City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Transportation Committee
Bob Giberson, Public Works Director 4,
Robin Tischmak, City Engineer
March 21, 2014
Strander Boulevard Extension /53rd Ave S /Cascade View Safe Route Phase II
Project Nos. 98610403, 99110301, 91210301
Grant Applications
ISSUE
Authorize the submittal of grant applications for federal and state transportation funds.
BACKGROUND
The USDOT announced TIGER FY 2014 grant applications are due on April 28, 2014. PSRC
is overseeing the regional and countywide competitive process for federal transportation
grants. The regional grant applications are due on April 8, 2014 and the countywide
applications are due May 7, 2014. WSDOT has announced that Safe Routes to School grant
applications are due on May 5, 2014.
DISCUSSION
Strander Boulevard Extension Project:
Final Phase
TIGER FY grant (68 %)
PSRC /FHWA grant
FMSIB (pledged)
TIB /Renton /Tukwila Match
$37,000,000
$25,000,000
$5,000,000
$5,000,000
$2,000,000
53rd Ave S (S 137th St to S 144thSt
Project Total
City 103 Fund
Safe Routes to School
Surface Water Fund
Water Fund
$4,168,000
$451,000
$1,000,000
$1,557,000
$1,160,000
Cascade View Safe Routes to School — Phase II (33rd Ave S/S 140th St
Project Total
City 103 Fund
Safe Routes to School
Developer Contribution
$839,000
$89,000
$750,000
Future potential from nearby shortplat
RECOMMENDATION
Committee approval to submit grant applications for the grant funds listed above.
Attachments: Strander Blvd /SW 27th St Extension, CIP page 31
53rd Ave S, CIP pages 6, 90, and 65
Cascade View Safe Routes to School, CIP page 3
W: \PW Eng \OTHER \Grant Applications\2014 \INFO MEMO 2014 Grant Apps TC 03- 24- 14.docx
8
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2014 to 2019
PROJECT: Strander Blvd /SW 27th St Extension Project No. 98610403
DESCRIPTION: Renton to design and construct arterial improvements for a new roadway extending Strander Blvd/
SW 27th St from West Valley Highway to Oaksdale Ave.
JUSTIFICATION: East/west capacity between 1 -405 and S 180 St is needed to serve Tukwila and Renton access.
This project will be constructed in three phases. Phase 1 has been completed that extended Stander Blvd/
STATUS: SW 27th St from Oaksdale Ave to Naches Ave SW. Phase 2 will construct a 2 lane roadway from Naches
to the new Sounder's Tukwila Longacres Station's parking lot. Phase 3 will construct the undercrossing
of the UPRR and complete the 4 lane roadway from West Valley Hwy to Naches Ave SW.
MAINT. IMPACT: New street.
COMMENT: Project partners include the City of Renton, Boeing, WSDOT, FMSIB, Sound Transit, Metro, Amtrak, and
BNSF and UP Railroads. Funds in 2014 are for professional services for a TIGER grant application.
FINANCIAL Through Estimated
(in $000's)
2012 2013 2014
2015
2016
2017
2018
2019
BEYOND TOTAL
EXPENSES
�r
L
F,otgr
'.lam
Design
40
20
3,000
3,060
Land (R/W)
104
500
604
Const. Mgmt.
4,050
4,050
Tukwila's Share
1,000
25,600
26,600
TOTAL EXPENSES
1,144
0
20
0
0
0
0
0
33,150
34,314
FUND SOURCES
Awarded Grant
0
Proposed FMSIB Grant
5,000
5,000
Proposed TIGER Grant
27,000
27,000
Bond
0
Traffic Impact Fees
0
City Oper. Revenue
1,144
0
20
0
0
0
0
0
1,150
2,314
TOTAL SOURCES
1,144
0
20
0
0
0
0
0
33,150
34,314
2014 - 2019 Capital Improvement Program
31
9
�r
L
F,otgr
'.lam
5 1 W'n°� Dr" 'rY..,
2014 - 2019 Capital Improvement Program
31
9
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Strander Blvd /SW 27th St Extension
Project No, 98610403
DESCRIPTION: Design and construct arterial improvements for a new roadway extending StrandearZ
from West Valley Highway to Oaksdale Ave.
JUSTIFICATION: East /west capacity between 1 -405 and S 180 St is needed to servewila enton access.
This project will be constructed in three phases. R 'ase ; ' as "' e completed that extended Stander Blvd/
STATUS: SW 27th St from Oaksdale Ave to Naches Ave PhasE 2 wur construct a 2 lane roadway from Naches
to the new Sounder's Tukwila Longacres n o ' , F ;-king lot. Phase 3 will construct the undercrossing
of the UPRR and complete the 4 lar ru,li West Valley Hwy to Naches Ave SW_
MAINT. IMPACT: New street.
COMMENT: Proj?
9 City of Renton, Boeing, WSDOT, FMSIB, Sound Transit, Metro, Amtrak, and
Railigads. Funds in 2014 are for professional services fora TIGER grant application.
FINANCIAL Through Estimated
in $000's)
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
40
20
2,000
2,450
4,510
Land (R/W)
104
500
829
1,433
Const. Mgmt.
5,000
5,000
Tukwila's Share
1,000
1,000
Construction
26,900
26,900
TOTAL EXPENSES
1,144
20
2,500
3,279
0
0
0
0
31,900
38,843
FUND SOURCES
Awarded Grant
0
Proposed FMSIB Grant
5,000
5,000
Proposed TIGER Grant
25,000
25,000
Proposed STP Grant
2,163
2,837
5,000
City Oper. Revenue
1,144
20
337
442
0
0
0
0
1,900
3,843
TOTAL SOURCES
1,144
20
2,500
3,279
0
0
0
0
31,900
38,843
2014 - 2019 Capital Improvement Program
31
10
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2014 to 2019
PROJECT: 53rd Ave S (S 137th St - S 144th St) Project No. 99110301
DESCRIPTION: Design and construct urban residential street improvements that include curb, gutter, sidewalk, and
illumination. Street portion will coordinate with Water ($1.1m) and Surface Water ($1.5m) CIP projects ($4m total).
JUSTIFICATION: Provide pedestrian and vehicle safety, drainage, and neighborhood revitalization.
STATUS: New project for 2014 - 2019 CIP.
MAINT. IMPACT: Reduce pavement, shoulder, and drainage work.
COMMENT: Transportation Improvement Board grant is proposed with Streets, Water, and Surface Water as match.
FINANCIAL Through Estimated
(in $000's)
2012 2013 2014
2015 2016 2017 2018 2019 BEYOND TOTAL
EXPENSES
Design
251
251
Land (R/W)
0
Const. Mgmt.
100
100
200
Construction
500
500
1,000
TOTAL EXPENSES
0
0
0
251
600
600
0
0
0
1,451
FUND SOURCES
Awarded Grant
0
Proposed Grant
500
500
1,000
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
0
0
0
251
100
100
0
0
0
451
TOTAL SOURCES
0
0
0
251
600
600
0
0
0
1,451
2014 - 2019 Capital Improvement Program
6
11
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2014 to 2019
PROJECT: 53rd Ave S Surface Water Drainage System Project No. 90341213
Replace existing storm drainage system. Provide bioswales along 53rd Ave S and a water quality structure
DESCRIPTION: at the downstream end of the system to treat storm water runoff. Purchase right -of -way, if required, for
bioswale construction and provide asphalt overlay.
JUSTIFICATION: New conveyance system will reduce flooding on right -of -way and private property. Existing system is in poor
condition and street runoff flows onto private property.
STATUS:
MAINT. IMPACT:
COMMENT:
Expected to decrease maintenance.
Combine with future roadway project.
FINANCIAL Through Estimated
(in $000 °s)
2012 2013 2014
2015
2016
2017
2018
2019
BEYOND TOTAL
EXPENSES
Design
293
293
Land (R/W)
0
Const. Mgmt.
195
195
Construction
1,069
1,069
TOTAL EXPENSES
0
0
0
293
1,264
0
0
0
0
1,557
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
293
1,264
0
0
0
0
1,557
TOTAL SOURCES
0
0
0
293
1,264
0
0
0
0
1,557
ro ect Location
2014 - 2019 Capital Improvement Program
90
12
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2014 to 2019
PROJECT: 53rd Ave S Water Main Replacement Project No. 90540106
DESCRIPTION: Install approximately 3,000 LF of new 12" water line along 53rd Ave S from Interurban Ave S to S 144th St.
JUSTIFICATION: This provides a needed loop within the distribution system and will improve water service and fire
flows to the north side of Tukwila Hill.
STATUS:
MAINT. IMPACT:
COMMENT:
The water main route will be along 53rd Ave S from Interurban Ave S and 52nd Ave S to 53rd Ave S,
then along S 137th St to 53rd south to S 144th St.
FINANCIAL Through Estimated
(in $000's
2012 2013 2014
2015
2016
2017
2018
2019
BEYOND TOTAL
EXPENSES
Design
75
25
25
125
Land (RAN)
0
Const. Mgmt.
67
68
135
Construction
450
450
900
TOTAL EXPENSES
0
0
0
75
542
543
0
0
0
1,160
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
75
542
543
0
0
0
1,160
TOTAL SOURCES
0
0
0
75
542
543
0
0
0
1,160
roject Location
2014 - 2019 Capital Improvement Program
65
13
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2014 to 2019
PROJECT: Cascade View Safe Routes to School Project No. 91210301
Construct an off - street, paved shared use path, sidewalks, and a traffic circle at 33rd Ave S and S 140th St.
DESCRIPTION: This route was identified in the Walking Audit prepared for the Cascade View school zone. S 140th St is one
of the high priority missing sidewalk areas prioritized as part of the Walk and Roll Plan.
JUSTIFICATION: Enhance safety for students walking to Cascade View Elementary School and encourage transportation choices
for Cascade View neighborhood residents.
STATUS: Phase I is construction of an off - street, paved shared use path between S 137th St and S 140th St.
Phase II includes a traffic circle at 33rd Ave S/S 140th St. Also includes sidewalks on the east side of 33rd Ave S
between S 140th St & S 144th St and the north side of S 140th St between Military Rd S and 34th Ave S.
MAINT. IMPACT: New trail, traffic circle, and sidewalks will need to be maintained.
COMMENT:
WSDOT Safe Routes to School State grant for $428K for Phase I. Funding for Phase II in beyond will be part of a
future grant application.
FINANCIAL Through Estimated
(in $000's)
2012 2013
2014
2015
2016
2017
2018
2019
BEYOND TOTAL
EXPENSES
rj+ect Location
N <
o
.,.-'
( T
,Yf. •. , .,
P
's L _ 1
~ e
.a^��
lh-5^dV' CAI k fN9�' Vf 9µi Y ., ePro VF. '� °f
Phase II
IS
•aa+�a
Design
55
29
183
267
Land (RNV)
78
78
Const . Mgmt.
45
126
171
Construction
250
530
780
TOTAL EXPENSES
0
133
324
0
0
0
0
0
839
1,296
FUND SOURCES
Awarded Grant
133
295
428
School District Grant Portion
29
29
Proposed Grant
750
750
Mitigation Expected
0
City Oper. Revenue
0
0
0
0
0
0
0
0
89
89
TOTAL SOURCES
0
133
324
0
0
0
0
0
839
1,296
2014 - 2019 Capital Improvement Program
3
14
rj+ect Location
N <
o
.,.-'
( T
,Yf. •. , .,
P
's L _ 1
~ e
.a^��
lh-5^dV' CAI k fN9�' Vf 9µi Y ., ePro VF. '� °f
€ is sl €
\? a
5721,
-
�'k -. t -.L'
+ � I Tf��tt 1! �ukv l2glwry s
IS
•aa+�a
2014 - 2019 Capital Improvement Program
3
14