PERMIT # Date Date Wanted ICY"' I j '94-) a.m. p.m. Project LOOr\e , sl iI Phone # l-131- 1103 o v Qtla`cEI f. e: 3° 1 ` .$ 1716141 Date j 0--1 S W October 23, 1990 Mr. Bill Looney P.O. Box 66098 Seattle, WA 98166 Dear Bill: Dave Larson Building Inspector CITY OF TUKWILA 6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 PHONE k /206) 433.1800 RE: Proposed house move to 13028 32nd Avenue South, Tukwila The items listed below will be required repairs that need to be taken care of prior to occupancy. 1. Any broken glass replaced with thermal -pane glass per current code. 2. Replace rotten wood or infested areas. 3. Insulate under floor (R -19 insulation) if not over basement. 4. Install smoke detectors per U.B.C. 5. Attic space to be vented per U.B.C. 6. Obtain necessary permits: A. Building Permit (Foundation) B. Electrical Permit - Washington State Department of Labor and Industries (277 -7272) C. Plumbing Permit - King County Health Department (296 -4732) D. Utility Permits E. Mechanical Permits F. House Moving Permit NOTE: U.H.C. - Uniform Building Code, 1988 Edition. Sincerely, Gary L. VanDusen, Mayor "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 X 11 Pre — Move Inspection 431 - 3670 12 13 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 17 BUILDING FINAL 431 -3670 (INSPECTOR COMMENT SECTION ON REVERSE) CITY OF TUKWILA Department of Community Development - Building 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 Division SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: ) o - /9b PROJECT: Looney, Bill J SITE ADDRESS: 1627 S 130 BUILE»NG PERMIT INSPEC1ION RECORD (Post with Building Permit In conspicuous place CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11 12, 13, 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 06/17/90