Loading...
HomeMy WebLinkAboutPermit M07-103 - CALIFORNIA PIZZA KITCHENCALIFORNIA PIZZA KITCHEN 150 ANDOVER PK W M07 -103 Parcel No.: 0223100010 Address: Suite No: Tenant: Name: Address: Owner: Name: Address: doc: IMC - 10/06 150 ANDOVER PK W TUKW City ,f Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http://www.citukwila.wa.us CALIFORNIA PIZZA KITCHEN 150 ANDOVER PK W , TUKWILA WA GIBSON PROPERTIES LLC 401 ANDOVER PARK E , TUKWILA WA Contact Person: Name: GEET CHAND /NINA RAEY Address: 1342 BELL AV, STE 3K , TUSTIN CA Contractor: Name: MERIT MECHANICAL INC. Address: PO BOX 2109 , REDMOND, WA Contractor License No: MERITMI163CM DESCRIPTION OF WORK: MECHANICAL FOR NEW 6136 SF RESTAURANT Value of Mechanical: 185,000.00 Type of Fire Protection: SPRINKLER/AFA Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial MECHANICAL PERMIT EOUIPMENT TYPE AND OUANTITY 0 4 0 12 7 0 1 0 0 8 1 3 0 0 * *continued on next page ** M07 -103 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 714 258 -1808 Phone: 425 883 -9224 Expiration Date: 06/01/2009 M07 -103 08/22/2007 02/18/2008 Fees Collected: $1,761.94 International Mechanical Code Edition: 2003 Boiler Compressor: 0-3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15-30 HP /1,000,000 BTU.. 0 30 -50 HP/1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 7 Thermostat 2 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 4 Printed: 08 -22 -2007 Permit Center Authorized Signature: Print Name: doc: IMC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us GAL Permit Number: M07 -103 Issue Date: 08/22/2007 Permit Expires On: 02/18/2008 Date: g c I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulatinc construction or a performance of ork. I m to sign and obtain this mechanical permit. Signature: iC / iC/` ° v . 2 , _C 7 Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspende, or abandoned for a period of 180 days from the last inspection. M07 -103 Printed: 08-22 -2007 Parcel No.: 0223100010 Address: Suite No: Tenant: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 150 ANDOVER PK W TUKW CALIFORNIA PIZZA KITCHEN 1: ** *FIRE DEPARTMENT CONDITIONS * ** PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: M07 -103 ISSUED 05/03/2007 08/22/2007 2: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 3: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 4: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 5: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 6: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 7: A fire alarm system is required for this project. The fire alarm system shall meet the requirements of N.F.P.A. 72 and City Ordinance #2051. 8: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 9: An electrical permit from the City of Tukwila Building Department Permit Center (206 - 431 -3670) is required for this project. 10: All electrical work and equipment shall conform strictly to the standards of the National Electrical Code. (NFPA 70) 11: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 12: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 13: These plans were reviewed by Inspector 512. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. 14: ** *BUILDING DEPARTMENT CONDITIONS * ** 15: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 16: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. doc: Cond -10/06 M07 -103 Printed: 08 -22 -2007 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 17: Readily accessible access to roof mounted equipment is required. 18: Insulating materials, where exposed as installed in buildings of any type of construction, shall have a flame spread index of not more than 25 and a smoke development index of not more than 450. Where facings are installed m concealed spaces in buildings of Type III, IV, or V construction, the flame spread and smoke - developed limitations do not apply to facings, that are installed behind and m substantial contact with the unexposed surface of the ceiling, wall or floor finish. 19: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 20: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 21: Except for direct -vent appliances that obtain all combustion air directly from the outdoors; fuel -fired appliances shall not be located in, or obtain combustion air from, any of the following rooms or spaces: Sleeping rooms, bathrooms, toilet rooms, storage closets, surgical rooms. 22: Water heaters shall be anchored or strapped to resist horizontal displacement due to earthquake motion. Strapping shall be at points within the upper one -third and lower one -third of the water heater's vertical dimension. A minimum distance of 4- inches shall be maintained above the controls with the strapping. 23: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 24: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206 - 431 - 3670). 25: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: Cond - 10/06 * *continued on next page ** M07 -103 Printed: 08 -22 -2007 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. r Signature: / / ' .: Date: Print Name: doc: Cond -10/06 7t F;1-4-c_ea M07 -103 Printed: 08-22 -2007 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http: / /www. ci. tukwila. wa. us E -Mail Address: Q:1Applications\Ponns- Application On Line\3 -2006 - Permit Applicaton.doc Revised: 9 -2006 bh Building Permit No. Mechanical Permit No. M 0 10 3 Plumbing/Gas Permit No. Public Works Permit No. Project No. X07 - oar to (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION ra \ J Vt a Site Address: 1Sb p t X vc 2 per-. W SST Tenant Name: COtf} m l . P I . 110 kat er 19.Ed7A.Urnat New Tenant: VI Yes ❑ ..No Property Owners Name: 1 Mailing Address: too 53 vl) • CChem f A`vd . , kkTh f IaYr Las P 1f 1L'�i 'es c ° oO4 J City State Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: Red - (MO Yid j 1.11r.tx Y.? & Mailing Address: l 7 13eAk Avenue 1 5urte- 00- a -0 E -Mail Address: C € tr end u ' n c 4. (. ovY) GENERAL CONTRACTOR INFORMATION - (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: Jr YXWYn jt Des9dp COMiru C.t1 or Mailing Address: 5(00 tia r r► n Avenuee, Systr M 02-\ Contact Person: 1teitt\ r [ `t)V - 000 E -Mail Address: Vq1 ffira t t: S k Vi t 1 • ( 6x(1'1 Contractor Registration Number: SF/&JMb L01 6-"IM King Co Assessor's Tax No.: 02-2 "OW — Suite Number: Floor: Day Telephone: (1 2S1 , )- City State Zip Fax Number: 011 \L) Z 24O City (( State Zip Day Telephone:lLQ 10 2- RD Fax Number: C tat - 4 - ) teal - 0 3q Expiration Date: ' opg - Da g ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name:.cl ftrC.hltEGk Mailing Address: 3\ CID - fkiYp0it LOOV ‘)VtVe CfEt ■€. C4 ' q 2 (Q2JQ y� City d Stattc �� `T Zip M.IkE Contact Person: Cki i Ca P , -o ie ( ' V vr.4t11 Ct1 Day Telephone: (. ) ' 9 — ,G � E -Mail Address: Fax Number: Ti Z' ' — 3 ‘k 0 ENGINEER OF RECORD All plans must be wet stamped by Engineer. of Company Name: 0Oth ' b 14 I eE Mailing Address: 31 Sto P- Mr( VP) Utz.itt 1\Lec ar 2 2 `,� City State Zip Contact Person: b 1lYr1C I �IW Rtt �QY Day Telephone 16 ) 7 4tiZ Fax Number: C1 444 - 2Cy47 Page 1 of 6 BUILDING PERMIT INFORMATION - 206 -431- 3670 Valuation of Project (contractor's bid price): $ CYO ('O . (`A Existing Building Valuation: $ Scope of Work (please provide detailed information): COrginCti CAN tf \t A 1 9rovoct 93r9 Stuai \di u , k'd an a devetc er lave_ rtrvd rpari. Will there be new rack storage? ❑ Yes S. No If yes, a separate permit and plan submittal will be required. 1" Floor : P7oor'` : Pl oo i ;Basement''' Accessory:$iructin e* Attached Garage, `Detached Garage ilttaehed C orport DO-ached Coy er . Vncovece v Addition to `:• sbg Structure .: u 116 Coastrticdon I TYPe Of- bccupancy IBC PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: l0 L S r.) Compact: ` �, �.� Handicap: n Will there be a change in use? ❑ Yes ❑ No If `yes ", explain: K . e J 1 u a n a l - C N w) FIRE PROTECTION /HAZARDOUS MATERIALS: - s Con11 Sprinlders Automatic Fire Alarm ❑ None ❑ Other (specify) Provide MI Buit4ing Areas in Square Footage Below Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If 'yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safe Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q:Mppliations\Fonns- Applications On Line 3 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 2 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace>100K BTU Li Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Fumace Ventilation Fan Connected to Single Duct S Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater L6 Ventilation System + I Wood/Gas Stove 30 -50 HP/1,750,000 BTU Appliance Vent Hood and Duct 3 Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/Ind MECIAANICAL PERMIT INFORMATION - 206- 431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: ACM t V- t 1 l h t Mailing Address: 1 U30 ( 3 to N. 0. space Al itechyprci tN $- q Sr643 City State Zip Contact Person: t.%)cA PafL I Ci& " Day Telephone: C A) 25s - ' )� E -Mail Address: 11 \%t C/tl" f t �E'�/Q,tf erti • con Fax Number: (.3V ' 2 —2i 1 Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ 1�� 1 (X,. 0 0 Scope of Work (please provide detailed information): ftit VY1P.CA 11 C W (x fix (f new V'Sta U ' i nd Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New ....1, Replacement .... ❑ Fuel Tvpe: Electric ❑ Gas ....D Other: Indicate type of mechanical work being installed and the quantity below: Q: Applications\Ponns- Applications On Une13 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 4 of 6 Print Name: Mailing Address: Date Application Accepted: BUILDING OWNER O A UTHORIZE AGE NT: Signature: 6 r s PERMIT APPLICATION NOTES = Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Date: U o r Day Telephone: 7/4 tre --/ AV? 3 (Ia -,�; << � s:-,A-e. 7e- State 7 �' Date Application Expires: Staff Initials: Q:Uppiications\Fonns- Applications On Line13 -2006 - Permit Application.doc Revised: 9 - 2006 Page 6 of 6 bh 1 Parcel No.: 0223100010 Permit Number: M07 -103 Address: 150 ANDOVER PK W TUKW Status: APPROVED Suite No: Applied Date: 05/03/2007 Applicant: CALIFORNIA PIZZA KITCHEN Issue Date: Receipt No.: R07 -01766 Initials: WER Payment Date: 08/22/2007 09:35 AM User ID: 1655 Balance: $0.00 Payee: FANCHER DEVELOPMENT TRANSACTION LIST: Type Method Description Amount Payment Check 3262 1,415.55 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Account Code Current Pmts 000/322.100 1,415.55 Total: $1,415.55 Payment Amount: $1,415.55 1913 08/22 9710 TOTAL 10410.86 03-(4 doc: Receiot -06 Printed: 08 -22 -2007 RECEIPT NO: R07 -00743 Initials: JEM Payment Date: 05/03/2007 User ID: 1165 Payee: FANCSER DEVELOPMENT SERVICES INC SET ID: S000000747 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member Amount City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us D07 -164 3,263.69 M07 -103 346.39 PG07 -119 184.00 TOTAL: 3,794.08 Payment Check 3087 ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES SET RECEIPT TOTAL: Total Payment: 3,794.08 TRANSACTION LIST: Type Method Description Amount 3,794.08 3,794.08 Account Code Current Pmts 000/345.830 3,794.08 TOTAL: 3,794.08 7775 05/03 9716 TOTAL 3794.08 Project: Type of Inspection: Address: 1 SO A7U00 -r eiC tJeSr Date Called: Special Instructions: Date Wanted: 1 , ' _km- 2-S' `�J p.m. Requester: Phone No: 't DSO 3 is M07 - /v3 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION It- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. COMMENTS: 1• �r rte, a ,0/f7',4,irt/ Date / . 0 REINSPECTION F E REQUI D. Prior to inspection. fee must be - id at 6300Southcenter lvd.. Si 100. Call the schedule reinspection. (Receipt No.: 'Date: Project: ( • ?4 Type of Inspection: / /7 - ;.v Address: ,r�" .� /55 iliu�'/✓zzv Date Called: Special Instructions: Date Wanted: Requester: Phone No: 425 -2 r73 INSPECTION RECORD Retain a copy with permit 1 ION NO. PERMIT NO CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: 58. REINSPECTIO FEE R QUIRED. ° rior to inspection. fee must be pa' • at 6300 Southcenter Blvd.. Suite ' O. Call the schedule reinspection. pt No.: 'Date: Date: mo7/o3 3— d Project: e-AtAte- A z Type of Insgfrction: Address: IS 0 INc.P- Eats. W Date Special Instructions: Date Wante • I f 1( 0 a.m. Requester: Phone No: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERPnJ NO. CITY OF TUKWILA BUILDINGJDIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 El Approved per applicable codes. COMMENTS: Pfr W'L <_ 4 01C— 6(<... ttwkss 3 1lnspector: C ie4s, .6 El Corrections required prior to approval. Date: 12.. rt $58.00 REINSPECTION FEE REQUIRED. Prior to inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. 1 07 —C.3 IAA PERMIT NO. IT (206)431 -3670 Project: CAL AC. PZZA- Address: SO ''/E& W Special Instructions: Type of Inspection: (� • r� Date Called: Date Wante Requester: a.m. Phone No: Corrections required prior to approval. COMMENTS: t(vP 60a " , �s r-Nlc‘,.Lcl U C t tty›14c:., 3 2z -44 /�- O�� 'Inspector: aLcoa \J (Date: 2 I $58.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: c. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 1 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -36A0 Project: Address` _ Special Instruction f Approved per applicable codes. 'Inspector: Type of Inspection: I _ l i'4 Date Called: Date Wanted: Requester: Phone No: I4�?-/03 1 El Corrections required prior to approval. COMMENTS: 5 � �.tS2 1 2&3 Date: (( $58.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. (Receipt No.: 'Date: Project: (141/f 4/1'11/4 0 iZ_24 Type of Inspection: thief" S•v5 Address: Date Called: Special Instructions: Date Wan teed: P --) mo - Requester: Phone No: 4 /2 5' - 6 70 3 PECTION NO. CI OF TUKWILA BUILDING DIVISION 0 Approved per applicable codes. INSPECTION RECORD Retain a copy with permit / PERMIT NO. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -367 COMMENTS: iva Qc4z7 fi a <-7/ } Q ., Date % / l 0$58 40 R SPECTION FEE REQU RED. Pr t inspe Ion. fee must be pa at . 00 Southcenter Blvd.. Suite 100. ll the schedule reinspection. 'Receipt No.: 'Date: Corrections required prior to approval. Project: ��, // d R� /4 //LZA Type of Inspection: �,,,�� Ott Address: Date Called: Special Instructions: Date Want d: x/73/ 7 = m Requester: Phone No: /211 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (200431 -3670 El Approved per applicable codes. COMMENTS: ? 9 a,wce- ,( ix' / ?a,y l / — 'jrmk Inspecto INSPECTION RECORD Retain a copy with permit El Corrections required prior to approval. Date: .00 REINSPECTION FEE ' EQUI . Prior to inspection. fee must be aid at 6300 Southcenter Blv .. Stuitte 100. Call the schedule reinspection. e ipt No.: 'Date: Proje t: ��� /�dQ�via pizza Type of Inspection: ft�,h - Address: Date Called: Special Instructions: Date Wan i tyd: / /i 0 7 m: Requester: Phone No: ` INSPECTION RECORD . /D �1Q 1 3 Vw�- Ret ain a cop with permit J INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION P- 6 3 0 0 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 CO ENTS: p. Inspecto Approved per applicable codes. 'Receipt No.: El Corrections required prior to approval. /24 if r1- o/' ro Tl✓Su Lain 7„, / 7 4.)zte .00 REINSPECTION FE REQUIRED. P aid at 6300 Southcenter Blvd., Suite 10 Date: 7 or to inspection, fee must be Call the schedule reinspection. 'Date: INSPECTIO NO 11RMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: Special Instructions: ��G /% eN/4 AZZ 4ype of s2(t � A dr ss: [Y 7 i c ! -i l/G( P/6 L / Date Called: Date Wanted: / /p � U-2 p.m. Requester: Phone No: 1/ Z5- e 7 El Approved per applicable codes. c Corrections required prior to approval. COMMENTS: f /) INSPECTION RECORD ecto Retain a copy with permit I " /U z l 5 - /2 ) c4'v 5 ) aeg-r4, 0 REINSPE ction, fee must be at 6300 Southcenter edule reinspection. Receipt No.: Date: FEE R UIRED rior to inspe Blvd., Suite 00. Call the sch 'Date: COMMENTS: . A ' = E' -. . Type of Inspection: l ' i* ._ 4 a',: f t,., Fj �; S _. a . t it , $d:..�... 1` Address f -- ,: > Suite #: 4 �' Contact Person Special Instructions: Pre-Fire: . . , Phone No.: Occupancy Type: f' ....:x .‘1..4._, : :i , 4r- i° Project: . A ' = E' -. . Type of Inspection: l ' i* ._ 4 a',: f t,., Fj �; S _. a . t it , $d:..�... 1` Address f -- ,: > Suite #: 4 �' Contact Person Special Instructions: Pre-Fire: . . , Phone No.: Needs. Shift Inspection: K = t< . Sprinklers: Fire Alarm: , };:, ; , , >; Hood & Duct; Monitor :, , Pre-Fire: . . , Permits: Occupancy Type: f' INSPECTION NUMBER Approved per applicable codes. INSPECTION RECORD Retain a copy with permit Word /Inspection Record Form.Doc 1/13/06 CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206 -575 -4407 Corrections required prior to approval. Inspector: 4 Date: $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. T.F.D. Form F.P. 113 Fan Equipment Schedule — s +.,�...e� Brand Name' Model No. Equip. ID Brand Name' Model No. CFM sP' HP /BHP Flow Control Location of Service APPROVED RECEIVED CITY C4 Tut W LA MAY 0 3 20011 City 1 _ , ic1 . .4.,‘. . , 1 1 .i:.�1 Cri4 RECEIVED Cooling Equipment Schedule Equip. ID Brand Name' Model No. Capacity Btu/h Total CFM OSA CFM or Econo? SEER or EER IPLV Location APPROVED UU - 5 2007 .____L_IsL.4, City _ ne in Of Tukwila my: ./a .., ... Heating Equipment Schedule REVIEVUEI Equip. ID Brand Name' Model No. Cap i Bt heu 1� a 1�O� �P , , tc.E nput Btuh Output Btuh Efficiency' APPROVED UU - 5 2007 .____L_IsL.4, City _ ne in Of Tukwila my: ./a .., ... Mechanical Summary MECH -SUM 2004 Washington State Nonresidential Energy Code Compliance Forms Project Info Pc; No. Project Description Briefly describe mechanical system type and features. iv Joe Juraich, Henderson Egineera, Inc. Project Address FILE COPY . pplicant Name: Includes Plans Mop- l03 Applicant Address: 1A ant Phone: 913 -307 -5300 California Pizza Kitchen, Park Nest Plaza Packaged bane RTU'S with economizers. Refer to drjtving M2.0 for Equipment schedules. Date EXP. 11 /07 /VS Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 Revised May 2005 007 Compliance Option Q Simple System O Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. 'If available. 2 As tested according to Table 14 -1A through 14 -1G. 3 If required. 's COP, HSPF Combustion Eff/�� t iptr otAW�is applicable. s Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). UU �U STDR ARCHITECTS System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: J Constant vol? ./ Air cooled? J Packaged sys? <20,000 Btuh? Split system? ./ Economizer included? If Heating Only: <5000 cfm? fl <70% outside air? Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only Reference Section 1421 Heating /Cooling or Cooling Only Simple System Allowed (section 1420) Yes — Yes* Yes Reference Section 1423 Yes otal Ca . wo economize <240,000 Btuh or 10 %? CC= Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Fan Equipment Schedule Equip. ID Brand Name' Model No. CFM SPt HP /BHP Flow Control Location of Service Location Tukwila, WA Applicant Name: Joe aursich, Henderson Egineers, Inc. Applicant Address: 8325 Lenexa Dr., Lenexa, KS, 66214 Applicant Phone: 913- 307 -5300 Cooling Equipment Schedule Equip. ID Brand Name Model No. Capacity Btu/h Total CFM OSA CFM or Econo? SEER or EER IPLV Location Tukwila, WA Applicant Name: Joe aursich, Henderson Egineers, Inc. Applicant Address: 8325 Lenexa Dr., Lenexa, KS, 66214 Applicant Phone: 913- 307 -5300 Heating Equipment Schedule Equip. ID Brand Name Model No. Capacity Btu/h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency" Tukwila, WA Applicant Name: Joe aursich, Henderson Egineers, Inc. Applicant Address: 8325 Lenexa Dr., Lenexa, KS, 66214 Applicant Phone: 913- 307 -5300 Project Info Project Address California Pizza Kitchen, Park West Plaza Date . 07 Corner of Andover Park heat /Baker Blvd. For Buil. - �+ •`4•.] 4 -pt.HjLq vv�� A[ VIASII/+: Tukwila, WA Applicant Name: Joe aursich, Henderson Egineers, Inc. Applicant Address: 8325 Lenexa Dr., Lenexa, KS, 66214 Applicant Phone: 913- 307 -5300 Mechanical Summary MECH -SUM 2004 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. ❑ Indudes Plans �.,..� ..C1O,....y...,..,.u.0 •■•,.•., .......J,............,.... Revised May 2005 EXP. 11/07/ Include documentation requiring compliance with commissioning requirements, Section 1416. Compliance Option ® Simple System O Complex System o Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following Information Is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. 'If available. 2 As tested according to Table 14 -1A through 14 -1G. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: Constant vol? Split system? Air cooled? Packaged sys? Q <20,000 Btuh? Economizer included? If Heating Only: fl <5000 cfm? <70% outside air? Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only Reference Section 1421 J Yes — otal Ca . wo economize <240,000 Btuh or 10 %? Heating /Cooling or Cooling Only Simple System Allowed (section 1420) C Reference Section 1423) Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Mechanical 2014 Washington State - Complex Systems Checklist MECH -COMP Nonresidential Energy Code Compliance Forms Revised May 2005 Project Address California Pizza Kitchen, Park West Plaza Date 4/27/2007 The following additional information is necessary to check a mechanical permit application for a complex mechanical system for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Use the checklist as a reference for notes added to the mechanical drawings (see the MECH - CHK checklist for additional system requirements). This information must be on the plans since this is the official record of the permit. Having this information in separate specifications alone is NOT an acceptable alternative. For Building Department Use Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY 1431.1 Field assem. sys. Provide calculations 1432.1 Setback & shut -off Indicate separate systems or show isolation devices on plans 1432.2.1 Air system reset Indicate automatic reset 1432.2.2 Hydr. system reset Indicate automatic reset 1433 Air Economizer Indicate economizer on equipment schedule or provide calculations to justify exemption and demonstrate 10% higher efficiency for equipment with out economizer. 1433 Water Economizer Indicate water economizer and provide calculations if 1433 Exception 2 is utilized 1434 Separate air sys. Indicate separate systems on plans 1435 Simul. htg. & clg. Indicate that simultaneous heating and cooling is prohibited, unless use of exception is justified 1436 Heat recovery Indicate heat recovery on plans; complete and attach heat recovery calculations 1437 Elec. motor effic. MECH -MOT or Equip. Schedule with hp, rpm, efficiency 1438 Variable flow sys. Indicate variable flow on fan and pump schedules 1439.1 Kitchen Hoods Indicate uncooled and unheated make -up air 1439.2 Fume Hoods Indicate VAV, unheated /uncooled or heat rec. makeup no is circtea for any questton, provide exptanatton: Decision Flowchart Use this flowchart to determine how the requirements of the Complex Systems Option apply to the project. Refer to the indicated Code sections for more complete information on the requirements. Start Here Section 1411.1 Equipmen Efficiency Shall Meet Tables 14-1A through 14 -1G Yes l 1411,1 Intermittent Ignition Device & Power Venting or Damper, 0.75% Maximum Jacket Loss 1412.6 Modulating or Staged Combustion Controls Required Section 1432.2.1 Supply Air Reset Controls Required apacity of H Heating System > 00,000 Btuh4 Yes l Section 1431.1 Calculations of Total On - Site Energy Input & Ouput Required (continued on back) Yes viv Yes No Section 1432.2.2 Hot Water Supply Temperature Reset Required Mechanical - Complex Systems (back) MECH -COMP 2004 Washington State Nonresidential Energy Code Compliance Forms 0% Air Econ Provided? Section 1413 Water Cooled w/Water Econo? Yes otal CIg Capacity w/ Water Econo <500 Tons pply Air >5,0 cfm & OSA > 70% otor Incl. qpmt. Covr'd by Tbl 14- 1A -14- 1G? Section 1436 50% Effective Heat Recovery Required Yes Yes No DONE Yes♦ Yes tal Cap. cono <= 480,00 Btuh or 20% of otal Cap. Yes Multi -speed Motor in Multi - ed system Yes Yes Yes stem or Zon w/ Simultaneous Htg. & Clg.? Application Involves Variable Flow? Yes—Or Yes■ Section 1435 Zone Controls Must Reduce Supply Air Quantity Before Reheating Recooling No Yes Section 1439.1 No Heating or Cooling for at Least 50% of Make -up Air Yes No—■. Yes—■ Section 1433 Air -Side Economizer Required Yes Section 1437 Motors Must Meet Efficiencies in Table 14-4 Section 1438 Variable Flow Devices Required Yes Section 1439.2 One Required: a. 50% VAV Exhaust & Make -up b. 75% Direct Makeup w/ Tempering Only c. Heat Recovery per 1436 d. Constant Volume w/ < 50fpm Face Velocity Yes Revised May 2005 Open Motors Closed Motors 3,600 1 1.800 1 1.200 3.600 1 1,800 1 1,200 Efficiency - ( %) 82.5 80.0 Efficiency 75.5 ( %) 82.5 80.0 82.5 84.0 84.0 82.5 84.0 85.5 84.0 84.0 85.5 84.0 84.0 86.5 84.0 86.5 86.5 85.5 87.5 87.5 85.5 87.5 87.5 87.5 87.5 87.5 87.5 88.5 88.5 88.5 89.5 89.5 88.5 89.5 90.2 89.5 89.5 89.5 89.5 91.0 90.2 90.2 91.0 90.2 90.2 91.0 91.0 90.2 91.0 90.2 91.0 91.7 91.7 91.0 92.4 91.7 91.0 92.4 92.4 91.0 92.4 91.7 91.7 93.0 93.0 91.7 93.0 93.0 92.4 93.0 93.0 92.4 93.0 93.0 93.0 93.6 93.6 930 93.6 93.6 93.0 94.1 93.6 93.0 94.1 93.6 93.0 94.1 94.1 93.6 94.5 94.1 93.6 94.5 94.1 94.5 94.5 94.1 93.6 95.0 94.5 94.5 95.0 95.0 94.5 95.0 94.5 95.0 95.0 95.0 Electric Motors MECH -MOT 2004 Washington State Nonresidential Energy Code Compliance Forms Project Address Complete the following for all design A & B squirrel -cage, T -frame induction permanently wired polyphase motors from 1 hp to 200 hp having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the exceptions below applies). Motor No. or Location Minimum Nominal Full-Load Efficienc Synchronous Speed (RPM) HP 1.0 1.5 2.0 3.0 5.0 7.5 10 15 20 25 30 40 50 60 75 100 125 150 200 HP California Pizza Kitchen, Park West Plaza Type (open /closed) Description of Application or Use Date 4/27/2007 For Building Department Use Synch. Speed Revised May 2005 Min.Nom. Full Toad Efficiency Exceptions: 1. Motors in systems designed to use more than one speed of a multi -speed motor. 2. Motors already included in the efficiency requirements for HVAC equipment (Tables 14 - or 14 -2) . 3. Motors that are an integral part (i.e. not easily removed and replaced of specialized process equipment (i.e. equipment which requires a special motor, such as an explosion - proof motor). 4. Motors integral to a listed piece of equipment for which no qualifying motor has been approved (i.e. if the only U.L. listing for the equipment is with a less- efficient motor and there is no energy - efficient motor option). For motors claiming an exception, list motor and note which exception applies. Mechanical Permit 2004 Washington State Nonresidential Plans Checklist MECH -CHK Energy Code Compliance Forms Revised May 2000 Project Address California Pizza Kitchen, Park West Plaza 'Date 4/27/2007 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code I Section 'Component 'Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 - 1424) 1411 Equipment performance n. a. 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency m2.0 yes 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss M2.0 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans M1.0 yes 1412.2 Deadband control Indicate 5 degree deadband minimum 145.0 n. a. 1412.3 Humidity control Indicate humidistat yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types 145.0 yes 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage 145.0 n.a. 1412.4.2 Optimum Start Indicate optimum start controls n.a. 1412.5 Heat pump control Indicate microprocessor on thermostat schedule yes 1412.6 Combustion htg. Indicate modulating or staged control 142.0 yes 1412.7 Balancing Indicate balancing features on plans 141.0 yes 1422 Thermostat interlock Indicate thermostat interlock on plans M5.0 yea 1423 Economizers Equipment schedule M2.0 1413 Alr economizers yes 1413.1 Air Econo Operation Indicate 100% capability on schedule 145.0 n.a. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb n.a. 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance yes 1413.3 Integrated operation Indicate capability for partial cooling 145.0 n.a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary 145.0 yes 1414.2 Duct insulation Indicate R -value of insulation on duct 145.0 yes 1415.1 Piping insulation Indicate R -value of insulation on piping x45.0 1416 Completion Requirements yes 1416.1&2 Drawings & Manuals indicate requirement for record drawings and operation dots. 145.0 yea 1416.3.2 Air Balancing Indicate air system balance requirements x45.0 n.a. 1416.3.3 Hydronic Balancing Indicate hydronic system balance requirements yes 1416.4 Commissioning Indicate requirements for commissioning and prelim. Report 445.0 n. a. 1424 Separate air sys. Indicate separate systems on plans n. a. Mechanical Completed and attached. Equipment schedule with types, Summary Form input/output, efficiency, cfm, hp, economizer SERVICE WAl ER HEATING AND HEAl ED POOLS (Sections 1440 - 1454) 1440 Service water htg. n.a. 1441 Elec. water heater Indicate R -10 insulation under tank yes 1442 Shut -off controls Indicate automatic shut -off P3.0 yes 1443 Pipe Insulation Indicate R -value of insulation on piping P6.0 n . a. 1452 Heat Pump COP Indicate minimum COP of 4.0 yes 1452 Heater Efficiency Indicate pool heater efficiency n.a. 1453 Pool heater controls Indicate switch and 65 degree control n.a. 1454 Pool covers Indicate vapor retardant cover n.a. 1454 Pools 90+ degrees Indicate R -12 pool cover no is circiea for any question, proviae expiana ion: Mechanical Permit Plans Checklist MECH -CHK 2004 Washington State Nonresidential Energy Code Compliance Forms Revised May 200' Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14-1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas - fired and oil - fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) shall also have an intermittent Ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Cooling Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20,000 Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F Inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off -hour controls. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum start controls shall be designed to automatically adjust the start time of an HVAC system each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include microprocessor controls that minimize supplemental heat usage during start -up, set -up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. Exceptions: 1. Boilers. 2. Radiant Heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry - bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry -bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following Information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and Leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity . less than 65,000 Btu/h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water-cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum Indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246- 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu/h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Seating: Duct work which is designed to operate at pressures above 1/2 Inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 Inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W .C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 insulation: Piping shall be thermally insulated in accordance with Table 14-6. Exception: Piping installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAG 51 - 26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for building completion and commissioning requirements.) r EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 Mechanical Permit Plans Checklist MECH -CHK 2004 Washington State Nonresidential Energy Code Compliance Forms Revised May 200' Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14-1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas - fired and oil - fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) shall also have an intermittent Ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Cooling Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20,000 Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F Inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off -hour controls. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum start controls shall be designed to automatically adjust the start time of an HVAC system each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include microprocessor controls that minimize supplemental heat usage during start -up, set -up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. Exceptions: 1. Boilers. 2. Radiant Heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry - bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry -bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following Information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and Leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity . less than 65,000 Btu/h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water-cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum Indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246- 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu/h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Seating: Duct work which is designed to operate at pressures above 1/2 Inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 Inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W .C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 insulation: Piping shall be thermally insulated in accordance with Table 14-6. Exception: Piping installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAG 51 - 26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for building completion and commissioning requirements.) r PERMIT COORD COPY % - PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M07 -103 DATE: 05 -03 -07 PROJECT NAME: CALIFORNIA PIZZA KITCHEN SITE ADDRESS: 160 ANDOVER PK W X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: B't,llTding Division kpi Public Works ❑ 5I Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete 1I Incomplete Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROU ING: Please Route Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 Planning Division Permit Coordinator C DUE DATE: 05-08 -07 Not Applicable ❑ No further Review Required DATE: DUE DATE: 06-05-07 Not Approved (attach comments) n DATE: n Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Business Owner Information Name Role Effective Date Expiration Date KIRKWOOD, RODERICK V PRESIDENT 02/14/1984 Bond Amount KIRKWOOD, JOAN M SECRETARY 02/27/2006 FRICKBERG, WILLIAM MICHAEL VICE PRESIDENT 02/27/2006 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. License Information License Licensee Name Licensee Type UBI Ind. Ins. Account Id Business Type Address 1 Address 2 City County State Zip Phone Status Specialty 1 Specialty 2 Effective Date Expiration Date Suspend Date Separation Date Parent Company Previous License Next License Associated License MERITMI163CM MERIT MECHANICAL INC CONSTRUCTION CONTRACTOR 600517946 46817500 CORPORATION PO BOX 2109 REDMOND KING WA 980732109 4258839224 ACTIVE GENERAL UNUSED 2/14/1984 6/1/2009 AUTOMMC044QH https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= MERITMI163CM 08/22/2007 architecture + interiors SCHEER TANAKA DENNEHY RILEY ARCHITECTS 3190 -K Airport Loop Drive Costa Mesa, California 92626 (714) 444 -1960 (714) 444 -3160 Fax design @stdr.net cc z W m Z a 0 Imo- 0 J W z 0_ N ~ � Q W � c < 0- f o O 0 2 Job No. 06298 Scale No SCALE m Li O n 0 1 j N W ce FIELD VERIFICATION Contractor shall venTy all figured dimensions and conditions at the job site and notify STDR Architects, Inc. of any dimensional errors, omissions or discrepancies before beginning or fabricating any work. Do not scale these drawings. COPYRIGHT These drawings are the property and copyright of Scheer Tanaka Dennehy Rey Architects, Inc. and shall not be used on any other work except by agreement with Scheer Tanaka Dennehy Riley Architects, Inc.. © STDR ARCHITECTS, NC. 1 2 2 -20 -07 5 -01 -07 HEALTH SUBMITTAL AGENCY SUBMITTAL REVISIONS Drawing Title HVAC SCHEDULES Drawn JMJ Date Sheet No. M2.0 KITCHEN EXHAUST HOOD SCHEDULE MARK SERVES MANUFACTURER MODEL HOOD LENGTH AIR REQUIREMENTS FILTERS LIGHTS FIRE SYSTEM HOOD WEIGHT (LBS.) COOKING TEMPERATURE NOTES EXHAUST RISER FRONT PLENUM RISER HOOD CONSTRUCTION QTY. HEIGHT LENGTH TYPE QTY. TYPE TYPE LOCATION QTY. DUCT SIZE CFM SP QTY. DUCT SIZE CFM SP WIDTH LENGTH WIDTH LENGTH KEH -1 COOKLINE CAPTIVE -AIRE 4524 ND -PSP -F 14' -9" 2 10" 19" 2,050 (each) 0.54 3 8" 26" 1,095 (each) 0.21 TYPE 430 S.S. WHERE EXPOSED 9 20" 20" FLAME -GUARD SPARK ARRESTOR 7 INCANDESCENT - 100W ANSUL R -102 KEH -1 911 600 DEGREES A, B, C, D, F, G ,H KEH -2 COOKLINE CAPTIVE -AIRE 4524 ND -PSP -F 6' -3" 1 10" 14" 1 ,600 0.48 1 10" 28" 1,275 0.18 TYPE 430 S.S. WHERE EXPOSED 1 20" 16" FLAME -GUARD SPARK ARRESTOR 3 INCANDESCENT - 100W ANSUL R -102 KEH -1 444 600 DEGREES A, B, C, D, F, G, H 3 20" 20" KEH -3 PIZZA OVEN WOODSTONE SG- BDL- O- WX -MS -7 4' -6" 1 7.5" 7.5" 700 0.80 -- -- -- -- -- TYPE 304 S.S ( #4 FINISH WHERE EXPOSED) 1 16" 20" FLAME -GUARD SPARK ARRESTOR -- ---- -- -- 200 600 DEGREES A, B, E, G, J 1 16" 16" NOTES A. EXHAUST HOOD WILL BE FURNISHED BY FOOD SERVICE EQUIPMENT CONTRACTOR (FSEC), AND SHALL BE INSTALLED BY MECHANICAL CONTRACTOR. B. MOUNT BOTTOM OF EXHAUST HOOD AT 7' -0" ABOVE FINISHED FLOOR. C. PROVIDE WITH 3" BACK STANDOFF, AND STAINLESS STEEL ENCLOSURE PANELS FROM TOP OF EXHAUST HOOD UP TO FINISHED CEILING ON ALL SIDES AND BACK. D. EXHAUST HOOD WILL BE DESIGNED IN ACCORDANCE WITH REPORT # UL MH12106. E. EXHAUST HOOD WILL BE DESIGNED IN ACCORDANCE WITH REPORT # UL MH13522. F. EXHAUST HOOD FIRE EXTINGUISHING SYSTEM WILL BE FURNISHED AND INSTALLED BY FSEC, IN COMPLETE CONFORMANCE WITH NFPA 96, LOCAL CODES; AND SIZED TO SERVE KEH -1 AND KEH -2. G. AUTOMATIC GAS SHUTOFF VALVE WILL BE FURNISHED BY FSEC AND SHALL BE INSTALLED BY PLUMBING CONTRACTOR. H. EXHAUST HOOD MANUFACTURER WILL FACTORY INSTALL THE CONTROLS PACKAGE IN THE EXHAUST HOOD UTILITY CABINET. J. INSTALL HOOD SO AN 8" SPACE EXISTS BETWEEN HOOD AND OVEN FRONT TO ACCESS FILTERS. REFERENCE ARCHITECTURAL DETAILS. ELECTRIC DUCT HEATER SCHEDULE ROOFTOP UNIT SCHEDULE (NATURAL GAS HEAT) MARK MANUFACTURER MODEL MIN. OUTPUT (MBH) MIN. INPUT (KW) MIN. NO. STAGES SIZE (W" x H ") MAX. APD (IN) CFM TEMPERATURE RISE (°F) V /PH NOTES MARK MANUFACTURER MODEL AREA SERVED SUPPLY FAN COOLING COIL HEATING COIL MIN. 0/A CFM MCA MOCP V /PH WEIGHT (LBS.) NOTES CFM ESP (IN) MIN BHP TH (MBH) SH (MBH) EAT (DB /WB) LAT (DB /WB) INPUT (MBH) OUTPUT (MBH) MIN EFF. ( %) MIN. NO. STAGES EDH-1 INDEECO QUA 44.3 13 3 14x14 0.03 1200 34 208/3 A - F RTU -1 TRANE YSCO9O DINING 3,000 1.00 2.01 78.9 65.2 77.9/63.3 56.0/53.9 150 121.5 81 2 900 43 60 208/3 1,057 A - P NOTES: A. UNIT AIR PRESSURE DROP SHALL NOT EXCEED SCHEDULED VALUE. B. SUPPORT UNIT FROM STRUCTURE WITH ALL - THREAD HANGING RODS. C. PROVIDE FACTORY MOUNTED INTEGRAL FUSED DISCONNECT SWITCH. D. PROVIDE AIRFLOW PROVING SWITCH AND THERMAL OVERLOAD PROTECTION. E. PROVIDE MAGNETIC CONTACTORS. F. PROVIDE LINE VOLTAGE WALL MOUNTED THERMOSTAT. RTU -2 TRANE YSC12O DINING 4,000 1.00 3.07 117.1 89.6 77.9/63.3 56.0/54.2 200 162 81 2 1200 53 60 208/3 1 ,297 A - P RTU -3 TRANE YCD180 KITCHEN 5,360 1.00 3.12 135.7 126.7 76.8/63.1 56.0/52.9 350 284 81 2 965 78 90 208/3 2,044 A - P RTU -4 TRANE YSC120 KITCHEN 4,510 1.00 3.82 1 12.6 110 75.3/62.6 56.0/52.3 200 162 81 2 140 57 70 208/3 1,297 A - P NOTES. A. EQUIPMENT SIZED FOR 105T AMBIENT TEMPERATURE. B. PROVIDE 2" PLEATED THROWAWAY AIR FILTERS. D. PROVID ROOF CURB. INCLUDE OF ROOF CURB SHALL LBER 12" MINIMUM ABOVE FINISHED ROOF SURFACE. COORDINATE ROOF INSULATION THICKNESS WITH GENERAL CONTRACTOR E. PROVIDE ENTHALPY ECONOMIZER WITH BAROMETRIC RELIEF DAMPER. F. PROVIDE WITH 7 -DAY PROGRAMMABLE THERMOSTAT, HONEYWELL TB8220U1003 WITH REMOTE SENSOR (HONEYWELL T7770A1006) WITH STAGED HEATING AND COOLING CAPABILITY AS REQUIRED FOR OPERATION OF AUXILIARY HEATING, COOLING AND ECONOMIZER CONTROLS. PROVIDE ACRYLIC, VANDEL - PROOF, LOCKING THERMOSTAT COVER. G. DIVISION 16 CONTRACTOR TO FURNISH AND INSTALL SMOKE DETECTOR IN RETURN AIR DUCT. H. FUSED DISCONNECT SWITCH SHALL BE PROVIDED BY DIVISION 16 CONTRACTOR. J. STARTERS FOR ALL MOTORS SHALL BE PROVIDED INTEGRAL WITH UNIT. K. COORDINATE SIZE OF CONDUCTOR TERMINATION LUGS WITH CONDUCTOR SIZES SHOWN ON ELECTRICAL DRAWINGS. L. REMOTE TEST STATION FOR EACH SMOKE DETECTOR SHALL BE PROVIDED BY DIVISION 16 CONTRACTOR. M. PROVIDE ADDITIONAL SET OF NEW AIR FILTERS IN UNIT JUST BEFORE TURNING OVER TO OWNER. N. LEAVING AIR TEMPERATURE (LAT) LISTED IS THE LEAVING AIR TEMPERATURE FROM THE UNIT. 0. PROVIDE WITH GUARDS OR LOUVERED PANELS TO PROTECT CONDENSER COIL FROM HAIL OR OTHER DAMAGE. P. HEATING COIL INPUT VALUE (MBH) BASED ON EQUIPMENT SELECTED. UNIT HEATER SCHEDULE (ELECTRIC) MARK MANUFACTURER MODEL MIN. OUTPUT (MBH) MIN. OUTPUT (KW) MIN. NO OF STAGES CFM MOTOR HP THROW (FT) V /PH NOTES UH-1 TRANE UHEC -10 34.1 10 2 700 1/50 22 208/3 A - E NOTES: A. MOUNT BOTTOM OF HEATER 8 FEET ABOVE FINISHED FLOOR WITHOUT OBSTRUCTING AIRFLOW. B. PROVIDE WITH UNIT MOUNTED THERMOSTAT. C. PROVIDE MANUAL SUMMER /WINTER CHANGE -OVER SWITCH, SET TO 60 °F, ADJUSTABLE. D. PROVIDE NECESSARY MOUNTING BRACKET AND ACCESSORIES FOR HORIZONTAL MOUNTING, SUSPENDED FROM CEILING OR STRUCTURE ABOVE. E. PROVIDE FACTORY MOUNTED DISCONNECT SWITCH. CEILING HEATER SCHEDULE (ELECTRIC) ROOFTOP MAKEUP AIR UNIT SCHEDULE (NATURAL GAS HEAT) MARK MANUFACTURER MODEL MIN. OUTPUT (MBH) MIN. OUTPUT (KW) MIN. NO. OF STAGES CFM TEMP. RISE (°F) V/PH NOTES MARK MANUFACTURER MODEL UNIT TYPE SERVES SUPPLY FAN HEATING COIL ELECTRICAL WEIGHT (LBS) NOTES ECH -1 Q -MARK CDF- -- 558 --DS 17.1 5 1 396 45 208/3 A - E FAN TYPE CFM ESP (IN) RPM MIN. HP MIN. INPUT (MBH) MIN. OUTPUT (MBH) MIN. EFF. ( %) GAS VALVE TYPE V /PH NOTES: A. PROVIDE # CDF -RE FACTORY RECESSED MOUNTING KIT. B. PROVIDE # CDF -TK FACTORY TRIM KIT FOR HARD CEILING INSTALLATION. C. PROVIDE WITH # M602 FACTORY LINE VOLTAGE WALL MOUNTED THERMOSTAT D. PROVIDE WITH BAKED ENAMEL FINISH, COLOR AS SELECTED BY ARCHITECT. E. PROVIDE FACTORY MOUNTED DISCONNECT SWITCH. MAU -1 CAPTIVE -AIRE A2- D5.00 -G15 DIRECT KEH -1, 2 FC 4,560 0.5 960 3 228.8 210.5 92% MODULATING 208/3 810 A - M NOTES: A. MAKEUP AIR UNIT SHALL BE PROVIDED BY DIVISION 15 CONTRACTOR. B. PROVIDE 20" HIGH INSULATED ROOF CURB. C. PROVIDE WITH FACTORY INSTALLED AND WIRED MOTORIZED INLET DAMPER INTERLOCKED WITH MAKEUP AIR FAN TO OPEN WHEN FAN STARTS. D. PROVIDE WITH 2" THROWAWAY FILTERS. E. PROVIDE WITH FACTORY DISCHARGE TEMPERATURE SENSOR CONTROLS FOR HEATING SET AT 65 °F, ADJUSTABLE. F. DIVISION 16 CONTRACTOR SHALL PROVIDE SMOKE DETECTOR IN THE SUPPLY AIR DUCT. G. PROVIDE WITH ALUMINIZED STEEL HEAT EXCHANGER. H. DESIGN UNIT FOR NATURAL GAS AT 960 BTU /CF AT A GAS SUPPLY PRESSURE OF 7' -10" WC. J. PROVIDE STARTER IN HOOD CONTROL PANEL. K. DISCONNECT SWITCH SHALL BE PROVIDED WITH UNIT. L. NATURAL GAS DIRECT - FIRED, FULLY MODULATED BURNER WITH 25:1 TURNDOWN RATIO. M. UNIT SIZED TO PROVIDE A 42 °F TEMPERATURE RISE. GRILLE, REGISTER AND DIFFUSER SCHEDULE MARK MANUFACTURER MODEL FACE TYPE MOUNTING LOCATION FACE SIZE (IN) MAX. PRESS. DROP (IN. W.C.) NOTES SD -1 TITUS OMNI SQUARE PANEL CEILING 24 x 24 0.1 A, B, C, G, J, 0 SD -2 TITUS TMS-M CONE CEILING 24 x 24 0.1 A, B, C. D, G, M, 0 SD -3 TITUS 300RL ADJUSTABLE BLADE CEILING 14 x 14 0.1 A, D, E, F, G SD -4 TITUS PAR -AA PERFORATED CEILING 24 x 24 0.1 A, D, F, G, L, N, 0 EXHAUST FAN SCHEDULE SD -5 TITUS TMS -AA CONE CEILING 24 x 24 0.1 A, B, C, D, G, K, M, 0 LD -1 TITUS FL -10 48" LONG WITH (1) 1" SLOT CEILING AS NOTED 0.1 A, G, M, P MARK SERVES MANUFACTURER MOUNTING MODEL CFM ESP (IN) DRIVE (BELT /DIRECT) MIN. HP FAN RPM ELECTRICAL NOTES LD-2 TITUS FL -10 48" LONG WITH (2) 1" SLOTS CEILING AS NOTED 0.1 A, G, M V /PH DISC. TYPE LD -3 TITUS FL -10 72" LONG WITH (2) 1" SLOTS CEILING AS NOTED 0.1 A, G, M EF -1 COOKLINE CAPTIVE AIRE ROOF NCA24FA 5,700 1.5 BELT 5 977 208/3 NON FUSED A, C, D, F, J, L, RG-1 TITUS 5OFF EGGCRATE CEILING 24 x 24 0.1 A, G, J, L EF -2 PIZZA HOOD CAPTIVE AIRE ROOF DU5OHFA 700 1.0 DIRECT 0.5 1,289 115/1 NON FUSED A, C, F, H, L RG -2 TITUS 5OFF EGGCRATE CEILING 24 x 12 0.1 A, 0, L EF -3 DISHWASHER CAPTIVE AIRE ROOF DU3OHFA 600 0.625 DIRECT 0.25 1,310 115/1 NON FUSED A, C, G, K, L EG -1 TITUS 350FL FIXED BLADE CEILING AS NOTED 0.1 D, E, F, G, H EF -4 RESTROOMS CAPTIVE AIRE ROOF DR25HFA 525 0.5 DIRECT 0.25 1,094 115/1 NON FUSED A, B, C, E, L NOTES: A. NECK SIZE SHOWN ON DRAWINGS. B. 4 -WAY THROW PATTERN UNLESS OTHERWISE SHOWN ON DRAWINGS. C. BRANCH DUCT SIZE SHALL BE SAME AS NECK SIZE UNLESS OTHERWISE SHOWN ON DRAWINGS. D. BAKED ENAMEL FINISH, OFF WHITE. E. FRONT BLADES PARALLEL TO SHORT DIMENSION. F. PROVIDE NECK FOR DUCT CONNECTION. G. FRAME TYPE TO MATCH CEILING CONSTRUCTION, COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN. H. PROVIDE OPPOSED BLADE DAMPER. J. DIFFUSER SHALL BE PREFINISHED MATTE BLACK PER ARCHITECTURAL SPECIFICATIONS IN C -2 TYPE BLACK CEILINGS. K. PROVIDE TITUS MODEL D -100 SLIDING BLADE DAMPER, OPERABLE FROM DIFFUSER FACE, MOUNTED DIRECTLY ON NECK FOR AIR BALANCING L. PROVIDE WITH NECK FLANGE FOR DUCT CONNECTION AND 1/4 TURN FASTENERS FOR REMOVAL AND CLEANING, FILTER NOT REQUIRED. M. DIFFUSER SHALL BE PAINTED TO MATCH SURROUNDINGS PER ARCHITECTURAL SPECIFICATIONS. N. PROVIDE WITHOUT DIRECTIONAL PATTERN CONTROLLERS. 0. PROVIDE TITUS "TRM" RAPID MOUNT FRAME TO CREATE LAY -IN APPLICATION WHEN INSTALLED IN A HARD CEILING. P. PROVIDE WITH INSULATED PLENUM MODEL FBPI -10 OR EQUAL. FOR DUCT CONNECTION. EF -5 SERVICE YARD CAPTIVE AIRE WALL CEPRSM24 1,265 0.2 DIRECT 0.25 1,075 1 15/1 NON FUSED A, C, I, L, M NOTES: ' A. FAN SHALL BE PROVIDED BY DIVISION 15 CONTRACTOR. B. PROVIDE INSULATED ROOF CURB, BIRDSCREEN AND BACKDRAFT DAMPER. TOP OF ROOF CURB SHALL BE 12" MINIMUM ABOVE FINISHED ROOF SURFACE. COORDINATE ROOF INSULATION THICKNESS WITH GENERAL CONTRACTOR. C. PROVIDE FACTORY MOUNTED DISCONNECT SWITCH. D. INTERLOCK FAN OPERATION WITH MAKEUP AIR UNIT. E. INTERLOCK FAN OPERATION WITH TIMESWITCH; REFERENCE ELECTRICAL DRAWINGS. F. PROVIDE WITH VENTED ROOF CURB EXTENSION FOR 40" MINIMUM DISCHARGE HEIGHT ABOVE ROOF SURFACE, GREASE TRAP AND DRAIN CONNECTION, HINGE KIT, AND INTEGRAL MOTOR OVERLOAD PROTECTION. G. INTERLOCK FAN OPERATION WITH DISHWASHER. H. INTERLOCK FAN OPERATION WITH PIZZA HOOD. I. PROVIDE LINE VOLTAGE THERMOSTAT, SET TO 85°F ADJUSTABLE. J. PROVIDE FACTORY MOUNTED STARTER, LOCATE IN HOOD CONTROL PANEL. . E �� �� K. PROVIDE WITH 22" HIGH INSULATED ROOF CURB, BACKDRAFT DAMPER AND DRAIN. CODS �ONIP9� ROVED M. PROVIDE WITH GRAVITY BACKDRAFT DAMPER, LOUVER, BIRDSCREEN, AND WALL HOUSING FOR FLUSH EXTERIOR MOUNTING. . .- nnR' L. REFER TO CAPTIVE AIRE DRAWINGS SHEET M4.0 FOR ADDITIONAL INFORMATION. AP96:0,:t ju� -, �uu AIR BALANCE SCHEDULE cap �� ���0� �UjL��(�C � T� . ; : r , . �.: .. I i ll � ' , r` ;; _ -. CIS �3E U ®FTlJK WILA MAY 0 3 7007 PERMITCENTER ON njHE G N RS Liii INCORPORATED EXHAUST: SERVES EXHAUST (CFM) TOTALS (CFM) EF -1 Cookline Hood 5,700 EF -2 Pizza Oven 700 EF3 Dishwasher 600 EF -4 Restrooms /Lockers 525 7,525 MAKEUP AIR: SERVES SUPPLY AIR DESIGN OA (CFM) PERCENT OA /SA (CFM) RTU- -1 Dining 3,000 900 30.0% RTU -2 Dining 4,000 1,200 30.0% RTU -3 Kitchen 5,360 965 18.0% RTU -4 Kitchen 4,510 140 3.1% MAU -1 Cookline 4,560 4,560 100.0% 21,430 7765 36.2% 7,765 TO POSITIVE AIR FLOW PERCENT POSITIVE AIR FLOW 240 3.1% 8325 LENEXA DRIVE, SUITE 400 LENEXA, KANSAS 56214 -1695 PH 913.307.5300 FX 913.307.5400 WWW.HENDERS❑NENGINEERS.00M 0650001814 t architecture + interiors SCHEER TANAKA DENNEHY RILEY ARCHITECTS 3190 -K Airport Loop Drive Costa Mesa, California 92626 (714) 444 -1960 (714) 444 -3160 Fax design @stdr.net cc z W m Z a 0 Imo- 0 J W z 0_ N ~ � Q W � c < 0- f o O 0 2 Job No. 06298 Scale No SCALE m Li O n 0 1 j N W ce FIELD VERIFICATION Contractor shall venTy all figured dimensions and conditions at the job site and notify STDR Architects, Inc. of any dimensional errors, omissions or discrepancies before beginning or fabricating any work. Do not scale these drawings. COPYRIGHT These drawings are the property and copyright of Scheer Tanaka Dennehy Rey Architects, Inc. and shall not be used on any other work except by agreement with Scheer Tanaka Dennehy Riley Architects, Inc.. © STDR ARCHITECTS, NC. 1 2 2 -20 -07 5 -01 -07 HEALTH SUBMITTAL AGENCY SUBMITTAL REVISIONS Drawing Title HVAC SCHEDULES Drawn JMJ Date Sheet No. M2.0 OUTSIDE DIMENSION ROOFTOP HVAC UNIT — =, i 23 ", 19 ", 17" OR 11" O O , OUTSIDE DIMENSION 23 ", 19 ", 17" OR 11" r INSIDE DIMENSION / lu" Aw 'Mullu"Illulll" 111"" II ;IU1uI1:1,11w11111u111w1111uur• �. ■" ��—. •., wuuluu ul uuwwuuum"u"uuwuu ll ww ANL w 7r 4 CD ROOF FLOOR MAKEUP AIR DUCT SUPPLY AIR DUCT PROVIDE FIRE RATED DUCT WRAP ONLY WHERE MANDATED BY LOCAL CODE. SEE GENERAL NOTES. (PROVIDE NON COMBUSTIBLE DUCT SHAFT WHERE DUCT WRAP IS NOT ALLOWED BY LOCAL CODES.) SUPPLY AIR DIFFUSER - STAINLESS STEEL ENCLOSURE PANELS MAKE —UP AIR DIFFUSER TYPICAL KITCHEN EXHAUST HOOD ELEVATION NO SCALE VENTED CURB EXTENSION GREASE TRAP INSTALL NEOPRENE GASKET BETWEEN DUCT AND FAN PREFABRICATED INSULATED CURB WITH TREATED WOOD NAILER ROOF INSULATION / i EXHAUST FAN 1 MECHANICAL LEGEND J r J r I \' EXHAUST AIR DUCT UP \I i >d EXHAUST AIR DUCT DOWN SUPPLY OR OUTSIDE AIR DUCT UP SUPPLY OR OUTSIDE AIR DUCT DOWN 10 "0 SD -1 450 re AFF CFM ETR IN. WC MBH NC OA TYP J r IN NEW DUCTWORK OR EQUIPMENT SHOWN HEAVY HEAVY LINE WEIGHT BRANCH DUCT WITH 45' RECTANGLE—ROUND BRANCH FITTING AND MANUAL VOLUME DAMPER ELBOW WITH TURNING VANES MANUAL VOLUME DAMPER RETURN AIR DUCT UP RETURN AIR DUCT DOWN SIZE, TYPE, CFM OF DIFFUSER, REGISTER OR GRILLE TEMPERATURE SENSOR (60" AFF) THERMOSTAT (48" AFF) MOTORIZED DAMPER DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER LOWER NUMBER INDICATES SHEET NUMBER CONNECTION POINT OF NEW WORK TO EXISTING EQUIPMENT DESIGNATION AND NUMBER MECHANICAL NOTE DESIGNATION SECTION CUT DESIGNATION ABOVE FINISHED FLOOR CUBIC FEET PER MINUTE EXISTING TO REMAIN INCHES OF WATER COLUMN 1000 BTU PER HOUR NOISE CRITERIA OUTSIDE AIR TYPICAL VENTED ROOF CURB TRANSITION GREASE EXHAUST DUCTS TO ROOF CURB (COORDINATE SIZE WITH ROOF CURB SUPPLIER) GREASE EXHAUST DUCT, OFFSET WHERE REQUIRED USING MAX. 45' ELBOWS TO AVOID STRUCTURE CEILING 7 3" HOOD STANDOFF FLAME —GUARD SPARK ARRESTOR GREASE FILTERS GREASE DRAIN WITH REMOVABLE CUP INCANDESCENT EXHAUST HOOD LIGHTS COOKING EQUIPMENT ROOF DECK REFER TO 7 ARCHITECTURAL DRAWINGS y r r r r r 1 r 'A PRE — INSULATED FLEXIBLE DUCT AS REQUIRED, INSTALL PERMANENTLY SEALED AND SUPPORTED TO PREVENT KINKING AND SHARP TURNS UPBLAST GREASE EXHAUST FAN DETAIL NO SCALE NOTE: PROVIDE NON WRAP IS N CEILING DIFFUSER WITH VOLUME DAMPER, FIRE DAMPER OR COMBINATION VOLUME /FIRE DAMPER AS SCHEDULED NOTES: 1. EXTEND HARD METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT EXCEED 5' -0 ". PROVIDE RIGID 90' ELBOW WHERE REQUIRED TO KEEP FLEXIBLE DUCT WITHIN 5' -0" LENGTH LIMITATION. WEATHERPROOF (NEMA 3R) DISCONNECT SWITCH 4.. A. '"--- WELDED EXHAUST DUCT UP THRU ROOF. SEE PLANS FOR SIZE AND LOCATION. SEE NOTE 1. METAL BAND (TYPICAL) OVERSIZED GALVANIZED COVER TWO PIECE GALVANIZED COUNTER FLASHING AND CURB 11 METAL BAND OVER INSULATION (TYPICAL) HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED WITH VOLUME DAMPER AND DAMPER LOCK WITH EXTENSION PROVIDE FACTORY INSULATED SUPPLY PLENUM CONNECTED TO SLOT AS SHOWN AND SCHEDULED LAY-IN AND SLOT TYPE 4 CO EILINS G DIFFUSER DETAIL N � U --0 0 w co 0 r J w 1— w Z _= w 0 IX = c7 U kn 0 CAVITY SHAFT WALL UL DESIGN 469 OR 499 WITH 1" GYPSUM LINER PANELS ON INSIDE AND 5/8" TYPE X GYPSUM PAN ON OUTSIDE 6" MINIMUM CLEAR L AROUND GREAS XHAUST DUCT (TYP 2) MBUSTIBLE DUCT SHAFT WHER FIRE RATED DUCT ALLOWED BY LOCAL CODE. SEE L, NERAL NOTES. NOT USED REASE EXHAUST DUCT ENCLOSURE NO SCALE CEILING EXHAUST FAN INSTALL NEOPRENE GASKET BETWEEN DUCT AND FAN PREFABRICATED INSULATED CURB WITH TREATED WOOD NAILER ROOF DECK REFER TO 7 ARCHITECTURAL DRAWINGS TAIL INSULATED DUCT —1 t MOUNTING ARRANGEMENT PER SCHEDULE • ROOF INSULATION 1111111111111 •� ����� • A 7 25 1 / 4 ", 21 1 /4 ", 19 1 /4" OR 13 1 /4" 1 It 24 ", 20 ", 18" OR 12" SECURE EXHAUST FAN TO GALVANIZED COVER, SEAL CONNECTION WEATHERTIGHT .— OVERSIZED GALVANIZED COVER ■ TWO PIECE GALVANIZED COUNTER FLASHING AND CURB COUNTER BALANCED BACKDRAFT DAMPER (UNLESS NOTED OTHERWISE). SECURE TO DUCT FROM ABOVE TO ALLOW SERVICE OR REMOVAL OF DAMPER FROM ROOF EXHAUST DUCT UP THROUGH ROOF. SEE PLANS FOR SIZE AND LOCATION ® UPBLAST EXHAUST FAN DETAIL NO SCALE 1t 25 1/4", 21 1/4", 1 1 /2" 1 NOTE: ROUGH —IN OPENING SIZES: NOMINAL 12 "x 12" = 12 1/2 "x 12 1/2" NOMINAL 24 "x 24" = 24 1/2 "x 24 1/2" NOMINAL 24 "x 12" = 24 1/2 "x 12 1/2" NOMINAL 18 "x 18" = 18 1/2 "x 18 1/2" NOMINAL 20 "x 20" = 20 1/2 "x 20 1/2" 19 1/4" OR 13 1/4" 1 1/8- 3 DRYWALL MOUNTING FRAME DETAIL NO SCALE STAINLESS STEEL EXHAUST DUCT DISHWASHER FIRE BARRIER DUCT WRAP ACCESS DOOR NO SCALE METAL STUD REINFORCING BY G.C. AROUND OPENING. ROUGH OPENING BY G.C. MOUNTING SCREW FIELD INSTALLED DRYWALL CEILING STEEL MOUNTING FRAME ALUMINUM EXHAUST DUCT G: \Programs \California Pizza Kitchen \0000000000 CPK Prototype \000 \Mech \Supp \fire door_20061 01 1 '174 FRONT VIEW RETURN AIR DUCT BOOSTER HEATER BY MECHANICAL CONTRACTOR BY KITCHEN EQUIPMENT CONTRACTOR - n rr l SIDE VIEW r � 1 I L J 1 NOTE: 1. CONFIRM WHAT IS BEING PROVIDED BY KITCHEN EQUIPMENT CONTRACTOR AND EXACT LOCATION OF MECHANICAL/ ELECTRICAL CONNECTION POINTS. DISHWASHER /BOOSTER HEATER EXHAUST DUCT DETAIL NO SCALE SUPPLY AIR DUCT FLEXIBLE CONNECTION (TYPICAL) ELECTRIC DUCT HEATER DETAIL NO SCALE RE: ROOF CURB DETAIL THIS SHEET BOOSTER HEATER CEILING NOTES I. PROVIDE OPENING THROUGH ROOF AND ROOF DECK INSULATION NO LARGER THAN REQUIRED TO ALLOW DUCTS TO PASS THROUGH. REFER TO PLANS FOR DUCT SIZES. TRANSITION AS REQUIRED IN ROOF CURB TO RTU SUPPLY AND RETURN OPENINGS. 2. PROVIDE SLOPED ROOF CURB TO INSTALL ROOFTOP UNIT LEVEL TO ENSURE PROPER DRAINAGE. COORDINATE ROOF SLOPE WITH ARCHITECTURAL. FLASH AND COUNTER FLASH ROOF PENETRATIONS, ETC. TO ENSURE WEATHER TIGHT INSTALLATION. ROOFTOP UNIT WITH DUCTWORK DETAIL NO SCALE EXHAUST FAN ROOF CURB ALUMINUM EXHAUST DUCT ALUMINUM TRANSITION STAINLESS STEEL EXHAUST DUCT EXTEND DUCTWORK OVER TOP OF CURB, SECURE DUCTWORK TO CURB NAILER SECURE CURB TO ROOF WITH SCREWS, PINS, OR BOLTS FASTEN ANGLE IRON SECURELY TO DUCT AND ROOF STRUCTURE U 0 ROOFTOP UNIT ALTERNATE LAYERS OF ROOF INSULATION AND 5 8" SHEET ROCK (FILL ENTIRE CURB SPACE) PREFABRICATED ROOF CURB FASTEN SECURELY TO ROOF (BY HVAC CONTRACTOR) PATCH AND INSTALL ROOFING MATERIAL TO MATCH ROOFING AND MAKE WEATHERTIGHT ROOF INSULAT ON CAULK OPENING AROUND SUPPLY AND RETURN DUCTS EXHAUST FAN HINGED BASE TRANSITION FROM GREASE DUCT TO SQUARE FAN BASE EXHAUST CURB PROVIDE FIRE RATED DUCT WRAP AND EXTEND 6" ABOVE ROOF DECK. SEAL PENETRATIONS AIR TIGHT. (WHERE FIRE RATED DUCT WRAP NOT ALLOWED BY LOCAL CODES, PROVIDE NON COMBUSTIBLE DUCT SHAFT.) 4 1/2" MIN TRANSITION TO FAN CONNECTION CONTINUOUS WELD ROOF ROOF CURB DETAIL NO SCALE 1 m CURB SCREW TO CURB BASE 18 GA. FLAT TOP WELDED TO TRANSITION GREASE DUCT CONNECTION TO FAN DETAIL NO SCALE I� ej r Ilif>�i�� EXHAUST FAN DETAIL NO SCALE EXHAUST FAN WITH BIRDSCREEN SECURE EXHAUST FAN TO ROOF CURB PREFABRICATED INSULATED CURB WITH TREATED WOOD NAILER. ROOF INSULATION — ROOF DECK REFER TO ARCHITECTURAL DRAWINGS COUNTER BALANCED BACKDRAFT DAMPER (UNLESS NOTED OTHERWISE). SECURE TO DUCT FROM ABOVE TO ALLOW SERVICE OR REMOVAL OF DAMPER FROM ROOF EXHAUST DUCT UP THROUGH ROOF. SEE PLANS FOR SIZE AND LOCATION. RECEIVED CITY OFTUKWILA MAY 0 3 2007 PERMITCENTER ruri HENDERSON lIlliJ ENGINEERS INCORPORATED 8325 LENEXA DRIVE, SUITE 400 LENEXA, KANSAS 55214 - 1695 PH 913.307.5300 FX 913.307.5400 WWW.HENDER50NENGINEERS.00M 0650001814 • • • Job No. 06298 Scale NO SCALE architecture + interiors SCHEER TANAKA DENNEHY RILEY ARCHITECTS 3190 —K Airport Loop Drive Costa Mesa, California 92626 (714) 444 -1960 (714) 444 -3160 Fax design@stdr.net FIELD VERIFICATION Contractor shall verify all figured dimensions and conditions at the job site and notify STDR Architects, Inc. of any dimensional errors, omissions or discrepancies before beginning or fabricating any work. Do not scale these drawings COPYRIGHT These drawings are the property and copyright of Scheer Tanaka Dennehy Riley Architects, Inc. and shall not be used on any other work except by agreement with Scheer Tanaka Dennehy Riley Architects, Inc.. © STDR ARCHITECTS, INC. 1 2 2 -20 -07 5 -01 -07 HEALTH SUBMITTAL AGENCY SUBMITTAL REVISIONS Drawing Title HVAC DETAILS AND LEGEND Drawn JMJ Date Sheet No. M3.0 FAN UNIT NO. FAN UNIT MODEL # EXHAUST FAN SUPPLY FAN MODEL TAG CFM S.P. RPM HP. 0 VOLT FLA BLOWER HOUSING TAG CFM S.P. RPM H.P. 0 VOLT FLA 1 NCA24FA EF -1 NCA24FA 16' 5700 - 1500' 977 5.000 3 208 144 1 Lit O YES LABS 8 16' 430 SS Where Exposed 2 N/A 10' 2 DU55OHHFA DU5OHFA -0544' 700 - 1.000' 1289 0.500 1 115 6,3 NO 44 LBS. 3 1093 0 430 SS Where Exposed 3 D 30 3 A BU3OHFA 126 MISC -(PSP) 600 - 0.625 1310 0.250 1 115 4.0 16 ' 2 Incandescent Light NO 430 SS Where Exposed RIGHT N/A 4 B 25 4 A DR25HFA 600 Deg. 525 - 0.500' 1094 0.250 1 115 3,4 430 SS Where Exposed ALONE N/A 5 CEPR SM24 -5 CEPRSM24 1264 - 0.200' 1075 0.250 1 115 2,4 6 A2- D,500 -G15 MAU -1 G15 A2-D.500 4560 0.500' 960 3.000 3 230 8.7 g FILTERS) LIGHTS) UTILITY CABINETS) FIRE PIP) WE�SGHT TYPE QTY HEIGHT LENGTH QTY TYPE WIARD RE GU LOCATION FIRE SYSTEM ELECTRICAL SWITCHES LOCATION TYPE SIZE MODEL # QUANTITY 1 Spark Arrestor Baffle 1 4824 ND -2 16' 5 Incandescent Light ND Left Ansul R102 3.0/3.0/1. 311110JB 1 Lit O YES LABS 8 16' 430 SS Where Exposed 2 N/A 10' 19' 28' 0 -0544' 2 126 MISC-(PSP) 8' 0.00' 300 Deg. D NO 44 LBS. 3 1093 0 430 SS Where Exposed LEFT WA 3 126 MISC -(PSP) 8' 6.00' 300 Deg. NO 52 LBS. 4 Spark Arrestor Baffle 2 16 ' 2 Incandescent Light NO 430 SS Where Exposed RIGHT N/A 4 YES 293 600 Deg. W 10' HDDD NO MODE LENGTH MAX. COOKING TEMP. EXHAUST PLENUM SUPPLY PLENUM CONSTRUCTION HDDD CDNFIG. TOTAL EXH. CFM RISER(S) TOTAL SUP. CFM RISER(S) END TD END ROW WIDTH LEND. DIA. CFM SP. WIDTH LENG. DIA. CFM SP. 1 4824 ND -2 14' 9.00' 600 Deg. 4100 10' 19' 17 1/2 2050 -0544• 0 0.242' Supply 3 3.000 208 430 SS Where Exposed ALANE N/A 10' 19' 28' 2050 -0544' 2 126 MISC-(PSP) 8' 0.00' 300 Deg. D 1093 430 SS Where Exposed LEFT WA 3 126 MISC -(PSP) 8' 6.00' 300 Deg. 0 2186 430 SS Where Exposed RIGHT N/A 4 4824 ND -2 -PSP -F 6' 3.00' 600 Deg. 1600 10' 14' 1600 -0.482' 1280 430 SS Where Exposed ALONE N/A ND. FAN ITEM SIZE 1 8 1 Curb 31500'W x 3L5n0'L x 20.000'H Vented Hinged 2 # 2 Curb 19500'W x 19.5001_ x 20.000.4 Vented Hinged 3 # 3 Curb 19.500'W x 19500'L x 22.000'H 4 4 4 Curb 19.500W x 19.500'L x 12.00011 6 # 6 Curb 31.000'V x 79.000'L x 20.00011 Insulated N0. TAG PACKAGE # LOCATION SWITCHES ROOFTOP STARTERS OPTION FANS CONTROLLED LOCATION QUANTITY TYPE 0 HP. JOLT FLA 1 CCP -1 311110JB Utility Cabinet Left Hood # 1 Utility Cabinet Left Hood 8 1 1 Light 1 Fan Gas Valve Dn-Off (reset button In cabinet. Exhaust 3 5.000 208 14.1 112 13 1/4 17 1/2 55 1093 0.242' Supply 3 3.000 208 95 FAN NO. OPTION (Qty. - Descr.) 1 1 - Grease Box 2 1 - Grease Box 3 1 - SCR -11 Bird Screen 3' 1 - I 15 -BDD Damper 4 1 - I 15-BDD Damper 6 1 - Motorized Backdraft Damper for A2 - Housing HOOD NO. OPTION W B C 1 RIGHT END STANDOFF (FINISHED) 3' Wide 4 LEFT END STANDOFF 3' Wide 25 1/2 2 FAN MODEL HT W B C 5 F F R RD WEIGHT LB DU30HFA 25 1/4 25 1/2 2 21 18 1/2 12 1/8 17 1/2 50 DUSDHFA 27 1/4 28 7/8 2 21 21 112 13 1/4 17 1/2 55 FAN MODEL A B B C 5 E F G H J WO ■ WEIGHT LB CEPRS1.124 27 1/8 20 3 9/16 9/16 3 9/16 20 12 5/8 3 24 25 60 FAN MODEL HT W B C R RU WE L IGHT LH DR25HFA 19 1/8 26 1/4 2 21 12 1/8 16 45 FAN MODEL HT W B C F R RO WEIGHT LB NCA24FA 37 1/2 43 3/8 2 33 30 5/8 23 7/8 28 270 FAN MODEL D E DU30HFA 19 1/2 22 DU50HFA 19 1/2 20 UNIT N N0. BTU's E TYPE 6 210519 42 deg F Natural FAN MODEL D E DR25HFA 19 112 12 FAN MODEL D E NCA24FA 31 1/2 20 HDDD RISER(S) WIDTH LENG. DIA. CFM S.P. NEL ADS. LENGTH WIDTH HEIGHT 2 Front 96' 12' 6' 8' 26' 1092 0.173' 3 Front 102' 12' 6' 8' 26' 1093 0.242' 8' 26' 1093 0242' 101111 MEMI® 6' 10' 28' 1280 0491' HOOD INFORMATION PERFORATED SUPPLY PLENUMS HOOD OPTIONS ANSUL R -102 WET CHEMICAL FIRE SUPPRESSION SYSTEM FACTORY PREWIRED CONDUIT PREWIRED TERSKAND SUPPLY FAN SHUT - DOWN RELAY. (SEE ELECTRICAL DRAWINGS FDR DETAILS) ELECTRIC GAS VALVE RESET LIGHT & (LIGHTED) FAN SWITCH PREWIRED BY CAPTIVE -ADZE SYSTEMS. Met G SOPFLY d Cut FLAN VIEW - 6' 3.00' LONG 4824ND -2 -PSP -F Hood #4 U. U.L Listed Incandescent Wit O Feld C 3. UNDIMMED SR . L00 u, TED EMMERT D SUPPLY Hood #3 Id Cut A PLAN VIEW - 14' 9.00" LONG 4824ND -2 PLAN VIEW - 8' 0.00' LONG 126MISC -CPSP) PLAN VIEW - 8' 6.00' LONG 126MISC -(PSP) KITCHEN EXHAUST HOOD REQUIREMENTS 1. KITCHEN TYPE I EXHAUST HOODS SHALL BE UL LISTED (SEE UL LISTING DESCRIPTION) 2. JOINTS AND SEAMS ON EXHAUST HOODS SHALL BE WELDED LIQUID -TIGHT 3. EXHAUST FAN MOTOR SHALL BE LOCATED OUTSIDE OF THE EXHAUST DUCT. EXHAUST DISCHARGE MUST TERMINATE AT LEAST 40 INCITES ABOVE THE HIGHEST POINT THE SURFACE OF THE ROOF MEETS THE DUCT 4. MAKE UP AIR FANS MUST BE ELECTRICALLY INTERLOCKED WITH THE HOOD EXHAUST FAN 5. ALL OUTSIDE AIR INTAKES SHALL BE LOCATED A MINIMUM OF 10 FEET AWAY FROM THE EXHAUST DUCT TERMINATION 6. FOR LISTED HOODS, A 6" OVERHANG MINIMUM IS REQUIRED ON ALL SIDES OF EQUIPMENT. 7. GREASE TROUGH SHALL BE SLOPED TO REMOVABLE GREASE CUP (1 GALLON MAX) 8. CLEARANCE TO COMBUSTIBLES SHALL BE OBSERVED FOR THE FOLLOWING: 18 INCHES, OR 2-HOUR RATED DUCT W/ DESIGN LISTING INFORMATION, OR 9 IN. OR 3 IN., FOLLOWING NEPA 96 GUIDELINE'S (1- 321) 9. EXHAUST HOOD METAL SHALL BE A MINIMUM OF 18 GA ALUMINIZED STEEL AND 20 GA STAINLESS STEEL 10. DISTANCE FROM THE FLOOR TO THE BOTTOM OF THB HOOD ON A CANOPY EXHAUST HOOD SHALL BE 84 ". 11. DISTANCE FROM THE COOKING SURFACE TO THE BOTTOM OF THE FILTER SHALL BE GREATER THAN 18" (SEE DRAWING) 12. CLEANOUTS ON THE EXHAUST DUCT SHALL BE PROVIDED AT ALL CHANGES OF DIRECTION AND 20 FOOT INTERVALS ON ALL HORIZONTAL RUNS 13. CLE 1NOUT3 ON THE EXHAUST DUCT SHALL HAVE A MINIMUM DIMENSION OF 12" 14. AN AUTOMATIC SUPPRESSION SYSTEM COMPLYING WITH UL300 SHALL BE INSTALLED IN THE KITCHEN HOOD SYSTEM 15. IF A FIRE ALARM IS PROVIDED, THE AUTOMATIC SUPPRESSION SYSTEM MUST BE CONNECTED TO THE FTREALARM SYSTEM 16. ACTIVATION OF THE SYSTEM SHALL AUTOMATICALLY SHUT OFF ALL FUEL AND HEAT COMPONENTS TO ALL EQUIPMENT UNDER THE HOOD 17. MANUAL ACTIVATION FOR THE SUPPRESSION SYSTEM SHALL BE LOCATED AT LEAST 10' BUT NOT MORE THAN 20' AWAY FROM THE EXHAUST HOOD, IN THE PATH OP EGRESS. 19. HOOD MUA MUST BE TEMPERED WIHTIN 10° F OP AIR IN CONDITIONED SPACE 20. KITCHEN EQUIPMENT CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS 21. DISHWASHER FAN SWITCH SUPPLIED BY MECHANICAL OR ELECTRICAL CONTRACTOR 22. KITCHEN EQUIPMENT CONTRACTOR SHOULD SEAL THE PERIMETER OF THE HOOD WHEN IN CONTACT WITH A PERFORATED SUPPLY PLENUM, WHERE APPLICABLE, HANGING ANGLE 3' INTEGRATED STA5 ur IT IS THE RESPONSIBILITY OF THE ARCHITECT /OWNER TD ENSURE THAT THE HOOB CLEARANCE FROM LIMITED- COMBUSTIBLE AND COMBUSTIBLE MATERIALS I5 IN COMPLIANCE WITH LOCAL CODE REQUIREMENTS EXHAUST RISER 16" U.L CLASSIFIED BAFFLE -TYPE GREASE FILTERS GREASE DRAIN WITH REMOVABLE CUP EQUIPMENT BY OTHERS 100W VAPORPROOF INCANDESCENT LIGHT 2,75' SECTION VIEW - MODEL 4824 -ND -2 with_P_SP Accessory 6 ' VOLUME ONLY SUPPLY DAMPER 2357. OPEN STAINLESS STEEL PERFORATED PANEL *am ME1 MOS TO M MIMED ar METALLED CONIMMOR MONO MEI.E S PRE-MEMO Al FACIt)f!r HANGING ANGLE DETAIL HOOD STYLE CANOPY EXR T ;10 PAC TYPE 11 DRYS itf% DIM FROM 2.00" 2.00" 2.00" 36'X36" 5" DIM FROM (24 H) 10.50" 10.50" 14.25" 42"X42" 11" DIM FROM 6.00" 6.00" 48"X49" 11" HANGING ANGLE LOCATIONS E10wsT CfwniccN of Nom x OS/1M.FT. (Lao) SUPPLY r)U- •aEAl5F ME x PE RC NELE NAMED CFI) FPM() TOM war AREA TOTAL at= .0tEA -I44 x DIAT LIME. DUCT DEPTH • COMEA RE VLNN_1TOR DUCT OR 2 MODALS° Y9NC.wW+usr vaWarc OF mama NE AEd).1 SIRPI-Y YELCxm' OF 1000 TON CALCULATIONS UTILIZED CAI: WVEEIRE HOODS ARE BUILT IN COMPLIANCE WITH: cD NFPA' BUILDING CODES CAPTIVE - -ANRF HOODS HAVE (ATRIUM_ n F40ANCE REDt1CTEH SYSTEMS AVAILABLE AS FOLLOWS: 11IMI& I131- COMIUS10iE TIME MIMEO LMzmm- COMSIME 3' ur061LAYED SEMCFF CCURIETELE P AJ1 0 513"ANF CLEARANCE TO COMBUSTIBLES 211121.1.611.25 1. ALL ^''0I "FIELD' CON IECIEM AND RELATED soutcomaEnnotas Hr ISECHCL 03nt1RAC10PS. 2 ML PURaR C 'FEED- WINEC1A10 Ale SEWED MERDDU.EM N9 BY PLASM CORRMCTOSS. 3. MOM DOOMS L O C O E D NO •F1VFD AS SFIORO ON PING ML OTHER MEER WARNS 5 MIMEO BY WHOM CgORACTOPS 4, C, PLA� CE DI PER 141:13444402 DONIMOTOFCS 0. COCAIG EMIM1ERT l0 9IRCFF 111 BENT OF FEE: 6 E1ow15T FMS 1D itN MI N EVENT W ME. 7. M.I. Lags MAE SHORN REM= SY COFTNE-OSE ME WART PROMO. ME%OIOIElTIONS FEWER HMOS Mal TO SKIMS S Hr IELOnar-AL CCMFECIDEL IL IMPS FOR LIGHT FIXTURES BY IS0WWC 031111ROCAL O . SEIM WARM ME III' CF 10. WTILJNM WNTRACTOIB ASSUME ALL RF1AAlFD MPNLSMUTY FOR YEFta72 CF DINDIS CNEL ,oj V. idEONCFCN. TROPIO OF m r REZIIMIE]@!IS IN EFFECT PREN 10 ANY RELEASE FOR PRCWLTON OF mum: NT wet& MACE 11. OMEN IAOcc KW SE EOLANCE0 mM I0RAIE31. 12 0T KOCIEN 5f SE IE'C0bE 'AWM RUA= 13. 4 TO � T MULL EC MIRO mM RESPECT =M k% 14. PITMEN Four MIMIC HAW P IEIXC ICE OVER SOLE 12 CONED Mm 'APPROVED COPES OF T108 DDCIAQNT Rf' DIE FAOTtRY A001t N GENERAL NOTES 5 RESISTANCE VS AIRFLOW - T s0mem.Tf.meT r�eF'_ - A ■■■ Wm wurw� ... W 0pm /m/s) 47R6 Ball= RDA X1100 Kleen -Gard Baffle Type HIM are UL Classified Grease Extracting Filters. MLA # 168 -78-M Alnmiaum MEA 1T` 247 -96-E Stainless Steel FILTER DETAIL ELECTRICAL PREWIRE PACKAGE .I® NAPE rn'C - Tukwila, WA DRAWING HUMBER minus JIB NUMBER 5 CONTROL INPUT 125VAC H7.LINE. N1.NEUTRAL 15A 055 14 LIMIT INPUT 12OVAC H2- HS.UNE. N2- N5.NELIRLL 15 15, 5107 LS-01 I6 17 18 INPUT - 3 WIRE - 3 MOE- 19 ao 21 E2 23 24 Lighted Coe Reset 8,11160 Mailed Inside box DATE BRAWN BY 3 Phase Package with centrals 00 dudbg starters) for 1 Exhaust n and 1 Supply Fan. Oechtc Ga. Valve Reset (reset button located in Cabinet) labsd Dsdaft DDa Storhu FS Fan SMlkh 9 K R 5 ays Q m a y ache a) I L F Sw (1400W cox) GP Gn°.raT'Pu')rpoea Reddy DPOT TX Transformer C Contactor Be Ground AF Mr Flaw Switch son Renj 25 115-2 lec1Swltch OmW.G Ansul Pymchem C - RD C nst NO- NO - ILK NC -BR NC - BR CANW'REMITEDY @IT1CTS ITENS =Lam NUT 1002 WEN NE FIRE 5T51cTI T rra . mar PO-135 6S SLILY ' MP. RELAT�CPOOV Contacts 12-1 =HEAL Me REED 05 201.2 03_2 ONLY S FIN SIGNAL - 132 _L _3_ .L WI IF- _/034_9_ 2. ®.8 57521MIOOaGI_lL, '551 I C7© 7 ©RSK=S E' 3E- ESE=1E!I1 - - - DEEM FED WIRING - METES EMAIL MOIL WIRE m.M[ x 0.Mx Y0 - YELLOY L 161E SY - HNT R L ONE FR - 25555E WE COML - 'EMOTE/HIE 110 LED DLIFO NH V - - N.OE/PEB MEMO RD/EN - REIVERE©I MTRIPD ClatillE ME IF WALL IMO P EVIRE, D7 F1EL0 INSTALLED FIRE STEM HICROWITML TIC FMTUrt'HIROO RE =Mt 12 x 18x6 Box Size HOOD CALCULATIONS FOR HOOD '.f1, CA5. TUIIW17 A, WA E.T.L. LISTING = 3054804-001 WITHOUT EXHAUST DAMPER FOR CANOPY STYLE, SLNG1$ REAR -HANK FILTER HOODS Wr114 PERFORATED SUPPLY PLL841M (ND2rPSRF) 450" COOKING EQUIPMENT = 150 CFM / LIN. FT. OF HOOD MEN. 600 COOIIONG EQUIPMENT = 200 CFM / 1.Ud. FT. OF HOOD MIN. 700" COOKING EQUIPMENT = 250 CFM / 2.0'). Fr. OF HOOD MEN. 14'9" OP 14000 X 200 CFM / I.IN. Fr. OP HOOD MDd- = 2950 CFM EXIOAUSO MIN. ACTUAL EXHAUST CFM = 4100 CFM 10" X 19" EXHAUST RISER X 2 RISERS = 380 SQ. IN. / 144 = 2639 SQ. FT. 4100 CFM EXHAUST / 2.639 SQ. Fr. = 1554 FPM SUPPLY CPM = TOTAL EXHAUST CFM X 80"/0 = 3280 CFM SUPPLY 8 "X26" SUPPLY RISER X 3 RISERS = 624 SQ. IN. / 144 = 0.333 5Q. FT. 3280 CFM EXHAUST / 4,333 5Q. Fr. = 757 FPM FOR EACH SUPPLY RISER FREE AREA OF FILTER(5): 16 "X16 " = 135,16 "X20 " = 1.73,20 "X20 " = 223 1 +1.73 +8X223 =1957 4100 CFM EXHAUST / 1957 5Q. Fr. (FD.TER AREA) = 210 PPM HOOD CALCULATIONS FOR HOOD #2, CP1 TUKWEA, WA E.T.L. LISTING = 3054804 -001 WITHOUT EXHAUST DAMPER FOR CANOPY 01'21S, 5ING1.E, REAR -DANK( FILTER HOOD5 WITH PERFORATED SUPPLY PLENUM (ND2.1504') 450" COOKING EQUIPMENT = 150 CFM / LSM. FT. OF HOOD MN. 600 COOKING EQUIPMENT = 2E0 CFM / 124. FT. OF HOOD MN. 700° COOKING EQUIPMENT = 250 CFM / 124. FT. OF HOOD MIN. 69" OF 1400D X 150 CFM / LIN. FT. OF HOOD MIN. = 1250 CFM EXHAUST MEd. ACTUAL EXHAUST CFM = 1600 CFM 10" X 14" EXHAUST RN5ER 0 tan SQ. 1N. / 144 a 0.972 SQ. 01. 1600 CFM EXHAUST / 0.972 SQ. Fr. = 1646 FPM SUPPLY CFM = 'TOTAL EXHAUST CFM X 80 = 1280 CFM SUPPLY 10" X 28" SUPPLY RISER X 1 RISERS = 2805Q. IN. / 144 = 1.944 SQ. FT. 1280 GPM EXHAUST / 1.944 SQ. Fr. = 658 FPM FOR EACH SUPPLY RISER FREE AREA OF 12 .TER0, 16 "72 16 " = 135,16 "X20 " = 1.73,20 "X20 " =221 2X1.73 +2X2.23 =7.92 1600 CFM EXHAUST / 7.92 S4 01. (FILTER AREA) = 202 FPM DRHFA SERIES RADIAL EXHAUST FANS DRHFA DIRECT DRIVE CENTRIFUGAL RADIAL EXHAUST FANS DIMENSIONAL DATA CEPRSM SERIES AXIAL WALL MOUNTED FANS WITH SHUTTERS 528 X S8 SLOT (8) CEPRSM AXIAL WALL MOUNTED FANS WITH SHUTTER DIMENSIONAL DATA FEATURES; - ROOF MOUNTED FANS - UL70S - SAFETY DISCONNECT - STANDARD BIRD SCREEN - SPEED CONTROL OPTIONS: BACKDRAFT DAMPER HINGED FAN PITCHED CURB INSULATED CURB ✓ RO RD PITCHED CURBS ARE AVAILABLE FOR PITCHED ROOFS, SPECIFY PITCH EXAMPLE 7/12 PITCH = 30" SLOPE CURB DDIENSIONAL DATA FEATURES; DPFA -it REVJ4 1I/29/172 20 GAUGE STEEL CONSTRUCTION 3' FLANGE ROOF OPENING DIMENSIONS NOTE) Tx WALL OPENING - COMPLETELY ASSEMBLED - OSHA REAR GUARD STANDARD - TOTALLY ENCLOSED 115 VOLT MOTOR - BUILT IN SHUTTER - COMPLETELY ASSEMBLED FOR EASY INSTALLATION *g00 MID NUTS 1b SE S& ED BY IRMALMG MOWTp7 M1CN0 AMC 21 PEE- MMSHIA AT FACTORY HANGING ANGLE DETAIL HOOD STYLE CANOPY �LV BAC NO LY TYPE II a 20 s¢E DIM FROM 2.00" 2.00" 200" 36"X36" 5" DIM FROM (24 10.50' 10.50" 14.25" 42"(42" 11" DIM FROM FROM 6.00" 6.00" 48"X48" 11" HANGING ANGLE LOCATIONS E1o0921T 171 ■t0aMH OF woo x 10/LIILPr. NAND) SIMPLY CFM EDNIA02 COI E PERCENPCE REQUIRED TAAL DUCT 49E4=144 x CFY 0ICT LOON. TORY. FACT PPM DUCT DEPTH - Ta7TNEA2E VENTILATOR n MT WS 59 u1TnATFn usw5 AN lower VELOCITY OF 15 -IA00AiumASO1FL202900IY OF moo FPA5 CALCULATIONS UTILIZED CAVRVE -AIRS HOODS ARE BUILT IN COMPLIANCE WM + J NF AM BUILDING CODES 0Ea1NH -DIRE H00a3 RAVE 17000042_ rJ 527202E R®11CTON S1STB.0S AVALABLE AS FOIJ DNS: AMID& rY JACAN20 EEIE !MN 010152 11011-CMA SIRE IICM REQUIRED UMIIED-0030.2713.E Y 00015 TEU SIME FF COMHUSIRHLE 3' N9MTED SWOON CLEARANCE TO COMBUSTIBLES INSTAL l A10N 1. ML B,ECIPICIL 'FED' WIe1E 11021 ANN MIRED MCRCOMECTOES RY E.E0173231 CANTFACTPK. 2. AIL MAIM . FILLY COIROMI S Mm MATED ROIRC OECMI21 0 1 211221110 common: es. 3. 4410416 WOKEN LOWED AND WELDED AS SWAN ON PLANS ALL OTHER 9010511 10219NO5 P535053 H/ ISDLLIG CCNIRAC10Rs 4. C COMB S RMS� DUCT PER S. DORM =MEW TO NNW M ow OF ORE. 0. EDNUST FMS 70 TURN ON M VENT OF FIRE. 7. AIR. LJO{l0 FD0ew 811010 N 10050 ID• r/PTM1E -422 ARE mom 55310, MEICJ1F0IE51ICES RE16TD7 IIWOS MID TO SWIM Er ElEC12422L WMFACTORS. 0. LADE' FOR LORI MOM RY INECNIDG1 CONIPACIOR5. 0. WOW RESTAIOS ARE RUMMY= OF 9135 WMRPOTM. 10. MIMIC CLEIMIXES AS911E ML MEET RFPOIAHO2 FOR Yp00150 OF mgtelOHa 0274 53(2AA5D ON TIESE MODEM FOR =LOAM, MECRANON, NID 200557R21311 OF CEDE RFAlafdlIENI4 N EFFECT PM TO NT 0127$ FIR PR00WI0 OF E0S0510 SHOW. WAKE 11. 10X0124 HOTS LIFT M eWM7CE1 0111 MOIEN. 12 TOT .WF EE 1EOA7ME WIN RESPECT 13. FONLOANT SHAM FE PONT& mM RO'aFC2 Atranna 14. PITIEII HCOD OAENSIp2 HOE PIE72313FE OVER SONE 15. y E NNO "AMINO COPILi OF 100 WOWEM WIOmL91QIfPFL'ET.EJ Wart/ rt/ MDR TO GENERAL NOTES RESISTANCE 98. AIRFLOW . z• Ta°nc"rd MELT', effallelite3 ■■■, EINEM MIME Kleen -Gard Baffle Type Filters are UL Classified Grease FT*"°�g Filters. MEA # 168 -78-M Aluminum MEA # 247 -96-E Stainless Steel .ru yw AIRF LOW lrl /m /s) mrY• FILTER DETAIL RE VISIO NS A - - A A A L SCALE 3/4" = 1 Ft SHEET# 1 of 3 DATE: 2 -15 -07 DWG. #: 558904 DRAWN RUSTY ST: HOOD DETAIL PLAN l REV ISIONS A = - A A DWG. #: 558904 SHEET# 3 of 3 DATE: 2 -15 -07 DRAWN RUSTY SCALE 3/4" = 1 Ft HOOD DETAIL PLAN FAN INFORMATION FAN OPTIONS CURB ASSEMBLIES NCAFA SERIES UPBLAST EXHAUST FANS (UL762) NCAFA BELT DRIVE CENTRIFUGAL UP -BLAST EXHAUST FANS DIMENSIONAL DATA FEATURES: OPTIONS: GREASE BOX HINGE) FAN PITCHED CURB INSULATED CURB DUCTWORK BETWEEN EXHAUST RISER ON HOOD AND FAN CV OTHERS) CAS FIRED MAKE - UP AIR UNITS - ROOF MOUNTED FANS - RESTAURANT MODEL - UL762 - MICA SOUND AND AIR CERTIFIED - WIRING FROM MUTER TO DISCONNECT SWITCH - WEATHERPROOF DISCONNECT - HIGH HEAT OPERATION 300'F (149•C) - GREASE CLASSIFICATION TESTING NORMAL TEMPERATURE TEST EXHAUST FAN MUST OPERATE CONTINUOUSLY WHILE EXHAUSTING AIR AT 300'F (149'C) UNTIL ALL FAN PARTS HAVE REACHED THERMAL EQUILIBRIUM, AND WITHOUT ANY DETERIORATING EFFECTS TO THE FAN WHICH WOULD CAUSE UNSAFE OPERATION. ABNORMAL FLARE -UP TEST EXHAUST FAN MUST OPERATE CONTINUOUSLY WHILE EXHAUSTING BURNING GREASE VAPORS AT 600•F (316'C) FOR A PERIOD OF 15 MINUTES WITHOUT THE FAN BECOMING DAMAGED TO ANY EXTENT THAT COULD CAUSE AN UNSAFE CONDITION. RO PITCHED CURBS ARE AVAILABLE FDR PITCHED ROOFS. CURB 80450 5152122 DATA 3' FLANGE SPECIFY PITCH. EXAMPLE. 7/12 PITCH = 30" SLOPE te4FA -ULT42 LEWD 0220/1505 VENTED CURB STEE CONSTRUCTION ROOF OPENING DIMENSIONS MODULAR OUTDOOR DOWN DISCHARGE DIRECT FIRED HEATER ROOF OPENING ALL DIMENSIONS ARE NOMINAL AND GIVEN IN INCHES. MODEL I WEIGHT D.500 -615 810 LBS UNIT DIMENSIONS A B C A2 -3/g 27 -3/8 136 -3/4 D 33 -1/16 G H 7 -13/16 42 -13/16 CURB J 31 K 79 DISCHARGE OPENING P R f8 - 16 6 -1/8 S 10 -13/16 E F 3 -3/4 1 53 -5/8 UNIT INFORMATION. MODEL 0.500 -G15 BTU RANGE (MSH) BURNER LENGTH IBTU LOW I BTU HIGH 12' L 550 GAS PRESSURE MIN I MAX 7' WC 14' WC GAS CONNECTION CFM RANGE MIN 2500 MAX 6000 FILTER SIZE & RTY 20')(25'x2' (3) MAX. FILTER VELOCITY 26000 CFM = 696 FPM 'T' (NPT) DUHFA SERIES UPBLAST EXHAUST FANS (UL752) f i 0 d DISCHARGE OPENING r -FLEX CONDUIT FOR FIELD WIRING AIRFLOW ■■ GREASE DRAIN DUH DIRECT DRIVE CENTRIFUGAL UP -BLAST EXHAUST FANS DIMENSIONAL DATA OPTIONS: GREASE BOX HINGED FAN PITCHED CURB INSULATED CURB DUCTWORK BETWEEN EXHAUST RISER ON HOOD AND FAN OW OTHERS) SERVICE DISCONNECT SWITCH FEATURES; - ROOF MOUNTE71 FANS -- RESTAURANT MODEL - UL762 - VARIABLE SPEED CONTROL -- INTERNAL WIRING - WEATHERPROOF DISCONNECT - THERMAL OVERLOAD PROTECTION (SINGLE PHASE) - HIGH HEAT OPERATION 300T (149'C) - GREASE CLASSIFICATION TESTING NORMAL TEMPERATURE TEST EXHAUST FAN MUST OPERATE CONTINUOUSLY WHILE EXHAUSTING AIR AT 300'F (149 UNTIL ALL FAN PARTS HAVE REACHED THERMAL EQUILIBRIUM, AND WITHOUT ANY DETERIORATING EFFECTS TO THE FAN WHICH WOULD CAUSE UNSAFE OPERATION. ABNORMAL FLARE -UP TEST EXHAUST FAN MUST OPERATE CONTINUOUSLY WHILE EXHAUSTING BURNING GREASE VAPORS AT 600 "F (316'C) FOR A PERIOD OF 15 MINUTES WITHOUT THE FAN BECOMING DAMAGED TD ANY EXTENT THAT COULD CAUSE AN UNSAFE CONDITION. LIFTING LUGS 4 PLACES 20 IN HIGH EQUIPMENT CURB CURB /RAIL COMBINATION USED ON UNITS WITH 20' AND 25' BLOWERS RD RD PITCHED CURBS ARE AVAILABLE FDR PITCHED ROOFS. CURB DIMENSIONAL DATA 2D IN HIGH EQUIPMENT CURB & RAIL 3' FLANGE SPECIFY PITCH. 12 EXAMPLE. 7/12 PITCH = 30' SLOPE l/3f REWJD lnrmn 0FAiL702 OCVJ2 08/19/05 VENTED CURE 20 GAUGE STEEL CONSTRUCTION ROOF OPE141140 DIMENSIONS FOR REFERS \CE Q \EY -REVIEWED COD COMPLIANCE APPROVED JUN - 5 2007 City Of Tuk pia BU LEON G D_ e 5,12 A A A A 1 c REVISIONS 0019035 MID DATE: 2-15-07 DWG. #: 558904 SHEET# 2 of 3 DRAWN I3Y; RUSTY SCALE 3/4" = 1 Ft HOOD DETAIL PLAN RECEIVED CITY OFTIIKWIIA MAY 0 3 2007 PEF MITCENTER rri HENDERSON ENGINEERS INCORPORATED 8325 LENEXA DRIVE, SUITE Q4❑❑ LENEXA, KANSAS 66 - 1695 FH 91 3.3 ❑7.53❑❑ FX 91 3.3027.541301 WWW.HENDER5CLNEN(31NEERS.00M ❑65❑ ❑01814 architecture + interiors SCHEER TANAKA DENNEHY RILEY ARCHITECTS 3190 -K Airport Loop Drive Costa Mesa, California 92626 (714) 444 -1960 (714) 444 -3160 Fax design@stdr.net FIELD VERIFICATION Contractor shall verify all figured dimensions and conditions nt the job site and notify STDR Architects, Inc. of any dimensional errors, omissions or discrepancies before beginning or fabricating any work. Do not scale these drawings. COPYRIGHT These drawings are the property and copyright of Scheer Tanaka Dennehy Riley Architects, Inc. and shall not be used on any other work except by agreement with Scheer Tanaka Dennehy Riley Architects, Inc.. © STIR ARCHITECTS, INC. 1 1 2 2 -20 -07 5 -01 -07 HEALTH SUBMITTAL AGENCY SUBMITTAL REVISIONS Drawing Title CAPTIVE AI RE DRAWINGS Job No. 06298 Scale A5 NOTED Drawn JMJ Date Sheet No. M4.0 AProgramsiCalifomia Pizza Kitchenl0650001614 Tukwila WA - South Centeri0001Mech10650001814M40.dwg, Plot, 4/27/2007 2'.116:51 PM, douge, 1:1 California Pizza Kitchen California Pizza Kitchen California Pizza Kitchen 17910 SKYPARK SUITE 210, IRVINE, CA 92614 PFIONE: (949) 66P-7701, (600) 967-7701 FAX: (949) 660-7702 E-Mall reg86@captlyealr.com 17910 SKYPARK SUITE 210, IRVINE, CA92614 PHONE: (949)660-7701, (Boo) 967-7701 FAX (949) 660-7702 E-Mall reg86@cardvealr.com 17910 SKYPARK SUITE 210, IRVINE, CA92614 PHONE: (949)660-T701, (600) 967-7701 FAX: (949)660-7702 E-Mall regE36@captivealr.com Slag 11 H UT1S 013A1331N ffilitalf2E11111•1 IFIENNI . NMI .11•■ .■NMIII ppr d■ IMIll 1■1 MINIIMI■‘ 41■IM iir mr la Awin . — . AMME■ 1 I V' .,,.....„ 11■1 1•11■L .11■" 111.111111111, =NM sil■If .■ IMIM 111•■ SOUTHERN CALIFORNIA REGIONAL OFFICE www.captiveafr.oam 1 0 0 ?:1 V 15A: HEATING. VENTILATING. AND AIR CONDITIONING 15A 1 GENERAL INSTRUCTIONS 15A 1-1 GENERAL REQUIREMENTS REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THESE SPECIFICATIONS SHALL BE A PART OF THIS SECTION. CONTRACTOR SHALL BECOME THOROUGHLY ACQUAINTED WITH ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR SECTION. THE WORK REQUIRED UNDER THIS SECTION INCLUDES MATERIAL, EQUIPMENT, APPLIANCES, TRANSPORTATION, SERVICES, AND LABOR REQUIRED TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS. THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY, AND PORTIONS OF THE WORK DESCRIBED IN ONE, SHALL BE PROVIDED AS IF DESCRIBED IN BOTH. IN THE EVENT OF DISCREPANCIES, NOTIFY THE ENGINEER AND REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK INVOLVED. 15A 1-2 DEFINITIONS FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION AND SIMILAR OPERATIONS." INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT THE PROJECT SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS." PROVIDE: THE TERM "PROVIDE" MEANS 10 FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE." FURNISHED BY OWNER OR FURNISHED BY OTHERS: THE ITEM WILL BE FURNISHED BY THE OWNER OR OTHERS. IT IS TO BE INSTALLED AND CONNECTED UNDER THE REQUIREMENTS OF THIS DIVISION, COMPLETE AND READY FOR OPERATION, INCLUDING ITEMS INCIDENTAL TO THE WORK, INCLUDING SERVICES NECESSARY FOR PROPER INSTALLATION AND OPERATION. THE INSTALLATION SHALL BE INCLUDED UNDER THE GUARANTEE REQUIRED BY THIS DIVISION. ENGINEER: WHERE REFERENCED IN THIS DIVISION, "ENGINEER" IS THE ENGINEER OF RECORD AND THE DESIGN PROFESSIONAL FOR THE WORK UNDER THIS DIVISION, AND IS A CONSULTANT TO, AND AN AUTHORIZED REPRESENTATIVE OF, THE ARCHITECT, AS DEFINED IN THE GENERAL AND/OR SUPPLEMENTARY CONDITIONS. WHEN USED IN THIS DIVISION, IT MEANS INCREASED INVOLVEMENT BY, AND OBLIGATIONS TO, THE ENGINEER, IN ADDITION TO INVOLVEMENT BY, AND OBLIGATIONS TO, THE "ARCHITECT". AHJ: THE LOCAL CODE AND/OR INSPECTION AGENCY (AUTHORITY) HAVING JURISDICTION OVER THE WORK. THE TERMS "APPROVED EQUAL", "EQUIVALENT", OR "EQUAL" ARE USED SYNONYMOUSLY AND SHALL MEAN "ACCEPTED BY OR ACCEPTABLE TO THE ENGINEER AS EQUIVALENT TO THE ITEM OR MANUFACTURER SPECIFIED". THE TERM "APPROVED" SHALL MEAN LABELED, LISTED, OR BOTH, BY A NATIONALLY RECOGNIZED TESTING LABORATORY (E.G. UL, ETL, CSA), AND ACCEPTABLE TO THE AHJ OVER THIS PROJECT. 15A 1-3 PREBID SITE VISIT PRIOR TO SUBMITTING BID, VISIT THE SITE OF THE PROPOSED WORK AND BECOME FULLY INFORMED AS TO THE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. FAILURE TO DO SO WILL NOT BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND ABOVE THE CONTRACT PRICE. 15A 1-4 MATERIAL AND WORKMANSHIP PROVIDE NEW MATERIAL EQUIPMENT, AND APPARATUS UNDER THIS CONTRACT UNLESS OTHERWISE STATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN GOOD COMMERCIAL PRACTICE, AND FREE FROM DEFECTS. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT NECESSARILY INTENDED TO DESIGNATE THE REQUIRED TRIM, WRITTEN DESCRIPTIONS OF THE TRIM GOVERN MODEL NUMBERS. PIPE, PIPE FITTINGS, PIPE SPECIALTIES AND VALVES SHALL BE MANUFACTURED IN PLANTS LOCATED IN THE UNITED STATES. WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" APPEARANCE WHEN COMPLETED, TO THE SATISFACTION OF THE ARCHITECT AND ENGINEER. WORKMANSHIP SHALL BE THE FINEST POSSIBLE BY EXPERIENCED MECHANICS. INSTALLATIONS SHALL COMPLY WITH APPLICABLE CODES AND LAWS. THE COMPLETE INSTALLATION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT TO EFFICIENCY, CAPACITY, NOISE LEVEL, ETC. ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, PIPING, DUCTS, AIR DEVICES, AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. IN GENERAL, MATERIALS AND EQUIPMENT SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. LIGHT DUTY AND RESIDENTIAL TYPE EQUIPMENT WILL NOT BE ACCEPTED. REMOVE FROM THE PREMISES WASTE MATERIAL PRESENT AS A RESULT OF WORK, INCLUDING CARTONS, CRATING, PAPER, STICKERS, AND/OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC. CLEAN EQUIPMENT INSTALLED UNDER THIS CONTRACT TO PRESENT A NEAT AND CLEAN INSTALLATION AT THE TERMINATION OF THE WORK. REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING JURISDICTION. 15A 1-5 COORDINATION COORDINATE WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF THE SYSTEMS WILL BE INSTALLED AT THE PROPER TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO THOSE ITEMS REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE ABOVE SHALL BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER. UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACTOR WILL PROVIDE CHASES AND OPENINGS IN BUILDING CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. CONTRACTOR SHALL FURNISH THE GENERAL CONTRACTOR WITH INFORMATION WHERE CHASES AND OPENINGS ARE REQUIRED. KEEP INFORMED AS TO THE WORK OF OTHER TRADES ENGAGED IN THE CONSTRUCTION OF THE PROJECT, AND EXECUTE WORK IN A MANNER AS TO NOT INTERFERE WITH OR DELAY THE WORK OF OTHER TRADES. FIGURED DIMENSIONS SHALL BE TAKEN IN PREFERENCE TO SCALE DIMENSIONS. CONTRACTOR SHALL TAKE HIS OWN MEASUREMENTS AT THE BUILDING, AS VARIATIONS MAY OCCUR. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS THAT COULD HAVE BEEN AVOIDED BY PROPER CHECKING AND INSPECTION. PROVIDE MATERIALS WITH TRIM THAT WILL PROPERLY FIT THE TYPES OF CEILING, WALL, OR FLOOR FINISHES ACTUALLY INSTALLED. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT INTENDED TO DESIGNATE THE REQUIRED TRIM. 15A 1-6 ORDINANCES AND CODES WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A MINIMUM, BE IN CONFORMANCE WITH APPLICABLE NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. EQUIPMENT FURNISHED AND ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL AHJ INCLUDING ANY AMENDMENTS AND STANDARDS AS SET FORTH BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES (UL), OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), AMERICAN SOCIET' OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS (ASHRAE), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AMERICAN SOCIETY OF TESTING MATERIALS (ASTM) AND OTHER NATIONAL STANDARDS AND CODES WHERE APPLICABLE. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREMENTS OF THE REFERENCED CODES, STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. PROCURE AND PAY FOR PERMITS AND LICENSES REQUIRED FOR THE ACCOMPLISHMENT OF THE WORK HEREIN DESCRIBED. WHERE REQUIRED, OBTAIN, PAY FOR AND FURNISH CERTIFICATES OF INSPECTION TO OWNER. CONTRACTOR WILL BE HELD RESPONSIBLE FOR VIOLATIONS OF THE LAW. 15A 1-7 PROTECTION OF EQUIPMENT AND MATERIALS STORE AND PROTECT FROM DAMAGE EQUIPMENT AND MATERIALS DELIVERED TO JOB SITE. COVER WITH WATERPROOF, TEAR—RESISTANT, HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO PROTECT FROM PLASTER, DIRT, PAINT, WATER, OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL THAT HAS BEEN DAMAGED BY CONSTRUCTION ACTIVITIES WILL BE REJECTED, AND CONTRACTOR IS OBLIGATED TO FURNISH NEW EQUIPMENT AND MATERIAL OF A LIKE KIND. KEEP PREMISES BROOM CLEAN FROM FOREIGN MATERIAL CREATED DURING WORK PERFORMED UNDER THIS CONTRACT. PIPING, EQUIPMENT, ETC. SHALL HAVE A NEAT AND CLEAN APPEARANCE AT THE TERMINATION OF THE WORK. PLUG OR CAP OPEN ENDS OF DUCTWORK AND PIPING SYSTEMS WHILE STORED AND INSTALLED DURING CONSTRUCTION WHEN NOT IN USE TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS. 15A 1-8 SUBSTITUTIONS THE BASE BID SHALL INCLUDE ONLY THE PRODUCTS FROM MANUFACTURERS SPECIFICALLY NAMED IN THE DRAWINGS AND SPECIFICATIONS. NO SUBSTITUTION WILL BE CONSIDERED PRIOR TO RECEIPT OF BIDS UNLESS WRITTEN REQUEST FOR APPROVAL TO BID HAS BEEN RECEIVED BY THE ENGINEER AT LEAST TEN CALENDAR DAYS PRIOR TO THE DATE FOR RECEIPT OF BIDS. EACH SUCH REQUEST SHALL INCLUDE THE NAME OF THE MATERIAL OR EQUIPMENT FOR WHICH IT IS TO BE SUBSTITUTED AND A COMPLETE DESCRIPTION OF THE PROPOSED SUBSTITUTE INCLUDING DRAWINGS, CUTS, PERFORMANCE AND TEST DATA AND OTHER INFORMATION NECESSARY FOR AN EVALUATION. A STATEMENT SETTING FORTH CHANGES IN OTHER MATERIALS, EQUIPMENT OR OTHER WORK THAT INCORPORATION OF THE SUBSTITUTE WOULD REQUIRE SHALL BE INCLUDED. THE BURDEN OF PROOF OF THE MERIT OF THE PROPOSED SUBSTITUTE IS UPON THE PROPOSER. THE ENGINEER'S DECISION OF APPROVAL OR DISAPPROVAL TO BID OF A PROPOSED SUBSTITUTION SHALL BE FINAL THE TERMS "APPROVED", "APPROVED EQUAL", OR "EQUAL", REFER TO APPROVAL BY THE ENGINEER AS AN ACCEPTABLE ALTERNATE BID. NO SUBSTITUTIONS WILL BE CONSIDERED THAT ARE NOT BID AS AN ALTERNATE. NO MATERIAL SUBSTITUTIONS SHALL BE CONSIDERED FOR APPROVAL PRIOR TO AWARD OF CONTRACT. COORDINATE AND VERIFY WITH OTHER TRADES WHETHER OR NOT THE SUBSTITUTED EQUIPMENT CAN BE INSTALLED AS SHOWN ON THE CONSTRUCTION DRAWINGS WITHOUT MODIFICATION TO ASSOCIATED SYSTEMS OR ARCHITECTURAL OR ENGINEERING DESIGN. INCLUDE ADDITIONAL COSTS FOR ARCHITECTURAL AND ENGINEERING DESIGN FEES IN BID IF DRAWING MODIFICATIONS ARE REQUIRED BECAUSE OF SUBSTITUTED EQUIPMENT. 15A 1-9 SHOP DRAWINGS UPON BEING AWARDED A CONTRACT, SUBMIT TO THE ARCHITECT FOR APPROVAL, SIX (6) COPIES OF MANUFACTURER'S SHOP DRAWINGS FOR EQUIPMENT TO BE FURNISHED UNDER THIS CONTRACT, ITEMS REQUIRING COORDINATION BETWEEN CONTRACTORS AND SHEET METAL DUCTWORK FABRICATION DRAWINGS. BEFORE SUBMITTING SHOP DRAWINGS AND MATERIAL LISTS, VERIFY THAT EQUIPMENT SUBMITTED IS MUTUALLY COMPATIBLE AND SUITABLE FOR THE INTENDED USE, AND WILL FIT THE AVAILABLE SPACE AND ALLOW AMPLE ROOM FOR MAINTENANCE. THE ENGINEER'S CHECKING AND SUBSEQUENT APPROVAL OF SUCH SHOP DRAWINGS WILL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS IN DIMENSIONS, DETAILS, SIZE OF MEMBERS, QUANTITIES, OMISSIONS OF COMPONENTS OR FITTINGS; COORDINATION OF ELECTRICAL REQUIREMENTS; OR FOR COORDINATING ITEMS WITH ACTUAL BUILDING CONDITIONS. PROCEED WITH THE PROCUREMENT AND INSTALLATION OF EQUIPMENT ONLY AFTER RECEIVING APPROVED SHOP DRAWINGS RELATIVE TO EACH ITEM. CATALOG DATA SHALL BE PROPERLY BOUND, IDENTIFIED, INDEXED AND TABBED IN A 3—RING BINDER. EACH ITEM OR MODEL NUMBER SHALL BE CLEARLY MARKED AND ACCESSORIES INDICATED. LABEL THE CATALOG DATA WITH THE EQUIPMENT IDENTIFICATION ACRONYM OR NUMBER AS USED ON THE DRAWINGS AND INCLUDE PERFORMANCE CURVES, CAPACITIES, SIZES, MATERIALS, FINISHES, WIRING DIAGRAMS AND DEVIATIONS FROM SPECIFIED EQUIPMENT OR MATERIALS. MARK OUT INAPPLICABLE ITEMS. SHOP DRAWINGS WILL BE RETURNED WITHOUT REVIEW IF THE ABOVE MENTIONED REQUIREMENTS ARE NOT MET. 15A 1-10 ELECTRONIC DRAWING FILES IN PREPARATION OF SHOP DRAWINGS, CONTRACTOR MAY, AT HIS OPTION, OBTAIN ELECTRONIC DRAWING FILES IN AUTOCAD OR DXF FORMAT FROM THE ENGINEER FOR A SHIPPING AND HANDLING FEE OF $200 FOR A DRAWING SET UP TO 12 SHEETS AND $15 PER SHEET FOR A SET OF MORE THAN 12 SHEETS. CONTRACTOR SHALL CONTACT THE ARCHITECT FOR WRITTEN AUTHORIZATION. CONTRACTOR SHALL COMPLETE AND SEND THE FORM ATTACHED AT THE END OF THIS SECTION ALONG WITH A CHECK MADE PAYABLE TO HENDERSON ENGINEERS, INC. CONTRACTOR SHALL INDICATE THE DESIRED SHIPPING METHOD AND DRAWING FORMAT ON THE ATTACHED FORM. IN ADDITION TO PAYMENT, ARCHITECT'S WRITTEN AUTHORIZATION AND ENGINEER'S RELEASE AGREEMENT FORM MUST BE RECEIVED BEFORE ELECTRONIC DRAWING FILES WILL BE SENT. 15A 1-11 OPERATION AND MAINTENANCE INSTRUCTIONS DURING THE COURSE OF CONSTRUCTION, COLLECT AND COMPILE A COMPLETE BROCHURE OF EQUIPMENT FURNISHED AND INSTALLED ON THIS PROJECT. INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, MANUFACTURER'S CATALOG SHEETS, WIRING DIAGRAMS, PARTS LISTS, APPROVED SHOP DRAWINGS, AND DESCRIPTIVE LITERATURE AS FURNISHED BY THE EQUIPMENT MANUFACTURER. INCLUDE AN INSIDE COVER SHEET THAT LISTS THE PROJECT NAME, DATE, OWNER, ARCHITECT, CONSULTING ENGINEER, GENERAL CONTRACTOR, SUB—CONTRACTOR, AND AN INDEX OF CONTENTS. SUBMIT THREE COPIES OF LITERATURE BOUND IN APPROVED BINDERS TO THE ARCHITECT AT THE TERMINATION OF THE WORK. PAPER CLIPS, STAPLES, RUBBER BANDS, AND MAILING ENVELOPES ARE NOT CONSIDERED APPROVED BINDERS. FINAL APPROVAL OF MECHANICAL SYSTEMS INSTALLED UNDER THIS CONTRACT WILL BE WITHHELD UNTIL THIS EQUIPMENT BROCHURE IS RECEIVED AND DEEMED COMPLETE BY THE ARCHITECT AND ENGINEER. INSTRUCT WORKMEN TO SAVE REQUIRED LITERATURE SHIPPED WITH THE EQUIPMENT ITSELF, FOR INCLUSION IN THIS BROCHURE. PROVIDE "AS—BUILT" DRAWINGS (SEE SPECIAL CONDITIONS). 15A 1-12 TRAINING AT A TIME MUTUALLY AGREED UPON BETWEEN THE OWNER AND CONTRACTOR, PROVIDE THE SERVICES OF A FACTORY TRAINED AND AUTHORIZED REPRESENTATIVE TO TRAIN OWNER'S DESIGNATED PERSONNEL ON THE OPERATION AND MAINTENANCE OF THE EQUIPMENT PROVIDED FOR THIS PROJECT. PROVIDE TRAINING TO INCLUDE BUT NOT BE LIMITED TO AN OVERVIEW OF THE SYSTEM AND/OR EQUIPMENT AS IT RELATES TO THE FACILITY AS A WHOLE; OPERATION AND MAINTENANCE PROCEDURES AND SCHEDULES RELATED TO STARTUP AND SHUTDOWN, TROUBLESHOOTING, SERVICING, PREVENTIVE MAINTENANCE AND APPROPRIATE OPERATOR INTERVENTION; AND REVIEW OF DATA INCLUDED IN THE OPERATION AND MAINTENANCE MANUALS. SUBMIT A CERTIFICATION LETTER TO THE ARCHITECT STATING THAT THE OWNER'S DESIGNATED REPRESENTATIVE HAS BEEN TRAINED AS SPECIFIED HEREIN. LETTER SHALL INCLUDE DATE, TIME, ATTENDEES AND SUBJECT OF TRAINING. THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL SIGN THE CERTIFICATION LEI I ER INDICATING AGREEMENT THAT THE TRAINING HAS BEEN PROVIDED. SCHEDULE TRAINING WITH OWNER WITH AT LEAST 7 DAYS' ADVANCE NOTICE. 15A 1-13 SPARE PARTS FURNISH TO OWNER, WITH RECEIPT, THE FOLLOWING SPARE PARTS FOR THE EQUIPMENT FURNISHED FOR THIS PROJECT: A. ONE SET OF SPARE FILTERS OF EACH TYPE REQUIRED FOR EACH UNIT. IN ADDITION TO THE SPARE SET OF FILTERS, INSTALL NEW FILTERS AT COMPLETION OF INSTALLATION WORK, AND PRIOR TO TESTING, ADJUSTING, AND BALANCING WORK. B. FURNISH ONE COMPLETE SET OF BELTS FOR EACH FAN. C. FURNISH THREE OPERATING KEYS FOR EACH TYPE OF AIR OUTLET AND INLET THAT REQUIRE THEM. 15A 1-14 WARRANTIES WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALL DEFECTS DUE TO FAULTY WORKMANSHIP, DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF SUBSTANTIAL COMPLETION, UNLESS SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S STANDARD WARRANTY EXCEEDS 12 MONTHS. REMEDY ALL DEFECTS, OCCURRING WITHIN THE WARRANTY PERIOD(S), AS STATED IN THE GENERAL CONDITIONS AND DIVISION 1. WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS OR REPLACEMENTS WITHOUT ANY ADDITIONAL COSTS TO THE OWNER. PERFORM THE REMEDIAL WORK PROMPTLY, UPON WRITTEN NOTICE FROM THE ENGINEER OR OWNER. AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN WRITING AND PROPERLY EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND THE ONE YEAR PERIOD, EACH WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND STATING THE COMMENCEMENT DATE AND TERM. 15A 1-15 CUTTING AND PATCHING PERFORM CUTTING OF WALLS, FLOORS, CEILINGS, ETC. AS REQUIRED TO INSTALL WORK UNDER THIS SECTION. OBTAIN PERMISSION FROM THE ARCHITECT PRIOR TO CUTTING. DO NOT CUT OR DISTURB STRUCTURAL MEMBERS WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES AS SMALL AS POSSIBLE. GENERAL CONTRACTOR SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED BY WORK UNDER THIS SECTION. PATCHING SHALL MATCH THE ORIGINAL MATERIAL AND CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BY WORK TO THE CONDITION OF ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT. 15A 1-16 ROUGH—IN COORDINATE WITHOUT DELAY ROUGHING—IN WITH GENERAL CONSTRUCTION. CONCEAL PIPING AND CONDUIT ROUGH—IN EXCEPT IN UNFINISHED AREAS AND WHERE OTHERWISE SHOWN. 15A 1-17 STRUCTURAL STEEL STRUCTURAL STEEL USED FOR SUPPORT OF EQUIPMENT, DUCTWORK AND PIPING SHALL BE NEW, CLEAN, AND CONFORM TO ASTM DESIGNATION A-36. SUPPORT MECHANICAL COMPONENTS FROM THE BUILDING STRUCTURE. DO NOT SUPPORT MECHANICAL COMPONENTS FROM CEILINGS, OTHER MECHANICAL OR ELECTRICAL COMPONENTS, AND OTHER NON— STRUCTURAL ELEMENTS. 15A 1-1&ACCESS DOORS PROVIDE ACCESS DOORS IN CEILINGS, WALLS, ETC. WHERE INDICATED OR REQUIRED FOR ACCESS OR MAINTENANCE TO CONCEALED VALVES AND EQUIPMENT INSTALLED UNDER THIS SECTION. PROVIDE CONCEALED HINGES, SCREWDRIVER—TYPE LOCK, ANCHOR STRAPS; MANUFACTURED BY MILCOR, ZURN, TITUS, OR EQUAL. OBTAIN ARCHITECT'S APPROVAL OF TYPE, SIZE, LOCATION AND COLOR BEFORE ORDERING. 15A 1-19 PENETRATIONS SEAL MECHANICAL FLOOR, EXTERIOR WALL AND ROOF PENETRATIONS WATERTIGHT AND WEATHERTIGHT. SEAL AROUND MECHANICAL PENETRATIONS WITH 3M CP-25 FIRE BARRIER CAULK (THICKNESS AS REQUIRED AND RECOMMENDED BY MANUFACTURER) TO MAINTAIN FIRE RESISTANCE RATING OF FIRE—RATED ASSEMBLIES. PROVIDE PREFABRICATED ROOF CURBS MANUFACTURED BY CUSTOM CURB, INC., PATE COMPANY, THYCURB OR APPROVED EQUAL. PROVIDE ROOF CURB WITH FACTORY INSTALLED WOOD NAILER; WELDED, 18 GAUGE GALVANIZED STEEL SHELL, BASE PLATE AND FLASHING; 1-1/2" THICK, 3 POUND RIGID INSULATION; FULLY MITERED 3—INCH RAISED CANT; COVER OF WEATHER—RESISTANT, WEATHER—PROOF MATERIAL AND PIPE COLLAR OF WEATHER—RESISTANT MATERIAL WITH STAINLESS STEEL PIPE CLAMPS. 15A 1-20 AIR FILTERS PROVIDE FARR 30/30 PLEATED, THROWAWAY TYPE FILTERS, UNLESS OTHERWISE INDICATED. AIR UNITS SHALL HAVE NEW FILTERS INSTALLED WHEN THEY ARE OPERATED BEFORE FINAL ACCEPTANCE. PROVIDE EXTRA SET OF FILTERS AND INSTALL IN UNITS JUST BEFORE TURNING OVER BUILDING TO OWNER. FILTERS SHALL BE MANUFACTURED BY AMERICAN AIR FILTER, FARR, FLANDERS, OR APPROVED EQUAL. IF HVAC EQUIPMENT IS USED DURING THE CONSTRUCTION PERIOD, CONTRACTOR SHALL PROVIDE ONE SET OF FILTERS WHEN THE UNIT IS STARTED AND REPLACE FILTERS WHEN NEEDED, BUT NOT LESS THAN EVERY MONTH. ON THE DAY OF SUBSTANTIAL COMPLETION, THE CONTRACTOR SHALL CLEAN THE UNIT AND PROVIDE A NEW SET OF FILTERS IN THE UNIT. 15A 1-21 MOTORS AND STARTERS PROVIDE MOTORS AND STARTING EQUIPMENT WHERE NOT FURNISHED WITH THE EQUIPMENT PACKAGE. MOTORS SHALL HAVE COPPER WINDINGS, CLASS B INSULATION, AND STANDARD SQUIRREL CAGE WITH STARTING TORQUE CHARACTERISTICS SUITABLE FOR THE EQUIPMENT SERVED. MOTORS FOR AIR HANDLING EQUIPMENT SHALL BE SELECTED FOR QUIET OPERATION. EACH MOTOR SHALL BE CHECKED FOR PROPER ROTATION AFTER ELECTRICAL CONNECTION HAS BEEN COMPLETED. PROVIDE DRIPPROOF ENCLOSURE FOR LOCATIONS PROTECTED FROM WEATHER AND NOT IN AIR STREAM OF FAN; AND TOTALLY ENCLOSED FAN COOLED ENCLOSURE FOR MOTORS EXPOSED TO WEATHER. MOTORS SHALL BE MANUFACTURED BY CENTURY, GENERAL ELECTRIC, WESTINGHOUSE, LOUIS ALLIS, OR APPROVED EQUAL. PROVIDE EVERY MOTOR, EXCEPT FRACTIONAL HORSEPOWER SINGLE PHASE MOTORS WITH AN APPROVED TYPE OF "BUILT—IN" THERMAL OVERLOAD PROTECTION, WITH A MOTOR STARTER. EACH STARTER SHALL BE PROVIDED WITH OVERLOAD HEATERS SIZED TO THE MOTOR RATING, AND EVERY THREE PHASE MOTOR STARTER SHALL HAVE OVERLOAD HEATERS IN EACH PHASE. AMBIENT COMPENSATED HEATERS SHALL BE INSTALLED WHEREVER NECESSARY. UNLESS NOTED OTHERWISE, MOTOR STARTERS SHALL BE FURNISHED BY THE DIVISION 15 CONTRACTOR FOR INSTALLATION AND CONNECTION BY THE DIVISION 16 CONTRACTOR. STARTERS SHALL BE ALLEN—BRADLEY, CLARK, FURNAS, SQUARE D, OR APPROVED EQUAL. 15A 1-22 ELECTRICAL WIRING LINE VOLTAGE WIRING SHALL BE FURNISHED BY DIVISION 16. LINE VOLTAGE CONTROL AND INTERLOCK WIRING FOR MECHANICAL SYSTEMS SHALL ALSO BE FURNISHED BY DIVISION 16 CONTRACTOR. LOW VOLTAGE CONTROL WIRING SHALL BE BY THE DIVISION 15 CONTRACTOR. PROVIDE WIRING DIAGRAMS TO THE DIVISION 16 CONTRACTOR AS REQUIRED FOR PROPER EQUIPMENT HOOKUP. COORDINATE WITH THE DIVISION 16 CONTRACTOR THE ACTUAL WIRE SIZING AMPS FOR MECHANICAL EQUIPMENT (FROM THE EQUIPMENT NAMEPLATE) TO ENSURE PROPER INSTALLATION. 15A 1-23 FINAL TESTING AND ADJUSTMENTS FINAL SYSTEM TESTING, BALANCING AND ADJUSTMENTS SHALL BE PERFORMED BY A CONTRACTOR CERTIFIED BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB), ASSOCIATED AIR BALANCE COUNCIL (AABC) OR OTHER APPROVED AGENCY. PERFORM TEST READINGS ON FANS, UNITS, COILS, ETC. AND ADJUST EQUIPMENT TO DELIVER SPECIFIED AMOUNTS OF AIR. PREPARE TESTING AND BALANCING REPORT LOG SHOWING AIR SUPPLY QUANTITIES, AIR ENTERING AND LEAVING TEMPERATURES AND PRESSURES, FAN AND UNIT TEST READINGS, ETC., AND SUBMIT SIX COPIES OF THE FINAL COMPILATION OF DATA TO THE ARCHITECT FOR EVALUATION AND APPROVAL BEFORE FINAL INSPECTION OF THE PROJECT. BALANCE AIR SYSTEMS TO WITHIN PLUS OR MINUS 10 PERCENT FOR TERMINAL DEVICES AND BRANCH LINES AND PLUS OR MINUS 5 PERCENT FOR MAIN DUCTS AND AIR HANDLING EQUIPMENT OF THE AMOUNT OF AIR SHOWN ON THE DRAWINGS. FURTHER ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN SPACES. ADJUST EQUIPMENT TO OPERATE AS INTENDED BY THE SPECIFICATION. ALIGN BEARINGS AND REPLACE BEARINGS THAT HAVE DIRT OR FOREIGN MATERIAL IN THEM WITH NEW BEARINGS WITHOUT ADDITIONAL COST TO THE OWNER. BALANCE CONTRACTOR SHALL INCLUDE IN THE REPORT ANY IMPROPERLY INSTALLED OR MISSING BALANCING DEVICES THAT WOULD NEGATIVELY IMPACT THE SYSTEM OPERATION. ADJUST THERMOSTATS AND CONTROL DEVICES TO OPERATE AS INTENDED. ADJUST BURNERS, PUMPS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY TO ARCHITECT THAT ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. FURTHER ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN SPACES. CALIBRATE, SET, AND ADJUST AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF INTERLOCK SYSTEMS, AND OPERATION OF SAFETY CONTROLS. 15A 1-24 EQUIPMENT FURNISHED BY OTHERS PROVIDE NECESSARY EQUIPMENT AND ACCESSORIES THAT ARE NOT PROVIDED BY THE EQUIPMENT SUPPLIER OR OWNER TO COMPLETE INSTALLATION OF COOKING EQUIPMENT, WASHING EQUIPMENT, ETC., FURNISHED BY OTHERS, IN LOCATIONS AS INDICATED ON THE DRAWINGS AND/OR DESCRIBED IN THE GENERAL NOTES TO THIS CONTRACTOR. EQUIPMENT AND ACCESSORIES NOT PROVIDED BY THE EQUIPMENT SUPPLIER MAY INCLUDE FLUES, VENTS, INTAKES, ASSOCIATED ROOF JACKS AND CAPS TO OUTDOORS, DAMPERS, IN—LINE FANS, ROOF FANS, CONTROL INTERLOCKS, ETC. AS REQUIRED FOR PROPER OPERATION OF THE COMPLETE SYSTEM IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECT ROUGH—IN DIMENSIONS, AND SHALL VERIFY SAME WITH ARCHITECT AND/OR EQUIPMENT SUPPLIER PRIOR TO SERVICE INSTALLATIONS. 15A 1-25 MISCELLANEOUS REMODELING WORK PROVIDE ITEMS OF HVAC SYSTEMS MODIFICATION REQUIRED BECAUSE OF BUILDING REMODELING, AS NOTED ON THE DRAWINGS OR NECESSARY FOR PROPER OPERATION. MATCH EXISTING MATERIALS AND CONSTRUCTION TECHNIQUES WHEN MODIFYING EXISTING SYSTEMS UNLESS SPECIFIED OTHERWISE. COORDINATE ADDITIONAL REQUIREMENTS WITH GENERAL CONTRACTOR AND ARCHITECT. 15A 1-26 BUILDING OPERATION COMPLY WITH THE SCHEDULE OF OPERATIONS AS OUTLINED IN THE ARCHITECTURAL PORTIONS OF THIS SPECIFICATION. BUILDING SHALL BE IN CONTINUOUS OPERATION. ACCOMPLISH WORK REQUIRING INTERRUPTION OF BUILDING OPERATION AT A TIME WHEN THE BUILDING IS NOT IN OPERATION, AND ONLY WITH WRITTEN APPROVAL OF BUILDING OWNER AND/OR TENANT. COORDINATE INTERRUPTION OF BUILDING OPERATION WITH THE OWNER AND/OR TENANT A MINIMUM OF SEVEN DAYS IN ADVANCE OF WORK. 15A 2 INSULATION AND SHEET METAL WORK 15A 2-1 DUCT INSULATION PROVIDE DUCT LINER IN RECTANGULAR SUPPLY AND RETURN AIR DUCTWORK. LINER SHALL BE 1" THICK, 3 POUND DENSITY FIBERGLASS, CERTAINTEED CORP. "TOUGHGARD" OR OWENS—CORNING "AEROFLEX DUCT LINER. LINER SURFACE SHALL SERVE AS A BARRIER AGAINST INFILTRATION OF DUST AND DIRT, SHALL MEET ASTM C 1338 FOR FUNGI RESISTANCE AND SHALL BE CLEANABLE USING DUCT CLEANING METHODS AND EQUIPMENT OUTLINED BY NORTH AMERICAN INSULATION MANUFACTURERS ASSOCIATION (NAIMA) DUCT CLEANING GUIDE. INSTALL WITH MASTIC AND MECHANICAL FASTENERS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. DUCTWORK SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. INCREASE SHEET METAL BY LINER THICKNESS IN BOTH DIRECTIONS WHERE LINER IS INSTALLED. COVER CONCEALED RIGID ROUND SUPPLY, RETURN, OUTSIDE AIR DUCTWORK AND RECTANGULAR OUTSIDE AIR DUCTWORK AND MAKEUP AIR DUCTWORK WITH 1-1/2" THICK DUCT WRAP, CERTAINTEED OR EQUAL OWENS—CORNING, 3/4 POUND DENSITY, WITH HEAVY—DUTY FOIL—SCRIM— KRAFT FACING, AND WITH JOINTS TAPED WITH 3" WIDE FOIL TAPE. INSULATING MATERIALS, ADHESIVES, COATINGS, ETC., SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATING OF 50 PER ASTM E 84. CONTAINERS FOR MASTICS AND ADHESIVES SHALL HAVE U.L. LABEL. FOR DUCTWORK THAT IS LOCATED EXTERIOR TO THE BUILDING, PROVIDE 2" THICK FIBROUS BOARD INSULATION AND PROVIDE MINIMUM 16 GAUGE ALUMINUM JACKET. 15A 2-2 DUCTWORK PROVIDE GALVANIZED STEEL DUCTWORK AND HOUSINGS AS SHOWN ON DRAWINGS. DUCTWORK SHALL BE IN CONFORMANCE WITH CURRENT SMACNA STANDARDS RELATIVE TO GAUGE, BRACING, JOINTS, ETC. MINIMUM THICKNESS OF DUCT SHALL BE 26 GAUGE SHEET METAL. REINFORCE HOUSINGS AND DUCTWORK OVER 30" WITH 1-1/4" ANGLES NOT LESS THAN 5'-6" ON CENTERS, AND CLOSER IF REQUIRED FOR SUFFICIENT RIGIDITY TO PREVENT VIBRATION. SUPPORT HORIZONTAL RUNS OF DUCT FROM STRAP IRON HANGERS ON CENTERS NOT TO EXCEED 8 DO NOT SUPPORT CEILING GRID, CONDUITS, PIPES, EQUIPMENT, ETC. FROM DUCTWORK. CONSTRUCT SUPPLY DUCTS TO MEET SMACNA POSITIVE PRESSURE OF 3" W.G. CONSTRUCT RETURN, OUTDOOR AND EXHAUST DUCTWORK UPSTREAM OF FANS TO MEET SMACNA NEGATIVE PRESSURE OF 2"W.G. CONSTRUCT EXHAUST DUCTWORK DOWNSTREAM OF FANS TO MEET SMACNA POSITIVE PRESSURE OF 2" W.G. EXPOSED DUCTWORK TO BE FIELD PAINTED SHALL HAVE GALVANIZED METAL PRIMER APPLIED IN THE SHOP AFTER FABRICATION AND PRIOR TO SHIPPING. SEAL DUCTWORK WITH HEAVY LIQUID SEALANT, HARDCAST IRONGRIP OR APPROVED EQUAL, APPLIED ACCORDING TO SEALANT MANUFACTURER'S INSTRUCTIONS. FOR DUCTS WITH PRESSURE CLASSIFICATION OF 2" W.G. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT TO MEET SMACNA CLASS B. FOR DUCTS WITH PRESSURE CLASSIFICATION LESS THAN 2" W.G. SEAL TRANSVERSE JOINTS AIRTIGHT TO MEET SMACNA CLASS C. DUCTWORK ABOVE ROOF OR OTHERWISE EXTERIOR TO BUILDING SHALL BE MINIMUM #18 GAUGE WITH LONGITUDINAL AND TRANSVERSE JOINTS SEALED AIRTIGHT WITH WEATHERPROOF HEAVY LIQUID SEALANT APPLIED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. PROVIDE AIRFOIL TYPE TURNING VANES, OF SAME GAUGE AS DUCTWORK, RIGIDLY FASTENED WITH GUIDE STRIPS IN DUCTWORK HAVING AN OFFSET OF 45 DEGREES OR MORE. CONNECT FANS, BLOWERS, UNITS, ETC. TO DUCTWORK WITH NEOPRENE COATED GLASS CLOTH CANVAS CONNECTIONS, DURO—DYNE, ELGEN, VENTFABRIC OR EQUAL. CANVAS CONNECTIONS SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE DEVELOPED RATING NOT HIGHER THAN 50. INSTALL WITH MINIMUM 1-1/2" SLACK. PROVIDE BALANCING DAMPERS WHERE SHOWN ON DRAWINGS AND WHEREVER NECESSARY FOR COMPLETE CONTROL OF AIR FLOW. SPLITTER DAMPERS SHALL BE CONTROLLED BY LOCKING QUADRANTS; PROVIDE YOUNG REGULATOR OR VENTLOK END BEARINGS FOR THE DAMPER ROD. VOLUME DAMPERS SHALL BE OPPOSED BLADE INTERLOCKING TYPE, FACTORY MADE BY RUSKIN, APC, AIR BALANCE, OR APPROVED EQUAL. OUTSIDE AIR DAMPERS SHALL BE RUSKIN MODEL CD- 50, GREENHECK, AIR BALANCE, OR APPROVED EQUAL. PROVIDE FLEXMASTER MODEL STO OR EQUAL 45 DEGREE RECTANGULAR/ROUND SIDE TAKEOFF FITTING WITH MODEL SLBO DOUBLE BEARING DAMPER WITH INSULATION BUILD OUT FOR ROUND DUCTWORK BRANCH TAKEOFFS TO INDIVIDUAL AIR DEVICES. WHERE ACCESS TO DAMPERS THROUGH A HARD CEILING IS REQUIRED, PROVIDE TITUS MODEL D-100 SLIDING BLADE DAMPER OR APPROVED EQUAL. DAMPER SHALL BE ADJUSTABLE THROUGH THE DIFFUSER FACE WITH A STANDARD 1/4" NUTDRIVER OR FLAT SCREWDRIVER. DAMPER SHALL BE MOUNTED DIRECTLY ON THE NECK OF THE DIFFUSER FOR AIR BALANCING. ROUND OR OVAL DUCTWORK SHALL BE SEMCO, UNITED, WESCO OR EQUAL, SHEETMETAL, WITH SMOOTH INTERIOR SURFACE, WITH LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) ROUND DUCTWORK GAUGES PER THE FOLLOWING TABLE (REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS FOR GAUGES WHEN PRESSURES EXCEED 2" W.G.): SIZE GAUGE 14" & UNDER 26 15" THRU 26" 24 28" THRU 36" 22 38" THRU 50" 20 52" THRU 60" 18 LINDAB SPIROSAFE, LEWIS & LAMBERT OR APPROVED EQUAL FACTORY— MANUFACTURED ROUND DUCTWORK AND FITTINGS MAY BE SUBSTITUTED FOR SPECIFIED ROUND BRANCH DUCTWORK, AT CONTRACTORS OPTION. HEAVY LIQUID JOINT SEALANT MAY BE OMITTED ON FACTORY— MANUFACTURED ROUND DUCTWORK. LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) FITTINGS 24" IN DIAMETER AND LESS SHALL BE PREFABRICATED, SPOTWELDED AND INTERNALLY SEALED. CONTINUOUSLY WELD FITTINGS LARGER THAN 24" IN DIAMETER. FITTING GAUGE SHALL BE 22 GAUGE FOR 36" FITTINGS AND UNDER, 20 GAUGE FOR LARGER SIZES. 90 DEGREE TEE'S SHALL BE CONICAL TYPE. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT WITH HEAVY LIQUID SEALANT APPLIED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. PROVIDE GAUGE THICKNESS IN MEDIUM PRESSURE (DUCT PRESSURE CLASS 3" TO 6" MC.) DUCTWORK AS RECOMMENDED BY SMACNA. 15A 2-3 FLEXIBLE DUCT LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) AND MEDIUM PRESSURE (DUCT PRESSURE CLASS 2.1" TO 6" W.G.) FLEXIBLE DUCT SHALL BE FLEXMASTER TYPE 8, THERMAFLEX TYPE G—KM, OR EQUAL (FIRE RETARDANT POLYETHYLENE) PROTECTIVE VAPOR BARRIER, U.L.181 CLASS 1, ACOUSTICAL INSULATED DUCT, 1-1/2" (R-4.2) FIBERGLASS INSULATION. PROVIDE CPE LINER WITH STEEL WIRE HELIX MECHANICALLY LOCKED OR PERMANENTLY BONDED TO THE LINER. FLEXIBLE DUCT RUNS SHALL NOT EXCEED 5 FEET IN LENGTH, AND SHALL BE INSTALLED STRAIGHT AS POSSIBLE AVOIDING TIGHT TURNS. CONNECT EACH END WITH STAINLESS STEEL SCREW OPERATED METAL DRAWBANDS. 15A 2-4 FLUES WHERE FLUES ARE INDICATED ON THE DRAWINGS, PROVIDE SELKIRK METALBESTOS MODEL QC OR RV OR EQUAL BY METAL—FAB, SIMPSON OR VAN—PACKER, TYPE "B" DOUBLE WALL GAS VENT FLUES FROM THE VARIOUS ITEMS OF GAS—FIRED EQUIPMENT UP TO FLUE CAPS ABOVE THE ROOF. SINGLE WALL FLUES ARE UNACCEPTABLE. FLUES SHALL BE COMPLETE WITH NECESSARY FITTINGS, CONNECTORS, FLASHING CONE, STORM COLLAR, THIMBLE SUPPORTS, GUY WIRES, AND OTHER ACCESSORIES, AND SHALL BE INSTALLED AS RECOMMENDED BY THE MANUFACTURER, AND IN CONFORMANCE WITH APPLICABLE CODES. FLASH FLUES WATERTIGHT AT THE ROOF LINE. 15A 2-5 AIf DEVICES PROVIDE AIR DEVICES AS SCHEDULED ON DRAWINGS, MANUFACTURED BY CARNES, E.H. PRICE, KRUEGER, NAILOR INDUSTRIES, TITUS, OR TUTTLE & BAILEY. SELECT AIR DEVICES TO LIMIT ROOM NOISE LEVEL TO NO HIGHER THAN NC-30 UNLESS OTHERWISE SHOWN. PROVIDE DEVICES WITH A SOFT PLASTIC GASKET TO MAKE AN AIRTIGHT SEAL AGAINST THE MOUNTING SURFACE. COORDINATE FINAL LOCATION, FRAME, AND MOUNTING TYPE OF AIR DEVICES WITH ARCHITECTURAL REFLECTED CEILING PLANS. SUBMIT COMPLETE SHOP DRAWINGS INCLUDING INFORMATION ON NOISE LEVEL, PRESSURE DROP, THROW, CFM FOR EACH AIR DEVICE, STYLES, BORDERS, ETC. CLEARLY MARKED WITH SPECIFIED EQUIPMENT NUMBER. SUBMIT SAMPLES OF EACH AIR DEVICE AS REQUESTED BY THE ENGINEER. PROVIDE WALL SUPPLY AIR REGISTERS WITH DOUBLE DEFLECTION BLADES AND OPPOSED BLADE DAMPERS. PROVIDE CEILING SUPPLY AIR REGISTERS OF ALUMINUM CURVED BLADE TYPE WITH BLADES PARALLEL TO LONG DIMENSION AND WITH THROW PATTERN AS INDICATED ON DRAWINGS. PROVIDE WALL MOUNTED RETURN AIR GRILLES AND EXHAUST AIR REGISTERS WITH HORIZONTAL 45 DEGREE ANGLE VISION—PROOF BARS. PROVIDE CONCEALED FASTENERS FOR WALL MOUNTED REGISTERS AND GRILLES. PROVIDE FLOOR SUPPLY AIR REGISTERS OF ALUMINUM HEAVY DUTY TYPE WITH 0 DEGREE DEFLECTION. PROVIDE OPPOSED BLADE DAMPERS FOR SUPPLY AIR REGISTERS AND EXHAUST AIR REGISTERS UNLESS INDICATED OTHERWISE. PROVIDE LINEAR SLOT DIFFUSERS OF STANDARD ONE—PIECE LENGTHS UP TO 6—FEET AND FURNISH IN MULTIPLE SECTIONS GREATER THAN 6—FEET. JOIN MULTIPLE SECTIONS TOGETHER END—TO—END WITH ALIGNMENT PINS TO FORM A CONTINUOUS SLOT APPEARANCE. PROVIDE ALIGNMENT COMPONENTS BY THE MANUFACTURER. PROVIDE PLENUMS BY THE SLOT DIFFUSER MANUFACTURER. PLENUMS SHALL BE INTERNALLY INSULATED, BY THE MANUFACTURER, WITH MINIMUM 1/4" THICK, CLOSED—CELL INSULATION. INSULATION SHALL NOT BE MADE OF FIBROUS MATERIAL. 15A 2-6 LOUVERS. PLENUMS. SCREENS PROVIDE INTAKE AND EXHAUST AIR LOUVERS BY RUSKIN MODEL ELF375X OR EQUAL GREENHECK, AMERICAN WARMING & VENTILATING, CESCO, INDUSTRIAL LOUVERS OR LOUVERS & DAMPERS AS NOTED ON THE DRAWINGS. COORDINATE EXACT SIZE AND LOCATION WITH ARCHITECTURAL DRAWINGS. LOUVERS SHALL BE STATIONARY, WITH MILL FINISH. LOUVERS SHALL HAVE EXTRUDED ALUMINUM BLADES, 0.080" WALL THICKNESS, 45 DEGREE BLADE ANGLE, BLADES ON 5" CENTERS; FRAME SHALL BE EXTRUDED ALUMINUM, 0.080" WALL THICKNESS; WITH EXPANDED FLATTENED ALUMINUM BIRDSCREEN. PROVIDE LOUVERS WITH A MINIMUM FREE AREA OF 50%, WITH A MAXIMUM AIR PRESSURE DROP OF 0.1" AT SCHEDULED AIRFLOW. CONSTRUCT PLENUMS WITH GALVANIZED STEEL FRAMING MEMBERS AND GALVANIZED SHEETMETAL, BRACED WITH GALVANIZED ANGLES. GAUGES AND BRACING SHALL CONFORM TO SMACNA RECOMMENDATIONS FOR DUCTWORK OF LIKE SIZES. WHERE ACCESS DOORS ARE SHOWN, PROVIDE HINGED DOORS WITH #202 VENTLOK LATCH. MAKE WATERTIGHT CONNECTIONS TO LOUVERS, SLOPING BOTTOM OF PLENUM TO DRAIN WATER TO WEEPHOLES IN BOTTOM OF LOUVER. PROVIDE BIRDSCREENS AND/OR INSECT SCREENS ON LOUVERS, DUCTS, HOODS, FANS, AND OPENINGS TO THE OUTDOORS AS SCHEDULED AND/OR NOTED ON THE DRAWINGS. BIRDSCREENS SHALL BE 3/4" ALUMINUM MESH. INSECT SCREENS SHALL BE ALUMINUM MESH. 15A 2-7 EXHAUST AIR SYSTEMS PROVIDE ROOF MOUNTED EXHAUST FANS AS SCHEDULED ON THE DRAWINGS, OR EQUAL COOK OR GREENHECK COMPLETE WITH ALUMINUM HOUSING, ALUMINUM CENTRIFUGAL WHEEL, MOTOR WITH INTEGRAL THERMAL OVERLOAD PROTECTION, DISCONNECT SWITCH MOUNTED INSIDE THE HOUSING, BIRDSCREEN, BACKDRAFT DAMPER, AND PATE PREFABRICATED ROOF CURB. THREE PHASE FANS SHALL BE FURNISHED WITH MAGNETIC STARTERS WITH PUSH BUTTON STATION. PROVIDE ROOF MOUNTED UPBLAST EXHAUST FANS AS SCHEDULED ON THE DRAWINGS, OR EQUAL COOK OR GREENHECK. COMPLETE WITH ALUMINUM HOUSING, ALUMINUM CENTRIFUGAL WHEEL, MOTOR WITH INTEGRAL THERMAL OVERLOAD PROTECTION, DISCONNECT SWITCH MOUNTED INSIDE THE HOUSING, DRAIN TROUGH, BIRDSCREEN AND PATE PREFABRICATED ROOF CURB WITH MINIMUM HEIGHT OF 12 INCHES FOR ROOFS WITH NO INSULATION, 15" FOR ROOFS WITH INSULATION OR AS SCHEDULED ON THE DRAWINGS. 15A 2-8 KITCHEN EXHAUST AND MAKE—UP AIR SYSTEMS PROVIDE DUCTS CONNECTING TYPE 1 EXHAUST HOODS TO EXHAUST FANS MADE OF #16 GAUGE BLACK IRON WITH CONTINUOUSLY WELDED JOINTS AND ACCESS DOORS SPACED 10'-0" ON CENTER. ENCLOSE DUCT WITH FIRE RATED DUCT WRAP BY 3M OR THERMAL CERAMICS. PROVIDE MINIMUM TWO—HOUR RATED GREASE EXHAUST DUCT WRAP INSULATION FOR KITCHEN HOOD GREASE DUCT. INSULATION SHALL BE RATED FOR MINIMUM 2000 F AND FOR ZERO CLEARANCE TO COMBUSTIBLES AND FACED WITH FOIL SCRIM. INSULATION SHALL BE TESTED FOR THIS USE IN ACCORDANCE WITH ALL APPLICABLE CODES AND SHALL BE APPROVED BY THE LOCAL CODE OFFICIAL. PROVIDE ACCESS DOORS BY SAME MANUFACTURER AS FABRICATED FOR USE SPECIFICALLY WITH THE INSULATION SYSTEM. WHERE FIRE RATED DUCT WRAP NOT ALLOWED BY LOCAL CODES, ENCLOSE DUCT IN FIREPROOF ENCLOSURE PER LOCALLY ADOPTED MECHANICAL CODE. SLOPE DUCT BACK TOWARDS HOOD AT MINIMUM OF 1/4" PER LINEAL FOOT. AT CONTRACTOR'S OPTION, A UL LISTED CONCENTRIC DUCTWORK PACKAGE MAY BE USED IN LIEU OF THE WELDED BLACK IRON DUCT FOR CONNECTING HOOD TO EXHAUST FAN, DUO—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—DRIVE CENTRIFUGAL FAN SECTION, DIRECT FIRED NATURAL GAS HEATER WITH 100 PERCENT SAFETY SHUTOFF CONTROLS, DISCHARGE THERMOSTAT, MOTORIZED INLET DAMPER FACTORY WIRED TO OPEN WHEN SUPPLY FAN STARTS, FILTER SECTION WITH 2" THICK THROWAWAY FILTERS, FACTORY WIRED CONTROL CENTER WITH DISCONNECT SWITCHES, MAGNETIC STARTERS, CONTROLS, ETC., MOUNTED IN AN ENCLOSURE, ALUMINIZED STEEL HOUSING WITH BAKED ENAMEL FINISH, AND VIBRATION ISOLATORS. PROVIDE A REMOTE CONTROL PANEL WITH PILOT LIGHTS AND SWITCHES FOR FAN AND LIGHTS. COORDINATE CONTROLS WITH HOOD AND EXHAUST FAN SUPPLIER. FLUSH MOUNT REMOTE PANEL IN WALL BELOW HOOD. DISHWASHER EXHAUST DUCTWORK BELOW CEILING SHALL BE 18 GAUGE STAINLESS STEEL WITH FLANGED AND WELDED SEAMS AND JOINTS. LOCATE JOINTS AND SEAMS ON TOP OR SIDE OF DUCT. PITCH DUCT TOWARD THE DISHWASHER. DISHWASHER EXHAUST DUCT SYSTEMS WILL BE IN ACCORDANCE WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS," 1995 EDITION, FIGURE 2-18. EXHAUST DUCTWORK ABOVE CEILING SHALL BE ALUMINUM WITH LONGITUDINAL SEAMS AND LAPS ARRANGED ON TOP OF DUCT. SEAL JOINTS WITH SILICONE SEALANT TO PROVIDE WATERTIGHT JOINT. ALUMINUM SHEETS SHALL BE ASTM B 209, ALLOY 3003, TEMPER H14, SHEET FORM; WITH STANDARD MILL FINISH FOR CONCEALED DUCTS. FOOD SERVICE EQUIPMENT CONTRACTOR SHALL PROVIDE FIRE EXTINGUISHING SYSTEM FOR EACH HOOD AS SCHEDULED ON DRAWINGS COMPLETE WITH HOOD NOZZLES, WET CHEMICAL CYLINDERS, PIPING, ETC. AND ACCESSORIES TO PROVIDE AN APPROVED, OPERATING SYSTEM. PROVIDE MANUAL PULL STATION(S) AT LOCATIONS SHOWN ON THE DRAWINGS. SYSTEM SHALL BE IN FULL CONFORMANCE WITH NFPA-96. FOOD SERVICE EQUIPMENT CONTRACTOR SHALL FURNISH, PLUMBING CONTRACTOR SHALL INSTALL MECHANICAL OR ELECTRICAL GAS SHUTOFF VALVE TO SHUTOFF FUEL OR POWER SOURCE TO COOKING EQUIPMENT UPON DETECTION OF FIRE. VALVE SHALL HAVE A CLEARLY MARKED OPEN/CLOSED INDICATOR. 15A 3 HVAC EQUIPMENT 15A 3-1 ROOFTOP UNITS (GAS FIRED HEAT) PROVIDE ELECTRIC COOLING, GAS HEATING ROOFTOP UNITS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY TRANE, CARRIER OR LENNOX, COMPLETE WITH FACTORY INSTALLED DIRECT—DRIVE HERMETIC COMPRESSORS WITH INTERNAL SPRING VIBRATION ISOLATION, BUILT—IN MOTOR THERMAL OVERLOAD PROTECTION, CRANKCASE HEATER, AND LOW PRESSURE SWITCHES; DIRECT EXPANSION COOLING AND CONDENSING COILS, 9.7 MINIMUM EER RATING (COOLING); CENTRIFUGAL EVAPORATOR BLOWER; AIR FILTER RACK WITH 2" THICK THROWAWAY FILTERS, PROPELLER TYPE CONDENSER FAN; ALUMINIZED STEEL HEAT EXCHANGER, 81 PERCENT MINIMUM AFUE RATING (HEATING), FORCED COMBUSTION AIR BLOWER; COMPLETE FACTORY INSTALLED MICRO—PROCESSOR CONTROLS INCLUDING ANTI—SHORT CYCLE TIMERS, TIME DELAY RELAYS AND MINIMUM "ON" TIME CONTROLS, 100 PERCENT SAFETY GAS SHUTOFF, DIRECT SPARK IGNITION SYSTEM; BUILT—IN THERMAL OVERLOAD PROTECTION ON MOTORS AND COMPRESSORS; AND 100 PERCENT OUTDOOR AIR ENTHALPY ECONOMIZER WITH BAROMETRIC RELIEF DAMPER; WEATHERTIGHT HOUSING CONSTRUCTED OF ZINC COATED, HEAVY GAUGE, GALVANIZED STEEL WITH WEATHER—RESISTANT BAKED ENAMEL FINISH; SINGLE POINT ELECTRICAL POWER CONNECTION. PROVIDE GUARDS OR LOUVERED PANELS TO PROTECT THE CONDENSER COIL FROM HAIL OR OTHER DAMAGE. PROVIDE A 125 VAC, 20 AMP DUPLEX CONVENIENCE RECEPTACLE MOUNTED TO UNIT READY FOR FIELD WIRING WITH A COVER UL LISTED FOR WET AND DAMP LOCATIONS WHEN IN USE. PROVIDE HONEYWELL OR EQUAL ELECTRONIC PROGRAMMABLE TYPE THERMOSTAT, SEVEN—DAY MODEL, MANUAL CHANGEOVER, SWITCHING SUBBASE, MULTI—STAGE AS REQUIRED TO MATCH UNIT COOLING/HEATING STAGING. DIVISION 16 CONTRACTOR SHALL PROVIDE A FUSED DISCONNECT SWITCH AND UL LISTED DUCT TYPE SMOKE DETECTOR IN RETURN AIR DUCTWORK AS REQUIRED BY CODE TO SHUT DOWN ROOFTOP UNIT UPON DETECTION OF SMOKE. PROVIDE UNIT COMPLETE WITH MANUFACTURER'S ONE YEAR GUARANTEE ON COMPONENTS PLUS AN ADDITIONAL FOUR YEAR GUARANTEE ON THE COMPRESSORS AND HEAT EXCHANGERS. 15A 3-2 ELECTRIC UNIT HEATERS PROVIDE ELECTRIC UNIT HEATERS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY TRANE, INDEECO, MARKEL, BRASCH OR BERKO, STANDARD TYPE PROPELLER UNIT HEATERS WITH SIDEWALL MOUNTING BRACKETS AND HARDWARE FOR HORIZONTAL AIRFLOW. FURNISH HEATER FAN MOTORS COMPLETE WITH A MANUAL MOTOR STARTER WITH AUTOMATIC THERMAL CUTOUTS SIZED TO THE MOTOR LOAD, DISCONNECT SWITCH, AND OTHER CODE REQUIRED SAFETY DEVICES. PROVIDE UNIT MOUNTED THERMOSTAT AND MANUAL SUMMER/WINTER CHANGEOVER SWITCH. 15A 3-3 ELECTRIC DUCT HEATERS PROVIDE INSULATED DUCT HEATERS OF THE VOLTAGE, SIZE, WATTAGE AND NUMBER OF STAGES AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY INDEECO, BRASCH, BESCO OR CHROMOLOX. HEATERS SHALL BE UL APPROVED FOR ZERO CLEARANCE OF THE HEATERS AND THEIR INSTALLATION SHALL MEET APPLICABLE REQUIREMENTS OF THE LATEST EDITION OF THE NATIONAL ELECTRIC CODE. HEATING ELEMENTS SHALL BE OPEN COIL TYPE, 80 PERCENT NICKEL 20 PERCENT CHROMIUM WITH ADEQUATE SPACERS AND SUPPORTING BRACKETS. COIL TERMINALS SHALL BE STAINLESS STEEL, ENCASED IN A GALVANIZED STEEL BOX. WHERE COILS ARE MOUNTED SIDE BY SIDE, TERMINAL BOXES SHALL BE LOCATED ON THE BOTTOM OF THE COIL. HEATERS RATED OVER 150 KW SHALL BE FURNISHED WITH HEAVY DUTY COILS, DERATED TO 35 WATTS PER SQUARE INCH OF WIRE SURFACE. PROVIDE DUCT HEATER CONTROLS TO INCLUDE A FACTORY WIRED NON— FUSED DISCONNECT SWITCH AND INTERNAL BRANCH CIRCUIT FUSE PROTECTION AS REQUIRED BY UL AND THE NEC WHENEVER THE TOTAL HEATER DRAW IS 48 AMPS OR GREATER (48 AMPS PER STEP MAXIMUM). ON HEATERS LESS THAN 48 AMPS, INCLUDE A FACTORY WIRED FUSED DISCONNECT SWITCH. INCLUDE MANUAL AND AUTOMATIC OVERHEAT PROTECTION, PRESSURE TYPE AIRFLOW SWITCHES AND SAFETY CONTACTORS. OPERATING CONTACTORS, WHERE REQUIRED FOR ON/OFF OR STEP CONTROL OPERATION, SHALL BE MAGNETIC TYPE. AUTOMATIC RESET OVERHEAT PROTECTION CUTOUTS SHALL UTILIZE LINEAR SENSING ELEMENTS FOR COILS OVER 72 INCHES WIDE. OPERATING CONTROLS AND CIRCUITS SHALL BE COMPATIBLE WITH THE TYPE OF TEMPERATURE CONTROLS SPECIFIED. DUCT HEATER MANUFACTURER SHALL RECEIVE AND MOUNT TEMPERATURE CONTROL DEVICES, SAFETIES, ETC., IN A FACTORY WIRED AND HINGED COVERED TERMINAL BOX. THREE PHASE COILS SHALL HAVE THE LOAD EQUALLY BALANCED BETWEEN PHASES FOR STEPS OF CONTROL. PROVIDE WALL MOUNTED THERMOSTAT. WHERE HEATERS ARE INSTALLED IN DUCTWORK HAVING INTERNAL INSULATION (LINING), THE COIL OPEN FACE AREA SHALL BE REDUCED 1" IN HEIGHT AND WIDTH TO MATCH THE DUCT FREE AREA. FIELD INSTALL BAFFLE PLATE, AIR STRAIGHTENERS OR VANES AT DUCT HEATERS, IF REQUIRED TO ASSURE EVEN AIRFLOW ACROSS THE COIL. 15A 3-4 ELECTRIC CEILING HEATER PROVIDE ELECTRIC CEILING HEATER AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY Q—MARK. FURNISH HEATER FAN MOTORS COMPLETE WITH RECCESED MOUNTING KIT, TRIM KIT FOR HARD CEILING INSTALLATION, MANUAL MOTOR STARTER WITH AUTOMATIC THERMAL CUTOUTS SIZED TO THE MOTOR LOAD, DISCONNECT SWITCH, AND OTHER CODE REQUIRED SAFETY DEVICES. PROVIDE UNIT WITH REMOTE THERMOSTAT AND MANUAL SUMMER/WINTER CHANGEOVER SWITCH. 15A 4 TEMPERATURE CONTROLS 15A 4-1 GENERAL REQUIREMENTS THE HVAC EQUIPMENT SUPPLIER SHALL INCLUDE WITH HIS EQUIPMENT PACKAGE A SYSTEM OF TEMPERATURE CONTROLS INCLUDING THERMOSTATS, TEMPERATURE SENSORS, CONTROL PANELS, TIME SWITCHES, OVERRIDE TIMERS, DAMPER MOTORS, AND RELAYS REQUIRED TO PROVIDE THE DESIRED SEQUENCE OF OPERATION. PROVIDE INTEGRATED WIRING DIAGRAMS SHOWING INTERCONNECTIONS BETWEEN FIELD INSTALLED EQUIPMENT AND PACKAGE WIRING FURNISHED WITH THE HVAC EQUIPMENT. EQUIPMENT SUPPLIER SHALL PROVIDE SUPERVISION AND ON—JOB CHECKOUT SERVICE AS REQUIRED TO ASSURE THAT INSTALLATION MEETS REQUIREMENTS OF THE SPECIFICATION. THE SYSTEM SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING THE ACCEPTANCE OF THE SYSTEM BY THE ARCHITECT/ENGINEER. CORRECT DEFECTS OCCURRING DURING THIS PERIOD AT NO ADDITIONAL COST TO THE OWNER. 15A 4-2 EQUIPMENT MANUFACTURERS AND MODEL NUMBERS ARE LISTED FOR REFERENCE AS TO QUALITY AND FEATURES REQUIRED FOR THE CONTROL DEVICES. PROVIDE CONTROL DEVICES BY BARBER—COLMAN, HONEYWELL, JOHNSON CONTROLS, TRANE OR WHITE RODGERS WITH QUALITY AND FEATURES AS INDICATED. INSTALL THERMOSTATS AT 48" AFF TO MEET ADA REQUIREMENTS UNLESS OTHERWISE NOTED ON THE PLANS. INSTALL TEMPERATURE SENSORS AT 60" AFF UNLESS OTHERWISE NOTED ON PLANS. PROVIDE DUCT TYPE SMOKE DETECTORS WITH UL LISTING (OR HEAT DETECTORS, IF PERMITTED BY CODE) FOR EACH UNIT TO SHUT DOWN SUPPLY FAN UPON ACTIVATION. 15A 5 SEQUENCE OF OPERATION 15A5-1 ROOFTOP UNIT CONTROL DURING OCCUPIED HOURS, OPERATE ROOFTOP UNIT SUPPLY FAN CONTINUOUSLY AND OPEN OUTSIDE AIR DAMPER TO MINIMUM POSITION TO MAINTAIN MINIMUM VENTILATION. CYCLE STAGE(S) OF COOLING AND HEATING TO MAINTAIN ROOM THERMOSTAT SETPOINT (7 5 DEGREES FAHRENHEIT ADJUSTABLE). MODULATE ENTHALPY TYPE OUTDOOR AIR ECONOMIZER TO MAINTAIN 55 DEGREES FAHRENHEIT SUPPLY AIR TEMPERATURE WHEN OUTDOOR TEMPERATURE IS BELOW 60 DEGREES FAHRENHEIT (ADJUSTABLE) OR WHEN OUTDOOR ENTHALPY IS BELOW 22 BTU/LB OF DRY AIR (ADJUSTABLE). RETURN ECONOMIZER TO MINIMUM POSITION WHEN OUTDOOR TEMPERATURE IS ABOVE 60 DEGREES FAHRENHEIT OR WHEN OUTDOOR ENTHALPY EXCEEDS 225 BTU/LB. RETURN AIR DUCT MOUNTED SMOKE DETECTOR SHALL SHUTDOWN UNIT UPON ALARM. ROOFTOP UNIT FAN, COOLING AND HEATING SYSTEM, SHALL CYCLE WITH OUTSIDE AIR DAMPER CLOSED DURING UNOCCUPIED HOURS TO MAINTAIN SETBACK TEMPERATURES OF 80 DEGREES F SUMMER AND 65 DEGREES F WINTER (ADJUSTABLE). 15A5-2 MAKEUP AIR UNIT CONTROL MAU-1 UNIT SUPPLY AIR FAN SHALL BE ENERGIZED AND MOTORIZED OUTSIDE AIR DAMPER SHALL OPEN WHEN EF-1 IS ENERGIZED. UNIT SUPPLY AIR FAN SHALL BE DE—ENERGIZED AND MOTORIZED DAMPER SHALL CLOSE BY THE KITCHEN EXHAUST HOOD FIRE EXTINGUISHING SYSTEM OR BY SUPPLY AIR DUCT MOUNTED SMOKE DETECTOR. 15A5-3 KITCHEN EXHAUST HOOD FAN CONTROL EF-1 AND MAU-1 SHALL BE ENERGIZED BY KITCHEN EXHAUST HOOD CONTROL PANEL, WITH FAN SWITCH PROVIDED BY EXHAUST HOOD SUPPLIER. MAU-1, RTU-2, AND RTU-3 SHALL BE INTERLOCKED TO BE ON, WITH OUTDOOR AIR DAMPER OPEN, WHEN HOOD EXHAUST FAN (EF-1) IS ON. 15A5-4 PIZZA OVEN EXHAUST HOOD FAN CONTROL EF-2 SHALL BE INTERLOCKED WITH PIZZA OVEN AND SHALL BE TURNED "ON" AND "OFF" WITH PIZZA OVEN OPERATION. 15A5-5 DISHWASHER EXHAUST HOOD FAN CONTROL EF-3 SHALL BE INTERLOCKED WITH DISHWASHER AND SHALL BE TURNED "ON" AND "OFF" WITH DISHWASHER OPERATION. 15A5-6 PUBLIC RESTROOM EXHAUST FAN CONTROL EF-4 SHALL OPERATE CONTINUOUSLY DURING OCCUPIED HOURS AND SHUT DOWN DURING UNOCCUPIED HOURS. PROVIDE A 7—DAY TIMESWITCH TO SWITCH EACH SYSTEM BETWEEN OCCUPIED AND UNOCCUPIED OPERATION. 15A5-6 SERVICE YARD EXHAUST FAN CONTROL EF-5 SHALL BE CONTROLLED BY A THERMOSTAT LOCATED IN THE SPACE. THE FAN SHALL BE ENERGIZED AT 857. THE MOTORIZED DAMPER AT THE INTAKE LOUVER SHALL BE OPENED WHEN THE FAN IS STARTED. IEWED F017 CODE COMPLIANCE \ APPROVED JUN 5 20131 City Of Tukwii? RECEIVED CITY OF TUKWILA MAY 0 3 2007 PERMITGENTER M HENDERSON i ENGINEERS INCORPORATED 832$ LENEXA DRIVE, SLATE 400 LENEXA, KANSAS 6621 4 - 1 695 PH 91 3.307.5300 PX 913.307.5400 WWW.FIENIDERSONENSINEERS.COM 055000 1 1 4 architecture + interiors SCHEER TANAKA DENNEHY RILEY ARCHITECTS 3190—K Airport Loop Drive Costa Mesa, California 92626 (714) 444-1960 (714) 444-3160 Fax design@sfdr.nef FIELD VERIFICATION Contractor shall verify all figured dimensions and conditions at the job site and notify SIDR Architects, Inc. of any dimensional errors, omissions or discrepancies before beginning or fabricating any work. Do not scale these drawings. COPYRIGHT These drawings are the property and copyright of Scheer Tanaka Dennehy Riley Architects, Inc. and shall not be used on any other work except by agreement with Scheer Tanaka Dennehy Riley Architects, Inc.. 0 STDR ARCHITECTS, INC. 1 2-20-07 5-01-07 HEALTH SUBMITTAL AGENCY SUBMITTAL REVISIONS Drawing Title HVAC SPECIFICATIONS Job No. 06298 Scale NO SCALE Drawn JNJ Date Sheet No. M5.0 te 3 10 5 10 2 �I KP21 1C 12 KP2 N— 2 "G DN T WATER HEATERS 398 CFH v 4 11 t MDP 8 4 "G UP FROM GAS METER 5' 0" tr 0 WP /GFCI NEMA 3R 100/3/90 LP1 6 (PART) I - - ■ ■ 1 �• I I RD — I 4"VTR 12— MDP 3 — —11. 350 CFH SAL a AIM Ter (TYPICAL) N 3"G—\ 4 "G— — -- 1 f 2 -1/2 "G DN TO KITCHEN EQUIPMENT 1137 CFH 4 MDP LP1 9 6 (PART 201 CFH (RTU) 4 111_ _• - AMWAY 7"0 WATER HEATER FLUES. TERMINATE 24" MINIMUM ABOVE ROOF SURFACE WITH FLUE CAP. COORDINATE WITH LOCAL CODE REQUIREMENTS REMOTE ICE MACHINE - OMPRESSORS 6114 El 6 —13 MD 2 "G -Fr — 2 -1 /2 "G -— • NEMA 3R 30 /3 /NF '7 HINGE --- 7 O R1 10 KP2 2 "G - - -- MDP 5 NEMA 3R 100/3/70 12 0 HINGE no COLD ZONE UNIT MDP 4 10 LP1 6 (PART) RTU 1 150 CFH NEMA 3R 60/3/60 m f O • • M DP 2 "G— C RTU\ 2 200 CFH Et MEP ROOF PLAN SCALE: 1 /4 " =1' -0" —1 -1 /2 "G 1 - 1/2 "G DN TO PATIO HEATERS 250 CFH • ELECTRICAL GENERAL NOTES: 1. READ THE SPECIFICATIONS AND REVIEW DRAWINGS OF ALL DIVISIONS OF WORK. COORDINATE THIS WORK WITH ALL OTHER DIVISIONS OF WORK AND ALL SUBCONTRACTORS. PROVIDE ALL SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. 2. MAKE ALL FINAL CONNECTIONS AS REQUIRED FOR A FULLY COMPLETE AND OPERABLE SYSTEM. VERIFY THE TYPE OF FINAL CONNECTION AND PROVIDE APPROPRIATE WIRING METHOD. 3. FIELD VERIFY EXACT LOCATION AND ELECTRICAL REQUIREMENTS OF ALL HVAC AND PLUMBING EQUIPMENT WITH OTHER TRADE CONTRACTORS PRIOR TO ORDERING RELATED ELECTRICAL EQUIPMENT. 4. REFER TO KITCHEN DRAWINGS FOR ADDITIONAL INFORMATION. ELECTRICAL PLAN NOTES: El u 4 n 0 8 9 10 m 14 PROVIDE CONDUIT AND CONDUCTORS AS SHOWN THROUGH CONTROL PANEL FOR HOOD SYSTEM. SEE SHEET E1.1. PHOTOCELL FOR CONTROL OF EXTERIOR LIGHTING AND SIGNAGE. MOUNT TO ROOFTOP UNIT PER MANUFACTURER'S RECOMMENDATIONS. REFER TO SHEET E1.0 FOR TIMESWITCH /CONTACTOR LOCATION. INTERLOCK FAN OPERATION WITH DISHWASHER. INTERLOCK FAN OPERATION WITH PIZZA OVEN. REFER TO DETAIL 3, SHEET E3.0. CONTROL FAN BY TIME SWITCH. REFER TO PLAN NOTE #6, SHEET E1.1. REMOTE ICE MACHINE COMPRESSOR. COORDINATE EXACT LOCATION WITH ARCHITECTURAL AND KITCHEN EQUIPMENT DRAWINGS. PROVIDE CONDUIT AND CONTROL WIRING THROUGH ICE MAKER AND INTERCONNECT PER MANUFACTURER'S REQUIREMENTS. REFER TO SHEET E1.1 AND KITCHEN EQUIPMENT DRAWINGS FOR LOCATION OF ICE MAKER. VERIFY EXACT LOCATION OF COLD ZONE UNIT WITH KITCHEN EQUIPMENT CONSULTANT. REFER TO SHEET E1.1. FOR INTERCONNECTION REQUIREMENTS WITH COOLER AND FREEZER EVAPORATOR COILS. COORDINATE ALL REQUIREMENTS WITH KITCHEN EQUIPMENT DRAWINGS. PROVIDE DUCT MOUNTED SMOKE DETECTOR IN DUCTS AS INDICATED AND INTERCONNECT WITH CONTROL WIRING TO SHUT —DOWN UNIT UPON DETECTION OF SMOKE. PROVIDE REMOTE INDICATING LIGHT AND REMOTE TEST STATION MOUNTED TO CEILING BENEATH DUCT DETECTOR. INTERCONNECT DEVICES WITH FIRE ALARM CONTROL PANEL. SATELLITE DISH. ROUTE 3/4" CONDUIT FROM BELOW UP THROUGH ROOF INSIDE RIGID STRUCTURAL SATELLITE CONDUIT. REFER TO ARCHITECTURAL DETAILS FOR SATELLITE MOUNTING INFORMATION. PROVIDE FINAL POWER CONNECTION TO FACTORY MOUNTED DISCONNECT SWITCH. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION. PENETRATE ELECTRICAL CONDUITS THROUGH ROOF DIRECTLY BENEATH DISCONNECT SWITCH. COORDINATE ROOF PENETRATIONS AND DISCONNECT SWITCH LOCATIONS PRIOR TO INSTALLING EQUIPMENT. REFER TO DETAIL ON SHEET F6.1 FOR CONDUIT PENETRATION THROUGH UNIT CURB. REFER TO ARCHITECTURAL ROOF PLAN. 13 PENETRATE ELECTRICAL CONDUIT THROUGH ROOF ON HINGE SIDE OF FAN LEAVING ENOUGH SLACK IN ELECTRICAL CONDUIT 50 THAT FAN CAN OPEN FREELY ON ITS HINGE. COORDINATE ROOF PENETRATION AND DISCONNECT SWITCH LOCATION PRIOR TO INSTALLATION. REFER TO DETAIL 12, SHEET A3.2 FOR CONDUIT PENETRATION THROUGH UNIT CURB. REVIEW FOR CODE COMPLIANCE APPROVE JUN - 5 2001 City Of Tukwi9.a BUILD IN5g r vir , F 7 ftv RECEIVED CITY OFTl1KWILP► MAY 03 Z001 PERMSTCENTER Tr ip HENDERSON JENGINEERS INCORPORATED 8325 LENEXA DRIVE, SUITE 400 LENEXA, KANSAS 6621 4 -1 69 5 PH 913.3 07.5300 FX 913.307.5400 WWW.HENDER5❑NENGINEERS.00M 0650001614 architecture + interiors SCHEER TANAKA DENNEHY RILEY ARCHITECTS 3190 —K Airport Loop Drive Costa Mesa, California 92626 (714) 444 -1960 (714) 444 -3160 Fax design@stdr.net FIELD VERIFICATION Contractor shall verify all figured dimensions and conditions at the job site and notify STDR Architects, Inc. of any dimensional errors, omissions or discrepancies before beginning or fabricating any work. Do not scale these drawings. COPYRIGHT These drawings are the property and copyright of Scheer Tanaka Dennehy Rey Architects, Inc. and shall not be used on any other work except by agreement with Scheer Tanaka Dennehy Riley Architects, Inc.. © STDR ARCHITECTS, INC. 1 2 -20 -07 5 -01 -07 HEALTH SUBMITTAL AGENCY SUBMITTAL REVISIONS Drawing Title MEP ROOF PLAN Job No. 06298 Scale 1/4"-1 Sheet No. MEP1.0 Drawn HEI Date