HomeMy WebLinkAboutCAP 2008-11-10 Item 2A - Discussion - Proposed 2009-2010 Permit Fees Increase
To:
From:
Date:
Subject:
ISSUE
City of Tukwila
Jim Haggerton} Mayor
Department of Community Deflelopment
Jack Pace} Director
INFORMATION MEMO
Community Affairs and~: Committee
Jack Pace, DCD Director
November 5, 2008
Proposed Permit fee incre es for 2009 and 2010.
Shall the City Council approve increases in the permit fees for Building, Mechanical,
Electrical, Plumbing, and Fuel-gas piping permits, such that there is an incremental
increase scheduled for each year of each budget cycle.
BACKGROUND
Building permit and inspection fees can be defined as user fees or service charges. Our
system of permit fees, inspection fees and plan review fees are intended to recover a
portion of the total cost of code administration and required inspections for each permit.
In 2007 the issue of a fee increase was brought to the Council and approval was granted
to increase the permit fees by 4% for 2008. This was the first proposed fee increase since
the 2003 adoption of the International Codes.
The department will be implementing internet access for the application and issuance of
certain permits that currently can be issued "across the counter". The intent is to increase
efficiency ofthe building permit process and eliminate the current turn around time for
these permits. This system will be a key component of code administration and therefore
the cost thereof should be recovered by the permit fees.
ANALYSIS
The fees collected by the permit center for code administration have been maintained at a
consistent rate of recovery since the International Codes were adopted by the City. A
proposed 5% increase for each year of each budget cycle is proposed. This would index
the recovery rate to the increase in administrative costs. For reference the following
exhibits are submitted as attachments.
6300 Southcenter Boulevard, Suite #100 · Tukwila, Washington 98188 · Phone: 206-431-3670 · Fax: 206-431-3665
Exhibit "A" is a draft of the fee schedules including a 5% increase in the fee rates. The
print format shows the proposed rate schedules and the current rate in the margin.
Exhibit "B" is a comparison of the proposed increase and our surrounding jurisdiction's
2008 fee rates
REVENUE SOURCE
No revenue required for this proposal. No impact to biennium budget.
RECOMMENDATION
Approve the fee increase, and forward to COW with recommendation for approval.
16.04.250
A. Building Permit Fee Schedule:
1 Total Valuation
$1 to $500
$501 to $2,000
$2,001 to $25,000
$25,001 to $50,000
$50,001 to $100,000
$100,001 to $500,000
$500,001 to $1,000,000
$1,000,001 and up
B.
C. Other Fees:
1.
EXHIBIT A"
SCHEDULE OF PERMIT FEES.
Building Permit Fees
I Formatted: Centered
Deleted: 29
I Deleted: 29
Deleted: 3.78
1 Deleted: 85.70
r Deleted: 72
$60., Deleted: 17.36
$60. for the first $500, plus $4.00 for each additional $10,0,:;or( Deleted: 550.00
fraction thereof, to and including $2,000
$120.00 for the first $2,000, plus $18.20ior each addit#''ortall
$1,000, or fraction thereof, to and including $25,000 Deleted: 13.52
$556.80 for the first $25,000, plus $14.20 for each additi irt al 1 t Deleted: 12.52
$1,000, or fraction thereof, to and including $50,000
i Deleted: 888.00
$911.80 for the first $50,000, plus $9.80 for each additional
$1,000, or fraction thereof, to and including $100,000 Deleted: 797.98
$1,401.80 for the first $100,000, plus $7.87 for each additionall- Deleted' 9.36
$1,000, or fraction thereof to and including $500,000 s Deleted: 8.68
$4,549.80 for the first $500,000, plus $6.56 for each additidriall Deleted: 1,356.00
$1,000, or fraction thereof, to and including $1,000,000 t, Deleted: 1,231.98
$7829.80 for the first $1,000,000, plus $4.35 for each additi4 all Deleted: 7.50
$1,000, or fraction thereof l Deleted: 6.94
1 Deleted: 4,356.00
Plan Review Fee: plan review fee shall be paid at the time of
I Deleted: 4,007.98
submitting plans and specifications for review. The plan review fee shall be 65% `',l Deleted: 6.25
t I Deleted: 5.89
of the permit fee as set forth in the permit fee schedule. The plan review fee t
specified herein is a separate fee from the permit fee and is in addition to the f Deleted: 7,480.00
permit fee.
Deleted: 6,952.98
Deleted:
f Deleted: 4.15
1 Deleted: 3.90
r Formatted: Font: Bold
Inspections outside normal business hours: $60,,per hour with a
three, hour minimum charge,
2. Re- inspection fee: $60. hour, assessed upon call for third
inspection of same correction notice.
3. Inspections for which no fee is specifically indicated: $60. _per hour
(1/2 -hour minimum charge).
4. Additional plan review necessary due to additions or revisions to
the plans: $60. per hour (1 2 hour minimum chase'.,
Deleted: Whensubmittaldocl fil 1
I Deleted: a
Formatted: Font: Bold
1 58
Deleted:
j Deleted: two
jDeleted:
Deleted: 58
1 Deleted: 58
1 Deleted: 58
1 Deleted:
:1 Deleted: 484.98
1
1
1
1
J
I 121 1
5. Commencing work before permit issuance shall be subject to an
investigation fee of 100% of the usual permit fee.
6. Renewal of expired Permits: The fee shall be one half the amount required
for a new Permit for such work, provided that suspension or i Formatted: Font: Not Italic
abandonment has not exceeded one tear. Renewals after expiration of 1 Formatted: Font: Not Italic
1 Deleted: 58
where applicable. Deleted: 58
more than one near, shall require a full permit fee and plan review
Valuation of
Work (Total
Contract Amount)
1 $250 or less
$251 to $500
$501 to $1,000
$1,001 to $5,000
$5,001 to $50,000
$50,001 to $250,000
$250,001 to $1,000,000
$1,000,001 and up
$60.00. i Deleted: 11232
$60.00, for first $250, plus $7.00 or each $100 or frafition, Deleted: 8.95
thereof, to and including $500 4 Deleted: 8.31
$78.60 for the first $500, plus $7.85 for each $100 or fra nl Deleted:55
thereof, to and including $1,000 roeieted: 145.56
$117.85 for the first $1,000, plus $9.18 for each $1,08 /Oil Deleted: 935
fraction thereof, to and including $5,000 i Deleted: 9.22
$154.57for the first $5,000, plus $9.68 for each $1,004= or) Deleted: 575.30
fraction thereof, to and including $50,000 l Deleted: 414.90
$590.20_ for the first $50,000, plus $7.55 for each $1,0017v, Deleted:
fraction thereof to and including $250,000
$2,100.20, for the first $250,000, plus $6 .70_ for each $1,000 x�
fraction thereof, to and including $1,000,000
$7,125.20 for first $1,000,000, plus $195, for each $1,000'pri
1
1
fraction thereof
3. Plan review fee: 25% of the calculated permit fee.
4. Work commencing beforepermit issuance shall be subject to an
investigation fee of 100% of the usual permit fee.
Inspections outside of normal business hours: $60,per hour with a
three hour minimum charge,_
6. Re- inspection fee assessed: $60 per hour.
Mechanical Permit Fees
fee
Deleted: Work c
Formatted: Font: Not Italic
,4 Formatted: Font: Not Italic
Formatted: Font: Not Italic
Deleted: 25
Deleted: 74.87
4 Deleted: 30
:'a Deleted: 6.75
Deleted: 8.10
,.'1 Deleted: 7.49
Deleted:
Deleted: 80
Deleted: 7.19
Deleted: 35.30
Deleted: 1,852.90
Deleted: 6.85
Deleted: 6.39
Deleted: 272.80
Deleted: 4,79250
Deleted: 6.25
I Deleted:5.68
j Formatted: Font: Not Italic
Deleted: y
I Formatted: Font: Not Italic
Deleted: f
.,i Deleted: 58
1 Deleted:
1 Deleted: 58
I [31
1
7. Additional plan review required by changes, additions or revisions
to plans or to plans for which an initial review has been completed:
$60. per hour (one -half hour minimum).
8. Renewal of expired _permits: The fee shall be one half the amount -I Formatted: Font: Not Italic
required for a new permit for such work, provided that suspension Formatted: Font: Not Italic
or abandonment has not exceeded one year. -1 Formatted: Font: Not Italic
Renewals after expiration of more than one year, shall require a full Formatted: Font: Not Italic
permit fee and plan review fee where applicable. -I Formatted: Font: Not Italic
E. Plumbing Permit Fee Schedule
1. Permit Issuance Issuance of each permit (base fee): $32.00,
2. Issuance of each supplemental permit $15.75,
3. Unit Fee Schedule (in addition to Items 1 2 above):
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.)
For each additional fixture
For each building sewer and each trailer park sewer
Rain water system per drain (inside building)
For each water heater and /or vent
For each industrial waste pretreatment interceptor, including its trap and
vent, except for kitchen type grease interceptors
For each grease trap (connected to not more than four fixtures 7 gal.),
For each grease interceptor for commercial kitchens Greater than 750 gallon
capacity)
For each repair or alteration of water piping and/or water treating
equipment, each occurrence
For each repair or alteration of drainage or vent piping, each fixture
For each lawn sprinkler system on any meter including backflow
protection devices therefore.
For atmospheric -type vacuum breakers not included in lawn sprinkler
backflow protection. 1 to 5 $13.00
Over 5, $13.00 for first 5 plus $3.00 for each additional
For each backflow protective device other than atmospheric -type vacuum
breakers: 2 inch diameter and smaller: $27.00
Over 2 inch in diameter: $29.00
For each medical gas piping system serving one to five inlets /outlets for a
specific gas
For each additional medical as inlet(s) outlet(s)
Deleted: 58
Formatted: Font: Bold
Deleted: 30.00.
Deleted: 60
Deleted: 15.00
$60_ -1 Deleted: 58
1 $13.13th Deleted: 10
$23.001 Deleted: 21
$13.11Q1 Deleted: 10
$13 00rDeleted:10
$13.0 10
1 $162 -5 Deleted:
$27.001 Deleted: 515
Deleted: less
$13.001 Deleted: 25
'I Deleted: 10
1
$27.00
$76001 Deleted: 70
$15.00 I.
Other Inspections and Fees.
1. When a plan or other data is reauired to be submitted with a permit
application. a plan review fee shall be paid at the time of submitting plans
and specifications for review. The Plan review fee shall be 25% of the
calculated permit fee and shall be in addition to the permit fee.
2. Inspections outside of normal business ours: $60.00./ Hr. With a three
hour minimum.
3. Reinspection fee: $60.00/ Hr.
4. Inspections for which no fee is specifically indicated: $60.00/ Hr.
5. Additional plan review reauired by changes. additions. or revisions to
approved plans $60.00 (minimum charge one -half hour).
F. Fuel Gas Piping Permit Fees
1. Permit Issuance:
For issuing each permit (base fee): ($0 if permit is in conjunction with $33
a plumbing permit for an appliance with both plumbing and gas
connection.)
For issuing each supplemental permit
2. Unit Fee Schedule (in addition to items in F.1. above):
1 For each gas piping system of one to five outlets
1 For each additional gas piping system outlet, per outlet
3. Other Inspections and Fees (fuel gas piping):
1 Inspections outside of normal business hours (Three hour minimum) j
1 Re- inspection fee
1 Inspection for which no fee is specifically indicated
Additional plan review required by changes, additions, or revisions to
approved plans (minimum charge one -half hour)
Work commencing before permit issuance shall be subject to an
investigation fee equal to 100% of the permit fee
-1 Formatted: Font: Not Bold
-1 Formatted: Font: Bold
j Formatted: Font: Bold
Deleted: 30
$15.75 Deleted: 60
$60.00, -I Deleted: 58
$13.00 4 Deleted: 57
$60.00 /hour( Deleted: 58
$60.00 /h0ur' Deleted: 58
$60.00 /hour -j Deleted: 58
$60.00 /hour -j Deleted: 58
100% of the
permit fee
Formatted: Bullets and Numbering
1 Deleted: 15
Plan review fee: The fee for review shall be 25% of the total fuel gas
piping permit fee. The plan review fee is a separate fee from the
permit fee and is required when plans are required in order to show
compliance with the code.
G. Electrical Permit Fees.
NEW SINGLE FAMILY DWELLINGS l
New single family dwellings (including a garage) $145.60,_ 1 Deleted: 140.
Garages, pools, spas and outbuildings 78 00 Deleted: 75
Low voltage systems 57.O� Deleted: 55
SINGLE FAMILY REMODEL AND SERVICE CHANGES.
Serivice change or alteration no added /altered circuits 78 00 Deleted: 75
Service change with added /altered circuits 78.00,_ --j Deleted: 75.
plus $11.00,for each added circuit (maximumpermit fee $145.60). -1 Deleted: 10
Circuits added /altered without service change (includes up to 5 circuits) 52.00, Deleted: 140
1 Deleted: 50
Circuits added/ altered without service change (more than 5 circuits) $52.00., Deleted: so
plus $7.30, for each added circuit (maximumpermit fee $94.00. Deleted: 7.
Meter /mast repair $65.00 Deleted: 90.
Low voltage systems $57.00 Deleted: 65.
1 Deleted: 55.
Deleted:
MULTIFAMILY AND
/VIULTIFAMILY AND COMMERCIAL (ncluding low voltage).
VALUATION of electrical contract. PERMIT FEE
250 or less
$60.00 1 Deleted: 58
Deleted: Renewal of expired permits:
The fee shall be one half the amount
required for a new permit for such work,
provided that suspension or abandonment
has not exceeded one year. Renewals
after expiration of more than one year,
shall require a full permit fee and plan
review fee where applicable.
COMMERCIAL (Including low
voltage).
Formatted: Font: Bold
251 $1000
$1,001 $5,000
$5001 $50,000
$50,001 $250,000
$250,001 $1,000,000.
Over $1,000,000.
$60.00 for the first $250 plus $4.00 for
each $100 or fraction thereof, to and
including $1000.
$90.00_for the first $1000 plus $20 for
each $1000 or fraction thereof, to and
including $5,000.
$170.00,for the first $5000 plus $16.40
for each $1000 or fraction thereof, to
and including $50,000.
$908.00,for the first,$50,000 plus
$12.00 for each $1000 or fraction
thereof, to and including $250,000.
$3.308.00.for the first $250,000 plus
$8.50 for each $1000 or fraction
thereof, to and including $1,000,000.
$9.683.00,plus 0.5 of cost over one
million.
Other Inspections and Miscellaneous Fees:
Plan review fee In addition to the permit fee, when plan review is required, a
plan review fee must be paid at the time of permit application equal to 25% of
the permit fee with a minimum of $60.00,
Temporary service, $60.00,
Temporary service /generators $75.
Manufactured /mobile home service (Excluding garage or outbuildings) 80.
Carnivals
Base fee $75.
Each concession 10.
Inspections or plan review not specified elsewhere $60.00IHr. (one half hour
minimum).
Work covered without inspection or work not ready at the time of inspection
may be charged a reinsoection fee at the hourly rate listed above.
Work without a permit: Any person who commences electrical work before
obtaining the necessary peiutits, shall be subiect to an investigation fee. The
investigation fee shall be twice the established Permit fee as set forth in the
electrical fee schedule or $100.00 minimum. This fee shall be collected in all
cases. whether or not a permit is subseauently issued.
1 Deleted: 58
Deleted: 84
-1 Deleted: 164
j Deleted: 902
1 Deleted: S
i Deleted: 3302
Deleted: 9
I Deleted: ,677
,1 Formatted: Font: Bold
1 Deleted: 58
Deleted:
M SCELLANEOUS FEES.
1 Deleted: (residential)
1 Deleted: 58
L_____________________________________________________---------~/
/ / Deleted: Inspections or plan revi.ew
not specified elsewhere
$58./ Hr.~
Work covered without inspection or
work not ready at the time of
inspection may be charged a trip fee
at the hourly rate listed above. "I
Work wi.thout a permit Any person
who commences electrical work
before obtaining the necessary
permits shall be subject to tw:ice the
established fees as set forth in the
electrical fee schedule or increased
by $100, whichever is greater. This
fee, which shall constitute an
I investigation fee, shall be imposed
. ., .., . and collected in all cases, whether or
H. Fee Refunds L JJ1! _~u!~d!1'!g 9Jfj0!!~ 1}l!!Y !if!!.1}g _a!!y y.~1J1!-~t J~e_pa!g _1?Y t~ _o!,~~qJ ___ I not a permit is subsequently issued. 'i
pemit applicant that was erroneously paid or collected. The Building Official may also " ' , 'i
authorize the refund of not more than 80 % of the permit fee when no work has been done', i Deleted: Fee Refullds
under a permit issued in accordance with the code. Where a plan review fee has been 'i Formatted: Font: Bold
collected, no refund will be authorized once it has been determined that the plan review
process has commenced. Refund of any permit fee paid shall be requested by the original
permittee in writing and not later than one hundred and eighty (180) days after the date
of fee payment.
End
EXHIBIT B
City min. val. fee Per MilVal plus/1000
Renton $500.00 $28.00 $6,615.50 $4.35
Kent $500.00 $25.30 $6,042.10 $3.40
Fed.Way $500.00 $34.00 $8,135.50 $5.50
SeaTac $500.00 $50.00 $7,010.94 $3.94
Tukwila* $500.00 $60.00 $7,829.80 $4.35
Valuation Index Tukwila* Renton Kent Fed. Way SeaTac Average
$1.00 to $500. Min. $60.00 $28.00 $25.30 $34.00 $50.00 $39.46
$501 to $2000. Per$C $4.00 $3.65 $3.30 $4.50 $3.81 $3.85
$2001 to $25,000. Per $K. $18.20 $16.75 $15.10 $20.50 $17.50 $17.61
$25,001 to $50,000. $14.20 $12.00 $10.90 $14.50 $12.63 $12.84
$50,001 to $100,000. $9.80 $8.35 $7.55 $8.00 $8.75 $8.49
$100,001 to $500,000. $7.87 $6.70 $6.05 $8.00 $7.00 $7.12
$500,001 to $1,000,000. $6.56 $5.65 $5.10 $7.00 $5.94 $6.05
$1,000,001 and up $4.35 $4.35 $3.40 $5.56 $3.94 $4.30
City of Tukwila
Department of Community Development
Jim Haggertol1, Mayor
Jack Pace, Director
MEMORANDUM
TO:
Mayor Haggerton
Community Affairs and Parks c01'ttee
Nora Gierloff, Deputy DCD Directo .
Proposed Land Use Fee Update
November 3, 2008
FROM:
RE:
DATE:
BACKGROUND
The Council last updated the Land Use Fee Schedule in 2007 with implementation at the
beginning of2008. Staff has since identified additional items that should be added to the list and
is recommending that the fees be updated to reflect increased City costs.
FINDINGS
Periodically we review Tukwila's fees against the average charged by our south King County
neighbors and the overall increase in cost to provide City services. Attachment A shows
Tukwila's current land use fees compared to the fees charged by Auburn, Burien, Kent, Federal
Way, Renton and SeaTac for similar permits.
In calculating the average fees charged by adjacent jurisdictions we tried to compare "apples to
apples," but we also found that there were many different approaches to fee calculation. Most
jurisdictions used systems more complex than Tukwila's flat fee approach, for example:
o Burien's flat fee acts as a retainer with any staff or consultant time over a certain number of
hours charged back to the applicant at $70 per hour. The cost of any special studies is also
passed through to the applicant.
o Many of SeaTac and Federal Way's fees are calculated on a sliding scale based on either
square footage or value of construction.
o When two or more applications for a project are processed together Kirkland and Renton
charge the full amount for the highest fee and reduce the associated permit fees by 50%.
However on average Kirkland's fees were significantly higher than those charged in the
south County.
PROPOSED FEE CHANGES
Staff is recommending that Tukwila's permit fees be increased by at least 5% annually, the
amount Tukwila's overall budget has grown in recent years, rounded to the nearest $5. In some
NG Page 1 of2 10/3112008
P:\Users\Nora\FeeUpdateMemo.doc
6300 Southcenter Boulevard, Suite #100 . Tuhvila, Washington 98188. Phone 206-431-3670 . Fax: 206-431-3665
cases where are fees are significantly lower than the average or are inconsistent with other
permits that require a similar level of review we recommend an additional increase. This would
still put us at or near the average of our neighboring jurisdictions. Attachment B shows the
complete list of current land use fees, the proposed increases and the potential revenue generated
by the changes.
The only fee that would be lowered under the proposal is for shoreline substantial development
permits in the LDR Zone. Our current fee is a bit higher than the average and the reduction
would have minimal effect on revenue since most o\vner-occupied single family houses are
exempt from permitting requirements.
Staff is also recommending that we start charging a fee for annexations and development
agreements. The fee for development agreements is proposed to be $500 for the first 20 hours of
staff time with additional staffhours charged at $50.
FUTURE UPDATES
Redmond, Kirkland and Federal Way update their fees on an annual basis so that they stay
CUlTent with City expenses. Given our new two-year budget cycle staff is also suggesting fees
for 2010 tied to the growth ofthe City budget, rounded to the nearest $5, see Attachment B.
Council could adopt a two year fee schedule to align with the two year budget cycle.
REQUESTED ACTION
Review the proposed fee schedule, provide Staff with policy direction about the fee changes and
forward the proposal to the COW for review.
NG
P:\Users\Nora\FeeUpdateMemo.doc
Page 2 of2
10/31/2008
Comparison of Neighboring Jurisdictions' Land Use Permit Fees
2009 Proposed: Fees +j
Tukwila Pricing j Minimum 5 %'.Increaso
Appeal of Type 2
Decision
;Tiding Site
Improvement Plan
Shoreline Substantial
Development Permit
Short Plat (2 -4 lots)
Short Plat (5 -9 lots)
Variance
Apps of Type 4
Decision
SEPA Checklist
Anexation Petition
Other
LDR Zones
$110
$1,215
$2,435
$610
$1,215
$730
$110
$215
$1,215
$2,435
$1,215
$1,215
$1,215
$215
Conditional Use Permit $2,435 $2,435
Public Ileanng uesign
Review $1,700 $1,700
Subdivision Preliminary $3510 +12 $3510 +12
Plat(10+ lots) 0 new unit 0 new unit
Rezone (Map Cnange) or
Zoning Code Text
Amendment
Subdivision Final Plat
(10+ lots)
$143
$1,093
$1,182
$2,576
$2,576
$1,722
$134
$2,429
$1,242
$3,640
$615 $615 $1,934
$1215 +$6 $1215 +$6
5 new unit 5 new unit $1,793
$615 $615 $1,111
No Fee No Fee $2,500
Average Net
of Net Difference
Neighbor Difference Other
Cities LDR Zones
-$33
$122
$1,254
$1,966
$1,361
-$992
-$24
$6
$458
-$130
$1,319
-$578
-$496
$72
$122
$1,254
$1,361
$1,361
-$507
$82
$6
$458
-$130
$1,319
-$578
-$496
Hier;
Auburn
8115
2,0001. $2,555 $1,100
$1,400
082,000`;;! °'82,SOD:. $1,400
$1,706ir„ N/A
;q 1
N/A
82,555` $2,555';, $467 400 535
$1,785 $2',555 I1 N/A
$3685 +1�5 $3685+125
new unit new unit $1,100
$250
Plus
$1,100 $60 /lot
$1;000, ,$1,000r "I $1,700
I $127,*t 70 $1275;1.
''I %new unit new unit';;: $1,500
$1',000 "i: "1'81;000 1
$2,500 $2,500 N/A
2009 Feel ncreaseProposa I.xls
Burien
$271
4868 for
$1,460 major
$1,055
$3,570
$3,570
$2,110
$271
N/A
$2,110
$4,868
map
amendme
$1,623 nt only
$1,460
$775 Plus costs $2,110
N/A
Federal Way Kent
$164 $215
$1,271 $635
$654 /over
$1,458 $15,000 $1,126
$1,271 $3,919
$1,271 $3,919
($816 for
$2,187 res) $2,213
$163 $25
$3,464
$327 over
$1,027 $25,000
$3,772 $4,101
$989
$1,593
$989
N/A
Renton
$75
$1,000
$2,000
$
$2,000
N/A
$4,000
N/A
$2,000 $6,000
$1000 for Plus
10-20 $1800 /acr
$790 $2,000 acres $4,500 e
Plus
$2,203 $22 /lot $1,000 $3,000
$790 $1,000 $1,000
N/A $2,500 N/A
2010 Proposed Fees,
Tukwila Pricing Min, 5% Increase
Other Revenue Total Othero:'
LDR Zones Increase Revenue Zones:;:'
5110 NA 50 50
5490 5490 S25 S515
S610 S610 50 SO
No Fee No Fee SO
5110 S215 SO SO
$110 $215 SO SO
Sl10 S215 SO SO
Sl10 S215 SO SO
Sl.215 Sl,215 SO SO
S305 $545 13 $1,235 S5,200
5110 $110 55 Sl15
$1,215 51,215 S3,140 58,000
Conditional Use Permit $2,435 52,435 S240 S5,110
Design Review Major
Modification S490 5490 S25 S515
Devalo ment reemc...nt No Fee No Fee
Environmenta Sensitive Areas
Deviation (mC 18AS.08O and
,100 5240 S365 5 548 Sl,248
Exception from Single Family
. n Standard S240 NA S10 S250
$95 $165 S5 Sl00
S240 5365 510 S250
Pennanent S' n Permit 120 S600 515,600
S329O;,135
ment -Co -rie\Y'unjt~
S240 S240 35 S336 58,736
51,700 $1,700 15 512,825 538,325
Sl10 5110 10 S900 S2,OOO
S730 $1,215 50 SO
$615 5615 S770 52,000
51.215 $1,215 50 $0
SEPA Oled<list 5615 $615 19 57,315 519,000
SEPA EIS Administrative Fee 51,215 $1,215 50 SO
SEPA MDNS eel 5110 5215 SO SO
SEPA Planned Acti<ln 5NA 5305 4 5180 Sl,4oo
Shoreline Conditional Use Permit S2,435 52,435 SO 50
Shoreline Environment
Red . nation 51,215 Sl,215 50 50
Shoreline Permit Exemption
Letter SO $125 S15 S390
Shoreline Substantial
Devalo t Permit 52,435 52,435 9 (S585 521,330
Short Plat 5610 Sl,215 11 54,290 Sll,ooO
$1,215 Sl,215 3 S2,355 S6,ooo
S240 S365 SO SO
S240 S365 S10 $250
S240 $365 S30 S750
S365 S30 S760
S1215>S65
new unit SO
~3510+120
new unit 5240 S4,950
10/3112008 2009FeelncreaseProposal.xls
ATTACHMENT B
-- ------ .-.---
Permit Type
Tukwila Pricing
Other
LDR Zones
565 565
$25 $25
Undassified Use Permit $2.435 $2.435
Unique Sign Detennination (TNC
1,9.28.010 $240 $365
Variance $730 $1,215
\-'\Iireless Communkation Fadlity,
Administrative $490 $490
52.435 52.435
5240 $240
Zoni Verification Letter $0 5125
,CO Yearly
Perm its
. Suggest lowering cost for Shoneline Substantial Development Peoot in LDR
** Fee wouJd cover first 20 hours of staff time, additional time charged at $50fhour
10/31/2008
2009FeelncreaseProposaLxls
Revenue
Increase
Total
Revenue
70
5350 $4.900
SO 550
5120 $2,555
$10 5250
5140 51,600
525 5515
SO 50
510 5250
525 5550
$34,731 $164,561
2
2
- -----------.
2010 Proposed Fees,
Min. 5% Increase
Other: '"
Zones .:c