Loading...
HomeMy WebLinkAboutPermit 6277 - Southcenter South Industrial - Reroof1 - warm Corporate Property Investors 575 -8787 ADDRESS 20206 72nd Avenue South, Kent, WA ZIP 98032 CONTRACTOR Custom Roofing, Inc. PHONE 762 -0170 ADDRESS 8001 Fifth Avenue South, Seattle, WA 'ZIP 98108 WA. ST. CONTRACTOR'S LICENSE # CUSTOR *291M9 EXP. DATE 9 -30 -91 ARCHITECT PHONE ADDRESS ZIP USE ,4 (•OI)r ('OmPi 'Ariyl- FLOOR SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD. SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD TOTAL TYPE OF CONST.: UBC EDITION (year) 1988 SETBACKS: N - S - E No ❑ Yes '.- W (Pub(io rough Worksl ®No FIRE PROTECTION: ❑Sprinklers ❑ Detectors UTILITY PERMITS REQUIRED? O Yes BAR /LAND USE CONDITIONS? See at tached "Reroof Conditions © N/A ZONING: or attached to permlbplans) CONDITIONS (other than those noted on CITY OF TUKWILA Dept. of Community Development- Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BUILDING PERMIT NO. � DATE ISSUED: 1c)- 1 ►o BUILDILG PERMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) BUILDING PERMIT FEE' PLAN CHECK FEE BUILDING SURCHARGE TOTAL:: - • r F 10-04 1,018.00 4.50 1,022.50 2193 2193 ::': :10»04 -.90 PLAN CHECK NO.: 90 -414 18291 Olympic Av S PROJECTNAME/TENANT Southcenter South Industrial Park ASSESSOR ACCOUNT # 788890- 0152 -09 TYPE OF O New Building Addition ❑ Tenant Improvement (commercial) Li Demolition (building) Li Grading/Fill WORK: ❑ Rack Storage © Reroof ❑ Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: Install new built up roof over existing roof. 208,000.00 APPROVED FOR ISSUANCE BY: SIGNATURE: e, C- CERTIFICATE OF OCCUPANCY NO. BUILDING OFFICIAL DATE ISSUED: DATE: . 0 _ d I hereby certify that I have read and exa ined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. DATE: /0 - / :" This permit shall become null and void if the work is not commenced within 180 days from t e date of . issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT NO. CONTACTED c DATE READY DATE NOTIFIED iq BY: PERMIT EXPIRES 2nd NOTIFICATION BY: Mt.) AMOUNT OWING 3RD NOTIFICATION BY: Unit.) • BUILDINCPERMIT APPLICATION TRACKING PR E T NAME oumc n e ( 3oVih "rid P . alrl< SITE ADDRESS SUITE NO. ' U ►1 O19 lL NV PLAN CHECK NUMBER C IO - L - 11 1 4 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGEJOCCUPANCY INFORMATION (to be filled out by Plan Checker) LOAD SQUARE FEET OCC, LOAD DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. BUILDING - � �_ initial review O FIRE O PLANNING O PUBLIC WORKS O OTHER a BUILDING - final review REVIEW COMPLETED INIT: INIT: INIT: INIT: INIT: ZONING: REFERENCE FLE NOS.: MINIMUM SETBACKS: N- I ' - -5101 '' :i PUBLIC WORKS LETTER DATED: - TYPE OF CONSTRUCTION: .}:/ C T$ Date - dat �pprovsd S- OS IBARILAND USE CONDITIONS? ' [ ]Yes fj/No UBC EDITION (year): w SITE ADDRESS SUITE # 18291 Olympic Avenue South VALUE OF CONSTRUCTION - $ 208,000.00 PROJECT NAME/TENANT Southcenter So. Ind. Park / Bldg. 469 ASSESSOR ACCOUNT # 788890 - 0152 - 09 TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building) WORK: 0 Rack Storage Tg Reroof 0 Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: Install new built up roof over existing roof. BUILDING USE (office, warehouse, etc.) Office & Warehouse NATURE OF BUSINESS: Multi Tenant Facility WILL THERE BE A CHANGE IN USE? L2 No U Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: 126,000 Tenant Space: 126,000 Area of Construction:12 6 , 0 0 0 WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? Ig No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER Corporate Property Investors PHONE 575 -8787 ADDRESS 20206 - 72nd Avenue South, Kent, Washington ZIP 98032 CONTRACTOR Custom Roofing, Inc. PHONE 762 -0170 ADDRESS 8001 - 5th Avenue South, Seattle, Washington ZIP 98108 WA. ST. CONTRACTOR'S LICENSE # CUSTOR *291M9 EXP DATE 9/30/91 ARCHITECT N/A PHONE ADDRESS ZIP HEREBY CERTIFY THAT I; HAVE READ AND °EXAMINED THIS APP'LICATI KNOW THE SAM TO BE T RUE AND CORRECT, AND I. AM AUTHORIZED TO APPLY FOR THIS PERMIT BUILDING OWNER OR AUTHORIZED AGENT SIGNATURE �' ~ /: , P � - 0- - ,_.� DATE 10/4/90 PRINT NAME E.L. Larson PHONE 762 -0170 ADDRESS 8001 - 5th Avenue South CITY /ZIP Seattle 98108 CONTACT PERSON Ed Larson •� � �, P HO NE 762 -0170 CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 APPLICATION 11.1W- BE FILLED OUT COMPLETELY D ATE APPLICATION ACCEPTED qo BUILDINa PERMIT APPLICATION FEES (for staff use only) DESCRIPTION BUILDING :PERMIT:: FEE PLAN CHECK .FEE BUILDING SURCHARGE ENERGY SURCHARGE OTHER: TOTAL • AMOUNT: >:1 ►018.00.:. 4.50 RCPT # 1:022.50' ; y DATE itt, 440 APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 433 -1851 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION EXPIRES 09/90/80 COMMERCIAL ‘••• • Stru celcuMons stamp ] Soi report stamped by a Washington .•••• so S tate Hof. - description plan Architectural drawIns Struural • • ' '' ••• – Aftwitf! • drawing*....:::,H Mechanical Things '''' .... "••••••• ••••• "•••••••.•:'•••f: NOTE S.. ut Wiy permit application and • - Completed building permit application • . o (2) sets of plans, which md Bung oor plan showing M�uio , • . , , • : .NOT.E:i.JaPisIde•OntertalOneel. i*Cltel h;... and exit ways on plan i...tibOobjilibelObistlOns'etenitied by *Wet* engineer (radi storage Wand over) ited •:s1846).../Eils rdi.toyf • • • Exit doors Tenan! spat* Poor plan showing 110 b19( RESIDENTIAL NEW $INGLEFAN$LY DViELL.INICIEWADDI Completed building permit application (one for each strudi J Legal description C : . .• • i• ... • :. : • • Assessor Account Number Two sets (2) of eaorcingdreWings;*hich:inclu Si* plan , • , • , • 'Foundatio plan , .•:•" • Floor plows. views •......•: 134401 or?" • • Siwctural framing plans SISdMITTAL CHEC KLIST leted bulldng permit application (one for each Narrative describing existing roof material being removed an NOTE A oeriltfoaUon lefler Is required prior to final Inspection and ....... • • **000 a.PP1 ... ,...e,ani to 044 40 !# 9 q :,. !!T i . , • ,. ••••'••• • fl Assessor Account 04 wo (2) sets of plans, which InclUde Site Plan (showing building and location of antenns/satellfte dishj • Detail • eit/Sitellbe dish and Structural c slcr4ations stamped Washington State Iloeni . COMpletedbUildingpermltepplicatIon Assessor Account Number • • • • • • • • •••••''''.. • ••• :•• • :,....:::::::,•:i•:•40;:Y Twe c!'...,::::.,::::::•• ::.',..:::::.•,..:;.:?,:::: '•::.--4..,.,;'..:,.....1.;:,:,::.:::::::'.:::- :':.'.......:.:,.:::::::;i:.::::::.E::::::••:::::: ''''''''''''''":•••• ::. w or king . 0!:r.•:::.•::::::::•::.,.:,•,:•:.::::',:::::.,..,.:::::•::::::::::.:::::...,.. sets of ::::•""::::.'•:''''''.elie 011111::••:.,i;iiiii::1::„:.,:;:.-•,:::,,Ji••:•.::•...„:::,„:-.: ;..... ,..., ., , . Foundation F1bOr'Plr.::::::::•..„.._..., ..,:',:',!..!;•fiif.;:fio4-.. ) • ,........ . . ••• • ".;:liti.:::t;;H' ' . 1:4::*'' " swan,- kilOCIroil'•crt!sur7-109: ...,„.....,.......:....:: ,-. RERooF " ... Completed building oer**0004#96 (op*. for..000 Narrative describing existing root, material being removed, and - msedal being installed PROJECT: _1 p ` /.40 /.I • '-` ii _//. . a (" PERMIT NO. / , '' SITE ADDRE8 = : i r Al .�! ... / �'I� DATE CALL '2 - �- � TYPE OF INSPECTION 1 DATE WANTED: Z r/ — � �• 4/2) -- � SPECIAL INSTRUCTIONS: a A4(1)22 D REQUESTER: (i PHONE NO.: /' ? r O/2 ' at ' iV .i..ia - VA . 1 4/ ' .'' , IN = i ECTION RESULT /COMMENTS: 4' .. - v 2 . , • 'Z' _../ / _ r DATE: 2,...— ,�-- / PECTOR: f, ., � le-1,--4% • CRY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 e , A. 8001 5TH AVENUE SOUTH SEATTLE, WASH. 98108 PHONE 762 -0170 Subj: Reroofing Project: Building 469 :Southcenter South Industrial Park 18291 Olympic Avenue South Tukwila, Washington February 7,• 1991 .Custom Roofing has. installed a new built up roofing membrane in compliance with the following specifications Owens- Corning Specification # 31 - IC Insulation -- 3/4" Fiberglass Per Owens- Corning specifications this roof tae:-a. Class : " "A "'rating, over 3/4" fiberglass insulation. Please:. see c o p y of UL Specification Index attached. Interply/ Surfacing / ' Slope Bitumen Type Materials per 100 ft Interply Felts 3 plies Bitumen 0 -1/2" II, Ill 75 lbs 1/2-3" III 75 lbs 3 -6" IV 60 lbs Surfacing Asphalt 0 -3" III 25 lbs 3 -6" IV 20 lbs PERMA CAP 78 lbs rJBERGLAS Insulated -Cap Sheet 33 -1 PERMA PLY -R Application of Insulation Apply roof insulation in accordance with specification requirements. Insulation joints should be staggered in one direction, For multiple -layer applications, joints of each layer should be offset a minimum of 6 inches from all joints of the preceding layer. Application of Plies Embed three plies of PERMA PLY in shingle fashion (starter sheets required), lapping 24-2/3 inches into uniform moppings of hot asphalt, using a nominal 26 lb /100 ft per ply. Plies may be left exposed up to six months without surfacing, Application of Mineral Surface Embed 12 -ft. lengths of PERMA CAP (18-ft. in Area III) with 2 inch side and end laps into a uniform solid mopping of hot steep asphalt, using a nominal 25 lb /10010. PERMA CAP end laps should be staggered 3 ft. 31 -IC PERMA PLY -IV ,•vr I n yr J u.i.r Fleshings See Flashing Section, General Nolte All general instructions contained in the General Requirements section shall be considered part of this specification. Drainage Roof decks must be graded to drain all water freely. Drains shall be sufficient in number and size to assure rapid elimination of water from the roof surface. Nailing Treated wood milers are required on inclines exceeding 2 inches per foot to help secure insulation and roof membranes to non- nailabte decks or to decks with insulation. Natters should be the same thickness as the insulation and should be installed perpendicular to the slope on 8 foot face -to -face for slopes up to 3 inches per foot and 4 foot face -to- face for slopes greater than 3 inches per foot. Felts are to run parallel to the incline and must be secured at each nailer, 12" in from the back edge of the felt. Each nail must be covered by succeeding plies. High temperature areas may require nailing on lower slopes. !r 33 IC All Areas 31 -IC All Areas moor ,,.vr n,'r $ .1.r I RI ▪ ` To P LOW% PLY PON pv To Nob 33 Nominal Installed lb /100 ft (Below weights exclude roof insulation and are provided for system design consideration) 33 -IC 31 -IC 202 202 rJBERGLAS Insulated -Cap Sheet 33 -1 PERMA PLY -R Application of Insulation Apply roof insulation in accordance with specification requirements. Insulation joints should be staggered in one direction, For multiple -layer applications, joints of each layer should be offset a minimum of 6 inches from all joints of the preceding layer. Application of Plies Embed three plies of PERMA PLY in shingle fashion (starter sheets required), lapping 24-2/3 inches into uniform moppings of hot asphalt, using a nominal 26 lb /100 ft per ply. Plies may be left exposed up to six months without surfacing, Application of Mineral Surface Embed 12 -ft. lengths of PERMA CAP (18-ft. in Area III) with 2 inch side and end laps into a uniform solid mopping of hot steep asphalt, using a nominal 25 lb /10010. PERMA CAP end laps should be staggered 3 ft. 31 -IC PERMA PLY -IV ,•vr I n yr J u.i.r Fleshings See Flashing Section, General Nolte All general instructions contained in the General Requirements section shall be considered part of this specification. Drainage Roof decks must be graded to drain all water freely. Drains shall be sufficient in number and size to assure rapid elimination of water from the roof surface. Nailing Treated wood milers are required on inclines exceeding 2 inches per foot to help secure insulation and roof membranes to non- nailabte decks or to decks with insulation. Natters should be the same thickness as the insulation and should be installed perpendicular to the slope on 8 foot face -to -face for slopes up to 3 inches per foot and 4 foot face -to- face for slopes greater than 3 inches per foot. Felts are to run parallel to the incline and must be secured at each nailer, 12" in from the back edge of the felt. Each nail must be covered by succeeding plies. High temperature areas may require nailing on lower slopes. !r 33 IC All Areas 31 -IC All Areas moor ,,.vr n,'r $ .1.r I RI ▪ ` To P LOW% PLY PON pv To Nob 33 05/20/1990 14144 FROM CUSTOM ROOF N C. I • PERIMA PLY•V UL' Specification Index. . CNu • lige? a Gteyet lmuttlott 4112 3142 Alumimon amid Awrlte / MtnetII Cee • t>e NC .Nan•Comlw4l'ets C .CoNwUM4 .• Pl. Plye/esd Mm 1 '• • NA .Nut ApAeme4 eo44Mtatlene PERMA tvIV • 31PC 2' 2' 2• 11" 2• 2' 14' 2 • 2• n• 31• (C 2' 21TC 41.NC 31.40 41.4C 3 1♦" 3' 31 T/ 3' a1•N1 3• 41•X1 3' )1•IC 2140 41•NC $1•40 41•x0 Mate C. Meeinum • km4•14,0 Ddtitt WIN Mky,Tblebtae Mu. Tt4 knees 1 111412W.W1110 DodsONO, , • :13•A CD IMF O ty1 linilmtee 4140 3' tAC:C: 3' NC:C:PL 31 0 3' NC: 3' NC7CPL 21•TO 3' NC;C:'L • . 1110 Unlimited a1P•10 x' ' NC:C:K' .. A'PO,PWINC Osck OnlY) Unlimited to NC:C,'OL , . ; • 1•3 4' 31P•TO 14' . NC;6.PL, • • •11'MO,1%%11C the it Wei UntlmiNd A• NC,C;PL • 1.3•A a' 71111.10 w' NQIK' ' . ,I'WINC Mk Orly) UMMI 41•NO 3' • •. • NCIC,PI.'• . ' .NM,. NA 31.40 3' • • NA NA 4111.NO 'v NC: ' C.RL • • . Nb1 . NA 311440 K' NC,'CIIR ; IlA • NA $1.20 a. NC4:114 • • ' IA � NAA 31•k0 3" :NC:C:AI'.. • 41 4 f n ' . ...lt$444,�•'NjN. ,.� -�.t « , 1.710 ¶1' . 311 51.• NClC:K Well C 11 4 1.10 2' NC :CAL E ., " • 1•11epe) Unlimited NC:C,'►L N•PaRW or 1,3'A 4" NC :0:M. . • A'Pa Uv mIi,d NC:C:PI, A•P0.'1•MM,s, 11401 UnlY•h44 NC • 1.211 • V 1414.111Y or 1.3'A 4• liArnited NC,'C;K NC • C;K NC • • • . NC• NC . VMS' tit ' ' : • %'Ita11W w 1.2'A NC 14 [0,11' NC '' ,; A ' Nd , ' NA NC • m 41•1 2' • IL O.I lb' NC. . 4410.1114 w 1.3 2111 2' NO • .•M • 3115 2' NC • 41.1C 3' • NC/0 • • WOO' N'0 12' . I • • . NCtC K: • 1112.YV • 12' NC:t::K 1.3% 12 • yyCC,, • • a. PO 12• NNlCC�..JCC;;Pl. • NA, NOON. :. ':'. • 12' NGC NA NIA NIA NA NIA NA 1' • 4• • 4• NA 4' 1' 4' 4• UPliffkhed • 4• P.05 , U � mites k tiler/se te Mt* ` 1. Ale m olleaNan memidI to sill l 2. &II vowr liti 4s epprorda gal. • ••1: $ 1M4a 1lt1knSNSe, elms end 44440 27 TOTAL P.05 • f �. C�tc'�.F �:-. 1�•�i3 t : !?' ?`a.* ' 7;ii iWd rt&r: CITE OF TUKWILA 6300 6300 S partmant enter Boulty rd Tukwila, 98188 (206) 431-3670 Inspector Inspection Results /Comments: ‘, va.1.�Lv`alituyvKS'o91g kxl. ma' L.. C iA. c um,:6:'.'.i'�iZ'.;wvita u;.a INSPECTION RECORD PERMIT # 1 Date 1 0- 1 1 -9 o Date io Type of Inspection Pf.e 1242.(00►f Date Wanted 1 0— '1 cj...gC p.m Site Address 1efj'o?q 0 I3mp14 f\ ' J ` S Project Spu- tihcprttey 5. zr,1 Pat* Requestor -e_v.2. L&r on Phone # - (pa' ono Special Instructions '\.pUX. CaI\ o. rva (- -them Kmu,) Wes{- +6111L Can YY ,2 oV x nSw-er anj or't . mss- "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 X 11 Pre - reroof 431 - 3670 12 13 14 FIRE FINAL Imp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 18291 Olympic Av S OTHER AGENCIES: BUILNING PERMIT INSPECTION RECORD (Post with Building Permit in conspicuous place) SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: Co ate 1 0-1 - ) - ctiO PROJECT: Southcenter South Industrial Park CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE (INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if undersiab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be Installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 0611790 October 9, 1990 City of Tukwila 6300 8outhcenter 81vd. Tukwila, WA 98188 Duane: Richard .lank R .E. President / / 0 3�t�z4 TOM ROOF pit I � NNC 7Ut FROM 9� CUS 2 1 � i uk z 869k LL8 90L NORTHWEST Attention: Duane Griffin Reference; Building 469 - Reroofing 01ympio Ave. S. Tukwila, wA 98108 • T O M . L All66 gill 06 -60 -100 d;1 er ,4 lot Ast. iS 4 c�dYe55 ! � dr // �. . -� y o� t P•eY4r�'i 0.,P /�tg 6 k oc k. out or Is ro N a i f s S4 hc,c• b/4 f1 td3 p4 Qc(drei6es-. 16 -10-70 We have checked our original design of the above referenced project and found that there was enough reserve in that design to compensate for the additional 2.75 psf of new roofing to be added to the existing roofing. There has been only one roof applied to bui,ldi:ng to date. A second is acceptable, a third will not be. The new roof will be mechanically fastened through the existing roofing to the sheathing below. There is no insulation (bait or rigid) in the present building and the underside of the sheathing is fully exposed. An areas that show signs of water damage or staining will be checked top and bottom for rot. The existing roofing will be removed and an examination made prior to installation of the new roof. Rotted plywood will be replaced, If you need further information, please call ale. Sincerely, afwv ck (>062 ndo fi dLi a so & / 0_,..„0 g — — 464esei 10/04/199 0 00103 FROM CUSTOM ROOFIN _ VH vm to l • 7r .. 9 � r T L 1 E ltv . h?I 1:. P I 5E44 , 1 � .', ; � .0' 1, Et 3��Y�l�Ec�,S TRIHWES 5 2-6 3 October 1, 1990 Corporate Property investors 20206 72nd Avenue South Kent, WA .96032 Attention: Jack Sennett Reference: Reroof 0469 Jack: Sincerely, ort R le, Vice President P.03 RECEIVED CITY OF TUKWILA OCT 4 1990 PERMIT CENTER In my previous letter to Rob Davlston, I •011a.i6ad that. there may be 2 1 aye rs of 6/8 •' gyp board oVer., the office area If they existed, there was no surp.Ni� Papacity. It has been confirmed that the gyp 'bard .O $ not exist. Thus, the reroofing can take place over , : .QAti re roof area without overloading it. � 10/0!t/t9,0,08i02 FROM CU5TOMig 0 F remises part of real property located..n ` King County, Washingt01 ascribed as Lot 21, as described in Short Plat. 071- 45 -35, recorded under King County Avditor's.Fi3S #7 #05011098 which is a portion of the Alan of Southcont,r s :South Industrial Park as recorded in Volum0 ,97 .of plats, pages 22, 23, 24 and 25, records of King „Count t0tsshington. I� LA CITY OF CE TUKW 0CT 41990 PERMIT CENTER P.02 P 012 •