HomeMy WebLinkAboutReg 2014-04-07 Item 5C - Final Acceptance - 2013 Small Drainage Program with Henderson Partners for $307,233.51COUNCIL AGENDA SYNOPSIS
Meeting Date
Prepared by
04/07/14
BC
Initiatc
Mayor's recipe
Council review
ITEM INFORMATION
ITEM No.
5.C.
CAS NUMBER:
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DATE: 04/07/14
.AGENDA ITEM TITLE 2013 Annual Small Drainage Program
Project Completion and Acceptance
CATEGORY E Discussion
Aug Date
Z Motion
Mtg Dale 04/07/14
['Resolution
AN Date
111 Ordinance
A Its Date
Bid Alllard
Mtg Date
Public Hearin
0 Other
A4.2, Date
Mg Date
SPONSOR Council E Mayor fl fIR D CD Finance D Fire IT E P&R E Police V4 PIP'
SP oNSoie s The contract with Henderson Partners, LLC of Gig Harbor, WA is complete for the 2013
SUMMARY Annual Small Drainage Program. This project provided storm drainage improvements at
four locations. Construction began October 1, 2013 and was completed on January 24,
2014. One change order was issued for a time extension and unit price under-runs credited
($31,815.49). Council is being asked to accept and finalize the contract with Henderson
Partners in the amount of $307,233.51.
REVIEWED BY E COW Mtg. CA&P Cmte El F&S Cmte E Transportation Cmte
Z Utilities Cmte 0 Arts Comm. 111 Parks Comm. E Planning Comm.
DATE: 03/17/14 COMMITTEE CHAIR: KATE KRULLER
RECOMMENDATIONS:
SPONS( )R/ADMIN.
COMMDIEE
Public Works
Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$307,233.51 $457,000.00 $0.00
Fund Source: 412 SURFACE WATER (PG 136, 2013 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
04/07/14
MTG. DATE
ATTACHMENTS
04/07/14
Informational Memorandum dated 03/14/14
State of WA Depart of Revenue Notice of Completion 13-151
Minutes from the Utilities Committee meeting of 03/17/14
15
16
TO:
FROM:
BY:
DATE:
SUBJECT:
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Utilities Committee
Bob Giberson, Public Works Director,
Peter Lau, Senior Program Manager
March 14, 2014
2013 Annual Small Drainage Program
Project No. 91341201, Contract No. 13-151
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of retainage.
BACKGROUND
The Notice to Proceed for Contract No. 13-151 with Henderson Partners, LLC of Gig Harbor,
Washington was issued on October 1, 2013 for the 2013 Annual Small Drainage Project. This
project provided drainage improvements at four locations in Tukwila. The improvements included
storm pipe and structure replacements, temporary erosion control, asphalt paving, asphalt
thickened edge installation and site restoration.
ANALYSIS
Construction was physically completed on January 24, 2014. Only one (1) change order was
executed for a contract time extension due to an extended period of unusual sub-freezing
weather. Unit price under-runs were due to bid item quantities not fully utilized during
construction. Retainage is being held by the City for this project in the amount of $15,361.68. The
construction budget was $457,000.00 with a 15% contingency.
Construction Contract Amount
Change Order No. 1 (time only)
Unit Price Under-runs
No Sales Tax
Total Amount Paid
$339,049.00
0.00
(31,815.49)
0.00
$307,233.51
RECOMMENDATION
The Council is being asked to formally accept and authorize the release of retainage, subject to
standard claim and lien release procedures, for the 2013 Annual Small Drainage Program with
Henderson Partners in the final amount of $307,233.51, and to consider this item on the Consent
Agenda of the April 7, 2014 Regular Meeting.
Attachment: Notice of Completion
W\PW Eng PROJECTS1A- DR Projects \Annual Small Drainage Programs2013 SDP (91341201)1 Construction *700 Post Construction & Closeout \ Info Memo 2013 SDP Closeout 03.14-14.docx
17
18
NOTICE OF CO P ETION OF PUBLIC WORKS CONTRACT
�
Name & Address of Public Agency
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
UBI Number: 179 000 208
Contractor's UBI Number: 602 834 024
Date: February 24, 2014
Departrnent Use Only
Assigned to:
Date Assigned:
Notice is herebgiven relative to the completion of contract or project described below
Project Name
2013 Small Drainage Pro
Contract Number
13-151
Job Orde Contracting
0 Yes El No
Description of Work Done/Include Jobsite Address(es)
Storm drainage improvements at 4 locations within the City. Specific improvements include: 1) Removing and replacing
existing storm drain pipes and drainage structures; 2) Installing new storm drain pipes and drainage structures; 3) Providing
temporary erosion control; 4) Removing and replacing asphalt pavement and thickened edge; and 5) Site restoration.
Federally funded road transportation project? [l Yes Wr No
Contractor's Name
Henderson Partners, LLC
Telephone Number
253'851'5896
Contractor Address
11302 Burnham Drive NW, Gig Harbor, WA 98332
If Retainage is Bonded, List Surety's Name (or attach a copy)
Surety Agent's Address
Date Contract Awarded
September 3, 2013
Date Work Commenced
October 7, 2013
Date Work Completed
January 24, 2014
Dote Work Accepted
Contract Amount
Additions (+)
Reductions ( - )
Sub-Total
Amount of Sales Tax Paid at 096
(If various rates apply, please send a breakdown)
Aficerwill
Please List all Subcon
TOTAL
../
ac ors Below:
� 339.049.00
�
0.00
�
31,815.49
�
307,233.51
Liquidated Damages $
Amount Disbursed $
Amount Retained $
0.00
� 307,233.51
NOTE: These two totals must be equal
0.00
291,871.83
15,361.68
TOTAL $ 307,233.51
Subcontractor's Name:
UBI Number:
Affidavit ID (if known)
Everson's Econo Vac, Inc.
601
443
326
500427
4-M Hydroseeding/Erosion Control, Inc.
603
041
395
500019
Corliss Resources, Inc.
602
237
779
499940
Lakeridge Paving Company, LLC
601
592
135
499932
Stripe Rite, Inc.
501
048
084
499917
Evergreen Concrete Cutting, Inc.
601
605
667
498325
- �o n�z 11
REV 31 0020 N8/25/11)
Continued on page 2
Please List all Subcontractors Below:
Subcontractor's Name:
UBI Number:
Affidavit ID (if known)
Comments:
Contact Name: Diane Jaber
Email Address: Diane.Jaber@TukwilaWA.gov
Title: Fiscal Specialist
Phone Number: (206) 433-1871 x1871
Note: Th Disbursing Office must submit this completed notic immediately after acceptanc of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form to all three agencies below. For a faster response. please submit by e-mail,
ell Washington State
�n'm o°v°mm°mme^�""o
� �� Public Works Section
po Box *r47v
Olympia WA 98504-7474
FAX (360) 664-4159
Washington State
Department of Labor and Industries
Contract Release
PO Box 44274
Olympia, WA 98504-4272
(360)902-4754
FAX (360) 902-6897
Washington State
Employment Security Department
Specialized Collections Unit
PO Box 9046
Olympia WA 98507-9046
(360) 902-9780
Fax (360) 902-9287
nubl icworks@esd=^gov
For tax assistance or to request this document in an alternate format, visit http://dor.wa.gov or call 1'800'647-7706.
Teletype (7TY) users may call (360)7O5'67lX.
r215-08-00 08-2 011
REV 31 0020 N8/25/11)
20
Utilities Committee Minutes March 17, 2014 - Page 2
B. Annual 2013 Small Drainage Program Project Completion and Acceptance
Staff is asking Council to accept as complete Contract No. 13 -151 with Henderson Partners,
LLC, for the 2013 Annual Small Drainage Project. The project provided drainage
improvements at four locations in the City, including storm pipe and structure replacements,
temporary erosion control, asphalt paving, asphalt thickened edge installation and site
restoration. Construction was completed on January 24, 2014 and included one change order
due to a time extension as a result of sub - freezing weather. The total amount paid was
$307,233.51, which was under budget. The Council is also being asked to authorize the
release of retainage. UNANIMOUS APPROVAL. FORWARD TO APRIL 7, 2014 REGULAR
CONSENT AGENDA.
III. MISCELLANEOUS
Meeting adjourned at 6:26 p.m.