Loading...
HomeMy WebLinkAboutPermit M02-091 - CITY OF TUKWILA - 6300 BUILDINGM02 -091 ZF re W UO N0 co W NLL City ofTukwila WO 111 uj Dp U -: 0 UJ u 6300 ' uiZ U O Southcenter Bl Z Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: Permit Center Authorized Signature: Si doc: Mech City of'1'ukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 0003200005 6300 SOUTHCENTER BL TUKW CITY OF TUKWILA 6300 SOUTHCENTER BL, TUKWILA, WA 6300 BUILDING C/O TRAMMELL CROW CO, PO BOX 80326 STEVE BOHLMAN 19411 66 AV S, KENT WA SOUTHLAND INDUSTRIES 17941 FITCH, IRVINE, CA Contractor License No: SOUTHI *044MH Value of Construction: $4,138.00 Type of Fire Protection: MECHANICAL PERMIT cLtIILU 0 0, MO2 -091 Permit Number: Issue Date: Permit Expires On: MO2 -091 05/01/2002 10/28/2002 Phone: (206)762 -4750 Phone: 206 -283 -1732 Phone: 206 - 321 -7252 Expiration Date: 04/11/2003 DESCRIPTION OF WORK: REMOVAL BWR036A CONDENSING UNIT AND REPLACING IT WITH A TWA036D400A CONDENSING UNIT. UNIT WILL BE LIFTED OFF AND REPLACED BY CRANE. THE SAME ELECTRICAL & SUCTION & DISCHARGE LINES WILL BE USED. Fees Collected: Uniform Mechnical Code Edition: Date: U 2 ' $46.50 1997 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulat' • : . r tion or the performance of . I am authorized to sign and obtain this mechanical permit. Date:, 5 2__ Print Name: /lam This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Printed: 05 -01 -2002 DEPARTMENTS: Builditjvision Fit oo - Public Wor s Complete PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: MO2 -091 DATE: 04 -18 -02 PROJECT NAME: City of Tukwila SITE ADDRESS: 6300 Southcenter BI Ig ,„ Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued Fire Prevention r‘r Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete n Planning Division Permit Coordinator DUE DATE: 04 -23-02 ic. Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 05 -21 -02 Not Approved (attach comments) n DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2-28-02 PERMIT COORD COPY ( ACTIVITY NUMBER: MO2 -091 DATE: 04 -18 -02 PROJECT NAME: City of Tukwila SITE ADDRESS: 6300 Southcenter BI x Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Please Route Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: REVIEWER'S INITIALS: REVIEWER'S INITIALS: Documents/routing slip.doc 2-28-02 APPROVALS OR CORRECTIONS: PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Incomplete n Structural Review Required C n Planning Division Permit Coordinator E n DUE DATE: 04-23-02 Not Applicable n No further Review Required DATE: DUE DATE: 05 -21 -02 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: DATE: 4 f 23 Co~z Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: DEPARTMENTS: Building Division Public Works Complete n Documents/routing slip.doc 2.28.02 r PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: MO2 - 091 DATE: 04 -18 -02 PROJECT NAME: City of Tukwila SITE ADDRESS: 6300 Southcenter BI Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued APPROVALS OR CORRECTIONS: Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ n Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: Planning Division Permit Coordinator ❑ DUE DATE: 04 -23-02 Not Applicable n DATE: 4 DUE DATE: 05 -21 -02 Approved U Approved with Conditions ❑ Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 0 PERMIT NO.: N\ D ( MECHANICAL PERMIT APPLICATIONS INSPECTIONS a 2 Pre- construction Q 50 WSEC Residential ❑ 60 WA Ventilationllndoor AQC [] 610 Chimney Installation/All Types ❑ 700 Framing ❑ 1080 Woodstove ❑ _ 1090 Smoke Detector Shut Off 1100 Rough -in Mechanical 1101 Mechanical Equipment/Controls 1102 Mechanical Pip/Duct Insul 1105 Underground Mech Rough -in 1115 Motor Inspection 1400 Fire - Final 1800 Mechanical - Final 4015 Special -Smoke Control System CONDITIONS 0 10001 No changes to plans unless approved by Bldg Div 10002 Plumbing permits shall be obtained through King Co 10003 Electrical permits obtained through L & I 10005 All permits, insp records & approved plans available 10014 Readily acceskible access to roof mounted equipment 10016 Exposed insulation backing material 10019 All construction to be done in conformance w /approved plans 10027 Validity of Permit 10036 Manufacturers installation instructions required on site 10041 Ventilation is required for all new rooms & spaces 10042 Fuel burning appliances 10043 Appliances, which generate.... 10044 Water heater shall be anchored.... Additional Conditions: TENANT NAME: FEES Tu_L(A4 Basic Fee (Y/N) Supplemental Fee (Y/N) Plan Check Fee (Y/N) FurnaceBumer to 100,000 BTU (qty) Over 100,000 BTU (qty) Floor Furnace (qty) Suspended/Wall/Floor - mounted Heater (qty) Appliance Vent (qty) Heating/Refrig/Cooling Unii/System (qty) Boiler /Compressor to 3 HP /100,000 BTU (qty) to 15 HP /500,000 BTU (qty) to 30 HP /1,000,000 BTU (qty) to 50 HP /1,750,000 BTU (qty) over 50 HP /1,750,000 BTU (qty) Air Handling Unit to 10,000 cfm (qty) over 10,000 cfm (qty) Evaporative Cooler (qty) Ventilation Fan (qty) Ventilation System (qty) Hood (qty) Incinerator — Domestic (qty) Incinerator — Comm/Ind (qty) Other Mechanical Equipment (qty) Other Mechanical Fee (enter SS) Add'l Fees — Work w/o Permit (Y/N) Insp Outside Normal Hours (hrs) Reinspections (hrs) Miscellaneous Inspections (hrs) Add'l Plan Review (hrs) Plan Reviewer: �L. Date: I �l Permit Tech: A Date: ■ Project Name/Tenant: r, G' -f 0 "r Tu k\ Liu i I c Value of Mecha ical Equipment: f 4 1/3 6 c ' ' Site Address : I City State/Zip: 300 .Sot) 4- (A.c ev..4 -e t- 0(jc h.4- L,dc. W4 9 8 11 5 1 Tax Parcel Number: Property Owner: ( Ci 4- f lUkwt Ic&„ Phone: ( 2.0 ) tr -a i - 3• 70 Street Address: I 5 City State/Zip: 6 300 Soo {i.ct ok �Iuct A o. , Ku Fax #: ( ) 7 .✓�,s� 177 Address /9 ,, /// tbi, /We- 5 - ; Contractor: f S0,4-1,1,,..,,,i( 7-tAJus �, e5 Phone: (2.o to ) z sr 3 - (7 3 1._. Street Address: City State/Zip: 19411 G 5. reef" 755023 Fax #: ( , ) Z 513 - 1 Contact Person: Phone: (2 )7,1r t73 z___ Street Address: City State/Zip: / ' 4 1( (DG - 41( 4 u e. S. Kc, -4" ctgoz 3 Fax #: ( ) B . GO, !OR.AUTH`: za gnature: P " Date: / L _18 '— 62 -- ri �'-- / � //yt< Phone:)_ f7 Fax # : ( ? ) ,..2i..33 / 77D City/State/Zip: / , - /y o 32... 7 .✓�,s� 177 Address /9 ,, /// tbi, /We- 5 - ; CITY OF r''KWVI LA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 - 3670 Project Number. 44-0-a--.10-011--- Permit Number. R SI of I USI ONI Y Mechanical Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. CN ANICA .4 ifiAiiiiii VIE*ANDvAPPROVA T.:iREOUESTED'(TO. /LLED OUTBYAPPLICANV Description of work to be done (please be specific): ( A / I o36,4 f‘, ..;4. a�rX v.e. /( i�u. r f u���4 4- d//� 03 D ( 1/074 V cl tie_ lb pi s ref Lee Go w.de ' uH 4 . aie, .i I( V ut 7' b / r ,,.,V he yr k e Su,.gm S /I I t'd i 44$ G t / i Current copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued OR submit Form H-4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent: If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 114.4 of the Uniform Mechanical Code (current edition). No application shall be extended more than once. Date application accepted: q 1 g -�� Date application expires: /0 ' /8. Application taken by: (initials) 11/2/99 meth permitdoc Z Q • 6 lY� 00 0 w ▪ 0 �Q u) _ w Z= H O w ~ • w • 0 O - • (2 w W 2 u- O .z w U u O ~ Z ✓ Submittal Requirements Floor plan and system layout Roof plan required to identify individual equipment and the location of each installation (Uniform Mechanical Code 504 (e)) Details and elevations (for roof mounted equipment) and proposed screening Heat Loss Calculations or Washington State Energy Code Form #H -7 H.V.A.C. over 2,000 CFM (approximately 5 ton and larger) must be provided with smoke detection shut- off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical Code 1009). Specifications must be provided to show that replacement equipment complies with the efficiency ratings and other applicable requirements of the Washington State Nonresidential Energy Code. Structural engineer's analysis is required for new and the replacement of existing roof equipment weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be stamped by a Washington State licensed Structural Engineer. Mechanical Permits COMMERCIAL: Two complete sets of drawings and attachments required with application submittal NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. RESIDENTIAL: Two complete sets of attachments required with application submittal Submittal Requirements New Single Family Residence Heat Toss calculations or Form H -6. Equipment specifications. 11/2/99 miscpml.doc Change -out or replacement of existing mechanical equipment 1 Narrative of work to be done, including modification to duct work. Installation of Gas Fireplace NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. Narrative with specification of equipment and chimney type. If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney is in safe Condition. ( City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 0003200005 Address: 6300 SOUTHCENTER BL TUKW Suite No: Tenant: CITY OF TUKWILA PERMIT CONDITIONS 1: ** *BUILDING DEPARTMENT * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (206- 835 - 1111). 4: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 7: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. 8: Manufacturers installation instructions required on site for the building inspectors review. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating constructio • or the performance of work. doc: Conditions Signature: Print Name: MO2 -091 Permit Number: MO2 -091 Status: ISSUED Applied Date: 04/18/2002 Issue Date: 05/01/2002 Date: Printed: 05 -01 -2002 TRANSACTION LIST: ACCOUNT ITEM LIST: doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431-3670 Parcel No.: 0003200005 Permit Number: MO2-091 Address: 6300 SOUTHCENTER BL TUKW Status: APPROVED Suite No: Applied Date: 04/18/2002 Applicant: CITY OF TUKWILA Issue Date: Receipt No.: R020000578 Payment Amount: 46.50 Initials: KAS Payment Date: 05/01/2002 02:06 PM User ID: 1684 Balance: $0.00 Payee: SOUTHLAND INDUSTRIES Current Pmts Amount MECHANICAL - NONRES PLAN CHECK - NONRES Type RECEIPT Method Description Payment Check 400734 46.50 Description Account Code 000/322.100 37.20 000/345.830 9.30 Total: 46.50 •Ti. 7) ".'71.6 Tc.1TAL Printed: 05-01-2002 COMMENTS: ` -3 _ _ __ .Type of Inspectio • Address � : � ,, � • o fis ,1 Date called: Special instructions: Date want • .m Requester: Phone: i. X -c) y Projec ' s.r' -.` ` -3 = .Type of Inspectio • Address � : � ,, � • o fis ,1 Date called: Special instructions: Date want • .m Requester: Phone: ns INSPECTION RECOR Retain a copy with permit IVSP.ECTION NO. I TV OF.TUKWILA BUILDING „DIVISION 300'Soiuthcenter Blvd, #1.00; Tukwila,. WA 98188 Approved per applicable codes. 0 Corrections required prior to approval. Date:6-7 7. OREINSPECTION gE REQUIRED. Prior to inspection, fee must be paid 4 Southcenter Blvd., Suite 100. Call to schedule reinspection. �,RecelRt�No; Date: Ysftfl YAi :kcl ~�' R-1P2 x i:+ 14102 - loll MN` I understand that the Plan Check approvals are subject to errors and omissions and approval of plans does not authorize the violation of any adopted code or ordinance. c k t no acknowledged. tractor's copy of app roved plans ac F = 1 ^. CQ ISO CHANGES SHALL ICE MADE TO rF SCOPE OF WORK WITHOUT I :3 E: F_Vfu:ONS WILL. REQUIRE ��L`�tL �4� AND MAY U CCWDE, AJ�JIT - — PLAN SEPARATE PERMIT REQUIRED FOR: ❑ MECHANICAL (17 ELECTRICAL rePLUMBING [7'GAS PIPING CITY OF TUKWILA BUILDING DIVISION Un;f # j. G. E co 40 , 3 M# B w 3 b Ay IiepL.. L -11 j C W T W403 4, G Kcb.! CITYOF APR 18 2002 PERMIT CENTER 00 Sog1 ce wtev - LIRb( Tu kw i I.,- MO- O3I OUTDOOR UNIT NOISE inn MEOWS) 0 POWER COIDIS.--V/PINCE MN. RACH. CM. MAMMY ea. elk l • MAX.(MIPS) PROF RIG. f MK (AMPS) COMPRESSOR SPEEDS VOLTS/MO - RI. AMPS el •LFL AMPS FACTORY INSO41ED START COMPONENTS 0 MA NfA NO INSWIROWSOUND MARKET NO ILE A YES OIIDOOR PAN -TYPE PROPELLER PROPEU.ER OMMA •NO.USED 18 -1 18 -1 CM SOEOS 0 2350 .• 1 t9RECT -1 WINO/ORS =If 1.15 1- U4 MOTOR SPEED RPM 1075 1075 IAXTB)PRN2 200230160 4804.60 FL• AMPS 1.00 0.80 01770008 COIL-TYPE SPINE SPINE Wm EMS -ER/ 1 -24 1 -24 TI OE SIZE (W.) FE) 1 318 1 35 REFAIi8IMITCONTRO EXPANSIONVA1 EXP/NS10NVAUIE (OD urm FACTORY SUPPLIED LMNE SIZE - W.O.13 GAS 0 UNE SIZE - IN. Oil U0.0 • FCCY THICTOR ORIFICE 912E TWA8780300A _ , TWA 15 25 25 90 460160 . 15 15 CUMEIJFF 1.1 2002309160 10,8 -71 5 L6&,13 02. YES 111 318 CLIMEIIFP- SCROLL 1 -.1 480360 5.3.39 51.89.33 02. YES 748 3)8 OUTDOOR UNIIUNIT•CRATEDMt) UNMATED 11101(7 - SNIPPING CRS) $ S EV NSIONTYPE TEA03004 C14010 71 RATII S IEATING)0 (MGR TEMA) STUN 31800 SYSTEM PONIR (KW) 3.40 COP 274 HSPF :1114NAT FNR. • 610 EXPANSIOMTYPE RATNIGS (COOM NO) STUN (TOTAL) STUN (SENS!li.E) INDOOR ANRFLOW ICF M) SYSTEM DOWER (KW) SEER STU WATFNA. RAf1NGSO4EATTN01 (MIGHTEMP.) 87UH 32200 SYSTEM POWER (KW) 2.97 HSPF (BTUNVA 1 HR.L 7 '544 papa 23 and 2I for combloakns will Ausigry 04 38600 26803 1350 3.89 1020 OA71 HXWXO 3310X26.112X00 SEE MUNE oWO. APR 18 Z00 ` J U7/ General • Data TWA03a03/4CAIA TXA031C4 TX•O3SCI 0837071 FAMINE it 31800 3.19 282 7.15 TXA048G 7X.001904 TXAOSOCA CHGTO 71 CHGTO 71 CMGTO71 38600 26800 1350 3.89 1020 32200 2.97 3.18 7.60 0.071 HEWED SEEE 199 184 31800 140 274 810 36600 26000 1350 3.88 1020 322 3.18 7.80 RECEIVED CITY OF TUKW II_P PERMIT CENTER 0 cameo IN ACCORDANCE WTIMTME AIRSOURCE UNITARV MEAT PUMP EOUWMENTCER AF1CATIONPROGAIw,WHIcS115 B et & .L VANDARD 210240. r r(iK f 71 0 RATED INA000ROANCE WON A .RI8TAN0A$0270. ArwR()V • 193 184 OUTDOOR UNIT WITH HEAT PUMP COILS TXAmeC4 FACT INS 71 32000 3.09 3.04 7.35 33800 21800 1100 3.69 10.05 SPUT .:}"� 0 CALCULATED it ACCORDANCE WITH NEXNJAL ELECTRIC CODE ONLY USE MACK CIRCUIT BREAKERS OR FUSES. O STANDARD AIR • DRY COIL • OUTDOOR 0 TM18 VALUE APPROMIAME. FOR MORE PRECISE VALUE SEE UN17 NAMEPLATE AROSEFAIICE INSTRUCTION. 0 WAX. LINEAR LEL:TN OO FTWRM REGROWING COMPRESSOR - 60 FT wpm SCROLL MAX LIFT- SUCTION 60 FT. MAX LIFT - U0U10 60 FT. FOR GREATER LENGTH REFER TO REFRIGERANT PIPING SOFTWARE Plb. NO.32- 3312-01. 0 THE VALUE SHOWN FOR COMPRESSOR RUA ON THE UNIT NAMEPLATEAROON THISSPECIFICATIONSHEEi IS USED TO COMPUTE MINIMUM BRANCH CIRCU4TAMP)ACITY AND MAXIMUM FUSE SIZE- THE VALUE SW*41STNE MANOR CIRCUIT SELECTION CURRENT. 0 NO MEANS NO START COMPONENTS YES PAEANS MACK START KR COMPONENTS PIC MEANS POSITIVE TEMPERATURE COEFFICIENT STARTER, TXA037C4 TXA042G TXA013CA INS 71 CHGlo71 C140TO71 NAM lC00LM16j 0 _ _ _ _ _ _ STUN (SENSIBLE) 21000 23000 21803 24400 24400 24700 II4000R AIRFLOW (CFI) 1100 1100 1100 1200 1200 1200 SYSTEM POWUi (KW) 3.69 3.72 3.68 3.78 3.78 3.79 SEER (BTINNATLNR.) 70.06 10.10 10.05 1020 1020 1020 32000 3.09 3E4 7.35 33800 21800 1100 3.69 10.05 32000 3.05 308 7.40 TXCO3O A TXCO30O4 7XCO31C4 CHGT071 CHGTO71 _ CHGTO71 34203 23000 1100 3.72 10.10 31800 31800 ' 31100 3.40 3.40 3.19 2.74 2.74 2.92 6.80 8b0 • 7.15 32200 3.01 3.14 7.50 1XCO3104 CMGTO71 4f'R2Li 222 As No ;.11 3'6200 1330 329 10.15 34200 23000 1100 3.72 10.10 31800 3.19 2.92 7.15 • • SERVICE PANEL ELECTRICAL AND REFRIGERANT PEP CODES. 229 191 1 127 151 l 41 1 28.6 11 -1/81 D1A. K.O. WITH 22.2 47/91 WA. HOLE ELECTRIC POWER SUPPLY 22.2 17/91 01A. HOLE LOW "VOLTAGE P N0.22.1645.05.1200 (EN) 175 16 249 19 1 210 041 12, 1 51 121 Dimensions TWWAO3O 072 OUTLINE DRAWING NOTE: AU. DIMENSIONS ARE M MM (INO4ES) FIG. 1 GAS LINE BALL SERVICE VALVE, BALL 1/4 TURN 1) fEUALE GRAZED CO0NNE ION WITH 1/4 PITT MARL CT LIQUID LINE SERVICE VALVE. E" 0.0. FEMALE BRAZED PRESSURE TAP If1TTING. CLARE "0-0.0. c LINE E 1 LE BRAZ P CONNECTION APFITTING. A£ FLARE LIOUIO LINE SERVICE VALVE, 0.u. FEMALE BRAZED P RE S SUR E T AP � F I T TIN G. FLARE 31 • Timm I4 -TOP OISCNARGE AREA SHOULD BE UNR € EE UNIT SMOULO B E i 5 1 FEE WIVE PLACED 50 ROOF RUN -OFF WATER AND SHOU 8 6 DIRECTLY AT 30 1 2'i FROM WALL. *NO ALL SURROUNDING Two S5DE5 uNRESTRICTEO- OTHER TWA042C TWA048D TWA060D TWA072C 17332 CI 032 7 1 8 3!4 CM (32.3/4) . 4) (2 (3/ 8 a1101 (go my El ?311 IIENIESICICII Rom DW0. 210147662 Rev. 6 MM motto HALF LIMP iMUMPLIINI UALEQAll tor Fume mos 1111111.LUIAIND tat I MOIL OM Ili gllMli ° fK�ILMllRaM1N . 11 6 - \\ S 7 RWR7357 ou fno UNITS QIfrAAIMILAli11•My MAMA An A r s mILI M�I.AM mess I isinM tbIx13 �FOA a��Mll ___ lMls1NMM SEE PHOTO KUM FOR REFRIGERANT CONTROLS MOM PRONT PANEL • 10 DATA sat+Mv. *mow MonCE sw arf CASA TAI MIMI voila 1/IrlfFOR lMHSLIMAM _ j SEE FIrOTO GEIM FUA ELECTRICAL commix* MERINO WOE PANEL • • B COI OUTDOOR UNIT • U■IA.UMI" 1r1M 1MtAA>a s/1lif�//WMR Ram sutra N�f AMU SAL rMwftV�� $4001 Ewt . • P011 REfIMORfIANT MIND FRONT PANEL CI M M Mow . ~~ • ELECTRICAL CONTROLS REFRIGERANT CONTROLS TY OF TIP M1 `" 2 R 2 • f%S fiao Oq tl C1213417 VIAL 1 t ECEIVE( - Ii'Y OF TUK APR 18 2( A tJ lb !VILA 02 ER MO.-O3I • • • 5 � 1a OM NI b ew04iSt, w 0. LL OWN 2* SPOT SYSTEM GENERAL ELECT/sit, rn ve. v ., . . . CENTRAL AtR CO?400X)111d6 OEPAR*Me11. TROVP MGHWAY. TWA TEXAS 7571v PRODUCT SPECIFICATIONS � CO24dit bowsaw et ads* probe 04120 ll.c*k OWL ends whir wpwindi Fay now pubs VISO Ms wit essobis wd mks iincloiL -- WWI 1DR Max 101410 0AmarIM We 40 E for gear 0O wwr b R 21018 W 4404 Owed Pd. 1b. MONO. DATA SDIDIECT 10 pM*OE atllqur •sar:rtnsiVair YfgtiMSlaMY, ,. ....rminpe'�`kRlfs'. . VAA SWINU • Z W g U ND w -r -J p u) Lt. W o co 9. LU 2 U 1 -- = W 1 - O W UN 0 Z 4411140 1S t3 ZS PONES CONNS. -- VONI/Ns foes etas - fts.tOmost Foss Site - 0.c06 , . tows) $..1, Ra114s 14. 1ZI 23011141 44 19 • 240- 21013/6/ t7 n' . 19 COMMON -Ms. 106 C111.41,“ -TN I t cltOat111 - TS 1 -1 - Clia4tett - TN 1-1 yetis/Ph/Ns 230 /1/4f 200 -2901$ /40 14213/06 R.L. OMs .. L.N. Atos 16.0- 101 11.9- 100 6.0 -4f: 0rca. Ct.. Nil 10.6 14.9 6.0 011/1000 FAN -- Sta. $t..) - 14. Ust4 Tres Soles - u OISE= - 1 11AQT - 1 INSECT 1 11;11 00.0 is. 5300 9900 Ile. 0.tMp• - M Palos /MOW R. 1 - 0.31 • 2 011 /M 1 - 6.33 2301114 _ 1 Ni 46011/14 i.L.• Are - LO. 110e4• 1.4 ■ O.9 1.4 - 1.9 1'.3 ■ SWOOP COIL -- Tres 1P141 MIN SPINE FIN SPINE F1* 'Isle'- F.P.T. • 1 - is f 20 1 - ON fret+ Aria tsa. 14.1 17.5 17.3 17 S Ube Oise tie.) 0.31 0.3f 0•i. tIe /rts.rp*t Castro) EXP41E100 VALVE 1IP011SI0N SALVE EXPANSION VALVE 'afters 0 1$14 U(40 [!1 ' TEES TES Lies Oise - to. 0.1. Css 16) 0.00 0.01 0.00 Liss Sams - le. 0.1. U. (62 0.91 0.91 0.31 1 1 2 1 1 1 0 0 1 0 1 1 1 1 1 1 2 1 1 1 0 0 1 0 1 1 1 1 - - N N O N S 9 , . ; - , . . N o 11 It II SoWler•M11 - Crstsa 11..) 17.11 a 1e.5 x 03.5 06 x M x *3 34 It 9! 4 M Uscraaa SEE OUTLINE 3 190*$) !SE OUTLINE 01tA0111C13) ONE OUTLINE 1.00211010$ Nt iesJ 104.) � 2 WM + ' •.r• -' G.'.; j ,•NAII'T',1Qilt N : !C,!.� 1 J ` � ,a . .;I 1 .. 7: f1i074M r 1187604.10 U 40oNP • =IC .Nth MT=M00 *C,.lts.f 117 1 012114* 400 arm P4ter INN) • MTNNC1 04461141) (1) 0*1.1. Tssr.) 1114 . i E 1 Srsts. Paver OW) 0.0.0. *L.. Tees.) STUN Svutoi Ps.tr U01) C.O.S. • t1.M. - 40000 90000 1 1 %CI f0 fN I•. 10610 A1rstes tCFI*) 1110 1060 Svelte., P.•er 0031 4.7 4.6 NATION INta11.!) 11) 011.8 T1*..) 4711N tsetse Pees, Wm) 99000 '9.13 MOOS 4.4 • C.O.S. sys w 0111) 2.9 7 2.7 9 C.0.0. ,I..1 2.1 • 5 � 1a OM NI b ew04iSt, w 0. LL OWN 2* SPOT SYSTEM GENERAL ELECT/sit, rn ve. v ., . . . CENTRAL AtR CO?400X)111d6 OEPAR*Me11. TROVP MGHWAY. TWA TEXAS 7571v PRODUCT SPECIFICATIONS � CO24dit bowsaw et ads* probe 04120 ll.c*k OWL ends whir wpwindi Fay now pubs VISO Ms wit essobis wd mks iincloiL -- WWI 1DR Max 101410 0AmarIM We 40 E for gear 0O wwr b R 21018 W 4404 Owed Pd. 1b. MONO. DATA SDIDIECT 10 pM*OE atllqur •sar:rtnsiVair YfgtiMSlaMY, ,. ....rminpe'�`kRlfs'. . VAA SWINU • Z W g U ND w -r -J p u) Lt. W o co 9. LU 2 U 1 -- = W 1 - O W UN 0 Z Project Info Project Address f^„3 (50 � _/j , /," p Model No. Date 6/ .... / r ' 0 Z /veioJc //a_. // , /� SEER or EER For Building Dept. Use n Location / y e , } r ) Applicant Name: Cr t1 Q./ hi /DL IA* b Applicant Address: i�y�l 6 ,4b S // fi 0� f _ 08-3 , Applicant Phone: 2� /.3.2_. Cooling Equipment Schedule Equip. ID Brand Name Model No. Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location / y e , } r ) 7 Ac i(0i to f 3 P-ob IA* b //• ?- F(=.01 CITY OF TUKWILA Mechanical Summary MECH -SUM 2001 Washington State Nonresidential Energy Code Compliance Forms N -7 -c. Building Division June 2001 - KJM Project Description Briefly describe mechanical systen J 4e ca.7�.P�$// D - e,lf - • type and features. CePol /'q £) ». (' 0 Includes Plans Include documentation requiring compliance with commissioning requirements, Section 1416. Compliance Option Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Heating Equipment Schedule Equip. - ID Brand Name . AL• • Model No. Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiencv Fan Equipment Schedule Equip. ID Brand Name Model No. CFM SP' HP /BHP Flow Control Location of Service 1 If available. 2 As tested according to Table 14 -1, 14 -2 or 14 -3. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). of l al4Pc a � � ,0 APR 18 2002 PERMIT CENTER RECEIVED CITY OF TUKWILA nn0a -oR System Description If Heating /Cooling • Consta nt vol? • Air cooled? • Packaged sys? ■ <54,000 Btuh See Section 1421 for full description Simple System or Cooling Only: a Split system? Economizer included? or 1900 cfm? • of qualifications. If Heating Only: IN <5000 cfm? • <70% outside air? CITY OF TUKWILA Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only 'Complex Systems Heating! Cooling or Cooling Only Reference Section 1421) Yes Yes Reference Section 1423 Reference Section 1420 Building Division Use Complex Reference Systems Section 1430 Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. arem genovrw.....,a..nV . waR.:xrrxMr AXtitni z �2 ce W O 0 co w W • 0 2 g Q . Z W ui 0 ON 0 I- W U u O . i z 0 1 Mechanical - Complex Systems Checklist MECH -COMP 2001 Washington State Nonresidential Energy Code Compliance Forms June 2001 - KJM Project Address Date The following additional information is necessary to check a mechanical permit application for a complex mechani system for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Use the checklist as a reference for notes added to the mechanical drawings (see the MECH -CHK checklist for additional system requirements). This information must be on the plans since this is the official record of the permit. Having this information in separate specifications alone is NOT an acceptable alternative. For Building Department Use Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY 1431.1 Field assem. sys. Provide calculations 1432.1 Setback & shut -off Indicate separate systems or show isolation devices on plans 1432.2.1 Air system reset Indicate automatic reset 1432.2.2 Hydr. system reset Indicate automatic reset 1433 Economizers Indicate economizer on equipment schedule or provide calculations to justify exemption 1434 Separate air sys. Indicate separate systems on plans 1435 Simul. htg. & cig, indicate that simultaneous heating and cooling is prohibited, unless use of exception is justified 1436 Heat recovery Indicate heat recovery on plans; complete and attach heat recovery calculations 1437 Elec. motor effic. MECH -MOT or Equip. Schedule with hp, rpm, efficiency 1438 Variable flow sys. Indicate variable flow on fan and pump schedules 1439.1 Kitchen Hoods Indicate uncooled and unheated make -up air 1439.2 Fume Hoods Indicate VAV, unheated /uncooled or heat rec. makeup CITY OF TUKWILA no is circled for any question, prov exp Decision Flowchart Use this flowchart to determine how the requirements of the Complex Systems Option apply to 1 project. Refer to the indicated Code sections for more complete information on the requirements Section 1432.2 Hot Water Supply Temperature Reset Required apacity of H Heating System > 00,000 Btuh Field - Assemble Equipment? Air System Serving Multiple Zones? Section 1432.2 Supply Air Reset Controls Required 4--Yes No 0 Start Here 4, Section 1411.1 Equipment Efficiency Shall Meet Tables 14- 1 through 14-3 Yes Yes—► (continued on back) Building Division Section 1431.1 Calculations of Total On -Site Energy Input 8 Ouput Required 1 CITY OF TUKWILA Mechanical - Complex Systems (back) MECH -COMP 2001 Washington State Nonresidential Energy Code Compliance Forms Cooling Capacity > 20,000 Btuh? Section 1411.4 Must be a Heat Pump Section 1412.5 Provide Microprocessor Heat Pump Controls e @q & Cooling n One Package? pply Air >5, clm8OSA> 70% Cooling Capacity > 54,000 Btuh? ystem or Zon w/ Simultaneous Htg. & Clg.? Section 1433 Air-Side Economizer Required Application Involves Variable Flow? otal Bldg. Fu Exhaust> 15,000 dm? tchen Exhau Hood > 5,000 dm? Section 1436 50% Effective Heat Recovery Required Package Unit? arts or Pumps > 10 HP? Section 1438 Variable Flow Devices Required otal Bldg Capacity >240,000 Btuh or %ofTo Yes Yes 0 0 0 0 No DONE Yes Motor Eft. Included In Equip. Perf. Rating? Section 1437 Motors Must Meet ERciandes In Table 14-4 Yes-10 Yes No • Section 1435 Zone Controls Must Reduce Supply Air Quantity Before RehealinglRecooling Yes Section 1439.1 No Heating or Cooling for at Least 50% of Make-up Air Yes-0 Yes • Section 1412.6 Modulating or Staged Combustion Controls Required Yes Section 14392 One Required: • a. 50% VAV Exhaust & Make -up b. 75% Direct Makeup w/ Tempering Only c. Heat Recovery per 1436 d. Constant Volume w/ < 501pm Face Velocity FPuildin ! Division June 2001 • KJM Yes No ,...c.:: ad.•..,iu _!. n'a : �! cr..: ci,: �Sa�at,: u,:' �. i .:StLiwil��oii�::.�:uif,�.il:5, Electric Motors MECH -MOT 2001 Washington State Nonresidential Energy Code Compliance Forms June 2001 - KJM Project Address Date Complete the following for all design A & B squirrel -cage, T -frame Induction permanently wired polyphase motors from 1 hp to 200 hp having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the exceptions below applies). For Building Department Use Motor No. or Location HP Type (open /closed) Description of Application or Use Synch. Speed Min.Nom. Full load Efficiency Minimum Nominal Full -Load Efficiency Open Motors Closed Motors Exceptions: 1. Motors in systems designed to use more than one speed of a multi -speed motor. 2. Motors already Included In the efficiency requirements for HVAC equipment (Tables 14 -1 or 14 -2) . 3. Motors that are an integral part (Le. not east removed and replaced of specialized process equipment (i.e. equipment which requires a special motor, such as an exploslon -proof motor). 4. Motors integral to a listed piece of equipmer for which no qualifying motor has been approved (i.e. if the only U.L. listing for the equipment is with a less- efficient motor and there is no energ) efficient motor option). For motors claiming an exception, list motor and note which exception applies. Synchronous Speed (RPM) 3.600 I 1,800 I 1,200 3,600 I 1,800 1,200 HP Efficiency (%) Efficiency (%) 1.0 - 82.5 80.0 75.5 82.5 80.0 1.5 82.5 84.0 84.0 82.5 84.0 85.5 2.0 84.0 84.0 85.5 84.0 84.0 86.5 3.0 84.0 86.5 86.5 85.5 87.5 87.5 5.0 85.5 87.5 87.5 87.5 87.5 87.5 7.5 87.5 88.5 88.5 88.5 89.5 89.5 10 88.5 89.5 90.2 89.5 89.5 89.5 15 89.5 91.0 90.2 90.2 91.0 90.2 20 90.2 91.0 91.0 90.2 91.0 90.2 25 91.0 91.7 91.7 91.0 92.4 91.7 30 91.0 92.4 92.4 91.0 92.4 91.7 40 91.7 93.0 93.0 91.7 93.0 93.0 50 92.4 93.0 93.0 92.4 93.0 93.0 60 93.0 93.6 93.6 93.0 93.6 93.6 75 93.0 94.1 93.6 93.0 94.1 93.6 100 93.0 94.1 94.1 93.6 94.5 94.1 125 93.6 94.5 94.1 94.5 94.5 94.1 150 93.6 95.0 94.5 94.5 95.0 95.0 200 94.5 95.0 _ 94.5 95.0 95.0 95.0 CITY OF TUKWILA Building Division Mechanical Permit Plans Checklist MECH -CHK 2001 Washington State Nonresidential Energy Code Compliance Forms June 2001 - KJM Project Address !Date The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Requires Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401-1424) 1411 Equipment performance 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency 1412 HVAC controls 1412.1 Temperature zones Indicate locations on plans 1412.2 Deadband control Indicate 5 degree deadband minimum 1412.3 Humidity control Indicate humidistat 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types 1412.4.1 Dampers Indicate damper location and automatic controls 1412.4.2 Optimum Start Indicate optimum start controls 1412.5 Heat pump control Indicate microprocessor on thermostat schedule 1412.6 Combustion htg. Indicate modulating or staged control 1412.7 Balancing Indicate balancing features on plans 1422 Thermostat interlock Indicate thermostat interlock on plans 1423 Economizers Equipment schedule 1413 Air economizers 1413.1 Operation indicate 100% capability on schedule 1413.2 Control Indicate controls able to evaluate outside air 1413.3 Integrated operation Indicate capability for partial cooling 1414 Ducting systems 1414.1 Duct sealing Indicate sealing necessary 1414.2 Duct insulation Indicate R -value of insulation on duct 1415.1 Piping insulation Indicate R -value of insulation on piping 1416 Completion Requirements 1416.182 Drawings & Manuals Indicate requirement for record drawings and operation docs. 1416.3.2 Air Balancing Indicate air system balance requirements 1416.3.3 Hydronic Balancing Indicate hydronic system balance requirements 1416.4 Commissioning Indicate requirements for commissioning and prelim. Report 1424 Separate air sys. Indicate separate systems on plans Mech. Sum. Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440-1454) 1440 Service water htg. 1441 Elec. water heater indicate R -10 insulation under tank 1442 Shut -off controls Indicate automatic shut -off 1443 Pipe Insulation Indicate R -value of insulation on piping 1453 Pool heater controls Indicate switch and 65 degree control 1454 Pool covers Indicate vapor retardant cover 1454 Pools 90+ degrees indicate R -12 pool cover CITY OF TUKWILA no is circles for any question, provtae explanation: Building Division 1a . .aec+sn,oa..- ns+smm- ns.v>r.+uxr ++.��,wwueiwvum +srusnvrrx * ✓.�troM#^ ^h°SR 4I40{§fin CITY OF TUKWILA Mechanical Permit Plans Checklist 2001 Washington State Nonresidential Energy Code Compliance Forms MECH -CHK June 2001 - KJM Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1 through 14 -3. If a nationally recognized certification program exists for a product covered in Tables 14 -1 through 14 -3, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Cooling Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20,000 Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by Individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Ofi: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or altemate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu/h) or less may be controlled by readily accessible manual off-hour controls. 1412.4.1 Dampers: Outside air Intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum start controls shall be designed to automatically adjust the start time of an HVAC system each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. Building Division 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall Include microprocessor controls that minimize supplemental heat usage during start-up, set -up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall Indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. Exceptions: 1. Boilers. 2. Radiant Heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. 1413.2 Control: Air economizers shall be controlled by a control system capable of determining if outside air can meet part or all of the building's cooling loads. 1413.3 integrated Operation: Building Heating Energy: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Controls shall not preclude the economizer operation when mechanical cooling is required simultaneously. Exception: Economizers on individual, direct expansion, cooling systems with capacities not greater than 75,000 Btu /h may include controls that limit simultaneous operation of the economizer and mechanical cooling for the purpose of preventing ice formation on cooling coils. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 Inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required Is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be Isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with Tess than 2,800 cfm of total supply air capacity shall be Insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 Insulation: Piping shall be thermally Insulated in accordance with Table 14 -6. Exception: Piping installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAC 51 -26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for building completion and commissioning requirements.) V Tf11 R}:Y MOBNOMMINefaig"lina - , ..vw"w.�v EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 CITY OF TUKWILA Mechanical Permit Plans Checklist 2001 Washington State Nonresidential Energy Code Compliance Forms MECH -CHK June 2001 - KJM Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1 through 14 -3. If a nationally recognized certification program exists for a product covered in Tables 14 -1 through 14 -3, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Cooling Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20,000 Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by Individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Ofi: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or altemate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu/h) or less may be controlled by readily accessible manual off-hour controls. 1412.4.1 Dampers: Outside air Intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum start controls shall be designed to automatically adjust the start time of an HVAC system each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. Building Division 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall Include microprocessor controls that minimize supplemental heat usage during start-up, set -up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall Indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. Exceptions: 1. Boilers. 2. Radiant Heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. 1413.2 Control: Air economizers shall be controlled by a control system capable of determining if outside air can meet part or all of the building's cooling loads. 1413.3 integrated Operation: Building Heating Energy: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Controls shall not preclude the economizer operation when mechanical cooling is required simultaneously. Exception: Economizers on individual, direct expansion, cooling systems with capacities not greater than 75,000 Btu /h may include controls that limit simultaneous operation of the economizer and mechanical cooling for the purpose of preventing ice formation on cooling coils. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 Inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required Is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be Isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with Tess than 2,800 cfm of total supply air capacity shall be Insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 Insulation: Piping shall be thermally Insulated in accordance with Table 14 -6. Exception: Piping installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAC 51 -26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for building completion and commissioning requirements.) V Tf11 R}:Y MOBNOMMINefaig"lina - , ..vw"w.�v 05/01/2002 WED 09:15 FAX 949 756 3239 524ilm t;i1Y/. CORPORATE SAFETY DEPT a 001 . - SOUTHLAND INDUSTRIES 17941 FITCH IRVINE CA 92614 DU.PARTNIFINT OF LABOR AND INDUS'lltiES REGISTERED AS PROVIDED BY LAW AS CONST ,CONT GENERAL , EXP DATE - CC01 sepTHI *p44 mli 04 /11 /2 0, 03 EEFECTIVE DATE ' 07/08/1996 •. - D 3,11,11)j‘:1)1:Ay • ."'"7•7. - REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL REGIST. # EXF. DATE CCOI SOUTHI*044MH 04/11/2003 EFFECTIVE DATE 07/08/1996 SOUTHLANp INDUSTRIES 17941 FITCH IRVINE CA 92614 • Sign:ttute • .... • Ist:Ited fly DIYAR I NtrINIT Ur. 1 A1301: •s:D INDI.!STRIbti RECENED C1TYOFTUKW MAY - A 2042 PERMIT CENTER