HomeMy WebLinkAboutCAP 2007-10-09 Item 2A - Resolution - 2008 Land Use Fee ScheduleCity of Tukwila
Department of Community Development Steve Lancaster, Director
RE: Permit Fees
DATE: October 3, 2007
TO: Mayor
Community Affairs and Parks
FROM: Jack Pace, Acting Director
Issue
In 2005 when the City Council updated land use fees, the Council requested that fees be
revaluated on a regular basis.
Background
The Mayor's 2008 budget includes an increase of four percent for general operation
expenditures. Staff is proposing all Planning fees be increased by approximately four
percent for 2008, as provided by the draft resolution, attached'. The 2007 fees are shown
in strikethrough with the proposed 2008 fees.
Next Sten
Staff recommends that the draft resolution be forwarded to the Committee of the Whole
for consideration.
The fee for a tree clearing permit is not being changed since that fee is enacted by Ordinance.
Steven M. Mullet, Mayor
6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 431 -3670 Fax: 206 431 -3665
Type 1
Type 2
City of Tukwila
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, ADOPTING
A LAND USE FEE SCHEDULE
WHEREAS, Council asked staff to review and update fees on a regular basis;
WHEREAS, The City intends to update these fees on an annual basis with any increases
tied to growth in City expenses; and
WHEREAS, the Mayor's 2008 budget calls for a minimal general fund increase of four
percent for general operations;
WHEREAS, The City intends to periodically review the fees in comparison to those
charged by neighboring jurisdictions;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Land use permit and processing fees will be charged according to the following schedule:
Appeal of Type 1 Decision
Boundary Line Adjustment
Lot Consolidation
Permanent Sign Permit
Temporary Sign Permit
Tree Permit and Exceptions (TMC 18.54.140)
Wireless Communication Facility, Minor (TMC 18.71)
Administrative Design Review
Fees 2C'`.ie: Fee
LDR
81.85 $110
$295 $305
X30 $95
8+28 $125
60 $65
$25
5-30 $240
g47-0 $490
All other Zones
225 $215
$545
S-1-7-5 $185
8a-2Q $125
S-60 $65
$25
50 $240
547-8 $490
I Type 3
Type 4
Administrative Planned Residential Development
Appeal of Type 2 Decision
Appeal of Sign Code Decision
Binding Site Improvement Plan
1 Code Interpretation
Environmentally Sensitive Areas Deviation (TMC
18.45.080 and .100)
1 Exception from Single Family Design Standard
Shoreline Substantial Development Permit
Short Plat (2 -4 lots)
Short Plat (5 -9 Tots)
Special Permission Cargo Container (TMC 18.50.060)
Special Permission Landscape Requirement Deviations
(TMC 18.52.020)
Special Permission Parking and Modifications to
Certain Parking Standards (TMC 18.56.065 .070)
Special Permission Sign and Sign Area Increase,
except "unique sign" (various sections of TMC title 19)
Wireless Communication Facility, Administrative
Variance
Appeal of Type 4 Decision
Conditional Use Permit
Shoreline Conditional Use Permit
Public Hearing Design Review
Design Review Major Modification
Parking Variance, Modification or Waiver (TMC
18.56.130, .140)
Reasonable Use Exception (TMC 18.45.180)
Subdivision Preliminary Plat(10+ lots)
Unique Sign Determination (TMC 19.28.010)
Wireless Communication Facility, Major or Height
Waiver Request
Type 5 Comprehensive Plan Amendment
1. Fees =rk i k.
$610
S -1-0 -5 $110
$110, $115
S1170
$1215
5105 $110
X238 $240
X230 $240
$231
$2435
SE25 $610
$1170
$1215
$230 $240
$23,0 $240
$23-0 $240
$230 $240
$47-0 $490
1 $739 $730
$1 -0-5 $110
$221-0
$2435
$2310
$2435
51635
$1700
$47 $490
$230 $240
$700 $730 I
$3.375 +1151
unit
$3510 +120
unit
X230 $240
$231 -0
$2435
$1170
$1215
$5$5 $610
$205 $215
$25 $215
$1170 $1215
5105 $110
$3E0 $365
NA
$231 $2435
$1170 $1215
$1170 $1215
5350 $365
s35O $365
S35O $365
$350 $365
$47 $490
$1170 $1215
$205 $215
$2340
$2310 $2435
S1635 $1700
$470 $490
$3--50 $365
S1170 $1215
+115; new
uni -t $3510 +120
new unit
'3 $365
$2 $2435
S1170 $1215
Other I
Planned Residential Development
Rezone (Map Change) or Zoning Code Text
Amendment
Subdivision Final Plat (10+ lots)
Sensitive Area Master Plan Overlay
Shoreline Environment Redesignation
Unclassified Use Permit
Accessory Dwelling Unit Approval /Inspection
Preapplication Meeting
Public Notice Mailing Labels
SEPA Checklist
SEPA EIS Administrative Fee
SEPA MDNS Appeal
SEPA Planned Action
Shoreline Permit Exemption Letter
Zoning Verification Letter
$2890 4-$.120
r ^c.: S2900- c
$3015 +$125 $3015 +$125 /new
new unit unit
$5 $615
S1170 -!$60
now unit
$1215 +$65
new unit
$1170
$1215
$1170
$1215
$2435
s 1-G5 $110
S-2-3-9 $240
$40-5 $110
5500 $615
$1170
$1215
$4-8-5 $110
$NA
$0
$0
$590 $615
51 70 $60 now
unit $1215 +$65
new unit
$1170 $1215
$1170 $1215
S23/10 $2435
NA
5230 $240
$1-0 -5 $110
5598 $615
S1170 $1215
$2 -0 -5 $215
S2 05 $305
$1-20 $125
$-1 -20 $125
1 Preapplication fee credited toward applications submitted within 90 days.
2 Fee would be waived through 12/31/2007 and not charged for new units created with a
building permit because they would not require any additional inspections.
I. Fcc