HomeMy WebLinkAboutCAP 2007-10-09 Item 2B - Ordinance - 2008-2009 Building Permit Fee ScheduleTo: Community Affairs Parks Co e
From: Jack Pace, Acting Director D.C.D. r� e
Date: October 1, 2007
Subject: Permit fee increase.
ISSUE
BACKGROUND
City of Tukwila
Department of Community Development Steve Lancaster, Director
INFORMATION MEMO
Steven M. Mullet, Mayor
Shall the City Council approve increases in the permit fees for Building, Mechanical, Plumbing,
and Fuel -gas piping permits, such that there are incremental increases scheduled through each
year of the code change cycle.
The Unifoun Building Code was published on a three year cycle. Each code change included an
increase in their published fee schedule. Prior to 1991 there had been no increase in the fee
schedule for two code cycles. Upon publishing of the 1997 UBC, I.C.B.O. included a 14
increase in their fee schedule. The pellnit fees remained unchanged for six years. The adoption
of the International codes brought an increase of approximately 22% to the fee schedules. These
were significant increases made at each code change cycle.
Previously the permit fee schedules were adopted as presented in the Codes. The authors of the
International codes do not include fee schedules in the administration section of their codes.
Permit fees are left to be established by the governing authority. To date we have adopted the
fee schedule format that was used by ICBO and increased the fees by the ICBO methodology.
DISCUSSION /ANALYSIS /ALTERNATIVES
Our system of permit fees and plan review fees do not recover the cost of the administration and
inspections for each permit. The intent of these fees is to recover some of the costs incurred in
the issuance of each permit. Currently, the rising cost of code administration is exceeding our
recovery rate. The proposed fee increase is intended to reflect the increase in cost to the City.
A historic analysis of the published schedules shows that there was an increase of approximately
4% per each year of the code cycle. This would be an incremental and predictable increase if it
were to be employed annually by the proposed ordinance.
6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206- 431 -3670 Fax: 206 431 -3665
Alternatives.
Do nothing, and remain with the current fee schedule through 2008 and 2009 and adopt
the 2009 International codes with no overall increase in the fee schedules.
Amend TMC Section 16.04.250 "Schedule of Permit Fees" to include a 4% increase in
the fee schedules, effective January 2008 with an increase of 4% each year thereafter.
Amend TMC Section 16.04.250 "Schedule of Permit Fees to include a 4% increase in the
Fee schedules effective January 2008 through 2009.
RECOMMENDATION
Approve the proposed ordinance that would provide for a 4% increase in the permit fees for
Building, Mechanical, Plumbing, and Fuel -gas piping permits for the years 2008 and 2009.
Review the issue of fee increases in conjunction with the Code adoption process.
Forward this recommendation to the November 26, 2007 COW for approval.
Attachments:
Attachment "A Fee amendments.
Draft Ordinance
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON; AMENDING ORDINANCE NO. 2171; AS CODIFIED AT
TUKWILA MUNICIPAL CODE CHAPTER 16.04, SECTION 16.04.250
"SCHEDULE OF PERMIT FEES ADOPTING NEW PERMIT FEE
SCHEDULES FOR BUILDING, MECHANICAL, PLUMBING, AND FUEL
GAS PIPING PERMITS. PROVIDING FOR SEVERABILITY; AND
ESTABLISHING AN EFrECTIVE DATE.
WHEREAS, a permit shall not be valid until the fees prescribed by law have been
paid; and
WHEREAS, it has been four years since the current permit fee schedules were
established; and
WHEREAS, the City Council desires to increase cost recovery rate for permit
administration and inspections for 2008 and 2009; and
WHEREAS, the City Council desires to index the cost of providing permit
administration and inspection services to the increase costs incurred by the City; and
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO ORDAIN AS FOLLOWS:
Section 1. TMC Section 16.04.250 Amended. Ordinance No. 2171, as codified at
TMC Chapter 16.04 "Buildings and Construction" is hereby amended to read as
follows:
16.04.250 SCHEDULE OF PERMIT FEES.
A. Building Permit Fee Schedule:
1 Total Valuation
1 $1 to $500
$501 to $2,000
$2,001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $500,000
$500,001 to $1,000,000
$1,000,001 and up
Ordinance Sample, 10 /2/07,1
City of Tukwila
Washington
Ordinance No.
1 Building Permit Fees
$30
$30 for the first $500, plus $3.90 for each additional $100, or
fraction thereof, to and including $2,000
$88.50 for the first $2,000, plus $18.00 for each additional
$1,000, or fraction thereof, to and including $25,000
$502.00 for the first $25,000, plus $13.00 for each additional
$1,000, or fraction thereof, to and including $50,000
$827.00 for the first $50,00D, plus $9.00 for each additional
$1,000, or fraction thereof, to and including $100,000
$1,270.00 for the first $100,000, plus $7.20 for each additional
$1,000, or fraction thereof to and including $500,000
$4,150.00 for the first $500,000, plus $6.00 for each additional
$1,000, or fraction thereof, to and including $1,000,000
$7,150.00 for the first $1,000,000, plus $4.00 for each
additional $1,000, or fraction thereof
B. Plan Review Fee: When submittal documents are required by IBC Section 108
or IRC Section R108, a plan review fee shall be paid at the time of submitting plans and
specifications for review. The plan review fee shall be 65% of the permit fee as set forth
in the permit fee schedule. The plan review fee specified herein is a separate fee from
the permit fee and is in addition to the permit fee.
C. Other Fees:
1. inspections outside normal business hours: $60. per hour (two-hour minimum
charge).
2. Re- inspection fee: $60. per hour, assessed upon call for third inspection of
same correction notice.
3. Inspections for which no fee is specifically indicated: $60. per hour (1/2 -hour
minimum charge).
4. Additional plan review necessary due to additions or revisions to the plans:
$60. per hour.
5. Work commencing before permit issuance shall be subject to an investigation
fee of 100% of the usual permit fee.
Valuation of
Work (Total
Contract Amount)
$250 or less
$251 to $500
$501 to $1,000
$1,001 to $5,000
$5,001 to $50,000
$50,001 to $250,000
$250,001 to $1,000,000
$1,000,001 and up
Ordinance Sample, 10 /1/07, 2
Mechanical Permit Fees
$60.
$60. for first $250, plus $7.00 for each $100 or fraction thereof,
to and including $500
$77.50 for the first $500, plus $7.80 for each $100 or fraction
thereof, to and including $1,000
$116.50 for the first $1,000, plus $8.60 for each $1,000 or
fraction thereof, to and including $5,000
$151.00 for the first $5,000, plus $9.00 for each $1,000 or
fraction thereof, to and including $50,000
$556.00 for the first $50,000, plus $7.50 for each $1,000 or
fraction thereof, to and including $250,000
$2,056.00 for the first $250,000, plus $6.60 for each $1,000 or
fraction thereof, to and including $1,000,000
$7,006.00 for first $1,000,000, plus $6.00 for each $1,000 or
fraction thereof
3. Plan review fee: 25% of the calculated permit fee.
4. Work commencing before permit issuance shall be subject to an investigation fee of
100% of the usual permit fee.
5. Inspections outside of normal business hours: $60. per hour.
6. Re- inspection fee assessed: $60. per hour.
7. Additional plan review required by changes, additions or revisions to plans or
to plans for which an initial review has been completed: $60. per hour (one -half hour
minimum).
8. Renewal of expired pe The fee shall be one half the amount required for a new permit
for such work, provided that suspension or abandonment has not exceeded one year. Renewals
after expiration of more than one year, shall require a full permit fee and plan review fee where
applicable.
E. Plumbing Permit Fee Schedule
1. Permit Issuance Issuance of each permit (base fee): $32.00
2. Issuance of each supplemental permit: $15.60
3. Unit Fee Schedule (in addition to Items 1 2 above):
1 For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) j $60.
For each additional fixture j $12.
For each building sewer and each trailer park sewer j $22.
1 Rain water system per drain (inside building) i $12.
For each water heater and /or vent $12.
For each industrial waste pretreatment interceptor, including its trap and $12.
vent, except for kitchen type grease interceptors
For each grease trap (connected to not more than four fixtures) 1 $15.60
For each grease interceptor for commercial kitchens (greater than 750 gallon $26.
capacity)
For each repair or alteration of water piping and /or water treating $12.
equipment, each occurrence
For each repair or alteration of drainage or vent piping, each fixture j $12.
For each medical gas piping system serving one to five inlets /outlets for a $73,
specific gas
F. Fuel Gas Piping Permit Fees
1. Permit Issuance:
For issuing each permit (base fee): ($0 if permit is in conjunction with $32.
a plumbing permit for an appliance with both plumbing and gas
connection.)
1 For issuing each supplemental permit 1 $15.60
2. Unit Fee Schedule (in addition to items in F.1. above):
1 For each gas piping system of one to five outlets 1 $60
1 For each additional gas piping system outlet, per outlet 1 $7.30
3. Other Inspections and Fees (fuel gas piping):
1 Inspections outside of normal business hours 1 $60. /hour
1 Re- inspection fee 1 $60. /hour
1 Inspection for which no fee is specifically indicated 1 $60. /hour 1
Additional plan review required by changes, additions, or revisions to $60. /hour
approved plans (minimum charge one -half hour)
Work commencing before permit issuance shall be subject to an 100% of the
investigation fee equal to 100% of the permit fee permit fee
Ordinance Sample, 10 /1/07, 3
Plan review fee: The fee for review shall be 25% of the total fuel gas
piping permit fee. The plan review fee is a separate fee from the
permit fee and is required when plans are required in order to show
compliance with the code.
Renewal of expired permits: The fee shall be one half the amount required for
a new permit for such work, provided that suspension or abandonment has
not exceeded one year. Renewals after expiration of more than one year, shall
require a full permit fee and plan review fee where applicable.
G. Electrical Permit Fees.
NEW SINGLE FAMILY DWELLINGS
New single family dwellings (including a garage) $140.
Garages, pools, spas and outbuildings 75.
Low voltage systems 55.
SINGLE FAMILY REMODEL AND SERVICE CHANGES.
Serivce change or alteration no added /altered circuits 75.
Service change with added /altered circuits 75. plus $10
for each added circuit (maximum permit fee $140).
Circuits added /altered without service change (includes up to 5 circuits) 50.
Circuits added /altered without service change (more than 5 circuits)
for each added circuit (maximum permit fee $90.).
Meter /mast repair
Low voltage systems
MULTIFAMILY AND COMMERCIAL (Including low voltage).
MULTIFAMILY AND COMMERCIAL (Including low voltage).
VALUATION of electrical contract. PERMIT FEE
$50. plus $7.
$65.
250 or less 1 $58
251 $1000 $58 for the first $250 plus $4.00 for each
$100 or fraction thereof, to and
including $1000.
$1,001 $5,000 $84 for the first $1000 plus $20 for each
$1000 or fraction thereof, to and
including $5,000.
$5001 $50,000 $164 for the first $5000 plus $16.40 for
each $1000 or fraction thereof, to and
including $50,000.
$50,001 $250,000 1 $902 for the first $$50,000 plus $12.00
Ordinance Sample, 10 /1/07, 4
$250,001 $1,000,000.
Over $1,000,000.
End
Ordinance Sample, 10/1/07, 5
for each $1000 or fraction thereof, to
and including $250,000.
$3302 for the first $250,000 plus $8.50
for each $1000 or fraction thereof, to
and including $1,000,000.
I $9,677 plus 0.5 of cost over one
million.
Plan review fee In addition to the permit fee, when plan review is required, a plan
review fee must be paid at the time of permit application equal to 25% of the permit fee
with a minimum of $58.
MISCELLANEOUS FEES.
Temporary service (residential) $58
Temporary service /generators $75.
Manufactured /mobile home service (Excluding garage or outbuildings) 80.
Carnivals
Base fee $75.
Each concession 10.
Inspections or plan review not specified elsewhere $60. Fir.
Work covered without inspection or work not ready at the time of inspection may be
charged a trip fee at the hourly rate listed above.
Work without a permit Any person who commences electrical work before obtaining
the necessary permits shall be subject to twice the established fees as set forth in the
electrical fee schedule or increased by $100, whichever is greater. This fee, which shall
constitute an investigation fee, shall be imposed and collected in all cases, whether or
not a permit is subsequently issued.
H Fee Refunds. The Building Official may refund any permit fee paid by the original pemit
applicant that was erroneously paid or collected. The Building Official may also authorize the
refund of not more than 80 of the permit fee when no work has been done under a permit
issued in accordance with the code. Where a plan review fee has been collected, no refund will be
authorized once it has been determined that the plan review process has commenced. Refund of
any permit fee paid shall be requested by the original permittee in writing and not later than one
hundred and eighty (180) days after the date of fee payment.
Section 2. Ordinance No. 2171 is hereby amended.
Section 3. Severability. If any section, subsection, paragraph, sentence, clause or
phrase of this ordinance or its application to arty person or situation should be held to
be invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 4. Effective Date. This ordinance or a summary thereof shall be published
in the official newspaper of the City, and shall take effect and be in full force five days
after passage and publication as provided by law.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKth'ILA, WASHINGTON,
at a Regular Meeting thereof this day of 2005.
A TTEST
Jane E. Cantu, CMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
Ordinance Sample, 10 /1/07, 6
Steven M. Mullet, Mayor
Filed with the City Clerk:
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
ATTACHMENT "A"
FEE AMENDMENTS
16.04.250 SCHEDULE OF PERMIT FEES.
A. Building Permit Fee Schedule:
Total Valuation I Building Permit Fees
1 $1 to $500
$30, Deleted: 29
$501 to $2,000 $30 for the first $500, plus $3.90 for each additional $100, or; Deleted: 29
fraction thereof, to and including $2,000 I Deleted: 3.78
$2,001 to $25,000 $88.50 for the first $2,000, plus $18.00 for each additional; Deleted: 85.70
$1,000, or fraction thereof, to and including $25,000 r Deleted: 17.36
$25,001 to $50,000 $502.00 for the first $25,000, plus $13.00 for each a_ dditionalj Deleted: 484.98
$1,000, or fraction thereof, to and including $50,000 Deleted: 1252
$50,001 to $100,000 $827.00 for the first $50,000, plus $9.00 for each additionalr Deleted: 797.98
$1,000, or fraction thereof, to and including $100,000' Deleted: 8.68
$100,001 to $500,000 $1,270.00, for the first $100,000, plus $7.20 for each additional
I Deleted: 1,231.98
$1,000, or fraction thereof to and including $500,000
$500,001 to $1,000,000 $4,150.00 for the first $500,000, plus $6.00 for each additional Deletea: 6.94
$1,000, or fraction thereof, to and including $1,000,000 Deleted: 4,007.98
$1,000,001 and up $7,1.50.00 for the first $1,000,000, plus $4.00 for each Deleted: 5.89
additional $1,000, or fraction thereof Deleted; 6,93298
B. Plan Review Fee: When submittal documents are requited by IBC
Section 108 or IRC Section R108, a plan review fee shall be paid at the time of
submitting plans and specifications for review. The plan review fee shall be 65%
of the permit fee as set forth in the permit fee schedule. The plan review fee
specified herein is a separate fee from the permit fee and is in addition to the
permit fee.
C. Other Fees:
1. Inspections outside normal business hours: $60 per hour (two -hour
minimum charge).
2. Re- inspection fee: $60. per hour, assessed upon call for third
inspection of same correction notice.
3. Inspections for which no fee is specifically indicated: $60. per hour
(1/2 -hour minimum charge).
Formatted: Centered
Deleted: 3.90
Deleted: 58
1 Deleted: 58
Deleted: 58
4. Additional plan review necessary due to additions or revisions to
the plans: $60,per hour.
5. Work commencing before permit issuance shall be subject to an
investigation fee of 100% of the usual permit fee.
Valuation of
Work (Total
Contract Amount)
1 $250 or less
$251 to $500
$501 to $1,000
$1,001 to $5,000
$5,001 to $50,000
$50,001 to $250,000
$250,001 to $1,000,000
$1,000,001 and up
Mechanical Permit Fees
1 $60. Deleted: 58
$60. for first $250, plus $7.00 for each $100 or fraction thereof,' Deleted: 58
to and including $500 j Deleted: 6.75
$777.50 for the first $500, plus $7.00 for each $100 or fraction) deleted: 74.87
f Deleted: 749
or, Deleted: 112.32
Deleted: 8.31
Or; Deleted: 145.56
Deleted: 9.22
each $1,000 'J I Deleted:414.90
Deleted: 7.19
Deleted: 1,85290
Deleted: 6.39
or
Deleted: 4,792.50
l Deleted: 5.68
thereof, to and including $1,000
$116.50 for the first $1,000, plus $8.60 for
fraction thereof, to and including $5,000
$151.00 for the first $5,000, plus $9.00 for
fraction thereof, to and including $50,000
$556.00 for the first $50,000, plus $7.50 for
fraction thereof, to and including $250,000
$2,056.00 for the first $250,000, plus $6.60 for each $1,000
fraction thereof, to and including $1,000,000
$7,006.00 for first $1,000,000, plus $6.00 for each $1,000
fraction thereof
each $1,000
each $1,000
3. Plan review fee: 25% of the calculated peuulit fee.
4. Work commencing before permit issuance shall be subject to an
investigation fee of 100% of the usual permit fee.
5. Inspections outside of normal business hours: $60 per hour.
6. Re- inspection fee assessed: $60. per hour.
7. Additional plan review required by changes, additions or revisions
to plans or to plans for which an initial review has been completed: $60,, per
hour (one -half hour minimum).
8. Renewal of expired permits: The fee shall be one half the amount required for a new
permit for such work, provided that suspension or abandonment has not exceeded one
Deleted: 58
Deleted: 58
Deleted: 58
Deleted: 58
year. Renewals after expiration of more than one year, shall require a full permit fee and
plan review fee where applicable.
E. Plumbing Peul it Fee Schedule
1. Permit Issuance Issuance of each permit (base fee): $32.00,
2. Issuance of each supplemental permit: $15.60,
3. Unit Fee Schedule (in addition to Items 1 2 above):
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) $60. I Deleted: 58
F. Fuel Gas Piping Permit Fees
1. Permit Issuance:
For issuing each permit (base fee): ($0 if permit is in conjunction with
a plumbing permit for an appliance with both plumbing and gas
connection.)
For issuing each supplemental permit
2. Unit Fee Schedule (in addition to items in F.1. above):
$60.
For each gas piping system of one to five outlets
1 For each additional gas piping system outlet, per outlet 1 57.30,
Deleted: 30.00.
Deleted: 15.00
For each additional fixture $12. Deleted: 10
For each building sewer and each trailer park sewer I $22. j Deleted: 21
Rain water system per drain (inside building) $12. I Deleted: 10
For each water heater and /or vent $12. i Deleted: 10
For each industrial waste pretreatment interceptor, including its trap and $12. 4 Deleted: 10
vent, except for kitchen type grease interceptors 1
1 For each grease trap (connected to not more than four fixtures) 1 S15.60 1 Deleted: S15
For each grease interceptor for commercial kitchens (greater than 750 gallon $26. j Deleted: less
capacity) I Deleted: 25
For each repair or alteration of water piping and /or water treating $12. Deleted: 10
equipment, each occurrence 1
For each repair or alteration of drainage or vent piping, each fixture 1 $12. I Deleted: 10
For each medical gas piping system serving one to five inlets /outlets for a $73. Deleted: 70
specific gas i
$3 j Deleted: 30
1 $15.60, Deleted: 15
Deleted: 58
I Deleted: 57
3. Other Inspections and Fees (fuel gas piping):
Inspections outside of normal business hours $60.Jhour Deleted: 58
Re- inspection fee $60.Jhour Deleted: 58
Inspection for which no fee is specifically indicated $60.Jhour Deleted: 58
Additional plan review required by changes, additions, or revisions to $60.Jhour Deleted: 58
approved plans (minimum charge one -half hour)
Work commencing before permit issuance shall be subject to an 100% of the
investigation fee equal to 100% of the permit fee permit fee
Plan review fee: The fee for review shall be 25% of the total fuel gas
piping permit fee. The plan review fee is a separate fee from the
permit fee and is required when plans are required in order to show
compliance with the code.
Renewal of expired permits: The fee shall be one lualf the amount required for
a new permit for such work, provided that suspension or abandonment has
not exceeded one year. Renewals after expiration of more than one year, shall
require a full permit fee and plan review fee where applicable.
G. Electrical Permit Fees.
NEW SINGLE FAMILY DWELLINGS
New single family dwellings (including a garage) $140.
Garages, pools, spas and outbuildings 75.
Low voltage systems 55.
SINGLE FAMILY REMODEL AND SERVICE CHANGES.
Serivce change or alteration no added /altered circuits 75.
Service change with added /altered circuits 75.
plus $10 for each added circuit (maximum permit fee $140).
Circuits added /altered without service change (includes up to 5 circuits) 50.
Circuits added /altered without service change (more than 5 circuits) $50.
plus $7. for each added circuit (maximum permit fee $90.).
Meter /mast repair $65.
Low voltage systems $55.
MUL'i'l AMILY AND COMMERCIAL (Including low voltage).
MULTIFAMILY AND COMMERCIAL (Including low voltage).
VALUATION of electrical contract. PERMIT FEE
250 or less I $58
251 $1000 $58 for the first $250 plus $4 00 for
each $100 or fraction thereof, to and
including $1000.
$1,001 $5,000 $84 for the first $1000 plus $20 for
each $1000 or fraction thereof, to and
including $5,000.
$5001 $50,000 $164 for the first $5000 plus $16.40 for
each $1000 or fraction thereof, to and
including $50,000.
$50,001 $250,000 $902 for the first $$50,000 plus $12.00
for each $1000 or fraction thereof, to
and including $250,000.
$250,001 $1,000,000. $3302 for the first $250,000 plus $8.50
for each $1000 or fraction thereof, to
and including $1,000,000
Over $1,000,000. $9,677 plus 0.5 of cost over one
million.
Plan review fee In addition to the permit fee, when plan review is required, a
plan review fee must be paid at the time of permit application equal to 25% of
the permit fee with a minimum of $58.
MISCELLANEOUS IFP.ES
Temporary service (residential) $58.
Temporary service /generators $75.
Manufactured /mobile home service (Excluding garage or outbuildings) 80.
Carnivals
Base fee $75.
Each concession 10.
Inspections or plan review not specified elsewhere $58.
Hr.
Work covered without inspection or work not ready at the time of inspection
may be charged a trip fee at the hourly rate listed above.
Work without a permit: Any person who commences electrical work before
obtaining the necessary permits shall be subject to twice the established fees as
set forth in the electrical fee schedule or increased by $100, whichever is greater.
This fee, which shall constitute an investigation fee, shall be imposed and
collected in all cases, whether or not a permit is subsequently issued.
H. Fee Refunds. The Building Official may refund any permit fee paid by the original
pemit applicant that was erroneously paid or collected. The Building Official may also
authorize the refund of not more than 80 of the permit fee when no work has been done
under a permit issued in accordance with the code. Where a plan review fee has been
collected, no refund will be authorized once it has been determined that the plan review
process has commenced. Refund of any permit fee paid shall be requested by the original
permittee in writing and not later than one hundred and eighty (180) days after the date
of fee payment.
End
16.04.250 SCHEDULE OF PERMIT FEES.
A. Building Permit Fee Schedule:
1 Total Valuation
$1 to $500
$501 to $2,000
$2,001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $500,000
$500,001 to $1,000,000
$1,000,001 and up
C. Other Fees:
Building Permit Fees
1 $30_ 1 Deleted: 29
$30 for the first $500, plus $3.90 for each additional $100, or Deleted: 29
fraction thereof, to and including $2,000 j Deleted: 3.78
$88.50 for the first $2,000, plus $18.00 for each additional! Deleted: 85.70
$1,000, or fraction thereof, to and including $25,000
1 Deleted: 17.36
$502.00 for the first $25,000, plus $13.00 for each additionalfDeleted: 484.98
$1,000, or fraction thereof, to and including $50,000 Deleted: 1252
$827.00 for the first $50,000, plus $9.00 for each additional Deleted: 797.98
$1,000, or fraction thereof, to and including $100,000 1 Deleted: 8.68
$1,270.00, for the first $100,000, plus $7.20 for each additional Deleted: 1,231.98
$1,000, or fraction thereof to and including $500,000
$4,150.00 for the first $500,000, plus $6.00 for each additional; Deleted: 6.94
Deleted: 4,007.98
$1,000, or fraction thereof, to and including $1,000,000
$7,150.00, for the first $1,000,000, plus $-1.00 for each! Deleted: 5.89
additional $1,000, or fraction thereof
i Deleted: 6,952.98
i Deleted: 3.90
B. Plan Review Fee: When submittal documents are required by IBC
Section 108 or IRC Section R108, a plan review fee shall be paid at the time of
submitting plans and specifications for review. The plan review fee shall be 65%
of the permit fee as set forth in the permit fee schedule. The plan review fee
specified herein is a separate fee from the permit fee and is in addition to the
permit fee.
1. Inspections outside normal business hours: $60 per hour (two -hour
minimum charge).
2. Re- inspection fee: $60 per hour, assessed upon call for third
inspection of same correction notice.
3. Inspections for which no fee is specifically indicated: $60. per hour
(1/2 -hour minimum charge).
I Deleted: 58