HomeMy WebLinkAboutPermit M04-001 - BOEING #9-101BOEING #9 -101
BUILDING
9725 EAST
MARGINAL WAY
SOUTH
M04 -007
U O`
co
U W,
w W
W C)
te
a,
1-O
z�
LLI 111:
D
0
Wu
F=. U(
- Q;
Z'.
U-
' 1`
O
z
Parcel No.: 0003400018
Address: 9725 EAST MARGINAL WY S TUKW
Suite No:
Tenant:
Name: BOEING #9 -101
Address: 9725 EAST MARGINAL WY S, TUKWILA WA
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name: BOEING COMPANY
Address: 100 N RIVERSIDE, M/C 5003 -4027, CHICAGO IL
Contractor License No: BOEINC *294ML
DESCRIPTION OF WORK:
FABRICATE AND INSTALL EXHAUST STACK FROM OVEN; REUSE DUCT. (BLDG PERMIT
REFERRED TO WORK BUT NO DRWGS WERE SUBMITTED - PERMIT NO. D03 -323 ISSUED)
Value of Construction: $35,000.00
Type of Fire Protection:
Permit Center Authorized Signature:
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and
ordinances governing this work will be complied with, whether specified herein or not.
The granting of s permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating cons ction the performance of work. I am authorized to sign and obtain this mechanical permit.
Date
Signature:
doc: Mech
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
THE BOEING COMPANY
PO BOX 3703 M/S #1F -09, SEATTLE WA
JOHN MURDOCH
P.O. BOX 3999, M/C 89 -14, SEATTLE, WA
Print Name: 4. /1 "?t.e'N
MECHANICAL PERMIT
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is
suspended or abandoned for a period of 180 days from the last inspection.
M04 -001
Permit Number:
Issue Date:
Permit Expires On:
Phone:
Phone: 253 773 -0444
Phone: 312 544 -2535
Expiration Date: 01 /14/2005
M04 -001
01/22/2004
07/20/2004
Fees Collected: $65.06
Uniform Mechnical Code Edition: 1997
Date: -22-4
Printed: 01 -22 -2004
Signature'
Print Name:
doc: Conditions
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
Parcel No.: 0003400018 Permit Number: M04 -001
Address: 9725 EAST MARGINAL WY S TUKW Status: ISSUED
Suite No: Applied Date: 01/08/2004
Tenant: BOEING #9 - 101 Issue Date: 01/22/2004
1: ** *BUILDING DEPARTMENT CONDITIONS * **
2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division.
3: Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical
work will be inspected by that agency (206- 835- 1111).
4: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any
construction. These documents are to be maintained and available until final inspection approval is granted.
5: Readily accessible access to roof mounted equipment is required.
6: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997
Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition).
7: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be
construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any
other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this
code shall be valid.
8: Manufacturers installation instructions required on site for the building inspectors review.
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws
regulating co uction or the performance of work.
Jo�u 6. MuQswiI
PERMIT CONDITIONS
M04 -001
DateAaAt /
Printed: 01 -22 -2004
Company Name:
Contact Person:
E -Mail Address:
Contact Person:
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
^- 1
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
JA aje
lapplicationalpennit application (3.2003)
3/2003
70 200/N6 C weetV
E -Mail Address:
Page l
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
` ¥4SITE-L-Y� A F1O
r a
Z IOW �ssessor's Tax No.: Aye ovD ��Q/r
Site Address: . q'? Z bArit /�� I 'Suite Number:
Tenant Name: C'oNPRAM New Tenant: 0 .... Yes X..No
Property Owners Name: 77- ION& 6009/J '
Mailing Address: r• Os » 3949 $ / 8 9• l � 43prit6 Mi' `gat/ -z4"I
City State Zip
Name: f VHG ea Day Telephone 25
Mailing Address: . �. .60) L599? /& D7 - v� 4 -A47 .G W 9iz % Z4'
ns 'dock rev �e/o� Zx CZo) s1 -73- E -Mail Address: �O ti � • � Number:
Floor:
.
AC 'QR TN FoRMATI O1
��''FF'+'t'Mj` a tiS�
Mailing Address:
Zip
City
Day Telephone:
Fax Number:
State
Contractor Registration Number: Expiration Date:
* *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance **
p14n519.4st'be
et stamped
rchitectPoRecor
Company Name:
Mailing Address:
State
Zip
City
Day Telephone:
Fax Number:
x E$GINEEItO RECC
1 p must be wet stamped by,
State
Zip
City
Day Telephone:
Fax Number:
'Unit`Ty,,e _,
ty:::..
yP. -: ..
(2ty.
,Unit YPe
.. Qty .
.Boi er Compressor. ; ;;
.: - ty,
Furnace <100K BTU
Air Handling Unit
>= 10,000 CFM
Other Mechanical
Equipment
0 -3 HP /100,000 BTU
Furnace>100K BTU
Evaporator Cooler
3 -15 HP /500,000 BTU
Floor Furnace
Ventilation Fan
15 -30 HP /1,000,000 BTU
Suspended/Wall/Floor
Mounted Heater
Ventilation System
30 -50 HP /1,750,000 BTU
Appliance Vent
Hood
50+ HP/1,750,000 BTU
Heat/Refrig/Cooling
System
Incinerator - Domestic
Air Handling Unit
<= 10,000 CFM .
Incinerator — Comm/Ind
'1'Rll�1 ORMATI
r . : �r 1 `:: ,YT�J .���f ` � ', � ` i,`�1;�"r{' til� Y j„(yw fiRy.?�'•:
MECHANICAL CONTRACTOR INFORMATION ✓ r
Company Name: / 150670416 150670416 6 WNW )/ -* kW , J7 te, ) t & Mu/moor/ •
Mailing Address: � r / p GQ /T "Pang WA cnIzifrZW9
City State 6G . '/
�,� Ziip
Contact Person: �N /' /� aDad Day Telephone: // 3 ;431:M
E -Mail AddressjObN Meirde C heWtenp.CO/ 8 t Fax Number: �J3 ??'3'07 3
Contractor Registration Number: Expiration Date:
* *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance **
Valuation of Project (contractor's bid price): $ 36K.
Scope of Work (please provide detailed information): F 4 ill SniPt t/ i SICK. /l
i ue,vn . RttS6E D��'. A' EV,. Fti2 ( l 'RED 70 Luau. NIT No b W L 4 S
w A '_7 -
Use: Residential: New ....❑ Replacement .... 0
Commercial: New .... ❑ Replacement .... ❑
Fuel Type: Electric ❑ Gas ....0 Other:
Indicate type of mechanical work being installed and the quantity below:
1 E tNii' Y F CAT�ON O TE� ='
" S +
� 9St ... rte `` ':'C �
tS' afi4:: r". Yt rx`K.�^tMF.r�H.- Yr;4.� ^
�Uc�lile�to'a11= 'permits �in'tlisapplicat�ion��;
.. r.. ..,,1'A {„ E1.r_Y..1 Cf.: ?.. ^.+ ._!rSF t �.<k�S!.. ji5h:'•ct! ="fd .".•'. :.:
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as
defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY O... ERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING 0 !,.4 ' 0 U f , • • IZE • AG NT: Mien' Signature: 4 . ' Date: i��/'�.J'e '
Print Nam f I y 7 ..4 /
G -f2 ��}
' q V � Day Telephone: 743..0011# Mailing Address: r, o. �39, L M/& m-/if 9e `r'ie WA 98(74k Z C j
City State Zip
Date Application Accepted:
Date Application Expires:
Staff Initials:
tappliationdpumit application (3.2003)
3/2003
Page 4
Parcel No.: 0003400018 Permit Number: M04-001
Address: 9725 EAST MARGINAL WY S TUKW Status: APPROVED
Suite No: Applied Date: 01/08/2004
Applicant: BOEING ##:1 -101 Issue Date:
Receipt No.: R04 -00061 Payment Amount: 65.06
Initials: SAGS Payment Date: 01/22/2004 08:38 AM
User ID: 1165 Balance: $0.00
Payee: BOEING TRUST ACCT. 000.99.586.908.03
TRANSACTION LIST:
Type Method Description Amount
ACCOUNT ITEM LIST:
Description
doc: Receipt
City of Tukwila
6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
Payment Other
MECHANICAL - NONRES
PLAN CHECK - NONRES
RECEIPT
65.06
Account Code Current Pmts
000/322.100 52.05
000/345.830 13.01
Total: 65.06
:;779 01/23 9716 TOTAL. 0.00
Printed: 01 -22 -2004
Project
9' ,D/
Type of Inspection:
�r
Date Called:
� aml�
Ad -
Special Instructions:
1 GI,%!/
Date Wanted:
/4
Requester:
Phone No:
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISIO
6300 Southcenter Blvd., #100, Tukwila, WA 98188
COMMENTS:
'Inspector
n S47.
INSPECTION RECORD
Retain a copy with permit
F;
a
MO
PE :
(206)431 -3670
Approved per applicable codes. Corrections required prior to approval.
Date:
INSPECTION kW REQUIRED. Prior to inspection, fee must e
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
'Receipt No.:
'Date:
Y�,
Project ..4,-0—
415/0F/A).9- 9 - /o/
Type nspection:
of iAJ/-L 1146-:C1-/ .
Address:
, q7/5 --.
' / .
Date Called:
— /�
—0Y
Speer structions: W ,' ti
An Requester
24446, S 7.�
Date Wante
9 !T ij
l y
d
p.m.
phone
79 7 --*/
5-/
6300 Southcenter Blvd., #100, Tukwila, WA 98188
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
M a y --cO/
(206)431 -3670
Approved per applicable codes. Corrections required prior to approval(
COMMENTS:
C 1 . 1 a94157.5 19 -4 4 c
/mot 61, e' �"� 14,1- .
?% (r 7/441J
74 Zezt,
$47. EINSPECT 'SN FEE REQUIRED. Prior to inspection, fee m)fst be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
1 Receipt No.:
(Date:
City of Tukwila
Fire Department
TUKWILA FIRE DEPARTMENT
FINAL APPROVAL.FORM
Project Name 60e. i r1
'Address E. rar (l I /,v.
V Retain current inspection schedule
Needs shift, inspection
pproved without correction notice
Approved with correction notice issued
I
Sprinklers:
Fire Alarm:
Hood & Duct:
Halon:
Monitor:
Pre- Fire:
Permits:
.� /�..., 6710
Authorized Signature
FINALAPP.FRM Rev. 2/19/98
Permit No. vW -6 W
Suite #
Date
T.F.D. Form F.P. 85
Steven M. Mullet, Mayor
Thomas P Keefe, Fire Chief
Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: 206 -575 -4404 • Fax: 206 -575 -4439
::,r;,Jtc..:.�.,.:,1r •: J3: �s: a::'s;:'::s4s:.: „;s',ac::..;�:.
0
`3 0 do
, 1�Q`Lv
PS � \S�o N
1
CENTER OF EXHAUST STACK
- �—
d O\
�� \ �� \!J
ROUND OR RECTANGULAR
-
EXHAUST STACK GAGE &
SIZE AS REQUIRED
TO HOOD IC REQUIRED
TO BE FABRICATED
18 GA. GALV. IRON.
OF
_
=
—
� -
— W ��
h 2
E--- 3" MIN.
�Jlr�
=
_
=
_
=
► \�
=
11
I
- CURB DETAIL TO SUIT
N
--
5
STRUCTURAL REQ's.
LINE STACK OPENING WITH
18 GA. GALV. IRON &
EXTEND AS SHOWN.
PROVIDE 3 EA. Z SPACER BRACKET
c
3" MIN.
SPACED AT 120', STACK MUST BE
SUSPENDED INDEPENDENTLY OF
THESE SPACERS.
THIS DETAIL IS ACCEPTABLE
AS AN ALTERNATE FOR
NFPA REQ'D 18" CLEARANCE
BETWEEN A HEATED STACK
& COMBUSTIBLE CONSTRUCTION
NOTES:
1. FOR HOT STACKS (600'F
PAINT BOOTH STACKS
2. FOR LOW TEMPERATURE
AND NON- COMBUSTIBLE
INSULATION OR ROOFING
COMBUSTIBLE CURBS
INSULATION.
COVER EXHAUST STACK WITH 1 1/2"
THICK METAL COVERED CALCIUM
SILICATE INSULATION & EXTEND
AS SHOWN.
OR MORE) AND SPRAY RECEIVED
USE AS SHOWN. CITY OFTUKWILA ,
STACKS (BELOW 600'F) JAN 0 2004
ROOFS WITHOUT COMBUSTIBLE
PERMIT CENTER
MATERIALS, USE NON -
AND OMIT CALCIUM SILICATE '
/06 910 0/
REV
DESCRIPTION
DWN
DATE
APVD
DATE
A
LGE FOR BCA MR & D LAB J #130198 -
10/01/03
TWH
10/01/03
*
REDRAWN ON COMPUTER
J.TORR
10/8/93
ML SMITH
10/8/93
Own: J.TORR
Date: 10/8/93
Title HOT STACK THRU
COMBUSTIBLE ROOF T.B.C. STANDARD
Scale: wnc
Sht: °'
Ckd: ML SMITH
10/8/93
Rev Sym: *
Oath: 10/8/93
"pvd:
20,E/NC I C°mp.No,
Dwg. No. 250-45
::,r;,Jtc..:.�.,.:,1r •: J3: �s: a::'s;:'::s4s:.: „;s',ac::..;�:.
K
r
1
CITY Of II_
GENERAL NOTES APR
J
EQUATIONS USED: ,, P ‘A 1 5 2Mit
r
K = J + 1" A�, :i0 ED
M = K - = nINIlSyON
N =M +12 -- - - DIOC:
BUI-
L =4xJ ���
(fill
DUCT SIZE Wri
I R M ,
J
K
L
M
N
GA.
1/2.
SPOTWELD
OR SHT. MA
4"
5
16
5
17
24
SCREWS RECEIVED
CITY OF TUKWILA
JAN 082004
*REFERENCE: PERMIT CENTER
1. INDUSTRIAL VENTILATION 20th EDITION
SECTION 8 -11, FIGURE 8 -6.
2. SMACNA HVAC DUCT CONSTRUCTION STANDARD
1st EDITION
* SHEET METAL GUAGE BASED ON 2" WG
WITH NO RE-INFORCEMENT, MINUS (1)
GUAGE SIZE.
1
6"
7
24
7
19
24
8"
9
32
9
21
24
9"
10
36
10
22
24
10"
11
40
11
23
24
11"
12
44
12
24
22
12"
13
46
13
25
22
14"
15
56
15
27
22
16"
17
64
17
29
22
18"
19
72
19
31
22
20"
21
80
21
33
22
22"
23
88
23
35
22
24"
25
96
25
37
22
MO ea/
DESCRIPTION
DWN
DATE
_ APVD
DATE _
_
0.0: J. TORR
00 5/20/89
Tab: HAMA WEATHER CAP
f 51* a
�, NEW
N9. KSC
u 5/20/89
SID -Y1
DA R.J. NICHOLS
5/21/89
R.D. SAMPAIR
5/23/89
a0E /ANC — � �°"n "0•
PERMIT COORD COPT
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: M04 -001
PROJECT NAME: BOEING #9 -101 BLDG
SITE ADDRESS: 9725 EAST MARGINAL WAY SOUTH
X Original Plan Submittal
DATE: 01 -08 -04
Response to Incomplete Letter #
Response to Correction Letter # Revision # after /before permit is issued
DEPARTMENTS:
Buildin� "�i iision E
A45/ "�a.
Fire Prevention Prevention Planning Division
Public Works ❑ Structural ❑ Permit Coordinator
DC
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 01 -13 -04
Complete Incomplete ❑
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS ROUTING:
Please Route [V Structural Review Required ❑ No further Review Required ❑
REVIEWER'S INITIALS: DATE:
DUE DATE: 02 -10 -04
Approved ❑ Approved with Conditions IE( Not Approved (attach comments) ❑
Notation:
APPROVALS OR CORRECTIONS:
REVIEWER'S INmALS:
Not Applicable ❑
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing sllp.doc
2 -28 -02
PERMIT COORD COPY
YM
FLEX
CONN
44/24
34/24
24/24
X20724
32/24
26/24
38/24
32/24
46/24
36/24
1543 CFM
18/30(TYP)
INSTA BELT GUARD
MOTO PULLEY 9.4"
FAN P 12.4"
3 BEL S ChECK
CEN TE DISTANCE
AIR PUMP
SCOTT X605041
AFF)
AHU #84 "PACE" B -24
21,600 CFM 0 3" SP
25 HP, 480 VOLT, 30
AIR FILTER
SIZE 12H -48
INSPECTION
B OOR
LOUVER
PARCEL STORAGE
AREA SEE SHEET
109 -101- 4551 - 146
1M
1/2" CPLG
(4' AFF)
12' ' 'Oct fie
55/24
10 ' 36 "x18"
GRI S
2.''' CFM EA.
AH1 D
PACE B -20
AHU 11
20,000CFM
32/24
TORIT
MOO. VS -2400
S/N 1G355532
460V I 3 PH 5 HP
2400 CFM 5.7 ESP
[CF AEROVENT #14 BIA FAN
RATED TO 1000 "
ESP WITH 3/4" HP, 460 V
MOTOR & 500' F CONSTRUCTION
I c i
1M -•1
I 8 EXH. STACK
Malt
� ■ - iii
A REDRAW FROM 109-101-4551-M1
b MAKE PAINT BOOTH
C RELOCATE SAO& 910P
0
REMOVE PONEIM A IC SIB' REPLACE N /DELTA
SEE DWG 109- 101 -1656
1M 0 -
10 '0 STACK
TO 25' G
1M
E INSTALL GMOS SAW
STRUCTURAL PLATE
8 "a
Wirloso
M3
10" DIAM.
EXHAUST
T
8"
WNW
• • •
BUILDING EXHAUST
FAN 7000 CFM
TOW 90 CAB
S/N 1G077334 -3
3 HP 208/460 / 3 PHASE
8 132- 008012
1425 CFM
t0 AIR FILTER
6,500 CFM
,, OUTSIDE AIR
1 -M3
ROVENT SIZE 22 BIA A
SET RATED TO 3000 CFM 0 1/2
ESP WITH 3/4" HP, 460 V MOTOR
HIGH TEMP (500' F) CONSTRUCTION
BY *PROM OM
HARRAH
776259 -LO S ROSS(
110141 -02 KGP RwS /DOT 12/4/96
793748 -10 KGP RwS /DOT 9/17/99
703325 -00 OV RWS/MM 12/15/00
Sv
AHU #85 "PACE"
H A-18 6,500 CFM
0 3" SP, 7.5 HP
01
1625 COY
18/30
G INSTAL SPINDLE SANDER
H iGE - MIBUAN 1118 ON- LOADS
F RE- 1N4STM L COMB. 06G/BELT SANDER
32/24 UP
TO ROOF
23/20 14 32/20
co
SECURITY B
SEE BOEING
STD 83 - BMA
► •'1 24/8 • � � lir MI
120129 -00 OW
cu
1301N-00 M.M NG
•
tcT
OAR
660
711791 -00 OMV/RwS MM 04 /02/01
RNS
03/06/02
09.30.03
10 36 "x18"
GRILLES 0
2,000 CFM EA.
IgLAIROE /A/O•
•
BAND SAW
600 CFM
GRINDER
450 CFM
B.O. DUCT
EL. — 18' -1"
mammas 6
APPROVED Of
•
FLEX CONN.
(Ail
PLATE EL. 17' -0"
_M3
CURING ROOM
STRUCTURAL. PLATFORMS
SEE DWG 109 - 101 - 1656 —S1
0/A 62/46
SECURITY BARS
SEE DWG. 83- 81AC-1
PLAN
1M
SCALE: 1/8- : - 0 "
ACCEPTABILITY
WON
G HARRAH a " [
1H6 DESIGN A:IX:
_M2
MECHANICAL WS
CHANGEC !
THE !SCOPE C
•
HVAC DUCTWORK - PARTIAL PLAN
BUILDING 9 -101.1
COL A i —s
LEGEND:
gENERAL NOTES;
CONSTRUCTION NOTES:
RETURN REDLINED PRINT BACK TO ENGINEER WITH ANY CHANGES
FROM THE DESIGN.
MOON WONG, 655 -8428, M/S 46 -87
CC> FABRICATE AND INSTALL THE EXHAUST STACK FROM THE OVEN TO
THE OUTDOOR. RE —USE AS MUCH INSULATED DUCT AS POSSIBLE.
1:2::::;» FABRICATE AND INSTALL A HAMA WEATHER CAP AS SHOWN ON THE
DRAWING KSC— STD —M1. THE STACK ELEVATION AND THE STACK
SUPPORT SHALL MATCH OTHER STACKS IN THE AREA.
3. FABRICATION AND INSTALLATION SHALL CONFORM TO THE SMACNA
STANDARD.
FILE COPY
I understand that the Plan Check approvals are
subject to errors and omissions and approval of
plans does not authorize the violation of any
adopted code or ordinance. Receipt of con-
tractor's copy of approved plans acknowledged.
IVe
Permit No. 1 L � £ rrt ~ °)
,., IRIVIMIAL
1:: -LL
•
MOVED
rgmr cWlLA
JAN 0 8 2004
PEEMTCENTER
aPwvir ecNSaN
,a,
1M10
4o• N�
OM NO.
P
9- 101 -1M10
ti
SEPARATE PERMIT
REQUIRED FOR:
❑ MECHANICAL
ELECTRICAL
[� LUMBING
AS PIPING
CITY OF TUKWILA
BUILDING DIVISION
UV
M r b
IND
Q ® 8
ru
UN
wa
ref
Iw
S
S
•
t•
CORP NO.
09.30.03
z
• I
• •
STAIR
#1
I ENV.
) TH
) TH) W /(3)
FANS
3,500
ECIRC.)
18/24
2250CFM
B REF: AVIONICS SILENCER
2250 CFM
40/12
150 0 BOD EL.
4747139 -03
J1137126-12
BOD EL 15 -8"
8"0 BOD
12' -4"
10 "0 DUCT
PENETRATION
r1
h`-1 60/24
8"0 BOD
14' -4"
(9000 CFU RETURN)
BOD EL 15' -8"
ii►7i 111=1401111111
FLOOR PLAN
2250 CFM
BOD EL 16' - 8"
PARTIAL PLAN
scams: 114' • r-o-
TRANSPORTATION AISLE
78/24
120 1/8/50 1/2
20,000 CFM
0 A 62 46
200 NECK
DIFFUSER
1425 CFM
(1 rP 15)
—FILTER SECTION
SEE DETAIL
SECURRY BARS
SEE M. 83 -NOC -1
TORIT CONTROL B
(SANDING B
5 HP, 460
PRODUCING
CFM (100%
TACKIER SPRAY
e01114 MSS -17
4 "• DN.
CONNECT
TO 3 "0
TO
AHU-
2250C
Blue
Oven
C MULL EMIR. 800TM
D RELOCATE 18 ASSY TO 9 -101
F REPLACE GRIMM if =1VOS .
20" EXHAUST THRU. ROOF
SEE DWG. 9 -103- 2110
FOR CON'T
TUBEAXIAL FAN RATED TO
2000 CFIII 0 1.75` ESP W/A
5 HP 460 V, PREMIUM
EFFICIENCY MOTOR P.O.C.
,108 1 180112 -00
4757251 -01
1 791257 -L0
KGP/RWS EJC
SL8
Ste
r
RWS DT
8" OVENS TACK THRU.
ROOF SEE DWG.
9-103-21110 FOR CON'T
10 -9 -95
10.28.90
SYM
F VACATE (SS
RELOCATE GRIND SHOP
H MR do D PREP
J 1G( -,MAIN LAO 0N-LOMS
. T'I. -
•
w,
41110376 -00 IHARRAM
4110311 -00 KGP
4130198 -06 M.WONG
J1130196 -00 M.wONG
r
S
OAR
5.5.99
RWS 03.13.02
RWS 04.25.03
10.01.03
APIOPEZIVal •
er
•
_MECHANICAL MAS
BUILDING 9 -101
INS LA1K91
DUCTWORK — PARTIAL PLAN
• ASBESTOS NOTIFICATION:
A good IP 'troy of M oat woo Mee been owMcfo1
God osb.1so aoMioUe rooMiiw woo sot doomed •iot NOW
be Erdal in IUo wools iso of No fnojrct. Of Rot rom ,
dooms or die1Mb my oAeN, aMMl/ r/Mom4 M Ow wok
woo rases mild Why WMoe O1o'orMrt N rodeo
ovwleini, inedoriW io *mop. or dowel el est Is regrind
M M rwrorel M moped us&
'111 folwieg roodoriolo iw M once Mjo oif M Ids jlk or e
_$w. N be mike for abaft FLOOR TIES
COI. E -,I 1 -6 DEV. CENTER, WA
•
LEGEND:
mis — z WIDE « > > ca LOOP HANGER
GENERAL NOTES:
t. Aft ►•NOLwc uwf SUPPLY DUCTWORK To BE INSULATED.
2. EXISTING AIR FWOIIIlG UNITS AND DUCTWORK BEING REUSED all
BE REPAIRED AND CLEANED WORE INSTALLATION.
3. dICS HUMIDISTATS FOR CLEAN ROOM EXPANSION AREA LOCATED N
NC 18 RA.
CONSTRUCTION NOTES:
RETURN REDLINED PRINT BACK TO ENGINEERING WITH ANY
CHANGES FROM THE DESIGN.
MOON WONG, 655 -8428, M/S 46 -87
REMOVE A SUPPLY AIR GRILLE AND TURNING VANE. SAVE
THE SUPPLY AIR GRILLE FOR THE RE- INSTALLATION, SEE
FLAG NOTE 2. REPAIR THE OPENING WITH SHEET METAL.
1:2:::::» INSTALL A PREVIOUSLY REMOVED SUPPLY AIR GRILLE AT
THIS . LOCATION WITH TURNING VANES.
D>. REMOVE AN EXHAUST DUCTWORK WITH AN EXHAUST FAN.
REMOVE 18 "X38" VERTICAL EXHAUST DUCT IN THE 9 -103
BUILDING. SEE DWG. 9- 103 -2M 10 FOR THE DETAIL.
13>. REMOVE PORTION OF 20 "i EXHAUST DUCT AS SHOWN.
FABRICATE AND INSTALL NEW SUPPLY AIR DUCT WITH (2)
AIR SUPPLY DIFFUSERS. USE 26 GA. GALV. STEEL FOR
THIS DUCTWORK.
• FABRICATE AND INSTALL EXHAUST DUCT FOR THE PAINT
BOOTH USING 24 GA. GALV. STEEL. PORTION OF 20 "0
DUCT CAN BE RE -USED BUT NEED TO MOVE
APPROXIMATELY 1 FOOT EAST TO UNE UP WITH THE WALL
PENETRATION. SLOPE THE DUCTWORK DOWN TOWARD THE
PAINT BOOTH. INSTALL (9) ACCESS DOORS ON THE
EXHAUST DUCT TO MAINTAIN THE SPRINKLER HEADS. SEE
DWGS. 1M261 & 9-103-N10 FOR THE SPK. HEAD
LOCATIONS.
(NOTE: THERE SHALL BE "NO" 90' ELBOWS IN THE
DUCTWORK!! USE 45' ELBOWS ONLY)
INSTALL 45' ANGLE DUCT PENETRATION THROUGH THE WALL
AND INSTALL A 45 ELBOW ON THE 2ND FLOOR OF THE
9 -103 BUILDING.
REMOVE AND RE- INSTALL THE OVEN EXHAUST DUCT AS
SHOWN. AN OUTSIDE VENDOR SHALL REPAIR THE
INSULATION.
10. SHEET METAL DUCTWORK SHALL CONFORM TO THE SMACNA
STANDARD.
4
11110 11111
1M16
1M17
11122 1M23
1M18
1M24
1131
1106
11128 1M29 1130
11134 1M35
1M39 1M40 1WM
1M12 1M13 1M14
1M19
1M25
1 44
1M20
1M26
1M32
11137
1142
11115
11115
•
1M21
1M27
Will
1M143
0116
0
JOS
ONO NO.
KEY PLAN
ICU on
w
/770 9-�t
parr �vaau
4130198-00 srMa► J
'1gT 1M11
180376 -00
9-- 101 -11111
10.01.03
r
9d I
•
1 i''COP PER
CL
SUMP PUMP
AURORA SPD5OH
50 GPM
30 FT HEAD
1/21C
TO THE
BARREL
STORAGE
MR REGULATOR
AIR ALTER
(TO SERVE CIVICS BOX)
EL +31.75'
J.130198-00
08.10.99
08.19.02
09.30.03
U. ~ow Milormi rA rm.". nom
11111.111111 • 111111111181111111111111MINI/4telleir
LEGEND
GENERAL NOTES
STAIR
"A"
GATE VA. & CHECK
VA. IN RISER
INSTALL BACKFLOW PREWNTER
PROVIDE WATER PUMP SEAL J • 79107610
PROVIDE Pa TO EOUIP. J I 791710-10
INSTALL DIM *TER LINE. J 526319-00
WIEDEMANN
COORDINATOR
P.O.C.
6 LOOP
4 LOOP
EXTEND 1/2" VACUUM LINE TO THE OVEN AND CONNECT IT TO THE
TERMINATION POINT.
1:1>. INSTALL AN AIR VENT FROM THE OVEN TO THE OUTDOOR. CUT THE END OF
THE PIPE, 45' ANGLE TO PREVENT RAIN FROM ENTERING.
4. ALL PIPING FABRICATION AND INSTALLATION SHALL CONFORM TO THE UNIFORM
PLUMBING CODE.
UMBING FIRST FLOOR PLAN
BUILDING 9-101.1
cot_ A4 1-6
EXTEND 1/2" COMPRESSED AIR LINE TO THE OVEN AND PROVIDE 1 /4" DUPLEX
AIR DROP.
RETURN REDUNED PRINT BACK TO ENGINEER WITH ANY CHANGES FROM THE
DESIGN.
MOON WONG, 655-8428, M/S 46-87
CONSTRUCTION NOTES
REFERENCE DRAWINGS
* ASBESTOS NOTIFICATION:
A good faith survey of the work area has been conducted and asbestos
containing material was not scovered that would be invoked in the
ccostruction of this project Do not remove, damage or disturb any
asbestos material adjocent to the work cnia. Please contact Boeing
Facilities Department if asbestos containing material is damaged or
discovered that is required to be removed to wort work.
The following moterials in the areas adjacent to this b are assumed
to be positive for asbestos: FLoomEs & PEE ipisuLATKN
111116
111122
111128
1M117
111123
1M129
111112
111118
111124
111135
111113
111119
111125
111131
111114
111120
111115
114137
111126 111127
111132 111133
111142 111143
111145 111146
JAN 0 8 2009 KEY PLAN
SCALE: N.T.S.
PERMIT CENTER
J1130198-00
g
•
le
•
S
...-.00111•411.
.t l
■■ ow Lao
■
.
brasi
mum IN
pigs! Po
L
STAIR
fety Fork Ar
P.O.C.
P.O.C.
TORIT
SAND -BLAST
P.O.C.
9U0 SS
P.O.C.
Surface
Prep La
P.O.C.
P.O.C.
CHROMOLUX
ON.
PUMP
MSS 63534
R M D OAR SvM
RIMS 03.13.02
RWS 04.01.03
RWS 09.30.03
P.O.C.
- --�-
P.O.C.
2 ~ - 7 a.
.O.C.
VAC
WATER HEATER, A.O.SMITH EES
52, 913 CAP. GAL. 50, 4.5KW,
PN/ EES- 52- F202172000
BRADLEY
HALF SINK
VAC
P.o.c
PARTIAL PLAN
SCALE: 1/4' • 1'-0'
1M111 4527 -M2
2" FROM 2ND
FLOOR DRINKING
FOUNTAIN
r " COPPER
% EL 33 -09'
2" UP TO SINK
1/2" FROM 2ND
FLOOR SINK
114116
114122
114128
114117
114123
111129
111139
9 -101.1 KEY PLAN
SCALE: N.T.S.
111113
1A119
11125
111114
11120
114126
111132
114137
114142
111145
111115
111121
111127
111133
111138
111143
111146
• RETURN REDLINED PRINT BACK TO ENGINEER WITH ANY CHANGES FROM
THE DESIGN.
MOON WONG, 655 -8428, 14/S 46 -87
D:::› EXTEND THE COMPRESSED AIR PIPING AS SHOWN AND INSTALL DUPLEX
AIR OUTLETS. INSTALL (12) HARD PIPED DUPLEX OUTLET AT THE
WALLS AND COLUMNS. INSTALL (16) FLEXIBLE HOSE DUPLEX AIR
DROPS AT THE OPEN AREA. AU. NEW COMPRESSED AIR DROPS SHALL
BE 1/4' CEJN 103103454 VENTED COUPUNGS.
E::::: REMOVE (10) COMPRESSED MR DROPS AND A COMPRESSED AIR
BRANCH.
c:::::» EXTEND THE VACUUM PIPING AS SHOWN AND INSTALL DUPLEX VACUUM
OUTLETS. INSTALL (15) HARD PIPED DUPLEX OUTLETS AT THE WALLS
AND COLUMNS. INSTALL (13) FLEXIBLE HOSE DUPLEX DROPS AT THE
OPEN AREA. ALL VACUUM DROPS SHALL BE SWAGELOK STEAMS,
SS-QC6-D-6PMHS QUICK CONNECTORS.
ALSO REPLACE THE QUICK CONNECTOR BODIES ON THE EQUIPMENT TO
SS- OC6- B- 6PAIHS AS NECESSARY.
REMOVE (9) VACUUM DROPS.
E> RAISE THE 2 "I VACUUM UNE AS CLOSE AS POSSIBLE TO THE CEILING
TO ELIMINATE A TRIP HAllARD.
PROVIDE COMPRESSED AIR PIPING TO THE PAINT BOOTH.
e›- REMOVE AN ELECTRIC WATER FOUNTAIN AND CAP THE DRAIN.
8
REMOVE THE COLD WATER PIPING AS SHOWN.
9 EXTEND THE COLD WATER PIPING DOWN THE WALL AND INSTALL A
HOSE BIBB AT 2 FEET ABOVE THE FLOOR.
Br.> REPLACE (2) EXISTING DUPLEX COMPRESSED AIR DROPS WITH 1/4"
CEJN 103103454 VENTED COUPUNGS.
[f► INSTALL AN EMERGENCY EYE WASH /SHOWER EAST OF THE COL. E /2.
(NOTE: EYE WASH /SHOWER IS RELOCATED FROM AUBURN).
lj:z::::» INSTALL AN EMERGENCY EYE WASH /SHOWER WATER HEATER AT THIS
LOCATION. BUILD AN UNISTRUT SUPPORT FOR THE HEATER.
14: INSTALL A 1 -1 /4" COLD WATER TAP FROM THE 4'0 MAIN. RUN THE
COLD WATER UNE TO THE EYE WASH /SHOWER WATER HEATER AND
INSULATE THE UNE WITH 1 " THICK FIBER GLASS. THEN RUN THE
TEPID WATER TO THE EMERGENCY EYE WASH/SHOWER.
N>fr INSTALL A PETE PLUG ON THE TEPID WATER LINE.
Ei.3::=> REMOVE /CAP THE DRAIN AND COLD WATER PIPING BACK TO THE WALL.
THESE UTILITIES ARE LEFT FROM THE REMOVED SINK.
PLUMBING — PARTIAL PLAN
BUILDING 9 -101.1
LEGEND
A-
..__._ CW
o
,- G
rep
- V
RM IIM=PV -
- VAC ----
CONSTRUCTION NOTES
15. REPAIR ALL THE WALL OPENINGS LEFT FROM THE REMOVED PIPING
AND DUCTWORKS.
16. INSTALLATION OF ALL PIPING SHALL CONFORM TO THE UNIFORM
PLUMBING CODE.
REFERENCE DRAWINGS
130198 -00
9- 101- 11N111
1111011140
CITY OF TUKVIILA
JAN 0 8 2004
PERMIT C@1TEP
EWC
2 DUPLEX
FITTINGS
w/o Q.D.
P.O.C.
i1
•
ittall?!tt
iPAP" r
c
r al
I:1
EMERG. EYE /S
WATER HEATER
Eemax EX720T1
VALVE
P.O.C.
F-
SYM
A RELOCATE GRIND SHOP
iNsT
ALL CINCINNATI TiC GRINDER
C LGE -AUBURN LAS ON -LOMOS
TORIT #ECB -1 ENV.
CONTROL BOOTH
(SANDING BOOTH) W /(3)
5 HP, 460 V, FANS
PRODUCING 13,500
CFM (100% CIRC. )
r
110311 -00
1000654615
130198 -00
P.O.C.
PLUG
A
..,...� .... w ,
•
i
FIRST FLOOR PLAN
SCALE: 1/8"=1'-0"
S
4
•
_• ... , ' _r*.w►.�.r_ a ..
vdilo
• a
I
P.O.C.
C EL 33-09'
P.O.C.
P.O. C
P. O. C.
P.O.C.
P.O. C .
A CONSOLIDATE L. 9-3269
8 RELOCATE CUM
C RELOCATE MSC CFAC FUNCTION
4772962-00
J# 180372-00
4180375-00
RWS 03-14-02
09.30.03
c0
q EL 33-09'
HANKINSON
ILIDFP20-6-5SH
PRE-FILTER
INSTALL BEFORE
MEMBRANE DRIER
CONSTRUCTION NOTES:
RETURN REDUNED PRINT BACK TO ENGINEER WITH ANY CHANGES FROM
THE DESIGN.
MOON WONG, 655-8428, M/S 46-87
[1:›- EXTEND THE COMPRESSED AIR PIPING AS SHOWN AND INSTALL DUPLEX
AIR OUTLETS. INSTALL (3) HARD PIPED DUPLEX OUTLET AT THE
WALLS AND COLUMNS. INSTALL (3) FLEXIBLE HOSE DUPLEX AIR
DROPS AT THE OPEN AREA. ALL NEW COMPRESSED MR DROPS SHALL
BE 1/4" CEJN 103103454 VENTED COUPUNGS.
[=:". REMOVE (2) COMPRESSED AIR DROPS AND A COMPRESSED AIR
BRANCH.
[X> EXTEND THE VACUUM PIPING AS SHOWN AND INSTALL DUPLEX VACUUM
OUTLETS. INSTALL (6) HARD PIPED DUPLEX OUTLETS AT THE WALLS
AND COLUMNS. INSTALL (2) FLEXIBLE HOSE DUPLEX DROPS AT THE
OPEN AREA. ALL VACUUM DROPS SHALL BE SWACELOK STEAMS,
SS—QC6—D-6PMHS QUICK CONNECTORS.
ALSO REPLACE THE QUICK CONNECTOR BODIES ON THE EQUIPMENT TO
SS—QC6—B-6PMHS AS NECESSARY.
REPLACE (3) EXISTING DUPLEX COMPRESSED AIR DROPS WITH 1/4"
CEJN 103103454 VENTED COUPLINGS.
INSTALLATION OF ALL PIPING SHALL CONFORM TO THE UNIFORM
PLUMBING CODE.
VIM
10.30.97
P[UMBING - PARTIAL PLAN
BUILDING 9-101
COL. 6-11 (—J
9-101-1M117
1 - 1 / 2*
1/2
3" VAC
I LI
2 1/2"
1 1 / 4" A
0 MRS: 21-03 MMA 35 ON-LOAD
!MOVE CP450 TO COL F/7
s -SAND13LAST CAINNET
6
180139-02
793032-10
•
A
• •7•77 7117. 71,
HARRAH RWS/EJC 12.2.97 F ADD AIR ounEr
KGP RiSMOT 5/10/99
RAD • MIS 7/21/99
S1.8 RWS 8.4.99
SYM
4 r
,
KGP MAO 2/18/99 G LGE-AAMARN LAB ON-LOADS
3 4"
C
I
714990-02 OMV
130198-00 M.WONG
•
1M117/1 7
2 "
4" AIR
7717■110M71111■01
TABLE
ASH
TION
EL
HANKINSON fRHD052SS
PERMA-DRI MEMBRANE
AIR DRYER INSTAUEDIN
A HORIZONTAL POSITION
IN COLIC SPACE
A
CW
1/2" cw
0• I/2 —1
I
-4
-4
•
•
3/4"
CI
Lar ,„ DRAIN
2-1/2" CHWS
2-1/2" CHWR
1-1/4" HWS
1-1/4" HWR
Mom
ACCEPTABILITY HARRAH
flis SPECIFICATION 5
PNtD
OESVGN Plow
411121WER
DATE
um, 77.7.777 •
4
SCALE: 1/ 1-0
(WICK DISC.
FIRST FLOOR PLAN
71170
ELEVITION
£
-SEW C
TIZ OF Mt LOCM016.
UNISTRUT
POST BASE
•
LEGEND
CM 10CiiiLA
APPROvE
30 1 5 20
P■S liut
BUILDING DAVISON
COMPRESSED MR
DOMESTIC COLD WATER
DOMESTIC HOT WATER SUPPLY
PROCESS WATER
'WSW/ WASTE KAM
VNT
RPM WATER LEADER
SANITARY WASTE
VACUUM
0
1 11 1 10
1M121
1M111 1M112
1M116 111118
111123
11113
1M124
111130
r 1 111131 111140
11134 1M135 111136
111140
0 0 0
11113
11119
AS
111125
111131
1 1 1 44 -
11114 1M115
11120 111121
111126 11127
11132 111133
11137 11131
111142 111143
111145 111146
lo
- 7,••■••••
OF TUKVVILA
JAN 0 8 2004
FOOMMENTER
/VI) il t i tja
G 09.30.03
•
•
rM
A RELOCATE MAG PARTICAL UNIT
8 RELOCATE WI SHOP
C CONSOUQATE OA LABS
f) REVISE FIARD VACUUM 11E-114
E RELOCATE (2) 10' TRfS
- , •••• ,,..._ ........
€ EL 28.00'
3/4"
€ EL 27.00'
,EL27.
1
1/2" VTR ---�
E EL 27.50'
L 25.17'
314"
EL 33.09'
1/2" PRESS
DRAIN
WORK TABL
DETAIL
111
DETAIL 1
1Y1
DETAIL 1
3/4" VACUUM
C, EL 25.17'
1
VENT LINE TO SINK
AMON
U
3
HW
- GAS CYL.
2" SINK DRAIN IN
45' WYE & CLEANOUT
IN 4" WASTE LINE
' EL 36.60'
VAC
'd EL 34.00'
X
ey
J #771259 -00 C. HARRAH
J/190106-00 OM■
J/190106-06 C. WARM
.11190106 -00 DMV
4130185-10 C. HPRRAM
•
4
r -i EL 35.60'
APPROVED OAR
11.7.00
6.3.03
S YM
P.O.C.
TING 13" SWEAT
ER CW UNE
F LGE- AUBURN LAB ON -LOADS
D
EXISTING DRAIN
ELECT.WTR
HEATER 100 GAL
STORAGE EWH -1
FLOOR DRAIN
C EL 33.09'
1 1/414W FROM
MEZZ TOILET 14
INKING FOUNTAIN
RELOCATED FROM
FORMER LOCATION
0 COL P -14
- 3 /4 "CW DN W/
1/2"CW TO OF
(APPROx 34" AFFO
EXISTING :N
•CW
D
3 "DRAIN
FLOOR DRAIN
ABOVE PILE CAP
8"
3/4" VAC -
A
CW
4130198-00 M.INONG
IL EL 31.75'
1" VALVE
C EL 31.75'
D
A N
C EL
FIRST FLOOR PLAN
PW ,„„ - ,_,
tA
I I�
" 1.1"- NDER PLATFORM
1
00 .
•
APPROVED DATE
09.30.03
1 " PW UNDER PLATFORM
TO N/C HYDROTEL, SEE
I DWG 9- 101 -114175
1/2"
x
EARTHQUAKE
RET WALL
CW --
WATER TO DRINKING FOUNTAIN
N
CW
•
1 1/4-
W ASTE DN
Or
1 /2 "CW SUPPLY TO
ROCKFORD PRESS,
SEE PROCESS PIPING
DWG 19- 101 -111175
STD. FUNNEL DRAIN
�--- 3/4" VACUUM
3/4" VACUUM
12
•
IMRE
7.e.97
REFERE CE DRAWINGS
MECHANICAL A1AS
P MBING FIRST FLOOR PLAN
BUILDING 9 -101.1
COL. N 11-15
•
LEGEND
•• A
- - CW-
D ••_•.
,-- G .,�.
VAC -----
GENERAL NOTES
CONSTRUCTION NOTES
RETURN REDLINED PRINT BACK TO ENGINEER WITH ANY CHANGES
FROM THE DESIGN.
MOON WONG, 655 -8428, M/S 46 -87
REMOVE (1) DUPLEX FLEX. VACUUM OUTLETS.
EXTEND THE VACUUM PIPING TO INSTALL (1) FLEX.
VACUUM OUTLETS. ALL VACUUM DROPS SHALL BE
STEAMS, SS -006 -D -6PMHS QUICK CONNECTORS.
ALSO REPLACE THE QUICK CONNECTOR BODIES ON
EQUIPMENT TO SS -QC6 -B -6PMHS AS NECESSARY.
3. INSTALLATION OF ALL PIPING SHALL CONFORM TO THE UNIFORM
PLUMBING CODE.
4. INSTALL PIPING LABELS PER BOEING STANDARD.
ASBESTOS NOTIFICATION:
A GOOD FAITH SURVEY OF THE WORK AREA HAS BEEN CONDUCTED
AND ASBESTOS CONDITIONING MATERIAL WAS NOT DISCOVERED THAT
WOULD BE INVOLVED IN THE CONSTRUCTION OF THIS PROJECT.
DO NOT REMOVE, DAMAGE, OR DISTURB ANY ASBESTOS MATERIAL
ADJACENT TO THIS WORK AREA. PLEASE CONTACT BOEING
FACILITIES DEPARTMENT IF ASBESTOS CONTAINING MATERIAL IS
DAMAGED OR DISCOVERED THAT IS REQUIRED TO BE REMOVED
TO SUPPORT WORK.
.w A
COMPRESSED AIR
DOMESTIC COLD WATER
DRAIN
GAS
DOMESTIC HOT WATER SUPPLY
PROCESS WATER
INDUSTRIAL WASTE PUMPED
VENT
RAIN WATER LEADER
SANITARY WASTE
VACUUM
1M11
114116
111122
1M128
m
111111
111117
111123
1M129
111112
111118
111124
111130
111135
114140
111113
111119
114125:
//1
111131
111136
111141
111114
111120
111126
111132
111137
111142
111115
111121
111127
114133
111138
111143
11444 111145 114146
crrY Or
JAN 0 g 20 9 -1 O 1.1 KEY PLAN
, catais SCPLE: N.T.S.
D.0
" 1M125
JO. NO.
CNN NO.
S
130185 -10
9- 101 -114125
COW NO.
DUPLEX
SWAGELOK
THE
09.30.03
1G(-AUBURN 1/48 ON-LOADS
J/130198-00
09.30.03
11.11.97
12.18.97
HVAC EX
CONSTRUCTION NOTES:
RETURN REDLINED PRINT BACK TO ENGINEER WITH ANY CHANGES
FROM THE DESIGN.
MOON WONG, 655-8428, M/S 46-87
FABRICATE AND INSTALL 3". GALV. SHEET METAL DUCT TAPS INTO
THE 20 MAIN.
INSTALL (2) BLAST GATES AND 2"0 FLEXIBLE DUCT TO THE
EQUIPMENTS.
FABRICATION AND INSTALLATION OF THE SHEET METAL DUCTWORK
SHALL CONFORM TO THE SMACNA STANDARD.
CITY OF TUIgiiiA
APPROvfu
JAN 1 5 2004
AS U ILL
BUILDING
1M23 1M24
1MI6 I 1M17 1M18
1M28 11129 1M30
9-101.1 KEY PLAN
PIECOVID
WV OF 'TUKWILA
JAN 0 8 2004
12.18.97
UST DUCTWORK - PARTIAL PLAN
BUILDING 9-101
N-S 6-11
DN
STAIR
i
UP
RAG-1
400CFM
10x1WIE
PHYSICAL LAB
1
1 M19EXHa
A
109-101-4460 142
SP ATCH OVEN
200-cni EXH.
650% 24KW
OWN 460V,311
UP BL -M
,,.
I I 1
UP
rya I In I_
P I i rlq .. • iii, •
AI 0 11111. WO
. ii DOWN
Al
1
INV
# 11' ir
AN01101 r t f
d . .
311 GNI.
STIII.
S
MSS 172 17196
No UN
Twos' as •.. .., .......,
1 M19EXHa
GENERAL NOTES;
1. FOR HVAC OWING OF IRS AREA SEE MANG 1M19
9-101-1M19EXHA
•
"'"
•
•
411111m 11111 .01.11.I.IN. .1M*. • ,
•
..■•• - MN..
411111111101•11111•10m --a
•
•
S
- REDRAWN
A ICE -AUBURN LAB ON -LOADS 41 301 98 -00 M.WONG RWS 09.30.03
•
BY *PROM
KB /CH
F
,• .. _,,.
SYM
•
OAR
•
•
APPROVED IX OPT. DATE
•
9
ACCEPTABILITY
11115 Mal NID� (OR� �
SPECIFICATION 6 Mr�OYED /MINER
FIRST FLOOR PLAN
HWC PIPING - PARTIAL PLAN
BUILDING 9 -101.1
MECHANICAL IMSiR COL. E -J /1 -6
LEGEND
HPC
—
HPS
« --
HWR ----
•-- CHWR ----
--- CHWS
-- Hos
�— HOR -�---
--- COND --
-- P COND—
GENERAL NOTES
CONDENSATE STEAM (HIGH PRESSURE)
STEAM SUPPLY
(HIGH PRESSURE 125, 250 PSIG)
STEAM SUPPLY
HEATING WATER SUPPLY
HEATING WATER RETURN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HOT OIL SUPPLY
HOT OIL RETURN
CONDENSATE
PUMPED CONDENSATE
CONSTRUCTION NOTES
RETURN REDUNED PRINT BACK TO ENGINEERING WITH ANY CHANGES
FROM THE DESIGN.
MOON WONG, 655-8428, M/S 46 -87
INSTALL (2) SETS OF HOT OIL SUPPLY AND RETURN PIPING FROM
THE CHROMALOK HEAT EXCHANGER TO THE RADIUS PRESS. SEE
DWG. M594 FOR THE PIPING DETAIL. THE 2 THICK PIPE INSULATION
WILL BE DONE BY AN OUTSIDE CONTRACTOR.
INSTALL (2) 2' HOT TAPS ON THE CHILLED WATER SUPPLY AND
RETURN.
INSTALL THE CHILLED WATER SUPPLY AND RETURN PIPING FROM THE
HOT TAPS TO THE CHROMALOK HEAT EXCHANGER. SEE DWG. M594
FOR THE PIPING DETAIL. THE 1* THICK INSULATION WILL BE DONE
BY AN OUTSIDE CONTRACTOR.
4. INSTALLATION OF ALL PIPING SHALL CONFORM TO THE UNIFORM
PLUMBING CODE.
5. INSTALL PIPING LABEL AFTER THE PIPING INSULATION IS INSTALLED.
0
CITY GE TUK,'i LA
APPROVED
JAN 1 5 2004
iiUitU
BUILDING DWI S ON
D.0
CITY OF TUKWILA
JAN 0 8 2004
PST CENTER
1M60
11166
11172
11161 1M62
1M67 1M68
1M78 1M79 1M110
1M84 1MS5
11190
11163
11169
1M7S
1M81
111116
1M64
11170
11176
11182
11107
O
1M65
11171
‚Mn
11183
11193
1
J1130198-00
1M61
400 NO.
ONG ND.
•
KEY PLAN
SCALE: NONE
9- 101 -1U61
CONP NO.
09.30.03
i
---- ■ ■
STAIR
a
2 1 /2"
" ="1 4 19
UP
- --
-.
PLUG
�
� HWR
•
1
HWS 1
P COND
n
1
2 2
Ji
1
► r
1
�+
HWR
H
---- CON
_+ -•
T :
• _
HWR - ,,,� 1
"f4
3/4
w
1
3
r
150
HWS — 4' 0l 1 1 e . • .•.
P COND 1.
HPS
4 150# 3
II
...
1r
II
'F.-)
M594
13" HOS&R
ZONE
cn
a
=
=
'
ill%
1 •dI
i
-
1,..)4:-_-_,
UM
CHRauxux
II
' -II�
-2
�_
;I
PUMP
' 11
• �
(J")
4
�■�■
HISS 6353+
l •
x x
,49
i ;j
it
0 1 HWS&R
ZONE-1
3" 150#
4 "
Z
�'
U
I
I
1
�.
1
13" SCH -80 BLACK
EN
n
_
on
•
»
3
E1
COND
l
.
2"
H
. 3" 150
STEEL PIPE W/ 2"
THICK FIBER GLASS
INSULATION ''
COPPER TUBING W/
1" THICK FIBER GLASS
INSULATION
■
00
__
cc
_
V
ric
=
i
Q_
a
_
h
‘-
---
'-4
w
II
RADIUS PRESS MSS 36
,Q
I
1
ower
"
1 � HWSdcR
ZONE -2
)ONE-
2 '�
CHWS C
CHW
=
O
V
111161 4528 -113
3"--/
'%4\ e
Vic'
j
113
1
■■
Nil
NE
E:
_
2772
l
I 2 \ L
}
LJ
PS' HPS an
--- HWS
2"
t+— HWR 2
HWS COND COND- -�
CHWS
000
►i 7.741...
CHWR
HWR
C HWR
!'-
HWS
0
+
t
r
4
3w /
-+
_
=
HWR
- ----
r
--
P COND
AM
cn
=
cn
Z
1 1 /2" 2
STM O ki
r ,/ �
1
►1
1 4"
/
W
1 1 /2"
• - - P COND ..
STM —
HPS'
.,.
1 1/2 "
s, f
--- HWS HWR
- 3 w - 4 "
"
itr: 3 CHWS
r.
- 2 150
•
1
.�
' COND
••••••••
■■
"
3 C HWR
•
S
- REDRAWN
A ICE -AUBURN LAB ON -LOADS 41 301 98 -00 M.WONG RWS 09.30.03
•
BY *PROM
KB /CH
F
,• .. _,,.
SYM
•
OAR
•
•
APPROVED IX OPT. DATE
•
9
ACCEPTABILITY
11115 Mal NID� (OR� �
SPECIFICATION 6 Mr�OYED /MINER
FIRST FLOOR PLAN
HWC PIPING - PARTIAL PLAN
BUILDING 9 -101.1
MECHANICAL IMSiR COL. E -J /1 -6
LEGEND
HPC
—
HPS
« --
HWR ----
•-- CHWR ----
--- CHWS
-- Hos
�— HOR -�---
--- COND --
-- P COND—
GENERAL NOTES
CONDENSATE STEAM (HIGH PRESSURE)
STEAM SUPPLY
(HIGH PRESSURE 125, 250 PSIG)
STEAM SUPPLY
HEATING WATER SUPPLY
HEATING WATER RETURN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
HOT OIL SUPPLY
HOT OIL RETURN
CONDENSATE
PUMPED CONDENSATE
CONSTRUCTION NOTES
RETURN REDUNED PRINT BACK TO ENGINEERING WITH ANY CHANGES
FROM THE DESIGN.
MOON WONG, 655-8428, M/S 46 -87
INSTALL (2) SETS OF HOT OIL SUPPLY AND RETURN PIPING FROM
THE CHROMALOK HEAT EXCHANGER TO THE RADIUS PRESS. SEE
DWG. M594 FOR THE PIPING DETAIL. THE 2 THICK PIPE INSULATION
WILL BE DONE BY AN OUTSIDE CONTRACTOR.
INSTALL (2) 2' HOT TAPS ON THE CHILLED WATER SUPPLY AND
RETURN.
INSTALL THE CHILLED WATER SUPPLY AND RETURN PIPING FROM THE
HOT TAPS TO THE CHROMALOK HEAT EXCHANGER. SEE DWG. M594
FOR THE PIPING DETAIL. THE 1* THICK INSULATION WILL BE DONE
BY AN OUTSIDE CONTRACTOR.
4. INSTALLATION OF ALL PIPING SHALL CONFORM TO THE UNIFORM
PLUMBING CODE.
5. INSTALL PIPING LABEL AFTER THE PIPING INSULATION IS INSTALLED.
0
CITY GE TUK,'i LA
APPROVED
JAN 1 5 2004
iiUitU
BUILDING DWI S ON
D.0
CITY OF TUKWILA
JAN 0 8 2004
PST CENTER
1M60
11166
11172
11161 1M62
1M67 1M68
1M78 1M79 1M110
1M84 1MS5
11190
11163
11169
1M7S
1M81
111116
1M64
11170
11176
11182
11107
O
1M65
11171
‚Mn
11183
11193
1
J1130198-00
1M61
400 NO.
ONG ND.
•
KEY PLAN
SCALE: NONE
9- 101 -1U61
CONP NO.
09.30.03
SPRINKLER LEGEND
SYMBOL
DESCRIPTION
QUANTITY
o
1/2" PLAIN UPRIGHT FUSIBLE LINK
165T TEMPERATURE RATING
169
A
1/2" PLAIN UPRIGHT BULB TYPE
286T TEMPERATURE RATING
124
TOTAL
293
r k . 1 , L
L M k (
( 1
1,2)
(VT
0
/4/ 4 7,
2Y260 2
2M26e; 3
3262 3
31263
A
0
211266 2
211267 a
aese a
am
(I)
, (
N273 2
2M274 3
31275
.
31279 3
31280 2
2M281
•
a.
1M261 14594
12X16 SPIRAL
DUCT ACCESS
DOOR, DM1216-,4
LI
• •
• •
•
1M261 M594
• 1 041
Mik
I IBS. iinP.
. oj
TACKIF121111 7
• 1P 20
SPRAY
BOOTH
*.•••
1.
a
3
..111•■•
1 1 / 4
SEE DWG 109-
101-4576-M1
1
101-4576-M1-
EX
SEE DWG 109-
1 1/2" PLUG
.11.000,so ■•••.• - • • ...••• • • •••••••• •■ • •
—
3 0
a
MUCIFIFEIC. L M, 155.F OS&Y ISOLATI I
VALVE AT 5'-
• •
ABOVE Fl SH FL
4. '11%1
STAIR
.M11 --
TORIT
SAND
BLAST
a
SEE DWG.
5 21110 FOR
COO
12" L NG DRY
PENDENT, VIKING
a
8X12 SPIRAL
DUCT ACCESS
DOOR, 8 EACH
DM812 -20
31
3"
a
Cs1
31
EX
EX
2 1/2
0
a
a
a
a
9
3"
SYM WWI
A EXTRS: 21-63 RELOC MO TOOL STORAGE
B LG( -AUBURN LAB ON-LOAOS
•
1
3 "
9
3"
a
a
a
a I I
I
_ 1/4" _ _ _ _ _ s t t _L112 11
a
g.. I
JO 180371- 00
4130198-00
••••••., • moorommomo-• •
BY
1 1j4"
CH/KB
M.WONG
3"
THRU CEILING
a
a
a
a
1
ii
/4"
cpsr— I
X '
F
Z2"
EX
10.01.03
a
a
a
a
EL. 36'-3"
0
0
a
4 1
a
Tc SYM
8.9.99
3 1/2"
+r1
3 r 1/2"
5"
i
1 112"
7 .--1 1/2"
2"
: Yr
SV - 907
REF DWG 109 103 -4002M1
FOR CONTINUATION
17
EL. 34' -9"
a
a
*my
(.4
3 1/2"
1 1/2"
3 1/2"
a
a
Co
a
2"
I I
CD
a
1 1/4"
-o-
4" MISER
41.
a
a
a
a
1 1/4
1
1 1/4"
-0-
a
2 1/2"
a
a
a
a
0
a
a
0
4
6 o
•
1
3 1 2"
a
a
1N077
ey PDPNOtte CATE
1 1 4"
- --n
NC
II
<
Ct
LJJ
0 1 3."-
I CL I
1
3 N
= = =
a
<
w
N
LA A N
Zt N
I II
N
ON
< I
N
L.L. •
LAJ
N
N
<
N
CL
•
2 1/2" DN T
TTER
SE
GA
URE
UNISTRUT
PIPE CLAMP
EL. 36$_30
5" to
1
I\ s EL .
cr fir
07-111MMO
2 1/2"
a
a
p
..,„
2 1 2"
Igh
12117
LU
0
E—
LL'
—J
a-
2 1/2" fli 2 1/2"
THRU CEILING
2 1/2"
I
§ raw war
a
a
0
a
a
a
a
VERIFY 6" MIN. BETWEEN
WALL AND SPRINKLERS--
1/2" DN TO
POTTER ROEMER
4300 SERIES
HOSE GATE VALVE
e .-SECURE TO RACKS
WITH UNISTRUT
AND PIPE CLAMP
: 1 1
11/4"
1 - 2" --
s...11 c.41
/2 4 2 /2"
J
3 w t 3 w ig
2' DN
L _
a
2 1/2" fir 21/2" 4jor 2 1
2" DPI UNDER---U
I
1111-411
a
a
2"
13
2 1/2"
(3) HEADS UN
VAULT
IM • igrS
OAD: 15
TOTikl AREA FOF
15'1 HIGH STORA3E
-tl , 1 00 SF
1 1/4"
ACCEPTABILITY
SPECIFICATION
Des DESIGN P=
if MOVED BY DEPT.
•
EX
4:
DATE
1 4 %MINN
EUR"
WNW
6) HEADS I
TRANS VAULT
CONST UCTION NOTES
RETURN REDLINED P NT BACK TO ENGINEER WITH ANY CHANGES
FROM THE DESIGN.
MOON WONG, 65 -8428, M/S 46-87
REPLACE APPROXIMA LY 6 FEET OF 2 PIPE WITH 4
RE-CONNECT THE EX TING 2 LINE TO THE NEW 4 PIPE.
c::::::» INSTALL NEW 2-1/2" BRANCH FOR THE PAINT BOOTH WITH AN
ISOLATION VALVE AND LOW POINT DRAIN.
INSTALL (9) PENDENT FIRE SPRINKLER HEADS (1/2" ORIFICE
155*F GLASS BULB) INSIDE THE DUCT AND (1) PENDENT EXISTING
HEAD (1 /2" ORIFICE, 165T FUSIBLE LINK) INSIDE THE PAINT
BOOTH.
13> INSTALL A DRY PEND NT FIRE SPRINKLER HED A (1/2" ORIFICE
155T GLASS BULB, 1Z LONG)
r§::>. INSTALL A NEW PEND NT FIRE SPRINKLER HEAD, (1 /2" ORIFICE
155*F GLASS BULB, 1 " LONG) IN THE FAN SECTION INSIDE THE
PAINT BOOTH.
Irl>. INSTALL (9) MAINTENANCE ACCESS DOORS ON THE DUCTWORK FOR
THE FIRE SPK. HEAD
8. FABRICATION AND INS
SHALL CONFORM TO
9. NOTIFY BOEING FIRE
DOING WORK (206)6
LOCATED IN THE 9-1
•
TION OF THE FIRE SPRINKLER PIPING
E NFPA- 13.
EPARTMENT 24 HOURS IN ADVANCE OF
-7700. THE SHUT-OFF VALVE SVII907 IS
3 BUILDING.
EWE
10
FLOOR
SCALE:
SUOMI
FIRE
MECHANICAL IAAS
PLAN
: 1/8 =
—o•
PROTECTION FIRST FLOOR PLAN
BUILDING 9-101.1
R COL. 1 6 E J
•
LEGEND
is..S -. STANDARD SPRINKLER, PENDANT (1 6,5*
UNLESS OTHERWISE NOTED)
-0-- (NEW) STANDARD SPRINKLER, PENDANT (165 *
UNLESS OTHERWISE NOTED)
"arm SPRINKLER PIPING, SIZE AND SLOPE TO LOW
POINT DRAIN
6 SPRINKLER RISER (ALARM VALVE OR UPPER FLOORS
WATER MOTOR GONG
PIPE HANGER
2-WAY EARTHQUAKE BRACING
4-WAY EARTHQUAKE BRACING
11111111111111,10(1111111•10
GENERAL NOTES
1. ALL MATERIALS AND INSTALLATION SHALL CONFORM
TO N.F.P.A. PAMPHLET 13 FOR ORDINARY HAZARD
OCCUPANCY.
2. SEE DWG. 109-000-4504, Ml, M2, M3 FOR YARD
PIPING.
3. SECOND FLOOR SPRINKLER SYSTEMS SERVED BY RISERS
AT COL. F/3 & F/7 FROM SV 907 AND RISERS AT COL.
H/3 & H/5. HAVE BEEN CALCULATED HYDRAUUCALLY
TO VERIFY CONFORMITY TO NFPA-13.
4. SEE GRINNELL DWG #29 DATED 2-22-57
FOR LOCATIONS OF HOSE CABINETS
Ply ISP903 (FIRE HOSE CABINETS)
D.0
4011 NO.
NO.
KEY PLAN
ICOIL
PROEM
MY OF TUKWILA
JAN 0 8 2004
PERMIT CENTER
1
CLOINENT 11ON I MINX B
4130198-00
1 M 6 1
9- 101 -1M261
CONP NO.
10.01.03
9
SiM
A LGE- AUBURN tA8 ON -LOADS
.•.�.
••• - . ..". ..qM.,�.
SCALE: NONE
1i"
ZONE -1
8' -0 "# AFF '� O se
2` -CTWS
1" LOW
POINT DRAIN
NEWSOM
MAV
c7t1
A o
L
T T
D
:41-40
21
I • D
2 " -CTWR
EXH. PANEL W/
20 "x20 "x 1 " PAINT
ARRESTOR FILTER
PADS (QTY 12)
I >
SPRINKLER
ACCESS DOOR
12x16
V 0-i-
24 "0
MAV
r
1"- FP
10' -0 "f
AF F
C-14)141.-s- f-0101-
2" 2"
J/130198-00 M.WONG
.....,,. -Maw.
13"
ZONE -2
OIL DRAIN
LINES TO CABINET
CHROMALOX
HEAT EXCHANGER
CHROMALOX HEAT EXCHANGER
DETAIL (MSS 63534) ric\)
iM67 M594
- DRIP PAN (REF)
1 7 .- FIN. FLR. (REF)
1"-FP
LOW POINT
DRAIN
1 L l
M594
TACKIFIER SPRAY BOOTH g
SCALE: 1 /4 " =1 -0" 1 M1 I , 1 M261 M594
DATE SYM
10.01.03
M
1
a »
r
I
•
20"0
AN EXIST.
PENDENT HEAD
IN THE PAINT
SPRAY AREA
SEIASION
SPRINKLER
ACCESS DOOR
12x16
SCALE: 1 /4 " =1' -0"
-FP
1"-FP
1 " -FP
5 1
(REF
QUICK QISCONNECT
(TYP. 8 PIACESY
1/2" DUPLEX
VAC. DROP
1�
" -FP
LOW PO
DRAIN
24 "o
■T
-FP
TACKIFIER SPRAY 600TH
•
sae s
Csi CM IN C*4
.-
r
ZONE 2
1/2"- DUPLEX
MR OUTLET
A NEW PENDENT
HEAD IN FAN
SECTION INSIDE
THE BOOTH
C
11411, 1M261 M594
v v
*c=443
Wes/
ZONE 1
•
TOOL
FIN. FIR. (REF)
PRESS
RADIUS PRESS (MSS 3649)
DETAIL (VIEW LOOKING NORTH) n
SCALE: NONE
1 41j M594
3/16 V
STIFFENER PL
CS 6x6x 1 /4"
AIMILWAVIII •
SEAL ALL PENETRATIONS
wmH NON-FEE
APPROVED CAULKING
CEILING PENETRATION
DETAIL ri
SCALE: 1 I/2' =1 -0' 14594
UNISTRUT W /UBOLT
5/16 - 18x3/4 LG ROUND
HEAD SS MACHINE
SCREW W /NUT & FW
PAINT STORAGE/MIX RM
CEILING PANEL (TYP)
1/2 STD STL CPLG
PENDANT SPRINKLER W/
WE GUARD
7 '
ACCEPTABILITY
MS oaia� Iwo aR
sv�a�uiai a
AIENCIRER
IMl11040 Mr DEPT. g DAM KEW
von
M.WONG 09.22.03
APPIIINED
09.22.03
•
SECTIONS AND DETAILS
M
BUILDING 9 •101
MECHANICAL wAsTOR COL. X-X X-X oEV. CENTER, WA
LEGEND
COL -MET SPRAY BOOTH MODEL IB -0608 WITH TUBE
AXIAL EXHAUST FAN FOR EXPLOSION PROOF SERVICE
(VENTILATION OF TACKIFIER SPRAY BOOTH) 6,000
CFM AT 1.5" SP (W.G.) ALUMINUM NON- SPARKING
CONSTRUCTION. EXTERNAL STATIC PRESSURE DROP
INCLUDES SPRAY BOOTH.
GENERAL NOTES
REFERENCE DRAWINGS
CONSTRUCTION NOTES
JAN 15 2004
AS lib < <U
BUILDING DI VISION
J#130198-00
CITY GF TLiI '' iLA
APNROvtD
sea' M594
AO NO.
STR).
MEM
CITY OF TUKWILA
JAN 0 8 2004
PERMlrPINrER
134198-00 rote "a
9-101-14594
•
ACCEPTABILITY
THIS DESIGN
SPECIFICATION 6
MAR
ORM
OM.
ONIE
IMAM
gaP. DUARTE
UM
09.15.03
N.waNG
09.22.03
......
APPRoft IN
,
.
'
tow=
. ..
IPPRIXED
"Pm=
-
.
• .1111,..141111111.1.
LGE-AUBURN 1/48 010
4130198-00
10.01.03
8 OVEN
STACK
BEFORE
DETAIL rf")
SCALE: 1/4"= 1' -0 2M10
GUY WIRE
20 ROOF
PENETRATION P
DWG. 250-4
80 OVEN
STACK
SEE DWG.
9-101-11411
FOR CON'T
[ 20 ° 0 HAMA
WEATHER CAP PER
.SKETCH KSC
, STD-M1
20 24GA.
GALV. STL
SCALE: 1/4". 1' -0" 210410
.5 ORIFICE, VIKING
MODEL 14, 12 LONG
DRY HEAD, GLASS
BULB, W/ PLASTIC BAG
LEGEND:
CONSTRUCTION NOTES:
RETURN REDLINED PRINT BACK TO ENGINEER WITH ANY CHANGES FROM
THE DESIGN.
MOON WONG, 655-8428, M/S 46-87
FABRICATE AND INSTALL A 20"0 PAINT BOOTH EXHAUST DUCT. USE
24 GA. GALV. STEEL.
p FABRICATE AND INSTALL A 20"0 HAMA WEATHER CAP.
INSTALL A BACK DRAFT DAMPER BELOW THE ROOF.
I D> INSTALL A DRY FIRE SPRINKLER HEAD AND PIPING IN THE DUCT. SEE
DWG. 1 1126 1 FOR THE PIPING CONTINUATION.
USE EXISTING GUY WIRES, (2) ON THE ROOF AND (2) ON THE WALL
TO SUPPORT THE STACK.
7. FABRICATION AND INSTALLATION OF THE SHEET METAL DUCTWORK
SHALL CONFORM TO THE SMACNA STANDARD.
GENERAL NOTES:
CulINDO IIrvIVON S 1E
JI130198-00 A 10.01.03
M
A
•
.411.1,11,"
4
HVAC PLAN
SCALE: 1 /4"= 1 -O
dIP
MECHANICAL MASTER
•••■• goon.r. AIM sew...Vil.vorr.v....
HVAC PLAN
BUILDING 9-103
Mi
DEV. CENTER, WA
'OM NO.
• 1.40.111.....1%,
9-103-2M10
•