Loading...
HomeMy WebLinkAboutCAP 2007-10-09 Item 2A - Resolution - 2008 Land Use Fee ScheduleCity of Tukwila Department of Community Development Steve Lancaster, Director RE: Permit Fees DATE: October 3, 2007 TO: Mayor Community Affairs and Parks FROM: Jack Pace, Acting Director Issue In 2005 when the City Council updated land use fees, the Council requested that fees be revaluated on a regular basis. Background The Mayor's 2008 budget includes an increase of four percent for general operation expenditures. Staff is proposing all Planning fees be increased by approximately four percent for 2008, as provided by the draft resolution, attached'. The 2007 fees are shown in strikethrough with the proposed 2008 fees. Next Sten Staff recommends that the draft resolution be forwarded to the Committee of the Whole for consideration. The fee for a tree clearing permit is not being changed since that fee is enacted by Ordinance. Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 431 -3670 Fax: 206 431 -3665 Type 1 Type 2 City of Tukwila Washington Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A LAND USE FEE SCHEDULE WHEREAS, Council asked staff to review and update fees on a regular basis; WHEREAS, The City intends to update these fees on an annual basis with any increases tied to growth in City expenses; and WHEREAS, the Mayor's 2008 budget calls for a minimal general fund increase of four percent for general operations; WHEREAS, The City intends to periodically review the fees in comparison to those charged by neighboring jurisdictions; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Land use permit and processing fees will be charged according to the following schedule: Appeal of Type 1 Decision Boundary Line Adjustment Lot Consolidation Permanent Sign Permit Temporary Sign Permit Tree Permit and Exceptions (TMC 18.54.140) Wireless Communication Facility, Minor (TMC 18.71) Administrative Design Review Fees 2C'`.ie: Fee LDR 81.85 $110 $295 $305 X30 $95 8+28 $125 60 $65 $25 5-30 $240 g47-0 $490 All other Zones 225 $215 $545 S-1-7-5 $185 8a-2Q $125 S-60 $65 $25 50 $240 547-8 $490 I Type 3 Type 4 Administrative Planned Residential Development Appeal of Type 2 Decision Appeal of Sign Code Decision Binding Site Improvement Plan 1 Code Interpretation Environmentally Sensitive Areas Deviation (TMC 18.45.080 and .100) 1 Exception from Single Family Design Standard Shoreline Substantial Development Permit Short Plat (2 -4 lots) Short Plat (5 -9 Tots) Special Permission Cargo Container (TMC 18.50.060) Special Permission Landscape Requirement Deviations (TMC 18.52.020) Special Permission Parking and Modifications to Certain Parking Standards (TMC 18.56.065 .070) Special Permission Sign and Sign Area Increase, except "unique sign" (various sections of TMC title 19) Wireless Communication Facility, Administrative Variance Appeal of Type 4 Decision Conditional Use Permit Shoreline Conditional Use Permit Public Hearing Design Review Design Review Major Modification Parking Variance, Modification or Waiver (TMC 18.56.130, .140) Reasonable Use Exception (TMC 18.45.180) Subdivision Preliminary Plat(10+ lots) Unique Sign Determination (TMC 19.28.010) Wireless Communication Facility, Major or Height Waiver Request Type 5 Comprehensive Plan Amendment 1. Fees =rk i k. $610 S -1-0 -5 $110 $110, $115 S1170 $1215 5105 $110 X238 $240 X230 $240 $231 $2435 SE25 $610 $1170 $1215 $230 $240 $23,0 $240 $23-0 $240 $230 $240 $47-0 $490 1 $739 $730 $1 -0-5 $110 $221-0 $2435 $2310 $2435 51635 $1700 $47 $490 $230 $240 $700 $730 I $3.375 +1151 unit $3510 +120 unit X230 $240 $231 -0 $2435 $1170 $1215 $5$5 $610 $205 $215 $25 $215 $1170 $1215 5105 $110 $3E0 $365 NA $231 $2435 $1170 $1215 $1170 $1215 5350 $365 s35O $365 S35O $365 $350 $365 $47 $490 $1170 $1215 $205 $215 $2340 $2310 $2435 S1635 $1700 $470 $490 $3--50 $365 S1170 $1215 +115; new uni -t $3510 +120 new unit '3 $365 $2 $2435 S1170 $1215 Other I Planned Residential Development Rezone (Map Change) or Zoning Code Text Amendment Subdivision Final Plat (10+ lots) Sensitive Area Master Plan Overlay Shoreline Environment Redesignation Unclassified Use Permit Accessory Dwelling Unit Approval /Inspection Preapplication Meeting Public Notice Mailing Labels SEPA Checklist SEPA EIS Administrative Fee SEPA MDNS Appeal SEPA Planned Action Shoreline Permit Exemption Letter Zoning Verification Letter $2890 4-$.120 r ^c.: S2900- c $3015 +$125 $3015 +$125 /new new unit unit $5 $615 S1170 -!$60 now unit $1215 +$65 new unit $1170 $1215 $1170 $1215 $2435 s 1-G5 $110 S-2-3-9 $240 $40-5 $110 5500 $615 $1170 $1215 $4-8-5 $110 $NA $0 $0 $590 $615 51 70 $60 now unit $1215 +$65 new unit $1170 $1215 $1170 $1215 S23/10 $2435 NA 5230 $240 $1-0 -5 $110 5598 $615 S1170 $1215 $2 -0 -5 $215 S2 05 $305 $1-20 $125 $-1 -20 $125 1 Preapplication fee credited toward applications submitted within 90 days. 2 Fee would be waived through 12/31/2007 and not charged for new units created with a building permit because they would not require any additional inspections. I. Fcc