Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M07-224 - BOEING #9-99
BOEING #9 -99 9725 EAST MARGINAL WY S EXPIRED 09 -09 -OS M07 -224 Parcel No.: 0003400018 Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Cityf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 9725 EAST MARGINAL WY S TUKW BOEING #9 -99 9725 EAST MARGINAL WY S , TUKWILA WA BOEING COMPANY THE PROPERTY TAX DEPT , PO BOX 3707 M/C 20-00 Contact Person: Name: JOE CEDERNA Address: 9410 DELRIDGE WY SW , SEATTLE WA MECHANICAL PERMIT Contractor: Name: SYSTEM HEATING & AIR CONDITIONING CO INC Address: 9410 DELRIDGE WY SW , SEATTLE WA Contractor License No: SYSTEHA19OBT DESCRIPTION OF WORK: 3RD FLOOR MECHANICAL PENTHOUSE. REPLACE AHU AND MODIFY DUCTWORK. Value of Mechanical: $81,613.00 Type of Fire Protection: Furnace: <100K BTU 0 >100K BTIJ 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 0 Appliance Vent 0 Repair or Addition to Heat/Refrig /Cooling System.... 0 Air Handling Unit <10,000 CFM 0 >10,000 CFM 1 Evaporator Cooler 0 Ventilation Fan connected to single duct 1 Ventilation System 0 Hood and Duct 0 Incinerator: Domestic 0 Commercial/Industrial 0 EQUIPMENT TYPE AND OUANTITY * *continued on next page ** Permit Number: Issue Date: Permit Expires On: M07 -224 12/17/2007 06/14/2008 Phone: Phone: 206 762 -4249 X 109 Phone: 206 - 762 -4249 Expiration Date: 10/02/2008 Fees Collected: $836.23 International Mechanical Code Edition: 2006 Boiler Compressor: 0-3 HP /100,000 BTU 0 3-15 HP /500,000 BTU 0 15-30 HP /1,000,000 BTU.. 0 30-50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment doc: IMC -10/06 M07 -224 Printed: 12 -17 -2007 Permit Center Authorized Signature: Signature: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read and ed this permit and know the same to be true and correct. All provisions of law and ordinance: governing this work will be complied , whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulatinc construction or the performance of work. I am authorized to sign and obtain this mechanical permit. Permit Number: M07 -224 Issue Date: 12/17/2007 Permit Expires On: 06/14/2008 Date: Date: v24E14 Print Name: �G�/l,✓1 -� �/� 1 �✓1 l� This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspende or abandoned for a period of 180 days from the last inspection. doe: IMC-10 /06 M07 -224 Printed: 12 -17 -2007 1: ** *BUILDING DEPARTMENT CONDITIONS * ** City of Tukwila Parcel No.: 0003400018 Address: 9725 EAST MARGINAL WY S TUKW Suite No: Tenant: BOEING #9 -99 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http://www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M07 -224 Status: ISSUED Applied Date: 10/19/2007 Issue Date: 12/17/2007 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206 - 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** 11: Maintain sprinkler coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may require relocating and/or adding sprinkler heads. (IFC 901.4) 12: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate flooring, cutting tables, shelves and overhead doors. (NFPA 13- 8.6.5.3.3) 13: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk Insurers Kemper or any other representative designated and/or recognized by the City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #2050) 14: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) doc: Cond -10/06 M07 -224 Printed: 12 -17 -2007 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 15: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 16: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 20: An electrical permit from the City of Tukwila Building Department Permit Center (206431 -3670) is required for this project. 21: All electrical work and equipment shall conform strictly to the standards of the National Electrical Code. (NFPA 70) 22: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 23: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 24: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. * *continued on next page ** doc: Cond -10/06 M07 -224 Printed: 12 -17 -2007 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: doc: Cond -10106 Print Name: a_ A �/�� — ►� (� Date: k / � M07 -224 Printed: 12 -17 -2007 SITE LOCATION r l� Site Address: C — 4. — L E . NA.,yRG wP.�r ', • Suite Number: Tenant Name: \'N C, J'C) Property Owners Name: - t' k-kF Mailing Address: It r) . 12:,2\1. Company Name: Mailing Address: Contact Person: E -Mail Address: Mailing Address: Cc') ti l "T P_S. ,TI ON. \ G City Company Name: CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.waus IA Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** Contact Person: leC,C\/ fv l >I t i E -Mail Address: \c C=V 1 '. , F N, 1� Q \ApplicamonstFonns- Applications On Line 3 -2006 - Permit Application.doc Revised: 9 - 2006 bh Building Permit No. Permit No. Plumbing/Gas Permit No. Public Works Permit No. Project No. For office use only) C • C A(■, C) City King Co Assessor's Tax No.: COO GO I v Floor: New Tenant: ❑ Yes R{No \L State CONTACT PERSON - who do we contact when your permit is ready to be issued Name: Lint =- C l l �� Day Telephone: — )( 4 ) 762 - 424 k 1cq Mailing Address: (-42.1 V 1 ZQ11 - )(3 L t) t / S(-c.J City E -Mail Address: LiCEDE '�C'� 5' S1 .\ --\ t NG1CCYvEax Number: 266 6c/CiS State Zip GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: ¶ V TE) \ G cc) \ tvt C' Mailing Address:G4 \O 0 G q' r City State Zip �~ Contact Person: vs CE �C�t. Day Telephone: ZcO 762 — 4 ?LP Y CDC E -Mail Address: c CJF12.1'-() 5€)v-Er � X_fp/v N. Fax Number: 206 Contractor Registration Number: SYST F - \G.C7 FNT Expiration Date: 1C) - Z - ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record State Zip Zip City Day Telephone: Fax Number: ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record State Zip Day Telephone: - LC C SG14 - 14.E Fax Number: - 4e5-2. Page 1 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Fumace>100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct , Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30 - 50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator – Comm/Ind • MECHANICAL PERMIT INFORMATION - 206 -431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: t1C; 4- A- \0 csDk-ss> \.'t I. C> tiG , C_C). . 1 ‘\1, C Mailing Address: 9L{ In \ \ 1Z \ 1 ( C C :51A) City State Zip Contact Person: Day Telephone: E -Mail Address: (PE \T VC- \ `t\i,�' D - P ("t , 1 n c l Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ t / �� - Scope of Work (please provide detailed information): r c `` �- L \ / IAn c) r �l TW OZ )C\ Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... ❑ Replacement .... Lld' Fuel Type: Electric ❑ Gas ....CI Other: r HLA.) / 1 -C_ F P. CD! C = A■S. ?/ ."_ Indicate type of mechanical work being installed and the quantity below: Q:\Applications\Foros- Applications On Line 3 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 4 of 6 I PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Signature: Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). Date Application Accepted: BUILDING OWNER 0 . -y" ORIZED AGENT: Date: 1O — Print Name: 1O Day Telephone: "?CiF, 7-07 - &7Z-G y 1 Mailing Address:-Lt 1() \ >F1 .Nix '7 F Li AV ,S/t) S i l E lam - Cr=3 I ,e) City State Zip Date Application Expires: 09 1 lic1 iolwl/AA— Q \Applications\Forms- Applications On Line'3 -2006 - Permit Application. doc Revised 9 -2006 bh Staff Initials: Page 6 of 6 i Receipt No.: R07 -02294 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us 000/322.100 000/345.830 RECEIPT Parcel No.: 0003400018 Permit Number: M07 -224 Address: 9725 EAST MARGINAL WY S TUKW Status: PENDING Suite No: Applied Date: 10/19/2007 Applicant: BOEING #9 -99 Issue Date: Initials: JEW' Payment Date: 10/19/2007 12:14 PM User ID: 1165 Balance: $0.00 Payee: SYSTEM HEATING & AIR CONDITIONING CO., INC. TRANSACTION LIST: Type Method Description Amount Payment Check 24234 836.23 Account Code Current Pmts Payment Amount: $836.23 674.98 161.25 Total: $836.23 doc: Receiot -06 Printed: 10 -19 -2007 Pro ect: 0 e/i✓4 -c1 -% Type of Inspection: F A/ A / �c Address: c 7Z 3 F //)84,/„,4 Date Called: Special Instructions: Date Wanted: .3-/1 -08 a.m P.m. Requester: Phone No: -7 e D S/ - 225 - 7 2 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION II- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3 0 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Sjh 4 _5 /4/ - Ath 4. Cye' /JCS f?P C .7A. Q Lc. r r ' .00 REINSPECTION FEE RHQU D. Prior to inspection, fee must be aid at 6300 Southcenter Blvd. uite 100. Call the schedule reinspection. ceipt No.: 'Date: P967-22, Dat / Project: /ofi%v.t j -- q Type of)pspection: d * h - / Address: '725 P/Y S7" /)7,..'W 6 Date Call d: (ti'/ Special Instructions: �1 l �. - 4, `h y 3:.-:�„ ' q r ., 1 Date Wanted: /- 5- ec a p.m. Requester: Phone No: c7o‘' 5 7/ - Z9 _ 7 1 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 X Approved per applicable codes. Corrections required prior to approval. / COMMENTS: / %- - 4 ipvl/ P c7 "Vd / f , , , f �.,, ,-�— 4/4 Inspect s Date: — O{ REINSPECTION FEE REQUIRED. Pyi to inspection, fee must be d at 6300 Southcenter Blvd., Suite 109' Call the schedule reinspection. Receipt No.: ( IDate: 3805108 NE, BELLEVUE WA 98004 425 - 828 -6536 — PH 425 - 828 -3982 — FAX ,SALES(6)NORBYCO.COM — MAIN EMAIL TO: Boeing Company Sincerely, Norby Company Jim Pechan NOTE: HEATING VENTILATING AND AIR - CONDITIONING EQUIPMENT QTY: 1 15K Indoor Mr Handling Unit MOa -gay McQuay, "Vision" indoor air handling unit complete features: • 2" double walled construction. • Double walled, hinged access doors. • 12 x 12 view window in fan access door CORRE TION LTR # Mo'7 PROPOSAL with the following Y --- r..— .�.....— ,....— ..saw -..�.. REVIEWED FUR CODE COMPLIANCE • Marine light with switch & GFI receptacle in fan section • Mixing box with two top low leak dampers • Qty 2 actuators for the above dampers • 1 set of MERV 5 filters • Seismic spring isolated fan assembly BUILD • ABB, factory mounted VFD w/ cir. brkr. disconnect, line rea `� DIVISION electronic bypass (comes in package). • Hot water coil (No valve – excluded) • Chilled water coil (No valve – excluded) • Air Blender (may not be required) ' — a TEFC motors Plenum fan wheel, shaft, belt, & inlet guards • VFD certified start-up 1. Shipment in 7 – 9 weeks ARO, alternate faster deliveries available for additional money if required. 2. Coil control valves are not included. 3. Sprinklers are not available – access space provided for field installation. 4. Anti -slam detention cylinder on doors are not included. Delivery Terms: FOB Factory / Full Freight Allowed Terms of Payments: N /30 days Sales Will Be Made Subject To Regular Terms And Agreements Of Manufacturers • Prices Subject to Change Without Notice DEC 12 801 ty Of Tukwila NOV 2 9 20U7 PERMIT CENTEL Unit configuration Drive (handing) location Inline horizontal I Left SUPPLY RETURN /EXHAUST Air volume 15000 Insulation s cfrn Altitude 0 Base ft Turning loss 0.00 Tread Plate floor liner in WC. External static 1.00 in WC. Total static 3.13 in WC. External H x W 60 x 98 (Not including base rails) Ins CASING DETAILS Outer panel Standard G90 gale steel (unpainted) Liner Galvanized steel (Unless noted per section) Insulation R -13 Injected Foam (Unless noted per section) Frame 2 ins Base 6" formed channel Sound baffles None (unless noted per section) Tread Plate floor liner None (unless noted per section) JOB NAME HLS592(XX.000) REP. OFFICE Norby Company JOB DESCRIPTION Boeing 9-99 15K AHU SALESPERSON JJP MODEL NUMBER CAH030GDOC ENGINEER UNIT TAGGING 15,000 CFM AHU VERSION 8.41 AIR HANDLING UNIT TECHNICAL DATA 11 MIXING BOX(32 Ins) 1 SECTION Drain pan Length x Width Location Dampers Actuation Rated cfm Air pressure drop Door location Door width Door opening Drain pan DOOR DATA Door location Door width Door opening None OUTSIDE AIR 28.00 x 94.00 End UltraSeal Low Leak 15000 0.09 DOOR DATA Drive side 28 Outward 12 ACCESS SECTION(16 Ins) 'SECTION 1 None Drain side RETURN AIR 28.00 x 94.00 Top UltraSeal Low Leak 15000 Window size ins Ught Removable panels Window size 12 ins tight Outward () ® McQuay International 3/6/2007, www.mcauay.com Page 1 of 5 Drain side None None None None Date Saved : 3/6/2007 ins dm in WC AIR HANDLING UNiT TECHNICAL DATA L3 PANEL FiLTER(12 Ins) !SECTION 1 i Type Efficiency Face velocity Face area Air volume Throwaway (MERV 5) 458 fpm 32.8 ft2 15000 cfm I BANK ARRANGEMENT No. of Filters Size H x W x D 8 20.00 x 24.00 x 2.00 4 12.00 x 24.00 x 2.00 Ins DOOR DATA Door location Door width Door opening Drive side 8 Outward ins Clean air press. drop 0.22 Mean alr press. drop 0.61 Dirty air press. drop 1.00 Access Side Window size Light None None Date Saved : 3/6/2007 ins WC ins WC ins WC 14 ACCESS SECTION(16 Ins) SECTION 1 1 Drain pan DOOR DATA Door location Door width Door opening None Removable panels 12 Outward ins 15 HOT WATER COIL(12 ins) 'SECTION 11 Coil model 5W81101C Number of cons Capacity 336266 Btu/h Number of rows Fins per inch Air volume Entering db Leaving db Finned height x length Face area Face velocity Coil air pressure drop Connection type Connection Qty x size Connection location Glycol type ( %) Fouling Factor Coil code 15000 68.5 89.0 24 x 82 27.33 549 0.21 Threaded 2 x 1.50 Drive side - (0 %) 0 5WB1101C cfm F F ins it2 ft/m ins WC ins o 0 McQuay International 3/6/2007. www.mcouay.cont Page 2 of 5 Drain side Window size Light Entering water Leaving water Water flow rate Water pressure drop Water velocity Fluid volume Fluid weight Fin material Tube material Header material Case material Drain pan Drain pan side Turbospirals Electro-fin coat None None 2 1 11 200.0 148.2 12.50 0.50 1.70 4.0 36.00 Aluminum (.0075) Copper (.020) Copper Galvanized track None None None F F gpm ftHD ft/s gal lb [6 CHILLED WATER COIL(30 ins) SECTION 21 Coil model Total capacity Sensible capacity Air volume Entering db/wb Leaving db/wb Finned height x length Face area Face velocity Coil air pressure drop Connection type Connection Qty x size Connection location Glycol type (%) Fouling Factor Coil code Drain pan DOOR DATA Door location Door width Door opening AIR HANDLING UNIT TECHNICAL DATA 5WL1206C 472566 436854 15000 76.5 / 60.8 49.9 / 49.3 24 x 85 28.33 529 1.22 Threaded 2 x 2.00 Drive side -(0%) 0 5WL1206C IT ACCESS SECTION(24 Ins) SECTION 21 None Drive side 20 Outward Btu/h Btu/h cfm F F ins ft2 ft/m ins WC Fin material Ins Tube material Header material Case material Drain pan Window size ins Ught () ® McQuay International 3/6/2007, www.mcquay.com Page 3 of 5 Number of coils Number of rows Fins per inch Entering water Leaving water Water flow rate Water pressure drop Water velocity Fluid volume Fluid weight Drain pan side Turbospirals Electra -fin coat Drain side 2 6 12 42.0 58.0 59.00 5.50 2.60 22.0 191.00 None None Date Saved : 3/6/2007 Aluminum (.0075) Copper (.020) Copper Galt'. steel Microbial resistant coated galvanized Drive side None None F F gpm ftHD ft/s gal lb Mme' 18 SUPPLY FAN SECTION(56 Ins) [SECTION 31 Air volume External static pressure Total static pressure Type Blade type/Class Fan wheel diameter Brake horsepower Operating/Max speed Discharge Air modulation Drain pan Drain pan side Wheel guard Belt guard Inspection port DRIVES Fan sheave Number of belts Type Seismic restraint Door location Door width Door opening Selection type Option type Mounting Enclosure Drain pan Opening location I DOOR DATA Door location Door width Door opening AIR HANDLING UNIT TECHNICAL DATA 15000 1.00 3.13 Plenum AirFoil / 2 33.00 11.48 1131 / 1579 Axial None None Provided Provided None 2B5V90 2 Spring With snubbers Drive side 30 Outward cfm ins WC ins WC ins HP rpm I ANTI - VIBRATION MOUNTS / SPRINGS I DOOR DATA Ins VFD / STARTER / DISCONNECT DATA VFD E- Bypass, CB Disconnect, AC Line Reactor Door Side NEMA 1 None None Drive side 26 Outward Motor power Motor type Frame size Electrical supply Motor efficiency Motor speed Motor pole Full load current Lock rotor current Motor supplier Actual drive service fac. Bearing type Outlet velocity Inlet screen Provided Outlet screen None Motor sheave Belt Window size Light Vendor Voltage HxWxD Coil Voltage 19 PLENUM SECTION(30 ins) I SECTION 31 Drain side Opening size Window size ins Light 15.0 ODP 254 T frame 230 - 460/60/3 Premium 1750 4 37.8 / 18.9 233.6 / 117 Generic 1.53 Standard - L50 (200K) 2B5V60 BX92 12x12ins Marine light kit with GFI outlet ABB (Model ACH550) 460 47.00 x 4.90 x 10.60 ins N/A 26.00 x 94.00 None None Date Saved : 3/6/2007 HP rpm A A ft/m ins (CONTROL DETAILS Control Company Control Type 1 Mixing box 2 Mixing box Invensys Digital Ready o ® McQuay International 3/6/2007, www.rncauay.com Page 4 of 5 Number Of Control Points Belimo Outside Air /Return Air Dampers (Mech Linked) (ACTOBeiimo Outside Air /Return Air Dampers (Mech Linked) (ACTOBeilmo COMPONENT I DESCRIPTION I VENDOR I MODEL # Belimo 2 AF24 -MFT US + P -10001 AF24 -MFT US + P -10001 rattlumi SHIPPING SECTION DETAILS Length (inches) Weight (lb) Section 1 88 1524 Section 2 54 1588 Section 3 86 2511 TOTALS 228.00 (Lower level total) 5623 (Entire unit weight) AIR HANDLING UNIT TECHNICAL DATA Date Saved : 3/6/2007 NOTES Plenum (plug) fan applications are outside the scope of ARI Standard 430. As a standalone component, unit meets or exceeds requirements of ASHRAE 90.1 -1999. The approving authority is responsible for compliance of multi- component building systems. UNIT SOUND Radiated Unit discharge Unit return 63 Hz 125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz 8000 Hz 80 85 77 70 63 58 40 34 88 93 89 87 83 81 75 70 84 89 84 81 76 74 66 67 () ® McQuay International 3/6/2007, www.mcauay.com Page 5 of 5 A B C D E F G H J Cold water inlet K Condensate drain conn. L Supply outlet Dimensions measured from 6) NOTE: Opening Damper Damper Hot water outlet Hot water inlet Hot water outlet Hot water inlet Cold water outlet Cold water inlet Cold water outlet VIEW: DRAWN: JOB NAME: UNIT TAGGING: MODEL: Right Side March-06 -2007 (13:53) Boeing 9-99 15K AHU 15,000 CFM AHU CAH030GDDC X Y Z 0.00 2.00 22.00 2.00 2.00 66.00 80.57 105.00 33.80 80.57 105.00 13.65 80.57 105.00 59.20 80.57 105.00 39.05 92.66 105.00 34.94 99.16 105.00 13.06 92.66 105.00 60.94 99.16 105.00 39.06 103.00 100.90 9.00 228.00 2.00 38.00 W(Width) 94.00 94.00 1.50ins. MPS 1.50ins. MPS 1.50Ins. MPS 1.50Ins. MPS 2.00ins. MPS 2.00ins. MPS 2.00ins. MPS 2.00ins. MPS 1.25ins. MPS 94.00 C 9 El H(HeIght) 28.00 28.00 26.00 J Base 6.00ins deep, Cross members extend 4ins on each side of the unit. z r McQuay .x REPLACEMENT AHU, JOB 55776009 SPECIFICATION NO. 5728 J3OEING DEVELOPMENTAL CENTER. BLDG 9 -99 DECEMBER 18. 2006 PREPARED BY: REVIEWED BY: CONTENTS BRIAN HARR RALPH SQIJIRES ( SPECIFICATION 5728 REPLACEMENT OFFICE AIR HANDING UNIT BOEING DEVELOPMENTAL CENTER BUILDING 9 -99 TUKWILA, WA DECEMBER 19, 2006 I. Overview 2 2. Capacities 2 3. General Arrangement 2 4. Standards 2 5. Quality Assurance 3 6. General Construction 3 7. Mixing Box 3 8. Dampers 4 9. Blender 4 10. Filter Section 4 11. Sprinklers 4 12. Chilled Water & Hot Water Coils 4 13. Drain Pans 5 14. Fan 5 15. Motors S 16. Drive 7 17. Combination Variable- Frequency Drive and Disconnects 7 18. Vibration Isolation 7 19. Discharge 7 20. Controls 8 21. Submittals With Quotation 8 SPECIFICATION 5728 PAGE - I REPLACEMENT AHU, JOB 55776009 pOEING DEVELOPMENTAL CENTER. BLDG 9 -99 DECEMBER IR. 2006 1. OVERVIEW A. This specification is for purchase of a replacement air handler to be installed in the third -floor mechanical room of Building 9 -99. The heating/cooling system will serve four variable air volume zones, one on the first floor and three on the second. 2. CAPACITIES 3. GENERAL ARRANGEMENT This diagram shows the general arrangement of the required air handling unit: 4. STANDARDS A. B. C. D. E. FOUR VAV ZONES AMCA 99 AMCA 210 AMCA 300 AMCA 500 ANSI/AFBMA 9 SPECIFICATION NO. 5728 RA OA FAN COILS FILTERS BLENDER MIXING (if recom BOX mended) General arrangement. side view. viewed from the service side, Standards Handbook Laboratory Methods of Testing Fans for Rating Purposes Test Code for Sound Rating Air Moving Devices Test Method for Louvers, Dampers, and Shutters Load Ratings and Fatigue Life for Ball Bearings 9 SPECIFICATION 5728 PAGE -2 CFM EXTERNAL SP Base performance at sea level SUP. FAN 15000 1.0 " WG I 1 I AIR TEMP, F WATER TEMP, F HEATING BTU/HR IN OUT IN OUT GPM 250,000 68.5 88.7 200 160 12.5 AIR IN TEMP. F AIR OUT TEMP. F WATER TEMP. F COOLING BTU /HR IN DB IN WB H DB WB I H IN I OUT ( GPM 356,000 76.5 60.8 26.9 50 49.5 19.9 42 54 59 REPLACEMENT AHU, JOB 55776009 pOEING DEVELOPMENTAL CENTER. BLDG 9 -99 DECEMBER IR. 2006 1. OVERVIEW A. This specification is for purchase of a replacement air handler to be installed in the third -floor mechanical room of Building 9 -99. The heating/cooling system will serve four variable air volume zones, one on the first floor and three on the second. 2. CAPACITIES 3. GENERAL ARRANGEMENT This diagram shows the general arrangement of the required air handling unit: 4. STANDARDS A. B. C. D. E. FOUR VAV ZONES AMCA 99 AMCA 210 AMCA 300 AMCA 500 ANSI/AFBMA 9 SPECIFICATION NO. 5728 RA OA FAN COILS FILTERS BLENDER MIXING (if recom BOX mended) General arrangement. side view. viewed from the service side, Standards Handbook Laboratory Methods of Testing Fans for Rating Purposes Test Code for Sound Rating Air Moving Devices Test Method for Louvers, Dampers, and Shutters Load Ratings and Fatigue Life for Ball Bearings 9 SPECIFICATION 5728 PAGE -2 REPLACEMENT AHU, JOB 55776009 SPECIFICATION NO. 5728 BOEING DEVELOPMENTAL CENTER. BLDG 9 -99 DECEMBER 18. 2006 F. AR! 430 Standard for Central- Station Air - Handling Units t G. API 435 Standard for Application of Central- Station Air - Handling Um` H. MC Mechanical Code Cam' I. NFPA 90A Installation of Air Conditioning and Ventilation Systems J. OSHA Occupational Safety and Health Administration Crkti K. UL Underwriters Laboratory t *1. � � �A Cl"' S. QUALITY ASSURANCE P A. Fan performance ratings: Conform to AMCA 210 and bear the AMCA Certified Rating Seal. / Y ee 0o– � �ti sy B. Sound ratings: AMCA 301; tested to AMCA 300 and bear AMCA Certified Sound Rating Seal. VS:5- C. Fabrication: Conform to AMCA 99 and ARI 430. tO D. Unit approval and installation: Conform to UMC Part III, Heating, Ventilating, and Cooling. E. Manufacturer. Recognized manufacturer regularly engaged in production of components who issues complete catalog data on total product. F. Provide UL- listed electrical components. 6. GENERAL CONSTRUCTION coet Factory- fabricated and tested air handling unit of size, capacity and configuration specified herein. Class I, II, or III in accordance with AMCA standards, as determined by the size and static pressure shown. B. Unit includes fan section with motor and drive, cooling and heating coils, filter section, and mixing C . c yq'�' 00'box. Provide access doors 'for maintenance and inspection. Units with doors and access panels �.� o A � v s -0, greater than 10. square feet in area or units with operating at pressures greater than 3 inches water .-(' ct gage are to have doors and access panels fitted with anti -slam detention cylinder on the closing � 4 0 stP' Iit mechanism. 0 04 SAZy °I. Access Doors: access doors shall be constructed with a double- wall, solid, galvanized steel interior ) i e tl. panel and a solid, galvanized -steel exterior panel. Gasketing shall be provided around the full y /perimeter of the doors to prevent air leakage. Surface mounted handles shall be provided to allow Q� quick access to the interior of the module and to prevent through - cabinet penetrations that could '�c=4:1 cause air leakage. Access doors shall be hinged and removable for quick, easy access. p. View Windows: a glass window for viewing, capable of withstanding nit operating pressures, shall e_ot►'0 be provided in the door. f1/4N �.�- G CTt es nttY — AMo (ru 0.PoSG t m erryatrt. CP CGCS° 7CCT�Mt E. Marine Lights: factory- mounted, vapor- tight, incandescent light fixture shall be provided for access CD t • ' andlor fan modules. The fixture shall be complete with junction box, globe, aluminum globe guar receptacle, and bulb. F Iou Se C.TCAN o ML`I — Sal puapoS a Tu aTtl t AcCLb 5 eCTcciss F. Insulate coil and fan sections with I -inch thick, neoprene- coated, glass fiber insulation, K value at 75 °F. maximum 0.26 Btu/inch/sq. R/°F/hr, applied to internal surfaces with adhesive and impale �- pins. Coat exposed edges of insulation with adhesive. Insulation and adhesive: Conform to NFPA Qbv�+'it. 9,4x+• 90A. Mcduok't t, a" nlc't'nu. t-ojs, wzrH �lfti At67At t. C�n&2, py� S (Oougt.L - W AU_) a cccg03 4 tls•E 46Quutsma +rs � -V' 7. MIXING BOX A. Furnish mixing box section configured for top inlet of return air and outside air, complete with outside air L1 and return air dampers. SPECIFICATION 5728 PAGE -3 Co & 1 REPLACEMENT AHU, JOB 55776009 SPECIFICATION NO. 5728 BOEING DEVELOPMENTAL, CENTER, BLDG 9 -99 DECEMBER 18. 2006 8. DAMPERS A. Provide low - leakage, airfoil type dampers with a leakage rate less than 0.2% at 2 inches of water differential pressure tested in accordance with AMCA 500; steel parallel blades. steel shaft, nylon or bronze bushings, blade gaskets. Arrange so outside air and return air mix when entering the mixing box and as required to provide evenly mixed air to the filters. B. Provide 0 -10 volt DC actuators installed on all control dampers. Belimo or approved. 9. BLENDER Co A. - Include a blender section if and as required for uniform mixing of outside and return air. 10. FILTER SECTION A. The filters shall be throwaway -type, 30% nominal efficiency, and shall have 2 -inch fiberglass media X 6 4" contained in a rigid frame. Filters shall be capable of operating up to S00 -fpm face velocity without toss of filter efficiency and holding capacity. Filters shall have a rigid supporting mesh across the leaving face of the media. (MERV 5 rating). Filter section to have racks and access doors. B. Make provisions for sprinkler protection on each side of the filter bank. C. Standard sizes: Provide for interchangeability of filter media of other manufacturers; for panel filters, size for 24 x 24 inches filter media, minimum 2 inches thick. eXCj.y 11. SPRINKLERS w0 1.1. A. Furnish two fire protection sprinklers, 286 degrees F. one on each side of filter bank pre -piped to a single point of connection — he esss Fof. Ftet.p ZMSTALLATLotu L ?Roy COO) — TN r S LS r.stitkT SS ♦Jokwtat.ti (3or,t ems ectsxmc P0.omri 12. CHILLED WATER & HOT WATER COILS A. Tubes: S/8 -inch O.D. seamless copper expanded into fins, brazed joints. B. Fins: Aluminum or copper continuous plate type with MI fin collars or individual helical finned tube e 'q% , °. type wound under tension. C. Casings 16 - gage galvanized steel casings with end supports. Provide galvanized steel center tube supports for lengths over 42 inches. D . Headers: Cast -iron with tubes expanded into header, seamless copper tube with silver brazed joints, or prime - coated steel pipe with brazed joints. G.XC* n'? • E. Configuration: Drainable, with threaded plugs for drain and vent; threaded plugs in return bends and in headers opposite each tube. C art. t ORAcs+A G L t! qr Ld 4 +4 - I 3 - HEAP P GD #o N aruT WP A. HE.AP511. • T MADeO pt.rt.s r*. 0.eiuKK 136NOS Nor Coil capacities, pressure drops, and selection procedures certified in accordance with ARI 410 and as Pkotx o . scheduled on the Contract Drawings. G. Tests and working pressures: 1. Cooling coils: Proof test coils at 300 psig and leak test at 200 psig air pressure under water. 2. Cooling coils suitable for working pressure and temperatures of up to 200 psig and 200 °F. 3. Heating coils: Proof test coils at 300 psig and leak test at 200 psig air pressure under water. 4. Heating coils suitable for working pressures and temperature of up to 200 psig and 325 °F. H. Control valves: 1. Chilled water control valve: two -way. > pj' GAutU o r 1S F >'u1ou Aare p, Our MI T fkikaisfoRrArdom D AMACe - —' }[S 196.0c-ta- rs Cx- rep.m6t- Cf ,411a - Ater Pe ar 01. 'NW S L a411./ SPECIFICATION 5728 PAGE -4 04 REPLACEMENT AIIU, JOB 55776009 SPECIFICATION NO. 5728 DECEMBER 18. 2006 BOEING DEVELOPMENTAL CENTER. BLDG 9 -99 �,U:fC� °� � p�vts e� in 2. Hot water control valve: three -way. � M '" \3. Furnish 0 — 10 volt DC operators on control valves. f A. 13. DRAIN PANS A. B. C. D. E. 15. Provide pans under coil and fan plenum sections. Construct from double thickness galvanized steel, insulation between layers, welded corners, inner pan corrosion - resistant coating. Alternative construction: One piece galvanized steel drain pan insulated with seamless 1/2 -inch thick, cellular insulation. Provide threaded drain connection in each pan section. FAN The fan type shall be provided as required for stable operation and optimum energy efficiency. The fan shall be statically and dynamically balanced at the factory as a complete fan assembly (fan wheel, motor, drive, and belts). The fan shaft shall not exceed 75 percent of its first critical speed at any cataloged speed. Fan wheels shall be keyed to the fan shaft to prevent slipping. The fan shafts shall be solid. The fan module shall be provided with an access door on the drive side of the fan Mount fan internally on welded steel base painted for corrosion resistance. Fan shaft Solid or hollow hot -rolled steel. Key fan wheels to shaft. Bearings: Grease lubricated bats bearings. L-S0 life at 200,000 hours selected in accordance with ANSI/AFBMA 9. Provide lubrication fittings for greasing, extend to outside of unit if motor is internally mounted. Balancing: Dynamically balance fans and perform overspecd test at 125% of normal fan speed. Ensure that critical speed does not occur between normal and 125% of normal fan speed. MOTORS A. Motor. Size fan motor for power required to deliver the supply air quantity against a system static pressure as indicated on the Drawings without overloading. See Section 15170 - Motors, for additional requirements. B. All motors shall comply with The Washington State Energy Code. C. All motors shall be listed or labeled as approved by Underwriter's Laboratory (UL) or an alternate listing agency approved by Boeing and the local authority having jurisdiction. D. Motor characteristics: I. One -half hp and smaller: Single -phase capacitor - start, induction -run type: 115-volt or 115/230 -volt nameplate rating with integral thermal overload protection. 2. Three - quarter hp and larger. Premium efficiency, three phase, single - speed. squirrel - cage induction type with nameplate rating 208 - 230 /460 -volt suitable for operation at 480 volts. 3. Full load amperes at design conditions: Not to exceed motor nameplate (FLA). 4. Motor WK2: NEMA MG1.20.42. S. Capable of across - the -line, fall- voltage starts as follows: Two starts in succession, coasting to rest between starts, with motor initially at ambient temperature. Capable of carrying full load continuously in an ambient of 40 °C with temperature rise by resistance of 80 °C. 6. Motor torque characteristics must allow the connected load to be accelerated to full load speed and then operate continuously at full load without damaging the motor. 7. Service factor shall be 1.15. SPECIFICATION 5728 PAGE -5 ( REPLACEMENT AHU, JOB 55776009 SPECIFICATION NO. 5728 BOEING DEVFLOPMFNTAI. CENTER. BLDG 9.99 DECEMBER 18 2006 2. t A A t a CP c. 8. Single phase fractional horsepower motors shall have integral thermal protectors to prevent overheating from overload or failure to start. E. Construction and Insulation 1. Electric motors and enclosures design and construction: NEMA Standard MG I . 2. Insulation: NEMA Class F or H with a Class B or better temperature rise design, non - hygroscopic, for operation in 40 degrees C. 3. Unless otherwise specified, motors in non - hazardous areas shall be TEFC or TEAO Type. Furnish with drain - breather elements. Motors in hazardous areas (NEC Class I. Division I) shall be explosion proof, TEFC. When open drip -proof motors are specified in the drawings, provide moisture drains, tapped and plugged, at lowest part of motor housing. 4. Rotor: Keyed or shrunk to shaft. Do not weld rotor to shaft. Where aluminum die - cast rotor assemblies are not provided, make rotor bars and conducting end rings of copper with bars brazed to rings. 5. Make stator windings of high - conductivity copper. 6. On motors 25 hp and larger, supply lifting lugs with motor. Drill and tapped holes for eyes are not to penetrate the motor enclosure. 7. Coat cast iron parts with zinc -rich primer before final coats of high -gloss epoxy enamel are applied. 8. Provide ground lug securely attached to motor frame in conduit box for attachment of copper ground wire. Connections 1. Motor leads shall be permanently marked for identification and be non - wicking. Use diagonally split type conduit boxes, preferably, arranged so that 60 degrees C cable can be used without heat deterioration. 2. Conduit or terminal boxes shall be capable of being rotated in 90- degree increments: G. Bearings and Lubrication 1. Bearings shall be high quality anti - friction type. Provide means for re- greasing motor during operation. Provide shaft slings and effective seals. Seal and relief arrangement are to prevent grease from being forced into winding during re- greasing. Belt connected motors AFBMA 9 L life 50,000 hours minimum with maximum NEMA shaft extension. Direct drive motors AFBMA L life 125,000 hours minimum. 2. Ball, roller and sleeve bearings are acceptable. H. Nameplates 1. Provide readily visible stainless steel nameplate containing information required in NEMA MG -I. Attach with stainless steel fasteners. List nominal efficiency of premium - efficiency motors. 2. Provide the following additional labeling: supply voltage; power source/circuit. Use 5/8 -inch minimum size letters. 1. Variable frequency drive motors: 1. Same as single speed motors, except motor shall follow NEMA Design B and be adequate for voltage stress induced by drive. Provide 3 stator mounted RTDs. Coordinate RTD type with motor control center supplier for compatibility with protective relay. Ns.? ('RevcOCO — 14suAci., c ory LP. Cdtt. Moms.% THwa Plleve0tro 1 EP,.t — VPD Aktirex s M„eii.s. SPECIFICATION 5728 PAGE -6 REPLACEMENT AHU, JOB 55776009 BOEING DEVELOPMENTAL CENTER. BLDG 9 -99 SPECIFICATION NO. 5728 DECEMBER 18. 2006 16. DRIVE A. Drive: Multiple V -belt with a minimum of two belts in each drive. Belts to be selected for 50% of maximum power draw of the fan. B. Sheaves: Cast -iron, adjustable pitch type for 7 -12 hp and less, fixed pitch over 10 hp; Dodge, Browning, Gates, or approved. C. Minimum pitch diameter. Not less than the minimum recommended by the belt manufacturer for the combination of motor horsepower and motor rotational speed. D. Drive ratio: Size to give the required flow at the static pressure specified. E. Guard: Provide removable belt guard for exposed drives and for exposed parts of shafts on fans and motors. Support guard from base or from fan. Meet OSHA standards. 17. COMBINATION VARIABLE - FREQUENCY DRIVE AND DISCONNECTS A. Combination variable- frequency drives (VFDs) and disconnects shall be provided for each fan motor. Each VFD- disconnect shall be properly sized, mounted, and wired to the fan motor. B. Furnish line reactors. C. The combination VFD- disconnect shall include the VFD, a circuit breaker disconnect, a drive -off switch, and manual speed - control. D. The VFD shall include the following minimal protective features:. 1. Current- limited stall prevention • 2. Auto restart after momentary power loss • 3. Speed watch for starting into rotating motor • 4. Anti - windmill with DC injection before start • 5. Phase -to -phase short- circuit protection • 6. Ground -fault protection E. The VFD- disconnect shall be supplied with an instantaneous, short - circuit -trip circuit breaker. A through - the -door interlocking handle shall be spring loaded and designed to rest only in the full On or Off state. A concealed defeater mechanism shall allow entry into the enclosure when the handle is in the On position. A heavy -duty, snap action, flange- operated, fusible disconnect switch is also acceptable. The blades shall be visible in the Off position. A terminal guard shall be supplied on the line -side terminals. F. The VFD- disconnect shall have a NEMA Type 1 enclosure. The VFD shall be UL508C- listed and CSA- certified and shall conform to applicable NEMA, ICS, NFPA, IEC, and ISO 9001 standards. 18. VIBRATION ISOLATION A. For internally mounted motor provide vibration isolators, factory installed under fan and motor frame. Provide isolation in fan, electrical, and grease connections. For externally mounted motor provide vibration isolators with unit for field installation. B. Vibration isolators: Unguided spring type with 1/4 -inch neoprene friction pad and leveling bolts. Size for equipment load with a spring diameter not less than 0.8 of the compressed height of the spring at rated load. Provide spring with minimum additional travel equal to 50% of rated deflection. Mason Industries type SLF, or approved. 19. DISCHARGE A. Four outlet ports will be installed in the air handler by others for the four VAV zone ducts and control dampers. SPECIFICATION 5728 PAGE -7 REPLACEMENT AHU, JOB 55776009 SPECIFICATION NO. 5728 BOEING DEVELOPMENTAL CENTER. BLDG 9 -99 DECEMBER 18. 2006 20. CONTROLS A. Furnish components suitable for connection to owner's Invensys CMCS. Damper and valve actuators shall be suitable for 0-10 VDC control inputs. B. Control Strategy: Variable Air Volume: each of the four zone supply dampers throttles air flow to maintain the zone temperature setpoint. Fan Speed: the supply fan operates at variable speed to maintain the supply air pressure setpoint. Critical Zone Reset: the chilled water or hot water control valve is throttled to maintain zone temperature setpoint for the zone with the (sally open supply damper (the "critical zone "). Minimum Outside AIr: the outside air damper minimum opening position is set to provide 10% outside air when the supply fan is at 100% speed and the recirculated air damper is 100% open. The outside air damper is then controlled to maintain mixed air plenum pressure at setpoint when fan speed varies (constant differential equals constant outside air volume). Economizer: when outside air temperature is suitable for cooling, the outside and recirculated air dampers are controlled to mixed air temperature setpoint. 21. SUBMITTALS WITH QUOTATION A. Estimated duration from receipt of order to shipment B. Drawings indicating sizing of all components. C. Product data: 1. Unit 2. Coils 3. Fans 4. Filters 5. Dampers 6. Motors 7. Drives 8. Vibration isolation D. Fan curves with specified operating point clearly plotted. E. Sound power levels for both fan outlet and casing radiation at rated capacity. F. Electrical requirements for power supply wiring including wiring diagrams for interlock and control wiring, clearly indicating factory- installed wiring. G. Manufacturer's installation instructions. H. Operation and maintenance data. END OF SPECIFICATION SPECIFICATION 5728 PAGE -8 07 -29 -2008 JOE CEDERNA 9410 DELRIDGE WY SW SEATTLE WA 98106 RE: Permit No. M07 -224 9725 EAST MARGINAL WY S TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Codes, Uniform Plumbing/Fuel Gas Code and/or the National Electrical Code, every permit issued by the Building Division under the provisions of the code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit issuance, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the International Codes, Uniform Plumbing/Fuel Gas Code and/or the National Electrical Code does allow the Building Official to approve one extension of time for an additional period not exceeding 180 days. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 09/09/2008 , your permit will become null and void and any further work on the project will require a new permit application and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: r Marshall 't Technician Permit File No. M07 -224 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 November 19, 2007 Joe Cederna System Heating & Air Conditioning Co 9410 Delridge Way SW Seattle WA 98106 RE: CORRECTION LETTER #1 Mechanical Permit Application Number M07 -224 Boeing #9 -99 — 9725 East Marginal Way S Dear Mr. Cederna, This letter is to inform you of corrections that must be addressed before your mechanical permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire Department has no comments. Building Department: Allen Johannessen, at 206 433 -7163, if you have questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) complete sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted throufh the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, R "R j j.tr_ Bill Rambo Permit Technician encl xc: File No. M07 -224 Nino Cizy of Tukwila Department of Community Development Steve Lancaster, Director P:\Permit Center\Correction Letters \2007\MO7 -224 Correction Ltr #1.DOC wer Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Building Division Review Memo Date: November 16, 2007 Project Name: Boeing #9 -99 Permit #: M07 -224 Plan Review: Allen Johannessen, Plans Examiner Tukwila Building Division Allen Johannessen, Plan Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Please provide manufactures specification and installation documents for the new AHU including other packaged steam/hot water heat transfer station or mechanical equipment to be installed. Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. ■ October 23, 2007 Joe Cedena 9410 Delridge Way SW Seattle WA 98106 Dear Mr. Cedena: Sincerely, Enclosures File: M07 -224 Cizy of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director RE: Letter of Incomplete Application # 1 Development Permit Application M07 -224 Boeing #9 -99 — 9725 East Marginal Wy S This letter is to inform you that your permit application received at the City of Tukwila Permit Center on October 19, 2007 is determined to be incomplete. Before your application can continue the plan review process the following items from the following department needs to be addressed: Building Department: Allen Johannessen, at 206 433 -7163, if you have any questions concerning the following comments. 1. Revise plan notes to show compliance with 2006 International Building Codes. 2. Check plan set for compliance with current codes. Please address the comment above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service If you have any questions, please contact me at the Permit Center at (206) 431 -3670. h iA9),X P:1Permit Center'1ncomplete Letters\2007\M07 -224 Incomplete Ltr #1.DOC Jon 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 ACTIVITY NUMBER: M07 -224 DATE: 11 -29 -07 PROJECT NAME: BOEING #9 - SITE ADDRESS: 9725 EAST MARGINAL WAY S _ Original Plan Submittal X Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS Buil ing "l7ivision Public Works Complete TUES/THURS ROUTING: Please Route Documents/routing slip.doc 2 -28 -02 PLAN REVIEW /ROUTING SLIP APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ Structural Review Required Planning Division ❑ Permit Coordinator DUE DATE: 12 -04 -07 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ❑ No further Review Required REVIEWER'S INITIALS: DATE: DUE DATE: 01 -01 -08 n Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: DEPARTMENTS: Buil ng Division on Public Works ❑ Comments: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28 -02 `'�pERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M07 -224 DATE: 11 -05 -07 PROJECT NAME: BOEING #9 -99 SITE ADDRESS: 9725 EAST MARGINAL WY S Original Plan Submittal X Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ TUES/THURS ROU NG: Please Route AA Structural Review Required REVIEWER'S INITIALS: El Planning Division ❑ Permit Coordinator ❑ DUE DATE: 11 -06-07 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: No further Review Required DATE: DUE DATE: 12-04-07 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) Ef Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldgg" Fire ❑ Ping ❑ PW ❑ Staff Initials: ACTIVITY NUMBER: M07 -224 DATE: 10 -19 -07 PROJECT NAME: BOEING #9 -99 SITE ADDRESS: 9725 EAST MARGINAL WY S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTM Bu ng Division Public Works ❑ Comments: 101 Permit Center Use Only INCOMPLETE LETTER MAILED: t.O Departments determined incomplete: REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28-02 �r�EaMIT COORD COPY PLAN REVIEW /ROUTING SLIP Bldg �I ! 40 0- Fire Prevention Structural ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ❑ Incomplete LETTER OF COMPLETENESS MAILED: DUE DATE: 10-22 -07 Not Applicable n Fire ❑ Ping ❑ PW ❑ Staff Initials: /J��Inr TUES/THURS ROUTING: Please Route ❑ Structural Review Required n No further Review Required DATE: DATE: Planning Division Permit Coordinator n DUE DATE: 1 1-19-07 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail fax; etc. Date: ,l /Q Q D Plan Check/Permit Number: M - as y Response to Incomplete Letter # Response to Correction Letter # I Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: (, f) R - q9 Project Address: � y �j , in(v f) ur / 1, 0o y Loa Me (c Contact Person: ■ U -ej. n £(, Phone Number: 0X l0 • - 7(. vcD . Ya cll Y /Q Summary of Revision: �rn rrtaInh Received at the City of Tukwila Permit Center by: Entered in Permits Plus on lapplications\forms- applications on line revision submittal Created: 8-13-2004 Revised: Steven M Mullet, Mayor Steve Lancaster, Director pECEIVFr crri OF T(UKWILA NOV 29 20011 oFpNAtT CFMTES Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Date: 1 / ba. /O-1 Created: 8 -13 -2004 Revised: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: //www.citukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fad etc. Received at the City of Tukwila Permit Center by: K Entered in Permits Plus on lapplications\forms- applications on Tine revision submittal Plan Check/Permit Number: it" ! — 7 Response to Incomplete Letter # ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: F - e i . n G -9 al Project Address: 1 J F . '-�( q X11 lnyka 1,17 03. Contact Person: —�- ✓1 Phone N o� 70 t '����:1 (li u �)Q U1�'��c��"J � 1 Summary of Revision: crry nEcEiveD NOV 05 Z007 Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision gm& License Information License SYSTEHA190BT Licensee Name SYSTEM HTNG & AIR COND CO INC Licensee Type CONSTRUCTION CONTRACTOR UBI 600383522 Ind. Ins. Account Id SECRETARY Business Type CORPORATION Address 1 9410 DELRIDGE WAY SW Address 2 City SEATTLE County KING State WA Zip 98106 Phone 2067624249 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 1/30/1981 Expiration Date 10/2/2008 Suspend Date Separation Date Parent Company Previous License CRIMPHV340NA Next License Associated License Business Owner Information Name Role Effective Date Expiration Date CRIMP, HERBERT V JR PRESIDENT 01/30/1981 CRIMP, MAXINE F SECRETARY 01/30/1981 CRIMP, JANINE L VICE PRESIDENT 09/28/2001 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Bond Information Bond Company Bond Account Effective Expiration Cancel Impaired Bond Received https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= SYSTEHA190BT 12/17/2007 SYM DRAWI \G I \D -X APPROVED DRAWING NO. SHEET TITLE REVISION BY DATE DATE ARCHITECT, RAL ISSUE FOR BIDDING 55776009 HARR RWS 9 -99 -AO TITLE SHEET -- 06/01/07 V -C -A\ I CAL 10/31/07 9- 99 -2M12R SECOND FLOOR DUCT REMOVALS REV. B B 06/01/07 9- 99 -2M12 SECOND FLOOR DISTRIBUTION DUCT MODIFICATIONS REV. C 06/01/07 9- 99 -3M62R HVAC PIPING REMOVALS REV. E 06/01/07 9- 99 -3M62 HVAC PIPING PLAN REV. F 06/01/07 9- 99 -3M262 FIRE PROTECTION PIPING PLAN REV. A 06/01/07 9- 99 -M313 CONTROL DIAGRAM NEW 06/01/07 9 -99 -M549R DUCT & EQUIPMENT REMOVALS NEW 06/01/07 9- 99 -M549 DUCT & EQUIPMENT INSTALLATION NEW 06/01/07 9 -99 -M549R DUCT & EQUIPMENT REMOVALS - COLOR PRINT NEW 06/01/07 9-99 -M549 DUCT & EQUIPMENT INSTALLATION - COLOR PRINT NEW 06/01/07 STR U CL PAL 109 -099 -1 002 —S12 2ND & 3RD FLOOR SLAB A r i SEP 0 9 2000 ELECTRICAL Demolition: 3E62R DR Installation: 3E62 D Demolition: 3E112R ER Installation: 3E112 E Demolition: 3E262R AR Installation: 3E262 A Reference: 1E112 R Reference: REED B Reference: 1 E4C A SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE -- ISSUE FOR BIDDING 55776009 HARR RWS 06/01/07 A CORRECT CODE REFERENCES FROM 2003 TO 2006 55776009 HARR RWS 10/31/07 B CORRECTED 2ND REF TO 2003 CODES 55776009 HARR RWS 11/05/07 B.,ILDI \3 ADDRESS: EAST vARGI \AL WAY SO TI, '<WILA, WAS HI GTO vICI \ ITY V AP 99 ❑ LT d 14 -01 PROJECT SITE D 7 -127 99 FROM SEATTLE— TACOMA AIRPORT -VELOP FROM DOWNTOWN SEATTLE EAST MARGINAL WAY CORPORATE PARK V E 599 TUKWILA TAL C 900 EXIT 157 EXIT 158 FROM KENT & AUBURN NO SCALE EXIT 157 B • I • 'ANY 9 -99 BUILDING REPLACE MULTI -ZONE AIR HANDLING UNIT JOB NO. 55776009 BOEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON 98108 QiB /N c ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN E.DUARTE CHECKED ENGINEER HARR CHECKED APPROVED APPROVED SEPARATE PERMIT REQUIRED FOR: 0 Mechanical VElectrical (plumbing Li Gas Piping City of Tukwila BUILDING DIVISION ,1' `1S1ONS s No r;iirAncies st»11 e rrin;IP to th ( of work without prior apprOv :-)1 Tukwila Building Division NOTE: Revisions will require a w r p submiP�al plan fees. and may include additional plan fees. GE\ ERN_ \ OT -S CONSTRUCTION SET OF DOCUMENTS MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS. I. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS BEFORE COMMENCING WORK. 2. NOTIFY KEVIN RAMBALDINI, CONST. MGR. (206)544 -1479, IF EXISTING CONDITIONS REQUIRE DESIGN REVISIONS. 3. COORDINATE WORK WITH OTHER CRAFTS. 4. RETURN THIS SAME SET TO KEVIN RAMBALDINI AT BUILDING 9 -51, AFTER COMPLETION OF THIS CONSTRUCTION. 5. RETURN COMPLETE CONSTRUCTION "AS— BUILT" REDLINED DRAWINGS TO BRIAN HARR (206)550 -0397 AFTER COMPLETION OF THIS CONSTRUCTION. 6. CONTRACTOR TO MAINTAIN CONSTRUCTION AREAS CLEAN, ORGANIZED SAFE CONDITON. MAINTAIN "CONSTRUCTION ZONE" THAT ALLOWS ACCESS TO OTHER OPERATING AREAS KEEP DUST & DEBRIS CONFINED WITHIN THE CONSTRUCTION SITE. PROJ - CT C - C KLIST CHECK BOX El THESE DRAWINGS CONFORM TO THE 2006 LB.C., I.F.C., U.P.C., AND THE WAC 51 -20 AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. El ROOMS LABELED PER OCCUPANCY PER U.B.C. TABLE 10 —A. BUILDING FLOOR NUMBER ON PRINT FOR AREA OF CONSTRUCTION. NUMBER OF PRINTS REQUIRED FOR PERMIT PACKAGE: ❑ 1. TENANT IMPROVEMENT (STRUCTURAL): ❑ 5 SETS OF ARCHITECTURAL DRAWINGS ❑ 5 SETS OF STRUCTURAL DRAWINGS ❑ 5 SETS OF STANDARD DETAILS ❑ 5 SETS OF ENGINEERING CALCULATIONS ❑ 5 SETS OF ENERGY CALCULATIONS ❑ 5 SETS OF CONST. SPECIFICATIONS a ❑ 2. TENANT IMPROVEMENT (NON — STRUCTURAL): 4 SETS OF ARCHITECTURAL DRAWINGS ❑ 4 SETS OF STANDARD DETAILS ❑ 4 SETS OF ENERGY CALCULATIONS El 4 SETS OF CONSTRUCTION SPECIFICATIONS ❑ 3. TENANT IMPROVEMENT (REVISION), 2 SETS. ® 4. MECHANICAL, 4 COMPLETE SETS (SUBMITTED SEPARATELY) ❑ 5. FIRE PROTECTION /SPRINKLERS, 3 COMPLETE SETS (SUBMITTED SEPARATELY) I BRIEF PROJECT NARRATIVE: REPLACE AIR HANDLING UNIT IN THIRD FLOOR MECHANICAL ROOM WITH OWNER — FURNISHED MCQUAY PACKAGED AIR HANDLING UNIT. RECONNECT NEW UNIT TO ELECTRICAL, CMCS CONTROL, STEAM, CONDENSATE, AND WET PIPE SPRINKLER SYSTEM. MODIFY AIR DISTRIBUTION DUCTWORK. MODIFY DUCTWORK TO FIT NEW UNIT. INSTALL AND CONNECT OWNER — FURNISHED STEAM /HOT WATER CONVERTER STATION. DATE 09.16.93 06/01 SUBTITLE TITLE LAND USE CODE BUILDING CODES ARCHITECTURAL MASTER OCCUPANCY GROUP CONSTRUCTION TYPE FLOOR AREAS: BUILDING FOOTPRINT BUILDING GROSS FIRST FLOOR SECOND FLOOR PENTHOUSE BUILDING HEIGHT STORIES OCCUPANT LOAD: HANDICAPPED REQUIREMENTS FIRE PROTECTION SEISMIC ZONE FILE COPY Permit No..114 Plan review approval 13 ettject to ern= and omissions. Approval of construction documents does not authorize the violation of arty aclotted coda or wawa* Rea* of apptioved Meld Copy and aolstosiedget TITLE SHEET REPLACE AIR HANDLING UNIT BUILDING 9 -99 COL. A —G/1 -4 O City of Tukwila BUILDING DIVISION D S V V LFt NOV 0 5 ?flu f P l .l` IVH f G E N C Ft D.0 ARY CURRENT REVISION 55776009 SHEET JOB NO. DWG NO. AO 59,292 67,799 59,292 4,082 4,425 44 FT. (32' -2" IN PROJECT AREA) 3 (1 STORY IN PROJECT AREA) NO CHANGES BARRIER FREE FULLY AUTOMATIC, F/S CLASS 1 SPRINKLERS THROUGHOUT 3 SYMBOL 9 -99 —AO COMP NO. TUKWILA 2006 I.B.C., I.F.C., U.P.C., AND THE WAC 51 -20 AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. GROUPS B AND F -2 (OFFICE AND FACTORY) TYPE II, NON — COMBUSTIBLE INCOMPLETE LT R# .J 2:2 DATE 11/05/07 REMOVE DIFFUSERS, DUCT, AH -8 55776009 BY HARR REVISION REPL DIFFUSERS 55776003 HARR APPROVED RWS RWS DATE 05/31/06 06/01/07 MEM SYM Mill APPROVED BY DEPT. DATE MIMI ill 15 93 = CHECKED APPROVED APPROVED MEI SYM A REVISION SUBTITLE TITLE MECHANICAL MASTER PLAN - HVAC DUCTWORK BUILDING 9 -99 COL. E -G/1 -4 DEV. CENTER, WA CURRENT REVISION 55776009 SHEET SYMBO 2M12R DATE 06/01 /07 ZONE 2 • 300 SF 16 1 SA ZONE 1 1300 SF 18/12 SA ZONE 3 1ST FL 70/18 - SEP 0 9 2000 BY 2N D FLOOR PLA SCALE: 1/8" = 1'--0" APPROVED DATE BOE /NG - ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN EDDIE P. DUARTE IH LEG GE R \D =FFR -RAL_ JOB NO. DWG NO. OTES DRAWI GS CON STRLCTIC REMOVE 7 LINEAR DIFFUSERS. REMOVE 2 SMALL DIFFUSERS IN STORAGE AREA. \ CST S REMOVE ABOVE-CEILING AIR CONDITIONER AN--S AND RESTORE MAIN DUCT, BLANKING BRANCHES TO AH -8. REMOVE SECTION OF ZONE 2 DUCT FOR RECONNECTION TO ZONE 1. 55776009 9---99 -2M12R RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER REMOVAL - I COMP NO. ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED EDD P. DUARTE D 8/15/93 CHECKED APPROVED BY DEPT. DATE CHECKED APPROVED APPROVED A B C REPL DIFFUSERS Mill IuiEIMIL_iui■ ■II L a ■ NM _MI WII I ■ gm li I�� � �' �' � �%�■ ■ .fiG711 �� �_� � ■II��c',�u � rr.a�nr�a,rrr ` "� i7.rrrr�� ■�r� �i1li� EL= �� Imo■ - .�..i I� alarm !� a TY pIII u■■■■ . rrw� it ■��� rj 11 r �■r■�fs I ' �� * ■�I��1[r�111s1:��r®�rrrrr■11!.1 .11 ■ his awi�m■ ■wi ■■'T■ Cs1 I I�IU �t I I ��r - !II I IIIN ZONE 4 �■ ■ ION it i l►� ■ 24/24 N � _ — — I .� I t•1C �.9 -..I _I ,. . ,.... il �r�i� � lr ����■ wi•■ ■Irirr.r.,�.w�■l■r.rrrM.�r.■�. m" r r ■ raba Wi ■ _ im■ ■ � , ..—. C m ih m .1. 20 %,...... � iiIUL I•:I _ j II iiii I I C I II �I ■II1 ■III�I■ MillimEll,,,iiim,d. ang . ...;�....�.` .r•rw■rll.�.rr ■1il 111 /���� rte_ I I I�- � r C:.. .. L . —� �■ I , i �� I I I N.... *r__ �I \ ` ®-' „ ice ►_I_ r= • i I =1r �.. 9 ' ■ �� ■ Sri : ' . t �+iy � AM ar Ir 1J, LEI Ii9rC » = �: -.��. ■ I t I ■ I , ( m ii l a t 5o '�L- 16" ®.,t I Im ■1■��■ ■1 ■C�■ Is I IIIIITIO ,, „r --- , 61 ■. I SMAE I IIIIt■II� 1 III ■EMIT I 11 � ■Il 4 . 11111 ■■1 in =I ilw IN di iih ICOM C IO 11 0_ N __- I _ ma. ix� _ � ■ 11� � _ �� � X11 10/12 €' 1 1 2/10 r ■' 2 jai wr i as-Erg � u1 ■� �i■� �I�wr■rj \� '" o `���= • , I m, , . R - -,willegENE • • +�_1119,01;1,21. I �i ■. hia ZONE � � • ligia 10/8 18/12 � �■ I �” ! UI © 1 12/6 • 5 "9 . I ■TI■■■■■11111■■■■ r i I ■■ SYM REVISION BY APPROVED DATE SYM REVISION REMOVE DUCT, DIFFUSERS, AH-8 55776003 55776009 HARR HARR RWS RWS 05/31/06 06/01/07 DUCT & DIFFUSER MODS FOR AHU REPLACEMENT 55776009 HARR RWS 06/01/07 BY 2 \D FLOOR PLAN SCALE: 1 /8" = 1' -0" APPROVED DATE Q� BOE /NG c' OT 2„,v-01 UBTITLE TITLE MECHANICAL MASTER PLAN - HVAC DUCTWORK BUILDING 9 -99 COL. E —G/1 -4 GENERAL. N OTES: 1. ALL SUPPLY DIFFUSERS SHOWN ON THIS DRAWING ARE TITUS MCD BORDER #3, STEEL, WITH AG -95 DAMPER 8c 6" SQUARE —TO —ROUND ADAPTER. INSTALL 10/12 DUCT WHERE SHOWN TO CONNECT EXISTING 10/12 BRANCH TO EXISTING 10/17 MAIN. INSTALL 16 DIFFUSERS WHERE SHOWN IN ZONE 1. INSTALL 4 DIFFUSERS WHERE SHOWN FOR ZONE 2. INSTALL 4 DIFFUSERS WHERE SHOWN IN THE STORAGE AREA PORTION OF ZONE 4. DEV. CENTER, WA LEGEND: SEP 0 9'006 CURRENT REVISION 55776009 SHEET JOB NO. DWG NO. SYMBOL 2M12 55776000 9- 99 -2M12 RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER DATE 06/01 /07 COMP NO. f.� �, Tp;r 2"0 CHWS &R DOWN TO 1ST FLR. . A B C D E BOP EL 50'- 3M62 4000 -M8 REMOVALS CONSOLIDATE B -1 B & B2 0) J v) 0 0) 0 REV PIPE ROUTING; ADD HEAT TAPE ADD VFD TO PUMP PU3G3A CO 0 1 1 /2" ° RECONN. 2 --1/2" CHW FOR A/C 4 B - 3 STM --r 2 "0 CHWS & R CHWS 3M62 M504 CHILLER ROOM HPS 18001506 RWS /DOT 56629401 HARR 56629401 HARR 56629401 HARR 55776009 HARR BOP EL 52' -6" AIR HANDLER ROOM 2 1/2" '° T 1 -•,1 1 2 "%% CHWS (COPPER) ELECTRICAL 415 CHWS & iJi s (COPPER) co PU3G3A RWS RWS RWS RWS 11/13/98 06/16/06 09/26/06 01/29/07 06/01/07 COND RET r COOLING TOWER ALCOVE c, 2> 2 1/7 MPS --. —;- 1 1/4" CLWS& 1 1/4" -6" ( 60 PSI g z a PIPE ANCHORS / 2 1/2" 6 "CLWS 'I 0'4,1' ci 10' -0" cL CNI ci 0 U DATE T -8 0) 1 1/4" -i-- COND RET 2 "CONDENSATE RETURN ABOVE 4" MEDIUM PRESSURE STEAM BELOW 3M62 M509 00 J ! 2 -1/2" BLK STL D ' 41 TIi e 1 4" COND RET —� „ HPS -- „0t to 10I 1 1/4" CLWR CLWS 2 1/2" WR CLWS CLWR CLWS CLWS APPROVED BY 2 1/2" 2 1/2" ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE 0 cc 0 2 "CLWS &R 35 GPM DRAWN CHECKED ENGINEER ROSSE RWS CHECKED APPROVED CARRIGAN APPROVED 4" CLWS &R DN DATE 4" 10 CLWR I 1 CLWS 10 - 1 1/2" CLWS &R TITLE v) J 0 SUBTITLE SEP 0 9 2108 PIPING PLAN BUILDING 9-099.3 LEG =� G \ =RAL * ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Department if asbestos containing material is damaged or discovered that is required to be removed to support work. RERE\ CURRENT REVISION 55776009 SHEET JOB NO. MECHANICAL MASTER COL. E -G /1 .EV. CENTER WA DWG NO. ci \OT 3M62R DRAW!\ • CO \STRCTION OT REMOVE ALL CHILLED WATER PIPING IN AIR HANDLER ROOM BACK TO 4" CHWS /R - LOCATIONS MARKED WITH: 222> REMOVE TWO STEAM PIPE BRANCHES. REMOVE ALL COOLING WATER PIPING SOUTH OF COLUMN LINE 3 INCLUDING MAKEUP WATER AND BACKFLOW PREVENTER. ABANDON ANY PIPING NORTH OF COLUMN LINE 3. REMOVE COOLING TOWER AND ALL ANCILLIARY PIPING, WIRING, AND EQUIPMENT, REMOVE HOT WATER CONVERTER STATION COMPONENTS, INCLUDING HEAT EXCHANGER, EXPANSION TANK, AND ANCILLIARY VALVES, CONTROLS, FITTINGS, AND INTERCONNECTING PIPES. DISCONNECT PIPES ABOVE FLOOR AT DUCT CHASE; CAP AND ABANDON THE PIPES LEADING DOWN THE CHASE. REMOVAL SYMBOL GS RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER DATE 06/01/07 COMP NO. 9- 099 -3M62R BOP EL 50' -6" ELECTRICAL 1 1/4" CLWS& 3 "LPS „ 3M62 4000 -M8 1 1/4" HWS /R AIR HANDLER ROOM 3M62 M504 COOLI G TOWER COVE OMMOKIVAPV COND RET fx `'' " PIPE ANCHORS 2 1/2" -MPS 1 1/4" COND RET 2 "CONDENSATE RETURN ABOVE 4" MEDIUM PRESSURE STEAM BELOW 3M62 M509 2-1/2" BLK STL 2 "CLWS &R 35 GPM CLWS &R DN 1 1/2" CLWS&R 6 "CLWS - ABANDONED BY HARR SYM REVISION BY APPROVED DATE SYM REVISION B CONSOLIDATE B -1 B & B2 18001506 RECONN. 2 -1/2" CHW FOR A/C 8 -3 56629401 C REV PIPE ROUTING; ADD HEAT TAPE RWS /DOT HARR 56629401 HARR RWS RWS 11/13/98 06/16/06 09/26/06 F NEW CONVERTER; CHW & HW TO NEW AHU 55776009 D ADD VFD TO PUMP PU3G3A 56629401 HARR RWS 01/29/07 (-- FLOOR PLAN SCALE: 1/8" = 1' -0" APPROVED RWS DATE 06/01/07 el AigerAEZAW ° ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN CHECKED ENGINEER ROSSE RWS CHECKED APPROVED CARRIGAN APPROVED D E SUBTITLE TITLE MECHANICAL MASTER C SEP 0 9 2000 PIPING PLAN BUILDING 9 -099.3 COL. E-G/1 -4 LIC G -RAL \OT STEAM -TO -HOT WATER CONVERTER STATION: SPIRAX SARCO MODEL HXVD- 12- 12.5P- SS -H -36. 12.5 GPM, 160 -200 DEG F, 12 PSIG STEAM. eR \D INC I DRAW GS CO \STR,CTIO\ \OT I S INSTALL CHILLED WATER CONNECTIONS FROM EXISTING CHWS /R PIPING TO NEW AIR HANDLER. INSTALL BOEING- FURNISHED PACKAGED STEAM /HOT WATER HEAT TRANSFER STATION AT SOUTH WALL COORDINATE EXACT LOCATION WITH ELECTRICAL AND CONTROLS AND OBTAIN BOEING APPROVAL FOR FINAL LAYOUT. CONNECT HEAT TRANSFER STATION TO EXISTING LPS, LPC, AND PW. INSTALL 1 -1/4" COPPER HOT WATER PIPING FROM NEW HEATER TO NEW AIR HANDLER. RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER CURRENT REVISION 55776009 SYMBOL DEV. CENTER, WA DWG N0 9- 099.3 -3M62 DATE 06/01/07 COMP NO. SYM A R 11 CA V OVALS SCALE: 1/8" = 1' -0" 7- 3" DN 1, _ 11 r r x C N 0 V A !, fi N N 3RD FLOOR SPRI \KLFR PLA 0 0 0 0 H H H BY APPROVED 410 REPLACE AHU REVISION 55776009 BY HARR APPROVED RWS DATE SYM REVISION 06/01/07 DATE N • MI • • • 11 rr iL SCALE: 1/8" = 1' -0" N I \ S ALLATI O \ 3RD FLOOR SPR 3" DN APPROVED BY ,1 IH1 DEPT. \ <L-R PLA 0 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DATE 71 DRAWN S.RUDELL CHECKED ENGINEER HARR CHECKED APPROVED APPROVED 0 0 0 0 fi 0 N 0 DATE 6.13.07 H H rI 06/14/07 22 SUBTITLE TITLE SEP 0 9 Z008 3RD FLOOR FIRE PROTECTION PLAN BUILDING 999.1 MECHANICAL MASTER COL. E -G/1 -4 LEG =ND 0 UPRIGHT SPRINKLER HEAD CE R 9- DEV. CENTER. WA IF -RAL ALL WORK TO CONFORM TO NEPA 13 AND FACTORY MUTUAL FOR ORDINARY HAZARD PIPE SCHEDULE SYSTEM. CONTACT BOEING FIRE DEPARTMENT 24 HR. BEFORE STARTING ANY WORK ON THE SPRINKLER SYSTEM (206 - 655 - 7700). 3. PROVIDE ENGINEER WITH RED LINE DRAWINGS SHOWING ANY DEVIATIONS. SPRINKLER HEADS: 155 DEGREE F, UPRIGHT OR SEMI- RECESSED PENDENT TYPE, CHROME PLATED, GLASS BULB HEAD, STANDARD RESPONSE, 1/2" ORIFICE; VIKING MICROMATIC D OR EQUAL. -R_\ C 01 09- 099- -1M262 FIRST FLOOR FIRE PROTECTION PLAN CO\ STR., CTIO =S REMOVE TWO SPRINKLER HEADS & BRANCHES UNDER DUCT BEING REMOVED. PLUG TEES. RELOCATE ONE SPRINKLER HEAD IF AND AS REQUIRED TO MAINTAIN COVERAGE UNDER OUTSIDE AIR DUCT AS REQUIRED BY NFPA 13, USE EXISTING 1" PLUGGED TEE TO ROUTE 1" PIPE TO TWO SPRINKLER HEADS IN NEW AHU. FIELD VERIFY REVISED SPRINKLER SYSTEM PROVIDES FULL COVERAGE UNDER AND AROUND OBSTACLES PER NFPA 13. I CURRENT REVISION 55776009 SHEET JOB NO. DWG NO. EC •: 0•• P o••o • <EY PLA\ SCALE: NONE Is DRAW( \GS TECTION PLAN SYMBOL 3M262 55776009 DATE 9- 99.1 -3M262 • 0 EIVED CITY OF TUKWILA 1 9 Z007 T CENTER nnT COMP NO. 06/01/07 REVISION DI DIRTY FILTER ALARM 1 A DISCH. ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 1 ZONE 2 ZONE 3 ZONE 4 FREEZE AIR CFM CFM CFM CFM VAV VAV VAV VAV STAT TEMP DAMPER DAMPER DAMPER DAMPER Al Al BY AI APPROVED Al DATE Al SYM AO AO REVISION AO DI 0 -4 Al ZONE DAMPERS ` DM J FAN CFM BY RETURN AIR ALARM SIGNAL TO ADT APPROVED 66/30 RA (66/18 1ST FLOOR + 66/12 2ND FLOOR) 15000 CFM; 1091 FPM; VP =0.074 LOSS =0.028 IN /100FT --- O -tl --- O - 0- 0- 0- 0 -0 -0 -0 -O -O Al FAN RPM AIR HA SCALE: NONE DATE VFD DO FAN START/ STOP DL \G 0.028 DI SF ON /OFF STATUS DMA 24/24 SA — ZONE 4 2ND FLR WEST OFFICE 12/16 SA — ZONE 2 2ND FLR SOUTH LAB FREEZE STAT G IT 0.444 A AIR FILTER AO CHW VALVE RED e) i ... __ABWFAEZAW 70/18 SA — ZONE 3 / ALL FIRST FLOOR A.•• ••11111• \NININI• r.... r••NI. INF .... ••••• MINIM! A 0.028 I�a VD -0 -01 SYST SCALE: NONE SD —1 AO HW VALVE 1 co c7 �DM V ooni. ADM; Al MIXED AIR TEMP TROLS TI 0.677 0.03 0.03 DESIG\ APPROVED BY FAN e-0.23 PRESS,,R EXHAUST AIR OUTSIDE AIR Al OSA DAMPER DP ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DATE FIRST FLOOR (OSA) FILTERS & COILS SECOND FLOOR I S TI 8 AO HARR CHECK D EOM HARR CH RH RWS APPROVED APPROVED AO —0.25 MIXING BOX Al 0.S. AIR RTN AIR OSA DAMPER DAMPER TEMP DATE 06/01/07 TITLE �DM 0.07 0.07 Al UBTITLE ADM,, X 12/18 SA — ZONE 1 2ND FLR EAST LAB Al MECHANICAL MASTER AO OSA RA RELIEF CFM TEMP DAMPER 0.00 Al ..1-1D OA SEP 0 9 2008 Al TT -2 REPLACE MCOUAY AHU BUILDING 9 -099 Al I TT - 3 SEQU.k ZONE 1 ZONE 2 ZONE 3 ZONE 4 SPACE TEMPERATURE SENSORS AIR HANDLER CONTROL DIAGRAM C LEGEND: GE\ ERAL NOTES: I OF CONTROL ANALOG ELECTRICAL SIGNAL DIGITAL ELECTRICAL SIGNAL ELECTRIC POWER ADT GENERAL: THE AIR HANDLING SYSTEM INCLUDES FOUR VARIABLE AIR VOLUME ZONES. ALL FOUR ZONE VOLUME CONTROL DAMPERS ARE LOCATED IN THE MECHANICAL ROOM ON THE AHU DISCHARGE. 1) ZONE CONTROL: ROOM AIR TEMPERATURE IN EACH ZONE CONTROLS ITS ZONE AIR VOLUME CONTROL DAMPER TO MAINTAIN SPACE TEMPERATURE. 2) FAN SPEED: FAN SPEED IS VARIED SUCH FAN AIR FLOW SIGNAL EQUALS THE SUM OF THE FOUR ZONE AIR FLOW SETPOINTS. MINIMUM OUTSIDE AIR: THE OSA DAMPER MINIMUM POSITION IS SET 3) SUCH THAT WITH RA DAMPER FULLY OPEN AND FAN AT FULL SPEED, OUTSIDE AIR FLOW EQUALS 15% OF FAN FLOW. THE DIFFERENTIAL PRESSURE (DP) MEASURED ACROSS OSA DAMPER IN THIS CONDITION BECOMES THE OSA DP SETPOINT. IN OPERATION, AS FAN SPEED VARIES WITH LOAD, RETURN AND RELIEF DAMPERS ARE THROTTLED TO MAINTAIN THE OSA DP SETPOINT. CHILLED WATER 8c HOT WATER VALVES: THE VALVES ARE 4) CONTROLLED AS PRIMARY MEANS OF REACHING SUPPLY AIR TEMPERATURE SETPOINT. SUPPLY AIR TEMPERATURE SHALL BE RESET FROM THE AVERAGE ZONE TEMPERATURE: AVG. ZONE TEMP SUPPLY TEMP 5) 76 DEG F 58 DEG F 70 DEF F 68 DEG F ECONOMIZER: WHEN OUTSIDE AIR TEMPERATURE IS BELOW RETURN AIR TEMPERATURE, THE OSA AND RA DAMPERS MODULATE AS PRIMARY CONTROL TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT, IN ECONOMIZER MODE, CHILLED WATER VALVE OPENS 6) ONLY TO THE DEGREE OSA DAMPER OPERATION CANNOT MEET SA TEMPERATURE SETPOINT. INTERLOCKS: FREEZE STAT OR SMOKE DETECTOR ACTIVATION SHUTS 7) DOWN FAN AND ALARMS CMCS. SMOKE DETECTOR ALSO ALARMS ADT. EVENING /WEEKEND SETBACKS: WHEN UNOCCUPIED, THE CMCS COMMAND AUTOMATICALLY RESETS SPACE TEMPERATURE SETPOINTS. ‘22. 2 p�c) EMCS PANEL (NE) EMCS PANEL Al COL. F -3 DEV, CENTER, WA l COMMUNICATION CABLE IN CONDUIT TO CENTRAL EMCS IN BLDG 9 -51 CURRENT REVISION SHEET JOB NO. DWC NO. SYMBOL M313 9- 099 —M313 RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER DATE COMP NO. ISSUE FOR SCOPE REVIEW 55776009 APPROVED RWS 06 /01/07 REVISION APPROVED 0,46,40e1914EF - REVISION APPROVED BY '7n ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED HARR CHECKED ENGINEER HARR CHECK D RWS APPROVED APPROVED 06 01 07 06/01/07 SUBTITLE TITLE REPLACE MCQUAY AHU -1 BUILDING 9 -99 DEV. CENTER, WA CURRENT REVISION 55776009 SYMBOL M549R 66/30 RA = 66/18 1ST FL+ 66/12 2ND FL 18/12 SA ZONE 1 A M549 B M549 56/22 RA ZONE RF 56/22 SA ZONE RF 70/18 SA ZONE 3 24/24 SA ZONE 4 16/12 SA ZONE 2 10/10 TE M549 6/12 MECH RM EXH HEATING SOIL EFRF3A (EF -1) AHRF4A (AH -1) C M549 AHRF4B (AH -2) 4 SCALE: 1 /4 "" - ELEVATIO\ SCALE: 1/4" = 1 1> L- VATIO\ SCALE: 1/4" = 1 11 M549 1 " 1 M549 I � 1 M549 IFVATIO\ SCALE: 1/4" = 11 M549 SEP 0 9 2008 L IC D POINT TO WHICH DUCTWORK IS TO BE REMOVED. r, R CO RAL \OT R \STR..CTIO POINT TO WHICH DUCTWORK IS TO BE REMOVED. - s DRAWI \GS Of Is REMOVE ABANDONED COOLING TOWER AND ALL ASSOCIATED EQUIPMENT, PIPING, AND SUPPORT STEEL. REMOVE PORTION OF EXTERIOR WALL PANELS AND GIRT AS REQUIRED TO FACILITATE EQUIPMENT REMOVALS AND INSTALLATIONS OVER DURATION OF PROJECT. DISASSEMBLE AS NEEDED AND REMOVE ABANDONED AHRF4B (AH -2) & ASSOCIATED DUCT, PIPING, ETC. DISASSEMBLE AS NEEDED AND REMOVE RETURN FAN EFRF3A (EF -1) & ASSOCIATED DUCT, SUPPORTS, ETC. REMOVE EXHAUST FAN EFRF4A FOR RELOCATION APPROX 1 FOOT SOUTH. IF NOT IMMEDIATELY REINSTALLED, PROVIDE TEMPORARY FAN AND FLEX DUCT TO MAINTAIN RESTROOM EXHAUST DURING CONSTRUCTION. REMOVE PORTION OF EXISTING 10" SQUARE DUCT. REMOVE PORTIONS OF EXISTING DUCTWORK FROM EXISTING AHU -1 FOR RECONNECTION OF REMAINING DUCTWORK TO NEW UNIT. DISMANTLE AS NEEDED AND REMOVE AHRF4A (AHU -1) & ASSOCIATED DUCT, PIPING, ETC. REMOVE EXISTING STEAM HOT WATER CONVERTER SYSTEM FOR COMPLETE REPLACEMENT. REMOVE EXISTING MCC. REFER TO ELECTRICAL DRAWINGS. REMOVAL JOB NO. DWG NO. 55776009 9 -99 -M549R RECEIVED CITY OF TUKVVILA OCT 1 9 2007 PERMIT CENTER DATE 06/01/07 COMP NO. CI891A: 02/06/07 08:48 ■ EF RF4A 4„ as t \ 4 I 1 r \NM IN EFRF3A i� is- -- _ I - ( ! i AHRF4A (AH -1) 4 --(-- , NN, 1 \I :: F iir41 1 V I I I 1 I AHRF4B (AH-2) I I I I I L EVAT I O \ ISSUE FOR SCOPE REVIEW 55776009 APPROVED RWS 06 /01/07 REVISION APPROVED 0,46,40e1914EF - REVISION APPROVED BY '7n ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED HARR CHECKED ENGINEER HARR CHECK D RWS APPROVED APPROVED 06 01 07 06/01/07 SUBTITLE TITLE REPLACE MCQUAY AHU -1 BUILDING 9 -99 DEV. CENTER, WA CURRENT REVISION 55776009 SYMBOL M549R 66/30 RA = 66/18 1ST FL+ 66/12 2ND FL 18/12 SA ZONE 1 A M549 B M549 56/22 RA ZONE RF 56/22 SA ZONE RF 70/18 SA ZONE 3 24/24 SA ZONE 4 16/12 SA ZONE 2 10/10 TE M549 6/12 MECH RM EXH HEATING SOIL EFRF3A (EF -1) AHRF4A (AH -1) C M549 AHRF4B (AH -2) 4 SCALE: 1 /4 "" - ELEVATIO\ SCALE: 1/4" = 1 1> L- VATIO\ SCALE: 1/4" = 1 11 M549 1 " 1 M549 I � 1 M549 IFVATIO\ SCALE: 1/4" = 11 M549 SEP 0 9 2008 L IC D POINT TO WHICH DUCTWORK IS TO BE REMOVED. r, R CO RAL \OT R \STR..CTIO POINT TO WHICH DUCTWORK IS TO BE REMOVED. - s DRAWI \GS Of Is REMOVE ABANDONED COOLING TOWER AND ALL ASSOCIATED EQUIPMENT, PIPING, AND SUPPORT STEEL. REMOVE PORTION OF EXTERIOR WALL PANELS AND GIRT AS REQUIRED TO FACILITATE EQUIPMENT REMOVALS AND INSTALLATIONS OVER DURATION OF PROJECT. DISASSEMBLE AS NEEDED AND REMOVE ABANDONED AHRF4B (AH -2) & ASSOCIATED DUCT, PIPING, ETC. DISASSEMBLE AS NEEDED AND REMOVE RETURN FAN EFRF3A (EF -1) & ASSOCIATED DUCT, SUPPORTS, ETC. REMOVE EXHAUST FAN EFRF4A FOR RELOCATION APPROX 1 FOOT SOUTH. IF NOT IMMEDIATELY REINSTALLED, PROVIDE TEMPORARY FAN AND FLEX DUCT TO MAINTAIN RESTROOM EXHAUST DURING CONSTRUCTION. REMOVE PORTION OF EXISTING 10" SQUARE DUCT. REMOVE PORTIONS OF EXISTING DUCTWORK FROM EXISTING AHU -1 FOR RECONNECTION OF REMAINING DUCTWORK TO NEW UNIT. DISMANTLE AS NEEDED AND REMOVE AHRF4A (AHU -1) & ASSOCIATED DUCT, PIPING, ETC. REMOVE EXISTING STEAM HOT WATER CONVERTER SYSTEM FOR COMPLETE REPLACEMENT. REMOVE EXISTING MCC. REFER TO ELECTRICAL DRAWINGS. REMOVAL JOB NO. DWG NO. 55776009 9 -99 -M549R RECEIVED CITY OF TUKVVILA OCT 1 9 2007 PERMIT CENTER DATE 06/01/07 COMP NO. CI891A: 02/06/07 08:48 ■ 4„ \ 1 r \NM IN is- -- AHRF4A (AH -1) I I , NN, 1 \I :: 1 V ISSUE FOR SCOPE REVIEW 55776009 APPROVED RWS 06 /01/07 REVISION APPROVED 0,46,40e1914EF - REVISION APPROVED BY '7n ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED HARR CHECKED ENGINEER HARR CHECK D RWS APPROVED APPROVED 06 01 07 06/01/07 SUBTITLE TITLE REPLACE MCQUAY AHU -1 BUILDING 9 -99 DEV. CENTER, WA CURRENT REVISION 55776009 SYMBOL M549R 66/30 RA = 66/18 1ST FL+ 66/12 2ND FL 18/12 SA ZONE 1 A M549 B M549 56/22 RA ZONE RF 56/22 SA ZONE RF 70/18 SA ZONE 3 24/24 SA ZONE 4 16/12 SA ZONE 2 10/10 TE M549 6/12 MECH RM EXH HEATING SOIL EFRF3A (EF -1) AHRF4A (AH -1) C M549 AHRF4B (AH -2) 4 SCALE: 1 /4 "" - ELEVATIO\ SCALE: 1/4" = 1 1> L- VATIO\ SCALE: 1/4" = 1 11 M549 1 " 1 M549 I � 1 M549 IFVATIO\ SCALE: 1/4" = 11 M549 SEP 0 9 2008 L IC D POINT TO WHICH DUCTWORK IS TO BE REMOVED. r, R CO RAL \OT R \STR..CTIO POINT TO WHICH DUCTWORK IS TO BE REMOVED. - s DRAWI \GS Of Is REMOVE ABANDONED COOLING TOWER AND ALL ASSOCIATED EQUIPMENT, PIPING, AND SUPPORT STEEL. REMOVE PORTION OF EXTERIOR WALL PANELS AND GIRT AS REQUIRED TO FACILITATE EQUIPMENT REMOVALS AND INSTALLATIONS OVER DURATION OF PROJECT. DISASSEMBLE AS NEEDED AND REMOVE ABANDONED AHRF4B (AH -2) & ASSOCIATED DUCT, PIPING, ETC. DISASSEMBLE AS NEEDED AND REMOVE RETURN FAN EFRF3A (EF -1) & ASSOCIATED DUCT, SUPPORTS, ETC. REMOVE EXHAUST FAN EFRF4A FOR RELOCATION APPROX 1 FOOT SOUTH. IF NOT IMMEDIATELY REINSTALLED, PROVIDE TEMPORARY FAN AND FLEX DUCT TO MAINTAIN RESTROOM EXHAUST DURING CONSTRUCTION. REMOVE PORTION OF EXISTING 10" SQUARE DUCT. REMOVE PORTIONS OF EXISTING DUCTWORK FROM EXISTING AHU -1 FOR RECONNECTION OF REMAINING DUCTWORK TO NEW UNIT. DISMANTLE AS NEEDED AND REMOVE AHRF4A (AHU -1) & ASSOCIATED DUCT, PIPING, ETC. REMOVE EXISTING STEAM HOT WATER CONVERTER SYSTEM FOR COMPLETE REPLACEMENT. REMOVE EXISTING MCC. REFER TO ELECTRICAL DRAWINGS. REMOVAL JOB NO. DWG NO. 55776009 9 -99 -M549R RECEIVED CITY OF TUKVVILA OCT 1 9 2007 PERMIT CENTER DATE 06/01/07 COMP NO. CI891A: 02/06/07 08:48 ■ 4„ \ r \NM IN ISSUE FOR SCOPE REVIEW 55776009 APPROVED RWS 06 /01/07 REVISION APPROVED 0,46,40e1914EF - REVISION APPROVED BY '7n ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED HARR CHECKED ENGINEER HARR CHECK D RWS APPROVED APPROVED 06 01 07 06/01/07 SUBTITLE TITLE REPLACE MCQUAY AHU -1 BUILDING 9 -99 DEV. CENTER, WA CURRENT REVISION 55776009 SYMBOL M549R 66/30 RA = 66/18 1ST FL+ 66/12 2ND FL 18/12 SA ZONE 1 A M549 B M549 56/22 RA ZONE RF 56/22 SA ZONE RF 70/18 SA ZONE 3 24/24 SA ZONE 4 16/12 SA ZONE 2 10/10 TE M549 6/12 MECH RM EXH HEATING SOIL EFRF3A (EF -1) AHRF4A (AH -1) C M549 AHRF4B (AH -2) 4 SCALE: 1 /4 "" - ELEVATIO\ SCALE: 1/4" = 1 1> L- VATIO\ SCALE: 1/4" = 1 11 M549 1 " 1 M549 I � 1 M549 IFVATIO\ SCALE: 1/4" = 11 M549 SEP 0 9 2008 L IC D POINT TO WHICH DUCTWORK IS TO BE REMOVED. r, R CO RAL \OT R \STR..CTIO POINT TO WHICH DUCTWORK IS TO BE REMOVED. - s DRAWI \GS Of Is REMOVE ABANDONED COOLING TOWER AND ALL ASSOCIATED EQUIPMENT, PIPING, AND SUPPORT STEEL. REMOVE PORTION OF EXTERIOR WALL PANELS AND GIRT AS REQUIRED TO FACILITATE EQUIPMENT REMOVALS AND INSTALLATIONS OVER DURATION OF PROJECT. DISASSEMBLE AS NEEDED AND REMOVE ABANDONED AHRF4B (AH -2) & ASSOCIATED DUCT, PIPING, ETC. DISASSEMBLE AS NEEDED AND REMOVE RETURN FAN EFRF3A (EF -1) & ASSOCIATED DUCT, SUPPORTS, ETC. REMOVE EXHAUST FAN EFRF4A FOR RELOCATION APPROX 1 FOOT SOUTH. IF NOT IMMEDIATELY REINSTALLED, PROVIDE TEMPORARY FAN AND FLEX DUCT TO MAINTAIN RESTROOM EXHAUST DURING CONSTRUCTION. REMOVE PORTION OF EXISTING 10" SQUARE DUCT. REMOVE PORTIONS OF EXISTING DUCTWORK FROM EXISTING AHU -1 FOR RECONNECTION OF REMAINING DUCTWORK TO NEW UNIT. DISMANTLE AS NEEDED AND REMOVE AHRF4A (AHU -1) & ASSOCIATED DUCT, PIPING, ETC. REMOVE EXISTING STEAM HOT WATER CONVERTER SYSTEM FOR COMPLETE REPLACEMENT. REMOVE EXISTING MCC. REFER TO ELECTRICAL DRAWINGS. REMOVAL JOB NO. DWG NO. 55776009 9 -99 -M549R RECEIVED CITY OF TUKVVILA OCT 1 9 2007 PERMIT CENTER DATE 06/01/07 COMP NO. CI891A: 02/06/07 08:48 ZONE 2 UTH LAB — ZONE 1 EAST LAB 16/12 MECH RM EXH FILTERS & COILS MIXING BOX APPROVED ISSUE FOR SCOPE REVIEW REVISION 55776009 APPROVED 06/01/07 REVISION ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY FILTERS MIXING & COILS DEPT. HARR CHECKED ENGINEER HARR CHECKED RWS APPROVED APPROVED 06/01/07 06/01/07 SUBTITLE TITLE MECHANICAL REPLACE MCQUAY AHU -1 BUILDING 9 -99 DEV. CENTER, WA CURRENT REVISION 55776009 JOB NO. SYMBOL 55776009 M549 M549 70/18 SA — ZONE 3 ALL FIRST FLOOR 24/24 SA — ZONE 4 2ND FLR WEST OFFICE 66/30 RA (66/18 1ST FLOOR + 66/12 2ND FLOOR) 10/10 RESTROOM EXHAUST 12/16 SA — 2ND FLR S 12/18 SA 2ND FL M -C HA\ I CAL SCALE: 1/4" = 1 ` —O" ROOV L - \TIO\ SCALE: 1/4" = 1 FAN L _VATI O \ SCALE: 1/4" = 1' -0" L -VATI O \ SCALE: 1/4' = 1' -0" - LIVATI O \ SCALE: 1/4' = 1'-0 1 z FILTERS & COILS MIXING M549 � � a M549 OX M549 1 1 M549 414 SEP 0 9 2008 $� POINT OF CONNECTION G RE CO\ =ER -RAL SOT \ C STR,CTIO s DRAM \GS OT i s INSTALL COVER(S) ON TWO ABANDONED 56" X 22" DUCTS. REFER TO STRUCTURAL DRAWING. INSTALL AND ASSEMBLE THREE AIR HANDLER MODULES ON MCQUAY — FURNISHED STEEL BASE RAILS. ADAPT AND CONNECT EXISTING DISTRIBUTION DUCTWORK TO NEW AIR HANDLER: 4 SUPPLY ZONES, 1 RETURN, 1 EXHAUST, 1 OUTSIDE AIR. POINTS OF CONNECTION TO EXISTING DUCTWORK SHOWN BY -4-. INSTALL FOUR ZONE VOLUME CONTROL DAMPERS AND ONE RELIEF AIR CONTROL DAMPER. INSTALL NEW BOEING — FURNISHED STEAM /HOT WATER CONVERTER SYSTEM AND HW CONTROL VALVE. ROUTE HWS ,& HWR TO AHU. SEE DWG 3M62. INSTALL AND CONNECT TWO SPRINKLER HEADS IN AIR HANDLER. RETAIN OR INSTALL ONE SPRINKLER HEAD UNDER 66" WIDE DUCT. RELOCATE EXHAUST FAN ABOUT ONE FOOT SOUTH TO CLEAR RECONFIGURED RETURN /EXHAUST DUCT. 8. INSTALL ELECTRICAL SERVICE TO VFD /DISCONNECT SUPPLIED WITH AIR HANDLER. CONNECT VFD, DAMPER & VALVE ACTUATORS, & INSTRUMENTATION TO CMCS. 10. INSULATE ALL SUPPLY AIR DUCTWORK. DWG NO. 9 -99 —M549 RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER DATE 06/01 O M P N O. I ■ 1 L _J .,, ,.... 10/10 ` _— ,/, /\ _, — —_ —_ —►'� r \-3 X — r )! AI li II ili Ah I/ 1 I 4 .. -.4 1ff"Mi I IHIA- 1 i ZONE 2 UTH LAB — ZONE 1 EAST LAB 16/12 MECH RM EXH FILTERS & COILS MIXING BOX APPROVED ISSUE FOR SCOPE REVIEW REVISION 55776009 APPROVED 06/01/07 REVISION ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY FILTERS MIXING & COILS DEPT. HARR CHECKED ENGINEER HARR CHECKED RWS APPROVED APPROVED 06/01/07 06/01/07 SUBTITLE TITLE MECHANICAL REPLACE MCQUAY AHU -1 BUILDING 9 -99 DEV. CENTER, WA CURRENT REVISION 55776009 JOB NO. SYMBOL 55776009 M549 M549 70/18 SA — ZONE 3 ALL FIRST FLOOR 24/24 SA — ZONE 4 2ND FLR WEST OFFICE 66/30 RA (66/18 1ST FLOOR + 66/12 2ND FLOOR) 10/10 RESTROOM EXHAUST 12/16 SA — 2ND FLR S 12/18 SA 2ND FL M -C HA\ I CAL SCALE: 1/4" = 1 ` —O" ROOV L - \TIO\ SCALE: 1/4" = 1 FAN L _VATI O \ SCALE: 1/4" = 1' -0" L -VATI O \ SCALE: 1/4' = 1' -0" - LIVATI O \ SCALE: 1/4' = 1'-0 1 z FILTERS & COILS MIXING M549 � � a M549 OX M549 1 1 M549 414 SEP 0 9 2008 $� POINT OF CONNECTION G RE CO\ =ER -RAL SOT \ C STR,CTIO s DRAM \GS OT i s INSTALL COVER(S) ON TWO ABANDONED 56" X 22" DUCTS. REFER TO STRUCTURAL DRAWING. INSTALL AND ASSEMBLE THREE AIR HANDLER MODULES ON MCQUAY — FURNISHED STEEL BASE RAILS. ADAPT AND CONNECT EXISTING DISTRIBUTION DUCTWORK TO NEW AIR HANDLER: 4 SUPPLY ZONES, 1 RETURN, 1 EXHAUST, 1 OUTSIDE AIR. POINTS OF CONNECTION TO EXISTING DUCTWORK SHOWN BY -4-. INSTALL FOUR ZONE VOLUME CONTROL DAMPERS AND ONE RELIEF AIR CONTROL DAMPER. INSTALL NEW BOEING — FURNISHED STEAM /HOT WATER CONVERTER SYSTEM AND HW CONTROL VALVE. ROUTE HWS ,& HWR TO AHU. SEE DWG 3M62. INSTALL AND CONNECT TWO SPRINKLER HEADS IN AIR HANDLER. RETAIN OR INSTALL ONE SPRINKLER HEAD UNDER 66" WIDE DUCT. RELOCATE EXHAUST FAN ABOUT ONE FOOT SOUTH TO CLEAR RECONFIGURED RETURN /EXHAUST DUCT. 8. INSTALL ELECTRICAL SERVICE TO VFD /DISCONNECT SUPPLIED WITH AIR HANDLER. CONNECT VFD, DAMPER & VALVE ACTUATORS, & INSTRUMENTATION TO CMCS. 10. INSULATE ALL SUPPLY AIR DUCTWORK. DWG NO. 9 -99 —M549 RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER DATE 06/01 O M P N O. I 1 � r _J 30/30 — r" _— — —_ —_ —►'� — r Ah mi -.4 1ff"Mi I IHIA- 1 i ZONE 2 UTH LAB — ZONE 1 EAST LAB 16/12 MECH RM EXH FILTERS & COILS MIXING BOX APPROVED ISSUE FOR SCOPE REVIEW REVISION 55776009 APPROVED 06/01/07 REVISION ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY FILTERS MIXING & COILS DEPT. HARR CHECKED ENGINEER HARR CHECKED RWS APPROVED APPROVED 06/01/07 06/01/07 SUBTITLE TITLE MECHANICAL REPLACE MCQUAY AHU -1 BUILDING 9 -99 DEV. CENTER, WA CURRENT REVISION 55776009 JOB NO. SYMBOL 55776009 M549 M549 70/18 SA — ZONE 3 ALL FIRST FLOOR 24/24 SA — ZONE 4 2ND FLR WEST OFFICE 66/30 RA (66/18 1ST FLOOR + 66/12 2ND FLOOR) 10/10 RESTROOM EXHAUST 12/16 SA — 2ND FLR S 12/18 SA 2ND FL M -C HA\ I CAL SCALE: 1/4" = 1 ` —O" ROOV L - \TIO\ SCALE: 1/4" = 1 FAN L _VATI O \ SCALE: 1/4" = 1' -0" L -VATI O \ SCALE: 1/4' = 1' -0" - LIVATI O \ SCALE: 1/4' = 1'-0 1 z FILTERS & COILS MIXING M549 � � a M549 OX M549 1 1 M549 414 SEP 0 9 2008 $� POINT OF CONNECTION G RE CO\ =ER -RAL SOT \ C STR,CTIO s DRAM \GS OT i s INSTALL COVER(S) ON TWO ABANDONED 56" X 22" DUCTS. REFER TO STRUCTURAL DRAWING. INSTALL AND ASSEMBLE THREE AIR HANDLER MODULES ON MCQUAY — FURNISHED STEEL BASE RAILS. ADAPT AND CONNECT EXISTING DISTRIBUTION DUCTWORK TO NEW AIR HANDLER: 4 SUPPLY ZONES, 1 RETURN, 1 EXHAUST, 1 OUTSIDE AIR. POINTS OF CONNECTION TO EXISTING DUCTWORK SHOWN BY -4-. INSTALL FOUR ZONE VOLUME CONTROL DAMPERS AND ONE RELIEF AIR CONTROL DAMPER. INSTALL NEW BOEING — FURNISHED STEAM /HOT WATER CONVERTER SYSTEM AND HW CONTROL VALVE. ROUTE HWS ,& HWR TO AHU. SEE DWG 3M62. INSTALL AND CONNECT TWO SPRINKLER HEADS IN AIR HANDLER. RETAIN OR INSTALL ONE SPRINKLER HEAD UNDER 66" WIDE DUCT. RELOCATE EXHAUST FAN ABOUT ONE FOOT SOUTH TO CLEAR RECONFIGURED RETURN /EXHAUST DUCT. 8. INSTALL ELECTRICAL SERVICE TO VFD /DISCONNECT SUPPLIED WITH AIR HANDLER. CONNECT VFD, DAMPER & VALVE ACTUATORS, & INSTRUMENTATION TO CMCS. 10. INSULATE ALL SUPPLY AIR DUCTWORK. DWG NO. 9 -99 —M549 RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER DATE 06/01 O M P N O. / M549 I t% M549 56/22 RA ZONE RF 56/22 SA ZONE RF 70/18 SA ZONE 3 24/24 SA ZONE 4 66/30 RA = 66/18 1ST FL+ 66/12 2ND FL 18/12 SA ZONE 1 16/12 SA ZONE 2 16/12 MECH RM EXH M549 Y VI= CHA \ICAL R30 SCALE: 1/4" = 1' -0" EFRF3A (EF -1) AHRF4B (AH-2) MIMI 11111111=111111111 1111111111111•11 11111111111111.111111111111111111111111111111 111111•1111 SYM REVISION ISSUE FOR SCOPE REVIEW 55776009 ECM HARR APPROVED RWS DATE 06/01/07 REVISION BY APPROVED DATE 3M62 M549 EFRF4A (EF - 3 AHRF4A (AH -1) g ® EL -VAT10 SCALE: 1 /4" = 1 . LVAT I O \ SCALE: 1/4" = 1'_0" M549 M549 �LEVATIO\ SCALE: 1/4" = 1' -0" re" ELEVATIO\ SCALE: 1 /4" = 1'® APPROVED BY ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DATE D7 uN HARR CHECKED ENGINEER HARR RWS CHECKED M549 06 /0 1 /07 DEPT. APPROVED 06/01/07 06 01 07 SUBTITLE TITLE SEP 0 9 2008 REPLACE MCQUAY AHU -1 BUILDING 9 -99 L G -GE POINT TO WHICH DUCTWORK IS TO BE REMOVED. REF CO\ ERAL N 4- POINT TO WHICH DUCTWORK IS TO BE REMOVED. ) TES =R - \CE DRAM \GS STRUCTO\ \OTES REMOVE ABANDONED COOLING TOWER AND ALL ASSOCIATED EQUIPMENT, PIPING, AND SUPPORT STEEL. REMOVE PORTION OF EXTERIOR WALL PANELS AND GIRT AS REQUIRED TO FACILITATE EQUIPMENT REMOVALS AND INSTALLATIONS OVER DURATION OF PROJECT. DISASSEMBLE AS NEEDED AND REMOVE ABANDONED AHRF4B (AH-2) & ASSOCIATED DUCT, PIPING, ETC. 4>` DISASSEMBLE AS NEEDED AND REMOVE RETURN FAN EFRF3A (EF- 1) & ASSOCIATED DUCT, SUPPORTS, ETC. REMOVE EXHAUST FAN EFRF4A FOR RELOCATION APPROX 1 FOOT SOUTH. IF NOT IMMEDIATELY REINSTALLED, PROVIDE TEMPORARY FAN AND FLEX DUCT TO MAINTAIN RESTROOM EXHAUST DURING CONSTRUCTION. REMOVE PORTION OF EXISTING 10" SQUARE DUCT. REMOVE PORTIONS OF EXISTING DUCTWORK FROM EXISTING AHU -1 FOR RECONNECTION OF REMAINING DUCTWORK TO NEW UNIT. DISMANTLE AS NEEDED AND REMOVE AHRF4A (AHU -1) & ASSOCIATED DUCT, PIPING, ETC. REMOVE EXISTING STEAM HOT WATER CONVERTER SYSTEM FOR COMPLETE REPLACEMENT. REMOVE EXISTING MCC. REFER TO ELECTRICAL DRAWINGS. ()172A TREMOVAL 1 DEV. CENTER, WA CURRENT REVISION 55776009 SHEET JOB NO. DWG NO. SYMBOL M549R 55776009 9-- 99- -M549R RECEIVED CITY OF TUKWILA OCT 19 2007 PERMIT CENTER DATE COMP NO. 06/01/07 SYM 70/18 SA -- ZONE 3 ALL FIRST FLOOR 24/24 SA — ZONE 4 2ND FLR WEST OFFICE 66/30 RA (66/18 1ST FLOOR + 66/12 2ND FLOOR) A/ \ M549 /B\ M549 10/10 RESTROOM EXHAUST 12/16 SA — %ZONE 2 2ND FLR SOUTH LAB 12/18 SA — ZONE 1 2ND FLf EAST LAB 16/12 MECH RM EXH REVISION V EC APICAL ROO' SCALE: 1/4" = 1' -0 RWS MIXING BOX M549 APPROVED DATE SYM 2 FAN FILTERS & COILS REVISION M549 3M62 M549 BY ISSUE FOR SCOPE REVIEW 55776009 06/01/07 APPROVED DATE N �BOE /NG EILIVA11O\ SCALE: 1/4' = 1' -0" LEVATIO\ SCALE: 1/4" = ELEVATI O SCALE: 1/4" = 1' -0" ELEVATIO SCALE: 1/4" = 1'— APPROVED BY ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE DRAWN HARR ENGINEER HARR APPROVED � 1 M549 DATE 06/01/07 06/01/07 TITLE SUBTITLE MECHANICAL BUILDING 9 -99 F -4 REPLACE MCQUAY AHU -1 LEGE\J POINT OF CONNECTION GEC R CO DEV. CENTER, WA ERAL FER.E C OTES STRUCTIO\ INSTALL COVER(S) ON TWO ABANDONED 56" X 22" DUCTS. REFER TO STRUCTURAL DRAWING. INSTALL AND ASSEMBLE THREE AIR HANDLER MODULES ON MCQUAY — FURNISHED STEEL BASE RAILS. ADAPT AND CONNECT EXISTING DISTRIBUTION DUCTWORK TO NEW AIR HANDLER: 4 SUPPLY ZONES, 1 RETURN, 1 EXHAUST, 1 OUTSIDE AIR. POINTS OF CONNECTION TO EXISTING DUCTWORK SHOWN BY . INSTALL FOUR ZONE VOLUME CONTROL DAMPERS AND ONE RELIEF AIR CONTROL DAMPER. INSTALL NEW BOEING— FURNISHED STEAM /HOT WATER CONVERTER SYSTEM AND HW CONTROL VALVE. ROUTE HWS & HWR TO AHU. SEE DWG 3M62. INSTALL AND CONNECT TWO SPRINKLER HEADS IN AIR HANDLER. RETAIN OR INSTALL ONE SPRINKLER HEAD UNDER 66" WIDE DUCT. RELOCATE EXHAUST FAN ABOUT ONE FOOT SOUTH TO CLEAR RECONFIGURED RETURN /EXHAUST DUCT. 8. INSTALL ELECTRICAL SERVICE TO VFD /DISCONNECT SUPPLIED WITH AIR HANDLER. 9. CONNECT VFD, DAMPER & VALVE ACTUATORS, & INSTRUMENTATION TO CMCS. 10. INSULATE ALL SUPPLY AIR DUCTWORK. CURRENT REVISION 55776009 SHEET JOB NO. DWG NO, DRAWI MBOL M549 SEP 0 9 200o \GS OTES 55776009 9 -99 -M549 RECEIVED CITY OF TUKWIL.A OCT 1 9 2007 PERMIT CENTER DATE 06/01/07 COMP NO. EQUIPMENT SCHEDULE ITEM DESCRIPTION PROPERTY NO. - HP 7.5 KW REMARKS 480V, 3 PHASE 1 ABRASIVE CUT -OFF SAW 2 0150 SANDER MSS - 050065 - - 3 POWERMATIC BANDSAW BC- 547665 - 4 POWERMATIC DRILL PRESS MSS- DP0071 - 5 EMCO 30- 080679 - •• :. :• 31 072949 1 7 STATE DISC SANDER 14A B MURPHY - RODGERS DUST COLLECTOR - 2.7A 9 CROB BAND SAW K -34743 8.0A 10 TRACER LATHE BC- 527915 - 16.6 KVA 11 BRIDGEPORT DRILL BEHC- 30162979 - 8.0A 12 MUSING DRILL PRESS 30- 026087 1 13 SYM H J K L M CONSTRUCTION NOTES 1 E112: Refer to drawing sheet 3E112R for re- connecting duplex pump prior to removal of MCC1. E3.5/14,16,18 M CRIZED ROLL —UP DOOF, 1 -1/2 HP,460V,30 FLOAT SWITCH E3/21 b,23c HOT W 5 KW 5KW HTR MOTORIZED RO_—UP DOOR, 1-1/2 HP,460V,30 3/4 "C —(3) #8 E3 1/19A,21b,23c E3.5/1 9,21,23 MOTORIZED ROLL —UP DOOR, 1 -1/2 HP,460V, PROCESS ROOM 7///,/iii /7 E3.5/13/15/17 MDE- 3/44a,46b,48c 2 "AL- (3) #3/0 & (1) #6 GND /ifiiiifii /iii /iii/ 60/6 E3--7 25,27,29 1" 3 6 L E3 -5 E PRO OOM) PNL F2 - (ABOVE PRO "OOM) A 30/30A MCC --2/A6 MCC -2/B5 EF -10 3 HP UH-5 3 HP 460V,30 30/20P 25,27,2 20 22,24 26,28,30 0 38,40,42 32,34,36 PNL. E3 REVISION 75KVA XF R (T8)(for 2.3) 200/200 200 200 /200 E2.3 (REF) PANEL E3-7 100 100 /NF E3- 5/2,4,6 1 "C,3 #2 E3- 7/8,10,12 ...." /4" BY SANTOS SANTOS AVILA ESBROOK PLAN APPROVED VAVREK VAVREK VAVREK \1 -1/4 "C 3 #1 E3- 5/25,27,29 SCALE: 1 /8" = 1' -0" DATE 12/22/04 5/22/06 06.13.07 E3- 7/14,16,18 3/4" 3 #10 E3 -7 2,4,6 1" 3 6 PNL E -2 ROLL -UP DOOR i 1 1 L BOE /A m o' 30/3 XFMR T -1 E2 -1 /31,33,35 ( ?) 3" 3 #350MCM FROM SUB #55, F2 E2- 1/19,21,23 1/2" 3 #10 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT, DATE DRAWN M. DITTMAR CHECKED R. ERICKSON CHECKED APPROVED APPROVED DATE 10- 30-98 II SUBTITLE TITLE PANEL F1 w ELECTRICAL MASTER DE) TeLi 24 "X36 "X10" 36 "X24 "X10" (SPARE) 24 "X36 "X10" (3) 3" 3#500MCM ROM SUB #55, F5 (WAS BUSWAY E1.25) (2) 3" 3 #350MCM (1) 3" 3 #350MCM (SPARE) FROM SUBSTATION #55, F4 - (2) 3" 3 #350MCM FROM SUB #55, F4 480Y/277 VOLT POWER BUILDI \G 9 -991 COL. E G/ ---4 LEGEND: 480 VOLT RECEPT., 3 —WIRE, 4 —POLE, CROUSE HINDS, TYPE ARE, XX AMPERES. 480/277V DISTRIBUTION PANEL TRANSFORMER, CAPACITY, PHASE & VOLTAGE AS SHOWN GROUND 480V 3 PHASE MOTOR MOTOR STARTER, MAGNETIC MOTOR STARTER, MAGNETIC W/ DISCONNECT SWITCH MOTOR STARTER, MANUAL DISCONNECT SWITCH, NON - FUSED, XX AMPERES MACHINE /EQUIPMENT NUMBER X, Y HORSEPOWER GENERAL NOTES: 1.) ALL CONDUIT TO BE 3/4" EMT UNLESS OTHERWISE NOTED. 2.) ALL WIRE TO BE #12 THWN UNLESS OTHERWISE NOTED. 3.) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V "A" PHASE (LEFT BUS IN PANEL) BLACK BROWN "B" PHASE (CENTER BUS IN PANEL) RED ORANGE "C" PHASE (RIGHT BUS IN PANEL) BLUE YELLOW NEUTRAL WHITE GRAY EQUIPMENT GROUND GREEN 4.) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPRIATELY COLORED TAPE, 5.) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG —IN CIRCUIT BREAKERS ON BUSWAY, 6.) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3 7.) DYMO LABEL ALL RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. 8.) INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. REFERENCE DRAWINGS: I 1 > 9-99-1E62 CONSTRUCTION NOTES: Refer to drawing sheet 3E112R for re- connecting duplex pump prior to removal of MCC1. RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER REVISION R & E STORAGE J #18013800 100A POWER INSTALL J #70292200 REMOVE UNDERFLOOR BLOWER J #13041300 WAT LAB CONSTRUCTION J #13043302 RELOCATE WELD SHOP 1302326.02 ERICKSON VAVREK SANTOS SAMUELSON APPROVED VAVREK MOORE VAVREK VAVREK VAVREK 10/13/00 03.16.04 WELD SHOP RELOCATE EQUIPMENT J #54702800 M &PT INSTALL LATHE & MILL J #56628800 DISCONNECT /CONNECT DRILL PRESSES 4950111 REFEED DUPLEX PUMP F -4 55776009 D.0 CURRENT REVISION SHEET JOB NO. DWG NO. 55776009 SEP 0 9 2006 KEY PLAN SCALE: NONE SYMBOL 1E112 9-99-1E112 DATE OMP NO. 06.13.07 Ckt BreakerT •e j Wire Size Load Served Load Am «s Location Frame Ph A Ph B Ph C la BA 20A #12 (2) 4- EX IN FLOOR BOXES 6e x1 '? k F/3.3 -3.6 3b BA 20A #12 (3) 4 -PLEX IN FLOOR BOXES 8a BA 20A F.313.3 -3.6 SPARE BA 20A 3 4 -PLEX IN FLOOR BOXES (3) � ;u " k Y d 20A F.5/3.6 -4 7a BA 20A #12 (2) 4 -PLEX IN FLOOR BOXES BA ' ' F.7/3.3 -3.5 9b 110 R BA 111M11 BA 20A 20A 20A 20A #12 11313 (4) 4-PLEX IN FLOOR BOXES (1) 20ANP 4 PLEX IN FLOOR BOX � i ) ; G13.9 (1) POWER STRIP - DATA CLOSET E/4 15b BA (1) POWER STRIP DATA CLOSET '� 20A .... E/4 17c BA 20A • (1) POWER STRIP - DATA CLOSET BA t _SPARE,. E/4 19a BA 20A #12 (1) 4 -PLEX RECEFT. - DATA CLOSET — NE SPARE . €,F E/4 21 b BA 20A #12 (2) 2T/48 FLUOR FIXTURES- DATA CLOSET ska� IIIIIIIIIIIIIIIII � y , BA 230 BA 20A #12 DATA CLOSET FAN 1 , 4 . 30c 32a 34b BA BA 25a BA 20A MI SPARE :, , m� a' 11111111111 BA AIR HANDLER AH #8 27b BA 20A NM SPARE ..: 38a BA 1111111111111.111 29c BA 20A z`a SPARE ?' ' Ts0111111 31a BA 20A 11111 SPARE 42c 33b BA 20A SPARE t s�k ^'. F- eY r 35c BA 20A NM SPARE sea 11 37a BA 20A SPARE 39b ��9� 41c BA 20A SPACE W /HARDWARE HARDWARE 1 9�IIIIIMIIIIIIIIIIIIIIII 2a BA 20A • (1) 20A 4 PLEX IN FLOOR BOX (COPIER) „ . � a IIIIMEIIIII 4b BA 20A #12 (2) 15ANP4 PLEX IN FLOOR BOX r . . . ... d � 6e BA 20A #12 (4) 4-PLIW( IN FLOOR BOXES 0+ f j . 8a BA 20A SPARE ���� Fq.. ` : �� : € 10b BA 20A SPARE 11 BA 20A SPARE i , a , 14a BA 20A SPARE ' 16b BA 20A 1172311111111111 '' r �111.11.1111., , .g 1111111111.11111 18c BA 20A _SPARE,. 20a BA 20A 20A 20A 20A — NE SPARE 22b 24c 26a BA BA BA SPARE SPARE SPARE . # IF - Ai . ..,...., Ow . . •...„ ska� IIIIIIIIIIIIIIIII 28b BA 20A . 1 , 30c 32a 34b BA BA 20A 20A 30A 1111 #10 SPARE 1 �, �; � '., �� ; . :, , m� a' 11111111111 BA AIR HANDLER AH #8 36e #10 4 38a BA 100A 1/0 z`a n 40b 1/0 (Does not exist) PANEL—P:6-0N FIRST FLOOR 42c 1/0 SYM A B [3.6/13,15,17,19 AHU #8 NF 4KW, 208, 10 1/4 HP ABLATIVE COATING FAC. ABLATIVE COATING FAC. PANEL E3.6 PNL [7.33 1 E7.33/16b,18c' 1/2 "flex 2 #12 +G E7.3 23c 30 DEAD 28 DEAD 28 18c (18c [18c) f.ejlt 'I E7.33/5c 7a 9b Gs.Gu� nw.il! 19a DED ) =M1I11MMU MMI.w r r �rrr BALCONY X3E3.1 3RD FLOOR 1 /2 "CO TOP OF PROCESS RM. 75KVA 480- 208/120V 3ph, 4W PANEL F2.5 -1 F2.5-1/16b /C 12A 208V 14 MIT. ?PCH24EK A/C 16A 248410 MIT. PPUH24EK E7- 33/13a,15b,17c,19c 1"C,3#2 F2,5/2,4,6 2 "C,4 #4 /O REVISION 757566 -07 757566 -07 BY GBOLA GBOLA C ADDITIONS TO ABL COATING FAC. 757566 -13 K. DARCY D B -1B LAB 180015 -02 PT MEZZ POWER REMOVAL 710717 -00 VAVREK APPROVED JV /NM JV /NM DATE 1/ 8/97 1/ SYM F G REVISION RELOCATE VMS' LAB FROM 9 -53 RECONFIGURE EMERGENCY POWER PANEL E2.3 SAMUELSON — 130465 -00 53416808 JV /AW 8/28/97 H 9 -99 MEZZ REMOVATION 557476 -00 JV /AW 5/19/98 J RE —FEED 2E3 -6 55776009 MORVICE 1/24/01 BY SAMUELSON BEIER VAVREK ESBROOK FLOOR PLA\ SCALE: 1/8" = 1' -0" APPROVED VAVREK DATE 1/21/04 11.29.05 06.13.07 ei,Agsraler 1.� Panel Designation E3.6 Panel Type Main Bkr Rating Panel Rating Ref. Dwg.No. Revision Engineer PLR1 WESTINGHOUSE 150A TYPE HFD 150A, 120/208V 3PH 4W 9•-99 -2E62 F ELECTRICAL PANEL SCHEDULE SAMUELSON ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. Location, bldg. col. Date Installed Feeder Size Fed From Revised Ckt Date Revised Job Number TOTAL DATE �• D. CHESTERFIELD CHECKED ENGINEER CHECKED J. VAVREK APPROVED APPROVED NAREN MEHTA 9 -99.2 E /3.5 AUG -89 2" FLEX. 4 #4 /O MCC -1/E2 VIA 45KVAXFRR. * AS INDICATED 1/16/2004 13046500 7/30/93 8/3/93 8/3/93 SUBTITLE TITLE ELECTRICAL MASTER SEP 0 9 2008 0 208/120V POWER COL. E -0/2 -4 BUILDING 9 -99.2 LEGEND: I 15A, 125V, 1 PHASE, DUPLEX RECEPTACLE 20A, 125V, 1 PHASE DUPLEX RECEPTACLE 15A, 125V, 1 PHASE DUPLEX RECEPTACLE (DEDICATED) Ifit 30A, 125V, 1 PHASE, TWISTLOCK RECEPTACLE 15A, 125V, 1 PHASE, 4 —PLEX RECEPTACLE 15A, 125V, 1 PHASE, DUPLEX FLOORSTACK 15A, 125V, 1 PHASE, 4 —PLEX FLOORSTACK ® J —BOX 120/208V DISTRIBUTION PANEL A, TRANSFORMER, CAPACITY, PHASE & VOLTAGE AS SHOWN NE 60 0-1 DISCONNECT SWITCH, NON — FUSED, XX AMPERES ® MOTOR STARTER, MAGNETIC J MOTOR STARTER, MAGNETIC 0 115V MOTOR (SIZE AS NOTED) GENERAL 1.) ALL CONDUIT TO BE 1/2" EMT UNLESS OTHERWISE NOTED. 2.) ALL WIRE TO BE #12 THWN UNLESS OTHERWISE NOTED. 3.) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V "A" PHASE (LEFT BUS IN PANEL) BLACK BROWN "B" PHASE (CENTER BUS IN PANEL) RED ORANGE "C" PHASE (RIGHT BUS IN PANEL) BLUE YELLOW NEUTRAL WHITE GRAY EQUIPMENT GROUND GREEN 4,) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPRIATELY COLORED TAPE. 5.) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG—IN CIRCUIT BREAKERS ON BUSWAY. 6.) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3 7.) DYMO LABEL ALL RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. 8.) INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. CONSTRUCTION NOTES: Re feed panel 2E3 -6 from 3 floor panel 3F4 /abc. Re feed panel 2E3-6 from 3 floor panel 3F4 /abc. Reference drawing sheet 3E112R. DEV. CENTER, WA 15A, 125V, 1 PHASE (2) DUPLEX RECEPTACLES FLOOR STACK ON RAISED FLOOR WALKER #500 SERIES \ CURRENT REVISION 55776009 SHEET JOB NO. DWG NO YMBOL 2E62 53416808 9- 99.2.2E62 RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER DATE COMP NO. 06.13 07 TAE9937: 06 SYM A B C DR 1/2"R 4#12 BATTERY CHARGER TO MANHOLE SUMP PUMPS CMOS 9-99 STRUC LAB EXP H ... .„_..-VERTICAL 1"C 4b,6c (CONTENTS UNKNOWN) MI C s r3r a:174M SWITCH FOR X3E3.2/50 FUEL PUMP - R3E - 3`71 - 7 1 -1-€ , Ail 1/2" 2#12 X3E3.1/16,18 3 4"R 3#10 INSTALL HEAT TAPE NEW LOOP 4 - 6 REVISION RECONFIGURE EMERGENCY POWER NEW AIR HANDLING UNIT REMOVALS E3.4/2 75 KW ENGINE GENERATOR INTERLOCK WP EF-2 1/4HP - 5C3E37-1-/-4,4_ XS3E3.1 /4,6 3/4"R 3#12 137044-05 53416808 55776009 WIN 480-240/120V 7.5 KVA, 1 PH X3E3.2 EMERGENCY 3/4"R 3#12 E3. 4/3,5, _J PANEL E3.4 E3.4/1,3,5, 400 HZ MANUAL TRANSFER SNATCH MOTOR GENERATOR E3.4/11 13 BY Dal BEIER ESBROOK ESBROOK E3.4/4,6 7a APPROVED DN, TO PANEL F3.3 DN. TO PANEL F.3.28 DN. TO PANEL F3.2A IN TER LOC JV/NM E3A_ CONSTRUCTION NOTES 3E62R: DATE 9/9/93 09.09.06 06.13.07 Heat Trace EQUIP GEC! BREAKER 8c PN 3.2 ALARM LT Disconnect power to old Air Handling Unit devices. Save circuit for new unit light and outlet. Remove old duct work access lights and circuit wires back to home run j box. SYM E3.4/12 -- F 7 A - NEE - T3E-371- PANEL XS3E3.1 STAND-BY T3 a 20 ft XS3E3.1 /20 SR 55 SUB 56 S eat Trace Splice Boxes 57 B 25' 3b E3.4/17 PML METERS FOR SUBSTATIONS 33E3 ---XS3E3.1/1,3 X3E3.1 / REVISION BY APPROVED FLOOR PLAN SCALE: 1/8" = DATE e)LAgra F A4e7A V ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY -7 DEPT. DATE N D. CHESTERFIELD CHECKED EN R. ERICKSON CHECKED APPROVED APPROVED 7/22/93 SUBTITLE TITLE ELECTRICAL MASTER SEP 0 9 2008 208/120 VOLT POWER BUILDING 09-99 COL. E-G/1-4 * ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Ddepartment if asbestos containing material is damaged or discovered that is required to be removed to support work. I:©: E DUPLEX, 2 POLE, 3 WIRE IQ DUPLEX, 2 POLE, 3 WIRE (DEDICATED) SINGLE, 2 POLE, 3 WIRE, TWISTLOCK, 30 AMP $ SINGLE POLE TOGGLE SWITCH C) J-BOX 120/208V DISTRIBUTION PANEL 480/277V DISTRIBUTION PANEL FAN WEATHERPROOF TRANSFORMER (XFMR)CAPACITY,PHASE & VOLTAGE GROUND MOTOR NON-FUSED SAFETY SWITCH, 60 AMPERE AIR DROP WP 60a • LEGEND: K DEV. CENTER, WA GENERAL NOTES: 1.) ALL CONDUIT TO BE 3/4" EMT UNLESS OTHERWISE NOTED. 2.) ALL WIRE TO BE #12 THWN UNLESS OTHERWISE NOTED. 3.) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V "A" PHASE (LEFT BUS IN PANEL) BLACK "B" PHASE (CENTER BUS IN PANEL) RED "C" PHASE (RIGHT BUS IN PANEL) BLUE NEUTRAL WHITE EQUIPMENT GROUND GREEN 4.) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPRIATELY COLORED TAPE. 5.) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG—IN CIRCUIT BREAKERS ON BUSWAY. 6,) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3 7.) DYMO LABEL ALL RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. 8.) INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. CONSTRUCTION NOTES: >- Disconnect power to old Air Handling Unit devices. Save circuit for new unit light and outlet. Remove old duct work access lights and circuit wires back to home run j—box. URRENT REVISION 55776009 SHEET JOB NO. DWC NO. SYMBOL 3E62R 53416808 09-99-3E62 BROWN ORANGE YELLOW GRAY RECEIVED CITY OF TUKWILA OCT • 9 2007 PERMIT CENTER DATE COMP NO. 06.13.07 SYM A B C D W P� E3.4/8 _.� EF -2 5 1 /4HP E3.4/11,13 E3.4/15 1 c _. 75 KW ENGINE GENERATOR XS3E3.1 /4,6 3/4 "R 3 #12 \ 11TE 371'74Mb SWITCH FOR -X3E3.2/5a FUEL PUMP 1 /2" 2 #12 480- 240/120V 7.5 KVA, 1 PH X3E3.2 EMERGENCY 3/4 "R 3 #12 PANEL E3.4 [3.4/3,5, E3.4/4,6 400 HZ MANNAL TRANSFER SWITCH MOTOR GENERATOR 1 400 HZ NANDI TRANSFER SWITCH DN. TO PANEL E3.4/12 PANEL XS3E3.1 STAND -BY Heat Trace EQUIP GFCI BREAKER & ALARM LT feat Trace ;piece Boxes XS3E3.1 /20 PML METERS FOR SUBSTATIONS X3E3.1 / - g3E3:1 -/-1-- - XS3E3.1/1,3 Panel Designation [3.4 Panel Type Main Bkr Rating Panel Rating Ref. Dwg.No. Revision Engineer GE TYPE NAB 225A. CB 225A. 200Y/120V, 3P, 4W Esbrook ELECTRICAL PANEL SCHEDULE Location, bldg. 9 -99.3 PENTHOUSE Date Installed 7/29/07 Feeder Size 3" 4#300MCM Fed From PNL MDE- 3/13,15,17 VIA 75KVAXFMR (T -7) Revised Ckt $ Date Revised 061307 Job Number 55776009 Breaker Type Wire Load Am s Ckt Frame Trip Size Load Served Ph A Ph B Ph C Location la TE 20A #12 (3) DUPLEX RECEPTACLES g; r k s 0 4 E3/3.3 3b TE 20A #12 (4) DUPLEX RECEPTACLES E6/1.4 Sc TE 20A #12 (4) DUPLEX RECEPTACLES F/4 7a TE 20A #12 Dead -end J -box ?: .. M • • . . F -3.5 9b TE 20A #12 OUTSIDE LIGHTS G/3 11 c TE 20A #12 CHEMICAL FEED - CKTS #2 , a b a• , G13.6 13a TE 20A #12 CHEMICAL FF r1- CKTS #1 G13.7 15b TE 20A #12 HEAT TAPE (OUTSIDE) F13.2 17c TE 20A #12 HEAT TAPE (OUTSIDE) ;' y " G13.3 19a TE 20A #12 (4) DUPLEX RECEPTACLESF, ROOF 21b TE 20A #12 CMCS CONTROLS FOR HVAC ROOF 23c TE 20A SPARE 25a TE 20A SPARE 27b TE 20A SPARE Rte °t9' 29c TE 20A SPARE .•: � ," � 2a TE 15A #12 AHU Heat Exchanger ; F -4 4b TE iSA #12 CMCS Panel: Ai F -4 6c TE 15A #12 AHU Light & Receptacle outlet F-4 8a TE 15A #12 EF -2, 1/4 HP located in back room of penthouse ��r G/3.7 10b TE 15A - SPARE 12c TE 20A #12 Heat Trace Equip outdoor chilled w tr lines F3 14a TE 20A SPARE `,? 16b TE 20A SPARE ,xrrs;�'' 18c 20A SPARE ''��' ' 20a 20A ■ SPARE 22b 20A SPAREA:F'_ k e' 24c 20A SPARE 26a �s t B X �fl 'kg.'of5 28b 100A #2 PANEL E7.33 2nd floor lab 300 - #2 t` TOTAL 1/2 "R 4 #12 BATTERY CHARGER TO MANHOLE SUMP PUMPS CONSTRUCTION NOTES 3E62: Install 120 volt circuit to new air handling unit Switch and Outlet assembly. Connect 120 volt feed to CMCS equipment panel. Re-feed from circuit 4 as shown. Connect new heat exchanger pump motor to ciruit 2 per manufacturers instructions. Provide Cutler- Hammer "Vlanual Motor Protector - Rotary" control device, Part numbers XTPR2P5BC1 and XTPAXENAS55B enclosure. (vlotor FLA = 1.7 ©120V) EAT TRACE REVISION BY FLOOR PLAN SCALE: 1 /8" APPROVED DATE 0 ( Y2 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE N D. CHESTERFIELD c ENGINEER R. ERICKSON CHECKED APPROVED APPROVED DATE 7/22/9 SUBTITLE TITLE • SEP 092008 ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Ddepartment if asbestos containing material is damaged or discovered that is required to be removed to support work. REVISION 9---99 STRUC LAB EXP 137044 -05 RECONFIGURE EMERGENCY POWER HEAT TAPE NEW CHILLEWD WATER LOOP 53416808 CONNECT LIGHT AND OUTLET NEW AHU 55776009 BY DEH BEIER ESBROOK ESBROOK APPROVED JV /NM DATE 9/9/93 09.09.06 06.13.07 SYM DRAW ELECTRICAL MASTER 208/120 VOLT POWER BUILDING 09 -99 COL. E- -G/1 -4 LEGEND: ICE DUPLEX, 2 POLE, 3 WIRE DUPLEX, 2 POLE, 3 WIRE (DEDICATED) I SINGLE, 2 POLE, 3 WIRE, TWISTLOCK, 30 AMP WP Al 1 00 NF so EP DEV. CENTER, WA SINGLE POLE TOGGLE SWITCH J -BOX 120/208V DISTRIBUTION PANEL 480/277V DISTRIBUTION PANEL FAN WEATHERPROOF TRANSFORMER (XFMR)CAPACITY,PHASE & VOLTAGE GROUND MOTOR NON -FUSED SAFETY SWITCH, 60 AMPERE AIR DROP GENERAL NOTES: 1.) ALL CONDUIT TO BE 3/4" EMT UNLESS OTHERWISE NOTED. 2.) ALL WIRE TO BE f12 THWN UNLESS OTHERWISE NOTED. 3.) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V "A" PHASE (LEFT BUS IN PANEL) BLACK "B" PHASE (CENTER BUS IN PANEL) RED "C" PHASE (RIGHT BUS IN PANEL) BLUE NEUTRAL WHITE EQUIPMENT GROUND GREEN BROWN ORANGE YELLOW GRAY 4.) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPRIATELY COLORED TAPE. 5.) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG -IN CIRCUIT BREAKERS ON BUSWAY. 6.) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3 7.) DYMO LABEL ALL RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. 8.) INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. CONSTRUCTION NOTES: Install 120 volt circuit to new air handling unit Switch and Outlet assembly. Connect 120 volt feed to CMCS equipment panel. Re -feed from circuit 4 as shown. Connect new heat exchanger equipment to ciruit 2 per manufacturers instructions. CURRENT REVISION 55776009 SHEET JOB NO. DWG NO. SYMBOL 3E62 09 -99 -3E62 RECEIVED CITY OF TUKWIL-A OCT 192007 PERMIT CENTER DATE COMP NO. 06.13.07 SYM A B C 3F4/4 T_3 45KVA 480- 120/208V MDE-3/26,28,30 56 I 1 1/2"R, 3 #3/O M DE-- 3/13,15,17 2 "R 3 #2 STRUCRURE LAB EXP B1 B LAB INSTALLATION RELOCATE WELD SHOP CONSTRUCTION NOTES 3E112R: Have these preperations already in place prior to replacing MCC1 with new 480 volt power panel. Schedule a power outage to complete the circuit transfer to the new panel and connect to the remaining loads on the MCC Intercept existing MC1 feed with large 36x36x12 f-box. From j —box route tea 2 -1/2" Aluminum conduit and 3 #300 MCM. Install new 400 Amp panel with 400 Amp main to replace MCC1. Locate panel 12 " away from wall. Provide floor to ceiling 1-1/ 2" 12 gauge channel supports. Specified in SE800614G701 -000 use the NEG —ALT number on bottom of Page as per Ken Jude of WESCO phone #(206) 650 -0981. 400 amp main 480v- 3ph -3w with 400 amp copper bus. $9893.00 And with 2 —each FDE -160 3pole breakers 12 each FDE -80 3pole breakers. Feed MCC2 from new panel with 3" aluminum conduit and 3 # 1/0 Feed transformer T3.6 from new panel with 1" EMT and 3# 4. Intercept conduit and install junction box. REVISION J #137044 -05 J #180015 -06 J #130232 -02 STAND —BY TS BY DEH ERICKSON SAMUELSON D INSTALL VFD ON CHILLED VTR PUMP 456650801 ESBROOK E- -POWER ATS APPROVED VAVREK VAVREK VAVREK VAVREK DATE 9/9/93 1/18/98 3/15/04 01.16.07 ER REPLACE AHU #1 J #55776009 ESBROOK VAVREK 02.16.07 480- 240/120V 7.5 KVA, 1 PH 30A NF X3E3/16,18 SYM XFMR T7 75 KVA 100A NF XFMR T3 30 KVA 60A NE EMERG. PNL.X3E3 (OLD EM) PNL. MDE3 1 -1HP C2 /Cr I- .r- Re—feed 2HP Chilled water pump PU3G3A and 5HP duplex condensate pump on fisrt floor (Reference sheet 1E112) from new panel. Install 6x6x6 j--box by old MCC1. Route 3/ 4" EMT and 6# 12 wires from new panel. Use 1 -20A circuit for existing 5 HP Duplex Pump on 1st floor and another 20A circuit to intercept chilled water pump unit as shown. Re —feed Exhaust Fan #3. Provide a combination motor starter at old MCC1 location from new panel feed with 3/ 4" EMT and 3# 12 circuit wires from new panel. Connect new starter to exhaust fan #3. Cutler— Hammer #ETC2201CHB— BP67P29P68 with HOA, green run and red off LED lights. $1181.80 As per Wesco Ken Jude Quote. Notify ADT to disconnect alarm points prior to shutdown. Re —Use ADT conduit for new air handler smoke detector Reference Sheet 3E262R. -- Disconnect AHU1 and AHU2 and EF1 and chilled water pump. And remove MCC1 and associated control wires. Disconnect control wires back to CMCS panel. -- REVISION BY _ APPROVED DATE PLA\ SCALE: 1/8" = 1 -0" ei APPROVED BY ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE DITTMAR CHECKED ENGINEER HARRIS CHECKED VAVREK APPROVED APPROVED MEHTA 8/3/93 8/11/93 9/17/93 9 17 93 SUBTITLE TITLE ELECTRICAL MASTER SEP 0 9 2008 BUILDING 9 -99.3 REPLACE MCC1 WITH NEW PANEL 480 VOLT POWER LEGEND: i0 COL. E —G/1 -4 DEV. CENTER, WA GENERAL NOTES: 1.) ALL CONDUIT TO BE 1/2" EMT UNLESS OTHERWISE NOTED. 2.) ALL WIRE TO BE #12 THWN UNLESS OTHERWISE NOTED. 3.) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V "A" PHASE (LEFT BUS IN PANEL) BLACK "B" PHASE (CENTER BUS IN PANEL) RED "C" PHASE (RIGHT BUS IN PANEL) BLUE NEUTRAL WHITE EQUIPMENT GROUND GREEN 4.) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPRIATELY COLORED TAPE. 5.) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE, INCLUDING PLUG —IN CIRCUIT BREAKERS ON BUSWAY. 6.) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3 7.) DYMO LABEL ALL RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. 8.) INSTALL REVISED PANEL SCHEDULES UPON COME JOB. CONSTRUCTION * ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Ddepartment if asbestos containing material is damaged or discovered that is required KEY PLAN to be removed to support work. - r ' CURRENT REVISION J #55776009 SHEET JOB NO. DWG NO. 120/208V DISTRIBUTION PANEL 480/277V DISTRIBUTION PANEL TRANSFORMER (XFMR) NOTES: SYMBOL 3E112R DATE 9- 99.3 -3E112 COMP NO. BROWN ORANGE YELLOW GRAY RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER 02.16.07 Lb Ckt Breaker Type 'vVire Size Load Served Load Amps Location Frame Trip Ph A Ph B Ph C 1a FDE 160 1111111111111111.111111111111.111 2c 11111 d s ns , 1 b Spare 4a FDE 70 . d3k [: yy 3 #4 2E3 -6 - VIA 45KVA X -FO 3a FOE 80 E-3 4c we Tr 3b Spare FOE 20 z :ri� 6b 3 #10 P10 - 2 -5HP Duplex Pumps - 1st Floor Janitors Closet; h:,.,' FDE 80 F -4 6c ', �+ 1 1 r 1Rk 4 °, 5b IIIMIIIMIII F-4 Spare `a 20 ) 'a 5c S MI 6�3,..� �y. l���U+.2a� , FOE 80 g r 7b Spare s ' 20 80 p IMIMIIIII 1 1 E e r 7 s+ Xe �t 1 3 #12 MillEME111111MIIIII1 IIIMIIMIIIMIIIIIIIIIIIMIIIIIIIIIIIIIIIIIMII _ FOE 80 10c Sb EN Spare FOE 12b Spare - MI z }s *A r r , IHNEffaill 1.11111.11111 111111111.. 1111 12c 14a 11a, FDE 80 IIIIIIIIIIIIIIIIMIIIIIIIINIIIMIIIIIIIM 14b A YF }�f s ' 11b Spare : . 11c 13a FDE 80 13b Spare -. 13c N t i..2 2a FDE 125 IIIIIIIIIIIOIIIIIIIIIIIIIIIIIIIIIMIIIIIIMIIINMII 3 #110 2b MCC2 - Penthouse rn F-4 2c 11111 , 4a FDE 70 4b 3 #4 2E3 -6 - VIA 45KVA X -FO ` ' E-3 4c Tr 6a FOE 20 z :ri� 6b 3 #10 P10 - 2 -5HP Duplex Pumps - 1st Floor Janitors Closet; h:,.,' � , F -4 6c r 1 r 1Rk 4 °, IIIMIIIMIII F-4 8a FDE 20 IIIIHIIIIIIIMIIIIIIIIIIIIIMIIIIIIIMIINIIIIIIIIIII Eas 8b EF3 -112HP Restroom exhaust Fan 8c g r 10a FDE 20 80 IMIMIIIII 1 0 b 3 #12 MillEME111111MIIIII1 IIIMIIMIIIMIIIIIIIIIIIMIIIIIIIIIIIIIIIIIMII PU3G3A - 2HP Chilled Water Pump 10c 11111111 12a FOE 12b Spare - MI z }s *A r r , IHNEffaill 1.11111.11111 111111111.. 1111 12c 14a FDE 80 IIIIIIIIIIIIIIIIMIIIIIIIINIIIMIIIIIIIM 14b s ' MN 14c : . 11111111 SYM A B C D E 1/2 HP DOOR MOTOR F4 /6abc,10abc 1"C,6#12 60 3 ■ •0/3 o 1 P1/ HP /2HP (3) HOIST MOTORS S3E3.5/ 13,15,17 ` — 2 "R 4#1/0 SUB56F2– 500A 2-2-1/2",3#300 I Hz MG I SET MDE- 3/26,28,30 1 1/2"R, 3 #3 /O XS3E3.5/7,9,11 3/4" 3 #8 PNL F3 (400HZ) Connect CMCS conduit and controls. E –POWER ATS CONSTRUCTION NOTES 3E112: Install power to new AHU1. --- Provide raceway for ADT Smoke Detector (by others.). – Reference sheet 3E262– 480- 240/120V 7.5 KVA, 1 PH 30A NF X3E3/16,18 XFMR T7 75 KVA 100A NF XFMR T3 30 KVA 60A NF EMERG. PNL.X3E3 (OLD EM) PNL. MDE3 - 11 -1HP C2/Clr 12 -11P C C2 /d 2 PLA\ SCALE: 1/8" = easfi rierErArAfEcP® Panel Designation 3F4 Ref. Dwg.No. 9- 99 -3E112 Revision A Engineer Panel Type PLR4 Cutler- Hammer Main Bkr Rating 400A TYPE HFD Panel Rating 400A, 480V 3PH 3W Esbrook ELECTRICAL PANEL SCHEDULE ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY Location, bldg. 9 -99.3 Penthouse col. F -4 Date Installed 06 -21 -07 Feeder Size 2EA-2-1/2"C, 3#350MCM Fed From "$" SUB 56 - BRKR 2 Revised Ckt $ AS INDICATED Date Revised 06 -21 -07 Job Number 55776009 TOTAL REVISION STRUCRURE LAB EXP B1B LAB INSTALLATION RELOCATE WELD SHOP INSTALL VFD ON CHILLED WTR PUMP J #137044 -05 J #180015 -06 J #130232 --02 J #56650801 REPLACE AHU #1 J #55776009 DATE DEPT. DATE DRAWN DITTMAR CHECKED ENGINEER HARRIS CHECKED VAVREK APPROVED APPROVED MEHTA DATE 8/3/93 8/11/93 9/17/93 9/17/93 TITLE i SUBTITLE ELECTRICAL MASTER BUILDING 9 -99.3 COL. E –G/1 -4 480Y/277 VOLT POWER PLAN LEGEk D: DEV, CENTER, WA 120/208V DISTRIBUTION PANEL 480/277V DISTRIBUTION PANEL TRANSFORMER (XFMR) GENERAL NOTES: 1.) ALL CONDUIT TO BE 1/2" EMT UNLESS OTHERWISE NOTED. 2.) ALL WIRE TO BE #12 THWN UNLESS OTHERWISE NOTED. 3.) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V "A" PHASE (LEFT BUS IN PANEL) BLACK "B" PHASE (CENTER BUS IN PANEL) RED "C" PHASE (RIGHT BUS IN PANEL) BLUE NEUTRAL WHITE EQUIPMENT GROUND GREEN BROWN ORANGE YELLOW GRAY 4.) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPRIATELY COLORED TAPE. 5.) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG —IN CIRCUIT BREAKERS ON BUSWAY. 6.) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3 7.) DYMO LABEL ALL RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. 8.) INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF° JOB. CONSTRUCTIO Install power to new AHU1. -- Connect CMCS conduit and controls. RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER CURRENT REVISION J #55776009 SHEET JOB NO. DWG NO. NOTES: Provide raceway for ADT Smoke Detector (by others.). – Reference sheet 3E262– YMBOL 3E112 SEP 0 9 2008 * ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Ddepartment if asbestos containing material is damaged or discovered that is required KEY PLAN N to be removed to support work. - = DATE 9- 99.3 -3E112 COMP NO. 02.16.07 1/2 "R 4 #12 BATTERY CHARGER TO MANHOLE SUMP PUMPS 75 KW ENGINE GENERATOR XS3E3.1 /4,6 I AH1-20HP L MCC1 /A3 EF1 -1 MCC1, Ti .4/1,3,5, ro rii+ i�sirrrr :w.►wi/r Ar�,r. frr ■ ADT SMOKE DETECTOR AHU 1 REVISION 1$11$* PANEL E3.4 PANEL XS3E3.1 480- 240/120V STAND —BY 7.5 KVA, 1 PH X3E3.2 EMERGENCY Nom .411211 CONSTRUCTION NOTES: Notify ADT to disconnect alarm points prior to shutdown. Re—Use ADT conduit for new air handler smoke detector Reference Sheet 3E112R. -- ----- Original Message— From: Winter, Marshal A (Boeing Fire Deoartment) Call Fire dispatch at 206 -655 -8800, they will put the codes on hold and notify the Fire Department. The ADT code is 58 -2 -31, all points. Marshal Winter 206 - 437 -1187 55776009 PML METERS FOR SUBSTATIONS X3E3.1 / \otify AST to cisconnect cicr points prior to slutcown. Re --Jse ADT co -lcuit for new cir ncndler smoKe cetector Reference Sheet 3E112R. Origincl vesscge Fro Winter, Vcrshcl A (Boeing Fire DeocrtTent) call Fire dispctch ct 206 - 655 -8800, they will put t coces on lolc cnd notify t Fire Depertment. Tie ADT cote is 58 -2 -31, cll points Vcrshal Winter 206- 437 -1 187 FLOOR PLAN ESBROOK APPROVED ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. R. ERICKSON CHECKED APPROVED APPROVED SUBTITLE TITLE ELECTRICAL MASTER ADT ALARMS SEP 0 9 Z008 * ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Ddepartment if asbestos containing material is damaged or discovered that is required to be removed to support work. BUILDING 09 -99 COL. E —G/1 -4 LEGEND: DUPLEX, 2 POLE, 3 WIRE K; DUPLEX, 2 POLE, 3 WIRE (DEDICATED) ( SINGLE, 2 POLE, 3 WIRE, TWISTLOCK, 30 AMP $ SINGLE POLE TOGGLE SWITCH ® J —BOX 120/208V DISTRIBUTION PANEL MI 480/277V DISTRIBUTION PANEL ( FAN WP WEATHERPROOF ®, TRANSFORMER (XFMR)CAPACITY,PHASE & VOLTAGE GROUND MOTOR . oFDi NON —FUSED SAFETY SWITCH, 60 AMPERE AIR DROP GENERAL NOTES: 1.) ALL CONDUIT TO BE 3/4" EMT UNLESS OTHERWISE NOTED. 2.) ALL WIRE TO BE #12 THWN UNLESS OTHERWISE NOTED. 3.) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V BROWN ORANGE YELLOW GRAY Notify ADT to disconnect alarm points prior to shutdown. Re —Use ADT conduit for new air handler smoke detector Reference Sheet 3E112R. -- DEV. CENTER, W 4.) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPRIATELY COLORED TAPE. 5.) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG —IN CIRCUIT BREAKERS ON BUSWAY. 6.) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3 7.) DYMO LABEL ALL RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. 8.) INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. CONSTRUCTION NOTES: JOB NO. DWG NO. "A" PHASE (LEFT BUS IN PANEL) BLACK "B" PHASE (CENTER BUS IN PANEL) RED "C" PHASE (RIGHT BUS IN PANEL) BLUE NEUTRAL WHITE EQUIPMENT GROUND GREEN CURRENT REVISION 55776009 SYMBO SHEET 3E262R RECEIVED CITY OF TUKWILA OCT 1 9 ZOOI PERMIT CENTER COMP NO. 06.12.07 09- 99 -3E262 to to to A Ve WIWI PANEL E34 PANEL XS3E3.1 460- 240/120V STAND -BY 1 7.5 KVA, 31; 1 N lk , PML METERS FOR SUBSTATIONS X3E3.1 / \ 0tify points From: -ire Ccll 200 -655 codes Fire is 58-2-31, Mcrshcl ADT prior - OrigincI Winter, Deocrtment) Fire cispatch -8830, on 3epertment° Winter t a to -olc cisconnect shutcown. Mcrsncl and all 206 v•esscge cicrm A (Boeing at they will put the notify the The ADT code points. —X37- 1187 EMERGENCY - .' --- - �, _ i -__ __ .� T7 l l T3 ION .4/1,3,5, ,r' 1a S 55 r,111111111111 U '' XS3E3.1 /4,6 0 1 SA B 75 KW ENGINE RY 'aER ,S FMCS ..r GENERATOR li = 1 SA 57 1 11110W I ■ . 1 11111111111111-1 ):1 v- ' a alll IrAll . ■ L EWAHU 1 EXF -3 1 /2HP CM, se AD' O - diii RI i -° _ ` A1 , _ 3/4 "EMT ! W /dull String ' NIP .,... 5������. r...► ...».....���...rr......�.���s3� SYM A BATTE CHAR TO MANHO SUMP PUM ADT SMOKE DETECTOR AHU 1 REVISION CONSTRUCTION NOTES 3E362: Install 3 4." EMT w /pull string for ADT connection to AHU smoke detector system. 55776009 BY APPROVED ESBROOK DATE 06.12.07 SYM REVISION BY FLOOR PLAN SCALE: 1/8" = 1' -0" APPROVED DATE e ) i ... 45 0P ATE I ZAW ° p:7 7 22 93 INN APPROVED BY DEPT. DATE R. ERICKSON APPROVED SUBTITLE TITLE ELECTRICAL MASTER ADT ALARMS BUILDING 09 - COL. E -G/1 -4 DEV. CENTER, WA CURRENT REVISION 55776009 SHEET JOB NO. SYMBOL 3E262 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED D. CHESTERFIELD CHECKED * ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adjacent to the work area. Please contact Boeing Facilities Ddepartment if asbestos containing material is damaged or discovered that is required to be removed to support work. LEGEND: ICE DUPLEX, 2 POLE, 3 WIRE M. DUPLEX, 2 POLE, 3 WIRE (DEDICATED) IV SINGLE, 2 POLE, 3 WIRE, TWISTLOCK, 30 AMP SINGLE POLE TOGGLE SWITCH J -BOX 120/208V DISTRIBUTION PANEL 480/277V DISTRIBUTION PANEL FAN WP WEATHERPROOF A TRANSFORMER (XFMR)CAPACITY,PHASE & VOLTAGE --- GROUND MOTOR 0 s NF EY NON -FUSED SAFETY SWITCH, 60 AMPERE AIR DROP GENERAL NOTES: 1.) ALL CONDUIT TO BE 3/4" EMT UNLESS OTHERWISE NOTED. 2.) ALL WIRE TO BE #12 THWN UNLESS OTHERWISE NOTED. 3.) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V "A" PHASE (LEFT BUS IN PANEL) BLACK BROWN "B" PHASE (CENTER BUS IN PANEL) RED ORANGE "C" PHASE (RIGHT BUS IN PANEL) BLUE YELLOW NEUTRAL WHITE GRAY EQUIPMENT GROUND GREEN 4.) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPRIATELY COLORED TAPE. 5.) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG —IN CIRCUIT BREAKERS ON BUSWAY. 6.) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3 7.) DYMO LABEL ALL RECEPTACLES, JUNCTION BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. 8.) INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. CONSTRUCTION NOTES: Install 3 /�," EMT w /pull string for ADT connection to AHU smoke detector system. DWG NO. SEP 0 9 2000 09 -99 -3E262 RECVED CITY OF TUKWIL_A OCT 19 2007 PERMIT CENTER DATE COMP NO. 06.12.07 Cri TAE9937: 06/19/07 A ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED B C C BLANK D 1 SPARE -50A BKR - COOLING TOWER PAN HEATER F F BLANK 1 BOOSTER PUMP PU3G3A 2HP 1 SPARE SIZE 1 1 1 SPARE SIZE 1 1 SPARE SIZE 1 7.5 HP 1 COOL WATLR PUMP P8 ROOF E -2.5 4 40A BKR for VFD to Right EFRE2 - 15HP SUPPLY FAN AH -2 15 HP 2 2 SPARE SIZE 1 2 CONTROL TRANSFORMER 2 SPARE SIZE 1 2 SPARE SIZE 1 2 COOLING TOWER FAN APPROVED - SUPPLY FAN AH 3 DWG NO. F -1 , EXHAUST FAN EF -3 1/2 HP 2A 3 SPARE SIZE 1 3 - EF 5 3 - - -:. FAN T=2 SUPPLY FAN AH-1 H HP 3 SPARE SIZE 1 3 MCC -2 3 4 COOLING TOWER FA BLANK 4 (6) 15A, 1P B 4 3 PNL 2E3-6 4 BLANK 5 EXHAUST FAN EF-- -1 15 HP 4 5 COMMON CONTROL TRANSFORMER 5 SPARE SIZE 1 4 SPARE 5 F 4 5 CONDENSATE PUMP P -10 (2) 5 HP SPARE SIZE 1 6 COOLING TOWER PUMP CT 2 A ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED B C PA BLANK 1 1 SPARE -50A BKR - COOLING TOWER PAN HEATER PENTHOUSE EXHAUST FAN EF- 12 3 HP 1 SPARE UNIT 2 ROOF B -2.5 2 EXHAUST FAN EF-7 3 HP PENTHOUSE EXHAUST FAN EF- 4 3 HP 2 NEATER -U-1— ROOF B.5 -1.5 UNIT HEATER UH -2 3 HP 3 ROOF C.5 -2.5 3 EXHAUST FAN EF -8 3 HP ROOF B -2 AHRB2 15 HP 3 ROOF D -3.5 AHRD3 15 HP 4 ROOF E -2.5 4 40A BKR for VFD to Right EFRE2 - 15HP (6) 15A, 1P BREAKERS 4 ROOF D -2 AHRD2 15 HP 5 ROOF F -2.5 5 EXHAUST FAN EF- 10 3 HP CONTROL TRANSFORMER 5 ROOF F -2 UNIT HEATER UH -5 3 HP 6 PENTHOUSE 6 EXHAUST FAN EF -11 3 HP APPROVED DWG NO. SYM A B EFRBO3A 460V,3H 460V,3HP conduit Up To Install CMCS 3 /4 "C +P conduit tring To AHRD3 Unit -CMCS MCC2 C1 3F4/2 MCC -2 VFD -EFRE2 MCC2 /B4 1 MCC1 /A1 Install CMC conduit Up Tc AHRB3 Unit. ( 3/ "C +Pull String -CMCS 0 ["l MCC 2/C3 ig 6 fU oo1- 1"C-3#8,314 3 &1#100 AHR EF -7, 3 HP MCC -2/B2 HA4 /Xabc 6 1 » C,3 #8 Re- connect H -0 -A contr AHRL33 Unit. MANUFACTURER: GE 7700 LINE CONTROL CENTER CC--2 (�1 (z( 3 HP,460V,30 VCC2 -B3 () 0 0 BY • SYM REVISION PROVIDE CMCS CONTROLS TO AHRB3 BY 55776005 ESBROOK ESBROOK SHUTDOWN REFERENCE FOR MCC1 & 2 55776009 APPROVED VAVREK DATE 10.25.06 06.14.07 REVISION U A ., D2 1"C-3#8,2#14 & 1#10G MCC -2/A5 1 "C- W3 #8,2 114 & 1 #100 MCC -2/A4 1 "C- 3 #8,2# 14 & 1#10G �• MCC -2/B4 VIA VFD Oir -j MCC -2/ CL MANUFACTURER: GE 7700 LINE CONTROL CENTER MANUFACTURER: GE 7700 LINE CONTROL CENTER 600A MAIN, 480 VOLTS, 120 VOLTS CONTROL VOLTAGE YEAR: 7/5/68; ORDER NO. 77307 APPROVED DATE MCC -1 LA&AE , NG' n 0 B5 MCC-�2 / CONSTRUCTION NOTES: Shutdown reference drawing for MCC1 and MCC2. SEP 0 9 2008 RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DATE DRAWN PA SUBTITLE CMCS - ROOF COMPOSITE DRAWING CURRENT REVISION 55776009 SYMBOL B DATE 06.14.07 CHECKED - ENGINEER SHEET RFEO TITLE ELECTRICAL MASTER BUILDING 09-099 COL. X -X /X -X DEV. CENTER, WA APPROVED BY DEPT. CHECKED APPROVED JOB NO. COMP NO. APPROVED DWG NO. 09- 099 -RFEO SYM A B EFRBO3A 460V,3H 460V,3HP conduit Up To Install CMCS 3 /4 "C +P conduit tring To AHRD3 Unit -CMCS MCC2 C1 3F4/2 MCC -2 VFD -EFRE2 MCC2 /B4 1 MCC1 /A1 Install CMC conduit Up Tc AHRB3 Unit. ( 3/ "C +Pull String -CMCS 0 ["l MCC 2/C3 ig 6 fU oo1- 1"C-3#8,314 3 &1#100 AHR EF -7, 3 HP MCC -2/B2 HA4 /Xabc 6 1 » C,3 #8 Re- connect H -0 -A contr AHRL33 Unit. MANUFACTURER: GE 7700 LINE CONTROL CENTER CC--2 (�1 (z( 3 HP,460V,30 VCC2 -B3 () 0 0 BY • SYM REVISION PROVIDE CMCS CONTROLS TO AHRB3 BY 55776005 ESBROOK ESBROOK SHUTDOWN REFERENCE FOR MCC1 & 2 55776009 APPROVED VAVREK DATE 10.25.06 06.14.07 REVISION U A ., D2 1"C-3#8,2#14 & 1#10G MCC -2/A5 1 "C- W3 #8,2 114 & 1 #100 MCC -2/A4 1 "C- 3 #8,2# 14 & 1#10G �• MCC -2/B4 VIA VFD Oir -j MCC -2/ CL MANUFACTURER: GE 7700 LINE CONTROL CENTER MANUFACTURER: GE 7700 LINE CONTROL CENTER 600A MAIN, 480 VOLTS, 120 VOLTS CONTROL VOLTAGE YEAR: 7/5/68; ORDER NO. 77307 APPROVED DATE MCC -1 LA&AE , NG' n 0 B5 MCC-�2 / CONSTRUCTION NOTES: Shutdown reference drawing for MCC1 and MCC2. SEP 0 9 2008 RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER A B C C BLANK 1 1 SPARE -50A BKR PENTHOUSE EXHAUST FAN EF-12 3 HP = F BLANK 1 BOOSTER PUMP PU3G3A 2 HP 1 SPARE SIZE 1 1 1 SPARE SIZE 1 1 SPARE SIZE 1 7.5 HP 1 3 ROOF D -3.5 AHRD3 15 HP PUMP P 8 ROOF E -2.5 4 40A BKR for VFD to Right EFRE2 — 15HP SUPPLY FAN AH -2 15 HP 2 ROOF D -2 AHRD2 15 HP 2 TOWER- SPARE SIZE 1 2 =• 2 CO OLING - ir FAN COMMON CONTROL TRANSFORMER SPARE SIZE 1 2 SPARE SIZE 1 2 FAN SUPPLY AH 3 F -1 2A 3 3 3 EXHAUST FAN EF -3 1/2 HP SPARE SIZE 1 EXHAUST FAN EF 5 FAN F SUPPLY FAN AH -1 20 HP 3 SPARE SIZE 1 3 MCC -2 3 4 TOWER BLANK 4 (6) 15A, 1P BREAKERS 4 COOLING FAN F 3 PNL 2E3 -6 4 BLANK 5 - EXHAUST FAN EF -1 15 HP 4 5 COMMON TRANSFORMER 5 SPARE 4 SPARE 5 _ FAN F— 5 CONDENSATE PUMP P--10 (2) 5 H P SIZE 1 6 SPARE SIZE 1 6 COOLING TOWER PUMP CT 2 A B C BLANK 1 1 SPARE -50A BKR PENTHOUSE EXHAUST FAN EF-12 3 HP 1 COOLING TOWER PAN IIEATER SPARE HEATER 2 ROOF B -2.5 2 EXHAUST FAN EF -7 3HP PENTHOUSE EXHAUST FAN EF -4 3 HP 2 UNIT UH 1 —3--H-P-- R B.5 -1.5 UNIT HEATER UH -2 3 HP 3 RO C.5 -25 3 EXHAUST OF FA EF -8 3HP ROOF B -2 AHRB2 15 HP 3 ROOF D -3.5 AHRD3 15 HP 4 ROOF E -2.5 4 40A BKR for VFD to Right EFRE2 — 15HP (6) 15A, 1P BREAKERS 4 ROOF D -2 AHRD2 15 HP 5 ROOF F -2.5 EXHAUST FAN F-10 3HP 5 ROOF F -2 UNIT HEATER UH -5 3 HP 6 PENTHOUSE 6 EXHAUST FAN EF -11 3HP COMMON CONTROL TRANSFORMER SYM A REFER TO DRAWING XXX LINE 7 LINE 1 GROUND PT FOR FEEDER 7 3 -1/2 "STEEL CONDUIT 3 #4/O, 15KV, EPR 1 1/2" 3 #4, 460 -- UNIT SUBSTATION 56 WATTHOUR DEMAND G.E. DSM -43 2" 4 #4/0 2-1/2" 3 #4/O 2 - 1/2" 3 #3/0 - U-AJ 45KVA ?r n- n ISOL 208Y/120V PNL B4 225A? 208Y/120V 3 PH, 4W 1" 3 #4 9KV 80E r T41 1600 AF J FT 1600 AT AK-1-50 1 1600:5 PNL. HA4 XXX A 480/277V 3PH, 4W 4 #1/0 l � 45KVA 208Y/120V 1000/1333 KVA ? ?? 480Y/277V (3) PNL. C3.2 XXX A 480V 3PH, 3W 1 1/2" 3 #4, 1 #6G BUS DUCT 63.5 800A 3PH, 3W (3) 3" 3 #400MCM / / /// PNL. B2 XXX A 480V 3PH, 3W 45KVA 1Y ISOL 208Y/120V PNL B2 -1 225A? 208Y/120V 3 PH, 4W (2) 3 3/4 ",3# 10 2" 4 #4/0 1 "4 #1 LINE 7 LINE 1 f 56E1 l 800 AF I 1 800 AT BUS DUCT D3.5 800A 3PH, 3W 2 "3 #3/0 3 #500MCM PNL. E4 200 A 480V 3PH, 3W (3) 1 -1/4" 9 #14 a L JJ 20KVA ISOL 208Y/120V PNL E4 -1 60A 208Y/120V 3 PH, 4W REVISION TO SUBSTATION 57 2" 3 #1/0 (AL) MCC 2 ???A 3PH, 3W MCP PUSHBUTTON CONTROL STA. PNL. FDR 5 56F2 800 AF 500 AT FDR 8 ,.— (2) 2 -1/2" 3 #300MCM / /// PNL 3F4 400A 480V 3PH, 3W 45KVA f 208Y/120V PNL E3.6 ? ? ?A 208Y/120V 3 PH, 4W BY APPROVED 0 H- 56F3 800 AF 400 AT ONE LINE DIAGRAM REVISION REPLACE MCC1 WITH PANEL 3F4 55776009 BY APPROVED DATE 06.14.07 SYM ESBROOK DATE TRANSFORMER SUBSTATION 56 (2) 2 -1/2" 3 #250MCM (AL) 45KVA 208Y/120V z 0 H- c +r 56F4 800 AF 400 AT 0 SPARE SUBSTATION 56 METERS MAIN 56F1 56P 480 V, 2400 A, 3 PH, 4 WIRE (40,000 AIC) SPARE 56F2 56F3 56F4 56F5 56F5 ) 800 AF 400 AT NOT TO SCALE MANUFACTURER: GE 7700 LINE CONTROL CENTER V CC -2 e ) LAir OE/NG 56F6 TIE 57F6 BLANK 56F6 800 AF I 800 AT PNL. C3.1 800A 480V 3PH, 3W (2) 4" 3 #500MCM APPROVED BY 57F2 57E3 57F4 57E5 DOUDLE-ENDED SUBSTATION 56 & 57 MANUFACTURER: ITE DEPT. 56F7 800 AF i J 800 AT Nie PNL. C3.3 800A 480V 3PH, 3W ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DATE METERS MAIN 57F1 BLANK (2) 4" 3 #600MCM MANUFACTURER: GE 7700 LINE CONTROL CENTER 600A MAIN, 480 VOLTS, 120 VOLTS CONTROL VOLTAGE YEAR 7/5/68; ORDER NO. 77307 PABLO SANTOS CHECKED ENGINEER PABLO SANTOS CHECKED APPROVED JOHN J. VAVREK APPROVED DATE SUBTITLE 5/20/04 5/20/04 TITLE 5/20/04 0 [-- Cr) r-- TRANSFORMER SUBSTATION 57 - Ir I K I 1600 AF 800 AT SUB 56/57 TIE -1 \ CC -1 ELECTRICAL MASTER FDR 5 FDR 8 (3) 3" 3 #400MCM, 1 #2/0 NEUT. , 1 TO SUB 55, REFER TO SHEET E4B UNDERFLOOR FURTHER FIELD VERIFICATION REQUIRED. PABLO - 8/25/04 ONE LINE DIAGRAM - SUBSTATION 56 BUILDING 9 -99 COL. LEGEND: GENERAL NOTES: 1. REFER TO SUBSTATION BOOK (3 —RING BINDER) C PRIME POWER MAINTENANCE OFFICE, BLDG. 9 -51.1 FOR UPDATED SETTING OF BREAKERS. MEL NELSON, PRIME POWER ELECTRICIAN, PHONE (206) 544 -6937, IS THE CUSTODIAN OF THE BOOK. 2 ALL WIRES ARE STRANDED COPPER UNLESS OTHERWISE NOTED. REFERENCE DRAWINGS: 9- 99 —E4D 109-101B-2001—E4 9- 99 —E135 CONSTRUCTION NOTES: DT 2,2./.4 Replace MCC1 with new panel 3F4. Contact Boeing Prime Power for turning off substation breakers. D.0 CURRENT REVISION 55776009 HEET JOB NO. DWG NO. SYMBOL E4C 9- 99 —E4C DATE RECEIVED CITY OF TUKWILA OCT 1 9 2007 PERMIT CENTER COMP NO. 06.14.07 MAC nn nnn rA