HomeMy WebLinkAboutPermit M02-091 - CITY OF TUKWILA - 6300 BUILDINGM02 -091
ZF
re W
UO
N0
co W
NLL
City ofTukwila
WO
111 uj
Dp
U
-:
0
UJ
u
6300
'
uiZ
U
O
Southcenter Bl
Z
Parcel No.:
Address:
Suite No:
Tenant:
Name:
Address:
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Address:
Permit Center Authorized Signature:
Si
doc: Mech
City of'1'ukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
0003200005
6300 SOUTHCENTER BL TUKW
CITY OF TUKWILA
6300 SOUTHCENTER BL, TUKWILA, WA
6300 BUILDING
C/O TRAMMELL CROW CO, PO BOX 80326
STEVE BOHLMAN
19411 66 AV S, KENT WA
SOUTHLAND INDUSTRIES
17941 FITCH, IRVINE, CA
Contractor License No: SOUTHI *044MH
Value of Construction: $4,138.00
Type of Fire Protection:
MECHANICAL PERMIT
cLtIILU 0 0,
MO2 -091
Permit Number:
Issue Date:
Permit Expires On:
MO2 -091
05/01/2002
10/28/2002
Phone: (206)762 -4750
Phone: 206 -283 -1732
Phone: 206 - 321 -7252
Expiration Date: 04/11/2003
DESCRIPTION OF WORK:
REMOVAL BWR036A CONDENSING UNIT AND REPLACING IT WITH A TWA036D400A CONDENSING
UNIT. UNIT WILL BE LIFTED OFF AND REPLACED BY CRANE. THE SAME ELECTRICAL &
SUCTION & DISCHARGE LINES WILL BE USED.
Fees Collected:
Uniform Mechnical Code Edition:
Date: U 2 '
$46.50
1997
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and
ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulat' • : . r tion or the performance of . I am authorized to sign and obtain this mechanical permit.
Date:, 5 2__
Print Name: /lam
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is
suspended or abandoned for a period of 180 days from the last inspection.
Printed: 05 -01 -2002
DEPARTMENTS:
Builditjvision Fit
oo -
Public Wor s
Complete
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: MO2 -091
DATE: 04 -18 -02
PROJECT NAME: City of Tukwila
SITE ADDRESS: 6300 Southcenter BI
Ig ,„ Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter # Revision # After Permit Is Issued
Fire Prevention r‘r
Structural
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Incomplete n
Planning Division
Permit Coordinator
DUE DATE: 04 -23-02
ic.
Not Applicable ❑
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS ROUTING:
Please Route Structural Review Required ❑ No further Review Required ❑
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved n Approved with Conditions
Notation:
REVIEWER'S INITIALS:
DUE DATE: 05 -21 -02
Not Approved (attach comments) n
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents/routing slip.doc
2-28-02
PERMIT COORD COPY
(
ACTIVITY NUMBER: MO2 -091
DATE: 04 -18 -02
PROJECT NAME: City of Tukwila
SITE ADDRESS: 6300 Southcenter BI
x Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter # Revision # After Permit Is Issued
DEPARTMENTS:
Building Division
Public Works
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Please Route
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS ROUTING:
REVIEWER'S INITIALS:
REVIEWER'S INITIALS:
Documents/routing slip.doc
2-28-02
APPROVALS OR CORRECTIONS:
PLAN REVIEW /ROUTING SLIP
Fire Prevention
Structural
Incomplete n
Structural Review Required
C
n
Planning Division
Permit Coordinator
E
n
DUE DATE: 04-23-02
Not Applicable n
No further Review Required
DATE:
DUE DATE: 05 -21 -02
Approved ❑ Approved with Conditions Not Approved (attach comments) ❑
Notation:
DATE: 4 f 23 Co~z
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
DEPARTMENTS:
Building Division
Public Works
Complete n
Documents/routing slip.doc
2.28.02
r
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: MO2 - 091
DATE: 04 -18 -02
PROJECT NAME: City of Tukwila
SITE ADDRESS: 6300 Southcenter BI
Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter # Revision # After Permit Is Issued
APPROVALS OR CORRECTIONS:
Fire Prevention
Structural
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Incomplete ❑
n
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS ROUTING:
Please Route ❑ Structural Review Required ❑ No further Review Required
REVIEWER'S INITIALS:
Planning Division
Permit Coordinator
❑
DUE DATE: 04 -23-02
Not Applicable n
DATE: 4
DUE DATE: 05 -21 -02
Approved U Approved with Conditions ❑ Not Approved (attach comments) n
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
0
PERMIT NO.: N\ D (
MECHANICAL PERMIT APPLICATIONS
INSPECTIONS
a 2 Pre- construction
Q 50 WSEC Residential
❑ 60 WA Ventilationllndoor AQC
[] 610 Chimney Installation/All Types
❑ 700 Framing
❑ 1080 Woodstove
❑ _ 1090 Smoke Detector Shut Off
1100 Rough -in Mechanical
1101 Mechanical Equipment/Controls
1102 Mechanical Pip/Duct Insul
1105 Underground Mech Rough -in
1115 Motor Inspection
1400 Fire - Final
1800 Mechanical - Final
4015 Special -Smoke Control System
CONDITIONS
0
10001 No changes to plans unless approved by Bldg
Div
10002 Plumbing permits shall be obtained through King
Co
10003 Electrical permits obtained through L & I
10005 All permits, insp records & approved plans
available
10014 Readily acceskible access to roof mounted
equipment
10016 Exposed insulation backing material
10019 All construction to be done in conformance
w /approved plans
10027 Validity of Permit
10036 Manufacturers installation instructions required
on site
10041 Ventilation is required for all new rooms &
spaces
10042 Fuel burning appliances
10043 Appliances, which generate....
10044 Water heater shall be anchored....
Additional Conditions:
TENANT NAME:
FEES
Tu_L(A4
Basic Fee (Y/N)
Supplemental Fee (Y/N)
Plan Check Fee (Y/N)
FurnaceBumer
to 100,000 BTU (qty)
Over 100,000 BTU (qty)
Floor Furnace (qty)
Suspended/Wall/Floor - mounted Heater (qty)
Appliance Vent (qty)
Heating/Refrig/Cooling Unii/System (qty)
Boiler /Compressor
to 3 HP /100,000 BTU (qty)
to 15 HP /500,000 BTU (qty)
to 30 HP /1,000,000 BTU (qty)
to 50 HP /1,750,000 BTU (qty)
over 50 HP /1,750,000 BTU (qty)
Air Handling Unit
to 10,000 cfm (qty)
over 10,000 cfm (qty)
Evaporative Cooler (qty)
Ventilation Fan (qty)
Ventilation System (qty)
Hood (qty)
Incinerator — Domestic (qty)
Incinerator — Comm/Ind (qty)
Other Mechanical Equipment (qty)
Other Mechanical Fee (enter SS)
Add'l Fees — Work w/o Permit (Y/N)
Insp Outside Normal Hours (hrs)
Reinspections (hrs)
Miscellaneous Inspections (hrs)
Add'l Plan Review (hrs)
Plan Reviewer: �L. Date:
I �l
Permit Tech:
A Date:
■
Project Name/Tenant: r,
G' -f 0 "r Tu k\ Liu i I c
Value of Mecha ical Equipment:
f 4 1/3 6 c ' '
Site Address : I City State/Zip:
300 .Sot) 4- (A.c ev..4 -e t- 0(jc h.4- L,dc. W4 9 8 11 5 1
Tax Parcel Number:
Property Owner: (
Ci 4- f lUkwt Ic&„
Phone: ( 2.0 ) tr -a i - 3•
70
Street Address: I 5 City State/Zip:
6 300 Soo {i.ct ok �Iuct A o. , Ku
Fax #: ( )
7 .✓�,s� 177
Address /9 ,, /// tbi, /We- 5 - ;
Contractor: f
S0,4-1,1,,..,,,i( 7-tAJus �, e5
Phone: (2.o to ) z sr 3 - (7 3
1._.
Street Address: City State/Zip:
19411 G 5. reef" 755023
Fax #: ( , ) Z 513
- 1
Contact Person:
Phone: (2 )7,1r
t73 z___
Street Address: City State/Zip:
/ ' 4 1( (DG - 41( 4 u e. S. Kc, -4" ctgoz 3
Fax #: ( )
B . GO, !OR.AUTH`: za
gnature: P "
Date: / L _18 '— 62 --
ri �'-- /
�
//yt<
Phone:)_ f7 Fax # : ( ? ) ,..2i..33 / 77D
City/State/Zip: / , - /y o 32...
7 .✓�,s� 177
Address /9 ,, /// tbi, /We- 5 - ;
CITY OF r''KWVI LA
Permit Center
6300 Southcenter Boulevard, Suite 100
Tukwila, WA 98188
(206) 431 - 3670
Project Number.
44-0-a--.10-011---
Permit Number.
R SI of I USI ONI Y
Mechanical Permit Application
Application and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or facsimile.
CN ANICA .4 ifiAiiiiii VIE*ANDvAPPROVA T.:iREOUESTED'(TO. /LLED OUTBYAPPLICANV
Description of work to be done (please be specific): ( A / I
o36,4 f‘, ..;4. a�rX v.e. /(
i�u. r f u���4 4- d//� 03 D ( 1/074 V cl tie_ lb pi s ref Lee
Go w.de ' uH 4 . aie, .i I( V ut 7' b /
r
,,.,V he yr
k e Su,.gm
S /I I
t'd i 44$ G t / i
Current copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of
application, a copy of this license will be required before the permit is issued OR submit Form H-4, "Affidavit in Lieu of Contractor
Registration ".
Building Owner /Authorized Agent: If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the
State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the
permit will be required as part of this submittal.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by
limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written
request by the applicant as defined in Section 114.4 of the Uniform Mechanical Code (current edition). No application shall be
extended more than once.
Date application accepted:
q 1 g -��
Date application expires:
/0 ' /8.
Application taken by: (initials)
11/2/99
meth permitdoc
Z
Q •
6
lY�
00 0
w
▪ 0
�Q
u)
_
w
Z=
H O
w ~
• w
• 0
O - • (2
w W
2
u- O
.z
w
U u
O ~
Z
✓
Submittal Requirements
Floor plan and system layout
Roof plan required to identify individual equipment and the location of each installation (Uniform
Mechanical Code 504 (e))
Details and elevations (for roof mounted equipment) and proposed screening
Heat Loss Calculations or Washington State Energy Code Form #H -7
H.V.A.C. over 2,000 CFM (approximately 5 ton and larger) must be provided with smoke detection shut-
off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical
Code 1009).
Specifications must be provided to show that replacement equipment complies with the efficiency ratings
and other applicable requirements of the Washington State Nonresidential Energy Code.
Structural engineer's analysis is required for new and the replacement of existing roof equipment
weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be
stamped by a Washington State licensed Structural Engineer.
Mechanical Permits
COMMERCIAL: Two complete sets of drawings and attachments required with application submittal
NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water
heaters or vents being installed or replaced.
RESIDENTIAL: Two complete sets of attachments required with application submittal
Submittal Requirements
New Single Family Residence
Heat Toss calculations or Form H -6.
Equipment specifications.
11/2/99
miscpml.doc
Change -out or replacement of existing mechanical equipment
1 Narrative of work to be done, including modification to duct work.
Installation of Gas Fireplace
NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water
heaters or vents being installed or replaced.
Narrative with specification of equipment and chimney type.
If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney is in safe
Condition.
(
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
Parcel No.: 0003200005
Address: 6300 SOUTHCENTER BL TUKW
Suite No:
Tenant: CITY OF TUKWILA
PERMIT CONDITIONS
1: ** *BUILDING DEPARTMENT * **
2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division.
3: Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be
inspected by that agency
(206- 835 - 1111).
4: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These
documents are to be
maintained and available until final inspection approval is granted.
5: Readily accessible access to roof mounted equipment is required.
6: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as
amended, Uniform Mechanical Code
(1997 Edition), and Washington State Energy Code (1997 Edition).
7: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a
permit for, or an approval
of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to
give authority to violate
or cancel the provisions of this code shall be valid.
8: Manufacturers installation instructions required on site for the building inspectors review.
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws
regulating constructio • or the performance of work.
doc: Conditions
Signature:
Print Name:
MO2 -091
Permit Number: MO2 -091
Status: ISSUED
Applied Date: 04/18/2002
Issue Date: 05/01/2002
Date:
Printed: 05 -01 -2002
TRANSACTION LIST:
ACCOUNT ITEM LIST:
doc: Receipt
City of Tukwila
6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431-3670
Parcel No.: 0003200005 Permit Number: MO2-091
Address: 6300 SOUTHCENTER BL TUKW Status: APPROVED
Suite No: Applied Date: 04/18/2002
Applicant: CITY OF TUKWILA Issue Date:
Receipt No.: R020000578 Payment Amount: 46.50
Initials: KAS Payment Date: 05/01/2002 02:06 PM
User ID: 1684 Balance: $0.00
Payee: SOUTHLAND INDUSTRIES
Current Pmts
Amount
MECHANICAL - NONRES
PLAN CHECK - NONRES
Type
RECEIPT
Method Description
Payment Check 400734 46.50
Description Account Code
000/322.100 37.20
000/345.830 9.30
Total: 46.50
•Ti. 7) ".'71.6 Tc.1TAL
Printed: 05-01-2002
COMMENTS:
` -3
_ _ __
.Type of Inspectio •
Address � : � ,, �
• o
fis
,1
Date called:
Special instructions:
Date want
•
.m
Requester:
Phone:
i.
X -c)
y
Projec ' s.r' -.`
` -3
=
.Type of Inspectio •
Address � : � ,, �
• o
fis
,1
Date called:
Special instructions:
Date want
•
.m
Requester:
Phone:
ns
INSPECTION RECOR
Retain a copy with permit
IVSP.ECTION NO.
I TV OF.TUKWILA BUILDING „DIVISION
300'Soiuthcenter Blvd, #1.00; Tukwila,. WA 98188
Approved per applicable codes. 0 Corrections required prior to approval.
Date:6-7
7. OREINSPECTION gE REQUIRED. Prior to inspection, fee must be paid
4 Southcenter Blvd., Suite 100. Call to schedule reinspection.
�,RecelRt�No;
Date:
Ysftfl YAi :kcl ~�' R-1P2 x i:+
14102 - loll
MN`
I understand that the Plan Check approvals are
subject to errors and omissions and approval of
plans does not authorize the violation of any
adopted code or ordinance. c k t no acknowledged.
tractor's copy of app roved plans ac
F = 1 ^. CQ
ISO CHANGES SHALL ICE MADE TO
rF SCOPE OF WORK WITHOUT
I :3 E: F_Vfu:ONS WILL. REQUIRE ��L`�tL �4�
AND MAY U CCWDE, AJ�JIT - — PLAN
SEPARATE PERMIT
REQUIRED FOR:
❑ MECHANICAL
(17 ELECTRICAL
rePLUMBING
[7'GAS PIPING
CITY OF TUKWILA
BUILDING DIVISION
Un;f # j.
G. E co 40 , 3
M# B w 3 b Ay
IiepL.. L -11
j C W T W403 4, G Kcb.!
CITYOF
APR 18 2002
PERMIT CENTER
00 Sog1 ce wtev - LIRb( Tu kw i I.,-
MO- O3I
OUTDOOR UNIT
NOISE inn MEOWS) 0
POWER COIDIS.--V/PINCE
MN. RACH. CM. MAMMY
ea. elk l • MAX.(MIPS)
PROF RIG. f MK (AMPS)
COMPRESSOR
SPEEDS
VOLTS/MO -
RI. AMPS el •LFL AMPS
FACTORY INSO41ED
START COMPONENTS 0 MA NfA NO
INSWIROWSOUND MARKET NO
ILE A YES
OIIDOOR PAN -TYPE PROPELLER PROPEU.ER
OMMA •NO.USED 18 -1 18 -1
CM SOEOS 0 2350 .• 1 t9RECT -1
WINO/ORS =If 1.15 1- U4
MOTOR SPEED RPM 1075 1075
IAXTB)PRN2 200230160 4804.60
FL• AMPS 1.00 0.80
01770008 COIL-TYPE SPINE SPINE Wm
EMS -ER/ 1 -24 1 -24
TI OE SIZE (W.) FE) 1 318 1 35
REFAIi8IMITCONTRO EXPANSIONVA1 EXP/NS10NVAUIE
(OD urm
FACTORY SUPPLIED
LMNE SIZE - W.O.13 GAS 0
UNE SIZE - IN. Oil U0.0
• FCCY
THICTOR ORIFICE 912E
TWA8780300A _ , TWA
15
25
25
90
460160 .
15
15
CUMEIJFF
1.1
2002309160
10,8 -71
5 L6&,13 02.
YES
111
318
CLIMEIIFP- SCROLL
1 -.1
480360
5.3.39
51.89.33 02.
YES
748
3)8
OUTDOOR UNIIUNIT•CRATEDMt)
UNMATED
11101(7
- SNIPPING CRS)
$ S
EV NSIONTYPE
TEA03004
C14010 71
RATII S IEATING)0
(MGR TEMA) STUN 31800
SYSTEM PONIR (KW) 3.40
COP 274
HSPF :1114NAT FNR. • 610
EXPANSIOMTYPE
RATNIGS (COOM NO)
STUN (TOTAL)
STUN (SENS!li.E)
INDOOR ANRFLOW ICF M)
SYSTEM DOWER (KW)
SEER STU WATFNA.
RAf1NGSO4EATTN01
(MIGHTEMP.) 87UH 32200
SYSTEM POWER (KW) 2.97
HSPF (BTUNVA 1 HR.L 7
'544 papa 23 and 2I for combloakns will Ausigry 04
38600
26803
1350
3.89
1020
OA71
HXWXO
3310X26.112X00
SEE MUNE oWO.
APR 18 Z00 ` J U7/
General
•
Data TWA03a03/4CAIA
TXA031C4 TX•O3SCI
0837071 FAMINE it
31800
3.19
282
7.15
TXA048G 7X.001904 TXAOSOCA
CHGTO 71 CHGTO 71 CMGTO71
38600
26800
1350
3.89
1020
32200
2.97
3.18
7.60
0.071
HEWED
SEEE
199
184
31800
140
274
810
36600
26000
1350
3.88
1020
322
3.18
7.80
RECEIVED
CITY OF TUKW II_P
PERMIT CENTER
0 cameo IN ACCORDANCE WTIMTME AIRSOURCE UNITARV MEAT
PUMP EOUWMENTCER AF1CATIONPROGAIw,WHIcS115 B et
& .L VANDARD 210240. r r(iK f 71
0 RATED INA000ROANCE WON A .RI8TAN0A$0270. ArwR()V
•
193
184
OUTDOOR UNIT WITH HEAT PUMP COILS
TXAmeC4
FACT INS 71
32000
3.09
3.04
7.35
33800
21800
1100
3.69
10.05
SPUT .:}"�
0 CALCULATED it ACCORDANCE WITH NEXNJAL ELECTRIC CODE
ONLY USE MACK CIRCUIT BREAKERS OR FUSES.
O STANDARD AIR • DRY COIL • OUTDOOR
0 TM18 VALUE APPROMIAME. FOR MORE PRECISE VALUE SEE UN17
NAMEPLATE AROSEFAIICE INSTRUCTION.
0 WAX. LINEAR LEL:TN OO FTWRM REGROWING COMPRESSOR -
60 FT wpm SCROLL MAX LIFT- SUCTION 60 FT. MAX LIFT - U0U10
60 FT. FOR GREATER LENGTH REFER TO REFRIGERANT PIPING
SOFTWARE Plb. NO.32- 3312-01.
0 THE VALUE SHOWN FOR COMPRESSOR RUA ON THE UNIT
NAMEPLATEAROON THISSPECIFICATIONSHEEi IS USED TO
COMPUTE MINIMUM BRANCH CIRCU4TAMP)ACITY AND MAXIMUM
FUSE SIZE- THE VALUE SW*41STNE MANOR CIRCUIT
SELECTION CURRENT.
0 NO MEANS NO START COMPONENTS
YES PAEANS MACK START KR COMPONENTS
PIC MEANS POSITIVE TEMPERATURE COEFFICIENT STARTER,
TXA037C4 TXA042G TXA013CA
INS 71 CHGlo71 C140TO71
NAM lC00LM16j 0 _ _ _ _ _ _
STUN (SENSIBLE) 21000 23000 21803 24400 24400 24700
II4000R AIRFLOW (CFI) 1100 1100 1100 1200 1200 1200
SYSTEM POWUi (KW) 3.69 3.72 3.68 3.78 3.78 3.79
SEER (BTINNATLNR.) 70.06 10.10 10.05 1020 1020 1020
32000
3.09
3E4
7.35
33800
21800
1100
3.69
10.05
32000
3.05
308
7.40
TXCO3O A TXCO30O4 7XCO31C4
CHGT071 CHGTO71 _ CHGTO71
34203
23000
1100
3.72
10.10
31800 31800 ' 31100
3.40 3.40 3.19
2.74 2.74 2.92
6.80 8b0 • 7.15
32200
3.01
3.14
7.50
1XCO3104
CMGTO71
4f'R2Li 222
As No ;.11
3'6200
1330
329
10.15
34200
23000
1100
3.72
10.10
31800
3.19
2.92
7.15
•
•
SERVICE PANEL
ELECTRICAL AND REFRIGERANT
PEP CODES.
229 191
1 127 151
l
41 1
28.6 11 -1/81 D1A. K.O. WITH
22.2 47/91 WA. HOLE
ELECTRIC POWER SUPPLY
22.2 17/91 01A.
HOLE LOW "VOLTAGE
P N0.22.1645.05.1200 (EN)
175 16
249 19 1
210 041
12, 1
51 121
Dimensions
TWWAO3O 072 OUTLINE DRAWING
NOTE: AU. DIMENSIONS ARE M MM (INO4ES)
FIG. 1
GAS LINE BALL SERVICE VALVE,
BALL 1/4 TURN 1) fEUALE
GRAZED CO0NNE ION WITH
1/4 PITT MARL CT
LIQUID LINE SERVICE VALVE.
E" 0.0. FEMALE BRAZED
PRESSURE TAP If1TTING. CLARE
"0-0.0. c LINE E 1 LE BRAZ
P
CONNECTION
APFITTING. A£ FLARE
LIOUIO LINE SERVICE VALVE,
0.u. FEMALE BRAZED
P RE S SUR E T AP � F I T TIN G. FLARE
31
• Timm
I4 -TOP OISCNARGE AREA SHOULD BE
UNR € EE UNIT SMOULO B E i 5 1
FEE WIVE
PLACED 50 ROOF RUN -OFF WATER
AND SHOU 8 6 DIRECTLY AT 30 1 2'i
FROM WALL. *NO ALL SURROUNDING
Two S5DE5 uNRESTRICTEO- OTHER
TWA042C
TWA048D
TWA060D
TWA072C
17332
CI 032 7 1 8 3!4 CM
(32.3/4) . 4)
(2
(3/ 8
a1101 (go my
El ?311 IIENIESICICII
Rom DW0. 210147662 Rev. 6
MM motto
HALF
LIMP iMUMPLIINI
UALEQAll
tor Fume mos
1111111.LUIAIND tat
I
MOIL OM Ili
gllMli °
fK�ILMllRaM1N
. 11
6 - \\ S 7
RWR7357 ou fno UNITS
QIfrAAIMILAli11•My MAMA An A
r s mILI M�I.AM mess
I isinM
tbIx13 �FOA a��Mll ___ lMls1NMM SEE PHOTO KUM
FOR REFRIGERANT CONTROLS
MOM PRONT PANEL
•
10 DATA sat+Mv. *mow MonCE
sw
arf
CASA
TAI MIMI voila
1/IrlfFOR
lMHSLIMAM _ j SEE FIrOTO GEIM
FUA ELECTRICAL commix*
MERINO WOE PANEL
• • B COI OUTDOOR UNIT
• U■IA.UMI" 1r1M 1MtAA>a s/1lif�//WMR
Ram sutra N�f AMU
SAL rMwftV��
$4001 Ewt . • P011 REfIMORfIANT
MIND FRONT PANEL
CI M M
Mow . ~~
•
ELECTRICAL CONTROLS REFRIGERANT CONTROLS
TY OF TIP M1
`" 2 R 2
•
f%S
fiao Oq tl C1213417 VIAL 1
t
ECEIVE(
- Ii'Y OF TUK
APR 18 2(
A
tJ
lb
!VILA
02
ER
MO.-O3I
•
•
•
5 � 1a
OM NI b ew04iSt, w 0. LL OWN 2*
SPOT SYSTEM
GENERAL ELECT/sit, rn ve. v ., . . .
CENTRAL AtR CO?400X)111d6 OEPAR*Me11. TROVP MGHWAY. TWA TEXAS 7571v
PRODUCT SPECIFICATIONS
� CO24dit bowsaw et ads* probe 04120 ll.c*k OWL
ends whir wpwindi Fay now pubs VISO Ms wit essobis wd mks iincloiL -- WWI 1DR
Max 101410 0AmarIM We 40 E for gear 0O wwr b R 21018 W
4404 Owed Pd. 1b. MONO.
DATA SDIDIECT 10 pM*OE atllqur
•sar:rtnsiVair YfgtiMSlaMY, ,. ....rminpe'�`kRlfs'. . VAA SWINU •
Z
W
g
U
ND
w -r
-J p
u) Lt.
W o
co 9.
LU
2
U
1 --
= W
1 -
O
W
UN
0
Z
4411140
1S
t3
ZS
PONES CONNS. -- VONI/Ns
foes etas - fts.tOmost Foss Site - 0.c06 ,
. tows)
$..1, Ra114s 14. 1ZI
23011141
44
19 •
240- 21013/6/
t7
n'
. 19
COMMON -Ms.
106
C111.41,“ -TN
I t
cltOat111 - TS
1 -1
- Clia4tett - TN
1-1
yetis/Ph/Ns
230 /1/4f
200 -2901$ /40
14213/06
R.L. OMs .. L.N. Atos
16.0- 101
11.9- 100
6.0 -4f:
0rca. Ct.. Nil
10.6
14.9
6.0
011/1000 FAN --
Sta. $t..) - 14. Ust4
Tres Soles - u
OISE= - 1
11AQT - 1
INSECT 1
11;11 00.0 is.
5300
9900
Ile. 0.tMp• - M
Palos /MOW R.
1 - 0.31
• 2 011 /M
1 - 6.33
2301114
_
1 Ni
46011/14
i.L.• Are - LO. 110e4•
1.4 ■ O.9
1.4 - 1.9
1'.3 ■
SWOOP COIL -- Tres
1P141 MIN
SPINE FIN
SPINE F1*
'Isle'- F.P.T.
• 1 - is
f 20
1 - ON
fret+ Aria tsa. 14.1
17.5
17.3
17 S
Ube Oise tie.)
0.31
0.3f
0•i.
tIe /rts.rp*t Castro)
EXP41E100 VALVE
1IP011SI0N SALVE
EXPANSION
VALVE
'afters 0 1$14 U(40 [!1 '
TEES
TES
Lies Oise - to. 0.1. Css 16)
0.00
0.01
0.00
Liss Sams - le. 0.1. U. (62
0.91
0.91
0.31
1 1 2 1 1 1 0 0 1 0 1 1 1 1
1 1 2 1 1 1 0 0 1 0 1 1 1 1
-
-
N N O N S
9 , . ; - , .
. N o 11 It II
SoWler•M11 - Crstsa 11..)
17.11 a 1e.5 x 03.5
06 x M x *3
34 It 9! 4 M
Uscraaa
SEE OUTLINE 3 190*$)
!SE OUTLINE 01tA0111C13)
ONE OUTLINE 1.00211010$
Nt iesJ 104.)
�
2
WM
+ ' •.r• -' G.'.;
j ,•NAII'T',1Qilt N : !C,!.�
1
J ` � ,a . .;I 1 .. 7:
f1i074M r
1187604.10
U 40oNP
•
=IC .Nth
MT=M00 *C,.lts.f 117
1 012114* 400
arm P4ter INN)
•
MTNNC1 04461141) (1)
0*1.1. Tssr.) 1114 .
i
E
1
Srsts. Paver OW)
0.0.0.
*L.. Tees.) STUN
Svutoi Ps.tr U01)
C.O.S.
•
t1.M. -
40000
90000
1 1 %CI f0 fN I•.
10610 A1rstes tCFI*)
1110
1060
Svelte., P.•er 0031
4.7
4.6
NATION INta11.!) 11)
011.8 T1*..) 4711N
tsetse Pees, Wm)
99000
'9.13
MOOS
4.4
•
C.O.S.
sys w 0111)
2.9
7
2.7
9
C.0.0.
,I..1
2.1
•
5 � 1a
OM NI b ew04iSt, w 0. LL OWN 2*
SPOT SYSTEM
GENERAL ELECT/sit, rn ve. v ., . . .
CENTRAL AtR CO?400X)111d6 OEPAR*Me11. TROVP MGHWAY. TWA TEXAS 7571v
PRODUCT SPECIFICATIONS
� CO24dit bowsaw et ads* probe 04120 ll.c*k OWL
ends whir wpwindi Fay now pubs VISO Ms wit essobis wd mks iincloiL -- WWI 1DR
Max 101410 0AmarIM We 40 E for gear 0O wwr b R 21018 W
4404 Owed Pd. 1b. MONO.
DATA SDIDIECT 10 pM*OE atllqur
•sar:rtnsiVair YfgtiMSlaMY, ,. ....rminpe'�`kRlfs'. . VAA SWINU •
Z
W
g
U
ND
w -r
-J p
u) Lt.
W o
co 9.
LU
2
U
1 --
= W
1 -
O
W
UN
0
Z
Project Info
Project Address f^„3 (50
� _/j , /," p
Model No.
Date 6/ .... / r ' 0 Z
/veioJc //a_.
// ,
/�
SEER
or EER
For Building Dept. Use
n
Location
/
y e , } r )
Applicant Name: Cr t1 Q./
hi /DL
IA* b
Applicant Address: i�y�l
6 ,4b S //
fi
0�
f
_ 08-3 ,
Applicant Phone: 2� /.3.2_.
Cooling Equipment Schedule
Equip.
ID
Brand Name
Model No.
Capacity
Btu /h
Total CFM
OSA CFM
or Econo?
SEER
or EER
IPLV
Location
/
y e , } r )
7 Ac i(0i to
f 3 P-ob
IA* b
//• ?-
F(=.01
CITY OF TUKWILA
Mechanical Summary
MECH -SUM
2001 Washington State Nonresidential Energy Code Compliance Forms
N -7 -c.
Building Division
June 2001 - KJM
Project Description
Briefly describe mechanical systen J 4e ca.7�.P�$// D - e,lf - •
type and features. CePol /'q £) ». ('
0 Includes Plans
Include documentation requiring compliance with commissioning requirements, Section 1416.
Compliance Option
Simple System 0 Complex System 0 Systems Analysis
(See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.)
Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the
plans. For projects without plans, fill in the required information below.
Heating Equipment Schedule
Equip.
- ID
Brand Name
. AL• •
Model No.
Capacity
Btu /h
Total CFM
OSA cfm
or Econo?
Input Btuh
Output Btuh
Efficiencv
Fan Equipment Schedule
Equip.
ID
Brand Name
Model No.
CFM
SP'
HP /BHP
Flow Control
Location of Service
1 If available. 2 As tested according to Table 14 -1, 14 -2 or 14 -3. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as
applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS).
of l al4Pc
a � � ,0 APR 18 2002
PERMIT CENTER
RECEIVED
CITY OF TUKWILA
nn0a -oR
System Description
If Heating /Cooling
• Consta nt vol?
•
Air cooled? • Packaged sys?
■
<54,000 Btuh
See Section 1421 for full description
Simple System
or Cooling Only:
a Split system?
Economizer included?
or 1900 cfm?
•
of qualifications.
If Heating Only:
IN <5000 cfm?
•
<70% outside air?
CITY OF TUKWILA
Mechanical Summary (back)
MECH -SUM
Decision Flowchart
Use this flowchart to determine if project qualifies for Simple System Option. If not, either the
Complex System or Systems Analysis Options must be used.
Heating
Only
'Complex Systems
Heating!
Cooling
or Cooling Only
Reference
Section 1421)
Yes
Yes
Reference
Section 1423
Reference
Section 1420
Building Division
Use Complex Reference
Systems Section 1430
Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which
Complex Systems requirements are applicable to this project.
arem genovrw.....,a..nV . waR.:xrrxMr AXtitni
z
�2
ce W
O 0
co w
W • 0
2
g Q .
Z
W ui
0 ON
0 I-
W
U
u O
. i z
0
1
Mechanical - Complex Systems Checklist MECH -COMP
2001 Washington State Nonresidential Energy Code Compliance Forms June 2001 - KJM
Project Address
Date
The following additional information is necessary to check a mechanical permit application for a complex mechani
system for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code.
Use the checklist as a reference for notes added to the mechanical drawings (see the MECH -CHK checklist for
additional system requirements). This information must be on the plans since this is the official record of the
permit. Having this information in separate specifications alone is NOT an acceptable alternative.
For Building Department Use
Applicability
(yes, no, n.a.)
Code
Section
Component
Information Required
Location
on Plans
Building Department
Notes
ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY
1431.1
Field assem. sys.
Provide calculations
1432.1
Setback & shut -off
Indicate separate systems or show isolation devices on plans
1432.2.1
Air system reset
Indicate automatic reset
1432.2.2
Hydr. system reset
Indicate automatic reset
1433
Economizers
Indicate economizer on equipment schedule or provide
calculations to justify exemption
1434
Separate air sys.
Indicate separate systems on plans
1435
Simul. htg. & cig,
indicate that simultaneous heating and cooling is prohibited,
unless use of exception is justified
1436
Heat recovery
Indicate heat recovery on plans; complete and attach heat
recovery calculations
1437
Elec. motor effic.
MECH -MOT or Equip. Schedule with hp, rpm, efficiency
1438
Variable flow sys.
Indicate variable flow on fan and pump schedules
1439.1
Kitchen Hoods
Indicate uncooled and unheated make -up air
1439.2
Fume Hoods Indicate VAV, unheated /uncooled or heat rec. makeup
CITY OF TUKWILA
no is circled for any question, prov exp
Decision Flowchart
Use this flowchart to determine how the requirements of the Complex Systems Option apply to 1
project. Refer to the indicated Code sections for more complete information on the requirements
Section 1432.2 Hot
Water Supply
Temperature Reset
Required
apacity of H
Heating System >
00,000 Btuh
Field - Assemble
Equipment?
Air System
Serving Multiple
Zones?
Section 1432.2
Supply Air Reset
Controls Required
4--Yes
No
0
Start Here
4,
Section 1411.1
Equipment Efficiency
Shall Meet Tables 14-
1 through 14-3
Yes
Yes—►
(continued on back)
Building Division
Section 1431.1
Calculations of Total
On -Site Energy Input
8 Ouput Required
1
CITY OF TUKWILA
Mechanical - Complex Systems (back)
MECH -COMP
2001 Washington State Nonresidential Energy Code Compliance Forms
Cooling Capacity
> 20,000 Btuh?
Section 1411.4
Must be a Heat Pump
Section 1412.5
Provide
Microprocessor Heat
Pump Controls
e @q & Cooling
n One Package?
pply Air >5,
clm8OSA>
70%
Cooling Capacity
> 54,000 Btuh?
ystem or Zon
w/ Simultaneous
Htg. & Clg.?
Section 1433
Air-Side Economizer
Required
Application
Involves Variable
Flow?
otal Bldg. Fu
Exhaust> 15,000
dm?
tchen Exhau
Hood > 5,000
dm?
Section 1436
50% Effective Heat
Recovery Required
Package Unit?
arts or Pumps >
10 HP?
Section 1438
Variable Flow
Devices Required
otal Bldg
Capacity
>240,000 Btuh or
%ofTo
Yes
Yes
0
0
0
0
No
DONE
Yes
Motor Eft.
Included In Equip.
Perf. Rating?
Section 1437
Motors Must Meet
ERciandes In
Table 14-4
Yes-10
Yes
No
•
Section 1435
Zone Controls Must
Reduce Supply Air
Quantity Before
RehealinglRecooling
Yes
Section 1439.1
No Heating or
Cooling for at Least
50% of Make-up Air
Yes-0
Yes
•
Section 1412.6
Modulating or Staged
Combustion Controls
Required
Yes
Section 14392
One Required:
•
a. 50% VAV Exhaust &
Make -up
b. 75% Direct Makeup w/
Tempering Only
c. Heat Recovery per
1436
d. Constant Volume w/
< 501pm Face Velocity
FPuildin ! Division
June 2001 • KJM
Yes No
,...c.:: ad.•..,iu _!. n'a : �! cr..: ci,: �Sa�at,: u,:' �. i .:StLiwil��oii�::.�:uif,�.il:5,
Electric Motors MECH -MOT
2001 Washington State Nonresidential Energy Code Compliance Forms June 2001 - KJM
Project Address
Date
Complete the following for all design A & B squirrel -cage, T -frame Induction permanently wired polyphase
motors from 1 hp to 200 hp having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the
exceptions below applies).
For Building Department Use
Motor
No. or
Location
HP
Type
(open /closed)
Description of Application or Use
Synch.
Speed
Min.Nom.
Full load
Efficiency
Minimum
Nominal Full -Load Efficiency
Open Motors
Closed Motors
Exceptions:
1. Motors in systems designed to use more
than one speed of a multi -speed motor.
2. Motors already Included In the efficiency
requirements for HVAC equipment (Tables 14 -1
or
14 -2) .
3. Motors that are an integral part (Le. not east
removed and replaced of specialized process
equipment (i.e. equipment which requires a
special motor, such as an exploslon -proof motor).
4. Motors integral to a listed piece of equipmer
for which no qualifying motor has been approved
(i.e. if the only U.L. listing for the equipment is
with a less- efficient motor and there is no energ)
efficient motor option).
For motors claiming an exception, list motor and
note which exception applies.
Synchronous
Speed (RPM)
3.600 I
1,800 I
1,200
3,600 I
1,800
1,200
HP
Efficiency (%)
Efficiency (%)
1.0
-
82.5
80.0
75.5
82.5
80.0
1.5
82.5
84.0
84.0
82.5
84.0
85.5
2.0
84.0
84.0
85.5
84.0
84.0
86.5
3.0
84.0
86.5
86.5
85.5
87.5
87.5
5.0
85.5
87.5
87.5
87.5
87.5
87.5
7.5
87.5
88.5
88.5
88.5
89.5
89.5
10
88.5
89.5
90.2
89.5
89.5
89.5
15
89.5
91.0
90.2
90.2
91.0
90.2
20
90.2
91.0
91.0
90.2
91.0
90.2
25
91.0
91.7
91.7
91.0
92.4
91.7
30
91.0
92.4
92.4
91.0
92.4
91.7
40
91.7
93.0
93.0
91.7
93.0
93.0
50
92.4
93.0
93.0
92.4
93.0
93.0
60
93.0
93.6
93.6
93.0
93.6
93.6
75
93.0
94.1
93.6
93.0
94.1
93.6
100
93.0
94.1
94.1
93.6
94.5
94.1
125
93.6
94.5
94.1
94.5
94.5
94.1
150
93.6
95.0
94.5
94.5
95.0
95.0
200
94.5
95.0
_ 94.5
95.0
95.0
95.0
CITY OF TUKWILA
Building Division
Mechanical Permit Plans Checklist MECH -CHK
2001 Washington State Nonresidential Energy Code Compliance Forms June 2001 - KJM
Project Address
!Date
The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the
Washington State Nonresidential Energy Code.
Applicability
(yes, no, n.a.)
Code
Section
Component
Information Requires
Location
on Plans
Building Department
Notes
HVAC REQUIREMENTS
(Sections 1401-1424)
1411
Equipment performance
1411.4
Pkg. elec. htg.& clg.
List heat pumps on schedule
1411.1
Minimum efficiency
Equipment schedule with type, capacity, efficiency
1412
HVAC controls
1412.1
Temperature zones
Indicate locations on plans
1412.2
Deadband control
Indicate 5 degree deadband minimum
1412.3
Humidity control
Indicate humidistat
1412.4
Automatic setback
Indicate thermostat with night setback and 7 diff. day types
1412.4.1
Dampers
Indicate damper location and automatic controls
1412.4.2
Optimum Start
Indicate optimum start controls
1412.5
Heat pump control
Indicate microprocessor on thermostat schedule
1412.6
Combustion htg.
Indicate modulating or staged control
1412.7
Balancing
Indicate balancing features on plans
1422
Thermostat interlock
Indicate thermostat interlock on plans
1423
Economizers
Equipment schedule
1413
Air economizers
1413.1
Operation
indicate 100% capability on schedule
1413.2
Control
Indicate controls able to evaluate outside air
1413.3
Integrated operation
Indicate capability for partial cooling
1414
Ducting systems
1414.1
Duct sealing
Indicate sealing necessary
1414.2
Duct insulation
Indicate R -value of insulation on duct
1415.1
Piping insulation
Indicate R -value of insulation on piping
1416
Completion Requirements
1416.182
Drawings & Manuals
Indicate requirement for record drawings and operation docs.
1416.3.2
Air Balancing
Indicate air system balance requirements
1416.3.3
Hydronic Balancing
Indicate hydronic system balance requirements
1416.4
Commissioning
Indicate requirements for commissioning and prelim. Report
1424
Separate air sys.
Indicate separate systems on plans
Mech. Sum. Form
Completed and attached. Equipment schedule with types,
input/output, efficiency, cfm, hp, economizer
SERVICE WATER HEATING AND HEATED POOLS (Sections 1440-1454)
1440
Service water htg.
1441
Elec. water heater
indicate R -10 insulation under tank
1442
Shut -off controls
Indicate automatic shut -off
1443
Pipe Insulation Indicate R -value of insulation on piping
1453
Pool heater controls
Indicate switch and 65 degree control
1454
Pool covers
Indicate vapor retardant cover
1454
Pools 90+ degrees
indicate R -12 pool cover
CITY OF TUKWILA
no is circles for any question, provtae explanation:
Building Division
1a . .aec+sn,oa..- ns+smm- ns.v>r.+uxr ++.��,wwueiwvum +srusnvrrx * ✓.�troM#^ ^h°SR 4I40{§fin
CITY OF TUKWILA
Mechanical Permit Plans Checklist
2001 Washington State Nonresidential Energy Code Compliance Forms
MECH -CHK
June 2001 - KJM
Mechanical - General Requirements
1411.1 General: Equipment shall have a minimum performance at the
specified rating conditions not less than the values shown in Table 14 -1
through 14 -3. If a nationally recognized certification program exists for a
product covered in Tables 14 -1 through 14 -3, and it includes provisions for
verification and challenge of equipment efficiency ratings, then the product
shall be listed in the certification program.
1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test
conditions and procedures when available. Where no applicable
procedures exist, data shall be furnished by the equipment manufacturer.
1411.3 Combination Space and Service Water Heating: For
combination space and service water heaters with a principal function of
providing space heat, the Combined Annual Efficiency (CAE) may be
calculated by using ASHRAE Standard 124 -1991. Storage water heaters
used in combination space heat and water heat applications shall have
either an Energy FActor (EF) or a CAE of not less than the following:
1411.4 Packaged Electric Heating and Cooling Equipment: Packaged
electric equipment providing both heating and cooling with a total cooling
capacity greater than 20,000 Btu /h shall be a heat pump.
Exception: Unstaffed equipment shaelters or cabinets used
solely for personal wireless service facilities.
1412 Controls
1412.1 Temperature Controls: Each system shall be provided with at
least one temperature control device. Each zone shall be controlled by
Individual thermostatic controls responding to temperature within the zone.
At a minimum, each floor of a building shall be considered as a separate
zone.
1412.2 Deadband Controls: When used to control both comfort heating
and cooling, zone thermostatic controls shall be capable of a deadband of
at least 5 degrees F within which the supply of heating and cooling energy
to the zone is shut off or reduced to a minimum.
Exceptions:
1. Special occupancy, special usage, or code requirements
where deadband controls are not appropriate.
2. Buildings complying with Section 1141.4, if in the proposed
building energy analysis, heating and cooling thermostat
setpoints are set to the same temperature between 70
degrees F and 75 degrees F inclusive, and assumed to be
constant throughout the year.
3. Thermostats that require manual changeover between
heating and cooling modes.
1412.3 Humidity Controls: If a system is equipped with a means for
adding moisture, a humidistat shall be provided.
1412.4 Setback and Shut -Ofi: HVAC systems shall be equipped with
automatic controls capable of accomplishing a reduction of energy use
through control setback or equipment shutdown during periods of non -use
or altemate use of the spaces served by the system. The automatic
controls shall have a minimum seven -day clock and be capable of being
set for seven different day types per week.
Exceptions:
1. Systems serving areas which require continuous operation at
the same temperature setpoint.
2. Equipment with full load demands of 2 kW (6,826 Btu/h) or
less may be controlled by readily accessible manual off-hour
controls.
1412.4.1 Dampers: Outside air Intakes, exhaust outlets and relief outlets
serving conditioned spaces shall be equipped with dampers which close
automatically when the system is off or upon power failure.
Exceptions:
1. Systems serving areas which require continuous operation.
2. Combustion air intakes.
1412.4.2 Optimum Start Controls: Heating and cooling systems with
design supply air capacities exceeding 10,000 cfm shall have optimum
start controls. Optimum start controls shall be designed to automatically
adjust the start time of an HVAC system each day to bring the space to
desired occupied temperature levels immediately before scheduled
occupancy. The control algorithm shall, as a minimum, be a function of the
difference between space temperature and occupied setpoint and the
amount of time prior to scheduled occupancy.
Building Division
1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall Include
microprocessor controls that minimize supplemental heat usage during
start-up, set -up, and defrost conditions. These controls shall anticipate
need for heat and use compression heating as the first stage of heat.
Controls shall Indicate when supplemental heating is being used through
visual means (e.g., LED indicators).
1412.6 Combustion Heating Equipment Controls: Combustion heating
equipment with a capacity over 225,000 Btu /h shall have modulating or
staged combustion control.
Exceptions:
1. Boilers.
2. Radiant Heaters.
1412.7 Balancing: Each air supply outlet or air or water terminal device
shall have a means for balancing, including but not limited to, dampers,
temperature and pressure test connections and balancing valves.
1413 Air Economizers
1413.1 Operation: Air economizers shall be of automatically modulating
outside and return air dampers to provide 100 percent of the design supply
air as outside air to reduce or eliminate the need for mechanical cooling.
1413.2 Control: Air economizers shall be controlled by a control system
capable of determining if outside air can meet part or all of the building's
cooling loads.
1413.3 integrated Operation: Building Heating Energy: Air economizers
shall be capable of providing partial cooling even when additional
mechanical cooling is required to meet the remainder of the cooling load.
Controls shall not preclude the economizer operation when mechanical
cooling is required simultaneously.
Exception: Economizers on individual, direct expansion, cooling
systems with capacities not greater than 75,000 Btu /h may
include controls that limit simultaneous operation of the
economizer and mechanical cooling for the purpose of preventing
ice formation on cooling coils.
1414 Ducting Systems
1414.1 Sealing: Duct work which is designed to operate at pressures
above 1/2 Inch water column static pressure shall be sealed in accordance
with Standard RS -18. Extent of sealing required Is as follows:
1. Static pressure: 1/2 inch to 2 inches; seal transverse joints.
2. Static pressure: 2 inches to 3 inches; seal all transverse joints
and longitudinal seams.
3. Static pressure: above 3 inches; seal all transverse joints,
longitudinal seams and duct wall penetrations.
Duct tape and other pressure sensitive tape shall not be used as the
primary sealant where ducts are designed to operate at static pressures of
1 inch W.C. or greater.
1414.2 Insulation: Ducts and plenums that are constructed and function
as part of the building envelope, by separating interior space from exterior
space, shall meet all applicable requirements of Chapter 13. These
requirements include insulation installation, moisture control, air leakage,
and building envelope insulation levels. Unheated equipment rooms with
combustion air louvers must be Isolated from the conditioned space by
insulating interior surfaces to a minimum of R -11 and any exterior
envelope surfaces per Chapter 13. Outside air ducts serving individual
supply air units with Tess than 2,800 cfm of total supply air capacity shall be
Insulated to a minimum of R -7 and are not considered building envelope.
Other outside air duct runs are considered building envelope until they,
1. connect to the heating or cooling equipment, or
2. are isolated from the exterior with an automatic shut -off damper
complying with Section 1412.4.1.
Once outside air ducts meet the above listed requirements, any runs
within conditioned space shall comply with Table 14 -5 requirements.
Other ducts and plenums shall be thermally insulated per Table 14 -5.
Exceptions:
1. Within the HVAC equipment.
2. Exhaust air ducts not subject to condensation.
3. Exposed ductwork within a zone that serves that zone.
1415 Piping Systems
1415.1 Insulation: Piping shall be thermally Insulated in accordance with
Table 14 -6.
Exception: Piping installed within unitary HVAC equipment.
Water pipes outside the conditioned space shall be insulated in
accordance with Washington State Plumbing Code (WAC 51 -26)
1416 Completion Requirements (Refer to NREC Section 1416 and the
Building Commissioning Guidelines, published by the Building
Commissioning Association, for complete text and guidelines for building
completion and commissioning requirements.)
V Tf11 R}:Y MOBNOMMINefaig"lina - , ..vw"w.�v
EF
CAE
< 50 gal storage
0.58
0.71
50 to 70 gal storage
0.57
0.71
> 70 gal storage
0.55
0.70
CITY OF TUKWILA
Mechanical Permit Plans Checklist
2001 Washington State Nonresidential Energy Code Compliance Forms
MECH -CHK
June 2001 - KJM
Mechanical - General Requirements
1411.1 General: Equipment shall have a minimum performance at the
specified rating conditions not less than the values shown in Table 14 -1
through 14 -3. If a nationally recognized certification program exists for a
product covered in Tables 14 -1 through 14 -3, and it includes provisions for
verification and challenge of equipment efficiency ratings, then the product
shall be listed in the certification program.
1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test
conditions and procedures when available. Where no applicable
procedures exist, data shall be furnished by the equipment manufacturer.
1411.3 Combination Space and Service Water Heating: For
combination space and service water heaters with a principal function of
providing space heat, the Combined Annual Efficiency (CAE) may be
calculated by using ASHRAE Standard 124 -1991. Storage water heaters
used in combination space heat and water heat applications shall have
either an Energy FActor (EF) or a CAE of not less than the following:
1411.4 Packaged Electric Heating and Cooling Equipment: Packaged
electric equipment providing both heating and cooling with a total cooling
capacity greater than 20,000 Btu /h shall be a heat pump.
Exception: Unstaffed equipment shaelters or cabinets used
solely for personal wireless service facilities.
1412 Controls
1412.1 Temperature Controls: Each system shall be provided with at
least one temperature control device. Each zone shall be controlled by
Individual thermostatic controls responding to temperature within the zone.
At a minimum, each floor of a building shall be considered as a separate
zone.
1412.2 Deadband Controls: When used to control both comfort heating
and cooling, zone thermostatic controls shall be capable of a deadband of
at least 5 degrees F within which the supply of heating and cooling energy
to the zone is shut off or reduced to a minimum.
Exceptions:
1. Special occupancy, special usage, or code requirements
where deadband controls are not appropriate.
2. Buildings complying with Section 1141.4, if in the proposed
building energy analysis, heating and cooling thermostat
setpoints are set to the same temperature between 70
degrees F and 75 degrees F inclusive, and assumed to be
constant throughout the year.
3. Thermostats that require manual changeover between
heating and cooling modes.
1412.3 Humidity Controls: If a system is equipped with a means for
adding moisture, a humidistat shall be provided.
1412.4 Setback and Shut -Ofi: HVAC systems shall be equipped with
automatic controls capable of accomplishing a reduction of energy use
through control setback or equipment shutdown during periods of non -use
or altemate use of the spaces served by the system. The automatic
controls shall have a minimum seven -day clock and be capable of being
set for seven different day types per week.
Exceptions:
1. Systems serving areas which require continuous operation at
the same temperature setpoint.
2. Equipment with full load demands of 2 kW (6,826 Btu/h) or
less may be controlled by readily accessible manual off-hour
controls.
1412.4.1 Dampers: Outside air Intakes, exhaust outlets and relief outlets
serving conditioned spaces shall be equipped with dampers which close
automatically when the system is off or upon power failure.
Exceptions:
1. Systems serving areas which require continuous operation.
2. Combustion air intakes.
1412.4.2 Optimum Start Controls: Heating and cooling systems with
design supply air capacities exceeding 10,000 cfm shall have optimum
start controls. Optimum start controls shall be designed to automatically
adjust the start time of an HVAC system each day to bring the space to
desired occupied temperature levels immediately before scheduled
occupancy. The control algorithm shall, as a minimum, be a function of the
difference between space temperature and occupied setpoint and the
amount of time prior to scheduled occupancy.
Building Division
1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall Include
microprocessor controls that minimize supplemental heat usage during
start-up, set -up, and defrost conditions. These controls shall anticipate
need for heat and use compression heating as the first stage of heat.
Controls shall Indicate when supplemental heating is being used through
visual means (e.g., LED indicators).
1412.6 Combustion Heating Equipment Controls: Combustion heating
equipment with a capacity over 225,000 Btu /h shall have modulating or
staged combustion control.
Exceptions:
1. Boilers.
2. Radiant Heaters.
1412.7 Balancing: Each air supply outlet or air or water terminal device
shall have a means for balancing, including but not limited to, dampers,
temperature and pressure test connections and balancing valves.
1413 Air Economizers
1413.1 Operation: Air economizers shall be of automatically modulating
outside and return air dampers to provide 100 percent of the design supply
air as outside air to reduce or eliminate the need for mechanical cooling.
1413.2 Control: Air economizers shall be controlled by a control system
capable of determining if outside air can meet part or all of the building's
cooling loads.
1413.3 integrated Operation: Building Heating Energy: Air economizers
shall be capable of providing partial cooling even when additional
mechanical cooling is required to meet the remainder of the cooling load.
Controls shall not preclude the economizer operation when mechanical
cooling is required simultaneously.
Exception: Economizers on individual, direct expansion, cooling
systems with capacities not greater than 75,000 Btu /h may
include controls that limit simultaneous operation of the
economizer and mechanical cooling for the purpose of preventing
ice formation on cooling coils.
1414 Ducting Systems
1414.1 Sealing: Duct work which is designed to operate at pressures
above 1/2 Inch water column static pressure shall be sealed in accordance
with Standard RS -18. Extent of sealing required Is as follows:
1. Static pressure: 1/2 inch to 2 inches; seal transverse joints.
2. Static pressure: 2 inches to 3 inches; seal all transverse joints
and longitudinal seams.
3. Static pressure: above 3 inches; seal all transverse joints,
longitudinal seams and duct wall penetrations.
Duct tape and other pressure sensitive tape shall not be used as the
primary sealant where ducts are designed to operate at static pressures of
1 inch W.C. or greater.
1414.2 Insulation: Ducts and plenums that are constructed and function
as part of the building envelope, by separating interior space from exterior
space, shall meet all applicable requirements of Chapter 13. These
requirements include insulation installation, moisture control, air leakage,
and building envelope insulation levels. Unheated equipment rooms with
combustion air louvers must be Isolated from the conditioned space by
insulating interior surfaces to a minimum of R -11 and any exterior
envelope surfaces per Chapter 13. Outside air ducts serving individual
supply air units with Tess than 2,800 cfm of total supply air capacity shall be
Insulated to a minimum of R -7 and are not considered building envelope.
Other outside air duct runs are considered building envelope until they,
1. connect to the heating or cooling equipment, or
2. are isolated from the exterior with an automatic shut -off damper
complying with Section 1412.4.1.
Once outside air ducts meet the above listed requirements, any runs
within conditioned space shall comply with Table 14 -5 requirements.
Other ducts and plenums shall be thermally insulated per Table 14 -5.
Exceptions:
1. Within the HVAC equipment.
2. Exhaust air ducts not subject to condensation.
3. Exposed ductwork within a zone that serves that zone.
1415 Piping Systems
1415.1 Insulation: Piping shall be thermally Insulated in accordance with
Table 14 -6.
Exception: Piping installed within unitary HVAC equipment.
Water pipes outside the conditioned space shall be insulated in
accordance with Washington State Plumbing Code (WAC 51 -26)
1416 Completion Requirements (Refer to NREC Section 1416 and the
Building Commissioning Guidelines, published by the Building
Commissioning Association, for complete text and guidelines for building
completion and commissioning requirements.)
V Tf11 R}:Y MOBNOMMINefaig"lina - , ..vw"w.�v
05/01/2002 WED 09:15 FAX 949 756 3239
524ilm t;i1Y/.
CORPORATE SAFETY DEPT a 001
. -
SOUTHLAND INDUSTRIES
17941 FITCH
IRVINE CA 92614
DU.PARTNIFINT OF LABOR AND INDUS'lltiES
REGISTERED AS PROVIDED BY LAW AS
CONST ,CONT GENERAL
, EXP DATE -
CC01 sepTHI *p44 mli 04 /11 /2 0, 03
EEFECTIVE DATE ' 07/08/1996
•.
- D 3,11,11)j‘:1)1:Ay
• ."'"7•7. -
REGISTERED AS PROVIDED BY LAW AS
CONST CONT GENERAL
REGIST. # EXF. DATE
CCOI SOUTHI*044MH 04/11/2003
EFFECTIVE DATE 07/08/1996
SOUTHLANp INDUSTRIES
17941 FITCH
IRVINE CA 92614
• Sign:ttute • ....
• Ist:Ited fly DIYAR I NtrINIT Ur. 1 A1301: •s:D INDI.!STRIbti
RECENED
C1TYOFTUKW
MAY - A 2042
PERMIT CENTER