PROJECT UPDATE
/
i
/
e� 1 / /
Titj Poo.... r � / / / , / / //
a �a o cf/ / / , / / /
Staff continues to work on their in -house punchlist of items to continue to improve the details around the
facility. Some items from the list include: painting, refinishing benches, installing benches, miscellaneous
maintenance items, repairing doors, cleaning out old supplies in storage, cleaning up at the pool and in the shop
area in the mechanical room, brushing and vacuuming the new liner, and many other various items. McKinstry
has completed all the punchlist items and is focusing on the project closeout paperwork and the pool recirc
pump and VFD warranty item. The Commencement of Energy Savings started on May 1 and will last for one
year. During this time McKinstry will measure and verify that energy savings that were guarenteed to the pool
through this project. At the end of the year if the savings have not been realized then McKinstry will either pay
the difference or conduct repair work at their cost to ensure savings are obtained. Staff continue to hear lots of
postive feedback from patrons and occasional comments in regards to tweaking systems (Le. push button
shower run times, etc.).
Target Completion Date: Notice of Completion coming to May MPD Meeting
Project Stage: Closeout
Project Budget: $1.67M
Ti#I , u fla oo Ext aol cae srjrrf ro /, / / //r //
Description - The Parking Lot & Access Improvements Project work was finished 1/14/13 on time and under
budget. Project completion and closeout process was initiated March 4 by the City Council. This typically takes
up to 90 days for all releases.
Target Completion Date: Completed
Project Stage: Design
Project Budget: $60,000
Staff met with the roofing contractor on 5/8/13 and completed and inspection and substantial complettion.
There is a punchlist of items that will be taken care of but the project closeout paperwork has begun now. The
plan to fix the issue of water spilling over the gutters is being handled by adding three additional downspouts to
the gutter system. Remaining equipment and supplies were off loaded on 5/10/13
Target Completion Date: Weather Dependent (Spring 2013).
Project Stage: Construction Wrap -up /Project Closeout
Project Budget: $85,000
ea?r� , ear r "pia„
e,�irtmn�IJll,i�irAnutl /�,rii ��aiiii nwiir��i,�,. n mirrrr «o,ram4iniiiiaa
No change.
mi1i
o tii r i g iii�ri✓ i
do us�c� / / / /
Target Completion Date: Fall 2013
Project Stage: Researching Products
Project Budget: $10,000
5
5
7
8
9
10
TUKWILA
PARKS . PIC . EAT1ON
PARKS COMMISSION
PROJECT UPDATE
' G'///r, /e//% // / /iii /l0 OG %l // /i /v / / !U /� %l k /v� //' ,off/ 4 /i /an,�;,�J7 ,�
ne Elflci , #r+ p r/1oY Y�e�Cllu i e
mra.,.,./r // r'JJJJJ7f /v7,i /�ii�umoG. /a0 /��(/ O „/„ „u// /;: //,, %/: , ii / _:, /G /� /. /: ,/ ,e, / / rCl /,
This has not panned out and will be removed from the project list.
Target Completion Date:
Project Stage:
Project Budget:
pj /ioiapiirrN,, iiiaiiac , rriiG r for .a /ao ii7 /Ninii / /aril riiirir ai
rem
j ein„ ` 9r ! '`i 1? j �' �
Receiving a quote for this work. Planning on looking into possibilty of rebate from SCL.
Target Completion Date: June 2013
Project Stage: Research and Planning
Project Budget: $2,000 - $5,000
r. ,r.; r r l� Nr r �i
it r J i /1'r / W.l./ ....3 // �
iE�� � I P e' a re / /
A few of the DHP Management Team members have been emailing back and forth trying to find a time to meet.
Unfortunately this has not worked out so staff are looking to meet with one or two and the other team members
will provide input via email. All involved are anxious to get the plan for this year solidified. Still awaiting further
info on the CIP funding issue.
Target Completion Date: On -going
Project Stage: Testing for Phase 2 /Restoration /Maintenance
Project Budget: Unknown but lots grants for this project
itlif/Ds „c
No update
,'ou�ED / / % %O %O
Target Completion Date: Unknown
Project Stage: Public Input Gathering
Project Budget: N/A right now
1, , „
r
/ % Off/ //
ParN/ ia�lAr9i epa�i / ref „/ ,
�ao
Preliminary work has begun on the request for bids specs for a "maintenance striping” contract,
Target Completion Date: 2013 Weather Dependent
Project Stage: Scope Planning /Design
Project Budget: $15,000 - $20,000
,,Yr ,Y,
Grr a ! / tr c lJ L rc, drf Aio oY�
l/
I
r
l�
tl,,,, P e:rn,
i fi
� 1
No new update.
ivy /„
'1".011,0* a / /i / y /
I / / / /
Target Completion Date: 2013
Project Stage: Design
Project Budget: $30,000