Loading...
HomeMy WebLinkAboutPermit M07-204 - WESTFIELD SOUTHCENTER MALL - METROPARKMETROPARK 657 SOUTHCENTER MALL M07 -204 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: DESCRIPTION OF WORK: MECHANICAL FOR TI Value of Mechanical: $10,000.00 Type of Fire Protection: Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial doc: IMC-10 /06 Cityf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 6364200010 657 SOUTHCENTER MALL TUKW METROPARK 657 SOUTHCENTER MALL , TUKVVILA WA WEA SOUTHCENTER LLC 11601 WIISHIRE BLVD , LOS ANGF.I,FS CA Contact Person: Name: MARTHA MARTIN Address: 1327 POST AV, SUITE H , TORRANCE CA Contractor: Name: MERIT MECHANICAL INC. Address: PO BOX 2109 , REDMOND, WA Contractor License No: MERITMI163CM MECHANICAL PERMIT EOUIPMENT TYPE AND OUANTITY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *continued on next page ** Permit Number: M07 -204 Issue Date: 03/19/2008 Permit Expires On: 09/15/2008 Phone: Phone: 310 -328 -6300 X 104 Phone: 425 883 -9224 Expiration Date: 06/01/2009 Fees Collected: $269.58 International Mechanical Code Edition: 2006 Boiler Compressor: 0-3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15-30 HP /1,000,000 BTU.. 0 30 -50 HP/1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 12 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 M07 -204 Printed: 03 -19 -2008 Permit Center Authorized Signature: I hereby certify that I have read and e governing this work will be complied Signature: Print Name: doc: IMC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us ith The granting of this permit does not presume to • 've authority to violate or cancel the provisions of any other state or local laws regulatinc constructiop.er perfxxnance of work. I am � ed to sign and obtain this mechanical permit. g7i cj,51 d •€17 Permit Number: M07 -204 Issue Date: 03/19/2008 Permit Expires On: 09/15/2008 Date: 1401 1 i ed this permit and know the same to be true and correct. All provisions of law and ordinance: whether specified herein or not. Date: ,/Z This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspend& or abandoned for a period of 180 days from the last inspection. M07 -204 Printed: 03 -19 -2008 City of Tukwila Parcel No.: 6364200010 Address: 657 SOUTHCENTER MALL TUKW Suite No: Tenant: METROPARK 1: ** *BUILDING DEPARTMENT CONDITIONS * ** Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M07 -204 Status: ISSUED Applied Date: 09/26/2007 Issue Date: 03/19/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206 - 431- 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: ** *FIRE DEPARTMENT CONDITIONS * ** 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air moving equipment upon detection of smoke in the main return duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) doc: Cond -10/06 M07 -204 Printed: 03 -19 -2008 doc: Cond -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 15: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 16: Dedicated fire alarm system circuit breaker(s) shall be equipped with a mechanical lockout device. (NFPA 72 (4.4.1.4.2.1)) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 18: In areas that are not continuously occupied, automatic smoke detection shall be provided at each fire control unit(s) location to provide notification of fire at that location. (NFPA 72) 19: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 20: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 21: An electrical permit from the City of Tukwila Building Department Permit Center (206 - 431 -3670) is required for this project. 22: Fire Department lock boxes shall be provided for access to all fire alarm panels and sprinkler risers. The appropriate key(s) for access shall be placed in the lockbox. Lockbox order forms must be obtained from the Tukwila Fire Department. The lockbox should be mounted so that it is readily visible and not over 60 inches high. (City Ordinance #2051) 23: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 24: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 25: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. * *continued on next page ** M07 -204 Printed: 03 -19 -2008 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. doc: Cond -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Print Name: 7 7 7 a l c 0 2 17 Date: M07 -204 Printed: 03 -19 -2008 k H VA C Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Prints* Site Address: Tenant Name: CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 i 57 J vri.fr cm. Parr K y Air 70 ,Ls! Property Owners Name: /.4 r 4 L () C -of1 Mailing Address: if 4a (A., ,f S1,� �3rvo% 5- f Hoo Name: /11th- f7 111- A /t. -r/ A I Mailing Address: / 4-vri .n E -Mail Address: Company Name: Mailing Address: Contact Person: Company Name: Mailing Address: q ipermib tluia's changeapimmit application (7.2001) Revised u-8A5 hh O e,',' c ✓u %l ptwd r-- /4 te,,L eek 7 Contact Person: P v (/ 3 0 E -Mail Address: Page 1 Building Permit No. Mechanical Permit No. "107— eO L Public Works Permit 0. Project No. L a- CA 9oo2f • city City tFor office use oreh•I SITE LOCATION q0-3 King Co Assessor's Tax No.: 14 2 3 64 Suite Number: /2 Floor: New Tenant: isr. .. Yep ❑ No State CONTACT PERSON Day Telephone: 3 (4 - 3 2 $ 6 ? co C ( c4) T6 (rIP -13,-*-/L,c C4 y s 1 State Zip Fax Number: 3 3 633 GENERAL CONTRACTOR INFORMATION - (Meebanical Contractor information on back page) 't To i3 Company Name: Mailing Address: City Contact Person: Day Telephone: it -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** State bf7 J P 7f Af / igt4 sta Zip Zip ARCHITECT OF RECORD All plans must be wet stamped by Architect of Record Zip Day Telephone: Ord s - �?Uf E -Mail Address: Fax Number: £r60 . S - e vi 1 76o 1 City State Day Telephone: e'' / 7 4(J 2 Zip Fax Number: f (7 4 ZSl - g 4-ef ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Unit Type: (lt - Unit Type: (Ay Unit Type: tlty Boiler /Compressor: Qtv Furnace 10f )1( BT1I Air Handling Unit Iti iN1u CFM Fire Damper 1t-3 HP 11)0.1)0)) BTI I Furnace It BTIJ E. aporatur Cooler Diftiuser / I - 3 - 1 3 HP 5(1I 1 tnHI [;TI 1 Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -310 HP 1.000.000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wotxl Gas Sim a 311 -5t► HP 1.7:31osi.► [.3T11 Apphamx Vent Hoxxl and Duct Water Heater 50+ HP 1.730.(I01) Lift! Rcpair or Addition to Heat/Refrig /Cooling S, stem incinerator - Domestic F. ntcrgeticy (*venerator 1 V /A. v / ,�o 6 Crime / / Air Handling Unit IU,UIN) CFM Incinerator ••• Comm Ind _ Other Mech:uui aI Equipment MECHANICAL PER.I1'IIT INFORMATION -- 206-431-3M MECHANICAL CONTRACTOR INFORMATION Company Name: Mailing Address: Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** Valuation of Project (contractor's hid pnce): $ Scope of Work (please provide detailed information): 6 vn✓ —f Indicate type of mechanical work being installed and the quantity below: BUILDING OWNE • OR AUTHORIZED AGENT: Signature: ' / /, Pnnt Name: ►J 1 Ail • Mailing Address: IF ¶S I Date Application Accepted: ipermiu pito iicc changeapennit application (7.2004) Revved 6.8 -0S bh City state Zip /00 v C-r Ilse Restdent ial. New .. • ❑ Replacement . ❑ Commercial' New _ ❑ Replacement ❑ Fuel Type. Electric ❑ (ices.._ Other: Ti(• r 2r/) ✓M/ CC t./pn4 t_ PERMIT APPLICATION NOTES Applicable to all permits in this application Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. r\ AQ- SV1 1� - P Date Application Expires: Page 4 Date: O/ 2 1 /01 Day Telephone: i3(°" 32€ - CD-3 rq n.(2_ CA- gc) V City state Lip 1 Staff Initials: RECEIPT NO: R08 -00824 Payee: METROPARK USA, INC. SET TRANSACTIONS: Set Member Amount ACCOUNT ITEM LIST: Description City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http:/lwww.cttukwila.wa.us D07 -375 1,236.48 M07 -204 221.66 PG07 -299 186.50 TOTAL: 1,644.64 Payment Check 33612 BUILDING - NONRES MECHANICAL - NONRES PLUMBING - NONRES STATE BUILDING SURCHARGE SET RECEIPT Initials: JEM Payment Date: 03/19/2008 User ID: 1165 SET ID: 0319 SET NAME: METROPARK Total Payment: 1,644.64 TRANSACTION LIST: Type Method Description Amount TOTAL: 1,644.64 1,644.64 Account Code Current Pmts 000/322.100 1,231.98 000/322.100 221.66 000/322.100 186.50 000/386.904 4.50 TOTAL: 1,644.64 Receipt No.: R07 -02106 Payee: EXPRESS PERMITS ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us RECEIPT Parcel No.: 2623049023 Permit Number: M07 -204 Address: 633 SOUTHCENTER MALL TUKW Status: PENDING Suite No: Applied Date: 09/26/2007 Applicant: METROPARK Issue Date: Initials: WER Payment Date: 09/26/2007 04:25 PM User ID: 1655 Balance: $221.66 TRANSACTION LIST: Type Method Description Amount Payment Check 9848 47.92 Account Code Current Pmts 000/345.830 47.92 Total: $47.92 Payment Amount: $47.92 3290 09P7 9710 T: ` m 47,92 doc: Receipt-06 Printed: 09 -26 -2007 Project: di 1 Type of Inspection: L , se a , 0 Address: 6,67 Na-// Date Called: Special Instructions: Date Wanted: 7f2/ 0 p.m. . m Requester: Phone No: INSPECTION RECORD Retain a copy with permit IN ECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION IZ 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 COMMENTS: ,,',164 cop/4e , A Inspector: $58. pai ,/(23 V Approved per applicable codes. E1 Corrections required prior to approval. Date: 7 f p EINSPECTION FEE REQUIRED. Prior to inspection, fee must be t 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. 'Receipt No.: I Date: Pro : Idt F 4 Cc0te- Type of Inspection: F— (1.104 Date Called: Address: (0 Pi 1 1 Special Instructions: Date Wanted: " 7 _ 17— COQ P.m. Requester: Phone No: "1( - 2- C t 1 - s INS CTION NO. INSPECTION RECORD Retain a copy with permit CVO PERMIT NO. CITY OF TUKWILA BUILDING DIVISION K. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 OMMENTS: Flo, eivill/7 Approved per applicable codes. Corrections required prior to approval. EJ $6 EINSPECTION FEE REQUIRED. Prior to inspection, fee must be p at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: 'Date: .1i • •i�_��" �2- .ti ...:.5�`1 —:tied vT%:...._ Y.. ... PType � fac of Inspection: a A; AA/ / Address: y Date Called: Special Instructions: Date Wanted: 7 / / � / ® /a m m . Requester: Phone No: 1 1 INSPECTION RECORD Retain a copy with permit 6 INSPECTION NO PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 1E- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 D Approved per applicable codes. El Corrections required prior to approval. COMMENTS: 0 $60.0 INSPECTION FEE REQUIRED. Prior to inspection, fee must be paid a('6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: Project: . ., -Cfir Pa. of Inspection: oK e ‘11 dooP► Address: Date Called: Special Instructions: Date Wanted: 7 //11 0 7 Rm. Requester: Phone No: 7-fats ' f C_ OS ? INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION --- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Ill Approved per applicable codes. COMMENTS: �1aV t ,w•-s AAdd✓" Ss ho, i4[ - QaSStdi 4 .e,r i/ es, VI n 1 4- G/Q (-- Z 1 Inspector.' \ Date: (SA El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: / -zoo El Corrections required prior to approval. Proje Type Inspectiop Address: (2S7 SACI Date Called: Special Instructions: Date W ted: _ .Th — ) 'D — (---Y2 m. i(L)..r._)n.. Requester: Ph¢>,e Igo to � y Q p 3 7 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION K - 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. COMMENTS: �1AI— Oft -23 Corrections required prior to approval. fo iv15 /j/ e ea 7 re., r Inspector: Date rU� El $58. INSPECTION FEE REQUIRED. Prior to inspection, fee must be paid 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. (Receipt No.: 'Date: Receipt No.: R08 -01859 Payee: BOB WARD ACCOUNT ITEM LIST: Description MECHANICAL - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www. ci. tukwila. wa. us Payment Cash 58.00 TRANSACTION LIST: Type Method Descriptio Amount RECEIPT Parcel No.: 6364200010 Permit Number: M07 -204 Address: 657 SOUTHCENTER MALL TUKW Status: ISSUED Suite No: Applied Date: 09/26/2007 Applicant: METROPARK Issue Date: 03/19/2008 Initials- gm Payment Date: 05/30/2008 10:06 AM User ID: 1165 Balance: $0.00 Account Code Current Pmts 000/322.100 58.00 Total: $58.00 Payment Amount: $58.00 3022 05/30 9711 TOTAL 58.00 Project: pl e 4.„ ..0 _ Fire Alarm: Type of Insp Lion: Address: 6 Suite #: S, ( 11441 Contact Person: - Special Instructions: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fre: Permits: Oiupancy Type: INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT — 37c C - `- Poi. p - 7- fQe)y PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206 -575 -4407 roved per applicable codes. I I Corrections required prior to approval. COMMENTS: --- 0 K Word /Inspection Record Form.Doc 1/13/06 Inspector: ;date: 7 rs . .. 0 $80.00 REINSPECTION FEE REQUIRED Ef . You will receive an invoice 1 the City of Tukwila Finance Department. Call to schedule a reins ion. tY �P reinspection. Form F.P. 113 Project Info Project Address Metropark- Southcenter Mall Date 5/15/2008 633 Southcenter Pkwy -Space *1525 For Building Department Use Tukwila, WA 98188 Applicant Name: non Penn Consulting Engineer Applicant Address: 635 Westport Parkway, Ste 300. Grapevine, TX 76051 Applicant Phone: 817 - 410 - 2858 2006 Washington State Nonresidential Energy Code Compliance Forms 2006 Washington State Nonresidential Energy Code Compliance Form Project Summary PRJ -SUM REED CITY OF MAY 22 2008 PERMIT CENTER F COPY �RrXSL` '1► - -vim[' Revised July 2007 rE'i1ION NCB,! Mme 9-64( Location (floor /room no.) Occupancy Description Allowed Watts per ft •• Area in ft Allowed x Area 1st Floor Sales Area 1.50 2401.0 3601.5 1st Floor Stock room 0.50 329.0 164.5 1st Floor Toilet /Corridor 0.80 113.0 90.4 1st Floor Display • 1.50 2500.0 3750.0 •' From Table 15-1 (over) - document all exceptions on form LTG -LPA Total Allowed Watts 7606.4 v Location (floor /room no.) v Fixture Description Number of Fixtures Watts/ Fixture Watts Proposed Display A- Downlight 1 45.0 45.0 Display s- Downlight 10 70.0 700.0 Display C -Track heads - Current limiters installed 1 1920.0 1920.0 Sales D -Track heads - Current limiters installed 1 1920.0 1920.0 Sales E- Downlight 10 70.0 700.0 Sales F- Flour. Strip 4 32.0 128.0 Sales a- Flour. Track 8 45.0 360.0 Sales I- Downlight 13 42.0 546.0 Sales IEM- Downlight Emergency Exempt 42.0 Sales J- Downlight 3 50.0 150.0 Sales K-Flour. Strip 2 28.0 56.0 Stock /toilet M- Flour. Strip 4 64.0 256.0 Sales L1- Pendant 5 50.0 250.0 Sales 0-Pendant 3 100.0 300.0 Total Proposed Watts may not exceed Total Allowed Watts for Interior Total Proposed Watts 7331.0 Interior Lighting Summary LTG -INT 2006 Washington State Nonresidential Energy Code Compliance Forms 2006 Washington State Nonresidential Energy Code Compliance Form Revised July 2007 Project Info Project Address Metropark- Southcenter Mall 633 Southcenter Pkwy -Space 11525 Tukwila, WA 98188 Applicant Name: Don Penn Consulting Engineer ApplicantAddress: 635 Westport Parkway, Ste 300. Grapevine, TX 76051 Applicant Phone: 817 -410 -2858 Date 5/15/2008 For Building Department Use Project Description ❑ New Building ❑ Addition 151 Alteration 12 Plans Included Indicate controls (Sections 1513) including commissioning requirements on plans. Compliance Option O Prescriptive 0 Lighting Power Allowance 0 Systems Analysis (See Qualification Checklist (over). Indicate Prescriptive & LPA spaces dearly on plans.) Alteration Exceptions (check appropriate box - sec. 1132.3) ❑ No changes are being made to the lighting ❑ Less than 60% of the fixtures new, installed wattage not increased, & space use not changed. Maximum Allowed Lighting Wattage Provosed Lighting Wattage Notes: 1. For proposed Fixture Description, indicate fixture type, lamp type (e.g. T-8), number of lamps in the fixture, and ballast type (if included). For track lighting, list the length of the track (in feet) in addition to the fixture, lamp, and ballast information. 2. For proposed Watts /Fixture, use manufacturer's listed maximum input wattage of the fixture (not simply the lamp wattage) and other criteria as specified in Section 1530. For hard -wired ballasts only, the default table in the NREC Technical Reference Manual may also be used. For track lighting, list the greater of actual luminaire wattage or length of track multiplied by 50, or as applicable, the wattage of current limiting devices or of the transformer. 3. List all fixtures. For exempt lighting, note section and exception number, and leave Watts /Fixture blank. Use' LPA` (Wlsf) Use' LPA` (W /sf) Automotive facility 0.9 Office buildings, office/administrative areas in facilities of other use types (including but not limited to schools, hospitals, institutions, museums, banks, churches) ' ' 1.0 Convention center 1.2 Penitentiary and other Group 1 -3 Occupancies 1.0 Courthouse 1.2 Police and fire stations 1.0 Cafeterias, fast food establishment?, restaurants/bars 1.3 Post office 1.1 Dormitory 1.0 Retail retail banking, mall concourses, wholesale stores (pallet rack shelving) 1.5 Exercise center 1.0 School buildings (Group E Occupancy only), school classrooms, day care centers 1.2 Gymnasia assembly spaces 1.0 Theater, motion picture 1.2 Health care clinic 1.0 Theater, performing arts 1.6 Hospital, nursing homes, and other Group 1 -1 and 1 -2 Occupancies 1.2 Transportation • 1.0 Hotel /motel 1.0 Warehouses ', storage areas 0.5 Hotel banquet/conference /exhibition hall" 2.0 Workshops 1.4 Laboratory spaces (all spaces not classified laboratory" shall meet office and other appropriate categories) 1.8 Parking garages 0.2 Laundries 1.2 Libraries' 1.3 Plans Submitted for Common Areas Only' Manufacturing facility 1.3 Main floor building lobbies' (except mall concourses) 1.2 Museum 1.1 Common areas, corridors, toilet facilities and washrooms, elevator lobbies 0.8 Prescriptive Spaces Occupancy: Q Warehouses, storage areas or aircraft storage hangers 0 Other I Qualification Checklist Note: If occupancy type is "Other and fixture answer is checked, the number of fixtures in the space is not limited by Code. Clearly indicate these spaces on plans. If not qualified, do LPA Calculations. Lighting Fi (Section 1521) 1. Fluorescent fixtures which are non - lensed with a Check if 95% or more of fixtures comply with 1,2 or 3 and rest are ballasted. a) 1 or 2 two lamps, p b) b reflector or louvers, c) 5-60 watt T -1, T -2, T-4, T -5, T -8 lamps, and d) hard -wired elec- tronic dimming ballasts. Screw -in compact fluorescent fixtures do not qualify. 2. Metal Halide with a) reflector b) ceramic MH lamps <= 150w c) electronic ballasts 3. LED lights. Interior Lighting Summary (back) LTG -INT 2006 Washington State Nonresidential Energy Code Compliance Forms 2006 Washington State Nonresidential Energy Code Compliance Form Revised July 2007 E 15 -1 Unit Li Power Allowance (LPA Footnotes for Table 15 -1 1) In cases in which a general use and a specific use are listed, the specific use shall apply. In cases in which a use is not mentioned specifically, the Unit Power Allowance shall be determined by the building official. This determination shall be based upon the most comparable use specified in the table. See Section 1512 for exempt areas. 2) The watts per square foot may be increased, by two percent per foot of ceiling height above twenty feet, unless specifically directed otherwise by subsequent footnotes. 3) Watts per square foot of room may be increased by two percent per foot of ceiling height above twelve feet. 4) For all other spaces, such as seating and common areas, use the Unit Light Power Allowance for assembly. 5) Watts per square foot of room may be increased by two percent per foot of ceiling height above nine feet. 6) Reserved. 7) For conference rooms and offices less than 150ft with full height partitions, a Unit Lighting Power Allowance of 1.10 w /ft may be used. 8) Reserved. 9) For indoor sport tournament courts with adjacent spectator seating over 5,000, the Unit Lighting Power Allowance for the court area is 2.60 W /ft 10) Display window illumination installed within 2 feet of the window, provided that the display window is separated from the retail space by walls or at least three- quarter - height partitions (transparent or opaque). and lighting for free - standing display where the lighting moves with the display are exempt. An additional 1.5 w/ft of merchandise display luminaires are exempt provided that they comply with all three of the following: a) located on ceiling - mounted track or directly on or recessed into the ceiling itself (not on the wall). b) adjustable in both the horizontal and vertical axes (vertical axis only is acceptable for fluorescent and other fixtures with two points of track attachment). c) fitted with LED, tungsten halogen, fluorescent, or high intensity discharge lamps. This additional lighting power is allowed only if the lighting is actually installed. 11) Provided that a floor plan, indicating rack location and height, is submitted, the square footage for a warehouse may be defined, for computing the interior Unit Lighting Power Allowance, as the floor area not covered by racks plus the vertical face area (access side only) of the racks. The height allowance defined in footnote 2 applies only to the floor area not covered by racks. Tradable Locations Description Allowed Watts per ft or per If Area (ft perimeter (If) or # of items Allowed Watts x ft (or x If) Non - Tradable Locations Description Allowed Watts per ft or per If Area (ft perimeter (If) or # of items Allowed Watts x ft (or x If) Location Fixture Description Number of Fixtures Watts/ Fixture Watts Proposed Location Fixture Description Number of Fixtures Watts/ . Fixture Watts Proposed Building Grounds (luminaires > 100 Watts) ❑ Efficacy> 60 Iumens/W ❑ Controlled by motion Sensor ❑Exemption (list) Exterior Lighting Summary LTG -EXT 2006 Washington State Nonresidential Energy Code Compliance Forms Compliance Option Alteration Exceptions (check appropriate box - sec. 1132.3) 2006 Washington State Nonresidential Energy Code Compliance Form ❑ No changes are being made to the lighting Tradable Maximum Allowed Li Wattage 0 Lighting Power Allowance For Building Department Use 0 Systems Analysis Revised July 2007 Project Info Proj Addres Metrop Southcenter Mall 633 Southcenter Pkwy -Space 81525 Tukwila, WA 98188 Name: Don Penn Consulting Engineer Appl. Name 635 Westport Parkway, Ste 300. Grapevine, TX 76051 Appl. Phone 817 -410 -2858 Date 5/15/2008 Project Description ❑ New ❑ Addition ❑ Alteration ❑ Plans Induded Refer to WSEC Section 1513 for controls and commissioning requirements. ❑ 1 eae than Rf % of the fixtl tres new installed wattage not increased & space uce not changed Tradable Proposed Lighting Wattage otal Allowed Wa Use mfgr listed maximum input wattage. For fixtures with hard -wired ballasts only, the default table in the NREC Technical Reference Manual may also be used. Total Proposed Watts may not exceed Total Allowed Watts for Exterior Non - Tradable Maximum Allowed Lighting Wattage Non - Tradable Proposed Lighting Wattage Proposed Watts may not exceed Allowed Watts for Category otal rroposeo wa Tradable Surfaces (Lighting power densities for uncovered parking areas, building grounds, building entrances and exits, canopies and overhangs and outdoor sales areas may be traded.) Uncovered Parking Areas Parking lots and drives 0.15 W /ft Building Grounds Walkways less than 10 feet wide 1.0 W/linear foot Walkways 10 feet wide or greater Plaza areas Special feature areas 0.2W /ft Stairways 1.0 W/ft Building Entrances and Exits Main entries 30 W/linear foot of door width Other doors 20 W /linear foot of door width Canopies and Overhangs Canopies (free standing and attached and overhangs) 1.25 W/ft Outdoor Sales Open areas (including vehicle sales lots) 0.5 W/ft Street frontage for vehicle sales lots in addition to "open area" allowance 20 W /linear foot Non- Tradable Surfaces (Lighting power density calculations for the following applications can be used only for the specific application and cannot be traded between surfaces or with other exterior lighting. The following allowances are in addition to any otherwise Building Facades 0.2 W/ft for each illuminated wall or surface or 5.0W/linear foot for each illuminated wall or surface length Automated teller machines and night depositories 270 W per location plus 90 W per additional ATM per location Entrances and gatehouse inspection stations at guarded facilities 1.25 W/ft of uncovered area (covered areas are included in the "Canopies and Overhangs" section of "Tradable Surfaces ") Loading areas for law enforcement, fire, ambulance and other emergency service vehicles 0.5 W /ft of uncovered area (covered areas are included in the "Canopies and Overhangs" section of "Tradable Surfaces") allowance permitted in the "Tradable Surfaces" section of this table.) Material handling and associated storage 0.5 W /ft Drive -up windows at fast food restaurants 400W per drive- through Parking near 24-hour retail entrances 800 W per main entry Exterior Lighting Summary (back) LTG -EXT 2006 Washington State Nonresidential Energy Code Compliance Forms 2006 Washington State Nonresidential Energy Code Compliance Form TABLE 15-2 LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS Revised July 2007 2006 Washington State Nonresidential Energy Code Compliance Form Lighting Power Allowance Adjustments LTG -LPA 2006 Washington State Nonresidential Energy Code Compliance Forms Adjusted Lighting Power Allowances (Interior) "" From Table 15-1 based on exceptions listed in footnotes Revised July 2007 Project Address IMetropark- 9outhcenter Mall Date 5/15/2008 Use this form if you are claiming any ceiling height adjustments for your Lighting Power Allowances for in erior lighting. The Occupancy Description should agree with the "Use" listed on Code Table 15-1. Identify the appropriate Ceiling Height Limit (9 feet, 12 feet or 20 feet) on which the adjustment is based. The Adjusted LPA is calculated from this number and from the Allowed Watts per ft Carry the Adjusted LPA to the corresponding "Allowed Watts per ft location on LTG -SUM. Location (floor /room no.) Occupancy Description Mowed Watts per ft " Ceiling Height for this room Ceiling Height limit for this exception** Adjusted LPA Watts per ft2 Lighting, Motor, and Transformer Permit Plans Checklist LTG -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Address Metropark- southcenter Mall 'Date 5/15/2008 The following information is necessary to check a permit application for compliance with the lighting, motor, and transformer requirements in the 2006 Washington State Nonresidential Energy Code. Applicability (yes. no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes LIGHTING CONTROLS (Section 1513) yes 1513.1 Local control /access Schedule with type, indicate locations E2 yes 1513.2 Area controls Maximum limit per switch E3 . a. 1513.3 Daylight zone control Schedule with type and features, indicate locations . a. vertical glazing Indicate vertical glazing on plans . a. overhead glazing Indicate overhead glazing on plans yes 1513.4 Display /exhib /special Indicate separate controls E3 1513.5 Exterior shut -off Schedule with type and features, indicate location yes (a) timer w/backup Indicate location E3 . a. (b) photocell. Indicate location 1513.6 Inter. auto shut -off Indicate location .. a. 1513.6.1 (a) occup. sensors Schedule with type and locations yes .1513.6.2 (b) auto. switches Schedule with type and features (back -up, override capability); Indicate size of zone on plans . a. 1513.7 Commissioning Indicate requirements for lighting controls commissioning 1E3 EXIT SIGNS (Section 1514) I 1514 'Max. watts 'Indicate watts for each exit sign I ' LIGHTING POWER ALLOWANCE (Section 1530 -1532) yes 1531 Interior Lighting Summary Form Completed and attached. Schedule with fixture types, lamps, ballasts, watts per fixture . a. 1532 Exterior Lighting Summary Form Completed and attached. Schedule with fixture types, lamps, ballasts, watts per fixture MOTORS (Section 1511) • . a. I 1511 'Elec motor efficiency IMECH -MOT or Equipment Schedule with hp, rpm, efficiency I I TRANSFORMERS (Section 1540) yes I 1540 'Transformers 'Indicate size and efficiency IE3 I 2006 Washington State Nonresidential Energy Code Compliance Form If "no" is circled for any question, provide explanation: Lighting Motor, and Transformer Permit Plans Checklist LTG -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Lighting - General Requirements 1513 Lighting Controls: Lighting, including exempt lighting in Section 1512, shall comply with this section. Where occupancy sensors are cited, they shall have the features listed in Section 1513.6.1. Where automatic time switches are cited, they shall have the features listed in Section 1513.6.2. 1513.1 Local Control and Accessibility: Each space, enclosed by walls or ceiling- height partitions, shall be provided with lighting controls located within that space. The lighting controls, whether one or more, shall be capable of tuming off all lights within the space. The controls shall be readily accessible, at the point of entry/exit, to personnel occupying or using the space. EXCEPTIONS: The following lighting controls may be centralized in remote locations: 1. Lighting controls for spaces which must be used as a whole. 2. Automatic controls. 3. Controls requiring trained operators. 4. Controls for safety hazards and security. 1513.2 Area Controls: The maximum lighting power that may be controlled from a single switch or automatic control shall not exceed that which is provided by a 20 ampere circuit loaded to not more than 80%. A master control may be installed provided the individual switches retain their capability to function independently. Circuit breakers may not be used as the sole means of switching. EXCEPTIONS: 1. Industrial or manufacturing process areas, as may be required for production. 2. Areas less than 5% of the building footprint for footprints over 100,000 ft 1513.3 Daylight Zone Control: All daylighted zones, as defined in Chapter 2, both under overhead glazing and adjacent to vertical glazing, shall be provided with individual controls. or daylight- or occupant- sensing automatic controls, which control the lights independent of general area lighting. Contiguous daylight zones adjacent to vertical glazing are allowed to be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations (i.e. north, east, south, west). Daylight zones under overhead glazing more than 15 feet from the perimeter shall be controlled separately from daylight zones adjacent to vertical glazing. EXCEPTION: Daylight spaces enclosed by walls or ceiling height partitions and containing 2 or fewer light fixtures are not required to have a separate switch for general area lighting. 1513.4 Display, Exhibition and Specialty Lighting Controls: All display, exhibition or specialty lighting shall be controlled independently of general area lighting. 1513.5 Automatic Shut -off Controls, Exterior: Lighting for all exterior applications shall have automatic controls capable of turning off exterior lighting when sufficient daylight is available or when the lighting is not required during nighttime hours. Lighting not designated for dusk -to -dawn operation shall be controlled by either: a. A combination of a photosensor and a time switch; or b. An astronomical time switch. Lighting designated for dusk -to -dawn operation shall be controlled by an astronomical time switch or photosensor. All time switches shall be capable of retaining programming and the time setting during loss of power for a period of at least 10 hours. EXCEPTION: Lighting for covered vehicle entrances or exits from buildings or parking structures where required for safety, security, or eye adaptation. 1513.6 Automatic Shut -Off Controls, Interior. Buildings greater than 5.000 ft and all school classrooms shall be equipped with separate automatic controls to shut off the lighting during unoccupied hours. Within these buildings, all office areas less than 300 ft enclosed by walls or ceiling - height partitions, and all meeting and conference rooms, and all school classrooms, shall be equipped with occupancy sensors that comply with Section 1513.6.1. For other spaces, automatic controls may be an occupancy sensor, time switch or other device capable of automatically shutting off lighting. 2006 Washin•ton State Nonresidential Ener• Code Compliance Form illuminated in a manner requiring manual operation of the lighting. 2. Emergency lighting systems. 3. Switching for industrial or manufacturing process facilities as may be required for production. 4. Hospitals and laboratory spaces. 5. Areas in which medical or dental tasks are performed are exempt from the occupancy sensor requirement. 1513.6.1 Occupancy Sensors: Occupancy sensors shall be capable of automatically turning off all the lights in an area, no more than 30 minutes after the area has been vacated. Light fixtures controlled by occupancy sensors shall have a wall- mounted, manual switch capable of turning off lights when the space is occupied. EXCEPTION: Occupancy sensors in stairwells are allowed to have two step lighting (high -light and low - light) provided the control fails in the high -light position. 1513.6.2 Automatic Time Switches: Automatic time switches shall have a minimum 7 day clock and be capable of being set for 7 different day types per week and incorporate an automatic holiday "shut -off" feature, which tums off all loads for at least 24 hours and then resumes normally scheduled operations. Automatic time switches shall also have program back -up capabilities, which prevent the loss of program and time settings for at least 10 hours, if power is interrupted. . Automatic time switches shall incorporate an over -ride switching device which: a. is readily accessible; b. is located so that a person using the device can see the lights or the areas controlled by the switch, or so that the area being illuminated is annunciated; c. is manually operated; d. allows the lighting to remain on for no more than 2 hours when an over -ride is initiated; and e. controls an area not exceeding 5,000 ft or 5% of the building footprint for footprints over 100,000 ft whichever is greater. 1513.7 Commissioning Requirements: For lighting controls which include daylight or occupant sensing automatic controls, automatic shut -off controls, occupancy sensors, or automatic time switches, the lighting controls shall be tested to ensure that control devices, components, equipment and systems are calibrated. adjusted and operate in accordance with approved plans and specifications. Sequences of operation shall be functionally tested to ensure they operate in accordance with approved plans and specifications. A complete report of test procedures and results shall be prepared and filed with the owner. Drawing notes shall require commissioning in accordance with this paragraph. 1514 Exit Signs: Exit signs shall have an input power demand of 5 Watts or Tess per sign. Motors - General Requirements 1511 Electric Motors: All permanently wired polyphase motors of 1 hp or more, which are not part of an HVAC system, shall comply with Section 1437. EXCEPTIONS: 1. Motors that are an integral part of specialized process equipment. 2. Where the motor is integral to a listed piece of equipment for which no complying motor has been approved. Transformers - General Requirements SECTION 1540 — TRANSFORMERS The minimum efficiency of a low voltage dry-type distribution transformer shall be the Class 1 Efficiency Levels for distribution transformers specified in Table 4 -2 of the "Guide for Determining Energy Efficiency for Distribution Transformers" published by the National Electrical Manufacturers Association (NEMA TP -1- 2002). Project Info Project Address Metropark- Southcenter hall Date 5/15/2008 633 Southcenter Pkwy -Space #1525 For Building Department Use Tukwila, WA 98188 Applicant Name: Don Penn Consulting Engineer Applicant Address: 635 Westport Parkway, Ste 300. Grapevine, TX 76051 Applicant Phone: 817 -410 -2858 2006 Washington State Nonresidential Energy Code Compliance Form Project Summary PRJ -SUM 2008 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Fan Equipment Schedule Equip. ID Brand Name' Model No.' CFM SP' HP /BHP Flow Control Location of Service Location Tukwila, WA 98188 TITUS Applicant Name: Don Pena Consulting Engineer 3325 Applicant Address: 635 Westport Parkway, Ste 300. Grapevine, TX 7605] Applicant Phone: 817- 410 -2858 Project Info Project Address Metropark- Southcenter Mall Model No.' Date 5/15/2008 Total CFM 633 Southcenter Pkwy -Space *1525 SEER • or EER For Building Dept. Use Location Tukwila, WA 98188 TITUS Applicant Name: Don Pena Consulting Engineer 3325 Applicant Address: 635 Westport Parkway, Ste 300. Grapevine, TX 7605] Applicant Phone: 817- 410 -2858 Cooling Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu/h Total CFM OSA CFM or Econo? SEER • or EER IPLV Location vAv -1 TITUS ATQS -16 65914 3325 10.00 9.90 Sales Heating Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu/h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency"' 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary MECH -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. ❑ Includes Plans Include documentation requiring compliance with commissioning requirements, Section 1416. Compliance Option Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. 'If available. 2 M tested accord ng to Table 14-IA through 14-1G. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). Revised July 2007 System Description See Section 1421 for full description of Simple System qualifications. If Heating/Cooling or Cooling Only: ❑ Constant vol? ❑ Split system? ❑ Air cooled? ❑ Packaged sys? ❑ <20,000 Btuh? ❑ Economizer included? If Heating Only: g ❑ <5000 cfm? ❑ <70% outside air? Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only No 2006 Washington State Nonresidential Energy Code Compliance Form Yes — Simple System Allowed (section 1420) C Reference Section 1421 otal Ca . wo economize <240,000 Btuh r 10 %? Heating /Cooling or Cooling Only (Sect 1423 Reference Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Fan Equipment Schedule Equip. ID Brand Name Model No. CFM SP HP /BHP Flow Control 6 Location of Service Location Tukwila, WA 98188 Applicant Name: Don Penn Consulting Engineer Applicant Address: 635 Westport Parkway, Ste 300. Grapevine, TX 7605] Applicant Phone: 817- 410 -2858 • Project Info Project Address metropark- Southcenter mall • Model No. Date 5/15/2008 Total CFM. 633 Southcenter Pkwy -Space 81525 SEER or EER For Building Dept. Use Location Tukwila, WA 98188 Applicant Name: Don Penn Consulting Engineer Applicant Address: 635 Westport Parkway, Ste 300. Grapevine, TX 7605] Applicant Phone: 817- 410 -2858 Cooling Equipment Schedule Equip. ID Brand Name • Model No. Capacity2 Btu/h Total CFM. OSA CFM or Econo? SEER or EER IPLV Location • Heating Equipment Schedule Equip. ID Brand Name Model No. Capacity2 Btu/h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency' Mechanical Summary MECH -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. ❑ Indudes Plans 2006 Washington State Nonresidential Energy Code Compliance Form Include documentation requiring compliance with commissioning requirements, Section 1416. Revised July 2007 Compliance Option O Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. 1 lf available. 2 As tested accord ng to Table 14 through 14 - 1G. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). System Description See Section 1421 for full description of Simple System qualifications. If Heating/Cooling or Cooling Only: ❑ Constant vol? ❑ Split system? ❑ Air cooled? ❑ Packaged sys? ❑ <20,000 Btuh? ❑ Economizer included? If Heating Only: < � <5000 cfm? o ❑ <70 /o outside air? Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only 2006 Washington State Nonresidential Energy Code Compliance Form Simple System _ Allowed (section 1420) ( Reference Section 1421 otal Ca . wo economize <240,000 Btuh r 10 %? Heating /Cooling or Cooling Only Yes Reference Section 1423 Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Address tiretropark- Southceater Mall !Date 5/15/2008 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance .a. 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency . a. 1411.1 Combustion htg. Indicate intermittent ignition, flue/draft damper & jacket loss 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans . a. 1412.2 Deadband control Indicate 5 degree deadband minimum . a. 1412.3 Humidity control Indicate humidistat . a . 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types . a. 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage . a. 1412.4.2 Optimum Start Indicate optimum start controls ..a. 1412.5 Heat pump control Indicate microprocessor on thermostat schedule . a. 1412.6 Combustion htg. Indicate modulating or staged control yes 1412.7 Balancing Indicate balancing features on plans M1 1412.8 Ventilation Control Indicate demand control ventilation for high - occupancy areas .a. 1422 Thermostat interlock Indicate thermostat interlock on plans . a . 1423 Economizers Equipment schedule 1413 Air economizers . a. 1413.1 Air Econo Operation Indicate 100% capability on schedule . a. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb . a. 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance ye a 1413.3 Integrated operation Indicate capability for partial cooling M1 . a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary 141 yes 1414.2 Duct insulation Indicate R -value of insulation on duct M1 yes 1415.1 Piping insulation Indicate R -value of insulation on piping 141 1416 Completion Requirements yes 1416.2.1 Commissioning Provide commissioning plan 142 yes 1416.2.2 -3 Sys.BaI & Func.Test Indicate air and water system balancing & functional testing 141 yes 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training 141 yes 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report 141 . a. 1434 Separate air sys. Indicate separate systems on plans yes I Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. yes 1441 Elec. water heater Indicate R -10 insulation under tank 262 yes 1442 Shut -off controls Indicate automatic shut -off M yes 1443 Pipe Insulation Indicate R -value of insulation on piping 1H2 . a. 1452 Heat Pump COP Indicate minimum COP of 4.0 . a. 1452 Heater Efficiency Indicate pool heater efficiency 1453 Pool heater controls Indicate switch and 65 degree control . a. 1454 Pool covers Indicate vapor retardant cover . a . 1454 Pools 90+ decrees Indicate R -12 Dool cover 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist 2006 Washington State Nonresidential Energy Code Compliance Forms MECH -CHK Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14-1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1 G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. 2006 Washington State Nonresidential Energy Code Compliance Form Gas -fired and oil -fired forced air fumaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (110), and have either mechanical draft (including power venting) or a flue damper. A vent damper Is an acceptable altemative to a flue damper for fumaces where combustion air is drawn from the conditioned space. All fumaces with input ratings > 225,000 Btu /h (65 kW). including electric fumaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be fumished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not Tess than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements.where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis. heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut•Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or altemate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off -hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon Toss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. b.4.in - v6euef on,i ronnf 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and retum air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and intemal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling bad. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water-cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246- 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225.000 Btu/h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Ductwork which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches: seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W .C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope. by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with Tess than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 Mechanical Permit Plans Checklist 2006 Washington State Nonresidential Energy Code Compliance Forms MECH -CHK Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14-1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1 G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. 2006 Washington State Nonresidential Energy Code Compliance Form Gas -fired and oil -fired forced air fumaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (110), and have either mechanical draft (including power venting) or a flue damper. A vent damper Is an acceptable altemative to a flue damper for fumaces where combustion air is drawn from the conditioned space. All fumaces with input ratings > 225,000 Btu /h (65 kW). including electric fumaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be fumished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not Tess than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements.where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis. heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut•Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or altemate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off -hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon Toss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. b.4.in - v6euef on,i ronnf 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and retum air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and intemal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling bad. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water-cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246- 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225.000 Btu/h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Ductwork which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches: seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W .C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope. by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with Tess than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air UuutlW 111 MIS 1611M 5lu1 y Gllu $ VtlI ueBJW ultl IIISL 3tUIy us uum nlys three or more stones in h e 2006 Washington State Nonresidential Eh eedif or 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2. are isolated from the exterior with an automatic shut -off damper complying with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6. Exception: Piping installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAC 51 -26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for building completion and commissioning requirements.) air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum start controls shall be designed to automatically adjust the start time of an HVAC system each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include microprocessor controls that minimize supplemental heat usage during start-up, set- up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btulh shall have modulating or staged combustion control. 000 EXCEPTIONS: 1. Boilers. 2. Radiant heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. I Cooling Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu/h Total CFM OSA CFM or Econo? SEER or EER IPLV Location VAV -1 TITUS ATQS -16 65914 3325 9.90 Roof 0i + z (uofi.... V..,..... —,. c– t. --2 - -1_ I Fan Equipment Equip. ID Schedule Brand Name' � .IWNWEIN teRU ->mIA Model No.' CFM SP' 1/211•11111111• _ ' ' maw n p4. th 9cation orService + z Mechanical Summary 2004 Seattle Nonresidential Energy Code Compliance Forms 2004 Seattle Nonresidential Energy Code Compliance Form MECH -SUM Revised May 2005 Project Info Project Address MatroPark Southcentar /fall Tukwila, Nahington Applicant Name: Don Penn Consulting Engineer Applicant Address: 635 Westport Parkway, Ste 300. Grapevine, TX 7604 Applicant Phone: 817 -410 -2858 Date 9/6/2007 For Building Dept. Use Project Description Briefly describe mechanical system type and features. ❑ Includes Plans Include documentation requiring compliance with commissioning requirements, Section 1416. Compliance Option QQ Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Equip. ID Brand Name' Model No.' Capacity Btu/h Total - CFM OSA cfm or Econo? COD Input Btuh COW r F'77 Output Btuh Tr WCF Efficiency` i If available. As tested according to Table 14-1A through 14 -1G. ' If required. ` COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). Mop- • R ECEIVE SEP 2 :7 2007 PERMIT CENTL, System Description If Heating /Cooling II Constant vol? ❑ Air cooled? • Packaged sys? See Section 1421 for full description of Simple System or Cooling Only: Split system? Economizer included? ❑ <20,000 Btuh? 0 MI qualifications. If Heating Only: 0 <5000 cfm? • <70% outside air? ( START ) Heating Only 2004 Seattle Nonresidential Energy Code Compliance Form Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Simple System Allowed (section 1420) otal Ca.. wo economize <240,000 Btuh r 10 %? ( Reference Section 1421 J Heating /Cooling or Cooling Only Reference Section 142 Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. RECEIVEr SEP 27 2007 PERMIT CENTER 02 -12 -2008 MARTHA MARTIN 1327 POST AV, SUITE H TORRANCE CA 90501 RE: Permit Application No. M07 -204 657 SOUTHCENTER MALL TUKW Dear Permit Applicant: In reviewing our current permit application files, it appears that your permit application applied for on 09/26/2007 , has not been issued by the City of Tukwila Permit Center. Per the International Codes, Uniform Plumbing Code and/or the National Electrical Code, every permit application not issued within 180 days from the date of application shall expire by limitation and become null and void. Your permit application expires on 03/24/2008 . If you choose to pursue your project, a written request for extension of your application addressed to the Building Official, demonstrating justifiable cause, will need to be received at the Permit Center prior to your expiration date of 03/24/2008. If it is determined that an extension is granted, your application will be extended for an additional 90 days from the expiration date. In the event we do not receive your written request for extension, your permit application will become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: fer Marshall • Technician Permit File No. M07 -204 city of Tukwila Department of Community Development Jim Haggerton, Mayor Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M07 -204 DATE: 09 -27 -07 PROJECT NAME: METROPARK SITE ADDRESS: SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Bui d g Division Public Works ❑ Structural ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete TUESITHURS ROXJTING: Please Route Documents/routing slip.doc 2 -28-02 APPROVALS OR CORRECTIONS: l( AM (0 .VV. Fire Prevention Incomplete Structural Review Required Planning Division DUE DATE: 10 -02 -07 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ❑ No further Review Required REVIEWER'S INITIALS: DATE: DUE DATE: 10 -30 -07 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ACTIVITY NUMBER: M07 -204 DATE: 05 -22 -08 PROJECT NAME: METROPARK SITE ADDRESS: 657 SOUTHCENTER MALL Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # X Revision # 1 after Permit Issued DEPARTM NTS: B �� g 0( ision Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: � PERMIT COORD COPY � - PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Incomplete ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUT G: Please Route Structural Review Required REVIEWER'S INITIALS: Approved Notation: APPROVALS OR CORRECTIONS: REVIEWER'S INITIALS: Documents/routing stip.doc 2 -28-02 ❑ Permit Coordinator DUE DATE: 05-27-08 Not Applicable ❑ ❑ No further Review Required DATE: DUE DATE: 06-24 -08 Approved with Conditions ❑ Not Approved (attach comments) n DATE: Planning Division Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INI ALS IIIIIIMEEZ MIME t$.1 0 IIle Summary of Revision: f44 tck [xA0'CLVN/V, 144 . yt 4 Received by: i CZr (.9Jocirb REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: PROJECT NAME: r?VEIL SITE ADDRESS: - AA P(1/ REVISION LOG PERMIT NO: O ORIGINAL ISSUE DATE: 011 ivea b (please print) (please print) (please print) (please print) (please print) City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206- 431 -3665 Web site: http: //www.ci.tulwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: / / 0 E ❑ Response to Incomplete Letter # ❑ Response to Correction Letter # ❑ Revision # 1 after Permit is Issued ❑ " Revision requested by a City Building Inspector or Plans Examiner Project Name: Summary of Revision: »s dze Project Address: (o 7 Plan Check/Permit Number: A01 ' 204 Contact Person: )O? W Phone Number: 4eft 7?1 `a l) d 6-1- 17/ Sheet Number(s): / < ( 1 • Z , R • 3 "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on -Q e lapplications\forn s- applications on 6nekmvision submittal Created: 8 -13 -2004 Steven M Mullet, Mayor Steve Lancaster, Director APCMVOD CITY OF TUKW1LA MAY 2 2 2008 PERMIT CI?WTTFA Business Owner Information Name Role Effective Date Expiration Date KIRKWOOD, RODERICK V PRESIDENT 02/14/1984 Bond Amount KIRKWOOD, JOAN M SECRETARY 02/27/2006 FRICKBERG, WILLIAM MICHAEL VICE PRESIDENT 02/27/2006 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date ...,/,•■■ vt/ w vv.u..�vw.� i..w�... ... v. a ..,....vv. .I.vv..w ...•.....1 a 415 . v. Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. License Information License Licensee Name Licensee Type UBI Ind. Ins. Account Id Business Type Address 1 Address 2 City County State Zip Phone Status Specialty 1 Specialty 2 Effective Date Expiration Date Suspend Date Separation Date Parent Company Previous License Next License Associated License MERITMI163CM MERIT MECHANICAL INC CONSTRUCTION CONTRACTOR 600517946 46817500 CORPORATION PO BOX 2109 REDMOND KING WA 980732109 4258839224 ACTIVE GENERAL UNUSED 2/14/1984 6/1/2009 AUTOMMC044QH https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= MERITMI163CM 03/19/2008 I . V A, C. LEGI \ 3 SYMBOL DESCRIPTION VAV -1 DUCTWORK / al THERMOSTAT (100) DENOTES CFM QUANTITY ):( CEILING DIFFUSER 0 DUCT MOUNTED DIFFUSER CEILING RETURN REGISTER \ L_ VOLUME DAMPER <— -u- 1" UNDERCUT DOOR 5D DUCT SMOKE DETECTOR AL 1" ACOUSTICAL LINING CFM CUBIC FEET OF AIR PER MINUTE EF EXHAUST FAN NK NECK VIECI IA\ICAL i V E\ I SC If lJLI - INSTALLED BY T.G.C. MARK DESCRIPTION VAV -1 FAN POWERED VARIABLE AIR VOLUME CONTROL TITUS ATQS -16" DEVICE SET SIZE 16, 500 CFM MINIMUM AIRFLOW, SET AIRFLOW AT 3325 CFM. VAV DEVICE SET, COMPLETE WITH ELECTRONIC CONTROLS AND ZONE SENSOR (T -STAT) PROVIDED AND INSTALLED BY T.G.C. VERIFY ALL REQUIREMENTS WITH LANDLORD. COOLING OA DB COOLING IA DB HEATING OA ROOF U- FACTOR LIGHT DIVERS ** VAV MIN AIR LTS - SURFACE %LTS- SURFACE WALL AREA %ROOF TO SPACE PEOPLE SENS HEAT SENSIBLE HEAT GAIN PEOPLE VENTILATION ROOF LOAD LTS - SURFACE LTS - RECESSED MISC LOAD WALL LOAD SENSIBLE HEAT GAIN VENTILATION ROOF LOAD WALL LOAD ASHRAE DESIGN CONDITIONS 85 75 23 0.000 1.3 500 5622 83 0 0 250 COOLING LOAD SUMMARY 9477 0 0 20704 849 27304 0 TOTAL SENSIBLE 58333 TOTAL COOLING LOAD SENS/TOTAL RATIO NOMINAL CFM (15 DEG F DIFF) SUPPLY AIR TEMP TEMPERATURE DIFFERENCE 0 0 0 TOTAL SENSIBLE 0 metropark Southcenter Mall Tukwila,WA 2843 SQUARE FEET COOLING OA WB COOLING IA WB HEATING IA LTS- RECESSED %LTS- RECESSED MISC. WATTS SQ FT/PERSON NO OF PEOPLE WALL U- FACTOR PEOPLE LATENT LATENT HEAT GAIN PEOPLE VENTILATION 0% TO SPACE 83% TO SPACE 17% TO SPACE HEATING LOAD SUMMARY 65914 BTUH 88 % 3119 CFM 58 DEG F 17 DEG F TOTAL LATENT LATENT HEAT GAIN TOTAL HEATING LOAD NOMINAL KW ELEC HEAT MINIMUM KW ELEC HEAT (BASED ON 20 DEG F RISE @ VAV MIN AIR) 12:00:00 AM CNTYVAV.WKS SA TEMP AT UNIT AT SPACE ON DESIGN DAY *" SPECIAL ALLOWANCE FACTOR PER ASHRAE (TABLE 15 /CHAPTER 26) DESIGN BASED ON LANDLORD PROVIDING MORNING WARMUP. ■: 65 + 63 68 1125 + 17+ 8000 + 75 + 38 0.20 + 200 7581 0BTUH 0 KW 3 KW 0 7581 VENTILATION 0 TOTAL LATENT 0 2.4 W /SQ FT 1.10 CFM /SQ FT 23 BTUH /SQ FT 5.5 TONS - 518 SQ FT/TON MECHANICAL PLAN CODED NOTES: 0 THERMOSTAT MOUNTED AT 48" A.F.F. COORDINATE EXACT LOCATION WITH TENANT. VERIFY ANY NEW REQUIREMENTS WITH MALL MANAGEMENT. CONTRACTOR TO PROVIDE AND INSTALL EXHAUST 2 FAN. FAN SHALL BE 100 CFM. INTERLOCK WITH TOILET ROOM LIGHTING. SEE LICHT FIXTURE SCHEDULE ON SHEET M2 FOR MANUFACTURER & MODEL NUMBER. PROVIDE 10" EXH. DUCT TO EXISTING L.L. EXHAUST DUCT V.I.F. PROVIDE BACKDRAFT DAMPER. T.G.C. SHALL INSTALL VAV -1 PER LL. DIRECTION. LANDLORD NOTES: LANDLORD HAS PROVIDED A PROPRIETARY D,D.C. CONTROL SYSTEM FOR V.A.V. CONTROL- TENANT TO PROVIDE r CONDUIT AND SHIELDED CABLE FROM LANDLORD'S JUNCTION BOX TO V.A.V. BOX(ES) AND THERMOSTAT(S) -FINAL WIRING CONNECTIONS TO ALL DEVICES BY LANDLORD AT TENANT'S EXPENSE -ALL AS PER PROJECT STANDARD DETAILS. T.G.C. SHALL ENGAGE A SEPERATE TEMPERATURE CONTROL CONTRACTOR FOR FINAL SET -UP OF SYSTEM(S) OPERATIONS AND AIR BALANCING. GIVE ONE COPY OF BALANCE REPORT TO LANDLORD'S BUILDING ENGINEER. T.G.C. MUST USE LANDLORD APPROVED CONTRACTOR SET VAV BOX TO DELIVER 3,325 CFM MAX. EXIST'G. 16" Dl TAP FOR TENANTV 1 CONNECTION. It SD -1 (250) _ lAr MECHANICAL GENERAL NOTES: 1. ALL DUCTWORK, HANGERS, DAMPER CONSTRUCTION, SEAMS, INSTALLATION, ETC., SHALL CONFORM TO THE STANDARDS AS ADOPTED BY A.S.H.R.A.E. AND SMACNA. ALL WORK SHALL CONFORM TO ALL APPLICABLE LAWS, RULES AND REGULATIONS AND RECOMMENDATIONS OF LOCAL BUILDING DEPARTMENT, NATIONAL BOARD OF FIRE UNDERWRITERS, N.F.P.A., AND SHOPPING CENTER GENERAL SPECIFICATIONS. ALL DUCTWORK SHALL BE SHEETMETAL CONFORMING TO SMACNA STANDARDS FOR LOW PRESSURE DUCTWORK AND A.S.H.R.A.E. STANDARD 90 -75. 2. EXAMINATION: BIDDER, BEFORE SUBMITTING A PROPOSAL SHALL EXAMINE THE SITE, DRAWINGS AND SPECIFICATIONS, INFORM HIMSELF AS TO THE STATE AND LOCAL CODES AND LAWS HAVING JURISDICTION AND ALLOW FOR LICENSES AND FEES TO BE PAID AS DIRECTED OR REQUIRED TO COMPLETE THE WORK UNDER THE SCOPE OF THIS CONTRACT. 3. THE MECHANICAL CONTRACTOR SHOULD FURNISH, CONNECT AND INSTALL THE THERMOSTAT /CONTROL WIRING AND THE ELECTRICAL CONTRACTOR SHOULD PROVIDE, INSTALL AND CONNECT THE ELECTRIC TO THE UNITS. 4. SCHEDULE OF WORK: THIS CONTRACTOR SHALL BE REQUIRED TO FAMILIARIZE HIMSELF WITH THE PROPOSED WORK SCHEDULE AND SHALL COORDINATE HIS WORK SCHEDULE WITH THE OTHER TRADES, SO THAT WORK PROGRESSES CAN BE PLANNED IN A PROPER SYSTEMATIC FASHION TO AVOID ANY DUPLICATION OF EFFORT AND RESULTANT DELAY OF PROJECT. 5. CUTTING AND PATCHING: THIS CONTRACTOR MUST LAY OUT HIS WORK IN ADVANCE OF NEW CONSTRUCTION IN ORDER THAT UNNECESSARY CUTTING AND PATCHING WILL BE AVOIDED. OPENINGS SHALL BE REUSED AS SHOWN AND ANY MODIFICATIONS TO ROOF OPENINGS SHALL BE APPROVED BY THE LANDLORD, DONE BY THE LANDLORD'S ROOFING CONTRACTOR AND PAID FOR BY THE TENANT. 6. FLEXIBLE DUCTWORK: FOR CONNECTIONS BETWEEN RIGID DUCTWORK INSTALL FLAT METAL SPIRAL MECHANICALLY LOCKED FABRIC COMPONENTS, CAPABLE OF BEING SHAPED FOR CONNECTION TO EITHER ROUND OR OVAL BOOT CONNECTIONS. ALL CONNECTIONS SHALL BE MADE AIR TIGHT BY MEANS OF CLAMPS OR INDUSTRIAL CEMENT #330 AND WRAPPED WITH DUCT TAPE. LENGTH OF FLEXIBLE DUCT TO BE MAXIMUM OF 5'. STEEL SPIRAL TO BE ELECTROGALVANIZED FABRIC TO BE NEOPRENE COATED, WITH FABRIC CAPABLE OF MEETING N.F.P.A. 90A AND UL 181 FOR CLASS 1 CONNECTORS. MANUFACTURER: WIREMOLD AIR DUCT TYPE 57. EXISTING MAIN SUPPLY AIR TRUNK p e INSTALL 16" DIA. INSULATED MED. _ �� PRESSURE METAL SPIRAL DUCTWORK f 5 FEET LONG STRAIGHT FROM TAP TO VAV BOX. PROVIDE A 30 "X24" RETURN AIR OPENING THRU WALL AS HIGH AS POSSIBLE WITH UPSIDE DOWN LOUVER FILE C Porno No. Plar reviow approv is s Approve' of construction � not - the violation of any adopted coda or ordinance. Receipt of approved aF. C�,• are Is acknowledged: EXIST'G. MALL TOILET EXHAUST DUCT FOR TENANT CONNECTION. V.I.F. Py 7. DUCTWORK SHALL BE FABRICATED OF GALVANIZED SHEET METAL PER AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR CONDITIONING ENGINEERS' STANDARDS AS OUTLINED FOR "AIR DUCT DESIGN" IN THE LATEST EDITION OF THE "ASHRAE FUNDAMENTALS" AND AS REQUIRED BY THE CONSTRUCTION DETAILS OUTLINED IN THE APPLICABLE SMACNA STANDARDS. 8. SUPPLY DUCTWORK INSIDE BUILDING SHALL BE INSULATED WITH 1" ALUMINUM FOIL FACED FIBERGLASS BLANKET OVERLAPPED AND WIRED ON AND ALL DUCTWORK SHALL BE INSTALLED IN CONCEALED SPACE ABOVE CEILINGS. 9. PROVIDE CLEAR ACCESS TO ALL EQUIPMENT WITHIN THE LEASED SPACE. 10. CONTRACTOR SHALL PROVIDE OPERABLE H AND V SYSTEMS COMPLETE IN ALL RESPECTS AS CONTEMPLATED BY THE INFORMATION INDICATED ON THE DRAWINGS. IT 15 NOT INTENDED THAT THE DRAWINGS AND SPECIFICATIONS INDICATE EACH AND EVERY ITEM OF INFORMATION NECESSARY FOR COMPLETE SYSTEMS BUT INDICATE SUFFICIENT INFORMATION FOR THE CONTRACTOR TO SECURE ADDITIONAL INFORMATION FROM OTHER SOURCES AND PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR NECESSARY FOR COMPLETE INSTALLATIONS. 11. ALL LABOR, MATERIALS AND EQUIPMENT SHALL BE PROVIDED WITH ONE YEAR GUARANTEE FROM DEFECTS. 12. PROVIDE ARCHITECT WITH THREE (3) COPIES OF AIR BALANCE REPORT. INSTRUCT OWNER IN USE OF EQUIPMENT. AIR BALANCE REPORT TO BE AN INDEPENDENT TESTING AGENCY. AIR BALANCE TEST REPORT TO BE TAKEN IN THE LATE AFTERNOON WITH THE FOLLOWING TEMPERATURE READINGS DOCUMENTED (IN ADDITION TO CFM) 1.) TEMPERATURE OF AIR LEAVING EACH CEILING DIFFUSER, 2.) TEMPERATURE OF AIR LEAVING HVAC UNIT, 3.) TEMPERATURE OF OUTSIDE AIR AT HVAC UNIT, 4.) TEMPERATURE OF AIR WITHIN SALES AREA (AT THERMOSTAT). 13. T.G.C. TO REPLACE FILTERS PRIOR TO TURNOVER. 14 DEMOLITION: REMOVE ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PLUMBING FIXTURES, PIPING SYSTEMS, ETC...NOT BEING REUSED. DO NOT JUST ABANDON. i CO \TRACTOR \OTES: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ARCHITECT, LANDLORD OR TENANT OF ANY DISCREPANCIES ENCOUNTERED ON THE PLANS OR IN EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK. BIDDERS ARE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND SATISFY THEMSELVES AS TO THE NATURE AND SCOPE OF WORK. THE BASE BID SHALL REFLECT MODIFICATIONS TO SYSTEMS AND DEVICES AS REQUIRED BY STATE AND LOCAL CODES WHETHER INDICATED OR NOT ON CONTRACT DOCUMENTS. THE SUBMISSIONS OF A BID WILL BE EVIDENCE THAT SUCH AN EXAMINATION AND COMPLIANCE WITH GOVERNING CODES / REQUIREMENTS HAS BEEN MADE. LATER CLAIMS FOR LABOR, EQUIPMENT, OR MATERIALS REQUIRED OR FOR DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN, HAD AN EXAMINATION AND CODE REVIEW BEEN MADE, WILL NOT BE ALLOWED. PROVIDE A 24 "X24" RETURN AIR OPENING THRU WALL ABOVE CEILING AS HIGH AS POSSIBLE COVER OPENING WITH 1 "X1" WELDED WIRE SCREEN. OM= a • .■..- ■1 - .M•'1 MEM PROVIDE A 24"X24" RETURN AIR OPENING THRU WALL ABOVE CEILING AS HIGH AS POSSIBLE COVER OPENING WITH 1"X1" WELDED WIRE SCREEN. 1 11 DON PENN CONSULTING ENGINEER 635 WESTPORT PARKWAY, SUITE 300 GRAPEVINE, TEXAS 76051 817- 410 -2858 FAX 817- 251 -8411 n � 1 mac.* RECEIVED CITY OF TUKWILA MAY 2 2 2008 PERMIT CENTER REVISIONS 11.30.07 BLDG DEPT TENANT BLDG DEPT 02.11.08 LL /BID 04.25.08 FIELD ZO C DM W CIY W ral ❑@ I 9 : 0 SHEET M.1 1 OF 3 M €HEETS BY drvd drvd drvd drvd LJ cn z U 0 Q CO DO J y co N QQ DO C L 00 I— C) co m 0 rn m 0 0 c m CO (,4 CO DATE: 09.20.07 SCALE: 1/4 "=1'-o" DRAWN: T5 JOB: MP_SOCM City of Tukwila rJI DING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. . NOTE: Revisions will require a new plan c,..,n ltal may include , and � � .fie f�G��t10r8a T T.S AIR DISTRIBLTI3\ 3EVICES MARK MANUF. CATALOG # SIZE MOUNTING MATERIAL FINISH ACCESSORIES BORDER STYE EMARKS MOD. NECK SIDE WALL CEILING DUCT STEEL ALUM. DPR. EQUAL GRID FIRE DPR. SD -1 TITUS OMNI 24 "X24" 1017 • • • B • B SD -2 TITUS R —OMNI 22 "0 10 "J • • B 0 A SD -3 TITUS OMNI 12 "X12" 6 "(1) 0 • B • A SD -4 TITUS OMNI 24 "X24" 8 1 • 0 6 0 B RG -1 TITUS 355RL 24 "X24" — • • B B 1. CONTRACTOR TO VERIFY FINISHES WITH ARCHITECT. 6. PROVIDE CABLE OPERATED DAMPER FOR AIR OUTLETS IN SHEETROCK CEILINGS. 2. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. 3. ALL AIR OUTLETS SHALL BE SUITABLE FOR THE TYPE OF CEILING CONSTRUCTION USED. COORDINATE BORDER STYLES AND FRAMING. 4. INSTALL FOUR (4) WAY DIFFUSERS WITH BLANK —OFF BAFFLES FOR 2 —WAY AND 3 —WAY BLOW ARRANGEMENTS. 5. PROVIDE 24 x 24 FULL FACE LOUVER FOR TDC DIFFUSERS. ELECTRIC WATER HEATER TEMPERATURE & PRESSURE RELIEF VALVE TEMPERATURE & PRESSURE RELIEF DRAIN DISCHARGE 16 GAUGE GALVANIZED SAFETY PAN 2" WIDE MIN. DUCT STRAP 48" O.C. MAX. RIGID ROUND MET INTERNALLY INSULATED RIGID ROUND D ELBOW INTERNALLY INSULATED ALL METAL DUCT —MUST BE 26 GA. MIN. W /EXCEPTION OF STOCK ROOM VOLUME DAMPER (FOR FINAL BALANCE ADJUSTMENT) .3/4" HOT WATER WATER HEATER 3.CT MAX. WATWER TEMP. OF 110 DEG. F DLTAIL __ HOT WATER TO FIXTURES (105 DEG. F) f VACUUM BREAKER 3/4" COLD WATER SUPPLY 3 /4 "CW SHUT —OFF VALVES — TYPICAL DRAIN VALVE SAFETY MIXING VALVE APPROVED UNDER ASSE 1016 OR 1017 DRAIN — DISCHARGE TO /INTO FLOOR DRAIN IN TOILET ROOM Th SPIN —IN FITTING WITH BALANCING DAMPER AND 45 DEG. EXTRACTOR (DAMPER USED FOR ROUGH BALANCING) DIFFUSER EXPANSION TANK. CHECK VALVE UNION(TYPICAL) F TAIL SCALE: NONE SCALE: NONE INTERNALLY INSULATED SPIRAL DUCTWORK MS WCO 2" INSULATED FLEXIBLE DUCT — INSIDE DIAMETER AS NOTED ON PLANS. MAX LENGTH 5' -0" LAV (H.C.) 5 WAST SECURE FLEXIBLE DUCT TO PLENUM AND SPIN —IN FITTING WITH S.S. SCREW CLAMP WC (H.C. ,L WC 4 " r 214 1 W C (H.C_) RISES INSULATION DAMPER i SCREW CLAMP CEILING DIFFUSER DETAIL LAV H.C.) TO TRA RIMER ( 2" SCALE: NONE DUCT STRAP TYPICAL IN TWO PLACES. MIN. 2" WIDE SPIN —IN FITTING WITH DAMPER AND AIR SCOOP AIR SCOOP CEILING NOTES: *FOR LENGTHS GREATER THAN 5—O" USE EXTERNALLY INSULATED RIGID ROUND DUCT THE SAME SIZE AS THE FLEXIBLE DUCT FOR THE ADDITIONAL LENGTH. *FLEXIBLE DUCT SHALL BE UL181 APPROVED AND SHALL NOT BE KINKED OR SAGGED. *PROVIDE SPIN —IN FITTING FOR ALL ROUND FLEXIBLE DUCT CONNECT1ONS TO RECTANGULAR DUCT. SPIN —IN FITTINGS SHALL BE FACTORY FABRICATED, AND INCLUDE AN AIR EXTRACTOR SCOOP AND A BALANCING DAMPER WITH A LOCKING QUADTANT AND HANDLE. BALANCING SHALL BE AT THE SPIN—IN FITTING AND NOT AT THE AIR DISTRIBUTION DEVICE. 3" VENT TO LANDLORD'S TOILET VENT SYSTEM. SUPPLY DUCT CONNECT TO 4" SANITARY SEWER SYSTEM— V.I.F. T.G.C. SHALL PROVIDE SHUT —OFF VALVES AT ALL CONNECTIONS TO PLUMBING FIXTURES SCALE: NONE f'LU E31\C FIXT RLS WC WATER CLOSET — AMERICAN STANDARD "CADET" MODEL #2168.100 (1.6 GAL. /PA) FLOOR MOUNTED, (H.C.) ELONGATED BOWL, TANK TYPE, CHROME TRIP LEVER, WATER SAVER, VITREOUS CHINA, 17" RIM HEIGHT MEETS ADA GUIDELINES AND ANSI REQUIREMENTS FOR PEOPLE WITH DISABILITIES FURNISH WITH WHITE COLOR OLSONITE MODEL #96 OPEN FRONT SEAT WITH COVER AND CHROME SUPPLY WITH STOP. LAV LAVATORY— AMERICAN STANDARD MODEL #0124.024 WITH FAUCET (MODEL #2985.130) EQUAL BY (H.C.) KOHLER MODEL #K1729, WITH FAUCET (MODEL #K15199) EQUAL BY CRANE MODEL #3 -377 OR ELGER MODEL #051 -1 358. FCO FLOOR CLEAN OUT —ZURN #Z1400 —HD -2 (CONC. FLOOR) OR ZN 1400 -2 (TILE FLOOR). EQUALS BY J.R. SMITH OR WADE. WHA WATER HAMMER ARRESTER —SIOUX CHIEF 750 SERIES OR EQUAL BY PRECISION PLUMBING PRODUCTS, INC. FD FLOOR DRAIN —ZURN #Z415, 3" WITH NICKEL BRONZE STRAINER. (PROVIDE WITH TRAP PRIMER IF REQUIRED BY CODE OR SHOWN ON DRAWINGS). WH A.O. SMITH MODEL PV -10, 10 GALLON CAPACITY, COPPER CORE TANK, 1.5 K.W., 120V. DF SPLIT LEVEL WATER FOUNTAIN (DF) OASIS -- P8ACSL, TWO STATION WALL MOUNT WATER COOLER. WITH LEFT, RIGHT AND FRONT CONTROLS ON EACH UNIT. BRUSHED STAINLESS STEEL FINISH MS 24" x 24" FLOOR MOUNTED MOP BASIN. FLOORSTONE MODEL 85 NEO ANGLE MOP RECEPTOR WITH AMERICAN STANDARD 8340.242 FAUCET (OR EQUAL) AND HOSE AND MOP HANGER. NO PLASTIC PIPE 15 ALLOWED. WATER R MS 3 PART AL_ PL PROVIDE BACKFLOW 3 /4 "HW TO WATER HEATER PREVENTION DEVICE AS MOUNTED ABOVE MOP SINK. REF. PER LOCAL DTL #3 THIS SHEET. JURISDICTION. J v D.F. TRAP PRIMER SER DIAGRA 1/2" TO FLOOR 1 DRAIN'S 1/2 ;___ �J SLAV (H.C.) v SCALE: dp Bl\ C PLA SCALE: 1/4"= 0" 4" S.S. VERIFY EXACT LOCATION, FLOW AND M AY 2 r RECEIVED CITY OF TUKWL.A MAY 2 2 2008 PERMIT CENTER NONE DON PENN CONSULTING ENGINEER 635 WESTPORT PARKWAY, SUITE 300 GRAPEVINE, TEXAS 76051 817 -410 -2858 FAX 817 -251 -8411 REVISIONS 11.30.07 BLDG DEPT TENANT BLDG DEPT 02.11.08 LL/BID A 04.25.08 FIELD Z (NT TA O �o F . ffc BY drvd drvd drvd drvd 0) co co 0) cci u� co co X RI - E o 0 csi co o� ca DATE: 09.20.07 SCALE: 1/4" =1'-O" DRAWN: TS JOB: MP_SOCM SHEET M2 2 OF 3 M- SHEETS REVISION NOtL M07- 2-0'4 - X I A ST EA\ S MANUFACTURER MODEL NO. TYPE C.F.M. S.P. H.P. FAN MOTOR DATA ACC. REF. NOTE NOTES VOLTS PHASE R.P.M. NUTONE 8673P EF -1 100 .125 1/10 120 1 - -- ELECTRIC WATER HEATER TEMPERATURE & PRESSURE RELIEF VALVE TEMPERATURE & PRESSURE RELIEF DRAIN DISCHARGE 16 GAUGE GALVANIZED SAFETY PAN 2" WIDE MIN. DUCT STRAP 48" O.C. MAX. RIGID ROUND MET INTERNALLY INSULATED RIGID ROUND D ELBOW INTERNALLY INSULATED ALL METAL DUCT —MUST BE 26 GA. MIN. W /EXCEPTION OF STOCK ROOM VOLUME DAMPER (FOR FINAL BALANCE ADJUSTMENT) .3/4" HOT WATER WATER HEATER 3.CT MAX. WATWER TEMP. OF 110 DEG. F DLTAIL __ HOT WATER TO FIXTURES (105 DEG. F) f VACUUM BREAKER 3/4" COLD WATER SUPPLY 3 /4 "CW SHUT —OFF VALVES — TYPICAL DRAIN VALVE SAFETY MIXING VALVE APPROVED UNDER ASSE 1016 OR 1017 DRAIN — DISCHARGE TO /INTO FLOOR DRAIN IN TOILET ROOM Th SPIN —IN FITTING WITH BALANCING DAMPER AND 45 DEG. EXTRACTOR (DAMPER USED FOR ROUGH BALANCING) DIFFUSER EXPANSION TANK. CHECK VALVE UNION(TYPICAL) F TAIL SCALE: NONE SCALE: NONE INTERNALLY INSULATED SPIRAL DUCTWORK MS WCO 2" INSULATED FLEXIBLE DUCT — INSIDE DIAMETER AS NOTED ON PLANS. MAX LENGTH 5' -0" LAV (H.C.) 5 WAST SECURE FLEXIBLE DUCT TO PLENUM AND SPIN —IN FITTING WITH S.S. SCREW CLAMP WC (H.C. ,L WC 4 " r 214 1 W C (H.C_) RISES INSULATION DAMPER i SCREW CLAMP CEILING DIFFUSER DETAIL LAV H.C.) TO TRA RIMER ( 2" SCALE: NONE DUCT STRAP TYPICAL IN TWO PLACES. MIN. 2" WIDE SPIN —IN FITTING WITH DAMPER AND AIR SCOOP AIR SCOOP CEILING NOTES: *FOR LENGTHS GREATER THAN 5—O" USE EXTERNALLY INSULATED RIGID ROUND DUCT THE SAME SIZE AS THE FLEXIBLE DUCT FOR THE ADDITIONAL LENGTH. *FLEXIBLE DUCT SHALL BE UL181 APPROVED AND SHALL NOT BE KINKED OR SAGGED. *PROVIDE SPIN —IN FITTING FOR ALL ROUND FLEXIBLE DUCT CONNECT1ONS TO RECTANGULAR DUCT. SPIN —IN FITTINGS SHALL BE FACTORY FABRICATED, AND INCLUDE AN AIR EXTRACTOR SCOOP AND A BALANCING DAMPER WITH A LOCKING QUADTANT AND HANDLE. BALANCING SHALL BE AT THE SPIN—IN FITTING AND NOT AT THE AIR DISTRIBUTION DEVICE. 3" VENT TO LANDLORD'S TOILET VENT SYSTEM. SUPPLY DUCT CONNECT TO 4" SANITARY SEWER SYSTEM— V.I.F. T.G.C. SHALL PROVIDE SHUT —OFF VALVES AT ALL CONNECTIONS TO PLUMBING FIXTURES SCALE: NONE f'LU E31\C FIXT RLS WC WATER CLOSET — AMERICAN STANDARD "CADET" MODEL #2168.100 (1.6 GAL. /PA) FLOOR MOUNTED, (H.C.) ELONGATED BOWL, TANK TYPE, CHROME TRIP LEVER, WATER SAVER, VITREOUS CHINA, 17" RIM HEIGHT MEETS ADA GUIDELINES AND ANSI REQUIREMENTS FOR PEOPLE WITH DISABILITIES FURNISH WITH WHITE COLOR OLSONITE MODEL #96 OPEN FRONT SEAT WITH COVER AND CHROME SUPPLY WITH STOP. LAV LAVATORY— AMERICAN STANDARD MODEL #0124.024 WITH FAUCET (MODEL #2985.130) EQUAL BY (H.C.) KOHLER MODEL #K1729, WITH FAUCET (MODEL #K15199) EQUAL BY CRANE MODEL #3 -377 OR ELGER MODEL #051 -1 358. FCO FLOOR CLEAN OUT —ZURN #Z1400 —HD -2 (CONC. FLOOR) OR ZN 1400 -2 (TILE FLOOR). EQUALS BY J.R. SMITH OR WADE. WHA WATER HAMMER ARRESTER —SIOUX CHIEF 750 SERIES OR EQUAL BY PRECISION PLUMBING PRODUCTS, INC. FD FLOOR DRAIN —ZURN #Z415, 3" WITH NICKEL BRONZE STRAINER. (PROVIDE WITH TRAP PRIMER IF REQUIRED BY CODE OR SHOWN ON DRAWINGS). WH A.O. SMITH MODEL PV -10, 10 GALLON CAPACITY, COPPER CORE TANK, 1.5 K.W., 120V. DF SPLIT LEVEL WATER FOUNTAIN (DF) OASIS -- P8ACSL, TWO STATION WALL MOUNT WATER COOLER. WITH LEFT, RIGHT AND FRONT CONTROLS ON EACH UNIT. BRUSHED STAINLESS STEEL FINISH MS 24" x 24" FLOOR MOUNTED MOP BASIN. FLOORSTONE MODEL 85 NEO ANGLE MOP RECEPTOR WITH AMERICAN STANDARD 8340.242 FAUCET (OR EQUAL) AND HOSE AND MOP HANGER. NO PLASTIC PIPE 15 ALLOWED. WATER R MS 3 PART AL_ PL PROVIDE BACKFLOW 3 /4 "HW TO WATER HEATER PREVENTION DEVICE AS MOUNTED ABOVE MOP SINK. REF. PER LOCAL DTL #3 THIS SHEET. JURISDICTION. J v D.F. TRAP PRIMER SER DIAGRA 1/2" TO FLOOR 1 DRAIN'S 1/2 ;___ �J SLAV (H.C.) v SCALE: dp Bl\ C PLA SCALE: 1/4"= 0" 4" S.S. VERIFY EXACT LOCATION, FLOW AND M AY 2 r RECEIVED CITY OF TUKWL.A MAY 2 2 2008 PERMIT CENTER NONE DON PENN CONSULTING ENGINEER 635 WESTPORT PARKWAY, SUITE 300 GRAPEVINE, TEXAS 76051 817 -410 -2858 FAX 817 -251 -8411 REVISIONS 11.30.07 BLDG DEPT TENANT BLDG DEPT 02.11.08 LL/BID A 04.25.08 FIELD Z (NT TA O �o F . ffc BY drvd drvd drvd drvd 0) co co 0) cci u� co co X RI - E o 0 csi co o� ca DATE: 09.20.07 SCALE: 1/4" =1'-O" DRAWN: TS JOB: MP_SOCM SHEET M2 2 OF 3 M- SHEETS REVISION NOtL M07- 2-0'4 DIVISION 15 - MECHANICAL SECTION 15000 MECHANICAL GENERAL PROVISIONS A. GENERAL CONDITIONS 1, DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS ARE A PART OF THIS CONTRACT AND APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. 2. THE CONTRACTOR FOR THIS WORK IS REQUIRED TO READ THE ENTIRE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL OTHER TRADES. 3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE SUBCONTRACTORS WITH A FULL SET OF BID SET DOCUMENTS (INCLUDING SPECIFICATIONS) AND THE COORDINATION OF HIS WORK AND INSPECTIONS AND THE WORK AND INSPECTIONS OF THE SUBCONTRACTORS WITH ALL OTHER TRADES ON SITE CONFORMING TO THE GENERAL CONTRACTOR'S TIME SCHEDULE. 4. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING THE BID TO DETERMINE CONDITIONS AFFECTING THE WORK. BIDS SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF WORK_ 5. WHEN USED, THE TERM 'PROVIDED BY CONTRACTOR" SHALL BE INTERPRETED AS MEANING "FURNISHED AND INSTALLED WITH THE EXCEPTION WHERE ITEMS ARE "PROVIDED BY TDS WHICH MEANS "FURNISHED ONLY (INSTALLED BY CONTRACTOR), EXCEPT AS SPECIFICALLY NOTED OTHERWISE B. GENERAL REQUIREMENTS 1. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY 70 PROVIDE A COMPLETE AND FULLY FUNCTIONAL MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD, AS REQUIRED. FIELD VERIFY THE EXACT TYPE, SIZE AND LOCATION, ETC. OF EXISTING PIPE AND DUCTS IN THE TENANT SPACE PRIOR TO BID. 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH D11-ER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE PROVIDED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH 15 OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE PROVIDED AS PART OF CONTRACT. 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR 15 51111 RESPONSIBLE FOR PROVIDING THE SYSTEM AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 4. ALL MECHANICAL WORK SHALL BE INSTALLED 50 AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. THE CONTRACTOR 15 RESPONSIBLE FOR PROVIDING SUFFICIENT ACCESS TO ALL EQUIPMENT FOR SERVICE 5. THE CONTRACTOR SHALL DO ALL CUTTING, CORE DRIWNG, CHASING OR CUTTING SHALL HAVE PRIOR APPROVAL BY THE TENANT'S STORE PROJECT MANAGER CHANNELING AND PATCHING REQUIRED FOR ANY WORK UNDER THIS DIVISION. AND THE LANDLORD. PATCHING SHALL MATCH, FINISH OF SURROUNDING AREA. C. CODES 1, ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD ENGINEERING PRACTICES. ALL WORK SHALL CONFORM TO THE LANDLORD'S CRITERIA, THE STATES, COUNTY'S, CITYS AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPUCABLE CODES AND REQUIREMENTS. THE CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO COOE ISSUES SHALL BE REIMBURSED BY THE TENANT TO THE CONTRACTOR. D. LICENSES, PERMITS, INSPECTIONS & FEES 1. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO THIS WORK. 2. FURNISH THE TENANTS PROJECT MANAGER All CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT SUBSTANTIAL COMPLETION DATE OF PROJECT. E DRAWINGS 1, DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL DUCT AND PIPING OFFSETS, FITTINGS AND ACCESSORIES THAT MAY BE REQUIRED. 2. THE LAYOUT SHOWN ON THE DRAWINGS 15 BASED ON A PARTICULAR MAKE OF EQUIPMENT. IF ANOTHER MAKE OF EQUIPMENT 15 USED WHICH REQUIRES MODIFICATION OR CHANGE OF ANY DESCRIPTION FROM THE DRAWINGS OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE AS PART OF THIS WORK, FOR MAKING ALL SUCH MODIFICATIONS AND CHANGES, INCLUDING THOSE INVOLVING OTHER TRADES WITH THE COST THEREOF INCLUDED IN THIS BID. IN SUCH CASE, CONTRACTOR SHALL SUBMIT DRAWINGS AND SPECIFICATIONS PRIOR TO STARTING WORK SHOWING ALL SUCH MODIFICATIONS AND CHANGES. THE PROPOSAL SHALL BE SUBJECT TO THE APPROVAL OF THE TENANTS PROJECT MANAGER. F. EXISTING SHELL SPACE CONDITONS 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING MECHANCIAL WORK SHOWN ON THE MECHANCIAL DRAWINGS AND THE MECHANCIAL DEMOLITION SHOWN ON THE ARCHITECTURAL DRAWINGS. 2. THE CONTRACTOR SHALL INCLUDE, AND WILL BE HEW RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK, AND EQUIPMENT PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED UNLESS NOTED FOR REUSE OR RECONFIGURATION ON PLANS. ROOF PATCHING SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE BY A ROOFING CONTRACTOR APPROVED BY THE LANDLORD. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF (ABOVE THIS SPACE) NOT APPLICABLE TOIHENEWWO APPLICAB WORK OR PART OF THE LANDLORD'S OR ANOTHER TENANT'S ACTIVE SYSTEM MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY LANDLORD OR CODES, ABANDONED PIPING AND /OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID AND INCLUDE IN BID PROPOSAL. 3. ACTIVE LANDLORD OR OTHER TENANT SERVICES ENCOUNTERED IN WORK SHALL BE PROTECTED AND SUPPORTED. IF EXISTING SERVICES NOT ANTICIPATED REQUIRE RELOCATION, CONTACT THE DISNEY STORE PROJECT MANAGER IMMEDIATELY. ALL COSTS FOR REPAIR OF DAMAGES TO ACTIVE LANDLORD OR OTHER TENANT SERVICES DURING CONSTRUCTION SHALL BE PAID FOR BY THE CONTRACTOR CAUSING THE DAMAGE. 4. 11E -INS AND MODIFICATIONS TO EXISTING LANDLORD SERVICES MUST BE DONE WITH MINIMUM INTERRUPTION OF LANDLORD OPERATION AND DURING HOURS SPECIFIED BY THE LANDLORD. THE CONTRACTOR 15 RESPONSIBLE FOR CONFIRMING EXACT WORKING HOURS OF THIS WORK WITH THE LANDLORD PRIOR TO SUBMITTING HIS BID. THE CONTRACTOR SHALL INCLUDE IN HIS BID, ALL PREMIUM TIME REQUIRED TO PERFORM MODIFICATIONS DURING OTHER THAN NORMAL WORKING HOURS. ALL SUCH WORK MUST BE COORDINATED WITH THE LANDLORD. G. DISCREPANCIES IN DOCUMENTS 1, DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE GENERAL CONTRACTOR IN WRITING, PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR 15 RESPONSIBLE TO ADVISE THE DISNEY STORE'S PROJECT MANAGER, IN WRITING, OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR 70 SUBMISSION OF BID. OTHERWISE, THE TENANT PROJECT MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. H. TRADE NAMES AND MANUFACTURERS 1, WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM STANDARD FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL STORE'S IN WRI TING BY THE DISNEY STDR PROJECT MANAGER PRIOR TO ACCEPTANCE. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. I. SHOP DRAWINGS 1, SUBMIT TWO COPIES OF MATERIAL LISTS AND SHOP DRAWINGS FOR ALL EQUIPMENT AND DUCT FABRICATION DRAWNGS TO THE GENERAL CONTRACTOR FOR APPROVAL PRIOR TO ORDERING EQUIPMENT. SUBMISSIONS MUST BE EARLY ENOUGH TO ALLOW THE TENANTS PROJECT MANAGER EIGHT WORKING DAYS FOR REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BE IN ACCORDANCE WITH THE GENERAL CONDITIONS USING THE MANUFACTURER'S LISTED ON THE DRAWINGS. SHOP DRAWINGS SHALL INCLUDE ALL DATA THAT PERTAINS TO THE REQUIREMENTS SET FORTH ON THE DRAWINGS AND IN THE SPECIFICATIONS. THE SUBMITTAL SHALL INCLUDE BUT NOT LIMITED TO CUTS OR CATALOGS INCLUDING DESCRIPTIVE LITERATURE AND CHARACTERISTICS OF EQUIPMENT SHALL SHOW MAJOR DIMENSIONS, ROUGHING -IN DATA, CAPACITY, CURVES, PRESSURE DROP, CODE COMPLIANCE, MOTOR AND DRIVE DATA AND ELECTRICAL DATA. OBSERVE SPECIAL INSTRUCTIONS WHEN REQUIRED. SUBMITTALS SHALL BEAR THE STAMP OF THE GENERAL AND SUB- CONTRACTOR SHOWING THAT HE HAS RENEWED AND CONFIRMED THAT THEY ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS TAKE PLACE. LACK OF SUCH CONTRACTOR'S RENEW AND APPROVAL WILL BE CAUSE FOR REJECTION WITHOUT REVIEW BY THE TENANT'S PROJECT MANAGER. ALL SHOP DRAWINGS MUST APPEAR IN THE OPERATION AND MAINTENANCE MANUALS SENT TO THE HOME OFFICE OF 111E TENANT'S PROJECT MANAGER AT JOB COMPLETION. RECORD DRAWINGS 1. THE CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS AND SPECIFICATIONS ON THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS A LOCATION Cr CONCEALED PIPING VALVES AND DUCTS. B. REVISIONS, ADDENDUMS, AND CHANGE ORDERS. C. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER TRADES. D. EXACT ROUTING OF ALL SANITARY AND DOMESTIC WATER PIPING UNDER FLOOR. 2. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. THE DRAWINGS ARE TO BE SENT 70 THE HOME OFFICE OF THE DISNEY STORE'S PROJECT MANAGER. K. GUARANTEE 1. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY THE TENANT'S PROJECT MANAGER. PROVIDE EXTENDED WARRANTIES AS SPECIFIED NTH INDIVIDUAL EQUIPMENT. IN CASE OF REPLACEMENT OR REPAIR OR EQUIPMENT DUE TO FAILURE WITHIN GUARANTEE PEROID, GUARANTEE ON THAT PORTION OF WORK SHALL BE EXTENDED FOR A PEROID OF ONE (1) YEAR FROM DATE OF SUCH REPLACEMENT OR REPAIR. L OPERATIONS MANUALS 1. ONE COPY OF EACH OPERATION AND MAINTENANCE MANUAL FOR ALL EQUIPMENT FURNISHED ON JOB SHALL BE COLLECTED AND INSERTED IN A 3' THREE RING BINDER AND SENT TO THE OFFICE OF THE TENANTS PROJECT MANAGER. EACH NOTEBOOK SHALL INCLUDE BUT NOT BE LIMITED TO INSTALLATION, MAINTENANCE AND OPERATING INSTRUCTIONS, PAMPHLETS OR BROCHURES APPROVED SHOP DRAWINGS AND WARRANTIES OBTAINED FROM EACH MANUFACTURER OF PRINCIPAL ITEMS OF EQUIPMENT. M. SLEEVES 1. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH ITS RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2" ABOVE THE FLOOR_ 2 ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND /OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SUCONE ° RTV" FOAM, "3M' FIRE RATED SEALANTS OR EQUAL, 5O AS TO RETAIN THE FRE RATING OF THE FLOOR OR WALL CONFORM TO U.L ASSEMBLY RATING OF FLOOR OR WALL 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED C©UNGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. 4. DUCT SLEEVES TO BE MINIMUM 14 GAUGE STEEL J. N. HANGERS 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C- CLAMPS WITH RETAINING CUPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 2 HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING CR DUCTWORK. HANGING FROM METAL DECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES OCCUR, IN ORDER TO SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS 70 FIRE DAMPERS, VALVES, ACCESS DOORS AND OTHER EQUIPMENT SERVICE REQUIREMENTS AND /OR OTHER TRADES. HANGER TYPES AND INSTALLATION METHODS ARE SUBJECT TO LANDLORD CRITERIA. 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION, INSTALL 6 LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI- ELECTRICALLY SEPARATED FROM ONE ANOTHER. 0. ACCESS DOORS 1. FURNISH SILLL ACCESS DOORS AND FRAMES, MIN. 16" X 20" OR AS SHOWN ON DRAWINGS, TO GENERAL CONTRACTOR FOR ALL LOCATIONS WHERE NECESSARY TO PROVIDE ACCESS TO CONCEALED VALVES, AND OTHER EQUIPMENT REQUIRING SERVICE OR INSPECTION. LOCATION, TYPE, SIZE AND NUMBER AS DETERMINED BY CONTRACTOR AND APPROVED BY THE TENANT'S PROJECT MANAGER TO SUIT EQUIPMENT REQUIREMENTS. GENERAL CONTRACTOR WILL INSTALL ACCESS DOORS AND FRAMES. 2. ACCESS DOORS LOCATED IN FIRE -RATED WALLS, FLOORS, CEILING -FLOOR OR CLUNG -ROOF ASSEMBLIES SHALL BE FIRE RATED, UNDERWRITER'S LABORATORIES, INC., LISTED AND LABELED. 3. ACCESS DOORS SHALL BE FLUSH TYPE, MANUFACTURED FROM NO. 14 GAUGE STEEL COMPLETE WITH FLUSH FLANGE TYPE FRAMES MANUFACTURED FROM NO, 16 GAUGE STEEL, PROVIDED VATH ANCHORS. ACCESS DOORS SHALL BE SUITABLE FOR INSTALLATION IN WALL OR CEILING MATERIALS SHOWN IN ROOM FINISH SCHEDULES. P. ELECTRICAL MOTORS 1. FURNISH, INSTALL AND ALIGN ALL MOTORS REQUIRED FOR THIS EQUIPMENT. UNLESS THEY ARE FACTORY INSTALLED ON THE UNIT, ALL STARTERS AND ASSOCIATED WIRING AND SAFETY SWITCHES FOR SUCH MOTORS SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR. STARTERS SHALL MEET ALL REQUIREMENTS AS DEFINED IN THE ELECTRICAL DIVISION OF THE SPECIFICATIONS. 2. DESIGN, CONSTRUCTION AND PERFORMANCE CHARACTERISTICS OF MOTORS SHALL CONFORM TO ALL APPUCABLE PROVISIONS OF LATEST NEMA, ANSI, ISEE STANDARDS FOR ELECTRICAL EQUIPMENT. ALL MOTORS SHALL BE SUITABLE FOR OPERATION ON VOLTAGE VARIATION A ON OF PLUS OR MINUS 10%, 4D DEGREES C AMBIENT TEMPERATURE; HAVE A SERVICE FACTOR OF NOT LESS THAN 1.15. Q. LOW VOLTAGE (24 VOLT) WIRING 1. THE CONTRACTOR IS TO INSTALL ALL LOW VOLTAGE WIRING REQUIRED FOR THE EQUIPMENT, THIS WORK INCLUDES ALL TRANSFORMERS AND DEVICES TO MAKE THIS A COMPLETE FUNCTIONAL SYSTEM. 2 ALL WORK 15 TO CONFORM TO THE LATEST ADDITION N.E.0 AND TO DIVISION 16 ELECTRICAL SPECIFICATIONS. 3. ANY CONDUIT REQUIRED BY CODE OR THE LANDLORD WILL BE INSTALLED BY THE ELECTRICAL SUBCONTRACTOR. DIVISION 15 - MECHANICAL SECTION 15200 PLUMBING A. SCOPE OF WORK 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: (REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES) A. B. 0 D. E. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION. PLUMBING FIXTURES AND EQUIPMENT AS SCHEDULED. COMPLETE NATURAL GAS PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS). TESTS AND ADJUSTMENTS. 2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE PLUMBING SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 3. RELOCATION OF EXISTING WATER, GAS, WASTE, VENT, OR DRAINAGE UNES TO FACIUTATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL B. PLUMBING EQUIPMENT C. GENERAL PIPING REQUIREMENTS 1. GENERALLY, SANITARY AND POTABLE WATER TAPS VALL BE PROVIDED BY THE LANDLORD. FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO SUBMITTING BID AND NOTIFY THE TENANT'S PROJECT MANAGER IF CONDITIONS ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTOR MUST VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE IN AS FOLLOWS: A SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE. B. TEST WATER PRESSURE TO INSURE MINIMUM OF 50 P. 2. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND 5E15MIC BRACING WHERE REQUIRED BY CODES. 3. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT ALL PIPE PENETRATIONS AT WALLS, FLOORS, AND CEIUNGS IN FINISHED AREAS. 4. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE LANDLORD'S CRITERIA. USE A LANDLORD APPROVED ROOFING CONTRACTOR WHERE APPLICABLE D. PIPING 1. SANITARY PIPING - A. WASTE, DRAIN AND VENT PIPING SHALL BE SERVICE WEIGHT, CAST IRON SOIL PIPE. VENT PIPING ABOVE FLOOR 2' DR SMALLER MAY BE GALVANIZED STEEL B. JOINTS: BELOW FLOOR SLAB - COMPRESSION TYPE PLASTIC SEAL (HUB AND SPIGOT). ABOVE FLOOR SLAB - NEOPRENE SEALING SLEEVE WITH STAINLESS STEEL SHIELD AND CLAMP WITH APPROVED NEOPRENE - BASED LUBRICANT, (HUBLESS). GALVANIZED VENT - SCREWED JOINTS WITH TEFLOW TAPE ON MALE THREADS. C. PITCH WASTE LINES 2" AND SMALLER NOT LESS THAN 1/4" PER FOOT. PITCH LARGER MAINS NOT LESS THAN 1/8" PER FOOT. D. INSTALL A CLEANOUT AT BASE OF EACH SOIL STACK, AT EACH CHANGE IN DIRECTION, AT INTERVALS NOT OVER 50 FEET, AND ELSEWHERE AS SHOWN ON DRAWINGS OR REQUIRED BY LOCAL CODE. CLEANOUTS SHALL NOT BE INSTALLED IN PUBLIC AREAS WITHOUT SPECIFIC PERMISSION BY THE TENANTS PROJECT MANAGER; BUT WHERE NECESSARY, THE WALL COVERS ARE TO BE STAINLESS STEEL AND THE FLOOR COVERS ARE TO BE BRASS (FLUSH WITH FINISHED FLOOR). PROVIDE COVERS WITH INSET AREA FOR CARPETED FLOOR LOCATIONS. ALL CLEAN -OUT LOCATIONS SHALL BE APPROVED BY THE TENANTS PROJECT MANAGER. E. INSULATE ALL HORIZONAL RUNS OF PIPING LOCATED IN CEILING SPACES WHEN APPLICABLE INSULATION TO BE AS SPECIFIED FOR WATER PIPING. F. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH TRUEBRO MODEL 102W 'HANDI LAV GUARD" INSULATION KIT. 2. CONDENSATE PIPING SHALL BE TYPE GALVANIZED PIPE WITH SCREWED FITTINGS WITH DIELETRIC SEPARATION BETWEEN DISSIMILAR METALS. 3. POTABLE WATER PIPING: A BELOW GRADE: TYPE 'M' COPPER TUBE FOR PIPE. BRASE ALL JOINTS B. ABOVE GRADE TYPE 'M' COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95 -5 TIN - ANTIMONY SOLDER. C. INSTALL AIR CHAMBER SHOCK ABSORBERS IN PIPING SYSTEM TO PREVENT NOISE AND DAMAGE DUE TO WATER HAMMER. D. ALL BRANCH PIPING SYSTEM SHALL HAVE ACCESSIBLE SERVICE VALVE. PROVIDE SHUT OFF VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE ACCESS DOORS WHERE NECESSARY. E. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL U11UTIES REQUIREMENTS IF APPLICABLE. REFER TO PLANS TO DETERMINED IF WATER METER 15 REQUIRED. F. SECURE PIPE AT ANGLE STOPS, G. PROVIDE FLEXIBLE INSERTS AT ALL PIPE PENETRATIONS THROUGH FRAMING TO KEEP PIPES FROM HITI1NG FRAME WHEN IN OPERATION. 4, INSULATION A. INSULATE ALL WATER AND INTERIOR CONDENSATE PIPING WITH 1" THICK (K =0,23 ® 75 F) SNAP -ON FIBERGLASS PIPE INSULATION WITH AN ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATINGS OF 50. APPROVED MANUFACTURER: MANVILLE MICRO -LOK. 5. TEST & STERILIZATION A. LEAKAGE TESTS SHALL BE PER LOCAL CODES, MINIMUM AS FOLLOWS: 1. TEST POTABLE WATER PIPING AND CONDENSATE PIPING AT 125 P51G FOR SIX HOURS. 2. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS. ALL JOINTS SHALL BE GAS AND WATER TIGHT. 3. TEST GAS PIPING WITH PER NEPA 54 CODES, 4. STERIUZE POTABLE HDT & COLD WATER ONES UPON COMPLETION OF SYSTEM. STERIUZE WATER SYSTEM IN ACCORDANCE WITH LOCAL COOES. DIVISION 15 - MECHANICAL SECTION 15300 FIRE PROTECTION A. SCOPE OF WORK 1. THE F.P. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL T0, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE SPRINKLER SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: A. INSTALLATION OF NEW WET SPRINKLER SYSTEM AS REQUIRED TO PROVIDE COVERAGE IN ACCORDANCE WITH NFPA -13, LOCAL CODES, LANDLORD'S CRITERIA, AND INSURANCE CARRIERS FOR THE MALL AND TENANT. B. TAPS, RISERS, LATERALS, BRANCHES, VALVES, ALARMS, SPRINKLER HEADS AND ALL COMPONENTS REQUIRED FOR A COMPLETE SYSTEM. C. DESIGN DRAWINGS, CALCULATIONS, SUBMITTALS AND APPROVALS. D. PERMITS, FEES, AND CHARGES. E. TESTS AND TEST CERTIFICATES. F. COST FOR SHUT DOWN FEES. 2. THE CONTRACTOR THAT DOES THE ACTUAL SPRINKLER WORK IS REQUIRED TO BE A LANDLORD APPROVED SPRINKLER CONTRACTOR. 3. BEFORE STARTING WORK, THE CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE FIRE PROTECTION SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 4. RELOCATION OF EXISTING MAINS, LATERALS, BRANCHES AND RISERS TO FACIUTATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL B. SHOP DRAWINGS 1. THE FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS AND CALCULATIONS FOR HIS WORK, SUBMIT TWO (2) COPIES TO GENERAL CONTRACTOR FOR APPROVAL NO WORK SHALL BEGIN UNTIL THE TENANTS PROJECT MANAGER APPROVES IN WRITING THE HEAD AND PIPING LOCATIONS. 2. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR SUBMITTING COORDINATED DRAWINGS, CALCULATIONS, HEAD TYPES AND COLORS TO ALL AUTHORITIES HAVING JURISDICTION FOR APPROVAL. NO WORK SHALL BEGIN UNTIL ALL APPROVALS HAVE BEEN RECEIVED. 3, A COPY OF THE LETTER OF APPROVAL FROM THE LANDLORD'S INSURANCE RATING BUREAU SHALL BE FORWARDED TO THE LANDLORD'S AGENT AND TO THE TENANTS PROJECT MANAGER. C. EQUIPMENT 1. SPRINKLER HEADS: A. ALL SPRINKLER HEADS SHALL BE NEW (EXISTING HEADS IN EXISTING STORES TO BE REPLACED), U.L, F.M. USTED AND APPROVED AUTOMATIC SPRAY TYPE AS MANUFACTURED BY CENTRAL SPRINKLER CO., GLOBE, GRINNELL, RELIABLE, STAR, OR VIKING. B. ALL SPRINKLER HEADS SHALL BE RATED FOR 165 DEG. F UNLESS INDICATED OTHERWISE ON DRAWINGS OR REQUIRED BY LOCAL CODES. C, ALL SALES FLOORS HEADS ARE TO HAVE BE FACTORY APPLIED COLOR FINISH TO MATCH ARCHITECTURAL CEILING FINISH. VERIFY HEAD TYPES AND COLORS WITH SPECIFICATIONS ON SHEET A010 AND SUBMIT WITH SPRINKLER DRAWINGS FOR PERMIT. D. SPRINKLER HEAD TYPES: SEE SHEET M1.0 FOR ADDITIONAL INFORMATION. D. GENERAL PIPING 1 A FIRE PROTECTION SYSTEM STUB IN SHALL BE FURNISHED BY THE LANDLORD. SPRINKLER SPACING SHALL NOT EXCEED 1.30 SQ. FT. IN "SALES' AREAS AND 100 5Q. FT. IN 'STOCK' AREAS. COMPLY WITH LANDLORD'S DESIGN CRITERIA. PIPE SIZING SHALL BE BASED ON NFPA ORDINARY HAZARD. 2, ALL SPRINKLER UNES SHALL BE INSTALLED CONCEALED, AVOIDING INTERFERENCE WITH LIGHTS, DUCTS, PIPES, STORAGE DECK, ETC. FIRE PROTECTION CONTRACTOR SHALL PREPARE COORDINATED SHOP DRAWINGS INDICATING THE LOCATIONS OF ALL SPRINKLER HEADS, SPRINKLER UNES, LIGHTS, DIFFUSERS, GRILLES AND REGISTERS PRIOR TO INSTALLATION. HORIZONTAL SPRINKLER RUNS AT MERCHANDISE SOFFITS SHALL BE PLACED INSIDE SOFFIT STRUCTURE. VERTICAL DROPS FROM CEILING TO MERCHANDISE SOFFIT SHALL BE LOCATED FISH AGAINST DEMISING WALLS. 3. WHERE POSSIBLE, REWORK THE EXISTING SPRINKLER SYSTEM TO MEET THE NEW REQUIREMENTS OF THIS DESIGN. RELOCATE ALL MAINS AND BRANCHES INTERFERING WITH CEILING HEIGHTS, EQUIPMENT, AND MAJOR COMPONENTS INCLUSIVE OF ADJACENT TENANTS AND MALL COMMON AREAS. REMOVE ALL UNUSED PIPING. 4. LOCATIONS OF ALL HEADS SHOULD BE APPROVED BY THE LOCAL FIRE PROTECTION OFFICIAL AND THE TENANTS PROJECT MANAGER BEFORE INSTALLATION. HEADS MUST BE LOCATED IN THE CENTER OF CEILING TILES AND IN A SYMMETRICAL PAI IEHN WITH OTHER CEILING FIXTURES. ADDITIONAL MONIES WILL NOT BE ALLOCATED FOR ADDITIONAL HEADS REQUIRED BY FIELD FIRE INSPECTOR AFTER BIDS ARE ACCEPTED. HEADS IN MERCHANDISE BAYS SHALL BE CENTERED SIDE TO SIDE AND FRONT TO BACK, 5 PROVIDE AND INSTALL A VALVED TEST CONNECTION FOR THE SPRINKLER SYSTEM AS REQUIRED OR REQUESTED BY THE MALL, LOCAL INSPECTOR, OR INSURANCE CARRIER. COORDINATE LOCATION WITH THE TENANTS PROJECT MANAGER AND LOCAL FIRE PROTECTION OFFICIAL PRIOR TO ROUGH-1N. 6. SPRINKLER HEADS LOCATED IN STOCK, CORRIDOR OR TOILET ROOM CEILINGS OR WALLS BELOW 8' -0' ABOVE THE FINISHED FLOOR ARE TO BE PROTECTED WITH APPROVED GUARDS. E PIPING: 1. SCHEDULE 4J, BLACK STEEL PIPE, ASTM A -53 FOR FERROUS PIPING, WELDED AND SEAMLESS, ANSI B-36 -10-70 FOR WROUGHT STEEL PIPE. 2. CAST IRON OR MALLEABLE IRON SCREWED FITTINGS FOR PIPES 2 INCHES AND SMALLER. SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES LARGER THAN 2 INCHES. 3. GALVANIZED OR BLACK MALLEABLE IRON WITH BRASS SEAT SCREWED UNIONS FOR PIPES 2 INCHES AND SMALLER. 4. VICTAUUC TYPE COUPLINGS ARE ACCEPTABLE, WHERE APPROVED BY CODE AND THE LANDLORD. F. TESTS 1. WHEN COMPLETED, THE ENTIRE FIRE PROTECTION PIPING SYSTEM SHALL BE HYDROSTATICALLY TESTED AS REQUIRED BY THE RULES AND REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION. SYSTEM SHALL SHOW NO SIGNS OF LEAKAGE OR OTHER DEFECTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO THE WORK OF THE OTHER CONTRACTORS OR TO THE BUILDING, OR TO ITS CONTENTS, PEOPLE, ETC., CAUSED BY LEAKS IN ANY OF THE EQUIPMENT INSTALLED BY HIM. ALL REPAIRS OR REPLACEMENT OF DAMAGES SHALL BE AT THIS CONTRACTOR'S EXPENSE 2. PROPERLY COMPLETED AND SIGNED "SPRINKLER CONTRACTOR'S MATERIAL AND TEST CERTIFICATES" SHALL BE FURNISHED TO THE LANDLORD, AUTHORITIES HAVING JURISDICTION, AND THE TENANT'S PROJECT MANAGER. A. B. C. D. F. G. H. J. DIVISION 15 - MECHANICAL SECTION 15500 HEATING, VENTILATION, AND AIR CONDITIONING A. SCOPE OF WORK 1. THE HVAC CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE MECHANICAL SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN 111E SPECIFICATIONS, AND AS JOB CONDITIONS TO INCLUDE, BUT BY J T NOT BE LIMITED TO THE FOLLOWING:(REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES) HVAC UNITS, EQUIPMENT, AND APPURTENANCES. DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. CHIT 1 FD WATER PIPING AND INSULATION (AS APPLICABLE, REFER TO PLANS). DIFFUSERS, GRILLES, AND REGISTERS. CURBS AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). TESTING, ADJUSTING, AND BALANCING. OPERATIONS MANUALS. TEMPERATURE CONTROLS AND RELATED DIAGRAMS. SEQUENCES OF OPERATION, CONNECTION TO ANY LANDLORD ENERGY MANAGEMENT SYSTEM. 3. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. B. HVAC EQUIPMENT 1, PRIMARY HEATING, VENTILATION AND AIR CONDITIONING UNITS. A. PRIMARY HEATING, VENTILATION, AND AIR CONDITIONING UNITS ARE TO BE BY CARRIER CORPORATION AS SCHEDULED. ALL COMPRESSORS ARE TO INCLUDE A 5 -YEAR EXTENDED WARRANTY. B. NOT USED C. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, APPURTENANCES, AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HERON. D. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST CONDENSATE TRAPPED WITH HAVE A DENSATE DRAIN AND BE TRAP ED IN ACCORDANCE MANUFACTURERS DATA. SEE DRAWINGS FOR ADDITIONAL DETAILS. E. SECONDARY DRAIN PANS ARE REQUIRED TO BE INSTALLED BENEATH ALL INDOOR AIR CONDITIONING EQUIPMENT WITH THE EXCEPTION OF VAV BOXES. SECONDARY PANS ARE TO PROTECT ENTIRE UNIT. PROVIDE CONDENSATE CONDENSATE PUMPS, AS REQUIRED. CO EN SATE SHALL BE DIRECTED TO MOP SINK OR AS SPECIFIED ON PLANS. 2. TOILET EXHAUST FANS A. WHERE SHOWN ON DRAWINGS, PROVIDE A TOILET EXHAUST FAN UNIT COMPLETE WITH GRAVITY BACK DRAFT DAMPERS, ALL DUCTWORK, ROOF OPENINGS AND CAPS NECESSARY TO PROVIDE A COMPLETE EXHAUST SYSTEM SHALL BE PROVIDED BY THE CONTRACTOR. REFER TO PLANS FOR APPUCABILITY. 3. VIBRATION ISOLATION DEVICES A VIBRATION ISOLATION DEVICES SHALL BE PROVIDED IN All SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, AIR HANDLERS, FAN POWERED VAV BOXES, ETC.) AND STRUCTURE. B. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. C. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID ° GROUNDING" THE ISOLATOR. D. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. E. CONSULT MANUFACTURER FOR APPLICATION DATA 4. VARIABLE AIR VOWME BOXES (VAV) A. WHERE SHOWN ON DRAWINGS, INSTALL VAV BOXES COMPLETE MTH CONTROLS, (FANS AS REQUIRED). ALL DUCT CONNECTIONS FLEXIBLE DUCT /PIPE CONNECTIONS SHALL BE PROVIDED TO THE THE TENANTS PROJECT MANAGER PRIOR TO INSTALLATION. 5. CURBS AND STEEL FRAMING FOR SUPPORT A. THIS CONTRACTOR WILL PROVIDE ALL NECESSARY CURBS AND STEEL FRAMING REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED OR IMPLIED ON THE DRAWINGS. CURBS SHALL BE A MINIMUM OF 14" HIGH, OF THE SAME MANUFACTURER OF THE EQUIPMENT SUPPORTED, INSULATE PREVENT CONDENSATION. CURBS MPR ENSATION. ALL CU UNDER THE COMPRESSOR SECTION TO PR MUST BE INSTALLED SO THAT TOP OF CURBS ARE "DEAD" LEVEL ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE IN ACCORDANCE TO THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPENSE C. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED 1, NO DUCTWORK SHALL BE FABRICATED PRIOR TO APPROVAL BY THE TENANTS PROJECT MANAGER. SIGNIFICANT DEVIATIONS FROM DESIGN MUST BE APPROVED BY THE TENANTS PROJECT MANAGER PRIOR TO FABRICATION OR INSTALLATION. ALL DUCT MAINS ARE TO BE RECTANGULAR UNLESS NOTES OTHERWISE. ALL DUCT BRANCHES (IF REQUIRED) TO DIFFUSERS ARE TO BE ROUND RIGID DUCT. (FLEXIBLE DUCT CONNECTIONS TO THE DIFFUSER ARE NOT ALLOWED ON THE SALES FLOOR OR EXPOSED CEILINGS) 2. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR DUCTS WITH GALVANIZED SHEET STEEL, IN ACCORDANCE WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION. CONFORM TO THE REQUIREMENTS IN THE REFERENCED STANDARD FOR METAL THICKNESS, REINFORCING TYPES AND INTERVALS, 11E ROD APPLICATIONS, AND JOINT TYPES AND INTERVALS. 3. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: (VERIFY WHETHER RETURN OR EXHAUST DUCT 15 POSITIVE OR NEGATIVE PRESSURE). A SUPPLY DUCTS: 2 INCHES WATER GAUGE, POSITIVE PRESSURE B. RETURN AND EXHAUST DUCTS: 2 INCHES WATER GAUGE, NEGATIVE PRESSURE. PRESSURE TEST DUCTS FOR LEAKAGE. REMAKE LEAKING JOINTS AND APPLY SEALANTS AS REQUIRED TO FABRICATE A SYSTEM THAT DOES NOT EXCEED 5% LEAKAGE OR LESS AS STATED BY PRESSURE CLASS RATINGS IN SMACNA STANDARDS. 4. AS A MINIMUM, CROSSBREAK ALL FLAT SURFACES OR REINFORCE WITH A BEAD APPROXIMATELY 3 /B' WIDE X 3/16" DEEP ON 12 CENTERS TO PREVENT VIBRATIONS. 5. INSTALL DOUBLE THICKNESS TURNING VANES IN ALL RIGHT ANGLE ELBOWS. 6. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FLEI OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES CR BY LANDLORD. 7. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1- 1/2'X1-1/2" X1/8" STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. 8. ALL TRAVERSE JOINTS AND SEAMS IN SUPPLY AIR DUCT SHALL BE SEALED AIR TIGHT WITH DAP CMG DUCT SEALER JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. 9. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. 10. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE 11. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION, IF THE ACCESS PANEL LOCATION 15 EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY THE TENANT'S PROJECT MANAGER PRIOR TO INSTALLATION. LAY -IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS. 12. FLEXIBLE CONNECTIONS A. FLEXIBLE COLLARS SHALL BE PROVIDED IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, AIR HANDLERS, FAN POWERED VAV BOXES, ETC.) AND DUCTS OR CASINGS. ALSO, PROVIDE FLEXIBLE CONNECTIONS WHERE DUCTS C ROSS BUILDING EXPAN50N I JOINTS. B. FLEXIBLE CONNECTIONS SHALL CONSTRUCTED OF NEOPRENE - COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. C. FLEXIBLE CONNECTION 15 TO BE RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. 13. FIRE DAMPERS A PROVIDE PRIMARY FIRE DAMPERS MERE INDICATED OR REQUIRED BY CODES. DAMPERS SHALL BE DESIGNED FOR HORIZONTAL OR VERTICAL FLOW OF AIR AS REQUIRED. FIRE DAMPERS SHALL BE UL LABELED. B. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIRSTREAM AND A 165 DEG. F FUSIBLE LINK, TYPE A, AS MINIMUM. C. PROVIDE ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER UL AND CODE REQUIREMENTS. D. PROVIDE DUCT ACCESS DOORS IN AN ACCESSABLE LOCATION FOR ALL FIRE DAMPERS. DOOR 15 TO BE 20 GA GALVANIZED DOOR WITH QUICK- OPENING LATCH AND PIANO HINGE. 14.. FLEXIBLE AIR DUCT A FLEXIBLE AIR DUCT SHALL BE 1 INSULATED CLASS 1 AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN THE BID. B. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS WITH PRIOR APPROVAL FROM THE TENANTS PROJECT MANAGER. C. FLEXIBLE DUCT SHALL NOT EXTEND OVER 5' -0 IN LENGTH AT ANY ONE LOCATION AND 15 ONLY USED IN CONCEALED LOCATIONS IF AT ALL D. HYDRONIC PIPING 1, PROVIDE A COMPLETE HYDRONIC PIPING SYSTEM IF APPUCABLE. REFER TO PLANS TO DETERMINE IF A HYDRONIC SYSTEM I5 REQUIRED. 2. PIPING A HYDRONIC PIPING FOR CHILLED WATER AND /OR HEATING WATER AND /OR CONDENSER WATER SHALL BE ASTM A -120, SCHEDULE 40, ERW, BLACK STEEL PIPE WITH PLAIN ENDS. INSTALL STEEL PIPE WITH WELDED JOINTS WHERE PIPE 15 2 -1/2 INCH AND LARGER. INSTALL STEEL PIPE WITH THREADED JOINTS AND FITTINGS OR INSTALL TYPE ° K" ANNEALED TEMPERED COPPER TUBE WITH SLEDS JOINTS FOR 2 INCH AND SMALLER PIPE. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS. ALL PIPING SHALL BE IN STRICT CONFORMANCE WITH ASTM, ASA, AND LANDLORD'S REQUIREMENTS, WHICHEVER I5 MOST STRINGENT. UNIONS OR FLANGES MUST BE USED AT EQUIPMENT CONNECTIONS WHERE SERVICE OR REMOVAL MAY BE REQUIRED. B. ALL PIPING AND EQUIPMENT SHALL BE PRESSURE TESTED WITHOUT LEAKAGE AT A MINIMUM PRESSURE OF 125 PSI. C. ALL HYDRONIC PIPING AND EQUIPMENT CONNECTED TO THE HVAC PIPING SYSTEM SHALL BE CLEANED AND FLUSHED. REMOVE, CLEAN, AND REPLACE STRAINER SCREENS. FLL TENANTS SYSTEM WITH DOMESTIC WATER AND VENT ALL PIPING AND EQUIPMENT PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM. CONTRACTOR SHALL NOT ELL TENANTS SYSTEM WITH WATER FROM THE LANDLORD'S SYSTEM UNLESS SPECIFICALLY INSTRUCTED TO DO SO FROM THE LANDLORD'S FIELD REPRESENTATIVE. D. PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM, CONTRACTOR SHALL OBTAIN WRITTEN CONFIRMATION FROM THE LANDLORD'S FIELD REPRESENTATIVE, THAT ALL TESTING, FLUSHING, AND PROPER FIWNG OF THE TENANTS SYSTEM HAS BEEN COMPLETED IN ACCORDANCE TO THE LANDLORD'S REQUIREMENTS AND THAT THE TENANTS SYSTEM IS READY TO CONNECTED TO THE LANDLORD'S SSY TEM. 5 3. VALVES A. GATE VALVES, 2 -INCH AND SMALLER: CLASS 150, BODY AND UNION BONNET OF ASTM B 62 CAST BRONZE WITH THREADED OR SOLDER ENDS, INTEGRAL SEAT, RENEWABLE SOUD BRONZE EDGE DISC, RISING STEM, - SCREWED BONNET AND RE PACKABLE UNDER PRESSURE. BALL VALVES ARE ACCEPTED AS AN EQUAL SUBSTITUTION. B. GATE VALVES, 2 -1/2 INCH AND LARGER: CLASS 125 CAST IRON BODY, RENEWABLE BRONZE SEATS AND SOLID WEDGE DISC, RISING STEM, FLANGED ENDS, AND RE- PACKABLE UNDER PRESSURE. C. SWING CHECK VALVES, 2 -INCH AND SMALLER: CLASS 150, CAST BRONZE BODY AND CAP CONFORMING TO ASTM B 62 WITH HORIZONTAL SWING, Y- PATTERN, RENEWABLE BRONZE DISC, AND HAVING THREADED OR SOLDERED ENDS. D. SWING CHECK VALVE, 2 -1/2 INCH AND LARGER CLASS 125 CAST IRON BODY AND BOLTED CAP, HORIZONTAL SWING, RENEWABLE BRONZE DISC, FLANGED ENDS AND CAPABLE OF BONG REF1III WHILE THE VALVE REMAINS IN THE LINE. E. COMBINATION BALANCING AND SHUT --OFF VALVES: BELL & GOSSETT CIRCUIT SLI ILN WITH LOCKING SETPOINT. A CIRCUIT SETTER BALANCE WHEEL MUST BE INCLUDED WITH 0 & M MANUAL. F. FLOW METER: BELL AND GOSSETT THERMOFLO INDICATOR MODEL TFI. 4. PIPING SPECIALTIES A PRESSURE/TEMPERATURE TEST PLUGS ( PETE'S PLUG) - 1/4 INCH NPT FITTINGS TO RECEIVE OTHER A TEMPERATURE CR PRESSURE PROBE, 1/8 INCH 0.D. FITTING AND CAPS SHALL BE BRASS WITH VALVE CORE OF NORDEL, RATED AT 400 P51G, 0 DEG. F TO 200 DEG. F. B. STRAINERS - 'Y PAI ILRN STRAINERS, 125 P51G, CAST IRON BODY WITH PERFORATED STAINLESS STEEL SCREEN, THREADED FOR 2 INCHES AND SMALLER, FLANGED FOR 2 -1/2 INCHES AND LARGER. SCREEN OPENING SIZE AT 0.033 INCH FOR HEATING AND 1/8 INCH FOR CHILLED OR CONDENSER WATER. PROVIDE WITH BLOWDOWN VALVE WITH HOSE END FITTING. C. THERMOMETERS - DIE CAST ALUMINUM, 9" INDUSTRIAL MERCURY THERMOMETER, FULLY ADJUSTABLE WITH CLEAR ACRYLIC WINDOW AND BRASS SEPARABLE SOCKET. D. MANUAL AIR VENTS - 1/8" COIN - OPERATED VENT. PROVIDE AN AIR CHAMBER CONSISTING OF A 3/4" NIPPLE AND BUSHINGS. 5. GENERAL INSTALLATION A. INSTALL WATER MAINS WITHOUT PITCH. USE ECCENTRIC REDUCING COUPLINGS AT CHANGES IN SIZE WITH THE TOP OF PIPES AT SAME ELEVATION. MAKE CHANGES IN DIRECTION WITH FITTINGS. B. BRANCHES TO UNITS BELOW MAINS TO BE TAKEN FROM BOTTOM OF MAINS AT A 45 DEGREE ANGLE, PITCH DOWNWARD TOWARD UNITS. BRANCHES TO UNITS ABOVE MAINS TO BE TAKEN FROM TOP OF MAINS AT A 45 DEGREE ANGLE PITCHED UPWARD TOWARDS UNITS. PITCH NOT LESS THAN 1" TO 10 FEET. C. HANGERS SHALL BE SIZED AND INSTALLED FOR THE OUTSIDE DIAMETER OF THE INSULATED PIPE. INSTALL 6" LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND PIPE INSULATION. D. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DIELECTRICALLY SEPARATED FROM ONE ANOTHER. E. SEE PLANS FOR APPLICABLE DETAILS. F. ALL PRESSURE PIPING SYSTEMS INSTALLED SHALL CONFORM TO THE REQUIREMENTS OF THE STATE PIPING AND WELDING CODES. G. INSTALL VALVES AT LOW POINTS FOR DRAINING EACH SYSTEM AND INSTALL MANUAL VENTS AT All HIGH POINTS OF EQUIPMENT AND PIPING IN THE SYSTEM TO PROPERLY REMOVE ENTRAPPED AIR. 6. INSULATION A. ALL HYDRONIC PIPING FOR CHILLED WATER AND /OR HEATING WATER, VALVES, FITTINGS, AND ACCESSORIES SHALL BE INSULATED. FOR PIPE SIZES UP TO 2 INCHES, INSULATE WITH 1 INCH THICK (K =0.23 @ 75 F) FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. FOR PIPE SIZES 2 -1/2 INCHES AND LARGER, INSULATE WITH 1 -1/2 INCH THICK (K =0.23 11 75 F) FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER, B. INSULATION AT ALL HANGERS FOR PIPING 2 -1/2 INCHES AND LARGER SHALL BE HARD AND NON - COMPRESSIBLE. C. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 TO CONFORM WITH THE REQUIREMENTS OF THE NFPA. 15. SUPPLY AIR TAKE -OFF FITTINGS A. PROVIDE CONICAL OR "BELL - MOUTH' TAKE -OFFS FROM MAIN DUCTWORK TO ROUND BRANCHES. INSTALL PER MANUFACTURER'S INSTRUCTIONS. B. PROVIDE 45 DEG. RECTANGULAR TAKE -OFFS FROM MAIN DUCTWORK TO RECTANGULAR BRANCHES. 16. DAMPERS A. PROVIDE MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE OPERATORS IN EACH BRANCH DUCT AND AS SHOWN ON PLANS TO FACILITATE AIR BALANCING. B. WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED, YOUNG'S REGULATORS SHALL BE USED. C. ALL RECTANGULAR DAMPERS IN OUTSIDE NR, RELIEF AIR, OR RETURN AIR DUCTS ARE TO BE OF OPPOSED BLADE TYPE. ALL OUTSIDE AIR DUCT DAMPERS MUST ALSO BE OF THE LOW LEAKAGE TYPE. D. ALL MOTORIZED DAMPERS NOT FURNISHED WITH EQUIPMENT ARE TO BE HONEYWELL DAMPERS. 17. DIFFUSERS, GRILLES, AND REGISTERS A. PROVIDE DIFFUSERS GRILLES AND REGISTERS AS SCHEDULED. DEVICES TO BE COMPLETE WITH DAMPERS FRAMES AND ALL ACCESSORIES. FINISH AS INDICATED. INSTALL ALL AIR DEVICES AS LOCATED ON THE ARCHITECTURAL REFLECTED CEILING PLAN, C. APPROVED MANUFACTURERS: KRUEGER. NO SUBSTITUTIONS WITHOUT WRITTEN APPROVAL FOR THE TENANTS PROJECT MANAGER. 19. DUCTWORK INSULATION A. INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NFPA 90A, B. ALL ROUND AND OUTSIDE AIR DUCTWORK ABOVE THE FINISHED CEILING SHALL BE EXTERNALLY INSULATED WITH A MINIMUM OF 1- 1 /21HICK, 1 -1/2 LB. DENSITY DUCT WRAP WITH VAPOR BARRIER. VAPOR BARRIER 15 TO BE MAINTAINED THROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE TAPED SO THAT NO INSULATION FIBER IS VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, AND SIMILAR PENETRATIONS, C. PROVIDE 1' THICK 1 1/2 LB. INTERNAL DUCT LINER ON ALL RETANGULAR SUPPLY DUCTS WHERE INDICATED ON PLANS. D. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF ND HIGHER THAT 50 WHEN TESTED IN ACCORDANCE WITH ASTM C 411, OR AS REQUIRED BY LOCAL CODES. 20. SYSTEM CLEANOUT A DUCTWORK AND AIR HANDLING EQUIPMENT IS TO BE CLEANED OUT AND BLOWN OUT BEFORE PAINTING 15 STARTED BY THE GENERAL CONTRACTOR_ B. FILTERS MUST BE IN UNITS AT ANY TIME FANS ARE OPERATED. B. E. SYSTEM TESTING, ADJUSTING, AND BALANCING 1. TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR WHO IS CURRENTLY UCENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING SHALL BE MADE BY THE GENERAL CONTRACTOR. 2. THE HVAC CONTRACTOR SHALL INSTALL NEW FILTERS IN ALL UNITS PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION. 3. BALANCE AIR AND WATER QUANTITIES TO WITHIN + 5% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS, PULLEYS, OR THE ADDITION OF DAMPERS REQUIRED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO THE TENANTS PROJECT MANAGER. 4. THE BALANCE REPORT SHALL INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION: A. AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF BALANCING CONTRACTOR. B. INSTRUMENTATION UST WITH LAST CALIBRATION DATES, C. MAKE AND MODEL NUMBERS OF ALL HVAC EQUIPMENT TESTED. D. AIR CFM AND STATIC PRESSURE READINGS (DISCHARGE AND SUCTION) AS MEASURED BY PITOT TUBE DUCT TRAVERSE AT THE UNIT. E. MOTOR NAMEPLATE DATA WITH ACTUAL FELD VOLTAGE AND AMPERAGE READINGS FOR EACH LEG. F. MOTOR AND FAN RPMS, SHEAVE SIZES AND BELT SIZES. G. OUTSIDE, RETURN, MIXED AND SUPPLY AIR TEMPERATURES AT FULL COOLING. H. WATER BALANCE DATA INCLUDING GPM WITH INLET AND OUTLET TEMPERATURE AND PRESSURE READINGS (WHERE APPLICABLE). I. MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. J. FINAL BALANCED AIR VOLUMES AT ALL OUTLETS (INCLUDING RETURNS WHERE DUCTED), K. INDEXED PLAN I1m DIFFUSER AND RETURN LOCATIONS. 5. ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND OPERATING STATUS RECORDED IN THE REPORT. 6. THREE STAMPED ORIGINALS OF THE BALANCE REPORT SHALL BE SUBMIT II THROUGH THE GENERAL CONTRACTOR TO THE TENANTS PROJECT MANAGER FOR APPROVAL 7. THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED IN THESE DRAWINGS. THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT THE TENANT DEEMS NECESSARY AT NO ADDITIONAL COST TO THE TENANT. 8. FINAL BALANCE REPORT SHALL BE INCLUDED IN THE OPERATION & MAINTENANCE MANUALS. F. FINAL HVAC INSPECTIONS 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, THE TENANT SHALL HAVE THE RIGHT TO HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPUANCE WITH THE PLANS, SPECIFICATIONS, AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS AT NO COST TO THE TENANT. C P E FTY 4 RECEIVED OE TUKWILA MAY 22 2008 MI T CENTER RMIT REVISIONS 11.30.07 BLDG DEPT TENANT BLDG DEPT 02.11.08 LL /BID 04.25.08 FIELD SHEET M.3 3 OF 3 M.HEETS BY drvd drvd drvd drvd co co a? Cl) 0 ca a) d) U 0 d) fD c` O) CV co CV 0) L co u7 co co LL E o c ' J a 0 U 1 CV 0) 10 a ❑ ci DATE: 09.20.07 SCALE: 1/4"=T-0" DRAWN: TAS JOB: MP REVISION NO: 1 )1O32Oy MECHA H.V,A,C. LPCE \D SYMBOL DESCRIPTION VAV -1 FAN POWERED VARIABLE AIR VOLUME CONTROL TITUS ATQS -16" DEVICE SET SIZE 16, 500 CFM MINIMUM AIRFLOW, SET AIRFLOW AT 3325 CFM. VAV DEVICE SET, COMPLETE WITH ELECTRONIC CONTROLS AND ZONE SENSOR (T -STAT) PROVIDED AND INSTALLED BY T.G.C. VERIFY ALL REQUIREMENTS WITH LANDLORD. DUCTWORK THERMOSTAT (100) DENOTES CFM QUANTITY 1):( CEILING DIFFUSER 0 DUCT MOUNTED DIFFUSER \ CEILING RETURN REGISTER L� VOLUME DAMPER -id- 1" UNDERCUT DOOR 5D DUCT SMOKE DETECTOR AL 1" ACOUSTICAL LINING CFM CUBIC FEET OF AIR PER MINUTE EF EXHAUST FAN NK NECK _ ..... .. MECHA \CAL EQUIP V \T SC I RULE -- INSTALLED BY T.G.C. MARK DESCRIPTION VAV -1 FAN POWERED VARIABLE AIR VOLUME CONTROL TITUS ATQS -16" DEVICE SET SIZE 16, 500 CFM MINIMUM AIRFLOW, SET AIRFLOW AT 3325 CFM. VAV DEVICE SET, COMPLETE WITH ELECTRONIC CONTROLS AND ZONE SENSOR (T -STAT) PROVIDED AND INSTALLED BY T.G.C. VERIFY ALL REQUIREMENTS WITH LANDLORD. of EXIST'G. 16" DIA. TAP FOR TENANT CONNECTION V a (300) 100 PROVIDE SPLITTER DAMPER WITH 65/35 SPLIT. TF• PAAIT SHEET REVISIONS DATE: 09.20.07 SCALE: 1/4 "4 DRAWN: TS JOB: MP OF 3 NI- SHEETS COOLING OA DB COOLING IA DB HEATING OA ROOF U- FACTOR LIGHT DIVERS ** VAV MIN AIR LTS - SURFACE %LTS - SURFACE WALL AREA %ROOF TO SPACE PEOPLE SENS HEAT SENSIBLE HEAT GAIN PEOPLE VENTILATION ROOF LOAD LTS - SURFACE LTS - RECESSED MISC LOAD WALL LOAD TOTAL SENSIBLE 58333 TOTAL COOLING LOAD SENS/TOTAL RATIO NOMINAL CFM (15 DEG F DIFF) SUPPLY AIR TEMP TEMPERATURE DIFFERENCE SENSIBLE HEAT GAIN VENTILATION ROOF LOAD WALL LOAD TOTAL SENSIBLE metropark Southcenter Mall Tukwila,WA 2843 SQUARE FEET ASHRAE DESIGN CONDITIONS 85 75 23 0.000 1.3 500 5622 83 0 0 250 COOLING LOAD SUMMARY 9477 0 0 20704 849 27304 0 PEOPLE VENTILATION 0% TO SPACE 83% TO SPACE 17% TO SPACE HEATING LOAD SUMMARY 0 0 0 65914 BTUH 88 % 3119 CFM 58 DEG F 17 DEG F COOLING OA WB COOLING IA WB HEATING IA LTS- RECESSED %LTS- RECESSED MISC. WATTS SQ FT/PERSON NO OF PEOPLE WALL U- FACTOR PEOPLE LATENT • LATENT HEAT GAIN TOTAL LATENT LATENT HEAT GAIN VENTILATION 0 TOTAL LATENT TOTAL HEATING LOAD NOMINAL KW ELEC HEAT MINIMUM KW ELEC HEAT (BASED ON 20 DEG F RISE @ VAV MIN AIR) 12:00:00 AM CNTYVAV.WKS * SA TEMP AT UNIT AT SPACE ON DESIGN DAY ** SPECIAL ALLOWANCE FACTOR PER ASHRAE (TABLE 15 /CHAPTER 26) DESIGN BASED ON LANDLORD PROVIDING MORN WARMUP. ING 200 7581 7581 0 BTUH 0 KW 3 KW 65 + 63 68 1125 + 17+ 8000 + 75 + 38 0.20+. 0 0 0 2.4 W /SQ FT 1.10 CFM /SQ FT 23 BTUH /SQ FT 5.5 TONS - 518 SQ FT/TON MECHANICAL PLAN CODED NOTES: O THERMOSTAT MOUNTED AT 48" A.F.F. COORDINATE EXACT LOCATION WITH TENANT. VERIFY ANY NEW REQUIREMENTS WITH MALL MANAGEMENT. ® CONTRACTOR TO PROVIDE AND INSTALL EXHAUST FAN. FAN SHALL BE 100 CFM. INTERLOCK WITH TOILET ROOM LIGHTING. SEE LIGHT FIXTURE SCHEDULE ON SHEET M2 FOR MANUFACTURER & MODEL NUMBER. PROVIDE 10" EXH. DUCT TO EXISTING L.L. EXHAUST DUCT V.I.F. PROVIDE BACKDRAFT DAMPER. ® T.G.C. SHALL INSTALL VAV-1 PER L.L. DIRECTION. LANDLORD NOTES: LANDLORD HAS PROVIDED A PROPRIETARY D.D.C. CONTROL SYSTEM FOR V.A.V. CONTROL- TENANT TO PROVIDE " CONDUIT AND SHIELDED CABLE FROM LANDLORD'S JUNCTION BOX TO V.A.V. BOX(ES) AND THERMOSTAT(S)-FINAL WIRING CONNECTIONS TO ALL DEVICES BY LANDLORD AT TENANT'S EXPENSE-ALL AS PER PROJECT STANDARD DETAILS. T.G.C. SHALL ENGAGE A SEPERATE TEMPERATURE CONTROL CONTRACTOR FOR FINAL SET -UP OF SYSTEM(S) OPERATIONS AND AIR BALANCING. GIVE ONE COPY OF BALANCE REPORT TO LANDLORD'S BUILDING ENGINEER. T.G.C. MUST USE LANDLORD APPROVED CONTRACTOR SET VAV BOX TO DELIVER 3,325 CFM MAX. MECHANICAL GENERAL NOTES: 1. ALL DUCTWORK, HANGERS, DAMPER CONSTRUCTION, SEAMS, INSTALLATION, ETC., SHALL CONFORM TO THE STANDARDS AS ADOPTED BY A.S.H.R.A.E. AND SMACNA. ALL WORK SHALL CONFORM TO ALL APPLICABLE LAWS, RULES AND REGULATIONS AND RECOMMENDATIONS OF LOCAL BUILDING DEPARTMENT, NATIONAL BOARD OF FIRE UNDERWRITERS, N.F.P_A., AND SHOPPING CENTER GENERAL SPECIFICATIONS. ALL DUCTWORK SHALL BE SHEETMETAL CONFORMING TO SMACNA STANDARDS FOR LOW PRESSURE DUCTWORK AND A.S.H.R.A.E. STANDARD 90 -75. 2. EXAMINATION: BIDDER, BEFORE SUBMITTING A PROPOSAL SHALL EXAMINE THE SITE, DRAWINGS AND SPECIFICATIONS, INFORM HIMSELF AS TO THE STATE AND LOCAL CODES AND LAWS HAVING JURISDICTION AND ALLOW FOR LICENSES AND FEES TO BE PAID AS DIRECTED OR REQUIRED TO COMPLETE THE WORK UNDER THE SCOPE OF THIS CONTRACT. 3, THE MECHANICAL CONTRACTOR SHOULD FURNISH, CONNECT AND INSTALL THE THERMOSTAT /CONTROL WIRING AND THE ELECTRICAL CONTRACTOR SHOULD PROVIDE, INSTALL AND CONNECT THE ELECTRIC TO THE UNITS. 4. SCHEDULE OF WORK: THIS CONTRACTOR SHALL BE REQUIRED TO FAMILIARIZE HIMSELF WITH THE PROPOSED WORK SCHEDULE AND SHALL COORDINATE HIS WORK SCHEDULE WITH THE OTHER TRADES, 50 THAT WORK PROGRESSES CAN BE PLANNED IN A PROPER SYSTEMATIC FASHION TO AVOID ANY DUPLICATION OF EFFORT AND RESULTANT DELAY OF PROJECT. 5. CUTTING AND PATCHING: THIS CONTRACTOR MUST LAY OUT HIS WORK IN ADVANCE OF NEW CONSTRUCTION IN ORDER THAT UNNECESSARY CUTTING AND PATCHING WILL BE AVOIDED. OPENINGS SHALL BE REUSED AS SHOWN AND ANY MODIFICATIONS TO ROOF OPENINGS SHALL BE APPROVED BY THE LANDLORD, DONE BY THE LANDLORD'S ROOFING CONTRACTOR AND PAID FOR BY THE TENANT. 6. FLEXIBLE DUCTWORK: FOR CONNECTIONS BETWEEN RIGID DUCTWORK INSTALL FLAT METAL SPIRAL MECHANICALLY LOCKED FABRIC COMPONENTS, CAPABLE OF BEING SHAPED FOR CONNECTION TO EITHER ROUND OR OVAL BOOT CONNECTIONS. ALL CONNECTIONS SHALL BE MADE AIR TIGHT BY MEANS OF CLAMPS OR INDUSTRIAL CEMENT #330 AND WRAPPED WITH DUCT TAPE. LENGTH OF FLEXIBLE DUCT TO BE MAXIMUM OF 5'. STEEL SPIRAL TO BE ELECTROGALVANIZED FABRIC TO BE NEOPRENE COATED, WITH FABRIC CAPABLE OF MEETING N.F.P.A. 90A AND UL 181 FOR CLASS 1 CONNECTORS. MANUFACTURER: WIREMOLD AIR DUCT TYPE 57. EXISTING MAIN SUPPLY AIR TRUNK INSTALL 16" DIA. INSULATED MED. PRESSURE METAL SPIRAL DUCTWORK 5 FEET LONG STRAIGHT FROM TAP TO VAV BOX. PROVIDE A 30 "X24" RETURN AIR OPENING THRU WALL AS HIGH AS POSSIBLE WITH UPSIDE DOWN LOUVER EXIST'G. MALL TOILET EXHAUST DUCT FOR TENANT CONNEC11ON. V.I.F. Permit No. review approval Is subject to error:, Approval of construction dacumcnu Elbe violation cf ehv r r • Gty of Tukwila BUILDING DMSION 7. DUCTWORK SHALL BE FABRICATED OF GALVANIZED SHEET METAL PER AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR CONDITIONING ENGINEERS' STANDARDS AS OUTLINED FOR "AIR DUCT DESIGN" IN THE LATEST EDITION OF THE "ASHRAE FUNDAMENTALS" AND AS REQUIRED BY THE CONSTRUCTION DETAILS OUTLINED IN THE APPLICABLE SMACNA STANDARDS. 8. SUPPLY DUCTWORK INSIDE BUILDING SHALL BE INSULATED WITH 1" ALUMINUM FOIL FACED FIBERGLASS BLANKET OVERLAPPED AND WIRED ON AND ALL DUCTWORK SHALL BE INSTALLED IN CONCEALED SPACE ABOVE CEILINGS. 9. PROVIDE CLEAR ACCESS TO ALL EQUIPMENT WITHIN THE LEASED SPACE. 10. CONTRACTOR SHALL PROVIDE OPERABLE H AND V SYSTEMS COMPLETE IN ALL RESPECTS AS CONTEMPLATED BY THE INFORMATION INDICATED ON THE DRAWINGS. IT IS NOT INTENDED THAT THE DRAWINGS AND SPECIFICATIONS INDICATE EACH AND EVERY ITEM OF INFORMATION NECESSARY FOR COMPLETE SYSTEMS BUT INDICATE SUFFICIENT INFORMATION FOR THE CONTRACTOR TO SECURE ADDITIONAL INFORMATION FROM OTHER SOURCES AND PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR NECESSARY FOR COMPLETE INSTALLATIONS. 11. ALL LABOR, MATERIALS AND EQUIPMENT SHALL BE PROVIDED WITH ONE YEAR GUARANTEE FROM DEFECTS. 12. PROVIDE ARCHITECT WITH THREE (3) COPIES OF AIR BALANCE REPORT. INSTRUCT OWNER IN USE OF EQUIPMENT. AIR BALANCE REPORT TO BE AN INDEPENDENT TESTING AGENCY. AIR BALANCE TEST REPORT TO BE TAKEN IN THE LATE AFTERNOON WITH THE FOLLOWING TEMPERATURE READINGS DOCUMENTED (IN ADDITION TO CFM) 1.) TEMPERATURE OF AIR LEAVING EACH CEILING DIFFUSER, 2.) TEMPERATURE OF AIR LEAVING HVAC UNIT, 3.) TEMPERATURE OF OUTSIDE AIR AT HVAC UNIT, 4.) TEMPERATURE OF AIR WITHIN SALES AREA (AT THERMOSTAT). 13. T.G.C. TO REPLACE FILTERS PRIOR TO TURNOVER. 14 DEMOLITION: REMOVE ALL EXISTING MECHANICAL EQUIPMENT, DUCTWORK, PLUMBING FIXTURES, PIPING SYSTEMS, ETC...NOT BEING REUSED. DO NOT JUST ABANDON. cni emission r.::2 cuthorize nor vieclged: C0 \TRACTOR IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ARCHITECT, LANDLORD OR TENANT OF ANY DISCREPANCIES ENCOUNTERED ON THE PLANS OR IN EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK. BIDDERS ARE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND SATISFY THEMSELVES AS TO THE NATURE AND SCOPE OF WORK. THE BASE BID SHALL REFLECT MODIFICATIONS TO SYSTEMS AND DEVICES AS REQUIRED BY STATE AND LOCAL CODES WHETHER INDICATED OR NOT ON CONTRACT DOCUMENTS. THE SUBMISSIONS OF A BID WILL BE EVIDENCE THAT SUCH AN EXAMINATION AND COMPLIANCE WITH GOVERNING CODES / REQUIREMENTS HAS BEEN MADE. LATER CLAIMS FOR LABOR, EQUIPMENT, OR MATERIALS REQUIRED OR FOR DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN, HAD AN EXAMINATION AND CODE REVIEW BEEN MADE, WILL NOT BE ALLOWED. REQUIRED FOR: D echanical P nlectricai lumbing Gas Piping 24 4 City of Tukwila • , BUILDING DIVISION MECHANICAL PLAN \OT • REVISIONS No changes shall be made to tho scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plPn sUhrnittPl :nr1 may include additional plan rwt' v PROVIDE A 24 "X24" RETURN AIR OPENING THRU WALL ABOVE CEILING AS HIGH AS POSSIBLE COVER OPENING WITH 1"X1" WELDED WIRE SCREEN. p PROVIDE A 24 "X24" RETURN AIR OPENING THRU WALL ABOVE CEILING AS HIGH AS POSSIBLE COVER OPENING WITH 1"X1" WELDED WIRE SCREEN. I DON PENN CONSULTING ENGIN 635 WESTPORT PARKWAY, GRAPEVINE, TEXAS 76051 817-410-2858 FAX 817 EER SUITE 300 —251 -8411 )oL1 RECEIVED SEP 2 7 2007 PERMIT CENTER TITS AIR 3 STRIBTIO\ 3EV CES MARK MANUF. CATALOG # SIZE MOUNTING MATERIAL FINISH ACCESSORIES BORDER STY_EEMARKS NOTES MOD. NECK SIDE WALL CEILING DUCT STEEL ALUM. DPR. EQUAL GRID FIRE DPR. SD -1 TITUS OMNI 24 "X24" 10 1 • • • B • B SD-2 TITUS R -OMNI 22 "0 1017 • • B • A SD -3 TITUS OMNI 12"X12" cep • • B • A SD -4 TITUS OMNI 24 "X24" 8 1 • • B 0 6 RG -1 TITUS 355RL 24 "X24" - • • B B 1. CONTRACTOR TO VERIFY FINISHES WITH ARCHITECT. 6. PROVIDE CABLE OPERATED DAMPER FOR AIR OUTLETS IN SHEETROCK CEILINGS. 2. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. 3_ ALL AIR OUTLETS SHALL BE SUITABLE FOR THE TYPE OF CEILING CONSTRUCTION USED. COORDINATE BORDER STYLES AND FRAMING. 4. INSTALL FOUR (4) WAY DIFFUSERS WITH BLANK -OFF BAFFLES FOR 2 -WAY AND 3 -WAY BLOW ARRANGEMENTS. 5. PROVIDE 24 x 24 FULL FACE LOUVER FOR TDC DIFFUSERS. PX -A ST FA\S MANUFACTURER MODEL NO. TYPE C.F.M. S.P. H.P. FAN MOTOR DATA ACC. REF' NOTE NOTES VOLTS PHASE R.P.M. NU TONE 8673P EF-1 100 .125 1/10 120 1 - -- 16 GAUGE GALVANIZED SAFETY PAN 2" WIDE MIN. DUCT STRAP 48" O.C. MAX. RIGID ROUND METAL D INTERNALLY INSULATED RIGID ROUND D ELBOW INTERNALLY INSULATED ALL METAL DUCT -MUST BE 26 GA. MIN. W /EXCEPTION OF STOCK ROOM VOLUME DAMPER (FOR FINAL BALANCE ADJUSTMENT) MAX. WATWER TEMP. OF 110 DEG. F DUCT DIFFUSER DETAIL 3/4" HOT WATER ELECTRIC WATER HEATER TEMPERATURE & PRESSURE RELIEF VALVE TEMPERATURE & PRESSURE RELIEF DRAIN DISCHARGE WATER HEATER SPIN -IN FITTING WITH BALANCING DAMPER AND 45 DEG. EXTRACTOR (DAMPER USED FOR ROUGH BALANCING) o z ..-3/4 HOT WATER TO FIXTURES (105 DEG. F) VACUUM BREAKER 3/4" COLD WATER SUPPLY 3 /4 "CW SHUT -OFF VALVES - TYPICAL XPANSION TANK. CHECK VALVE UNION(TYPICAL) DRAIN VALVE SAFETY MIXING VALVE APPROVED UNDER ASSE 1016 OR 1017 1" DRAIN - DISCHARGE TO /INTO FLOOR DRAIN IN TOILET ROOM DETAIL SCALE: NONE SCALE: NONE INTERNALLY INSULATED SPIRAL DUCTWORK MS WCO SECURE FLEXIBLE DUCT TO PLENUM AND SPIN -IN FITTING WITH S.S. SCREW CLAMP INSULATED FLEXIBLE DUCT - INSIDE DIAMETER AS NOTED ON PLANS. MAX LENGTH 5' -O" LAV (H.C.) NOTES: *FOR LENGTHS GREATER THAN 5' -0" USE EXTERNALLY INSULATED RIGID ROUND DUCT THE SAME SIZE AS THE FLEXIBLE DUCT FOR THE ADDITIONAL LENGTH. *FLEXIBLE DUCT SHALL BE UL181 APPROVED AND SHALL NOT BE KINKED OR SAGGED. *PROVIDE SPIN -IN FITTING FOR ALL ROUND FLEXIBLE DUCT CONNECTIONS TO RECTANGULAR DUCT. SPIN -IN FITTINGS SHALL BE FACTORY FABRICATED, AND INCLUDE AN AIR EXTRACTOR SCOOP AND A BALANCING DAMPER WITH A LOCKING QUADTANT AND HANDLE. BALANCING SHALL BE AT THE SPIN -IN FITTING AND NOT AT THE AIR DISTRIBUTION DEVICE. WC (H.C.) WCO CWASTE RIS Ar o ��r AO AP Ar =�r INSULATION S.S. SCREW CLAMP CEILING 'DIFFUSER \ CEILING � DCT DETAIL �� WC (H.C.) -R PLJ v BI \G FIXT.,R -S WC WATER CLOSET- AMERICAN STANDARD "CADET" MODEL #2168.100 (1.6 GAL. /PA) FLOOR MOUNTED, (H.C.) ELONGATED BOWL, TANK TYPE, CHROME TRIP LEVER, WATER SAVER, VITREOUS CHINA, 17" RIM HEIGHT MEETS ADA GUIDELINES AND ANSI REQUIREMENTS FOR PEOPLE WITH DISABILITIES FURNISH WITH WHITE COLOR OLSONITE MODEL #96 OPEN FRONT SEAT WITH COVER AND CHROME SUPPLY WITH STOP. LAV LAVATORY - AMERICAN STANDARD MODEL #0124.024 WITH FAUCET (MODEL #2985.130) EQUAL BY (H.C.) KOHLER MODEL #K1729, WITH FAUCET (MODEL #K15199) EQUAL BY CRANE MODEL #3 -377 OR ELGER MODEL #051 -1358. FCO FLOOR CLEAN OUT -ZURN #Z1400 -HD -2 (CONC. FLOOR) OR ZN 1400 -2 (TILE FLOOR). EQUALS BY J.R. SMITH OR WADE. WHA WATER HAMMER ARRESTER -SIOUX CHIEF 750 SERIES OR EQUAL BY PRECISION PLUMBING PRODUCTS, INC. FD FLOOR DRAIN -ZURN #2415, 3" WITH NICKEL BRONZE STRAINER. (PROVIDE WITH TRAP PRIMER IF REQUIRED BY CODE OR SHOWN ON DRAWINGS). WH A.O. SMITH MODEL PV -10, 10 GALLON CAPACITY, COPPER CORE TANK, 1.5 K.W., 120V. DF SPLIT LEVEL WATER FOUNTAIN (DF) OASIS - P8ACSL, TWO STATION WALL MOUNT WATER COOLER. WITH LEFT, RIGHT AND FRONT CONTROLS ON EACH UNIT. BRUSHED STAINLESS STEEL FINISH MS 24" x 24" FLOOR MOUNTED MOP BASIN. FLOORSTONE MODEL 85 NEO ANGLE MOP RECEPTOR WITH AMERICAN STANDARD 8340.242 FAUCET (OR EQUAL) AND HOSE AND MOP HANGER. LAV H.C.) TO TRAP RIMER ( 2" 3" VENT TO LANDLORD'S TOILET VENT SYSTEM. SCALE: NONE DUCT STRAP TYPICAL IN TWO PLACES. MIN. 2" WIDE SPIN -IN FITTING WITH DAMPER AND AIR SCOOP AIR SCOOP SUPPLY DUCT CONNECT TO 4" SANITARY SEWER SYSTEM- V.I.F. T.G.C. SHALL PROVIDE SHUT -OFF VALVES AT ALL CONNECTIONS TO PLUMBING FIXTURES SCALE: NONE NO PLASTIC PIPE IS ALLOWED. PROVIDE BACKFLOW 3 /4 "HW TO WATER HEATER PREVENTION DEVICE AS MOUNTED ABOVE MOP SINK. REF. PER LOCAL DTL #3 THIS SHEET. JURISDICTION. 0 WCO MS LAV 0 LAV PARTIAL PLUVBI \G PLA\ 6 WATER RIS ■ TRAP PRIMER 1/2 WC 1 /2" TO (H.C_) ; FLOOR WC DRAIN'S (H.C.) D.F. -R 3IAGRA v 4" S.S. VERIFY EXACT LOCATION, FLOW AND SCALE: 1/4 '=1 ' - 0" SCALE: NONE dp DON PENN CONSULTING ENGIN 635 WESTPORT PARKWAY, GRAPEVINE, TEXAS 76051 817- 410 -2858 FAX 817 MO72O9 EER SUITE 300 - 251 -8411 REVISIONS BY DATE: 09.20.07 SCALE: 1/4 "4_13" DRAWN: TS JOB: • MP_SOCM. SHEET M.2 2 OF 3 M €HEFTS ECEIVE® SEP 2 7 2007 PERMIT CENTER GENERAL CONDITIONS 1, DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS ARE A PART OF THIS CONTRACT AND APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. 2. THE CONTRACTOR FOR THIS WORK IS REQUIRED TO READ THE ENTIRE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL OTHER TRADES. 3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE SUBCONTRACTORS WITH A FULL SET OF BID SET DOCUMENTS (INCLUDING SPECIFICATIONS) AND THE COORDINATION OF HIS WORK AND INSPECTIONS AND THE WORK AND INSPECTIONS OF THE SUBCONTRACTORS WITH ALL OTHER TRADES ON SITE CONFORMING TO THE GENERAL CONTRACTOR'S TIME SCHEDULE. 4. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING THE BID TO DETERMINE CONDITIONS AFFECTING THE WORK. BIDS SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXIST1NG CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF WORK. 5. WHEN USED, THE TERM "PROVIDED BY CONTRACTOR" SHALL BE INTERPRETED AS MEANING 'FURNISHED AND INSTALLED" WITH THE EXCEPTION WHERE ITEMS ARE "PROVIDED BY TLS" WHICH MEANS "FURNISHED ONLY' (INSTALLED BY CONTRACTOR), EXCEPT AS SPECIFICALLY NOTED OTHERWISE GENERAL REQUIREMENTS 1. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. CLOSELY COORDINATE THE ENURE INSTALLATION WITH THE LANDLORD, AS REQUIRED. FIELD VERIFY THE EXACT TYPE, SE AND LOCATION, ETC. OF USING PIPE AND DUCTS IN II-1E TENANT SPACE PRIOR TO BID. 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE PROVIDED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH 15 NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BU" WHICH 5 OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUAI LY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE PROVIDED AS PART OF CONTRACT. 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR IS S11LL RESPONSIBLE FOR PROVIDING THE SYSTEM AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 4. ALL MECHANICAL WORK SHALL BE INSTALLED 50 AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. THE CONTRACTOR 15 RESPONSIBLE FOR PROVIDING SUFFICIENT ACCESS TO ALL EQUIPMENT FOR SERVICE 5, THE CONTRACTOR SHALL DO ALL CUIT1NG, CORE DRIVING, CHASING OR CUTTING SHALL HAVE PRIOR APPROVAL BY THE TENANTS STORE PROJECT MANAGER CHANNELING AND PATCHING REQUIRED FOR ANY WORK UNDER THIS DIVISION. AND THE LANDLORD. PATCHING SHALL MATCH, FINISH OF SURROUNDING AREA. C. CODES DIVISION 15 - MECHANICAL SECTION 15000 MECHANICAL GENERAL PROVISIONS 1. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD ENGINEERING PRACTICES. ALL WORK SHALL CONFORM TO THE LANDLORD'S CRITERIA, THE STATE'S, COUNTYS, CITYS AND LOCAL CODES AND ORDINANCES. SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THE CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPUCABLE CODES, ORDINANCES, AND REGULATIONS. AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED BY THE TENANT TO THE CONTRACTOR. LICENSES, PERMITS, INSPECTIONS & FEES 1. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO THIS WORK. 2, FURNISH THE TENANTS PRO,ECT MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT SUBSTANTIAL COMPLETION DATE OF PROJECT. DRAWINGS 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT 5 NOT POSSIBLE TO INDICATE ALL DUCT AND PIPING OFFSETS, FITTINGS AND ACCESSORIES THAT MAY BE REQUIRED. 2. THE LAYOUT SHOWN ON THE DRAWINGS IS BASED ON A PARTICULAR MAKE OF EQUIPMENT. IF ANOTHER MAKE OF EQUIPMENT IS USED WHICH REQUIRES MODIFICATION OR CHANGE OF ANY DESCRIPTION FROM THE DRAWINGS OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE AS PART OF THIS WORK, FOR MAKING ALL SUCH MODIFICATIONS AND CHANGES, INCLUDING THOSE INVOLVING OTHER TRADES WITH THE COST THEREOF INCLUDED IN THIS BID. IN SUCH CASE, CONTRACTOR SHALL SUBMIT DRAWINGS AND SPECIFICATIONS PRIOR TO STARTING WORK SHOWING ALL SUCH MODIFICATIONS AND CHANGES. THE PROPOSAL SHALL BE SUBJECT TO THE APPROVAL OF THE TENANTS PROJECT MANAGER. EXISTING SHELL SPACE CONDITONS 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING MECHANCIAL WORK SHOWN ON THE MECHANCIAL DRAWINGS AND THE MECHANCIAL DEMOLITION SHOWN ON THE ARCHITECTURAL DRAWINGS. 2. THE CONTRACTOR SHALL INCLUDE, AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE CONTRACTOR MUST VERIFY WITH THE LANDLORD Aft PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK, AND EQUIPMENT PRIOR TO REMOVAL ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED UNIFSS NOTED FOR REUSE OR RECONFIGURATION ON PLANS. ROOF PATCHING SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE BY A ROOFING CONTRACTOR APPROVED BY THE LANDLORD, ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF (ABOVE THIS SPACE) NOT APPLICABLE TO THE NEW WORK OR PART OF THE LANDLORD'S OR ANOTHER TENANT'S ACTIVE SYSTEM MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED/REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REVISED IN THIS PROJECT. IF REQUIRED BY LANDLORD OR CODES, ABANDONED PIPING AND /CR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID AND INCLUDE IN BID PROPOSAL 3. ACTIVE LANDLORD OR OTHER TENANT SERVICES ENCOUNTERED IN WORK SHALL BE PROTECTED AND SUPPORTED. IF EXISTING SERVICES NOT ANTICIPAIW REQUIRE RELOCATION, CONTACT THE DISNEY STORE PROJECT MANAGER IMMEDIATELY. ALL COSTS FOR REPAIR OF DAMAGES TO ACTIVE LANDLORD OR OTHER TENANT SERVICES DURING CONSTRUCTION SHALL BE PAID FOR BY THE CONTRACTOR CAUSING THE DAMAGE. 4. 11E -INS AND MODIFICATIONS TO EXISTING LANDLORD SERVICES MUST BE DONE WITH MINIMUM INTERRUPTION OF LANDLORD OPERATION AND DURING HOURS SPECIFIED BY THE LANDLORD. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING EXACT WORKING HOURS OF THIS WORK WITH THE LANDLORD PRIOR TO SUBMITTING HIS BID. THE CONTRACTOR SHALL INCLUDE IN HIS BID. ALL PREMIUM TIME REQUIRED TO PERFORM MODIFICATIONS DURING OTHER THAN NORMAL WORKING HOURS- ALL SUCH WORK MUST BE COORDINATED WITH THE LANDLORD. DISCREPANCIES IN DOCUMENTS 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFUCT OR ARE UNCLEAR, ADVISE THE GENERAL CONTRACTOR IN WRITING, PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ADVISE THE DISNEY STORE'S PROJECT MANAGER, IN WRITING, OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, THE TENANT PROJECT MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. TRADE NAMES AND MANUFACTURERS 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM STANDARD FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL STORE'S PRO ACCEPTANCE. IN WRITI NG NG BY THE DISNEY JECT MANAGER PRIOR TO ACC[ ANY UNAUTHORIZED EQUIPMENT THE USE OF AN QU WENT SIHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. I. SHOP DRAWINGS 1. SUBMIT TWO COPIES OF MATERIAL LISTS AND SHOP DRAWINGS FOR ALL EQUIPMENT AND DUCT FABRICATION DRAWINGS TO THE GENERAL CONTRACTOR FOR APPROVAL PRIOR TO ORDERING EQUIPMENT. SUBMISSIONS MUST BE EARLY ENOUGH TO ALLOW THE TENANTS PROJECT MANAGER EIGHT WORKING DAYS FOR REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BE IN ACCORDANCE WITH THE GENERAL CONDITIONS USING THE MANUFACTURER'S USTED ON THE DRAWINGS. SHOP DRAWINGS SHALL INCLUDE ALL DATA THAT PERTAINS TO THE REQUIREMENTS SET FORTH ON THE DRAWINGS AND IN THE SPECIFICATIONS. THE SUBMITTAL SHALL INCLUDE BUT NOT LIMITED TO CUTS OR CATALOGS INCLUDING DESCRIPTIVE IJTERATURE AND CHARACTERISTICS OF EQUIPMENT SHALL SHOW MAJOR DIMENSIONS, ROUGHING -IN DATA, CAPACITY, CURVES, PRESSURE DROP, CODE COMPLIANCE, MOTOR AND DRIVE DATA AND ELECTRICAL DATA. OBSERVE SPECIAL INSTRUCTIONS WHEN REQUIRED. SUBMITTALS SHALL BEAR THE STAMP OF THE GENERAL AND SUB- CONTRACTOR SHOWING THAT HE HAS REVIEWED AND CONFIRMED THAT THEY ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS TAKE PLACE. LACK OF SUCH CONTRACTOR'S REVIEW AND APPROVAL WILL BE CAUSE FOR REJECTION WITHOUT REVIEW BY THE TENANTS PROJECT MANAGER. ALL SHOP DRAWINGS MUST APPEAR IN THE OPERATION AND MAINTENANCE MANUALS SENT 113 THE HOME OFFICE OF THE TENANT'S PROJECT MANAGER AT JOB COMPLETION. J. RECORD DRAWINGS 1. THE CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS AND SPECIFICATIONS ON THE JOB STE TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS A. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. B. REVISIONS, ADDENDUMS, AND CHANGE ORDERS. C. SIGNIFICANT DEVIATIONS MADE NECESSARY BY HELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER TRADES. D. EXACT ROUTING OF ALL SANITARY AND DOMESTIC WATER PIPING UNDER FLOOR. 2. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. THE DRAWINGS ARE TO BE SENT TO THE HOME OFFICE OF THE DISNEY STORE'S PROJECT MANAGER. K. GUARANTEE 1. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY THE TENANT'S PROJECT MANAGER. PROVIDE EXTENDED WARRANTIES AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. IN CASE OF REPLACEMENT OR REPAIR OR EQUIPMENT DUE TO FAILURE WITHIN GUARANTEE PEROID, GUARANTEE ON THAT PORTION OF WORK SHALL BE EXTENDED FOR A PEROID OF ONE (1) YEAR FROM DATE OF SUCH REPLACEMENT OR REPAIR. L OPERATIONS MANUALS 1. ONE COPY OF EACH OPERATION AND MAINTENANCE MANUAL FOR ALL EQUIPMENT FURNISHED ON JOB SHALL BE COLLECTED AND INSERTED IN A 3" THREE RING BINDER AND SENT TO THE OFFICE OF THE TENANT'S PROJECT MANAGER. EACH NOTEBOOK SHALL INCLUDE BUT NOT BE UMITED TO INSTALLATION, MAINTENANCE AND OPERATING INSTRUCTIONS, PAMPHLETS OR BROCHURES APPROVED SHOP DRAWINGS AND WARRANTIES OBTAINED FROM EACH MANUFACTURER OF PRINCIPAL ITEMS OF EQUIPMENT. M. SLEEVES 1. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2" ABOVE THE FLOOR. 2 ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND /OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SIUCATE, SILICONE "REV" FOAM, '3M' FIRE RATED SEALANTS OR EQUAL, 50 AS TO RETAIN THE FIRE RATING OF THE FLOOR OR WALL. CONFORM TO U.L ASSEMBLY RATING OF FLOOR OR WALL 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. 4. DUCT SLEEVES TO BE MINIMUM 14 GAUGE STEEL N. HANGERS 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C- CLAMPS WITH RETAINING CUPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OR WORK. 2 HANGERS SHALL BE FASTENED TO BUILDING STEEL CONCRETE, OR MASONRY, BUT NOT TO PIPING OR DUCTWORK. HANGING FROM METAL DECK IS NOT PERMI I IEU. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES OCCUR, IN ORDER TO SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, ACCESS DOORS AND OTHER EQUIPMENT SERVICE REQUIREMENTS AND /OR OTHER TRADES. HANGER TYPES AND INSTALLATION METHODS ARE SUBJECT TO LANDLORD CRITERIA. 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPOT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI- ELECTRICALLY SEPARATED FROM ONE ANOTHER. 0. ACCESS DOORS 1. FURNISH STEEL ACCESS DOORS AND FRAMES, MIN. 16' X 20" OR AS SHOWN ON DRAWINGS, TO GENERAL CONTRACTOR FOR ALL LOCATIONS WHERE NECESSARY TO PROVIDE ACCESS TO CONCEALED VALVES, AND OTHER EQUIPMENT REQUIRING SERVICE OR INSPECTION. LOCATION, TYPE, SIZE AND NUMBER AS DETERMINED BY CONTRACTOR AND APPROVED BY THE TENANTS PROJECT MANAGER TO SUIT EQUIPMENT REQUIREMENTS. GENERAL CONTRACTOR WILL INSTALL ACCESS DOORS AND FRAMES. 2 ACCESS DOORS LOCATED IN FIRE -RATED WALLS, FLOORS, CEILING -FLOOR OR CHUNG -ROOF ASSEMBLIES SHALL BE FIRE RATED. UNDERWRITER'S LABORATORIES. INC., USTED AND LABELED. 3. ACCESS DOORS SHALL BE FLUSH TYPE, MANUFACTURED FROM NO. 14 GAUGE STEEL, COMPLETE WITH FLUSH FLANGE TYPE FRAMES MANUFACTURED FROM NO. 16 GAUGE STEED, PROVIDED WITH ANCHORS. ACCESS DOORS SHALL BE SUITABLE FOR INSTALLATION IN WALL OR CEILING MATERIALS SHOWN IN ROOM FINISH SCHEDULES. P. ELECTRICAL MOTORS 1. FURNISH, INSTALL AND ALIGN ALL MOTORS REQUIRED FOR THIS EQUIPMENT. UNLESS THEY ARE FACTORY INSTALLED ON THE UNIT, ALL STARTERS AND ASSOCIATED WRING AND SAFETY SWITCHES FOR SUCH MOTORS SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR. STARTERS SHALL MEET ALL REQUIREMENTS AS DEFINED IN THE ELECTRICAL DIVISION OF THE SPECIFICATIONS. 2. DESIGN, CONSTRUCTION AND PERFORMANCE CHARACTERISTICS OF MOTORS SHALL CONFORM TO ALL APPLICABLE PROVISIONS OF LATEST NEMA, ANSI, ISEE STANDARDS FOR ELECTRICAL EQUIPMENT. ALL MOTORS SHALL BE SUITABLE FOR OPERATION ON VOLTAGE VARIATION OF PLUS OR MINUS 1D%, 40 DEGREES C AMBIENT TEMPERATURE; HAVE A SERVICE FACTOR OF NOT LESS THAN 1.15. O. LOW VOLTAGE (24 VOLT) WRING 1. THE CONTRACTOR 15 TO INSTALL ALL LOW VOLTAGE WIRING REQUIRED FOR THE EQUIPMENT. THIS WORK INCLUDES All TRANSFORMERS AND DEVICES TO MAKE THIS A COMPLETE FUNCTIONAL SYSTEM. 2 ALL WORK 15 TO CONFORM TO THE LATEST ADDITION N.E.0 AND TO DIVISION 16 ELECTRICAL SPECIFICATIONS. 3. ANY CONDUIT REQUIRED BY CODE DR THE LANDLORD WILL BE INSTALLED BY THE ELECTRICAL SUBCONTRACTOR. DIVISION 15 - MECHANICAL SECTION 15200 A. SCOPE OF WORK PLUMBING 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: (REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES) A. B. C. D. E. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION. PLUMBING FIXTURES AND EQUIPMENT AS SCHEDULED. COMPLETE NATURAL GAS PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS). TESTS AND ADJUSTMENTS. 2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE PLUMBING SYSTEM, MATERIALS. AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 3. RELOCATION OF EXISTING WATER, GAS, WASTE, VENT, OR DRAINAGE ONES TO FACILITATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL B. PLUMBING EQUIPMENT C. GENERAL PIPING REQUIREMENTS 1. GENERALLY, SANITARY AND POTABLE WATER TAPS WILL BE PROVIDED BY THE LANDLORD. FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO SUBMITTING BID AND NOTIFY THE TENANT'S PROJECT MANAGER IF CONDITIONS ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTOR MUST VERIFY THE OPERABIUTY OF ENURE SYSTEM PRIOR TO TIE IN AS FOLLOWS: A. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE B. TEST WATER PRESSURE TO INSURE MINIMUM OF 50 P51. 2. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED BY CODES. 3. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT ALL PIPE PENETRATIONS AT WALLS, FLOORS, AND CEILINGS IN FINISHED AREAS. 4. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE LANDLORD'S CRITERIA. USE A LANDLORD APPROVED ROOFING CONTRACTOR WHERE APPUCABLE. D. PIPING 1. SANITARY PIPING - A. WASTE, DRAIN AND VENT PIPING SHALL BE SERVICE WEIGHT, CAST IRON SOIL PIPE. VENT PIPING ABOVE FLOOR 2" OR SMALLER MAY BE GALVANIZED STEEL B. JOINTS: BELOW FLOOR SLAB - COMPRESSION TYPE PLASTIC SEAL (HUB AND SPIGOT). ABOVE FLOOR SLAB - NEOPRENE SEALING SLEEVE WITH STAINLESS STEEL SHIELD AND CLAMP NTH APPROVED NEOPRENE - BASED LUBRICANT, (HUBLESS). GALVANIZED VENT - SCREWED JOINTS WITH TEFLOW TAPE ON MALE THREADS. C. PITCH WASTE LINES 2' AND SMALLER NOT LESS THAN 1/4' PER FOOT. PITCH LARGER MAINS NOT LESS THAN 1/8' PER FOOT. D. INSTALL A CLEANOUT AT BASE OF EACH SOIL STACK, AT EACH CHANGE IN DIRECTION, AT INTERVALS NOT OVER 50 FEET, AND ELSEWHERE AS SHOWN ON DRAWINGS OR REQUIRED BY LOCAL CODE. CLEANOUTS SHALL NOT BE INSTALLED IN PUBLIC AREAS WITHOUT SPECIFIC PERMISSION BY THE TENANTS PROJECT MANAGER; BUT WHERE NECESSARY, THE WALL COVERS ARE TO BE STAINLESS STEEL AND THE FLOOR COVERS ARE TO BE BRASS (FLUSH WITH FINISHED FLOOR). PROVIDE COVERS WITH INSET AREA FOR CARPETED FLOOR LOCATIONS. ALL CLEAN -OUT LOCATIONS SHALL BE APPROVED BY THE TENANTS PROJECT MANAGER. E. INSULATE ALL HORRIZDNAL RUNS OF PIPING LOCATED IN CEILING SPACES WHEN APPLICABLE. INSULATION TO BE AS SPECIFIED FOR WATER PIPING. F. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH TRUEBRO MODEL 102W ° HAND, LAV GUARD" INSULATION KIT. 2. CONDENSATE PIPING SHALL BE TYPE GALVANIZED PIPE WITH SCREWED FITTINGS WITH DIELETRIC SEPARATION BETWEEN DISSIMILAR METALS. 3. POTABLE WATER PIPING: A. BELOW GRADE: TYPE 'M' COPPER TUBE FOR PIPE. BRASE ALL JOINTS B. ABOVE GRADE TYPE 'M' COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95 -5 T1N- ANTIMONY SOLDER. C. INSTALL AIR CHAMBER SHOCK ABSORBERS IN PIPING SYSTEM TO PREVENT NOISE AND DAMAGE DUE TO WATER HAMMER. D. ALL BRANCH PIPING SYSTEM SHALL HAVE ACCESSIBLE SERVICE VALVE. PROVIDE SHUT OFF VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE ACCESS DOORS WHERE NECESSARY. E. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL U11U11ES REQUIREMENTS IF APPLICABLE. REFER TO PLANS TO DETERMINED IF WATER METER 15 REQUIRED. F. SECURE PIPE AT ANGLE STOPS. G. PROVIDE FLEXIBLE INSERTS AT ALL PIPE PENETRATIONS THROUGH FRAMING TO KEEP PIPES ROM HITTING FRAME WHEN IN OPERATION. 4. INSULATION A. INSULATE ALL WATER AND INTERIOR CONDENSATE PIPING WITH 1' THICK (K =0.23 0 75 F) SNAP -ON FIBERGLASS PIPE INSULATION WITH AN ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATINGS OF 50. APPROVED MANUFACTURER: MANVILLE MICRO -LOK. 5. TEST & STERILIZATION A. LEAKAGE TESTS SHALL BE PER LOCAL CODES, MINIMUM AS FOLLOWS: 1. TEST POTABLE WATER PIPING AND CONDENSATE PIPING AT 125 PSIG FOR SIX HOURS. 2. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS. ALL JOINTS SHALL BE GAS AND WATER 11GHT. 3. TEST GAS PIPING WITH PER NFPA 54 CODES. 4. STERILIZE POTABLE HOT & COLD WATER ONES UPON COMPLETION OF SYSTEM. STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES. DIVISION 15 - MECHANICAL SECTION 15300 FIRE PROTECTION A. SCOPE OF WORK 1. THE F.P. CONTRACTOR SHALL FURNISH ALL LABOR. MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION. COMPLETION AND TESTING OF ALL THE WORK FOR THE SPRINKLER SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TD INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: A. INSTALLATION OF NEW WET SPRINKLER SYSTEM AS REQUIRED TO PROVIDE COVERAGE IN ACCORDANCE WITH NFPA -13, LOCAL CODES, LANDLORD'S CRITERIA, AND INSURANCE CARRIERS FOR THE MALL AND TENANT. B. TAPS, RISERS, LATERALS, BRANCHES, VALVES, ALARMS, SPRINKLER HEADS AND ALL COMPONENTS REQUIRED FOR A COMPLETE SYSTEM. C. DESIGN DRAWINGS, CALCULATIONS, SUBMITTALS AND APPROVALS. D. PERMITS, FEES, AND CHARGES. E. TESTS AND TEST CERTIFICATES. F. COST FOR SHUT DOWN FEES. 2. THE CONTRACTOR THAT DOES THE ACTUAL SPRINKLER WORK IS REQUIRED TO BE A LANDLORD APPROVED SPRINKLER CONTRACTOR. 3. BEFORE STARTING WORK, THE CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE FIRE PROTECTION SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 4. RELOCATION OF EXISTING MAINS, LATERALS, BRANCHES AND RISERS TO FACILITATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL B. SHOP DRAWINGS 1. THE FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS AND CALCULATIONS FOR HIS WORK. SUBMIT TWO (2) COPIES TO GENERAL CONTRACTOR FOR APPROVAL NO WORK SHALL BEGIN UNTIL THE TENANTS PROJECT MANAGER APPROVES IN WRITING THE HEAD AND PIPING LOCATIONS. 2. THE FIRE PROTECTION CONTRACTOR 15 RESPONSIBLE FOR SUBMITTING COORDINATED DRAWINGS, CALCULATIONS, HEAD TYPES AND COLORS TO ALL AUTHORFTIES HAVING JURISDICTION FOR APPROVAL. NO WORK SHALL BEGIN UNTIL ALL APPROVALS HAVE BEEN RECEIVED. 3_ A COPY OF THE LETTER OF APPROVAL FROM THE LANDLORD'S INSURANCE RATING BUREAU SHALL BE FORWARDED TO THE LANDLORD'S AGENT AND TO THE TENANTS PRD,ECT MANAGER. C. EQUIPMENT 1. SPRINKLER HEADS: A. ALL SPRINKLER HEADS SHALL BE NEW (EXISTING HEADS IN EXISTING STORES TO BE REPLACED), U.L, F.M. USTED AND APPROVED AUTOMATIC SPRAY TYPE AS MANUFACTURED BY CENTRAL SPRINKLER CO., GLOBE, GRINNELL, RELIABLE, STAR, OR VIKING. B. ALL SPRINKLER HEADS SHALL BE RATED FOR 165 DEG. F UNLESS INDICATED OTHERWISE ON DRAWINGS OR REQUIRED BY LOCAL CODES. SALES FACTORY APPLIED COLOR C. ALL ALES FLOORS HEADS ARE TO HAVE BE FAC FINISH TO MATCH ARCHITECTURAL CEILING FINISH. VERIFY HEAD TYPES AND COLORS WITH SPECIFICATIONS ON SHEET A010 AND SUBMIT WITH SPRINKLER DRAWINGS FOR PERMIT. D. SPRINKLER HEAD TYPES: SEE SHEET M1.0 FOR ADDITIONAL INFORMATION. D. GENERAL PIPING 1 A FIRE PROTECTION SYSTEM STUB IN MALL BE FURNISHED BY THE LANDLORD. SPRINKLER SPACING SHALL NOT EXCEED 130 SQ. FT. IN 'SALES" AREAS AND 100 SQ. FT. IN "STOCK' AREAS. COMPLY WITH LANDLORD'S DESIGN CRITERIA. PIPE SIZING SHALL BE BASED ON NFPA ORDINARY HAZARD. 2. ALL SPRINKLER LINES SHALL BE INSTALLED CONCEALED, AVOIDING INTERFERENCE MATH LIGHTS, DUCTS, PIPES, STORAGE DECK, ETC. FIRE PROTECTION CONTRACTOR SHALL PREPARE COORDINATED SHOP DRAWINGS INDICATING THE LOCATIONS OF ALL SPRINKLER HEADS, SPRINKLER ONES, LIGHTS, DIFFUSERS, GRILLES AND REGISTERS PRIOR TD INSTALLATION. HORIZONTAL SPRINKLER RUNS AT MERCHANDISE SOFFITS SHALL BE PLACED INSIDE SOFFIT STRUCTURE. VERTICAL DROPS FROM CEILING TO MERCHANDISE SOFFIT SHALL BE LOCATED FLUSH AGAINST DEMISING WALLS. 3. WHERE POSSIBLE, REWORK THE EXISTING SPRINKLER SYSTEM TO MEET THE NEW REQUIREMENTS OF THIS DESIGN. RELOCATE ALL MAINS AND BRANCHES INTERFERING WITH CEILING HEIGHTS, EQUIPMENT. AND MAJOR COMPONENTS INCLUSIVE OF ADJACENT TENANTS AND MALL COMMON AREAS. REMOVE ALL UNUSED PIPING. 4. LOCATIONS OF ALL HEADS SHOULD BE APPROVED BY THE LOCAL FIRE PROTECTION OFFICIAL AND THE TENANTS PROJECT MANAGER BEFORE INSTALLATION. HEADS MUST HE LOCATED IN THE CENTER OF CEILING TILES AND IN A SYMMETRICAL PATTERN WITH OTHER CEILING FIXTURES. ADDITIONAL MONIES WILL NOT BE ALLOCATED FCR ADDITIONAL HEADS REQUIRED BY FIELD FIRE INSPECTOR AFTER BIDS ARE ACCEPTED. HEADS IN MERCHANDISE BAYS SHALL BE CENTERED SIDE TO SIDE AND FRONT TO BACK. 5 PROVIDE AND INSTALL A VALVED TEST CONNECTION FOR THE SPRINKLER SYSTEM AS REQUIRED OR REQUESTED BY THE MALL, LOCAL INSPECTOR, OR INSURANCE CARRIER. COORDINATE LOCATION WITH THE TENANTS PROJECT MANAGER AND LOCAL FIRE PROTECTION OFFICIAL PRIOR TO ROUGH -IN. 6. SPRINKLER HEADS LOCATED IN STOCK, CORRIDOR OR TOILET ROOM CEILINGS OR WALLS BELOW 8' -0' ABOVE THE FINISHED FLOOR ARE TO BE PROTECTED WITH APPROVED GUARDS. E. PIPING: 1. SCHEDULE 40, BLACK STEEL PIPE, ASTM A -53 FOR FERROUS PIPING, WELDED AND SEAMLESS, ANSI B- 36 -10 -70 FOR WROUGHT SHELL PIPE. 2. CAST IRON OR MALLEABLE IRON SCREWED FITTINGS FOR PIPES 2 INCHES AND SMALLER. SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES LARGER THAN 2 INCHES. 3. GALVANIZED OR BLACK MALLEABLE IRON WITH BRASS SEAT SCREWED UNIONS FOR PIPES 2 INCHES AND SMALLER. 4. VICTAULIC TYPE COUPLINGS ARE ACCEPTABLE, WHERE APPROVED BY CODE AND THE LANDLORD. F. ILS'S 1. WHEN COMPLETED, THE ENTIRE FIRE PROTECTION PIPING SYSTEM SHALL BE HYDROSTATICALLY TESTED AS REQUIRED BY THE RULES AND REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION. SYSTEM SHALL SHOW NO SIGNS OF LEAKAGE OR OTHER DEFECTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO THE WORK OF THE OTHER CONTRACTORS OR TO THE BUILDING, OR TO ITS CONTENTS, PEOPLE, ETC., CAUSED BY LEAKS IN ANY OF THE EQUIPMENT INSTALLED BY HIM. ALL REPAIRS OR REPLACEMENT OF DAMAGES SHALL BE AT THIS CONTRACTOR'S EXPENSE. 2. PROPERLY COMPLETED AND SIGNED 'SPRINKLER CONTRACTOR'S MATERIAL AND TEST CERTIFICATES" SHALL BE FURNISHED TO THE LANDLORD, AUTHORITIES HAVING JURISDICTION, AND THE TENANTS PROJECT MANAGER. A. B. C. D. E A SCOPE OF WORK 1. THE HVAC CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE MECHANICAL SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: (REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES) F. G. H. J. DIVISION 15 - MECHANICAL SECTION 15500 HEATING, VENTILATION, AND AIR CONDITIONING HVAC UNITS, EQUIPMENT, AND APPURTENANCES. DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. CHILLED WATER PIPING AND INSULATION (AS APPLICABLE, REFER TO PLANS). DIFFUSERS, GRILLES, AND REGISTERS CURBS AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). TESTING, ADJUSTING, AND BALANCING. OPERATIONS MANUALS. TEMPERATURE CONTROLS AND RELATED DIAGRAMS. SEQUENCES OF OPERATION. CONNECTION TO ANY LANDLORD ENERGY MANAGEMENT SYSTEM. 3. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL STRUCTURAL MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. B. HVAC EQUIPMENT 1. PRIMARY HEATING. VENTILATION AND AIR CONDITIONING UNITS. A. PRIMARY HEATING, VENTILATION, AND AIR CONDITIONING UNITS ARE TO BE BY CARRIER CORPORATION AS SCHEDULED. ALL COMPRESSORS ARE TD INCLUDE A 5 -YEAR EXTENDED WARRANTY. B. NOT USED C. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, APPURTENANCES, AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. D. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE MTH THE MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST HAVE A CONDENSATE DRAIN AND BE TRAPPED IN ACCORDANCE WITH MANUFACTURERS DATA. SEE DRAWINGS FOR ADDITIONAL DETAILS. E. SECONDARY DRAIN PANS ARE REQUIRED TO BE INSTALLED BENEATH ALL INDOOR AIR CONDITIONING EQUIPMENT WITH THE EXCEPTION OF VAV BOXES. SECONDARY PANS ARE TO PROTECT ENTIRE UNIT. PROVIDE CONDENSATE PUMPS, AS REQUIRED. CONDENSATE SHALL BE DIRECTED TO MOP SINK OR AS SPECIFIED ON PLANS. 2. TOILET EXHAUST FANS A. WHERE SHOWN ON DRAWINGS, PROVIDE A TOILET EXHAUST FAN UNIT COMPLETE WITH GRAVITY BACK DRAFT DAMPERS. ALL DUCTWORK, ROOF OPENINGS AND CAPS NECESSARY TO PROVIDE A COMPLETE EXHAUST SYSTEM SHALL BE PROVIDED BY THE CONTRACTOR. REFER TO PLANS FOR APPLICABILITY. 3. VIBRATION ISOLATION DEVICES A. VIBRATION ISOLATION DEVICES SHALL BE PROVIDED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, AIR HANDLERS, FAN POWERED VAV BOXES, ETC.) AND STRUCTURE. RATING EQUIPMENT HUNG FROM STRUCTURE SHALL B. VIB Q BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. C. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID 'GROUNDING' THE ISOLATOR. D. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. E. CONSULT MANUFACTURER FOR APPUCATION DATA. 4. VARIABLE AIR VOWME BOXES (VAV) A. WHERE SHOWN ON DRAWINGS, INSTALL VAV BOXES COMPLETE WITH CONTROLS, (FANS AS REQUIRED). ALL DUCT CONNECTIONS FLEXIBLE DUCT/PIPE CONNECTIONS SHALL BE PROVIDED TO THE THE TENANTS PROJECT MANAGER PRIOR TO INSTALLATION. 5. CURBS AND STEEL FRAMING FOR SUPPORT A. THIS CONTRACTOR WILL PROVIDE ALL NECESSARY CURBS AND STEEL FRAMING REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED OR IMPLIED ON THE DRAWINGS. CURBS SHALL BE A MINIMUM OF 14' HIGH, OF THE SAME MANUFACTURER OF THE EQUIPMENT SUPPORTED. INSULATE UNDER THE COMPRESSOR SECTION TO PREVENT CONDENSATION. ALL CURBS MUST BE INSTALLED SO THAT TOP DF CURBS ARE 'DEAD" LEVEL ALL PENETRATIONS OF DGSTING STRUCTURE SHALL BE DONE IN ACCORDANCE TO THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPENSE. C. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED 1. NO DUCTWORK SHALL BE FABRICATED PRIOR TO APPROVAL BY THE TENANT'S PROJECT MANAGER. SIGNIFICANT DEVIATIONS FROM DESIGN MUST BE APPROVED BY THE TENANT'S PROJECT MANAGER PRIOR TO FABRICATION OR INSTALLATION. ALL DUCT MAINS ARE TD BE RECTANGULAR UNLESS NOTES OTHERWISE. ALL DUCT BRANCHES (IF REQUIRED) TO DIFFUSERS ARE TO BE ROUND RIGID DUCT. (FLEXIBLE DUCT CONNECTIONS TO THE DIFFUSER ARE NOT ALLOWED ON THE SALES FLOOR OR EXPOSED CEILINGS) 2 EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR DUCTS WI11-1 GALVANIZED SHEET STEEL, IN ACCORDANCE WITH SMACNA 'HVAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION. CONFORM TO THE REQUIREMENTS IN THE REFERENCED STANDARD FOR METAL THICKNESS, REINFORCING TYPES AND INTERVALS, 11E ROD APPLICATIONS. AND JOINT TYPES AND INTERVALS. 3. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: (VERIFY WHETHER RETURN OR EXHAUST DUCT IS POSITIVE OR NEGATIVE PRESSURE). A. SUPPLY DUCTS: 2 INCHES WATER GAUGE, POSITIVE PRESSURE B. RETURN AND EXHAUST DUCTS: 2 INCHES WATER GAUGE, NEGATIVE PRESSURE. PRESSURE TEST DUCTS FOR LEAKAGE. REMAKE LEAKING JOINTS AND APPLY SEALANTS AS REQUIRED TO FABRICATE A SYSTEM THAT DOES NOT EXCEED 5% LEAKAGE OR LESS AS STATED BY PRESSURE CLASS RATINGS IN SMACNA STANDARDS. 4. AS A MINIMUM, CROSSBREAK ALL FLAT SURFACES OR REINFORCE WITH A BEAD APPROXIMATELY 3/8" WIDE X 3/16" DEEP ON 12" CENTERS TO PREVENT VIBRATIONS. 5. INSTALL DOUBLE THICKNESS TURNING VANES IN ALL RIGHT ANGLE ELBOWS. 6. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FFEI OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. 7. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1- 1/2"X1-1/2 X1/8" STEEL ANGLE FRAMES AT EACH SIDE OF OPENING, THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. 8. ALL TRAVERSE JOINTS AND SEAMS IN SUPPLY NR DUCT MALL BE SEALED AIR 11GHT WITH DAP CMC DUCT SEALER. JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. 9. SOFT ELASTOMER BUM GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. 10. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE 11. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST DE APPROVED BY THE TENANT'S PROJECT MANAGER PRIOR TO INSTALLATION. LAY -IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS. 12. FLEXIBLE CONNECTIONS A. FLE)9BLE COLLARS SHALL BE PROVIDED IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, AIR HANDLERS, FAN POWERED VAV BOXES, ETC.) AND DUCTS OR CASINGS. ALSO, PROVIDE FLEXIBLE CONNECTIONS WHE RE DUCTS CROSS BUILDING EXPANSION JOINTS. B. FLEXIBLE CONNECTIONS SHALL CONSTRUCTED OF NEOPRENE - COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. C. FLEXIBLE CONNECTION IS TO BE RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. 13. FIRE DAMPERS A. PROVIDE PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES. DAMPERS SHALL BE DESIGNED FOR HORIZONTAL OR VERTICAL FLOW CF AIR AS REQUIRED. FIRE DAMPERS SHALL BE UL LABELED. B. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIRSTREAM AND A 165 DEG. F FUSIBLE UNK, TYPE A, AS MINIMUM. C. PROVIDE ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER UL AND CODE REQUIREMENTS. D. PROVIDE DUCT ACCESS DOORS IN AN ACCESSABLE LOCATION FOR ALL FIRE DAMPERS. DOOR IS TO BE 20 GA GALVANIZED DOOR WITH QUICK- OPENING LATCH AND PIANO HINGE. 14. FLEXIBLE AIR DUCT A. FLEXIBLE AIR DUCT SHALL BE 1" INSULATED CLASS 1 AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN THE BID. B. FLEXIBLE NR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS WITH PRIOR APPROVAL FROM THE TENANTS PROJECT MANAGER. C. FLEXIBLE DUCT SHALL NOT EXTEND OVER 5' -0 IN LENGTH Al" ANY ONE LOCATION AND 15 ONLY USED IN CONCEALED LOCATIONS IF AT ALL D. HYDRONIC PIPING 1. PROVIDE A COMPLETE HYDRONIC PIPING SYSTEM IF APPLICABLE. REFER TO PLANS TO DETERMINE IF A HYDRONIC SYSTEM 5 REQUIRED. 2 PIPING A. HYDRONIC PIPING FOR CHILLED WATER AND /OR HEATING WATER AND /OR CONDENSER WATER SHALL BE ASTM A -120, SCHEDULE 40, ERW, BLACK STEEL PIPE WITH PLAIN ENDS. INSTALL STEEL PIPE WITH WELDED JOINTS WHERE PIPE 15 2 -1/2 INCH AND LARGER. INSTAL SILEL PIPE WITH THREADED JOINTS AND FITTINGS OR INSTALL TYPE ° K" ANNEALED TEMPERED COPPER TUBE WITH SLFOS JOINTS FOR 2 INCH AND SMALLER PIPE. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS. All PIPING SHALL BE IN STRICT CONFORMANCE WITH ASTM, ASA, AND LANDLORD'S REQUIREMENTS, WHICHEVER IS MOST STRINGENT. UNIONS OR FLANGES MUST BE USED AT EQUIPMENT CONNECTIONS WHERE SERVICE OR REMOVAL MAY BE REQUIRED. B. ALL PIPING AND EQUIPMENT SHALL BE PRESSURE TESTED WITHOUT LEAKAGE AT A MINIMUM PRESSURE OF 125 PSI. C. ALL HYDRONIC PIPING AND EQUIPMENT CONNECTED TO THE HVAC PIPING SYSTEM SHALL BE CLEANED AND FLUSHED. REMOVE, CLEAN, AND REPLACE STRAINER SCREENS. FILL TENANTS SYSTEM WITH DOMESTIC WATER AND VENT ALL PIPING AND EQUIPMENT PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM. CONTRACTOR SHALL NOT FILL TENANTS SYSTEM WITH WATER FROM THE LANDLORD'S SYSTEM UNLESS SPECIFICALLY INSTRUCTED TO DO 50 FROM THE LANDLORD'S FIELD REPRESENTATIVE. D. PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM, CONTRACTOR SHALL OBTAIN WRITTEN CONFIRMATION FROM THE LANDLORD'S HELD REPRESENTATIVE, THAT ALL TESTING, FLUSHING, AND PROPER FILLING DF THE TENANTS SYSTEM HAS BEEN COMPLETED IN ACCORDANCE TO THE LANDLORD'S REQUIREMENTS AND THAT THE TENANTS SYSTEM 5 READY TO BE CONNECTED TO THE LANDLORD'S SYSTEM. 3. VALVES A. GATE VALVES, 2 -INCH AND SMALLER: CLASS 150, BODY AND UNION BONNET OF ASTM B 62 CAST BRONZE WITH THREADED OR SOLDER ENDS, INTEGRAL SEAT, RENEWABLE SOLID BRONZE WEDGE DISC, RISING STEM, SCREWED BONNET AND RE- PACKABLE UNDER PRESSURE. BALL VALVES ARE ACCEPTED AS AN EQUAL SUBSTITUTION. B. GATE VALVES, 2 -1/2 INCH AND LARGER: CLASS 125 CAST IRON BODY, RENEWABLE BRONZE SEATS AND SOLID WEDGE DISC, RISING STEM, FLANGED ENDS, AND RE- PACKABLE UNDER PRESSURE C. SWING CHECK VALVES, 2 --INCH AND SMALLER: CLASS 150, CAST BRONZE BODY AND CAP CONFORMING TO ASTM B 62 WITH HORIZONTAL SWING, Y- PATTERN, RENEWABLE BRONZE DISC, AND HAVING THREADED OR SOLDERED ENDS. D. SWING CHECK VALVE, 2 -1/2 INCH AND LARGER: CLASS 125 CAST IRON BODY AND BOLTED CAP, HORIZONTAL SWING, RENEWABLE BRONZE DISC, FLANGED ENDS AND CAPABLE OF BEING REFITTED WHILE THE VALVE REMAINS IN THE LINE. E. COMBINATION BALANCING AND SHUT -OFF VALVES: BELL & GOSSLII CIRCUIT SETTER WITH LOOKING SETPOINT. A CIRCUIT SETTER BALANCE WHEEL MUST BE INCLUDED WITH 0 & M MANUAL. F. FLOW METER: BELL AND GOSSEI1 THERMOFLO INDICATOR MODEL TEL 4. PIPING SPECIALTIES A. PRESSURE/TEMPERATURE TEST PLUGS ( PETE'S PLUG) - 1/4 INCH NPT FITTINGS TO RECEIVE EITHER A TEMPERATURE OR PRESSURE PROBE, 1/8 INCH O.D. FITTING AND CAPS SHALL BE BRASS WITH VALVE CORE OF NORDEL, RATED AT 400 PSIG, 0 DEG. F TO 200 DEG. F. B. STRAINERS - Y PATTERN STRAINERS, 125 PSIG, CAST IRON BODY MTH PERFORATED STAINLESS STEEL SCREEN, THREADED FOR 2 INCHES AND SMALLER, FLANGED FOR 2-1/2 INCHES AND LARGER. SCREEN OPENING SIZE AT 0.033 INCH FOR HEATING AND 1/8 INCH FOR CHILLED OR CONDENSER WATER. PROVIDE WITH BLOW/OWN VALVE WITH HOSE END FITTING. C. THERMOMETERS - DIE CAST ALUMINUM, 9' INDUSTRIAL MERCURY THERMOMETER, FULLY ADJUSTABLE W11H CLEAR ACRYLIC WINDOW AND BRASS SEPARABLE SOCKET. D. MANUAL AIR VENTS - 1/8' COIN - OPERATED VENT. PROVIDE AN AIR CHAMBER CONSISTING OF A 3/4' NIPPLE AND BUSHINGS. 5. GENERAL INSTALLATION A. INSTALL WATER MAINS WITHOUT PITCH. USE ECCENTRIC REDUCING COUPLINGS AT CHANGES IN SIZE WITH THE TOP OF PIPES AT SAME ELEVATION. MAKE CHANGES IN DIRECTION WITH FITTINGS. B. BRANCHES TO UNITS BELOW MAINS TO BE TAKEN FROM BOTTOM OF MAINS AT A 45 DEGREE ANGLE, PITCH DOWNWARD TOWARD UNITS. BRANCHES TO UNITS ABOVE MAINS TO BE TAKEN FROM TOP OF MAINS AT A 45 DEGREE ANGLE PITCHED UPWARD TOWARDS UNITS. PITCH NOT LESS THAN 1" TO 10 FEET. C. HANGERS SHALL BE SIZED AND INSTALLED FOR THE OUTSIDE DIAMETER OF THE INSULATED PIPE. INSTALL 6' LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND PIPE INSULATION. D. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DIELECTRICALLY SEPARATED FROM ONE ANOTHER. E. SEE PLANS FOR APPUCABLE DETAILS. F. ALL PRESSURE PIPING SYSTEMS INSTALLED SHALL CONFORM TO THE REQUIREMENTS OF THE STATE PIPING AND WELDING CODES. G. INSTALL VALVES AT LOW POINTS FOR DRAINING EACH SYSTEM AND INSTALL MANUAL VENTS AT ALL HIGH POINTS OF EQUIPMENT AND PIPING IN THE SYSTEM TO PROPERLY REMOVE ENTRAPPED AIR. 6. INSULATION A. ALL HYDRONIC PIPING FOR CHILLED WATER AND /OR HEATING WATER, VALVES, FITTINGS. AND ACCESSORIES SHALL BE INSULATED. FDR PIPE SIZES UP TO 2 INCHES, INSULATE WITH 1 INCH THICK (K =0.23 @ 75 F) FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. FOR PIPE SIZES 2 -1/2 INCHES AND LARGER, INSULATE WITH 1 -1/2 INCH THICK (K =0.23 0 75 F) FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. B. INSULATION AT ALL HANGERS FOR PIPING 2 -1/2 INCHES AND LARGER SHALL BE HARD AND NON - COMPRESSIBLE. C. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 TO CONFORM WITH THE REQUIREMENTS OF THE NFPA. 15. SUPPLY AIR TAKE -OFT FITTINGS A PROVIDE CONICAL OR "BELL - MOUTH" TAKE -OFFS FROM MAIN DUCTWORK TO ROUND BRANCHES. INSTALL PER MANUFACTURER'S INSTRUCTIONS. B. PROVIDE 45 DEG. RECTANGULAR TAKE -OFFS FROM MAIN DUCTWORK TO RECTANGULAR BRANCHES. 16. DAMPERS A PROVIDE MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE OPERATORS IN EACH BRANCH DUCT AND AS SHOWN ON PLANS TO FACIUTATE AIR BALANCING. B. WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED, YOUNG'S REGULATORS SHALL BE USED. C. ALL RECTANGULAR DAMPERS IN OUTSIDE NR, RELIEF AIR, OR RETURN AIR DUCTS ARE TO BE OF OPPOSED BLADE TYPE. ALL OUTSDE AIR DUCT DAMPERS MUST ALSO BE OF THE LOW LEAKAGE TYPE. D. ALL MOTORIZED DAMPERS NOT FURNISHED WITH EQUIPMENT ARE TO BE HONEYWELL DAMPERS. 17. DIFFUSERS, GRILLES, AND REGISTERS A. PROVIDE DIFFUSERS GRILLES AND REGISTERS AS SCHEDULED. DEVICES TO BE COMPLETE WITH DAMPERS FRAMES AND ALL ACCESSORIES. FINISH AS INDICATED. B. INSTALL ALL AIR DEVICES AS LOCATED ON THE ARCHITECTURAL REFLECTED CEILING PLAN. C. APPROVED MANUFACTURERS: KRUEGER. NO SUBSTITUTIONS WITHOUT WRITTEN APPROVAL FOR THE TENANTS PROJECT MANAGER. 19. DUCTWORK INSULATION A INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NFPA 90A. B. ALL ROUND AND OUTSIDE AIR DUCTWORK ABOVE THE FINISHED CEILING SHALL BE EXTERNALLY INSULATED WITH A MINIMUM OF 1- 1/2`THICK, 1 -1/2 LB. DENSITY DUCT WRAP WITH VAPOR BARRIER. VAPOR BARRIER IS TO BE F MAINTAINED THROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE TAPED SO THAT NO INSULATION FIBER IS VISIBLE EXTEND DUCTWORK INSULATION' WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, AND SIMILAR PENETRATIONS. C. PROVIDE 1' THICK 1 1/2 LB. INTERNAL DUCT LINER ON ALL RETANGULAR SUPPLY DUCTS WHERE INDICATED ON PLANS. ( ;; D. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 WHEN TESTED IN ACCORDANCE WITH ASTM C 411, OR AS REQUIRED BY LOCAL CODES. 20. SYSTEM CLEANDUT A. DUCTWORK AND AIR HANDLING EQUIPMENT 15 TO BE [LEANED OUT AND BLOWN OUT BEFORE PAINTING IS STARTED BY THE GENERAL CONTRACTOR. B. FILTERS MUST BE IN UNITS AT ANY TIME FANS ARE OPERATED. E. SYSTEM TESTING, ADJUSTING, AND BALANCING 1. TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR WHO 5 CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THOR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING SHALL BE MADE BY THE GENERAL CONTRACTOR. 2. THE HVAC CONTRACTOR SHALL INSTALL NEW FILTERS IN ALL UNITS PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION. 3. BALANCE AIR AND WATER QUANTITIES TO WITHIN + 5% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS, PULLEYS, OR THE ADDITION OF DAMPERS REQUIRED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO THE TENANTS PROJECT MANAGER. 4. THE BALANCE REPORT SHALL INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION: A. AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF BALANCING CONTRACTOR. B. INSTRUMENTATION UST WITH LAST CALIBRATION DATES. C. MAKE AND MODEL NUMBERS OF ALL HVAC EQUIPMENT TESTED. D. AIR CFM AND STATIC PRESSURE READINGS (DISCHARGE AND SUCTION) AS MEASURED BY PITDT TUBE DUCT TRAVERSE Al" THE UNIT. E. MOTOR NAMEPLATE DATA WITH ACTUAL FIELD VOLTAGE AND AMPERAGE READINGS FOR EACH LEG. F. MOTOR AND FAN RPMS, SHEAVE SIZES AND BELT SIZES. G. OUTSIDE, RETURN, MIXED AND SUPPLY NR TEMPERATURES AT FULL COOLING. H. WATER BALANCE DATA INCLUDING GPM WITH INLET AND OUTLET TEMPERATURE AND PRESSURE READINGS (WHERE APPLICABLE). I. MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. J. FINAL BALANCED AIR VOLUMES AT I R ALL OUTLETS (INCLUDING [TURNS WHERE DUCTED). K. INDEXED PLAN WITH DIFFUSER AND RETURN LOCATIONS 5. ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND OPERATING STATUS RECORDED IN THE REPORT. 6. THREE STAMPED ORIGINALS OF THE BALANCE REPORT SHALL BE SUBMIIILU THROUGH THE GENERAL CONTRACTOR TO THE TENANTS PROJECT MANAGER FOR APPROVAL 7. THE BALANCING CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED IN THESE DRAWINGS, THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT THE TENANT DEEMS NECESSARY AT NO ADDITIONAL COST TO THE TENANT. 8. FINAL BALANCE REPORT SHALL BE INCLUDED IN THE OPERATION At MAINTENANCE MANUALS. F. FINAL HVAC INSPECTIONS 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, THE TENANT SHALL HAVE THE RIGHT TO HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE FINI SHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS, AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS AT NO COST TO THE TENANT. M0 209 REVISIONS i0 Cr] Q) Cr) 0 a ) 00 CO co 8 co N 0 O 1D CD c co DATE: 09.20.07 SCALE: 1/4 " =T - DRAWN: TAS JOB: MP_SOCM SHEET 3 OF 3 M €HEETS M.3 BY U LU CC a X W ECEAV D SEP 2 7 2007 PERMIT CENTER