Loading...
HomeMy WebLinkAboutPermit M07-002 - BEST WESTERN - RIVER'S EDGEBEST WESTERN 15901 WEST VALLEY HY M07 -002 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: 0005800030 15901 WEST VALLEY HY TUKW Contact Person: Name: SOOZEE KIM Address: 16212 BOTHELL EVEREIT HY F271 , MILL CREEK WA Contractor: Name: SUNDANCE ENERGY SERVICES INC. Address: 10228 MAIN ST , BOTHELL WA Contractor License No: SUNDAES063J9 DESCRIPTION OF WORK: INSTALLATION OF GAS FIREPLACE Value of Mechanical: $1,800.00 Type of Fire Protection: BEST WESTERN RIVER'S EDGE 15901 WEST VALLEY HY , TUKWILA WA LIU SHUN- WEN +KIN -LUAN CHEN NENDELS SOUTHCENTER , 15901 W VALLEY Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: htty: / /www.ci.tukwila.wa.us MECHANICAL PERMIT EOUIPMENT TYPE AND OUANTITY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *continued on next page ** Permit Number: Issue Date: Permit Expires On: Phone: Phone: 253 970 -9565 Phone: Expiration Date: 09/11/2007 Steven M Mullet, Mayor Steve Lancaster, Director M07 -002 01/11/2007 07/10/2007 Fees Collected: $180.79 International Mechanical Code Edition: 2003 Boiler Compressor: 0-3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15-30 HP/1,000,000 BTU.. 0 30-50 HP /1,750,000 BTU.. 0 50+ HP/1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 1 Wood/Gas Stove 1 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 doc: IMC -10/06 M07 -002 Printed: 01 -11 -2007 Permit Center Authorized Signature: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: httn: / /www.ci.tukwila.wa.us Print Name: Steven M. Mullet, Mayor Steve Lancaster, Director Permit Number: MOT -002 Issue Date: 01/11/2007 Permit Expires On: 07/10 /2007 Date: 0///1/C 7 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinance: governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulatinc construction or the performance of wor autho t ` 'gn and obtain this mechanical permit. Signature: �.— emu, -/ Date: / — // - 07 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspende or abandoned for a period of 180 days from the last inspection. doc: IMC -10/06 M07 -002 Printed: 01 -11 -2007 Parcel No.: 0005800030 Address: Suite No: Tenant: 15901 WEST VALLEY BY TUKW BEST WESTERN RIVER'S EDGE 1: ** *BUILDING DEPARTMENT CONDITIONS * ** City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS * *continued on next page ** Permit Number: M07 -002 Status: ISSUED Applied Date: 01/08/2007 Issue Date: 01/11/2007 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Readily accessible access to roof mounted equipment is required. 5: Insulating materials, where exposed as installed in buildings of any type of construction, shall have a flame spread index of not more than 25 and a smoke development index of not more than 450. Where facings are installed in concealed spaces in buildings of Type III, IV, or V construction, the flame spread and smoke - developed limitations do not apply to facings, that are installed behind and in substantial contact with the unexposed surface of the ceiling, wall or floor finish. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 9: All electrical work shall be inspected and approved under a separate permit issued by the Washington State Department of Labor and Industries (206/248 - 6630). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: Cond -10/06 M07 -002 Printed: 01 -11 -2007 doc: Cond -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Date: //-40 7 M07 -002 Printed: 01 -11 -2007 Site Address: /C tA) \)--- H Tenant Name: 13, t V. V S cq°d -e New Tenant: Property Owners Name: ' Li G( 4uI1- - I - 1n9C4J C 4 E -Mail Address: l./ / r .jr t1 VA vvlu Community Developmcfk.separtment Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.citukwila.wa.us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** Company Name: Mailing Address: t b3:Z9 Ma lrt Contact Person: h O u t- • E -Mail Address: MECHANICAL PERMIT APPLICATION Contractor Registration Number: S c t N I) lN cCa 3 5 Q:\Applications\Forms- Applications On Line \3-2006 - Mechanical Permit Application.doc Revised: 4 -2006 bh Mechanical Project No. King Co Assessor's Tax No.: 7D oi-g 00030 Suite Number: Mailing Address: i, 0 I t \„)(00111-- y' �� p (x") A City ice use only) Floor: ...Yes `tg1 State 3 ..No Zip CONTACT PERSON'- who do we contact when your permit is ready to be issued Name: Sn2Pp Day Telephone: ) fi3 --970 -- 9.6.5"" Mailing Address: l 140 (t 1�1t:11 ( l ?eeV- WA- qa*-- Cit State / Zip rAbp■-}-05 ( Y) , Me-c Fax Number: 4 — G ' 3 i4 MECHANICAL CONTRACTOR INFORMATION ARCHITECT OF RECORD All plans must be wet stamped by Architect of Recor ENGINEER OF RECORD All, plans must be wet stamped by Engineer of Recor t 430A-het,\ t) q 011 City State Zip Day Telephone: 79' — 67--- 1 4 Fax Number: Expiration Date: Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Addre . Fax Number: Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Addre - Fax Number: Page 1 of 2 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/ as St I 30 -50 HP/1,750,000 BTU Appliance Vent Hood and Duct Water Heater 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Emergency Generator Air Handling Unit <10,000 CFM Incinerator — Comm/Ind Other Mechanical Equipment Valuation of Project (contractor's bid price): $ BUILDING OWNER OR AU HORIZED AGENT: Signature: Mailing Address: Print Name: SooZPe �� 0 Scope of Work (please provide detailed information): 114, Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... ❑ Replacement .... ❑ Fuel Type: Electric ❑ Gas .... Other: Indicate type of mechanical work being installed and the quantity below: Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. 1, • • Q:\Applications\Fonns- Applications On Line3-2006 - Mechanical Permit Application.doc Revised: 4 -2006 bh is .vr,f),G1( Day Telephone: Z 3 97 o City Date: VP / State Zip 0 Z Date Application Accepted: o 1 — Date Application Expires: 11 ' 1v - Staff Initials Page 2 of 2 Doc: RECSETS-06 RECEIPT NO: R07 -00028 Initials: User ID: JEM 1165 Payee: SOOZEE KIM SET ID: 5000000662 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member Amount M07 -002 180.79 PG07 -002 88.00 TOTAL: 268.79 TRANSACTION LIST: Type Method Description Amount Payment Cash ACCOUNT ITEM LIST: Description GAS - NONRES MECHANICAL - NONRES PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //wwwci.tukwila.wa.us SET RECEIPT 268.79 TOTAL: 268.79 Account Code Current Pmts 000/322.100 88.00 000/322.100 150.63 000/345.830 30.16 TOTAL: 268.79 Payment Date: 01/08/2007 Total Payment: 268.79 3520 01/08 9710 TOTAL 268.79 Projesy � `� Type of 1, ectC / .. Address: Date Called: Special Instructions: Date Wanted: Requester: Phone No: INSPECTI • N NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -36 'Approved per applicable codes. El Corrections required prior to approval. COMMENTS: Pe°c / 11; / (�e-� . 0/6/-7' tnspecto . / Date , u r I .- j - C �00 REINSPECTION FE REQUIRED: Prior to inspection, fee must be Old at 6300 Southcenter lvd., Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: Proj t �ST (Ant „ P S �✓ TY Inspection:, 9 Tv - � ' i i i Ma..47 Q Address: /'SCj l) 1 (A /rs-1 IM(f Date Called: Special Instructions: 7 Date Wanted: / — / U7 p.m. Requester: Phone No: 53 -976 43' INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 n 4pproved per applicable codes. INSPECTION RECORD Retain a copy with permit PERMIT (206)431 -36 Corrections required prior to approval. COMMENTS: F ' .mo r� /.! o, //0,4)- 4 ` 9 / 2 iz.4- V A l['` E QUIREDn Date: ��- / ' a 58.00 REINSPECTION FEE 'or to inspection, fee must be paid at 6300 Southcenter Blv d. Suite 00 00. Call to sechedule reinspection. Receipt No.: Date: COMMENTS: Type of Inspection: /2o y 4 - ix J l Al / / , e° --/- -,6k ,- /.) ,/' 4 // ___7,r,c o ( (z_) sAa-- // .../ /vr -1 e.) 6-- Special Instructions: / N S f.? //' , G-9/ / . e re U "7 % (a.m.. p.m. Requester: Phone No: 53 5 7U S & Pro t: // 41..5-/,-,--Ai j b F. 5--/- Type of Inspection: /2o y 4 - ix Address: /S / 4)"s 'j/A //F //9 Date Called: Special Instructions: / Date Wanted: /-- / 2 - p - 7 (a.m.. p.m. Requester: Phone No: 53 5 7U S & INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. INSPECTION RECORD Retain a copy with permit 1/06 7- 0 Corrections required prior to approval. Daie: / /z v� 58.00 REINSPE TION FEE'REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. Receipt No.: Date: 3' -0" 7' -0" L r c'5 10' -0" r 7 7' -0" 2'-0" 1 -0" 3' -0" t I'M" N.G SUPPLY FROM EXISTING LINE ON ROOF VENT TO ROOF WITH SIMPSON 4" DIRECT VENT PIPE swami is Guided to esois sod cats* 'ar manias documaft doss sot sabot . Cany acceptid ads sr salaam. Au BUILDING Field copy IS ackaatidecto otTlikwila DIMON RECEIVED CITY OFTIMILA JAN 0 8 2007 PERMITGENTER SECURE TO EXISTING 2X6 WALL AND ANCHOR TO CONCRETE FLOOR WITH 1/2 X 5' ANCHOR BOLTS Mod —cb2 N.G SUPPLY 1/2" I.P. WITH RECESSED SHUT OFF VAL' Best Western Rivet's Edge Fireplace Plan Delta World LLC. 01/07/07 Frarnmin Plan Pare 1 of cop 0 141 *kr R -2000 Q/ ` INSTALLATION AND OPERATION INSTRUCTIONS FOR iONTURAL GAS MODEL GD36NTR BG036NTR PROPANE GAS MODEL GD36PTR & ► • ' R QUALITY FIREPLACES Awmoi W4 DIRECT VENT MILLIVOLT SYSTEM CERTIFIED FOR CANADA AND UNITED STATES USING ANSI / CSA METHODS WARNING: If the information in these instructions is not followed exactly, a fire or explosion may result causing property damage, personal injury or death. FOR YOUR SAFETY Do not store or use gasoline or other flammable vapours and liquids in the vicinity of this or any other appliance. WHAT TO DO IF YOU SMELL GAS: • Do not try to light any appliance. • Immediately call your gas supplier from • Do not touch any electrical switch. a neighbour's phone. Follow the gas • Do not use any phone in your build supplier's instructions. ing. • If you cannot reach your gas supplier, call the fire department. Installation and service must be performed by a qualified installer, service agency or the gas supplier. Ib.,l.Iw • •re«.. AwoaY•en Warnock Hersey CW US Wolf Steel Ltd., 24 Napoleon Rd., Barrie, ON L4M 4Y8 Canada • (705)721 -1212 • fax(705)722 -6031 www.Napoleonfireplaces.com • ask @Napoleon.on.ca w414 C f7FTJKMLA JAN 0 8 2007 R z r Mod-- oca • 16 WALL AND CEILING PROTECTION NOTE: BEAREM -A clearance to combustibles of 1 at the bottom of the vent and 2" at the top must be maintained during the first 12" of venting when penetrating combustible walls. The firestop spacer (W615-0044) supplied with the unit should be used to maintain this dearance.. Thereafter a 1" clearance to combustibles may be maintained using firestop spacer (W500-0096). TOP EXIT - Only a clearance to combustibles of 1" all around the vent pipe is required. HORIZONTAL INSTALLATION This application occurs when venting through an exterior wall. Having determined the air termi- nal location, cut and frame a hole in an exterior wall with a minimum opening as required. See Note above. (As an alternative to fram- ing, a vent pipe shield may be in- stalled, ensuring a 1' clearance to combustibles.) FIGURE 24 W415-0210/J/ 0927.05 `.- 11 I1 I 1 DETERMINE 11 I THE 1 t ; H EIGHT II , 1 1 1 ,i 1. Mark and cut the vent pipe shield to the determined depth of the combustible wall. Apply a bead of caulking (not sup- plied) to the framework or to the shield plate (in the case of a finished wall) and secure the shield through the opening to the interior wall. The final location of the vent pipe shield should maintain the required clearance to the 7" vent pipe /liner. (See note above). Do not fill this cavity with any type of material. Apply a bead of caulking all around and place a firestop spacer over the vent shield to restrict cold air from being drawn into the room or around the fireplace. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its final position, apply sealant between the pipe / liner and the firestop spacer. FIGURE A HOLE VERTICAL INSTALLATION This application occurs when venting through a roof. Installation kits for various roof pitches are available from your Napo- leon dealer. See Acces- sories to order the spe- cific kit required. 1. Determine the air terminal location, cut and frame 91i inch openings in the ceiling and the roof to provide the mini- mum 1 inch clearance between the fireplace pipe / liner and any combustible material. Try to center the exhaust pipe location midway between two joist to prevent having to cut them. Use a plumb bob to line up the center of the openings. DO NOT FILL THIS SPACE WITH ANY TYPE OF MATERIAL. A vent pipe shield will prevent any ma- terials such as insu- lation, from filling up CAULKING the 1" air space around the pipe. Nail headers between the joist for extra support. 2. Apply a bead of caulking (not supplied) to the frame- work or to the Wolf Steel vent pipe shield plate or equiva- lent (in the case of a finished ceiling), and secure over the opening in the ceiling. A firestop must be placed on the bottom of each framed opening in a roof or ceiling that the venting system passes through. Apply a bead of caulking all around and place a firestop spacer over the vent shield to restrict cold air from being drawn into the room or around the fireplace. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its final position, apply sealant be- tween the pipe / liner and the firestop spacer. FIGURE 25 FlRESTOP UNDERSIDE OF JOIST NOTE: Two methods to ensure the air terminal covers the cut out in the wall are; 1. Where the opening in the outside wall has been cut 101/2" tall to provide the 2" clearance from the vent pipe, terminal extension plate W500 -0103 must be used to cover the opening. 2. The first 12' of vent pipe must have a 2" clearance to combustible material when the vent pipe exits off the back of the fireplace. This applies to any finishing. material or insulation in the wall that the vent pipe passes through within that 12'. The clearance from the top of the vent pipe to the combustible material on the outside surface of the wall only requires a 1" clearance from the vent pipe. NOTE: REAR EXIT -A clearance to combustibles of 1' at the bottom of the vent and 2" at the top must be maintained during the first 12" of venting when penetrating combustible walls The firestop spacer (W615-0044) supplied with the unit should be used to maintain this clearance. Thereaftera 1" clearance to combustibles may be maintained using firestop spacer(W500-0096). TOP EXIT - Only a clearance to combustibles of 1° all around the vent pipe is required. HORIZONTAL INSTALLATION This application occurs when venting through an exterior wall. Having determined the air termi- nal location, cut and frame a hole in an exterior wall with a minimum opening as required. See Note above. (As an alternative to fram- ing, a vent pipe shield may be in- stalled, ensuring a 1' clearance to combustibles.) 1. Mark and cut the vent pipe shield to the determined depth of the combustible wall. Apply a bead of caulking (not sup- plied) to the framework or to the shield plate (in the case of a finished wall) and secure the shield through the opening to the interior wall. The final location of the vent pipe shield should maintain the required clearance to the 7' vent pipe /liner. (See note above). Do not fill this cavity with any type of material. Apply a bead of caulking all around and place a firestop spacer over the vent shield to restrict cold air from being drawn into the room or around the fireplace. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its final position, apply sealant between the pipe / liner and the firestop spacer. FIGURE24 W415-0210/.1/ 0927.05 NO OR ARE HOLE I " *• . I 1 DETERMINE I 1 THE II I CORRECT I i HEIGHT • II $ Ii a VERTICAL INSTALLATION This application occurs when venting through a roof. Installation kits for various roof pitches are . available from your Napo- leon dealer. See Acces- sories to order the spe- cific kit required. 1. Determine the air terminal location, cut and frame 91/2 inch openings in the ceiling and the roof to provide the mini- mum 1 inch clearance between the fireplace pipe / liner and any combustible material. Try to center the exhaust pipe location midway between two joist to prevent having to cut them. Use a plumb bob to line up the center of the openings. DO NOT FILL THIS SPACE WITH ANY TYPE OF MATERIAL A vent pipe shield will prevent any ma- terials such as insu- lation, from filling up the 1' air space around the pipe. Nail headers between the joist for extra support. 2. Apply a bead of caulking (not supplied) to the frame- work or to the Wolf Steel vent pipe shield plate or equiva- lent (in the case of a finished ceiling), and secure over the opening in the ceiling. A firestop must be placed on the bottom of each framed opening in a roof or ceiling that the venting system passes through. Apply a bead of caulking all around and place a firestop spacer over the vent shield to restrict cold air from being drawn into the room or around the fireplace. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its final position, apply sealant be- tween the pipe / liner and the firestop spacer. FIGURE 25 Fl UNDERSIDE OF JOIST NOTE: Two methods to ensure the air terminal covers the cut out in the wall are; 1. Where the opening in the outside wall has been cut 101' tall to provide the 2' clearance from the vent pipe, terminal extension plate W500-0103 must be used to cover the opening. 2. The first 12' of vent pipe must have a 2' clearance to combustible material when the vent pipe exits off the back of the fireplace. This applies to any finishing material or insulation in the wall that the vent pipe passes through within that 12'. The clearance from the top of the vent pipe to the combustible material on the outside surface of the wall only requires a 1' clearance from the vent pipe. greater man equal to or greater than less than equal to or less than total of both horizontal vent lengths (H and offsets (H in feet combined horizontal vent lengths in feet offset factor: .03(total degrees of offset - 90 ° in feet combined vertical vent lengths in feet when (H _< (V Simple venting configuration (only one 90° elbow) FIGURE6 See graph to determine the required vertical rise V for the required horizontal run H VERTICAL RISE IN 20 V = NMI 111s111111 WM ENNUI s!isi119111 ■■ kali:v. 1111111111 Iu L � $ssaUusi.sss*u s ■s••sasass *R••111kt •s••ss••u • Rui ■suss ■se• *tRSSS+r.' i1�•s•••s•••s WW1 sen nse s s aan isai R ais a ns ami : ' i s a�ii ' s ■ a• ss ■sssssusssssssssssasssss�isrz._ •sssts ■ SKIM RUM= Man s *s ss•s•s•sa•aa••• III ••a ■•. 5R Ina sssssas moans amnia sawn nu nun int. A es an us s R is:si aasapiiii•h. *P as ma. ■■ MMMMMMMM mmumwgagimmigmlitimmum I slsssssssss•SS•sssse2 $S •sun s=ssn •5O5e�AR ••55•••••555555 nom sssssss•s.sii uss s s iron savem ruins mpg!! ssv -iAs� s sss•ss s • mass••■ ow s 55sO•su•5sa5s5.s•N• 2.s 7.5 125 175 HORIZONTAL VENT RUN PLUS OFFSET IN FEET H The shaded area within. the lines represents acceptable values for H and V . 15° 30° 45° 90 0.45 0.9 1.35 2.7 6.0 11.0 16.0 32.0 * the first 90° offset has a zero value and is shown in the formula as -90° TOP EXIT / HORIZONTAL TERMINATION For vent configurations requiring more than one 90° el- bow, the following formulas apply: Formula 1: H < VT Formula 2: H + V < 40 feet Example 1: 90 FIGURE7 V, V V H, H H H H = 3ft = 8ft 90° 90° = V, +V 3 +8 =11ft = 2.5 ft = 2ft H 2.5 +2 =4.5ft = .03(three 90° elbows - 90 °) = .03(270° - 90 °) = 5.4 ft = H +H 4.5 +5.4 =9.9ft H +V 9.9 +11 =20.9ft Formula 1: H < V 9.9 < 11 Formula 2: H + V < 40 feet 20.9 < 40 Since both formulas are met, this vent configuration is ac- ceptable. W415-0210/J/09.27.05 — - - - - -- -- - - -. -- -- - - •- -• som••• imrn•••••■••• •v• ..•••• • •••.I f1• •• • V•\ VV • P••• -•• For optimum performance, it is recommended that all horizontal runs have a 1 inch rise per foot. REAR EXIT: Remove the baffle from the back of the firebox (Model GD36 Remove the baffle from the back of the firebox (Model GD36 only) by removing the four screws. FIGURE 20. only) by removing the four screws. FIGURE 20. From inside the firebox, insert the 4" flue pipe assembly (provided) through the rear of the firebox. Secure the as- sembly to the rear and top of the unit using 4 #8 x % inch Hex Head Wildrill screws supplied. Do not overtighten. The gasket needs only to be snug against the firebox. FIGURE 21. Before attaching elbows to the collars on the back of the fireplace, 1W will need to be trimmed off the 4" collar. - MODEL GD36 ONLY: Re- attach the baffle to the back of - the firebox using the four screws. FIGURE 20. TOP EXIT: 1. Remove the 7 inch diameter cap from the top of the fireplace and re- secure it over the 7' collar located at the rear of the unit. Press firmly on the cap while securing to ensure an airtight seal. Do not damage the gasket. 2. Remove the plate covering the 4' diameter flue open- ing (seen inside the top of the 7' diameter collar) and dis- card. Try not to disturb the retaining ring or the gasket be- neath. Re- secure the ring and gasket using the screws removed from the plate. 3. From inside the firebox, insert the 4" flue pipe assem- bly through the heat shield and out through the retaining ring. Secure the assembly to the rear and top of the unit using 4 #8 x % inch Hex Head Wildrill screws supplied. Do not overtighten. The gasket needs only to be snug against the firebox. FIGURE 22. MODEL GD36 ONLY: Re- attach the baffle to the back of the firebox using the four screws. FIGURE 20. FOR SAFEAND PROPER OPERATION OF THE FIREPLACE, FOLLOW THE VENTING INSTRUCTIONS EXACTLY. W415-0210/J/0927.05 LU GAS INSTALLATION Proceed once the vent Installation Is complete. 1. Move the fireplace into position and secure using the nailing tabs and/or secure to the floor through the 14"0 holes located at either end of the base. 2. Route a 3/8" N.P.T. black iron gas line, 1/2' type -L copper tubing or equivalent to the fireplace. 3. For ease of accessibility, an optional remote wall switch or millivolt thermostat may be installed in a convenient location. Route 2- strand (solid core) millivolt wire through the electrical hole located at the bottom left side of the unit. The recommended maximum lead length depends on wire size: WIRE SIZE MAX. LENGTH 14 gauge 100 feet 16 gauge 60 feet 18 gauge 40 feet Attach the two leads to terminals 1 and 3 located on the gas valve. FIGURE37 t(t� �Ifca(Ka(cc(acc((r( ;AP R FITTING FIGURE38 W415.0210/J/ 0927.05 n n'f 4. Install rigid black pipe, 1/2' type -L copper tubing or, if local codes permit, a 3/8" flex connector and shutoff valve to the gas line and the fireplace gas valve. FLEXIBL NNECTOR V At 4 OFF AVCK The as line and the shutoff valve (if so equipped) must not interfere with the opening and closing of the door latch. Seal and tighten securely. An adapter fitting is required between the gas valve and the copper tubing or flex con- nector. 00 not kink flex connector 5. Check for gas leaks by brushing on a soap and water solution. Do not use open flame. 00 not connect either the waft switch, thermostat or gas valve to electricity (11O volts). Purge all gas lines with the glass door or the nreplace open. Assure theta continuous gas flow is at the burner oeeore ciosing the door MOBILE HOME INSTALLATION In Canada, mobile home installation may be vented hori- zontally or vertically. In the United States, it may only be installed vertically. See 'Vertical Venting" or "Horizontal Air Terminal Installation' for installation. The fireplace is equipped with two 1/4' diameter holes lo- cated in the front left and right corners of the base. For mobile home installations, the fireplace must be fastened in place. Use #10 hex head screws, inserted through the holes in the base to secure. It is recommended that the fireplace be secured in all installations. Always turn off the pilot and the fuel supply at the source, priori° moving the mobile home. After moving the mobile home and prior to lighting the fireplace, ensure that the logs are positioned correctly. FRAMING It is best to frame your fireplace after it is positioned and the vent system is installed. Use 2x4's and frame to local building codes. It is not necessary to install a hearth extension with this fireplace system. Objects placed in front of the fireplace should be kept a minimum of 48' away from the front face. When roughing in the fireplace, raise the fireplace to ac- commodate for the thickness of the finished floor materi- als, i.e. tile, carpeting, hard wood, which if not planned for will interfere with the opening of the lower access door and the installation of many decorative flashing accessories. Note: In order to avoid the possibility of exposed insulation or vapour barrier coming in contact with the fireplace body, it is recommended that the walls of the fireplace enclosure be `finished" (ie: drywalUsheetrock), as you would finish any other outside wall of a home. This will ensure that clearance to combustibles is maintained within the cavity. Combustible materials may be installed flush with the front of the fireplace but must not cover any of the black face- areas of the fireplace. Non - combustible matenai (brick, stone or ceramic tile) may protrude in these areas. BGD36 FIGURE 39a41 36 1/4" 14" 35 1/4" 14 36 1/ 2 " 36 1/ 14" 1 I NSIDE CHASE GD36 F 1 1-37 3/ 37 3 /4"--4.6.. 14" INSIDE CHASE W4150210/J/0927.05 21 LL MANTLE CLEARANCES AND ENCLOSURES Uombustible mantle clearance can vary according to the mantle depth. Use the graph to help evaluate the clear- ance needed. Curtains, above the fireplace, must not be positioned lower than the 2" distance required for the 2" combustible mantle. These same requirements apply to any combustibles protruding on either side of the fire - place I i 4" MANTLE " 6" 4" { 2' MANTLE 1 l 2 t TOP OF UNIT 12 M H 10 A E 8 TG6 ET 2 0 11 0927.05 TOP OF COMBUSTIBLE ENCLOSURE V MANTLE FIRESTOP SPACER COMBUSTIBLE MATERIAL 2x4 MANTLE WIDTH r 2 4 6 8 fo'2 i 14'h" TMANTLE 6"MANTLE T T "MANTLE I 4 j 2"fiAANTLE 4, 2" t TOP OF UNIT TOP OF COMBUSTIBLE ENCLOSURE COMBUSTIBLE it MATERIALS Irva annum F M� STUD 6 VAA " DOOR REMOVAL & INSTALLATION GVFL LOUVRE INSTALLATION DOOR OPENING AND CLOSING: The upper lou- vres must be removed to allow the door to be opened or closed. To access the lower door latch, open the valve control door. Release the top and bottom door R'L - latches, located at the right `tE44a -i side of the door. TO INSTALL THE UPPER LOUVRES: Insert the up- per louvres into the slots on both brackets. Press the top flange of the hood into the four clips located along the top of the unit as shown. GE-SCREEN — LOWER LOUVRES ALVE CONTROL DOOR) W415-0210/J/ 0927.05 TO INSTALL THE LOWER LOUVRE ASSEMBLY: At- tach each hinge to the fire- box with 2 screws. Position the hinge screen into place and with the control door open, secure to the firebox using three screws. Optional plated door trim, and arched door facia are avail- able at your local Napoleon dealer. NOTE: The protective wrap is best removed when the as- sembly is at room temperature but this can be improved if the assembly is warmed, using a hair dryer or similar heat source. L36 LOUVRE INSTALLATION CENTRE SLO -' Curs FLANGE HOOD Attach the hood by pressing the top flange into the clips along the top of the louvre opening. Secure using a screw through the centre slot. UPPER LOUVRES Insert the louvre tabs into the slots located at the top left and right corners of the unit. LOWER LOUVRES Insert the hinge clips into the slots located at the bottom left and right corners of the unit. To remove the louvres, pull the back tabs of the clips forward, while pushing the louvre assem- bly back. Lift the clip. LOG PLACEMENT PI AZERM" logs and glowing embers exclusive to Napoleon Fire- places, provide a unique and realistic glowing effect that is different in every installation. Take the time to carefully po- sition the glowing embers for a maximum glowing effect. Log colours may vary. During the initial use of the fireplace, the colours will become more uniform as colour pigments bum in during the heat activated curing process. FIGURE46a -d 1. Place the back log ( #1) onto the log support tray and in front of the tabs. The tabs maintain an air space between the log and firebox back to facilitate combus- tion air flow. Ensure that the back of the log rests against the brackets on the back wall of the firebox. 2. Move the two small logs ( #2 & #3) Into position, lining up the studs located on the burner with the holes on the bottom of the logs. Ensure that the small logs sit flat on the burner. 3. Place the bottom of the left crossover log ( #4) against the left firebox side and pulled forward to the grate. The top of the log should rest in the pocket on the back log. 4. Position the base end of the center log ( #5) against the middle grate post with the other end of the log resting in the pocket of the left crossover log. 5. Place the bottom of the right crossover log ( #6) against the right firebox side and pulled forward to the grate. The top of the log should rest in the pocket provided on the center log ( #5). CHARCOAL EMBERS Randomly place the charcoal embers along the front and sides of the log support tray in a realistic manner. Fine dust found in the bottom ofthe bag should not be used. VERMICULITE (MODEL GD36 ONLY) Sprinkle vermiculite around the charcoal embers. Note: Both charcoal embers and vermiculite are not to be placed on the burner GLOWING EMBERS Tear the embers into pieces and place along the front row of ports covering all of the burner area in front of the small logs ( #2 & #3). Care should be taken to shred the embers into thin, small irregular pieces as only the exposed edges of the fibre hairs will glow. The ember material will only glow when exposed to direct flame; however care should be taken to not block the burner porta Blocked burner ports can cause an incorrect flame pattern, carbon deposits and delayed ignition. PHAZER'" logs glow when exposed to direct flame. Use only certified "glowing embers' and PHAZEWM logs available from your Napo- leon dealer. LOGO PLACEMENT Remove the backing of the logo supplied and place on the glass viewing door, as indicated. 25 06 -04 -2007 SOOZEE KIM 16212 BOTHELL EVERETT HY F271 MILL CREEK WA 98012 RE: Permit No. M07 -002 15901 WEST VALLEY HY TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be In writine and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 07/16/2007 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, fer Marshall, Permit Technician xe: Permit File No. M07 -002 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 ACTIVITY NUMBER: M01 -002 DATE: 01 -08 -07 PROJECT NAME: BEST WESTERN RIVER'S EDGE SITE ADDRESS: 15901 WEST VALLEY HY X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Pig Buil ing Division Public Works ❑ Complete Comments: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28-02 COORD COPY PLAN REVIEW /ROUTING SLIP S(1 'lit. I.4- Fire Prevention 8 Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ TUES/THURS ROU ING: Please Route Structural Review Required REVIEWER'S INITIALS: C ❑ Permit Coordinator ❑ DATE: DUE DATE: 01-09-07 DATE: Planning Division Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: No further Review Required {=1 DUE DATE: 02-06-07 Approved ❑ Approved with Conditions IY1 Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License SUNDAES063J9 Licensee Name SUNDANCE ENERGY SERVICES INC Licensee Type CONSTRUCTION CONTRACTOR UBI 601541637 Verify Workers Comp Premium Status Ind. Ins. Account Id Business Type CORPORATION Address 1 10228 MAIN ST Address 2 City BOTHELL County KING State WA Zip 980113428 Phone 4254819660 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 4/29/1994 Expiration Date 9/11/2007 Suspend Date Separation Date Parent Company Previous License Next License Associated License 7 1 0 1 14 41 )Vitn SW0C [Npartmeot cef °and industries Printer Friendly_Yersion Look Up a Contractor, Electrician or Plumber Topic Index I Contact Info Search Home Safety Claims a Insurance Workplace Rights Trades & Licensing Find a Law or Rule 1 Get a Form or Publication 'General/Specialty Contractor A business registered as a construction contractor with Lai to perform construction work within the scope of its specialty. A Genera! or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. https://fortress.wa.gov/lni/bbip/Detail.aspx?License=SUNDAES063J9 01/11/2007