Loading...
HomeMy WebLinkAboutPermit M07-229 - WESTFIELD SOUTHCENTER MALL - HOLLISTER COMPANYHOLLISTER COMPANY 857 SOUTHCENTER MALL M07 -229 Parcel No.: 6364200010 Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: 857 SOUTHCENTER MALL TUKW HOLLISTER COMPANY 857 SOUTHCENTER MALL , TUKWILA WA WEA SOUTHCENTER LLC 11601 WILSHIRE BLVD , LOS ANGELES CA ROB HUMPHREY 833 SE MAIN ST #242 , PORTLAND OR Contractor: Name: T N T MECHANICAL LLC Address: 22833 BOTHELL- EVERETT , HY 1164 Contractor License No: TNTMEL *011K7 DESCRIPTION OF WORK: MECHANICAL FOR TENANT IMPROVEMENT Value of Mechanical: $35,000.00 Type of Fire Protection: SPRINKERS /AFA Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 0 Appliance Vent 0 Repair or Addition to Heat/Refrig /Cooling System.... 5 Air Handling Unit <10,000 CFM 0 >10,000 CFM 0 Evaporator Cooler 0 Ventilation Fan connected to single duct 1 Ventilation System 0 Hood and Duct 0 Incinerator: Domestic 0 Commercial/Industrial 0 doc: IMC -10/06 City►f Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us MECHANICAL PERMIT EOUIPMENT TYPE AND OUANTITY * *continued on next page ** Permit Number: Issue Date: Permit Expires On: Phone: Phone: 503 320 - 5030 Phone: 425 - 486 - 4327 Expiration Date: 05/27/2008 M07 -229 03/19/2008 09/15/2008 Fees Collected: $557.70 International Mechanical Code Edition: 2006 Boiler Compressor: 0-3 HP/100,000 BTU 0 3-15 HP /500,000 BTU 0 15-30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 27 Thermostat 4 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 M07 -229 Printed: 03 -19 -2008 X.0 City of Tukwila Permit Center Authorized Signature: Ljtj Print Name: #~ S -' I doc: IMC -10/06 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M07 -229 Issue Date: 03/19/2008 Permit Expires On: 09/15/2008 Date: 3' 19- 00 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinance: governing this work will be complied with, whether specified herein or not. The granting of this • - does not presume to give authority to violate or cancel the provisions of any other state or local laws regulatin< construction or the iI - ce of work. I am authorized to sign and obtain this mechanical permit. Signature: Date: l i i tY6 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspende or abandoned for a period of 180 days from the last inspection. M07 -229 Printed: 03 -19 -2008 Parcel No.: 6364200010 Address: Suite No: Tenant: HOLLISTER COMPANY 1: ** *BUILDING DEPARTMENT CONDITIONS * ** City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 857 SOUTHCENTER MALL TUKW PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: M07 -229 ISSUED 10/25/2007 03/19/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 10: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 11: All electrical work shall be inspected and approved under a separate permit issued by the City of Tulcwila Building Department (206 - 431- 3670). 12: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tulcwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 13: ** *FIRE DEPARTMENT CONDITIONS * ** 14: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 15: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the doc: Cond -10/06 M07 -229 Printed: 03 -19 -2008 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http :• / /www.ci.tukwila.wa.us manufacturer's installation instructions. (IMC 606.1, 606.2.1) 16: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 20: An electrical permit from the City of Tukwila Building Department Permit Center (206 - 431 -3670) is required for this project. 21: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 22: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 23: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond -10/06 * *continued on next page ** M07 - 229 Printed: 03 -19 -2008 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: Print Name: ' c 41 ��� ��✓ doc: Cond -10/06 Date: - 3/ l I /11:■ M07 -229 Printed: 03 -19 -2008 Site Address: Mailing Address: Mailing Address: Mailing Address: CITY OF TUKWIL4' Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://wwwatukwila.wa.us Company Name: To �� ►� Contact Person: E -Mail Address: Contractor Registration Number: Company Name: tA) I t. t, t M"A.. Contact Person: 130-t. l Ti of Q:\ApplicationsWorms- Applications On Line\3 -2006. Permit Application.doe Revised: 9 -2006 bb Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** JO n C JTe Mi Tenant Name: HOLL / STQ �- -O W . Property Owners Name: trftELo coed . i t1 IoO( t.t DwD tt CONTACT PERSON – who do we contact ' ilien your permit is ready to be'issned Name: ` � Vw 1 j{/Z�y - 1 tS f E!- 1 Mailing Address: 5 5 F AlY+tvl Sr 4-2. S/'2 E -Mail Address: C S Telt-P EA-Al r r •S . C GENERAL CONTRACTOR INFORMATION (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Pipbig (pg �3o F _ /-} 3aoi —r E -Mail Address: B 1 ' 13BoY ( A(" oT -Pri o , C14y4 Company Name: M — d'..N p-r d 6 t " 1 - C. . Mailing Address: .? 56 3 01 ED tto 3 LX Contact Person: 60 4- i No vs E -Mail Address: King Co Assessor's Tax No.: Suite Number: 1 /1fi Floor: New Tenant: .... Yes ❑ ..No City l- orArg64Lt., CA- 9 oo ZS State Zip Day Telephone: po?-.; 09 City Fax Number: city Day Telephone: Fax Number: S - 3 -so3 Oct 9r Zl� State Zip ) -o3 — Z6 2-6 3v State Zip Expiration Date: ARCHITECT OF RECORD All g lans must be w et st by Ar chitect of j C 1-te.57 r Sr .1 3 COL VAAZvj , t i 93 City State Zip Day Telephone: (0 Ii t/(/ o l 0 J x 2 Z& Fax Number: -All plans must be we (9 -1-60 v S C C ,M CvP�c 4 iuN . c.," c,t) Ora g4 Lt is t>h- City Day Telephone: Fax Number: State Iola d is Zip 3 Z-3 Page 1 of 6 Q:\ Applications\Forms- Appliations On Line\9 -2006 - Permit Application.doc Revised: 9 - 2006 bh Valuation of Project (contractor's bid price): $ b 0 00 Scope of Work (please provide detailed information): Existing Building Valuation: $ tJ £v-) s i{ b 1.1 L06 Will there be new rack storage? ❑.... Yes ovide All uare Will there be a change i e? ❑ Yes 1 8.1No If yes, a separate permit and plan submi will be required. 175 Number of Parking Stalls ' • vided: Standard: FIRE PROTEC i N/HAZARDOUS MATERIALS: it 3 Compact: Handicap: M PLANNING DIVISION: Single family building footprint (area . f the foundation of all structures, plus any decks over 18 inches . d overhangs greater than 18 inches) *For an Accessory dwelling, provi • the following: Lot Area (sq ft): Floor area of principal dwelling: Floor a of accessory dwelling: *Provide documentati • that shows that the principal owner lives in one of the dwellings as his or her p residence. ❑ No If `yes ", explain: Sp • lers . Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If "yes', attach list of materials and storage locations on a separate 8 -1/2" x 11 " paper including quantities and Material Sata Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of current septic design approved by King County Health Department. Page 2 of 6 Unit Type: Qty =' Unit : ' �i Unit .Type:` . Qty' 8oilerICoimpressor - Qty rn Fuace<100K BTU Air Handling Unit >10,000 CFM Fire Damper 0-3 H /100,000 BTU Furnace>100K BTU Evaporator Cooler Diffuser a,l 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/Ind tvnr ...-ta lit — ,.;i., J r n1vu 1 NJ T. - 206431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: To Tit Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ J Scope of Work (please provide detailed information): 1 S= T , �.. - tJ 1--; S tAGL∎ �� p Use: Residential: New .... 0 Replacement .... D Commercial: New ...$ Replacement ....0 Fuel Type: Electric Gas ....0 Other: Indicate type of mechanical work being installed and the quantity below: State Zip QMppliationiWmms- Applications On Line\3 -2006 - Permit Appliation.doc Revised: 9 -2006 bb Page 4 of 6 Scope of Work (please provide detailed information): / SS CW S fleck_ Water District ...Tukwila ❑... Water District #125 ...Water Availability Provided Sewer District no Tukwila ...Sewer Use Certificate Submitted with Application (mark b • es which apply): ❑ ...Civil Plans (Maximum Paper Size 22" x 34 ") ❑ ...Technical Information Report (Storm ► • *nage) ❑ ...Bond ❑ .. Insurance .. Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 ho ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right -of -way Non Right -of -way ❑ ...Total Cut ❑ ...Total Fill ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic W ❑ ...Permanent Water Meter Size... " ❑ ...Temporary Water Meter Size.. ❑ ...Water Only Meter Size ❑ ...Sewer Main Extension ...Public ❑ ...Water Main Extension... Public FINANCE INFORMATI Fire Line Size at Prop ; Line ❑...Water ❑...Sewer Monthly Service Bi ling to: Name: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: Pl ease refer to Public Works' Bulletin " #1 for 'fees and estimate sheet. 0... ValVue ❑ .. Renton ❑ ... Sewer Availability Provided Septic System: ❑ On -site Septic System — For o ite septic system, provide 2 copies of a current septic . esign approved by King County Health Department. cubic yards cubic yards tt ❑ .. Ab don Septic Tank b Cut ❑ . ' avement Cut .. Looped Fire Line a.. VI Q:\Applicatiions\Ponns- Applications On Line\3 -2006 - Permit Applieation.doc Revised: 9 - 2006 bh CaII before you Dig: 1- 800 -424 -5555 , , WO # WO # WO # Private Private ❑ .. Highline ❑ .. Geote ical Report 0 .. Mai t - nance Agreement(s) .. Work in Flood Zone .. Storm Drainage Number of Public Fire Hydrant(s) ❑ ...Sewage Treatment City City ❑ ...Re .n ...Seattle Right -of -way Use - Profit for less than 72 hours .. Right -of -way Use — Potential Disturbance ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑...Deduct Water - Size ❑ ...Traffic Impact Analysis ❑ ...Hold Harmless — (SAO) ❑ ...Hold Harmless — (ROW) Day Telephone: State Day Telephone: State Zip Zip Page 3 of 6 PERMIT APPLICATION NO'2 -Applicable to all permits in this Print Name: Mailing Address: QAAppliatioroWmms- Applications On Linel3 -2006 - Permit Appliation.doc Revised: 9 -2006 bh Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW AUTHORIZED AG Signature: / Date: / / Z - � 0 7 .44-14 14 v - T Pert., /73 Day Telephone: Poe- -T City 533 Se 4Mte) S0 3 - 326 -SO3u o 9 721 State Date Application Accepted: Date Application Expires: Staff Initials: c .st.........., _ Page6of6 PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: "To - t Mailing Address: Contact Person: E -Mail Address: Contractor Registration Number: Valuation of Pl 1 bing work (contractor's bid price): $ t Valuation of Gas • . ing work (contractor's bid price): $ Scope of Work (pleas = erovide detailed information): S,_f- I ire Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor tui Floor drain Shower, single he ik 1 1124.4,oed-ri P M Drinking fountain or wate cooler (per head) Food -waste grinder, commercial Wash fountain Receptor, indirect waste Sinks W ure J nals i ty Building Use (per Intl Building C Occupancy (per Int'1 Building Code): Utility Purveyor: Water: .J t1 Dishwasher, domestic, with independent drain Indicate type of plumbing fixtures and/or gas pip' r _ outlets being Building sewer or trailer park sewer Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Lavatory Rain water tem — per drain (insi building) Repair s alteration of water d/or water treating equ'. ent Q :Wpplications\Forms- Applications On Line\3 -2006 - Permit Appliation.doe Revised: 9 -2006 bh a 0 Sewer: Closet Water h er and/or vent Repair or al =tion of drainage or piping City State Zip Day Telephone: Fax Number: Expiration Date: talled and the quantity below: a-) -),.> S M P LL✓ Additional medical gas inlets/outlets - six or more Medical gas piping system serving one to five inlets/outlets for specific gas Page 5 of 6 Receipt No.: R08 -00827 Payee: TNT MECHANICAL ACCOUNT ITEM LIST: Description rtnr:. RAr. lnt-OR MECHANICAL - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 6364200010 Permit Number: M07 -229 Address: 857 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 10/25/2007 Applicant: HOLLISTER COMPANY Issue Date: Initials: WER Payment Date: 03/19/2008 10:44 AM User ID: 1655 Balance: $0.00 TRANSACTION LIST: Type Method Descriptio Amount Payment Check 4748 452.16 Account Code Current Pmts 000/322.100 452.16 Total: $452.16 Payment Amount: $452.16 0137 03/19 9710 TOTAL 542.1 Printarl. f13- 14 -90fR n..n• Art'VL+IC'_ Copy Reprinted on 10 -25 -2007 at 12:59:21 10/25/2007 RECEIPT NO: R07 -02345 Initials: JEM User ID: 1165 Payee: PRECISION PERMIT SERVICE SET ID: S000000881 SET TRANSACTIONS: Set Member Amount D07 -402 2,834.90 EL07 -621 270.50 M07 -229 105.54 PG07 -289 39.50 TOTAL: 3,250.44 TRANSACTION LIST: Type Method Payment ACCOUNT ITEM LIST: Description City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http:/lwww.citukwila.wa.us Check 5066 ELECTRICAL PLAN - NONRES PLAN CHECK - NONRES Description SET RECEIPT TOTAL: Account Code SET NAME: Temporary Set 000.345.832.00.0 000/345.830 TOTAL: Payment Date: 10/25/2007 Total Payment: 3,250.44 Amount 3,250.44 3,250.44 Current Pmts 270.50 2,979.94 3,250.44 Proe4ec g onliai9A/ T)ye D� /S � of Ins ection: k//V/ / s 6 7 / l Q`/ ate Called: Special Instructions: Dat Wanted: ; p.m. / �(p Requester: Phone 2 10 - Ylr7 / , 7 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 14 Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: (Date: 7, O j) El 0 0 Southcenter FEE REQUIRED. Prior to inspection, fee FEE REQUIRED. Prior to fee must be Blvd., Suite 100. Call to schedule reinspection. 'Inspector: 7 $60.0 NS 'Receipt No.: 'Date: COMMENTS: v4u -1 R.t4k. -■ y4cI veSS h o , 1 I — ta4S -e..f e ve tAn'14- L&- I.L V('►J • Z R4 r h AO d r Q SS r&). 1 d5- ( ci 4 ,.c..,,t , c.9 ueNt4 LAC.- I. VA4 -3 (Pe ter ArnCrr.QSS nv 103 - 1 v,A;N. ' LAC - 1 ' int- Nilc 0 ) : h rod rQSS no. 11 — Qasse.d c 3 c . + 4? - : L L — l 14 V' S Qe, 4 -k,r✓i AJd✓ -e SS 0 . e ll — ec(sSc4 ►VRS uet! It L.AG - I t a) 347— T Project: ��a�1, -� r c T e of Inspection: 5/ Kt, Sh.�,-tdvwrt Date Called: Address: C „14L` Special Instructions: Date Wanted: 7 r v rob P m. Requester: Phone Now t a) 347— T PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 ' Approved per applicable codes. El Corrections required prior to approval. 'Inspector: INSPECTION NO. INSPECTION RECORD Retain a copy with permit J�. 1 Date: 1 $60.00 REINSPECTION I` E REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: COMMENTS: Type Inspection: " c �t.. S\'lJ \LN: \A Address: 1%"\(_.1/4\\ fV r_ , cz,∎C - \I`. \4\ \i c Date Wanted: — 1 • 7 • cc' Nr vc,L \ Phone No: Z , �� ' St Al - 4 g' / (- N —a r ' ( CQ-C.0 \VA45 n ( 1 Project: \ \ \ \\ S \, t S Type Inspection: " c �t.. S\'lJ \LN: \A Address: 1%"\(_.1/4\\ Date Called: Special Instructions: Date Wanted: — 1 • 7 • cc' a.m. P.m. Requester: Phone No: Z , �� ' St Al - 4 g' / (- INSPECTION RECORD Retain a copy with permit \ -17L- INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION P- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 D Approved per applicable codes. Corrections required prior to approval. � Inspector: Date: OCK $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: Project: iO �' `5 r _ /I 41 Type of spection: , Addes• _7 ko 1 t t /Date Called: Special Instructions: Date Wanted: a. Requester: Phone No: 2 7) v7 - C? SS( -, INSPECTION RECORD Retain a copy with permit INSPE ON NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. 6A Corrections required prior to approval. COMMENTS: V# v boeee Date: G/3/ $58.00 SPECTION FEE REQUIRED. Prior to inspection, fee must be paid 00 Southcenter Blvd., Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: Project: , / `/ ' /(, (/ -Y ( • Type of Inspection u 4 /, Address: -S7 4i/in. Date Called: Special Instructions: Date Wanted //: a.m. Requester: Phone No 9. 3 V,47 INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION I 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 El Approved per applicable codes. 'Lbl Corrections required prior to approval. COMMENTS: /Q 'd s eiS`bl1G `1 /evil a� c414e1 //4/, A.4 )ee.5 El $60.O EINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: 1 INSPECTION RECORD INSPECTION NO. Project: / 7 / A d 1 , s : , � 7 Special Instructions: Type o specti n: Date Called: Date W2r7d , - � p. Requester: Phone No: CITY OF TUKWILA BUILDING DIVISION R. ll 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 - 67C0 El Approved per applicable codes. COMMENTS: nspecto I L 58.00 INSPECTION FEE ' E UIRED. Prior to inspection, fee must be pal • . 6300 Southcenter BI Suite 100. Call the schedule reinspection. Re pt No.: 'Date: / 5»V' Retain a copy with permit '--L-Ev n-, •s 5/ Date iy_l v 1 1f7z I PERMIT NO. Corrections required prior to approval. k 1 INSPECTION NO. Retain a copy with permit 4 Z7) PERMIT N . CITY OF TUKWILA BUILDING DIVISION R 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -36 Proje, cy / LS A`l, A ess• / d X74 /( Special Instructions: ID Approved per applicable codes. INSPECTION RECORD Typ Inspec / ion: � Date Called: Date Wante : Requester: f. „ P / &j — j 7 - 5 (7 O Corrections required prior to approval. COMMENTS: /9 47, s SiA7 c5),c T, - ZVvs ?ft' i Inspect REINSPECTIO d at 6300 Southcen 'Receipt No.: $58 'Date: L/ / FEE RE Prior to inspection, fee must be r Blvd., Suite 100. Call the schedule reinspection. 'Date: COMMENTS: (L.-- Are Alarm: Hood & Duct: S P F ro e\ L. o (<. Address: ` , _1 -- v : <_ -re-\ 014", Contact Person: Suite #: Special Instructions: { -f ✓AC , o k- Phone No.: C J ( / //] Gf- -e`_c (. 1 - c 4-; .,, ,1e ; 5 ✓ P c. (J .0 t., , KL - Project: I -1 :5 f i 1 -4- (L.-- Are Alarm: Hood & Duct: Type of Inspection: :if f r .) r L { )_. ,J , A ( t C :4 r . „, 4 ^_e �, ` ly1 , f ~ < < Address: ` , _1 -- v : <_ , ; v , - Contact Person: Suite #: Special Instructions: Phone No.: C J ( / //] Needs Shift Inspection: Sprinklers: Are Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: INSPECTION NUMBER 444 Andover Park East, Tukwila, Wa. 98188 206 -575 -4407 ri Approved per applicable codes. INSPECTION RECORD Retain a copy with permit Word /Inspection Record Form.Doc 1/13/06 CITY OF TUKWILA FIRE DEPARTMENT PERMIT NUMBERS rrections required prior to approval. Inspector: Date: 71 gick Hrs.: t ,\ n $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. T.F.D. Form F.P. 113 03 -05 -2008 ROB HUMPHREY 833 SE MAIN ST #242 PORTLAND OR 97214 RE: Permit Application No. M07 -229 857 SOUTHCENTER MALL TUKW Dear Permit Applicant: In reviewing our current permit application files, it appears that your permit application applied for on 10/25/2007 , has not been issued by the City of Tukwila Permit Center. Per the International Codes, Uniform Plumbing Code and/or the National Electrical Code, every permit application not issued within 180 days from the date of application shall expire by limitation and become null and void. Your permit application expires on 04/22/2008 . If you choose to pursue your project, a written request for extension of your application addressed to the Building Official, demonstrating justifiable cause, will need to be received at the Permit Center prior to your expiration date of 04/22/2008. If it is determined that an extension is granted, your application will be extended for an additional 90 days from the expiration date. In the event we do not receive your written request for extension, your permit application will become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, v, fer Marshall t Technician xc: Permit File No. M07 -229 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 ACTIVITY NUMBER: M07 -229 DATE: 10 -25 -07 PROJECT NAME: HOLLISTER COMPANY SITE ADDRESS: SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPART ENTS: 4' n C 1) ing Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: PERMIT COORD COPY � PLAN REVIEW /ROUTING SLIP 6it Atli( 1I+- Fire Prevention 1 Structural Incomplete n Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route V Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28 -02 ❑ Permit Coordinator No further Review Required DATE: DATE: Planning Division n DUE DATE: 10-30-07 Not Applicable ❑ DUE DATE: 11 -27-07 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License TNTMEL *011K7 Licensee Name T -N -T MECHANICAL LLC Licensee Type CONSTRUCTION CONTRACTOR UBI 601950443 Ind. Ins. Account Id PARTNER/MEMBER Business Type LIMITED LIABILITY COMPANY Address 1 22833 BOTHELL - EVERETT HWY 1164 Address 2 City BOTHELL County SNOHOMISH State WA Zip 98021 Phone 4254864327 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 5/27/1999 Expiration Date 5/27/2008 Suspend Date Separation Date Parent Company Previous License Next License Associated License Business Owner Information Name Role Effective Date Expiration Date HARRISON, SCOTT PARTNER/MEMBER 01/01/1980 Bond Amount LIBSACK, JERI PARTNER/MEMBER 01/01/1980 850223C Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date #3 DEVELOPERS SURETY & INDEM CO 850223C 05/27/2002 Until Cancelled $12,000.00 03/18/2000 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. http 11 K7 03/19/2008 VERIFY ALL CONDITIONS IN FIELD PRIOR TO BIDS. TEMPERATURE CONTROL PANEL FOR MONITORING ONLY ELIELEHERFFLTE1 TENANT TEMPERATURE CONTROL PANEL SHALL BE FOR MONITORING ONLY PURPOSES. ALL CONTROLS SHALL BE COMPATIBLE WITH LANDLORD SYSTEMS AND SHALL BE FIELD VERIFIED PRIOR TO BID. — 77 — : EXI TING LL XHAU T DU Ir f f 7' %r. 12 "X10" 16 "X18" V :'— T-STAT 8 "X1 PC-1 - -: (E) 18 EXHAU 20 "X1 " T -STAT SD -4 355 7! RG--3 0 LANDLOR T DUCT L - (E)36" 36" LANDLORD SUPPL AIR DUCT E) 18 "X16" HAUST DUCT (E) 20 "X16" LAND D EXH- UST DUCT (/ / iii 14 "I 51' lr !/lfl f///f!f J'A X////• f ANY / G////// / / / / /I / /////f / / /10% / / //l.%` / /// carp samx _._.. rmaa r�aa cm:m rsna ._. _ _ 2 "X16"---/ / / ///slfl /./X, 12 "X12" - 16 "k12" 24 X14" 111 111111:11 1:111 111 : 1111111111111: 1 ' 1 ""1.111 PAN 111.101::11111111111 r.•**** ** - •;•••A .•. +Am :erne• 1 y i �.„ rifii /i���i'Uil ,iii•/ / /� /� / / /i'�/I�i -on r rii r i� rlrs' .` !/ rr i�/ L�! �f f J. f t'ftvh' ■■■irr •. ■r Ir■111r111■rrlrrrrr ■■r: 7 ■6. 1 ICri 7r =7 :1"■rl 17 min r 7 r 7 ■ P J❖: :J'S "`••• Val •41.4.470 •••••• Ti` :i W. WAWA NAV'••••• .:• • ial'A7.S iL :.. ! '.�'. r .'�l ' J ■ H' {{ �� i:i':iS'i'u`a• T � ���r•�� i r � 1 1 , in I P f� Jf /// u � liii'Ir� l /f � lr . u Sri r n rrr i.lifn .. I11:11....i.111111 "1 / e /rte ■ 1 //Y///416., 4 . irrrrr A /r / 7' ' .. ■: 111111.1111 7111111 11■■ ..... Hill 17 6 : 1: 011: 0111111r ■rr111 1:1111111.11■711111711 1.1■711111 12 (E) 18 "0 LANDLORD EXHAUST DUCT 1 12 (E) 20 "X20" LANDLORD 1 EXHAUST DUCT 1 I L 1 1 I (E;30 "X24" LANDLORD 1 l SUPPLY AIR DUCT 12 A __[ ___..__J _L V STRUCTURAL ELEVATIONS BASED ON: X FIELD SURVEY - LANDLORD INFORMATION LEVEL 1 OF 3 STRUCTURAL DRAWINGS HEIGHTS UNAVAILABLE FINISHED FLOOR TO BOTTOM OF DECK ABOVE IS APPROX. 18' -0" FINISHED FLOOR TO BOTTOM OF LOWEST STRUCTURAL MEMBER (STEEL, CONCRETE BEAM OR JOIST) IS APPROXIMATELY 15' -6" ELEV. OF EXISTING DUCTWORK IN THIS SPACE TO REMAIN IS NO LOWER THAN APPROXIMATELY 13' -6" ALL OTHER EQUIPMENT, PIPING, AND DUCTWORK ELEVATIONS ARE AS NOTED ON THE DRAWINGS. NOTE CONTRACTOR IS TO VERIFY ALL CONDITIONS IN THE FIELD PRIOR TO BIDDING WORK. ANY CONDI11ONS THAT AFFECT THE INSTALLATION OF THIS PROJECT MUST IMMEDIATELY BE BROUGHT TO THE CONSTRUCTION MANAGER'S ATTENTION OR BE INCORPORATED IN THE BID. DUCTWORK SHALL NOT BE FABRICATED NOR ANY EQUIPMENT ORDERED PRIOR TO APPROVAL BY THE TENANTS CONSTRUCTION MANAGER. SPACE WAS SURVEYED BY: BILL CARTER (A&A) DATE MECHANICAL CONTRACTOR MUST HAVE A SENIOR FOREMAN WITH A MINIMUM OF FIVE YEARS COMMISSIONING EXPERIENCE IN BOTH HVAC AND CONTROLS PRESENT AT STARTUP. 12 (E)94 "X20" LANDLORD SUPPLY AIR DUCT FIELD VERIFY ALL CONTROLS REQUIREMENTS WITH LANDLORD'S FIELD REPRESENTATIVE. ALL CONTROLS TO BE COMPATIBLE WITH LANDLORD BUILDING MANAGEMENT SYSTEM. MECHANICAL PLAN 1/4" = 1' -0" ITEEEFITITIEITaEEEBHDEE 1 MEE -F$FLT TIEBY 24 "X18" SEE SHEET M2.1 FOR MECHANICAL LEGEND, GENERAL AND CODED NOTES. LANDLORD TO PROVIDE 9820 CFM OF 55° AIR. FIELD VERIFY ALL CONDITIONS DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT. FILE COPY AE'nS.ONS No chancres without P [made P p the scope Tukwila Buildiroa Division. of NOTE: Revisions will requ're a new plan submittal and may include additional plan review fees. 1> on Fsrnilww. M•Retall Engineering, Inc. 760 Breoksedge Blvd. W.■terWle.Ohio 43081 PHONE 614818.2323 FAX 614818.2337 YNAV AI— CORPORATI0NSC0A1 RECEIVED CITY OF TU1<W1LA OCT 2 5 2007 pERMIT CENTER OCT 1 9 2007 HOLLISTER Co. REVISION DIRECTIVE KEY B.D.- BUILDING DEPT. T.D.- TENANT DIRECTIVE G.C. - GENERAL CONTRACTOR DIRECTIVE L.L. - LANDLORD DIRECTIVE REVISIONS: ISSUE DATE: PERMIT DATE: 9 -6 -07 I LANDLORD DATE:9 -6-07 BID DATE: 11 -12 -07 :. HOLLISTER Co. 0603 1 ;SOUTHCENTER MALL '633 SOUTHCENTER MALL, SPACE 1440 TUKWILA, WASHINGTON 98188 CHK: Eo : NMy80 1 DSGNR: GDP I FIRM: M- RETAIL I SCALE:A5 NOTED 1; •T co L EXhil p b . i)F.GON �' x `4 , �� t0;' b ?�j . y. We d W "� g 7,7777) C 1 G^ 4 0710115 SHEET 1 1 al VERIFY ALL CONDITIONS IN FIELD PRIOR TO BIDS. TEMPERATURE CONTROL PANEL FOR MONITORING ONLY ELIELEHERFFLTE1 TENANT TEMPERATURE CONTROL PANEL SHALL BE FOR MONITORING ONLY PURPOSES. ALL CONTROLS SHALL BE COMPATIBLE WITH LANDLORD SYSTEMS AND SHALL BE FIELD VERIFIED PRIOR TO BID. — 77 — : EXI TING LL XHAU T DU Ir f f 7' %r. 12 "X10" 16 "X18" V :'— T-STAT 8 "X1 PC-1 - -: (E) 18 EXHAU 20 "X1 " T -STAT SD -4 355 7! RG--3 0 LANDLOR T DUCT L - (E)36" 36" LANDLORD SUPPL AIR DUCT E) 18 "X16" HAUST DUCT (E) 20 "X16" LAND D EXH- UST DUCT (/ / iii 14 "I 51' lr !/lfl f///f!f J'A X////• f ANY / G////// / / / / /I / /////f / / /10% / / //l.%` / /// carp samx _._.. rmaa r�aa cm:m rsna ._. _ _ 2 "X16"---/ / / ///slfl /./X, 12 "X12" - 16 "k12" 24 X14" 111 111111:11 1:111 111 : 1111111111111: 1 ' 1 ""1.111 PAN 111.101::11111111111 r.•**** ** - •;•••A .•. +Am :erne• 1 y i �.„ rifii /i���i'Uil ,iii•/ / /� /� / / /i'�/I�i -on r rii r i� rlrs' .` !/ rr i�/ L�! �f f J. f t'ftvh' ■■■irr •. ■r Ir■111r111■rrlrrrrr ■■r: 7 ■6. 1 ICri 7r =7 :1"■rl 17 min r 7 r 7 ■ P J❖: :J'S "`••• Val •41.4.470 •••••• Ti` :i W. WAWA NAV'••••• .:• • ial'A7.S iL :.. ! '.�'. r .'�l ' J ■ H' {{ �� i:i':iS'i'u`a• T � ���r•�� i r � 1 1 , in I P f� Jf /// u � liii'Ir� l /f � lr . u Sri r n rrr i.lifn .. I11:11....i.111111 "1 / e /rte ■ 1 //Y///416., 4 . irrrrr A /r / 7' ' .. ■: 111111.1111 7111111 11■■ ..... Hill 17 6 : 1: 011: 0111111r ■rr111 1:1111111.11■711111711 1.1■711111 12 (E) 18 "0 LANDLORD EXHAUST DUCT 1 12 (E) 20 "X20" LANDLORD 1 EXHAUST DUCT 1 I L 1 1 I (E;30 "X24" LANDLORD 1 l SUPPLY AIR DUCT 12 A __[ ___..__J _L V STRUCTURAL ELEVATIONS BASED ON: X FIELD SURVEY - LANDLORD INFORMATION LEVEL 1 OF 3 STRUCTURAL DRAWINGS HEIGHTS UNAVAILABLE FINISHED FLOOR TO BOTTOM OF DECK ABOVE IS APPROX. 18' -0" FINISHED FLOOR TO BOTTOM OF LOWEST STRUCTURAL MEMBER (STEEL, CONCRETE BEAM OR JOIST) IS APPROXIMATELY 15' -6" ELEV. OF EXISTING DUCTWORK IN THIS SPACE TO REMAIN IS NO LOWER THAN APPROXIMATELY 13' -6" ALL OTHER EQUIPMENT, PIPING, AND DUCTWORK ELEVATIONS ARE AS NOTED ON THE DRAWINGS. NOTE CONTRACTOR IS TO VERIFY ALL CONDITIONS IN THE FIELD PRIOR TO BIDDING WORK. ANY CONDI11ONS THAT AFFECT THE INSTALLATION OF THIS PROJECT MUST IMMEDIATELY BE BROUGHT TO THE CONSTRUCTION MANAGER'S ATTENTION OR BE INCORPORATED IN THE BID. DUCTWORK SHALL NOT BE FABRICATED NOR ANY EQUIPMENT ORDERED PRIOR TO APPROVAL BY THE TENANTS CONSTRUCTION MANAGER. SPACE WAS SURVEYED BY: BILL CARTER (A&A) DATE MECHANICAL CONTRACTOR MUST HAVE A SENIOR FOREMAN WITH A MINIMUM OF FIVE YEARS COMMISSIONING EXPERIENCE IN BOTH HVAC AND CONTROLS PRESENT AT STARTUP. 12 (E)94 "X20" LANDLORD SUPPLY AIR DUCT FIELD VERIFY ALL CONTROLS REQUIREMENTS WITH LANDLORD'S FIELD REPRESENTATIVE. ALL CONTROLS TO BE COMPATIBLE WITH LANDLORD BUILDING MANAGEMENT SYSTEM. MECHANICAL PLAN 1/4" = 1' -0" ITEEEFITITIEITaEEEBHDEE 1 MEE -F$FLT TIEBY 24 "X18" SEE SHEET M2.1 FOR MECHANICAL LEGEND, GENERAL AND CODED NOTES. LANDLORD TO PROVIDE 9820 CFM OF 55° AIR. FIELD VERIFY ALL CONDITIONS DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT. FILE COPY AE'nS.ONS No chancres without P [made P p the scope Tukwila Buildiroa Division. of NOTE: Revisions will requ're a new plan submittal and may include additional plan review fees. 1> on Fsrnilww. M•Retall Engineering, Inc. 760 Breoksedge Blvd. W.■terWle.Ohio 43081 PHONE 614818.2323 FAX 614818.2337 YNAV AI— CORPORATI0NSC0A1 RECEIVED CITY OF TU1<W1LA OCT 2 5 2007 pERMIT CENTER OCT 1 9 2007 MECf- ANICAL /PLUME3INC RESPONSIBILITY SCI- IEDULE NOTE: ANY ITEM NOT SPECIFICALLY INDICATED TO BE FURNISHED 8Y TIE OWNER OR THE LANDLORD SHALL BE FURNISHED BY THE RESPECTIVE CONTRACTOR. ANY ITEM NOT SPECIFICALLY INDICATED TO BE INSTALLED BY THE LANDLORD OR ANOTHER CONTRACTOR SHALL BE INSTALLED BY THE RESPECTIVE CONTRACTOR. ITEM WN d/N enriddfls 2l3NMO ! OWNER INSTALLED a3!"1ddf1S 'T5 cI 11VISNI a31"lddfl5 a21O'IaN■f1 LANDLORD INSTALLED DNIJS1)C3 REMARKS AIR HANDLING UNIT • • • 11 J T- TV NO EQUALS, NO SUBSTITUTIONS ELECTRIC WATER COOLER AND ASSOCIATED ACCESSORIES MU FINAL COMMISSION L'ILL • • rAl DUCT SAN. CI . GAS PIPING/REGULATORS AND METERS A5 REQUIRED AIR BALANCE REPORT • • - 1 • NO EQUALS, NO SUBSTITUTIONS SPRINKLER PIPING AND HEADS AS -BUILT DRAWINGS • • WATER HEATER • MOTOR OPERATED DAMPERS * ACTUATORS 0 CONDENSATE DRAIN PIPING • • CONDENSING UNITS • "' DREAMSTEAMER • • ROOF CURBS AND /OR CURS ADAPTOR FOR CONDENSING UNITS AS REQUIRED • GENERAL NQ'TE ALL DRAWING NOTES AND COMMENTS REGARDING — .� -- '1 = °, '' :ex `` T1-1I5 RESPONSIBILITY SCHEDULE TAKES PRECEDENT OVER REsPO1d5IBILITY STRUCTURAL SUPPORTS FOR HVAC UNITS AS REQUIRED • • V.A.V. BOXES • • FIELD VERIFY ALL LANDLORD CONTROL REQUIREMENTS. DIFFUSERS AND GRILLES • • FIRE ECTINGUISWER5 0 • CEILING FIRE DAMPERS AND /OR COMBINATION 5MOKE/FIRE DAMPERS • LOW PRE55URE DUCTWORK 0 0 HIGH/MEDIUM PRESSURE DUCTWORK • • HIGH/MEDIUM PRESSURE TAPS • • DUCT/UNIT/BASEBOARD HEATERS • RETURN AND /OR RELIEF FAN TOILET EXHAUST FAN(5) • • TOILET EXHAUST DUCTWORK AND /OR ROOF CAP • • PLUMBING FIXTURES • • AS SPECIFIED - NO EQUALS, NO SUBSTITUTIONS ELECTRIC WATER COOLER AND ASSOCIATED ACCESSORIES • • SAN. CW/HW. GAS PIPING/REGULATORS AND METERS AS REQUIRED • • AS SPECIFIED - NO EQUALS, NO SUBSTITUTIONS SPRINKLER PIPING AND HEADS • • WATER HEATER 0 0 VIBRATION ISOLATORS 0 • SMOKE EVACTUATION SYSTEM WORK (AS SPECIFIED) • GENERAL NOTE OVER ALL DRAWING NOTES AND COMMENTS REGARDING RESPONSIBILITY T1415 RESPONSIBILITY SCI- IEDULE TAKES PRECEDENT PLUMBING RESPONSIBILITY SCI-- IEDULE NOTE: ANY ITEM NOT SPECIFICALLY INDICATED TO 8E FURNISHED BY THE OWNER OR THE LANDLORD SHALL BE FURNISHED BY THE RESPECTIVE CONTRACTOR. ANY ITEM NOT SPECIFICALLY INDICATED TO BE INSTALLED BY THE LANDLORD OR ANOTHER CONTRACTOR SHALL BE INSTALLED BY THE RESPECTIVE CONTRACTOR. ITEM WN OWNER SUPPLIED a3'1"1VJSN1 2i3NM0 C311ddf1S . G.C. INSTALLED LANDLORD SUPPLIED LANDLORD INSTALLED O NIlSIX3 REMARKS PLUMBING FIXTURES t �► • • 11 J T- TV NO EQUALS, NO SUBSTITUTIONS ELECTRIC WATER COOLER AND ASSOCIATED ACCESSORIES • L'ILL • rAl DUCT SAN. CI . GAS PIPING/REGULATORS AND METERS A5 REQUIRED IL • • - 1 --' . ---- " — FD NO EQUALS, NO SUBSTITUTIONS SPRINKLER PIPING AND HEADS • • - _ WATER HEATER • • CONDENSATE DRAIN PIPING • • "' DREAMSTEAMER • • F1? \i 11S e a GENERAL NQ'TE ALL DRAWING NOTES AND COMMENTS REGARDING — .� -- '1 = °, '' :ex `` T1-1I5 RESPONSIBILITY SCHEDULE TAKES PRECEDENT OVER REsPO1d5IBILITY SYMBOL SCHEDULE SYMBOL DESCRIPTION 1 11 11 SUPPLY AIR DIFFUSER DUCT OR WALL MOUNTED DIFFUSER RETURN AIR GRILL OR DUCT SUPPLY AIR DUCT RISE SIMILAR FOR RETURN AIR SUPPLY AIR DUCT DROP SIMILAR FOR RETURN AIR EXISTING MECHANICAL CONTRACTOR ELECTRICAL CONTRACTOR CONNECT TO EXISTING CEILING EXHAUST GRILLE RMOSTAT (S- E DENOTES SENSOR) TURNING VANES TRANSITIONS BRANCH DUCT SPIN -IN FITTING AND VOLUME DAMPER DUCT SMOKE DETECTOR EXISTING DUCTWORK FIRE DAMPER -r--r t �► 11 J T- TV MI L'ILL rAl DUCT IL 0 (E) in EC. - 1 --' . ---- " — FD L C PLUMBING CODED NOTES 0 ALL WATER LINES, VENT LINES, DRAIN LINES, SPRINKLER LINES, ETC. SHALL BE OFFSET BELOW PLATFORM AND CONCEALED IN WALL ABOVE PLATFORM. DO NOT ROUTE PIPING, ETC. THROUGH STORAGE SPACE ABOVE PLATFORM OR ABOVE ELECTRICAL EQUIPMENT. LANDLORD'S CONNECT NEW 4" SANITARY LINE INTO THE EXISTING SANITARY SERVICE. MELD VERIFY EXACT LOCATION AND DIRECTION OF LOW OF LANDLORD'S MAIN PRIOR TO BID. INSTALL CLEAN OUT, cOORDINATE LOCATION AND TYPE OF COVER REQUIRED TO MATCH rt.00R FINISH WITH CONSTRUCTION R. REFER TO STACK DIAGRAM AND PLUMBING SPECIFICATIONS FOR FURTHER INFORMATION. ALL PLUMBING FIXTURES SHALL BE INSTALLED WITH STOP VALVES TO ISOLATE EACH FIXTURE. REFER TO RISER DIAGRAM AND PLUMBING SPECIFICATIONS FOR FURTHER INFORMATION. ® RUN 1/2" WATER PIPE FROM TRAP PRIMER DOWN IN WALL UNDER FLOOR TO FLOOR DRAIN. TRAP PRIMER TO BE LOCATED IN AN ACCESSIBLE LOCATION. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. ® PROVIDE SHUT -OFF VALVE, ETC. ALL IN ACCORDANCE WITH LANDLORD'S CRITERIA. INSTALL A PRESSURE REDUCING VALVE WHEN INCOMING WATER PRESSURE IS GREATER THAN 60 PSI. ALL INSTALLATIONS AND CONNECTIONS SHALL BE IN ACCORDANCE WITH THE APPLICABLE CODES, LOCAL AUTHORITY'S REQUIREMENTS AND LANDLORD'S CRITERIA. ® ADJUSTABLE FLOOR DRAIN. CONTRACTOR TO SNAKE DRAINS 2 DAYS PRIOR TO OPENING. t0 FURNISH AND INSTALL AN APPROVED REDUCED PRESSURE BACKFLOW PREVENTING DEVICE IN LINE WITH THE LANDLORD'S DOMESTIC WATER CONNECTION. CONNECT NEW VENT FROM TENANTS PLUMBING FIXTURES INTO EXISTING VENT LINE. REFER TO STACK DIAGRAM AND PLUMBING SPECIFICATIONS FOR FURTHER INFORMATION. FIELD VERIFY EXACT LOCA11ON PRIOR TO BID. CONNECT NEW 3/4" COLD WATER UNE INTO LANDLORD'S EXISTING COLD WATER TAP. NOTIFY CONSTRUCTION IF TAP SIZE I5 SMALLER THAN SHOWN ON RISER DIAGRAM. FIELD VERIFY EXACT LOCATION OF TAP. REFER TO RISER DIAGRAM AND PLUMBING SPECIFICATIONS FOR FURTHER INFORMATION. FURNISH AND INSTALL WATER HAMMER ARRESTORS IN THE DOMESTIC COLD AND HOT WATER PIPING AS SHOWN ON THE WATER RISER DIAGRAM. WATER HAMMER ARRESTORS TO BE LOCATED IN AN ACCESSIBLE LOCA11ON. UNITS AS MANUFACTURED BY SIOUX OR PRECISION PLUMBING PRODUCTS ARE ACCEPTABLE. i 00 YLQ LAY FCO 77,7 I • WATER FOUNTAIN COORDINATE IN 1 FIELD WITH WH CAGE. 0 DECK ABOVE 1111'. III 0 at PLUMBING PLAN 1I4 =1' -0" L PLUMING FIXTURES Kg, WATER CLOSET: AMERICAN STANDARD 'CADET" MODEL 2377.100, FLOOR MOUNTED TANK TYPE PRESSURE ASSISTED WATER CLOSET, VITREOUS CHINA_ ELONGATED BOWL. CLOSED COUPLED FLUSHMFTER TANK. 1.6 GALLONS PER FLUSH, WHITE COLOR. 17" RIM HEIGHT WITH WHITE RISE- AND -51-TINE ELONGATED OPEN FRONT SEAT AND COVER 4t5325.024. FLUSH HANDLE TO BE ON OPEN SIDE OF WATER CLOSET. Jam[ LAVATORY: AMERICAN STANDARD MOUNTED AT WHEELCHAIR WEIGHT MODEL 8141.011. WALL MOUNTED 20' x 27' VITREOUS CHINA. 4" CENTERS. WHITE COLOR. PROVIDE JOSAM 17105 -67 SERIES CARRIER, CI- IICAGO #885 -317CP GOOSENECK FAUCET WITH 4" CENTERS, BLADE HANDLES AND CHICAGO VANDAL RESISTANT ECONO -FLO WATER CONSERVING AERATOR #E2805 -5. MCGUIRE #158 -WC SUPPLY STOP, MCGUIRE #155 -WC STRAINER WITH OFFSET TRAP. Ii MOP BASIN: FIAT MODEL MSB -2424. 24' x 24' x 10 ", MOLDED 5TONE SERVICEPTOR, VINYL BUMPERGUARD. PROVIDE #832.AA 36" LONG, 3/4' W05E AND BRACKET WITH WALL HOOK AND CHICAGO $ &g7 FAUCET WITH INTEGRAL VACUUM BREAKER. liy. ELECTRIC WATER HEATER: A.O. SMITH MODEL EWF -6, 6 GALLON ELECTRIC WATER HEATER, 1500 WATT ELEMENT. GLASS LINED, FOAM INSULATION. BAKED ENAMEL FINISH. 120 VOLT I PHASE. Ea FLOOR DRAIN: JOSAM #30003- 5A -50, 3' FLOOR DRAIN WITH NICKEL BRONZE FINISH AND TRAP PRIMER INLET CONNECTION. PROVIDE DEEP SEAL TRAP. m TRAP PRIMER: PRECISION PLUMBING PRODUCTS MODEL P2 -500 TRAP PRIMER VALVE, W111I DU -2 DISTRIBUTION UNIT AND 55 -8 SUPPLY TUBE FOR UBE WITW UP TO 2 FLOOR DRAINS. ELLC ELECTRIC WATER COOLER: OASIS MODEL PBACSL, WALL MOUNTED HI -LOW HANDICAPPED ELECTRIC WATER COOLER. STAINLESS STEEL CONSTRUCTION. 4-TIMED TOUCH PADS. 8.0 GPI 50 DEGREES F. I/4 HP, 4.6 AMPS, 115 VOLT/1 PHASE. PROVIDE WITH TRAP AND A BALL VALVE ON SUPPLY LINE. MOUNT WITH BUBBLER AT 36' A.F.F. WALL CLEAN OUT CAST IRON CLEAN OUT TEE WITH BRONZE THREADED, WATER AND GAS TIGHT CLEAN OUT PLUG. JOSAM #58604 -PLG4, WALL ACCESS PANEL 5 -1/2'0 SMOOTI1 NICKEL BRONZE, SET FLUSH TO FINISH WALL PLANE. FURNISHED WITH SECURING LUGS. FCO FLOOR CLEAN OUT: JOSAM #57004 -SD -2. CAST IRON BODY WITH GA5 AND WATER TIGHT A85 TAPERED THREAD PLUG AND ROUND SCORIATED TOP ADJUSTABLE TO FINISH FLOOR. •r 3®3" TO LANDLORD VENT MAIN ®4 " - - 1 -1 /2" 1 E QI 2 yr 3" i 4" 1 t I 2 " „ I 3 h �`� EQ � „” FCO I N.- /2" � 3 LAV „ < " 4" " 2"- 3 3 "1 �%2 2 " Ea I � I Fco 2 "1. ," STACK NTS " - 1 SEE PLUMBING CODED NOTES MECHANICAL CODED NOTES 0 ALL ROOM MONITORING TEMPERATURE SENSOR'S, FURNISHED BY HOWSTER AND INSTALLED BY MECHANICAL CONTRACTOR AT 48" ABOVE THE FINISHED FLOOR. NOTE: THERE MAY BE MULTIPLE SENSORS. CHECK DRAWINGS CAREFULLY TO VERIFY QUANTITIES. ® PRE - ASSEMBLED TEMPERATURE /LIGHTING CONTROL PANEL FURNISHED BY HOLLISTER AND INSTALLED BY THE MECHANICAL CONTRACTOR. ALL CONDUITS BY THE ELECTRICAL CONTRACTOR. PANEL SHALL BE FOR MONITORING PURPOSES ONLY AND SHALL NOT ASSUME CONTROL OF UNITS. CONTRACTOR. INSTALL T STAT AT 40" ABOVE TINISIICD FLOOR. ® PLENUM AIR SENSOR FURNISHED BY HOWSTER AND INSTALLED BY THE MECHANICAL CONTRACTOR. INSTALL SENSOR ABOVE CEILING AND MOUNT SECURELY TO THE STRUCTURAL BAR JOIST. VERIFY EXACT LOCATION OF SENSOR WITH HOWSTER CONSTRUCTION MANAGER PRIOR TO INSTALLATION. 0 INSTALL TWO SECTION RETURN AIR DEVICE OFFSET 6 T9E.CENTER LINE OF THE ARC OF THE BARREL VAULT CEIUNG TOWARD THE STOREFRONT. RIGHT AND LEFT SECTIONS JOIN WITH ALIGNMENT PINS. COORDINATE LOCATION AND INSTALLATION WITH THE GENERAL CONTRACTOR. ® COORDINATE ROUTE OF DUCTWORK WITH SUPPORTS FOR TRACK LIGHTING IN ALL SALES AREA. SEE LIGHTING FLOOR PLAN SHEET E2.1. NOTIFY GENERAL CONTRACTOR OF ANY AND ALL SUPPORT CONFUCTS. ® GENERAL CONTRACTOR SHALL UNDERCUT DOOR 1" FOR AIRFLOW. ® RELIEF AIR THROUGH STOREFRONT CUSTOMER ENTRANCE TO MALL CONCOURSE. 10 EF--1 - ACME VQ80 TOILET EXHAUST FAN COMPLETE WITH INTEGRAL BACKDRAFT DAMPER SHALL BE FURNISHED BY HOLUSTER WITH LIGHTING PACKAGE AND INSTALLED BY MECHANICAL CONTRACTOR. EXHAUST CAPACITY SHALL BE 80 CFM AT 0.25" S.P., 120V, 10, 48 WATTS. CONTRACTOR TO FURNISH AND INSTALL EXHAUST DUCT AND ALL REQUIRED ACCESSORIES. CONNECT DUCT TO EXISTING MALL CENTRAL EXHAUST SYSTEM. FIELD VERIFY EXACT LOCATION AND COORDINATE CONNECTION WITH LANDLORD. INSTALL. TOILET EXHAUST FAN IN LOWER DRYWALL CEIUNG. 11 TILE MECHANICAL CONTRACTOR SHALL TURNISII AND INSTALL A 1/2" 1/2" ALUMINUM WIRE • • 12 EXISTING DUCTWORK TO REMAIN. TYPE, SIZE AND ELEVATION ARE AS NOTED. Co EXISTING PIPING TO REMAIN. TYPE, SIZE AND ELEVATION ARE AS NOTED. 14 AIR DEVICE TO BE USED FOR ACCESS TO EQUIPMENT LOCATED ABOVE CEIUNG. CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT A MINIMUM UNOBSTRUCTED FREE AREA OF 3 -FEET VERTICALLY AND 2-FEET HORIZONTALLY IN ALL DIRECTIONS AROUND EQUIPMENT IS MAINTAINED TO ALLOW FOR INSTALLATION AND MAINTENANCE OF EQUIPMENT. IF THIS FREE AREA CAN NOT BE OBTAINED, CONTACT THE HOWSTER CONSTRUCTION MANAGER IMMEDIATELY. 15 DASHED UNE AROUND HVAC EQUIPMENT REPRESENTS MANUFACTURER'S RECOMMENDED CLEARANCES FOR EQUIPMENT MAINTENANCE. IT IS THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO MAINTAIN SERVICE CLEARANCES THE FULL HEIGHT OF THE UNIT IN THIS AREA AND TO PROVIDE ACCESS TO THESE AREAS SUBJECT TO HOWSTER'S PROJECT MANAGER'S APPROVAL. IF FREE AREA CANNOT BE OBTAINED IN THIS LOCATION, IMMEDIATELY CONTACT HOLLISTER'S CONSTRUCTION MANAGER FOR FURTHER INSTALLATION INSTRUCTIONS. 16 MECHANICAL CONTRACTOR TO FURNISH AND INSTALL MEDIUM PRESSURE DUCT, SIZE AS INDICATED, FROM VAV BOX TO LANDLORD EXISTING SUPPLY MAIN. CONTRACTOR TO FURNISH AND INSTALL SADDLE TAP AT CONNECTION IF EXISTING NOT AVAILABLE. FIELD VERIFY EXACT LOCATIONS AND REQUIREMENTS. 17 HOLUSTER SHALL FURNISH AND MECHANICAL CONTRACTOR SHALL INSTALL PARALLEL FAN POWERED VAV BOX AS SHOWN. REFER TO DETAIL ON SHEET M4.1 FOR ADDITIONAL INFORMATION. VERIFY BOX INLET AND OUTLET CONNECTION SIZES AND INCLUDE DUCT TRANSITIONS AND FLEX CONNECTIONS IN BID. 18 RELATIVE HUMIDITY SENSOR PROVIDED WITH HVAC MONITORING SYSTEM. RH SENSOR TO BE INSTALLED BY THE MECHANICAL CONTRACTOR AT 48" ABOVE FINISHED FLOOR. 19 ALL ROOM TEMPERATURE THERMOSTATS, FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR AT 48" ABOVE THE FINISHED FLOOR. THERMOSTATS SHALL BE EQUIPPED WITH AN OVERRIDE OPTION TO PROVIDE AFTER HOURS CONDITIONING TO TENANT SPACE AS REQUIRED. ALL THERMOSTATS AND CONTROLS TO BE COMPATIBLE WITH LANDLORD'S BASE BUILDING SYSTEMS. FIELD VERIFY REQUIREMENTS WITH LANDLORD'S FIELD REPRESENTATIVE PRIOR TO BID. �J VAV DISCHARGE AIR SENSOR FURNISHED BY HOWSTER, INSTALLED BY MECHANICAL CONTRACTOR. INSTALL SENSOR IN A LOCATION THAT ALLOWS SERVICE ACCESS. WIRING BY ELECTRICAL CONTRACTOR. VERIFY ALL CONDITIONS IN THE FIELD BEFORE STARTING WORK. 1/2" LAY 11 1/2" COPPER TUBING IE. fig 1/2" COPPER TUBING .4( 1/2" aryp) 3/4" RISER N TS 00 3/4: SUPPLY DRAINAGE FIXTURE UNITS BASED ON COPPER TUBE PIPING. p riESTIC COLD WATER FU'S FU'S GPM (2) BATHROOM GROUP'S (PUBLIC) 7.20 (1) MOP BASIN 3.00 (1) DREAMSTEAMER I1ER 025 10.45 15.0 COLD HATER PIPE SIZE - 3/4' MIN. DOMESTIC SANITARY FU'S FU'S (2) BATHROOM GROUP'S (PUBLIC) 10.0 (1) MOP BASIN 2.0 (I) EVIC 0.5 (I) FD FOR DREAMSTEAMER 2.2 14.3 SANITARY PIPE SIRE - 4" 1/ COPPER TUBING 1/2" TO DREAMSTEAMER SEE PLUMBING CODED NOTES MECHAI CAL GENERAL NOTES PER 2006 IMC SECTION 606 Install smoke detector to shut down air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection) A. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND I5 RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF ALL. SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. B. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL ANY ADDITIONAL STRUCTURAL STEEL REQUIRED TO SUPPORT ANY MECHANICAL EQUIPMENT. THIS CONTRACTOR SHALL COORDINATE LOCATIONS AND REQUIREMENTS WITH THE GENERAL CONTRACTOR AND LANDLORD PRIOR TO BID. C. MECHANICAL CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT, PIPING AND DUCTWORK, NOT BEING USED OR SHOWN TO REMAIN, IS FULLY REMOVED AND NOT ABANDONED. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. D. COORDINATE THE EXTENSION, MODIFICATION, FINAL CONNECTION AND TESTING OF ALL UTILITIES OR INTERFACED SYSTEMS WITH THE LANDLORD'S FIELD REPRESENTATIVE. E. PROVIDE ACCESS FOR ALL LANDLORD AND TENANT COMPONENTS REQUIRING PERIODIC INSPECTION AND SERVICE THAT ARE LOCATED WITHIN THE SPACE OR REQUIRE ACCESS THROUGH THE SPACE. DEMONSTRATE ACCESS TO ALL HIDDEN COMPONENTS FOR THE LANDLORD'S FIELD REPRESENTATIVE PRIOR TO OCCUPANCY. Mo RECEIVED CITY OF TUKWILA OCT 2 5 2007 PERMIT CENTER Env.* �.,.". M•Reta, Engineerbg, Inc. 750 Brooks*dg. Blvd. Weetervlle.Ohio 43081 PHONE 814.818 WW1 FAX 614.81/.2337 VAMI- CORPORA110H5.00M W i• Cino J 4:::::5o w ae 1- w O ES 5 co a os W H 0 z a 0 0 C W ti 9 co 0 w 1— a Lll 0 co O. J � a J2 0 2 1— uj � CC Z J M Ne 00ce) *vets "' CoJ • .p,,,3549 - f0; EXPIRES 07 / 11 / 09 0710115 SHEET 2.1 0 W z ce J U OC• 1 9 2007 L.L.- LANDLORD DIRECTIVE PERMIT DATE: 6301 FITC1-1 PATI-1 NEN ALBANY, 01-1[0 43054 614-283-6500 ISSUE DATE: LANDLORD DATE: 9-6-07 . ., . DESIGN;r.WEATHER ' Design Parameters: City Name Seattle IAP Location Washington Latitude 47.5 Deg. Longitude 122.3 Deg. Elevation 449.0 ft Summer Design Dry -Bulb 85.0 °F Summer Coincident Wet -Bulb 65.0 °F Summer Daily Range 18.3 °F ,. Winter'Design Dry -Bulb 23.0 °F Winter Design Wet -Bulb 19.2 °F Atmospheric Cleamess Number 1.05 Average Ground Reflectance 0.20 Soil Conductivity 0.800 BTU /(hr- ft- °F) Local Time Zone (GMT +/ - N hours) 8.0 hours Consider Daylight Savings Time No Simulation Weathe r Data Seattle - Tacoma (TMY) Current Data is 2001 ASHRAE Handbook Design Cooling Months January to December AIR SYSTEvl SIZING SUVV1ARY Air System information Air System Name ..... Hollister- Southcenter Number of zones 1 Equipment Class UNDEF Floor Area 8790.0 ft' Air System Type VAV Location Seattle IAP, Washington Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Peak zone sensible load Calculation Months Jan to Dec Space CFM Individual peak space loads Sizing Data Calculated Central Cooling Col Sizing Data Total coil load 16.3 Tons Load occurs at Jan 2000 Total coil load 195.1 MBH OA DB / WB 602 / 51.2 °F Sensible coil load 175.0 MBH Entering DB / WB 72.7 / 61.2 °F Coil CFM at Jan 2000 9044 CFM Leaving DB / WB 54.5153.4 °F Max block CFM at Jan 2000 9828 CFM Coil ADP 52.5 °F Sum of peak zone CFM 9828 CFM Bypass Factor 0.100 Sensible heat ratio 0.897 Resulting RH 52 % ft'/Ton 540.7 Design supply temp. 55.0 °F BTU /(hr -ftl 22.2 Zone T -stat Check 1 of 1 OK Water flow © 10.0 °F rise 39.04 gpm Max zone temperature deviation 0.0 °F Supply Fan Sizing Data % Actual max CFM at Jan 2000 9828 . Fan motor BHP 2.00 BHP Standard CFM 9670 CFM Fan motor kW 1.49 kW Actual max CFM/fe 1.12 CFM/ft' Outdoor Ventilation Air Data Design airflow CFM 0 CFM CFM /person 0.00 CFM/person CFM/fP 0.00 CFM/ft ZONE SIZING SUVMARY Air System information Air System Name Hollister - Southcenter Number of zones 1 Equipment Class UNDEF Floor Area 8790.0 ft' Air System Type VAV Location Seattle iAP, Washington Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Peak zone sensible load Calculation Months Jan to Dec Space CFM Individual peak space loads Sizing Data Calculated AIR SYSTEv' DESIGN LOAD SUN VARY • DESIGN COOLING DESIGN HEATING COOLING DATA AT Jan 2000 HEATING DATA AT DES HTG COOLING OA DB / WB" 60.2 °F 1512 °F HEATING OA DB / WB 23.0 °F 119.2 °F Sensible Latent Sensible Latent ZONE LOADS , ' Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads ,. r - Oft 0 - O ft' - - , Wall Transmission 0 fP 0 - 0 ft' 0 - Roof Transmission 0 fP 0 - 0 ft' D - Window Transmission 0 ft' 0 - 0 ft' 0 - Skylight Transmission 0 ft 0 - 0 it 0 - ' Door Loads 0 ft' 0 - 0 ft' 0 - Poor Transmission 8790 fP 0 - 8790 ftz 0 - Partitions - 0 - IP 0 - O ft 0 - Ceiling 0 ftz 0 - 0 ftz 0 - Overhead Lighting 0 W 0 - 0 0 - Task Lighting 14290 W 41387 - 0 0 - Electric Equipment 15335 W 49264 - 0 0 - People 92 18540 19172 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 40000 0 - 0 0 Safety Factor 5% / 5% 7460 959 5% 0 0 » Total Zone Loads - 156650 20130 - 0 0 Zone Conditioning - 170240 20130 - -1504 0 Plenum Wall Load 0% 0 - 0 0 - Plenum Roof Load 70% 0 - 0 0 - Plenum Lighting Load 30% 0 - 0 0 - Retum Fan Load 9044 CFM 0 - 98 CFM 0 - Ventilation Load 0 CFM 0 0 0 CFM 0 0 Supply Fan Load 9044 CFM 4723 - 98 CFM -1099 - Space Fan Coil Fans - 0 - - O - Duct Heat Gain / Loss 0% o - o% a » Total System Loads - 174963 20130 - -2603 0 Central Cooling Coil - 174963 20116 - -2604 0 Terminal Reheat Coils - 0 - - 0 - » Total Conditioning - 174963 20116 - -2604 0 Key: Positive values are clg loads Positive values are htg loads Negative values are htg loads Negative values are clg loads PARALLEL FAN POWERED VARIABLE AIR VOLUME BOX SCHEDULE <RUEGER AIR DEVICE SCHEDULE - FUR\IISHED BY HOLLISTER Co. SYMBOL KEY - 1. FINISHING COLOR BY MANUFACTURER- 2. BORDER STYLE - 'A' - BLACK FINISH 'A' - SURFACE MOUNTED • 'B' - STANDARD WHITE FINISH 'B' - LAY-IN FOR METAL GRID TYPE T -BAR CEILING SALES AREA WiTH PATTERN CONTROL 'C' - LAY -IN FOR T -BAR CEILING, NON -SALES AREA 'D' - LAY -IN PROVIDED WITH PLASTER FRAME ADAPTER AS NOTED IN REMARKS COLUMN FOR DRYWALL CEILING MOUNTING SYMBOL CATALOG # SIZE MOUNTING FINISH ACCESSORIES BORDER STYLE .' REMARKS FACE NECK SIDEWALL CEILING DAMPER FIRE DAMPER - SDI PLQ-23 24" x 24' 17 "X15" 2220 2000 3/4 277 1 9.5 2 480 3 s . a - 8'0 VAV -2 .-- ._ -411)= 7 - B 2170 2000 3/4 277 1 9_5 2 480 3 SD2 PLQ -23 24" x 24' 10 "0 6 • A - - B 24" x 24' LAY -IN SALES AREA • 5D3 PLQ-23 � 24" 1, 2 VAV -4 45N 7 A 17 "X15" 2935 2000 3/4 x 24 " 12'0 480 3 304 LBS _ _ - B 24" „ 24" LAY -1N 3 10 14.5 "X11.5' 710 800 1/4 277 1 SALES AREA SD4 PLQ -23 24" x 24" 101'0 0 A - - D 24" x 24" WITH DIRECTIONAL TABS AND SAME SIZE #-ICF23 MTG. FRAME - LOUNGE 22 SD5 1910-C (2) SLOTS 49" x 4 8' OVAL ® A - - A BOOT INSULATED PLENUM MOUNTING ROOM 5D6 1950 -C (1) 1a sr ® -�. B A C _: , ' • :. • • : • 1 4: •' :DOT 4/4s uLATE^ al MUM - PORCH OT 48' x 2" 8' O VAL - _ - 507 PLQ -23 24" x 24' 8'0 24" x 24" LAY -IN NON -SALES AREA 508 PLQ-23 24' x 24' 10 "0 B - - D 24" x 24" DRYWALL CEILING MOUNTED NON-SALES AREA SO PLQ - 23 24" x 24" 10 "0 0 B - - C 24" x 24' LAY-1N NON -SALES AREA RG1 S80H -23 24" x 24" 22" x 22" 0 A - - B 24" x 24' LAY -IN SALES AREA RG2 S80H --23 24" x 24" 22' x 22" 0 B - - C 24" x 24" LAY -IN NON -SALES AREA RG3 S8011-22 12' x 12" 10" x 10" ® A - - A 12" x 12" SURFACE MOUNT LOUNGE 22 RG4 $8011-23 24' x 24" 22" x 22" 0 B - D 24" x 24" LAY -IN NON -SALES AREA RG5 (2) 1" SLOTS 49 x 4 " N/A ® A - - A CONCEALED MOUNTING 48" LONG T PATTERN CONTROLLER - LOCKER RG6 1920 -C (2) 2" SLOTS 49 x 6 " 12 OVAL A - A CONCEALED MOUNTING 20 NO PATTERN CONTROLLER -- LOUNGE 22 PARALLEL FAN POWERED VARIABLE AIR VOLUME BOX SCHEDULE MARK CARRIER MODEL NO. (OR EQUAL) UNIT SIZE INLET SIZE OUTLET SIZE COOLING CFM HEATING CFM FAN HEATER WEIGHT REMARKS H.P. VOL TS PHASE KW STEPS VOLTS PHASE VAV -1 45N 7 16 17 "X15" 2220 2000 3/4 277 1 9.5 2 480 3 304 LBS 1, 2 VAV -2 45N 7 16 17 "X15" 2170 2000 3/4 277 1 9_5 2 480 3 304 LBS 1, 2 VAV -3 45N 6 14 17 "X15" 1785 1800 1/2 277 1 8 2 480 3 284 LBS 1, 2 VAV -4 45N 7 16 17 "X15" 2935 2000 3/4 277 .. 1 9.5 2 480 3 304 LBS 1, 2 VAV -5 45N 3 10 14.5 "X11.5' 710 800 1/4 277 1 3.5 2 480 3 230 LBS 1, 2 NOTES: 1. PROVIDE TRANSITIONS FROM DUCT SIZE TO VAV BOX INLET SIZE. 2. ALL VAV BOXES TO HAVE DDC CONTROLS COMPATIBLE WITH LANDLORD'S BUILDING MANGEMENT SYSTEM. HELD VERIFY CONTROL REQUIREMENTS WITH LANDLORD HELD REPRESENTATIVE PRIOR TO BID. VAV IDENTIFICATION CFM DISCHARGE S.P. (IN. WG) DISCHARGE TEMP('F) VAV -1 VAV-2 VAV -3 VAV -4 VAV -5 L • ti 9 a D 0710115 SHEET V.A.V. SELECTION I N FOR vI ATI ON AIR BALANCING CONTRACTOR SHALL FILL OUT FOLLOWING FORM AND FORWARD TO HOLLISTER'S PRIMARY ENGINEERING CONSULTANT AFTER TESTING AND BEFORE FINAL FRAMING OF CEILING. COMPANY TECHNICIAN'S NAME AABC /NEBB (CIRCLE ONE) CERTIFICATION # TIME DATE MALL ENGINEER O HVAC CONTRACTOR SHALL INSTALL A MINIMUM OF 5'-O" OF MEDIUM PRESSURE DUCTWORK FROM EXISTING OR NEW TAPS IN THE SITE AS NOTED ON DRAYINGS FOR C.FJ1., STATIC PRESSURE MID DISCHARGE AIR TEMPERATURE TESTING. EACH DUCT SHALL BE PROVIDED WITH A TEMPORARY MANUAL BALANCING DAMPER WiTN LOCKING QUADRANT. IF EXISTING V.A.V. BOXES ARE NOTED TO BE REUSED, THEN TEMPORARY BALANCING DAMPERS NEED NOT BE INSTALLED. ® PRIOR TO TESTING, HVAC CONTRACTOR SHALL INFORM THE LANDLORD OF HIS INTENTIONS SO THAT THE LANDLORD CAN CONFIRM THAT HIS UNIT IS RUNNING AT CAPACITY. ® THE AIR BALANCING CONTRACTOR SHALL PERFORM A PRELIMINARY AIR BALANCE OF V.A.V. SYSTEM SETTING ALL DAMPERS OR DISTING V.A.V. BOXE5 TO THE REQUIRED CFM. STATIC PRESSURE READINGS AND DISCHARGE AIR TEMPERATURE READINGS SHAU. BE RECORDED ALONG WITH THE TiME OF DAY AND OUTDOOR AIR CONDITIONS WHEN READINGS WERE TAKEN. THIS INFORMATION, ALONG WITH AIR BALANCE CERiiFICATION NUMBER, 5HA11 BE FORWARDED TO THE HOWSTER PRIMARY ENGINEERING CONSULTANT. APPROVAL SHALL BE OBTAINED FROM HOWSTER'S PRIMARY ENGINEERING CONSULTANT PRIOR TO THE INSTALLATION OF ANY DUCTWORK. HOWSTER CONSTRUCTION MANAGER TO BE NOTIFIED OF PRELIMINARY TEST RESULTS IMMEDIATELY AFTER DEMOLITION. ® THIS TEST MUST BE PERFORMED PRIOR TO FABRICATION OF ANY DUCTWORK. ANY FABRICATION OF DUCTWORK PRIOR TO THIS SHALL BE AT THE CONTRACTOR'S OWN FINANCIAL RISK. ® UPON APPROVAL FROM HOLLISTER'S PRIMARY ENGINEERING CONSULTANT, 1HE HVAC CONTRACTOR SHALL REMOVE TEMPORARY MANUAL BALANCING DAMPER AND COMPLETE INSTALLATION OF DUCTWORK AND V.A.V. BOXES iN ACCORDANCE TO SPECIFICATIONS AND DETAILS. ® SYSTEM CAPACITY PRETESTS & FINAL BALANCING MUST BE SCHEDULED WITH LANDLORD FIELD REPRESENTATIVE. PROVIDE COPY OF THE APPROVED TEST & BALANCE REPORT 1O THE LANDLORD. ® AT EACH TAP, VERIFY: MR QUANTITY (cFM) DISCHARGE STATIC PRESSURE DISCHARGE AIR TEMPERATURE FAX RESULTS OF TEST TO M- RETAIL ENGINEERING AT. FAX # -- 614.818.2337 TEMPERATURE /LIGHTING CONTROL SYSTEM & COMMISSIONING CONTROL SYSTEM. (OWNER PROVIDED TEMPERATURE LIGHTING CONTROL PANEL IS FOR HVAC MONITORING ONLY) THE MECHANICAL CONTRACTOR SHALL INSTALL A COMPLETE CONTROL SYSTEM TO AUTOMATICALLY CONTROL THE HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT AS SPECIFIED HEREIN AND AS SHOWN ON THE BID SET DRAWINGS. HOWSTER SHALL PROVIDE TO THE MECHANICAL CONTRACTOR ALL CONTROL EQUIPMENT NECESSARY TO PERFORM THE SEQUENCES OF OPERATION, EXCEPT AS SPECIFICALLY NOTED OTHERWISE. SYSTEM TO BE UL LISTED AS A WHOLE. THE HVAC CONTRACTOR I5 RESPONSIBLE TO CONTACT OWNER THREE WEEKS PRIOR TO CONSTRUCTION COMPLETION DATE TO SCHEDULE COMMISSIONING. THIS CONTRACTOR MUST HAVE CONTROL NUMBER AND HAVE SIGNED OFF ON THE CONTROL PANEL AT JOB SITE. FAILURE TO MENTION ANY SPECIFIC ITEM OR DEVICE DOES NOT RELIEVE THE MECHANICAL CONTRACTOR OF THE RESPONSIBILITY FOR INSTAWNG OR PROVIDING SUCH DEVICES OR ITEMS IN ORDER TO ACHIEVE THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. ALL 24 VOLT PLENUM RATED WIRE ASSOCIATED WITH CONTROLS SHALL BE PROVIDED BY HOWSTER AND INSTALLED BY THE MECHANICAL CONTRACTOR. UNE VOLTAGE WIRING, EQUIPMENT STARTERS AND DISCONNECTS AND ALL CONDUITS SHALL BE PROVIDED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. ELECTRICAL CONTRACTOR IS TO PROVIDE WEATHERPROOF DISCONNECTS FOR ROOFTOP UNITS. VAV BOXES WITH HEAT WILL BE PROVIDED WITH ALL REQUIRED CONTROLS, CONTACTORS AND DISCONNECT SWITCHES, E.C. WILL HAVE A SINGLE POINT CONNECTION. ALL WIRING AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODES. THE MECHANICAL CONTRACTOR SHALL RENDER WHATEVER ASSISTANCE IS REQUIRED BY THE ELECTRICAL CONTRACTOR IN MAKING POWER CONNECTIONS TO THE CONTROL DEVICES. HOWSTER SHALL PROVIDE COMPLETE WIRING AND INSTAULAIION INSTRUCTIONS FOR ALL TEMPERATURE CONTROL EQUIPMENT WITH THE TEMPERATURE CONTROL PACKAGE. ALL CONTROL WIRING DIAGRAMS WILL BE SPECIFIC TO EQUIPMENT CONTROLLED AND MUST REMAIN WITH RECORD DRAWINGS AT COMPLETION OF PROJECT. COMMISSIONING TEMPERATURES THE MECHANICAL CONTRACTOR MUST INCLUDE IN BASE BID TWO (2) HOURS FOR COMMISSIONING. INCLUDE AN ADDITIONAL 2 -HOURS OF COMMISSIONING PER HVAC UNIT FOR THE TEMPERATURE CONTROL SYSTEM. THE MECHANICAL CONTRACTOR WILL BE REQUIRED TO REPAIR/REPLACE COMPONENTS FOUND TO BE DEFECTIVE PRIOR TO RECEIVING A CONTROL NUMBER. THE MECHANICAL CONTRACTOR MUST SCHEDULE COMMISSIONING A MINIMUM OF SEVEN (7) DAYS PRIOR TO COMPLETION OF TEMPERATURE CONTROL INSTALLATION FOR THE NEXT AVAILABLE COMMISSIONING 11ME. FAILURE TO DO SO MAY REQUIRE THE MECHANICAL CONTRACTOR TO RETURN TO THE JOB SITE TO PERFORM COMMISSIONING ON A FUTURE DATE AT THE MECHANICAL CONTRACTOR'S EXPENSE. UGHIING CONTROLS THE ELECTRICAL CONTRACTOR MUST INCLUDE IN BASE BID TWO (2) HOURS OF COMMISSIONING FOR THE LIGHTING CONTROL SYSTEM. THE ELECTRICAL CONTRACTOR WILL BE REQUIRED TO REPAIR/REPLACE COMPONENTS FOUND TO BE DEFECTIVE PRIOR TO RECEIVING A CONTROL NUMBER. THE ELECTRICAL CONTRACTOR MUST SCHEDULE COMMISSIONING A MINIMUM OF SEVEN (7) DAYS PRIOR TO COMPLETION OF TEMPERATURE CONTROL INSTALLATION FOR THE NEXT AVAILABLE COMMISSIONING TIME. FAILURE TO DO 50 MAY REQUIRE THE ELECTRICAL CONTRACTOR TO RETURN TO THE JOB SITE TO PERFORM COMMISSIONING ON A FUTURE DATE AT THE ELECTRICAL CONTRACTOR'S EXPENSE. LIGHTING CONTROLS TO CONSIST OF THREE (3) ZONES. ZONE "A' FOR STOREFRONT AND SIGNAGE. ZONE "B' FOR STOCKING AND ZONE 'C" FOR SALES AREA. B & C ZONES SHALL HAVE AN OVERRIDE SWITCH FACTORY MOUNTED ON THE FRONT OF THE TEMPERATURE MONITORING/LIGHTING CONTROL CABINET. CONTROL RELAYS TO BE FACTORY MOUNTED INSIDE THE CONTROL CABINET AND ARE TO BE HARD WIRED TO A TERMINAL BLOCK. FIELD WIRING FROM THE CONTROL CABINET TO THE LIGHT FIXTURE CONTACTORS TO BE BY THE ELECTRICAL CONTRACTOR. TERMINAL BLOCK TO BE LABELED WITH CONNECTION POINTS INDICATED ON PROVIDED WIRING DIAGRAM. WARRANTY THE MECHANICAL/ELECTRICAL CONTRACTOR I5 RESPONSIBLE FOR THE PROPER INSTALLATION OF THE CONTROLS AND ACCESSORIES IN ACCORDANCE WITH THESE DRAWINGS AND THE INSTALLATION INSTRUCTIONS INCLUDED WITH THE CONTROLS PACKAGE. WARRANTY BEYOND THE INSTALLATION IS BY HOWSTER CO. THE UNIT MANUFACTURER WARRANTS ALL CONTROL EQUIPMENT PROVIDED BY HOWSTER TO BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIAL UNDER NORMAL USE AND SERVICE FOR A PERIOD OF ONE YEAR AFTER COMPLETION OF START -UP. HOWSTER WILL PROVIDE A SEPARATE SERVICE WARRANTEE FOR CONTROL EQUIPMENT FOR A PERIOD OF ONE YEAR AFTER THE CONTROL NUMBER(S) HAVE BEEN ISSUED. GENERAL INSTALL (ON INSTRUCTIONS (FOR BIDDING PURPOSES ONLY) DETAILED INSTALLATION INSTRUCTIONS WILL BE INCLUDED WiTH THE DELIVERY OF THE TEMPERATURE CONTROL PACKAGE. MOUNT CONTROL PANEL ON POWER WALL WHERE INDICATED ON DRAWINGS. REVIEW DETAILED INSTALLATION INSTRUCTIONS AND CONFIRM INSTALLATION LOCATIONS FOR ALL HOWSTER SUPPLIED EQUIPMENT. EACH COMPONENT HAS BEEN PREWIRED AND LABELED FOR IDENTIFICATION. INSTALL ALL COMPONENTS AND ROUTE CABLES THROUGH JOISTS BACK TO TEMPERATURE CONTROL PANEL CABLES MUST BE RUN INDIVIDUALLY AND INSTALLED WITH 6 INCH SEPARATION WITH SUPPORTS EVER 6 FEET. DO NOT RUN CABLES PARALLEL TO UNE VOLTAGE CONDUIT NOR LAY CABLES ON CEILING (MECHANICAL CONTRACTOR MUST INSTALL TEMPERATURE CONTROL I CABLES IN CONDUIT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. COORDINATE FINAL DESTiNA11ON LOCATIONS WITH ELECTRICAL CONTRACTOR.) ONCE ALL CONTROL EQUIPMENT HAS BEEN INSTALLED, CALL AND SCHEDULE FOR COMMISSIONING. THIS MUST BE DONE AT LEAST SEVEN (7) DAYS BEFORE SYSTEM IS READY FOR COMMISSIONING, TO SCHEDULE NEXT AVAILABLE COMMISSIONING TiME. N OV - G SEQUEUC�E O OPERATION �,, N p��p ap��n EMS HAS G A BUII.TSIN ea VI SHALL 9 • SET FOR OCCUPIED AND UNOCCUPIED HOURS. THE EMS SHALL CONTROL EVERY PIECE OF PRIMARY HVAC EQUIPMENT. UPON A LOSS OF SIGNAL FROM THE EMSP, THE CONTROL BOARD IN EACH PIECE OF PRIMARY HVAC EQUIPMENT SHALL MAINTAIN A SET POINT OF 72F IN THE COOLING MODE AND 717 IN THE HEATING MODE. THE EMSP SHALL CONTROL THE LIGHTING AS WELL AS THE PRIMARY HVAC UNIT(S), AND SHALL BE EQUIPPED WITH ONE HOUR OVERRIDE CONTROLS TO TURN THE LIGHTS ON DURING UNOCCUPIED HOURS. THE EMSP SHALL ALSO AVE A TELEPHONE CONNECTION FOR REMOTE MONITORING AND CONTROLLING. SENSOR O PERATION: EACH UNIT MAY HAVE MULTIPLE SENSORS. MULTIPLE SENSORS SHALL AVERAGE THE SPACE TEMPERATURE AND SHALL HAVE A DEAD BAND SE111NG OF 0.5. THE SENSORS ARE NOT CONTROL DEVICES, THE EMSP WILL CONTROL THE UNIT(S). COOUNQ MODE; DURING OCCUPIED HOURS, THE SALES AREA SHALL BE MAINTAINED AT 727 AND THE NON -SALES AREA SHALL BE MAINTAINED AT 75F. DURING yy UN AA OCCC C� UPIE pp D HOURS, ALL AREAS SHALL BE MAINTAINED AT 85F. DUR0NGGOCCUPIED HOURS, THE SALES AREA SHALL BE MAINTAINED AT 687 AND THE NON -SALES AREA SHALL BE MAINTAINED AT 657. DURING UNOCCUPIED HOURS, ALL AREAS SHALL BE MAINTAINED AT 557. MORNING WARM -UP /COOL -DOWN MODE: FOR ONE HOUR BEFORE AND AFTER OCCUPIED HOURS THE EMSP SHALL CALL FOR THE WARM -UP CYCLE. DURING WARM -UP, THE UNIT(S) WILL RUN ONLY IF COOLJNG AND /OR HEATING IS CALLED FOR TO REACH DESIRED SET POINTS. Pirli REPORTS A TEMPERATURE UNDER 50F, THE EMSP SHALL GO INTO ALARM AND TURN ALL THE LIGHTS ON IN THE SPACE. SMOKE DETECTOR: IF THE SMOKE DETECTOR IS ACTIVATED, THE SMOKE DETECTOR SHALL SHUT DOWN UNIT, AND THE EMS SHALL GO INTO ALARM. PRIMARY AIR VALVE OPERATION: THE EMSP SHALL CALLED FOR). THE INCREMENTS VALVE SHALL HAVE A MINIMUMSET POINT OF 1O %, AND IF H IBS COOLING CA ILL CALLED FOR O THE HEATER (IF IINSTAU�ED) HEATING ENERGIZE. MOTOR °PER EMSP. SHALL ENERGIZE FAN ONLY IF HEATING IS CALLED FOR FAN SHALL RUN AS LONG AS THE HEATER IS ENERGIZED. - g . e • "•1 ICJ- , ALL HEATING AND /OR COOLING IF THE PRIMARY AIR FLOW SENSOR REPORTS 0 (ZERO) CFM. IF THIS OVER RIDE OCCURS DURING OCCUPIED HOURS, THE EMSP SHALL ALSO GO INTO ALARM. CONTROLS PACKAGE DELIVERY NOTE THE CONTROLS PACKAGE HAS BEEN PRE- PURCHASED BY THE HOLLISTER CO, WITHIN THE FIRST WEEK OF CONSTRUCTION THE GENERAL CONTRACTOR OR THEIR MECHANICAL SUBCONTRACTOR SHALL PROVIDE THE PHONE AND THE FAX NUMBER OF THE CONTACT PERSON RESPONSIBLE FOR SCHEDULING AND RECEIVING THE CONTROLS PACKAGE AND ACCESSORIES. INCLUDE THE DELIVERY ADDRESS AND ACCESSORIES THAT ARE TO BE SHIPPED, PLUS ANY SPECIAL SHIPPING INFORMATION REQUIRED. ALLOW A MINIMUM OF TWO (2) WEEKS AFTER CONSTRUCTION STARTS FOR DELIVERY UNLESS, SPECIAL ARRANGEMENTS ARE MADE PRIOR TO THE START OF CONSTRUCTION. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL SHIPPING COST INCURRED IF DELIVERY IS REQUIRED PRIOR TO THE STANDARD TWO (2) WEEKS SCHEDULED. THE CONTROLS PACKAGE AND ACCESSORIES WILL SHIP IN ACCORDANCE WITH THE PURCHASE ORDER DATE AND INSTRUCTIONS ISSUED BY HOWSTER CO. AND THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR IT UNTIL SUCH TIME AS REQUIRED FOR INSTALLATION ON PROJECT. IT IS THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO VERIFY THAT ALL NECESSARY CONTROLS AND ACCESSORIES HAVE BEEN RECEIVED FOR HVAC EQUIPMENT. NtO1ZZ rmphmi. On Emile= M- Retail Engineering, Inc. 750 Brookssdge Blvd. **twat, Ohio 43081 PHONE 614.818.2323 FAX 814.818.2337 WWW.1I- OORPORA110NS.COM RECEIVED CITY OF TUKWILA OCT 2 5 2007 PERMIT CENTER dc1 1 9 2007 MAIN DUCT ALL DUCT LINER TRANSVERSE EDGES TO BE COATED W/ ADHESIVE IN ACCORDANCE WV SMACNA STANDARDS (TIP.) BRANCH DUCT 70 S.A. MAIN SHT. MIL. ELBOW REQUIRED VOLUME DAMPER LOCATION WHERE DAMPER WOULD BE INACCESSIBLE AT TAKEOFF. PROVIDE W/3' EXTENDED SHAFT, HANDLE AND COLLAR: 3' -0' INSULATED FLEXIBLE CONNECTION. TRANSITION FROM DUCT SIZE TO DIFFUSER NECK SIZE AS NECESSARY. CLIPPED ON DIFFUSER RODS. SEE NOTE BELOW. SUPPLY AIR DIFFUSER WALL LINE PIPE JACKET 4 INSULATION POLYSULFIDE POLYSUL.FIDE '// / SEALANT SEALANT BALLEMEGRAMA FLOOR PEON IrE ENETRATION DETAIL DECK ABOVE HANGERS (MUST BE AT 6' BEFORE DROP) INSULATED ROUND DUCT CEILING WALL PROVIDE A 3/8' BALL VALVE 1/2" TYPE 'L' VENT PIPE DV TO 1' AFF ON WALL ADJACENT TO 1/2" WATER SUPPLY. TURN CUT TOWARD FLOOR DRAIN WATTS SERIES "Da" ASSEI012 STANDARD DOUBLE CHECK BACKFLOW PREVENTER ICAL DIFFUSER MOUNTING DETAI.: 0 I/2' TYPE 'L" WATER SUPPLY, CLAMP TO WALL AT TOP, MIDPOINT AND BOTTOM. PROVIDE 6' OF 3/8' BRAIDED COPPER TUBING AND CONNECT TO STEAMER BY MANUFACTURER- PIPE ANUFACTURER PIPE SLEEVE 3/4" THICK FIRESAFING INSULATION PIPE JACKET 4 INSULATI PIPE DREAM - STEAMER BY OWNER WT. 3503 FINISHED FLOOR ug2JAMSTEAMER" PIPING DETAIL rI.Arltxu -+ AIYI/ f I W JUIN OR DUCT CONNECTION AND RE- ENFORCEMENT IN ACCORDANCE W/ SMACNA 2' W.G. CLASS, SEAL NON - GASKETED TRANS- VERSE JOINTS IN ACCORDANCE W/ SMACNA CLASS 'c' MP.) 1 ACOUSTICAL LINING VOLUME DAMPER AS. INDICATED ON PLANS. PROVIDE WITH LOCKING QUADRANT 18' LONG ORANGE MARKER TAPE ATTACHED TO DAMPER TO IDENTIFY LOCATION SQUARE TO SQUARE DUCT TAKEOFF DETAIL SECURE VINYL FLDf DUCT TO SHT. MTL. W/ METHOD AND MATERIALS RECOMMENDED BY FLEX DUCT MFGR. AND PER CODE, STRAP CLAMP OVER FLEX DUCT INSULATION 4 VINYL TO SW. MTL. SECURE INSULATION TO DUCT TO FORM A GOOD SEAL. 8 LONG 514T. MTL. SECTION SECURED TO DIFFUSER COLLAR WV MIN. (3) SHT. MIL. SCREWS, MASTIC AND MATERIALS RECOMMENDED BY FLEX DUCT MFGR. AND PER CODE. FIRE DAMPER WHERE INDICATED ON PLANS. THERMAL INSULATING sLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. DRYWALL CIA STEEL MOUNTING FRAME REQUIRED FOR DRYWALL CEILING INSTALLATION. FLOOR SLAB 3/4' THICK FIRESAFING INSULATION PIPE SLEEVE TRANSVERSE EDGES TO BE COATED W/ ADHESIVE IN ACCORDANCE W/ SMACNA STANDARDS (TYP.) MAIN DUCT TAPE DOWN EXTERNAL INSULATION FASTEN W/ MIN. (3) SHT. MTL. SCREWS, SEAL W/ DUCT TAPE AND MASTIC ROUND RIGID DUCT 1 1/2' WRAPPED INSULATION TO R.A. MAIN INSULATED ROUND DUCT VOLUME DAMPER LOCATION WHERE DAMPER WOULD BE INACCESSIBLE AT TAKEOFF. PROVIDE W/ 3" EXTENDED SHAFT, HANDLE AND COLLAR. INSULATED FLEXIBLE CONNECTION. (MIN. 3 FT., MAX. 4 FT.) (MIN.) 1'-0 SHEET METAL PLENUM BOX. BALANCING DAMPER AT FACE SEE AIR DEVICE SCHED. FOR DAMPER TYPE. RETURN AIR REGISTER (LAY -IN FRAME) 3M FIRE BARRIER (CAULK CP -25 OR PUTTY 303),. 26 GAUGE MINIMUM GALVANIZED STEEL PLATE. SECURE TO FLOOR WITH STEEL MASONRY FASTENERS PIPE JACKET 4 INSULATION PIPE WALL Map,E TO ROUND OUND DUCT TAKEOFF DETAIL T.5. EALL_ERIELEATIOI DJD_ RETURN SYSTEM URN GRILLE MOUNTING DETAIL .-.•t -11--N .+'/Ill1 VIA ✓I.M1.1 CONNECTION AND RE- ENFORCEMENT IN ACCORDANCE W/ SMACNA 2' W.G. CLASS, SEAL NON- GASKETED TRANS - VERSE JOINTS IN ACCORDANCE W/ SMACNA CLASS "G" (TIP.) PIPE MINERAL WOOL BATT OR CERAMIC (ALUMINA SILICA) FIBER BLANKET WITH A REMOVABLE FORM FLOOR PENETRATIQI ,ifE RATED PENETTATION DETAIL FL FLOW 1' ACOUSTICAL LINING CONICAL OR BELL MOUTH SPIN - IN FITTING, SEAL AIRTIGHT W/ MASTIC VOLUME DAMPER AS INDICATE) ON PLANS. PROVIDE WITH LOCKING QUADRANT IS' LONG ORANGE MARKER TAPE ATTACHED TO DAMPER TO IDENTIFY LOCATION SHT. MTL ELBOW REQUIRED. SECURELY TAPE VINYL FLEX DUCT TO SETT. MTL. W/ MIN. OF (2) CONTINUOUS WRAPS OF DUCT TAPE. STRAP CLAMP OVER FLEX DUCT INSULATION 4 VINYL TO SHT. MTL. TAPE INSULATION TO DUCT TO FORM A GOOD SEAL. 8" LONG SHT. MTL. SECTION SECURED TO DIFFUSER COLLAR W/ MIN. (3) SHT. MTL. SCREWS, DUCT TAPE AND MASTIC. THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. DRYWALL CLG. STEEL MOUNTING FRAME REQUIRED FOR DRYWALL CEILING INSTALLATION SEE DETAIL "D' 17415 SHEET. FIRE DAMPER WHERE INDICATED ON PLANS. 26 GAUGE MINIMUM GALVANIZED STEEL PLATE. SECURE TO FLOOR WITH STEEL MASONRY FASTENERS. PIPE JACKET 4 INSULATION FLOOR 3M FIRE BARRIER (CAULK CP -25 OR PUTTY 303) . 1 . 141rAmEe k tuglylintr a i s izto l TAP INTO THE NEAREST AVAILABLE COLD WATER SOURCE (COLD WATER INPUT TO WATER HEATER, DRINKING FOUNTAIN, BATHROOM, ETC.) USING 1/2' COPPER LINE OR TUBING. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A 1/2' THREADED BALL TYPE SHUT -OFF VALVE MOUNTED TO THE NALL IN AN EASILY ACCESSIBLE LOCATION. 72 INCHES OF STAINLESS STEEL. BRAIDED TUBING AND THE HARDWARE TO CONNECT TO A 3/8' BALL VALVE WILL BE INCLUDED WITH THE MACHINE. 114E DRAIN DOES Eta NEED TO BE CONNECTED. ALL CANADIAN AND CERTAIN U.S. LOCATIONS REQUIRE THE USE OF A BACKFLQW VALVE. CHECK YOUR LOCAL_ PLUMBING CODE. THE WATER LINE WILL NEED TO BE BLED AND FREE OF DEBRIS BEFORE IT 15 CONNECTED TO THE MACHINE, AFTER CONNECTING CLEAN INTERNAL STRAINER AND CYCLE WATER UNTILL STRAINER REMAINS CLEAR. THE WATER PRESSURE MUST NOT EXCEED 100 PSI. IF THE WATER PRESSURE I5 GREATER THAN 100 PEI THEN A EO PSI REGULATOR WILL NEED TO BE INSTALLED. IN WALL ACCESS PANES. BY GC 8 NON -SALES ti 'OREAMSTEAMER' INE 6 4r 48' PLAIT Vl111i JOIST/BEAM I /2' X 3/8" REDUCER FITTING 1/2 BACKFLOW PREVENTER VENT WALL 3/8' BRAIDED COPPER TUBING BY MANUFACTURER r. . OF OF DUCT OVER FLEX 4 VINYL TO E INSULATION TO ORM A GOOD SEAL. D SQUARE DUCTWORK FROM NECK UP TO BOTTOM OF DRYWALL DECK ABOVE AND CONNECT 8' ROUND DUCTWORK TO SIDE OF BOX. DRYWALL CEILING STEEL NT!NG FRAME REQUIRED FOR CEILING INSTALLATION ANA 3' 'S ' I US. ' MOUN IN r AI MAIN DUCT I TRANSVERSE EDGES TO BE COATED W/ ADHESIVE IN ACCORDANCE W/ SMACNA STANDARDS (m'•) FASTEN W/ MIN. (3) SHT. MTL. SCREWS, SEAL W/ DUCT TAPE AND MASTIC ROUND RIGID DUCT 1 I/2' WRAPPED INSULATION STUB SHEET METAL DUCT 6' UP SAME SIZE A5 NECK OF GRILLE. RETURN AIR REGISTER (LAY -IN FRAME FIRE DAMPER WHERE INDICATED ON PLANS. HIM ALL mom ARE 4-WAY SLOW IlUES NOTED =MIX DfRECIXNAL SLOW CONVERTRR3 LOLL EE PFEOVIDED lJr RC1115TER FOR DIFFUSERS THAT ARE --WAY, 2 -44AY OR 3-WAY MON AS MOWED CN PMIIIS BY SHADED AREA. ROUND TO ROUND NO -DUCT® RETURN 5Y5TEM *NGE 22 LINEAR REJUgN REGISTER MIN. CLEARANCE FOR ACCESS TO FAN 4 MOTOR mi 111•111I111111IIIU r � ALLOW 2' -O' MIN. CLEARANCE FOR CO ROL ACCESS F 4 x DIA. MIN. LENGTH FAN BALANCING TAP E3AGKD/RA/FT/ 777 PARTITION SECURE FLEXIBLE DUCT W/ DRAWBAND, SEAL CONN. AIR- TIGHT IN ACCORDANCE IV/ SMACNA STANDARDS. VAPOR BARRIER 4 INSULATION SHALL BE INSTALLED OVER CONN. 4 SECURED ICJ/ ADD'L. DRAW - BAND (TrP.) INSULATED LOW PRESSURE FLEXIBLE DUCT PRIMARY AIR FLO INSULATED LAW PRESSURE DUCT TRANSITION TO OVAL OR RECTANGULAR DUCT SAME SIZE AS VAV SOX CONNECTION SIZE ELECTRONIC CONTROL ENCLOSURE 1 w.wlw •vw .ar..nv -1 W wnj 1 Vr% 1 CONNECTION AND RE- ENFORCEMENT IN ACCORDANCE W/ SMACNA 2' W.G. CLASS, SEAL NON- GASKETED TRANS- VERSE JOINTS IN ACCORDANCE W/ SMACNA CLASS "C" (TYP.) -0 "M CONICAL, SADDLE OR TAP FITTING, SEAL AIRTIGHT W/ MASTIC AIR FLCH VOLUME DAMPER AS INDICATED ON PLANS. PROVIDE WITH LOCKING QUADRANT 15' LONG ORANGE MARKER TAPE ATTACHED TO DAMPER To IDENTIFY LOCATION THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. DRYWALL CLG. STEEL MOUNTING FRAME REQUIRED FOR DRYWALL CEILING INSTALLATION SEE DETAIL "D' THIS SHEET. FRONT OF STORE—P-- f BARREL VAULT CEILING N0TE1 ACROSS THE LENGTH OF THE LOUNGE 22 ROOM AS SHOWN ON PLANS. CORRUGATED METAL BARREL VAULT CEILING. REFER TO CE RCHITTEC D TUUR A AL PLANS FOR 2 1 -0 " AN POWERED PARALLEL VAV 80X DE1"AIL PLATE SAME GAUGE AS DUCT VANES PRE - ASSEMBLED ON RUNNER PLATES U5E GALVANIZED VANES FOR GALVANIZED OR ALUMINUM DUCTS OVER 36' IN LENGTH TO S.A. MAIN 3 -0' INSULATED FLEXIBLE CONNECTION SUPPLY AIR DIFFUSER (LAY -IN FRAME) BOTTOM OF DIFFUSER AT 7 AFF 52 WON WITH TYPE 'A' CABLE THICIVESS VMS 4ESSING ROOM SID'IALL DIFFUSER INDUCTION AIR FLOW MIN. SERVICE CLEARANCE SW' INDUCTION OPENING ELECTRIC HEATER CONTROLS PLATE SAME GAUGE AS DUCT VANES PRE - ASSEMBLED ON RUNNER PLATES USE GALVANIZED VANES FOR GALVANIZED OR ALUMINUM DUCTS R•2' OVER 36' IN LENGTH 32. BOON WITH SfHGLE VANES SECURELY TAPE VINYL DUCT TO SHT. MIL. (2) CONTINUOUS TAPE. STRAP C DUCT INSULA . DUCT T HARD DUCT TO SLIP INTO FLEXIBLE DUCT MINIMUM OF 6 ". CLAMP FLEX DUCT TO HARD DUCT. COVER R AW ENDS OF FLEX DUCT AND CLAMPS WITH DUCT TAPE TO CREATE AIR TIGHT SEAL. 3' -0' INSULATED FLEXIBLE CONNECTION 5" VALL DUCT KRUEGER 41910 - SOOT 48' LANG - INSULATED PLENUM THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. DISCHARGE M O P AIR FLOW I" LINED LOW PRESSURE DUCT, TRANSITION TO DUCT SIZE SHOWN ON DRAWING FLEXIBLE CONNECTOR MS IRAN Si" TURNING VANES LEJiG N INSTEAD DUCT SI1:E i t ATTACH DAMPER TO SLEEVE AS RECOM- MENDED BY MFGR. STEEL BLADES WITH INTERLOCKING JOINTS FUSIBLE FIRE LINK DUCT (TYP.) DUCT CONNECTION (TYP.) 25 1/4', 21 1/4' 19 1/4' OR 13 1/4" OUTSIDE DIMENSION 24 ", 20 ", 18' OR 12' _I NOTE= ROUGH IN OPENING SIZESI NOMINAL I2'x 12' • 12 1/2 "x 12 I /2' NOMINAL I8'x 18" • 18 I /2 "x 15 1/2' NOMINAL 20'x 20' • 20 1/2"x 20 1/2' NOMINAL 24'x 24" • 24 I/2'x 24 V2' NOMINAL 24'x 12' • 24 1/2"x 12 1/2" te plYWAU. MOUNTING FRAME DETAIL WALL E�TIGAL FIE PAMPER DETAIL r 3O AMP. INDIVIDUAL BRANCH CIRCUIT 30 AMP. 3 -POLE 4 -WIRE GROUNDING RECEPTACLE WITH NEUTRAL (NEMA U5 -30). SEE ELECTRICAL SHEET El FOR FURTHER INFORMATION. DRAIN (P0 NOT CONNECT) UNISTRUT P1000 BRACE, TYP. AT MID -POINT ALONG (2) PERPENDICULAR SIDES V SUSPENSION DETAIL UNISTRUT CUP ANGLE TYP. LE TO DAMPER FOR 1242 DIFFUSERS, MOUNT "YOUNG' DAMPER REGULATOR ON CHANNEL MOUNTING SCREW FIELD INSTALLED "C" CHANNEL REINFORCING BY G.C. AROUND OPENING DRYWALL CEILING TEEL MOUNTING FRAME BOLT TO SLEEVE (TIP.) MOUNT SLEEVE IN BLDG. CONSTRUCTION, SLEEVE TO BE OF GAUGE AS RECOM- MENDED BY MFGR. FoR U.L. APPROVAL AND CODE COM- PUANCE NOTE= PROVIDE ACCESS DOOR IN AN ACCESSIBLE LOCATION FOR RESETTING OF DAMPER FUSIBLE LINK RETAINING ANGLES, SIZE AS RECOM- MENDED BY MFGR. 'i2F_EAMS7EAMER" INSTALLATION DETAIL. EXIST. BAR JOIST W/ DOUBLE -ROD BOT. CHORD VIF. MAX. JOIST SPACING = 6'--8" VIE STRAINER, FLUSH WITH FLOOR DRAIN SUPPORT STRAP I-OOR DRAIN DETAIL VACUUM BREAKER BY P.0 .—\ EXPANSION TANK AMTROL 3/4' GATE/BALL VALVE 1 BY P.C. (TYP.) CHECK VALVE INSULATE ALL isu p n4 IPI NG IN SPECIFICATIONS. 3/4'T 4 P RELIEF VALVE BY P.C. 3/4' RUN FULL SIZE TO MOP BASIN DRAIN VALVE BY IiII GENERAL PLYWOOD CCNTRA PLATFO ItTER NEATER MOUNTING DETAIL IN ACCESS PANEL BY GC O ?a-1411 3/4' O' MECHANICAL VAV, UNISTRUT P1000 CHANNEL UNDER UNIT EDGES W/ P1010 CHANNEL NUT ill V2" COPPER LINE OR TUBING REDUCER 3/8' COILED COPPER TUBING APPROXIMATELY SIX FEET BY MANUFACTURER. "x4 "x4' PLATE WASHER TYP. DOUBLE NUT AT T&B 1/2"0 A307 ROD TYP. AT (4) CORNERS STOMA CO ltdallala M -Retaf Engineering, Inc. 750 8roakaedge Blvd. Weetervlle, Ohio 43081 PHONE 614.818.2323 FAX 814.818.2337 WWW.M- OORPORATIONS.COM FINISHED FLOOR (SEE ARCHITECTURAL FOR FLOOR SLOPES) ADJUSTABLE DRAIN HEAD DRAIN BODY SECURE VAV SUSPENSION BRACKET TO UNISTRUT FRAMING ACCORDING TO MANUFACTURER RECOMMENDATIONS INSIDE CAULK PIPE A. FLOOR DRAIN COVER FLUSH WITH TILE OR FLUSH WITH CONCRETE FLOOR IN AREA WITH NO TILE. B. CONTRACTOR TO SNAKE DRAINS 2 DAYS PRIOR TO OPENING. ,- UNION BY P.C. (TYP.) WATER HEATER SEE PLUMBING FIXTURE SCHEDULE FOR ADDITIONAL INFO. 2' WIDE, 20 GA. SHEET METAL BAND, SECURE TO WALL FOR SEISMIC BRACING WHERE REQUIRED BY CODE. (BY P.C.) ALV. DRIP PAN BY P.G. 7(` RECEIVED CITY OF TUKWILA OCT 2 5 2007 PERMIT CENTER EPARATE 3/4' DRAINS TO TO MOP BASIN. 7 WATER SHUTOFF VALVE MUST I3E SECURELY MOUNTED IN AN EASILY ACCESSIBLE LOCATION WITHIN FIVE FEET OF THE LEFT SIDE OF THE MACHINE BALL TYPE SHUTOFF VALVE FLOW VALVE PER LOCAL PLUMBING CODE BY CONTRACTOR z� 1 W somminli J 0 w h O w (ICI 1 9 2007 LANDLORD DATE: 9-6-07 L.L.- LANDLORD DIRECTIVE REVISION DIREC 6301 F1TC1-1 PATH NEN ALBANY, 01-110 43064 614-283-6500 ISSUE DATE: 23", 1q no OR 11' 1 25 1/4', 21 1/4' 19 1/4' OR 13 1/4' c INSIDE DIMENSION ' e r MAIN DUCT ALL DUCT LINER TRANSVERSE EDGES TO BE COATED W/ ADHESIVE IN ACCORDANCE WV SMACNA STANDARDS (TIP.) BRANCH DUCT 70 S.A. MAIN SHT. MIL. ELBOW REQUIRED VOLUME DAMPER LOCATION WHERE DAMPER WOULD BE INACCESSIBLE AT TAKEOFF. PROVIDE W/3' EXTENDED SHAFT, HANDLE AND COLLAR: 3' -0' INSULATED FLEXIBLE CONNECTION. TRANSITION FROM DUCT SIZE TO DIFFUSER NECK SIZE AS NECESSARY. CLIPPED ON DIFFUSER RODS. SEE NOTE BELOW. SUPPLY AIR DIFFUSER WALL LINE PIPE JACKET 4 INSULATION POLYSULFIDE POLYSUL.FIDE '// / SEALANT SEALANT BALLEMEGRAMA FLOOR PEON IrE ENETRATION DETAIL DECK ABOVE HANGERS (MUST BE AT 6' BEFORE DROP) INSULATED ROUND DUCT CEILING WALL PROVIDE A 3/8' BALL VALVE 1/2" TYPE 'L' VENT PIPE DV TO 1' AFF ON WALL ADJACENT TO 1/2" WATER SUPPLY. TURN CUT TOWARD FLOOR DRAIN WATTS SERIES "Da" ASSEI012 STANDARD DOUBLE CHECK BACKFLOW PREVENTER ICAL DIFFUSER MOUNTING DETAI.: 0 I/2' TYPE 'L" WATER SUPPLY, CLAMP TO WALL AT TOP, MIDPOINT AND BOTTOM. PROVIDE 6' OF 3/8' BRAIDED COPPER TUBING AND CONNECT TO STEAMER BY MANUFACTURER- PIPE ANUFACTURER PIPE SLEEVE 3/4" THICK FIRESAFING INSULATION PIPE JACKET 4 INSULATI PIPE DREAM - STEAMER BY OWNER WT. 3503 FINISHED FLOOR ug2JAMSTEAMER" PIPING DETAIL rI.Arltxu -+ AIYI/ f I W JUIN OR DUCT CONNECTION AND RE- ENFORCEMENT IN ACCORDANCE W/ SMACNA 2' W.G. CLASS, SEAL NON - GASKETED TRANS- VERSE JOINTS IN ACCORDANCE W/ SMACNA CLASS 'c' MP.) 1 ACOUSTICAL LINING VOLUME DAMPER AS. INDICATED ON PLANS. PROVIDE WITH LOCKING QUADRANT 18' LONG ORANGE MARKER TAPE ATTACHED TO DAMPER TO IDENTIFY LOCATION SQUARE TO SQUARE DUCT TAKEOFF DETAIL SECURE VINYL FLDf DUCT TO SHT. MTL. W/ METHOD AND MATERIALS RECOMMENDED BY FLEX DUCT MFGR. AND PER CODE, STRAP CLAMP OVER FLEX DUCT INSULATION 4 VINYL TO SW. MTL. SECURE INSULATION TO DUCT TO FORM A GOOD SEAL. 8 LONG 514T. MTL. SECTION SECURED TO DIFFUSER COLLAR WV MIN. (3) SHT. MIL. SCREWS, MASTIC AND MATERIALS RECOMMENDED BY FLEX DUCT MFGR. AND PER CODE. FIRE DAMPER WHERE INDICATED ON PLANS. THERMAL INSULATING sLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. DRYWALL CIA STEEL MOUNTING FRAME REQUIRED FOR DRYWALL CEILING INSTALLATION. FLOOR SLAB 3/4' THICK FIRESAFING INSULATION PIPE SLEEVE TRANSVERSE EDGES TO BE COATED W/ ADHESIVE IN ACCORDANCE W/ SMACNA STANDARDS (TYP.) MAIN DUCT TAPE DOWN EXTERNAL INSULATION FASTEN W/ MIN. (3) SHT. MTL. SCREWS, SEAL W/ DUCT TAPE AND MASTIC ROUND RIGID DUCT 1 1/2' WRAPPED INSULATION TO R.A. MAIN INSULATED ROUND DUCT VOLUME DAMPER LOCATION WHERE DAMPER WOULD BE INACCESSIBLE AT TAKEOFF. PROVIDE W/ 3" EXTENDED SHAFT, HANDLE AND COLLAR. INSULATED FLEXIBLE CONNECTION. (MIN. 3 FT., MAX. 4 FT.) (MIN.) 1'-0 SHEET METAL PLENUM BOX. BALANCING DAMPER AT FACE SEE AIR DEVICE SCHED. FOR DAMPER TYPE. RETURN AIR REGISTER (LAY -IN FRAME) 3M FIRE BARRIER (CAULK CP -25 OR PUTTY 303),. 26 GAUGE MINIMUM GALVANIZED STEEL PLATE. SECURE TO FLOOR WITH STEEL MASONRY FASTENERS PIPE JACKET 4 INSULATION PIPE WALL Map,E TO ROUND OUND DUCT TAKEOFF DETAIL T.5. EALL_ERIELEATIOI DJD_ RETURN SYSTEM URN GRILLE MOUNTING DETAIL .-.•t -11--N .+'/Ill1 VIA ✓I.M1.1 CONNECTION AND RE- ENFORCEMENT IN ACCORDANCE W/ SMACNA 2' W.G. CLASS, SEAL NON- GASKETED TRANS - VERSE JOINTS IN ACCORDANCE W/ SMACNA CLASS "G" (TIP.) PIPE MINERAL WOOL BATT OR CERAMIC (ALUMINA SILICA) FIBER BLANKET WITH A REMOVABLE FORM FLOOR PENETRATIQI ,ifE RATED PENETTATION DETAIL FL FLOW 1' ACOUSTICAL LINING CONICAL OR BELL MOUTH SPIN - IN FITTING, SEAL AIRTIGHT W/ MASTIC VOLUME DAMPER AS INDICATE) ON PLANS. PROVIDE WITH LOCKING QUADRANT IS' LONG ORANGE MARKER TAPE ATTACHED TO DAMPER TO IDENTIFY LOCATION SHT. MTL ELBOW REQUIRED. SECURELY TAPE VINYL FLEX DUCT TO SETT. MTL. W/ MIN. OF (2) CONTINUOUS WRAPS OF DUCT TAPE. STRAP CLAMP OVER FLEX DUCT INSULATION 4 VINYL TO SHT. MTL. TAPE INSULATION TO DUCT TO FORM A GOOD SEAL. 8" LONG SHT. MTL. SECTION SECURED TO DIFFUSER COLLAR W/ MIN. (3) SHT. MTL. SCREWS, DUCT TAPE AND MASTIC. THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. DRYWALL CLG. STEEL MOUNTING FRAME REQUIRED FOR DRYWALL CEILING INSTALLATION SEE DETAIL "D' 17415 SHEET. FIRE DAMPER WHERE INDICATED ON PLANS. 26 GAUGE MINIMUM GALVANIZED STEEL PLATE. SECURE TO FLOOR WITH STEEL MASONRY FASTENERS. PIPE JACKET 4 INSULATION FLOOR 3M FIRE BARRIER (CAULK CP -25 OR PUTTY 303) . 1 . 141rAmEe k tuglylintr a i s izto l TAP INTO THE NEAREST AVAILABLE COLD WATER SOURCE (COLD WATER INPUT TO WATER HEATER, DRINKING FOUNTAIN, BATHROOM, ETC.) USING 1/2' COPPER LINE OR TUBING. THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A 1/2' THREADED BALL TYPE SHUT -OFF VALVE MOUNTED TO THE NALL IN AN EASILY ACCESSIBLE LOCATION. 72 INCHES OF STAINLESS STEEL. BRAIDED TUBING AND THE HARDWARE TO CONNECT TO A 3/8' BALL VALVE WILL BE INCLUDED WITH THE MACHINE. 114E DRAIN DOES Eta NEED TO BE CONNECTED. ALL CANADIAN AND CERTAIN U.S. LOCATIONS REQUIRE THE USE OF A BACKFLQW VALVE. CHECK YOUR LOCAL_ PLUMBING CODE. THE WATER LINE WILL NEED TO BE BLED AND FREE OF DEBRIS BEFORE IT 15 CONNECTED TO THE MACHINE, AFTER CONNECTING CLEAN INTERNAL STRAINER AND CYCLE WATER UNTILL STRAINER REMAINS CLEAR. THE WATER PRESSURE MUST NOT EXCEED 100 PSI. IF THE WATER PRESSURE I5 GREATER THAN 100 PEI THEN A EO PSI REGULATOR WILL NEED TO BE INSTALLED. IN WALL ACCESS PANES. BY GC 8 NON -SALES ti 'OREAMSTEAMER' INE 6 4r 48' PLAIT Vl111i JOIST/BEAM I /2' X 3/8" REDUCER FITTING 1/2 BACKFLOW PREVENTER VENT WALL 3/8' BRAIDED COPPER TUBING BY MANUFACTURER r. . OF OF DUCT OVER FLEX 4 VINYL TO E INSULATION TO ORM A GOOD SEAL. D SQUARE DUCTWORK FROM NECK UP TO BOTTOM OF DRYWALL DECK ABOVE AND CONNECT 8' ROUND DUCTWORK TO SIDE OF BOX. DRYWALL CEILING STEEL NT!NG FRAME REQUIRED FOR CEILING INSTALLATION ANA 3' 'S ' I US. ' MOUN IN r AI MAIN DUCT I TRANSVERSE EDGES TO BE COATED W/ ADHESIVE IN ACCORDANCE W/ SMACNA STANDARDS (m'•) FASTEN W/ MIN. (3) SHT. MTL. SCREWS, SEAL W/ DUCT TAPE AND MASTIC ROUND RIGID DUCT 1 I/2' WRAPPED INSULATION STUB SHEET METAL DUCT 6' UP SAME SIZE A5 NECK OF GRILLE. RETURN AIR REGISTER (LAY -IN FRAME FIRE DAMPER WHERE INDICATED ON PLANS. HIM ALL mom ARE 4-WAY SLOW IlUES NOTED =MIX DfRECIXNAL SLOW CONVERTRR3 LOLL EE PFEOVIDED lJr RC1115TER FOR DIFFUSERS THAT ARE --WAY, 2 -44AY OR 3-WAY MON AS MOWED CN PMIIIS BY SHADED AREA. ROUND TO ROUND NO -DUCT® RETURN 5Y5TEM *NGE 22 LINEAR REJUgN REGISTER MIN. CLEARANCE FOR ACCESS TO FAN 4 MOTOR mi 111•111I111111IIIU r � ALLOW 2' -O' MIN. CLEARANCE FOR CO ROL ACCESS F 4 x DIA. MIN. LENGTH FAN BALANCING TAP E3AGKD/RA/FT/ 777 PARTITION SECURE FLEXIBLE DUCT W/ DRAWBAND, SEAL CONN. AIR- TIGHT IN ACCORDANCE IV/ SMACNA STANDARDS. VAPOR BARRIER 4 INSULATION SHALL BE INSTALLED OVER CONN. 4 SECURED ICJ/ ADD'L. DRAW - BAND (TrP.) INSULATED LOW PRESSURE FLEXIBLE DUCT PRIMARY AIR FLO INSULATED LAW PRESSURE DUCT TRANSITION TO OVAL OR RECTANGULAR DUCT SAME SIZE AS VAV SOX CONNECTION SIZE ELECTRONIC CONTROL ENCLOSURE 1 w.wlw •vw .ar..nv -1 W wnj 1 Vr% 1 CONNECTION AND RE- ENFORCEMENT IN ACCORDANCE W/ SMACNA 2' W.G. CLASS, SEAL NON- GASKETED TRANS- VERSE JOINTS IN ACCORDANCE W/ SMACNA CLASS "C" (TYP.) -0 "M CONICAL, SADDLE OR TAP FITTING, SEAL AIRTIGHT W/ MASTIC AIR FLCH VOLUME DAMPER AS INDICATED ON PLANS. PROVIDE WITH LOCKING QUADRANT 15' LONG ORANGE MARKER TAPE ATTACHED TO DAMPER To IDENTIFY LOCATION THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. DRYWALL CLG. STEEL MOUNTING FRAME REQUIRED FOR DRYWALL CEILING INSTALLATION SEE DETAIL "D' THIS SHEET. FRONT OF STORE—P-- f BARREL VAULT CEILING N0TE1 ACROSS THE LENGTH OF THE LOUNGE 22 ROOM AS SHOWN ON PLANS. CORRUGATED METAL BARREL VAULT CEILING. REFER TO CE RCHITTEC D TUUR A AL PLANS FOR 2 1 -0 " AN POWERED PARALLEL VAV 80X DE1"AIL PLATE SAME GAUGE AS DUCT VANES PRE - ASSEMBLED ON RUNNER PLATES U5E GALVANIZED VANES FOR GALVANIZED OR ALUMINUM DUCTS OVER 36' IN LENGTH TO S.A. MAIN 3 -0' INSULATED FLEXIBLE CONNECTION SUPPLY AIR DIFFUSER (LAY -IN FRAME) BOTTOM OF DIFFUSER AT 7 AFF 52 WON WITH TYPE 'A' CABLE THICIVESS VMS 4ESSING ROOM SID'IALL DIFFUSER INDUCTION AIR FLOW MIN. SERVICE CLEARANCE SW' INDUCTION OPENING ELECTRIC HEATER CONTROLS PLATE SAME GAUGE AS DUCT VANES PRE - ASSEMBLED ON RUNNER PLATES USE GALVANIZED VANES FOR GALVANIZED OR ALUMINUM DUCTS R•2' OVER 36' IN LENGTH 32. BOON WITH SfHGLE VANES SECURELY TAPE VINYL DUCT TO SHT. MIL. (2) CONTINUOUS TAPE. STRAP C DUCT INSULA . DUCT T HARD DUCT TO SLIP INTO FLEXIBLE DUCT MINIMUM OF 6 ". CLAMP FLEX DUCT TO HARD DUCT. COVER R AW ENDS OF FLEX DUCT AND CLAMPS WITH DUCT TAPE TO CREATE AIR TIGHT SEAL. 3' -0' INSULATED FLEXIBLE CONNECTION 5" VALL DUCT KRUEGER 41910 - SOOT 48' LANG - INSULATED PLENUM THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. DISCHARGE M O P AIR FLOW I" LINED LOW PRESSURE DUCT, TRANSITION TO DUCT SIZE SHOWN ON DRAWING FLEXIBLE CONNECTOR MS IRAN Si" TURNING VANES LEJiG N INSTEAD DUCT SI1:E i t ATTACH DAMPER TO SLEEVE AS RECOM- MENDED BY MFGR. STEEL BLADES WITH INTERLOCKING JOINTS FUSIBLE FIRE LINK DUCT (TYP.) DUCT CONNECTION (TYP.) 25 1/4', 21 1/4' 19 1/4' OR 13 1/4" OUTSIDE DIMENSION 24 ", 20 ", 18' OR 12' _I NOTE= ROUGH IN OPENING SIZESI NOMINAL I2'x 12' • 12 1/2 "x 12 I /2' NOMINAL I8'x 18" • 18 I /2 "x 15 1/2' NOMINAL 20'x 20' • 20 1/2"x 20 1/2' NOMINAL 24'x 24" • 24 I/2'x 24 V2' NOMINAL 24'x 12' • 24 1/2"x 12 1/2" te plYWAU. MOUNTING FRAME DETAIL WALL E�TIGAL FIE PAMPER DETAIL r 3O AMP. INDIVIDUAL BRANCH CIRCUIT 30 AMP. 3 -POLE 4 -WIRE GROUNDING RECEPTACLE WITH NEUTRAL (NEMA U5 -30). SEE ELECTRICAL SHEET El FOR FURTHER INFORMATION. DRAIN (P0 NOT CONNECT) UNISTRUT P1000 BRACE, TYP. AT MID -POINT ALONG (2) PERPENDICULAR SIDES V SUSPENSION DETAIL UNISTRUT CUP ANGLE TYP. LE TO DAMPER FOR 1242 DIFFUSERS, MOUNT "YOUNG' DAMPER REGULATOR ON CHANNEL MOUNTING SCREW FIELD INSTALLED "C" CHANNEL REINFORCING BY G.C. AROUND OPENING DRYWALL CEILING TEEL MOUNTING FRAME BOLT TO SLEEVE (TIP.) MOUNT SLEEVE IN BLDG. CONSTRUCTION, SLEEVE TO BE OF GAUGE AS RECOM- MENDED BY MFGR. FoR U.L. APPROVAL AND CODE COM- PUANCE NOTE= PROVIDE ACCESS DOOR IN AN ACCESSIBLE LOCATION FOR RESETTING OF DAMPER FUSIBLE LINK RETAINING ANGLES, SIZE AS RECOM- MENDED BY MFGR. 'i2F_EAMS7EAMER" INSTALLATION DETAIL. EXIST. BAR JOIST W/ DOUBLE -ROD BOT. CHORD VIF. MAX. JOIST SPACING = 6'--8" VIE STRAINER, FLUSH WITH FLOOR DRAIN SUPPORT STRAP I-OOR DRAIN DETAIL VACUUM BREAKER BY P.0 .—\ EXPANSION TANK AMTROL 3/4' GATE/BALL VALVE 1 BY P.C. (TYP.) CHECK VALVE INSULATE ALL isu p n4 IPI NG IN SPECIFICATIONS. 3/4'T 4 P RELIEF VALVE BY P.C. 3/4' RUN FULL SIZE TO MOP BASIN DRAIN VALVE BY IiII GENERAL PLYWOOD CCNTRA PLATFO ItTER NEATER MOUNTING DETAIL IN ACCESS PANEL BY GC O ?a-1411 3/4' O' MECHANICAL VAV, UNISTRUT P1000 CHANNEL UNDER UNIT EDGES W/ P1010 CHANNEL NUT ill V2" COPPER LINE OR TUBING REDUCER 3/8' COILED COPPER TUBING APPROXIMATELY SIX FEET BY MANUFACTURER. "x4 "x4' PLATE WASHER TYP. DOUBLE NUT AT T&B 1/2"0 A307 ROD TYP. AT (4) CORNERS STOMA CO ltdallala M -Retaf Engineering, Inc. 750 8roakaedge Blvd. Weetervlle, Ohio 43081 PHONE 614.818.2323 FAX 814.818.2337 WWW.M- OORPORATIONS.COM FINISHED FLOOR (SEE ARCHITECTURAL FOR FLOOR SLOPES) ADJUSTABLE DRAIN HEAD DRAIN BODY SECURE VAV SUSPENSION BRACKET TO UNISTRUT FRAMING ACCORDING TO MANUFACTURER RECOMMENDATIONS INSIDE CAULK PIPE A. FLOOR DRAIN COVER FLUSH WITH TILE OR FLUSH WITH CONCRETE FLOOR IN AREA WITH NO TILE. B. CONTRACTOR TO SNAKE DRAINS 2 DAYS PRIOR TO OPENING. ,- UNION BY P.C. (TYP.) WATER HEATER SEE PLUMBING FIXTURE SCHEDULE FOR ADDITIONAL INFO. 2' WIDE, 20 GA. SHEET METAL BAND, SECURE TO WALL FOR SEISMIC BRACING WHERE REQUIRED BY CODE. (BY P.C.) ALV. DRIP PAN BY P.G. 7(` RECEIVED CITY OF TUKWILA OCT 2 5 2007 PERMIT CENTER EPARATE 3/4' DRAINS TO TO MOP BASIN. 7 WATER SHUTOFF VALVE MUST I3E SECURELY MOUNTED IN AN EASILY ACCESSIBLE LOCATION WITHIN FIVE FEET OF THE LEFT SIDE OF THE MACHINE BALL TYPE SHUTOFF VALVE FLOW VALVE PER LOCAL PLUMBING CODE BY CONTRACTOR z� 1 W somminli J 0 w h O w (ICI 1 9 2007 LANDLORD DATE: 9-6-07 L.L.- LANDLORD DIRECTIVE REVISION DIREC 6301 F1TC1-1 PATH NEN ALBANY, 01-110 43064 614-283-6500 ISSUE DATE: 1 / l I 1 1 1 A V. : E ra s GV S / R4.4 r_ , OM ; ° tip /) 1 r, - _,-. 0710115 SHEET M5.1 I a L SHEETROCK WALL 00t1 TEMPEI Corn 1 or 2 - From EMSP or from The Previous Unit aV WIRING DIAGRAM 1/2' EMT AND FITTING 7 " 4- 5 Com 1 or 2 - To the Next Unit -S To Flow Pick -ups Sensor FErINI Air Flow Direction 15/2 CL2P IB/4 CL2P 1/4 Poly Tubing 18/2 CL2P to 1-iVAC Con pAT SENSOR MOUNTING DETAIL 18/2 CL2P to HVAC Control Module 1/2' Plastic Bushing 1/2" EMT AND FITTING — DISCHARGE AIR TEMP. MOUNTING. DETAIL MODULE DIRECTLY ON DUCTWORK USING WAFER TEX SCREWS WITHIN 2' - 3' AWAY FROM ZONE DAMPER. 24 VAC FROM EMSP COM i OR 2 - FROM EMSP OR FROM THE PREVIOUS Jit E DAMPER WIRING DIAGRAM CONTROL MODULE ZONE DAMPER SHAFT COM 1 OR 2 - TO THE NEXT UNIT 1 J41'IJVI�J MSC. 1 IwI 1 w M r 1 Atoll Inc nfV1.7Vt L' rt.Looc TOTHF CENTER OF THE SENSORS. RH SENSOR (REAR OF SALES FLOOR) 12 AWG 18/2 CL2P 18/4 CL2P CURRENT SWITCH (SENSORMATIC SYSTEM STATUS) 5P WIRING DIAGRAM I8/2 CL2P CABLE TO EMS MODULE OR PANEL I/2" EMT t 2X4 BOX red bik �C BASE COVER SENSOR NOUN 1 CEILING NOTES: E'15 CAM CABLE RISER WILL DEPEND ON LOCATION OF THE I-1VAC EQUIPMENT OF EACH STORE. CAM 1 - HVAC CONTROL MODULE PLENUM SENSOR • POWER BREAKER PANEL: 15 M 1 rm.= 1 Iwl' 1 cv M r 1 r1G A i r'L .Q TO THE CENTER OF THE SENSORS. r y I H EMSP Q, SHE ASiC OAP • LIGHT CONTACTORS PANEL /2" EMT end Fitting 18/4 CL2P CABLE TO EMS MODULE OR PANEL 1/2' EMT t 2X4 BOX BASE COVER QU CEILING RH SENSOR (FRONT OF SALES FLOOR) NOTES: ALL ROOM SENSORS ARE MOUNTED 4 FT FROM THE FINISHED FLOOR TO THE CENTER OF THE SENSORS. SHEETROCK HALL IL 18/2 CL2P CABLE TO EMS MODULE OR PANEL 1/2' EMT 4 2X4 BOX BASS COVER SO 1 CEILING 3-3/4" Y 1/2 HOLE IN NORTH FACING SIDE- ' ASSIGNED RTU ON THE ROOF OA DUCTWORK WHERE RTU ABLE ON THE ROOF. 5T1C BUSHING OAP (W I5 MOU U5INt1 RTU SHEET METAL OA DUCTWORK ES: FLCH SENSOR MUST SE MOUNTED CN THE TOP PART OF THE 114E PIPE. iJ 5' OF THE UNIT. TO FLOW PANEL fl W PIPE ON SENSOR MOUNTIN 18/2 CL2P CABLE TO EMS MODULE OR PANEL II i COVER 12AWG THHN TO EMSP ROOF 1/2 EMT 4 2X4 SOX _.,. ROOFING RAFTER U red bjk SENSQRMATIC STATUS— CURRENT DUCTWORK BASE 120V SUPPLIED FROM BREAKER PANEL TO SENSORMATIC SYSTEM C14 MOUNTING DETAIL N • s f 18/2 CL2P 18/4 CL2P D OF OR INS 15 NOT 18/4 CL2P TO EMSP 1/2' FAN STATUS —CU A. Control System 18/2 CL2P TO HVAC MODEL B. Scheduling and Coordination CONTACTOR CURRENT SWITCH � 0 0 SWI MOUNTIN The following shall be scheduled and coordinated with SIG: • Control System Delivery Date • Mid - Construction Walk -Thru • Mechanical Equipment Start -up • Control System Start-up and Commissioning. W L2 L3 W L2 L3 00 LOAD AI The Mechanical Contractor shall install a complete control system to automatically control the heating, ventilation and air conditioning equipment as specified herein and as shown on the bid set drawing. Hollister shall provide to the Mechanical Contractor all control equipment necessary to perform the sequences of operation, except as specifically noted otherwise. System to be UL listed as a whole. Control System to be as supplied by Systems Integration Group (SIG). Lighting controls will consist of three (3) zones. Zone "A" is for storefront and signage. Zone "B" is for stocking and Zone "C" is for sales area. All zones shall have override buttons mounted on the front of the EMS Panel. Control relays to be factory mounted inside the EMS Panel and are to be hard wired to a terminal block. Feld wiring from the EMS Panel to the light fixture contactors to be by the Electrical Contractor. Terminal block to be labeled with connection points indicated on SIG provided diagram. For questions, concerns or coordination needs in regards to the Control System, call SIG at (770) 427 -7443, Control System Delivery Date The Control System material will be delivered on site during the third week after construction start. Material supplied will include control panels, sensors, low voltage cables and fully engineered control system installation drawings. Dampers, valves and VAV boxes are supplied by others. Mid - Construction Walk Thru The Mid - Construction Walk -Thru shall be conducted after the mechanical equipment has been set. The General Contractor is responsible for contacting SIG one (1) week in advance to schedule walk -thru inspection of mechanical equipment installation. Mechanical Equipment Start-up The Mechanical Equipment Start -up shall be conducted after the mechanical equipment has been piped and wired. The General Contractor is responsible for contacting SIG one (1) week in advance to schedule start -up of mechanical equipment. A Start -Up Readiness form is included with the engineered drawings. This farm must be completed and faxed to SIG at (770) 427 -7576 prior to final scheduling of mechanical equipment start -up. Control System Start -Up and Commissioning Start -up and commissioning of the control system typically takes place one week prior to the project punch date. The General Contractor is responsible for contacting SIG at least three (3) weeks prior to anticipated control system start -up date. The General Contractor is responsible for verifying project readiness. A Start -Up Checklist form is included with the engineered drawings. This form must be completed and faxed to SIG at (770) 427 -7576 prior to final scheduling of start -up. The General Contractor will ensure that representatives of both the Mechanical Contractor and Electrical Contractor are onsite during control system start -up and commissioning to address any issues that may arise with installation or equipment. Late Trips and Return Trips It is critical that the control system start-up and commissioning be scheduled well in advance and that the project is completely ready for commissioning when SIG arrives on site. Late scheduling of start-up and commissioning may result in the Mechanical and Electrical Contractors returning to the site for commissioning at their own expense. If the project is not ready for the controls start -up and commissioning when scheduled, and SIG is required to make a return trip to complete the start -up, the General Contractor will be responsible for issuing a purchase order to SIG for the standard return trip charge of two thousand two hundred dollars ($2,200). C. Contractor Scopes of Work Mechanical Contractor Furnish and install all motor operated control valves. Furnish and install all outside air, return air and minimum outside air dampers. Install the following equipment supplied by SIG - Damper actuators, VAV box controllers, strap -on temperature sensors, water flow sensors and discharge air temperature sensors. RTU and AHU discharge air temperature sensors are to be mounted inside the unit, within 12 inches of final coil discharge. VAV discharge air temperature sensors are to be mounted in the duct work downstream of the VAV box, within 2 feet of control damper. Failure to mention any specific item or device does not relieve the Mechanical Contractor of the responsibility for installing or providing such devices or items in order to achieve the intent of the drawings and specifications. Electrical Contractor The Electrical Contractor shall furnish, install and terminate all line voltage wiring. Fumish and install all equipment starters, disconnects and conduit. Furnish and install weatherproof disconnects for all Rooftop Units (RTU's). Rough -in all room sensors and plenum air sensor. Install the following equipment supplied by SIG - central Energy Management System Panel (EMSP), Water Flow Transmitter Panels (WFTP's), Rooftop Unit Control Panels (RTP's), Air Handling Unit Control Panels (AHU's). VAV Boxes with heat will be provided with all required relays, contactors and disconnect switches, E.C. will have a single point connection. All wiring and equipment shall be installed in accordance with latest edition of the national electrical codes. Systems Integration Group (SIG) SIG shall furnish all panels, sensors, current switches and low- voltage cable as shown in the drawings for a fully operational control system. SIG shall mount all room sensors and the plenum air sensor. SIG shall install all fan status current switches and Sensormatic power status current switch. SIG shall perform final termination of all low voltage wiring for the control system. SIG shall perform final control system programming and start -up. Fully engineered wiring and installation instructions for all control system equipment shall be provided by SIG with as part of the control system delivery. All control wiring diagrams will be specific to equipment controlled and must remain with record drawings at completion of project. D. Installation Standards Device Mounting Panels larger than 12 "x12" shall be mounted with Uni -Stmt or mounted on plywood backboards. All panels and devices smaller than 12 "x12" shall be mounted with the appropriate type fasteners, one (1) fastener per mounting hole. Do not skip holes, i.e. if a panel has four (4) mounting holes, do not use only two (2) holes diagonally. Toggle bolts of the appropriate size shall be used for mounting panels or unistrut to sheetrock and hollow block walls. 114 wedge anchors shall be used for mounting panels or unistrut to concrete walls and floors. E -Z anchor fasteners shall be used for mounting sensors and conduit straps on sheetrock walls. Use E -Z Anchor fasteners for mounting sensors and conduit straps on sheetrock walls. Use plastic anchors for mounting sensors, .l- boxes, and conduit straps on block or concrete walls. All mountings of panels and devices will be checked and level. Wiring and Cable Installation The following wire types and colors will be used specified: • Red - 18awg THHN: 12 VDC+ • Org - 18awg THHN: 24 Vac hot • Yel -18awg THHN: All low voltage status • Mk - 18awg THHN: 12 Vdo - • Wht - 18awg THHN: 24 Vac common • Grn - any awg THHN: Earth ground • Blk - 12awg THHN: 120 Vac hot, supply circuits • Red - 12awg THHN: 120 Vac hot, control circuits and statuses • Wht - 12awg THHN: 120 Vac neutral circuits All cables will be pulled continuously from one panel to another. No junction boxes should be mounted in ceilings. All wiring done within a control panel will be wired, tied, and separated by class type. Whenever it is necessary to extend the control wire circuits, new wire of the appropriate length will be installed. Avoid the use of Butt splices and wire nuts to lengthen the control wire. All cables within panels and wall penetrations shall be run in EMT. All cables which are exposed to physical damage will also be in conduit. All cable that is required to pass through a high voltage HVAC compartment will be installed in a suitable conduit to provide for separation of the 300 volt cable from high voltages Install all components and route cables through joists back to temperature control panel. Cables must be run individually and installed with 6 inch separation with supports every 6 feet. Do not run cables parallel to line voltage conduit nor lay cables on ceiling (Mechanical Contractor must install EMSP cables in conduit provided and installed by Electrical Contractor. Coordinate final destination locations with Electrical Contractor.) Conduit Installation All penetration in walls will be made with the appropriate size drill bit or hole saw. The wall penetration will be sleeved with conduit and sealed for both fire rating and weather seals. All conduit work will be installed level and with respect to 90 degree angles. When more than three conduits enter a panel at the top, then Uni -Strut will be used to support the conduit. All conduit entering a panel will have uniform offsets, angles and spacing. Conduit installed in ceilings and on bar joists will be supported with beam clamps and minerlac straps as required. Wire ties or hanger wire is not acceptable. Flexible metallic conduit or seal tight will be used for vibration isolation when installing conduit on or in machines that have springs isolators or flexible transitions. Flex will be limited to 18° in length and will not be used as a primary raceway. LB or LL conduit bodies will be used for going around corners and/or wall penetration which change direction. As a minimum, conduit will be strapped and/or supported per the NEC. in addition to the NEC requirements, additional straps may need to be added so that there is a strap 8° from every box connector and 8" from every coupling. Any damage done to walls and futures will be fixed and cleaned completely as each area of installation is finished. E. Warranty The Mechanical and Electrical Contractors are responsible for the proper installation of the ALC -SIG controls and accessories in accordance with these drawings and the installation instructions included with the controls package. Warranty beyond the installation is by Hollister Co. SIG warrants all control equipment provided by Hollister to be free from defects in workmanship and material under normal use and service for a period of one year after completion of start -up. SIG and Hollister will provide a separate service warrantee for control equipment for a period of one year after controls have been commissioned. Systems Integration Group FIELD VERIFY ALL CONTROLS REQUIREMENTS WITH LANDLORD'S FIELD REPRESENTATIVE. ALL CONTROLS TO BE COMPATIBLE WITH LANDLORD BUILDING MANAGEMENT SYSTEM (HONEYWELL). TENANT TEMPERATURE /LIGHTING CONTROL PANEL SHALL BE FOR MONITORING PURPOSES ONLY. ALL UNIT CONTROLS TO BE COMPATIBLE WITH LANDLORD SYSTEMS AND SHALL BE FIELD VERIFIED PRIO TO BID. 140 RECEIVED CITY OF TUKWILA . OCT 2 5 2007 PERMIT CENTER 1800 Sandy Plains Ind. Play., Suite 216 Walla, Georgia 30066 Ph: (770) 427-7443 r p11w1. on Draw °. M•R•tai Englneering, Inc. '�� 4O1 PHONE 814.818.2323 FAX 614.818.2337 WWW.AI- coRPORAitONS.coM OCT 1 9 2007 AIR BALANCE REVIEW CI- IECKLIST PROJECT INFORMATION DIVI5ION: CENTER: NOBS: CONTRACTOR= DATE: FAX R : 'A COPY OF 11415 CHECKLIST MUST BE COMPLETED AND INCLUDED WITH BALANCE REPORT' SYSTEMS TO CHECK SYSTEM INDEX ACCEPTABLE (CHECK) ❑ NOT ACCEPTABLE (X) ❑ CHECK ALL THAT APPLY'S (SEE SYSTEM INDEX) 2. WATER SOURCE HEAT PUMPS 3. ROOFTOP UNIT 4. SPLIT DX OR BUILT -UP CW 5. FAN FOR CEILING F -I OR ETC. G. ELECTRIC BASEBOARD/UNIT HEATER UA UA UNACCEPTABLE FAN, EF-I ❑ ❑ �3 ❑4 ❑ ❑ 5 6 7 0 ❑ 0 ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Li ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 0 0 ❑0 ❑ ❑00 0 000❑❑ 00000 0 0 0 0 00000 0 0 0 0 0 ❑❑ 0 LICENSED CONTRRAACTOR INDEPENDENT IL EENSS AND SIGNATURE CONFORMANCE CERTIFICATE / PERFORMANCE GUARANTY REGISTERED WITH NATIONAL HEADQUARTERS - EQUIPMENT LIST AND CALIBRATION; DATE (WITHIN 6 MONTH OF TEST) MAKE AND MODEL. It OF EACMFPIECE OF EQUIPMENT TESTED - . ': , P10 NAMEPLATE DATA - , '._ - -' MANUFACTURER OF MOTOR; { MOTOR 14P/544P S UNIT VOLTAGE E'' ' A /U1f 1 I .L. MOTOR AMPERAGE (AMPS) KILOWATTS (KW) HEAT .-• - TT v MOTOR RPM T, SERVICE FACTOR (SF) SHEAVE SIZE/BORE SIZE - - - -.. -. .. NUM>3ER AND SIZE OF BELTS UNIT FIELD MEASUREMENTS FIELD VOLTAGE WITH EACH PHASE FOR 3-PHASE MOTORS AMP DRAW EACH PHASE FOR 3 -PHASE MOTORS KILOWATTS (ELECTRIC HEATER ONLY) FAN RPM EXTERNAL STATIC PRESSURE - INLET SIDE DCTERNAL STATIC PRESSURE - DISCHARGE SIDE WATER GPM CONDENSER/CHILLED/HEATING SUPPLY WATER TEMPERATURE CONDENSER/CHILLED/HEATING RETURN WATER TEMPERATURE CONDENSER/CHILLEP/MEATING DESIGN AND ACTUAL GEM'S (WI !N 5% OF DESI A5 FOLLOW • 0 ❑ ❑ ❑ ❑ ❑ ❑ 0 ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ AT EACH SUPPLY DIFFUSER AT EACH RETURN AIR GRILLE FOR DUCTED RETURN TOTAL SUPPLY BY DUCT TRAVERSES TOTAL RETURN/RELIEF BY DUCT TRAVERSES TOTAL OUTSIDE AIR AND METHOD OF TESTING O.A. AMOUNT PLAN INDECING EACH DIFFUSER AND GRILLE TESTED VERIFICATION OFQpERATIONAL STATUS SPACE TEMPERATURE AND SET POINT AFTER BALANCE SUPPLY TEMPERATURES (AT 100% COOLING 11 100% HEATING) OUTSIDE DIE/103 READING AT TIME OF BALANCE ECONOMIZER SETTING (A/B /C/D) IN ROOFTOP UNITS ADJ. 4 VERIFY ECONOMIZER EXHAUST FAN GOES ON AT 60X O.A. MAXIMUM CFM RELIEF WITH ECONOMIZER AT 100% OA. UNIT HEATER OPERATIONAL STATUS AND SET POINT TEST OF SUPPLY AIR FAN SHUTDOWN IN ALARM SEQUENCE TEST OF SMOKE EXHAUST FAN IN ALARM SEQUENCE ❑ COLUMN H EADED "U SS ' MITTED GE 114 AND ABOVE RET'1A LOCATION RA 8E_E7N REJECTED. NOTE CHECKS IN ❑ THE A/5/ REPORT SUBMITTED FOR 111E ABOVE LOCATION 15 APPROVED. APPROVED BY DATE: REMARKS: 4 ilisli• ty &. ri►w REV 1/97 L DIVISION 15 - MECI.- IANICAL - SECTION 15000 BASIC MECHANICAL REQUIREMENTS A. NOTE: I. ANY REFERENCE TO TENANT'S OR HOLLISTER CO. CONSTRUCTION MANAGER OR FURNISHED BY ANY OF THE ABCNE REFERS TO HOLLISTER CO. 2. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO 1141S AND THE OTHER SECTIONS OF DIVISION 15: 3. THE CONTRACTOR FOR THIS DIVISION OF WORK 15 REQUIRED TO READ THE SPECIFICATIONS AND REVII34 DRAWINGS FOR ALL DIVISIONS OF WORK AND I5 RESPONSIBLE FOR THE COORDINATION OF HIS WORK AND THE WORK Of HIS SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT 15 T4I5 `CONTRACTORS RESPONSIBILITY TO PROVIDE HIS SUBCONTRACTORS WITH A COMPLETE SET Of BID DOCUMENTS. 4. 1415 CONTRACTOR IS RESPONSIBLE FOR 5G- IEDULING THE COMPLETION AND INSPECTION OF HIS WORK MD THE WORK OF HIS SUB- CONTRACTORS WORK TO COMPLY WITH 711E 140U -ISTER CO. SCHEDULE AND THE PROJECT ' COMPLETION DATE. 5. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DE} ERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS SHALL 55 DROUGHT TO HOLLISTER'S ATTENTION, THERE ARE NO SUBSTITUTIONS. SUBMITTAL OF 51D SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND MY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF WORK 6. REFER TO RESPONSIBILITY SCI- IEDULE ON THE MECHANICAL DRAWINGS FOR INFORMATION IN REGARD TO RE5PONSIBILr1T OF WORK OR ITEMS WHICH MAY AFFECT BID. 8. GENERAL REQUIREMENTS 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN 714E SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOt SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR HOLLISTER CO. SHALL .BE PROVIDED BY THE MECHANICAL,• CONTRACTOR 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED AND INSTALLED EVEN TMOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH 15 NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN 114E SPECIFICATIONS, BUT WHICH 15 OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF CONTRACT. 3. WHERE 114E DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR I5 RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM W1114 THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED'OTHERWISE. 4. ALL MECHANICAL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. 11415 CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. 5, ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD ENGINEERING PRACTICES. 6. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW, UNDERWRITERS LABORATORIES LISTED AND LABELED AND SIZEE7,IN CONFORMITY WITH REQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER I5 MORE STRINGENT. C. CODES 1. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, 114E 5TATE'5, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFFA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THIS CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS '• CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN 114E SID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED BY HOLLISTER CO. TO THE CONTRACTOR. D. LICINSS, PERMITS, INSPECTIONS it FEES 1. 11415 CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO 1415 WORK.. 2. FURNISH TO THE HOLLISTER CO.'5 CONSTRUCTION MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT. E. TRADE NAMES, MANUFACTURERS AND S1-10P •DRAWINGS I. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS oR IN THE 5PECIFICATIC145, 114E Wm EQUIPMENT SHALL SE USED. THE USE OF ANY UNAUTI40RIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 2. GENERAL CONTRACTOR SHALL SUBMIT ONLY SUBSTTMION REQUESTS TO IOLLISTER co. CONSTRUCTION MANAGER FOR APPROVAL. SUBMISSIONS SHALL BE MADE EARLY ENOUGH 114 PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR HOLLISTER'S CONSTRUCTION MANAGER'S REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JO5'5 PROGRESS. SUBMITTALS SHALL SEAR 114E STAMP OF 114E GENERAL CONTRACTOR AND THE 5118- CONTRACTOR SHOWING THAT 14E 14A5 REVIEWED AND CONFIRMED THAT THE 'SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE 5E.EN TAKEN. F. GUARANTEE I. THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM TIE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY HOLLISTER CO.'S CONSTRUCTION MANAGER. EXTENDED WARRANTIES ARE AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. . 2. HOLLISTER CO. SHALL PROVIDE A COMPLETE 12 MONTH WARRANTY FOR ALL PARTS ON EQUIPMENT PROVIDED BY 14OLLISTER CO., INC. AND I4OLLISTER CO. VENDORS. 11419 CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM, AND AS SUCH, NO ADDITIONAL MONEYS SHOULD BE INCLUDED IN 114E BID. G. RECORD DRAWINGS 1. T14I5 CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS ON 111E -105 SITE TO RECORD DEVIATION5 FROM CONTRACT DRAWINGS, SUCH AS: A. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. C. SIGNIFICANT ADDENDUM, EVIA DEVIATIONS MADE E ESSAARRYY ORDERS. HELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER TRADES. 2. AT COMPLETION OF 1 PROJECT AND BEFORE FINAL APPROVAL, THE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACM PRINT BY SIGNATURE THEREON. ONE COPY OF THE MOST RECENT SET OF DRAWINGS W1T4 TEMPERATURE CONTROL DRAWINGS INCLUDED SHALL BE STAMPE37 '1)0 NOT REMOVE' AND SHALL BE PLACED IN A DRAWING 1116E LOCATED NEXT TO THE ELECTRICAL PANEL. SEE ARCHITECTURAL DRAWINGS FOR EXACT TUBE LOCATION. I-I. DISCREPANCIES IN DOCUMENTS 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF 114E MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE GENERAL CONTRACTOR IN WRITING, PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR 15 RESPONSIBLE TO ADVISE HOLLISTER CO.'S CONSTRUCTION MANAGER, IN WRITING, OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, 14OLLISTER CO. CONSTRUCTION MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL-BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. EQUIREMENTS ( NOT APPLICABLE THIS CONTRACT•' • INCLUDE IN WS BID • ARY SERVICE REQUIRED TO KEEP THE OP go- •.- • - •' 111E STORE'S I -IVAC, PLUMBING AND SPRINKLER SERVICE 1 ■•' E'+- 10 . ■r -CTOR MUST SCHEDULE IN WRITING WITH •• a 5 CONSTRUCTION MANAGg 111E LANDLORD ONE WEEK 27.1' O ANY SHUT DOWN OF THE HVAC, PLUMBING f• ECTION SYSTEMS. .. a� 2 t •• w - •' r • DEMOLITION ( NOT APPLICABLE ) CONTRACTOR SHALL BE RESPONSIBLE FOR THE OD ORDINATION t. E D • ION OF EXISTING WORK AND 714E DEMOLITION PROVIDED 8 E GENERAL • - - OR. COORDINATE 141114 THE GENERAL • -.-CTOR ANY EXISTING •'► - MENT REQUIRED To BE LEFT INTACT. 2. 11415 CONTRACT THE REMOVAL OF PIPING, HVAC UNITS, R ASSOCIATED ROOF CURBS SPECIFICALLY NOTED OTHERWI LANDLORD ALL PRESUMED ABA EQUIPMENT PRIOR TO REMOVAL. ROOF PATCMED. ALL NOT APPLICABLE TO THE ROOF/WALL/FLOOR PAT EXISTING ABANDON EMBEDDED IN AND SEALED TO BE ABAN OR PONSIBLE FOR, MBING FIXTURES, UST FANS, ETC. AND ON 11415 PROJECT UNLESS OR MUST VERIFr WITH THE IPMENT, PIPES, DUCTWORK, AND SHALL BE REMOVED AND 111E THE SPACE OR ON 114E ROOF WORK MUST REMOVED MD /REPAIRED TO MAT •- EXISTING STRUCTURE. 11E FLOOR, TO BE CUT OFF THEY ARE NOT CODES, OF I UDE IN SHALL INCLUDE, AND WILL BE HELD EXISTING FIRE PROTECTION, IGERANT RECAPTURE TO BE REU5 PES, DUCTS, OR EQUIPM OR OTHERWISE INACCESSIB OR 1 1.41THIN FLOOR OR WALL LEVEL IN 11415 PROJECT. IF REQUIRED BY LAND ED PIPING AND /OR DUCTWORK MUST 5! REVVED TO CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID AND PROPOSAL. K. SLEEVES I. 11115 CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT CR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH 11 RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLU514 W1114 EACH SURFACE EXCEPT SLEEVES THAT PENETRATE 114E FLOOR, WHICH SHALL EXTEND 2' ABOVE 114E FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND /OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV' FOAM, "3M' FIRE RATED SEALANTS OR EQUAL, 50 AS TO RETAIN THEIR FIRE RATING. 3• SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WIN SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. V U.S.G. GALVANIZED STEEL MINIMUM. L. I- {ANGERS I. HANGERS STALI.INCLUDE ALL MISCELLANEOUS STEEL SUCH A5 ANGLE IRON, BANDS, C-- CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOD' TO FINNS. HANGING FROM METAL DECK 15 NOT PERMITTED. HANGERS MUST 5! ATTACHED To UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SMALL 8E LOCATED WHERE THEY CO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO SUBJECT TO LANDLORD CRITERIA 3. HANGERS FOR ALL INSULATED PIPING SHALL 5! SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN 111E HANGER AND THE PIPE INSULATION. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI- ELECTRICALLY SEPARATED. M. FINAL I-IVAC INSPECTIONS I. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, HOLLISTER SHALL HAVE AN INDEPENDENT MVAC CONTRACTOR INSPECT THE FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS AND CODES. THE INSTALLNG CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT I4VAC CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS. END OF SECTION 15000 DIVISION 15 - MECI- IANICAL SECTION 15200 PLUMBING A. SCOPE OF WORK I. THI5 CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL WORK FOR THE PLUMBING SYSTEMS AS 51014N ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: A. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS. B. COMPLETE COLD AND 1-IOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION. FIXTURES AND EQUIPMENT AS SCHEDULED. COMPLETE NATURAL GAS PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS E. CONDENSATE PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS). F. TESTS AND ADJUSTMENTS. 2. BEFORE STARTING WORK, 11415 CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF 111E PLUMBING SYSTEM, MATERIALS, AND EQUIPMENT 141114 OTHER CONTRACTOR5 TO AVOID INTERFERENCES AND CONFRONTATIONS. 3. RELOCATION OF EXISTING HATER, GAS, WASTE, VENT, OR DRAINAGE LINES TO FACILITATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL.. B. EQUIPMENT AND INSTALLATION c. D. I. REFER TO PLANS FOR SCHEDULES OF EQUIPMENT AND FIXTURES. AMERICAN STANDARD, KOTLER AND CRANE ARE CONSIDERED ACCEPTABLE AS EQUALS. 2. SANITARY PIPING: A. WASTE, DRAIN AND VENT PIPING 514ALL BE' SERVICE WEIGHT CAST IRON SOIL PIPE, IF REQUIRED BY LOCAL CODE OR MALL, VENT PIPING ABOVE 2. FLOOR 2' OR SMALLER MAY 5! GALVANIZED STEEL. ALTERNATE PIPING MATERIALS ARE ACCEPTABLE AS A SUBSTITUTION WHEN THEIR USE IS PERMITTED BY THE LANDLORD, LOCAL CODES AND BUILDING DEPARTMENT OFFICIALS AND DOES NOT AFFECT OTHER TRADES. SUBSTITUTIONS MUST BE LISTED AND QUALIFIED IN BID. B. INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES OF TENANTS IN SPACES BELOW, WHEN APPLICABLE. INSULATION TO 5E AS SPECIFIED FOR WATER PIPING. C. CONDENSATE PIPING SHALL 8E TYPE 'L' DRAWN COPPER TUBE W1114 15 -5 TIN - ANTIMONY SOLDERED JOINTS AND WROUGHT COPPER FITTINGS WITH DIELECTRIC SEPARATION BETWEEN DISSIMILAR METALS. PVC MAY BE SUBSTITUTED IF LOCAL CODE PERMITS. 3. POTABLE WATER PIPING SHALL BE 45 FOLLOWS: A. BELOW GRADE: TYPE 'K', ANNEALED TYPE TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES AND SMALLER. BRAZE ALL JOINTS. B- ALL OTHER: TYPE 'L' DRAWN COPPER TUBE W17M WROUGHT COPPER FITTINGS AND q5-5 TIN - ANTIMONY SOLDER. 4. PIPING OF DISSIMILAR METALS MUST BE DI- ELECTRICALLY SEPARATED. 5. GENERALLY, SANITARY AND POTABLE WATER TAPS WILL BE PROVIDED BY THE LANDLORD. FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO SUBMITTING BID AND NOTIFY HOLLISTER'S CONSTRUCTION MANAGER IF CONDITIONS ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN 111E SPECIFICATIONS. CONTRACTOR MUST VERIFY' THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE IN AS FOLLOWS: A. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE. 5. TEST WATER PRESSURE TO INSURE MINIMUM P51 MATCHES MOST DE1A1vDING EQUIPMENT SUPPLIED. 6. INSULATE ALL HOT WATER, COLD WATER AND CONDENSATE PIPING 141114 THICK (K -0.23 P 75 'F) PIPE INSULATION WITH AN ALL SERVICE JACKET TO MEET LOCAL CODES AND UL. FLAME SPREAD AND SMOKE DEVELOPED RATINGS. 7. INSULA THE TRA SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH ARMSTR 'ARrAFLEX' PIPING INSULATION OR TRUEBRO MODEL 10214 'HANDI LAV GUARD' INSULATION K11. 8. INSTALL ALL NECESSARY PIPE MANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED BY CODES. 1. STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES. 10. CLEANOUTS AND FLOOR DRAINS STALL BE INSTALLED PER LOCAL CODES. HALL COVERS ARE TO BE STAINLESS STEEL AND FLOOR COVERS ARE TO 8E BRASS. 11. E5CUTCMEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT ALL PIPE PENETRATIONS AT WALLS, FLOORS, AND CEILINGS IN FINISHED AREAS. 12. LEAKAGE TESTS SHALL BE PER LOCAL CODES, MINIMUM AS FOLLOWS: A. TEST WATER PIPING AT 100 PSIG FOR SIX 14OURS. 8. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS. 13. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE LANDLORD'S CRITERIA USE A LANDLORD • APPROVED ROOFING CONTRACTOR WHERE APPLICABLE. 14. PROVIDE MATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL UTILITIES REQUIREMENTS IF APPLICABLE. REFER TO PLANS TO DETERMINE IF WATER METER 15 REQUIRED. FIXTURES IN PIPE SLEEVES SHALL BE FLUSHED INTO WATERPROOF MEMBRANE AND PIPE SLEEVES SHALL EXTEND A MINIMUM OF 4 A.F.F. PER 111E MEMBRANE MANUFACTURERS RECOMMENDATIONS 15 GAS PIPING ( NOT APPLICABLE ) SH AND INSTALL. A COMPLETE GAS PIPING SYSTEM IF APPLI TO PLANS TO DETERMINE IF A GAS SYSTEM IS REQUI 2. GAS L • SHALL BE BLACK STEEL, SCHEDULE 40, ASTM MALLEAB THREADED FITTINGS FOR 2' AND SMALLER, WELDED J0I - FOR 2 -1/2' AND LARGER. 3. FURNISH AND I -. • A GAS COCK, DIRT LEG, TO EACH PIECE OF le IPMENT. WITH D WITH 4. PITCH PIPING AT A UNI -' GRADE OF I/ ' 14 15 FEET UPWARD IN DIRECTION OF FLOW. SUP PIPING - 'ERY 5 FEET. SUPPORT AS REQUIRED BY LANDLORD CRI °' IA, •- DETAILED ON DRAWINGS, CR BY STANDARD INDUSTRY PRACTICE, 'ICHEVER 15 MORE STRINGENT. 5. GAS PIPING EXPOSED ON PAINT. 6. GAS PIPING INSTA VENTED OR PIELDE LOCAL- CODE, 7. TESTING REQUI APPL N RETURN AIR P IN ACCORDANCE WITH THE APPLICABLE NFPA 54 CODES. UNION CONNECTION E PAINTED WI114 RUST- INHIBITING 5 5HALL BE SLEEVED AND L GAS COMPANY, PURGING OF GAS PIPING SHALL 5E ■ • ER THE 5 OF 114E LOCAL GAS COMPANY, LOCAL. COD -. - AND LE NFPA 54 CODES. 8. • • ACT AND COORDINATE GAS SERVICE, METER AND REGULAT !RESITS WITH THE LOCAL GAS COMPANY AND THE MALL'S OPERATIONS MANAGER PRIOR TO BID. INCLUDE INSTALLATION COST 0 GAS METER AND REGULATOR IN BID. END OF SECTION 15200 DIVISION 15 - MECI- IANICAL SECTION 15300 FIRE PROTECTION A. SCOPE OF WORK 11413 CONTRACTOR MUST USE A LANDLORD APPROVED FIRE PROTECTION CONTRACTOR TO PERFORM ALL FIRE PROTECTION WORK. ALL COSTS MUST BE INCLUDED IN 11-115 CONTRACTORS BID. FIRE PROTECTION CONTRACTOR MUST COMPLY WITH ALL SECTIONS OF THIS SPECIFICATION AND INCLUDE SAME IN BID. 2. 1141S CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL T0, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE SPRINKLER SYSTEMS. AS`SHOWN ON 114E DRAWINGS, CALLED FOR IN 111E SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: 3. BEFORE STARTING WORK, 71-119 CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL FLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF 71E FIRE PROTECTION SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCE'S AND CONFRONTATIONS. CONTRACTOR SHALL USE APPROVED INDUSTRY FIRE SPRINKLER STANDARDS FOR REUSING EXISTING FIRE SPRINKLER BRANCHES AND SUBMIT CALCULATIONS TO HOLLISTER CO.'S CONSTRUCTION MANAGER UPON REQUEST OR REWORK SYSTEM TO NOLLISTER CO. CONSTRUCTION MANAGER'S SATISFACTION. 4. RELOCATION OF EXISTING MAINS, LATERALS, BRANCHES AND RISERS TO FACILITATE STORE DESIGN CRITERIA MUST SE INCLUDED IN BID PROPOSAL. B. SHOP DRAWINGS INSTALLATION OF NEW WET SPRINKLER SY5TE71 A5 REQUIRED TO PROVIDE 100% SPRINKLER COVERAGE IN ACCORDANCE WITH EXISTING CONDITIONS, NFPA -13, LASTEST EDITION ENFORCED BY LOCAL- CODES, LANDLORD'S CRITERIA, AND INSURANCE CARRIERS FOR THE MALL. TAPS, RISERS, LATERALS, BRANCHES, VALVES, ALARMS, SPRINKLER HEADS AND ALL COMPONENTS REQUIRED FOR A COMPLETE SYSTEM. DESIGN DRAWINGS, HYDRAULIC CALCULATIONS, SUBMITTALS AND APPROVALS. PERMITS, FEES, AND CHARGES. TESTS AND TEST CERTIFICATES. FIRE EXTINGUISHERS WITH TAGS. 11415 FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS AND CALCULATIONS FOR HIS WORK. SUBMIT SIX (6) COPIES TO GENERAL CONTRACTOR FOR APPROVAL AND ONE (1) COPY TO 140LLI5TER CO. FOR REVIEW AND APPROVAL. 2. THIS FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR SUBMITTING COORDINATED DRAWINGS, HYDRAULIC CALCULATIONS, HEAD TYPES AND COLORS TO ALL AUTHORITIES HAVING JURISDICTION FOR APPROVAL. NO WORK SHALL BEGIN UNTIL ALL APPROVALS HAVE BEEN RECEIVED. 3. A COPY OF THE LETTER OF APPROVAL FROM THE LANDLORD'S INSURANCE RATING BUREAU SHALL BE FORWARDED TO THE LANDLORD'S AGENT AND TO HOLLISTER CO.'S CONSTRUCTION MANAGER. C. EQUIPMENT AND INSTALLATION A. B. C. D. E. F. SPRINKLER HEADS: A. ALL SPRINKLER I4EADS SHALL BE NEW (HEADS IN EXISTING HOLLISTER CO. STORES ARE NOT TO BE REPLACED UNLESS NOTED OTHERWISE). HEADS SHALL BE U.L., F.M. LISTED AND APPROVED AUTOMATIC SPRAY TYPE AS MANUFACTURED BY CENTRAL SPRINKLER CO., GLOBE, GRINNELL, RELIABLE, STAR, OR VIKING. 5. ALL. SPRINKLER HEADS SHALL BE RATED FOR I65'F UNLESS INDICATED OTHERWISE ON DRAWINGS OR REQUIRED BY LOCAL CODES. C. ALL SPRINKLER HEADS ARE TO HAVE A FACTORY APPLIED COLOR FINISH. VERIFY HEAD TYPES AND COLORS WITH H0LLI5TER CONSTRUCTION MANAGER AND SUBMIT 14111 SPRINKLER DRAWINGS FOR PERMIT. D. SPRINKLER HEAD TYPES 514ALL SE AS FOLLOWS: 'SAL-ES' AREA SPRINKLER HEADS ARE TO BE FLAT OR MATTE BLACK SEMI - RECESSED HEADS WITH FLAT OR MATTE BLACK ESCUTCHEON. BASED ON RELIABLE AND ALTERNATE MAY BE VIKING OR GRINNELL AND MUST BE APPROVED BY THE HOLLISTER CONSTRUCTION MANAGER PRIOR TO ORDERING AND ANY INSTALLATIONS. ALL EXPOSED PIPING SHALL SE PAINTED BROWN IN COLOR AND MUST BE COORDINATED WITH ALL TRADES. 2. PORCH AREA SPRINKLER HEADS ARE TO BE FLAT OR MATTE BLACK ;SEMI- RECESSED MEADS 141114 FLAT OR MATTE SLACK ESCUTCHEON. 'BASE BID TO BE RELIABLE MODEL OR EQUAL. 3. "NON - SALES' AREA SPRINKLER HEADS ARE TO BE 14H1TE CONCEALED HEADS WITH WHITE ESCUTCHEON. BASED ON RELIABLE AND ALTERNATE MAY BE VIKING OR GRINNELL. 4. 'NON - SALES' OFFICE AND LAVATORY AREA SPRINKLER HEADS ARE TO BE FULLY CONCEALED ADJUSTABLE SCREW TYPE WITH WHITE COVER PLATE. 'MALL BULKHEAD' AREA SPRINKLER HEADS ARE TO 5E FULLY CONCEALED ADJUSTABLE SCREW TYPE WITH WHITE COVER PLATE. PIPING: A. SCHEDULE 40, BLACK 5TEEL PIPE, ASTM A -53 FOR FERROUS PIPING, WELDED AND SEAMLESS, ANSI 5- 36 -10 -70 FOR WROUGHT STEEL. PIPE. B. CAST IRON OR MALLEABLE IRON SCREWED FITTINGS FOR PIPES 2 INCHES AND SMALLER. SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES LARGER THAN 2 INCHES. C. GALVANIZED OR BLACK MALLEABLE IRON 141114 BRASS SEAT SCREENED UNIONS FOR PIPES 2 INCHES AND SMALLER. D. VICTUALIC TYPE COUPLINGS ARE ACCEPTABLE, WHERE APPROVED BY CODE AND 111E LANDLORD. ' 5. 3. A FIRE PROTECTION SYSTEM TAP 15 NORMALLY FURNISHED BY THE LANDLORD. VERIFY IN FIELD PRIOR TO BID. SPRINKLER SPACING SHALL NOT EXCEED 130 SQ. FT. IN "SALES" AREAS AND 100 50. FT. IN 'STOCK' AREAS. COMPLY WITH LANDLORD'S DESIGN CRITERIA AND LOCAL CODES IF MORE STRINGENT. PIPE SIZING SHALL BE BASED ON NEPA 13 ORDINARY HAZARD CLASSIFICATION. 4. ALL SPRINKLER LINES 514ALL BE INSTALLED CONCEALED, AVOIDING INTERFERENCE W1114 LIGHTS, DUCTS, PIPES, STORAGE DECK, ETC. FIRE PROTECTION CONTRACTOR SHALL PREPARE COORDINATED SHOP DRAWINGS INDICATING THE LOCATIONS OF ALL SPRINKLER HEADS, SPRINKLER LINES, LIGHTS, DIFFUSERS, GRILLES AND REGISTERS PRIOR TO INSTALLATION. 5. WHERE POSSIBLE, REWORK 114E EXISTING SPRINKLER SYSTEM TO MEET 114E NEW REQUIREMENTS OF 11H15 DESIGN. RELOCATE ALL MANS AND BRANCHES INTERFERING WITH CEILING HEIGHTS, EQUIPMENT, AND MAJOR COMPONENTS INCLUSIVE OF ADJACENT TENANTS AND MALL COMMON AREAS. REMOVE ALL UNUSED PIPING. 6. FURNISH AND INSTALL A VALVED TEST CONNECTION IN AN ACCESSIBLE LOCATION FOR THE SPRINKLER SYSTEM AS REQUIRED OR REQUESTED BY THE MALL, LOCAL. INSPECTOR, OR INSURANCE CARRIER. COORDINATE LOCATION WITH LOCAL FIRE PROTECTION OFFICIAL PRIOR TO ROUGH IN. 7. WHEN COMPLETED, 114E ENTIRE FIRE PROTECTION PIPING SYSTEM SMALL BE HYDROSTATICALLY TESTED AS REQUIRED BY THE RULES AND REGULATIONS OF 114E AUTHORITIES HAVING JURISDICTION. SYSTEM SHALL S140W 140 SIGNS OF LEAKAGE OR OTHER DEFECTS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO THE WORK OF THE OTHER CONTRACTORS OR TO THE BUILDING, OR TO ITS CONTENTS, PEOPLE, ETC., CAUSED BY LEAKS IN ANY OF THE EQUIPMENT INSTALLED BY 141M. ALL REPAIRS OR REPLACEMENT OF DAMAGES SHALL BE AT THIS CONTRACTOR'S EXPENSE. 5. PROPERLY COMPLETED AND SIGNED "SPRINKLER CONTRACTOR'S MATERIAL AND TEST CERTIFICATES' SHALL BE FURNISHED TO THE LANDLORD, AUTHORITIES HAVING JURISDICTION, AND HOLLISTER CO.'S CONSTRUCTION MANAGER. 9. SPRINKLER HEADS LOCATED IN CEILINGS CR WALLS BET..OW 8' -0" ABOVE 111E FINISHED FLOOR AND ABOVE STORAGE DECK5 ARE TO BE RECESSED. 10. FURNISH AND INSTALL 10 LB. TYPE "ABC" FIRE EXTINGUISHERS, WITH CABINETS IF REQUIRED AND AT LEAST A "2A10BC' RATING. LOCATIONS TO 8E ESTABLISHED IN THE FIELD BY THE LOCAL- FIRE PROTECTION OFFICIAL. MAXIMUM TRAVEL DISTANCE BETWEEN EXTINGUISHERS SHALL BE 75 FEET OR LESS AS REQUIRED BY LOCAL CODES. 11. SPRINKLER CONTRACTOR IS RESPONSIBLE FOR THE ENTIRE SPRINKLER SYSTEMS. WATER TIGHT INTEGRITY UNTIL SUCH TIME AS HOLLISTER CO. OCCUPIES 111E FACILITY. ANY WATER DAMAGE PRIOR TO THIS TIME SHALL BE THE SOLE RESPONSIBILITY OF 11415 CONTRACTOR END OF SECTION 15300 DIVISION 15 - MECHANICAL SECTION 15500 HEATING, VENTILATION, AIR CONDITIONING A. SCOPE OF WORK 1. T14I5 CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL T0, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL 111E WORK FOR 114E MECHANICAL SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY J05 CONDITIONS, TO INCLUDE, BUT NOT 5E LIMITED TO THE FOLLOWING: A. 6. C. D. E. F. 14VAC UNITS, EQUIPMENT, AND APPURTENANCES (UNLESS NOTED OTHERWISE). DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. HYDRONIC PIPING. (AS APPLICABLE, REFER TO PLANS). REFRIGERANT PIPING (AS APPLICABLE, REFER TO PLANS). CURBS, ROOFING, AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). TESTING, ADJUSTING, AND BALANCING. 2. REFER TO DRAWING TCI FOR INFORMATION ON THE FOLLOWING: A. TEMPERATURE CONTROLS AND RELATED DIAGRAMS. 8. SEQUI7NCE5 OF OPERATION. 3. BEFORE STARTING WORK, 11415 CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE ISM ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCE'S AND CONFRONTATIONS. 4. RELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. B. I-IVAC EQUIPMENT 1. PRIMARY HEATING AND AIR CONDITIONING UNITS ARE TO BE FURNISHED BY HOLLISTER CO. AS SCHEDULED UNLESS NOTED OTHERWISE. REFER TO PLANS FOR REQUIREMENTS. ALL EQUIPMENT SHALL INCLUDE A FIVE (5) YEAR COMPRESSOR AND TEN (10) YEAR HEAT EXCHANGER WARRANTY. 2. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH AU- DEVICES, APPURTENANCES, AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF 114E SYSTEMS $10W14 ON THE DRAWINGS AND SPECIFIED HEREIN. 3. EQUIPMENT SHALL BE INSTALLED It4 STRICT ACCORDANCE 141114 114E MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST BE TRAPPED IN ACCORDANCE WITH MANUFACTURERS DATA. SEE DRAWINGS FOR ADDITIONAL DETAILS. 4. SECONDARY DRAIN PANS ARE MUM TO BE INSTALL® BENEATH ALL INDOOR AIR CONDITIONING EQUIPMENT 141114 THE EXCEPTION OF VAV BOXES. SECONDARY PANS ARE TO PROTECT ENTIRE UNIT. PROVIDE CONDENSATE PUMPS, AS REQUIRED. CONDENSATE SHALL BE DIRECTED TO MOP SINK OR AS SPECIFIED ON PLANS. C. 1. D. TOILET EXI -IAUST SYSTEM . I. ALL. DUCTWORK, ROOF OPENINGS AND CAPS AND /OR CONNECTIONS TO LANDLORD SYSTEM NECESSARY FOR A COMPLETE TOILET EXHAUST SYSTEM TO SE PROVIDED BY THIS CONTRACTOR. E. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED I. NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND APPROVAL BY THE GENERAL CONTRACTOR. A SKETCH MUST BE SUBMITTED INDICATING SIGNIFICANT DEVIATIONS FROM DESIGN AND MUST BE APPROVED BY HOLLISTER'S CONSTRUCTION MANAGER PRIOR TO FABRICATION OR INSTALLATION. 2. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE WITH SMACNA 'WAG DUCT CONSTRUCTION STANDARDS" OF 714E LATEST EDITION. WHERE OTHER CODES ARE ENFORCED, (1E. UMC, BOLA, ETC.) USE THE MOST STRINGENT CODE FOR DUCT CONSTRUCTION STANDARDS. 3. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: SUPPLY DUCTS: 2' W.G., POSITIVE RETURN AND EXHAUST DUCTS: 2' W.G., NEGATIVE EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEALANTS OF THE FOLLOWING PRESSURE CLASSIFICATIONSz SUPPLY DUCTS: CLASS 5 - 3' W.G. RETURN AND EXHAUST DUCTS' CLASS C - 2' W.G. IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5Z AS REQUIRED FOR FINAL AIR BALANCE APPROVAL 4. ROUND DUCTWORK SHALL BE GALVANIZED STEEL 141114 SPIRAL LOCK SEAM CONSTRUCTION FOR ALL 51ZES 14' DIAMETER AND LARGER. ROUND DUCTWORK SIZES 13' DIAMETER AND SMALLER MAY BE SNAP- LOCK CONSTRUCTION. ALL SNAP LOCK SEAMS SHALL BE SEALED AS DESCRIBED 114 THESE SPECIFICATIONS. ROUND FITTINGS SHALL BE GALVANIZED STEEL. WITH SPOT WELDED AND BONDED CONSTRUCTION. DUCTWORK SHALL BE AS MANUFACTURED BY UNITED MCGILL, SEMCO, CR APPROVED EQUAL ROUND SPIRAL GALVANIZED STEEL DUCTWORK MAY BE USED IN PLACE OF RECTANGULAR DUCTWORK WHEN ABOVE CEILING CLEARANCES PERMIT AND EQUIVALENT FREE AREA IS MAINTAINED, WITH 114E FOLLOWING EXCEPTION; ALL SUPPLY AND RETURN DUCTWORK WITHIN 15 FEET OF THE AIR HANDLER MUST BE RECTANGULAR AND INTERNALLY LINED. WHERE ROUND DWI SUBSTITUTION WILL TAKE PLACE, SUBMIT A SKETCH AND CI4ART SHOWING EQUIVALENT ROUND CONVERSIONS OF RECTANGULAR DUCTWORK TO 14OLLISTER CO. FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION. 6. AS A MINIMUM, CROSS BREAK ALL FLAT SURFACES OR REINFORCE 14I1H A DEAD APPROXIMATELY 3/6' WIDE X 3/16' DEEP ON 12' CENTERS TO PREVENT VIBRATIONS, REGARDLESS OF DUCT GAUGE. 7. INSTALL FACTORY MANUFACTURED DOUBLE THICKNESS TURNING VANES IN ALL RIGHT ANGLE ELBOWS OVER 36" IN LENGTH. INSTALL FACTORY MANUFACTURED SINGLE THICKNESS TURNING VANES IN ALL OTHER ELE01.45. 5. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS- SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1- 1/2 -I/2' X1/8' STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. 10. ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2' NIDE, . GLAS5- FIBER FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGILL CORP., DOW CORNING, MIRACLE ADHESIVES AND SUREBOND INC. WILL BE ACCEPTED IN LIEU OF TAPE. il SOFT ELASTOMER BUTYL- GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. 12. DUCT TRANSITIONS SHALL NOT MCGEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. 13. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, CONTROLS, AND 0134!R ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE ACCESS PANEL LOCATION 15 EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY HOLLISTER CO. CONSTRUCTION MANAGER PRIOR TO INSTALLATION. LAY -IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS WHEN WITHIN 3' -0' OF DEVICE. 14. ALL DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS AS NOTED ON DRAWINGS. WHERE DUCTWORK SIZE 15 LARGER THAN CONNECTED DEVICE (IE. VAV BOX, DIFFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE TO TAKE PLACE JUST PRIOR TO DEVICE CONNECTION. REFER TO DETAILS. 5. 9. MEDIUM PRESSURE DUCT WHERE DUCTWORK IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, IT SHALL 5E CONSTRUCTED IN ACCORDANCE WITH SMACNA STANDARDS FOR A PRESSURE RATING OF 6 INCHES WATER COLUMN MINIMUM OR GREATER AS REQUIRED BY LANDLORD. 2. ALL GAUGES AND REINFORCEMENT MUST MEET WITH THE LATEST EDITION OF SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND 141114 THE LANDLORD'S CRITERIA. 3. CONNECTIONS TO 114E LANDLORD'S MEDIUM PRESSURE DUCTWORK SHAH. BE MADE WITH 'L0- L.055' SADDLE TEE TAPS BY UNITED MCGILL CORP., OR AS OTHERWISE REQUIRED BY 714E LANDLORD. 4. ALL OTHER ITEMS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO TH15 SECTION, WITH THE EXCEPTION THAT ALL MEDIUM PRESSURE DUCTWORK MUST BE WRAPPED INSULATION, NOT LINED. G. VIBRATION ISOLATION DEVICES 1. VIBRATION ISOLATION DEVICES SHALL BE FURNISHED AND INSTALLED WITH SUPPORTS BETWEEN VIBRATING EQU IPMENT AND THE STRUCTURE (FANS, AIR HANDLERS, ETC.) BY 11415 CONTRACTOR. 2. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. 3. (AMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID 'GROUNDING' THE ISOLATOR. 4. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. 5. CONSULT MANUFACTURER FOR APPLICATION DATA. F. 1. N. FLEXIBLE CONNECTIONS I. FLEXIBLE COLLARS SHALL BE FURNISHED AND INSTALLED IN ALL - CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) AND DUCTS OR CASINGS. ALSO, FURNISH AND INSTALL FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. 2. FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF NEOPRENE- COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT 111E TRANSMISSION OF VIBRATION. I. FLEXIBLE AIR DUCT FLEXIBLE AIR DUCT SHALL BE 1' INSULATED CLASS t AND RATED FOR THE OPERATING PRESSURE OF 111E SYSTEM. DUCT CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN 111E BID. 2. FLEXIBLE AIR DUCT SHALL BE ATTACHED PER DETAILS ON DRAWING M4.3 FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS WITHOUT PRIOR APPROVAL FROM HOLLISTER CO. CONSTRUCTION MANAGER UNLESS NOTED OTHERWISE. 3. FLEXIBLE DUCT SHALL NOT EXTEND OVER 5' -0' IN LENGTH AT ANY ONE LOCATION. 4. NO FLEXIBLE DUCTWORK UPSTREAM OF VAV BOX EQUIPMENT FURNISI -TED 137 POI-LISTER CO. THE FOLLOWING EQUIPMENT 15 FURNISHED 5Y HOLLISTER CO. AND INSTALLED BY 1141S CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. REFER TO RESPONSIBILITY SCHEDULE AND PLANS FOR APPLICABILITY. A. RTU'S, AI4U'S, VAV BOXES, ROOF CURBS, MIXING BOXES, POWER EXHAUST FANS. B. TOILET EXHAUST FANS, RELIEF FANS, RETURN AIR FANS. G. BASEBOARD, CABINET AND ELECTRIC UNIT HEATERS. D. DIFFUSERS, GRILLES AND REGISTERS. E. TEMPERATURE CONTROLS (REFER TO DRAINING 'MI) J. SUPPLY AIR TAKEOFF FITTINGS 1. FURNISH AND INSTALL CONICAL OR 'BELL- MOUTH" TAKEOFFS W/ DAMPERS FROM MAIN DUCTWORK TO ROUND BRANCHES. INSTALL PER MANUFACTURER'S INSTRUCTIONS AND DETAILS ON SHEET M4.3 K. DAMPERS 1. FURNISH AND INSTALL MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE OPERATORS AS SHOWN ON PLANS TO FACILITATE AIR BALANCING. 2. OPERATING HANDLES GN ALL DAMPERS SHALL BE TAGGED WITH A MINIMUM 18" LONG ORANGE MARKER TAPE. COLLARS MUST BE INSTALLED OVER ECTERNAL INSULATION TO ALLOW FREE MOVEMENT. SEE ADDITIONAL DETAILS ON MECHANICAL DETAIL DRAWING. 3. NO VOLUME DAMPERS UPSTREAM OF VAV BOX. L. DAMPERS (NOT APPLICABLE ) HOLLISTER •• . FURNISH AND M.C. SHALL INSTALL PRIMAR WHERE INDICATED II - • IRED BY CODES. DAMPERS HORIZONTAL OR VERTICAL -- OF AIR AS BE UL LABELED AND MEET ALL • i ' '1 M. DUCTWORK INSULATION DAMPERS BE DESIGNED FOR FIRE DAMPERS SHALL RELENTS. FIRE DAMPERS SHALL HAVE ■ =LADES •" • THE AIR STREAM AND A 1657 FUSIBLE LINK, AS MINIMUM. FURNI •. r INSTALL ACCESS DOORS AS - -= - - Y. FU -- • D INSTALL. ALL. NECESSARY FRAMING AND SLEEVES FOR OUNTING PER UL AND CODE REQUIREMENTS. SEE DETAIL ON SHEET M4.1. 1. FURNISH AND INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NFPA 90A. 2. DUCT SIZES 51 4OWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. ALL SUPPLY AND RETURN AIR RECTANGULAR DUCTWORK SHALL BE INTERNALLY INSULATED WITH 1' THICK, 1 -1/2 LB. DENSITY LINER (C -0.28 @ 75'F). WHEN A COMPLETE DUCTED RETURN AIR SYSTEM I5 INDICATED ON THE DRAWINGS, ONLY THE 15' -O' OF THE RETURN AIR DUCT CLOSEST TO THE AIR HANDLING UNIT I5 TO BE INSULATED. LINER IS TO HAVE A COATED SURFACE EXPOSED TO AIR STREAM TO PREVENT EROSION. APPLY ADHESIVES AND MECHANICAL FASTENERS AS RECOMMENDED BY SMACNA AND THE MANUFACTURER TO PREVENT LINER SEPARATION FROM THE DUCT. ALL TRANSVERSE EDGES TO BE COATED WITH ADHESIVE. 5. ALL ROUND DUCTWORK, OUTSIDE AIR DUCTWORK AND MEDIUM PRESSURE DUCTWORK SHALL BE EXTERNALLY INSULATED P4 1114 A MINIMUM OF 1 1/2' 1141CK, 1# DENSITY (R -5.6) DUCT WRAP WITH VAPOR BARRIER. VAPOR BARRIER 15 TO BE MAINTAINED THROUGHOUT DUCT SYSTEM. ALL .301115 MUST BE TAPED 50 THAT NO INSULATION FIBER 15 VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, AND SIMILAR PENETRATIONS. 4. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF 140 HIGHER THAT 50 WHEN TESTED 114 ACCORDANCE 1.411114 ASTM C 411, OR AS REQUIRED BY LOCAL CODES. • a- •• • ." • • • • • •,■ a a• - • UTO A UAL. TA EST PLUGS ( P ER A TEMPERATU SHALL BE BRASS W F TO 200'F. ERN STRAINERS, 125 P51 5 STEEL SCREEN, 11-1 OR 2 -1/2 INCHES AND LARG TING AND 1/5 INCH FOR CHI DOWN VALVE WITH NOSE TOR - BELL 4 GOSSETT MODEL PIPING FOR CHILLED WATER AND /OR H UNLESS WATER UNLS SPECIFICALLY 14 INGS, AND ACCESSORIES SHALL BE INSU ES, INSULATE WITH 1 INCH THICK (K.0.23 WITH ALL SERVICE JACKET AND VAPOR ES AND LARGER, INSULATE P41114 P41114 I -1/2 INCH INSULATION WITH ALL SERVICE JACKET AN ION AT AU. HANGERS FOR PIPING 2 1/2 INCHES AND AND NON - COMPRESSIBLE INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 TO E REQUIREMENTS OF THE NFPA. IDE ZEST OR EQUAL INSULATION FITTINGS FOR ALL TEES, EL PECIALTY FITTINGS. ERAL INSTALLATION INSTALL WATER MAINS WITHOUT PITCH. USE ECCENTRIC REDUCING CCU AT CHANGES IN SIZE WITH 114E TOP OF PIPES AT SAME ELEVATION. B. BRANCHES TO UNITS BELOW MAINS TO BE TAKEN FROM 501TOM OF MAINS A 45 DEGREE ANGLE, PITCH DOWNWARD TOWARD UNITS. BRANCHES TO UNI ABOVE MAINS TO BE TAKEN FROM TOP OF MAINS AT A 45 DEGREE ANGLE PITCHED UPWARD TOWARDS UNITS. PITCH NOT LESS THAN 1' TO 10 FEET. C. SEE MECHANICAL DETAIL DRAWIN(aS.,F,Q1j A�� T ll f. REFRIGERANT PIPING: �•v // IS CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE REFRIGERANT SYSTEM BETWEEN THE INDOOR FAN UNITS AND OUTDOOR FAN UNI LE. T PIPING SHALL 5E TYPE 'L' HARD DRAWN COPP ING SHA BE CLEAN, CAPPED AND NITROGEN C AND JOINTS SHALL BE WROUGHT COPPER ER TO COPPER JOIN'S SHALL BE B ON ER ALLOY AND ALL OER JOINT E LONG RADIUS 'TYPE. • ar ar • 5 WI 5 D 5 62 VI N. NYDRONIC PIPING ( NOT APPLICABLE ) FURNISH AND INSTALL A COMPLETE HYDRONIC PIPING SYSTEM IF APPLICABLE. REFER TO PLANS TO DETERMINE IF A HYDRGNIC SYSTEM 15 REQUIRED. 5. 6. PIPING: I4YDRONIC PIPING FOR CHILLED WATER, CONDENSER WATER AND /OR HEA WATER SHALL BE ASTM A -120, SCHEDULE 40, ERN BLACK STEEL PIPE 1114 • ENDS. INSTALL 51 ttL PIPE WITH WELDED JOINTS WHERE PIPE I- 2 -1/2 INCH AND LARGER. INSTALL STEEL PIPE WITH THREADED JOINTS AND TITINGS OR INSTALL TYPE 'K' ANNEALED TEMPERED COPPER TUBE 11714 I LFOS JOINTS FOR 2 INCH AND SMALLER PIPE. PROVIDE DIELECTRI UNIONS EEN DISSIMILAR METALS, A PIPING SHALL BE IN STRICT ORMANCE ASTM, ABA, AND LANDLORD'S REQUIREMENTS, WHICHEVER IS CST INTENT. UNIONS OR FLANGES MUST BE USED AT EQUIPMENT •NNECTIONS 1.41-1 SERVICE OR REMOVAL MAY BE REQUIRED. 8. ALL PING AND EQUIPMENT SHALL BE PRESSURE TESTED WI o LEAKAGE AT A INIMUM PRESSURE OF 125 PSI. C. ALL 5751E1 STRAIN VENT ALL SYSTEM. THE LAND 114E LAND D. PRIOR TO OBTAIN WRITT REPRESENTATIV TENANT'S 5151 REQUIREMENTS AN TO 114E LANDLORD' 3. VALVES' A. GATE VALVES, 2 -INCH OFASTM862 CAST 5 SEAT, RENEWABLE SOLI BONNET AND RE- PACKAB ACCEPTED AS AN EQUAL B. GATE VALVES, 2 -1/2 INCH RENEWABLE BRONZE SEATS ENDS, AND RE- PACKABLE U SWING CHECK VALVES, 2 -INCH AND CAP CONFORMING TO AS RENEWABLE BRONZE DISC, AND SWING CHECK VALVE, 2 -1/2 INCH AND BOLTED CAP, HORIZONTAL ENDS AND CAPABLE OF BEING LINE. COMBINATION BALANCING AND SE il K WITH LOCKING SET PO BE INCLUDED WITH 0 4 M EQUAL. C. D. E. 4. PIPING SPECIALTIES: A. PRESSURE/TEMPERATURE FITTINGS TO RECEIVE El O.D. FITTING AND CA RATED AT .400 PSIG, • STRAINERS - "Y' PA PERFORATED STAI SMALLER, FLANGED 0.033 INCH FOR 14 PROVIDE WITH B THERMOFLO INDI B. C. INSULATION: A ALL HYDRON INCLUDING VALVES, Fl • UPT021 INSULATI 2 -1/2 114 FIBERG B. INS LL C. ALL. D. RONIC PIPING AND EQUIPMENT CONNECTED TO THE AC PIPING BE CLEANED AND FLUSHED. REMOVE, C AND REPLACE SCREENS. FILL TENANT'S SYSTEM 141714 DOMES WATER AND IPING AND EQUIPMENT PRIOR TO CONNECTION To THE LANDLORD'S TOR C SHALL NOT FILL TENANT'S SYST WITH WATER FROM D'S SYSTEM UNLESS SPECIFICALLY INSTRU ED TO DO 50 FROM ' 5 FIELD REPRESENTATIVE. ION TO THE LANDLORD'S SYSTEM, CONFIRMATION FROM THE LANDL THAT ALL TESTING, FLUSHING, HAS PEEN COMPLETED IN A ••-•• THAT 114E TENANT'S SYSTEM 5 SYSTEM. D SMALLER' CLASS r E WITH THREAD BRONZE WEDGE D I UNDER UNDER TI11111014. D LARGER: • SOLID ER P TRACTOR SHALL 5 FIELD ■ PROPER FILLING OF THE ANCE TO THE LANDLORD'S READY TO BE CONNECTED 50, BODY AND UNION BONNET OR SOLDER ENDS, INTEGRAL RISING STEM, SCREWED } SURE. BALL VALVES ARE LASS 125 CAST IRON BODY, ■ E DISC, RISING STEM, FLANGED : CLASS 150, CAST BRONZE BODY WITH HORIZONTAL SWING, Y- PATTERN, G THREADED OR SOLDERED ENDS. LARGER: CLASS 125 CAST IRON BODY RENEWABLE BRONZE DISC, FLANGED • WHILE THE VALVE REMAINS IN THE VALVES: BELL 4 G055E1T CIRCUIT RCUIT SETTER BALANCE WHEEL. MUST • • OR GRISWOLD ARE CONSIDERED AS 5 PLUG) - 1/4 INCH EFT OR PRESSURE PROBE, 1/8 INCH VALVE CORE OF NORDEL, CAST IRON BODY WITH ED FOR 2 INCHES AND . SCREEN OPENING SIZE AT ■ OR CONDENSER WATER. • TING WATER (NOT OTHERWISE), LA . FOR PIPE SIZES B 'F) FIBERGLASS BARRI FOR PIPE SIZES THICK (KwO. it 75'F) D V ' + BARRIER. GER SHALL BE THAN 25 ORM WITH LINGS 1. 2. 3. PI ' APPL PIPING: A ▪ REFRI 588). 13. ALL FITTI e - 516.22). ALL • - COPPER -P1405P • SILFOS -5 ALLOY. C. ALL ELBOWS ARE T INSTALLATION' , IF LL TUBING (AST11 GED. CAST BRONZE (ANSI ED WITH A BE BRAZED WITH A. SUCTION LINES SHALL HAV ADEQUATE LI: TRAPS AND /OR DOUBLE SUCTION RISERS TO MEET THE REQUI - ENTS •. FIELD CONDITIONS AND EQUIPMENT MANUFACTURER'S RECOMMENDA ON5. B. BRAZE ALL JOINTS WITH SILJ=QS = ARTING AT THE INDOOR UNIT AND WORKING TOWARD THE OUTDOOR ' . THE SEALS ON THE OUTDOOR UNIT SHALL BE BROKEN LAST. A 14 - • a BLEED SHALE. BE USED DURING ALL SOLDERING AND ANY TIME SYS a 5 OPEN. ALL OPEN LINES SHALL 5E CAPPED AND SEALED IMF. v LEAVING T. SITE DURING CONSTRUCTION. PRESSURE TEST FOR WITH AN Mk GAS AT TO 245 PSIG- REDO LEAKING JOINTS AND T UNTIL SYSTEM TIGHT. EVACUATE ENTIRE SYSTEM TO 200 MI + OF MERCURY. CHAR SYSTEM P41114 25 PSI OF R -22 AND A INERT TO 245 PSI AND RETEST TSTEM WITH HALIDE LEAK DETECTOR. ALL ING JOINTS MUST BE COMP Y RESEALED UNTIL NO LEAKS EXIST. 0 RN ON CRANK CASE HEATERS 24 • ' PRIOR 70 STARTING EA COMPRES • ` 0 8E SURE ALL REFRIGERANT LIQUID 15 • OF THE COMP -•- C. UPON • LETION OF TESTING, BUT BEFORE THE REFRIG PIPING INSU ION IS APPLIED, THE PIPING MUST BE INSPECTED BY REP :r ENTATIVE OF THE LOCAL GOVERNING AUTHORITY AS NEC: SARY. D. I LATE THE REFRIGERANT SUCTION LINES AND CONDENSATE LI R ONLY ITN RUBATEX OR ARMSTRONG 1 11C14 THICK PIPE INSULATION WITH E SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED OF • MORE VAN 50 114 ACCORDANCE WITH INDUSTRY STANDARDS. DO NO I -1E THE 140T GAS (LIQUID) LINES OR ANY 140T GAS BYPASS LINES IF APPLI • = E. APPLY 2 COATS OF U.V. PROTECTANT /SEALER ON ALL INSULATION EXPOSED WEATHER. .4. I A. ' • S /PIPE MARKERS (NOT APPLICABLE ) PIPE IDENTIFICATION MARKERS ON A BE A MINIMUM OF 1 -1/ " LETT • _• , a- -. •a ••:a • r+. P. I. FURNISH AND •- THIS CONTRACT. MAR += - ACCORDANCE WITH THE BACKG NATIONAL STANDARDS INSTITUTE (ANS CHAMPION AMERICA INC. 800- 2. PIPING SHALL SE I SUPPLY ALL PIP 1 LED UNDER AND IDENTIFIED 114 ISSUED BY THE AMERICAN SHALL BE MANUFACTURED BY , OR EQUAL. ED AS FOLLOWS: CHILLED WATER R ATE, HOT WATER RETURN, HOT WATER SUPPLY, COND CONDENSER WATER SUPPLY, REFRIGERANT LIQUID, REFRIGERANT SUCTI DIRECTIONAL ARROWS ALL IDENTIFICATIONS MUST BE VISIBLE AT EQUIPMENT MILLED WATER TER •• = • • z (NOT APPLICABLE ) CONTRA PREPARE AND 5U5M11 A COMPLETE P EMATIC TO THE LOCAL EQUIPMENT MANUFA " a D REPRESS4TA - • - APPROVAL PRIOR TO BEGINNING INSTALLATION. UPON COMPI.ETI•'` cam -• , 1415 CONTRACTOR M151 CALL THE LOCAL EQUIPMENT MANUFA > •' F .5PF LOTION OF WORK PERFORMED AT 1OLLISTER VP a, y • L ITEMS FOUND TO BE INAD • 1 • . - PROPER PERFORMANCE BY •• 1 T MANUFACTURER FIELD REPRESENTATIVE MUST BE f• . Al • AT NO DITIONAL CHARGES TO HOLLISTER CO.. R. TESTING, ADJUSTING, AND BALANCING 1. TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR W140 15 A CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBS) BALANCING CONTRACTOR. 140 OTHER BALANCE REPORTS WILL 5E REVIEWED OR ACCEPTED. ALL BALANCING WORK MU5T BE COMPLETE AND DONE IN ACCORDANCE WITH 714E MOST RECENT STANDARDS OF THEIR SOCIETY AND AS A MINIMUM SHALL INCLUDE THE INFORMATION AS SHOWN 114 THE AIR BALANCE REVIEW CHECKLIST IN PARAGRAPH 7 BELOW. PAYMENT OF ALL. COSTS FOR TESTING AND BALANCING SHALL SE INCLUDED IN THE BID. TESTING AND BALANCING CONTRACTOR TO BE LANDLORD APPROVED. 2. ALL CHILLED OR CONDENSER WATER SYSTEMS, AND ALL LANDLORD VAV SYSTEM REQUIRE A PRETEST TO OCCUR ONCE TAPS HAVE SEEN MADE TO THE LANDLORD'S SYSTEM AND WITHIN THE FIRST TWO WEEKS OF CONSTRUCTION. REFER TO DETAILS FOR PROCEDURE. 3. FINAL TESTING, ADJUSTING AND BALANCING REPORT MUST BE COMPLETE AND TURNED OVER TO HOLLISTER CO. CONSTRUCTION MANAGER 3 WEEK PRIOR TO MERCHANDISING DATE. 4. THE 14VAC CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO 114E AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS 114 MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. HVAC CONTRACTOR SHALL ALSO INSTALL A NEW SET OF FILTERS EACH 10111 DURING CONSTRUCTION AND ONE DAY PRIOR TO MERCHANDISING. BALANCING CONTRACTOR MUST CONTACT SYSTEMS INTEGRATION GROUP (SIG) AT (770) 427 -7443, 24 HOURS PRIOR TO AIR BALANCE FOR COORDINATION OF THE DIRECT DIGITAL CONTROL PANEL OPERATION DURING 114E BALANCE. CALL SIG TO VERIFY PROCEDURES PRIOR TO BIDDING PROJECT AND INCLUDE ALL COSTS IN BID. 6. BALANCE AIR AND WATER QUANTITIES TO WITHIN + 5% OF 114AT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS OR PULLEYS NEEDED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY 114E 14VAC CONTRACTOR WITH 140 ADDITIONAL COST TO 14OLLISTER CO. INC. 7. ALL CONTROL SEQUENCES 514AL -L 5E TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND OPERATING STATUS RECORDED IN 711E REPORT. 8. THREE COPIES OF 714E BALANCE REPORT SHALL BE SUBMITTED THROUGH THE GENERAL CONTRACTOR TO HOLLISTER CO.'S CONSTRUCTION MANAGER FOR APPROVAL. THE GENERAL CONTRACTOR SHALL VERJFi 111E COMPLETENESS OF THE REPORTS PRIOR TO SUBMITTING TO 1401.LI5TER CO.. SUBMIT ONE COPY OF FINAL APPROVED AIR BALANCE REPORT TO MALL GENERAL MANAGER. 1. 114E BALANCING CONTRACTOR SHALL PERFORM ALL. APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED ON THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OF ORIGINAL BALANCE MUST BE BALANCED IN FUTURE AT NO ADDITIONAL EXPENSE TO HOLLISTER CO. THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT HOLLISTER CO. DEEMS NECESSARY AT NO ADDITIONAL COST TO HOLLISTER CO. S. CONTROL SYSTEM COMMISSIONING 1. THE HVAC CONTRACTOR 15 RESPONSIBLE TO CONTACT SYSTEMS INTEGRATION GROUP (SIG) AT (770) 427 -7443 THREE WEEKS PRIOR TO CONSTRUCTION COMPLETION DATE TO SCHEDULE COMMISSIONING. 11415 CONTRACTOR MUST HAVE 114E CONTROL PANEL NUMBERS AND 14AVE BEEN SIGNED OFF ON CONTROL PANEL AT JOB SITE. 2. T1415 CONTRACTOR SHALL INCLUDE AS A BASE, 8-14OURS OF COMMISSIONING TIME PLUS AN ADDITIONAL 2 -HOURS OF COMMISSIONING TIME PER HVAC UNIT SHOWN ON DRAWINGS. ADDITIONAL HOURS REQUIRED FOR TROUBLE- SHOOTING OR REPLACING FAULTY EQUIPMENT PROVIDED BY 14OLLISTER CO. OR ANY OF HOLLISTER CO. VENDORS SHALL BE REIMBURSABLE BY 140LLISTER CO. AND /OR HOLLISTER CO.'S VENDORS AS NECESSARY AND 140 ADDITIONAL HOURS SHOULD BE INCLUDED 114 THE BID. T1415 CONTRACTOR MUST RECEIVE APPROVAL FROM 14OLLISTER CONSTRUCTION MANAGER PRIOR TO PERFORMING ADDITIONAL 14OURS. END OF SECTION 15500 5. RECEIVED CITY OF TUKWIU\ OCT 2 5 2007 PERMIT CENTER AI -Retail Engineering, Inc. 750 Brookredge Blvd. Weetervee, Ohto 43061 PHONE 614.818.2323 FAX 614.616.2337 WWWJI- CORPORAT1ONS.0044 w 0 CC w z 0 1) LI! CC z 0 4 0 a 4 U z a 0 W 2 0 CD 0 0A u 0710115 SHEET 6.1 ISSUE DATE: