Loading...
HomeMy WebLinkAboutPermit M07-265 - WESTFIELD SOUTHCENTER MALL - AT&T MOBILITYAT &T MOBILITY 344 SOUTHCENTER MALL M07 -265 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: 6364200010 344 SOUTHCENTER MALL TUKW AT &T MOBILITY 344 SOUTHCENTER MALL , TUKWILA WA WEA SOUTHCENTER LLC 11601 WILSHIRE BLVD , LOS ANGELES CA Contact Person: Name: HIEP NGUYEN Address: 4 HUTTON CENTRE DR #800 , SANTA ANA CA Contractor: Name: PACIFIC MECHANICAL SYSTEMS INC Address: 2100 196TH STREET SW #123 , LYNNWOOD, WA Contractor License No: PACIFMS034B7 DESCRIPTION OF WORK: MECHANICAL TENANT IMPROVEMENT: AIR DISTRIBUTION AND BALANCING ONLY. INSTALLATION OF VAV BOXES, INTERIOR DUCTING, SUPPLY AND RETURN AIR GRILLES Value of Mechanical: $80,000.00 Type of Fire Protection: SPRINKLER/AFA Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial doc: IMC -10/06 Citf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us MECHANICAL PERMIT EOUIPMENT TYPE AND QUANTITY 0 0 0 0 0 0 0 0 0 2 0 0 0 0 * *continued on next page ** M07 -265 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 714 327 -4054 Phone: 425 771 -2495 Expiration Date: 02/10/2010 M07 -265 03/18/2008 09/14/2008 Fees Collected: $818.25 International Mechanical Code Edition: 2006 Boiler Compressor: 0 - 3 HP /100,000 BTU 0 3 - 15 HP /500,000 BTU 0 15-30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 18 Thermostat 2 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 Printed: 03 -18 -2008 Permit Center Authorized Signature: doc: IMC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M07 -265 Issue Date: 03/18/2008 Permit Expires On: 09/14/2008 Date: OA t I I hereby certify that I have read and a ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulatinc construction or the perfoorrmance of work. I am authorized to sign and obtain this mechanical permit. Signature: ( `// Date: lsl°r Print Name: � eci L , ' ee - a/ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspende or abandoned for a period of 180 days from the last inspection. M07 -265 Printed: 03 -18 -2008 Parcel No.: 6364200010 Address: Suite No: Tenant: 344 SOUTUCENTER MALL TUICW AT &T MOBILITY 1: ** *BUILDING DEPARTMENT COND1TiONS * ** 11: ** *FIRE DEPARTMENT COND1TiONS * ** doc: Cond -10/06 fist/ City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. M07 -265 ISSUED 12/05/2007 03/18/2008 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206 - 431- 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (UvIC 606.1, 606.2.1) 15: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) M07 -265 Printed: 03 -18 -2008 doc: Cond -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 - 3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 16: Local U.L. central station supervision is required. (City Ordinance #2051) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 20: An electrical permit from the City of Tukwila Building Department Permit Center (206 - 431 -3670) is required for this project. 21: All electrical work and equipment shall conform strictly to the standards of the National Electrical Code. (NFPA 70) 22: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 23: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 24: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. * *continued on next page ** M07 -265 Printed: 03 -18 -2008 Signature: C ' -t' Print Name: eCG/ L doc: Cond -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Date: ‘ VA0( r -r - M07 -265 Printed: 03 -18 -2008 Tenant Name: Name: Company Name: Mailing Address: Company Name: Mailing Address: Contact Person: E -Mail Address: CITY OF TUKWIL Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 intp://wwwatulavila.wa.us Q:\ApplicationsWorms- Applications On Line13 -2006 - Permit Application.doc Revised: 9 -2006 bh Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. , * *Please Print ** King Co Assessor's Tax No.: Vai l i e k0 - 00 bU Site Address: ‹ot.I TII G�r� v4 ,ice Suite Number: Floor: New Tenant: kg.... Yes [ ..No Property Owners Name: Gererse7" fl /c5t 4;,o ,:em0. 7J Mailing Address: 4-T q' T f /`y GENERAL CONTRACTOR 1NFO!IATIO (Contractor' nformation for Mechanical (pg 4) for Plumbing and Gas Piping City State #16, e ✓rG X Day Telephone: 7 3Z- _�___� � � - 7- 'tom' Mailing Address: � aET/z itJpiL- $ (A) f ,4j 54 OA- qi 70.7 City State Zip E -Mail Address: /is f , j� V �� e. A . (L0»l Fax Number: 7`r - ., ?7 /,( 0 -TY/ U � it cs7/6;t/, _..40 p /4 C rev 5. L.) , / SZ d'D / S7 SIbtiAW t<5/ eszl Day Telephone: - S' - t4 - ct ( 3 96 C4 6Ue-A14 /_ 3E 'L Fax Number: t - - /a'9 City State Zip Contact Person: E -Mail Address: Contractor Registration Number: 16 601/1 ) ,C R Expiration Date: g 3 /0 7 04/f -1 O* c 's' fr evernrAi eeiy77 -& - i91.--- 4t S �' - "%TA ( 4 Lz 7o 7 &i,---, / V - / City State Zip Day Telephone: 14 - n7- y-s Fax Number: Zip Company Name: 4ZLlfif - 5 Mailing Address: ( %?�7 ) C /'7j,L g 5; a , 7267 City State rp Contact Person: /Y t Day Telephone: 7 "f v7 l,6 Ov E -Mail Address: I*-1- - ✓J e_.- 6 ,, 6.4":› Fax Number: 7(5;- 3 1,7 - / 0/ Page 1 of 6 Valuation of Project (contractor's bid pric- : $ 9.00 &cc Existing :wilding Valuation: $ A -- Scope of Work (please provide detailed information): 7J' a „davGEGg /.A ) t c, . a.- /Ara' Will there be new rack storage? ❑.... Yes ,Q If yes, a separate permit and plans •mittal will be required. 0 wilding reas,'it tiara area of principal dwelling: Blow Floor area of accessory dwelling: PLANNING DIVISION: Single family building footprin : of the foundation of all structures, plus any decks over 18 inch and overhangs greater than 18 inches) *For an Accessory dwellin: rovide the following: Lot Area (sq ft): Floo *Provide doc ntation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: .... Sprinklers Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11 ” paper including quantities and Material Safe Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q: ApplicationsWotms- Applications On Line3-2006 -Permit Application.doc Revised: 9 bit Page 2 of 6 =Unit Types Qty . , Unit .Type. ; .; : - Unit Type: YP • ; . Qty ;BoileriGompr.essot. Furnace<100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler Diffuser 117 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct _ / �/ Thermostat v 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30-50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/Ind MECHANICAL CONTRACTOR INF Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ go avo Scope of Work (please provide detailed information): � -f /� - J ?Z ( fZ1:91) ¢/ - G/ Ag Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... ❑ Replacement .... ❑ Fuel Type: Electric ❑ Gas ....❑ Other: Indicate type of mechanical work being installed and the quantity below: Q :\ApplicationsWenns- Applications On Line\3 -2006 - Permit Application. doe Revised: 9 -2006 bh Page 4 of 6 Scope of Work (please provide detailed information): Water District ❑ ...Tukwila 0... Water District #125 ❑ ...Water Availability Provided Sewer District ❑ ...Tukwila ❑ ...Sewer Use Certificate Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right -of -way Non Right -of -way ❑ ...Total Cut ❑ ...Total Fill cubic yards cubic yards ❑...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements 0...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water FINANCE INFORMATI ❑ ...Water Water Meter Refund/Billing: Name: Mailing Address: ❑ ...Sewer Q:IApplicaiions\Fonns- Applications On t.inet3 -2006 - Permit Application.doc Revised: 9 - 2006 bh Call before you Dig: 1- 800 -424 -5555 Please refer to Public Works Bulletin #1 for fees and estimate sheet. ❑ .. Highline ... ValVue ❑ .. Renton .. Sewer Availability Provided Septic System: ❑ On -site Septic System — For on -site .tic system, provide 2 copies of a current septic design approve ❑ ...Renton ❑ ...Seattle Submitted with Application (mark boxes w 'ch apply): ❑ ...Civil Plans (Maximum Paper Size — 22" 4") ❑ ...Technical Information Report (Storm Draina ❑ .. Geotechnical Repo ❑...Traffic Impact Analysis ❑ ...Bond ❑ .. Insurance ❑ ement(s) ❑ .. Maintenance Agr ent(s) ❑...Hold Harmless — (SAO) ❑ ...Hold Harmless — (ROW) Fire Line Size at Pro. Line Number of Public Fire Hydrant(s) ❑ .. Right -o ` ay Use Profit for less than 72 hours ❑ .. Rig . f -way Use — Potential Disturbance Work in Flood Zone ❑ .. . rm Drainage ❑ .. Abandon .tic Tank ❑ Grease Interceptor ❑ .. Curb ❑ .. Channelization ❑ .. Pave ' nt Cut ❑ .. Trench Excavation ❑ .. Lo' .ed Fire Line ❑ .. Utility Undergrounding ff )f ❑ ...Permanent Water Meter Size... 27 WO # ❑ ...Temporary Water Meter Size.. WO # ❑ ...Water Only Meter Size 27 WO # ❑...Deduct Water • eter Size ❑ ...Sewer Main Extension blic Private ❑ ...Water Main Extension ....Public _ Private ❑ ...Sewage Treatment y King County Health Department. Monthly Service Billing to: Name: Mailing Address: State Zip Day Telephone: City Day Telephone: City Zip Page 3 of 6 PERMIT APPLICATION NOT Applicable to all permits in this a D ate Application Accepted: X21 01--- Q:\Appliations\Fomm- Appliations On Line\3 -2006 - Permit Appliation.doc Revised: 9 -2006 bit Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZES TO APPLY FOR THIS PERMIT. BUILDING OW R HORIZED AGENT: Signature: Date: / / L /oc /0 7 Print Name: Mailing Address: t 7y -0t) (e;I7Zt /L- o$it, ',IJV. ATA- ,�� '' ? 2 o 7 zip City state Telephone: - 74 4 — Date Application Expires: adock Staff Initials: Page 6 of 6 PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: Contact Person: E -Mail Address: Contractor Registration Number: Valuation of Plumbing work (c . tractor's bid price): $ S Valuation of Gas Piping work (c tractor's bid price): $ Scope of Work (please provide detai d information): ( !S tid 13 6 Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Indicate type of plumbing fixtures and/or gas piping outlets Fixture Ty Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Building sewer or trailer park sewer Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Qty 114 Lava ure Ty Drinking fountain or .. ter cooler (per head) Food -waste grin . r, commercial Floor drai Shower gle head trap water system — per drain (inside building) Repair or alteration of water piping and/or water treating equipment Q:kApplications\Poona-Applications On Line3-2006 - Permit Application.doc Revised: 9 -2006 bh Re wast Sinks Urinals /3 w E4.01 GE installed and the quantity below: ure ash fountain tor, indirect Water Clo t Water heater vent Repair or alterati of drainage or vent piping City Day Telephone: Fax Number: Expiration Date: Sewer: 11A ( d/or tJ State re Jype: Gas piping outlets Additional medical gas inlets/outlets — six or more Medical gas piping system serving one to five inlets/outlets for specific gas Zip Page 5 of 6 RECEIPT NO: R08 -00803 Initials: JEM Payment Date: 03/18/2008 User ID: 1165 Payee: CB BOVENKAMP, INC. SET TRANSACTIONS: Set Member Amount M07 -265 660.60 PG07 -329 143.03 TOTAL: 803.63 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES PLUMBING - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: //www. ci. tukwila. wa. us SET RECEIPT SET ID: 0318 SET NAME: AT &T Total Payment: 803.63 TRANSACTION LIST: Type Method Description Amount Payment Check 41481 803.63 TOTAL: 803.63 Account Code Current Pmts 000/322.100 660.60 000/345.830 15.03 000/322.100 128.00 TOTAL: 803.63 RECEIPT NO: R07 -02665 Initials: User ID: 1165 Payee: 1IIEP KRA NGUYEN SET TRANSACTIONS: Set Member Amount ACCOUNT ITEM LIST: Description City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us D07 -444 1,251.89 EL07 -747 184.50 M07 -265 157.65 PG07 -329 16.97 TOTAL: 1,611.01 ELECTRICAL PLAN - NONRES PLAN CHECK - NONRES SET RECEIPT 000.345.832.00.0 184.50 000/345.830 1,426.51 TOTAL: 1,611.01 Payment Date: 12/05/2007 Total Payment: 1,611.01 SET ID: 6000000906 SET NAME: Tmp set/Initialized Activities TRANSACTION LIST: Type Method Description Amount Payment Check 306 1,611.01 TOTAL: 1,611.01 Account Code Current Pmts 5709 12/05 9710 TOTAL 1611.01 Project: Type of Inspection: Addre L{ rn A ' Date Called: Special Instructions: Date Wanted: 7 r J 1- 6 ei i` p.m Requester: Phone No _ 3e -775 —se,f7 Approved per applicable codes. Tho7 -2($ INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Corrections required prior to approval. lo g COMMENTS: 'Inspector: 1Date: ?"'' -l� n $60.00 R PECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: COMMENTS: Tv a of Inspection: Str►ok—t s�wk -wK. \ Aiv - I R.e #t&r A /4L11l ha. 6 4 - Pa5'e-d 5/ v v c 5 LAe_ - /L (An i -t. U A V Z . llddr4 -SS m o, is 2 1P C,ive5 (AA; 4- L1/— it_ Project: /47.477._ Tv a of Inspection: Str►ok—t s�wk -wK. Address: 4 'Y L Date Called: Special Instructions: Date Wanted: 1 a.m. l 1 ! CAS. p.m. 7/1/0S Requester: • Phone N '?'Ih cn `1 INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 A pproved per applicable codes. El Corrections required prior to approval. n I /2/0B LI $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Inspecto INSPECTION RECORD Retain a copy with permit 1 1107 - 2-(6 PERMIT NO. 1 (206)431 -3670 'Receipt No.: (Date: Project: ''�` Type of Inspection: ` - ` N Address: .-21-1k -'\ N"c \\ Date Called: Special Instructions: Date Wanted: --1 . \ • Ot a.m. p.m. Requester: Phone No: 3 El Approved per applicable codes. r\-A-2-Gs INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION ( 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -36 Vi Corrections required prior to approval. 'Inspector: Date: El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. COMMENTS: C. avx -o-LS l■Tc.- (ev. tin - 7 'Receipt No.: 'Date: Project: Type of Inspection: \ Address: • \L\ L' . \\ Date Called: Special Instructions: Date Wanted: p C . 'Z • v$ a.m. p.m. Requester: Phone No: 505 - "T1 S- O "\L4'4 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION $ 6300 Southcenter Blvd., x`100, Tukwila, WA 98188 (206)431-3670 Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: J to( - t t Inspector: f.J4 A d _lw $58.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. (Receipt No.: 'Date: N�O�t -ZC° J Date: Pro' t: ` H ( 1 tYlObi ( I -t-t-/ Typ I spectio c_cr A re s IL( m 4• Date Called: Special Instructions: Date Wanted: m, Requester: - Phone No: { (' (,/ INSPECTION RECORD Retain a copy with permit 0 67 INSPE ION NO. PERMIT NO. Ni CITY OF TUKWILA BUILDING DIVISION P., 6300 Southcenter Blvd., #100, Tukwila, WA'98188 (206)43 1 -3670 COMMENTS: 0e c'e, /4 (2 L '7 Approved per applicable codes. Corrections required prior to approval. $58. INSPECTION FEE REQUIRED. Prior to inspection, fee must be pai t 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: Proje : % Q7" Type of Inspection: , j2etWH —,.0 Address 3 1/4/ /174i/ Date Called: Special Instructions: Date Wanted: 14 — /l —vL a !m. , Requester: Phone No: 3) (1s - 725 -asyy INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 fr07-z65 PERMIT NO. Iz (206)431 -3670 El Approved per applicable codes. Corrections required prior to approval. COMMENTS: P4. Inspecto ; I No.: R;►M1 0 REINSPECTION FE at 6300 Southcenter I Date: Z1-1 t'ag REpOIRED. Prior-to inspection, fee must be lvd., Suite 100. Call the schedule reinspection. I Date: Project: jr-; - t — Sprinklers: Type of Inspection: FA i Kj k-: / Address: -, = ,c Suite #: t v ■o, c s-.- Contact Person: Special Instructions: Occupancy Type: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: INSPECTION NUMBER n Approved per applicable codes. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT "/th City of Tukwila Finance Department. Call to schedule a reinspection. Word /Inspection Record Form.Doc 1/13/06 PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206- 575 -4407 rrorrections required prior to approval. COMMENTS: t vU 1 *r-1" i S c Inspector: tAkdb A ' 512 Date: Hrs.: $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from T.F.D. Form F.P. 113 ACTIVITY NUMBER: M07 -265 PROJECT NAME: AT &T MOBILITY SITE ADDRESS: 344 SOUTHCENTER MALL DATE: 12 -05 -07 X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: ul Ing ivision Public Works ❑ Complete Comments: �' PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP TUES/THURS ROUT G: Please Route Structural Review Required REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 APPROVALS OR CORRECTIONS: Approved E Approved with Conditions Notation: REVIEWER'S INITIALS: 'II 41C/ 1601 Fire Prevention Structural Incomplete ❑ ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 1 2-06-07 Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: No further Review Required DATE: DUE DATE: 01-03-08 Not Approved (attach comments) n DATE: Planning Division n Not Applicable E C Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License VALLEPE 151 BM Licensee Name VALLEY PLUMBING & ELECTRIC INC Licensee Type CONSTRUCTION CONTRACTOR UBI 600540228 Ind. Ins. Account Id 47708900 Business Type CORPORATION Address 1 PO BOX 65 Address 2 City SUMAS County WHATCOM State WA Zip 98295 Phone 3609889631 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 1/14/1985 Expiration Date 1/16/2009 Suspend Date Separation Date Parent Company Previous License VALLEPE172B1 Next License Associated License Business Owner Information Name Role Effective Date Expiration Date BOS, JERRY 01/01/1980 VANDER VEEN, BUTCH 01/01/1980 BOS, KATHY 01/01/1980 VANDERMEY, SID 01/01/1980 01/01/1980 BODE, KEITH AGENT 01/01/1980 01/01/1980 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Bond Information Bond Company Bond Account Effective Expiration Cancel Impaired Bond Received https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= VALLEPE 151 BM 03/18/2008 H VAC SYMBOLS (ALL SYMBOLS SHOWN ARE NOT NECESSARILY USED ON THE DRAWINGS) H VAC ABBREVIATIONS (ALL ABBREVIATIONS SHOWN ARE NOT NECESSARILY USED ON THE DRAWINGS) PLUMBING GENERAL NOTES: DUCTWORK A F P ABV ABOVE FA FIRE ALARM P PUMP AC AIR CONDONING FACP FIRE ALARM CONTROL PANEL PC PUMPED CONDENSATE ACLU AIR COOLED CONDENSING UNIT FC FAN COIL PD PRESSURE DROP ADJ ADJUSTABLE FCO FLOOR CLEANOUT PH PHASE AD ACCESS DOOR FD FIRE DAMPER, FLOOR DRAIN PIV POST INDICATOR VALVE AFF ABOVE FINISHED FLOOR FLA FULL LOAD AMPS PLBG PLUMBING AH POC PANEL FINS PER INCH PNL AL AIR HANDLING ALUMINUM FLR POINT OF CONNECTION FPI FLOOR AMPS AMPERES FPM FLOW SWITCH, FLOOR SINK POD POINT OF DISCONNECT FS FEET PER MINUTE AP ACCESS PANEL PRESS PRESSURE APD AIR PRESSURE DROP FSD FIRE -SMOKE DAMPER PRS PRESSURE REDUCING STATION APPROX APPROXIMATE PRV PRESSURE REDUCING VALVE FT FOOT, FEET PS PRESSURE SWITCH ARCH ARCHITECT, ARCHITECTURAL T DEGREE FAHRENHEIT PSF POUNDS PER SQUARE FOOT AS AIR SEPARATOR FV FACE VELOCITY ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING PSI POUNDS PER SQUARE INCH RV FEED WATER AND AIR CONDITIONING ENGINEERS PSIA POUNDS PER SQUARE INCH ABSOLUTE AUX AUXILIARY PSIG POUNDS PER SQUARE INCH GAUGE AV AIR VENT G PSV PRESSURE SAFETY VALVE G (NATURAL) GAS PV PLUG VALVE GA GAUGE PVC POLYVINYL CHLORIDE B GAL GALLON GALV GALVANIZED Q B BOILER GC GENERAL CONTRACTOR BDD BACKDRAFT DAMPER GPH GAALLONS S PER HOUR QTf QUANTITY BD BLOW -DOWN GPM GALLONS PER MINUTE BEL BELOW GV GRAVITY VENTILATOR R BFF BELOW FINISHED FLOOR RAD RADIANT BFV BUTTERFLY VALVE H RA RETURN AIR BFW BOILER FEED WATER RCP REFLECTED CEILING PLAN, BHP BRAKE HORSEPOWER H HEIGHT, HUMIDISTAT REINFORCED CONCRETE PIPE BKR BREAKER HB HOSE BIBB RD ROOF DRAIN BLDG BUILDING HC HEATING COIL RE: REFERENCE, REFER BOD BOTTOM OF DUCT HD HEAD, HUB DRAIN RECIRC RECIRCULATE BOP BOTTOM OF PIPE HHWR HEATING HOT WATER RETURN REFRIG REFRIGERANT BOS BOTTOM OF STEEL HHWS HEATING HOT WATER SUPPLY REINF REINFORCING BTU BRITISH THERMAL UNIT HHWP HEATING HOT WATER PUMP REQD REQUIRED BALL VALVE HOA RG REVISION, REVISE HORIZONTAL REV HORIZ HAND - OFF - AUTOMATIC RETURN GRILLE HP HORSEPOWER, HEAT PUMP RH RELATVE HUMIDITY C HS HUMIDITY SENSOR RHG REFRIGERANT HOT GAS CA COMPRESSED AIR HSTAT HUMIDISTAT RL REFRIGERANT LIQUID CAP CAPACITY HSTM HIGH PRESSURE STEAM RLA RUNNING LOAD AMPS CAV CONSTANT AIR VOLUME HTG HEATING RM ROOM CC COOLING COIL FR HEATER RPM REVOLUTIONS PER MINUTE CD CEILING DIFFUSER HVAC HEATING, VENTILATING AND AIR CONDITIONING RS REFRIGERANT SUCTION CFH CUBIC FEET PER HOUR FHfYWD WATER RTU ROOF TOP UNIT CFM CUBIC FEET PER MINUTE CH CHILLER HX HEAT EXCHANGER RWR RETURN WALL REGISTER CHWR CHILLED WATER RETURN HZ HERTZ S CHWS CHILLED WATER SUPPLY SA SUPPLY AIR CHWP CHILLED WATER PUMP I CI CAST IRON CIRCULATING ID INSIDE DIAMETER SAN SANITARY SEWER CIRC SD SMOKE DAMPER, STORM DRAIN CLG CEIILIINNG IN I NCH INVERT ELEVATION SEER SEASONAL ENERGY EFFICIENCY RATIO CMU CONCRETE MASONRY UNIT IN WG INCHES WATER GAUGE SF SUPPLY FAN CO CLEANO T IN WC INCHES OF WATER COLUMN SQ FT SQUARE FEET COL COLUMN SHT SHEET COP COEFFICIENT OF PERFORMANCE SIM SIMILAR COND CONDENSATE J SHT MTL SHEET METAL CP CONDENSATE PUMP J -BOX JUNCTION BOX SMACNA SHEEP METAL AND AIR CONDITIONING CPVC CHLORINATED POLYVINYL CHLORIDE CONTRACTORS NATIONAL ASSOCIATION CR CONDENSATE RECEIVER K SOV SHUT OFF VALVE CT COOLING TOWER SP STATIC PRESSURE CU CONDENSING UNIT KW KILOWATT SPEC SPECIFICATION CW COLD WATER KWH KILOWATT -HOUR SQ SQUARE SS STAINLESS STEEL SERVICE SINK CWS CONDENSER WATER SUPPLY ST SOUND TRAP, STEAM TRAP CWR CONDENSER WATER RETURN L STM STEAM CWP CONDENSER WATER PUMP 'C DEGREES CELSIUS L LENGTH STANDARD LAT LEAVING AIR TEMPERATURE STL STEEL LB(S), POUND(S) STRUC STRUCTURAL D LDB LEAVING DRY BULB SURF SURFACE LF LINEAR FEET SUSP SUSPEND D DEPTH LP LOW PRESSURE SV SUPPLY VALVE DB DRY BULB LRA LOCKED ROTOR AMPS SWR SUPPLY WALL REGISTER dB DECIBEL LSTM LOW PRESSURE STEAM (15 PSIG) SYM SYMBOL DDC DIRECT DIGITAL CONTROL LTG LIGHTING DESIG DESIGNATION LWB LEAVING WET BULB T DEC DEGREE LWT LEAVING WATER TEMPERATURE DIA DIAMETER TAU THERMAL AIR UNIT DIM DIMENSION TEMP TEMPERATURE DISC DISCONNECT M TDH TOTAL DYNAMIC HEAD DISCH DISCHARGE MAX MAXIMUM THRU THROUGH DN DOWN TP TOTAL PRESSURE MBH 1000 BTU PER HOUR DP DIFFERENTIAL PRESSURE MCA MINIMUM CIRCUIT AMPACIIY TS TEMPERATURE SENSOR DPS DIFFERENTIAL PRESSURE SWITCH MCC MOTOR CONTROL CENTER TSP TOTAL STATIC PRESSURE DS DOWNSPOUT T THERMOSTAT MD MOTORIZED DAMPER DWG(S) DRAWING(S) MECH MECHANICAL TYP TYPICAL DX DIRECT EXPANSION MFR MANUFACTURER MG MOTOR GENERATOR U E MH MANHOLE, METAL HALIDE U/C UNDER CUT MINIMUM (E) EXISTING TO REMAIN MIN IvITD MOUNTED U/F UNDERFLOOR EER ENERGY EFFICIENCY RATIO MU MAKE -UP U/G UNDERGROUND EA EXHAUST AIR, EACH MUA MAKE -UP AIR UNIT U/S UNDERSLAB EAT ENTERING AIR TEMPERATURE MZ MULTI -ZONE UNIT UTR UP THROUGH ROOF ECC ECCENTRIC UL UNDERWRITERS LABORATORIES, INC. EDB ENTERING DRY BULB UON UNLESS OTHERWISE NOTED EF EXHAUST FAN N UPS UNINTERRUPTIBLE POWER SUPPLY EFF EFFICIENCY EG EXHAUST GRILLE N/A NOT APPLICABLE V EL ELEVATION NC NOISE CRITERIA, NORMALLY CLOSED V VOLT, VENT ELEC ELECTRICAL NEMA NATIONAL ELECTRICAL VAC VACUUM ENCL ENCLOSURE MANUFACTURER'S ASSOCIATION VAV VARIABLE AIR VOLUME EQUIP EQUIPMENT NIC NOT IN CONTRACT VD VOLUME DAMPER ESP EXTERNAL STALK PRESSURE NO NORMALLY OPEN VEF VEHICLE EXHAUST FAN ET EXPANSION TANK NO. NUMBER VEL VELOCITY EV EXHAUST VALVE NOM NOMINAL VERT VERTICAL EWB ENTERING WET BULB NTS NOT TO SCALE V VARIABLE FREQUENCY DRIVE EWR EXHAUST WALL REGISTER ''''''-\ VENT THROUGH ROOF EWT ENTERING WATER TEMPERATURE Q sC�OP 0 W 1 review ��� �o� o valor" EXP. JOINT EXPANSION JOINT .\' ---S, �` oBD OPPOSED BLADE DAMPER W WATT, WIDTH E R SAL O WITHOUT _ ee n W � OC ON CENTER W/ WITH t h8 V1�8 � 5 s a t6g v\ e� �'ap �'� -" OD OUTSIDE DIAMETER W/O OVB� a 5� o ° , i�c' �� / Cr ik 6V v, gy p, OF OVERFLOW WB WET BULB N 0 -c ,..04 � le'-, -0 C ' OH OVERHEAD WC WATER COLUMN B� io ns O OPNG OPENING WPD WATER PRESSURE DROP �ev\S dud OPER OPERATING WP WEATHER PROOF Date. `� \ Ac , osl \ - OSA OUTSIDE AIR WR WATER RISER -------- OSHA U.S. DEPARTMENT OF LABOR OCCUPATIONAL WSHP WATER SOURCE HEAT PUMP SAFETY AND HEALTH ORGANIZATION WT WATERTIGHT, WEIGHT 1. THESE DOCUMENTS WERE PREPARED PER AVAILABLE AS -BUILT DOCUMENTS. CONTRACTOR SHALL VISIT SITE TO BECOME FULLY FAMILIAR WITH THE SCOPE OF WORK AND REVIEW EXISTING CONDITONS PRIOR TO BID. 2. EXACT LOCATION OF PLUMBING FIXTURES SHALL BE DETERMINED FROM ARCHITECTURAL DRAWINGS. 3. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS (SIZE, LOCATION, ETC.) PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE TO NOTIFY THE ARCHITECT /ENGINEER OF ANY DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS. 4. CONTRACTOR SHALL VERIFY IN FIELD, EXACT SEWER WASTE AND COLD WATER PIPE LOCATIONS. 5. CONTRACTOR SHALL VERIFY INVERT ELEVATIONS OF SEWER POINTS OF CONNECTION PRIOR TO THE INSTALLATION OF NEW WASTE SYSTEM. 6. CONTRACTOR SHALL VERIFY AND COORDINATE LOCATION OF ALL PLUMBING LINES WITH DUCT WORK AND ELECTRICAL SERVICES. 7. THE INSTALLATION OF ALL VALVES, UNIONS, THERMOMETERS, GAUGE, OR OTHER INDICATING OR RECORDING EQUIPMENT, OR SPECIALTIES REQUIRING FREQUENT READING, REPAIRS, ADJUSTMENT, INSPECTION, REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY AND ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED BUILDING. 8. ALL VENTS THROUGH ROOF SHALL BE 10' -0" FROM ALL A/C UNITS OR AIR INTAKES, ETC. 9. CONTRACTOR SHALL NOT CUT, NOTCH AND /OR BORE EXISTING JOIST, BEAMS AND /OR JOIST WITHOUT FIRST SECURING WRITTEN APPROVAL FROM ARCHITECT. 10. CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT ALL CONNECTIONS WITH DISSIMILAR METALS. 11. CONTRACTOR SHALL ROUGH -IN All WASTES AND SUPPLIES TO SPECIAL EQUIPMENT ACCORDING TO MANUFACTURER'S SHOP DRAWINGS AND MAKE FINAL CONNECTIONS. ALL SUPPLIES SHALL BE VALVED. 12. SEISMIC RESTRAINTS SHALL BE REQUIRED ON SEVERAL PIECES OF EQUIPMENT WITHIN THIS PLUMBING FLOOR PLAN AND ALL REQUIREMENTS SHALL BE OBTAINED FROM THE AUTHORITY HAVING JURISDICTION. 13. INSULATE ALL EXPOSED SUPPLY AND WASTE PIPING AT HANDICAPPED ACCESSIBLE SINKS. 14. REFER TO SHEET M -003 AND M -004 FOR ALL PLUMBING SPECIFICATIONS AND WORK REQUIREMENTS. 15. CONTRACTOR SHALL PERFORM ALL WORK IN A COMPLETE AND WORKMANLIKE WAY IN COMFOMANCE WITH ALL CODES, AND MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR SHALL COORDINATE WITH ARCHITECTS, ELECTRICAL AND STRUCTURAL. ALL WORK TO BE PERFORMED TO PROVIDE A COMPLETE AND WORKING SYSTEM. 16. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS, FEES, TESTING, ETC. CONTRACTOR SHALL PROVIDE A ONE YEAR WARRANTY /GURANTEE FOR ALL WORK PERFORMED UNDER THIS CONTRACT. H VA C GENERAL NOTES: SUPPLY DIFFUSER, 4 -WAY X T SUPPLY DIFFUSER, 2 -WAY 7 RETURN GRILLE EXHAUST GRILLE SUPPLY WALL REGISTER -1-] +0 RETURN /IXHA UST WALL REGISTER ` H = LINEAR SLOT 12 ° 0 a ROUND DUCTWORK. DIAMETER INDICATED IN INCHES ) 12 "0 C c RECTANGULAR DUCTWORK. SIZE INDICATED IN ) 20X12 20X12 INCHES FIRST NUMBER IS SIDE SHOWN C RECTANGULAR DUCTWORK. SIZE INDICATED IN 20X12 INCHES FIRST NUMBER IS SIDE SHOWN. DASHED 20X12 LINES INDICATE ACOUSTICAL LINER. DIMENSIONS INDICATES CLEAR INSIDE DIMENSIONS SUPPLY OR OUTSIDE AIR DUCT >.< - RETURN AIR DUCT �< REUEF OR EXHAUST AIR DUCT SUPPLY OR OUTSIDE AIR DUCT UP M'" SUPPLY OR OUTSIDE AIR DUCT DOWN PI RETURN AIR DUCT UP / RETURN AIR DUCT DOWN 1. PRIOR TO STARTING THE WORK, CONTRACTOR SHALL VERIFY THAT EXISTING AIR CONDI1ONING UNITS WORK PROPERLY AND CAN DELVER THE CFM SPECIFIED. SUBMIT TO ENGINEER FOR REVIEW. 2. COORDINATE LOCATIONS OF DIFFUSERS AND GRILLES WITH SUSPENDED CEILING AND LIGHT FIXTURES. 3. WHERE DUCTS ARE USED FOR BOTH HEATING AND COOLING, THE MINIMUM INSULATION SHALL BE PER SECTION 15250 OF THE SPECIFICATION ON M -003. 4. TRANSVERSE JOINTS FOR ALL AIR SUPPLY DUCTS INSTALLED SHALL BE SEALED WITH APROVED MAS11C. 5. VERIFY LOCATIONS AND SIZES OF EXISTING EQUIPMENT PRIOR TO COMMENCEMENT OF THE WORK. INFORM THE ENGINEER OF DISCREPANCIES. 6. COORDINATE THE LOCATION AND ELEVATION OF EQUIPMENT, DUCTWORK AND PIPING WITH OTHER TRADES, TO AVOID INTERFERENCES. 7. CONNECTION, DEMOLMON OR INTERRUPTION TO EXISTING SERVICES SHALL BE MINIMIZED AND COORDINATED WITH THE OWNER'S REPRESENTATIVE. 8. EQUIPMENT SHALL BE INSTALLED, DUCTED AND /OR PIPED IN ACCORDANCE WITH APPLICABLE CODES AND MANUFACTURERS RECOMMENDATIONS. 9. EQUIPMENT DESIGNED TO BE FIXED IN POSMON SHALL BE SECURELY FASTENED IN PLACE. 10. ALL SHEET METAL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH SMACNA DESIGNS AND CONSTRUCTION STANDARDS. 4 °' ; , f ' 11. AT COMPLETION OF INSTALLATION, BALANCE VAV TERMINALS AND DIFFUSERS /REGISTERS TO PROVIDE ;. SUPPLY AIR CFM INDICATED ON PLANS. BALANCE UNIT TO PROVIDE OUTSIDE AIR AS STATED. SUBMIT 4\ COPIES OF CERTIFIED AIR BALANCE REPORT FOR APPROVAL. 12. THE LOCATION OF ACCESS PANELS FOR CONCEALED VALVES, FUSIBLE LINKS, DAMPER OPERATORS AND EQUIPMENT SHALL BE COORDINATED WITH THE ARCHITECTURAL TRADES. r° ; "- 13. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PATCHING AND REPAIRING WORK AREAS, AS A RESULT OF THEIR WORK. REPAIR TO MATCH EXISTING FINISHES. 14. ACCURATE "AS- BUILT" DRAWINGS SHALL BE MAINTAINED DURING CONSTRUCTION AND SUBMITTED FOR APPROVAL UPON COMPLETION OF INSTALLATION. INDICATE DUCT AND EQUIPMENT SIZES AND LOCATIONS. 15. CONTRACTOR SHALL PERFORM ALL WORK IN A COMPLETE AND WORKMANLIKE WAY IN CONFORMANCE WITH ALL CODES, AND MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR SHALL COORDINATE WITH ARCHITECTS, ELECTRICAL AND STRUCTURAL. ALL WORK TO BE PERFORMED TO PROVIDE A COMPLETE AND WORKING SYSTEM. 16. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS, FEES, TESTING, ETC. CONTRACTOR SHALL PROVIDE A ONE YEAR WARRANTY /GUARANTEE FOR ALL WORK PERFORMED UNDER THIS CONTRACT. 17. THIS TENANT IMPROVEMENT PROJECT HAS NOT MODIFIED THE THERMAL CHARACTERISTICS OF THE ENVELOPE. 18. CONTRACTOR SHALL VERIFY THE EXISTING BUILDING'S OUTSIDE AIR SHAFT INTO THE BUILDING. ADJUST DAMPERS TO MATCH THE MECHANICAL VENTILATION REQUIREMENTS IN THESE DRAWINGS. 19. THESE DOCUMENTS WERE PREPARED PER AVAILABLE AS -BUILT DOCUMENTS. CONTRACTOR SHALL VISIT SITE TO BECOME FULLY FAMILIAR WMEH THE SCOPE OF WORK AND REVIEW EXISTING CONDITIONS PRIOR TO BID. 20. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS (SIZE, LOCATION, ETC.) PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE TO NOTIFY THE ARCHITECT /ENGINEER OF ANY DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDff10NS. 21. CONTRACTOR SHALL NOT CUT, NOTCH AND/OR BORE EXISTING JOIST, BEAMS AND/OR JOIST WITHOUT FIRST SECURING WRITTEN APPROVAL FROM ARCHITECT. / = �" " - Y �= ry �° r ..,i ,., ' ; : - RELIEF OR EXHAUST AIR DUCT UP C REUEF OR EXHAUST AIR DUCT DOWN --Z alalt l -LINE 90 DEGREE DROP (RISE) IN DUCT UP UP INCLINED RISE IN DUCT C C DN IIMMEN/ a ON 1 INCLINED DROP IN DUCT ' ( C ELBOW WITH VANES I, FLEXIBLE DUCT FIRE DAMPER MOTORIZED DAMPER �- 40,__- M BDD BACKDRAFT DAMPER 0 a POINT OF DISCONNECT POINT OF CONNECTION - NEW TO EXISTING �,1 TERMINAL AIR UNIT \ ••••••• \ \ \ TS 8 \\ HHW (AS APPLICABLE) DEMOLITION TEMPERATURE SENSOR THERMOSTAT DUCT MOUNTED SMOKE DETECTOR . DRAWING/DETAIL REFERENCE KEY REFER TO DRAWING /DETAIL NUMBER RE: 2/ MO.O1 SHEET NUMBER OF DRAWING DETAIL / 0 PLAN NOTE REFERENCE M FURNISHED & INSTALLED BY MECHANICAL 01 FURNISHED BY MECHANICAL INSTALLED BY ELECTRICAL EM FURNISHED BY ELECTRICAL INSTALLED BY MECHANICAL ® FURNISHED & INSTALLED BY ELECTRICAL =° w 1 , �-" r• � � ���� �� SEPARATE PERMIT REQUIRED MR: Mechanical Electrical [Plumbing Cl�Gas Plping City of Tukwila Bl,�1�.1711 "aG DIVISION RECEIVED RECEIVED CITY EC TLI. nnL,e, DEC 5 2007 i� - - �' -�'�` �,,. '.` PLHIVIIT Cr tf I ER 3//$ ©g City of Tukwila 13Ur DING DIVISION AA 0 .. Carter::Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327-1601 - 11 - 30 - 07 ISSUE FOR PERMIT NO. DATE WESTFIELD SHOPPINGTOWN SOUTHCENTER 633 Southcenter Mall Seattle, WA 98188 DESIGNED BY: KL CHECKED BY: MV DRAWN BY: DL PROJECT NUMBER: SCALE: coFtRUONr ® 2007 WRIER & BURGESS, INC. at &t 1 EXPIRES 03/15/08 1 ISSUES /REVISIONS DESCRIPTION APPROVED BY: MV 441805.011.039.0001 NONE MECHANICAL AND PLUMBING LEGEND, SYMBOLS AND ABBREVIATIONS M -001 COMcheck Software Version 3.4.2 Mechanical Compliance Certificate 2006 IECC Report Date: 11/29/07 Data filename: R: tJOBICingulariWASHIN- 1\SOUTHC- 1 \CalcslCatcslmech.cck Section 1: Project Information Project Title: at &t Construction Site: Owner /Agent Designer /Contractor: 633 Southcenter Mall Cingular Wireless. L.L.C. Carter & Burgess Seattle, WA 98188 1920 Customer Care Way 4 Hutton Centre Drive, Suite 800 Atwater, CA 95301 Santa Ana, CA 92707 Section 2: General Information Building Location (for weather data): Climate Zone: Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 50 degrees F): Project Type: Seattle, Washington 4c 4611 2120 New Construction Section 3: Mechanical Systems List uantl System Tvpe &Die crap I _i 1 HVAC System 1: Heating: Other, Electric/ Cooling: Other, Capacityy n =65 - <90 kt3tul11. Air - Cooled Condenser/ Single Zone i HVAC System 2: Heating: Other, Electric 1 Cooling: Other, Capacity <54 kBtulh, Air-Cooled Condenser / Single Zone Section 4: Requirements Checklist Requirements Specific To: 1-IVAC System 1 : 0 1. Integrated air economizer required - Exception: Airlevap condenser serving space with open -case refrigeration Requirements Specific To I4VAC System 2 : None �1. 04. Generic Requirements: Must be met by all systems to which the requirement is applicable: Load calculations per 2001 ASHRAE Fundamentals 0 2. Plant equipment and system capacity no greater than needed to meet Toads - Exception: Standby equipment automatically off when primary system is operating - Exception: Multiple units controlled to sequence operation as a function of toad Minimum one temperature control device per system Minimum one humidity control device per installed humidiificationldehumidification system Thermostatic controls has 5 degrees F deadband - Exception: Thermostats requiring manual changeover between heating and cooling 6. Automatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool): 7-day clock. 2 -hour occupant override, l0 -hour backup - Exception: Continuously operating zones A Page 1 of 2 - Exception: 2 kW demand or less, submit calculations $.7. Outside -air source for venhiation; system capable of reducing OSA to required minimum 4. 8. R -5 supply and return air duct insulation in unconditioned spaces R -8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly - Exception: Ducts located within equipment - Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F. - Exception: Continuously welled and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g. pressure classification '9. Mechanical fasteners and sealants used to connect duds and air distribution equipment 14 sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181 B tapes and mastics 0 11.0peration and maintenance manual provided to building owner '{ 12. Balancing devices provided in accordance with IMC 603.15 X 13.Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings - Exception: Gravity dampers acceptable in buildings <3 stories - Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are interlocked with fan 0 14.Statr and elevator shaft vents are equipped with motorized dampers Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2008 IECC requirements in COMcheck Version 3.4.2 and to comply with the mandatory requirements in the Requirements Checklist. WIN(' igs - L - AfEt A RAC bEsTkilt Name - Title Sign w Date 11 2V-D Page 2 of 2 e T -., • a?7 "•••.„ RECEIVED CITY OF TlJKWILA DEC 0 5 2007 PEkM T GEN 1 ER Cartereurgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, Califomia 92707 TEL: (714) 327-1600 FAX: (714) 327 -1601 11 -30 -07 ISSUE FOR PERMIT NO. DATE WESTFIELD SHOPPINGTOWN SOUTHCENTER 633 Southcenter Mall Seattle, WA 98188 DESIGNED BY: KL CHECKED BY: MV DRAWN 6Y: KL PROJECT NUMBER: SCALE: CFrtat tfr 0 2007 CAM & BURGESS, INC. MECHANICAL COMPLIANCE FORMS at &t 1 EXPIRES 03/15/08 1 ISSUES /REVISIONS DESCRIPTION APPROVED BY: MV 441805.011.039.0001 NONE M -002 SECTION 15010 GENERAL PROVISIONS PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. B. INCLUDE ALL LABOR, MATERIAL EQUIPMENT, TRANSPORTATION AND SERVICES TO FURNISH AND INSTALL COMPLETE MECHANICAL SYSTEMS AND ALTERATIONS AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED. THE WORK INCLUDES, BUT IS NOT LIMITED TO: 1. ALL PLUMBING WORK. 2. CONNECTION TO ALL UTILITIES. 3. HEATING AND AIR CONDITIONING. 4. INSULATION. 5. TEMPERATURE CONTROLS. 1.02 DESCRIPTION OF WORK A. EXTENT OF MECHANICAL WORK IS INDICATED ON DRAWINGS OR SPECIFIED IN DMSION 15 SECTIONS OF THE SPECIFICATION. PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION AND SERVICE NECESSARY FOR A COMPLETE MECHANICAL SYSTEM. 1.03 QUALITY ASSURANCE A. ALL WORK ACCOMPLISHED UNDER THESE SPECIFICATIONS SHALL BE IN ACCORDANCE WITH REQUIREMENTS AND RECOMMENDATIONS OF THE LOCAL COUNTY, STATE, ACCEPTED MECHANICAL CODE, PLUMBING CODE, BUILDING CODE, ETC. UNDER THIS JURISDICTION B. IN ADDmON, FOLLOW ALL REQUIREMENTS PERTAINING TO THE MALL TENANT DESIGN MANUAL 1.04 SUBMITTALS A. CONTRACTOR SHALL SUBMIT FOR REVIEW, SIX COPIES OF SHOP DRAWINGS, LITERATURE, AND EQUIPMENT UST WITHIN 30 DAYS AFTER CONTRACT IS LET. FIRE PROTECTION DRAWINGS SHALL BE SUBMITTED PER DMSION 1. B. SUBMIT PRIOR TO FABRICATION OR DELIVERY. C. SUBMIT COMPLETE, AT ONE TIME. PARTIAL SUBMITTALS WILL NOT BE CONSIDERED (EXCEPT AS NOTED ABOVE FOR CONTROLS AND DUCTWORK). D. CATALOG SHEETS SHALL BE COMPLETE AND THE TEEM OR MODEL TO BE USED SHALL BE CLEARLY MARKED. E. UST SUBSTITUTE TEEMS SEPARATELY AND SO IDENTIFIED. PART 2.00 - PRODUCTS 2.01 MATERIALS A. ALL MATERIALS SHALL BE NEW AND OF MANUFACTURERS SPECIFIED HEREIN. THEY SHALL BE U.S. MADE (EXCEPT CANADIAN COPPER PIPE IS ACCEPTABLE) AND BEAR THE U.L, ETL OR CSA LABEL WHERE POSSIBLE. B. ALL EQUIPMENT SHALL BE REGULARLY CATALOGUED ITEMS OF THE MANUFACTURER AND IN USE FOR AT LEAST TWO YEARS AND SHALL BE SUPPLIED AS A COMPLETE UNIT IN ACCORDANCE WITH THE MANUFACTURER'S STANDARD SPECIFICATIONS AND ANY OPTIONAL ITEMS REQUIRED FOR PROPER INSTALLATION FOR THE EQUIPMENT UNLESS OTHERWISE NOTED. ALL EQUIPMENT AND MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND BEST TRADE PRACTICES. 2.02 SUBSTITUTIONS A. IN ALL CASES IN THIS SPECIFICATION WHERE AN ARTICLE IS FOLLOWED BY THE WORDS OR APPROVED EQUAL ", THE ARCHITECT IS THE SOLE JUDGE OF THE QUALITY OF THE PROPOSED SUBSTITUTION. B. WHEN THE ARCHITECT /OWNER APPROVES A SUBSTITUTION, THE APPROVAL IS GIVEN WITH THE UNDERSTANDING THAT THE CONTRACTOR GUARANTEES THE ARTICLE OR MATERIAL SUBSTITUTED TO BE EQUAL TO OR BETTER IN EVERY RESPECT THAN THE ARTICLE OR MATERIAL SPECIFIED. THE CONTRACTOR SHALL ALSO ASSUME COMPLETE RESPONSIBILITY THAT THE ARTICLE OR MATERIAL WILL FIT THE JOB AS FAR AS SPACE, ACCESS AND SERVICING REQUIREMENTS. C. WHERE SEVERAL MATERIALS ARE SPECIFIED BY NAME FOR ONE USE, SELECT FOR USE ANY OF THOSE SO SPECIFIED. NOTE THAT EQUIPMENT LAYOUT IS BASED ON EQUIPMENT LISTED IN EQUIPMENT SCHEDULES. ANY OTHER EQUIPMENT USED MUST FIT IN AVAILABLE SPACE WITH ALL ACCESS AND SERVICING REQUIREMENTS MAINTAINED. IT I5 THE CONTRACTOR'S RESPONSIBILITY TO CHECK THAT THIS EQUIPMENT WILL MEET THESE REQUIREMENTS. D. WHENEVER ITEM OR CLASS OF MATERIAL IS SPECIFIED EXCLUSMIY BY DETAIL SPECIFICATION, TRADE NAME, MANUFACTURER'S NAME OR BY CATALOG REFERENCE, USE ONLY SUCH ITEM, UNLESS WRITTEN APPROVAL IS GIVEN FOR SUBSTITUTION PRIOR TO BID. PART 3.00 - EXECUTION 3.01 DRAWINGS A. THE MECHANICAL DRAWINGS ARE GENERALLY DIAGRAMMATIC. COMPLETE DETAILS OF THE BUILDING WHICH AFFECT THE MECHANICAL INSTALLATION MAY NOT BE SHOWN. FOR ADDMONAL DETAILS, THE CONTRACTOR IS REFERRED TO THE ARCHITECTURAL, STRUCTURAL, & ELECTRICAL DRAWINGS. 3.02 CODES, ORDINANCES AND PERMITS A. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES. TAKE OUT AND PAY FOR ALL INSPECTION FEES AND PERMITS. COMPLIANCE WITH CODES AND ORDINANCES SHALL BE AT THE CONTRACTOR'S EXPENSE. INCLUDE ALL CONNECTION AND PERMIT FEES IN BID. CONTRACTOR SHALL CONTACT L &I FOR INSPECTION OF ALL PRESSURE VESSELS IN A TIMELY MANNER BEFORE OCCUPANCY OF THE BUILDING. 3.04 TESTING A. WATER PIPING TEST ALL WATER PIPING SYSTEMS AT 125 PSI WATER PRESSURE AND HOLD FOR FOUR (4) HOURS. TEST IN SECTIONS BEFORE COVERING. TEST ENURE SYSTEM WHEN COMPLETELY INSTALLED REPAIR ANY DEFECTS SHOWN BY TEST AND RETEST UNTIL ENTIRELY TIGHT. B. WASTE AND SEWER PIPING TEST ALL WASTE, SEWER AND VENT PIPING BY FILLING WITH WATER TO ROOF. HOLD FOR FOUR HOURS. TEST IN SECTIONS AS WORK PROGRESSES. REPAIR ANY DEFECTS SHOWN BY TEST AND RETEST UNTIL ENTIRELY TIGHT. C. VALVES TEST ALL VALVE BONNETS FOR TIGHTNESS. OPERATE ALL VALVES AT LEAST ONCE FROM CLOSED -TO- OPEN -TO- CLOSED WHILE UNDER PRESSURE. 3.05 CLEAN UP AND HOUSEKEEPING A. LEAVE ALL EQUIPMENT CLEAN AND READY FOR USE. B. REMOVE ALL LABELS, PAINT, PLASTER, ETC., FROM FIXTURES, EQUIPMENT AND PIPING. 3.06 OPERATING INSTRUCTIONS AND MAINTENANCE MANUALS A. SCOPE 1. PROVIDE COMPLETE OPERATING AND MAINTENANCE INSTRUCTIONS AND 2. PROVIDE FOUR COPIES OF EACH BOUND INTO BOOKLET FORM. 3. DELIVER BOOKLETS TO THE ARCHITECT BEFORE FINAL INSPECTION. B. CONTENTS: EACH BOOKLET SHALL CONTAIN AT LEAST, BUT NOT LIMITED TO MAINTENANCE INSTRUCTIONS AND PARTS LIST AS FOLLOWS: 1. BASIC DESCRIPTION OF ALL SYSTEMS. 2. DESCRIPTION OF ROUTINE MAINTENANCE REQUIRED FOR EACH COMPONENT, 3. SUGGESTED FREQUENCY OF MAINTENANCE, 4. PARTS UST OF ALL EQUIPMENT. 5. OPERATING INSTRUCTIONS AND WARRANTIES ON ALL EQUIPMENT. 6. CONTROLS: AS -BUILT WIRING DIAGRAMS 7. MECHANICAL AS -BUILT DRAWINGS. 8. TROUBLE - SHOOTING UST. 9. NAME, ADDRESS, PHONE NUMBER OF ALL CONTRACTORS AND SUPPLIERS 3.07 RECORD DRAWINGS A. PROVIDE THE ARCHITECT WITH RECORD DRAWINGS. RECORD DRAWINGS SHALL BE NEW, REPRODUCIBLE MYLARS AND SHALL SHOW THE MEASURED LOCATIONS OF ALL CONCERNED PORTIONS OF THE WORK AND SHALL SHOW ALL CHANGES THE CONTRACTOR HAS MADE. B. DRAWINGS MUST SHOW ALL ADDENDUM ITEMS, CHANGE ORDERS AND DEVIATIONS FROM THE PLANS. 3.08 INTERFERENCE A. THE MECHANICAL CONTRACTOR'S ATTENTION I5 CALLED TO THE RESTRICTED SPACE FOR INSTALLATION OF MECHANICAL SYSTEMS. OFFSETS, REROUTING AND COORDINATION WILL BE REQUIRED TO FIT ALL ELEMENTS IN AVAILABLE SPACE AND THE MECHANICAL CONTRACTOR SHALL INCLUDE PROVISIONS FOR SUCH IN HIS BID. B. DUCTWORK AND PIPING SHALL BE ROUTED TO CLEAR UGHT FIXTURES. COORDINATE ROUTING OF DUCTWORK AND PIPING WITH EACH OTHER 50 GRADE OF PIPING CAN BE ACCOMPLISHED, AND TO FIT IN AVAILABLE SPACE. C. DUCTWORK SHALL BE INSTALLED AS REQUIRED TO CLEAR LIGHT FIXTURES AND TO FIT IN AVAILABLE SPACE. PROVIDE OFFSETS, V OR SLEEVES AS REQUIRED. MAINTAIN EQUIVALENT FREE AREA OF DUCTWORK. D. DUCTWORK TAKES PRECEDENCE OVER PIPING FOR AVAILABLE SPACE AND ROUTING. COORDINATE INSTALLATION BASED ON THIS PRECEDENCE. E. DUCTWORK AND /OR PIPING SHALL NOT BE RUN OVER ELECTRICAL PANELS. 3,09 WORKMANSHIP A. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH BEST TRADE PRACTICE. ANY SUBSTANDARD WORKMANSHIP SHALL BE REMOVED AND REPLACED AT NO EXTRA COST TO THE OWNER. 3.10 SEISMIC RESTRAINTS A. PROVIDE SEISMIC RESTRAINTS ON ALL PIPING AND DUCTWORK IN ACCORDANCE WITH THE "GUIDUNES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS" AS PREPARED BY SMACNA AND THE PLUMBING PIPING INSTITUTE COUNCIL B. PROVIDE SEISMIC RESTRAINTS ON ALL EQUIPMENT AND PROVIDE SLACK CABLE RESTRAINTS ON ALL SUSPENDED 'EQUIPMENT. COMPLETE RESTRAINT SYSTEM SHALL BE SELECTED, SHOP DRAWINGS SEALED BY AND CERTIFICATION PROVIDED BY A PROFESSIONAL STRUCTURAL ENGINEER. END OF SECTION 15010 SECTION 15030 ELECTRICAL PROVISIONS TO MECHANICAL WORK PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 STANDARDS A. FOR ELECTRICAL EQUIPMENT AND PRODUCTS, EMPLOY WITH APPLICABLE NEMA STANDARDS, AND REFER TO NEMA STANDARDS FOR DEFINITIONS OF TERMINOLOGY HERON. COMPLY WITH NATIONAL ELECTRICAL CODE (NFPA 70) FOR WORKMANSHIP AND INSTALLATION REQUIREMENTS AND TO APPLICABLE SECTIONS OF DMSION 16 OF THE SPECIFICATIONS. PART 2.00 - PRODUCTS A. MANUFACTURER 1. EXCEPT WHERE ITEM OF MECHANICAL EQUIPMENT (WHICH OTHERWISE COMPLIES WITH REQUIREMENTS) MUST BE INTEGRALLY EQUIPPED WITH MOTOR PRODUCED BY ANOTHER MANUFACTURER, PROVIDE MOTORS FOR MECHANICAL EQUIPMENT. B. MOTOR CHARACTERISTICS 1. EXCEPT WHERE MORE STRINGENT REQUIREMENTS ARE INDICATED, AND EXCEPT WHERE REQUIRED ITEM OF MECHANICAL EQUIPMENT CANNOT BE OBTAINED WITH FULLY COMPLYING MOTOR, COMPLY WITH THE FOLLOWING REQUIREMENTS FOR MOTORS OF MECHANICAL WORK: A. TEMPERATURE RATING: RATED FOR 40 DEG. C ENVIRONMENT WITH MAXIMUM 50 DEG. C TEMPERATURE RISE FOR CONTINUOUS DUTY AT FULL LOAD (CLASS A INSULATION). B. STARTING CAPABILITY: PROVIDE EACH MOTOR CAPABLE OF MAKING STARTS AS FREQUENTLY AS INDICATED BY AUTOMATIC CONTROL SYSTEM, AND NOT LESS THAN 5 STARTS /HOUR FOR MANUALLY CONTROLLED MOTORS. C. PHASES AND CURRENT CHARACIU ISTICS: PROVIDE SQUIRREL -CAGE INDUCTION POLYPHASE MOTORS FOR 1 HP AND LARGER, AND PROVIDE CAPACITOR -START SINGLE -PHASE MOTORS FOR 3/4 HP AND SMALLER, EXCEPT 1/6 HP AND SMALLER MAY, AT EQUIPMENT MANUFACTURER'S OPTION, BE SPLIT -PHASE TYPE. COORDINATE CURRENT CHARACTERISTICS WITH POWER SPECIFIED IN DMSION -16 SECTIONS, AND WITH INDMDUAL EQUIPMENT REQUIREMENTS SPECIFIED IN OTHER DMSION -15 REQUIREMENTS. FOR 2-SPEED MOTORS PROVIDE 2 SEPARATE WINDINGS ON POLYPHASE MOTORS. DO NOT PURCHASE MOTORS UNTIL POWER CHARACTERISTICS AVAILABLE AT LOCATIONS OF MOTORS HAVE BEEN CONFIRMED, AND UNTIL ROTATION DIRECTIONS HAVE BEEN CONFIRMED. D. SERVICE FACTOR: 1.15 FOR POLYPHASE MOTORS, AND 1.35 FOR SINGLE -PHASE MOTORS. C. MOTOR CONSTRUCTION 1 PROVIDE GENERAL PURPOSE, CONTINUOUS DUTY MOTORS, DESIGN "B ", EXCEPT "C" WHERE REQUIRED FOR HIGH STARTING TORQUE A FRAMES: NEMA NO. 48. B. BEARINGS: BALL OR ROLLER BEARINGS WITH INNER AND OUTER SHAFT SEALS, PERMANENTLY SEALED. WHERE BELT DRIVES AND OTHER DRIVES PRODUCE LATERAL OR AXIAL THRUST IN MOTOR, PROVIDE BEARINGS DESIGNED TO RESIST THRUST LOADING. REFER TO INDMDUAL SECTIONS OF DMSION -15 FOR FRACTIONAL -HP UGHT -DUTY MOTORS WHERE SLEEVE -TYPE BEARINGS ARE PERMITTED. C. ENCLOSURE TYPE: EXCEPT AS OTHERWISE INDICATED PROVIDE OPEN DROP -PROOF MOTORS FOR INDOOR USE WHERE SATISFACTORILY HOUSED OR REMOTELY LOCATED DURING OPERATION, AND PROVIDE GUARDED DRIP -PROOF MOTORS WHERE EXPOSED TO CONTACT BY EMPLOYEES OR BUILDING OCCUPANTS. PROVIDE WEATHER - PROTECTED TYPE I FOR OUTDOOR USE, TYPE II WHERE NOT HOUSED. REFER TO INDMDUAL SECTIONS OF DMSION -15 FOR OTHER ENCLOSURE REQUIREMENTS. D. OVERLOAD PROTECTION: PROVIDE BUILT -IN THERMAL OVERLOAD PROTECTION FOR 120V MOTORS. E. EFFICIENCY: MOTORS ARE TO BE "ENERGY EFFICIENT" HAVING MINIMUM EFFICIENCY AS SCHEDULED IN ACCORDANCE WITH IEEE STANDARD 112, TEST METHOD B. F. PROVIDE MOTORS WITH MINIMUM 85% POWER FACTOR. WHERE LESS THAN 85 %, PROVIDE POWER FACTOR CORRECTION TO MINIMUM 90% PER ENERGY CODES. D. NAMEPLATE PROVIDE METAL NAMEPLATE ON EACH MOTOR, INDICATING FULL IDENTIFICATION OF MANUFACTURER, RATINGS, CHARACTERISTICS, CONSTRUCTION, SPECIAL FEATURES, AND SIMILAR INFORMATION. 2.02 STARTERS, ELECTRICAL DEVICES AND WIRING A. MOTOR STARTER MANUFACTURER 1. EXCEPT WHERE ITEM OF MECHANICAL EQUIPMENT MUST BE INTEGRALLY FURNISHED WITH MOTOR STARTER PRODUCED BY ANOTHER MANUFACTURER, PROVIDE MOTOR STARTERS FOR MECHANICAL EQUIPMENT MANUFACTURED BY ONE OF THE FOLLOWING: CUTLER - HAMMER, GE OR SQUARE D. B. MOTOR STARTER CHARACTERISTICS 1. COMPLY WITH NEMA STANDARDS AND NEC. PROVIDE TYPE I GENERAL PURPOSE ENCLOSURES WITH PAD LOCK EARS, AND WITH FRAMES AND SUPPORTS FOR MOUNTING ON WALL, FLOOR OR PANEL AS INDICATED. PROVIDE TYPE AND SIZE OF STARTER RECOMMENDED BY MOTOR MANUFACTURER AND EQUIPMENT MANUFACTURER FOR APPLICABLE PROTECTION AND START -UP CONDmON; REFER TO INDMDUAL EQUIPMENT SECTIONS FOR BASIC LOAD REQUIREMENTS. A. MANUAL SWITCHES: PROVIDE MANUAL SWITCH AND PILOT LIGHT FOR MOTORS 1/2 HP AND SMALLER, EXCEPT W HERE INTERLOCK OR AUTOMATIC OPERATION IS INDICATED. 1) OVERLOAD PROTECTION: PROVIDE MELTING ALLOY TYPE THERMAL OVERLOAD RELAYS. B. MAGNETIC STARTERS: PROVIDE MAGNETIC STARTERS FOR 3 PHASE MOTORS AND FOR SMALLER MOTORS WHERE INTERLOCK OR AUTOMATIC OPERATION IS INDICATED. INCLUDE THE FOLLOWING: 1) 2) 3) 4) 5) 6) HAND - OFF -AUTO SWITCH AND PILOT LIGHTS, PROPERLY ARRANGED FOR SINGLE -SPEED OR MULTI -SPEED OPERATION AS INDICATED. TRIP -FREE THERMAL OVERLOAD RELAYS, EACH PHASE. INTERLOCKS, PNEUMATIC SWITCHES, AND SIMILAR DEVICES AS REQUIRED FOR COORDINATION WITH CONTROL REQUIREMENTS OF DMSION -15 CONTROLS SECTIONS. BUILT -IN 120 -VOLT CONTROL CIRCUIT TRANSFORMER, FUSED FROM LINE SIDE, WHERE SERVICE EXCEEDS 240 VOLTS. WHEN A TRANSFORMER ISN'T USED THE CONTROL COIL SHALL BE FUSED. EXTERNALLY OPERATED MANUAL RESET. UNDERVOLTAGE RELEASE OR PROTECTION FOR EACH PHASE. PART 3.00 - EXECUTION 3.01 STARTERS A. PROVIDE STARTERS AND WIRING DEVICES FOR MOTORS. INSTALLATION BY DMSION 16000. 3.02 MOTORS A INSTALL MOTORS ON MOTOR MOUNTING SYSTEMS IN ACCORDANCE WITH MOTOR MANUFACTURER'S INSTRUCTIONS, SECURELY ANCHORED TO RESIST TORQUE, DRIVE THRUSTS, AND OTHER EXTERNAL FORCES INHERENT IN MECHANICAL WORK. SECURE SHEAVES AND OTHER DRIVE UNITS TO MOTOR SHAFTS WITH KEYS AND ALLEN SET SCREWS, EXCEPT MOTORS OF 1/3 HP AND LESS MAY BE SECURED WITH ALLEN SCREWS ON FLAT SURFACES OF SHAFT. UNLESS OTHERWISE INDICATED, SET MOTOR SHAFTS PARALLEL WITH MACHINE SHAFTS. 3.03 EQUIPMENT FABRICATION A. FABRICATE MECHANICAL EQUIPMENT FOR SECURE MOUNTING OF MOTORS AND OTHER ELECTRICAL ITEMS INCLUDING IN WORK. PROVIDE EITHER PERMANENT ALIGNMENT OF MOTORS WITH EQUIPMENT, OR ADJUSTABLE MOUNTINGS AS APPLICABLE FOR BELT DRIVES, GEAR DRIVES, SPECIAL COUPLINGS AND SIMILAR INDIRECT COUPLING OF EQUIPMENT. PROVIDE SAFE, SECURE, DURABLE, AND REMOVABLE GUARDS FOR MOTOR DRIVES, ARRANGED FOR LUBRICATION AND SIMILAR RUNNING MAINTENANCE WITHOUT REMOVAL OF GUARDS. END OF SECTION 15030 SECTION 15050 MECHANICAL IDENTIFICATION PART 1.00 -- GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDMONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 STANDARDS A ANSI COMPLIANCE COMPLY WITH ANSI A13.1 FOR LETTERING SIZE, COLORS, AND INSTALLED VIEWING ANGLES OF IDENTIFICATION DEVICES. PART 2.00 PRODUCTS 2.01 ENGRAVED PLASTIC- LAMINATE SIGNS A PROVIDE ENGRAVED STOCK MELAMINE PLASTIC LAMINATE, COMPLYING WITH FS L- P -387, ENGRAVED WITH ENGRAVER'S STANDARD LETTER STYLE OF SIZES AND WORDING, BLACK WITH WHITE CORE (LETTER COLOR) EXCEPT AS OTHERWISE INDICATED, PUNCHED FOR MECHANICAL FASTENING EXCEPT WHERE ADHESIVE MOUNTING IS NECESSARY BECAUSE OF SUBSTRATE. PROVIDE 1/16" THICKNESS FOR UNITS UP TO 20 SQ. IN. OR 8" LENGTH; 1/8" FOR LARGER UNITS. PROVIDE FASTENING PER SELF - TAPPING STAINLESS STEEL SCREWS, EXCEPT CONTACT -TYPE PERMANENT ADHESIVE WHERE SCREWS CANNOT OR SHOULD NOT PENETRATE SUBSTRATE. PROVIDE FOR ALL EQUIPMENT. 2.02 ELECTRICAL EQUIPMENT A. ON ALL MECHANICAL EQUIPMENT THAT HAS POWER CONNECTORS, PROVIDE WITH PERMANENT MARKER, THE ELECTRICAL PANEL AND BREAKER NUMBER. MARK ON DISCONNECT. PART 3.00 - EXECUTION 3.01 MECHANICAL EQUIPMENT IDENTIFICATION A. MECHANICAL EQUIPMENT IDENTIFICATION INSTALL ENGRAVED PLASTIC LAMINATE SIGN ON OR NEAR EACH MAJOR ITEM OF MECHANICAL EQUIPMENT AND EACH OPERATING DEVICE. PROVIDE SIGNS FOR WATER HEATERS, FANS, HVAC UNITS AND OTHER OPERATIONAL DEVICES. END OF SECTION 15050 SECTION 15060 PIPE TUBE & FITTINGS PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 QUALITY ASSURANCE A. CERTIFY BRAZING PROCEDURES, BRAZERS, AND OPERATORS IN ACCORDANCE WITH ANSI B31.5. PART 2.00 - PRODUCTS 2.01 PIPING MATERIALS A. COPPER TUBE: ASTM 888. B. DWV COPPER TUBE: ASTM B 306. C. HUBLESS CAST -IRON SOIL PIPE: CISPI 301, WITH COUPLING ASSEMBLY, CISPI 310. D. SILL PIPE ASTM 106B, SCH 40, TREADED. 2.02 PIPE/TUBE FITTINGS A. CAST -IRON FLANGED FITTINGS: ANSI 816.1. B. CAST -IRON THREADED FITTINGS: ANSI B16.4. C. MALLEABLE IRON THREADED UNIONS: ANSI B16.3; GALVANIZED PIPING SYSTEMS. D. MALLEABLE IRON THREADED UNIONS: ANSI B16.39. E. DUCTILE IRON PRESSURE PIPING FITTINGS: ANSI A21.10; AWWA C110 F. THREADED PIPE PLUGS: ANSI B16.14. G. CAST -IRON THREADED DRAINAGE FITTINGS: ANSI 816.12. H. PIPE NIPPLES: SAME PIPING MATERIAL AS CONNECTING PIPING; SCHEDULE 80 FOR 1 -1/2" UNTHREADED LENGTH WITH PIPE SIZES LESS THAN 1 -1/4'; NO CLOSE NIPPLES ALLOWED. I. WROUGHT - COPPER SOLDER -JOINT FITTINGS: ANSI B16.22. J. CAST - COPPER SOLDER -JOINT DRAINAGE FITTINGS: ANSI B16.23. K. WROUGHT - COPPER SOLDER -JOINT DRAINAGE FITTINGS: ANSI B16.29. L COPPER -TUBE UNIONS: ANSI B16.15. M. RUBBER - GASKET JOINTS: ANSI A21.11; AWWA C111. N. HUBLESS CAST -IRON SOIL PIPE FITTINGS: CISPI 301. 0. HUB-AND SPIGOT CAST -IRON PIPE FITTINGS: ASTM A74. 2.03 MISCELLANEOUS PIPING MATERIALS /PRODUCTS A. SOLDERING MATERIALS: PROVIDE ONE OF THE FOLLOWING FOR EACH SERVICE: TIN -LEAD SOLDER: ASTM B32, GRADE 50A; FOR DRAINAGE PIPING OR TIN - ANTIMONY SOLDER: ASTM B32, GRADE 95TA FOR PRESSURE PIPING. B. PIPING CONNECTORS FOR DISSIMILAR NON- PRESSURE PIPE ELASTOMERIC ANNULAR RING INSERT, OR ELASTOMERIC FLEXIBLE COUPLING SECURED AT EACH END WITH STAINLESS STEEL CLAMPS, SIZED FOR EXACT FIT TO PIPE ENDS AND SUBJECT TO APPROVAL BY PLUMBING CODE. PART 3.00 - EXECUTION 3.01 GENERAL A. INSTALL PIPE, TUBE AND FITTINGS IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES WHICH WILL ACHIEVE PERMANENTLY LEAKPROOF PIPING SYSTEMS, CAPABLE OF PERFORMING EACH INDICATED SERVICE WITHOUT PIPING FAILURE. INSTALL EACH RUN WITH MINIMUM JOINTS AND COUPUNGS, BUT WITH ADEQUATE AND ACCESSIBLE UNIONS FOR DISASSEMBLY AND MAINTENANCE REPLACEMENT OF VALVES AND EQUIPMENT. REDUCE SIZES (WHERE INDICATED) BY USE OF REDUCING FITTINGS. ALIGN PIPING ACCURATELY AT CONNECTIONS, WITH 1/16 MISALIGNMENT TOLERANCE. 3.02 THREAD PIPE A. THREAD PIPE IN ACCORDANCE WITH ANSI B2.1. APPLY PIPE JOINT COMPOUND OR PIPE JOINT TAPE (TEFLON) ON MALE THREADS AND TIGHTEN JOINT TO LEAVE NOT MORE THAN 3 THREADS EXPOSED. 3.03 SOLDER JOINTS A. COMPLY WITH APPLICABLE PROVISIONS OF "COPPER TUBE HANDBOOK" BY CDA. 3.04 HUBLESS CAST -IRON JOINTS A. COMPLY WITH CISPI 310. 3.05 CLEANING, FLUSHING, AND INSPECTING A GENERAL CLEAN EXTERIOR SURFACES OF INSTALLED PIPING SYSTEMS OF SUPERFLUOUS MATERIALS, AND PREPARE FOR APPLICATION OF SPECIFIED COATINGS (IF ANY). FLUSH OUT PIPING SYSTEMS WITH TEST MEDIA BEFORE PROCEEDING WITH REQUIRED TESTS. INSPECT EACH RUN OF EACH SYSTEM FOR COMPLETION OF JOINTS, SUPPORTS, AND ACCESSORY ITEMS. 1. INSPECT PRESSURE PIPING IN ACCORDANCE WITH PROCEDURES OF ANSI B31. 2. DISINFECT WATER MAINS AND WATER SERVICE PIPING IN ACCORDANCE WITH AWWA C601. 3.06 PIPING TESTS A GENERAL PROVIDE EQUIPMENT FOR TESTING, TEST BEFORE INSULATION IS INSTALLED, REMOVE CONTROL DEVICES BEFORE TESTING. TEST EACH SECTION OF EACH PIPING SYSTEM INDEPENDENTLY. FILL EACH SECTION WITH WATER, AND TEST PER SECTION 15010 3.04. B. REPAIR PIPING SYSTEMS SECTION WHICH FAIL TEST, BY DISASSEMBLY AND RE-- INSTALLATION, USING NEW MATERIALS TO OVERCOME LEAKAGE. DO NOT USE CHEMICALS, STOP -LEAK COMPOUNDS, MASTICS, OR OTHER TEMPORARY REPAIR METHODS. END OF SECTION 15060 SECTION 15100 VALVES PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDMONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. PART 2.00 - PRODUCTS 2.01 GENERAL A. PROVIDE FACTORY- FABRICATED VALVES RECOMMENDED BY MANUFACTURER FOR USE IN SERVICE INDICATED. PROVIDE VALVES OF TYPES AND PRESSURE RATINGS INDICATED; PROVIDE PROPER SELECTION AS DETERMINED BY INSTALLER TO COMPLY WITH INSTALLATION REQUIREMENTS. PROVIDE SIZES AS INDICATED, AND CONNECTIONS WHICH PROPERLY MATE WITH PIPE, TUBE, AND EQUIPMENT CONNECTIONS. WHERE MORE THAN ONE TYPE IS INDICATED, SELECTION IS INSTALLER'S OPTION. 2.02 BALL VALVES A SELECT WITH PORT AREA EQUAL TO OR GREATER THAN CONNECTING PIPE AREA, INCLUDE SEAT RING DESIGNED TO HOLD SEALING MATERIAL. COMPLY WITH THE FOLLOWING STANDARDS: 1. BRONZE VALVES: MILWAUKEE " BUTTERBALL " OR EQUAL 2. MANUFACTURER: CRANE, FAIRBANKS, MILWAUKEE OR NIBCO. 2.03 AUTOMATIC FLOW CONTROL VALVES PART 3.00 - EXECUTION 3.01 INSTALLATION A. INSTALL VALVES WHERE REQUIRED FOR PROPER OPERATION OF PIPING AND EQUIPMENT, INCLUDING VALVES IN BRANCH LINES WHERE NECESSARY TO ISOLATE SECTIONS OF PIPING. LOCATE VALVES SO AS TO BE ACCESSIBLE AND SO THAT SEPARATE SUPPORT CAN BE PROVIDED WHEN NECESSARY. B. INSTALL VALVES WITH STEMS POINTED UP, IN VERTICAL POSmON DOWNWARD FROM HORIZONTAL PLANE. END OF SECTION 15100 SECTION 15250 MECHANICAL INSULATION PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDMONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. AT A MINIMUM, INSULATION VALUES SHALL MEET THE REQUIREMENTS OF THE STATE ENERGY CODE, IF APPUCABLE. 1.02 FLAME /SMOKE RATINGS A. PROVIDE COMPOSITE MECHANICAL INSULATION (INSULATION, JACKETS, COVERINGS, SEALER, MASTICS AND ADHESIVES) WITH FLAME SPREAD INDEX AT 25 OR LESS, AND SMOKE DEVELOPED INDEX OF 50 OR LESS, AS TESTED BY ASTM E84 (NFPA 225) METHOD. PART 2.00 - PRODUCTS 2.01 MATERIALS A. GLASS FIBER PIPE INSULATION: ASTM C 1136 & 547 TYPE I. B. GLASS FIBER PIPE FITTING INSULATION: ASTM C 553. 2.02 MANUFACTURERS A. ONE OF THE FOLLOWING: 1. CERTAINTEED CORP., KNAUF FIBER GLASS, MANVILLE CORP., OWENS - CORNING FIBERGLASS CORP., IMCOA, NOMACO. 2.03 PIPING INSULATION A. OMIT INSULATION ON EXPOSED PLUMBING FIXTURE RUN -OUTS, (EXCEPT AT HANDICAPPED FIXTURES) FROM FACE OF WALL OR FLOOR TO FIXTURE; ON UNIONS, FLANGES, STRAINERS, FLEXIBLE CONNECTIONS, AND EXPANSION JOINTS. 1. INSULATE THE FOLLOWING COLD PIPING SYSTEMS: A) DOMESTIC COLD WATER AND CONDENSATE DRAIN PIPING. 2. INSULATE THE ABOVE COLD PIPING WITH THE FOLLOWING INSULATION: A) GLASS FIBER, 1" THICK ON ALL PIPE SIZE EXCEPT 1" DIAMETER AND LESS PIPE AND RUNOUTS UP TO 2" DIAMETER PIPE SIZE. 3. INSULATE THE FOLLOWING HOT PLUMBING PIPING SYSTEMS: A) DOMESTIC HOT WATER PIPING. 4. INSULATE THE ABOVE HOT PIPING WITH ONE OF THE FOLLOWING INSULATIONS: A) DOMESTIC FIBERGLASS: 1" THICK FOR UP TO 2" DIAMETER PIPE SIZE AND 1.5" THICK FOR 2 -1/2" DIAMETER AND LARGER PIPE SIZES. 5. PROVIDE ASJ (ALL SERVICE JACKET) ON ALL PIPING, EXCEPT PIPING EXPOSED TO THE OUTSIDE SHALL HAVE AN ALUMINUM JACKET. 6. ALL PLUMBING SYSTEMS SHALL MEET OR EXCEED THE INSULATION REQUIREMENTS OF THE APPLICABLE CALIFORNIA ENERGY CODE. WHERE INSULATION THICKNESS SPECIFIED ARE LARGER THAN THOSE USIEU IN THE ENERGY CODE, THE LARGER VALUES SHALL BE USED. 2.04 DUCT SYSTEM INSULATION A. INSULATE ALL SUPPLY & VENTILATION AIR DUCTWORK WITH FSK GLASS FIBER INSULATION HAVING A MINIMUM INSTALLED R -VALUE OF 7. B. DO NOT WRAP SOUNDLINED DUCT. PART 3.00 - EXECUTION 3.01 INSTALLATION -- PIPE AND DUCT INSULATION A. EXAMINE AREAS AND CONDITIONS UNDER WHICH MECHANICAL INSULATION WILL BE INSTALLED. DO NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. B. INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES TO ENSURE THAT INSULATION SERVES ITS INTENDED PURPOSE. C. INSTALL INSULATION ON MECHANICAL SYSTEMS SUBSEQUENT TO TESTING AND ACCEPTANCE OF TESTS. D. CLEAN AND DRY MECHANICAL SURFACES PRIOR TO INSULATING. BUTT INSULATION JOINTS FIRMLY TOGETHER TO ENSURE COMPLETE AND TIGHT FIT OVER SURFACES TO BE COVERED. E. MAINTAIN INTEGRITY OF VAPOR- BARRIER JACKETS ON MECHANICAL INSULATION, AND PROTECT TO PREVENT PUNCTURE OR OTHER DAMAGE. F. COVER VALVES, FITTINGS AND SIMILAR ITEMS IN EACH PIPING SYSTEM WITH EQUIVALENT THICKNESS AND COMPOSMON OR EFFICIENCY OF INSULATION AS APPLIED TO ADJOINING PIPE RUN. G. EXTEND MECHANICAL INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS AND SIMILAR PIPING PENETRATIONS, EXCEPT WHERE OTHERWISE INDICATED. H. INSTALL PROTECTIVE METAL SHIELDS AND INSULATED SADDLES TO PREVENT COMPRESSION OF INSULATION. I. REPAIR DAMAGED SECTIONS OF EXISTING MECHANICAL INSULATION, DAMAGED DURING THIS CONSTRUCTION PERIOD. USE INSULATION OF SAME THICKNESS AS EXISTING INSULATION, INSTALL NEW JACKET LAPPING AND SEALED OVER EXISTING. END OF SECTION 15250 SECTION 15401 WATER PIPING PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDMONS AND DIV 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 COMPLIANCE A. COMPLY WITH APPLICABLE PLUMBING CODE STANDARDS PERTAINING TO MATERIALS, PRODUCTS, AND INSTALLATION OF DOMESTIC WATER PIPING. COMPLY WITH APPLICABLE PLUMBING AND MECHANICAL CODE STANDARDS PERTAINING TO MATERIALS, PRODUCTS, AND INSTALLATION OF PROCESS WATER PIPING (INCLUDING CONDENSER WATER). PART 2 - PRODUCTS 2.01 GENERAL A. BASIC PIPING MATERIALS AND PRODUCTS REQUIRED FOR WORK OF THIS SECTION, ARE SPECIFIED IN DMSION -15 BASIC MATERIALS AND METHODS SECTIONS. PROVIDE PRODUCTS OF SIZES, RATINGS, AND CHARACTERISTICS INDICATED, WHICH COMPLY WITH MANUFACTURER'S STANDARD MATERIALS, DESIGN, AND CONSTRUCTION IN ACCORDANCE WITH PUBLISHED PRODUCT INFORMATION; PROVIDE PROPER QUANTITY OF PIPING AND EQUIPMENT AS REQUIRED FOR COMPLETE INSTALLATION. 2.02 PIPE, TUBE AND FITTINGS A. DOMESTIC WATER PIPING 1. COPPER TUBE: TYPE L HARD - DRAWN TEMPER; WROUGHT - COPPER FITTINGS; SOLDERED JOINTS WITH 95 -5 SOLDER. 2.03 PIPING SPECIALTIES A. PIPE ESCUTCHEONS INSTALL ON EACH PIPE PENETRATION EXPOSED TO VIEW IN OCCUPIED SPACES. B. DRIP PANS INSTALL UNDER PIPES PASSING OVER ELECTRICAL EQUIPMENT. C. SUPPORTS, ANCHORS, AND SEALS PROVIDE FACTORY - FABRICATED HANGERS, SUPPORTS, AND ANCHOR COMPLYING WfT I MSS SP -69. INSTALL COMPLYING WITH MSS SP -89. PART 3.00 - EXECUTION 3.01 PIPING RUNOUTS TO FIXTURES A. PROVIDE HOT AND COLD WATER PIPING RUNOUTS TO FIXTURES OF SIZES INDICATED, BUT IN NO CASE SMALLER THAN REQUIRED BY THE PLUMBING CODE. 3.02 MECHANICAL EQUIPMENT CONNECTION A. CONNECT HOT AND COLD WATER PIPING SYSTEM TO MECHANICAL EQUIPMENT AS INDICATED, AND COMPLY WITH EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS. PROVIDE SHUTOFF VALVE AND UNION FOR EACH CONNECTION, PROVIDE DRAIN ; VALVE ON DRAIN CONNECTION. h END OF SECTION 15401 SECTION 15405 SOIL & WASTE PIPING SYSTEM � <, PART 1.00 -- GENERAL 1.01 GENERAL REQUIREMENTS A DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDMONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. ' 1.02 STANDARDS A. COMPLY WITH APPLICABLE PLUMBING CODE STANDARDS PERTAINING TO MATERIALS, PRODUCTS, AND INSTALLATION OF DRAINAGE PIPING AND EQUIPMENT. B. COMPLY WITH APPLICABLE PDI STANDARDS PERTAINING TO PRODUCES AND INSTALLATION OF SOIL AND WASTE PIPING SYSTEMS. PART 2.00 - PRODUCTS 2.01 GENERAL A. BASIC PIPING MATERIALS AND PRODUCTS REQUIRED FOR THIS SECTION, ARE SPECIFIED IN DMSION 15 PIPE, TUBE & FITTINGS SECTION. PROVIDE PRODUCTS OF TYPES, SIZES, RATINGS, AND CHARACTERISTICS INDICATED, WHICH COMPLY WITH MANUFACTURER'S STANDARD MATERIALS, DESIGN, AND CONSTRUCTION IN ACCORDANCE WITH PUBLISHED PRODUCT INFORMATION; PROVIDE PROPER QUANTITY OF PIPING AND EQUIPMENT AS REQUIRED FOR COMPLETE INSTALLATION. 2.02 PIPES, TUBES AND FITTINGS GENERAL PROVIDE ONE OF THE FOLLOWING SELECTIONS AT INSTALLER'S OPTION A. ABOVE GROUND BUILDING PIPING AND FITTINGS: 1. CAST -IRON HUB -AND- SPIGOT SOIL PIPE: SERVICE WEIGHT, CAST IRON HUB-AND-SPIGOT SOIL PIPE FITTINGS WITH COMPRESSION GASKETS. 2. CAST -IRON HUBLESS SOIL PIPE SERVICE WEIGHT CAST -IRON HUBLESS SOIL PIPE FITTINGS; HUBLESS JOINTS. B. UNDERGROUND BUILDING DRAIN PIPING 1. CAST -IRON HUB -AND- SPIGOT SOIL PIPE FITTINGS, COMPRESSION GASKETS. 2. CAST -IRON HUBLESS SOIL PIPE SERVICE WEIGHT; CAST -IRON HUBLESS SOIL PIPE FITTINGS; HUBLESS JOINTS. C. SUPPORTS, ANCHORS AND SEALS PROVIDE FACTORY- FABRICATED HANGERS, SUPPORTS AND ANCHORS COMPLYING WITH MSS SP -69. INSTALL COMPLYING WITH MSS SP-89. D. DRAINAGE PIPING PRODUCTS 1. CLEANOUT PLUGS: CAST- BRONZE OR BRASS, THREADS COMPLYING WITH ANSI B2.1, COUNTERSUNK HEAD. INSTALL IN CLEANOUTS AS INDICATED AND AS REQUIRED BY THE PLUMBING CODE. E. FLOOR CLEANOUTS CAST -IRON BODY AND FRAME; ADJUSTABLE ROUND TOP AS FOLLOWS: 1. NICKEL - BRONZE TOP: PATTERN TO SUIT ADJACENT FLOOR FINISH. INSTALL IN OCCUPIED AREAS. 2. CAST -IRON TOP: PATTERN TO SUIT ADJACENT FLOOR FINISH. INSTALL IN UNOCCUPIED AREAS. F. WALL CLEANOUTS CAST -IRON BODY ADAPTABLE TO PIPE WITH CLEANOUT PLUG, STAINLESS STEEL ROUND COVER AND SCREW. G. DRAINAGE PIPING PRODUCTS MANUFACTURER JOSAM, SMITH, WADE OR ZURN. H. FLOOR DRAINS: AS SPECIFIED ON DRAWINGS. PROVIDE TRAP PRIMER CONNECTION. RECEIVED CITY OF TIT!<WILA DEC 0 5 2007 PEkIVIIT CLN l ER Carter:Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 NO. DRAWN BY DL COPYRIGHT 0 2007 CARTER & BURGESS. RIM DATE PROJECT NUMBER: SCALE: at &t 1 EXPIRES 03/15/08 ISSUES /REVISIONS 111 -30-07 ISSUE FOR PERMIT DESCRIPTION MECHANICAL AND PLUMBING SPECIFICATIONS WESTFIELD SHOPPINGTOWN SOUTHCENTER 633 Southcenter Mall Seattle, WA 98188 DIMMED BY KL CHECKED BY: MV APPROVED BY: MV 441805.011.039.0001 NONE M -003 PART 3.00 - EXECUTION 3.01 GENERAL A. EQUIPMENT CONNECTIONS PROVIDE SOIL AND WASTE PIPING RUNOUTS TO PLUMBING FIXTURES AND DRAINS, WITH APPROVED TRAP, OR SIZES INDICTED; BUT IN NO CASE SMALLER THAN REQUIRED BY THE LOCAL PLUMBING CODE. B. LOCATE PIPING RUNOUTS AS CLOSE AS POSSIBLE TO BOTTOM OF FLOOR SLAB SUPPORTING FIXTURES OR DRAINS. C. TEST SOIL AND WASTE PIPING SYSTEM IN ACCORDANCE WITH REQUIREMENTS OF LOCAL PLUMBING CODES. D. COORDINATE WITH SOIL AND WASTE PIPING AS NECESSARY TO INTERFACE FLOOR DRAINS WITH DRAINAGE PIPING SYSTEMS. E. INSTALL FLOOR DRAINS IN ACCORDANCE WITH WRITTEN MANUFACTURER'S INSTRUCTIONS, AT LOW POINTS OF SURFACE AREAS TO BE DRAINED, OR AS INDICATED. SET TOPS OF DRAINS FLUSH WITH FINISHED FLOOR. COORDINATE WITH ARCHITECTURAL DRAWINGS. F. INSTALL DRAIN FLASHING COLLAR OR FLANGE SO THAT NO LEAKAGE OCCURS BETWEEN DRAIN AND ADJOINING FLOORING. MAINTAIN INTEGRITY OF WATERPROOF MEMBRANES, WHERE PENETRATED. 3.02 SEWER LINES A. INSTALLATION INSTALL UNDERGROUND BUILDING DRAINS AS INDICATED AND IN ACCORDANCE WITH THE PLUMBING CODE. LAY UNDERGROUND BUILDING DRAINS BEGINNING AT LOW POINT OF SYSTEMS, TRUE TO GRADES AND ALIGNMENT INDICATED WITH UNBROKEN CONTINUITY OF INVERT. PLACE BELL ENDS OF PIPING FACING UPSTREAM. INSTALL REQUIRED GASKETS IN ACCORDANCE WfrH MANUFACTURER'S RECOMMENDATIONS FOR USE OF LUBRICANTS, CEMENTS, AND OTHER SPECIAL INSTALLATION REQUIREMENTS. CLEAN INTERIOR OF PIPING OF DIRT AND OTHER SUPERFLUOUS MATERIAL AS WORK PROGRESSES. MAINTAIN SWAB OR DRAG IN UNE AND PULL PAST EACH JOINT AS IT IS COMPLETED. PLACE PLUGS IN ENDS OF UNCOMPLETED PIPING AT END OF DAY OR WHENEVER WORK STOPS. B. INSTALL SOIL AND VENT PIPING PITCHED TO DRAIN AT MINIMUM SLOPE OF 1/4" PER FOOT (2 %) AND 1/8" PER FOOT WHERE INDICATED ON DRAWINGS. VENT PIPING MAY BE INSTALLED HORIZONTAL IF REQUIRED TO AVOID CONFLICT WITH BUILDING ELEMENTS. C. PROVIDE TRAP PRIMER AT ALL FLOOR DRAINS. TRAP PRIMERS SHALL HAVE EASY MAINTENANCE ACCESS. D. CONDENSATE DRAIN PIPING SHALL BE PVC, UNLESS LANDLORD REQUIRES COPPER PER TENANT CRITERIA. 3.03 PIPING SPECIALITIES A. PIPE ESCUTCHEONS: INSTALL ON EACH PIPE PENETRATION EXPOSED TO VIEW IN OCCUPIED SPACES. B. DRIP PANS: INSTALL UNDER PIPES PASSING OVER ELECTRICAL EQUIPMENT. END OF SECTION 15405 SECTION 15410 PLUMBING PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 WORK INCLUDED A. PROVIDE AND INSTALL ALL PLUMBING FIXTURES AND EQUIPMENT SPECIFIED HEREIN AND INDICATED ON THE DRAWINGS. 1.03 SUBMITTALS A. SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA, ASSEMBLY -TYPE SHOP DRAWINGS, AND MAINTENANCE DATA, IN ACCORDANCE WITH SECTION 01300 IF SUBMITTING AS APPROVED EQUAL PART 2.00 - PRODUCTS 2.01 PLUMBING FIXTURES A. PROVIDE ALL PLUMBING FIXTURES INDICATED AND SPECIFIED ON DRAWINGS. ALL FAUCETS AND DRINKING FOUNTAINS, ETC., SHALL BE LEAD FREE AS DEFINED BY THE SAFE DRINKING WATER ACT AMENDMENTS FO 1986 AND THE LEAD CONTAMINATION CONTROL ACT OF 1988. CONTAMINATION CONTROL ACT OF 1988. 2.02 ELECTRIC WATER HEATER A. PROVIDE ALL WATER HEATERS INDICATED AND SPECIFIED ON DRAWINGS. 2.03 WATER HAMMER ARRESTOR A. PROVIDE ALL WATER HAMMER ARRESTORS INDICATED AND SPECIFIED ON DRAWINGS. PART 3.00 - EXECUTION 3.01 FIXTURES A. FIXTURES SHALL BE INSTALLED WHERE SHOWN ON PLANS, COMPLETE WITH TRAPS, VALVES, STOPS AND ALL FITTINGS. ALL FIXTURES SHALL BE FIRMLY ANCHORED AGAINST MOVEMENTS. LOCATE IN CENTER OF AREA ALLOWED UNLESS NOTED OTHERWISE. FIXTURES SHALL BE INSTALLED COMPLETE WM1 ALL FITTINGS AND NUMBERS SHALL INCLUDE THE FITTINGS AS IF THEY WERE COMPLETELY USTED AND SPECIFIED WITH EACH FIXTURE. PROVIDE CAULKING BETWEEN WALL AND FIXTURE ON ALL WALL HUNG FIXTURES. USE RESIDENT (FLEXIBLE) PRODUCT SUCH AS GE SILICONE BATHTUB SEALANT. PROVIDE SEALED WATER HAMMER ARRESTORS ON HW AND CW SUPPLY PIPES AT EACH FIXTURE OR BANK OF FIXTURES. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. B. SEE ARCHITECTURAL PLANS FOR MOUNTING HEIGHTS OF ALL FIXTURES NOT NOTED IN THIS SPECIFICATION. COMPLY WTH HANDICAPPED ACCESSIBILITY CODE REQUIREMENTS. C. TRAP PRIMERS SHALL BE EASILY ACCESSIBLE. PROVIDE ACCESS PANEL IN WALL END OF SECTION 15410 SECTION 15820 AIR DISTRIBUTION EQUIPMENT PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDMONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 COMPLIANCE A. AMCA COMPLIANCE: TEST AND RATE AIR DISTRIBUTION EQUIPMENT IN ACCORDANCE WITH AMCA STANDARDS, AND PROVIDE AMCA CERTIFIED RATINGS SEAL B. UL COMPLIANCE: PROVIDE ELECTRICAL COMPONENTS OF AIR DISTRIBUTION EQUIPMENT WHICH HAVE BEEN LISTED AND LABELED BY UL 1.03 SUBMITTALS A. SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA OF APPROVED EQUALS (SUBMITTALS ARE NOT REQUIRED IF PRODUCT MATCHES SPECIFIED ITEMS ON DRAWINGS), ASSEMBLY - TYPE SHOP DRAWINGS, LADDER -TYPE WIRING DIAGRAMS DIFFERENTIATING BETWEEN PORTIONS OF WIRING THAT ARE FACTORY INSTALLED AND PORTIONS TO BE FIELD - INSTALLED, AND MAINTENANCE DATA. PART 2.00 - PRODUCTS 2.01 HVAC SYSTEMS A. PROVIDE EQUIPMENT AS SCHEDULED WITH ALL OPTIONS AS DESCRIBED ON THE MECHANICAL SCHEDULES ON THE MECHANICAL DRAWINGS. B. WHEREVER POSSIBLE, PROVIDE BELT DRIVEN EQUIPMENT AS SCHEDULED OR PROVIDED BY THE MANUFACTURER WITH ALL OPTIONS INCLUDED IN THE SCHEDULES OR REQUIRED TO MEET THE PERFORMANCES NOTED ON THE MECHANICAL DRAWINGS. PART 3.00 - EXECUTION 3.01 INSTALLATION A. UNITS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, INSTRUCTIONS AND DETAILS ON DRAWINGS. B. ALL EXHAUST FAN SYSTEMS TO HAVE BACKDRAFT OR MOTORIZED DAMPERS IN THE SYSTEM. C. PROVIDE FLEXIBLE DUCT CONNECTIONS TO ALL FANS. D. PROVIDE ROOF CURBS FOR ALL ROOF HOODS, ROOF MOUNTED EQUIPMENT AND DUCT PENETRATIONS THRU ROOF. E. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT. END OF SEC11ON 15820 SECTION 15840 DUCTWORK PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND CONDITIONS AND DMSION 1 - GENERAAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 WORK INCLUDED A. INCLUDE ALL LABOR, MATERIALS, EQUIPMENT TRANSPORTATION AND SERVICES TO FURNISH AND INSTALL COMPLETE ALL DUCTWORK AND RELATED SYSTEMS SPECIFIED HEREIN AND INDICATED ON THE DRAWING. PART 2.00 - PRODUCTS 2.01 SHEETMETAL WORK A. FURNISH ALL DUCTWORK AS SHOWN ON PLANS. ALL DUCTWORK CONSTRUCTION SHALL COMPLY WITH SMACNA STANDARDS AND LOCAL MECHANICAL CODE STANDARDS, WHICHEVER IS MORE STRINGENT. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FOLLOWING PRESSURE VELOCITY CLASSIFICATIONS FOUND IN SMACNA HVAC DUCT CONSTRUCTION STANDARDS, FIRST EDMON (1985). 1. DUCTWORK BETWEEN VAV AIR HANDLING UNITS AND TERMINAL BOXES: MAXIMUM +6" W.G., 4,000 F.P.M., VARIABLE AIR VOLUME. 2. DUCTWORK DOWNSTREAM OF TERMINAL BOXES: +2 W.G., 2500 F.P.M., VARIABLE AIR VOLUME. 3. EXHAUST DUCTWORK (ALL EXHAUST FAN SYSTEMS WHERE DESIGN FAN STATIC IS LISTED AT 1.0 W.G. OR ABOVE): +2 TO - 2'W.G., 2500 F.P.M., CONSTANT VOLUME. 4. RETURN, RELIEF OR EXHAUST DUCTWORK WHERE FAN DESIGN STATIC IS LISTED BELOW 1.0'W.G.: +1" TO -1" W.G., 2500 F.P.M., CONSTANT VOLUME. 5. SUPPLY DUCTS NOT LISTED ABOVE: +2" TO -2" W.G., 2,500 F.P.M., CONSTANT VOLUME. 6. TRANSFER DUCTS: +0.5' TO -0.5" W.G., 2,000 F.P.M., CONSTANT VOLUME. B. PRIOR TO ANY FABRICATING OF SHEET METAL WORK, THE MECHANICAL CONTRACTOR SHALL CAREFULLY MEASURE (AT THE SITE) AVAILABLE SPACE FOR SHEET METAL WORK. HE SHALL PREPARE LARGE SCALE SHOP DRAWINGS OF SHEET METAL WORK SHOWING ALL OTHER ELEMENTS OF THE BUILDING INCLUDING PIPING, STRUCTURAL AND ELECTRICAL SO ALL ARE COORDINATED AND FIT AVAILABLE SPACE. THE SHOP DRAWINGS WILL NOT GO THROUGH A FORMAL SUBMITTAL PROCESS, BUT 2 COPIES SHALL BE GIVEN TO THE ARCHITECT AS EVIDENCE OF THEIR BEING COMPLETED. C. LONGITUDINAL SEAMS IN DUCTS SHALL BE FLAT, DOUBLE LOCK TYPE. S AND DRIVE TYPE. D. TRANSVERSE SEAMS SHALL BE OF TYPE AND SPACING AS FOLLOWS: MAX. SIDE TYPE SPACING UP TO 30" DRIVE SUP 7' -10" 31" TO 60" 1 -1/2" POCKET SUP 7' -10" 61" AND UP 1 -1/2" POCKET SUP 3'- 9" CROSS BREAK PANELS 18 AND OVER IN WIDTH. E. STANDING SEAMS ARE NOT ACCEPTABLE ON ANY DUCTWORK. F. JOINT LOCKING: THE SUPJOINT IN POCKET SUP SEAMS SHALL BE SCREWED USING NOT LESS THAN ONE SCREW PER FACE AND MAXIMUM SPACING OF 2' -0 ". G. DAMPERS PROVIDE DAMPERS AND QUADRANTS IN DUCTWORK AS NECESSARY FOR BALANCING. PROVIDE ONE DAMPER IN THE DUCT LEADING TO EACH SUPPLY OR RETURN /EXHAUST OPENING. DAMPERS SHALL BE LOCATED IN AN ACCESSIBLE LOCATION. DAMPERS SHALL BE FITTED WITH PARKER KALON DAMPER BEARINGS AND PARKER KALON NO. 195T QUADRANTS. DAMPERS SHALL BE OF 20 GA. G.I. SINGLE PLATE TYPE WITH EDGES HEMMED. FOR DAMPERS ABOVE "HARD (GYPBOARD OR NON- ACCESSIBLE) CEILINGS, PROVIDE BOWDEN CABLE CONTROLLER WITH CONCEALED OPERATORS IN NEAREST RETURN GRILLE. SHOW LOCATION OF ALL REMOTE DAMPER OPERATORS & VOLUME DAMPERS ON RECORD DRAWINGS. INCLUDE DRAWING W /BALANCING REPORT. ADUSTABLE SPUTTER DAMPERS TO BE YOUNG REGULATOR 8906. H. ACCESS DOORS SHALL BE PROVIDED BY THIS CONTRACTOR IN FINISHED WALLS AND CEILINGS WHERE REQUIRED TO REACH MECHANICAL EQUIPMENT, MILCOR OR EQUAL I. INSULATED LOW PRESSURE FLEXIBLE DUCT SHALL BE A FACTORY FABRICATED ASSEMBLY CONSISTING OF A ZINC - COATED SPRING STEEL HELIX, NON- PERFORATED INNER LINER, WRAPPED WITH A NOMINAL 1 THICK BY 1 LB /CU. FT. DENSITY FIBERGLASS INSULATION. THE ASSEMBLY SHALL BE SHEATHED IN A VAPOR BARRIER JACKET, FACTORY SEALED AT BOTH ENDS OF EACH SECTION, THUS ASSURING THE VAPOR RESISTANCE OF EACH SEC11ON AS WELL AS THE COMPLETED INSTALLATION. THE COMPOSITE ASSEMBLY INCLUDING INSULATION AND VAPOR BARRIER SHALL MEET THE CLASS 1 REQUIREMENTS OF NFPA BULLETIN NO. 90 -A AND BE LABELED BY UL WITH A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPED RATING OF 50 OR UNDER. FLEXIBLE DUCTS SHALL BE INSTALLED IN A FULLY EXTENDED LENGTH REQUIRED TO MAKE THE CONNECTION. WHERE HORIZONTAL SUPPORT IS REQUIRED, FLEXIBLE DUCT SHALL BE SUSPENDED ON 36" CENTERS WITH A MINIMUM 3/4" WIDE FLAT BANDING MATERIAL ALL JOINTS AND CONNECTIONS SHAD_ BE MADE WITH 1/2" WIDE POSITIVE LOCKING STEEL STRAPS. INSULATED LOW PRESSURE FLEXIBLE DUCT SHALL BE GREENFLEX TYPE SL -1 OR EQUAL. PROVIDE SPIN -IN FITTINGS FOR CONNECTION TO TRUCK DUCT. MAXIMUM LENGTH OF FLEX DUCT IS 5 1111 WITH ONE 90 DEGREE BEND. J. OFFSETS PROVIDE OFFSETS AND TRANSMONS AS REQUIRED TO FIT DUCTWORK INTO AVAILABLE SPACE. MAINTAIN EQUIVALENT FREE AREA OF DUCTWORK, AND TRANSITION SHALL BE SMOOTH (LESS THAN 15 DEGREES). 2.02 DUCT LINING A. JOHNS MANSVILLE 1 THICK 1.5 LB /CU.FT. DENSITY (WHERE CALLED OUT ON DRAWINGS AND OR WHERE SPECIFIED) UNACOUSTIC R-4 MIN. OR 1.5" THICK 1.5 LB /CU.FT. DENSITY UNACOUST1C R -5 MIN. WHERE "SOUNDUNED" OR "LINED DUCT IS CALLED OUT ON DRAWINGS OR SPECIFIED. SERVICE WITH GLUE AND CUPS. SPACE CUPS A MAXIMUM OF 18 "0.C. LINE ALL RECTANGULAR DUCTS (INCLUDES OUTSIDE AIR, SUPPLY, RETURN, EXHAUST AND TRANSFER DUCTS). THE NET FREE AREA OF THE DUCT DIMENSIONS GIVEN ON THE DRAWINGS SHAD_ BE MAINTAINED. INCREASE METAL DUCT DIMENSIONS AS NECESSARY TO COMPENSATE FOR ADDMON OF THE UNER. B. THE DUCT LINER SHALL BE APPLIED WITH 100% COVERAGE OF APPROVED FIRE RESISTANT ADHESIVE. LINER SHALL BE ADDMONALLY SECURED WITH MECHANICAL FASTENERS ON MAXIMUM 15' CENTERS. FASTENERS SHALL START WITHIN 2" OF THE LEADING EDGE OF EACH SEC11ON AND WITHIN 3° OF THE LEADING EDGE OF ALL CROSS JOINTS WITHIN THE DUCT SECTION. ALL EXPOSED EDGES AND THE LEADING EDGE OF ALL CROSS JOINTS OF THE LINER SHALL BE HEAVILY COATED WITH AN APPROVED FIRE RESISTANT ADHESIVE. THE DUCT UNER SHALL BE CUT TO ASSURE SNUG CLOSING CORNER JOINTS, THE BLACK SURFACE OF THE LINER SHALL FACE THE AIR STREAM, TRANSVERSE JOINTS SHALL BE NEATLY BUTTED, AND ANY DAMAGED AREAS SHALL BE HEAVILY COATED WITH AN APPROVED FIRE RESISTANT ADHESIVE. 2.03 BACKDRAFT DAMPERS A. GENERAL PROVIDE DAMPERS AT ALL OUTSIDE AIR AND RELIEF DUCTS WAKING OR EXHAUSTING TO ATMOSPHERE. B. TYPE 1. BACKDRAFT DAMPERS ON FAN SYSTEMS SHALL BE GALVANIZED STEEL OR ALUMINUM MULI1BLADE TYPE. BLADES SHALL HAVE FELT STRIPS RIVETED OR CRIMPED IN PLACE. BLADES SHALL BE JOINED TOGETHER WITH CONNECTION BARS. EACH BLADE SHALL BE RIGIDLY ATTACHED TO A PIVOT ROD. THE ROD SHALL EXTEND INTO OIL - IMPREGNATED BRONZE BUSHINGS, OR ANT- FRICTION BEARINGS, LOCATED IN THE FRAMES. RUSKIN CBD2 OR EQUAL 2. FABRIC BACKDRAFT DAMPERS ON RELIEF DUCTS SHALL BE CONSTRUCTED TO INDUSTRY STANDARDS. C. MANUFACTURER 2.04 LOUVERS A. FURNISH WONDER METAL MODEL `SDL -4" DRAINABLE FORMED GALVANIZED STEEL STORM -PROOF MULLION NON- MECHANICAL FIXED WALL LOUVERS, OR AIR LOUVERS INC., THE AIROLITE CO., CONSTRUCTION SPECIALTIES INC., RUSKIN, OR INDUSTRIAL LOUVERS INC. EQUIVALENT, OR APPROVED; SIZES AND CONFIGURATIONS AS SHOWN, COMPLETE WITH FLAT BAR ORNAMENTAL SHAPES WERE SHOWN; REFER TO EXTERIOR BUILDING ELEVATIONS AND LOUVER SCHEDULE, SECTION 22 OF PROJECT MANUAL VOLUME II. PROVIDE WITH BIRD SCREEN AND COLOR AS DESIGNATED BY ARCHITECT. B. LOUVERS SHALL HAVE BEEN TESTED AND RATED TO HAVE MINIMUM 45% FREE OPENING BASED ON A 4X4 FOOT SIZE LOUVER. C. FRAME AND BLADES TO BE 16 GAUGE GALVANIZED SIELL D. HEADS, SILLS AND JAMBS TO BE ONE PIECE STRUCTURAL MEMBERS AS DETAILED AND SECURELY ANCHOR TO WALL CONSTRUCTION AS APPROVED. E. SUDEABLE INTERLOCKED MUWONS TO HAVE PROVISION TO EXPANSION AND CONTRACTION. F. FURNISH COMPLETE WITH MANUFACTURER'S STANDARD BIRD SCREEN MOUNTED IN FOLDED "U" TYPE FRAME AND ATTACH TO INSIDE FACE OF LOUVER FRAME WITH STEEL SCREWS AT ACTIVE (OPEN) PORTIONS OF LOUVERS AND WITH 20 GAUGE GALVANIZED SILLL FACED INSULATED `BLANK -OFF' PANELS AT INACTIVE LOUVER AREAS, COMPLETE WITH PERIMETER GASKETS AND FINISHED TO MATCH LOUVER. INSULATION CORE SHAL BE 1 INCH THICK EXTRUDED POLYSTRYENE HAVING A MINIMUM THERMAL RESISTANCE "R" VALUE OF 5.0. G. AL LOUVERS TO BE FREE OF SCRATCHES AND BLEMISHES AND SHALL BE FINISH PAINTED Wm-I BAKED -ON ENAMEL POWDER COATING. 2.05 FIRE DAMPERS A. DYNAMIC FIRE DAMPERS SHALL BE CONSTRUCTED AND TESTED IN ACCORDANCE NH UL SAFETY STANDARD 555. EACH DAMPER SHALL HAVE A 1 1/2 HOUR RATING WITH 165 DEGREE F FUSABLE LINK AND BE LABLED PER UL 555 STANDARD. B. DYNAMIC COMBINATION FIRE /SMOKE DAMPERS,RUSKIN FSD36, SHALL BE CONSTRUCTED OF MIN. 16 GAUGE GALVANIZED STEEL WM-I STAINLESS STEEL BEARINGS, JAMB SEALS AND 450 DEG. F RATED BLADE EDGE SEAL DAMPERS SHAL BE 1 HR. RATED UNDER UL STANDARD 555 AND UL 555S. AL DAMPERS USED UNDER THIS SPECIFICATION MUST BE UL TESTED & QUALIFIED IN THE COMPLETE RANGE OF SIZES USED. A SINGLE DAMPER TESTED WITHIN THIS RANGE IS NOT ACCEPTABLE. LEAKAGE RATING SHALL BE CLASS 11. INCLUDE A UL CLASSIFIED FIRE STAT. FIRESTAT SHALL ELECTRICALLY AND MECHANICALLY LOCK DAMPER CLOSED WHEN DUCT TEMPERATURE EXCEEDS 165 DEG. F. DAMPER MUST BE OPERABLE ABOVE 250 DEG. F. FIRESTAT SHAL BE EQUIPPED WITH TWO DAMPER POSmON INDICATORS FOR REMOTE INTERFACING WITH SMOKE DETECTORS & FIRE ALARM SYSTEM. ALSO PROVIDE INTEGRAL FLOW RATED DUCT SMOKE DETECTORS FOR DUCTED FIRE/ SMOKE DAMPERS AND NO -FLOW DUCT SMOKE DETECTORS FOR NON- DUCTED FIRE SMOKE DETECTORS. C. CEUNG FIRE DAMPERS SHAL BE INSTALLED IN ALL CEILING REGISTERS AND GRILLES. IN THE RATED CEILING. FIRE DAMPERS CONSIST OF A RADIANT DAMPER IN THE DIFFUSER NECK AND THERMAL INSULATING BLANKET COVERING THE DIFFUSER PAN. THE ENTIRE SYSTEM SHALL BE UL RATED FOR FLOOR /CEILING AND ROOF /CEILING SYSTEM. PART 3.00 -- EXECUTION 3.01 SHEET METAL WORK A. PARTITIONS FORMING PLENUMS OR CASINGS SHALL BE #18 GA., WITH GALVANIZED IRON ANGLES AND RIVETS FOR SEAM CONNECTION AND STIFFENING. ALL JOINTS AND STANDING SEAMS SHALL BE SEALED WITH APPROVED DUCT SEALANT. B. CORK GASKETS SHALL BE INSTALLED BETWEEN ALL CONNECTIONS OF SHEET METAL TO COIL AND FILTER CASINGS. C. SHEET METAL CONNECTIONS OF PLENUMS AND AIR CHAMBERS TO WALL AND FLOORS SHALL BE MADE WITH GALVANIZED ANGLES ANCHORED TO WALL OR FLOOR CONSTRUCTION WITH ANCHOR BOLTS WM-I SHEET METAL BOLTED OR RIVETED TO ANGLES. MASTIC SEALER SHALL BE INSTALLED AT CONNECTION OF ANGLES TO SHEET METAL TO PROVIDE AIR-TIGHT JOINTS. PROVIDE ACCESS DOORS IN PLENUMS AND CHAMBERS WITH HANDLES OPERATED FROM BOTH SIDES, VENTLOCK NO. 205 OR APPROVED SUBSTITUTE. D. HINGED ACCESS DOORS IN SHEET METAL DUCT FOR ACCESS TO DAMPERS SHALL BE 118 GA., FRAMED WITH STEEL ANGLE AND HEMMED EDGES. E. CONNECT ALL GRILLES TO DUCTWORK. PAINT THE INSIDE OF THE DUCT A DULL BLACK AT ALL GRILLES. F. ALL AIR INLETS AND OUTLETS TO OUTSIDE SHALL HAVE BIRDSCREENS. BACKDRAFT DAMPER SHALL BE PROVIDED WHERE MOTORIZED DAMPER IS NOT INDICATED. G. ALL DUCTS THROUGH ROOF SHALL BE FLASHED WATER- T1GHT. SEE DETAIL ALL DUCTS THRU WALLS AND FLOORS /ROOFS SHALL HAVE ANGLE ENCLOSURES. H. CONNECTIONS OF ALL DUCTS TO ALL EQUIPMENT SHALL BE MADE WITH NEOPRENE. I. ELBOWS SHALL HAVE AN INSIDE RADIUS EQUAL TO 1/2 THE DUCT WIDTH. RECTANGULAR ELBOWS SHALL HAVE DUCT TURNS, T &B OR APPROVED EQUAL. USE RECTANGULAR ELBOWS WHEREVER A ROUND ELBOW CANNOT BE USED AND WHERE SHOWN ON DRAWINGS. SQUARE INSIDE ELBOW AND ROUND OUTSIDE ELBOW ARE NOT PERMITTED. DO NOT INSTALL TURNING VANES IN GREASE EXHAUST DUCTWORK. J. SUPPORTERS SHALL BE GALVANIZED STRAP OR ANGLE IRON HANGERS, ARRANGED TO PREVENT ANY BULGING, BENDING, OR SAGGING OF DUCTWORK. UNDER NO CONDITION SHALL HANGERS PIERCE THE DUCTS. VERTICAL DUCTS SHALL BE SUPPORTED AT EACH FLOOR WITH 18 GA. FORMED ANGLE. K. SEAL ALL DUCT JOINTS WITH APPROVED DUCT SEALANT. L HANGERS 1. PROVIDE HANGERS AND SEISMIC RESTRAINTS ON ALL DUCTWORK. 2. HANGERS FOR CIRCULAR DUCTS AND TUBING: A 118 GAUGE GALVANIZED SHEET STEEL STRAP SHALL BE WRAPPED AROUND THE DUCT AT EACH POINT OF SUPPORT. FOR CONCEALED WORK THIS STRAP SHALL BE BOLTED TO A STRAP HANGER OF SIMILAR GAUGE AND WIDTH; FOR EXPOSED WORK, BOLTED TO A STEEL ROD HANGER IN EACH CASE, ROD HANGER 1/4" SIZE FOR DUCTS UP TO 10" SIZE, 3/8' SIZE FOR LARGER DUCTS. WIDTH OF GALVANIZED STEEL STRAP WRAPPED AROUND THE DUCT SHALL NOT BE LESS THAN 1' IN ANY CASE; WHERE DUCTS ARE IN EXCESS OF 10" IN DIAMETER SHALL BE 2 ". 3. SPACING OF HANGERS SHALL NOT EXCEED 10' -0" ON CENTERS IN ANY CASE; WHERE DUCTS ARE INSULATED AND ARE IN EXCESS OF 10" IN SIZE, SPACING SHALL NOT EXCEED 8'-O'. M. A MAXIMUM OF 5 FEET LENGTH OF FLEX DUCT WITH ONE 90 DEGREE BEND WILL BE ALLOWED AT CONNECTIONS TO DIFFUSERS, WHERE FLEX DUCT IS SHOWN ON DRAWINGS. N. PROVIDE FIRE STOP AROUND DUCTWORK AT ALL DUCT PENETRATION OF RATED CONSTRUCTION. ° FIRE STOP SEALANT" BY DOW CORNING. 0. BACKDRAFT DAMPERS ON REUEF DUCTS SHALL BE METAL BLADE TYPE. P. PROVIDE DUCT TRANSITIONS AS REQUIRED TO SOUND TRAPS AND ALL EQUIPMENT CONNECTIONS. Q. PROVIDE DUCT LINING ON RECTANGULAR DUCTS WHERE INDICATED ON DRAWINGS (OUTSIDE AIR, SUPPLY, RETURN, EXHAUST AND TRANSFER AIR DUCTS). THE NET FREE AREA OF THE DUCT DIMENSION GIVEN ON THE DRAWINGS SHALL BE MAINTAINED. INCREASE METAL DUCT DIMENSIONS AS NECESSARY TO COMPENSATE FOR ADDITION OF THE LINER. R. ALL DUCTWORK, INCLUDING, BUT NOT LIMITED TO DUCTS, HANGERS, BRACKETS, FITTINGS AND JOINTS, SHALL BE INSTALLED IN A MANNER WHICH NEITHER REDUCES HEADROOM AND WALKWAY WIDTH NOR PROJECTS ANY SHARP EDGES INTO A CATWALK OR PASSAGE AREA. ANY DUCTWORK WHICH, IN THE OPINION OF THE ARCHITECT, PRESENTS A POSSIBLE HAZARD TO PEOPLE IN THE CATWALK AREA, SHALL BE CHANGED TO AN ACCEPTABLE AND SAFE MANNER. SUCH CHANGES MAY INCLUDE: MOVING THE EQUIPMENT, CHANGING ITS CONFIGURATION, AND /OR ADDING PROTECTIVE PADDING TO THE EQUIPMENT. 5. INTAKE BACKDRAFT DAMPERS SHALL BE INSTALLED AT THE ENVELOPE OF THE BUILDING. T. INSTALL FIRE DAMPERS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. END OF SECTION 15840 SEC11ON 15870 OUTLETS AND INLETS PART 1.00 - GENERAL 1.02 COMPLIANCES A. ADC COMPLIANCE TEST AND RATE REGISTERS, GRILLES, CERTIFIED RATINGS SEAL ON EACH U B. AMCA COMPLIANCE TEST AND RATE LOUVERS, DAMPERS, SEAL ON EACH UNIT. 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. AND DIFFUSERS IN ACCORDANCE WITH ADC NIT. AND SHUTTERS IN ACCORDANCE WITH AMCA EQUIPMENT TEST CODE 1062R4, PROVIDE STANDARD 500, PROVIDE CERTIFIED RATINGS 1.03 SUBMITTALS A. SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA UNLESS AS SPECIFIED ON DRAWINGS, ASSEMBLY -TYPE SHOP DRAWINGS, AND MAINTENANCE DATA. PART 2.00 - PRODUCTS 2.01 CEILING AIR DIFFUSERS A. GENERAL EXCEPT AS OTHERWISE INDICATED, PROVIDE MANUFACTURER'S STANDARD CEILING AIR DIFFUSERS WITH FIRE DAMPERS; OF SIZE, SHAPE, CAPACITY AND TYPE INDICATED; CONSTRUCTED OF MATERIALS AND COMPONENTS INDICATED AND AS INDICATED ON DRAWINGS FOR COMPLETE INSTALLATION. B. CEILING COMPATIBILITY PROVIDE DIFFUSERS WITH BORDER STYLES THAT ARE COMPATIBLE WITH ADJACENT CEILING SYSTEMS, AND THAT ARE SPECIFICALLY MANUFACTURED TO FIT INTO CEILING MODULE WITH ACCURATE FIT AND ADEQUATE SUPPORT. REFER TO GENERAL CONSTRUCTION DRAWINGS AND SPECIFICATIONS FOR TYPES OF CEILING SYSTEMS WHICH WILL CONTAIN EACH TYPE OF CEILING AIR DIFFUSER. C. TYPES PROVIDE 11TUS CEILING DIFFUSERS OF TYPE, CAPACITY, AND WITH ACCESSORIES AND FINISHES AS SCHEDULED. 2.02 REGISTERS AND GRILLES A GENERAL EXCEPT AS OTHERWISE INDICATED, PROVIDE MANUFACTURER'S STANDARD WALL REGISTERS AND GRILLES WITH FIRE DAMPERS; OF SIZE, SHAPE, CAPACITY AND TYPE INDICATED; CONSTRUCTED OF MATERIALS AND COMPONENTS AS INDICATED ON DRAWINGS, AND AS REQUIRED FOR COMPLETE INSTALLATION. B. PERFORMANCE PROVIDE WALL REGISTERS AND GRILLES THAT HAVE, AS MINIMUM, TEMPERATURE AND VELOCITY TRAVERSES, THROW AND DROP, AND NOISE CRITERIA RATINGS FOR EACH SIZE DEVICE AS LISTED IN MANUFACTURER'S CURRENT DATA. C. COMPATIBILITY PROVIDE REGISTERS AND GRILLES WITH BORDER STYLES THAT ARE COMPATIBLE WITH ADJACENT WALL OR CEILING SYSTEMS, AND THAT ARE SPECIFICALLY MANUFACTURED TO FIT INTO CONSTRUCTION WITH ACCURATE FIT AND ADEQUATE SUPPORT. REFER TO GENERAL CONSTRUCTION DRAWINGS AND SPECIFICATIONS FOR TYPES OF CONSTRUCTION WHICH WILL CONTAIN EACH TYPE OF WALL REGISTER AND GRILLE. D. TYPES PROVIDE WALL REGISTERS AND GRILLES OF TYPE, CAPACITY, AND WITH ACCESSORIES AND FINISHES AS SCHEDULED. E. MANUFACTURERS: 1. TITUS PART 3.00 - EXECUTION 3.01 INSTALLATION A. GENERAL INSTAL OUTLETS AND INLETS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES TO INSURE THAT PRODUCTS SERVE INTENDED FUNCTIONS. REFER TO INSTALLATION DETAILS REFERENCED IN PARAGRAPH 2.03A ABOVE. 8. COORDINATE WITH OTHER WORK, INCLUDING DUCTWORK AND DUCT ACCESSORIES, AS NECESSARY TO INTERFACE INSTALLATION OF OUTLETS AND INLETS WITH OTHER WORK. C. LOCATE CEILING NR DIFFUSERS, REGISTERS, AND GRILLES, AS INDICATED ON GENERAL CONSTRUCTION "REFLECTED CEILING PLANS" AND ° INTERIOR ELEVATIONS ". UNLESS OTHERWISE INDICATED, LOCATE UNITS IN CENTER OF ACOUSTICAL CEILING MODULES. END OF SECTION 15870 SECTION 15880 FILTERS PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDMONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 COMPLIANCE A. NFPA COMPLIANCE: INSTAL AIR TREATMENT EQUIPMENT IN ACCORDANCE WITH NFPA 90A AND 908. B. UL COMPLIANCE: PROVIDE AIR FILTER UNITS WHICH HAVE BEEN LISTED AND LABELED BY UL C. ASHRAE COMPLIANCE TEST AIR FILTER UNITS IN ACCORDANCE WITH ARI 850. PART 2.00 - PRODUCTS 2.01 AIR FILTERS A. EXTENDED SURFACE FILTERS PROVIDE FACTORY - FABRICATED, DRY, EXTENDED SURFACE FILTERS; WHERE SHOWN, IN SIZES INDICATED. EQUIP WITH UL CLASS 1 FIBROUS MEDIA MATERIAL FORMED INTO 2" DEEP V- SHAPED PLEATS AND HELD BY SELF- SUPPORTING FRAMES. FARR 30/30 OR EQUAL 2.02 FILTER FRAMES A PROVIDE METAL FILTER FRAMES AS DETAILED ON DRAWINGS. PART 3.00 - EXECUTION 3.01 INSTALLATION A. INSTALL AIR FILTERS AND HOLDING DEVICES OF TYPES INDICATED, AND WHERE SHOWN; IN ACCORDANCE WITH AIR FILTER MANUFACTURER'S WRITTEN INSTRUCTIONS AND WITH RECOGNIZED INDUSTRY PRACTICES; TO ENSURE THAT FILTERS COMPLY WITH REQUIREMENTS AND SERVE INTENDED PURPOSES. COMPLY WITI -I APPLICABLE PORTIONS OF NFPA 70, 90A AND B, PERTAINING TO INSTALLATION OF AIR FILTERS. PROVIDE AS SCHEDULED ON THE DRAWINGS. B. INSTALL FILTERS IN PROPER POSITION TO PREVENT PASSAGE OF UNFILTERED AIR. C. PROVIDE CLEAN SET OF FILTERS FOR ALL PIECES OF EQUIPMENT: 1. IMMEDIATELY PRIOR TO AIR BALANCING. 2. WHEN FINAL PUNCHLIST IS DONE. 3. IN ADDmON, FURNISH ONE COMPLETE EXTRA SET OF FILTERS TO OWNER WHEN FINAL PUNCHLIST 15 DONE. THREE SETS OF FILTERS ARE REQUIRED (TWO INSTALLED, ONE TURNED OVER TO OWNER). LOCATE EXTRA SET IN MECHANICAL ROOMS WHERE FILTERS ARE LOCATED. D. FILTERS SHALL BE EASILY CHANGED FROM FRAMES AND SHALL SLIDE FREELY ON TRACKS WITHOUT BINDING. MAINTAIN CLEAR ACCESS IN FRONT OF FILTER ACCESS DOOR TO FULL WIDTH OF THE FILTER. E. FILTER SECTIONS SHALL HAVE HINGED ACCESS DOORS WITH LATCHES. END OF SECTION 15880 SECTION 15980 BALANCING PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DMSION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 INDUSTRY STANDARDS A. ALL ILSIING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE PERFORMED BY AN INDEPENDENT CONTRACTOR WHO I5 CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING AND BALANCING SHALL BE BY THE GENERAL CONTRACTOR. ALL BALANCING WORK SHALL BE PERFORMED WITH ACCORDANCE WITH LOCAL CODES AND THIS SECTION. 1.03 SUBMITTALS A. SUBMIT CERTIFIED TEST REPORTS SIGNED BY TEST AND BALANCE SUPERVISOR WHO PERFORMED TAB WORK. SUBMIT RECORD HVAC PLAN SHOWING ALL VOLUME DAMPER & REMOTE VOLUME DAMPER OPERATOR LOCATIONS & CONNECTION LINKAGE. B. THE BALANCE REPORT SHALL BE ON THE AABC NA11ONAL STANDARD REPORT FORMS OR THE NEBB CERTIFIED REPORT FORMS AS PUBLISHED IN THEIR MOST CURRENT EDMONS AND SHALL INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION. 1. AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF BALANCING CONTRACTOR. 2. COPY OF A CERTIFICATE OF CONFORMANCE WITH NATIONAL STANDARDS FOR THIS PROJECT. 3. INSTRUMENTATION UST WITH LAST CALIBRATION DATES. 4. MAKE AND MODEL NUMBERS OF ALL HVAC EQUIPMENT. 5. AIR CFM AND STATIC PRESSURE READINGS (DISCHARGE AND SUCTION) AS MEASURED BY PITOT TUBE DUCT TRAVERSE AT THE UNIT. 6. MOTOR NAMEPLATE DATA WfrH ACTUAL FIELD VOLTAGE AND AMPERAGE READINGS FOR EACH LEG. 7. MOTOR AND FAN R.P.M.'S, SHEAVE SIZES AND BELT SIZES. 8. OUTSIDE, RETURN, MIXED AND SUPPLY NR TEMPERATURES AND VOLUMES SHALL BE MEASURED AT FULL COOLING WITH MINIMUM OUTSIDE AIR. RETURN /RELIEF /SMOKE EVACUATION AIRFLOW SHALL BE BALANCED AND MEASUREMENTS RECORDED BY PITOT DUCT TRAVERSE AT FULL ECONOMIZER AND POWER EXHAUST. 9. MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. 10. FINAL BALANCED AIR VOLUMES AT ALL OUTLETS (INCLUDING RETURNS WHERE DUCTED). 11. INDEXED PLAN WTrH DIFFUSER AND RETURN LOCATIONS. ALSO INDICATE IF DIFFUSER IS 3 -WAY OR 2 -WAY. A. FIVE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED TO HOLD EVERYTHING PROJECT MANAGER FOR APPROVAL PROVIDE ONE COPY OF APPROVED REPORT TO LANDLORD UPON COMPLETION OF CONSTRUCTION FOR THE PREMISE AS A REQUIREMENT TO OPEN FOR BUSINESS. 1.04 JOB CONDMONS A. WORK WILL NOT PROCEED WITH ILSIINC, ADJUSTING AND BALANCING WORK UNTIL WORK HAS BEEN COMPLETED AND IS OPERABLE. ENSURE THAT THERE IS NO LATENT RESIDUAL WORK STILL TO BE COMPLETED. INFORM ARCHITECT IN WRITING WHEN PROJECT I5 READY FOR ADJUSTING AND BALANCING. B. REFER TO LANDLORD TENANT CRITERIA MANUAL FOR SYSTEM BALANCING REQUIRED AS PART OF TENANT WORK. PART 2.00 - PRODUCTS 2.01 GENERAL A. MECHANICAL SUB CONTRACTOR SHALL PROVIDE ALL MOTORS, SHEAVES, BELTS, LADDERS, ETC. AS REQUIRED FOR BALANCER TO ACCOMPUSH WORK. B. BALANCING SUB CONTRACTOR SHALL BE HIRED BY THE DMSION 0 AT THE DMSION 0 EXPENSE. BALANCING CONTRACTOR SHALL BE AN INDEPENDENT CONTRACTOR, SEPARATE COMPANY FROM THE MECHANICAL SUB CONTRACTOR. COORDINATE WITH LANDLORD, LANDLORD MAY REQUIRE SPECIFIC CONTRACTOR FOR BALANCING. PART 3.00 - EXECUTION 3.01 GENERAL A. EXAMINE INSTALLED WORK AND CONDITIONS UNDER WHICH TESTING 5 TO BE DONE TO ENSURE THAT WORK HAS BEEN COMPLETED, CLEANED AND IS OPERABLE. DO NOT PROCEED WITH TAB WORK UNTIL UNSATISFACTORY CONDMONS HAVE BEEN CORRECTED IN MANNER ACCEPTABLE TO TESTER. B. TEST, ADJUST AND BALANCE AIR CONDITIONING SYSTEMS AND COMPONENTS, AS INDICATED, IN ACCORDANCE WITH PROCEDURES OUTLINED IN APPLICABLE STANDARDS. REFER TO LANDLORD TENANT CRITERIA MANUAL FOR SYSTEM BALANCING REQUIRED AS PART OF TENANT WORK. C. PREPARE REPORT OF TEST RESULTS IN FORMAT RECOMMENDED BY APPUCABLE STANDARDS. D. PATCH HOLES IN INSULATION, DUCTWORK AND HOUSING, WHICH HAVE BEEN CUT OR DRILLED IN MANNER RECOMMENDED BY THE ORIGINAL INSTALLER. E. MARK EQUIPMENT SETTINGS, INCLUDING DAMPER CONTROL POSmONS, VALVE INDICATORS, FAN SPEED CONTROL LEVERS, AND SIMILAR CONTROLS AND DEVICES, TO SHOW FINAL SETTINGS AT COMPLETION OF BALANCE WORK. PROVIDE MARKINGS WITH PAINT OR OTHER SUITABLE PERMANENT IDENTIFICATION MATERIALS. F. INFAL BALANCING SHALL INCLUDE BALANCING ALL AIR QUANTITIES TO WITHIN 10% OF THOSE LISTED ON THE DRAWINGS. G. BALANCER SHALL THEN CHECK ALL BUILDING TEMPERATURES AND READJUST AIR QUANTTES TO EVEN OUT SPACE TEMPERATURES TO WITHIN 1 DEG. F WITHIN SPACES. H. TESTING, ADJUSTING AND BALANCING REPORT MUST BE COMPLETE AND TURNED OVER TO HOLD EVERYTHING PROJECT MANAGER 1 WEEK PRIOR TO STORE TURNOVER. I. THE HVAC SUB CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE EH OUTSIDE AIR DAMPERS IN MINIMUM POSmON, EXCEPT AS NOTED OTHERWISE HVAC SUB CONTRACTOR SHALL ALSO INSTALL A NEW SET OF FILTERS AFTER PROJECT IS COMPLETE. J. BALANCE AIR TO WITHIN PLUS /MINUS 10% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS, PULLEYS OR THE ADDION OF DAMPERS REQUIRED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC SUB CONTRACTOR WITH NO ADDITIONAL COST TO HOLD EVERYTHING. K. THE BALANCING SUB CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED ON THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OF ORIGINAL BALANCE MUST BE BALANCED IN FUTURE AT NO ADDMONAL EXPENSE TO HOLD EVERYTHING. THE BALANCING CONTRACTOR' SHALL RECHECK ANY ITEMS THAT HOLD EVERYTHING DEEMS NECESSARY AT NO ADDMONAL COST TO HOLD EVERYTHING: END OF SECTION 15980 SECTION 15990 CONTROLS 1. IN ADDITION TO THERMOSTATS AND REMOTE ROOM TEMPERATURE SENSORS, 2. SET RTU'S & AHU'S THERMOSTATS FOR 73 D.F. COOLING AND 70 D.F. HEATING INITIALLY. END OF SECTION 15990 SEC11ON 15995 COMMISSIONING: , PART 1.00 GENERAL 1. PROVIDE MECHANICAL SYSTEMS COMMISSIONING IN ACCORDANCE WITH LOCAL ENERGY CODE AND THE REQUIREMENTS OF THISSPECIFICATION. AL CONTROL SEQUENCES SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN ACCORDANCE WITH THE 2. HVAC UNITS: OPERATE SYSTEM IN COOLING MODE; RECORD OUTSIDE TEMPERATURE, MIXED AIR TEMPERATURE, SUPPLY AIR TEMPERATURE. WHERE ECONOMIZERS ARE SPECIFIED, DEMONSTRATE PROPER OPERATION OF CHANGEOVER FROM ECONOMIZER DAMPER OPERATION (FREE COOLING WITH OUTSIDE AIR) TO MECHANICAL COOUNG (MINIMUM OUTSIDE AIR WITH COMPRESSOR COOLING). VERIFY THAT COOLING COIL SENSIBLE CAPACITY MATCHES THE TEMPERATURE DROP ON THE COOUNG COIL VIA THE FORMULA COOLING CAPACITY (BTUH) = AIRFLOW (CFM) X (1.1) X DELTA T (MIXED AIR TEMP - SUPPLY AIR TEMP DEGREES F). OPERATE UNITS IN HEATING MODE: RECORD OUTSIDE AIR TEMPERATURE, MIXED AIR TEMPERATURE, SUPPLY AIR TEMPERATURE. VERIFY THAT HEATING COIL CAPACITY MATCHES THE TEMPERATURE RISE ON THE HEATING COIL VIA THE FORMULA HEATING CAPACITY (BTUH) = AIRFLOW (CFM) X (1.1) X DELTA T (MIXED AIR TEMP - SUPPLY AIR TEMP DEGREES F). VERIFY THE OPERATION OF ANY CONTROL VALVES WHERE PRESENT (CHILLED WATER OR HEATING WATER VALVES). VERIFY THAT EACH UNIT OPERATES WITH THE CORRECT THERMOSTAT/ SENSOR. SET THERMOSTATS FOR 70 F HEATING SETPOINT AND 72 F COOLING SETPOINT. UNIT FANS SHALL RUN CONTINUOUSLY DURING OCCUPIED MODE AND CYCLE ON /OFF DURING UNOCCUPIED MODE. SETUP AND VERIFY HOURS ON OPERATION (11ME SCHEDULE) FOR OCCUPIED /UNOCCUPIED MODE AND HOLIDAY/WEEKEND SCHEDULING. 3. VERIFY SMOKE DETECTOR SHUTDOWN OF ANY FAN UNITS SCHEDULED FOR SMOKE DETECTOR SHUTDOWN. 4. VERIFY PROPER OPERATION OF ANY OTHER HVAC EQUIPMENT THAT I5 INTERLOCKED WITH OTHER EQUIPMENT. 5. PROVIDE CHECK OUT OF ALL PLUMBING SYSTEMS FOR PROPER OPERATION, INCLUDING HOT AND COLD WATER AT AL FAUCETS, WATER HEATERS SET FOR PROPER TEMPERATURE, OPERATION OF ALL VALVES, GREASE TRAPS, GAS VALVES, MIXING VALVES. RECORD DATA ON ALL DEVICES CHECKED AND THE STATUS OF THEIR OPERATION. RECEIVED CITY OF TLIK1WWIL.A DEC 0 5 2007 FEHIVIIT CEfu 1 ER Carter:Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 NO. DATE DRAWN BY DL PROJECT NUMBER: SCALE COPrRIGHr 0 2007 GARTER & BURG, INC. at &t EXPIRES 03/15/08 1 ISSUES /REVISIONS - 11 -30-07 ISSUE FOR PERMIT DESCRIPTION WESTFIELD SHOPPINGTOWN SOUTHCENTER 633 Southcenter Mall Seattle, WA 98188 DESIGNED BY: KL CHECKED BY: MV MECHANICAL AND PLUMBING SPECIFICATIONS APPROVED BY: MV 441805.011.039.0001 NONE M -004 100 CFM (E) 14 "0 STORAGE f I ECTRICAL i I� GE 8"0 1 100 CFTC kII 100 CFMM:_ 121i 100 CFM 111 - 6 7 '0 DROP • MEN. • FD 'r crm 6 "0 I.N'VF. I ORY \MDT i_OIJ4 MANAGER OFFICE r 24X16 STOR. 250 CFM . —, -- ._.T' -- 1„ 75 GFP4 300 CFM J� 200 CFM 8 " 300 CFM 200 CFM ()® 1200 CFM L_ . C v 1 ENTRY WAY TO (E) MALL'S ENTRANCE ECHA 18 " 0 SCALE: 1/4" = 1' -0" 1 r FD ()(TYP) i rar. cs�S -lusi ax RG 16"0 r \ICAL FLOOR PEA 300 CFM T J EA R L L. H f J • fr .• \ •_ i 300 CF r r / ir • f // /r•r e r P. f i ! •• 7 14 1 1 " ar r 300 CF!I � I r 1 . J ! • 1.1 r • . 1 1 I. t ! I 1.� 1 1 s I 1 :. 1. (E) MALL COLUMN &6' TO (E) !ALL MAIN PARKIN PLAN NOTES: 0 PROVIDE NEW VARIABLE VOLUME BOX TO 3000 CFM. �2 PROVIDE NEW VARIABLE VOLUME BOX TO 1000 CFM. 0 CONNECT TO MAIN SUPPLY DUCT TO MALL'S MAIN SYSTEM. VERIFY THAT THE EXISTING UNIT CAN PROVIDE OSA ACCORDING TO THE OUTSIDE AIR SCHEDULE. 0 INSTALL NEW THERMOSTAT AS SHOWN AT 48" AFT. SEE DETAIL 1/M -400. GANG BOX AND CONDUIT BY ELECTRICAL. a INSTALL NEW DIFFUSER. BORDER TO MATCH CEILING TYPE. REFER TO DIFFUSER SCHEDULE FOR MORE INFORMATION. 0 INSTALL NEW RETURN REGISTER. BORDER TO MATCH CEILING TYPE. REFER TO DIFFUSER SCHEDULE FOR MORE INFORMATION. J INSTALL NEW EXHAUST FANS. REFER TO SCHEDULE ON SHEET M -600. ®8 PROVIDE RETURN DUCT FOR TRANSFER AIR AT CEILING SPACE. VERIFY WITH THE OWNER THE EXACT LOCATION OF PENETRATION. O9 PROVIDE ACCESS DOOR FOR FIRE DAMPER. VERIFY WITH THE OWNER THE EXACT LOCATION OF INSTALLATION. PER 2006 IMC SECTION 606 Install smoke detector to shut down air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection) TABLE IS BASED FROM 2006 WASHINGTON STATE VENTILATION AND INDOOR AIR QUALITY CODE. at&t WIRELESS - 633 SOUTHCENTER MALL SEATTLE, WA 98188 TOTAL FLOOR AREA -3541 S.F. OUTSIDE AIR PROVIDED - VAV -1: SALES FLOOR VAV -2: MANAGER'S OFFICE OPEN OFFICE INVENTORY RESTROOMS OUTSIDE AIR SCHEDULE MINIMUM OA 0.20 CFM /S.F. 20 CFM /PERSON 50 CFM /TOILET CALCULATION 2851 S.F. x 0.20 CFM /S.F.= 570 20 CFM /PERSON x 5 PERSON= 100 50 CFM /TOILET x 2 TOILETS= 100 TOTAL: 600 CFM 100 CFM 100 CFM 800 CFM RECEIVED CITY OF TIIKWILA DEC 0 5 2007 P[� hI1VILT CIr Tu 1 ER CarternBurgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 c pm= 0 2001 CARTER & BURGESS, INC. 1 EXPIRES 03/15/08 1 ISSUES /REVISIONS 11 -30-07 ISSUE FOR PERMIT at &t NO. DATE DESCRIPTION WESTFIELD SHOPPINGTOWN SOUTHCENTER 633 Southcenter Mall Seattle, WA 98188 DRAWN 8'1f: DL PROJECT NUMBER: SCALE: NORTH DESIGNED BY: DL CHECKED BY: KL APPRCNED BY: MV 441805.011.039.0001 AS NOTED MECHANICAL FLOOR PLAN M -200 WOMEN - PLuva1\G FLOOR PEA SA ITARY 1 E SCALE: 1/2" = 1' -0" 1 PWvBI\G FLOOR PLAN - WATER PLUMBING PLAN NOTES: 0 CONNECT NEW SANITARY WASTE TO EXISTING 4" SANITARY WASTE STUB -UP FROM MAIN SEWER BELOW. HELD TO VERIFY EXACT LOCATION. Q CONNECT NEW COLD WATER TO EXISTING 3/4" MAIN. FIELD TO VERIFY EXACT LOCATION. O COLD WATER CONNECTION TO INSTANTANEOUS WATER HEATER. 0 PROVIDE SHUT -OFF VALVE ON RISER ACCESS PANEL Q CONNECT NEW VENT TO EXISTING 3 MAIN VENT. FIELD TO VERIFY EXACT LOCATION. RECEIVED CITY OF TUUKIMILA DEC 0 5 2007 P� kIVII T GEN 1 ER s A 44 C comfort 0 2007 carat & BURGESS, r&C. at &t Cartereurgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 DRAWN BY: DL PROJECT NUMBER: SCALE: 1 4. PLANS 1 EXPIRES 03/15/08 1 ISSUES /REVISIONS 11 -30-07 ISSUE FOR PERMIT NO. DATE DESCRIPTION WESTFIELD SHOPPINGTOWN SOUTHCENTER 633 Southcenter Mall Seattle, WA 98188 DESIGNED BY: DL CHECKED BY: KL PLUMBING FLOOR APPROVED BY: MV 441805.011.039.0001 AS NOTED M -201 carry O 2007 C/RTER & e JRGESS, rrc. at &t Carter::Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 1 EXPIRES 03/1108 1 NO. DATE ISSUES /REVISIONS — 11 30--07 ISSUE FOR PERMIT DESCRIPTION WESTFIELD SHOPPINGTOWN SOUTHCENTER 633 Southcenter Mall Seattle, WA 98188 DESIGNED BY: DL CHECKED BY: KL DRAWN BY: DL PROJECT NUMBER: SCALE: MECHANICAL AND PLUMBING DETAILS APPROVED BY: MV 441805.011.039.0001 NONE M -400 ROOFCAP WITH INTEGRAL BIRDSCREEN (PROVIDED BY FAN MFR) ROOF TWO SHEET METAL ROOF JOIST, SEE SELF TAPPING ARCHITECTURAL FOR SCREWS ROOF TYPE 1r ‘ TWO SHEET METAL SEE ARCH FOR FLASHING SELF TAPPING SCREWS I I ;l._ TWIST STRAP FLEX CONNECTION SO LID —LINED CEILING EXHAUST FAN CABINET SEE MECHANICAL EQUIP. SCHEDULE FOR SIZE. SEISMIC BRACING (TYP) ■ ��������M����m�M�M= ROUND DUCTWORK - ter --o 3 RECTANGULAR m DUCTWORK ' .WWWWWWWWWWWwwwaWiti NOTES \ r 1. ALL DUCT & SUPPORTS PER CMC. RIGID METAL DUCT (SEE PLAN FOR SIZE) REFER TO ARCHITECTURAL FOR CEILING TYPE BACKDRAFT DAMPER EXHAUST GRILLE (PROVIDED BY FAN MFR) NOT USED SCALE: 12 NOT USED SCALE: 9 CEILING MOUNTED•EXHAUST FAN DETAIL SCALE: 6 DUCT HANGER DETAIL SCALE: 3 N.T.S. N.T.S. N.T.S. . NONE PROVIDE BASE WfTH, BOOT, AND CLAMPS. REFER TO FOR APPLICATION BOOT INSTALLATION MATERIAL. ONE PIECE SPUN ALUMINUM GRADULATED STEPPED PVC ADJUSTABLE STAINLESS STEEL - :. _ ( MIN 3 SHEET METAL PER SEAL AIR SUPPORT TO DECK ABOVE, TYP SET BASE IN BED OF MASTIC. SECURE TO STRUCTURE ABOVE 3" WIDE SHEET METAL �✓ STR,gP 4' —O OC 45 • (2) 12 GA HANGER SCREWS GONNECT10N. TIGHT ARCHITECT'S DRAWING I i MINIMUM 12 ABOVE ROOF . CfD / OF VENT PIPE a.L— WITH ROOFING . " ROOF INSULATION II 1 CONNECT TO S TRUCTURE ABOVE I I 11 ROOF DECK " ' "Il HOT OUTLET If COLD 3/8" COPPER PROVIDE SLEEVE IF REQUIRED r _ANCHOR PIPE DECK OR JOISTS AN BOLT AROUND AND ANGLE IRON TO ROOF WITH PIPE CONNECTORS PIPE. FEET HORIZONTAL OR THREE VERTICAL SURFACE. WITHIN SIX FEET OF VENT DUCT LENGTH BY TYPE OF ROOF DECK. COLD INLET TUBING HEATER ROUND METAL INSTANT FLOW 1/2" THREE WAY = DUCT, TYP ' MINIMUM 12" BELOW ROOF WELDED OR SCREWED 110V BY ELEC - I 1 . HOT ANGLE STOP VALVE PROVIDE PIPE INCREASER WHERE TO DECK OR JOIST. ` �3 ! COLD HUBLESS PIPE 1 J ACOUSTICAL FLIP( CEILING DIFFUSER /RETURN GRILLE 5' -0" MAXIMUM SUSPENDED CEILING REQUIRED TO MAKE MINIMUM 3 0 0 0 0„LJ " —BOX VENT THRU ROOF. ON CAST IRON NOTE: ATTACH FLEX TO DUCT AND CEILING DIFFUSER USING MIN OF 3 SHEET METAL SCREWS. SEAL NR TIGHT REFER TO PLANS FOR VTR PIPE SIZES AND LOCATIONS. LOCATE VENT THRU ROOF MINIMUM TEN FEU VERTICAL ABOVE ANY BUILDING OPENING OR FRESH AIR INTAKE, AND ONE FOOT FROM ANY PROVIDE 1" FIBERGLASS INSULATION WITH ALL— SERVICE JACKET ON VENT PIPE INSIDE BUILDING THRU ROOF LOCATION. VERIFY FLASHING AND COUNTER FLASHING WITH ROOFING CONTRACTOR. NOT USED SCALE: 1 1 INSTANTANEOUS WATER HEATER PIPING DETAIL SCALE VENT THRU ROOF DETAIL SCALE: 5 CEILING DIFFUSER/RETURN GRILLE C ONNECTION DETAIL SCALE 2 N.T.S. NTS NONE NONE BRASS CLEANOUT PLUG WALL CONSTRUCTION 48" 30" 30 ,-. _.� � , r i' � ' 24 ": .� •,i ,., - F MAIN SUPPLY DUCT ( OR MAIN EXHAUST /RETURN DUCT (OR SUB —MAIN) SUB —MAIN ) 1/4 W, 4" MIN 1 4 W 4" / MIN. 4 I PROVIDE VOLUME DAMPER PROVIDE VOLUME BRANCH DUCT TAPPED CL No. 45 TEE JR SMITH Na. 4530, ZURN No. Z -1446 OR EQUAL DAMPER --- BRANCH DUCT W w -- / j - --,ti- -- SUPPLY AIR DUCT EXHAUST /RETURN AIR DUCT VOLUME DAMPER AIR FLOW DUCT MAIN STAINLESS STEEL CLEANOUT COVER - - SWITCH, OUTLET, TOP OF THERMOSTAT, CONTROL SWITCH, OUTLET, CONTROL x \ I R CTAN LAR TO ROUND EGUFINISHED FLO / �1� SIDE DUCT TAKE —OFF Ai 18 GAUGE VOLUME PAMPER WITH _ BRANCH CITY DEC Phi-iMU RECEIVED OF TtJI%ANILA 0 5 2007 GEN I ER CONICAL TAP MAIN 1' ' LOCKING QUADRANT SET (TYP EXHAUST AIR B RANCH RUNOUTS) NOT USED SCALE: 10 WALL CLEAN OUT DETAIL SCALE: 7 BRANCH TAKE -OFF DETAIL SCALE: 4 MOUNTING HEIGHT OVER OBSTRUCTION SCALE: I N.T.S. N.T.S N.T.S. NONE carry O 2007 C/RTER & e JRGESS, rrc. at &t Carter::Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 1 EXPIRES 03/1108 1 NO. DATE ISSUES /REVISIONS — 11 30--07 ISSUE FOR PERMIT DESCRIPTION WESTFIELD SHOPPINGTOWN SOUTHCENTER 633 Southcenter Mall Seattle, WA 98188 DESIGNED BY: DL CHECKED BY: KL DRAWN BY: DL PROJECT NUMBER: SCALE: MECHANICAL AND PLUMBING DETAILS APPROVED BY: MV 441805.011.039.0001 NONE M -400 DIFFUSER SCHEDULE MARK NO MANUFACTURER & MODEL NO. TYPE CFM RANGE MODULE � IN NECK IN) OPPOSE DAMPER MAX NC MAX PD MATERIAL COLOR REMARKS CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 0--100 24X24 6 NO 25 0.1 STEEL WHITE 3 1 CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 101 -200 24X24 8 NO 25 0.1 STEEL WHITE 2" 2 CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 201 -325 24X24 10 NO 25 0.1 STEEL WHITE LAVATORY 3 CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 326 -400 24X24 12 NO 25 0.1 STEEL WHITE 4 CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 401 -550 24X24 14 NO 25 0.1 STEEL WHITE 2.5 5 CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 551 -700 24X24 16 NO 25 0.1 STEEL WHITE ( s ( CD ) TITUS PCS ADJUSTABLE BLADE PERFORATED FACE D -80 12X12 6 y NO 25 0.1 STEEL WHITE 7 TITUS PXP PERFORATED FACE - 24X24 6 NO 25 0.1 STEEL WHITE 0 1 NOTES: O PROVIDE ROUND TO SQUARE ADAPTOR AS NEEDED. PLUMBING FIXTURE SCHEDULE ITEM DESCRIPTION MANUFACTURER W V CW HW QTY. &V ELECTRICAL OPER WEIGHT (LBS) REMARKS AND SPECIFICATIONS F.U. FU TOTAL F.U. . TOTAL TOTAL NO. OF STEPS AVAILABLE INSTANTANEOUS WATER HEATER CHRONOMITE LABORATORIES, INC. DISCHARGE VOLTS /PH /HZ 1/2" 1/2" 3 - - - - #M -20L, TANKLESS ELECTRIC WATER HEATER, FLOW ACTIVATED, STAINLESS SII.tL HEATING COILS, ONE -4160 WATT, 208/1/60 VOLT, SINGLE PHASE, 20 AMP, 1/2" WATER CONNECTION, 6 "HX9"WX2 -1/2 ° , 80T-105T TEMPERATURE RANGE. © VW 3 0.03 WATER CLOSET KOHLER 4" 2" 3 4" / - 2 4 8 2.5 5 #K- -3544, 17 -1/2" HIGH ELONGATED RIM VITREOUS CHINA TWO -PIECE TOILET, COMPLETE WITH POLISHED CHROME FLUSH ACTUATOR, BOWL: K-4324, TANK: K -4413, 5 -1/2" SEAT POST HOLE CENTER, ULTRA -LOW CONSUMPTION TOILET, FLUSHES ON 1.6 GAL OF WATER. ® MW 1000 1000 LAVATORY KOHLER 2" 1 -1/2" 1/2" 1/2" 2 1 2 1 2 #K -2005, VITREOUS CHINA WALL -HUNG LAVATORY WITH HANGER, DRILLED FOR CONCEALED ARM CARRIER WITH FAUCET HOLES ON 4" CENTERS, FRONT OVERFLOW; FAUCET: #501 - WFHDF, SINGLE HANDLE LAVATORY DECK FAUCET; METAL POP -UP DRAIN AND UFT HOLE IN POUSHED CHROME. 1 -1/4" TAILPIECE. PROVIDE 3/8" WALL SUPPLIES WITH STOP AND 1 --1/4" OFFSET DRAIN, METAL GRID STRAINER. (FURNISH AND INSTALL " BROCAR" #C500R -B TRAP WRAP FOR PF -2H) BROCAR TEL: (800) 827 -1207 c MOP SINK FLORESTONE 3" 2" 3/4" - 1 4 4 2.5 2.5 MODEL # 95 NEO ANGLE DROP FRONT TERRAZZO MOP RECEPTOR. MS 1 FIXTURE UNIT (F.U.) TOTALS 14 9.5 ALL FIXTURES TO BE SUPPUED & INSTALLED BY PLUMBING CONTRACTOR. VARIABLE VOLUME UNIT SCHEDULE MARK NO. MANUFACTURER & MODEL NO. LOCATION SERVICE UNIT SIZE PRIMARY AIR INLET SIZE (IN) FAN ELECTRICAL REHEAT COIL MAX NC LEVELS ELECTRICAL OPER WEIGHT (LBS) REMARKS MAX CFM MIN CFM CFM KW NO. OF STEPS AVAILABLE AIR PD (IN WG) RADIATOR DISCHARGE VOLTS /PH /HZ 1 TRANE VCEF CEILING OFFICES 10 10 1000 300 300 11 3 0.03 25 22 480/3/60 81 0 ® IT 20 TRANS VCEF CEILING SALES 16 16 3000 1000 1000 30 3 0.02 22 22 480/3/60 121 O VAV 2 NOTES: 0 CONTROL OF VAV BOX SHALL BE COORDINATED WITH EXISTING TRANE CONTROL SYSTEM. COORDINATE WITH OWNER FOR EXACT REQUIREMENT. EXHAUST FAN SCHEDULE MARK NO. MANUFACTURER & MODEL NO. SERVICE LOCATION TYPE CFM ESP (IN WG) QTY. DRIVE MOTOR OPER WEIGHT (LBS) REMARKS WATTS VOLTS /PH /HZ EF BROAN QTRE 110 RESTROOM CEILING BATHROOM ROOM 100 0.1 1 DIRECT 37 120/1/60 20 000 1 EF BROAN QTRE 110 RESTROOM CEILING BATHROOM ROOM 100 0.1 1 DIRECT 37 120/1/60 20 0 e 2 NOTES: O INTERLOCK WITH UGHT SWITCH. Q FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR. PROVIDE BACKDRAFT DAMPER. Q PIPING MATERIAL LEGEND DOMESTIC WATER SS, VENT AND STORM PIPING UNDERGROUND PIPING UNDERGROUND PIPING 2" AND SMALLER -SOFT DRAWN COPPER, TYPE K, NO JOINTS BELOW FLOOR 2 -1/2" AND LARGER -HARD DRAWN COPPER, TYPE K SERVICE WEIGHT CAST IRON PIPING, HUB AND SPIGOT TYPE ABOVE GROUND PIPING ABOVE GROUND PIPING 1/2" AND LARGER - HARD DRAWN COPPER, TYPE L 1 -1 /2" AND SMALLER - HARD DWV COPPER DRAINAGE TUBE 2" AND LARGER - SERVICE WEIGHT CAST IRON PIPING HUB AND SPIGOT TYPE, HUBLESS SERVICE WEIGHT CAST IRON, PVC PIPE, SCHEDULE 40, SOCKET TYPE DWV PATTERN (WHERE PERMITTED BY LOCAL JURISDICTION). PIPE SIZE GPM FT /SEC MAX FU 1/2" 2.3 2.9 3 3/4" 5.5 3.8 7 1" 12 4.5 16 1 -1/4" 20 5.2 30 1-1/2" 30 6.0 54 2" 70 7.5 225 NOTES: MAX VELOCITY IN WATER PIPE 8 FT /SEC. FOR COLD WATER. MAX VELOCITY IN WATER PIPE 5 FT /SEC. FOR HOT WATER. PLUMBING CONTRACTOR TO VERIFY AND COORDINATE EXACT STREET PRESSURE AND NOTIFY ENGINEER OF ANY DISCREPANCIES. PLUMBING CONTRACTOR TO PROVIDE A PRESSURE REDUCING VALVE (PRV) ON CUSTOMER SIDE OF WATER METER IF THE STREET PRESSURE EXCEEDS 80 PSI, PRV TO BE SET AT 60 PSI. THE FOLLOWING CHART IS USED TO SIZE THE TYPE L COPPER, COLD WATER PIPING IN ACCORDANCE WITH CPC APPENDIX A AT 4.0 P.S.I. / 100 FT. LOSS RECEIVED CITY OF TIJKWILA DEC 0 5 ?ON P�t�lvu 1 O N i ER COPYRIGHT 0 2007 WRIER & eta, INC. CarternBurgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 1 EXPIRES 03/15/08 I ISSUES /REVISIONS - 11 -30 -07 ISSUE FOR PERMIT NO. DATE WESTFIELD SHOPPINGTOWN SOUTHCENTER 633 Southcenter Mall Seattle, WA 98188 DESIGNED BY: KL CHECKED 8Y: KL DRAWN BY DL PROJECT NUMBER: SCALE: at &t DESCRIPTION APPROVED BY: MV 441805.011.039.0001 NONE MECHANICAL AND PLUMBING SCHEDULES M -600