HomeMy WebLinkAboutPermit 6312 - Dempere Residece - Reroof- • - "oil -
Tremana Ink
- e,
433 -8539
ADDRESS
4033 South 128th Street, Tukwila, WA
ZIP
98168
CONTRACTOR Jackie Dempere
PHONE 433 -8539
ADDRESS 4033 South 128th Street, Tukwila, WA
ZIP 98168
WA. ST. CONTRACTOR'S LICENSE # N/A
EXP. DATE N/A
ARCHITECT PHONE
ADDRESS
ZIP
USE .,�
/
01)1
('00
WI IAN(:f-
FLOOR
NV
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
■
TOTAL
TYPE OF CONST.: UBC EDITION (year) 1988
SETBACKS: N - S - E- W-
FIRE PROTECTION: (]Sprinklers Q Detectors 0 wA
UTILITY PERMITS REQUIRED? 0Yes R] No (through
Public Works)
ZONING:
BAR /LAND USE CONDITIONS? 0 Yes ED No
CONDITIONS (other than those noted on or attached to permit/plans)
APPROVED FO I. l i p - // BUILDING
BY: , 11 / '��/12 V , V ,,�,,'- J OFFICIAL
DATE: _ C/O
/ / _./6
CITY OF TUKWILA
Dept. of Community Development- Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDING
PERMIT NO ( - 3!
DATE ISSUED: I ) 90
B PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
BUILDING PERMIT FEE
PLAN:CHECK FEE
BUILDING SURCHARGE
OTHER:
TOTAL
25.00
4 50
3556
3556: :
11
16 -90
11- 16 -90
PLAN CHECK NO.:
90 -475
C
SIT 14211 37 Av S
PROJECT NAME/TENANT
Dempere, Jackie
TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building)
WORK: Q Rack Storage U Reroof U Remodel (residential) ® Other: _Reroof
DESCRIBE WORK TO BE DONE:
SIGNATU
PRINT NAME:
CERTIFICATE OF
OCCUPANCY NO.
L
OMPANY:
DATE ISSUED:
1,000.00
ASSESSOR ACCOUNT # 152304 - 9095 -09
Tear off existing roof and replace with new roofing material.
U Grading/Fill
I hereby certify that I have read and exam ed this permit and know the same to be true and correct. All provisions of lay
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
DATE: \ \ " \ k�? C ()
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection,
•
.
::
:::(
:i:3r. '
••� r
::: ».........
I1_1 b_9c
(ROUTED)
` 1 .1' : I ate ant - I ate .. rov
PERMIT EXPIRES
O FIRE
2nd NOTIFICATION
BY:
(Ink.)
BY:
ink
TOTAL
OCC. LOAD
,.
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUIRE
FEET
OCC. '
LQAD
TOTAL
SQUARE FEET
O OTHER
INIT:
0 BUILDING -
final review
'TYPE OF CONSTRUCTION: UBC EDITION (year):
•r: MN MN N .
. =r: •:i6 Vii•
_
.0: t
TOTA
. :.
.
::
:::(
:i:3r. '
••� r
SRI ■••
BUILDING -
initial review
I1_1 b_9c
(ROUTED)
` 1 .1' : I ate ant - I ate .. rov
PERMIT EXPIRES
O FIRE
2nd NOTIFICATION
BY:
(Ink.)
BY:
ink
FIRE PROTECTION: [) Sprinklers [ N/A
FIRE DEPT. LETTER DATED: INSPECTOR:
INIT:
0 PLANNING
O PUBLIC
WORKS
ZONING: 'BAR/LAND USE CONDITIONS? n yes jNo
REFERENCE FILE NOS.:
INIT:
MINIMUM SETBACKS: N- S- E- W-
i ' • - S TS - QU /4 as Yj .
PUBLIC WORKS LETTER DATED:
INIT:
O OTHER
INIT:
0 BUILDING -
final review
'TYPE OF CONSTRUCTION: UBC EDITION (year):
INIT:
PERMIT NO.
CONTACTED
DATE READY
DATE NOTIFIED
BY:
.)
(la)
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(Ink.)
BY:
ink
AMOUNT OWING
.1
_
3RD NOTIFICATION
� BUILDINGIPERMIT
APPLICATION TRACKING
PR E T NAME
PLAN CHECK
NUMBER
go-L115
•-• DAP r •
SITE ADDRESS
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
DEPARTMENTAL REVIEW
"X" In box indicates which departments need to review the project.
REVIEW COMPLETED
SUITE NO.
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
APPLICATION nal / &;I ILL
FILLED OUT COIIIP'L.f IEL V
SITE ADDRESS �} SUITE #
1�'�> > (fi 5
PROJECT NAME/TENANT
c 1 i� C Cam- tL,
TYPE OF ❑ New Building U Addition U Tenant Improvement (commercial) ❑ D
WORK: ❑ Rack Storaoe O Reroof O Remodel (residential) O Other
DESCRIBE WORK TO BE DONE:
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS:
WILL THERE BE A CHANGE IN USE? U No U Yes iF YES, EXPLAIN:
SQUARE FOOTAGE - Building: Tenant Space:
WA. ST. CONTRACTOR'S LICENSE #
ARCHITECT
ADDRESS
SIGNATURE
DATE APPLICATION ACCEPTED
BUILDINJ PERMIT
APPLICATION
•14:: .];1I i i r• y. (• 111: ho i N , '
;112IZEIPEEIPMM =MI
ismommierammonno
ILDING:PERMIT> FEE
TOTAL
BUILDING OWNER
OR PRINT NAME �►`
AUTHORIZED �� � L
AGENT ADDRESS Lkq
CONTACT PERSON p.Ck L . r
VALUE OF CONSTRUCTION - $
1, 000.00
ASSESSOR ACCOUNT #
i ans -- dots - o c1
litio
EXP. DATE
PHONE
(puildin
Area of Construction:
WILL THERE B STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? J No O Yes IF YES, EXPLAIN:
PROPERTY OWNER ( a ", v \/,) 1� PHONE L , -?„.1 <7, c.] - Ici
ADDRESS 'yo 2, 1 \ � �� U � � \ USE ZIP �� 1 ��
CONTRACTOR ,: c. .\ E (�( \� ' P HON t4 7 5 l
ADDRESS ..:� ( '`, Y 1 ZIP
SAME
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed Information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architecVengineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
DATE APPLICATION EXPIRES
ZIP
DATE
PHONE 1_133. cu-53q
CITY /ZIP -k J�� '
�
,, _
PHONE ) f �� `�
COMMERCIAL
•ERCAL. 0
t.1Nns
NEMI .W�AIbI
DOIT1t�1
Completed building permit ;app
:: .... .
sraor lccountN
�ratfvis;dr�aibi e xMng tnof msMEial
ttselr;.b.inp Ini taNad
lid building Pe/natal)
Assessor A000unl .NU
RACK';ATORA•
sassor Account Num
Two sets (2) of working drawings, which
• Sits plan *pram atawcoasst
• Foundation plan include sows 4 baiting, show r 0
• Floor plan Mrptb o/ac s) •
•:Roof plan . ; :;
• Building ekititlons (all viers
• Building cross - section
�.. St;uctural framing plain
Washington:Bialo Energy :Code
Completed uUllty permit appi
Six (6) sets of site plans showing ut i
Building site plan and utility site On snay.b. co+►IAin1d
permit &pp/kat/on and cheAWhst k>r eu6rrtit4tl nqukemwtti�
Additiorwt topographical and soil; information may be •
r c. oindidons. : .
SUBMITTAL CHECC.LIST
" REsppriAt 1lRiwIf7 •
.tyu
*.wtion
cm;.
s3b1100.1itarn
NOTE 1/ any utility tvor/t !a b ti er darts
and plxu Omit. tubrnitlagl
RE
o>yo /
•
RECEIVED
CITY OF TUKWILA
NOV 3 0 ,1990.
PERMITCENTER`
fMMM{Y1�Otiltlfinfi WrbY WM' .k�AMMIrtIWq +HFwblu"Nh.IHFRiH.!N W uVK.rad/:nuui M✓ �ruMYM.. ww <..uw...Yy.u� «.a..m...«.+.... war.+ Y. ww. ..hrvww.irca✓eew.rr....
CITY OF TUKWILA
Builds impartment
6300 S. center Boulevar. .
Tukw WA 98188
(206) 431 -3670 -#11
Date l R lb
Re — ' (ACK\ (RO Date Wanted I - 1a - ' gO ' n
a l .m.
Ljc&! ; j -- ) AN► j Project - RPm)-20e . CTO�C kl
- cuKl -e_. .Q r 47 P r , Phone # J- (653
Type of Inspection
Site Address
Requestor
Special Instructions
Inspection Results /Comments:
INSPEC .ION RECORD
PERMIT # Q0/ Q)
Inspector /..< Ge,._p��!�� Date
....... s........ w. ar.+. sr++ ww... nvrrn. w✓ r. ww�vona.+ w. Ye .nweRiwwM1YntllM1'Y�'w11lr1ijG; .
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED
INSPECT.
INITIALS
DATES)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
11 -1111apmrni
12
13
14 FIRE FINAL Insp: ___
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
X
17 BUILDING FINAL
431 -3670
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
SITE ADDRESS:
14211 37 Av S
OTHER AGENCIES:
BUILDING PERMIT
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
SUITE NO.:
BUILDING
PERMIT NO.
DATE ISSUED:
PROJECT:
Dempere, Jackie
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
- 3_10
(I-4)-ga
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar Is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
05/17/00