HomeMy WebLinkAboutFS 2007-09-04 Item 2B - Discussion - South County Jail Study FundingCity of Tukwila
6200 Southcenter Boulevard Tukwila, Washington 98188 Steven M Mullet, Mayor
MEMORANDUM
TO: Finance and Safety Committee
FROM: Mayor's Office
Tukwila Police Depart e t
DATE: August 29, 2007
SUBJECT: South County Regional Jail Feasibility Study
Staffs from cities in suburban King County have held a series of meetings to discuss
solutions to the problem of decreasing availability of inmate beds in the King County jail.
South County cities recognized early on that our needs were somewhat different than
those of eastside and north end cities, and formed a separate group to evaluate our needs.
The work group has dubbed itself South Corrections Entity (SCORE), and includes
representatives from Des Moines, Federal Way, Renton and Tukwila. Primary staff
support has been provided by the City of Renton.
SCORE is based on the Valley Communications (Valley Com) model, with four owner
agencies being those listed above. SeaTac has been identified as a potential contract
agency, and it's likely that other cities in the area would contract for services on an as-
needed basis. An RFQ was published in June; the responses received from four
consultants were reviewed and evaluated, and DLR Group was chosen as the superior
response. The SCORE work group looked long and hard at DLR's proposal and was able
to shave the initial S351,000 proposed cost down to $161,000 to study a 500 bed facility.
Cost allocation for each city has yet to be determined, but most likely we will pay a pro
rata share based on average daily inmate population. Depending upon the cost sharing
method chosen Tukwila's share of the study cost could range from approximately
$34,000 to 41,000. Staff requests that the Mayor be authorized to expend an amount not
to exceed $45,000 to cover any unforeseen expenses.
Staff requests that this item be referred to the COW on 9/10 and Regular Meeting on 9/17
for approval.
Phone: 206 -433 -1800 City Hall Fax: 206 433 -1833 www.ci.tukwila.wa.us
Work Group
• Des Moines
• Jennefer Henson
• Tukwila
• Don Lincoln
• Federal Way
• Andy Hwang
• Stan McCall
• Jason Wilson
• Kristen Gregory
• Renton
• Penny Bartley
•••
•••
• • ` I..
Organizational Structure for
SCORE
• Based upon Valley Com
• Four Owner Agencies
• Tukwila
• Federal Way
• Des Moines
• Renton
• Potential Contract Agency
• SeaTac
Feasibility Study
• Published RFQ on June 4th
• Received four responses
••o e
• a
0
0
• Team reviewed responses and unanimously
picked DLR Group as the superior response
DLR Proposal
• Team met with DLR on July 12t"
• Initial proposal for feasibility study was
$351,000
• Proposal has been modified and is now
$161,000
•••
•••
6
Proposal Highlights
• Early estimates for 500 bed facility
• Construction costs of $79,000 per bed
(Based upon 2011 costs)
• 35% indirect costs, including design
• Total - $54,000,000
Schedule
• DLR suggested that we accelerate our
building plans with occupancy planned for
2010. Accelerating the project could save
$3,000,000.
• Even without modification, the existing
schedule is achievable.
••00'1''
Projected Bed Needs
Owner City
2011 Usage
2026 Usage
Tukwila
70
83
Federal Way
61
71
Des Moines
20
23
Renton
177
208
Utilization Factor (15 %)
75
75
Extra Capacity
97
40
Feasibility Assumptions
•
0
• Facility will be designed with 500 beds,
potential for expansion at the site, up to a
maximum of 750 beds
• The facility should be designed to meet ACA
(American Correctional Association)
standards
• The facility will be based upon the Cowlitz.
County Jail
Assumptions (continued)
•
• The facility is designed to hold misdemeanor
offenders and investigative felony arrests
• The facility will be designed as a "full service
jail" anticipating that we will house ALL of our
misdemeanor inmates
• Medical
• Mental
• Management
Cowlitz County Facility
• Previous comparable for construction costs
• Team has seen and approved as comparable
facility
• Approximately 200 square feet per bed
• "Full- service" facility
• On -site medical, laundry, and kitchen
facilities
Potential Sites
• We need to provide sites to DLR to have
them begin the cost estimates.
• We have approximately one month after they
start the study to provide the locations.
• The reduced fee includes due diligence on
only one site.