HomeMy WebLinkAboutPermit M04-002 - TUKWILA SCHOOL DISTRICT - ADMINISTRATION BUILDINGTUKWILA SCHOOL DISTRICT ADMIN BLDG 4640 S 144 ST M04 -002 Parcel No.: 1523049108 Address: 4640 S 144 ST TUKW Suite No: City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 MECHANICAL PERMIT Tenant: Name: TUKWILA SCHOOL DISTRICT ADMINISTRATION BLDG Address: 4640 S 144 ST, TUKWILA WA Owner: Name: TUKWILA SCH DIST 406 Address: 6300 SOUTHCENTR BL, SUITE 212, TUKWILA, WA Contact Person: Name: JAMES CHAPMAN Address: HEERY INTERNATIONAL, 1101 WESTERN AV, STE 706 Contractor: Name: D 3 MECHANICAL INC Address: 5716 119 AV NE, LAKE STEVENS, WA Contractor License No: DJMECI *000JR Value of Construction: $150,000.00 Type of Fire Protection: Permit Center Authorized Signature: doc: Mech Permit Number: M04 -002 Issue Date: 05/12/2004 Permit Expires On: 11/08/2004 Phone: Phone: 206 587 -0473 Phone: 425 334 -3516 Expiration Date:02 /28/2005 DESCRIPTION OF WORK: INSTALLING NEW GAS FURNACES WITH OUTDOOR CONDENSING UNITS; NEW RESTROOMS AND PLUMBING FOR TYPICAL ADMINISTRATION OFFICE BUILDING. Fees Collected: $274.69 Uniform Mechnical Code Edition: 1997 Date: � /� -d y I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit. I Signatur .. ` Date: .51/2 -- Print Name`T)N ► L This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. <,rssv :+=: N13# tY>,.,::° a:`,' �Y.:'.: t: N. Y7;: ,'s•:b;$an},:rti.µc:::::i.o;;.. .. ... M04 -002 Printed: 05 -12 -2004 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 PERMIT CONDITIONS Parcel No.: 1523049108 Permit Number: M04 -002 Address: 4640 S 144 ST TUKW Status: ISSUED Suite No: Applied Date: 01/14/2004 Tenant: TUKWILA SCHOOL DISTRICT ADMINISTRATION BLDG Issue Date: 05/12/2004 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: Plumbing permits shall be obtained through the Seattle -King County Department of Public Health. Plumbing will be inspected by that agency, including all gas piping (296- 4722). 4: Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (206- 835 - 1111). 5: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 6: Any exposed insulations backing material shall have a Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 7: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 8: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. 9: Manufacturers installation instructions required on site for the building inspectors review. 10: Ventilation is required for all new rooms and spaces of new or existing buildings in conformance with the Uniform Building Code and the Washington State Ventilation and Indoor Quality Code, Chapter 51 -13 WAC. 11: Water heater shall be anchored to resist earthquake (U.P.C. 510.5). doc: Conditions * *continued on next page ** M04 -002 Printed: 05 -12 -2004 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any regulating construction or the performance of work. Signature:∎ -e Print Name:Thpvic, Yl doc: Conditions M04 -002 of law and ordinances Date: 61/2_7641-- other work or local laws Printed: 05 -12 -2004 00 • w .. F w O a -J J LL Q ; I w Z Z' I I D o uj U O - : .0H = -. P. 0 N H Ei Z JAN 09 ' 04 10: 36AM TUKWIL ,DCD /PW CITY OF TUKWII.A Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** 2'k.r , uwr�4 •� ,• I„u.• , n'^, in,u i 11 ; ✓� ' h �1 h t fr i 1° r� d, w� i •1 e � I j ", L9�11 "^ Ir , 1 �! 1471 r1 r ,� I ., +trr n••w ,.,, -, f I '�� r, I ' , r ut! '� ,Il,t G It ! li N� Xn ' 1 r i ..t I ' � "�!''b' .1 a I 1" 1i II.' i m�7�1 �J, fliu�� II• � i�• r !' rr ^ 1 r .I'a.1' 6UI 1 . y '' 1�It,� n a 1I•,�,':.�� 1 ' 0j�,pI„ G; '� � '�rOi 9 4 �,;., .1� r I�.r I r eAtirrt 1111f' IVll11�j �+tb, i, j JN jl" r �rilFll.lu "r!1 Uf M 'n 1d4X'4T1 1'fj fi e ► ► 1 , r� .Id' ('U Fist4f A. li iI'� T r�. �W_.��>!• 1. �lut.a,l,c �7��' III (wi- �!r•a�wr!(F'�1�� j ' M �'c�idn,! .• �II �11Y�cFiCll !'�•'�1�'ir"IlG�'�I��I,��ic.�n, cep ,:ll�l!�'',,'S�r� {r;'�>�i��: ,' J Kin Co Assessor's Tax No.: /5230'/" P'OO Site Address: L t0 S , � ��' �(� � t i t � ( , t w A � ' I Suite Number: Floor: ;j!' I t �I �7J;:II:;a ih�ll "�e�11ha ,r,l er %applieuioru \pentir nppl lestipu (1•1000 1,1001 Tenant Name: TU I \k SC{4,0 ( D' sly.. G New Tenant: Property Owners Name: — 11.A ..t4.) t t u School Di Ct Mailing Address: (' 3 Do S 0(411 ce ' cAr 614 21 Z - Lt/C,;vi �• •VN d' ru;, . r� �'i vr�•.� r I J,r, r N ' dl, �. e,I ua r (''i l P I' r rl. I 1 r I ,•i ' I• +, • •p •., • Tap ✓ } ' y t��!�' I +, ' ' (, " ,Q� + 4 • I • ' • (n ' � �,� r. J�I ,Q 1'i ,y �'�.��'�jl��• ,� `A�''� r l. Ktl �� ,,,' Ir 1., f�• '1p,1�•li , tr X11 t ' � � rr , Yl• , ,�'t l .° ci F �p hJ 'r "15� ►'a7,a� �"11''(� (,trl4'({ f ylr�I .1'r a,,, lJiI t'+', t ,hJ �IPNI7 P i1g. 11' I +!.!7:• hill � !1� b �'I���� C�� „ 'i' ° �+: t�yl,�", I Fhr,6 � ,i1110:1}Mr.,. , rn :ill(1:+,L14r.i.' 1i11�N I y I J. I rl 191' � Ati dt11�Ndll`• �l�'�' '' ° ' ..�:!. Name: 3 0 me.S 011010111(14/1 ' e e ( ,, (d. 6 VJ Day Telephone: at 5 - DV Mailing Address: h o t U045) -&[n t ' Q (S c )O( ) &c;W e Gotk c2110(/ City state Tap E -Mail Address: r3 Chu (J h P� (13 A Loth Fax Number: - 5 — O l ' . ( '.(eMarift, A ri" . r."'N" ,11 : i1 : o . .0 : 'r I 4." 4 a .r� 4. , Ib tir,r 'Al, 4 p , 1 ( , ' II. . I ' ; I l i % ' r i * 111(11I p , 4 •l, . , . 4 1 1 f •11 ; �: Il,d: '', A.;b �F!hu.nyrlW - til'O OL . r : t rir,:r. r�� litn! 41!, ,�' r i1 i�'Ji�i'� v„k!„11 Company Name: t 11 C: loot \S u-CL L61 Mailing Address: (b P) Ds._ ¶ 2.. 5 g(o Contact Person: l 1 E � 1 1- ( Contact Person: CGu 61 C( J E - Mail Address: C ��G� -1 G V; 4S at • CAl ifx Page 1 ` emrn�e Cc - . c0 0 I E -Mail Address: n\ \ -e, 1 0 � p� i k-o cons C i m 1C U' I ' Fax Number: t2) I — Db - ,S ( 0 Contractor Registration Number: PF 1-U C'" -- 'g' 0 ?K 0. c Expiration Date: I l — (C — Zoo 3 * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** t }' ' i„ t , '' 'lil `�•�' r .' IDI p { M J r I I , l[F ,r, 0:6" . ' ; iapa l'J 4' � ^5 i'1^ qt �,e � 7 . 5 rS',�(! .Ire dt, ,� iL;� •r Imw +• 1 7rG�1„ L,��;. r. �,�, �•c�n. rrn15M�1 �.•pd.}dtlL'GI'r jl:f�'I.d'���r��'•!,'�'ll Company Name: �5S Q LlO ∎rte l3 r u ,� �- Mailin Address: 7 2. C otLL4 i't tQi ' City 66 1;' ':1I5iu,,6,,,,, ;h11 i Ir'41 � ii �,I",�,t ih� ,� r. ,1a•(1 it. City Day Telephone: iv c r ❑ .... Yes pl.No c'(6 State zip t1Al�I� „ 4 ��i, I C'�' �j'.1'�1"'7''tr� �'��"�''t��'�'•�}r�'I"I h ..,1,1,1„1 '1�dI1I�+W y IC( , � , - 4 X11 j ks l i.14 4 a 1 4 I -V' "lmt +' ., „,i (II I{� h ll , � ti 1 '< >T. a iVirrL�,r, 1 , t' ^s'''ir. s rl i t L,01 Y0* 0 1 gI {,qv".'� t i t t:7 j 1 x I� �7 t t ! i�tl4la 4 rrr. , 14 NtK) 4 Lop 0 (h-e' L& g '5 D City / P Day Telephone: — s ��3 YZ SD Fax Number. .1 t Company Name: kiAN; p ¶;)1 CA 055 P)A6 «Q&f Mailing Address: Z 1 POI 3k' I. SIY-Pe TG (--b111 << V\ Y 0 7 L(\'\44.13 �� U/b1 City sate Zip Person: I - ( -I_ Day Telephone: ��c� ” �7 "321 E -Mail Address: Unit 4- 10 e. bu «t bk t cAos$ J C h' Fax Number: 2 S7 - )6s - - ,'j `Z K 3 .,u,p4 'e.e. ," S'M :::';,.t 1 . nit -'T' S:1<?.�r'','r Tyr:., "" " ". r r, ".`j. "15P4: 7;{'F'F: ::.. -. i.'^SY M'. 1 rie9.0 r`..Scitlr:: ... . :ligty:: Furnace<100K BTU 0 Air Handling Unit >10,000 CFM a Other Mechanical Equipment 0 0-3 HP /100,000 BTU Furnace>100K BTU 1{- Evaporator Cooler C? 3 -15 HP /500,000 BTU b Floor Furnace (7 Ventilation Fan 5 15 -30 HP /1,000,000 BTU 0 Suspended/Wall/Floor Mounted Heater © Ventilation System Jr 30-50 HP /1.750,000 BTU o Appliance Vent l/ Hood O 50+ HP/1,750,000 BTU 0 Heat/Ret'rig/Cooltng System if Incinerator - Domestic Air Handling Unit <= 10,000 CFM b Incinerator — Comm/Ind i7 JAN 09 '04 10:38AM TUKWILA DCD /PW r yV 1 u �Il G �. P �1 r 1 V , ' 't 1 �T dt'r p I ht" rLL T Nt �� r '� d r ' qTP ' rVlrx� � r n�r�n rri^ � ,,��.11,r,'�ry�1t� ua 1 ^r , rr 'i' it M , ;: n I Pr h, NT ralr.. rp: 7l IQ w1�y�tlL�lrl1 .,015111;14 rM� 1;�InI1nAr'�I{'.1;1�r�11i,r' rr rllCitl:�.. �IiRtt11„ rl'1 nr r�:; 'la t�" !! {'„ L!(�� l'1'�i{Ily'i11M1: �41), I I. �' 1[ tl'+I14M MECHANICAL CONTRACTOR INFORMATION Company Name: toeuhct,l,,,,', Mailing Address: 5 7 1 So I I 61 City Suts Tlp Contact Person: , Cl n 1 c Day Telephone: YZ S r 3 T 3S Z;(, E -Mail Address: 4.� ? �'Yl Q, c-A t1'�C " k 0 't t�V1G( -t,k Fax Number: 41-C 3 3 9 7 — 0 Contractor Registration Number: 03 m Ce,.1.. - r OOO..) (& Expiration Date: 2, — Gg - * *An original or notarized copy of current Washington , State Contractor License must be presented at the time of permit issuance ** Valuation of Project (contractor's bid price): $ J V� 1 0 Scope of Work (please provide detailed information): NQ,l• (1\CLS '&siVIC _ (i QlAkiL0 a ✓ Cc 1 ' b W-c3 VL iv S na —) Y Q_,S(V6 o) `' ,(J itAl, ` Io►► -F --kAo (&i Residential: New .... Replacement ....0 Commercial: New .... ❑ Replacement ... _ ` '' 1 (p " j) ( laW exi 5 ✓ D Fuel Type: Electric ❑ Gas....❑ Other: 611 S ti 14A 2 S itQ Use: Indicate type of mechanical work being installed and the quantity below: Y'l 3` ,filigrArgom rin 411 i. 1• 1 „fi Vt ; {J 1 '1F I' / 1'w t . r r+. 1 ,ltd irll:r Ph��. L. rllCrk a i 1 I Value of Construction —In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Ccntcr to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 ofthe Uniform Building Code (current edition). No application shall be extended more than once. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 *R • 10; : D AGENT: Signature: �� r /�l1ILLLt r Print Name: Mailing Address: 2 `t< NJ . 3 I S r 51 2 .mot Vpplicatiart014,01k (10004400a (3 -2003) 31'1003 � Gta. Qul ((l (W Page 4 r �II I�N'[I I 0 nn I I p 1 4' 1 r' !n '� ^, x is dl t -t-v thy (Lu PU�.iI1 b,h ) P.3/4 W ran , I I IG 11"1J ti a H71�I(It Date: V A1ctat4 9 ( 200V Day Telephone: '1S3 3Fs3 32 7 �Gt G61 in k W i‘k '9S 4 7 City Suit Zip Date Application Accepted; /V I Date Application Expires: Stafft 1 , a. tG.... �1.•...r.u.:ea.yn*e.;>:tw)v:.ra — ' . • .''+�i0.w+'. v +;ti:wu;w:arl7ie! • 1:044 • .. ACCOUNT ITEM LIST: Description doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Payee: PELLCO CONSTRUCTION CO. TRANSACTION LIST: Type Method Description Payment Check 9962 MECHANICAL - NONRES PLAN CHECK - NONRES RECEIPT Parcel No.: 1523049108 Permit Number: M04 -002 Address: 4640 5 144 ST TUKW Status: APPROVED Suite No: Applied Date: 01/14/2004 Applicant: TUKWILA SCHOOL DISTRICT ADMINISTRATION BLDG Issue Date: Receipt No.: R04 -00567 Payment Amount: 274.69 Initials: SKS Payment Date: 05/12/2004 08:35 AM User ID: 1165 Balance: $0.00 Amount 274.69 Account Code Current Pmts 000/322.100 219.75 000/345.830 54.94 Total: 274.69 n,y 9 05/12 9 716 TOTAL 274.69 Printed: 05 -12 -2004 Project: y Type of Ins pection: e FLC.1 Addr s: , Date Called: Special Instructions: ' Date Wanted 27—C) 4121P Requester: Phone No: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 : OMMENTS: Approved per applicable codes. r Corrections required prior to approval. I Dateg_ $4 . REINSPEC16N FEE REQUIRED. Prior to inspection, fee rrii:ist‘e paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: • 'Date: Ad Y - cv2_ PER 206)431-3670 eject: I?.1/� .biS1 Type of Inspection: 11.Q A.- t.i Address: ul yas. 1 5-- Date Called: 7 - 2$ J=s% Special Instructions: Date Wanted: a.m. e .. - Z ,p y p.m. Requester: / I _ Ali Phone No: L—)2 S" INSPECTION NO. CITY OF TUKWILA BUILDING DIVISIO 6300 Southcenter Blvd., #100, Tukwila, WA 98188 El Approved per applicable codes. $4 p 1 Rec pt No.: INSPECTION RECORD Retain a copy with permit 'Date: El . Corrections required prior to approval. COMMENTS: ( ') ,. "1 are 5 - V raves -; i CJ1 1 -kpr►NkQ i 6 N 0 esrnV 1 .P - .r.14 P ' r)' Z` i 06)431 -3670 .00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be d at 6300 Southcenter Blvd., Suite 100 Call to schedule reinspection. COMMENTS: / 0 c /'/ / r aV Q - 7)9 ! .5 Sr/5 &, /4-Adee / C's-1 S7'// (1 /? _5-blv 4 # Al" (1 1"- / t� c Sd?,,uJ o-v , L f !! r� )// �- 7 al /r,Poh,o,v/er,� LZ'r4 - (y f /%t'A J .3,J/ 747 /) ij ,-f4. e g ; ' c /v gs ivn /3-A M- K -v aid k, c P..rpect: i��I ��INr 0 Sl.�m/ � Type • n • ec ' • n: 4 ' 4 . Ad ress S t '3� , Date alle•: )� J O Li Sp cial Instructions: /0 Prin Date Wanted: 7 0 - Request II INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. lnspe FA paid at 6300 Southce INSPECTION RECORD Retain a copy with permit PE orrections required prior to approval. Date: 7 -3D —o )431 -3670 47.00 REINSPECTIOII FEE REQUI D. Prior to inspection, fee must be ter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Proar 7iot , I ,oi 4 , bfP Pr/ Type of Ins ior fa 0 • . Ti ----\,,,/ Ad r ss: 3 • ate Called , , 0 Special nstructions: Date Wante • f 6 Requeste : dLIA, I+ (( Ph ogAsio,_ ..... 7 s . Li toe INSPECTION RECORD Retain a copy with permit INSPE ION NO. CITY S F TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Corrections required prior to approval. COMMENTS: 0 e n/ R 0,4 /7 _ / -47S Inspec ert-A. IC" Date: --- -62 • 7.00 REINSPECrIOl FEE REQUIRED. dor to inspection, fee must be aid at 6300 Southcenter Blvd., Suite 0. Call to schedule reinspection. eceipt No.: 'Date: COMMENTS: V) CO Me0 I-, pc,-.1i el t ci-k-,r e ‘ e ( 0..- .1-0 fifc&) ■ 6 e -L cp-t3 hA Lei r..10 S • r4 A e•-- C -\-1 +e v'N'■ ( ( t er•%1 4 Date Called: 0 --, - r 6 ( I (IN e 4 s. vv\ 141/4 • c ( 019 ) \/- • ba,Ac.e..k 4l N r-r • -(7.-c vre,-Z I 'i N , r c. eo 4, r (, k 0-1..t-i-c,;(i, Q A: T-- 0 0,47) • k l v.\ G... ‘...±) 4 L (0 API 0 PA e.,./ -t- F.,-)Z v-- on \ Ll.,..\- 1 trYOrt-s? 0 .. ,P ,. I II 1‘ 0'11r/ Nkst, Type of In ction: ft • 4 ta A • dd e ilL CO i-io 3. if .3't I Date Called: 0 --, Spe ial Instructions: Date Wanted.:-.7 P.m. / 13 Requestef: Phone No: d--9(1) — DLI74 INSPECTION NO. Approved per applicable codes. ctor: INSPECTION RECORD Retain a copy with permit ) PERMIT CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 981 88 (206)431-3670 'Corrections required prior to approval. Date: — 7 — 2 —0 7.00 REINSPECTION FE REQUIRED. prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 0 'Receipt No.: Date: Tjec I a;: I pec: pe 01 Ad .-l1 re(s• s ` ,1 jr (. t t ,r Date Cal ed: jeloti Specia ZiArk Date Wanted: / .. ! m. p.m. Requester: �. Phone No: INSPECTION RECORD Retain a copy with permit Mu/ INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. COMMENTS: a r . 4\-ed, Date: r ... ` - a --15 -d . •• • d at 6300 Southcenter Blvd., Suite 100. C (Receipt No.: REINSPECTION FEE REQUIRED. Prior i inspection, fee mus(be to schedule reinspection. Date: • COMMENTS: P le v eie ?------ . — 4 -- - — Special Instructions: — Date Wanted: r 20- O L l a.m. p.m. ItCC£..SS 1--L A 70.- 1 L.Ac(c( - Klc S:s # Lel-%A b t C t i c k s ,\'\ e o h P I ems- 1 I (V--\ A e ec. s S , MIL r evv\ .1 r-' e4ss A b I -r ( -� r.N ET 13 LOC. 1 b) l g s:.. + Qi( 4- .a t - 5 -k a k cA 60-fe s-,-„1 <<- i A 1.."----rt,:Y 63,.14; r cAJec 2 ✓+-. PfyJect: C I '1 IL Al osf N � ��1 Type of In ection: r t l Ict L Address: ' ( y b S S. 1 Lt Li cA Date Calle --9 _ pH Special Instructions: — Date Wanted: r 20- O L l a.m. p.m. Requester: ^J e Phone Noo: (2j , or: (fi• e ipt No.: J Approved per applicable codes. INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 MJ 47.00 REINSPECTION EE REQUIRED. P� aid at 6300 Southcenter Blvd., Suite 100. 'Date: ploy -0°2 Date: Za`0 (206)431 -3670 Corrections required prior to approval. for to inspection, fee must be Call to schedule reinspection. Project:, k.v /c/} S( Z' s/ Typ f Inspection: F /NSa_. eal-ek Date alled: // - a9 d ress: to V o s. //V Special Instructions: Date Wanted: 5 1` 7 �m_ p.m. Requester e r Ph e No: �' 5 75"l /361 INSPECTION NO. INSPECTION RECORD Retain a copy permit mo PERMIT NO CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 pproved per applicable codes. El Corrections required prior to approval. COMMENTS: PG G, LP/ *7 A— /LA Date: .00 REINSPE ON F E REQUIRED. Pri ' to inspection, fee mus d at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. R rapt No.: !Date: Q Tukwila School District Administration Building Location Building owner Program user Company Comments By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density- specific heat product Latent heat factor Enthalpy factor Summer design dry bulb Summer design wet bulb Winter design dry bulb Summer clearness number Winter clearness number Summer ground reflectance Winter ground reflectance Design simulation period Cooling load methodology Heating load methodology Tukwila Tukwila School District Linda Burman Hultz/BHU /Cross Engineers hultz/bhu C:IMechLoad.trc 02:18 PM on 07/24/2003 4.1 Seattle, Washington 47.0 deg 122.0 deg 8 386 ft 29.5 in. Hg 0.0749 . ft 0.2444 Fsizrt!h ° 1.0988 Btuih• { :frmm 'V 4,836.9 Btu•rnirnIi►.c #r ft 4.4953 ib•rnin /la.cu ft 80 °F 64 °F 26 °F 0.95 0.95 0.20 0.20 January - December TETD -TA1 UATD NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. RECEIVED CITY OF TUIo jp . JAN 1 4 2004 PERMIT CENTER • Description Type Hallway 107 Zone Janitor /Supply 108 Zone Multipurpose Office 109 Zone Administrative Assistants 110 Zone `) ESHS Director 111 Zone Conference 112 Zone Cirriculum Director 113 Zone AHU -1 System - Incremental Heat Pump Conference Room 100 Zone Lobby/Reception 101 8102 Zone Hallway 103 Zone Women 104 Zone Men 105 Zone Table Storage 106 Zone AHU -2 System - Incremental Heat Pump Conference Superintendent 131 Zone File Room 130 Zone Payroll 129 Zone Bus Oper Manager 128 Zone Budget Manager /Assist 126 127 Zone Executive Assistants 121 Zone Hallway 120 Zone AHU -3 System - Incremental Heat Pump Hallway 114 Zone Workroom 115 Zone Breakroom 116 Zone Electrical 118 Zone File Room 119 Zone Conference 122 Zone Personel Manager 123 Zone Superintendent 124 Zone AHU-4 System - Incremental Heat Pump MDF 117 Zone AHU -5 System - Computer Room Unit Project Name: Tukwila School District Administration Building Dataset Name: C:WtechLoad.trc ENGINEERING CHECKS By hultz/bhu COOLING % OA cfm/ft cfm/ton ft Btu/hr•ft 6.09 2.30 540.0 235.0 51.07 6.09 2.30 -16.65 158 40.45 0.35 377.5 1,091.7 10.99 40.45 0.35 -8.41 172 14.67 0.95 713.4 748.3 16.04 14.67 0.95 -1! r - 470 18.42 0.76 500.2 658.7 18.22 18.42 0.76 - 10.79 348 8.89 1.57 537.0 341.2 35.17 8.89 1.57 -17.36 201 10.63 1.32 536.0 407.4 29.46 10.63 1.32 -13.45 197 10.66 1.31 536.0 408.4 29.38 10.66 1.31 -13.43 198 12.38 1.13 577.9 511.5 23.46 12.38 1.13 -12.52 1,743 23.33 1.62 578.2 357.5 33.56 23.33 1.62 -23.73 1.060 9.97 3.06 778.2 254.0 47.25 9.97 3.06 -22.19 655 2.14 6.54 543.2 83.0 144.58 7. 4 6.54 -32.61 279 39.91 0.35 382.5 1.091.5 10.99 39.91 0.35 -8.13 177 34.00 0.41 497.4 1,209.1 9.92 34.00 0.41 -8.16 177 24.56 0.57 419.6 736.9 16.28 24.56 0.57 -11.84 110 12.25 2.34 606.1 259.3 46.27 12.25 2.34 -21.55 2,458 5.31 2.63 514.9 195.5 61.37 5.31 2.63 -19.23 270 39.34 0.36 388.0 1.091.3 11.00 39.34 0.36 -8.42 216 8.02 1.74 502.5 288.3 41.63 8.02 1.74 - 14.95 224 6.72 2.08 507.1 243.8 49.22 6.72 2.08 -19.39 192 25.30 0.55 529.0 956.7 12.54 25.30 0.55 -10.92 304 32.24 0.43 390.6 900.4 13.33 32.24 0.43 -10.29 377 19.65 0.71 447.2 628.2 19.10 19.65 0.71 -14.70 163 12.06 1.16 500.8 431.7 27.80 12.06 1.16 -13.56 1.745 29.91 0.47 548.4 1,172.7 10.23 29.91 0.47 -8.61 70 29.91 0.47 548.4 1.172.7 10.23 29.91 0.47 -8 384 8.20 1.71 538.9 316.0 37.98 8.20 1.71 -15.55 283 39.86 0.35 382.8 1.090.9 11.00 39.86 0.35 -8.46 67 39.86 0.35 382.8 1.090.9 11.00 39.86 0.35 -8.46 180 11.71 1.19 537.5 450.1 26.66 11.71 1.19 - 12.92 226 10.90 1.28 538.0 419.4 28.61 10.90 1.28 -13.57 207 11.18 1.25 539.8 431.5 27.81 11.18 1.25 -14.58 214 14.40 0.97 550.7 566.9 21.17 14.40 0.97 -11.80 1.630 0.94 14.84 538.7 36.3 330.49 0.94 14.84 - 213.32 75 0.94 14.84 538.7 36.3 330.49 0.94 14.84 - 213.32 75 HEATING % OA cfm/ft Btu/hr•ft TPACF ' al021n ...,a = . ! r 1 ..r NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR - THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Floor Area ft2 AHU -1 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total =--> Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK Peaked at lime: Outside Air. Space Sens. + Lat Btu/h Mo/Hr. 9/ 11 OADB/WBIHR: 69 / 59 / 61 Plenum Net Percent Sens. + Lat Total Of Total Btu/h Btu/h (1) 41,657 273 40,900 100.00 Project Name: Tukwila School District Administration Building Dataset Name: C:lMechLoad.trc System Checksums By hultz/bhu CLG SPACE PEAK Mo/Hr. 9 / 11 OADB: 69 0 0 0 0.00 0 0 0 0 0.00 0 0 -50 -50 -0.12 0 25,106 0 25,106 61.38 27,531 -391 0 -391 -0.96 -1,000 1,126 462 1,588 3.88 1,126 0 0 0.00 0 0 0 0.00 0 124 124 0.30 -411 25,965 411 26,376 64.49 27,246 7,140 0 7,140 17.46 7,140 5,486 5,486 13.41 3,048 2,975 0 2,975 7.27 2,975 15,602 0 15,602 38.15 13,164 90 -90 0 0.00 21 0 0 -1,031 -2.52 0 0 0 0.00 0 -48 -48 -0.12 0 0.00 0 0 0.00 0 0 0.00 0 0.00 Space Percent Sensible Of Total Btu/h (%) 0.00 0.00 0.00 68.09 -2.47 2.79 0.00 0.00 -1.02 67.39 17.66 7.54 7.36 32.56 0.05 0.00 0.00 40,431 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load OvlUndr Sizing Exhaust Heat OA Preheat M. RA Preheat Diff. Additional Reheat Grand Total => COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR Leave DB1WB/HR ton MBh MBh cfm °F °F grub °F °F grub Main Clg 3.4 40.9 37.2 1,970 74.4 60.2 56.2 56.3 52.8 54.8 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 3.4 40.9 HEATING COIL PEAK Mo/Hr. 13/1 OADB: 26 Space Peak Space Sens Btu/h O 0 O 0 0 -2,303 0 0 - 4,111 - 4.111 -1,467 - 2,056 0 0 O 0 -2,414 • 2. 114 -7,992 - 11;,884 0 0 0 0 -583 0 0 -8,574 Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft (/) 1,743 0 0 1,743 0 0 1,090 155 1i Coil Peak Percent Tot Sens Of Total Btu/h ( %) 0 0 0 0 0.00 0.00 10.55 0.00 18.8 s 9.42 0.00 0.00 11.06 49.86 0.00 0.00 0.00 0.00 0 0.00 -11.2 51.56 0.00 3U, 0 0.00 0 0.00 0 0.00 - 21,828 100.00 Main Htg Aux Htg Preheat Hr imldif Or! Vent Total SADB Plenum Return RetlOA Fn MtrTD Fn BIdTD ch Frict r Vent Infil Supply MinStopiRh Rnr. ,rr; Exir?•r3t Rm °4 OA cfmlft cfmlto" ft'lton Btu/hr•ft' No. People -21.8 0.0 0.0 0.0 0.0 -21.8 TRACE i : r , ; , . • Alternative -1 Sys: _..,,,,.. re:ait i c: NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEARfiHAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Incremental Heat Pw.Rn p TEMPERATURES Cooling cr; , 74 C.0 00 0.0 .M9FLOWS Cociimj 244 52 270 t . 0 _e? 1 a. ^� 267 . 29 L. 0 0 ENGINEERING CKS Cooling Heating 12.4 12.4 1.13 1.13 577.85 511.53 23.46 -12.52 12 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F 1,970 0 0 Nslttng 72.0 r;7 0 6; 0 61 `. 0.0 0.0 0.0 61.9 0.0 0.0 ! vg °F 72.0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 AHU -2 System Checksums By hultz/bhu Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total =--> Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK Peaked at Time: Outside Air. Space Sens. + Lat. Btu/h MoIHr. 7 / 16 OADBtWB/HR: 79 / 63 / 62 CLG SPACE PEAK MoIHr. 7/ 17 OADB: 78 Plenum Net Percent Space Percent Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h ( %) Btu/h (%) o o 0 0.00 0 0.00 0 0 0 0.00 0 0.00 0 1,337 1,337 1.18 0 0.00 79,256 0 79,256 69.69 79,256 76.65 -680 0 -680 -0.60 -680 -0.66 1,314 666 1,980 1.74 1,362 1.32 0 0 0.00 . 0 0.00 0 0 0.00 0 0.00 73 73 0.06 117 0.11 79,963 2,003 81,966 72.07 80,055 77.42 10,067 0 10,067 8.85 10,067 9.74 15,838 15,838 13.93 8,799 8.51 4,195 0 4,195 3.69 4,195 4.06 30,100 0 30,100 26.47 23,061 22.30 261 -261 0 0.00 282 0.27 0 0 1,931 1.70 0 0.00 0 0 0.00 0 0.00 -264 -264 -0.23 0 0.00 0 0 0.00 0 0 0.00 0 0.00 110,324 1,477 113,732 100.00 103,398 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total => HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 0 -3,053 0 0 - 12,411 - 12,411 -1,356 -2,031 0 0 0 0 -3,403 -3,403 - 17,170 - 20,898 0 0 0 0 -409 0 0 - 17,579 Coll Peak Percent Tot Sens Of Total Btu/h ( %) 0 0 0 0 0 - 32,486 0 414 0 0 0 0.00 0.00 5.76 0.00 23.43 3.83 0.00 0.00 6.42 39.45 0.00 0.00 0.00 0.00 0.00 61.33 0.00 -0.78 0.00 0.00 0.00 - 52,970 100.00 Main Cig Aux Cig Opt Vent Total 9.5 COOLING COIL SELECTION Total Capacity Sens Cap. Coll Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F gr/lb 9.5 0.0 0.0 113.7 0.0 0.0 113.7 107.9 0.0 0.0 5,745 0 0 75.8 0.0 0.0 61.7 60.9 0.0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 58.6 55.0 59.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C :\MechLoad.trc Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft (%) 2,458 0 0 2,281 0 0 1,388 468 34 Main Htg Aux Htg Preheat Humidif Opt Vent Tote( Incremental Heat Pump TEMPERATURES Cooling Heating SADB 58.6 70.8 Plenum 75.3 67.5 Return 75.3 67.5 Ret/OA 75.8 62.4 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MinStoplRh Return Exhaust Rm Exh Auxiliary AIRFLOWS C ^ofng 704 74 5,745 0 5,758 718 60 0 Heating 704 74 5,745 0 5,758 718 60 0 ENGINEERING CKS % OA cfmlft' cfm /ton ft'Iton Btu /heft' No. People Cooling 12.3 2.34 606.14 259.35 46.27 35 Heating 12.3 � -21.55 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm `F -53.0 0.0 0.0 0.0 0.0 • 57, 0 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 5,745 0 0 62.4 0.0 0.0 Lvg °F 70.8 0.0 0.0 0 0.0 0.0 0 0.0 0.0 7,:n, 4 :8 FM r.4. t'_ !•-sums report Fag - ' AHU-3 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK Peaked at Time: MaIHr. 7 / 17 Outside Air. OADB/WB/HR: 78 / 62 / 58 Space Plenum Sens. + Lat. Sens. + Lat Btu/h Btu/h 0 0 0 28,649 474 926 0 0 484 30,534 7,148 5,492 2,978 15,618 46,432 0 0 0 0 970 970 0 28,649 0 474 425 1,352 0 0 484 1,396 31,929 280 -280 0 0.00 0 0 1,110 2.29 0 0 0.00 -145 -145 -0.30 0 0.00 0 0 0.00 0 0 0.00 0 0.00 971 0 7,148 5,492 0 2,978 0 15,618 Net Percent Total Of Total Btu/h (1) 48,513 100.00 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc 0.00 0.00 2.00 59.05 0.98 2.79 0.00 0.00 1.00 65.82 14.73 11.32 6.14 32.19 0 29,159 150 993 0 0 11 30,313 7,148 3,051 2,978 13,177 System Checksums By hultz/bhu CLG SPACE PEAK Mo/Hr. 7 / 17 OADB: 78 Space Percent Sensible Of Total Btu/h ( %) 0 0 0.00 0.00 0.00 66.44 0.34 2.26 0.00 0.00 0.03 69.07 16.29 6.95 6.79 30.03 395 0.90 0 0.00 0 0.00 43,885 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat DIff. RA Preheat Diff. Additional Reheat Grand Total => Main CIg 4.0 48.5 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 4.0 48.5 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBNVB/HR ton MBh MBh cfm °F °F gr/lb 44.6 0.0 0.0 2,025 75.8 0 0.0 0 0.0 60.5 55.2 0.0 0.0 0.0 0.0 Leave DB!WBIHR °F °F gr/lb 55.3 51.9 53.1 0.0 0.0 0.0 0.0 0.0 0.0 HEATING COIL PEAK MoHr. 13/1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 0 - 2306 0 0 -6,020 -6 020 - 1,351 -1 9S� 0 0 0 0 -2,416 -2,416 - 9,787 - 12,697 0" 0 0 0 - 576 0 0 - 10,363 Floor Part ExFir Roof Wall AREAS Gross Total Glass ft ( %) 1,745 0 0 1,745 0 0 1,116 227 20 Coil Peak Percent Tot Sens Of Total Btu/h ( %) 0 0 0 0 0 - 11,265 0 297 0 0 0 0.00 0.00 9.75 0.00 25.44 8.26 0.00 0.00 10.21 53.65 0.00 0.00 0.00 0.00 0.00 47.60 0.00 -1.26 0.00 0.00 0.00 - 23,664 100.00 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm `F Main Htg Aux Htg Preheat Humidif Opt Vent Total Incremental Heat Ptvmp TEMPERATURES Cooling Heating SADB 55.3 72.7 Plenum 75.5 67.0 <otum 75.5 67.0 Fist/OA 75.8 62.0 Fn YitrTD 0.0 0.0 rn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infll Supply MinSter'Rh Retum Exhaust Rm Exh Auxiliary % OA cfm/ft cfm /ton triton Btu /hr•ft' No. People ENGINEERING CKS Cooling Heating 12.1 12.1 1.16 1.16 500.85 431.70 27.80 -13.56 12 -23.7 0.0 0.0 0.0 0.0 -23.7 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. AIRFLOWS Cooling - .7tlnn 52 52 2 025 2,025 0 2,040 2.0'? 260 ?60 37 37 0 0 2 025 62.0 0 0.0 0 0.0 44 Lvg °F 72.7 0.0 0.0 0 nn n� 0 0.0 0.0 TRACE® 700 - A! +. I 7., ...ecksttn c AHU-4 Main Cig Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow ton MBh MBh cfm 2.9 34.5 31.5 1,583 74.0 60.3 57.4 55.7 52.5 54.9 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 2.9 34.5 Enter DBNVBIHR Leave DBIWBIHR °F °F gr/Ib °F °F gr/Ib Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc System Checksums By hultz/bhu COOLING COIL PEAK Peaked at Time: Mo/Hr. 8 / 9 Outside Air. OADB/WB/HR: 67 / 59 / 62 CLG SPACE PEAK Mo/Hr.. 7 / 9 OADB: 67 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/11 ( %) Btu/h ( %) Envelope Loads Skylite Solar 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0 0.00 0 0.00 Roof Cond 0 141 141 0.41 0 0.00 Glass Solar 21,264 0 21,264 61.62 21,360 63.45 Glass Cond -592 0 -592 -1.72 -598 -1.78 Wall Cond 522 226 747 2.17 589 1.75 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 0 0.00 Infiltration -22 -22 -0.06 -199 -0.59 Sub Total ==> 21,172 367 21,539 62.42 21,152 62.84 Internal Loads Lights 6,676 0 6,676 19.35 6,676 19.83 People 5,130 5,130 14.87 2,850 8.47 Misc 2,782 0 2,782 8.06 2,782 8.26 Sub Total => 14,588 0 14,588 42.28 12,308 36.56 Ceiling Load 87 -87 0 0.00 202 0.60 Ventilation Load 0 0 -1,577 -4.57 0 0.00 Ov /Undr Sizing 0 0 0.00 0 0.00 Exhaust Heat -43 -43 -0.13 Sup. Fan Heat 0 0.00 Ret. Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total => 35,847 237 34,506 100.00 33,662 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total => HEATING COIL PEAK Mo/Hr 13 / 1 OADB: 26 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h ( %) 0 0 0 0 0 -2,150 0 0 -3,182 -3,182 -1,002 -1,414 0 0 0 0 -2,257 -2,257 -6,442 -9,003 0 0 0 0 -584 0 0 -7,026 0 0 0 0 0 - 10,522 0 292 0 2 0 0.00 0.00 11.18 0.00 16.55 7.35 0.00 0.00 11.74 46.81 0.00 0.00 0.00 0.00 0.00 54.71 0.00 -1.52 0.00 0.00 0.00 - 19,232 100.00 Floor Part ExFir Roof Wall AREAS Gross Total Glass ft ( %) 1,630 0 0 763 120 16 1,630 0 0 Main Htg Aux Htg Preheat Humidif Opt Vent Total NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Incremental Heat Pump TEMPERATURES Cooling Heating SADB 55.7 72 Plenum 75.2 66.9 Return 75.2 66.9 Ret/OA 74.0 61.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MinStoplRh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling Heating 228 228 49 49 1,583 1,583 0 0 1,590 1,590 235 235 42 0 0 ENGINEERING CKS % OA cffn/ft cfm /ton ft /ton Bt tf rc, r , rte No. People Cooling 14.4 0.97 550.67 566.90 21 • 11 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm F -19.2 0.0 0.0 1.593 i3 0 Heating 14.4 0.97 61 r -11.80 Lvo °F 72.0 '.0 n 0 0.0 0 0.0 0.0 0 n 0 0.0 0.0 Alternative -1 SvM?wn Checksums ri • • : ;:+ AHU -5 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total =--> Internal Loads Lights People Misc Sub Total => Ceiling Load 0 Ventilation Load 0 OvlUndr Sizing 0 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK CLG SPACE PEAK Peaked at Time: Mo/Hr. 7/14 Outside Air. OADB/WB/HR: 79 / 64 / 67 Space Plenum Net Percent Total Of Total Btu/h Btu/h Btu/h (1) Sens. + Lat. Sens. + Lat 307 236 24,000 24,543 24,582 0 0 0 0.00 0 0 0 0.00 O 26 26 0.10 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0.00 O 0 0.00 39 39 0.16 39 26 64 0.26 0 307 1.24 236 0.95 0 24,000 96.83 0 24,543 99.02 0 0 0.00 0 179 0.72 O 0.00 0 0 0.00 O 0.00 0 0 0.00 0 0 0.00 0 0.00 25 24,787 100.00 System Checksums By hultz/bhu Mo/Hr. 7 / 15 OADB: 80 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 0 0 12 12 307 131 24,000 24,438 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.05 1.26 0.54 98.15 99.95 1 0.00 0 0.00 0 0.00 24,451 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load OvlUndr Sizing Exhaust Heat OA Preheat DIN. RA Preheat DIN. Additional Reheat Grand Total => Main Clg Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F grub 2.1 0.0 0.0 24.8 0.0 0.0 2.1 24.8 24.5 0.0 0.0 1,113 75.1 0 0.0 O 0.0 58.9 49.6 0.0 0.0 0.0 0.0 Leave DB/WBIHR °F °F grub 55.0 50.7 49.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C :WIechLoad.trc HEATING COIL PEAK Mo/Hr. 13/1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 -104 -104 -106 Floor Part ExFir Roof Wall AREAS Gross Total Glass ft ( %) 75 0 0 75 0 0 0 0 0 Coll Peak Percent Tot Sens Of Total Btu/h ( %) 0 0.00 o o 00 v." 0.63 0.00 U 0.00 0 0.00 0 0.00 O 0.00 -101 0 65 -205 1.28 0 0 0.00 0 0 0.00 O 0 0.00 0 0 _ 0.00 -2 0 0.00 0 -484 3.03 O 0 0.00 1 -0.01 O 0.00 0 0.00 - 15,311 93.70 - 15,999 100.00 Main Htg Aux Htg Preheat Humidif Opt Vent Total TEMPERATURE c` Cooling SADB 55.0 Plenum 75.0 Return 75 0 Ret/OA 75.1 Fn MtrTD 0.0 Fn BIdTD 0.0 Fn Frict 0.0 Vent Infiil Supply MinStop/Rh Return Exhaust Rm Exh Auxiliary % OA cfm/ft' cfm/ton ft' /ton Btu/hrdt' 1'1- People HEATING COIL SELECTION Capacity Coil Airflow Ent rr.r Computer Pr• "m Unit -16.0 0.0 0.0 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. AIRFLOWS Cooling to 2 1,113 1.113 1,115 13 0 ENGINEERING CKS Cooling Heating 0.9 0.9 14.84 14.84 538.68 36.31 330.49 - 213.32 1 1,113 55.0 0 0.0 0 0.0 0.0 0.0 nn Heating 10 2 1.113 1. 13 1,115 13 0 0 Lvg 68.1 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 - 16.0 T r:ACEta 700 v4.1 calculated at e:! i ° r ;`1 c / % ": ` • 1 ' Aite n.!' 1 System Checksw116 iapui • Conference Room 100 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Room Checksums By hultz/bhu COOLING COIL PEAK Peaked at Time: Mo/Hr. 8 / 16 Outside Air. OADBMIB/HR: 78 / 63 / 64 CLG SPACE PEAK Mo/Hr. 8 / 16 OADB: 78 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btulh Btulh Btulh ( %) Btulh ( %) Envelope Loads Skylite Solar 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0 0.00 0 0.00 Roof Cond 0 601 601 1.69 0 0.00 Glass Solar 17,892 0 17,892 50.29 17,892 59.14 Glass Cond 189 0 189 0.53 189 0.62 Wall Cond 814 348 1,163 3.27 814 2.69 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 0 0.00 Infiltration 55 55 0.15 87 0.29 Sub Total => 18,950 949 19,899 55.93 18,983 62.74 Internal Loads Lights 4,341 0 4,341 12.20 4,341 14.35 People 9,000 9,000 25.30 5,000 16.53 Misc 1,809 0 1,809 5.08 1,809 5.98 Sub Total => 15,150 0 15,150 42.58 11,150 36.85 Ceiling Load 113 -113 0 0.00 122 0.40 Ventilation Load 0 0 688 1.93 0 0.00 Ov/Undr Sizing 0 0 0.00 0 0.00 Exhaust Heat -159 -159 -0.45 Sup. Fan Heat 0 0.00 Ret Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total 34,213 677 35,578 100.00 30,255 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mo/Hr. 13 / 1 OADB: 26 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btulh Btulh ( %) 0 0 0 0 0 -1,419 0 0 -3,342 -3,342 -947 -1,351 0 0 0 0 -1,468 -1,468 -5,757 -7,579 0 0 0 0 -176 0 0 0 0 0 0 0.00 0.00 5.64 0.00 13.29 5.37 0.00 0.00 5.84 30.13 0.00 0.00 0.00 0.00 0 0.00 - 18,460 73.40 0 0.00 249 -0.99 0 0.00 0 0.00 0 0.00 640 -2.54 -5,933 - 25,151 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR ton MBh MBh cfm °F °F gr/Ib 3.0 0.0 0.0 35.6 0.0 0.0 3.0 35.6 32.0 0.0 0.0 1,714 75.8 0 0.0 0 0.0 62.7 0.0 0.0 65.5 0.0 0.0 Leave DBIWB/HR °F °F gr/lb 58.9 55.8 62.4 0.0 0.0 0.0 0.0 0.0 0.0 Floor Part ExFlr Roof Wall AREAS Gross Total C -g lass ft (i° 1,060 Main Htg 0 Aux Htg 0 Preheat 1,060 0 0 738 126 17 Humidif Opt Vent Total NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 58.9 71.2 Plenum 75.3 67.5 Return 75.3 67.5 RetIOA 75.8 57.8 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MinStop/Rh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 400 32 1,714 0 1,746 432 0 0 Heating 400 32 1,714 0 1,746 432 0 n % OA cfmlft cfm/ton ft' /ton Btu/hr•ft No. People ENGINEERING CKS Cooling Heating 23.3 23.3 1.62 1.62 578.24 357.52 33.56 -23.73 20 HEATING COIL SELECTION Capacity Coil Airfk:. Ent MBh cfm °F -25.2 0.0 -2.2 0.0 0.0 -25.2 1,714 0 1,714 57.8 0.0 57.8 Lvg °F 71.2 0.0 58.9 0 0.0 0.0 0 0.0 0.0 . .. slated at 02:18 FM `a;!,.,12!!..' • ^ ,CKXn Checksums report Page 8 of .' Lobby /Reception 101 & 102 COOLING COIL PEAK Peaked at Time: Mo/Hr. 7 / 17 Outside Air. OADB!WB/HR: 78 / 62 / 58 Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu/h Btu/h Btu/h (%) Envelope Loads Skylite Solar 0 0 0 0.00 Skylite Cond 0 0 0 0.00 Roof Cond 0 597 597 1.93 Glass Solar 22,204 0 22,204 71.74 Glass Cond 227 0 227 0.73 Wall Cond 18 121 139 0.45 Partition 0 0 0.00 Exposed Floor 0 0 0.00 Infiltration -39 -39 -0.13 Sub Total => 22,410 718 23,128 74.73 Internal Loads Lights 2,683 0 2,683 8.67 People 4,500 4,500 14.54 Misc 1,118 0 1,118 3.61 Sub Total =--.> 8,300 0 8,300 26.82 Ceiling Load 70 -70 0 0.00 Ventilation Load 0 0 -398 -1.29 Ov /Undr Sizing 0 0 0.00 Exhaust Heat -81 -81 -0.26 Sup. Fan Heat 0 0.00 Ret. Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total 30,780 568 30,949 100.00 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc CLG SPACE PEAK Mo/Hr. 7 / 17 OADB: 78 Room Checksums By hultz/bhu Space Percent Sensible Of Total Btu/h (%) 0 0.00 0 0.00 0 0.00 22,204 76.85 227 0.79 18 0.06 0 0.00 0 0.00 67 0.23 22,515 77.93 2,683 9.29 2,500 8.65 1,118 3.87 6,300 21.81 75 0.26 0 0.00 0 0.00 28,891 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Main Clg Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F grub 2.6 0.0 0.0 31.0 0.0 0.0 2.6 31.0 30.1 0.0 0.0 2,007 75.6 0 0.0 0 0.0 62.5 65.1 0.0 0.0 0.0 0.0 Leave DBIWBIHR °F °F grub 61.9 57.5 64.6 0.0 0.0 0.0 0.0 0.0 0.0 Ceiling Load Ventilation Load Ovlundr Sizing Exhaust Heat OA Preheat DIff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mo/Hr. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h Coll Peak Percent Tot Sens Of Total Btu/h ( %) 0 0 0 0 -877 0 0 -3,235 -3,235 -14 -107 0 0 0 0 -907 -907 -4,156 -5,126 0 0 0 0 -109 0 0 -4,265 Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft (To) 655 0 0 655 0 0 171 122 71 0 0 0 0 0 - 9,230 0 127 0 0 0 -307 0.00 0.00 6.03 0.00 22.26 0.74 0.00 0.00 6.24 35.26 0.00 0.00 0.00 0.00 0.00 63.50 0.00 -0.87 0.00 00 0.0! 2.11 - 14,537 100.00 TEMPERATURES Cooling SADB 6 69.9 Plenum 75.3 67.5 Return 75.2 67.5 Ret/OA 75 6 63.3 Fn MtrTD 0.0 0 0 Fn BIdTD 0.0 0 0 Fn Frict 0.0 0.0 Vent Infil Supply MinStoplRh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 200 200 20 20 2,007 2,007 0 0 2,027 2,027 220 220 0 0 0 0 % OA cfm/ft cfm /ton r - Bt No. People ENGINEERING CKS Cooling Heating 10.0 10.0 3.06 3.06 778.17 253.97 47.25 -22.19 10 HEATING COI! . FION Capacity ' . irfiow Ent Lvg f�1Et cfm °F °F Main Htg -14.5 2.007 63.3 Aux Htg 0.0 0 0.0 Preheat 0.0 0 0.0 Humidif Opt Vent Total TRACE® 700 v4.1 calculated at 02:18 PM on 07/24/2002 Alternative - Room Checksums report Page 70 of ')O NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 69.9 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -14.5 Hallway 103 Room Checksums By hultz/bhu COOLING COIL PEAK Peaked at Time: MolHr. 7 / 9 Outside Air. OADBMB/HR: 67/57/57 CLG SPACE PEAK Mo&Hr.7 /9 OADB: 67 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Let Total Of Total Sensible Of Total Btu/h Btu/h Btu/h ( %) Btu/h ( %) Envelope Loads Skylite Solar 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0 0.00 0 0.00 Roof Cond 0 -21 -21 -0.05 0 0.00 Glass Solar 39,160 0 39,160 97.08 39,160 97.59 Glass Cond -1,096 0 -1,096 -2.72 -1,096 -2.73 Wall Cond 0 38 38 0.09 0 0.00 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 0 0.00 Infiltration -39 -39 -0.10 -76 -0.19 Sub Total => 38,025 17 38,042 94.31 37,988 94.67 Internal Loads Lights 1,143 0 1,143 2.83 1,143 2.85 People 878 878 2.18 488 1.22 Misc 476 0 476 1.18 476 1.19 Sub Total => 2,497 0 2,497 6.19 2,107 5.25 Ceiling Load 30 -30 0 0.00 32 0.08 Ventilation Load 0 0 -184 -0.46 0 0.00 OvlUndr Sizing 0 0 0.00 0 0.00 Exhaust Heat -17 -17 -0.04 Sup. Fan Heat 0 0.00 Ret. Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total => 40,551 -30 40,337 100.00 40,127 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load OvlUndr Sizing Exhaust Heat OA Preheat DIN. RA Preheat DIN. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK MaHr. 13/1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 -5,834 0 0 0 -386 -6,221 0 0 0 0 - 46 0 0 -6,267 Coil Peak Percent Tot Sens Of Total Btu/h ( %) 0 0.00 0 0.00 -373 4.10 0 0.00 - 5,834 64.13 -48 0.53 0 0.00 O 0.00 -386 4.25 -6,642 73.01 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 -1,801 19.79 0 0.00 27 -0.30 0 0.00 O 0.00 O 0.00 -682 7.50 -9,098 100.00 Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F gr/lb 3.4 0.0 0.0 40.3 0.0 0.0 3.4 40.3 39.7 0.0 0.0 1,826 75.2 0 0.0 0 0.0 59.1 50.4 0.0 0.0 0.0 0.0 Leave DBIWBIHR °F °F grub 55.0 51.1 50.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Floor Part ExFIr Roof Wall AREAS Gross Total Glass Maln Htg Aux Htg Preheat ft (1) 279 0 0 279 0 0 242 220 91 Humidif Opt Vent Total TEMPERATURES Cooling Heating SADB 55.0 71.1 Plenum 75.3 67.5 RetU 75.3 67.5 Ret/OA 75.2 r5.6 Fn MtrTD 0.0 0.0 Fn RIdTD 0.0 0.0 Fn rr: ^t 0.0 0.0 Vent Infil Supply MlnStoplRh Return Exhaust Rm Exh Auxil NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR 1HAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. AIRFLOWS Cooling 39 8 1,826 0 1,834 47 0 0 OA cfm/ft cfmlton ft Btulhrft No. People ENGINEERING CKS Cooling Heating 2.1 2.1 6.54 6.54 543.21 83.00 144.58 -32.61 2 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -9.1 0.0 0.0 0.0 0.0 -9.1 TRACE® 700 v4. I y' • Altemati" -1 Room Che'ksu... 1,826 0 0 Heating 39 8 1,826 0 1,834 47 0 0 66.6 0.0 0.0 Lvg °F 1.1 ( 0 ( � .0 0 0.0 0.0 0 0r) 0.0 • • COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES 1 Peaked at Time: Mohr. 7 / 14 Mo/Hr. 7 / 18 Mo/Hr. 13 / 1 Cooling Heating Outside Air. OADB/WB/HR: 79 / 64 / 67 OADB: 76 OADB: 26 SADB 55 0 72.0 Plenum i b.J 57.5 Space Plenum Net Percent Space Percent Space Peak Coil Peal-. Percent Return 75.3 67 5 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 77.0 50.9 Btu/h Btu/h Btu/h (%) Btu/h (%) Btu/h Btu/h ( %) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads : rn BIdTO 0.0 0.0 Skylite Solar 0 0 0 0.00 0 0.00 Skylite Solar 0 0 0. '" Frict ^ 0 0.0 Skylite Cond 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0.00 Roof Cond 0 59 59 3.04 0 0.00 Roof Cond 0 - 217 16.47 Glass Solar 0 0 0 0.00 0 0.00 Glass Solar 0 0 0.00 Glass Cond 0 0 0 0.00 0 0.00 Glass Cond 0 0 0.00 Wall Cond 0 0 0 0.00 0 0.00 Wall Cond 0 0 0.00 AIRFLOWS Partition 0 0 0.00 0 0.00 Partition 0 0 0.00 Cooling :- a:i::g Exposed Floor 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 Vent 25 2F Infiltration 53 53 2.75 6 0.47 Infiltration -245 245 17.04 Infit 5 5 Sub Total ==> 53 59 113 5.79 6 0.47 Sub Total ==> -245 - 482 33.50 Supply 62 62 MinSi ^n /Rh 0 0 Internal Loads Internal Loads Return 37 37 Lights 725 0 725 37.25 725 53.18 Lights 0 0 0.00 Exhaust '! 0 People 557 557 28.62 309 22.70 People 0 0 0.00 Rm Exh 30 30 Misc 302 0 302 15.52 302 22.16 Misc 0 0 0.00 Auxil 0 0 Sub Total => 1,584 0 1,584 81.40 1,336 98.04 Sub Total => 0 0 0.00 Ceiling Load 19 Ventilation Load 0 -19 0 0 249 0.00 12.81 20 1.49 0 0.00 Ceiling Load Ventilation Load -29 0 0 0.00 -1,142 79.42 ENGINEERINn CKS Ov /Undr Sizing 0 0 0.00 0 0.00 OvlUndr Sizing 0 0 0.00 Cooling Heating Exhaust Heat 0 0 0.00 Exhaust Heat 0 0.00 % OA 39.9 39.9 Sup. Fan Heat 0 0.00 OA Preheat Diff. 0 0.00 cfmlft' 0 35 0.35 Ret. Fan Heat 0 0 0.00 RA Preheat DIff. 0 0.00 cfm /ton 382.52 Duct Heat Pkup 0 0 0.00 Additional Reheat 0 0.00 ft= /ton 1,091.53 Reheat at Design 0 0.00 System Plenum Heat 186 -12.93 Btu/hr•ft 10.99 -8.13 No. People 1 Grand Total => 1,656 40 1,946 100.00 1,363 100.00 Grand Total -> -274 -1,438 100.00 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DBUNB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F grub °F °F grub ft' ( %) t.' `F °F Main Clg 0.2 2.0 1.5 62 77.0 62.5 62.7 55.0 51.6 52.2 Floor 177 Main Htg -1.4 62 50.9 72.0 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0 << 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 ExFlr 0 Preheat -0.3 62 50.9 55.0 Roof 177 0 0 Total 0.2 2.0 Wall 0 0 0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total - 1.4 Women 104 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Room Checksums By huitz/bhu TRACES 700 v' ' ..tsiated arm IP f`6i .; Alternative -1 Roan Checksums ac; lyre 28 of 2y NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Men 105 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Grand Total => COOLING COIL PEAK Peaked at lime: Outside Air. OADB/W13/HR: 79 / 64 / 67 Space Sens. + Lat. Btu/h 725 557 302 1,584 Ceiling Load 19 Ventilation Load 0 Ov /Undr Sizing 0 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design 1,633 Plenum Sens. + Let Btu/h -19 Mo/Hr. 7/ 14 0 0 0 0 -19 0 725 557 0 302 0 1,584 Net Percent Total Of Total Btu/h (%) 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0.00 0 0 0.00 30 30 1.74 30 0 30 1.74 0 142 0 0 0 0 0 0 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc 41.27 31.71 17.20 90.17 0.00 8.09 0.00 0.00 0.00 0.00 0.00 0.00 1,757 100.00 CLG SPACE PEAK Mohr. 7 / 15 OADB: 80 Room Checksums By hultz/bhu Space Percent Sensible Of Total Btu/h ( %) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 29 2.10 29 2.10 725 52.31 309 22.33 302 21.79 1,336 96.43 20 1.47 0 0.00 0 0.00 1,386 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Grand Total => Main Cig Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR ton MBh MBh cfm °F °F gr/lb 02 0.0 0.0 1.8 0.0 0.0 0.2 1.8 1.5 0.0 0.0 73 76.7 63.2 66.3 0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWB/HR °F °F gr/Ib 57.7 55.1 61.7 0.0 0.0 0.0 0.0 0.0 0.0 Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat HEATING COL PEAK Mc Hr. 13/1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 -245 -245 0 0 0 0 -29 0 0 -274 Floor Part ExFir Roof Wall AREAS Gross Total Glass ft ( %) 177 0 0 0 0 0 0 0 0 Coll Peak Percent Tot Sens Of Total Btu/h ( %) O 0.00 0 0.00 0 0 00 0 •.:. u0 O 0.00 0 0.00 0 0.00 O 0.00 -245 16.96 -245 16.96 0 0.00 0 0.00 O 0.00 O 0.00 O 0.00 -1,142 79 OR 0 0.0 0 0.00 0 0.00 0 0.00 0 0.00 -57 3.95 -1,445 100 Vent Intil Supply MinStop/Rh Return Exhaust Rm Exh Auxil % OA cfm /ft cfm /ton fe /ton Stulhr•ft ?lo. People HI ATINC, COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg -1.4 73 53.4 Aux Htg 0.0 0 0.0 Preheat -0.3 73 53.4 Humidif Opt Vent Total 0.0 0.0 -1.4 Alternative- 1 tl n r:;.. • • 2z or 2b NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR - MAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 57.7 71.4 Plenum 75.3 67.5 Return 75.3 67.5 Ref/OA 76.7 53.4 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 AIRFLOWS Co oling Heating 25 25 5 5 73 73 0 0 48 48 0 0 '0 30 0 0 ENGINEERING CKS Cooling Heating 34.0 34.0 0.41 0.41 497.36 1,209.14 9.92 -8.16 1 Lvg °F 71.4 0.0 57.7 0 0.0 0.0 0 0.0 0.0 COOLING COIL PEAK Peaked at Time: Mo/Hc. 7 / 17 CLG SPACE PEAK Mohr. 7 / 18 HEATING COIL PEAK MoHr.. 13 / 1 TEMPERATURES Cooling Heating Outside Air. OADB/W13/HR: 78 / 62 / 58 OADB: 76 OADB: 26 SADB 55.0 76.2 Plenum 75.3 67.5 Space Plenum Net Percent Space Percent Space Peak (.:..ii Peak Percent Return 75.3 67.5 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens 1 Sens Of Total Ret/OA 76.0 57 ? _ Btu/h Btu/h Btu/h ( %) Btu/h (Y) Btu/h Btu/h (%) Fn MtrTD 0.0 C Envelope Loads Envelope Loads Fn BIdTD 0.0 C Skylite Solar 0 0 0 0.00 0 0.00 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0.00 Roof Cond 0 100 100 5.60 0 0.00 Roof Cond 0 -147 11.31 Glass Solar 0 0 0 0.00 0 0.00 Glass Solar 0 0 0.00 Glass Cond 0 0 0 0.00 0 0.00 Glass Cond 0 0 0.00 Wall Cond 482 159 641 35.79 529 38.46 Wall Cond -394 -524 40.25 AIRFLOWS Partition 0 0 0.00 0 0.00 Partition 0 0 0.00 Co ^ling Heating Exposed Floor 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 Vent 15 15 Infiltration 13 13 0.71 4 0.29 Infiltration -152 -152 11.70 Intl! 3 3 Sub Total => 494 260 754 42.10 533 38.75 Sub Total ==> -547 -824 63.25 Supply 63 63 MinStoplRh Internal Loads Internal Loads Return 66 66 Lights 451 0 451 25.15 451 32.73 Lights 0 0 0.00 Exhaust 19 19 People 346 346 19.32 192 13.97 People 0 0 0.00 Rm Exh n 0 Misc 188 0 188 10.48 188 13.64 Misc 0 0 0.00 Auxil 0 0 Sub Total => 984 0 984 54.95 831 60.34 Sub Total => 0 0 0.00 Ceiling Load 12 Ventilation Load 0 -12 0 0 60 0.00 3.33 13 0.92 0 0.00 Ceiling Load Ventilation Load -18 0 0 0.00 - 710 54.53 ENGINEERING CKS OvlUndr Sizing 0 0 0.00 0 0.00 Ov /Undr Sizing 0 0 0.00 Cooling Heating Exhaust Heat -7 -7 -0.38 Exhaust Heat 11 -0.83 % OA 24.6 24.6 Sup. Fan Heat 0 0.00 OA Preheat Diff. 0 0.00 cfm /ft' 0.57 0.57 Ret. Fan Heat 0 0 0.00 RA Preheat Dill. 0 0.00 cfmlton 419.63 Duct Heat Pkup 0 0 0.00 Additional Reheat 0 0.00 tenon 736.90 Reheat at Design 0 0.00 System Plenum Heat 221 -16.95 Btu /heft' 16.28 -11.84 No. People 1 Grand Total => 1,490 241 1,791 100.00 1,377 100.00 Grand Total => -565 -1,302 100.00 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBTWB!HR Leave DBIWBIHR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/Ib °F °F grub ft' ( %) MBh cfm °F °F Main CIg 0.2 1.8 1.6 63 76.0 61.0 57.6 55.0 50.9 49.6 Floor 110 Main Htg -1.3 6? 57.3 76.2 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 ExFIr 0 Preheat 0.0 0 0.0 0.0 Roof 110 0 0 Total 02 1.8 Wall 237 0 0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total - 1.3 Table Storage 106 Room Checksums By hultz/bhu Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc TRACE® 700 v4. at 07:1F! r -.r, P7r24J2003 Alternative -1 Room Cliee sun: " - of 29 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEARfiHAN THiS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Hallway 107 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK Peaked at Time: Mo/Hr. 9 / 13 Outside Air. OADB/WB/HR: 74 / 61 / 61 Space Sens. + Lat. Btu/h o o 0 0.00 0 0.00 0 0 0 0.00 0 0.00 0 -36 -36 -0.44 0 0.00 6,370 0 6,370 78.94 7,315 91.67 -29 0 -29 -0.36 -437 -5.47 21 39 60 0.75 15 0.19 0 0 0.00 0 0.00 0 0 0.00 0 0.00 52 52 0.65 -108 -1.36 6,414 4 6,418 79.53 6,785 85.03 647 0 647 8.02 647 8.11 497 497 6.16 276 3.46 270 0 270 3.34 270 3.38 1,414 0 1,414 17.52 1,193 14.95 8 0 0 7,836 -9 8,069 100.00 7,980 100.00 Main Clg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb 0.7 0.0 0.0 8.1 0.0 0.0 0.7 8.1 7.5 0.0 0.0 363 75.1 0 0.0 0 0.0 57.6 43.9 0.0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 49.2 43.4 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Plenum Sens. + Lat Btulh CLG SPACE PEAK Mo/Hr. 2 / 13 OADB: 54 Net Percent Space Percent Total Of Total Sensible Of Total Btulh ( %) Btulh (%) -8 0 0.00 2 0.02 0 243 3.01 0 0.00 0 0.00 0 0.00 -5 -5 -0.06 0 0.00 0 0 0.00 0 0 0.00 0 0.00 Room Checksums By hultz/bhu Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat DIff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mo/Hr. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0.00 0 0 0.00 0 -209 7.93 0 0 0.00 -928 - 928 35.27 -17 -47 1.80 0 0 0.00 0 0 0.00 -219 -219 8.31 -1,164 -1,403 53.32 0 0 0 0 -53 0 0 -1,216 Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 158 0 0 158 0 0 57 35 62 Coil Peak Percent Tot Sens Of Total Btulh ( %) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 - 1,020 38.76 0 0.00 31 -1.18 O 0.00 O 0.00 0 0.00 -240 9.11 -2,631 100.00 Main Htg Aux Htg Preheat Humidif Ont Vent Total NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR1 HAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 71.1 Plenum 75.2 67.0 Retum 75.2 67.0 Ret/OA 75.1 64.5 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infll Supply MinStoplRh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 22 5 363 0 368 27 0 0 Heating 22 5 363 0 368 27 0 0 % OA cfm /ft cfmlton fT= /ton Btu /heft No. People ENGINEERING CKS Cooling Heating 6.1 6.1 2.30 2.30 539.98 234.96 51.07 -16.65 1 HEATING COIL SEL FION Capacity Coil Airflow Ent MBh cfm °F -2.6 0.0 0.0 0.0 0.0 -2 6 363 n r;. • 0.0 Lvg 'F 7 1.1 0.0 0 0.0 0.0 0 0.0 0.0 _ at 02: I!? ' _ . Allnrr.aive - 1 P,»crn Ci:< _' : _., = : aye io of 29 Janitor /Supply 108 Envelope Loads Skylite Solar Skylite Cond Roof Gond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load OvlUndr Sizing Exhaust Heat Sup. Fan Heat Rat. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK Peaked at Time: Mo/Hr. 7 / 14 Outside Air. OADB/WB/HR: 79 / 64 / 67 Space Plenum Net Percent Sens. + Let. Sens. + Let Total Of Total Btu/h Btu/h Btu/h (%) 0 0 0 0.00 0 0 0 0.00 0 58 58 3.09 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0.00 0 0 0.00 52 52 2.74 52 58 110 5.83 704 0 704 37.26 541 541 28.63 294 0 294 15.53 1,539 0 1,539 81.41 1,600 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc 9 -9 0 0.00 0 0 241 12.76 0 0 0.00 0 0 0.00 0 0.00 0 0 0.00 0 0 0.00 0 0.00 50 1,891 100.00 CLG SPACE PEAK Mo/Hr. 7118 OADB: 76 Space Percent Sensible Of Total Btu/h ( %) 704 301 294 1,299 Room Checksums By hultz/bhu 2 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.47 0.47 53.90 23.01 22.46 99.37 0.16 0.00 0.00 1,307 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Gond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total =--> Grand Total => Main Clg Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F 0.2 0.0 0.0 1.9 0.0 0.0 0.2 1.9 1.5 0.0 0.0 59 76.9 0 0.0 0 0.0 62.5 62.7 0.0 0.0 0.0 0.0 Leave DBIWBIHR °F °F gr/Ib 55.0 51.4 51.5 0.0 0.0 0.0 0.0 0.0 0.0 Ceiling Load Ventilation Load OviUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat DHf. Additional Reheat System Plenum Heat HEATING COIL PEAK M&Hr. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 -238 -238 0 0 0 0 -57 0 0 -296 Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft ( %) 172 0 0 172 0 0 0 0 0 Coil Peak Percent Tot Sens Of Total Btu/h ( %) O 0.00 0 0.00 -227 15.71 0 0.00 O 0.00 0 0.00 O 000 O 0. - 238 19 ' *_ - 465 32. i r- 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 -1,110 76.73 O 0.00 O 0.00 0 0.00 O 0.00 O 0.00 129 -8.90 -1,447 100.00 Vent I nfil Supply MinStoplRh Return Exhaust Rm Exh Auxil OA cfm/ft= cfmlton ft' /ton Btulhrft= No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humldif Opt Vent Total -1.5 0.0 -0.3 0.0 0.0 -1.5 59 0 59 5u.4 0.0 50.4 72.5 0.0 55.0 0 0.0 0.0 0 0.0 0.0 ^Iculated at 02:18 PM " . "'74?^^ Alternative - ern Checksums rero d 29 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 72 5 Plenum 75.2 67.0 Return 75.2 67.0 Ret/OA 76.9 50.4 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 AIRFLOWS Cooling Heating 24 24 5 5 59 59 0 0 35 35 0 0 29 29 0 0 ENGINEERING CKS Cooling Heating 40.4 40.4 0.35 0.35 377.49 1,091.72 10.99 -8.41 1 Multipurpose Office 109 Project Name: Tukwila School District Administration Building Dataset Name: C:\MechLoad.trc Room Checksums By hultzlbhu Envelope Loads Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 2,176 Glass Cond 24 Wall Cond 558 Partition 0 Exposed Floor 0 Infiltration 52 Sub Total => 2,810 Internal Loads Lights 1,925 People 1,479 Misc 802 Sub Total => 4,206 Ceiling Load 24 Ventilation Load 0 Ov/Undr Sizing 0 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => 7,040 COOLING COIL PEAK Peaked at Time: Space Sens. + Lat. Btu/h Plenum Sens. + Lat Btu/h Mo/Hr. 8 / 14 Outside Air. OADB/WB/HR: 78 / 64 / 67 0 0 0 0 96 96 0 2,176 0 24 199 757 0 0 52 295 3,105 0 0 0 -24 0 -14 0 0 256 Net Percent Total Of Total Btulh ( %) 1,925 1,479 802 4,206 0 240 0 -14 0 0 0 0 0.00 0.00 1.27 28.87 0.32 10.05 0.00 0.00 0.68 41.20 25.54 19.62 10.64 55.81 0.00 3.19 0.00 -0.19 0.00 0.00 0.00 0.00 7,537 100.00 CLG SPACE PEAK Ma/Hr: 9 / 13 OADB: 74 Space Percent Sensible Of Total Btu/h (%) 0 0.00 0 0.00 0 0.00 2,912 41.62 -13 -0.19 565 8.08 0 0.00 0 0.00 -22 -0.31 3,442 49.20 1,925 27.51 822 11.74 802 11.46 3,549 50.72 6 0.08 0 0.00 0 0.00 6,997 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 26 Space Peak Space Sens Btulh Coil Peak Percent Tot Sens Of Total Btulh (%) 0 0 0 0 0 -621 0 0 - 424 -424 - 495 -667 0 0 0 0 - 651 -651 -1,570 -2,363 0 0 0 0 -157 0 0 -1,727 0 0 0 0 0 - 3,034 0 93 0 0 0 101 0.00 0.00 11.93 0.00 8.15 12.82 0.00 0.00 12.51 45.41 0.00 0.00 0.00 0.00 0.00 58.30 0.00 -1.78 0.00 0.00 0.00 -1.93 -5,204 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WBIHR Leave DB/WBIHR ton MBh MBh cfm °F °F grub °F °F gr/Ib Main Clg 0.6 7.5 6.8 448 75.5 62.7 66.1 60.8 57.2 65.1 Aux Cig 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.6 7.5 Floor Part ExFir Roof Wall AREAS Gross Total Glass 470 0 0 470 319 ft ( %) 0 0 16 5 Humidif Opt Vent Total TEMPERATURES Cooling Heating SADB 60.8 71.5 Plenum 75.2 67.0 Return 75.2 67.0 Ret/OA 75.5 60.9 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Intil Supply MinStoplRh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 66 14 448 0 462 80 0 0 Heating 66 14 448 0 462 80 0 0 ENGINEERING CKS % OA dm/ft' cfm/ton ft'/ton Btulhr•ft' No. People 0.0 0.0 -5.2 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR1HAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Cooling 14.7 0.95 713.38 748.34 16.04 3 HEATING COIL SELECTION) Capacity Coil Airflow Ent MBh cfm r Main Htg -5.2 448 9 Aux Htg 0.0 0 Reheat 0.0 0 0.0 Heating 14.7 0.95 -11.07 Lvg °F 71.5 0.0 0.0 0 0.0 0.0 0 3.0 0.0 TRACE® 700 v4.1 calculated at 02:18 rr.' ^7 Alternative ! Room Checksums report Page 23 of 25 Administrative Assistants 110 COOLING COIL PEAK Peaked at Time: Mohr. 9 / 13 Outside Jr A OADBTWB/HR: 74 / 61 / 61 CLG SPACE PEAK Mo/Hr.10 /13 OADB: 64 Space Plenum Net Percent Space Percent Sens. + Lat Sens. + Lat Total Of Total Sensible Of Total Btulh Btu/h Btu/h ( %) Btu/h ( %) Envelope Loads Skylite Solar 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0 0.00 0 0.00 Roof Cond 0 -78 -78 -1.23 0 0.00 Glass Solar 2,912 0 2,912 45.93 3,200 55.11 Glass Cond -13 0 -13 -0.21 -102 -1.75 Wall Cond 219 84 303 4.78 198 3.42 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 0 0.00 Infiltration 20 20 0.31 -122 -2.09 Sub Total => 3,138 6 3,143 49.58 3,175 54.68 Internal Loads Lights 1,425 0 1,425 22.48 1,425 24.54 People 1,095 1,095 17.27 608 10.48 Misc 594 0 594 9.37 594 10.23 Sub Total ==> 3,114 0 3,114 49.12 2,628 45.25 Ceiling Load 18 -18 0 0.00 4 0.07 Ventilation Load 0 0 93 1.46 0 0.00 Ov /Undr Sizing 0 0 0.00 0 0.00 Exhaust Heat - - - 0.17 Sup. Fan Heat 0 0.00 Ret Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total =--> 6,270 -23 6,340 100.00 , 5,807 100.00 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Room Checksums By hultz/bhu Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Dift RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => Main Cig Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coll Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F grub 0.5 6.3 5.7 264 74.9 60.5 56.8 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.5 6.3 Leave DB/WB/HR °F °F gr/lb 55.0 51.9 53.6 0.0 0.0 0.0 0.0 0.0 0.0 Space Peak Space Sens Btu/h 0 0 0 0 -116 0 0 -1,258 HEATING COIL PEAK Mo/Hr. 13 / 1 OADB: 26 Floor Part ExFir Roof Wall AREAS Gross Total Glass ft ( %) 348 0 0 348 0 0 163 16 10 Coll Peak Percent Tot Sens Of Total Btu/h ( %) 0 0 0.00 0 0 0.00 0 -460 12.25 0 0 0.00 -424 - 424 11.30 -235 -324 8.62 0 0 0.00 0 0 0.00 -482 -482 12.83 -1,142 -1.689 45.00 O 0.00 0 0.00 n + 0 0.00 O 0.00 -2,246 59.84 O 0.00 69 -1.82 0 0.00 0 0.00 O 0.00 113 -3.01 -3,754 100.00 HEATING COIL SELCta [ION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total TEMPERATURES Cooling Heating SADB 55.0 72.3 Plenum 75.2 67.0 Return 75.2 67.0 Ret/OA 74.9 59.4 Fn MtrTD 0.0 0 0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infii Supply MinStop /Rh Return Exhaust Rm Exh nxil % OA cfmlft cfm/ton ft' /ton Btulhrft No. People ENGINEERING CKS Cooling Heating 18.4 18.4 0.76 0.76 500.18 658.72 18.22 -10.79 2 -3.8 0.0 0.0 0.0 0.0 -3.8 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR - THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. AIRFLOWS Cooling 49 10 264 0 264 59.4 0 n • � Heating 49 10 264 0 275 59 0 0 723 0.0 0.0 0 0.0 0.0 0 0.0 0.0 - 1 RACES 700 ° ' - ?!culated at 02. :.. , , Alternative -1 Room Checksums rcr- • ^° ' - ;" ESHS Director 111 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Room Checksums By hultz/bhu COOLING COIL PEAK Peaked at Time: Outside Air. Envelope Loads Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 5,200 Glass Cond -139 Wall Cond 175 Partition 0 Exposed Floor 0 Infiltration 1 Sub Total => 5,237 Internal Loads Lights 823 People 633 Misc 343 Sub Total => 1,799 Ceiling Load 10 Ventilation Load 0 OvlUndr Sizing 0 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total > 7,046 Space Plenum Sens. + LaL Sens. + Lat Btu/h Btu/h Mo/Hr. 8 / 10 OADB/WBMR: 69 / 60 / 64 0 0 -34 0 0 69 35 18 7,069 100.00 CLG SPACE PEAK Mo/Hr. 9 / 10 OADB: 66 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h ( %) Btu/h ( %) 0 0.00 0 0.00 O 0.00 0 0.00 -34 -0.48 0 0.00 5,200 73.56 5,560 79.99 -139 -1.97 -209 -3.00 244 3.46 138 1.98 0 0.00 0 0.00 O 0.00 0 0.00 1 0.01 -58 -0.83 5,272 74.58 5,431 78.13 0 823 11.65 823 11.84 633 8.95 351 5.06 0 343 4.85 343 4.93 0 1,799 25.44 1,518 21.83 -10 0 0.00 2 0.04 0 5 0.06 0 0.00 O 0.00 0 0.00 -6 -6 -0.09 0 0.00 0 0 0.00 0 0 0.00 O 0.00 6,951 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Ma/Hr. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 -1,061 -452 0 0 -278 -1,791 0 0 0 0 -67 0 0 -1,858 Coil Peak Percent Tot Sens Of Total Btu/h ( %) 0 0.00 O 0.00 -266 7.61 O 0.00 -1,061 30.40 -627 17.97 0 0.00 O 0.00 -278 7.98 -2,232 63.96 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 1,297 37.18 0 0.00 40 -1.13 O 0.00 O 0.00 O 0.00 0 -0.01 -3,489 100.00 Main Clg Aux Clg Opt Vent Total 0.6 7.1 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F grill) 0.6 7.1 6.6 316 74.6 60.2 55.8 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWBIHR °F °F gr/Ib 55.0 52.2 54.5 0.0 0.0 0.0 0.0 0.0 0.0 Floor Part ExFir Roof Wall AREAS Gross Total Glass ft ( %) 201 0 0 201 0 0 325 40 12 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg mph cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total SADB Plenum Return Ret/OA Fn MtrTD Fn B1dTD Fn Frict TEMPERATURES Cooiu -; Heating 55.0 73.3 75.2 67.0 75.2 67.0 74.6 63.3 0.0 0.0 0.0 0.0 0.0 0.0 Vent Infil Supply MinStoplRh Return Exhaust Rm Exh Aux!! ENGINEERING CKS Cooling Heating % OA 8.9 8.9 cfm/ft - ' 57 crmlt -'n 53C ft' ;'r 341.20 Pt_i /hrft 35.17 -17.36 No °eople 1 -3.5 0.0 0.0 0.0 0.0 -3.5 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR11 THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. AIRFLOWS Cooling 28 6 316 0 322 34 0 0 3'5 0 0 Heating 28 6 316 n 63.3 0.0 0.0 n 73.3 00 I 0 0.0 0.0 0 0.0 0 r• Tr" ^: E ®700v4.1 cal ;'a a , rn , Alternative -1 R;.r.'i (1 r +nrt Page in �? Conference 112 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Room Checksums By hultrJbhu COOLING COIL PEAK Peaked at Time: Mo/Hr.. 8 / 9 Outside Air. OADBIWB/HR: 67 / 59 / 62 CLG SPACE PEAK Mo/Hr. 7 / 9 OADB: 67 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Let Total Of Total Sensible Of Total Btu/h Btu/h Btu/h ( %) Btu/h ( %) Envelope Loads Skylite Solar 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0 0.00 0 0.00 Roof Cond 0 -28 -28 -0.49 0 0.00 Glass Solar 4,224 0 4,224 72.84 4,272 75.05 Glass Cond -117 0 -117 -2.01 -120 -2.10 Wall Cond 76 35 111 1.92 105 1.84 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 0 0.00 Infiltration -26 -26 -0.45 -54 -0.95 Sub Total =---> 4,158 7 4,164 71.81 4,204 73.84 Internal Loads Lights 806 0 806 13.90 806 14.16 People 620 620 10.68 344 6.05 Misc 336 0 336 5.79 336 5.90 Sub Total => 1,762 0 1,762 30.38 1,486 26.11 Ceiling Load 10 -10 0 0.00 2 0.04 Ventilation Load 0 0 -121 -2.09 0 0.00 OvlUndr Sizing 0 0 0.00 0 0.00 Exhaust Heat -6 -6 -0.10 Sup. Fan Heat 0 0.00 Ret. Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total => 5,930 -9 5,799 100.00 5,692 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ovllindr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 -636 -134 0 0 -273 - 1,044 0 0 0 0 -66 0 0 -1,109 Coll Peak Percent Tot Sens Of Total Btu/h ( %) 0 0.00 O 0.00 -260 9.82 O 0.00 -636 24.03 -195 7.38 O 0.00 O 0.00 -273 10.29 -1,365 51.53 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 -1,271 47.98 O 0.00 39 -1.46 0 0.00 O 0.00 0 0.00 -52 1.95 -2,648 100.00 Main CIg 0.5 5.8 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.5 5.8 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F gdlb 5.4 0.0 0.0 259 0 0 74.3 0.0 0.0 60.0 55.8 0.0 0.0 0.0 0.0 Leave DBIWBIHR °F °F grit) 55.0 52.0 53.9 0.0 0.0 0.0 0.0 0.0 0.0 Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft' ( %) 197 0 0 197 0 0 113 24 21 Main Htg Aux Htg Preheat Humldif Opt Vent Total NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR1HAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 71.9 Plenum 75.2 67.0 Return 75.2 67.0 RetIOA 74.3 62 9 Fn MtrTD 0.0 0.0 Fn BIdmD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MlnStop /Rh Return Exhaust Rm Exh Auxil % OA cfm /ft' cfm /ton ft /ton Btu/hr-ft' No. People AIRFLC =VS Cooling 28 0 265 33 0 0 Heating 28 6 ,50 265 33 0 ENGINEERING CKS Cooling Floating 10.6 10.6 • 32 1.32 01 1 77 38 %9 nR -13.45 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -2.7 0.0 0.0 0.0 0.0 -2.7 259 0 0 62.6 0.0 0.0 Lvg °F 71.9 0.0 0.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v4.1 calculated at 02:1F r ^:+ ..r1 0 717417 1 ^ , Alternative -1 Room Checksums re,...,, Cirriculum Director 113 Room Checksums By huliz/bhu COOLING COIL PEAK Peaked at Time: MolHr. 8 / 9 Outside Air. OADB/WB/HR: 67 / 59 / 62 CLG SPACE PEAK Mo/Hr. 7 /9 OADB: 67 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btulh (%) Btu/h (%) Envelope Loads Skylite Solar 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0 0.00 0 0.00 Roof Cond 0 -28 -28 -0.49 0 0.00 Glass Solar 4,224 0 4,224 72.77 4,272 74.98 Glass Cond -117 0 -117 -2.01 -120 -2.10 Wall Cond 76 35 111 1.92 105 1.84 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 0 0.00 Infiltration -26 -26 -0.45 -54 -0.95 Sub Total => 4,157 7 4,164 71.74 4,203 73.78 Internal Loads Lights 809 0 809 13.94 809 14.20 People 622 622 10.71 345 6.06 Misc 337 0 337 5.81 337 5.92 Sub Total => 1,768 0 1,768 30.46 1,492 26.18 Ceiling Load 10 -10 0 0.00 2 0.04 Ventilation Load 0 0 -122 -2.09 0 0.00 Ov/Undr Sizing 0 0 0.00 0 0.00 Exhaust Heat -6 -6 -0.10 Sup. Fan Heat 0 0.00 Rat Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total => 5,936 -10 5,805 100.00 5,698 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mohr: 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 -636 -134 0 0 -274 -1,044 0 0 0 0 -66 0 0 Coil Peak Percent Tot Sens Of Total Btu/h ( %) 0 0.00 O 0.00 -261 9.83 0 0.00 -636 23.98 -195 7.36 O 0.00 O 0.00 -274 10.31 -1,366 51.48 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 - 1,275 48.05 O 0.00 39 -1.47 O 0.00 0 0.00 0 0.00 -51 1.93 -2,654 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gull) Main CIg 0.5 5.8 5.4 Aux Clg 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 Total 0.5 5.8 259 74.3 60.0 55.8 0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 52.0 53.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C :WIechLoad.trc Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 198 0 0 198 0 0 113 24 21 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humldif Opt Vent Total NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 71.9 Plenum 75.2 67.0 Return 75.2 67.0 Ret/OA 74.3 62.6 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxii AIRFLOWS Cooling 28 6 259 0 265 34 0 0 Heating 28 6 259 0 265 34 0 0 OA cfm /ft cfm /ton ft'lton Btulhr•ft No. People ENGINEERING CKS Cooling Heating 10.7 10.7 1.31 1.31 535.99 408.45 29.38 -13.43 1 -2.7 0.0 0.0 0.0 0.0 -2.7 259 0 0 62.6 0.0 0.0 Lvg °F 71.9 0.0 0.0 0 0.0 0.0 0 0.0 TRACE® 700 v4.1 calculated at G2. k ; Alternative -1 Room Checksum< < , Page 5 of 29 COOLING COIL PEAK Peaked at Time: Mc/Hr. 7 / 14 CLG SPACE PEAK MalHc. 7 / 17 HEATING COIL PEAK Mo/Hr. 13 / 1 TEMPERATURES Cooling Heating Outside Air. OADBM/B/HR: 79 / 64 / 67 OADB: 78 OADB: 26 SADB 59.9 71.4 Plenum 75.2 66.9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.2 66.9 Sens. + Let. Sens. I. Let Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.4 54.7 Btu/h Btu/h Btu/h ( %) Btu/h (%) Btu/h Btu/h ( %) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0.00 0 0.00 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0.00 Roof Cond 0 24 24 3.32 0 0.00 Roof Cond 0 -92 15.32 Glass Solar 0 0 0 0.00 0 0.00 Glass Solar 0 0 0.00 Glass Cond 0 Wall Cond 0 0 0 0 0 0.00 0.00 0 0 0.00 0.00 Glass Cond Wall Cond 0 0 0 0.00 0 0.00 AIRFLOWS Partition 0 0 0.00 0 0.00 Partition 0 0 0.00 Cooling Heating Exposed Floor 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 Vent 10 10 Infiltration 12 12 1.68 7 1.31 Infiltration -97 -97 16.09 Infll 2 2 Sub Total => 12 24 36 5.00 7 1.31 Sub Total => -97 -189 31.42 Supply 33 33 MinStop /Rh 0 0 Internal Loads Internal Loads Return 35 35 Lights 287 0 287 40.02 287 52.67 lights 0 0 0.00 Exhaust 12 12 People 220 220 30.75 122 22.48 People 0 0 0.00 Rm Exh 0 0 Misc 119 0 119 16.68 119 21.95 Misc 0 0 0.00 Aux!' 0 0 Sub Total = => 626 0 626 87.45 529 97.10 Sub Total => 0 0 0.00 Ceiling Load 4 Ventilation Load 0 -4 0 0 56 0.00 7.85 9 0 1.59 0.00 Ceiling Load Ventilation Load -25 0 0 -452 0.00 75.01 ENGINEERING CKS Ov /Undr Sizing 0 0 0.00 0 0.00 Ov/Undr Sizing 0 0 ' .::J Cooling Heating Exhaust Heat -2 -2 -0.31 Exhaust Heat 15 -2.45 % OA 29.9 29.9 Sup. Fan Heat 0 0.00 OA Preheat Diff. 0 0.00 cfm /ft 0.47 0.47 Ret. Fan Heat 0 0 0.00 RA Preheat Diff. 0 0.00 cfm /ton 548.40 Duct Heat Pkup 0 0 0.00 Additional Reheat 0 0.00 ft'lton 1,172.70 Reheat at Design 0 0.00 System Plenum Heat 24 -3.97 Btu/hrdt 10.23 -8.61 No. People 0 Grand Total -> 642 18 716 100.00 544 100.00 Grand Total => -122 -602 100.00 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F grub °F °F gr/lb ft ( %) MBh cfm °F °F Main Clg 0.1 0.7 0.6 33 76.4 63.1 66.3 59.9 55.8 61.0 Floor 70 Main Htg -0.6 33 54.7 71.4 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 ExFir 0 Preheat -0.2 33 54.7 59.9 Roof 70 0 0 Total 0.1 0.7 Wall 0 0 0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -0.6 Hallway 114 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Room Checksums By hultz/bhu TRACE® 700 v4.1 cai^u!ated at 02 PM on 07/24/2003 Altemative -1 :oorn Checksums report Page 17 of 29 ' NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR - THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Workroom 115 Room Checksums By hultz/bhu Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total Loads Lights People Misc Sub Total => Ceiling Load 20 Ventilation Load Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK Peaked at Time: M&Hr. 7 / 14 Outside Air. OADB/WB/HR: 79 / 64 / 67 Space Sens. + Lat. Btulh 0 0 0 0 0 0 0 0 66 66 1,573 1,208 655 3,436 3,523 Plenum Sens. + Let Btulh 0 0 130 0 0 0 Net Percent Total Of Total Btulh (X) 0 0.00 0 0.00 130 3.32 0 0.00 0 0.00 0 0.00 O 0.00 O 0.00 66 1.68 130 197 5.00 0 1,573 40.02 1,208 30.75 0 655 16.68 0 3,436 87.45 -20 0 0.00 0 0 308 7.85 0 0 0.00 -12 -12 -0.31 O 0.00 0 0 0.00 0 0 0.00 O 0.00 98 3,929 100.00 CLG SPACE PEAK Mo/Hr.. 7 / 17 OADB: 78 Space Percent Sensible Of Total Btulh (°lo) 1,573 671 655 2,899 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 39 1.31 39 1.31 48 0 0 52.67 22.48 21.95 97.10 1.59 0.00 0.00 2,986 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total =--> Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat 01ff. RA Preheat fliff. Additions; Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mohr. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h Coil Peak Percent Tot Sens Of Total Btu/h ( %) 0 0 0.00 0 0 0.00 O -506 15.32 0 0 0.00 0 0 0.00 0 o 0.00 0 0 0.00 0 0 0.00 -532 -532 16.09 -532 -1,038 31.41 O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -138 0 0.00 0 -2,479 75.01 O 0 0.00 81 -2.45 0 0.00 0 0.00 0 0.00 131 -3.97 -669 -3,304 100.00 COOLING Total Capacity Sens Cap. ton MBh MBh Main Clg 0.3 3.9 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.3 3.9 3.3 0.0 0.0 COIL SELECTION Coil Airflow Enter DBIWBIHR cfm °F °F gr /lb 180 76.4 0 0.0 0 0.0 63.1 66.3 0.0 0.0 0.0 0.0 Leave DBIWB/HR °F °F grub 59.9 55.8 61.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft' ( %) 384 0 0 384 0 0 0 0 0 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooiirc Heating SADB 59.9 71.4 Plenum 75.2 66.9 Return 75.2 66.9 Ret/OA 76.4 54.7 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infll Supply MinStop/Rh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 54 12 180 0 191 65 0 0 Heating 54 12 180 0 191 65 0 0 % OA cfm /ft' cfm/ton ft'lton Btulhr•ft' No. People ENGINEERING CKS Cooling Heating 29.9 29.9 0.47 0.47 548.40 1,172.70 10.23 -8.61 3 HEATING COIL SELECTION Capacity Colt Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif ,■• Total -3.3 0.0 -1.0 0.0 0.0 -3.3 fns F4 7 0 0.0 180 54 Lvg °F 71.4 0.0 59.9 0 0 0 0.0 0 0.0 TR.J'f: =', 7 00 vk_1 calculated at 02:18 FM on 07/24i2iU3 Fa:: - ; ' ::.Gull Checksums report Page 29 of 29 Breakroom 116 Room Checksums By hultz/bhu COOLING COIL PEAK Peaked at Time: Mo/Hr. 7 / 9 Outside Air. OADBNVB/HR: 67 / 57 / 57 Space Plenum Net Sens. + Let Sens. + Let Total Btu/h Btu/h Btu/h Envelope Loads Skylite Solar 0 0 0 Skylite Cond 0 0 0 Roof Cond 0 -20 -20 Glass Solar 8,544 0 8,544 Glass Cond -239 0 -239 Wall Cond 199 94 293 Partition 0 0 Exposed Floor 0 0 Infiltration -64 -64 Sub Total => 8,440 74 8,514 Internal Loads Lights 1,158 0 1,158 People 890 890 Misc 483 0 483 Sub Total => 2,530 0 2,530 Ceiling Load 15 -15 0 Ventilation Load 0 0 -298 OvlUndr Sizing 0 0 Exhaust Heat -9 -9 Sup. Fan Heat 0 Ret. Fan Heat 0 0 Duct Heat Pkup 0 0 Reheat at Design 0 Percent Of Total ( %) 0.00 0.00 -0.18 79.57 -2.23 2.73 0.00 0.00 -0.59 79.29 10.78 8.29 4.49 23.56 0.00 -2.77 0.00 -0.08 0.00 0.00 0.00 0.00 Grand Total => 10,986 50 10,738 100.00 CLG SPACE PEAK MoMr.7 /9 OADB: 67 Space Percent Sensible Of Total Btu/h ( %) 0 0.00 0 0.00 0 0.00 8,544 80.63 -239 -2.26 199 1.88 0 0.00 0 0.00 -77 -0.73 8,427 79.52 1,158 10.93 494 4.66 483 4.55 2,135 20.15 35 0.33 0 0.00 0 0.00 10,597 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mohr. 13/1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 -1,273 -255 0 0 -391 -1,920 0 0 0 0 -101 0 0 -2,021 Coil Peak Percent Tot Sens Of Total Btu/h ( %) 0 0.00 O 0.00 -373 8.48 0 0.00 -1,273 28.96 - 372 8.47 0 0.00 O 0.00 -391 8.90 - 2,410 54.81 O 0.00 O 0.00 0 0.00 O 0.00 0 0.00 -1,825 41.51 0 0.00 60 -1.36 0 0.00 0 0.00 O 0.00 - 221 5.03 -4,396 100.00 Main Clg Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR ton MBh MBh cfm °F °F grill) 0.9 10.7 10.3 482 74.5 59.8 54.6 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.9 10.7 Leave DBNVBIHR °F °F gr/lb 55.0 51.8 53.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 283 0 0 283 0 0 218 48 22 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 71.8 Plenum 75.2 66.9 Return 75.2 66.9 ReUOA 74.5 63.5 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent infil Supply MinStoplRh Return Exhaust Rm FY" Auxii r tDFI.OWS Cooling 40 8 482 0 491 48 0 0 Heating 40 8 482 0 491 48 0 0 ENGINEERING CKS Cooling % OA 8.2 cfm/ft 1.71 cfmlton 538.88 fN /ton 315.98 Btu /hr•f 2 37.98 No. People 2 Heating R2 55 Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm ° F °F Main Htg Aux Htg Preheat -4.4 0.0 0.0 0.0 0.0 -4.4 482 0 0 63.5 0.0 0.0 71.8 0.0 0.0 0 0.0 0.0 0 0.0 0.0 TRACE 700 vA . .,i n7. }8 i'.' ui,i`_4 ;tC•C' Alternative -1 Roan Checks ims report Page 2 c; MDF 117 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK Peaked at Time: Outside Air. Space Sens. + Lat. Btu/h Mohr. 7 / 14 OADBNVB/HR: 79 / 64 / 67 Plenum Sens. + Lat Btu/h Net Percent Total Of Total Btu/h (1) 0 0 0 0.00 0 0 0 0.00 0 26 26 0.10 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0.00 0 0 0.00 39 39 0.16 39 26 64 0.26 CLG SPACE PEAK MoiHr..7 /15 OADB: 80 307 0 307 1.24 307 236 236 0.95 131 24,000 0 24,000 96.83 24,000 24,543 0 24,543 99.02 24,438 0 0 0 0.00 1 0 0 179 0.72 0 0 0.00 0 0 0 0.00 0 0.00 0 0 0.00 0 0 0.00 0 0.00 0 24,582 25 24,787 100.00 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 0 0 12 12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.05 1.26 0.54 98.15 99.95 0.00 0.00 0.00 24,451 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK MoHr.. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 -104 -104 -106 Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0.00 O 0.00 -101 0.63 0 0.00 O 0.00 0 0.00 0 0.00 O 0.00 -104 0.65 -205 1.28 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -2 0 0.00 0 -484 3.03 0 0 0.00 1 -0.01 0 0.00 O 0.00 - 15,311 95.70 0 0.00 - 15,999 100.00 Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F grub 2.1 0.0 0.0 24.8 0.0 0.0 2.1 24.8 24.5 0.0 0.0 1,113 75.1 0 0.0 0 0.0 58.9 49.6 0.0 0.0 0.0 0.0 Leave DBIWBIHR °F ° F grub 55.0 50.7 49.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Room Checksums By hultz/bhu Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 75 0 0 75 0 0 0 0 0 Main Htg Aux Htg Preheat Humidif Opt Vent Total NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR tHAN THIS NOTICE iT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 68.1 Plenum 75.0 67.9 Return 75.0 67.9 Ret/OA 75.1 67.5 Fn MtrTD 0.0 0.0 Fn BldTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Intl Supply MinStop /Rh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 10 2 1,113 1,113 1,115 13 0 0 Heating 10 2 1,113 1,113 1,115 13 0 0 ENGINEERING CKS % OA cfmlft cfm/ton ft .;1 Btulhr•ft `^ - 213.32 No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F - 16.0 0.0 0.0 0.0 0.0 - 16.0 Cooling 0.9 14.84 G::p 58 1,1;3 0 0 55.0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 '''-`'. ._03 700 v4.1 f,,71 ,:u at 02: i6 I on 07/24/2003 "7•.;:..111 Checksums rer- r'71,E. 21 cf 29 Heating 0.9 14.84 68.1 0.0 0.0 Electrical 118 COOLING COIL PEAK Peaked at Time: Mo/Hr 7 / 14 Outside Air. OADBMIB/HR: 79 / 64/67 Space Plenum Sens. + Lat. Sens. + Let Btu/h Btu/h Envelope Loads Skylite Solar 0 0 0 Skylite Cond 0 0 0 Roof Cond 0 23 23 Glass Solar 0 0 0 Glass Cond 0 0 0 Wall Cond 0 0 0 Partition 0 0 Exposed Floor 0 0 Infiltration 20 20 Sub Total => 20 23 43 Internal Loads Lights 274 0 274 People 211 211 Misc 114 0 114 Sub Total => 600 0 600 Ceiling Load 4 -4 0 Ventilation Load 0 0 94 Ov /Undr Sizing 0 0 Exhaust Heat 0 0 Sup. Fan Heat 0 Rot. Fan Heat 0 0 Duct Heat Pkup 0 0 Reheat at Design 0 Grand Total => 623 19 737 Net Percent Total Of Total Btu/h (%) 0.00 0.00 3.09 0.00 0.00 0.00 0.00 0.00 2.75 5.84 37.23 28.61 15.51 81.36 0.00 12.81 0.00 0.00 0.00 0.00 0.00 0.00 100.00 CLG SPACE PEAK Mo/Fir. 7 / 18 OADB: 76 Space Percent Sensible Of Total Btu/h (%) 0 0 0 0 0 0 0 0 2 2 274 117 114 506 8 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.47 0.47 53.12 22.67 22.13 97.92 1.61 0.00 0.00 517 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mohr. 13/1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 -93 -93 0 0 0 0 -24 0 0 -117 Coil Peak Percent Tot Sens Of Total Btu/h ( %) 0 0.00 O 0.00 -88 15.59 O 0.00 O 0.00 0 0.00 O 0.00 O 0.00 -93 16.37 -181 31.95 O 0.00 0 0.00 O 0.00 0 0.00 0 0.00 -432 76.30 0 0.00 0 0.00 O 0.00 0 000 0 0.00 47 -8.25 -567 100.00 Main Clg Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb 0.1 0.0 0.0 0.7 0.0 0.0 0.1 0.7 0.6 0.0 0.0 24 76.9 0 0.0 0 0.0 62.4 62.6 0.0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gdlb 55.0 51.5 52.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Room Checksums By hultz/bhu Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft ( %) 67 0 0 67 0 0 0 0 0 Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat -0.6 0.0 -0.1 24 0 24 50.6 0.0 50.6 72.5 0.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 - 0.6 TRACE® 700 ..i I calculated at 02:18 PM on 07/24/2003 Attemative -1 Room Checksums report Per.? ' NOTICE: THIS NOTICE ITS DUE TO IN THE QUALITY OF THE DOCUMENT. N TH TEMPERATURES Cooling Heating SADB 55.0 72.5 Plenum 75 2 66.9 Return 75.2 66.9 Ret/OA 76.9 50.6 F. NrtrTD 0.0 u.0 Fn HidTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MlnStop/Rh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 9 2 24 0 14 0 11 0 Heating g 2 24 0 14 0 11 0 cfm/ft cfm /ton ft'lton Btulhr•ft No. People ENGINEERING CKS Cooling Heating 39.9 39.9 0.35 0.35 382.76 1,090.92 11.00 -8.46 0 File Room 119 Room Checksums By hultz/bhu Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Gass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK Peaked at Time: MolHr. 7 / 14 Outside Air. OADBNVB/HR: 79 / 64 / 67 Space Sens. + Lat Btu/h Plenum Sens. + Lat Btulh Net Percent Total Of Total Btu/h (%) O 0 0 0.00 0 0 0 0.00 0 61 61 3.09 O 0 0 0.00 0 0 0 0.00 0 0 0 0.00 O 0 0.00 0 0 0.00 54 54 2.75 54 61 116 5.84 737 0 737 37.23 566 566 28.61 307 0 307 15.51 1,611 0 1,611 81.36 10 -10 0 0.00 0 0 254 12.81 0 0 0.00 0 0 0.00 0 0.00 0 0 0.00 0 0 0.00 0 0.00 1,675 52 1,980 100.00 CLG SPACE PEAK MotHr. 7 / 18 OADB: 76 Space Percent Sensible Of Total Btu/h ( %) 0 0 0 0 0 0 0 0 6 6 737 315 307 1,359 22 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.47 0.47 53.12 22.67 22.13 97.93 1.61 0.00 0.00 1,388 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total =--> Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat DIff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mo/Hr. 13 / 1 OADB: 26 Space Peak Space Sens Btulh 0 0 0 0 0 0 0 0 -249 -249 0 0 0 0 -65 0 0.00 0 -1,162 76.30 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 126 -8.25 -314 CoII Peak Percent Tot Sens Of Total Btulh (%) O 0.00 0 0.00 -237 15.59 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -249 16.37 -487 31.95 O 0.00 0 0.00 0 0.00 0 0.00 -1,523 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR Leave DBIWBIHR ton MBh MBh cfm °F °F gr/lb °F °F gr/lb Main Cig 0.2 2.0 1.6 63 76.9 62.4 62.6 Aux Cig 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 02 2.0 55.0 51.5 52.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Floor Part ExFIr Roof Wall AREAS Gross Total Glass n= (%) 180 0 0 180 0 0 0 0 0 Main Htg Aux Htg Preheat Humidif Opt Vent Total TEMPERAT UPES Cooling Heating SADB s� 72.5 Plenum 75.2 66.9 Retum 75.2 66.9 Ret/OA 76.9 50.6 Fn MtrTD ^ 0 0.0 Fn BIddTD 0.0 0.0 Fr. Frict 0.0 0.0 AIRFLOWS Cooling Heating Vent 25 25 Infil 5 5 Supply 63 63 MinStopIRh 0 0 Return 38 38 Exhaust 0 0 Rm Exh 31 31 Auxil 0 0 % OA cfmlft' cfm /ton • 'lton "u /heft? r{^ People ENGINEERING CKS Cooling Heating 39.9 39.9 0.35 0.35 382.76 1,090.93 11.00 -8.46 1 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F - 1.5 0.0 -0.3 0.0 0.0 - 1.5 n:1cFrn7nn..± ..f n9.111 PM on 07/24,2.33 Alternative -1 Room Checksums report Page 13 of 29 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 63 50.6 0 0.0 63 sn6 Lvg °F 72.5 0.0 55.0 0 0.0 0.0 0 0.0 0.0 r Hallway 120 COOLING COIL PEAK Peaked at Time: Mo/Hr. 7 / 14 Outside Air. OADBPNB/HR: 79 / 64 / 67 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc CLG SPACE PEAK Mo/Hr. 6 / 19 OADB: 69 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (%) Btu/h (%) Envelope Loads Skylite Solar 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0 0.00 0 0.00 Roof Cond 0 53 53 1.72 0 0.00 Glass Solar 1,085 0 1,085 34.95 1,435 56.45 Glass Cond 92 0 92 2.98 -130 -5.12 Wall Cond 8 10 18 0.57 7 0.27 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 0 0.00 Infiltration 74 74 2.37 -33 -1.31 Sub Total => 1,259 63 1,322 42.59 1,279 50.29 Internal Loads Lights 666 0 666 21.44 666 26.18 People 511 511 16.47 284 11.17 Misc 277 0 277 8.93 277 10.91 Sub Total =--> 1,454 0 1,454 46.85 1,227 48.26 Ceiling Load 26 -26 0 0.00 37 1.45 Ventilation Load 0 0 343 11.06 0 0.00 Ov /Undr Sizing 0 0 0.00 0 0.00 Exhaust Heat -15 -15 -0.50 Sup. Fan Heat 0 0.00 Ret. Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total =--> 2,739 22 3,104 100.00 2,542 100.00 Room Checksums By hultz/bhu Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor infiltration Sub Total => Internal Loads Lights People Misc Sub Total ==> Grand Total => Main Cig Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/Ib 0.3 0.0 0.0 3.1 0.0 0.0 0.3 3.1 2.6 0.0 0.0 116 76.3 0 0.0 0 0.0 60.6 55.3 0.0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 51.0 50.2 0.0 0.0 0.0 0.0 0.0 0.0 Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat HEATING COIL PEAK MalHc 13 / 1 OADB: 26 Space Peak Space Sens Btu/h Coil Peak Percent Tot Sens Of Total Btu/h (%) 0 0 O 0 0 -215 0 0 -928 -928 -27 -61 0 0 O 0 -225 -225 -1,180 -1,429 0 0 0 0 -54 0 0.00 0 -1,049 43.90 O 0 0.00 32 -1.32 0 0.00 O 0.00 O 0.00 57 -2.40 -1,234 Floor Part ExFIr Roof Wall AREAS Gross Total Glass Il ( %C) 163 0 0 163 0 0 63 35 56 0 0 0 0 f).00 0.00 g 99 0.00 .7885 0.00 0.00 0 59.6E 0.00 0.00 0.00 0.00 -2,389 100.00 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEARTHAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 77.7 Plenum 75.5 67.0 Return 75.5 67.0 Ret/OA 76.3 58.9 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MinStop/Rh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 23 5 116 0 121 28 0 0 TRACE® 700 v4.1 at ^2:18 PM A;i�r mtive -1 Room Checksums report Par,_. Heating 23 5 116 0 121 28 0 0 % OA cfm/ft' cfm/ton ft' /ton Btu /hr•ft' No. People ENGINEERING CKS Cooling Heating 19.6 19.6 0.71 0.71 447.21 628.18 19.10 -1 1 HEATING COIL SELECTION Capacity Coll Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -2.4 0.0 0.0 0.0 0.0 -2.4 116 0 0 58.9 0.0 0.0 77.7 0.0 0.0 0 0.0 0.0 0 0.0 0.0 Executive Assistants 121 COOLING COIL PEAK Peaked at Time: Mo/Hr. 7 / 14 Outside Air. OADBIWBIHR: 79 / 64 / 67 Space Sens. + Lat. Btu/h Internal Loads Lights 1,544 People 1,186 Misc 643 Sub Total => 3,374 Plenum Sens. + Lat Btu/h Envelope Loads Skylite Solar 0 0 Skylite Cond 0 0 Roof Cond 0 124 Glass Solar 496 0 Glass Cond 42 0 Wall Gond 76 28 Partition 0 Exposed Floor 0 infiltration 163 Sub Total => 777 152 0 0 0 Ceiling Load 61 -61 Ventilation Load 0 0 Ov/Undr Sizing 0 Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total 4,211 - 36 0 0 Net Percent Total Of Total Btu/h (%) 0 0 124 496 42 104 0 0 163 928 1,544 1,186 643 3,374 0 758 0 -36 0 0 0 0 0.00 0.00 2.47 9.87 0.84 2.06 0.00 0.00 3.24 18.48 30.73 23.61 12.80 67.15 0.00 15.08 0.00 -0.71 0.00 0.00 0.00 0.00 56 5,024 100.00 CLG SPACE PEAK Mo/Hc. 6 / 19 OADB: 69 Space Percent Sensible Of Total Btu/h ( %) 0 0.00 0 0.00 0 0.00 656 18.25 -60 -1.66 143 3.98 0 0.00 0 0.00 -77 -2.14 662 18.43 1,544 42.96 659 18.34 643 17.90 2,846 79.20 85 2.37 0 0.00 0 0.00 3,594 100.00 Envelope Loads Skyfite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load OvlUndr Sizing Exhaust Heat OA Preheat Dlff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK MatHc. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 -424 -247 0 0 -522 -1,193 0 0 0 0 -124 0 0 -1,318 Coil Peak Percent Tot Sens Of Total Btu/h ( %) O 0.00 0 0.00 -498 12.85 O 0.00 -424 10.94 -339 8.74 O 0.00 0 0.00 -522 13.46 -1,783 45.99 O 0.00 0 0.00 O 0.00 O 0.00 O 0.00 -2,433 62.75 0 0.00 73 -1.89 O 0.00 0 0.00 0 0.00 266 -6.85 -3,878 100.00 Main Cig Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F gr/Ib 0.4 0.0 0.0 5.0 0.0 0.0 0.4 5.0 3.9 0.0 0.0 164 76.8 0 0.0 0 0.0 61.4 57.9 0.0 0.0 0.0 0.0 Leave DBIWBIHR °F °F grub 55.0 50.4 48.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Room Checksums By hultz/bhu Floor Part ExFir Roof Wall AREAS Gross Total Glass ft ( %) 377 0 0 377 0 0 170 16 9 Main Htg Aux Htg Preheat Humidif Opt Vent Total TEMPERATURES Cooling Heating SADB 55.0 75.3 Plenum 75.5 67.0 Return 75.5 67.0 RetIOA 76.8 53.8 Fn MtrTD 0.0 0.0 Fn BldTD 0.0 0.0 Fn Frict 0.0 Vent infil Supply MinStopIRh Return Exhaust Rm Exh Auxil % OA cfmlft cfm/ton Felton Btulhr•ft No. People -3.9 0.0 -0.2 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEARTHAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. AIRFLOWS Cooling 53 11 164 0 175 64 0 0 164 0 164 Heating 53 11 164 0 175 64 0 0 ENGINEERING CKS Cooling Heating 32.2 32.2 0.43 0.43 390.63 900.41 13.33 -10.29 3 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F 53.8 0.0 53.8 75.3 0.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -3.9 TP,ACEt 700 v4.1 calculated at 02 :1 ,.4,2003 Alternative - I Renrr Checksums report Page 12 of 29 COOLING COIL PEAK Peaked at Time: MolHr. 8 / 9 CLG SPACE PEAK Mo/Hr: 7 / 9 HEATING COIL PEAK Ma/Hr. 13 / 1 TEMPERATURES Cooling Heating Outside Air. OADB/W13/HR: 67 / 59 / 62 OADB: 67 OADB: 26 SADB 55.0 71.9 Plenum 75.2 66.9 Space Plenum Net Percent Space Percent Space Peak Coll Peak Percent Return 75.2 6. 9 Sens. + Let. Sens. + Let Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret1OA 74.2 62.1 Btu/h Btu/h Btu/h (X) Btu/h ( %) Btu/h Btu/h ( %) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0.00 0 • 0.00 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0.00 Roof Cond 0 -33 -33 -0.54 0 0.00 Roof Cond 0 -298 10.21 Glass Solar 4,224 0 4,224 70.11 4,272 72.04 Glass Solar 0 U 0.00 Glass Cond -117 Wall Cond 76 0 35 -117 112 -1.94 1.85 -120 -2.02 105 1.77 Glass Cond Wall Cond -636 -135 -636 21.80 -196 6.70 AIRFLOWS Partition 0 0 0.00 0 0.00 Partition 0 0 0.00 Cooling Heating Exposed Floor 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 Vent 32 32 Infiltration -31 -31 -0.52 -62 -1.04 Infiltration -313 -313 10.72 Infll 7 7 Sub Total =--> 4,152 3 4,155 68.96 4,196 70.75 Sub Total =--> -1,084 -1,443 49.42 Supply 270 270 MinStop/Rh 0 0 Internal Loads Internal Loads Return 277 277 Lights 926 0 926 15.36 926 15.61 Lights 0 0 0.00 Exhaust 38 38 People 711 711 11.80 395 6.66 People 0 0 0.00 Rm Exh 0 0 Misc 386 0 386 6.40 386 6.50 Misc 0 0 0.00 Auxil 0 0 Sub Total => 2,022 0 2,022 33.57 1,706 28.77 Sub Total => 0 0 0.00 Ceiling Load 12 Ventilation Load 0 -12 0 0 -145 0.00 -2.41 28 0.47 0 0.00 Ceiling Load Ventilation Load -81 0 0 0.00 -1,459 49.96 ENGINEERING CKS OvlUndr Sizing 0 0 0.00 0 0.00 Ov/Undr Sizing 0 0 0.00 Cooling Heating Exhaust Heat -7 -7 -0.12 Exhaust Heat 48 -1.63 % OA 11.7 11.7 Sup. Fan Heat 0 0.00 OA Preheat Diff. 0 0.00 cfm /ft 1.19 1.19 Ret. Fan Heat 0 0 0.00 RA Preheat DIN. 0 0.00 cfmlton 537.46 Duct Heat Pkup 0 0 0.00 Additional Reheat 0 0.00 ft= /ton 450.11 Reheat at Design 0 0.00 System Plenum Heat -66 2.26 Btu /heft 26.66 -12.92 No. People 2 Grand Total => 6,187 -16 6,025 100.00 5,930 100.00 Grand Total => -1,165 -2,920 100.00 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR Leave DBIWBIHR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F grub °F °F grub ft ( %) MBh cfm °F °F Main Clg 0.5 6.0 5.5 270 74.2 60.1 56.1 55.0 52.1 54.2 Floor 226 Main Htg -2.9 270 62.1 71.9 Aux Cig 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 ExFlr 0 Preheat 0.0 0 0.0 0.0 Roof 226 0 0 Total 0.5 6.0 Wall 113 24 21 Humldif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -2.9 Conference 122 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Room Checksums By hultr/bhu TRAC 700 v4.1 calculated at 02:18 PM on 07/24/2003 Alternative - 1 Room Checksums report Page 7 of 29 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. COOLING COIL PEAK Peaked at Time: Mohr. 8 / 9 CLG SPACE PEAK Mohr. 7 / 9 HEATING COIL PEAK Mo/Hr. 13 / 1 TEMPERATURES Cooling Heating Outside Air: OADB/WB/HR: 67159 / 62 OADB: 67 OADB: 26 SADB 55.0 72.0 Plenum 75.2 66.9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.2 66.9 Sens. + Lat Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total RetIOA 74.3 P^ Btu/h Btu/h Btu/h (X) Btu/h ( %) Btu/h Btu/h ( %) Fn MtrTD 0.0 ti 0 Envelope Loads Envelope Loads Fn BIdTD 0.0 C Skylite Solar 0 0 0 0.00 0 0.00 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0.00 Roof Cond 0 -30 -30 -0.50 0 0.00 Roof Cond 0 -272 9.72 Glass Solar 4,224 0 4,224 71.49 4,272 73.39 Glass Solar 0 0 0.00 Glass Cond Wall Cond -117 102 0 44 -117 145 -1.97 2.46 -120 140 -2.05 2.41 Glass Cond Wall Cond -636 -180 - 636 22.71 -255 9.10 AIRFLOWS Partition 0 0 0.00 0 0.00 Partition 0 0 0.00 Cooling Heating Exposed Floor 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 Vent 29 29 Infiltration -28 -28 -0.47 -57 -0.97 Infiltration -286 -286 10.20 intil 6 6 Sub Total =--> 4,182 14 4,195 71.01 4,236 72.77 Sub Total => -1,102 -1,450 51.73 Supply 265 265 MinStop /Rh 0 0 Internal Loads Internal Loads Return 271 271 Lights 846 0 846 14.31 846 14.53 Lights 0 0 0.00 Exhaust 35 35 People 650 650 11.00 361 6.20 People 0 0 0.00 Rm Exh 0 0 Misc 352 0 352 5.96 352 6.05 Misc 0 0 0.00 Auxil 0 0 Sub Total => 1,848 0 1,848 31.28 1,559 26.79 Sub Total => 0 0 0.00 Ceiling Load Ventilation Load 11 0 -11 0 0 -128 0.00 -2.17 26 0 0.44 0.00 Ceiling Load Ventilation Load -74 0 0 0.00 -1,333 47.57 ENGINEERING CKS OvlUndr Sizing 0 0 0.00 0 0.00 Ov /Undr Sizing 0 0 0.00 Cooling Heating Exhaust Heat -6 -6 -0.11 Exhaust Heat 44 - 1.56 % OA 10.9 10.9 Sup. Fan Heat 0 0.00 OA Preheat Di f. 0 0.00 cfm /ft 1.28 1.28 Ret. Fan Heat 0 0 0.00 RA Preheat Diff. 0 0.00 cfm /ton 537.97 Duct Heat Pkup 0 0 0.00 Additional Reheat 0 0.00 ft 419.40 Reheat at Design 0 0.00 System Plenum Heat -63 2.25 13tulhr•ft 28.61 -13.57 No. People 1 Grand Total => 6,040 -4 5,908 100.00. 5,821 100.00 Grand Total => -1,176 -2,802 100.00 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sena Cap. Coll Airflow Enter DBIWBIHR Leave DBIWB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfrn °F °F grub °F °F grub ft ( %) MBh cfm °F °F Main CIg 0.5 5.9 5.5 265 74.3 60.0 55.9 55.0 52.1 54.1 Floor 207 Main Htg -2.8 265 62.4 72.0 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 ExFIr 0 Preheat 0.0 0 0.0 0.0 Roof 207 0 0 Total 0.5 5.9 Wall 140 24 17 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -2.8 • Personal Manager 123 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Room Checksums By hultz/bhu "1 v4.1 calculated at 02:18 PM on 07/2' Alternative -1 Room Checksums report Page 25 29 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THIS NOTICE IT IS DUE TO THE QUALiTY OF THE DOCUMENT. 4 1 I Budget Manager /Assist 126 127 Envelope Loads Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 496 Glass Cond 42 Wall Cond 136 Partition 0 Exposed Floor 0 Infiltration 52 Sub Total => 726 Peaked at lime: Internal Loads Lights 1,244 People 956 Misc 518 Sub Total ==> 2,718 Ceiling Load 49 Ventilation Load 0 OvlUndr Sizing 0 Exhaust Heat Sup. Fan Heat Rat. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => 3,493 COOLING COIL PEAK Mo/Hr. 7 / 14 Outside Air. OADB/WB/HR: 79 / 64 / 67 Space Sens. + Lat. Btu/h Plenum Sens. + Let Btuth 0 0 100 0 0 50 150 -49 -29 0 0 0 0 100 496 42 186 0 0 52 876 0 1,244 956 0 518 0 2,718 0 Net Percent Total Of Total Btu/h ( %) 0 244 0 - 29 0 0 0 0 0.00 0.00 2.62 13.02 1.11 4.88 0.00 0.00 1.37 23.00 32.65 25.09 13.61 71.35 0.00 6.40 0.00 -0.75 0.00 0.00 0.00 0.00 72 3,810 100.00 CLG SPACE PEAK MoMr.7 /14 OADB: 79 Space Percent Sensible Of Total Btu/h ( %) 0 0.00 0 0.00 0 0.00 496 16.10 42 1.37 136 4.41 0 0.00 0 0.00 44 1.43 718 23.31 1,244 531 518 2,293 69 0 0 40.39 17.24 16.83 74.45 2.23 0.00 0.00 3,080 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mo/Hr. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 -424 -268 0 0 -421 -1,113 0 0 0 0 -100 0 0 -1,213 Coil Peak Percent Tot Sens Of Total Btu/h ( %) O 0.00 O 0.00 -401 12.10 0 0.00 -424 12.79 -366 11.05 O 0.00 O 0.00 -421 12.68 -1,613 48.62 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 -1,961 59.11 O 0.00 59 -1.78 0 0.00 0 0.00 0 0.00 197 -5.95 -3,317 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F grill) Main Cig 0.3 3.8 3.3 168 76.5 63.1 66.2 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.3 3.8 Leave DB/WB/HR °F °F gr/Ib 58.3 55.5 62.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Room Checksums By hultz/bhu Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft' ( %) 304 0 0 304 0 0 183 16 9 TEMPERATURES Cooling Heating SADB 58.3 74.6 Plenum 75.5 67.0 Return 75.5 67.0 Ret/OA 76.5 56.6 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 42 9 168 0 177 52 0 0 Heating 42 9 168 0 177 52 0 0 % OA cfm /ft' cfm/ton ft'/ton Btu/hrf 2 No. People ENGINEERING CKS Cooling Heating 25.3 25.3 0.55 0.55 528.98 956.73 12.54 -10.92 2 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -3.3 0.0 -0.3 0.0 0.0 -3.3 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 168 0 168 56a 0.0 56.6 Lvg °F 74.6 0.0 58.3 0.0 0.0 0 0.0 0.0 TRAr'Et 700 v4.1 calculated at 02.18 PM on 07/24/2003 Alternative -1 Room Checksums report Page 3 of 29 Bus Oper Manager 128 COOLING COIL PEAK Peaked at Time: Outside Air. Mo'Hr.7 /17 OADB/WB/HR: 78 / 62 / 58 CLG SPACE PEAK MotHr. 7 / 17 OADB: 78 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Let Total Of Total Sensible Of Total Btu/h Btu/h Btu/h (X) Btu/h ( %) Envelope Loads Skylite Solar 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0 0.00 0 0.00 Roof Cond 0 174 174 1.84 0 0.00 Glass Solar 6,916 0 6,916 73.18 6,916 78.80 Glass Cond 97 0 97 1.02 97 1.10 Wall Cond 251 109 360 3.81 251 2.86 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 0 0.00 infiltration 36 36 0.38 20 0.22 Sub Total =--> 7,300 283 7,583 80.24 7,283 82.99 Internal Loads Lights 786 0 786 8.32 786 8.96 People 604 604 6.39 336 3.82 Misc 328 0 328 3.47 328 3.73 Sub Total => 1,718 0 1,718 18.18 1,450 16.52 Ceiling Load 31 -31 0 0.00 43 0.49 Ventilation Load 0 0 168 1.77 0 0.00 Ov /Undr Sizing 0 0 0.00 0 0.00 Exhaust Heat -18 -18 -0.19 Sup. Fan Heat 0 0.00 Rat Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total => 9,049 234 9,451 100.00 8,776 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Dfff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mo/Hr. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 -1,379 -350 0 0 -266 -1,995 0 0 0 0 -63 0 0 -2,058 Coil Peak Percent Tot Sens Of Total Btu/h (%) O 0.00 0 0.00 -254 6.81 0 0.00 -1,379 37.03 -501 13.47 O 0.00 0 0.00 -266 7.14 - 2,400 64.45 O 0.00 O 0.00 0 0.00 O 0.00 0 0.00 -1,239 33.28 0 0.00 37 -1.00 0 0.00 O 0.00 0 0.00 -122 3.27 -3,724 100.00 Main Clg 0.8 9.5 Aux Cig 0.0 0.0 Opt Vent 0.0 0.0 Total 0.8 9.5 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBJWBIHR ton MBh MBh cfm °F °F grub 9.1 0.0 0.0 399 75.7 60.2 54.3 0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWBIHR °F °F grub 55.0 51.7 52.8 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Room Checksums By hultz/bhu Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 192 0 0 192 0 0 280 52 19 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -3.7 0.0 0.0 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 72.7 Plenum 75.5 67.0 Return 75.5 67.0 Ret/OA 75.7 64.2 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent lnfll Supply MinStoplRh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 27 27 6 6 399 399 0 0 405 405 33 33 0 0 0 0 % OA cfmlft= cfm/ton ft Btu /heft' No. People ENGINEERING CKS Cooling Floating 6.7 6.7 2.08 2.08 507.11 243.80 49.22 -19.39 1 399 0 0 64.2 0.0 0.0 Lvg °F 72.7 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -3.7 TRACE ® i!L; '.4. calculated at 02:18 i i on Alternative -1 Room Checksums report Page 4 of 79 • � °i��'r+ Z. Payroll 129 Room Checksums By hultz/bhu Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ==> Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total > COOLING COIL PEAK Peaked at Time: MolHr. 7 / 17 Outside Air. OADB/WBIHR: 78 / 62 / 58 Space Sens. + Let. Btu/h 0 0 0 0 0 203 6,552 0 67 0 197 99 0 0 40 6,855 302 917 705 382 2,005 0 8,896 Plenum Sens. + Let Btu/h 0 0 0 36 - 0 0 -21 0 0 245 Net Percent Total Of Total Btu/h ( %) 0 0 203 6,552 67 295 0 0 40 7,157 917 705 382 2,005 0 184 0 -21 0 0 0 0 0.00 0.00 2.18 70.26 0.72 3.17 0.00 0.00 0.42 76.75 9.84 7.56 4.10 21.50 0.00 1.98 0.00 -0.23 0.00 0.00 0.00 0.00 9,325 100.00 CLG SPACE PEAK Mohr. 7 / 17 OADB: 78 Space Percent Sensible Of Total Btu/h (%) 0 0 0 6,552 67 197 0 0 23 6,838 917 392 382 1,691 51 0 0 0.00 0.00 0.00 76.36 0.78 2.29 0.00 0.00 0.27 79.70 10.69 4.56 4.46 19.71 0.59 0.00 0.00 8,580 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mohr. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h Coil Peak Percent Tot Sens Of Total Btu/h ( %) O 0 0.00 0 0 0.00 0 -296 8.84 0 0 0.00 -955 -955 28.51 -153 -229 6.83 O 0 0.00 0 0 0.00 -310 -310 9.26 -1,418 -1,789 53.44 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 -74 0 0.00 0 -1,446 43.18 0 0 0.00 44 -1.30 0 0.00 0 0.00 0 0.00 -156 4.67 -1,492 -3,348 100.00 Main Cig Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /lb 0.8 9.3 8.9 390 75.7 60.3 54.8 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.8 9.3 Leave DB/WB/HR ° F °F gr/lb 55.0 51.8 53.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft (%) 224 0 0 224 0 0 140 36 26 Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat -3.4 0.0 0.0 0.0 0.0 -3.4 390 0 0 63.7 0.0 0.0 71.5 0.0 0.0 0 0.0 ^ 0 0 0.0 0.0 TRACES 7n^ " 'Plculated at 02:18 PM or 07/24/2003 Altematioe -1 Roan Checksums report Page 24 of 29 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR1HAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 71.5 Plenum 75.5 67.0 Return 75.5 67.0 Ret/OA 75.7 63.7 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MlnStoplRh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 31 7 390 0 397 38 0 0 Heating 31 7 390 0 397 38 0 0 % OA cfm /ft cfm/ton ft Btu/hr•ft No. People ENGINEERING CKS Cooling Heating 8.0 8.0 1.74 1.74 502.47 288.27 41.63 -14.95 2 File Room 130 Project Name: Tukwila School District Administration Building Dataset Name: C:1MechLoad.trc Room Checksums By hultz/bhu COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWBIHR ton MBh MBh cfm °F °F grub Main CIg 0.2 2.4 1.9 77 77.0 62.5 62.6 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.2 2.4 Leave DBIWBIHR °F °F grub 55.0 51.7 52.9 0.0 0.0 0.0 0.0 0.0 0.0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat Sup. Fan Heat RM. Fan Heat Duct Heat Pkup Reheat at Design Grand Total => COOLING COIL PEAK Peaked at Time: Mo/Hr 7 / 14 Outside Air. OADB/WB/HR: 79 / 64 / 67 Space Sens. + Lat Btulh 0 0 0 0 0 0 0 0 66 66 885 680 369 1,933 2,033 Plenum Sens. + Lat Btu/h 0 0 71 0 0 0 Net Percent Total Of Total Btulh (%) 0 0.00 0 0.00 71 2.99 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 66 2.76 71 137 5.75 0 885 37.25 680 28.62 0 369 15.52 0 1,933 81.38 35 -35 0 0.00 0 0 306 12.87 0 0 0.00 0 0 0.00 0 0.00 0 0 0.00 0 0 0.00 0 0.00 36 2,375 100.00 CLG SPACE PEAK MolHr. 7 / 18 OADB: 76 Space Percent Sensible Of Total Btulh ( %) 0 0 0 0 0 0 0 0 8 8 885 378 369 1,631 49 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.46 0.46 52.42 22.38 21.84 96.64 2.90 0.00 0.00 1,688 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total ==> Ceiling Load Ventilation Load OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK Mo/Hr. 13 / 1 OADB: 26 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 -299 -299 0 0 0 0 -71 0 0 -370 Coil Peak Percent Tot Sens Of Total Btu/h ( %) 0 0.00 0 0.00 -285 15.70 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 -299 16.45 -585 32.16 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 - 1,394 76.70 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 1 51 -8.85 - 1,818 100.00 Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 216 0 0 216 0 0 0 0 0 TRACE'v 700 v4.1 calculated at 02:18 PM on 07/24/2003 Alternative -1 Room Checksums report Page 14 of 29 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. TEMPERATURES Cooling Heating SADB 55.0 72.4 Plenum 75.5 67.0 Return 75.5 67.0 Ret/OA 77.0 50.9 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Friel 0.0 0.0 Vent Infll Supply MlnStoplRh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 30 6 77 0 47 0 37 0 Heating 30 6 77 0 47 0 37 0 % OA cfm /ft cfm/ton ft Btu /hr•ft No. People ENGINEERING CKS Cooling Heating 39.3 39.3 0.36 0.36 387.97 1,091.28 11.00 -8.42 2 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -1.8 0.0 -0.4 0.0 0.0 -1.8 77 0 77 50.9 0.0 50.9 Lvg °F 72.4 0.0 55.0 0 0.0 0.0 0 0.0 0.0 Conference Superintendent 131 Main Cig Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr/lb 1.4 0.0 0.0 16.6 0.0 0.0 1.4 16.6 16.0 0.0 0.0 711 75.6 0 0.0 0 0.0 60.0 53.6 0.0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr/lb 55.0 51.7 52.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Tukwila School District Administration Building Dataset Name: C:WIechLoad.trc Room Checksums By hultrJbhu COOLING COIL PEAK Peaked at Time: Mo/Hr. 7 / 17 Outside Air: OADB/WB/HR: 78 / 62 / 58 CLG SPACE PEAK Mo/Hr. 7 / 17 OADB: 78 Space Plenum Net Percent Space Percent Sens. + Let. Sens. + Let Total Of Total Sensible Of Total Btu/h Btu/h Btu/h ( %) Btu/h cm Envelope Loads Skylite Solar 0 0 0 0.00 0 0.00 Skylite Cond 0 0 0 0.00 0 0.00 Roof Cond 0 245 245 1.48 0 0.00 Glass Solar 13,104 0 13,104 79.08 13,104 83.87 Glass Cond 134 0 134 0.81 134 0.86 Wall Cond 259 130 389 2.35 259 1.66 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0.00 0 0.00 Infiltration 54 54 0.33 28 0.18 Sub Total ==> 13,551 374 13,926 84.04 13,525 86.56 Internal Loads Lights 1,106 0 1,106 6.67 1,106 7.08 People 850 850 5.13 472 3.02 Misc 461 0 461 2.78 461 2.95 Sub Total => 2,416 0 2,416 14.58 2,039 13.05 Ceiling Load 43 -43 0 0.00 61 0.39 Ventilation Load 0 0 253 1.53 0 0.00 Ov /Undr Sizing 0 0 0.00 0 0.00 Exhaust Heat -26 -26 -0.15 Sup. Fan Heat 0 0.00 Ret. Fan Heat 0 0 0.00 Duct Heat Pkup 0 0 0.00 Reheat at Design 0 0.00 Grand Total => 16,011 305 16,570 100.00 15,624 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total => Internal Loads Lights People Misc Sub Total => Ceiling Load Ventilation Load Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Grand Total => HEATING COIL PEAK MoHr. 13 / 1 OADB: 26 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0 0 O -357 0 0 -1,909 -1,909 -306 -457 O 0 0 0 -374 -374 -2,589 -3,097 0 0 0 0 -89 0 0 -2,678 0 0 0 0 0.00 0.00 6.87 0.00 36.78 8.81 0.00 0.00 7.20 59.67 0. 00 0.00 0.00 0.00 O 0.00 -1,743 33.57 O 0.00 52 -1.01 O 0.00 0 0.00 O 0.00 -403 7.77 -5,191 100.00 Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 270 0 0 270 0 0 280 72 26 TEMPERATURES Cooling Heating SADB 55.0 71.4 Plenum 75.5 67.0 Return 75.5 67.0 Ret/OA 75.6 64.8 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infli Supply MinStoplRh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 38 8 711 0 719 46 0 0 Heating 38 8 711 0 719 46 0 0 ° OA cfm /ft' cfm /ton ft'/ton Btulhr•fN No. People ENGINEERING CKS Cooling Heating 5.3 5.3 2.63 2.63 514.91 195.54 61.37 -19.23 2 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -5.2 0.0 0.0 0.0 0.0 -5.2 711 64.8 0 0.0 0 0.0 71.4 0.0 0.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v4.1 ca.culated at 02:18 PM on 07/24/2003 Alternative -1 Room Checksums report Page 9 of 29 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. ACTIVITY NUMBER: M04 -002 DATE: 01 -14 -04 PROJECT NAME: TUKWILA SCHOOL DISTRICT ADMIN. BLDG. SITE ADDRESS: 4640 SOUTH 144 STREET X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # after /before permit is issued DEPARTMENTS: Z I Buildiivision ❑ O PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Public Works ❑ h a., /145 1 5'0 l Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 01 -15 -04 Complete Incomplete ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS R9UTING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions [✓ Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments Issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slIp.doc 2-28-02 PERMIT COORD COPY Planning Division Permit Coordinator DUE DATE: 02 -12 -04 kf Not Applicable ❑ DATE: 05/11/2004 13:38 42539789x@ DJ MECHANICAL INC PAGE 02 MECHANICAL LEGEND SYMBOL DESCRIPTION ABBREV. DESCRIPTION CD WASTE OR SOIL (W) A AFF APPROX. ARCH AUTO AAV BDD B.O.D. BTU BTUH BLDG. C CAP CLG CO COMP CONN CONT. CFM CW DEG F, F' DIA, 0 DN DWG DB DL EA EFF ELEC. EER EOL EXH EXIST F FSD FPM FLEX FL FCO FLA FPI G GAL GALV. GWB HP HW�y INTEGR. IN I.E. KW LAT LOB MFR. MAX COMPRESSED AIR ABOVE FINISHED FLOOR APPROXIMATELY ARCHITECTURAL AUTOMATIC AUTOMATIC AIR VENT BACK DRAFT DAMPER BOTTOM OF DUCT BRITISH THERMAL UNIT BRITISH THERMAL UNIT /HOUR BUILDING CONDENSATE CAPACITY CEILING CLEANOUT COMPRESSOR CONNECTION CONTINUE, CONTINUATION CUBIC FEET PER MINUTE COLD WATER DEGREE FAHRENHEIT DIAMETER DOWN DRAWING DRY BULB DOOR LOUVER EACH EFFICIENCY ELECTRICAL, ELECTRIC ENERGY EFFICIENCY RATIO END OF LINING EXHAUST EXISTING FIRE FIRE SMOKE DAMPER FEET PER MINUTE FLEXIBLE FLOOR FLOOR CLEAN OUT FULL LOAD AMPS FINS PER INCH GAS GALLON GALVANIZED GYPSUM WALL BOARD HORSE POWER HOT WATER INTEGRAL INCH INVERT ELEVATION KILOWATT LEAVING AIR TEMPERATURE LEAVING DRY BULB MANUFACTURER MAXIMUM THOUSAND BTUH MECHANICAL MINIMUM MINIMUM CIRCUIT AMPS MAKE UP AIR NORMALLY OPEN NORMALLY CLOSED NUMBER NOT TO SCALE OPPOSED BLADE DAMPER OUTSIDE AIR PHASE PRESSURE DROP RETURN RATED LOAD AMPS REFERENCE REQUIRED RETURN AIR REVOLUTIONS PER MINUTE ROOM SUPPLY SUPPLY AIR SURFACE CLEANOUT SCREENED OPENING TEMPERATURE TRANSFER DUCT TRANSFER GRILLE TYPICAL UNDERCUT DOOR UNDER GROUND UNLESS NOTED OTHERWISE VENT THROUGH ROOF VOLTS, VOLTAGE, VENT W W A ALL CLEAN OUT WATT WET BULB WITH ZONE DAMPER CRG - VENT (V) ---- COLD WATER (CW) CEILING EXH. GRILLE -"--- HOT WATER (HW) WSG WALL SUPPLY GRILLE HOT WATER CIRCULATING (HWC) • - - WRG NON- POTABLE WATER -- NPW -- --- FIRE LINE F KRUEGER SERIES S580H NATURAL GAS G -1><1 GATE TYPE EXCEPT WHERE INDICATED TO BE ISOLATION VALVE A DIFFERENT TYPE - SEE DETAILS & SPEC'S 1/2"x1/2"x1/2" CUBE CORE _ CX1 GLOBE RUSKIN ELF6375DX 6 "DEEP, DRAINABLE, EXTRUDED ALUMINUM CONSTRUCTION, FIXED BLADE BALL VALVE 101 - KRUEGER SERIES S580H ANGLE VALVE 4 SHALL HAVE NO. & DIRECTION OF THROWS AS INDICATED = 3 WAY THROW) HAVE FACTORY FINISH, COLOR AS SELECTED BY USED IN AIR TERMINAL CALL -OUTS ON DRAWINGS. FOR CEILING TYPES, PROVIDE AIR TERMINALS TO MATCH IN. SIZE SHALL MATCH CONNECTING DUCT SIZE SHOWN ON IN GWB CEILING. COMBINATION SHUT -OFF & BALANCING VALVE SINK 2 " CHECK VALVE --�N4 1/2" BUTTERFLY VALVE P -6A - CLEANOUT Q FLOOR DRAIN (TOP) -- UNION -1 --- REFRIGERATOR BOX RELIEF VALVE OR SAFETY VALVE 1/2" CONCENTRIC REDUCER © seLs HOSE BIBB yP.D.L'A' WATER HAMMER ARRESTOR (P.D.I. SIZE AS SHOWN) 3/4" _ DUCT (FIRST FIGURE, SIDE SHOWN) P -10B 20/12 . _ - 3/4" _ LINED DUCT (DIM. FOR NET FREE AREA) EOL= END L* = 2" OF LINING THICK LINING P -11 A 20/121 } W/ TRAP PRIMER / P -11B FUNNEL DRAIN RISE (R) OR DROP (D) ARROW IN DIRECTION OF FLOW W/ TRAP PRIMER di 111004 DUCT SECTION (SUPPLY) I`■ DUCT SECTION (EXHAUST OR RETURN) ROUND DUCT, DIAMETER VOLUME DAMPER (MANUAL) MBH MECH. { MOTORIZED DAMPER MIN MCA FLEXIBLE CONNECTION MUA NO III : BACK DRAFT DAMPER (BDD) NC NO. NTS OBD OA PH PD R RLA REF REQ'D RA RPM RM. S SA SCO S.O. TEMP TD TG TYP U.C. U.G. UNO VTR W C0 W WA WB W/ ZD Ci • FIRE DAMPER COMBINATION FIRE /SMOKE DAMPER FLEXIBLE DUCT ELBOW WITH TURNING VANES I/ 5YMB CEILING OUTLET (SERE 2 CFM'S SHOWN LARGER = HIGH SPEED CFM SMALLER = LOW SPEED CFM) • SIZ E . SYBO1. CEILING INLET U LSG - 5 " - 5' LINEAR SLOT GRILLE, FIRST NO. IS NOMINAL DUCT WIDTH, SECOND NO. IS LENGTH CFM U LSD - 1 " - 2 - 4' CFM LINEAR SLOT DIFFUSER, FIRST NO. IS SLOT WIDTH, SECOND NO. IS NO. OF SLOTS, THIRD NO. IS LENGTH I C FIA oL WALL OUTLET (OR INLET) 0 OE®A G= WITH GUARD THERMOSTAT A= AVERAGED WITH OTHER 0 'a -e ZONE DAMPER, 8" DIAMETER 0 SWITCH TIME CLOCK BYPASS IT INTERVAL TIMER ak -- DETAIL IDENTIFICATION NUMBER SHEET ON WHICH DETAIL IS SHOWN IZEP , A SECTION IDENTIFICATION LETTER SHEET ON WHICH SECTION IS SHOWN M3 -.- AIR INLET & OUTLET SCHEDULE SYMBOL TYPE MANUFACTURER AND SERIES NUMBER REMARKS CD CEILING DIFFUSER KRUEGER SERIES SH LOUVER FACE, SQUARE NECK W/ STRAIGHTENING GRID CRG CEILING RETURN GRILLE KRUEGER SERIES EGC -5 1/2"x1/2"x1/2" CUBE CORE CEG CEILING EXH. GRILLE KRUEGER SERIES EGC -5 1/2"x1/2"x1/2" CUBE CORE WSG WALL SUPPLY GRILLE KRUEGER SERIES 5880H DOUBLE DEFLECTION, HORIZ. FACE BARS, VERT. REAR BARS 3/4 "O.C. WRG WALL RETURN GRILLE KRUEGER SERIES S580H HORIZ. FACE BARS 3/4" O.C., 35' DEFLECTION WEG WALL RETURN GRILLE KRUEGER SERIES S580H HORIZ. FACE BARS 3/4" O.C., 35' DEFLECTION TG TRANSFER GRILLE KRUEGER SERIES EGC -5 1/2"x1/2"x1/2" CUBE CORE _ WL WALL LOUVER RUSKIN ELF6375DX 6 "DEEP, DRAINABLE, EXTRUDED ALUMINUM CONSTRUCTION, FIXED BLADE SG SOFFIT GRILLE KRUEGER SERIES S580H HORIZONTAL ALUMINUM FACE BARS 3/4" O.C., NOTES: SHALL HAVE NO. & DIRECTION OF THROWS AS INDICATED = 3 WAY THROW) HAVE FACTORY FINISH, COLOR AS SELECTED BY USED IN AIR TERMINAL CALL -OUTS ON DRAWINGS. FOR CEILING TYPES, PROVIDE AIR TERMINALS TO MATCH IN. SIZE SHALL MATCH CONNECTING DUCT SIZE SHOWN ON IN GWB CEILING. 1. CEILING DIFFUSERS (CD) ON PLANS. (E.G. CD -3 2. ALL AIR TERMINALS SHALL ARCHITECT. 3. SEE LEGEND FOR TERMINOLOGY 4. SEE ARCH. FINISH SCHEDULE CEILING CONSTRUCTION INSTALLED 5. PROVIDE RVI & RVR THROAT PLANS 6. PROVIDE OBD IN CD'S LOCATED WATER HEATER SCHEDULE SYMBOL I SPECIFIED MFR. AND SERIES NO. TYPE _RppMS AREA SERVED INPUT RATING STORAGE (GAL) DOMESTIC HW ELECTRICAL REMARKS GPH 35 EWT 50 LWT 120 FLA 25 VOLTS/PH 240/1 WH -1 A.O. SMITH DSE -30 TANK TYPE ELECTRIC & BREAK ROOM 6000 WATTS 30 WALL MOUNT P -2A URINAL 2" 1 -1/2" 3/4" - WALL MOUNT ADA ACCESSIBLE P -3A LAVATORY 1-1/2"1-1/2° PLUMBING FIXTURE SCHEDULE SYMBOL DESCRIPTION W V CW HW . REMARKS SEE SPECS FOR ADDITIONAL INFORMATION P -1 A WATER CLOSET 4" 2" 1" 1" WALL MOUNT ADA ACCESSIBLE P -1B WATER CLOSET 4" 2" s r 1" WALL MOUNT P -2A URINAL 2" 1 -1/2" 3/4" - WALL MOUNT ADA ACCESSIBLE P -3A LAVATORY 1-1/2"1-1/2° 1 2" / 1/2" COUNTER MOUNT ADA ACCESSIBLE P -4A HOT WATER DISPENSER - - - 1/2" P -5A SINK 2 " 2" 2 1/2" 1/2" DOUBLE COMPARTMENT STAINLESS STEEL P -6A DRINKING FOUNTAIN 2" - 1/2" 1/2" - ADA ACCESSIBLE BI LEVEL P -7A REFRIGERATOR BOX 1/2" -- P-10A EXTERIOR HOSE BIBB _ _ 3/4" _ P -10B INTERIOR HOSE BIBB _ - 3/4" _ P -11 A FLOOR DRAIN SIZES AS NOTED ON PLANS W/ TRAP PRIMER / P -11B FUNNEL DRAIN SIZES AS NOTED ON PLANS W/ TRAP PRIMER di 0 Copyright 02003 by BASS Duarte Bryant. All rights reserved. 1. VERIFY LOCATION OF PLUMBING FIXTURES WITH ARCH. DRAWINGS BEFORE BEGINNING WORK. ARCH. DWGS. GOVERN. 2. PLUMBING FIXTURE HEIGHTS SHALL BE AS SHOWN ON ARCH. DRAWINGS. 3. 4. NO FLEX DUCT SHALL BE USED IN CORRIDOR CEILING SPACES. 5. ALL DUCT /WALL PENETRATIONS SHALL BE PROVIDED WITH CLOSURE COLLARS AND BE TIGHTLY SEALED TO PREVENT THE TRANSMISSION OF NOISE 6. FOR EXTERIOR CLEANOUTS, SEE DETAIL H8 SHEET M302. 7. ALL FLOOR DRAINS, FUNNEL DRAINS, AND FLOOR RECEPTORS SHALL HAVE TRAP PRIMERS, SEE DETAIL H13 SHEET M302. CONTRACTOR SHALL CAREFULLY COORDINATE WORK W/ ALL OTHER TRADES, ESPECIALLY IN CEILING SPACES WHERE SPACE IS TIGHT. SHEET METAL CONTRACTOR SHALL HAVE PRIORITY OVER OTHER MECHANICAL TRADES IN CEILING SPACE WHERE CONFLICTS OCCUR. 8. ALL PIPING & DUCTWORK SHOWN IS SCHEMATIC, CONTRACTOR SHALL PROVIDE ALL OFFSETS /ELBOWS AS REQ'D TO ALLOW ROUTING AROUND STRUCTURE, ELECTRICAL, & OTHER INTERFERENCES. 9. FLEXIBLE DUCT LENGTH SHALL NOT EXCEED 8 FEET, AND MAY ONLY BE USED WHERE SPECIFICALLY SHOWN ON THE PLANS. 10. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE & SELECT FINAL LOCATIONS OF ALL AIR INLETS /OUTLETS. SHIFT AIR INLETS/ OUTLETS FROM LOCATIONS SHOWN AS REQ'D TO AVOID CONFLICTS W/ STRUCTURE, LIGHTS, & OTHER ITEMS. SUCH SHIFTS SHALL MAINTAIN SYMMETRY OF AIR TERMINALS & SHALL HAVE PRIOR APPROVAL OF ARCHITECT /ENGINEER. 11. VARIOUS CEILING AIR INLETS CONN'S REQUIRE SIDE INLET PLENUM, SEE DETAIL G12 SHEET M402. PROVIDE WHERE REQ'D DUE TO SPACE LIMITATIONS TO PREVENT KINKS IN FLEX. DUCT AND ALLOW PROPER CONN. 12. FOR HVAC EQUIP. SUPPORTS, SEE DETAIL G8, SHEET M402. MECHANICAL GENERAL NOTES 13. PROVIDE MANUAL VOLUME DAMPERS IN ALL BRANCH DUCTS AND SPLITS IN MAIN DUCTS AND WHERE REQ'D BY BALANCERS; ONLY SOME OF THE REQ'D DAMPERS ARE SHOWN ON THE PLANS. 14. UNSIZED DUCTS SHALL MATCH THE SIZE OF THE LARGEST ADJACENT DUCT THAT IS SIZED. WHERE THE ADJACENT DUCT SIZE IS NOT SHOWN, PROVIDE THE FOLLOWING SIZED DUCTS (OR EQUIVALENT RECTANGULAR). CFM DUCTS TO AIR OTHER INLETS /OUTLETS DUCT 0 101 151 251 401 501 701 901 1201 1501 2001 - 100 - 150 - 250 - 400 - 500 -- 700 - 900 - 1200 - 1500 - 2000 -- 2400 6" 0 8" 0 10" 0 12" 0 14" 0 16 0 18" 0 20" 0 6" 0 8" 0 8" 0 10" 0 12" 0 12" 0 14" 0 16" 0 18" 0 20" 0 22" 0 15. VERIFY LOCATIONS OF ITEMS INSTALLED IN CEILINGS WITH ARCHITECTURAL REFLECTED CEILING PLANS PRIOR TO BEGINNING WORK. NOTIFY ARCHITECT OF DISCREPANCIES. 16. MECHANICAL EQUIPMENT 1/2 HP AND LESS SHALL HAVE ANY REQUIRED STARTER /CONTROL RELAY PROVIDED BY SECTION 15900 (EXCEPT WHERE SPECIFICALLY SHOWN OR SPECIFIED OTHERWISE). 17. UNSIZED PLUMBING PIPING SHALL MATCH THE SIZE OF THE LARGEST ADJACENT CONNECTING PIPE SIZE SHOWN, WHERE THE ADJACENT PIPE IS NOT SHOWN (OR NOT CLEAR), THE PIPE SIZE SHALL BE BASED ON THE GPM FLOWING IN THE PIPE (USE TOTAL OF COILS SERVED FOR HYDRONIC SYSTEM, USE FIXTURE UNITS AND CORRESPONDING GPM PER THE UPC FOR DOMESTIC WATER SYSTEMS, USE WASTE FIXTURE UNITS & UPC TABLES FOR WASTE /VENT SYSTEM), AND A VELOCITY NO GREATER THAN 4 FEET PER SECOND. USE UPC CURVES FOR GPM /VELOCITY FOR APPROPRIATE PIPING MATERIAL INVOLVED. SYMBOL EF--1 EF- 2 EF- 3 EF- 4 EF- 5 SPECIFIED MANUFACTURER AND SERIES NO. GREENHECK CSP- A1050 GREENHECK SP -B70 GREENHECK SP -A290 GREENHECK GREENHECK SP- A290 SP- A290 ..�a..... . r �.�...,�_..:....._ • i TYPE INLINE CABINET CEILING CABINET INLINE CABINET CEILING CABINET CEILING CABINET AV STORAGE 131 MDF ROOM 117 ELECTRICAL ROOM 118 WORK /COPY MAILROOM 115 LUNCHROOM 116 NOTES: . PROVIDE ALL DIRECT DRIVE FANS W/ SPEED CONTROL. 2 3 WOMEN 104, MEN 105, TABLE /CHAIR STORAGE 106, JANITOR /SUPPLY 108 EXHAUST FAN SCHEDULE AREA SERVED CFM 750 50 250 250 270 ESP .625 .25 .25 RPM 1080 675 1050 .25 1050 .25 1050 WHEEL DIA ELECTRICAL POWEK V/PH 455 W 45 W 115/1 81 W 115/1 81 W 115/1 81 W 2. PROVIDE ALL FANS WITH BACKDRAFT DAMPERS 115/1 115/1 DRIVE DIRECT DIRECT DIRECT DIRECT DIRECT CONTROL TIME CLOCK WALL SWITCH WALL SWITCH 4' • REMARKS ENERGY CODE REQUIREMENTS: THERMOSTAT /TIME CLOCK CONTROL SHALL BE PROVIDED BY CONTROL SYSTEM. SYSTEM SHALL PROVIDE 365 DAY CONTROL OF ALL EQUIPMENT (SEE SPEC SECTION 15900). B. ALL AHU'S SHALL HAVE 100% OA CAPABLE ECONOMIZERS. CONTROLS SHALL EVALUATE OA TEMP TO ALLOW FOR ECONOMIZER OPERATION. (SEE SPEC SECTION 15900). C. DUCTWORK SHALL BE SEALED IN ACCORDANCE W/ CODE, & PER SPECIFICATION REQUIREMENTS (SEE SPEC SECTION 15840). D. DUCT INSULATION R- VALUE SHALL BE IN ACCORDANCE W/ CODE, & PER SPECIFICATION REQUIREMENTS (SEE SPEC SECTION 15250). E. PIPE INSULATION R- VALUE SHALL BE IN ACCORDANCE W/ CODE, & PER SPECIFICATION REQUIREMENTS (SEE SPEC SECTION 15250). F. MOTORS 1 HP & LARGER SHALL BE ENERGY EFFICIENT TYPE, IN ACCORDANCE W/ CODE. A. ■ • IIEVISION '10 CHANGES V.ett. SE WUtta CF "•+, vl.Pvissuffi pFtol F ``� Ar y am' ,- a- f L .��� KM 7 e • FILE COPY l understand that the Plan Check subject to errors and omissio approvals are plans does not authorize the violation and approval an y o/ 0od or ordinance. R f n $ copy of approved plans °f con- a cknowledged. SEPARATE PERMIT REQUIRED FOR: 0 MECHANICAL (VELECTRICAL % PLUMBING GAS PIPING CITY OF TUKW1LA BUILDING DIVISION • I' CflN of TUOIL APPROvtD FEB 1 1 2W3 gt arm OP TuxwitA JAN 1 4 2004 M HULTZ BHU C ROSE consulting engineers. inc. 2407 North 31 et Str••t, Suit• 200 Tocomo, WA 85407 - (253) 303-3257 Fax (253)353 -3283 - gomprolehunateviceern Ot /041/a'sw Nowt 134 31 • I' ARCHITECTURE www elaeb,00m 724 Columbia Street 11W Suits 400 Olympia. Washington 911501 T 340.943.4650 F 340.357.9022 100 First Avenue South Suits 200 Ssttlds. Washingoxi 911104 T 206.340.1552 F 206.340.0412 Imam 0 -14-04 23032 c DAWN sY O,sY WCP LB DATE 94503 M BID SET MECHANICAL LEGENDS, NOTES, & SCHEDULES dr NIP • I • - Copyright 02003 by BJSS Duarte Bry.ret. All rights reserved. SYMBOL AHU —1 AC-1 AHU— 2 AC-2 AHU— 3 AC-3 AHU — 4 AC-4 SPECIFIED MANUFACTURER AND SERIES NUMBER •**** TRANE TUX120C AC-1A= TRANE 2TTB006A1000A, AC-1B= TRANE TXC060C5HPC TRANE TUX120C AC-2A= TRANE 2TTB006A1000A, AC-2B= TRANE TXC060C5HPC TRANE TUX120C AC— 3A= TRANE 2TTB006A1000A, AC— 313= TRANE TXC060C5HPC TRANE TUX120C AC— 4A= TRANE 2TTB006A1000A, AC— 4B= TRANE TXC060C5HPC * COOLING CAPACITY IS ARI RATING: AT 80* F DB; 6T F WB INDOOR COIL EAT AND 95 F OUTDOOR COIL EAT. ** HEATING CAPACITY IS ARI HI—TEMP RATING: AT 70' F DB INDOOR EAT AND 47• F DB; 43' F WB OUTDOOR COIL EAT. • ••■••• • ■■••••■••••••••••■•••••• •••••• ...1111111•■ 2 3 4 •••••••10,11•••••••P •'• ■••■•••••••••••■••■ •..••• • ••••••, AREA SERVED HEATING CAP. ** OUTPUT BTUH 112,000 AFUE 92% SUPPLY FAN CFM 1870 ESP 0.8" 1870 0.8" 1870 0.8" WORKROOM 11 , : REAKROOM 116, OFFICES 112,000 92% 1870 0.8" 122-124 *** ON PLANS "A" DESIGNATES INDOOR UNIT, "B" DESIGNATES OUTDOOR UNIT (e.g. AC-113 IS AHU-1 OUTDOOR UNIT). **** PRELIMINARY ONLY — SIZING & ACCUMULATOR SELECTION BY UNIT SUPPLIER — SEE SECTION 15810 S 6 GAS FURNACE COOLING UNIT SCHEDULE FURNACE MIN. OA 200 • 200 200 200 COMB. FAN QTY 1 1 1 1.0 1.0 1.0 HP VOLT PH INDOOR COIL TOTAL MBH EFF. TYPE ELECTRICAL COOLING CAP. * *** P.D. 3/4 3/4 3/4 115/1 115/1 AIR CONDITIONING 57.5 57.5 115/1 57.5 III 1.0 3/4 115/1 9.15 EER 9.15 EER 9.15 EER 9.15 EER CASED HORIZ CASED HORIZ CASED HORIZ CASED HORIZ ***** SUPPLIER SHALL VERIFY SERIES/MODEL NUMBERS REQUIRED TO PROVIDE CAPACITY & EFFICIENCIES SCHEDULED AND SPECIFIED 0.36" 0.38" 0.36" 0.39" 1 OUTDOOR COMP COMPRESSOR QTY 1 1 1 RLA EA 26.3 26.3 26.3 COND. FAN QTY 1 1 1 HP 1/4 1/4 1/4 COND *** ELECTRICAL MCA 35 35 35 VOLT/PH 208/1 208/1 208/1 REFRIGERANT **** PIPE SIZING RG 1-1/8" 1-1/8" 1-1/8" RL 3/8" 3/8" 3/8" INDOOR 225 225 225 WEIGHT OUTDOOR 230 230 230 HORIZONTAL FURNACE W/ CONCENTRIC VENT HORIZONTAL FURNACE W/ CONCENTRIC VENT HORIZONTAL FURNACE W/ CONCENTRIC VENT 26.3 1 1/4 35 20E3/1 1 3/8" 225 230 HORIZONTAL FURNACE W/ CONCENTRIC VENT REMARKS 0 - r • IJ t ‘t4 . ■ ) ‘ CITY OF TUKWIA JAN 1 If 2004 MAW cam 1100P00e HULTZ BHU.CRo SS consulting engineers, inc. 2407 North 31et Street. Suite 200 Tocorno. WA 01407 - (253) 383-3257 Fox (253)303-3283 - irenereillhotseft.ecorn notaMte/Crees Mc SO Nueeer 01-131 • ARCHITECTURE www.bissamom 724 Colunsbia Sweet NW Suite 400 Olympia. YVuhington 98501 T 360.943.4650 F 340.357.9022 ION First Avows South Suite 200 Seattle, Washington 98104 T 206.340.1552 F 206.340.0412 I Defies 6-14-04 1 ,I08 23032 DRAWN BY CHECKED BY WCP LB DATE 9-25-03 Nada. BID SET MECHANICAL SCHEDULES • • • • Copyright Q2003 by BJSS Duarte Bryant. All rights reserved. Al 1 FOUNDATION PLAN im" 1' -0" PLUMBING 1 2 0 is NORTH :01 1 { C- 2 "W UP 2 "W • ; I 1: 1 I I I i 1 1 LJ L ___1J UP 3 "W UP I TO 2"W UP 2 "W UP ' J L:::::: : :: - i • 2 "W UP 2 "W UP 3 "W 6 4 "W UP OFCO 4 "W, IE= 262.67'. VERIFY LOCATION & CONNECT TO SITE PIPING. SEE CIVIL PLANS FOR CONTINUATION DROP WASTE DN TO MEET OUTSIDE IE REQUIRED 1!\ 4 "W — 4 "W UP 2 "V UP 2 "W UP / "W UP o f-- "V UP 4 "W UP TO WCO • • L, ; I L NATURAL GAS SERVICE BY PSE INDICATES SPACE FOR GAS METER ABOVE fT1 1 -1 /2 "CW SERVICE, MIN. 3' —O" BELOW FINISHED GRADE. VERIFY LOCATION & CONNECT TO SITE PIPING. SEE CIVIL PLANS FOR CONTINUATION. GENERAL NQTES 1. SEE STRUCTURAL DRAWINGS FOR LOCATIONS/ VARIATIONS OF FOUNDATION COMPONENTS SHOWN ON THIS DRAWING. 2. RUN ALL WASTE PIPING 0 2% SLOPE 3. FIXTURES SHOWN ARE ON FLOOR ABOVE. SEE PLUMBING PLAN FOR LOCATION AND TYPE. 4. VERIFY ALL FINISHED FLOOR & FINISHED GRADE ELEVATIONS NOTED WITH ARCHITECTURAL & CIVIL PLANS. KEYED NOTES: O 1 1 /2 "CW TRAP PRIMER LINE TO FLOOR DRAIN/FLOOR RECEPTOR. 0 1- 1 /2 "CW MAIN UP. r CRYCIPTUNIMILA JAN 1 " 1004 maw M04 -c40. Huurz BHUi.C consulting engineer', inc. 2407 North 31st Street. Suite 200 Tocorno. WA 96407 - (253) 383-3257 Fox (253)363-3283 - gsroordlehultdottw.cont MAa/DIU/0 w wt. 4011swasr. 531 ARCHITECTURE www.biudLams n4 Columbia Strout NW Suite 400 Olympia. %shiny=1BS01 T 360.9143.4450 F 360.3571022 100 First Amass South Suite 200 Seat 90104 T 206.340.1 552 F 206.340.0412 toms 8 -14-04 23032 S+4L WCP LB 9 -25-03 REVISIONS BID SET PLUMBING FOUNDATION PLAN •J411t • a • • G F E D C B A Copyright Q 2003 by BASS Duarte Bryant. All rights raaorMed. _ _ Al 1/8" =1' -0" BUDGET MANAGER 1 125 1 BUS. /OPER. MANAGER I 127 I SUPERINTENDENT 1 124 1 EXECUTIVE ASSISTANTS — __,__ L 1 1' --10A FLOOR PLAN PLUMBING PAYROLL 1 1281 1 126 1 PERSONEL MANAGER 1 123 1 r HALLWAY 1 120 1 PURCH. /OPER. ASSISTANT FILE '\ ROOM SMALL CONFERENCE ROOM 11301 OFFICE 1122 1 FILE ROOM ELEC. ROOM (11$1 HALLWAY 1 103 1 RECEPTION 1 102 1 WAITING /LOBBY NORTH 1 101 I MDF b. ROOM sL 1 117 1 HALLWAY 1 114 I BREAK/LUNCN OOM 4 "VTR 1 " CW WORK/COPY 2 "V MAIL ROOM 3 "V 1 115 1 RUN LINES CONCEALED ACROSS HALLWAY .) • i • 1111 " r) " M AINNIMP r) " P5 1 • 3 /4 "CW 1 -1 /2" GAS _ ADMINISTRATIVE ASSISTANTS II 1� I FOR PLUMBING WORK ABOVE THIS AREA, SEE "MEZZANINE PLUMBING PLAN" THIS SHEET. FOR PLUMBING PLAN BELOW MEZZANINE, SEE "ENLARGED PLUMBING PLAN ", THIS SHEET. LARGE CONFERENCE 1 CURRICULUM DIRECTOR 1 no 1 OFFICE 1112 ,AECHANIC L -JACCESS— NOT BLOC • I 107 I I 131 I HALLWAY DIRECTOR It MULTI - PURPOSE OFFICE SPACE [log 1 P-1 OA GAS METER de REGULATOR BY PSE. 480 CFH CAPACITY 0 7" W.C. CONTACT PILCHUCK MECHANICAL 0 (206) 418 -4234 FOR GAS SERVICE & SITE COORDINATION SEISMIC SHUT —OFF DS • 2 "V DN 2 "V G10 1/4" = 1' -0" A10 I/4" = 1 -0" L a I— Ai-iv-3 I L P -11 PLUMBING 2 "W DN 2 "V UP 2 "W UP C L 3 /4 "HW DN 2 "V ON AHU -1 • • 4111 ItIONEIM 1 "GAS --� 1 -1 /2" GAS GAS MECHANICAL LOFT 12011 _1 1-7/ MEZZANINE PLUMBING PLAN "H W UP TO WH —1 1 O 1 '2 "V UP P -3A P -11 ENLARGED PLUMBING PLAN PLUMBING •o^ 011111.0 • it 2 "W UP 1 /4 "CW P -1A 2 "W D 2 "V U P P -11A� TRAP \ PRIMER _,. ACCESS PANEL P -1A I WCO -.. 4- I r I I < I L_ WATER HAMMER ARRESTOR II II Ii! 3/4"HW 3 "V 1 "CW 3 "V DN 3/4" OVERFLOW DRAIN 1 -1 /2" CW TO MAIN 1 -1 /2" DN TO PLUMBING CHASE WH -1 SEE GAS SHUT —OFF VALVE, LOCATE NEAR ACCESS HATCH MECHANICAL ACCESS, DO NOT BLOCK 3/4" OVERFLOW DRAIN (C3 NORTH NORTH 3 "V UP 2'V 2'V 2'V 13 W ATER "IAMMER ARRESTOR W /VALVE GENERAL NOTES 1. FOR PIPING SIZES TO INDIVIDUAL PLUMBING FIXTURES SEE "PLUMBING FIXTURE SCHEDULE ", SHEET M101. 2. PROVIDE WALL CLEANOUT BENEATH FIXTURES FOR ALL SINKS AND LAVATORIES. 3. ALL ISOLATION VALVES SHALL BE ACCESSIBLE. PLUMBING CONTRACTOR SHALL COORDINATE WITH OTHER TRADES TO INSURE VALVE IS ACCESSIBLE. 4. PROVIDE ISOLATION VALVE, DRIP LEG, AND UNION AT ALL GAS PIPING CONNECTIONS TO ALL EQUIPMENT. KEYED NOTES: O l 1 /2 "CW DOWN TO TRAP PRIMER WITH ACCESS DOOR. 0 MAIN CW RISER WITH SHUT —OFF IN RISE. SEE DETAIL Cl 3/M302. 1- 1 /2 "CW UP TO MEZZANINE. O 4 1 "HW UP TO MEZZANINE. OS RUN PIPING IN JOIST SPACE BETWEEN RESTROOM CEILING & MEZZANINE FLOOR. DO NOT RUN ON WALKWAY AREA OF MECHANICAL MEZZANINE ABOVE. 0 RUN GAS LINE AS HIGH AS POSSIBLE. DO NOT BLOCK EQUIPMENT ACCESS OR OBSTRUCT WALKWAY. 0 3/4" CONDENSATE OVERFLOW DRAIN. RUN DOWN CONCEALED IN WALL. TERMINATE WITH TURNED DOWN ELBOW 0 6" ABOVE FINISHED GRADE. PAINT TO MATCH SIDING COLOR. 08 PROVIDE CONNECTION FOR DISHWASHER, 1 /2" HW, AND AIR GAP FITTING FROM ADJACENT SINK. 09 1 /2 "CW DN TO REFRIGERATOR ICE MAKER. COORDINATE FINAL LOCATION WITH OWNER FURNISHED EQUIPMENT, PROVIDE WALL BOX WITH STOP VALVES. 14 IS i e R/ A r e RF :PPR D OVA JAN 1 It 2004 PIMP CENTiii4 r 1i PW 4't& Huuz BHUCRo consulting engineers, inc. 2407 North 31st Street, Suits 200 Tocorno. WA 95407 - (253) 353 -3257 Paw (253)3113 -3293 - iminsretStuttorou.corn I+MI:/111114/0‘ss tor. AO Ita 03-131 ARCHITECTURE www.bissdb.com 724 Columbia Street NW Suite 400 Olympia. Washington 91501 T 360.943.4650 F 360.357.9022 108 First Manus Smelt Suite 200 Saatda. Washington 98104 T 206340.1552 F 206.340.0412 [was 0- 14-4 1 )011N, 23032 DAWN BY CHECKED BY WCP LB DATE 9 -25-03 EMI BID SFr PLUMBING PLAN • I • j H G F E D C B A Copyright © 2003 by BJSS Duarte Bryant All rights reserved. i 2 • 4 3 4 S 6 • 7 Na NTS C8 NTS S FLOOR /SURFACE CLEAN OUT DETAIL PIPE FULL SIZE TO FUNNEL DRAIN SEISMIC STRAP 3/4" DRAIN, PIPE SAME AS SHOWN FOR RELIEF VALVE. KEEP SEPARATE FROM RELIEF PROVIDE RAISED PLATFORM TO ALLOW DRAIN PAN DRAIN TO SLOPE TOWARDS DRAIN 9 A FINISHED FLOOR • WATER NEATER DETAIL • \' :\ '` /i / ` / \ i\ i \iii \\,/,\ I � WATER HEATER WH -1 INDOOR to �. • • 4 • a d • r CLEANOUT BOX "/, " / / / /.' / / / /. /. OU TDOOR NOTE: PROVIDE UNISTRUT ANCHORED TO FLOOR TO INSTALL SEISMIC BRACING EXPANSION TANK 1 a • ` : �` \ \\` //`,, ?/ ▪ • > z, j /, '"\ \\ -\*//,>////' • 24 "X24 "X6" CONCRETE PAD PIPE INDEPENDENT OF CLEANOUT BOX / \ \ \ \ \\\\%\ \ `jam \ / � � Pi PE RainNC� / /;\ N •s \\_A&,‘ ///. //,;>/' / ///, \/,V\/ . \\///\.(/ /\//\//\// \ N \ ' \ ' , / ,.\\ 0 /, , //>\// SEE PLUMBING PLAN FOR SIZE SEE PLUMBING PLAN FOR SIZE 3/4" HOSE BIBB DRAIN 6" HIGH DRAIN PAN, MIN. 20 GA. GALV. STEEL CONSTRUCTION FINISH GRADE i 12 1-113 NTS C13 NTS ISOLATION VALVE ACCESS DOOR 1/2" (TYP.) is f 14 CW LINE TO FREQUENTLY USED FIXTURE / 7 - (OR LINE AS INDICATED ON PLAN) L SLEEVE & SEAL • TRAP PRIMER DETAIL F' A .' ■ 1 -1/2" CW SERVICE WATER RISER DETAIL J i i s 1 -1/2" CW • 1--1 /2" PR V SET FOR 70 PSI TO FIXTURE (OR AS SHOWN) TRAP PRIMER VALVE PRIMER MANIFOLD(S) (WHERE SERVING MORE THAN ONE FLOOR DRAIN) FINISHED FLOOR IS O FLOOR DRAIN TRAP TYP.) 3/4" HOSE END CONN. • * • • �,•� :. nicatvio art OF TUKWILA JAN 1 4 2004 POW CE'NTEP MD � -ADZ HULTZ 411, BHU C ROSS consulting engineers, inc. 240? North 31st Str••t. Suit• 200 tocorr o. WA 00407 — (253) 343-3257 Fox (253)343 -3253 — genereletwitabhu.com 1166z/1015/Crrss lac. AS It t*sr. 03-131 • ARCHITECTURE www.btssdb.com 724 Cdutrnbia Street NW Suits 400 Olpirrtpis. Washington lOSOI T 360 43.4650 F 360.357.9022 I011 Fire Avenue South Suits 200 Sends, Washington 95104 T 206340.1S52 F 206.390.0412 DAWN BY O#QCED BY WCP LB DATE 9 -25-03 BID SET PLUMBING DETAILS • 4 • 9 A M L K J H G F D Copyright 02003 by B)SS Duarte Bryant. AN rights reserved. AC_4� AC- 1B,-.' • REFRIGERAII/T LINES UP 'IN WALL (TYP) . AC-2B AC-3B I II . ,•••••••••• 20x20 SG Boo - - - -- - - HALLWAY 4 CD -4 125 BUDGET MANAGER ,--SUPERINTENDENT � 112x12 CD -4 - 11 1 f 270 - !12x12 p .MANAGER 1127 Al FLOOR PLAN 1/8" = I' -0" I MECHANICAL 0"0 8 -1 10 "R 20x20 CEG 11201 12 " ti Oo 2 UTIV ASSISTANT 1 8 " 10" "9x9 Cd -4 130 9x9 CD-- 8 I4112 PURCH. /OP A55ISTAN 10 "0 12x12 CD -4 300 12x12 CD -4 260 PAIEROLL PERSONEL 12x12 CD - 4 265 10" 2x1 CRG ts D D 16 "0- t i2B 1 20 0 - — T L- - --i 4- f ... ...; .+ .� , f 11_IB11■ I! — �Il' �NIIrLII CRG Fl RC 3 30x30 WEG 14/12 ``' - 12gI 72 )O 12x12 CD -4 270 OFFICE 1 1 :a 00 12x 46 WL SMAL CONFERENCE ROOM 130 — - 9x9 CO 150 15x15 CD -4 350 10x10 CEG [f' m NORTH 4 - RECEPTION 11021 9x9 CD -4 , 100 v 16x61 WSG 150 I) EOL 8/8 2x12 C I4AL 8/8L UP THROUGH ROOF (TYP L114 16 "0 18/18L EOL 8/18L 4/12 FOR HVA WORK THIS ' AREA SEE "MEZZANINE FLOO 'PLAN" THIS SHEE 14/6L " WAITING /LOBBY [ � 14/6 260 101 12x12 CR (TYP 2) 14/6 WR d' 'I -j_4 -- I — 1 S 12x12 CD -4 240 (TYP) RANGE HOOD 2x12 CD- 80 16x6 HALLWAY 11031 G i liumw 1 8 H. R ret • .., a BREAK/LUNCH ROOM F- WSG 150 I Iles 1 12/1,4 UP f2' 12 C -_ 285 WOMEN 18/18L 18 18L 12 "o (TYP) CURRICULUM DIRECTOR 8 18L 14/6L 11131 12-x42 CD- 260 �. 41111. Mb Ili IIM• 12x12 CD -4 335 (TYP 4) LARGE CONFERENCE' 11001 I i I I '0 " I i I 9xS CD = 4'___ 30 � 16 . 0L‘ - 6 6 HALLWAY 11071 � - x6 CR( 0 TYP 2) 11 12x12 CD -4 260 OFFICE I 112 I 10 "(6 E 8L SA W 18/18L RA 20/20L • 0x20 CEG 7 12x12 CD -4 1 30 E9,41S�L _DIRECTOR 10 "o 9x 130 9x9 CD -4 20x20 CEG J 10 - 0 111 I I111 Lt AD MIN STRATI ►SSISTANTS 1110 1 12x12 CD -4 300 12x CD -4 0 -I MULTI- PURPOSE OFFICE S ACE 18 "0 11 I F— .2 6/4..L 20x20 SC • 36x24 WL WITH SLOPED TOP TO MATCH ROOFLINE Kq 1/4 " =1 -0" MECHANICAL ACCESS SLOPE /OFFSET DUCTS TO - ADJACENT CEILING SPACE 18 /1= RA 18/18L RA 18/18L SA DN 4. 12 EXHAUST UP TO EF -1 ® 18/18L RA DN 14/16L 14x6 WRG 300 • 18/18L 18/18L 14/6L 14x6 WSG 260 10 LOUVER DETAIL MECHANICAL A I FLOOR PLAN 1/4" = 1' -0" I MECHANICAL 14/12L DN 10 AH -33 18/18L RETURN AIR AC -3 12/12L DN TO SERVE RESTROOM EXHAUST 11 72x46 WL SHALL MATCH ARCHITECTURAL WINDOW PATTERN, SEE DETAIL OUTSIDE AIR PLENUM • 18/18 OA 8/6 BELOW I "(::7 i NCRTw PROVIDE VISIBLE MULLION JOINT 18/181 SA BELOW 18/18L RA BELOW OA PLENUM. 18/18 L SA BELOW 18/18 L RA AC -4 COORDINATE APPROXIMATE LOCATION OF WATER HEATER WH -1 12 13 GENERAL NOTES: 1. SEE PLUMBING DRAWINGS FOR GAS PIPING TO EACH UNIT. 2. LOCATE MOTORIZED DAMPERS TO BE ACCESSIBLE (PROVIDE DUCT ACCESS DOORS). 3. ALL LOUVERS ARE BY DIVISION 15. VERIFY WITH ARCH DWGS SIZES OF ALL LOUVERS PRIOR TO ORDERING. 4. BDD & DUCT CONN'S AT LOUVERS SHALL MATCH FULL LOUVER SIZE (UNLESS NOTED OTHERWISE). 5. CFM'S SHOWN REPRESENT AIRFLOWS WITH SYSTEM IN "OCCUPIED" MODE. 6. RESTROOM EXHAUST & TRANSFER GRILLES SHALL BE INSTALLED TO BE INLINE W/ EACH OTHER. 7. VERIFY HEIGHTS OF ALL WALL INLETS /OUTLETS WITH ARCHITECT PRIOR TO WALL CONSTRUCTION. 8. LINE DUCTS WITHIN 10' OF EACH AHU UNIT AND EXHAUST FAN (OR AS INDICATED ON PLAN, - WHICHEVER gREATER). 9. ALL RELIEF AIR DUCTWORK SHALL BE SOUND LINED. 10. SEE SECTION 15840 FOR DUCTWORK CONTRACTOR REQUIREMENTS. 11. LOCATE AIR TERMINALS BETWEEN STRUCTURAL FRAMING MEMBERS. COORDINATE LOCATIONS WIN LIGHTS AND ELECTRICAL DEVICES. SEE STRUCTURAL AND ELECTRICAL PLANS FOR THIS INFORMATION. 12. CONTRACTOR SHALL FIELD MEASURE ALL DUCT RUN LOCATIONS WITH STRUCTURE IN PLACE PRIOR TO FABRICATING. KEYED NOTES: �1 EXHAUST FAN F-1 TIME CLOCK CONTROL. 0 PROVIDE SHEET METAL DIVIDER BETWEEN EXHAUST AND RELIEF DUCT CONNECTING TO LOUVER. 0 DUCT RUNS CONCEALED IN ARCHITECTURAL CHASE. SEE ARCHITECTURAL PLANS FOR SECTION THROUGH THIS AREA. O 12x12 7G. O 12/8 L TRANSFER DUCT. SEE DETAIL 06 DUCT RUNS BELOW MEZZANINE IN CEILING SPACE OF TOILET ROOM. DUCT RUNS BETWEEN STRUCTURAL FRAMING. COORDINATE OPENINGS WITH JOIST SPACING. 0 3" DIAMETER FLUE CONNECTION AND 3" DIAMETER OUTSIDE AIR CONNECTION UP TO ROOF. ®8 DUCT DROPS TO LEVEL REQUIRED TO FIT IN CONCEALED ARCHITECTURAL CHASE CROSSING THROUGH OPEN SPACE NORTH OF MECHANICAL MEZZANINE. 0 8/8 EXHAUST THROUGH ROOF. 10 RECIRCULATING TYPE RANGE HOOD. 11 COORDINATE LOCATIONS WITH ELECTRICAL SERVICE REQUIREMENTS. 14 � r IS O1111 1S11tWU JAN 1 4 2004 PERMIT CENTIEP Moo -1b2 HULTZ 4 IP BHU CRo S1S consulting engineers. inc. 2401 North 3140 Streot. Suite 200 'Tacoma. WA 90407 — (253) 383-3257 'Olt (253)363 -3203 — ww+or wItsb w.ex M AMr/ar.w Inc JO Weer. 03-131 I, ARCHITECTURE vAvw.bisedb.com 724 Columbia Stet NW Suite 400 !Olympia. Washkvi n 90SO1 T 360.943. 4iSO F 360.357.9022 100 First Avenue Saudi Suite 200 Seattle. Washington 90104 T 206.340.1552 F 206.340.0412 23032 DRAWN BY * CHECKED BY WCP LB DATE 9 -25"03 BID SET MECHANICAL PLANS • 0 • Copyright 02002 by RISS Duarte Bryant AN rights reserved. G4 NTS I L4 NTS .. I r I I I I L .._,._J r F PAR11110N WALL PROVIDE ADDED ELBOWS/ OFFSETS /FIRE DAMPERS AS MAY BE SHOWN ON PLAN TRANSFER DUCT DETAIL TYPICAL AIR HANDLING UNIT LINED RETURN PLENUM SEE DETAIL SOUND—LINED DUCT, SIZE PER PLAN. WHERE SIZE NOT SHOWN MATCH GRILLE SIZE. NET SIZE SHOWN AFTER LINING. NOTES: 1. SEE SPECIFICATIONS FOR COMPLETE UNIT REQUIREMENTS. FILTER SECTION • •• •• •• `\ • •• •• •• •• • •• •\•• PROVIDE FULL SIZE HINGED ACCESS DOOR (WITH FULL SIZE OPENING BEHIND) 0 FILTER SECTION. LOCATE ON ACCESSIBLE SIDE OF UNIT. CONDENSATE LINE PIPE TO DRAIN • FINISHED CEILING GE5_ NTS INTERNAL 1" THICK LINING RUN TO COMBINED VENT AT ROOF HANGER ROD TO STRUCTURE COMBINATION SPRING & DOUBLE DEFLECTION TYPE VIBRATION ISOLATOR MOUNTING CLIP FURNISHED W/ UNIT NOTES: 1. ALL SUSPENDED HVAC EQUIPMENT W/ ROTATING COMPONENTS SHALL HAVE VIBRATION ISOLATORS AS SHOWN. EXCEPT THAT NO EXTERNAL ISOLATORS ARE REQUIRED ON INTERNALLY ISOLATED EQUIPMENT. 2. VIBRATION ISOLATORS SHALL BE SELECTED FOR 1" DEFLECTION. 3. SEE STRUCTURAL FOR ATTACHMENT TO STRUCTURE & OTHER ANCHORING REQUIREMENTS. WHERE NOT SHOWN, CONTRACTOR SHALL SUBMIT PROPOSED METHOD FOR ENGINEER REVIEW. 4. ALL AHU'S SHALL BE SUSPENDED FROM BUILDING STRUCTURE. 3 "0 FLUE 3 "0 AIR INTAKE SUSPENDED EQUIPMENT SUPPORT FURNISH W/ SUPPORT CLIPS FOR HANGING UNIT (SEE NOTE 2) CC O -D o OVER FLOW DRAIN TO OUTSIDE PROVIDE FULL SIZE HINGED ACCESS DOOR (WITH FULL SIZE OPENING BEHIND AT FAN SECTION, LOCATE ON DRIVE SIDE OF UNIT. • FAN SECTION W/ INTERNALLY SPRING ISOLATED FAN. LOCATE DRIVE ASSY ON ACCESSIBLE SIDE OF UNIT. COIL SECTION DRAIN PAN LINED SUPPLY DUCT 4 lb G12 NT5 L12 NT5 .r..._r.......�... ■••■ J ' M ' 12 NOTES: i 1" MIN. (TYP. EQUIVALENT DUCT SIZE TO DIFFUSER NECK SIZE (BASED ON P.D.) SIZE TO MATCH DIFFUSER NECK SIZE NOTES: 1. PROVIDE W/ INDEPENDENT SUPPORTS TO STRUCTURE (SEE SECTION 15090) 2. PROVIDE TYPE 1 UNLESS BUILDING CONDITIONS REQUIRE LOWER PROFILE — THEN USE TYPE 2 3. CONSTRUCT PLENUM BOXES OF MIN 26 GA GALV STEEL DIFFUSER PLENUM DETAIL UNIT W/ MA PLENUM 2. SEE PLANS FOR ALL DUCT SIZES. INTERNALLY LINED W/ 1/2" THICK DUCT LINER LINED RA /OA PLENUM SIZE AS REQUIRED FOR REQUIRED DUCT CONN'S & TO MATCH UNIT CONN SIZE 13 M MIN. ALL AROUND TYPE 1 TRANSITION TO BRANCH DUCT SIZE TYPE 2 RA OR OA DUCT, SEE PLAN FOR SIZING AHU 1. SEE PLANS FOR WHERE DUCT OR PLENUM ARRANGEMENT IS USED. .), OTHER ARRANGEMENTS e AIR HANDLING UNIT CONNECTION DETAIL 14 I i 0 1 I I CONN. COLLAR, SIZE TO MATCH DUCT SHOWN ON PLAN HEIGHT AS REQUIRED TO SUIT CONDITIONS EtIREE11 t CITY OP TUKWILA JAN 1 4 2004 PERN1FT CENTER Huu'z • BHU.CRoSS► consulting engineers, inc. 2407 North 31st Strut. Suit• 200 Tacoma. WA 40407 - (253) 303 -3257 Fag (253)303-3203 - arsl0holtabhw. earn sstz/INU/,iw we, mawMr. 03-131 1 1 � • ARCHITECTURE www.bissdb.com 724 Columbia Street NW Suite 400 Olympia. W bington 90501 T 360.943.4150 F 360.357.1022 IN First Avenue South Suite 200 Sande, Washington 90104 T 206.340.1 552 F 206.340.0412 j 23032 DRAWN BY OEURE. WCP LB 9-25-03 MEMEL (VD SET MECHANICAL DETAILS • • 1 • M L K I H G F B Copyright 02003 by BPS Duarte &pint. Al rights nsuirsod. 1 I 2 11411111.1. ••■■••••.. r rzy.'.es, J3 1/8.1 G3 [LARGE CONFERENCE ROOM 4 I ad 3 18/18 SA BEYOND 16/14 EXHAUST 18/18 RA DUCTS RUN IN CONCEALED ARCHITECTURAL CHASE, DROP DOWN ALONG NORTH MEZZANINE WALL TO ALIGN WITH CHASE HEIGHT/ LOCATION SECTION 18/18L RA 12/8L 18/18L SA AllU— AMETTIOVIIVIrTOWSWITErri% SECTION rd iiiTAN r 142 :1 -111 LliISaI * AHU-2 4 18/18 OA TO AHU- I I ' . all1111111 di or I • -- 1 11 111 7 77 - 7 7 . 77 7 7 7 :77 771 77' 7'7 18/18L SA 18/18L RA BEYOND 18/18 OA 8/6 E F 1 WOMEN ROOM 1104 1 XHAUST TO . ..111 , 041 MEN ROOM 1 105 1 5 MEC14ANI LOFT I 201 1 1-IALJAAT 1103 18/18L SA ADMINISTRATIVE ASSISTANTS I no I REFRIGERANT PIPING RUN AS HIGH AS POSSIBLE 18"0 10"0 I ; • V PLENUM TOWARD LOUVER OPENING REFRIGERANT LINES BEYOND. RACK TOGETHER ON UNISTRUT ASSEMBLY 6 18/18 RA 7 CURRICULUM DIRECTOR • 113 I J s .A1101.■ • • 12 13 14 15 A1101111111D orrY OP TUKWILA JAN 1 f 2004 POINT CaNTER Pt e l m *, t HLTLTZ BFIU4*-C ROSS consulting engineers, inc. 2407 North 31iit Str••t, Suits 200 T000rreo, WA 96407 - (253) 383-3257 Fox (253)383 - giormwooShvitsbtiw.cont itsitsilinir/Cress 411111100ir 03 ARCHITECTURE ismow. bliumlb.com 724 Columbia Surest NW Suite 400 Olympia, Washington 90601 T 360143.4650 F 360.3571022 1011 First Manua South Suite 200 Sande, Washinvon 90104 T20&340.1552 F 206340.0412 ti 0 z u Ea 0 tin rnm§ z 0 0 < LL DATE 9.25-03 EZdfMrt D T T I mots 6-14-04 N� 23032 Y256. glEME. WCP LB MECHANICAL SECTIONS J •