HomeMy WebLinkAboutPermit 6274 - Looney Residence - Pre-Move InspectionPROPERTY OWNER Bill Looney
PHONE 242 - 8151
ADDRESS P.O. Box 66098, Seattle, WA
ZIP 98166
CONTRACTOR
PHONE
ADDRESS _J
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT
PHONE
ADDRESS
ZIP
USE ,:�
/
/
( ODE
COL11'I
/ .
IArJCI
/ ;.
/
FLOOR_r_
SQUARE
FEET
OCC.
LQAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
.
TOTAL
TYPE OF CONST:: N/A UBC EDITION (year) 1988
SETBACKS: N - S - E-
W—
(through
Public Works)
FIRE PROTECTION:
❑Sprinklers ❑Detectors NA
UTIL ITY PERMITS REQUIRED? ❑Yes [x] No
ZONING:
BAR /LAND USE CONDITIONS?
❑ Yes
❑X No
CONDITIONS (other than those noted on or attached to . ermit/•Ians)
CITY OF TUKWILA
Dept. of Community Development- Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDING
PERMIT NO.
DATE ISSUED:
SIT A
1627 S 130
PROJECT NAMElfENANT
Looney, Bill
N/A
ASSESSOR ACCOUNT # N/A
TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building) U Grading/Fill
WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ® Other: Pre - Move Inspection
DESCRIBE WORK TO BE DONE:
House to be moved to 13028 32nd Avenue South.
APPROVED FO
ISSUANCE BY:
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of lay
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
PRINT NAME: , / / f CC/VPL
SIGNATURE:
(pD
In is �o
C BUILDIN3 PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
BUILDING PERMIT FEE
PLAN CHECK.FEE ;
BUILDING SURCHARGE
25.00
25.00
OTHER: :::::
TOTAL-
2455 • 10_119
I PLAN CHECK NO.:
90 -421
BUILDING
OFFICIAL
DATE:
COMPANY:
DATE: /0
cta /a 11l0
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
I CERTIFICATE OF DATE ISSUED:
OCCUPANCY NO. , V 1 A
urrtoiw
PERMIT NO.
CONTACTED
Sill
DATE READY
DATE NOTIFIED
I o- i a qo
BY: ` On ,[�
,.-{a
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(mu)
AMOUNT OWING
Cb
3RD NOTIFICATION
BY:
(inf.)
BUILDINCOPERMIT
APPLICATION TRACKING
PLAN CHECK
NUMBER
q
PROJECT NAME
SITE ADDRESS
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
LOAD
SQUARE
FEET
occ.
LOAD
soul
FEET
oc4.
LOAD
bow
FIST
ode.
LOAD
FEET
060.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
DEPARTMENTAL REVIEW
"X" In box indicates which departments need to review the project.
.■•"t , 1'
BUILDING -
initial review
O FIRE
O PLANNING
O PUBLIC
WORKS
O OTHER
1BUILDING -
final review
Ior 1 1
REVIEW COMPLETED
INIT:
INIT:
INIT:
INIT:
(ROUTED)
(ill
I low] 5 ) 3D
rn•:: x:: r. .:y::•
fir.: x:: ,.;•, :;.: }:•
all
FIRE PROTECTION: L
FIRE DEPT. LETTER DATED:
ZONING:
REFERENCE FLE NOS.:
all
MINIMUM SETBACKS: N- 8-
DTILITY REWIRED? rj Yes (
PUBLIC WORKS LETTER DATED:
SUITE NO.
ciders ❑ Detectors od N/A
INSPECTOR:
LIAR/LAND USE CONDITIONS? n Yss J No
W
I :
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER • 0 Q
S
NATURE OF BU (NESS:
WILL THERE BE A CHANGE IN USE? ' No U Yes IF YES, EXPLAIN:
PROPERTY OWNER
/\J2
ADDRESS I o? In for
CONTRACTOR �fl
ADDRESS �/
_--
WA. ST. CONTRACTOR'S LICENSE #
ARCHITECT
ADDRESS
BUILDING OWNER
OR
AUTHORIZED
AGENT
CONTACT PERSON
DATE APPLICATION ACCEPTED
SUITE #
SIGNATURE nn
PRINT NAME '� 1 k , ox) lei
ADDRESS eo gcx 0(9
BUILDING PERMIT
APPLICATION
/1l'Pl IC/'l IIcON nici.; I lil
1 Il l E D Y
UILDING: PERMIT<FEE'>
UILDINGi! S RCHARGE
VALUE OF CONSTRUCTION - $
N(A
SITE ADDRESS
PROJECT NAME/TENANT
J ' > C/ '-
TYPE OF U New Building i<J Addition U Tenant Improvement (commercial) U Demolition (buitaing)
WORK: O Rack Storage O Reroof O Remodel (residential) O Other
ASSESSOR ACCOUNT #
„.• '
DESCRIBE WORK TO BE DONE: B
BUILDING USE (office, warehouse, etc.)
SQUARE FOOTAGE - Building: i no 1 Tenant Space:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? (kNo O Yes IF YES, EXPLAIN:
Area of Construction:
'PHONE
PHONE , 2& s I '
EXP. DATE
PHONE
DATE
DATE APPLICATION EXPIRES
t-I -I l -91
ZIP y
ZIP
ZIP
ti
// )c'5?
PHONE c<(L - &I E./
CITY/ZIP c ?( to
PHONE j3 Id 7D 3
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete In order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
COMMERCIAL
COMMERCUIL BUILWFIO$/A
oorsbuo%o
RESIDENTIAL
NEW WNQ L0AMILY :RMI LLNKi..
f Coma t p.MNt
wr Account Nu
wo[Wnp dnwn np� which ino udp:
sit. plug +!�1 {Q►t piuR NowddrM +t
Foundadon plan A! lud oNAN
*.Roof pauti.
Buillding oNiadfon : (wil
Building Cross- aeotlon >:
9ttuclun�l framing
WashMpbn Star 4Y,Cod..
Compiawd udlity pwmlt
Six :(8)..at+ of site plant • uhowi
NOTE Bu,Vdhp sit. plan **(IOW s O. plan may b
u lq! pNm lt nppifcation and ahp fkiNir br M>r! •
AdafUonat apog►aphioal.And io11d.infbrma0o0..
SlSBMITTAL CHECKLIST
2).* to
Inspection Results /Comments:
CITY OF TUKWILA
Builds nepartment
6300 S :enter Boulevard
Tukwila, A 98188
(206) 431 -3670
Type of Inspection (
Site Address 110a1 130
Requestor Si Lk Lao
Special Instructions plQ .Q2 L11
�ys�aurxuu /c. gran+ rv. xnv% l+ v�;: ttraen�ake.. wtrv. rtrp+ rxvsninwamur�uatf x' I��t1'"•.:; i. t4:;{;.l fif tGLL. tOINt�'• c1' l+ fyiat�+? a/: mrnr... w.. �... r... �. w ,.,........,,. >.,,..:.d�.....
_ • 0" ag
/30 ?'Y / / cam $�
INSPECTION RECORD
PERMIT #
Date
Date Wanted ICY"' I j '94-) a.m. p.m.
Project LOOr\e , sl iI
Phone # l-131- 1103 o v Qtla`cEI f.
e: 3° 1 ` .$ 1716141
Date j 0--1 S W
October 23, 1990
Mr. Bill Looney
P.O. Box 66098
Seattle, WA 98166
Dear Bill:
Dave Larson
Building Inspector
CITY OF TUKWILA
6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188
PHONE k /206) 433.1800
RE: Proposed house move to 13028 32nd Avenue South, Tukwila
The items listed below will be required repairs that need to be
taken care of prior to occupancy.
1. Any broken glass replaced with thermal -pane glass per current
code.
2. Replace rotten wood or infested areas.
3. Insulate under floor (R -19 insulation) if not over basement.
4. Install smoke detectors per U.B.C.
5. Attic space to be vented per U.B.C.
6. Obtain necessary permits:
A. Building Permit (Foundation)
B. Electrical Permit - Washington State Department of Labor
and Industries (277 -7272)
C. Plumbing Permit - King County Health Department
(296 -4732)
D. Utility Permits
E. Mechanical Permits
F. House Moving Permit
NOTE: U.H.C. - Uniform Building Code, 1988 Edition.
Sincerely,
Gary L. VanDusen, Mayor
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
X
11 Pre — Move Inspection
431 - 3670
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
17 BUILDING FINAL
431 -3670
(INSPECTOR COMMENT SECTION ON REVERSE)
CITY OF TUKWILA
Department of Community Development - Building
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
Division
SUITE NO.:
BUILDING
PERMIT NO.
DATE ISSUED:
) o - /9b
PROJECT:
Looney, Bill
J
SITE ADDRESS:
1627 S 130
BUILE»NG PERMIT
INSPEC1ION RECORD
(Post with Building Permit In conspicuous place
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11
12,
13,
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
06/17/90