Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M02-126 - BOEING #2-80
M02 -126 Boeing 2 -80 8123 E Marginal Wy S City of 'Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 MECHANICAL PERMIT Parcel No.: 0001600020 Permit Number: MO2 -126 Address: 8123 EAST MARGINAL WY S TUKW Issue Date: 07/15/2002 Suite No: Permit Expires On: 01/11/2003 Tenant: Name: BOEING #2 -80 Address: 8123 EAST MARGINAL WY S, TUKWILA, WA Owner: Name: BOEING Address: PO BOX 3707 - M/S 1 F -09, SEATTLE WA Contact Person: Name: RON TAYLOR/COLBY PHILLIPS Address: 7717 DETROIT AVENUE SW, SEATTLE, WA Contractor: Name: ENCOMPASS MECHANICAL SERVICES Address: 7717 DETROIT AVE SW, SEATTLE, WA Contractor License No: ENCOMMS984CA Phone: Phone: 206 766 -7184 Phone: 206 763 -9400 Expiration Date: 02/01/2004 DESCRIPTION OF WORK: RELOCATE AHU -DF -10 FROM MEZZANINE TO OUTSIDE LOCATION FOR TEMPORARY CONSTRUCTION USE. INSTALL NEW AHU WITH CHILLED WATER COOLING COIL AND HOT WATER HEATING COIL. INSTALL 8 NEW HOT WATER UNIT HEATERS, 4 FAN TERMINALS, 1 VAV AND MISCELLANEOUS FANS. RELOCATE 300 POUND COMPRESSED AIR LINES. Value of Construction: Type of Fire Protection: Permit Center Authorized Signature: ��CS �Gs�a. J�r.G� -�_ Date: T I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I apauthorized to sign and obtain this mechanical permit. Signature: .a ,mm Print Name: / a !'72/'7)v doc: Mech $235,000.00 MO2 -126 Fees Collected: Uniform Mechnical Code Edition: Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. 7 -/ - c- $316.63 1997 Printed: 07 -15 -2002 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 PERMIT CONDITIONS Parcel No.: 0001600020 Permit Number: MO2 -126 Address: 8123 EAST MARGINAL WY S TUKW Status: ISSUED Suite No: Applied Date: 06/17/2002 Tenant: BOEING #2 -80 Issue Date: 07/15/2002 1: ** *BUILDING DEPARTMENT * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: Plumbing permits shall be obtained through the Seattle -King County Department of Public Health. Plumbing will be inspected by that agency, including all gas piping (296- 4722). 4: Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (206- 835 - 1111). 5: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 6: Readily accessible access to roof mounted equipment is required. 7: Any exposed insulations backing material shall have a Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 8: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 9: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. 10: ** *FIRE DEPARTMENT CONDITIONS * ** 11: The attached set of plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 12: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #1900) 13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air - moving equipment upon detection of smoke in the main supply -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (UMC 608) 14: Local U.L. central station supervision is required. (City Ordinance #1900) 15: All new fire alarm systems or modifications to existing systems shall have the written approval of the Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #1900) (UFC 1001.3) 16: Call the Tukwila Fire Department at 575 -4407 for approval of any system shut down. Have job site address, name and Tukwila Fire Department Job Number available to confirm shut down approval. (City Ordinance #1900) 17: All electrical work and equipment shall conform strictly to the standards of The National Electrical Code. (NFPA 70) doc: Conditions MO2 -126 Printed: 07 -15 -2002 h co o 0 u_ WO 2 g a - a . W Z � uj W 2 p U O N 0 fi— W u - O 0 y2 W z O I- City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 18: This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. 19: Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 20: These plans were reviewed by Inspector 512. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575- 4407. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: Print Name: doc: Conditions ULm,29[ Yazq,& � � r n i - r v 1/a k yG� MO2 -126 Date: 7 o� Printed: 07 -15 -2002 Project Name /Tenant: `. - /n/6o 2. Site Address : . w I Z3 EA r 0114et.,AG- - LA LSAF C6IoL Q„ City State /Zip: 1,./ 2.0 r ,i /, A Value of Mechanical Equipment: S 600 , 00 ax ' ar I ' umber: J/O / - O / Property Ow er: Address: /y Ave- / i 77/ //GV0✓ A J _5c - 4772.- -- City /State/Zip: < c- ,_, / / ,f 4 /r 9 Phone: ( ) Street Address: City State /Zip: Fax #: ( ) Contractor: /V a 144 /76Z-4 /cAL. Sao c Es Phone: (2c , ) 76 6 --7 Street Address: -F- .7/ 7 t7�0_o T Av, 51 Sc- ci 9g oro : Fax #: ( ) 766 _ 31 �s Contact Person: , ;-.) cDv //4 no/2 CZ8 f Hsu/, /' (� ) � ' /$`J Street Address: /? Derao.T' fre City State /Zip: SO , E , ' 9; e7S Fax #: ( 206 ) .‘6 , 7/85 BUILDING OWNER OR AUTHORIZED AGENT: Signature: e c pie C Date: 1 q 3 - ; .,71.4 .- Z . Print name: ,thmc� r. ,P.S Phone: ( 0 , 6 ) 366- 7/Z Z Fax #: ( Z o 6 ) �l6 - 7/ 23 Address: /y Ave- / i 77/ //GV0✓ A J _5c - 4772.- -- City /State/Zip: < c- ,_, / / ,f 4 /r 9 CITY OF 1 LI KWILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Mechanical Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. MECHANICAL PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE FILLED OUT BY APPLICANT) Description of work to be done (please be specific): Re /occJe 4/7/4> vv7371 L.o c 4770r1>/ £. ir y CorvS7le.cJG7Io. L7SE �iv�Tfl`L Project Number. Permit Number: R STA, I USE ONI Y 4 /Ca) ,4k'U 1.t) /77/ ('N/-4-6O /a/ r: 4r,.7 ,V V 1-✓.'V2 NFq%,- (b/1- , �it/Si•9Lt- g /26*'V Hoi v v, r /7? AI, �' �9it/ % �r�f2 / I/A V e // ge %ooe r 3vO �'i yVG) co»//RE756D %4 GryL�, Current copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued OR submit Form H-4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent: If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PER JURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 114.4 of the Uniform Mechanical Code (current edition). No application shall be extended more than once. Date application accepted: Date application expires: Application taken by: (initials) SAS 11/1/99 ,,u c% permii.dnc ✓ Submittal Requirements Floor plan and system layout Roof plan required to identify individual equipment and the location of each installation (Uniform Mechanical Code 504 (e)) Details and elevations (for roof mounted equipment) and proposed screening Heat Loss Calculations or Washington State Energy Code Form #H -7 H.V.A.C. over 2,000 CFM (approximately 5 ton and larger) must be provided with smoke detection shut- off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical Code 1009). Specifications must be provided to show that replacement equipment complies with the efficiency ratings and other applicable requirements of the Washington State Nonresidential Energy Code. Structural engineer's analysis is required for new and the replacement of existing roof equipment weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be stamped by a Washington State licensed Structural Engineer. Mechanical Permits COMMERCIAL: Two complete sets of drawings and attachments required with application submittal NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. RESIDENTIAL: Two complete sets of attachments required with application submittal Submittal Requirements New Single Family Residence Heat loss calculations or Form H -6. Equipment specifications. Change -out or replacement of existing mechanical equipment I Narrative of work to be done, including modification to duct work. Installation of Gas Fireplace Narrative with specification of equipment and chimney type. If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney is in safe condition. NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. ► ►/2/')!) ra.► miscpuu.dnc City of 'I ukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 0001600020 Address: 8123 EAST MARGINAL WY S TUKW Suite No: Applicant: BOEING #2 -80 Receipt No.: R020000961 Payment Amount: 316.63 Initials: SKS Payment Date: 07/15/2002 09:11 AM User ID: 1165 Balance: $0.00 Payee: ENCOMPASS TRANSACTION LIST: ACCOUNT ITEM LIST: doc: Receipt Current Pmts Amount Payment Check 8865 316.63 MECHANICAL - NONRES PLAN CHECK - NONRES Type Description RECEIPT Method Description 000/322.100 253.30 000/345.830 63.33 Permit Number: MO2 -126 Status: APPROVED Applied Date: 06/17/2002 Issue Date: Account Code Total: 316.63 Printed: 07 -15 -2002 P ct: y ^� Type of Ins ectio 1 A ress i a . a . �1 .1 .( Data ailed . , I J 3e(O � �'m'! Special Instructions: C- q 3 O , ate Wanted: ! 1 ! �1 i (o ` • Requester• 1 !0,, P �o7neNNo:\ INSPECTION RECt"D Retain a copy with permit r INSKECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3 Approved per applicable codes. , Corrections required prior to approval. COMMENTS: 4 ... 7; 1 J d;�:,y.�::: pnFa r. �+, h, iYi, dL> v,: 3i��. �a: R'^ �w. di ;re.;rrF;t:�e;;•'.'�rJLw: +d,1 :: ,... , ...f:ds::; S: (Receipt No.: (Date: Inspect° Dat 7J "01 El $47. REINSPECTION EE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. ♦ t ,�. . -... i: re 2 v O 0 9 u. W O 52 a I- ILI W O O a I- WW H Z U O ProJect: ge•elf, .. yoaT f Insjectionv 7 Dir / 11 ta(e Address: ; ,:;3 E P 6 tom/ s De • ,--N • Special Instructions: PA F ( iC e. A /1 Date W. ted: --- .. ... Reques er77 Phone /), , 5 7/4h3 =me PE. N • S Approved per applicable codes. • • I lnspectorla INSPECTION REC Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 206)431-3670 k t orrections required prior to approval. COMMENTS: Sigr‘01 dr I Pi - P(k cr AucAs er )s-kryol=vi c i-e11 rr)Olan • Date: 12_ o 02 LJ $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: !Date: Project: ./D/11/6 ? -- ge, Type of Inspection: AiStegrt -1/ktecii Date Called: . i" Address: gic Et 1114P6 /Ai& Special Instructions: tvy e-- `". • • (2706,) Date Wonted: // -....v-a2 a.m. p.m. Requester,;--1 l one No /./1.?.3 523P CITY OF TUKWILA BUILDING DIVISION , 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION NO. INSPECTION REC Retain a copy with permit (206)431-3670 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: . —72 „a- "- p. Date: $47.00 FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: tD io 00 co tu w u_ uj 0 g uJ ZI- D. a M‘ Z Lu 2 D 0 co — 0 I— u j X 0 i= o . Z 0 — 1 0 erect: c�et � – $0 Type of Inspection: ((Tel( - fob' Air iFivi � Address: S12,3 Act I • Date Called; � i '5 - 0 ? - Special Instructions: J J Date Wanted: z -- P. Requester: , `` T....\ i1�. Phone No: 2 t 6 - , 1 7 0 — 7 03 INSPECTION RECD Retain a copy with permit INSPECTION NO. PERMIT Approved per applicable codes. fric2 - 1 2 V CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -367 gi Correctiorr required prior to approval. COMMENTS: A 7& !A u r Uv�clap . oOzt-- 2,06 --- `1 l 1 6`7(5 c,,1/2.1)(0-31Z--- 13 Z • dIA d d . �, V $47.1 0 REINSPECTI • FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: .t't�:' "x3.; ; i! ii :�cixii:, \;.. ^ y,= :e.x,',• -r: t.::;u'�'1::i1:lA': �', ^.,f.i;':a,: a'.ti !r::'ir, %!?.:il;i Pr 'ect:. P ill Z ` 1D Type of Inspec ■ . �� --- ... --_ ,— i _ ...... ' Address:. 5 /Z3 L /4t Ma/ N(/yS Date a e. / / / — Special Instructions: Date Wanted: i/ 4 D Z (a m) P.m. Requester: P hone No: 9 eb - 1 /Z3 -- Se . RCaa1; .. .. n A.. �utV.��ivkA'...}i x':'a:kh ^M�e.:Y:.i :✓ �:ti.: i.r.w %i. ■ INSPECTION REC Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 1 �u.� �Cbr_•?i`7'r^ .;.,>•.: , r iY4i;..:'::.'tY.:i..�3'^ � � PERMIT NO ' i/ (206)431 -3670 i 4! COMMENTS: C' .4 / 9 - (4•1 / / Inspector: Approved per applicable codes. Corrections required prior to approval. a $47.00 REINSPECTION FED REQUIRED. Prior to inspection, fee must be paid at b300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: 1:,�...n:. '::'�;:a. ,d'i.a' . w'a�.. i aw..�c:`i'i.ic:;c'e�;»'Zu5 i.'cT.•,7i"t:al Proj t: ` .it O Type of Inspection: G . ien t/G -// t! Ad ss: //j�/�� 4 A� //�/ Date C l ^ Special. Instructions: !/"! S (4:20 Date Wanted: . '7263 "0,0 Y Reque r: No• 03 — 5037 ra INSPECTION REC ct• Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 A4 o0 PERMIT NO. (206)431 -3670 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: 4 cLA- -o 4-h ly,„)1( ; is+�lc_ 6 c ` S �'G e *C1 — 13's u ctAt c , 11h Ins pectors (Date: $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: !Date: Pr ct: 4/6 .2 o Typ f Inspection: nu - /it/ Address: ,�/�3 8, . Mxga/ JAG ate Call d .�D /, =ate Special Instructions: kiY Date Wanted: ,�� "�� ` �0 a.m. P.m. Request Phone No: l ��D() 973 57234 INSPECTION REC Retain a copy with permit INSPECTION NO. • CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 06)431 -3670 COMMENTS: Approved per applicable codes. EJ Corrections required prior to approval. $47.00 REINSPECTION FEE EQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. `Receipt No.: !Date: ••' t .. * . ..'ti'A;:.tli.Lt;•.. ..:y.M1... Y';:�:+r. c,t 4::','Sr.::1�.4. ✓:Z'3eF4t�:''r:§.. ..r + +S'7::.., .. r:. .'�.y` %` :A�:' :.`i City of Tukwila Fire Department Thomas P. Keefe, Fire Chief A _ c� Project Name .y�G� t t� / Address C'23 6 /27 C.:) S Authorized Signature FINALAPP.FRM TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Retain current inspection schedule Needs shift inspection Approved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: 64G`- F D S/y Permit No. Steven M. Mullet, Mayor Suite # 5rx �.,,•} j /D 1-- Date / Rev. 2/19/98 T.F.D. Form F.P. 85 4. Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: 206 -575 -4404 • Fax: 206 -575 -4439 DEPARTMENTS: 14.00k. Build) 'T�ivlslon J Public Works ❑ Documents/routing slip.doc 2.28 -02 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: MO2 -126 DATE: 6 -17 -02 PROJECT NAME: BOEING 2 -80 LSAF CONTROL ROOM SITE ADDRESS: 8123 EAST MARGINAL WY S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued 612 kw - (0 -27 Fire Prevention Structural ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete [r Comments: Incomplete Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route 1 Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 7 -16 -02 Approved ❑ Approved with Conditions / Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: PERMIT COORD COPY Planning Division Permit Coordinator DUE DATE: 6-18 -02 ❑ Not Applicable ❑ DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ■ ACTIVITY NUMBER: MO2 -126 DATE: 6 -17 -02 PROJECT NAME: BOEING 2 -80 LSAF CONTROL ROOM SITE ADDRESS: 8123 EAST MARGINAL WY S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued DEPARTMENTS: Building Division Public Works Complete Comments: TUESITHURS ROUj1NG: Please Route REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved Notation: Documents/routing slip.doc 2.28 -02 PLAN REVIEW /ROUTING SLIP Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete Permit Center, Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: " Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: REVIEWER'S INITIALS: ❑ Planning Division ❑ Permit Coordinator DUE DATE: 6 -18-02 DATE: —( Not Applicable ❑ tructur I Review Required ❑ No further Review Required /� DATE: a DUE DATE: 7 -16-02 ❑ Approved with Conditions Not Approved (attach comments) ❑ S(0 7 Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: QQ � J U ✓ 0 to V) u_ w � w w U� co 0H Ww U O til tni ;;k Vi j; AsS PERMIT NO.: N1O2 - /2/. MECHANICAL PERMIT APPLICATIONS INSPECTIONS ❑ 2 ❑ 50 ❑ 60 ❑ 610 ❑ 700 ❑ 1080 ita 1090 a 1100 ❑ 1101 M 1102 1105 ❑ 1115 ❑ 1400 ® 1800 ❑ 4015 CONDITIONS Pre - construction WSEC Residential WA Ventilation/Indoor AQC Chimney Installation/All Types Framing Woodstove Smoke Detector Shut Off Rough -in Mechanical Mechanical Equipment/Controls Mechanical Pip/Duct Insul Underground Mech Rough -in Motor Inspection Fire - Final Mechanical - Final Special -Smoke Control System 10001 No changes to plans unless approved by Bldg Div 10002 Plumbing permits shall be obtained through King Co • 10003 Electrical permits obtained through L & I ,® 10005 All permits, insp records & approved plans available 10014 Readily accessible access to roof mounted equipment 10016 Exposed insulation backing material 10019 All construction to be done in conformance w /approved plans 10027 Validity of Permit 10036 Manufacturers installation instructions required on site 10041 Ventilation is required for all new rooms & spaces 10042 Fuel burning appliances 10043 Appliances, which generate.... 10044 Water heater shall be anchored.... rJ Additional Conditions: TENANT NAME: Qdein --- Z h S,q/: Covxos eettm FEES Basic Fee (Y/N) Supplemental Fee (Y/N) Plan Check Fee (Y/N) Fumace/Burner to 100,000 BTU (qty) Over 100,000 BTU (qty) Floor Furnace (qty) Suspended/Wa1VFloor- mounted Heater (qty) Appliance Vent (qty) Heating/Refrig/Cooling Unit/System (qty) Boiler /Compressor to 3 HP /100,000 BTU (qty) to 15 HP /500,000 BTU (qty) to 30 HP /1,000,000 BTU (qty) to 50 HP /1,750,000 BTU (qty) over 50 HP /1,750,000 BTU (qty) Air Handling Unit to 10,000 cfm (qty) over 10,000 cfm (qty) Evaporative Cooler (qty) Ventilation Fan (qty) Ventilation System (qty) L� Hood (qty) Incinerator — Domestic (qty) Incinerator — Comm /Ind (qty) Other Mechanical Equipment (qty) Other Mechanical Fee (enter $5) Add'1 Fees — Work w/o Permit (Y/N) Insp Outside Normal Hours (hrs) Reinspections (hrs) Miscellaneous Inspections (hrs) Add'l Plan Review (hrs) Plan Reviewer: Date: Permit Tech: Date: ,' 8"02 ...... ACTIVITY NUMBER: MO2 -126 DATE: 6 -17 -02 PROJECT NAME: BOEING 2 -80 LSAF CONTROL ROOM SITE ADDRESS: 8123 EAST MARGINAL WY S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued DEPARTMENTS: Building Division ❑ Public Works ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: REVIEWER'S INITIALS: Documents/routing slip.doc 2-28.02 PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Incomplete Approved ❑ Approved with Conditions Notation: 1 _ Planning Division Permit Coordinator DUE DATE: 6-18-02 DUE DATE: 7 -16 -02 DATE: /Z Not Applicable ❑ Not Approved (attach comments) ❑ Permit. Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Harris Group Inc. 1000 Denny Avenue, Suite 800 Seattle, WA 98109 -98124 Voice (206) 494 -9400 Fax (206) 494.9500 www.harrisgrp.com SCOPE OF WORK: (Description of Change) Reference the drawings for a complete description of work associated with this ECN. The following is a brief summary of changes: Structural: Revised note on feathering new slab to existing Revised mezzanine and roof penetration sizes and locations to coordinate with the HVAC modifications. Mechanical: Revised IA valve and added 1" exhaust line Extended heat tracing on exterior south wall steam and condensate lines. Deleted an exterior 1-1/2" A300 line near column DJ /11. Added V" IA to existing air, fuel and purge controls near column DI/15. Revised HVAC for noise issue, which included: new HVAC unit, HVAC unit piping modifications, Ductwork modifications, added a duct sound attenuator. Electrical: Revised branch circuit to AHU DD -11. Revised control wiring between Boeing ALDS PLC and status box 1. Revised reference call outs for Boeing Lab drawing numbers. DRAWING REVISIONS: Drawing Number PANEL DB12 2- 80 -S12a 2- 80 -M1S12 2- 80 -M1S16 TITLE: HVAC Noise Changes & Misc. Modifications REASON FOR ECN: Boeing.Request COST EFFECT: ECN REQUESTED BY COPIES: Boeing 5 sets Bau h 18 sets ENGINEERING CHANGE NOTICE INCREASE ENO CHANGE Mike Prittie HGI PROJECT NO.: PROJECT NAME: CLIENT JOB NO.: CUSTOMER HARRIS OTHER Print Initials LJC, SDB, LCC, MLD, RSM, JRP K I.IU S7 ,g .t. lII 1l. Ib nn 1.6 NI •: dN.�. ..�•., .• :. Ibr.. 9 .."..01 II \. v . •,. .. ' :c• 02- 11081.00 LSAF Control Room 711975 DRAWING LIST CONTINUES ON NEXT PAGE Drawing Drawing Title Rev & Date ELECTRICAL PANEL SCHEDULE PARTIAL FOUNDATION & FIRST FLOOR SLAB PLAN PARTIAL MEZZANINE FRAMING PLAN PARTIAL MEZZANINE FRAMING PLAN ['DECREASE TO BE DETERMINED A 06/05/02 B 06/05/02 A 06/05/02 A 06/05/02 ECN # 01 ECN REVISION NO: 0 DATE: 06 / 05 / 2002 DRAWN BY: RSM/MLD /JRP SDB c CHECKED BY: APPROVED BY: SHEET: i OF 1 ORIGINAL FILE: 10.0922 Mc9/ .• • - ENGINEERING CHANGE NOTICE PROJECT NO. 02-11081.00 NO 01 HARRIS GROUP INC. DRAWING REVISIONS: Drawing Number Drawing Title Drawing Rev & Date 2.80 -S166 2-80-M2a 2-80-M2b 2-80-M2e 2-80-1M12 2-80-1M16 2.80 -RFM16 2.80.1M62 2-80-1M66 2-80-1M112 2- 80 -M321 2-80-M324 2-80-M324B 2- 80 -M452 2- 80 -M513 2.80 -M542 2- 80 -M543 2- 80 -M544 2-80-M546 2-80-M1E116 2- 80 -1E162 2- 80 -E545 PARTIAL ROOF FRAMING PLAN EQUIPMENT SCHEDULES EQUIPMENT SCHEDULE EQUIPMENT SCHEDULE DUCTWORK DUCTWORK DUCTWORK HVAC PIPING HVAC PIPING PLUMBING 300 PSI AIRLINE CIRCUIT AIRFLOW /CONTROL DIAGRAM AHU -DD -11 SEQUENCE OF OPERATION AHU -DD -11 ENLARGED MEZZANINE PLAN LSAF CONTROL ROOM LOW SPEED AEROACOUSTIC FACILITY SECT AND DET HVAC SECTIONS HVAC SECTIONS DETAILS SECTIONS AND DETAILS 480Y/277 VOLT POWER 400HZ AND DC POWER PANEL DETAILS Page 2 of 2 B 06/05/02 C 06/05/02 E 06/05/02 B 06/05/02 D 06/05/02 D 06/05/02 A 06/05/02 F 06/05/02 F 06/05/02 H 06/05/02 A 06/05/02 B 06/05/02 A 06/05/02 A 06/05/02 B 06/05/02 B 06/05/02 A 06/05/02 A 06/05/02 A 06/05/02 A 06/05/02 D 06/05/02 A 06/05/02 mo_44a6, CIRCUIT STYLE /FRAME TRIP R. WIRE SIZE LOAD a b c (kVA) (kVA) (kVA) LOCATION a 14 \ \ \ \ \ \ \� \ \` \ \\ MEZZANINE 1 #4 PANEL MDD12 VIA 45kVA XFMR \ \ \ \ \ \` 14 \ \ \ \\ COL. DD /12 c 70A \ \ \ \ \ \�\ \ \ \ \ \\\ 14 a 34 \ \ \ \ \ \ \,�; \ \ \\ MEZZANINE 3 • #1 PANEL MDD11 VIA 76kVA XFMR \ \ \ \ \\ 34 \ \ \ \ \\, COL. OD/11 c 125A \ \ \ \\ . \ \ \ \ \ \\ 34 a 1.9 \ \ \ \ \ \\ \ \ \\\ OUTSIDE WALL 5 #12 SUMP PUMP DUPLEX CONTROLLER \ \ \ \\ 1.9 \\ \ \\ COL. DC -DD /9 c 20A \ \ \ \ \ \ \ \ \\\\ 1.9 a 0.5 \ \ \ \ \ \\ \\ MEZZANINE 7 •' #12 SF -10 FAN .75 HP \ \ \ \ \ \ 0.6 •;: \ \ \ \� COL. DE/11 c 20A \ \ \ \ \ \� \ \ \ \ \ \ \\ 0.5 a 6.9 \ \ \ \ \ \ \, \ \ \ \\ MEZZANINE 9 • #10 WH-01 WATER HEATER \ \ \ \ \ \\ 4 \ \ \ \\ COL. DC /10 c 30A \ \ \ \ \ \ \ \ \ \\ 4 a \ \\ \ \\ \ \ \\ 11 \ \ \ \ \ \\ *.:MX c \ \ \ \ \ \� \ \ \ \ \ a 3.7 \\ \ \ \ \ \� \ \ \ \� OUTSIDE 13 #10 AHU -DF /10 \ \ \ \ \\ 3.7 ; \ \ \\ NEAR COL. DF /9 c 30A EMPORARY FEED, DURING PHASE 1 CONST. \ \ \ \ \ \ \\ \ \ \ \ \\ 3.7 15 •' c \ \� \ \ \ \\ . \ \ \ \t. \ \\ \fit \ \ \ \ \� a 0.3 :� \ \ \\ \\ \\ \ \ \ 2 • #12 ROLL UP DOOR MOTOR (1/2 HP) \ \ \ \ \ \` 0.3 \ \\ COL. DC /9 c 20A \ \ \ \ \ \\ \ \ \ \ \� 0.3 a . \ \ \ •:� ,\\ \ \ \ 4 • SPARE \ \ \ \ \ \ \ \ \� \� , c 30A \ \ \ \\ \\ \ \ \ \` a 4.8 \ \ \ \ \ \\ �\ \ \ \ \\ MEZZANINE 6 #10 AHU DD -11 VFD (10hp), RF DD -11 (2hp) \ \ \ \ \\ 4.8 .��. \M ' COL. DO/11 c 30A \ \ \ \ \ \ \ \ \ \ \ \ \\ 4.8 a 20A #12 FT 2 -39, FT 2-41 FAN TERM. UNITS 1 \ \ \\\\ \ \ \ \ \\ MEZZANINE 8 20A #12 FT 2 -40 FAN TERM. UNIT \ 0.72 • \ ` COL. DE /11 c 20A #12 FT 2 .42 FAN TERM. UNIT 4, " \ 0.72 a 2 -P PANEL G11 VIA XFMR T-G11, 37.6kVA, 1PH 20 \ \ \ \ \`\ „N MEZZANINE 10 70A #2 (TEMPORARY FEED, DURING PHASE 1 CONST.) \ \ \ \ \ \\ 20 \ \ COL. DE /11 c \ \ \ \ \� \ \ \ \ \\ a 0.6 \ \`\` \� ; \ \ \ \\ 12 • #12 ROLL UP DOOR 3 /4HP MOTOR \ \ \ \ \\ 0.5 \ \ \ \ \\. COL. DF /9.5 c 20A \ \ \ \ \ \� :.\ \\ 0.5 a \ \ \ \ \ \ \� ,. \� 14 \ \ \ \ \ \ \ \\ cr a \ \\ 16 •' \ \ \ \ \�� \� \ \\ POST PANEL DB12 TYPE 480Y/277V 30 4W MAIN BKR. MLO RATING 800A REF DWG E2 REVISION A ENGINEER HGI/PRIESTLEY BLDG. 2 -80 CONNECTED kVA= 236.44 ELECTRICAL PANEL SCHEDULE (SURFACE) CONNECTED AMPS = 284 DATE 2/26/02 LOCATION COL. DB/12 FEEDERS (2)4"C-4#500kcmil + #1/0 GND FROM VAULT 51/B1 SHORT CKT. RTG. Isc 25kAIC REVISED CKT. 6 DATE REVISED 6.05.02 JOB NO. J #711975 ECN -01 MO DB12 ECN-01 5/31/2002 10:01 AM REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL REGIST: # EXP. DATE CCO1 ENCOMMS984CA 02/01/2004 EFFECTIVE DATE • • • 02/01/2002 ENCOMPASS MECHANICAL SERVICES 7717 DETROIT AVE SW SEATTLE WA 98106 Signature — Issued hy DEPARTMEt 'I OF LABOWAND INDUSTRIES a Balance Due: $ 3110 .103 Need Current Contractor Registration Card: (' Yes p No Need to Enter Contractor Information in Sierra: Yes ❑ No keyyli 1 lipte 91$41 RETURN /EXHAUST (RE) FAN - EXHAUST FAN (ET) - SUPPLY FAN (SF) SCHEDULE MARK NUMBER SERVICE LOCATION CFM T.S.P. INCH W.G. FAN RPM MOTOR TYPE MAKE Sc MODEL pV (FPM) WEIGHT (LBS) FAN WHEEL DIA (INCH) REMARKS (SEE EQUIPMENT NOTES) BHP DRIVE HP VOLTS PH Hz ® AHU 1 AIL 5400 1 1/4 1246 18 1/4 5400 3 480 3 60 CABINET FAN PACE CABINET FAN SIZE A18 1534 INCLUDED W /AHU -1 18 1/4 CC -1 v Aga. AHU 2 0.28 6400 1 1/2 1429 ANECHO,C CHAMBER 4 / 18 1/4 5 480 3 60 CABINET FAN PACE CABINET FAN SIZE A18 1845 INCLUDED W / „ U _ 2 18 1/4 E>� Ilir RE AHU -3 - 6680 1 3/4 1534 - - 5 480 3 60 CABINET FAN PACE CABINET FAN SIZE A18 1964 INCLUDED W /AHU -3 18 1/4 RE -3 AF -3 / \ AHU -4 � I! /i t 12000 1.0 988 - 12100 5 480 3 60 CABINET FAN PANE CABINET FAN SIZE A24 1968 INCLUDED W /AHU -4 24 1/4 7�E? ( ® REVERB ROOM ER - - 25000 2.5 685 - 20 480 3 60 UTILITY FAN PACE SIZE 44 2194 2445 44 1 2 PROVIDE W /DRAIN FITTING / 3 � AT BOTTOM OF SCROLL 11. ® ANECHOIC ROOM 25000 600 15 480 60 UTILITY FAN PACE SIZE 44 2200 2445 44 1/2 ®ATOBOTTOM /OFSCROLLFITTING v TOILET ROOMS - 1600 12 - 1/2 120 60 CENT ROOF EX CUBE- HECK 85 14 16x16 0 TO 0 CURB © PACE CABINET E • q.• IOIIS - 1280 :I 1725 - - 1 2 120 60 CABINET PAN GREENHECK 720 MOUNT ABOVE TOILET 75 12 di. 1.1.1111■1111a44 i��i�i lid I V ' I.Vi��i�i� % / /. �� � , i�iji /// /�f/ // // /' z r / % /� % / / / / /. �� ! � ' �/ � i / i,r, r /., r % / �� � � � / � // j�� �'�/ % / ' / / / // / �� � �����i j�� / % rr'���ry�/'SSry/fI� ' '/ " % / //. K i��i% / /kk / }� % % i ��� ! % / /i�j,Ii%� /�iI' N� �• '� % / /,I / / / / G% i�� / /�i�i/ / / / /A O / A /V / / / / / /. % / / ����i ��j /. j/ �rrr Jr. %,�* 0� ���j�� �r .7 VV j . � � / % j , 4.4 r i A �i/ o r %!, V.,! ". fir: /� �� / %/ j� /% ��/ ji.�j / '//i. j�i. �i.��/ j % 'A / ''A��.#• r � i. �%� �A I S_fiVA E3 DB.9/17.3 ELECTRICAL EQUIPMENT ROOM ROOF 7880 0.125 180000/ 1.55 BELT 1/4 gig 120 1 60 ROOF EXHAUSTER PENN- VENTILATOR DX309 2 SPEED, 2WINDING - � i /l l MECHANICAL EQUIPMENT ROOM ROOF 865 0.125 960 0.05 BELT ROOF EXHAUSTER PENN- VENTILATOR, DX9B - - - 0 ACM INST. VAN STAGING ROOF 10,000 1.5 694 4.1 BELT 5 480 3 60 ROOF EXHAUSTER GREENHECK, CUBE 360 HP - - - - VI CHILLER ROOM ROOF 3100 0.6 - 1.20 BELT 1 1/2 480 3 60 ROOF EXHAUSTER . PENN- VENTILATOR - - - 22x22 DUCT CONNECTION 0 AIM ELECTRICAL SHOP 2ND FLR ROOF 3440 0.5 560 0.48 BELT 1/2 120 1 60 - PENN- VENTILATOR MODEL DX24B _ _ Mr AIR HANDLING UNIT AHU SCHEDULE MARK NUMBER LOCATION MODEL SERVICE SUPPLY FAN SECTION MOTOR RETURN FAN SECTION (SEE FAN SCHEDULE) AIR FILTER (SEE FILTER SCHEDULE) COOLING COIL (SEE COOLING COIL SCHEDULE) STEAM HEATING COIL (SEE HEATING COIL SCHEDULE) OPERATING WEIGHT (LBS) REMARKS (SEE EQUIPMENT NOTES) TYPE OF SYSTEM WHEEL DIA. (INCH) CFM ACTUAL AIR T.S.P. INCH W.G. OV FPM RPM HP VOLTS PH Hz AIL R OOF PACE CABINET FAN SIZE A18 REVERB CHAMBER 18 1/4 5400 3 1/2 1535 1766 5 480 3 60 RE -1 AF -1 CC -1 HC -1 5250 E> I ? �j SET MIN. OA AT 150 CFM CONSTANT VOLUME 0.28 AL ROOF PACE CABINET FAN SIZE A18 ANECHO,C CHAMBER 4 / 18 1/4 6400 4 1845 1936 7.5 480 3 60 RE -2 AF -2 CC -2 HC -2 6300 1 2 , MIN. OA AT 240 CFM CONSTANT V�OLUI�/E �/ GQIVJ If11V1 i� SET � v ® ROOF PACE CABINET FAN SIZE A20 CONTROL ROOM 18 1/4 6680 2 1/4 1836 1569 5 480 3 60 RE -3 AF -3 CC -3 HC -3 9600 L8 7 ' SET MIN OA AT 300 CFM CONSTANT VOLUME AF � I! /i t ROOF �i % i /% � woromminini •�� ' '�� %//i.� /.��i %GA' FAN SIZE A18 WORK AREA �i■V`iYrU 12100 0.50 1968 /1Y�YY` 1279 10 �� •. SET MIN. OA AT 600 CFM CONSTANT VOLUME rs� ��V /r��lY� " Il .l %'//// / / /./ �/ 4 0 � � % //lA//// 0• /. / / / � A % / / / /� / % / / /�A/. % / / /// � % / / ///// //A / / //� A F M/ � i�/. % / / " / i s ' ''' / / /% i�i ���� oi . � / A % 324 480 60 ON W NW AL PACE CABINET E ANECHOIC CHAMBER I 12 100 MI 1952 1157 480 60 mow VA•IAB E OLUM IMF K ,,.. %� /Gi. r 4f i I A r�// / /% 1" ii i /vr: ! ∎ Jr. %,�* �j ,� �e'/.% �i�. l �r .7 VV j . � � / % j , 4.4 r i A �i/ o r %!, V.,! ". fir: /� �� / %/ j� /% ��/ ji.�j / '//i. j�i. �i.��/ j % 'A / ''A��.#• r � i. �%� �A I S_fiVA Y��WuVr � i /l l �� I %f% j��i / / � ►�/ /'� /. �1YY�� %��I�Y�IY�� W J' P%���� ���� ��, /��1� i � / ,r Tor ���� / �� ��� /% �� / �� �i /��///% j����/ � /�j� /I%'/�/III'� �� � bdoro AIR FILTER (AF) SCHEDULE MARK NUMBER UNIT SERVED AIR FLOW (CFM) FILTER REMARKS MEDIA TYPE EFFICIENCY PERCENT MAX�FV (FPM) (CRY-SIZE (INCHES) PRESSURE DROP IN WG CLEAN DIRTY AF U AHU -1 5400 PLEATED NON- WOVEN COTTON 25 -30 500 (3)-16x20x2 (3)- 20x20x2 0.28 0.90 FARR 30 -30 m AHU -2 6400 PLEATED NON- WOVEN COTTON 25 -30 500 (3)- 16x20x2 (3)- 20x20x2 0.28 0.90 FARR 30 -30 v AHU -3 6680 PLEATED NON- WOVEN COTTON 25-30 5002 2 - 2Dx20x2 2 - j6x25x2 2 - 16x20x2 0.28 0.90 FARR 30-30 MT AHU -4 12000 PLEATED NON- WOVEN COTTON 25 -30 500 0.28 0.90 FARR 30 -30 .. v (9)- 20x25x2 AF AHU -1A n 4120 PLEATED NON- WOVEN COTTON 25-30 50Q (3)- 16x20x2 (3)- 20x20x2 0.28 0.90 FARR 30-30 AHU-2A 1 2100 PLEATED TYPE NON -WOVEN COTTON 25 -30 500 (9)-20x25x2 0.28 0.90 FARR 30-30 Q AF CLEAN ROOM 800 PLEATED TYPE 95 290 (1)- 20x20x6 0.50 0.90 FARR RIGA -FLOW 200 SYM A RECORD DRAWING LSAF RECONFIGURATION LSAF CONTROL ROOM REVISIO J #982188 J #711975 BY D.G. NGI /LJC HGI /MLD APPROVED K.R. DATE 2.1.95 7.28.00 5.01.02 SYM L. d: THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE • ACCEPTABILITY I i'►( D WN R. BECHT D. GEONANGA ENGINEER D. GEONANGA CHECKED G. SMITH PROVED P. LONG PPROVED / RENSION BY APPROVED DATE re;LAsuarAErisfav® Mop. - QC. e026055 9 w Gi61'IO CS g We 4 nxi DATE 04 - 14 - 93 SUBTITLE TITLE LREMOVAL MECHANICAL MASTER FO CP.,,N5ES SHAT BE MADE TO OP : r;{ V.jTI-IOUT PRIOR C TUK;:fStA BUILDING pT V. V141.1 M.A. P. NEW PLAN ISUBIATINk. DMIXIE .oxrcom. Fos mom EQUIPMENT SCHEDULES BUILDING 2 -80 LEGEND 1. SEE SHEETS M1a, M1b AND M1c FOR MECHANICAL LEGEND AND ABBREVIATIONS. GENERAL NOTES ILL> DRAW -THRU UNIT, TOP HORIZONTAL DISCHARGE, AIRFOIL, BACKWARD INCLINED, DWOI, BELT DRIVE. UNIT SHALL BE WEATHERPROOFED FOR OUTDOOR INSTALLATION. SWSI, AIRFOIL, BACKWARD INCLINED CLOCKWISE ROTATION, TOP WITH VARIABLE SPEED BOTTOM HORIZONTAL DISCHARGE, BELT DRIVE. ® SWSI, AIRFOIL, BACKWARD INCLINED CLOCKWISE ROTATION, BOTTOM HORIZONTAL DISCHARGE, BELT DRIVE WITH VARIABLE SPEED MOTOR, UNIT SHALL BE WEATHERPROOFED FOR OUTDOOR INSTALLATION. E> NOT USED. © PROVIDE WITH COMBINATION MIXING BOX AND VEE FILTER SECTION. C> WITH 6" FLAT FILTER SECTION. ® DRAW THRU UNIT, DOWN DISCHARGE AIRFOIL, BACKWARD INCLINED, DWD1, BELT DRIVE. GENERAL NOTES EQUIPMENT TO BE RELOCATED TEMPORARILY. SEE DRAWING SK -1M12 FOR TEMPORARY LOCATION. REMOVE FROM SERVICE AFTER LSAF CONSTRUCTION IS COMPLETE. DISPOSITION OF EQUIPMENT PER BOEING INSTRUCTION. REMOVE EQUIPMENT FROM SERVICE. DISPOSITION OF EQUIPMENT PER BOEING INSTRUCTION. j DISCONNECT STEAM AND CONDENSATE SERVICE AT START OF CONSTRUCTION. ROUTE TEMPORARY CHILLED WATER SUPPLY AND RETURN PIPING TO MAINTAIN UNIT IN COOLING AND AIRFLOW SERVICE UNTIL EXISTING CONTROL ROOM IS TO BE DEMOLISHED. SEE DRAWING SK -1M62 AND SK -1M66 FOR TEMPORARY PIPING. DISPOSITION OF EQUIPMENT PER BOEING DIRECTION. SEPARATE P'ERId1IT REQUIRED FOR: D MECHANICAL 'ELECTRICAL E 9•PLU1t'BIIVG GAS PIPING CITY OF TUKWILA BUILDING DIVISION FILE COPY I understand that the Plan Check approvals are subject to errors ar4 omissions and approval of plans does not au'hcrize the violation of any adopted code or ordin,ce. Receipt of con- tractor's copy of approved plans acknowledged. � � . 1 By uQmm Date Permit PLANT 2 MO2/26 DIAG A �C RECENEG crn of rukwlta JUN 1 7 2002 PERMIT CENTER ISSUED FOR CONSTRUCTION DRAWN: 'CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET REVISIONS BY Harris Group Inc. M2aR DWG NO. 2-80-M2aR REVISION " B" ONLY B JOB N0. COMP N0. PL -2 -92064 DATE PROJECT 5.01.02 11081.00 ENG NEER: CHECKED: MLD RB DATE 5.01.02 SOUND ATTENUATOR (SA) SCHEDULE MARK NUMBER SERVICE ATTENUATOR BANK SIZE LENGTH FEET QUANTITY WIDTHxHEIGHT (INCHES) MAXIMUM PD IN /H20 MAX FV FPM AIR QUANTITY CFM MINIMUM REQUIRED ACOUSTIC RATING dB RE 10 -12 W OCTAVE BAND CENTER FREQUENCY HERTZ APPROX WT (LBS) REMARKS RATING 63 125 250 500 1000 2000 4000 8000 ROOF 20.4/1 AHU -1 3'- 0 "x4' -0" 10 (1) -36x48 0.19 450 5400 - 21 30 48 53 53 45 34 22 310 IAC MODEL LFS 0 SA RE-1 2'- 0 "x4' -0" 7 (1) -24x48 0.30 675 5400 - 15 25 43 48 49 35 26 18 260 IAC MODEL LFS 42 SA EF -1 3'- 0'x6' -O" 7 (3) -24x36 1.28 1389 25000 - 16 26 44 49 50 35 25 17 920 IAC MODEL LFS SA AHU -2 2'- 0 "x3' -0" 10 (1) -24x36 0.90 1066 6400 - 21 29 47 53 53 46 36 23 310 IAC MODEL LFS RE -2 2'- 0 "x3' -0" 10 (1) -24x36 0.90 1066 6400 - 23 33 50 52 52 45 30 20 310 IAC MODEL LFS IIII SA EF -2 3'- 0 "x6' -0" 10 (3) -24x36 1.36 1389 25000 - 22 32 48 52 52 44 28 18 920 IAC MODEL LFS AIL AHU -1A 2'- 0 "x3' -0" 7 (1) -24x36 0.32 686 4120 - 13 24 40 48 49 35 28 18 310 • IAC MODEL LFS SA AHU -2A 3'- 0 "x4' -0" 10 (2) -24x36 0.82 1008 12100 - 21 29 47 53 53 46 • 36 23 610 IAC MODEL LES AIL AHU -4 2'- 0 "x3' -0" 7 (1) -24x36 0.67 1000 6000 16 26 44 49 50 35 25 17 310 IAC MODEL LFS AIL AHU -4 2'- 0 "x3' -0" 7 (1) -24x36 0.67 1000 6000 - 16 26 44 49 50 35 25 17 310 IAC MODEL LFS MY ® AHU -3 2'- 0 "x4' -0" 5 (1) -30x48 0.81 1133 6800 - 16 21 35 41 41 28 20 14 260 IAC MODEL LFS - ELEC SHOP / 11B3 - - - - - - - - - - - - - - - - 35 -40 NC REQ'D LIBRARY / 21 DB22 - - - - - - - - - - - - - - - - 30 -35 NC RE ' S5 INTAKE /EXHAUST AIR PENTHOUSE SCHEDULE MARK NO. LOCATION SERVICE DIM. INCH CFM MANUFACTURER /MODEL REMARKS LENGTH WIDTH HEIGHT FSD -10 ELEVATOR MACHINE RM 12/12 RUSKIN, MODEL FSD -60 BLDG 2 -80 (1M15) FSD15 ELEVATOR 10/10 PH -2 ROOF 20.4/1 CHILLER ROOM 36 32 24 3100 RUSKIN - PH-3 ROOF 17.5/2 EF -03 80 48 36 7880 RUSKIN - PH-4 ROOF 17.5/2 EF -04 24 - 24 18 865 RUSKIN - PH -5 ROOF 19/3.5 AHU -3 BLDG 2 -80 72 42 - 36 I 6680 RUSKIN - PH -6 ROOF 19/3.5 AHU -3 BLDG 2 -80 72 42 36 6680 RUSKIN - FIRE / SMOKE DAMPERS MARK NO. SERVICE SIZE MANUFACTURER / MODEL REMARKS WXH(IN) FSD -6 E. CORRIDOR 14/14 RUSKIN, MODEL FSD 60 FSD -10 ELEVATOR MACHINE RM 12/12 RUSKIN, MODEL FSD -60 BLDG 2 -80 (1M15) FSD15 ELEVATOR 10/10 RUSKIN, MODEL FSD -60 FSD16 LIBRARY 18/18 RUSKIN, MODEL FSD -60 FSD -17 N.E. CORRIDOR 18/18 RUSKIN, MODEL FSD -60 FSD -18 LOBBY 10/10 RUSKIN, MODEL FSD -60 BLDG 2 -80 INTAKE /EXHAUST AIR PENTHOUSE SCHEDULE - LSAF MARK SERVICES -' LOCATION -- 7774 - 1,7*:,,Vr - DIMENSIONS PERCENT - COIL FACE AREA SQ. FT. CI® ®® 45.4 11=1 El ® 59.6 48:0 47.0 42 111111 MI - ® 6680 16 240,000 7.9 48.0 52 48 10 2.0 .59 75 PACE COIL MODEL N0. ISFASTME .694 rAFAVA 'Arlia#7;11vr7AW 4.4.,,ft iren=rorfAr AWANFZIAEr .F.FAr TAW ,WAFF 'AT '9fr)1/ TOTAL MBH 180,000 216,000 36 ROWS 8 FINS PER INCH 10 COIL CONN IN AIR - IN WG TUBE -FE H 2 0 447 PACE COIL MODEL NO. 1010 CW- 36.0X52. A -23/10 PACE COIL MODEL NO. 810 CW- 36.0X52. A23 /1O ® 0.94 2.0 • COOLING COIL (CC) SCHEDULE WATER MAX. PRESSURE DROP REMARKS SYM A v MAX. TI INCH WG. .033 .059 .055 .059 .01 .015 .033 14 25 16 20 30 30 30 <12 29 20 10 700 860 1300 3200 400 725 100 250 2160 6250 1350 350 TITUS MODEL MCD BORRER TYPE 3 TITUS MODEL TMS TITUS MODEL MCD BORDER TYPE 3 AIR DIFFUSER / REGISTER / GRILLE (AIR) SCHEDULE m v m v v Arsk v v v v v v v v m v �� EXHAUST GRILLE ISSUE FOR CONSTRUCTION UPDATE EQUIPMENT SCHEDULE REVISED SCHEDULES LSAF RECONFIGURATION LSAF CONTROL ROOM RENSION CTFFI J #982188 J #711975 BY DG DWM HGI /LJC HGI /MLD T i APPROVED GS/ KR KR MP DATE 5 -11 -93 10.15.93 7.28.00 5,01.02 50x26 51 11/16x27 11 /16 li l REVISION .238 - 31 BY 8400 APPROVED TITUS MODEL MCD BORDER TYPE 3 REMARK TITUS AERO BLADE SERIES MODEL 272RS TITUS MODEL MCD, BORDER TYPE 3 (USED IN TOILET ROOM) TITUS AERO BLADE SERIES > NOT USED MODEL 272RS / TITUS AERO BLADE SERIES MODEL 272RS TITUS AERO BLADE SERIES \ NOT USED MODEL 272RS / TITUS MODEL 272RL TITUS MODEL TMRA SURFACE MOUNT TITUS MCD SURFACE MOUNT TITUS MODEL MCD SURFACE MOUNT TITUS AERO BLADE SERIES MODEL 272RS TITUS EGGCRATE RETURN MODEL 50F WITH AG -15 OPPOSE BLADE DAMPER SURFACE MOUNT TITUS EGGCRATE RETURN MODEL 50F WITH AG -15 OPPOSE BLADE DAMPER SURFACE MOUNT TITUS EGGCRATE RETURN MODEL 50F WITH AG -15 DAMPER. LAY -IN MOUNT TITUS EGGCRATE RETURN MODEL 50F WITH AG -15 DAMPER. LAY -IN MOUNT TITUS EGGCRATE RETURN MODEL '50F. SURFACE MOUNT. v v v v 0 v v v EXHAUST GRILLE RETURN GRILLE RETURN GRILLE RETURN GRILLE RETURN GRILLE STEEL STEEL STEEL STEEL STEEL E> OFF WHITE 50x20 32x20 OFF WHITE OFF WHITE OFF WHITE 6x6 12x12 6x6 51 11/16021 11/16 24x24 16x6 .016 .01 .01 .01 .01 18 30 30 30 30 2240 3000 100 500 100 1600 620 TITUS EGGCRATE RETURN MODEL 50F. SURFACE MOUNT. TITUS MODEL 30R SURFACE MOUNT TITUS MODEL 25RL TITUS MODEL 3ORL TITUS MODEL 30RL TITUS MODEL 272FLS (OR EQUAL) TITUS MODEL 272FLS (OR EQUAL) DATE �BOE /NG' NOTE: 1. PROVIDE ACCESS DOOR(S) ON EAST SIDE FOR ACCESS TO MOTOR OPERATED DAMPERS LOCATED AT ROOF. :Art LEGEND 1. SEE SHEETS M1a, M1b & M FOR MECHANICAL LEGEND AND ABBREVIATIONS. GENERAL NOTES COORDINATE WITH ARCHITECTURAL FINISH. MO-I'(o TITLE MECHANICAL MASTER BUILDING 2 -80 CONSTRUCTION NOTES 1 REMOVE AFTER AHU -DF -10 HAS BEEN MOVED TO IT'S TEMPORARY SERVICE LOCATION. SEE DRAWINGS RFM -12R AND M542R. COIL TO REMAIN IN SERVICE UNTIL EXISTING CONTROL ROOM IS TO BE DEMOLISHED. PLANT 2 APPROVED JUL - 8 2002 AS Nolo IDEMOVAL ISSUED FOR CONSTRUCTION W:5b089 BY Harris Group Inc. DRAWN: WJB CURRENT REVISION J #711975 SHEET �c NECKED: WBB SYMBOL REVISION "D" ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED BY DRA K. BUN D. GEONANGA D. GEONANGA CHECKED G. SMITH APPROVED P. LONG 04 -14 -93 SUBTITLE EQUIPMENT SCHEDULE M2bR D DWG NO. 2- 80 -M2bR ONLY DATE 5 01.02 ENG NEER: MLD DATE 5.01.02 JOB N0. COMP NC, PL -2 -92064 PROJECT 11081.00 CHECKED: RB SPECIALTY VALVE AND COMPONENTS SCHEDULE MARK MARK NUMBER SERVICE SIZE Cv TYPE FLOW MATERIAL MANUFACTURER REMARKS BODY TRIM V -1 300 psi AIR 8 INCH 1000 BALL 1315 CFM (50 LBS /SEC) 20" 150 PSI JAMESBURY PNEUMATIC CONTROLLED, REMOTE OPERATOR, SEE NOTE 1 V -2 300 psi AIR p 8 INCH 1000 BALL 1315 S/ (50 LBS/SEC) JAMESBURY PNEUMATIC CONTROLLED, REMOTE OPERATOR, SEE NOTE 1 V -3 300 psi AIR 2 INCH 165 BALL (50 LBS /SEC) JAMESBURY PNEUMATIC CONTROLLED, REMOTE OPERATOR, SEE NOTE 1 V-4 300 psi AIR 8 INCH 135 CONTROL VALVE 3750 CFM (30 LBS /SEC) EMCO DIGITAL VALVE, 10 BIT, REMOTE OPERATED, SEE NOTE 1 & 2 V-5 300 psi AIR 6 INCH 90 CONTROL VALVE .25 CFM(5 LBS /SEC)MIN r500 CFM(20 LBS /SEC)MAX EMCO DIGITAL VALVE, 10 BIT, REMOTE OPERATED, SEE NOTE 1 & 2 FV -1 10 psig AIR 1 1/2 INCH 125 BALL 2530 CFM @ 10 psi JAMESBURY PNEUMATIC CONTROLLED, REMOTE OPERATOR, SEE NOTE 1 FV -2 10 psig AIR 1 1/2 INCH 125 BALL 2530 CFM @ 10 psi JAMESBURY PNEUMATIC CONTROLLED, REMOTE OPERATOR, SEE NOTE 1 FV-3 10 psig AIR 1 1/2 INCH 125 BALL 1530 CFM @ 10 psi JAMESBURY PNEUMATIC CONTROLLED, REMOTE OPERATOR, SEE NOTE 1 FV -4 10 psig AIR 1 1/2 INCH 125 BALL 1530 CFM @ 10 psi JAMESBURY PNEUMATIC CONTROLLED, REMOTE OPERATOR, SEE NOTE 1 FV -5 300 psi AIR 3 INCH 125 BALL 4100 CFM JAMESBURY MANUALLY OPERATED R1 300 psi AIR 6 INCH NA PRESSURE REGULATOR 300 psi INLET TO 50 psi OUTLET BRONZE N/A FISHER 298EK PILOT OPERATED INLET PRESSURE 300 psi OUTLET PRESSURE RANGE 50 -150 psig P1 150 psi AIR 10 INCH NA WAFER BUTTERFLY 2500 CFM JAMESBURY OR KEYSTONE MANUALLY OPERATED P2 150 psi AIR 10 INCH NA WAFER BUTTERFLY 6250 CFM (50 LBS /SEC) JAMESBURY OR KEYSTONE MANUALLY OPERATED BD1 80 psi AIR 6 INCH NA BURST DISC SET @ 95 psi (50 LBS/SEC) FIKE BD2 150 psi AIR 6 INCH NA BURST DISC SET @ 95 psi (20 LBS /SEC) FIKE FR1 300 psi AIR 2 INCH NA FUSELAGE PRESS 1; 4100 CFM 10 psi OUTLET NORGREN R18 -COD -RNXA PILOT OPERATED PRESSURE REGULATOR EXPANSION JOINT SCHEDULE (EJ) MARK NUMBER NOMINAL ID WORKING AIR PRESSURE TYPE END CONNECTIONS BELLOWS MATERIAL CONVOLUTIONS REMARKS EJ -1 26" 80 PSI SINGLE NON- EQUALIZING END ® FLANGED, 12511 LT WT F.S.S.O. STD DIA & BOLT CIRCLE 33 END © WELD END, 150# SERIES, 0.375 WALL SEE NOTE 0 STAINLESS STEEL, ASTM A 240 -T304 12 DESIGN BASED ON PATHWAY "FLEXWAY" EXPANSION JOINTS. SEE NOTE 02 EJ 2 20" 150 PSI EJ -3 20" 16" WG. EJ -4 20" 150 PSI INSTRUMENT AIR DRIER (IAD) SCHEDULE MARK NUMBER TYPE CAPACITY SCFM INLET AIR OUTLET AIR AMBIENT F ELECT MANUFACTURER AND MODEL REMARKS D.B. 'F W.B. 'F PRESSURE PSIG D.P. 'F AIR PRESSURE DROP PSI � 1 95 -1 /DUPLEX REFRIGERATED 50 100 78 100 38 3 100 ' F 208V/10 WILKERSON W -RA -0050 0 CONDENSATE RETURN UNIT SCHEDULE - ELECTRIC PUMP MARK MARK SERVICES LOCATION CAPACITY MODEL REMARK MANUFACTURER MANUFACTURER CP / � / �/ giiiiiiirimmenimPunl � 7 / »jJj`// I4 � , , , / 2 P∎CO � 1 95 -1 /DUPLEX I/ j % j /�j 9.59 IMP., 1759 RPM, 10GAL , E 0 I R D11 / As 1 101 5 'SI 1p I LSAF MISCELLANEOUS EQUIPMENT SCHEDULE MARK SERVICES CAPACITY REMARKS I /HR P MANUFACTURER REF DWGS 102-080-4072-M5 REF DWGS 102 - 080- 4072 -M7 CRU -1 EQUIPMENT RM COL 18/ DB.9 HEX -1, HEX -2 30 PSIG CONDENSATE RETURN UNIT SCHEDULE - PRESSURE PUMP EQUIP NO. LOCATION SERVES STEAM ES. I /HR i WEE T MANUFACTURER MODEL CRU -1 EQUIPMENT RM COL 18/ DB.9 HEX -1, HEX -2 30 PSIG 15000 1000 ARMSTRONG DPT- 412RP* SYM A NOTES: 1. JAMESBURY OPERATORS TO BE FAIL SAFE; AIR -TO -OPEN, SPRING TO CLOSE. REMOTE OPERATED BALL VALVES REQUIRE 100 psig PLANT AIR AT THE OPERATOR. 2. DIGITAL VALVES REQUIRE 120 VAC, 5A SERVICE, AND 100 psig PLANT AIR. NOTES: 1. FLANGE FOR END ® TO BE FURNISHED SEPARATELY BY FACTORY FOR FIELD WELDING; CLASS 150 B16.5 WITHOUT BOLT HOLES. SEE SECTION 1M526 2. LINER OF SAME MATERIAL AS BELLOWS REQUIRED IN ALL EXPANSION JOINTS, JOINED TO INSIDE DIAMETER AT AIR SOURCE END. SEE DWG 1M526 AND 1M527. 3. F.S.S.O. IS FORGED STEEL SLIP ON TYPE. RECORD DRAWING LSAF RECONFIGURATION LSAF CONTROL ROOM REVISION J #982188 J #711975 BY D.G. HGI /LJC HGI /MLD APPROVED K.R. DATE 2.1.95 7.28.00 5.01.02 REVISION APPROVED DATE il ® 6055 E [EXPIRES 12/18/ d * 2 PUMPS ON 1 SKID M01-- acs /?81) '(SON ACCEPTABILITY THIS DESIGN AND /OR PECIRCATION IS APPROVED DATE OVED K. RAMSEY APPROVED P. LONG 04 -14 -93 REMOVAL SUBTITLE TITLE MECHANICAL MASTER EQUIPMENT SCHEDULES BUILDING 2 -80 LEGEND 1. SEE SHEETS M1a, M1b & M1c FOR MECHANICAL LEGEND AND ABBREVIATIONS. GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES REMOVE EQUIPMENT FROM SERVICE. DISPOSITION OF EQUIPMENT PER BOEING INSTRUCTION. PLANT 2 511Y E 1U JUL - 8 2002 1S NAILS ISSUED FOR CONSTRUCTION DWG N0. 1 REVISIONS BY Harris Group Inc. D WN: CHECKED: WJB WBB CURRENT REVISION SYMBOL B J #711975 B SHEET M2cR JOB N0. PL -2 -92064 RECEIVED GIT.'OF iUKWIL4 JUN 1 7 2002 PERMIT CENTER REVISION "B" ONLY 2- 80 -M2cR DATE 5.01.02 ENG NEER: MLD DATE 5.01.02 COMP N0. PROJECT 11081.00 CHECKED: RB STEAM HEATING COIL (HC) SCHEDULE MARK NUMBER UNIT SERVED CFM COIL FACE AREA SQ. FT. COIL FACE VELOCITY (FPM) TOTAL MN (MIN) EAT T LAT T STEAM NO. OF ROWS (MIN) FINS PER INCH COIL CONN. IN. PRESSURE DROP REMARKS DB DB PSIG TEMP LBS /HR AIR —IN WG ARMSTRONG WITH INTEGRATED VACUUM BREAKER AHU -1 5400 9.75 415 16,000 70.5 — 8 234.7 20 1 6 1 1/2" 0.05 PACE MODEL #61L SD -6X52 4 v DRIP LEG AHU -2 6400 10.83 492 26,000 70.2 — 8 234.7 30 1 6 1 1/2" 0.06 PACE MODEL #61L SD -6X52 © m AHU -3 6680 11.28 430 30,400 69.3 — 8 234.7 32 1 6 1 1/2" 0.03 PACE MODEL #61L SD -6X57 Ilir SG —B -02 AHU 4 OQO 1 3/4" ' ∎MMII SG —B -09 ST -10 PE�MIM CHILLER 18.8 ROO DA.M 4 COL AHU 0.08 PACE MODEL #61L SD 37;5X68 70 1,760 30 480 3 60 1, 105 TACO TA1524 DOUBLE SUCTION SPLIT CASE WITH VFD P-6 CHILLER ROOM COL 18.8 DA.4 AHU'S SECONDARY CHILLED WATER PUMP K M v �r , p1: ; /4!/, / � • % • % jVi �/ j� v / JA /'%, - ,, ,�� r/,!/, /% �! r! / V z I/' %,i 3 PUMP SCHEDULE - 2 -80 CHILLER ROOM PUMP NO. LOCATION SERVES FUNCTION GPM HEAD FEET RPM HP ELECTRICAL WEIGHT LBS. MANUFACTURER MODEL REMARKS VOLTS PHASE Hz F & T 1 5 90 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST HC -3 F & T 1 5 105 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST HC -4 F Sc T 1 5 885 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 5 DRIP LEG INVERTED BUCKET 7 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED, ST 6 DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. ST 7 DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. 7 TAG NO SERVICE SIZE MFR MODEL NO REMARKS ST -8 DRIP LEG 1/2 STEAMGUARD SG —B -02 7.6 ST -9 COIL 3/4" STEAMGUARD SG —B -09 ST -10 P -5 CHILLER 18.8 ROO DA.M 4 COL AHU SECONDARY CHILLED WATER PUMP 1,100 70 1,760 30 480 3 60 1, 105 TACO TA1524 DOUBLE SUCTION SPLIT CASE WITH VFD P-6 CHILLER ROOM COL 18.8 DA.4 AHU'S SECONDARY CHILLED WATER PUMP 1,100 70 1,760 30 480 3 60 1,105 TACO TA1524 DOUBLE SUCTION SPLIT CASE WITH VFD P -7 MECOLEIQUIP ROOM & U FT S �OXES HOT WA ER PUMP 300 70 1,760 10 480 3 60 440 TACO FE3010 BASE MOUNTED END SUCTION • WITH VFD P-8 MECH EQUIP ROOM COL 18 /DB.9 AHU'S UH & FT BOXES HEATING HOT WATER PUMP 300 70 1,760 10 480 3 60 440 TACO FE3010 BASE MOUNTED END SUCTION WITH VFD P —g MECH EQUIP ROOM COL 18 /DB.9 HOT WATER RECIRC DOMESTIC RECIRC. HOT WATER 10 20 1,760 1/2 120 1 60 20 B &G — IN —LINE CIRCULATING SUPPLIED BY HEX -2 VENDOR STEAM TRAP (ST) SCHEDULE MARK NUMBER SERVICE TYPE PRESSURE (PSIG) PRESSURE (PSIG) LBS/HR (MIN) REMARKS e HC -1 F & T 1 5 60 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 2 HC -2 F & T 1 5 90 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST HC -3 F & T 1 5 105 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST HC -4 F Sc T 1 5 885 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 5 DRIP LEG INVERTED BUCKET 7 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED, ST 6 DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. ST 7 DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. 7 TAG NO SERVICE SIZE MFR MODEL NO REMARKS ST -8 DRIP LEG 1/2 STEAMGUARD SG —B -02 7.6 ST -9 COIL 3/4" STEAMGUARD SG —B -09 ST -10 — 1/2" STEAMGUARD SG —B -03 ST -11 COIL 3/4" STEAMGUARD SG —B -11 TEMPERATURE, CONTROL VALVE (TcV) SCHEDULE MARK NUMBER EQUIPMENT SERVED SERVICE AP ACROSS VALVE (PSI) CAPACITY GPM OR LBS /HR SIZE (INCHES) CV REMARKS AHU -1 CHILLED WATER 5 36 (GPM) 1 1/4 16 MODULATING PNEUMATIC ACTUATOR 0 V) AHU -1 STEAM 7 20 LBS /HR 1/2 0.58 MODULATING PNEUMATIC ACTUATOR (TC2 AIM AHU -2 CHILLED WATER 5 43 (GPM) 1 1/2 19 MODULATING PNEUMATIC ACTUATOR v V) AHU -2 STEAM 7 30 LBS /HR 1/2 0.72 MODULATING PNEUMATIC ACTUATOR (TC4 © AHU -3 CHILLED WATER 5 48 (GPM) 1 1/2 21.2 MODULATING PNEUMATIC ACTUATOR AHU -3 STEAM 7 35 LBS /HR 1/2 1,10 MODULATING PNEUMATIC ACTUATOR 0 ® AHU -4 STEAM 7 295 LBS /HR 1 7.6 MODULATING PNEUMATIC ACTUATOR v SYM A NOTES: 1. PUMP WEIGHT DOES NOT INCLUDE THE INERTIA BASE. 2. PUMPS WITH VFD DRIVES SHALL HAVE VFD COMPATIBLE MOTORS. RECORD DRAWING LOAF CONTROL ROOM REDSION J #972197 -00 J #711975 BY HGI /LJC HGI /MLD APPROVED 7.28.00 5.01.02 SY REVISION BY APPROVED DATE g LesualssrAw. C. MAAS CHECKED C. MAAS APPROVED L COSTELLO Exaacrtes 12f13/g MO2%--1 L� ACCEPTA:ILITT' K . EL LIOTT DATE THIS DESIGN AND /OR PECIHCATION IS APPROVED APPROVED 7.28.00 7.28.00 7.28.00 7.28.00 REMOVAL SUBTITLE TNL MECHANICAL MASTER EQUIPMENT SCHEDULE BUILDING 2 -80 CONSTRUCTION NOTES I EQUIPMENT TO BE RELOCATED TEMPORARILY. SEE SK -1M12 FOR TEMPORARY LOCATION. REMOVE FROM SERVICE AFTER LSAF CONSTRUCTION IS COMPLETE. DISPOSITION OF EQUIPMENT PER BOEING INSTRUCTION. REMOVE EQUIPMENT FROM SERVICE. DISPOSITION OF EQUIPMENT PER BOEING INSTRUCTION. PLANT 2 CITY OF TUKWLA C,T YO COIVDD LA APPROVED JUL — 8 2002 AS WOIED C*0 ..RS100 l JUN 1 7 2002 PERMIT CENTER ISSUED FOR CONSTRUCTION SHEET 1 REVISIONS BY Harris Group Inc. REVISION "A" ONLY 7 DATE PROJECT 5 01.02 11081.00 NN: CHECKED: ENG NEER: CHECKED: WJB WBB MLD RB CURRENT REVISION J #711975 M2eR SYMBOL DATE A 5.01.02 JOB NO. COMP NO. 972197 —DD DWG N0. 2 -80 —M2eR SYM A RENUMBER DRAWING - AS BUILT - ADDED LSAF B LSAF RECONFIGURATION - RECORD CHANGE C LSAF CONTROL ROOM REVISION Vottreg..4,1 r ATIMor, COMMON BUILT UP L12DC'• 7j J #982188 J11711975 BY WLS WLS HGI /LJC RFG HGI /MLD f 12" UP APPROVED REG 0 ROOF /ACUUM PU 20 DATE 1.30.87 7.11.93 7.28.00 4/17/01 5.01.02 SY 620 CFM N REVISION WIND TUNNE MATCHLINE, FOR CONTINUATION I —1 BY APPROVED DATE SEE 1M16R X Z PLAN VIEW 12� n «n «n i a t t tp 7 r i to SCALE: 1/8 " =1' -0" c?1__ Aerdezezir.a. EXPIRES 12/13/ Ed t G 11NATf ACCEPTABILITY THIS DESIGN AND /OR ECIRCATION IS APPROVED DEPT. DRAWN B.A. MERTA CHECKED R. GLADNEY ENGINEER W. BOLLIG CHEC R. GEHRING APPROVED R. GEHRING APPROVED 3.24.85 10.26.86 10.20 86 10.26.86 SUBTITLE TITLE E RISER COM MECHANICAL MASTER DUCTWORK cp BUILDING 2 -80 COL. DE— DJ/8 -17 1100 ' 09919 31.1L - 260 wit.0 REMOVAL LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES PHASE 1: REMOVE AHU —DF -10 SUPPLY /RETURN DUCTWORK. AHU —DF -10 SHALL BE REMOVED FROM THE FACILITY AND RELOCATED AS SHOWN ON SKETCH SK -1M12. FABRICATE AND INSTALL NEW SUPPLY AND RETURN DUCTING AND ROUTE TO ATTACH TO THE POINT OF CONNECTION INDICATED. MAINTAIN AHU -5 IN SERVICE (COOLING ONLY) UNTIL NEW CONTROL ROOM IS AVAILABLE FOR OCCUPANCY. SALVAGE THE SOUND ATTENUATOR & PROVIDE TO BOEING FOR DISPOSITION. PHASE 2: . REMOVE ALL EQUIPMENT AND DISPOSE OF PER BOEING DIRECTION. PLANT 2 ISSUED FOR CONSTRUCTION 1 BY Harris Group Inc. PP VED c DRAWN: / CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB No. DWG N0. 1M12R RECEIVED CITY OF TUKWILA JUN 1 7 2002 PERMIT CENTER C JUN 1 7 /002 PERMIT CENTER REVISION "C" ONLY DATE 5 01.02 ENG NEER: MLD DATE 2- 80 -1M12R COMP N0. PROJECT 11081.00': CHECKED: RB 5.01.02 SYM A RENUMBER DRAWING AS BUILT - ADDED LSAF LSAF RECONFIGURATION LSAF CONTROL ROOM REVISION i0 6 J #982188 J #711975 BY WLS WLS HGI /LJC HGI /MLD APPROVED DATE 1.30.87 7.11.93 7.28.00 5.01.02 SYM REVISION PARTIAL FIRST FLOOR PLAN SCALE: 1/8" = V-0" BY APPROVED e ® 0026055 EXPIRES 1 2/13/03 EU'c :,Arty ACCEPTABILITY' THIS DESIGN AND /OR PECIFICATION IS APPROVED' DRAWN DATE BA. MEHTA 3.24.85 HC E� R. GLADNEY 10.26.86 APPROVED 10.20.86 10.26.86 SUBTITLE MECHANICAL MASTER DUCTWORK REMOVAL BUILDING 2 -80 q1'f W RENO B 2.11n IS $0100 LC r- COL. DA- DE/8 -17 PLANT 2 LEGEND ® SUPPLY AIR FLOW TURNING UP Icy SUPPLY AIR FLOW TURNING DOWN z RETURN AIR FLOW TURNING UP z RETURN AIR FLOW TURNING DOWN GENERAL NOTES REFERENCE DRAWINGS 2.80-1M17 2.80 -1 M505 2.80-1M518 2.80 -M1 M17 CONSTRUCTION NOTES PHASE 1: REMOVE AHU U AND ALL ASSOCIATED HIGH BAY DUCTWORK BACK TO ABOVE WIND TUNNEL. DISPOSE OF AHU .0 PER BOEING DIRECTION. MAINTAIN DUCT FOR RECONNECTION TO AHU- DD -11. SAVE AIR FILTER AF -7 FOR RE- INSTALLATION. SEE DRAWING M452. ISSUED FOR CONSTRUCTION PP S DRAWN: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB ND. DWG N0. PLAN VIEW DUCTWORK) SECTIONS & DETAILS) ELBOWS ON CONTROL PANELS) (MEZZ DUCTWORK) RECEIVED CITY OF TUK4VILA JUN 1 7 2002 PERMIT CENTER REVISIONS BY Harris Group Inc. REVISION "C" ONLY 2- 80 -1M16R DATE PROJECT 5.01.02 11081.00 ENG NEER: CHECKED: MLD RB DATE 5.01.02 COMP NO. V I r I i C fl � I' -- �! r� _ I Li � z - SLWI 33S NOIIVf1NIlNO3 2103 '3N11H01VW lLINL 33S (3INI) PANEL TOP OF A/C UNIT STRIP TO OF A/C UNIT AIR INLET AREA J I II I - I (RO EM VABLE CLOSURE FLOOR TO CLOSURE TOP CR B 16 _,. 8" �T� DIA 1 11 j 1- 0 . I I I ie. - l , 76 �i m J ii II SO-4 - - -- CFM `C, d - O I J CONTROL PANEL,TY• me - � __ _■ WIND TUNNEL PCHBRGE HOOD �� III 10 I \ 1 I / Eli SHOP AREA I11DA111 H - - I I ,2 I I z� 0 "0 t rim � ' r��(* 6 , - // ;ii B OC R% 7? 1 i P 7�� / ii STORAGE O +� iri • �s 4 r10,1 , %. -- - - -� %�� � � / I11D D111 i� 7 �� -f/ I If �� � /l /����� I� % � / /r I % �I /% A.,' �16jA _ 1M16 M517 ti f ! ��/ 7104 �1 /� 9.�/ FrOlf /0 %% '''f--...1 r � 4%.: 4 I ri#V � J 0 0.441; I % , / 02 ; / MO AREA i ,i I Efy� IIT111•i��p7�//•) I'► �r i o .. I ! CC BULL 36x2 1/ iz � /�% � h�� . ,,. . // �� 4 , ..,�m .v/x -, /� +'�i� / it � ��.IVJ��'�'' !�° i�! �fl����� ///�������Ii� f`� /1 . �.1 �� i G viis / f G r� 16x6 % 4 i; vat. f i . �i� ��i,4A • , r / :Jiro %i� � / /1 .,, , �p • i. in 620 CFM . 30" DOOR GRILLE WITH - - - rr D 9 4 � - •� p' t ��� e � � % A r✓l 74 ..1. / //i 1 :. w �.. .!.. ✓. I l _ r z;i -� � / MOUNTED ON INSIDE OF DOOR MATCHLINE, FOR CONTINUATION SEE 1M12 1M16 M517 © ri "/ rte., I ,:ar SYM A RENUMBER DRAWING AS BUILT - ADDED LSAF LSAF RECONFIGURATION LSAF CONTROL ROOM REVISION i0 6 J #982188 J #711975 BY WLS WLS HGI /LJC HGI /MLD APPROVED DATE 1.30.87 7.11.93 7.28.00 5.01.02 SYM REVISION PARTIAL FIRST FLOOR PLAN SCALE: 1/8" = V-0" BY APPROVED e ® 0026055 EXPIRES 1 2/13/03 EU'c :,Arty ACCEPTABILITY' THIS DESIGN AND /OR PECIFICATION IS APPROVED' DRAWN DATE BA. MEHTA 3.24.85 HC E� R. GLADNEY 10.26.86 APPROVED 10.20.86 10.26.86 SUBTITLE MECHANICAL MASTER DUCTWORK REMOVAL BUILDING 2 -80 q1'f W RENO B 2.11n IS $0100 LC r- COL. DA- DE/8 -17 PLANT 2 LEGEND ® SUPPLY AIR FLOW TURNING UP Icy SUPPLY AIR FLOW TURNING DOWN z RETURN AIR FLOW TURNING UP z RETURN AIR FLOW TURNING DOWN GENERAL NOTES REFERENCE DRAWINGS 2.80-1M17 2.80 -1 M505 2.80-1M518 2.80 -M1 M17 CONSTRUCTION NOTES PHASE 1: REMOVE AHU U AND ALL ASSOCIATED HIGH BAY DUCTWORK BACK TO ABOVE WIND TUNNEL. DISPOSE OF AHU .0 PER BOEING DIRECTION. MAINTAIN DUCT FOR RECONNECTION TO AHU- DD -11. SAVE AIR FILTER AF -7 FOR RE- INSTALLATION. SEE DRAWING M452. ISSUED FOR CONSTRUCTION PP S DRAWN: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB ND. DWG N0. PLAN VIEW DUCTWORK) SECTIONS & DETAILS) ELBOWS ON CONTROL PANELS) (MEZZ DUCTWORK) RECEIVED CITY OF TUK4VILA JUN 1 7 2002 PERMIT CENTER REVISIONS BY Harris Group Inc. REVISION "C" ONLY 2- 80 -1M16R DATE PROJECT 5.01.02 11081.00 ENG NEER: CHECKED: MLD RB DATE 5.01.02 COMP NO. V N 1 II1I I SYM A LSAF CONTROL ROOM RENSION J #711975 BY HGI /MLD APPROVED 16 DATE 5.01.02 SYM r W6X15:5 - OLD W14X30 RENSION BY APPROVED DATE X PLAN VIEW W14X30 SCALE: 1/8 " =1' -0" ri M12 M511 47' PHASE 1: REMOVE ALL DUCTWORK FROM AHU —DF -10 TO CLEAN ROOM, SUPPLY ROOM AND MEZZANINE AREA. PHASE 2: REMOVE AHU -5 AND ALL DUCTWORK FROM CONTROL ROOM AND MEZZANINE AFTER NEW LSAF CONTROL ROOM IS AVAILABLE FOR OCCUPANCY. W14X30 B 0 4, ONA G I.RcRiRE.,$ .4 2/13//T3 ivst()),--1),,(0 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PPROVED BY 5 9 ' °7_ DEPT. DATE DRAWN SLOAN CHECKED CHECKED APPROVED APPROVED DATE 10.01.93 TIT REMOVAL SUBTITLE MECHANICAL MASTER DUCTWORK BUILDING 2 -80.M1 COL. DE— DJ/8 -17 LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES 35 26 M1M14R M1M1OR 17 M1M15R M1M11R MIM16R j M12R / / PLANT 2 SHEET ISSUED FOR CONSTRUCTION 1 REVISIONS BY Harris Group Inc. M REVISION "A" ONLY V p \ yE � D DRAWN: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 JOB NO. DWG N0. KEY PLAN NO SCALE M1 MI2R icp A 163180 2- 80— M1M12R RECEIVED CITY OF TUKWIIA JUN 1 7 200Z PERMIT CENTER DATE PROJECT 501.02 11081.00 ENG NEER: CHECKED: MLD RB DATE 5.01.02 COMP N0. EQUIPMENT LIST REF NO DESCRIPTION m AC UNIT: 02- 080506AC RO -G09 r � / ://77 j %_7/ 1 _ EF EXHAUST FAN: SY A LSAF CONTROL ROOM REVISION J#711975 BY HGI /MLD APPROVED DATE 5.01.02 SY REVISION BY APPROVED DATE � I EXPIRES - .. 12/1 3/13 A'PROV D PPRRVED 10.01.93 DH REMOVAL UBTITLe. DUCTWORK BUILDING 2 -80 MECHANICAL MASTER COL. DE- DJ \8 -17 LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES PHASE 2: REMOVE ROOF MOUNTED EQUIPMENT AFTER NEW LSAF CONTROL ROOM IS AVAILABLE FOR OCCUPANCY. PLANT 2 SHEET RECEIVED CITY OF TUKW JUN 1 7 2002 PERMIT CENTER JOB NO. DWG NO ISSUED FOR CONSTRUCTION REVISIONS BY Harris Group Inc. RFM12R 163180 REVISION "A" ONLY PR ED DATE PROJECT a / � 5.01.02 11081.00 DRAWN: CH € €CKED: ENGINEER: CHECKED: WJB WBB. MLD RB CURRENT REVISION SYMBOL DATE J #711975 A 5.01.02 ACCEPTABILITY .THIS DESIGN. AND /OR PECINCATION iS APPROVED PROVED BY 2- 80- RFM12R COMP N0. T W _ I V *.J ' I Q a 24X24 - - LARGE INT RE. KE STRUCTURE 0 1 1/2" STM VENT i "l �S. r ' r�N j 1" VTR I I r.. , l �: li'� 4 0 ∎ - :' /. y y . O %Z ' HIGH ROOF !' -!• ��.� :�' r % %�(/.i .. ,i m IH 1 TRANSFO�tMER VAULI p ( x \I ,}UL x - Or PLAN VIEW ,077N —__ ---------Y V SY A LSAF CONTROL ROOM REVISION J#711975 BY HGI /MLD APPROVED DATE 5.01.02 SY REVISION BY APPROVED DATE � I EXPIRES - .. 12/1 3/13 A'PROV D PPRRVED 10.01.93 DH REMOVAL UBTITLe. DUCTWORK BUILDING 2 -80 MECHANICAL MASTER COL. DE- DJ \8 -17 LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES PHASE 2: REMOVE ROOF MOUNTED EQUIPMENT AFTER NEW LSAF CONTROL ROOM IS AVAILABLE FOR OCCUPANCY. PLANT 2 SHEET RECEIVED CITY OF TUKW JUN 1 7 2002 PERMIT CENTER JOB NO. DWG NO ISSUED FOR CONSTRUCTION REVISIONS BY Harris Group Inc. RFM12R 163180 REVISION "A" ONLY PR ED DATE PROJECT a / � 5.01.02 11081.00 DRAWN: CH € €CKED: ENGINEER: CHECKED: WJB WBB. MLD RB CURRENT REVISION SYMBOL DATE J #711975 A 5.01.02 ACCEPTABILITY .THIS DESIGN. AND /OR PECINCATION iS APPROVED PROVED BY 2- 80- RFM12R COMP N0. SY M A RENUMBER DRAWING - AS BUILT - ADDED LSAF B PROVIDE DATA HOUSE C REROUTE CONDENSATE D LSAF RECONFIGURATION REVISION CONTR es.►iiise 1 C #;111 d ��//I+i © �'�, / / //// /1J/ / /L5I0W :./ erer WAr . / „ %L� 7 // / /i/ % //// // / /NAPA /sI /.% /f // �� v �� /-.0 _ e t o i.�yiniII.M.M NIAIMIrioiiii�. I .Mii�. biii2vi iii ioiiiioirAIAMWio , �VAri I/�. mif *ti rerifforp - 414 ■ o I 1 ! 1 r { 11 11 ;1 11 ' 1 't r l l l 11 1 { t i 1 \ 11 11 f t r I { [ \ II ll 11 11 I1 11 11 11 i !� ! 4 t l I I i f l I1 11 ! { f { 11 f l 11 r i ! 11 11 1 \ ll JI r i ll I t t t 11 I t 11 11 l l l \ 1 ©rom i ���/// ti 11 t! \; 1111 1i' 11 !i tl It it 171111 lr 1111 fl 1111 tl 11 If 111! lr.i/ i/ 1111 4/ I! 1! 11 I! 11 Ii 1/ l/ 4,' 11II 1 111 tp 1,r t ; 1 Il lr o r r i i/ I If ?/ Ii a l \I 5f ♦_ 10. / COMMON BUILD UP ri2DC11 1 STORAGE LIDI17 $482 M503 nnr nnnnnn nnn/lnl nnri 1.l SAII I L v�,1 1 1 y r 1 SEE FOR ANECHOIC CHAMBER PROPANE HEAT EXCHANGER 02- 080 - 4072 -M7 !PING FLOW DIAGRAM. PROPANE TANK -REF SEE DETAIL 1111 1 111DG10I .EIRE -WSER —J ROOM 11 D110 �1 J #D6210335 J #982188 BY WLS WLS WDB WDB /2 HGI /UC APPROVED WDB DATE 1.30.87 7.11.93 5.24.96 7.28.00 SYM LSAF CONTROL ROOM REVISION J #711975 MATCHLINE, FOR CONTINUATION SEE 1M66 BY HGI /MLD APPROVED DATE 0 3 5.01.02 x 12) M6 02 FLOOR PIPING PLAN N SCALE: 1/8 " =1' -0” p rizerAfAv. ExPInES. 12/13/0 CONSTRUCTION NOTES PHASE 1: REMOVE STEAM, CONDENSATE, CHILLED WATER SUPPLY AND CHILLED WATER RETURN TO AHU -DF -10 AND STEAM COIL SC- DE -10. NOTE TEMPORARY PIPING SERVICES TO RELOCATED AHU -DF -10 NEED TO BE MAINTAINED UNTIL NEW CONTROL ROOM /CUSTOMER ROOM IS COMPLETE. SEE SKETCH SK -1M62 AND SK -1M66. p REMOVE STEAM AND CONDENSATE RETURN PIPING TO AHU -5, TO PHASE 1 LINE. TEMPORARILY MAINTAIN CHILLED WATER SUPPLY AND RETURN UNTIL NEW CONTROL ROOM /CUSTOMER ROOM IS COMPLETE SEE SKETCH. SK -1M62 AND SK -1M66. REMOVE 4" AND 3" STEAM SUPPLY BACK TO NEAREST ISOLATION VALVE (ABOVE CONDENSATE PUMP CP- DD /17). ® REMOVE PUMPED CONDENSATE AND 1/2" CONDENSATE DRIP BACK TO CONDENSATE PUMP CP- DD /17. REMOVE STEAM PRESSURE REDUCING STATION. © REMOVE STEAM AND CONDENSATE PIPING FROM PROPANE HEATER BACK TO ELBOW IN RISE. NOTE: STEAM AND CONDENSATE PIPING NEEDS TO BE RE- ROUTED TO PROPANE HEATER. SEE 1M62 FOR NEW PIPE ROUTING. THE HEATER SHALL REMAIN IN SERVICE DURING CONSTRUCTION ACTIVUIES. PHASE 2: REMOVE ALL EXISTING STEAM, CONDENSATE, CHILLED WATER SUPPLY AND CHILLED WATER RETURN PIPING AFTER NEW LSAF CONTROL ROOM IS AVAILABLE FOR OCCUPANCY. L 8RAWN: WJB CURRENT REVISION J11711975 SHEET REVISIONS BY Harris Group Inc. CHECKED: WBB SYMBOL E 1M62R Joe No. 760015 DWG N0. 2- 80 -1M62R REVISION "E" ONLY DATE 5.01.02 ENGINEER: MLD DATE COMP NO. PROJECT 11081.00 CHECKED•. RB 5.01.02 Ufa1 '9a< Mo :- it (6 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN B.A. ME HTA R. GLADNEY 'ENGINLEN W. - BOWG. CHECKED R. GEHRING APPROVED R. GEHRING APPROVED ATE 3,24.85. 10.26.86 10.20.86 10.26.86 REMOVAL SUBTITLE TITLE MECHANICAL MASTER HVAC PIPING DTI BUILDING 2 -80 COL. DE- DJ/8 -17 HUH VUH AHU UH —PC— LEGEND PIPE GUIDE HORIZONTAL UNIT HEATER VERTICAL UNIT HEATER AIR HANDLING UNIT UNIT HEATER PUMPED CONDENSATE STEAM OR COND. HIDDEN FROM VIEW GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(OR MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW Q 10' INTERVALS 2 " -3" DIA. PIPE ® 15' INTERVALS 4 " -6" DIA. PIPE © 20' INTERVALS REFERENCE DRAWINGS RECEIVED ciTV oP TuKwiu JUN 1 7 2002 PERMIT CENTER PLANT 2 ISSUED FOR CONSTRUCTION ° ATCHLINE FOR CONT. SEE 2-80-1M62 \ ® %/Y r oi ���� //����� M� Ir ®_� I IL '� ,_ -- ////l/nfi s it MO SYM A D 1 RENUMBER DRAWING AS BUILT — ADDED LSAF PROVIDE DATA HOUSE REROUTE CONDENSATE LSAF RECONFIGURATION REVISION J #D6210335 J #982188 BY WLS WLS WDB WDB HGI /LJC ACCE•TABILITY THIS DESIGN AND/OR SPECIHCATON IS APPROVED APPROVED BY R. GEHRING APPROVED R. GEHRING APPROVED WDB DATE 1.30.87 7.11.93 5.24:96 7.28.00 SYM LSAF CONTROL ROOM REVISION J #711975 BY HGI /MLD APPROVED DATE 5.01.02 FLOOR PIPING PLAN SCALE: 1 /8 "= V-0" �o) 3.24.85 10.26.86 10.20 86 SUBTITLE TITLE DC DD MECHANICAL MASTER HVAC PIPING CRU of mow' reiotto JUL - 8 CORD AS WED REMOVAL BUILDING 2 -80 COL. DA- DE/8 -17 LEGEND PIPE GUIDE HUH HORIZONTAL UNIT HEATER VUH VERTICAL UNIT HEATER AHD AIR HANDLING UNIT UH UNIT HEATER — PC — PUMPED CONDENSATE - -- STEAM OR COND. HIDDEN FROM VIEW — STM— 125 LB STEAM — LPS— 0 -30 LB STEAM — C CONDENSATE— GRAVITY DRAIN GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(00 MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW ® 10' INTERVALS 2 " -3" DIA. PIPE ® 15' INTERVALS 4 " -6" DIA PIPE 0 20' INTERVALS REFERENCE DRAWINGS CONSTRUCTION NOTES PHASE 1: REMOVE STEAM AND CONDENSATE PIPING TO AHU (McQUAY UNIT). REMOVE CHILLED WATER SUPPLY AND CHILLED WATER RETURN BACK TO ABOVE WIND TUNNEL NOTE: TEMPORARY CHWS /CHWR PIPING' REQUIRED FOR AHU —5 AND RELOCATED AHU— DF -10. SEE SK -1M62 AND SK -1M66. REMOVE LOW PRESSURE STEAM SUPPLY AND CONDENSATE PIPING. REMOVE CONTROL PIPING /CONTROLS TO UNIT HEATERS UH —DA /12 AND UH - DA /15. SEE 1M66 FOR NEW HOT WATER SUPPLY PIPING. ® REMOVE TRAP AND ASSOCIATED STEAM CONTROLS. REMOVE CONDENSATE PUMP CP— DD /11. DISPOSE OF PER BOEING DIRECTIONS. © REMOVE PUMPED CONDENSATE AND 1/2" CONDENSATE DRIP BACK TO CONDENSATE PUMP CP— DD /17. PLANT 2 KEY PLAN SCALE: NTS ISSUED FOR CONSTRUCTION DRAWN: /CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB NO. DWG N0. REVISIONS BY Harris Group Inc. 1M66R 760015 2- 80 -1M66R RECEIVED CITY OF TUKWILq JUN 17 2002 PERMIT CENTER REVISION "E" ONLY DATE PROJECT 5.01.02 11081.00 ENG NEER: CHECKED: MLD RB DATE 5.01.02 COMP N0. X } } : x o o o o o ■ o o o L o o W W W MATCHLINE FOR CONT SEE 1M65 c _ 3 4' 1 11 #V�W `lA B A H _ LPS ' 7'7 i 3 i i t r nr ' ., I T /4 "RL A AIR flil A — 1 1 /8 "RG 2) L 1'p I ( I — I.o B / 16� / / 5 JJ 5 3 F G 5 1 1 I I G ru I I r I E ELECTRICAL R R0 ) )1A ,,,..---...,,---N, I I I WIND TUNNEL S 2 1/2" C 100161 , CHWR " � �POC SHOP AREA g 1 1 /4 "C FROM I 1 1/2 " , . - I, = " . n / T I I 2 � � i :40wA m .norii . . .., i i i� i / L .gym L "► i 2 _ L 2 HWR I- i i ® OH CONDENSATE 1 - , I j � �. I y � y ^ _ "7 L ' I l 0 ,0 � �. % % O '' il?i�� �S/, / ��' s s ii�ii M66 M541 � / / � � ' � // , OM" X v�i� r / / / A A 4 - 7 - 0 0 1 1401" a v j . X 4 .„):-„,„- id FIN" 4 4 A�PS � LI A .sfs « SYM A D 1 RENUMBER DRAWING AS BUILT — ADDED LSAF PROVIDE DATA HOUSE REROUTE CONDENSATE LSAF RECONFIGURATION REVISION J #D6210335 J #982188 BY WLS WLS WDB WDB HGI /LJC ACCE•TABILITY THIS DESIGN AND/OR SPECIHCATON IS APPROVED APPROVED BY R. GEHRING APPROVED R. GEHRING APPROVED WDB DATE 1.30.87 7.11.93 5.24:96 7.28.00 SYM LSAF CONTROL ROOM REVISION J #711975 BY HGI /MLD APPROVED DATE 5.01.02 FLOOR PIPING PLAN SCALE: 1 /8 "= V-0" �o) 3.24.85 10.26.86 10.20 86 SUBTITLE TITLE DC DD MECHANICAL MASTER HVAC PIPING CRU of mow' reiotto JUL - 8 CORD AS WED REMOVAL BUILDING 2 -80 COL. DA- DE/8 -17 LEGEND PIPE GUIDE HUH HORIZONTAL UNIT HEATER VUH VERTICAL UNIT HEATER AHD AIR HANDLING UNIT UH UNIT HEATER — PC — PUMPED CONDENSATE - -- STEAM OR COND. HIDDEN FROM VIEW — STM— 125 LB STEAM — LPS— 0 -30 LB STEAM — C CONDENSATE— GRAVITY DRAIN GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(00 MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW ® 10' INTERVALS 2 " -3" DIA. PIPE ® 15' INTERVALS 4 " -6" DIA PIPE 0 20' INTERVALS REFERENCE DRAWINGS CONSTRUCTION NOTES PHASE 1: REMOVE STEAM AND CONDENSATE PIPING TO AHU (McQUAY UNIT). REMOVE CHILLED WATER SUPPLY AND CHILLED WATER RETURN BACK TO ABOVE WIND TUNNEL NOTE: TEMPORARY CHWS /CHWR PIPING' REQUIRED FOR AHU —5 AND RELOCATED AHU— DF -10. SEE SK -1M62 AND SK -1M66. REMOVE LOW PRESSURE STEAM SUPPLY AND CONDENSATE PIPING. REMOVE CONTROL PIPING /CONTROLS TO UNIT HEATERS UH —DA /12 AND UH - DA /15. SEE 1M66 FOR NEW HOT WATER SUPPLY PIPING. ® REMOVE TRAP AND ASSOCIATED STEAM CONTROLS. REMOVE CONDENSATE PUMP CP— DD /11. DISPOSE OF PER BOEING DIRECTIONS. © REMOVE PUMPED CONDENSATE AND 1/2" CONDENSATE DRIP BACK TO CONDENSATE PUMP CP— DD /17. PLANT 2 KEY PLAN SCALE: NTS ISSUED FOR CONSTRUCTION DRAWN: /CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB NO. DWG N0. REVISIONS BY Harris Group Inc. 1M66R 760015 2- 80 -1M66R RECEIVED CITY OF TUKWILq JUN 17 2002 PERMIT CENTER REVISION "E" ONLY DATE PROJECT 5.01.02 11081.00 ENG NEER: CHECKED: MLD RB DATE 5.01.02 COMP N0. SYM LSAF CONTROL ROOM Li D pg.. D r ' IT A - 1; If . . A0 I i #!� oo oo oo /% .I 0 �. F /iii ' L. / / / //////I .ii i. , � lr' �A0 li , . ,, % ter a REWSION AUXILARY 8" CONNECTION FOR GE /UPS RIG - SEE DWG 2- YD -M621 J #711975 PT BY HGI /MLD MUFFLER ON LTC ROOF APPROVED DATE 5.01.02 SY V- 9_LSAF V- 8_LSAF I PI PI REVISION 10" TO LTC �\ PRIMARY LOW TEMP VENTURI SILENCER SECONDARY 600 kW ELECTRIC HIGH TEMP VENTURI HEATER SILENCER BY APPROVED DATE 10" TO LTC 300 PSI BRANCH SYSTEM " SEE 2- YD -M621 12 300 PSI \ 300 PSI -12" SUPPLY LINE FROM COMPRESSORS re;LAsnizEzow. EXPIRES -12113/03. M o a -iat(cs DRAWN ACCEPTABILITY 12- THIS DESIGN AND /OR SPECIHCATIONIS APPROVED APPROVED BY DEPT. •P'0 D yr ATSP• DATE 3.27.02 4.03.02 DATE MLD 4.05.02 4. 22.02 C,lO.OZ SUBTITLE /3,72.._ MECHANICAL MASTER 0,415 of O JUL - 8 2g02 OS� EM.6L13 REMOVAL 300 PSI AIRLINE CIRCUIT BUILDING 2 -80 LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES REMOVE EXISTING A300 PIPING. DISPOSITION OF PIPING PER BOEING ENGINEERING. REMOVE EXISTING 12" INTF ISOLATION GATE VALVE. SAVE VALVE FOR RELOCATION (LABEL AS V- O_INTF). REFERENCE 1M111, M321. REMOVE EXISTING 12" LSAF ISOLATION GATE VALVE V- O_LSAF. SAVE VALVE FOR RELOCATION(LABEL AS V- 1_LSAF. REFERENCE 1M112, M321. ® REMOVE EXISTING 12" MOTORIZED GATE VALVE. RETURN VALVE TO BOEING ENGINEERING FOR DISPOSITION. REMOVE EXISTING 10" LSAF CONTROL BUTTERFLY VALVE FLANGED SPOOL PIECE ( -4' -0" LONG). SAVE VALVE SPOOL PIECE FOR RELOCATION (LABEL AS V- 2_LSAF). REFERENCE 1M112, M321. © REMOVE EXISTING 3" LSAF BY -PASS BALL CONTROL VALVE. SAVE FOP RELOCATION. REFERENCE 1M112, M321. REMOVE EXISTING 6" MUFFLER CONTROL GLOBE VALVE. SAVE FOR RELOCATION. REFERENCE 1M112, M321. ® REMOVE EXISTING A300 CONTROL VALVE BOARD. RELOCATE EXISTING CV- 4_LSAF TO ROOF NEAR EXISTING MUFFLER. REFERENCE 1M112, M321. REMOVE EXISTING A300 CONTROL VALVE CV- 2_LSAF AND CV- 3_LSAF. RELOCATE CV- 2_LSAF AND CV- 3_LSAF NEAR V- 2_LSAF. REFERENCE 1M112, M321. PLANT 2 ISSUED FOR CONSTRUCTION CURRENT REVISION SHEET SYMBOL M321R RECEIVED CfTV OF TUKWIIA JUN 1 7 2002 PERMRCEMER Harris Group Inc. 11081.00 JOB No. J #711975 COMP NO. DWG NO. 2-80-M321R DATE 5.01.02 CONSTRUCTION NOTES REMOVE AHU- DF -10. SAVE FOR TEMPORARY RELOCATION OUTSIDE CONSTRUCTION ZONE. SEE DRAWING SK -M324 FOR TEMPORARY CONTROLS OF RELOCATED AHU- DF -10. TEMPORARY STRUCTURE WILL NEED TO BE BUILT TO PROTECT EQUIPMENT FROM THE ELEMENTS. NOTE: REMOVE AHU -DF -10 FROM SERVICE AFTER NEW CONTROL ROOM CONSTRUCTION IS COMPLETE. DISPOSITION OF AHU -DF -10 PER BOEING INSTRUCTION AFTER CONSTRUCTION IS COMPLETE. REMOVE AIR FILTER AF -7. SAVE FOR RELOCATION TO NEW DUCTWORK SERVING NEW CONTROL ROOM. REFERENCE M452. REVISION RECORD DRAWING J #982188 A LOAF CONTROL ROOM J #711975 HGI /WC HG I /MLD 7.28.00 5.01.02 REMOVE EQUIPMENT, DUCTWORK AND ALL ASSOCIATED HARDWARE. DISPOSITION OF REMOVED ITEMS PER BOEING DIRECTION. ® REMOVAL OF DUCTWORK AND ASSOCIATED HARDWARE AFTER CONSTRUCTION OF NEW CONTROL ROOM IS COMPLETE. POINT OF CONNECTIONS "POC" ARE FOR TEMPORARY TIE -IN OF DUCTWORK TO RELOCATED AHU- DF -10. DISPOSITION OF REMOVED DUCTWORK AND ASSOCIATED HARDWARE PER BOEING DIRECTION. REVISION APPROVED POC ce;LASZFAEZAW CEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEP, DATE CHEC D S. FRANKLIN ENGINEER V. YOSEFIAN C CKED C MAPS DRAWN W. BOLUS EXPIRES 12113J, 3.9.99 3.10.99 3.10.99 3.17.99 3.17.99 SUBTITLE MECHANICAL MASTER AIRFLOW / CONTROL DIAGRAM AHU -DF -10 AND AHU -5 BUILDING 2 -80 PLANT 2 JOB N0. DWG N0. 982188 DRAWN: CHECKED: WJB WBB CURRENT. REVISION SYMBOL J #711975 SHEET' M324R DATE 5.01.02 ENGINEER: MLD DATE 2- 80 -M324R COMP N0. PROJECT 11081.00 CHECKED: RB 5.01.02 • cyko SEQUENCE OF OPERATION (AHU— DF -10) CONTROL ROOM: SYSTEM DESCRIPTION: • THIS SYSTEM IS A CONSTANT AIR VOLUME, AIR HANDLING UNIT (AHU) WITH CHILLED WATER COOLING COIL, STEAM HEATING COIL, OUTDOOR AIR ECONOMIZER, SUPPLY AIR FAN, AND RETURN /EXHAUST AIR FAN. THIS SYSTEM SHALL BE CONTROLLED FROM THE CMCS. • THE AHU SERVES THE DATA ROOM CONTROL ROOM AND CUSTOMER ROOM. START -UP: • WITH THE SUPPLY FAN MOTOR STARTER SWITCH IN THE "AUTO" POSITION, THE AHU SUPPLY FAN MAY BE ENERGIZED/ DE- ENERGIZED THROUGH ITS MOTOR STARTER CONTACTOR BY A START /STOP COMMAND ISSUED BY AN OPERATOR FROM THE CMCS. THE SYSTEM SHALL OPERATE BASED ON THE OCCUPANCY SCHEDULE CODED INTO THE CMCS. THE SYSTEM SHALL HAVE A NIGHT OVERRIDE. • WHEN THE SUPPLY FAN IS ENERGIZED/ DE- ENERGIZED, THE RETURN/ EXHAUST FAN SHALL BE STARTED/ STOPPED THROUGH A HARDWIRE INTERLOCK (PROVIDED BY AHU VENDOR). • THE CURRENT SENSOR SWITCHES (IS) SHALL INDICATE SUPPLY AND RETURN/ EXHAUST FAN RUN STATUS AT THE CMCS. • WHEN THE AHU IS ENERGIZED, THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED UNTIL THE RETURN AIR TEMPERATUE TT) IS A MINIMUM OF 68 DEGREES F (ADJUSTABLE), THEN OPEN THE DAMPER TO ITS MINIMUM AIRFLOW POSITION (ADJUSTABLE). • WHEN THE AHU IS DE- ENERGIZED, THE CMCS SHALL POSITION THE RETURN AIR DAMPER OPEN, THE OUTSIDE AND EXHAUST AIR DAMPERS CLOSED, AND THE VALVES CLOSED. SAFETY: • SHOULD PARTICLES OF COMBUSTION BE SENSED, THE DUCT - MOUNTED SMOKE DETECTORS (MS) SHALL DE- ENERGIZE THE AHU SUPPLY AND RETURN/ EXHAUST FANS AND INDICATE AN ALARM AT THE CMCS. SMOKE DETECTORS SHALL BE LOCATED IN THE SUPPLY AND RETURN AIR PLENUMS AND SHALL BE HARDWIRED TO THE FAN MOTOR STARTERS. (THE SMOKE DETECTORS ARE PROVIDED AND HARDWIRED UNDER DIVISION 16.) • THE LOW -LIMIT TEMPERATURE SWITCH (TSL) SHALL DE- ENERGIZE THE AHU SUPPLY AND RETURN/ EXHAUST FANS AND INDICATE AN ALARM AT THE CMCS SHOULD THE TEMPERATURE FALL BELOW 35 DEGREES F (ADJUSTABLE). THE TSL SHALL BE HARDWIRED TO THE FAN MOTOR STARTERS. THE CMCS SHALL OPEN THE HEATING CONTROL VALVE TO 100% DURING A TSL ALARM CONDITION. • UPON ANY SAFETY SHUTDOWN, THE CMCS SHALL CLOSE THE EXHAUST AND OUTSIDE AIR DAMPERS. • A MANUAL RESET AT THE AHU MUST BE RESTORED TO ENERGIZE THE AHU FANS FOLLOWING A SHUTDOWN BY ANY SAFETY CONTROL. COOLING AND HEATING CYCLES: • THE CMCS, SENSING SPACE TEMPERATURE SENSORS (TT), SHALL RESET THE SUPPLY AIR TEMPERATURE (TT) SETPOINT AND THE MIXED AIR TEMPERATURE (TT) SETPOINT BASED ON A RESET SCHEDULE. THE RESET SCHEDULE SHALL BE DETERMINED BASED ON THE ZONE TEMPERATURE (TT) COOLING LOAD DEMAND. THE CONTROL ROOM SPACE SHALL BE 70 DEG F (ADJUSTABLE). • AHU COOLING AND HEATING: THE CMCS SHALL CONTROL THE CHILLED WATER VALVE, THE ECONOMIZER CYCLE, AND THE STEAM VALVE IN SEQUENCE TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT. 1.) AHU COOLING (CHILLED WATER): THE CMCS SHALL MODULATE THE CHILLED WATER VALVE (TCV) TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT (ADJUSTABLE). 2.) AHU COOLING (OUTDOOR AIR ECONOMIZER): WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE (TT) LESS THAN THE RETURN AIR TEMPERATURE (TT) (ADJUSTABLE), THE CMCS SHALL OPEN THE EXHAUST AIR DAMPER • AND MODULATE THE OUTSIDE AND RETURN AIR DAMPERS CORRESPONDINGLY TO MAINTAIN MIXED AIR SETPOINT (ADJUSTABLE). WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE (TT) GREATER THAN RETURN AIR TEMPERATURE (TT) • (ADJUSTABLE), THE CMCS SHALL POSITION THE OUTSIDE AIR DAMPER TO ITS PREDETERMINED MINIMUM POSITION (ADJUSTABLE). 3.) AHU HEATING: THE CMCS SHALL MODULATE THE STEAM VALVE (TCV) TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT (ADJUSTABLE). • SPACE REHEAT: THE CMCS, SENSING THE SPACE TEMPERATURE (TT), SHALL MODULATE THE STEAM VALVE (TCV) TO MAINTAIN SPACE SETPOINT OF 70 DEG F +/ -2 DEG F (ADJUSTABLE). FILTER CHANGEOUT: • THE DIFFERENTIAL PRESSURE GAUGE/ SWITCH (DPT), LOCATED ACROSS THE AHU FILTER RACK, SHALL INDICATE FILTER CHANGEOUT ALARM AT THE CMCS WHEN THE FILTER PRESSURE DIFFERENTIAL SETPOINT (ADJUSTABLE) IS REACHED. SEQUENCE OF OPERATION (SF /SC— DE -10) CLEAN ROOM: SYSTEM DESCRIPTION: • THIS SYSTEM IS A CONSTANT AIR VOLUME BOOSTER FAN AND STEAM HEATING COIL SUPPLIED FROM AHU- DF -10. THE SYSTEM SHALL BE CONTROLLED FROM THE CMCS. • THE BOOSTER FAN, FILTER AND STEAM COIL SERVE THE CLEAN ROOM, VESTIBULE AND STORAGE ROOM. START -UP: CITY OF TUKWIIA • THE BOOSTER FAN COIL MAY BE ENERGIZED / DE- ENERGIZED THROUGH JUN 1 7 1002 THE CMCS AND OPERATE WHENEVER AHU -DF -10 OPERATES. PERMIT CENTER • SPACE REHEAT: THE CMCS, SENSING THE SPACE TEMPERATURE (TT), SHALL MODULATE THE STEAM VALVE (TCV) TO MAINTAIN SPACE SETPOINT OF 70 DEG F +/ -2 DEG F (ADJUSTABLE). FILTER CHANGEOUT: • THE DIFFERENTIAL PRESSURE GAUGE/ SWITCH (DPT), LOCATED ACROSS THE FILTER RACK, SHALL INDICATE FILTER ADTR t� CHANGEOUT ALARM AT THE CMCS WHEN THE FILTER PRESSURE DIFFERENTIAL SETPOINT (ADJUSTABLE) IS REACHED. REMOVAL ISSUED FOR CONSTRUCTION REVISIONS BY Harris Group Inc. • REVISION "A" ONLY SYM A RECORD DRAWING LSAF CONTROL ROOM REVISION PRESSURE RELIEF VALVE PRESSURE ALARM SWITCH 4" DRY PIPE VALVE ANGLE VALVE 8' -0" 3 /4 "CGLOBE VALVE N.A.F. A.A.F. 3/4 "UNION W/1/2" ORIFICE. FLOW EQUAL TO ONE SPRINKLER HEAD 4' -0" A.A.F. FIRE PROTECTION RISER DIAGRAM DE TAI L SCALE: NONE J #982188 J #711975 FLOW SWITCH 3/4" GLOBE VALVE BY HGI /UC HGI /MDH 1M266 M513 APPROVED ACCEPTABILITY 11-110 DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEP, DATE DATE 7.28.00 5.01.02 �� ANGLE VALVE 4" ALARM CHECK VALVE 1' -0" A.A.F. SYM 3/4" 100 PSI AIR FOR CONT. SEE 1M116 PRESSURE REGULATING VALVE DPV 3/4" UNION W/1/2" ORIFICE. FLOW EQUAL TO ONE SPRINKLER HEAD SLAB TIN ELEVATION LOOKING NORTFI SECTION SCALE: 1/4"=1'-0" REVISION 8' -0" A.A.F. 4' -0" A.A.F. 4 -WAY ALL GRVD CPLGS ARE OF THE FLEXIBLE TYPE HORZ 2" PIPE STAND ATTACHED TO CMU WALL FLGD JOINT (TYP) ALV 2" PIPE STAND ATTACHED TO SLAB (2 PLACES) 2" CLEARANCE A 1M2661M513 APPROVED DATE 6" FIRELOCK 90' FLEX CPLG 4 -WAY 6 "GG FLOW SWITCH FLEX CPLG 6X0 -6 GG VIC FLG ADAP 6" ALV 2" CLEARANCE 2" CLEARANCE ELEVATION LOOKING SOUTH SECTION SCALE: 1/4 " =1' -0" g,i ��ROOF -- 4 -WAY - 4 -WAY B 1M262 M513 EXPIRES 1 2/1 3/ 63 3/4" PLYWOOD MOUNTING BOARD ATTACHED TO COLUMN OR WALL FROM AIR MAIN DRAIN VALVE SHUT OFF VALVE 10" VIC EEG ADAP 10X8 GRVD RED (VIC #50) FLEX CPLG 8X0 -6 GG 8" VIC FLG ADAP DPV COMPRESSED AIR DROP DETAIL SCALE: NONE AP PRESSURE RELIEF VALVE SET AT 200 PSI AIR F LTER PRESSURE REGULATOR 300 -100 PSI 1M112 3 M513 o �p is ���.�� /AI ZAifferfr #10 B AP TEMPORARY A TEMPORARY 1/2 " -A3001 SEE 1M112 FOR POINT OF CONNECTION. CONSTRUCTION NOTES REMOVE STEAM SUPPLY CONNECTION AND CONTROLS TO UNIT HEATER UH -DA /12 AND UH- DA /15. NOTE: UNIT HEATER STEAM SUPPLY WILL BE USED FOR HOT WATER RETURN, SEE 1M66 AND 1M66R. REMOVE CONDENSATE AND TRAP FROM UNIT HEATER UH -DA /12 AND UH- DA /15. NOTE: UNIT HEATER CONDENSATE PIPING WILL BE USED FOR HOT WATER SUPPLY, SEE 1M66 AND 1M66R. DETAIL NO LONGER NECESSARY. SEE DETAIL 7, M513 FOR HOT WATER SUPPLY AND RETURN TO UNIT HEATER. ® INSTALL TEMPORARY AIR SUPPLY TO EXISTING RETARDING CHAMBER TO FIRE PROTECTION RISER DURING PHASE 1 CONSTRUCTION. NOTE: REMOVE TEMPORARY AIR SUPPLY AND FIRE PROTECTION SYSTEM AFTER NEW LSAF CONTROL ROOM IS READY FOR OCCUPANCY. SEE 1M112 FOR AIR PIPE ROUTING. SEE 1M262R FOR FIRE PROTECTION DEMOLITION. NOTIFY BOEING FIRE PROTECTION 24 HOURS PRIOR TO BEGINNING WORK. MO- IL 0 ATE PRESSURE REGULATOR 100 PSI- SERVICE PRESSURE PAINT TO MATCH ADJACENT AREA TITLE REMOVAL MECHANICAL MASTER 4 A � 11D yR v� Y� 04 ..4rpri UNIT HEATER LOW SPEED AEROACOUSTIC FACILITY SECTIONS AND DETAILS BUILDING 2 -80 DRAWN: WJB JOB N0. DWG NO. REVISIONS BY Harris Group Inc. C;: C� C ECKED: WBB 982188 2- 80 -M513R REVISION "A" ONLY DATE 5.01.02 ENGINEER: MLD DATE 5.01.02 COMP N0. PROJECT 11081.00 CHECKED: RB PLANT 2 CITY OF TUKWI A APPROVED JUL - 8 2002 AS *ILL) RECEIVED CITY DF TUK4Vi W JUN 1 7 2002 PERMIT CENTER ISSUED FOR CONSTRUCTION CURRENT REVISION SYMBOL J #711975 A SHEET M513R SYM A g .ear � � / / / / / / / / / / / /zzzz,zrz� _vvz_ // is �� zz��, .„ II Vet' � %% / /�i� Pr/ ritn RECORD DRAWING LSAF CONTROL ROOM REVISION J #982168 J #711975 BY HGI /LJC HGI /MLD APPROVED DATE 7.28.00 5.01.02 SYM REVISION BY APPROVED NORTH /SOUTH SECTION n SCALE: 1/4 " =1' -0" DATE 1M12 M542 ,prOE /NG' M Iac� ACCEPTABILITY THIS DESIGN AND /OR SPECIOCATION IS - APPROVED DEPT. DATE DRAWN. DATE FG 8.13.98 S. FRANKLIN 12.23.98 VEY CHEC E� C. MARS APP VED R. BERRY APPROVED 8.13.98 12.24.98 12.31.98 REMOVAL SUBTITLE TITLE MECHANICAL MASTER SECTIONS BUILDING 2P8O LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES PHASE 1: 1(2>-FACILITY NORTH OF APPROXIMATELY COLUMN LINE DF WILL BE DEMOUSHED AS PART OF PHASE 1 CONSTRUCTION. POINT OF CONNECTION IDENTIFIES GENERAL LOCATION OF CONNECTION FOR TEMPORARY DUCTWORK FROM AHU- DF -10. SEE SK -1M12 AND SK -M542 FOR TEMPORARY DUCTWORK. PENTHOUSES SHALL BE REMOVED DURING PHASE 1 CONSTRUCTION AFTER AHU -DF -10 HAS BEEN RELOCATED. RELOCATE AHU- DF- 10, 'EXHAUST DUCT AND OUTSIDE AIR DUCT TO TO TEMPORARY LOCATION. SEE SK -1M12 FOR AHU -DF -10 TEMPORARY LOCATION. Li-REMOVE AIR FILTER AF -7. SAVE FOR RELOCATION TO NEW DUCTWORK SERVING NEW CLEAN ROOM. SEE M452. PHASE 2: ©REMOVE ALL REMAINING EXISTING DUCTWORK AND HVAC EQUIPMENT AFTER NEW LSAF CONTROL ROOM IS READY FOR OCCUPANCY. op TUK PR JUL - 8 2582 BS !,DIED EA1J PLANT 2 RECEIVED G Irr OF TUKYJILA JUN 17 2002 PERMIT GENTER ISSUED FOR CONSTRUCTION 11 I R BY Harris Group Inc. REVISION "A" ONLY PEROAED DRAWN: WJB' CURRENT REVISION. SYMBOL J #711975 SHEEP JOB N0. DWG N0. CHECKED: WBB M542R 982188 DATE 5.01.02 ENGINEER: MLD 2- 80 -M542R PROJECT 11081.00 CHECKED: RB aE 5.01.02 COMP N0. \ 1 2 "x8" RED TEE CAP SAFETY VALVE RELIEF PIPING (RUPTURE DISC PIPING SIMILAR) DETAIL SCALE: N.T.S. M621 M591 300 PSIG t--. RECORD DRAWING LSAF CONTROL ROOM I' -14 3/4" — W I _t` F' 11■ sar 1 q . 12 " -A300 EL 3' -6 3/4" e a ABOVE GRADE I u ,,,,*, Ilk 8 6" ==L timi,l E 1I':,IIn. IIII 8 " -A300 PRV H I 6" L I 8 "xs " J 8 "x6" POC GYP 2 V101 PRV102 V44 4" 4" V144 IV143- IN ;NOV 1 12" A300 5 EL 8" x io' -o" ABOVE GRADE 1 I Olt A i i i r� �� leai I '�. ri �i'► r 0,� a �i it , ei = '. ` "'ill�`.�rrlciielr ■a� �r.e� ,,:1�>• ®i� ■ ' r r 17 "1 I fs PSV T -27 8" RUPTURE DISC EL 2' -11" ABOVE GRADE M " I 1� 8 "x4" �: EL I 2' -11" 1 ABOVE GRADE M621 2" A300 (U /G) TO BF, BTWI, AND 2 -85 LASF ROOF do ` /, " �/�...� 1 � - / /// 4 , CONSTRUCTION NOTES COMPONENTS ARE TO BE RELOCATED & REVISED SEE DWG. 2- YD -M621, 2- 80- 1M112. 12 " -A300 EL 3' -6 3/4" ABOVE GRADE — E-12Y -A300 EL 10' -0" ABOVE GRADE DRAWN:.. GNECKED: MDH WJB CURRENT REVISION SYMBOL J #711975 SHEET M621R JOB N0. 982179 DWG N0. DAT 2- YD -M621R ENGINEER: CHECKED: MLD RB COMP N0. PROJECT 11081:00 5.01.02 REVISION 9 ._ 6 " M621 cc I V44 E - PROPANE TANK VENT TO ATMOS VENT PIPE VALVE OUTLET 4982179 4'71975 BY 3 ' HGI /MLD M621 HGI /HEW PROPANE PUMP ITEMS SHOWN ARE PART OF VALVE ASSEMBLY APPROVED SOUTH WALL OF LASF I I 1 DATE 1.15.99 5.01.02 20' - 0" STEAM HEATED PROPANE VAPORIZER X x x X x DETAIL PLAN SCALE: 1/4"=1'-0" E>T OSITIONER SCALE: N.T.S. M621 VOLUME ^BOOSTER SYM AUXILIARY REGULATOR FOR TESTING (NOT USED) FILTE CONTROL VALVE DIAGRAM n REVISION C cD La 17 V101 T I 0< HIGH PRESSURE REGULATOR M621 1 X x x l P f I,� 8 " -A1000 (U /G) __/ 6 J STAHL /GE HEATER 16' -6" 9'-7"± 20' -0" 985 PSIG TO NBF DT I IE V -143 x V -144 BY 8 "x4" VERTICAL 985 PSIG FROM 2-117 985 PSIG TO LASF 8 " -A1000 (U /G) TO NBF APPROVED I 7' -0 3/8' 10' -1 5/8" M621 M591 DATE 13" -kEL 3' -6 �" A80VE GRADE 111 ilk M621 M621 ip=ii1p H P?: 1f , am ii ' 1� . Ti IP viol PRV102 V4-4 ii__BOE /NG' SIM P50 V -27 12 "x8" 8" RUPTURE DISC - 112 -A300 EL 10' -0" ABOVE GRADE SECTION SCALE: ;1/4"=1' -0" Fri � - - �r��2 -A3oo (u / To �- - I NBF, BTWf AND 2 -85 M V143 V144 _EL 2' -11" ABOVE GRADE M62T DEPT. DATE CHECKED S. SHRIVER LNGINLER S. SHRIVER CHECKED R. BERRY ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN H. WARDELL APPROVED R. BERRY APPROVED L. COSTELLO DATE 12.22.98 2.08.99 12.12.98 2.08.99 2.08.99 2.08.99 SECTION SCALE: 1/4 " =1' -0" M621 C " -A300 EL 10' -U" ABOVE GRADE SUBTITLE MECHANICAL MASTER. V44 PRV102 V101 8 "x6 A1000 Cj 2 "- A30ALU1�T0 NBF BTWT, AND 2 - 85 SECTION SCALE: 1/4 " =1' -0" PLANT 2 YARD 2- 83 -OM110 PLUMBING PLAN 2 -YD -M3 COMPRESSED AIR BLOCK DIAGRAM 2- YD -M3b HIGH PRESSURE AIR DIAGRAM 2- YD -M134 PLUMBING PIPING 2- YD -M325 HP AIR SYSTEM PRV INSTR. LOCATION PLAN t� 2- 83 -E533 PLC -117 I/O SCHEMATICS SHT. 1 2- YD -E84 120/208V & GROUND 2 -83 -.535 PLC -117 I/O SCHEMATICS SHT. 3 2- 83 -E536 PLC -117 I/O SCHEMATICS SHT. 4 REMOVAL M621 COMPRESSED AIR REDUCING STATION SECTION AND DETAILS GENERAL NOTES 1. FOR MECHANICAL PIPING GENERAL NOTES, SEE DRAWINGS 2- YD -M2a AND 2- YD -M2b. 2. FOR MECHANICAL PIPING LEGEND AND SYMBOLS, SEE DRAWING 2- YD -MO. REFERENCE DRAWINGS PLANT 2 EXISTING PIPING A300 CITY OF Ro APPRDdED JUL - 8 2002 AS NOTED f)!AA'3 D - Kk1 f�FL 2' - 11" ABOVE GRADE RECEIVED CIN OF TIIKWILq JUN 1 7 2002 - PERMITCENTER ISSUED FOR CONSTRUCTION 'i REVISIONS BY Harris Group Inc. REVISION "A" ONLY PPR D DATE 501.02 COMMON BUILD UP U2DC1fl STORAGE 111D1171 12" UP REVISION LSAF CONTROL ROOM J #711975 .. APPROVED DATE ® REVISION . DATE MI MI -_1-- MI MN ME MU 111= 111111 __ -- MI - HGI /MLD 5.01.02 APPROVER (AS BUILT 3235 CFM) CONTRO 11D 26X32 3 6BONAL EO6 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY W. BRRTTAIN, DRAWN W. BOULDS 3.20.02 3.29.02 4.05.02 4.12.02 SUBTITLE DUCTWORK CURRENT REVISION 620 CFM 0 ROOF ACUUM PUMT 1M121M517 Il 11 /1 f5 !1 I WIND TUNNEL MATCHLINE, FOR CONTINUATION SEE 1M16 I II1111L.I ANECHOIC CHAMBER ISMS!, a'® 16 "0 160 ■� ��120 ��. ( (So CFM 700 CFM BUILT d 0 CFM) (AS BUILT 8 "0 360 CFM) 670;, CFM 880 CFM) 18x16 As 680 J 100 CFM IT 1 1 1 6/32 - )T t III Ank 61 ,v li aN nil, Nom i i I 0 Lo 111S..... y I WJ (AS uIL . CFM u 500 (AS T 550 ) (��T 0,,,,::: 700 CFM) PPROVED;: 6 FIRE RISER ROOM 11101101 s73 o MECHANICAL MASTER BUILDING 2 -80 COL. DE- DJ/8 -17 2 -81 BLDG. LEGEND GENERAL NOTES REFERENCE DRAWINGS SK -1M62 TEMPORARY HVAC PIPING SK -1M66 TEMPORARY HVAC PIPING SK -M324 TEMPORARY AIRFLOW CONTROL DIAGRAM AHU -DF -i0 AND AHU -5 SK -M542 TEMPORARY SECTIONS CONSTRUCTION NOTES RELOCATE AHU -DF -10 FROM THE MEZZANINE AND TEMPORARILY PLACE ON THE GROUND OUTSIDE THE EXISTING CONTROL ROOM. BUILD A TEMPORARY 3/4" PLYWOOD ON 2x6" PLATFORM TO MOUNT THE AHU. THE PLATFORM SHALL BE FLAT AND LEVEL. SECURE THE PLATFORM TO THE ASPHALT AT THE MOUNTING LOCATION. SECURE AHU -DF -10 TO THE PLATFORM. PROTECT THE TEMPORARY INSTALLATION WITH BARRIERS AS APPROPRIATE. ROUTE TEMPORARY SUPPLY AIR DUCT TO THE MEZZANINE LEVEL ABOVE THE EXISTING CONTROL ROOM. ROUTE TEMPORARY RETURN AIR DUCT TO THE MEZZANINE LEVEL ABOVE THE EXISTING CONTROL ROOM. ® CONNECT TEMPORARY SUPPLY AIR DUCT TO THE EXISTING SUPPLY AIR DUCT FEEDING THE EXISTING CONTROL ROOM. CONNECT TEMPORARY RETURN AIR DUCT TO THE EXISTING RETURN AIR DUCT FROM THE EXISTING CONTROL ROOM. CONSTRUCT AND SEAL THE DUCT FOR OUTDOOR SERVICE. NOT USED. d SUPPORT DUCTING WITH TEMPORARY SHORING AS REQUIRED. SEAL DUCT PENETRATION. FABRICATE A TEMPORARY SUPPLY DUCT WITH RAIN RESISTANT HOODED OPENING. PROVIDE A BIRD SCREEN OVER THE OPENING. SUPPLY DUCT OPENING SHALL BE APPROXIMATELY 10 TO 12 FEET ABOVE GOUND LEVEL. RELOCATE DAMPERS AS REQUIRED TO RESTORE ORIGINAL OPERATION OF AHU- DF -10. FABRICATE A TEMPORARY EXHAUST DUCT WITH RAIN RESISTANT HOODED OPENING. PROVIDE A BIRD SCREEN OVER THE OPENING. EXHAUST DUCT OPENING SHALL BE APPROXIMATELY 10 TO 12 FEET ABOVE GROUND LEVEL. RELOCATE DAMPERS AS REQUIRED TO RESTORE ORIGINAL OPERATION OF AHU- DF -10. CONSTRUCT A TEMPORARY RAIN BARRIER FROM DIMENSIONAL LUMBER. AND PLYWOOD OVER AHU- DF -10. NOTE: AHU -DF -10 ORIGINALLY DESIGNED AND BUILT AS AN INDOOR AIR HANDLING UNIT. AHU -DF -10 SHALL BE PROTECTED FROM THE ELEMENTS AS LONG AS IT IS IN TEMPORARY SERVICE. SK -1M11 PLANT 2 2 80 BLDG. KEY PLAN sCNE N. SK -1M16 JOB N0. DWG N0. SK-1 M12 11081.00 711975. SK -1M12 RECEIVED CITY Of TUKWItA JUN 1 7 2002 PERMIT CENTER. DATE 5.01.02 -- COMP N0. LSAF CONTROL ROOM J#711975 SYM DATE IM 1101•111I =I MI I= MEM MI NM MIII IIMMII MN MI I= MIMI HGI /MLD APPROVED REVISION 5.01.02 APPROVED M. DAVIS NECKED R. BERRY 3.29.02 4.05.02 4.12.02 5.10.00. REVISION �BOE /NG' EXPIRES 12/13/0.3 w.:BRTITAIN 543-0.2. MECHANICAL MASTER BUILDING 2 -80 COL. DE– DJ/8 -17 PLANT 2 JOB N0. 711975 DWG NO. SK -1M62 COMP N0. 5.01.02 111DG16I /2" HWS IHD IC 1 1/2' HWR I: 2" CHWR 2` CAWS--. - II1111•1111• ANECHOIC CHAMBER 111111 11 CONTROL ROOM 111DH111 AHU -5 N UI cc o 1i COMMON • BUILD UP 11200171 WIND TUNNEL 12 MATCHLINE FOR CONTINUATION SEE 1M66 FLOOR PIPING PLAN N SCALE: 1/8 " =1' -0" a,(0 ACCEPTABILITY THIS DESIGN .AND /OR;. SPECIFICATION IS APPROVED APPROVED BY LSAT CUSTOMER ROOM 11DH10 L_ - DI DRAWN W. BOULDS TEMPORARY ATE 3.22.02 FIRE RISER ROOM I11DI1OI SUBTITLE DDS HVAC PIPING LEGEND PIPE GUIDE HUH HORIZONTAL UNIT HEATER VUH VERTICAL UNIT HEATER AHU AIR HANDLING UNIT UH UNIT HEATER —PC— PUMPED CONDENSATE - - - -- STEAM OR COND. HIDDEN FROM VIEW GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(OR MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW CO 10' INTERVALS 2 " -3" DIA. PIPE CO 15' INTERVALS 4 " -6" DIA. PIPE © 20' INTERVALS REFERENCE DRAWINGS CONSTRUCTION NOTES INSTALL TEMPORARY CHILLED WATER SUPPLY AND RETURN PIPING TO AHU -5. NOTE: HEATING- COIL WILL NOT BE UTILIZED. REFERENCE SK -1M66. 122i INSTALL TEMPORARY CHILLED WATER SUPPLY AND RETURN TO AHU- DF -10. INSULATE ONLY WHERE CONDENSATION COULD DRIP ON OTHER EQUIPMENT. REUSE EXISTING AHU -DF -10 CHILLED WATER CONTROL VALVING. . INSTALL TEMPORARY HOT WATER SUPPLY AND RETURN PIPING TO RELOCATED AHU- DF -10.- INSPECT AND FLUSH EXISTING STEAM COIL PRIOR TO TIE -IN TO HOT WATER SUPPLY /RETURN PIPING. ROUTE TEMPORARY LINES TO CLEAR CONSTRUCTION ACTIVITIES. PROVIDE TEMPORARY COOLING COIL CONDENSATE DRAIN AND CONTAINMENT PAN. ISSUED FOR CONSTRUCTION 2 80 BLDG. KEY PLAN Sr r. DIS iii CURRENT REVISION SYMBOL SK -1M62 Harris Group Inc. 11081.00 aw OF nmmm.A JUN 1 7 2002 PERMIT CENTER -\- , ( I OSN3ON00 9 . mi N J L____ 3/4" HWR , ♦i.. •�. __J — t 5 Iui i O 3/4" - HWS Ma 12 ~.'.... IV* 4, \` 2 . I 1 / I I 1 VI r OW w/►/ m fir . d If A/��1/12% r��MOM '0 1 - 3" MPS 3'' CHWR ( " i t a MATCHLINE FOR CONT SEE 1M65 F N N f - (1vP 2) —( 8 � c 2 AIR INLET AREA -. CLEAN . � I. It - - TRANSPORTATION 11D69 111 DA11 I' i IL —��- VESTIBULE ;>-- �� _ 1 I ' I � * 1 , IG �1L i I11DB101 LJ - , /�'' B 1 / lL/!!/� w rnr# i - - - -� i i 11 MEN Cpl MI WOMEN ,. 1 l — 14D810 ®' I - - - ., 1 2" PC tie 1 1/2 "MPS TO INTF L� \ I _ -__. _ y E�'TRICALSid Ni ; " WIND TUNNEL - 2 1 2" CHWR H h� 1i ( ` 1 2DB10 ( \I 13DB10I I t , 11 LSAF CUSTOMER 1 1/4"C FROM INTF /� ,, I l �l � 2 1 2 C IW —z cwws L 2 t /2" cwws 3 3" HWR Hw s ►f7 11DC 1 TAI 7 2 1/ "CHWS 2 1/ "CHWR- + ^ c \ I[i i t �l ] 7 ' .0C �, \ I � � _ . _ I }L - _`� _ 1 - -- -a— 1 PO• V q� : i 11DC101 CONTROL ROOM .0 CONDENSATE RETURN UNIT i-o / 1" MPS � = g " . N � 3 r. TORAGE I 1 DC1 166 M541 3 STM I - YYY�r _M Mk-Oil „L l t- 1 11 DC9 1 { B II COMMON ,,- ri "vi 4" SON I 1 ` II 12DC171 a u II III 1 MATCHLINE FOR CONT. SEE 2- 80 -1M62 4 1 2 1 13.1 FLOOR PIPING PLAN. N SCALE: 1 /8' 1,_0 10 DA DB oa CONSTRUCTION NOTES INSTALL TEMPORARY CHILLED WATER SUPPLY AND RETURN PIPING TO AHU -5 AND RELOCATED AHU- DF -10. REMOVE TEMPORARY PIPING BACK TO ISOLATION VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. DISPOSITION OF REMOVED ITEMS PER BOONS DIRECTION. REFERENCE SK-1M62. INSTALL TEMPORARY HOT WATER SUPPLY AND RETURN PIPING TO RELOCATEDAHU- DF -10. REMOVE TEMPORARY PIPING BACK TO ISOLATION VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. DISPOSRION OF REMOVED TTEMS PER BOEING DIRECTION. REFERENCE SK -1M62. cm TUKVAA 3u11. - B 2002 RS 1+01et1 p RSt6 TEMPORARY LEGEND PIPE GUIDE HUH HORIZONTAL UNIT HEATER VUH VERTICAL UNIT HEATER AHU AIR HANDLING UNIT UN UNIT HEATER - -PC— PUMPED CONDENSATE STEAM OR COND. HIDDEN FROM VIEW -STM— 125 LB STEAM -LPS— 0 -30 LB STEAM —C CONDENSATE - GRAVITY DRAIN GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(OR MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW W 10' INTERVALS 2 " - 01k PIPE @ 15' INTERVALS 4 " -6" DIA. PIPE @ 20' INTERVALS REFERENCE DRAWINGS 2 80 BLDG. KEY PLAN SCALE IDS PERMITCENTER • ISSUED FOR CONSTRUCTION BY HGI /MLD LSAF CONTROL ROOM REVISION 4711975 SYM APPROVED DATE 5.01.02 SYM REVISION BY APPROVED DATE eLAsraPAE7A4w 14 ,1 OPINES 12/13/0s I ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT: SUBTITLE TIT MECHANICAL MASTER HVAC PIPING BUILDING 2 -80 COL. DA- DE /8 -17 PLANT 2 CURRENT REVISION Harris Group Inc. 11081.00 SYMBOL SK -1M66 JOB NO. 711975 DATE 5.01.02 COMP NO. DWG N0. SK -1M66 LSAF CONTROL ROOM REVISION J #711975 BY HGI /MLD APPROVED DATE 5.01.02 SY REVISION BY 1 1/2 " -5WR APPROVED DATE e 3.1 1/2 50 PIRES 12/13/03 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE 3 " — HWR DRAWN W. BOULDS C HECKED B. BRITTAIN ENSINEER M. DAVIS CHECKED R. BERRY APPROVED M i a c.0 DATE 4.03.02 4.05.02 4.05.02 TEMPORARY SUBTITLE TITLE 4.12.02 S_ 03 s% /3•02 MECHANICAL MASTER TO 2 -80 BLDG AHU, FTU'S, UH'S & CUH 03 -HWS 2-80 -M323 3' -HWR 2 -80 -M323 A -- AUTO AIR VENT T AT HIGH POINT T d�—r AUTO AIR VENT AT 1-1101-1 POINT '@. T III E /16 HEATING WATER PIPING DIAGRAM BUILDING 2 -80 LEGEND C11VT ° N.A JUL — 8 2002 AS MAU p+ 6 GENERAL NOTES HOT WATER SUPPLY AND RETURN PIPING INSULATION PER BOEING CONSTRUCTION SPECIFICATION 15260. REFERENCE. DRAWINGS MOTOR AND SOLENOID CONTROLS 2- 80 -E543 DETAILS CONSTRUCTION NOTES RELOCATE AHU- DF -10. EXISTING HEATING COIL IS STEAM, REFEED EXISTING STEAM COIL WITH HOT WATER. INSTALL TEMPORARY HOT WATER SUPPLY AND RETURN PIPING. SEE SK -1M62 AND SK -1M66. NEW TEMPERATURE CONTROL VALVE. RELOCATE TO AHU —DD -11 PRIOR TO COMMISSIONING. SEE M323A. ALL CONSTRUCTION THIS SHEET IS PHASE 1. PLANT 2 RECEPED ^.IT' 0� TU JUN 1 7 200? 'ERen, CENTER ISSUED FOR CONSTRUCTION CURRENT REVISION SYMBOL Harris Group Inc. 11081.00 S K -M323A JOB NO. 711975 COMP NO. DWG NO. SK —M323A DATE 5.01.02 - - -_ -� I l 1 f RA '7,, -A,-..- LLm V FILTERS H C SF -DF 1O RF -DE 7 TO -10 r 7.300 Q Q CY SYM LSAF CONTROL ROOM REVISION J#711975 CONSTRUCTION NOTES AHU -DF -10 AND ALL INSTRUMENTATION SHALL BE REMOVED FROM THE MEZZANINE AND RELOCATED AS SHOWN ON SK -1M12. ALL INSTRUMENTATION AND CONTROLS ARE EXISTING EXCEPT TCV -8. TEMPORARY SUPPLY AND RETURN DUCT SHALL BE PROVIDED AS SHOWN ON SK -1M12. 3 -EXISTING STEAM COIL SHALL BE UTILIZED IN AHU- DF -10, EXCEPT IT SHALL BE TIED TO TEMPORARY FEEDS FROM THE HOT WATER SUPPLY. AND HOT WATER RETURN PIPING SYSTEM FROM THE 2 -80 BLDG. SEE M450, 1M65, SK -1M62 AND SK -1M66. ® AHU -5 SHALL REMAIN IN PLACE DURING CONSTRUCTION OF THE NEW LSAF CONTROL ROOM. NO STEAM OR CONDENSATE RETURN. PIPING WILL WILL BE PROVIDED TO THIS UNIT ONCE CONSTRUCTION HAS BEGUN AND THESE SYSTEMS HAVE BEEN DISCONNECTED. ROUTE TEMPORARY CHILLED WATER SUPPLY AND CHILLED WATER RETURN PIPING TO AHU -5 AS SHOWN ON SK -1M62 AND SK -1M66. - BY HOI /MI D APPROVED START PO DATE 5.01.02 INTERLOCK W/ FAN STARTER t -1 SMOKE ALARM DI RA /EXH TEMP AI 0 PROOF SYM XAS PHASE 1 EXISTING RELIEF OA DAMPER DAMPER REVISION AO AO I/P I/P I/P RA DAMPER OA TEMP FILTER CHANGE 0 AI MIX FREEZE TEMP ALARM 5>PROVIDE A SMALL DEDICATED AIR COMPRESSOR, OR PROVIDE TEMPORARY PLANT AIR TO THE AIR CONTROLS FOR THIS UNIT TO MAINTAIN THE DDC CONTROLS IN PLACE UNTIL CONSTRUCTION IS COMPLETE. ©PURCHASE AND INSTALL A 1" TEMPERATURE CONTROL VALVE, FISHER CONTROLS MODEL NUMBER DVC5020.. RELOCATE THIS VALVE (TCV -8) TO AHU -DD -11 PRIOR TO COMMISSIONING AHU- DD -11. BY APPROVED NW RA HTG COIL AO HWR /HC1 F/10 I/ P DATA ROOM DATE SA CLG COIL PROOF AO DI I/P CHWR PHASE 1 EXISTING RA CONTROL ROOM START POC INTERLOCK W/ FAN STARTER 0 SA p arafrEzAng. SM DI ALARM OKE SA Al TEMP POC�2 SA CUSTOMER ROOM EXPIRES ' 12/13/43 ,. AHU-5 (EXISTING) APPROVED. BY SA J ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED.. DRAWN W.'BOULDS APPR aOVEE y�C DATE 3.26.02 s.laoz .5:/a4.2 TITLE TEMPORARY SEQUENCE OF OPERATION (AHU— DF -10) CONTROL ROOM: SYSTEM DESCRIPTION: • THIS SYSTEM IS A CONSTANT AIR VOLUME, AIR HANDLING UNIT (AHU) WIN CHILLED WATER COOLING COIL, HOT WATER HEATING COIL, OUTDOOR AIR ECONOMIZER, SUPPLY AIR FAN, AND RETURN /EXHAUST AIR FAN. THIS SYSTEM SHALL BE CONTROLLED FROM THE CMCS. • THE AHU SERVES THE 04TH, ROOM, CONTROL ROOM, AND CUSTOMER ROOM. START -UP: • WITH THE SUPPLY FAN MOTOR STARTER SWITCH IN THE "AUTO" POSITION, THE AHU SUPPLY FAN MAY BE ENERGIZED/ DE- ENERGIZED THROUGH ITS MOTOR STARTER CONTACTOR BY A START /STOP COMMAND ISSUED BY AN OPERATOR FROM THE CMCS. THE SYSTEM SHALL OPERATE BASED ON THE OCCUPANCY SCHEDULE CODED INFO THE CMCS. THE SYSTEM SHALL HAVE A NIGHT OVERRIDE. • WHEN THE SUPPLY FAN IS ENERGIZED/ DE- ENERGIZED, THE RETURN/ EXHAUST FAN SHALL BE STARTED/ STOPPED THROUGH A HARDWIRE INTERLOCK (PROVIDED BY AHU VENDOR). • THE CURRENT SENSOR SWITCHES (IS) SHALL INDICATE SUPPLY AND RETURN/ EXHAUST FAN RUN STATUS AT THE CMCS. • WHEN THE AHU IS ENERGIZED, THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED UNTIL THE RETURN AIR TEMPERATUE TT) IS A MINIMUM OF 68 DEGREES F (ADJUSTABLE), THEN OPEN THE DAMPER TO ITS MINIMUM AIRFLOW POSITION (ADJUSTABLE). • WHEN THE AHU IS DE- ENERGIZED, THE CMCS SHALL POSITION THE RETURN AIR DAMPER OPEN, THE OUTSIDE AND EXHAUST AIR DAMPERS CLOSED, AND THE VALVES CLOSED. SAFETY: • SHOULD PARTICLES OF COMBUSTION BE SENSED, THE DUCT - MOUNTED SMOKE DETECTORS (XAS) SHALL DE- ENERGIZE THE AFIU SUPPLY AND RETURN/ EXHAUST FANS AND INDICATE AN ALARM AT THE CMCS. SMOKE DETECTORS SHALL BE LOCATED IN THE SUPPLY AND RETURN AIR PLENUMS AND SHALL BE HARDWIRED TO THE FAN MOTOR STARTERS. (THE SMOKE DETECTORS ARE PROVIDED AND HARDWIRED UNDER DIVISION 16.) • THE LOW -LIMIT TEMPERATURE SWITCH (TSL) SHALL DE- ENERGIZE THE AHU SUPPLY AND RETURN/ EXHAUST FANS AND INDICATE AN ALARM AT THE CMCS SHOULD THE TEMPERATURE FALL BELOW 35 DEGREES F (ADJUSTABLE). THE TSL SHALL BE HARDWIRED TO THE FAN MOTOR STARTERS. THE CMCS SHALL OPEN THE HEATING CONTROL VALVE TO 100% DURING A TSL ALARM CONDITION. • UPON ANY SAFETY SHUTDOWN, THE CMCS SHALL CLOSE THE EXHAUST AND OUTSIDE AIR DAMPERS. • A MANUAL RESET AT THE AHU MUST BE RESTORED TO ENERGIZE THE AHU FANS FOLLOWING A SHUTDOWN BY ANY SAFETY CONTROL. COOLING AND HEATING CYCLES: • THE CMCS, SENSING SPACE TEMPERATURE SENSORS (TT), SHALL RESET THE SUPPLY AIR TEMPERATURE (TT) SETPOINT AND THE MIXED AIR TEMPERATURE (TT) SETPOINT BASED ON A RESET SCHEDULE. THE RESET SCHEDULE SHALL BE DETERMINED BASED ON THE ZONE TEMPERATURE (TT) COOLING LOAD DEMAND. THE CONTROL ROOM SPACE SHALL BE 70 DEG F (ADJUSTABLE). • AHU COOLING AND HEATING: THE CMCS SHALL CONTROL THE CHILLED WATER VALVE, THE ECONOMIZER CYCLE, AND THE HOT WATER VALVE IN SEQUENCE TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT. 1_) AHU COOLING (CHILLED WATER): THE CMCS SHALL MODULATE THE CHILLED WATER VALVE (TCV) TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT (ADJUSTABLE). 2.) AHU. COOLING (OUTDOOR AIR ECONOMIZER): WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE (TT) LESS THAN NE RETURN AIR TEMPERATURE (TT) (ADJUSTABLE), THE CMCS SHALL OPEN THE EXHAUST AIR DAMPER AND MODULATE THE OUTSIDE AND RETURN AIR DAMPERS CORRESPONDINGLY TO MAINTAIN MIXED AIR SETPOINT (ADJUSTABLE). WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE (TT) GREATER THAN RETURN AIR TEMPERATURE (TT) (ADJUSTABLE), THE CMCS SHALL POSITION THE OUTSIDE AIR DAMPER TO ITS PREDETERMINED MINIMUM POSITION (ADJUSTABLE). 3.) AHU HEATING: THE CMCS SHALL MODULATE THE HOT WATER VALVE (TCV) TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT (ADJUSTABLE). • SPACE REHEAT: THE CMCS, SENSING THE SPACE TEMPERATURE (TT), SHALL MODULATE THE HOT WATER VALVE (TCV) TO MAINTAIN SPACE SETPOINT OF 70 DEG F +/ -2 DEG F (ADJUSTABLE). FILTER CHANGEOUT: • THE DIFFERENTIAL PRESSURE GAUGE/ SWITCH (DPT), LOCATED ACROSS THE AHU FILTER RACK, SHALL INDICATE FILTER CHANGEOUT ALARM AT THE CMCS WHEN THE FILTER PRESSURE DIFFERENTIAL SETPOINT (ADJUSTABLE) IS REACHED. moa-ralo TEMPORARY 3.29.02 4.05.02 4.12.02 SUBTITLE AIRFLOW / CONTROL DIAGRAM AHU -DF -10 AND AHU -5 CURRENT. REVISION SYMBOL DATE SHEET SK -M324 Harris Group Inc. 11081.00 5.01.02 MECHANICAL MASTER BUILDING 2 -80 GTY Of TUKKA APPROVED JUL - 8 2002 AS 1101 E.0 �� r(3 D VTStON PLANT 2 ISSUED FOR CONSTRUCTION JOB No. 711975 DWG No. SK -M324 RECEIVED CITY OF TUKWi,q JUN i 7 2002 PERP, CENTER SYM REVISION BY APPROVED SYM REVISION APPROVED DATE �L< 11 14" D 860 CFM 18/26 TEMPORARY NORTH /SOUTH SECTION SCALE: 1/4 " =1 -0" SK- 1M12ISK -M542 �BOE /NG° DH u 14" D 860 CFM EEXPIRES. 12 O Ji 3.20.02 3.29.02 SUB TITLE TITLE 4.05.02 4.12 02 g./0.0? .s43a,2._MECHANICAL MASTER TEMPORARY SECTIONS BUILDING 2 -80 LEGEND GENERAL NOTES REFERENCE DRAWINGS SK -1M12 TEMPORARY DUCTWORK SK-1M62 TEMPORARY HVAC PIPING SK -1M66 TEMPORARY HVAC PIPING SK -M324 TEMPORARY AIRFLOW CONTROL DIAGRAM AHU -DF -10 AND AHU -5 CONSTRUCTION NOTES INSTALL NEW SUPPLY AIR DUCT FROM RELOCATED AHU- DF -10. REFERENCE TEMPORARY DRAWING SK -1M12. INSTALL NEW RETURN AIR DUCT FROM RELOCATED AHU- DF -10. REFERENCE TEMPORARY DRAWING SK -1M12. CAP AND SEAL END OF EXISTING DUCT. PLANT 2 DIY OF TIWWUA APPROVED JUL - 8 2002 �u L r. v �AEfrtx� DIJIT]t4 ISSUED FOR CONSTRUCTION %oral. O ACCEPTABILITY ® THIS DESIGN AND /OR 7 SPECIFICATION IS APPROVED APPROVED BY DEPT... DATE CHECKED R. BERRY CURRENT REVISION JOB N0. DWG NO. SYMBOL SHEET SK-M542 711975 SK -M542 RECEN'c CITY Of TUKWILA JUN 1 7 Z00Z PERMIT CENTER. Harris Group Inc. 11081.00 DATE COMP NO. 5.01.02 •r S! A b 1 4 FCO ° VTR © RD ® FD ® FS ® FFD FUD RECORD DRAWING LSAF CONTROL ROOM PIPE FITTING SYMBOLS WASTE FITTING SYMBOLS 7 CAP, SCREWED OR SOLDER II BLIND FLANGE .4 PLUG D CAP, WELDED OR GROOVED ELBOW, 90° TEE CROSS REDUCER, CONCENTRIC REDUCER, ECCENTRIC UNION, SCREWED ELBOW, TURNING DOWN OR AWAY 10 ELBOW, TURNING UP OR TOWARD TEE, OUTLET DOWN OR AWAY TEE, OUTLET UP OR TOWARD LATERAL WASTE PIPING QUARTER BEND PIPING SYMBOLS SANITARY WYE AND 1/8 BEND ELBOW, 45° CLEAN OUT, FLOOR wco CLEAN OUT, WALL VENT THRU ROOF ROOF DRAIN FLOOR DRAIN FLOOR SINK FUNNEL FLOOR DRAIN FUNNEL DRAIN BALANCING VALVE WITH METERING PORTS AUTOMATIC FLOW CONTROL VALVE NUMBER INDICATES GPM FLOAT VALVE ** VALVE SYMBOLS GATE VALVE, OUTSIDE SCREW AND YOKE GATE VALVE, (NORMALLY OPEN) GATE VALVE, (NORMALLY CLOSED) GATE VALVE WITH HOSE CONNECTION BALL VALVE, (NORMALLY OPEN) BALL VALVE, (NORMALLY CLOSED) BUTTERFLY VALVE GLOBE VALVE, (NORMALLY OPEN) GLOBE VALVE, (NORMALLY CLOSED) ANGLE GLOBE VALVE, PLAN ANGLE GLOBE VALVE, ELEVATION PLUG VALVE /STOP COCK CHECK VALVE 3 WAY VALVE BALANCING VALVE WITHOUT METERING PORTS NEEDLE VALVE JOINT HOSE BIB PRESSURE REDUCING /REGULATING VALVE WITH EXTERNAL PRESSURE TAP PRESSURE REDUCING /REGULATING VALVE SELF CONTAINED PRESSURE RELIEF /SAFETY VALVE REVISION J #982188 4711976 BY HGI /LJC HGI /MLD APPROVED ® "XX" ET - EXPANSION TANK WHA - WATER HAMMER ARRESTOR IPOC XXXX -XXI 71 ,M AV 0 y 7.28.00 5.01.02 VALVE SYMBOLS CONT. SYM MOTOR OPERATED VALVE SOLENOID OPERATED VALVE 3 WAY CONTROL VALVE CONTROL VALVE QUICK OPENING QUICK CLOSING, FUSIBLE LINK VALVE IN RISER MISCELLANEOUS PIPING SYMBOLS EQUIPMENT MARK NUMBER POINT OF CONNECTION POINT OF CONNECTION NUMBER AIR VENT, AUTOMATIC (WITH DRAIN) AIR VENT. MANUAL (WITH DRAIN) BACKFLOW PREVENTER COOLING COIL HEATING COIL EXPANSION JOINT FLOWMETER, ORIFICE FLOWMETER, VENIURI PRESSURE GAGE WITH VALVE STRAINER, WYE WITH BLOW OFF STRAINER, WYE STRAINER, BASKET STRAINER, DUPLEX TEST PLUG (PETE'S PLUG) TRAP SEAL PRIMER VALVE STEAM TRAP VALVE BOX PIPE GUIDE PIPE SUPPORT HANGER SPRING HANGER PIPE ANCHOR NITROGEN GAS OUTLET, HARD PIPE L5 NITROGEN GAS DROP, HOSE C VACUUM OUTLET, HARD PIPE La VACUUM DROP, HOSE © VACUUM CLEANING OUTLET 0 SIMPLEX AIR DROP, HOSE 0 DUPLEX AIR DROP, HOSE e SIMPLEX AIR OUTLET, HARD PIPE ® DUPLEX AIR OUTLET, HARD PIPE REVISION AIR CONDITIONING, REFRIGERATION AND COOLING SYMBOLS — CHWS - - CHWR - - CLWS- - CLWR — — CTFS — — CTFR — — CTWS — CTWR — — HPWS — HEAT PUMP WATER SUPPLY — HPWR — HEAT PUMP WATER RETURN — CLD — CLEAR WATER DRAIN (CONDENSATION) — RS — REFRIGERANT SUCTION (GAS) — RL — REFRIGERANT LIQUID — RHG — REFRIGERANT HOT GAS HEATING SYMBOLS - HWS — HEATING WATER SUPPLY -- HWR - - STM — — HPS --- - ---- MPS — — LPS — HPR — —C — PC — — CD — — HPC - -MPC- - [PC - -BBD- - BFW — — F0= — FOD— — FOG - - FOS— --- FOR --- --- FOV- - FOF— PLUMBING AND MISCELLANEOUS SYMBOLS A — A300 — — A1000— IA - - CF— F— S G- - LPG — — LN2- - GN2— — VAC — --- CLV— BY APPROVED CHILLED WATER SUPPLY CHILLED WATER RETURN COOLING WATER SUPPLY COOLING WATER RETURN COOLING TOWER FILTER SUPPLY COOLING TOWER FILTER RETURN DOLING TOWER WATER SUPPLY (FROM COOLING TOWER) DOLING TOWER WATER RETURN (TO COOLING TOWER) FUEL OIL SYMBOLS FUEL FUEL FUEL FUEL FUEL FUEL FUEL LIQUID NITROGEN GASEOUS NITROGEN VACUUM VACUUM CLEANING DOTE OIL OIL DISCHARGE OIL GAUGE OIL SUPPLY OIL RETURN OIL VENT OIL FILL LINE PIPING IDENTIFICATION SYMBOLS HEATING WATER RETURN STEAM SUPPLY HIGH PRESSURE STEAM SUPPLY (125 - 250 PSIG) MEDIUM PRESSURE STEAM SUPPLY (15 - 125 PSIG) LOW PRESSURE STEAM SUPPLY (0 - 15 PSIG) CONDENSATE RETURN (PRESSURE), STEAM CONDENSATE RETURN (GRAVITY), STEAM CONDENSATE (PUMPED), STEAM CONDENSATE DRAIN CONDENSATE, STEAM (HIGH PRESSURE) CONDENSATE, STEAM (MEDIUM PRESSURE) CONDENSATE, STEAM (LOW PRESSURE) BOILER BLOW DOWN BOILER FEED WATER COMPRESSED AIR (100 PSIG NOMINAL) COMPRESSED AIR (300 PSIG NOMINAL) COMPRESSED AIR (1000 PSIG NOMINAL) INSTRUMENT AIR CHEMICAL FEED FIRE LINE (AHEAD OF ALARM VALVE) SPRINKLER LINE (DOWNSTREAM OF ALARM VALVE) NATURAL GAS LIQUID PETROLEUM GAS �BOE /NC' — VPD — VACUUM PUMP DISCHARGE — CW — COLD WATER, DOMESTIC — HW — HOT WATER, DOMESTIC — HWC — HOT WATER, CIRCULATING DOMESTIC - DI DEIONIZED WATER —DW— DISTILLED WATER — PW — PROCESS WATER — AW — ACID WASTE — CRV — CORROSION RESISTANT VENT — CRW — CORROSION RESISTANT WASTE — ID — INDIRECT DRAIN — IW — INDUSTRIAL WASTE — SAN — SANITARY WASTE — STS — STORM DRAIN — RWL — RAIN WATER LEADER —V— VENT HVAC SYMBOLS BASIC DUCTWORK SYMBOLS RECTANGULAR DUCT (FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN) PLUMBING AND MISCELLANEOUS SYMBOLS CONT. RR RG ER EG SD SG SR TG SD 2/6 —T 100 1 CFM 1 12/6 100 CFM 1 Jr / � , �� EXPIRES 12/1 ROUND DUCT (NUMBER INDICATES DIAMETER) SUPPLY AIR DUCT, RECTANGULAR ELBOW TURNING TOWARD SUPPLY AIR DUCT, RECTANGULAR ELBOW TURNING AWAY ; EXHAUST AIR OR RETURN AIR DUCT RECTANGULAR ELBOW TURNING TOWARD EXHAUST AIR OR RETURN AIR DUCT RECTANGULAR ELBOW TURNING AWAY RECTANGULAR DUCT, SQUARE ELBOW, SHOWN WITH TURNING VANES ROUND DUCT, ELBOW TURNING TOWARD ROUND DUCT, ELBOW TURNING AWAY W---7V• FLEXIBLE DUCT FLEXIBLE DUCT CONNECTION DUCTWORK AIRFLOW DIRECTION ACCESS DOOR (AD), ACCESS PANEL (AP) GRILLES, LOUVERS, DIFFUSERS. AND OPENING SYMBOLS CFM SUPPLY OR OUTSIDE AIR FLOW DIRECTION v--- "CFM AIR UFLOWTDIRECTIO OR EXHAUST N RETURN REGISTER RETURN GRILLE EXHAUST REGISTER EXHAUST GRILL SUPPLY DIFFUSER SUPPLY GRILLE SUPPLY REGISTER TRANSFER GRILLE SIDEWALL SUPPLY AIR DIFFUSER, GRILLE OR REGISTER SCREENED OPENING SIDEWALL RETURN /EXHAUST GRILLE OR REGISTER � / CCEPTABILITY F G THIS DESIGN AND /0R SPECIRCATION IS APPROVED APPROVED BY DEPT DATE SOF APPR R. BERRY APPROVED • ll!� 0 DATE 8.13.98 1.1.99 8.13.98 1.4.99 1.4.99 SD 12/12 400 CFM SD 12/12 400 CFM SD 12 Q 400 CFM RG 24X24 ® 100 CFM MUM HVAC SYMBOLS CONT. GRILLES, LOUVERS, DIFFUSERS, AND OPENING SYMBOLS CONT. SUPPLY OUTLET DIFFUSER, GRILLE OR REGISTER FAN, AXIAL FLOW SUPPLY OUTLET DIFFUSER, GRILLE OR REGISTER SUPPLY OUTLET ROUND DIFFUSER RETURN /EXHAUST REGISTER OR GRILLE LINEAR DIFFUSER 100 CFM CG 24/24 RETURN /RELIEF GRILLE, CEILING TYPE 14 - 1 100 CFM NON - DUCTED DUCT MOUNTED EQUIPMENT SYMBOLS Q CENTRIFIGAL FAN CENTRIFIGAL FAN, INLET GUIDE VANES FSD SUBTITLE TITLE UNIT HEATER RECTANGULAR DUCT, RADIUS ELBOW, SHOWN WITH TURNING VANES TERMINAL UNIT INSTRUMENTATION AND CONTROL SYMBOLS DUCT TYPE HEAT DETECTOR DUCT TYPE SMOKE DETECTOR DUCT TYPE TEMPERATURE SENSOR CO TEMPERATURE TRANSMITTER OT THERMOSTAT OH HUMIDISTAT DAMPER SYMBOLS VD VOLUME DAMPER MECHANICAL MASTER OPPOSED BLADE DAMPER PARALLEL BLADE DAMPER BACK DRAFT DAMPER (ALLOWS FLOW IN DIRECTION OF ARROW) FIRE DAMPER (1 HOUR) FIRE DAMPER (2 HOUR) SMOKE DAMPER FIRE /SMOKE DAMPER LEGEND BUILDING 2 -80 MO- i;i (i, PLANT 2 CITY Of MYNA JUL - 8 2002 fS NOIED d�nt'��rta! ISSUED FOR CONSTRUCTION DRAWN: WJB CURRENT REVISION J #711975 SHEET JOB NO. DWG N0. REC n CITY OF T(1KNlILA JUN 1 7 2002 PERMIT CENTER REVISIONS BY Harris Group Inc. u€. WBB MO SYMBOL 982188 2 -80 -MO REVISION "A" ONLY DATE 5.01.02 ENGINEER: MLD DATE COMP NO PROJECT 11081.00 CHECKED: RB 5.01.02 • RETURN /EXHAUST (RE) FAN - EXHAUST FAN (EF) - SUPPLY FAN (SF) SCHEDULE MARK NUMBER SERVICE LOCATION CFM T.S.P. INCH W.G. FAN RPM MOTOR TYP MAKE & MODEL OV (FPM) WEIGHT (LBS) FAN WHEEL DIA (INCH) REMARKS (SEE EQUIPMENT NOTES) BHP DRIVE HP VOLTS PH Hz ® AHU -1 - 5400 1 1/4 1246 - - 3 480 3 60 CABINET FAN PACE CABINET FAN SIZE A18 1534 1845 INCLUDED W /AHU -1 INCLUDED' W /AHU -2 18 1/4 " 18 1/4 �L © ® AHU -2 - 6400 1 1 1429 - - 5 480 3 60 CABINET FAN PACE CABINET FAN SIZE A18 © AIM AHU -3 - 6680 1 3/4 1534 - - 5 480 3 60 CABINET FAN PACE CABINET FAN SIZE A18 1964 INCLUDED W /AHU 3 18 1/4 ROOF © CONTROL ROOM AHU -4 - 12000 1.0 988 - - 5 480 3 60 CABINET FAN PACE CABINET FAN SIZE A24 9600 INCLUDED Vy /AHU -4 24 1/4 LL 0 ® REVERB ROOM - 25000 2.5 685 - - 20 480 3 60 UTILITY FAN PACE SIZE 44 21916984 2445 44 1/2 ? PROVIDE W /DRAIN FITTING AT BOTTOM OF SCROLL Q ® ANECHOIC ROOM - 25000 2 600 - 18 1/4 15 480 1106 60 UTILITY FAN PACE SIZE 44 2200 2445 44 1/2 ® PROVIDE TBOTTOM / OF D SCROLL M. 0 �r •i a rev, S - 1600 .75 1295 - - 1/2 120., 24 1/4 60 e ` CENT ROOF EX GREENHECK , _ � _ 1157 85 14 16x16.0 TO 0 CURB 60 TOILET ROOMS LSAF RESTROOMS 180 .25 1400 - ECT DIRECT grigigii 0 m 60 CABINET FAN GREENHECK CSP -218 853 MOUNT ABOVE TOILET ROOM CEILING © 1 4 TOILET ROOMS _ - - - - 1280 80 1725 CC GH /15 - - .0 C, :I 'A SQ 720 75 LSAF CONTROL ROOM erg •:, ROOM CEILING 9000 AA CLEAN ROOM LSAF MEZZANINE 800 1.75 1757 .5 BELT .75 480 HC -DD -11 60 SQUARE, INLINE COOK CABINET 150 SQN -HP 287 10 75 WITH VIBRATION ISOLATORS �SF D -11 LSAF CONTROL ROOM LSAF MEZZANINE 9000 2.48 900 6.78 BELT 10 480 60 FC TRANE FAN SIZE 17B 1500 775 18.25 VSD BY OTHERS. COORDINATE REQ'MTS. W /CMCS CONTRACTOR DB.2/21 LOCKERS ROOF 2050 .0 1267 0.65 BELT 120 60 ROOF XHAUSTER ' + -► + V ,', •' :; - - - - © ® DB.9/17.3 ELECTRICAL EQUIPMENT ROOM ROOF 7880 0.125 1800/ 1200 1.55 BELT 480 60 ROOF EXHAUSTER PENN- VENTILATOR, DX309 2 SPEED, 2WINDING © 0 MECHANICAL EQUIPMENT ROOM ROOF 865 0.125 960 0.05 BELT 1/4 120 1 60 ROOF EXHAUSTER PENN - VENTILATOR, DX9B - - - v INST. VAN STAGING ROOF 10,000 1.5 694 4.1 . BELT 5 480 3 60 ROOF EXHAUSTER GREENHECK, CUBE 350 HP - - - - 0 CHILLER ROOM ROOF 3100 0.6 - 1.20 BELT 1 1/2 480 3 60 ROOF EXHAUSTER PENN- VENTILATOR 22x22 DUCT CONNECTION 0 ANL ELECTRICAL SHOP 2ND FLR ROOF 3440 0.5 560 0.48 BELT 1/2 120 1 60 - PENN- VENTILATOR MODEL DX24B Ilir AIR HANDLING UNIT (AHU) SCHEDULE MARK NUMBER UNIT SERVED MARK NUMBER LOCATION MAKE & MODEL SERVICE SUPPLY FAN SECTION MOTOR RETURN FAN SECTION (SEE FAN SCHEDULE) _ AIR FILTER (SEE FILTER SCHEDULE) COOLING COIL (SEE COOLING COIL SCHEDULE) STEAM /HOT WATER HEATING COIL (SEE HEATING COIL SCHEDULE) OPERATING WEIGHT (LBS) AHU 1 REMARKS (SEE EQUIPMENT NOTES) TYPE OF S'(STEM WHEEL DIA. (INCH) CFM ACTUAL AIR T.S.P. INCH W.G. OV FPM RPM HP VOLTS PH Hz alk ROOF PACE CABINET FAN SIZE A18 REVERB CHAMBER 18 1/4 5400 3 1/2 1535 1766 5 480 3 60 RE -1 AF -1 CC -1 HC -1 5250 => E> SET MIN. OA AT 150 CFM CONSTANT VOLUME Q AHU ROOF PACE CABINET FAN SIZE A18 ANECHOIC CHAMBER 18 1/4 6400 4 1845 1536 7.5 480 3 60 RE -2 AF -2 CC -2 HC -2 • 6300 1 ©15.■ SET MIN. OA AT 240 CFM CONSTANT VOLUME 12100 _ AM ROOF PACE CABINET FAN SIZE A20 CONTROL ROOM 18 1/4 6680 2 1/4 1836 1569 5 480 3 60 RE -3 AF -3 CC -3 HC -3 9600 ® E SET MIN OA AT 300 CFM CONSTANT VOLUME © P LEATED TYPE ROOF PACE CABINET FAN SIZE A24 WORK AREA 24 1/4 12,000 2 3/4 1968 1279 10 480 3 60 RE -4 AF -4 - HC -4 9670 8 ©I SET MIN. OA AT 600 CFM CONSTANT VOLUME 0 AL 1- PACE CABINET FAN SIZE A18 REVERB CHAMBER 18 1/4 4120 2 1106 1324 3 480 3 60 AF -5 3100 © ®1Ell■ VARIABLE VOLUME NEI Aellk 1 - PACE CABINET FAN SIZE A24 ANECHOiC CHAMBER 24 1/4 12,100 2 1952 1157 7.5 480 3 60 - AF -6 - 3720 1 2 VARIABLE VOLUME 0 m 1 DG 15 TRANE ALDS ROOM 853 1 4 115 - 60 CC GH /15 - CONSTANT VOLUME grACT AHU LSAF MEZZANINE TRANE CABINET FAN SIZE 17B LSAF CONTROL ROOM 18 1/4 9000 3.3 1500 900 10 480 3 60 _ AF-8 ; CC -DD -11 HC -DD -11 2623 =>=> SET MIN. OA AT 200 CFM VARIABLE VOLUME D -11 AIR FILTER (AF) SCHEDULE MARK NUMBER UNIT SERVED AIR FLOW (CFM) ALTER REMARKS MEDIA TYPE EFFICIENCY PERCENT MAX TV (FPM) ( �_SIZC (INCHES) PRESSURE DROP IN WG CLEAN DIRTY AF U AHU 1 5400 PLEATED NON-(3) WOVEN COTTON 25 -30 500 16x20x2 (3)- 20x20x2 0.28 0.90 FARR 30 -30 m AHU -2 6400 PLEATED NON- WOVEN COTTON 25-30 500 (3)-16x20x2 (3) 20x20x2 0.28 0.90 FARR 30-30 © AM AHU 3 6680 PLEATED NON- WOVEN COTTON 25 -30 500 2 - 20x20x2 2 - 20x25x2 2 - 16x25x2 2 - 16x20x2 0.28 0.90 FARR 30 -30 © . 4 12000 PLEATED NON- WOVEN COTTON 25-30 25 -30 500 0.28 0.90 FARR 30 -30 0 (9)- 20x25x2 AF AHU to 4120 PLEATED NON WOVEN COTTON 25 30 500 (3)- 16x20x2 (3)- 20x20x2 0.28 0.90 FARR 30-30 AF : H'- e 12100 _ PLEATED TYPE 0 W V 0 � 25 -30 500 (9)- 20x25x2 0.28 ������� 0.90 FARR 30 -30 6 ROOM 800 PLEATED TYPE 95 290 , (1)- 24x24x6 0.50 0.90 PUROLATOR DEFIANT e CLEAN . AHU -DD -11 9000 P LEATED TYPE 25 30 330 (8)- 20x16x2 (4)- 25x16x2 0.28 0.28 0.90 0.90 FARR 30-30 7.28.00 SYM A RECORD DRAWING LSAF RECONFIGURATION LSAF CONTROL ROOM REVISION J #982188 J8711975 BY D.G. HGI /LJC MOLD APPROVED DATE GYM K.R. 2.1.95 5.01.02 REVISION APPROVED DATE g)L ArasEArAw . EXPIRES 12I13/ CCEPTA.ILITY 11 DESIGN. AND /OR SPECIFICATION IS APPROVED BY • DEPT. DATE DRAWN R.'BECHT CHECKED D. GEONANGA ENGINEER D. GEONANGA CHECKED G. SMITH APPkOVED P. LONG APPROVED 04 - 14 - 93 SUBTITLE TITLE EQUIPMENT SCHEDULES BUILDING 2 -80 MECHANICAL MASTER PLANT 2 LEGEND 1. SEE SHEETS M1G, M1b AND M1c FOR MECHANICAL LEGEND AND ABBREVIATIONS. GENERAL NOTES E> DRAW -THRU UNIT, TOP HORIZONTAL DISCHARGE. AIRFOIL, BACKWARD INCLINED, DWDI, BELT DRIVE. UNIT SHALL BE WEATHERPROOFED FOR OUTDOOR INSTALLATION. SWSI, AIRFOIL, BACKWARD INCLINED CLOCKWISE ROTATION, TOP WITH VARIABLE SPEED BOTTOM HORIZONTAL DISCHARGE, BELT DRIVE. ® SWSI, AIRFOIL, BACKWARD INCLINED CLOCKWISE ROTATION, BOTTOM HORIZONTAL DISCHARGE, BELT DRIVE WITH VARIABLE SPEED MOTOR, UNIT SHALL BE WEATHERPROOFED FOR OUTDOOR INSTALLATION. 5TY DRAW THRU, HORIZONTAL DISCHARGE FC FAN, FAN ONLY, WITHOUT RETURN FAN. TOP INTAKE, BELT DRIVE, ECONOMIZER AND FILTERS. PROVIDE WITH COMBINATION MIXING BOX AND VEE FILTER SECTION. WITH 6" FLAT FILTER SECTION. DRAW THRU UNIT, DOWN DISCHARGE AIRFOIL, ARD CLI I, DWD1, BELT DRIVE. MO2- 0.6 CITY OF TUY,WIIA APPROVED JUL - 8 2002 AS NOTED is�a `,rtsot� DRAWN: C ECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEEP RECEIVED CITY OF TUKWILq JUN 1 7 2002 PERMIT CENTER ISSUED FOR CONSTRUCTION REVISIONS BY Harris Group Inc. M2a Jos ND. PL -2 -92064 DWG N0. 2 =80 -M2 REVISION " B" ONLY DATE PROJECT 5.01.02 11081.00 ENGINEER: CHECKED: MLD RB ATE 5.01.02 COMP NO. AIR DIFFUSER / REGISTER / GRILLE (AIR) SCHEDULE MARK NUMBER TYPE MATERIAL FINISH INLET /NECK S(IZE, (INCHES) FACE SIZE (INCHES) MAX. TP INCH WG. MAX. NOISE COEFFICIENT MAXIMUM SET CM REMARK m M. SQUARE CEILING DIFFUSER STEEL ED 125 24x24 .033 - 300 THUS MODEL MCD BORDER TYPE 3 CD 2 SQUARE CEILING DIFFUSER STEEL Eii> 16x16 24x24 .059 14 700 ITUS MODEL MCD BORRER TYPE 3 (T SQUARE CEILING DIFFUSER STEEL 1 ' 15 "0 24x24 .055 25 860 TITUS MODEL TMS m v SQUARE CEILING DIFFUSER STEEL 1� 20x20 24x24 .059 16 1300 TITUS MODEL MCD BORDER TYPE 3 All IEI/ SQUARE CEILING GRILLE STEEL 7 30x30 31 3/4x31 3/4 .017 20 3200 TITUS AERO BLADE SERIES MODEL 272RS - w_ SQUARE CEILING GRILLE -- -- STEEL _ - (3) -24x36 10x10 24, �� - , $1 TITUS MODEL MCD, BORDER TYPE 3 0 SQUARE CEILING DIFFUSER STEEL 10 "0 24x24 .037 14 330 BORDER O TYPE T 3 S 0 v SQUARE CEILING DIFFUSER STEEL 1 8 "0 24x24 .049 15 250 TITUS MODEL TMS BORDER TYPE 3 0 SQUARE CEILING DIFFUSER STEEL 10 "0 24x24 .05 14 350 BORMODEL ID CEILING DIFFUSER STEEL OFF WHITE OFF WHii 48 ° NECK x 11 1/8 .062 12 200 TITUS MODEL TMR826 EAST HIGH BAY v SIDEWALL SI 'L' 'IL S 36x12 37 1/4x13 1/4 .011 3020 880 MODEL 272RS U © SIDEWALL SUPPLY GRILLE STEEL l' 14x12 15 3/4x14 3/4 .058 1.36 750 TITUS SERIES ODEL 272RS ilk SIDEWALL SUPPLY GRILLE STEEL 36x12 37 1 4x13 1 4 / / .01 44 880 ' TTTODEUS L RO RS BLADE SERIES > NOT USED AE 272 M 0 SUPPLY GRILLE STEEL OFF WHITE 72x10 - .01 (1) -24x36 400 TITUS MODEL 272RL © SUPPLY GRILLE STEEL OFF WHITE - 6x6 .016 30 100 SURFACE MODEL 30ORS SURFACE MOUNT, BORDER TYPE 1 0 SUPPLY DIFFUSER • STEEL OFF WHITE 16 - 01 30 725 TiTUS MODEL TMRA SURFACE MOUNT m v SUPPLY DIFFUSER STEEL OFF WHITE 6x6 - Ot 30 TITUS MCD 100 SURFACE MOUNT 0 © SUPPLY DIFFUSER STEEL OFF WHITE 8x8 - .01 30 250 TITUS MODEL MCD SURFACE MOUNT 0 CEIUNG SUPPLY GRILLE STEEL 30(24 7 3 'x25 4 .015 <i2 2760 iiTUS AERO BLADE SERIES 0 v DISCHARGE GRILLE ALUM OFF WHITE 12x10 72x10 .006 11 TITUS MODEL 50F, EGG CRATE GRILLE, SURFACE 350 • MOUNT, STD CORE, CLEAN ROOM DISCHARGE 0 © DISCHARGE GRILLE ALUM OFF WHITE 8x6 8x6 Ot 10 TITUS MODEL 50F, EGG CRATE GRILLE, SURFACE 100 MOUNT, SD CORE, VESTIBULE DISCHARGE - i 4 ��'∎∎-���II`��* CEILING EXHAU RE ER EEL 48x20 41 71/16x20 11/16 WW .165 \Aa 29 82 0 AG -15 OPPOSE BLADE DAMPER SURFACE MOUNT 0 CEILING RETURN REGISTER STEEL 1� 48x14 49 11 / 16x20 11/16 .020 20 1 350 TITUS EGGCRATE RETURN MODEL 50F WITH AG -15 OPPOSE BLADE DAMPER SURFACE MOUNT 0 CEILING RETURN GRILLE STEEL i� 72 x72 13 11 16x73 11 16 / / .033 10 350 TITUS EGGCRATE RETURN MODEL 50F WITH AG -15 DAMPER. LAY -IN MOUNT 0 CEILING RETURN GRILLE STEEL C> 48x24 3/4x23 3/4 47 3 3 4 / .01 18 2200 TITUS EGGCRATE RETURN MODEL 50E WITH AG -15 DAMPER. LAY -IN MOUNT 0 EXHAUST GRILLE S TEEL I 50x26 ] Si 11/16x27 11/16 .238 31 8400 RETURN MODEL 50F. SURFACE MOUNT. 0 GRILLE STEEL 1-. 50x20 Ni 51 71/16x21 11/16 .016 18 2240 EGGCRATE RETURN MODEL 50F. URF EXHAUST SURFACE MOUNT. Q RETURN GRILLE STEEL OFF WHITE 32x20 - .0 30 3000 TITUS MODEL 30R SURFACE MOUNT 0 RETURN GRILLE STEEL OFF WHITE 6x6 - O1 30 100 TRUS MODEL 25RL © RETURN GRILLE STEEL OFF WHITE 12x12 - .01 30 500 TITUS MODEL 30RL A REURN RIL STEEL OFF WHITE x6 0 TiTUS MODEL 30RL 0 RETURN GRILLE STEEL OFF WHITE 24x48 013 10 2000 TITUS MODEL 50E, EGG CRATE STYLE, LAY IN BORDER, STANDARD CORE v RETURN GRILLE STEEL OFF WHITE _ 24x24 .013 10 1500 TIES MODEL 50E, EGG CRATE STYLE, LAY IN BORDER, STANDARD CORE (LSAF CUSTOMER OFFICE) 0 RETURN GRILLE STEEL OFF WHITE 12x12 .013 14 200 TITUS MODEL 23RL, SURFACE MOUNT CLEAN ROOM RETURN 0 RETURN GRILLE ALUM OFF WHITE 8x6 8x6 01 10 100 STD CORE, VESTIBULE CLG & TITUS MODEL MRESTROOM 1600 (OR EQUAL) AN 6 • TITUS MODEL 272FL5 0 TRANSFER GRILLE OFF WHITE 12x8 .002 20 100 TITUS MODEL WOOL, EGG CRATE STYLE, SURFACE MOUNT W /AUXILLIARY FRAME, VESTIBULE DOOR SOUND ATTENUATOR (SA) SERVICE SCHEDULE ATTENUATOR BANK SIZE LENGTH FEET QUANTITY W I (INCHES) • 20 MAXIMUM IN/H20 MAX '" EPM AIR QUANTITY MINIMUM OE A OUSTICRRATING dB 12 W ROWS MARK NUMBER APPROX (LOS) REMARKS RATING 63 125 250 • 500 1000 2000 4000 8000 0 AHU -1 3'- 0 "x4' -0" 10 (i) -36x48 0.19 450 5400 - 21 30 48 53 53 45 34 22 310 IAC MODEL LS v RE -1 2'- 0 "x4' -0" 7 (7) -24x48 0.30 675 5400 - 15 25 43 48 49 35 26 18 260 AC MODEL LFS 0 EF -1 ;'- 0"x6' -0" 7 (3) -24x36 1.28 1389 25000 - 16 26 44 49 50 35 25 17 920 IAC MODEL LS 4 e AHU -2 2'- 0 "x3' -0" 10 (1)- 24x36 . 0.90 1066 6400 - 21 29 47 53 53 46 36 23 310 IAC MODEL IFS RE -2 2' 0"x3' - 0" 10 (1)-24x36 0.90 1066 6400 - 23 33 50 52 52 45 3020 310 IAC MODEL LFS EF -2 3'- 0 "x6' -0" 10 (3) -24x36 1.36 1389 25000 - 22 32 48 52 52 44 28 18 920 IAC MODEL LFS SA AHU -1A 2•- 0 "x3' -0" 7 (1) -24x36 0.32 686 4120 - 13 24 40 48 49 35 28 18 310 IAC MODEL LFS 0 v AHU -2A 3'- 0'x4' -0" 10 (2)- 24x36 0.82 1008 12100 - • 21 29 47 53 53 46 36 23 610 IAC MODEL IFS AHU -4 2'- 0 "x3' -0" 7 (1) -24x36 0.67 1000 6000 - 16 26 44 49 50 35 25 17 310 INC MODEL LS 0 AHU -4 2' 0'x3' - 0" 7 (1)- 24x36 0.67 1000 6000 - i6 26 44 49 50 35 25 17 310 IAC MODEL LFS Ain lir AHU -3 2'- 0 "x4' -0" 5 (1) -30x48 - 0.81 1133 6800 - 16 21 35 41 41 28 20 14 260 IAC MODEL IFS ELEC SHOP / 1163 - - - - - - - - - - - 35 -40 NC REQ'D - LIBRARY/ 21DB22 - - - - - - - - - - - - - - 30 -35 NC REQ'D COOLING COIL (CC) SCHEDULE MARK NUMBER UNIT SERVED CM COIL FACE AREA SQ. FT. TOTAL MBH EAT 'F LAT 'F MAX. WATER ROWS FINS PER INCH COIL CONN. IN MAX. PRESSURE DROP REMARKS DB WB DB- .. WB EWT'F LWT'F GPM AIR - IN WG. TUBE -FT H ® 0 AHU -1 5400 13 180 73.6 58.2 46.4 45.4 42 52 36 10 10 1:5 0.94 4.47 PACE COIL MODEL N0. 1010 CW- 36.0X52. A -23/10 v AHU -2 8400 13 216 73.7 59.6 48:0 47.0 42 52 43 8 10 2.0 1.12 4,62 PACE COIL MODEL NO. 810 CW- 36.0X52. A23/10 AHU -3 6680 76 240 73.8 57.9 48.0 47.0 42 52 48 6 10 2.0 59 8.75 PACE COIL MODEL NO. CC AHU -DD -11 9000 16.8 233.8 78 64 59 55.4 45 55 47 4 9 2.0 0.47 8.5 COIL INSIDE AHU -DD -11 1 AC -GH /15 853 I:I:1 1 111 '1 INTAKE /EXHAUST AIR PENTHOUSE SCHEDULE - INTF MARK NO. LOCATION SERVICE DIM. INCH CM MANUFACTURER /MODEL REMARKS LENGTH WIDTH HEIGHT PH -2 ROOF 25.4/1 CHILLER ROOM 36 32 24 3100 RUSKIN - PH -3 ROOF 17.5/2 EF -03 80 • 48 36 7880 RUSKIN - PH -4 ROOF 17.5/2 EF -04 24 24 18 865 RUSKIN - PH -5 ROOF 19/3.5 AHU -3 BLDG 2 -80 72 42 36 6680 RUSKIN PH -6 ROOF 19/3.5 AHU -3 BLDG 2 -80 72 42 36 6680 RUSKIN - FIRE / SMOKE DAMPERS MARK NO. SERVICE SIZE MANUFACTURER / MODEL REMARKS WXH(IN) FSD -6 E. CORRIDOR 14/14 RUSKIN, MODEL FSD 60 AHU DD -11, (MAKE FSD -10 ELEVATOR MACHINE RM 12/12 RUSKIN, MODEL FSD -60 BLDG 2 -80 (1M15) FSD15 ELEVATOR 10/10 RUSKIN, MODEL FSD -60 3'-0" SD16 LIBRARY 18/18 RUSKIN, MODEL FSD -60 (DE /12) F55 -17 N.E. CORRIDOR 18/18 RUSKIN, MODEL FSD -60 FSD -18 LOBBY 10/10 RUSKIN, MODEL FSD -60 BLDG 2 -80 INTAKE /E(HAUST AIR PENTHOUSE SCHEDULE - LSAF MARK SERVICES LOCATION DIMENSIONS PERCENT FREE AREA REMARKS W L H ® owl i) AHU DD -11, (MAKE R OOF 2' 0" 4' -6" 3' - 0" 54 RUSKIN' PHM, 24 THROAT OPENING x 36" HIGH WITH MODEL ELF 375X STATIONARY LOUVERS 2 SIDES, 24 "x54" ® (DE /12) AHU- DD -11, IXHAUST R OOF 3'-0" 6' -0" 3'41" 54 RUSKIN PHM, 36 "x72" THROAT OPENING x 36" HIGH WITH MODEL ELF 375X STATIONARY LOUVERS 2 SIDES, 36 ° x72" (DE /12) AHU- DD -11; EXHAUST DUCT 3'- 0 6' -0" RUSKIN CD60 LOW LEAKAGE CONTROL DAMPER, AIR FOIL BLADES ISSUE FOR CONSTRUCTION UPDATE EQUIPMENT SCHEDULE REVISED SCHEDULES LSAF RECONFIGURATION LSAF CONTROL ROOM. REVISION J #982188 BY DG OHM HGI /LJC J #711975 HGI /MLD APPROVED DATE SYR GS/ KR KR MP 10.15.93 7.28.00 5.01.02 REVISION BY APPROVED DATE p rateyrAveo ° NOTE: 1. PROVIDE ACCESS DOOR(S) ON EAST SIDE FOR ACCESS TO MOTOR OPERATED DAMPERS LOCATED AT ROOF. i EXPIRES 1 2/1$/6 AR CCEPTABILITY THIS DESIGN AND /OR SPECIFICATION: IS APPROVED APPROVED BY DEPT. DATE DRAWN K. BUN BFEDRED D. GEONANGA ENGINEER D. GEONANGA CHECKED G. SMITH APPROVED K. RAMSEY APPROVED P. LONG ATE 04 - 14 - 93 SUBTITLE TITLE MECHANICAL MASTER EQUIPMENT SCHEDULE BUILDING 2 -80 LEGEND Tv\ 0 a aw (0 1. SEE SHEETS M10, M1b Sc M1c FOR MECHANICAL LEGEND AND ABBREVIATIONS. GENERAL NOTES COORDINATE WITH ARCHITECTURAL FINISH. PLANT 2 DIY Of TUKWI.A APPROVED JUL - 8 2002 AS NOTED ISSUED FOR CONSTRUCTION 7n!L y� / � / DRAWN: K : WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB NO DWG N0. REVISIONS BY Harris Group Inc. M2b PL -2 -92064 REVISION "D" ONLY 2 -80 -M2b RECEIVED CITY OF TUKWIIA JUN 1 7 2002 PE.:T CENTER DATE PROJECT 5.01.02 11081.00 ENGINEER: CHECKED:. MLD RB DATE 5.01.02 COMP N0. PLUMBING FIXTURE CONNECTION SCHEDULE MARK NUMBER DESCRIPTION CONNECTION (INCHES) TYPE REMARKS : ' SAN VENT HW CW 0 FLOOR DRAIN 2 2 -- LWT DEG F AO SMITH SERIES 212 O; SHALLOW BODY ® AX FLOOR DRAIN 2 2 1550 1/12 DIRECT AO SMITH SERIFS 2120, SHALLOW,BODY ® 160 FLOOR DRAIN 2 1 1/2 -- UH1 - D I . - ✓ ° ® ! 1 FLOOR DRAIN 2 1 1/2 -- 4.7 - fi✓ 0 0 FLOOR DRAIN 2 2 1/25 -- - 180 17 AIX 0o: DP: DAYTON, MODEL 1H20201 STEAM HOT HEATER WATER CONVERTED TO - WALKWAY z . - l ! 1550 1/25 All FUNNEL DRAIN 1 1/2 ' 1 1/2 -- - f' e CLEAR WATER DRAIN, SERVES AHU -DD -11 v ' 1 w •■■■■ WATER CLOSET 1070 1/8 DIRECT 56.0 ' - II G US' VA rE ) ''ND AP P -2 URINAL 2 1 1/2 - /4 WALL -HUNG FLUSH VALVE (H) HANDICAP P -3 LAVATORY 1 1/2 1 1/2 1 1/2 COUNTER TOP - RECESSED (H) HANDICAP P -4 MOP SINK 3 2 1/2 - 1/2 - - P -5 SHOWER 2 1 1/2 1/2 1/2 - - P -6 DRINKING FOUNTAIN _ 2 1 ',1/2 180 1/2 - 0.45 LAV -1 LAVATORY 1 1/2 1 1/2 1/2 1/2 WALL HUNG .- (H) HANDICAP SS -1 FLOOR K 3 1 1/2 1/2 1/2 - (H) HANDICAP S -2 INK 2 1 1/2 1/2 1/2 COUNTER TOP RECESSED (H) HANDICAP URN -1 URINAL 2 2 - 1 WALL -HUNG FLUSH VALVE (H) HANDICAP WC-1 WATER CLOSET 4 2 1 WALL -HUNG FLUSH VALVE (H) HANDICAP UNIT HEATER SCHEDULE - HOT WATER MARK NO. SERVICE FAN HOT WATER HEATING MANUFACTURER /MODEL REMARKS EVAPORATOR COIL HEATING COIL CFM RPM MOTOR HP DRIVE COIL CAPACITY MBH EWT DEG F LWT DEG F GPM MAX WPD FT RPM MOTOR BHP UH1 -01 (0.1/18.8) CENTRAL BUILDUP AND COMMON AREA 1120 1550 1/12 DIRECT 41.1 180 160 4.7 0.8 MODINE, MODEL HS -63 NOTE 1, 2 UH1 - D I . C TR' BU DUP AND COI ON ARF 0 5 0 1 DI: CT 41. 1:1 1.D 4.7 0.8 •1IN MODEL HS -6 NOTE UH -1 (DA /15) WALKWAY 365 1550 1/25 DIRECT 21.4 180 160 1.5 - DAYTON, MODEL 1H20201 STEAM HOT HEATER WATER CONVERTED TO UH -2 (DA -12) WALKWAY 365 1550 1/25 DIRECT 21.4 180 160 1.3 - MODINE, MODEL HS -18L TO STEAM HOTHWA.TER CONVERTED UH -DE /16 (DE.5/16) LSAF HIGH BAY - WEST 1528 1070 1/8 DIRECT 56.0 180 160 5.7 0.31 TRANE, MODEL 102P W/ LOUVER CONE DIFFUSER W/ LOUVER CONE DIFFUSER UH -DH /16 (DG.5 /16) LSAF HIGH BAY - WEST 1528 1070 1/8 DIRECT 56.0 180 160 5.7 0.31 TRANE, MODEL 102P Uhl -DB/11 (DB/11.6) LSAF HIGH BAY - EAST 1790 1100 1/8 DIRECT 68.6 180 160 7.0 0.45 TRANE, MODEL 122P NOTE LOUVER CONE DIFFUSER UH -DB /9 (DB.5/9.6) LSAF HIGH BAY - EAST 1790 1100 1/8 DIRECT 68.6 180 160 7.0 0.45 TRANE, MODEL 122P NOTE ,' 3, LO CONE DIFFUSER UH -DE /9 (DE.3/9.5) LSAF HIGH BAY - EAST 1790 1100 1/8 DIRECT 68.6 180 160 7.0 0.45 TRANE, MODEL 122P NOTE 2, 3; W/ LOUVER CONE DIFFUSER AIR CONDITIONING UNIT SCHEDULE MARK SERVICE LOCATION TYPE SUPPLY FAN COMPRESSOR EVAPORATOR COIL HEATING COIL FILTERS CONDENSER ELECT. CHAR. BASED ON REMARKS CFM TOTAL O.A. O.A a w vi ? 3 WHEEL OIA RPM MOTOR BHP MOTOR Hp NOM. TOTAL TON QUAN. FLA (EA) TOT. MBH SENS. MBH ENT AIR LVG AIR FACE AREA SQ.FT. REFRIG. TYPE TEMP TYPE MBH E.A.T. L.A.T. KW VOLTS PHASE HZ. TYPE FACE • AREA SQ.FT. ANB. AIR TEMP LOW A TE QUAN. HP(EA) SYSTEM VOLTS PHASE HZ. MAKE MODEL DB WB DB WB AC -1 CRU DB /16 ELECTRICAL ROOM VERTICAL AIR COOLED 4800 - 1.0" . 0 823 1.76 2 15 2 12.4 140 125 29.6 1.3 .58 .30 RIGHT R -22 - - - - - - - 1 THROW AWAY 16.6 - - - - 37 460,/3/60 TRANE SRUB -C154 15 TON NOMINAL FAN TERMINAL UNIT SCHEDULE - HOT WATER EQUIPMENT TAG INLET. SIZE IN. SUPPLY AIR CFM REQ'D MAX. INLET SP IN OF WTR FAN HP CAPACITY MBH GPM MAX WPD FT OF WTR MAX APD IN OF WTR CONTROL PANEL ACCESS REMARKS MAX MIN FT -2 -36 8 750 300 0.50 1/4 12.2 1.20 .1 .06 LEFT 1,2,3,4 FT -2 -37 6 580 230 0.50 1/6 9.4 0.90 .1 .04 LEFT 1,2,3,4 . .+.� FT -2 -39 - 4.0 I ' I I 3 I I 1/30 .01 _ - 1 180 ..a. 12 1500 500 1.0 1/3 29.6 1.3 _.1 . 8 . 0 RIGHT 1,3,4,5,7 FT -2 -40 12 1500 500 1.0 1/3 29.6 1.3 .58 .30 RIGHT 1,3,4,5,7 FT -2 -41 14 2000 500 1.0 1/2 32.9 1.3 .58 .35 RIGHT 1,3,4,6,7 FT -2 -42 14 2000 500 1.0 1/2 32.9 1.3 .58 .35 RIGHT 1,3,4,6,7 CABINET UNIT HEATER SCHEDULE - HOT WATER MARK NO. SERVICE FAN HOT WATER HEATING MANUFACTURER /MODEL REMARKS SIZE CONNECTION TYPE CPU MOTOR HP DRIVE COIL CAPACITY MBH EWT DEG F LWT DEG F GPM MAX WPD FT 1" THREADED CUH -04 NORTH STAIRWELL 85 1/30 DIRECT 4.63 180 160 0.46 7.0 INTERNATIONAL FSY -C2 NOTE 1 U. -0 O• TOOL BOX 165 1 30 DIRECT 3.14 1:i 160 0.3 4.0 INTERNATIONAL FSY -C2 N� CUH -06 SOUTHEAST VESTIBUL 50 1/30 DIRECT 2.76 180 160 0.28 0.1 INTERNATIONAL FSY -C2 NOTE 1, 2 STEAM PRESSURE REDUCING VALVE SCHEDULE EQUIP NO. LOCATION SERVES CAPg Ib h IN LET OUTLET PRESSURE SIZE CONNECTION TYPE MANUFACTURER PRESSURE PRV -1 COL 18/DB.9 HEX -1 HEX -2 2000 125 PSIG 30 PSIG 1" THREADED ARMSTRONG PRV -2 COL 18/DB.9 HEX -1 HEX -2 4000 125 PSIG 27 PSIG 1 1/2" THREADED ARMSTRONG PRV -3 COL 18/DB.9 HEX -1 HEX -2 2000 30 PSIG 15 PSIG 2" FLANGED ARMSTRONG PRV -4 COL 18/DB.9 -2 1 HHEX IX- 4000 30 PSIG 13 PSIG 3" FLANGED ARMSTRONG HEAT EXCHANGER SCHEDULE EQUIP Na LOCATION SERVES' EWT DEG F LWf DEG : F MBH GMP HOT SIDE DELTA P PSIG COLD SIDE DELTA P PSIG CONTROL VALVE DELTA P PSIG WEIGHT LBS. MANUFACTURER MODEL HEX-1 EQUIPMENT ROOM COL 18/DB.9 HEATING WATER SYSTEM 160 180 ' 3000 300 1.7 0.4 9 400 B &G SU-124-2 HEX -2 EQ R 0 M DOME RHOT 50 120 1750 50 0 . 2 0.4 - 700 CEMLINE H1OSEH103 VAV TERMINAL UNIT SCHEDULE - HOT WATER EQUIPMENT TAG INLET- SIZE IN. SUPPLY AIR CFM REQ'D MAX. INLET SP IN OF WTR FAN HP CAPACITY MBH GPM MAX WPD FT OF WTR MAX APD IN OF WTR CONTROL PANEL ACCESS REMARKS MAX MIN VAV -1 . ' 10 800 150 1.0 " - 20.1 1.7 .51 .26 RIGHT 1,2,3,4,5 AIR COOLED CONDENSER SCHEDULE MARK SERVICE LOCATION NOM TONS HEAT REJECT NO. FANS HP EACH A . A . T . LOW AMB REFRIG TYPE ELECT. CHAR. MIN. AMPS BASED ON REMARKS MAKE I MODEL C -1 AC -1 GRADE 15 161 MBH 3 3/4 95 OF R -22 460/3/60 9 TRANE CAUC -C154 AIR SEPARATOR SCHEDULE MARK NO. SERVES FLOW GPM CONN SIZE MANUFACTURER REMARK AS -1 HEATING HOT WATER SYSTEM 300 6" B &G WITH STRAINER SYM A NOTES: RECORD DRAWING LSAF CONTROL ROOM 1. UNIT HEATERS WERE SIZED BASED ON MODINE, MODEL HS -XX. EQUIVALENT OR GREATER THAN UNIT HEATERS MAY BE SUBMITTED FOR APPROVAL BY THE ENGINEER. 2. L UN HEATER_ FANS ARE: 120 VOLTS, 1- PHASE, 60Hz. 1 ' LL FAN OTORS ARE: 120 VOLTS 1- PHASE, 60Hz. 1. CONTROL PANEL ACCESS LOCATION IS BASED ON FACING OUTLET OF FAN TERMINAL BOX. 5. FAN POWERED VAV BOXES WERE SIZED BASED ON TRANE, MODEL VPWF1204. 2. FAN POWERED VAV BOXES WERE SIZED BASED ON TEMPMASTER, MODEL HVFS. 6. FAN POWERED VAV BOXES WERE SIZED BASED ON TRANE, MODEL VPWF1405. 3. SOUND NOISE CRITERIA (NC) IS BASED ON ARI STANDARD 880 -89. 7. VIBRATION ISOLATORS. 4. 277V / 1PH / 60HZ REASON J #972197 -00 J#711975 BY HGI /LJC HGI /MLD APPROVED DATE 7.28.00 5.01.02 SY REVISION APPROVED DATE p antaisrma ' NOTE: 1. CONTROL PANEL ACCESS LOCATION IS BASED ON FACING OUTLET OF FAN TERMINAL BOX. 2. SOUND NOISE CRITERIA (NC) IS BASED ON ARI STANDARD 880 -89. 3. 277V / 1PH / 60HZ - 4. POWERED VAV BOX SIZED BASED ON TRANE, MODEL. VCWF10 - -. 5. VIBRATION ISOLATORS. S 41- I EXPIRES 12/13/43 fi'a,VW arizy ACCEPTABILITY THIS.. DESIGN AND /OR SPECIFICATION IS APPROVED PROVED BY DEPT. DATE DRAWN K. ELLIOTT CHECKED S. FRANKLIN HN61NEtK C. MARS CHECKED C. MAAS APPROVED L COSTELLO APPROVED DATE 7.28.00 7.28.00 7.28.00 7.28.00 7.28.00 SUBTITLE TR MECHANICAL MASTER EQUIPMENT SCHEDULE BUILDING 2 -80 PLANT 2 RECEIVED CITY OF TtIXWILp JUN 1 7 2002 PERMIT CENTER MIMED JUL -8 TROD !S NOIED 6 slo ISSUED FOR CONSTRUCTION /p2 DRAWN: CH CKED: WJB• WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB N DWG NO. REVISIONS BY Harris Group Inc. M2d 972197 -00 REVISION "A" ONLY 2 -80 -M2d DATE 5.01.02 ENG NEER: MLD DA COMP NO. PROJECT 11081.00 CHECKED: RB 5.01:02 I PUMP SCHEDULE PUMP NO LOCATION SERVES FUNCTION GPM HEAD FEET RPM HP ELECTRICAL WEIGHT LBS. MANUFACTURER MODEL REMARKS VOLTS PHASE Hz 5 90 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 3 HC -3 F & T 1 5 105 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 4 4 HC -4 F T 1 5 885 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 5 DRIP LEG INVERTED! 1 BUCKET 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. r DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. ST 7 DRIP LEG INVERTED BUCKET 1 P -4 SANITARY SEWER PUMP COL 8.5 /DC.5 LSAF RESTROOM SANITARY SEWER TRANSFER 32 6 3,450 2 480 3 60 SERVICE BARNES XSGV DUPLEX SYSTEM, EAST SIDE 2 -80 BLDG REMARKS ST -8 DRIP LEG 1/2" STEAMGUARD SG -B -02 11.28 ST -9 COIL 3/4" STEAMGUARD SG -B -09 234.7 ST -10 - P -5 CHILLER OOM COL 18.8�DA.14 AHU'S SECONDARY CHILLED WATER PUMP 1,100 70 1,760 30 480 3 60 1,105 TACO TA1524 DOUBLE SUCTION SPLIT CASE WITH VFD P-6 CCHILLER 18.8 gal OM OL AHU'S SECONDARY CHILLED WATER PUMP 1,100 70 1,760 30 480 3 60 1,105 TACO TA1524 DOUBLE SUCTION SPLIT CASE WITH VFD P -7 MECH EQUIP ROOM COL 18/DB.9 AHU'S UH &' FT BOXES HEATING HOT WATER PUMP 300 70 1,760 10 480 3 60 440 TACO FE3010 BASE MOUNTED END SUCTION WITH VFD P -8 MECH EQUIP ROOM COL 18/DB.9 AHU'S UH & FT BOXES HEATING HOT WATER PUMP 300 70 1,760 10 480 3 60 440 TACO FE3010 BASE MOUNTED END SUCTION WITH VFD P-9 MECH EQUIP ROOM COL 18/D13.9 HOT WATER RECIRC DOMESTIC RECIRC. HOT WATER 10 20 1,760 1/2 120 1 60 20 B &G - IN -LINE CIRCULATING SUPPLIED BY HEX -2 VENDOR STEAM TRAP (ST) SCHEDULE MARK NUMBER SERVICE TYPE DIFF. PRESSURE (PSIG) OPERATING PRESSURE (PSIG) CAPACITY LBS /HR (MIN) REMARKS ® HC -1 F & T 1 5 60 . ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST HC -2 F & T 1 5 90 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 3 HC -3 F & T 1 5 105 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 4 4 HC -4 F T 1 5 885 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 5 DRIP LEG INVERTED! 1 BUCKET 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. ST 6 DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. ST 7 DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. 26 70.2 - 8 234.7 30 - TAG NO SERVICE SIZE MFR MODEL NO REMARKS ST -8 DRIP LEG 1/2" STEAMGUARD SG -B -02 11.28 ST -9 COIL 3/4" STEAMGUARD SG -B -09 234.7 ST -10 - 1/2" STEAMGUARD SG -B -03 6 ST -11 COIL 3/4" STEAMGUARD SG -B -11 AHU -4 12000 19.1 530 285 69.4 - 8 234.7 295 - - - HEATING COIL (HC) SCHEDULE - STEAM AND HOT WATER MARK NUMBER UNIT SERVED CFM COIL FACE AREA SQ. FT. COIL FACE VELOCITY (FPM) TOTAL MBH (MIN) EAT 'F LAT 'F STEAM HOT WATER Na OF ROWS (MIN) FINS PER INCH COIL CONN. IN PRESSURE DROP REMARKS DB DB PSIG TEMP LBS /HR GPM EWT DEG F LWT DEG F AIR -IN WG MIL AHU -1 5400 9.75. 415 16 70.5 - 8 234.7 20 - - - 1 6 1 1/2" 0.05 PACE MODEL #61L SD -6X52 W AM AHU 2 6400 10.83 492 26 70.2 - 8 234.7 30 - - - 1 6 1 1/2" 0.06 PACE MODEL #61L SD -6X52 W MIL AHU -3 6680 11.28 430 30.4 69.3 - 8 234.7 32 - - - 1 6 1 1/2" 0.03 PACE MODEL #61L SD 6X57 v m AHU -4 12000 19.1 530 285 69.4 - 8 234.7 295 - - - 1 6 2" 0.08 PACE MODEL #61 L SD- 37.5X68 v HC AHU -DD -11 9000 16 563 226 60 83 - - - 23 180' 160' 1 - 1 1/2" 1.41 - D-11 TEMPERATURE CONTROL VALVE (TCV) SCHEDULE MARK NUMBER EQUIPMENT SERVED SERVICE ACROSS VALVE (PSI) CAPACITY OR LBS /HR SIZE (INCHES) CV REMARKS ASCO 8342G1 AHU -1 CHILLED WATER 5 36 (GPM) 1 1/4 16 MODULATING PNEUMATIC ACTUATOR ® (TCV) AHU -1 STEAM 7 20 LBS /HR 1/2 0.58 MODULATING PNEUMATIC ACTUATOR VALVE, GLOBE, 6 ", AIR OPERATED AHU -2 CHILLED WATER 5 43 (GPM) 1 1/2 19 MODULATING PNEUMATIC ACTUATOR 0 K CV4/ \ _ \ AHU -2 STEAM 7 30 LBS /HR 1/2 0.72 MODULATING PNEUMATIC ACTUATOR © AHU -3 CHILLED WATER 5 48 (GPM) .1 1/2 21.2 MODULATING PNEUMATIC ACTUATOR AHU -3 STEAM 7 35 LBS /HR 1/2 1.10 MODULATING PNEUMATIC ACTUATOR 0 AHU -4 STEAM 7 295 LBS /HR 7,g MODULATING PNEUMATIC ACTUATOR AHU -DD -11 HOT WATER 8 23 (GPM) 1 7,8 MODULATING PNEUMATIC ACTUATOR AM AHU -DD -11 CHILLED WATER 6 39 (GPM) 1 9.1 MODULATING PNEUMATIC ACTUATOR 300# COMPRESSED AIR CONTROL VALVE SCHEDULE - LSAF MARK NUMBER DESCRIPTION PART NUMBER CV- 2_LSAF VALVE, 4 -WAY 2 -POS, 120VAC SOLENOID ASCO 8342G1 CV- 3_LSAF VALVE, 4 -WAY 2 -POS, 120VAC SOLENOID ASCO 8342G1 CV- 4_LSAF VALVE, 4 -WAY 2 -POS, 120VAC SOLENOID ASCO 8342G1 V- 0_INTF VALVE, GATE, 12" MANUAL Hz V- 1_LSAF VALVE, GATE, 12" MANUAL I L3 V- 2_LSAF VALVE, BUTTERFLY, 10 ", AIR OPERATED LSAF RESTROOMS CONTROL ROOM V- 3_LSAF VALVE, BALL, 3 ", AIR OPERATED DUAL E EMENT 4000}4000 V- 4_LSAF VALVE, GLOBE, 6 ", AIR OPERATED 3. V- 6_LSAF VALVE, AIR OPERATED FISHER VEEBALL V- 7_LSAF VALVE, 3 ", HYDRAULICALLY OPERATED FISHER V- 8_LSAF VALVE, 3 ", HYDRAULICALLY OPERATED FISHER V- 9_LSAF VALVE, AIR OPERATED FISHER VEEBALL WATER HEATER SCHEDULE MARK NO. LOCATION SERVES CAPACITY RECOVERY ELEMENT WATTAGE MANUFACTURER/MODEL EL L MANUFACTURER MODEL REMARKS VOLTS BHp Hz L1 I L2 I L3 m LSAF MEZZANINE COL. DC 10 LSAF RESTROOMS CONTROL ROOM 40 GAL. 30 GPH DUAL E EMENT 4000}4000 4.7 480 3. 60 14.4A 8.3A 8.3A A.O. SMITH DEL -40 - 0 180 160 21 72 144 15.0 10 TEMTROL FC -10 FAN COIL UNIT SCHEDULE - HEATING MARK NO. SERVICE LOCATION FAN FILTERS HOT WATER HEATING COIL MANUFACTURER/MODEL T -1 CHILLOL ER 7/B1OOM 8 C CHILLED WATER SYSTEM CFM E.S.P. in W.C. FAN RPM BHp MOTOR HP DRIVE 7 EFFICIENCY EWT DEG F LWT DEG F EAT DEG F LAT DEG F CAPACITY MBH GPM MAX WPD FT W 4.7 FCU -01 CHILLER ROOM CHILLER ROOM COL 20 OO 2600 1.0 1241 1.52 2.0 BELT 30 180 160 21 72 144 15.0 10 TEMTROL FC -10 EXPANSION TANK SCHEDULE - 2 -80 CHILLER ROOM EQUIP NO. LOCATION SERVES CAPACITY GALLONS WEIGHT LBS. MANUFACTURER MODEL T -1 CHILLOL ER 7/B1OOM 8 C CHILLED WATER SYSTEM 53 550 B &G B -200 T -2 CHILLER ROOM COL 18/2.7 HEATING WATER SYSTEM 105 1000 B &G B-400 T -3 CHILLER ROOM COL 18/2.7 DOMESTIC HOT WATER 4.7 53 AMTROL ST -12 -C SYM A NOTE: * 1750 RPM, 480 VOLTS, 3- PHASE, 60Hz. NOTES: 1. PUMP WEIGHT DOES NOT INCLUDE THE INERTIA BASE. 2. PUMPS WITH VFD DRIVES SHALL HAVE VFD COMPATIBLE MOTORS. RECORD DRAWING LSAF CONTROL ROOM REVISION 4972197 -00 J #711975 BY HGI /LJC HGI /MLD APPROVED DATE 7.28.00 5.01.02 SYM REVISION BY APPROVED DATE EXPIRES 12113/03 DEPT. DATE. DRAWN K. ELLIOTT CHECKED S. FRANKLIN ENVINELN C. MAAS CHECKED C. MAAS DATE 7.28.00 7.28.00 7.28.00 THIS DESIGN SPECIFICATION IS APPROVED L COSTELLO 7.28.00 APPROVED SUBTITLE MECHANICAL MASTER EQUIPMENT SCHEDULE BUILDING 2 -80 PLANT 2 R1K'N a �PRBVED JUL - 8 2002 AS WOWED CiRd6 DiV16 PP OVfD. / DRAWN: CH \ , DRAWN: '- KED: WJB WBB CURRENT REVISION J #711975 SHEET M2e SYMBOL A DATE RECEIVED JUN 1 7 2002 ,,WIT CENTER ISSUED FOR CONSTRUCTION' REVISIONS BY Harris Group Inc. REVISION "A" ONLY 5.01.02 ENG NEER: MLD DATE JOB NO. COMP NO. 972197 -00 DWG NO. 2- 80 -M2e PROJECT 11081.00 CHECKED: RB 5.01.02 SYM A RENUMBER DRAWING - AS BUILT - ADDED LSAF B LSAF RECONFIGURATION RECORD CHANGE C LSAF CONTROL ROOM REVISION J #982188 HGI /LUC APPROVED 1.30.87 7.11.93 7.28.00 4/17/01 5.01.02 REVISION APPROVED ACC PTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE EXPIRES 1'2/1,3/ (73 3.24.85 10.26.86 10.20.86 APPR�VE� R. GEHRING 10.26.86 APPROVED COMMON BUILD UP Fax; STORAGE i 11Di1 7 I {!s ,{nrl �. �11��t � /n� /' " :� i { v ftni{nnni{n!{n 1M12 M542 20' -0" 20' -0" nnnn� ! 11 ti Il (REF) 330 CFM 330 CFM alsowdwo 11 I NI 330 CFM 1 0 L 7 :4 �.50 i '- N 2 50 CFA ( = I v 1 0x4 10x4 IIIIIIIMVlltI■ I1iLS ... LS171 immt.��� a �aa ,— 48x24 R FTU -2 -42 11 DF11 ANECHOIC CHAMBER 11DF12 (REF) 12' -0" 25' - 0" (REF) 1M12 M543 20' -0" (REF) STORAGE .. C9 7) J #711975 HGI /MLD 12" U 1M121M517 I _ ACUUM PUMP TO ROOF MATCHLINE, FOR CONTINUATION SEE 1 16 (I 4 WIND TUNNEL X PARTIAL PLAN VIEW N SCALE: 1 /8 " =1' -0" ? Moa- i alp SUBTITLE MECHANICAL MASTER DUCTWORK DE.9 DI BUILDING 2 -80 GENERAL NOTES RECTANGULAR RADIUS ELBOW WITH TURNING VANES. SEE M452 FOR CONTINUATION. 2. ALL DUCTWORK SHALL BE PROVIDED WITH SEISMIC HAZARD LEVEL (SHL) "A" OF THE SEISMIC RESTRAINT MANUAL- GUIDUNES FOR MECHANICAL SYSTEMS DATED 1998. AS PUBLISHED BY SMACNA AND LOCAL CODES. REFERENCE DRAWINGS 2- 80 -M452 ENLARGED MEZZANINE PLAN LSAF CONTROL ROOM 2 -81 BLDG. ��� a 161 - 3V ppI O 510 COL. DE— DJ/8 -17 PLANT 2 CONSTRUCTION NOTES RECEIVED CITY OF TUKWILA JUN 1 7 2002 , ERMIT CENTER 2 80 BLDG. KEY PLAN se. NM ISSUED FOR CONSTRUCTION I REVISIONS BY Harris Group Inc. W REVISION "C" ONLY APP 65�/'^ DRAWN: /6H CKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB NO. DWG NO. 1M12 DATE 5.01.02 ENGINEER: MLD DATE 2- 80 -1M12 COMP NO. PROJECT 11081.00 CHECKED: RB 5.01.02 - - -- L_ Y `C \ X \ f \/ 12' 8" X C }< I MATCHLINE, FOR CONTINUATION SEE 1M15 4110161111.111721/2vv�ri %/l/J 711w 8 ,_ • ,z#I9 ,4 :04,, b • :N1 13 ._ 4 " I 1 i / 12x3. DN 2 12x3. DN ( 1 3'-8" v i� otXot L 7 (BELOW) 400 CFM -' m v D �xl7 t. ler ■ ,tom 10 TG i L y r® Ie U 1 FM I _ � I� ®. c g . I r r 0 j iyy v �. , I III II REMOVABLE CLOSURE PANEL FROM FLOOR TO TOP OF A/C UNIT 0 1 64� ` CLOSURE STRIP TO TOP OF A/C UNIT _1 ® ® �' ® �L ® �m� VAV -1 kW n n ,'� Q 20 8' 8 10x4 12x4 % t eV CR ; t/se/f /Ilr./Jn la, 10' -0" - 10 3/8" 7 . 7" 10x4 Aill I 8" DIA AM ► M L 200 CFM CONTROL PANELTYP. 41 CI r I 1`r �+ ... " .�� 4i _ 1: L f — r " sr nrs e A II c o H SCHARGE HOOD (8) _ o ru q ,�� I ® 48x24RG '2000 CFM IIIIII 2 ' x 1000 C 1 0x4 Ct �5 2 4x24 RG 10x4 ' " `FTU -2 39 \ ,, "�, � , -- - 1 r \ 330 CFM 330 CFM m 330 , Iv I ��_ _ CFM m m25O CFM 50 CF"1 ° .250 CFM ©p FTU - 2 1 a H 41 - -_ �� i +� I ! p ! �� !v 0 �' a..1 1 l..eu ii ��. i: ' __ 10x12 �� 0 � �I ®� Al. o� ” 10x4 ® 1 1M16 1TA 16 - m iY.,A::•......I. © L CFM m250 -CFM ° I�j 50 CFM � 250 CFM ` IIN E z � o I 1 0"0 ..."..r. � `" i ill' I' i , 330 CFM 330 0 CFM m � [ w ` 48x24 'G 2000 C 12x6, D '� . F 1 N r ® 1 M 16 r -- M517 © \ ! � E2 Lk � mYr.1:� L I C x8 SL �O �6'.� CFM .. al J I 36x22 — 10 , ■ ��L�I�LYI ���,I � x ®I� ' ®I ' x 250 CFM T4� YCi { w or - I � r • ` a \ 93 ' - 10x1 0 FOR COOT SEE M452 EW ^ " t a v 1x4 10x I I.��u �� I rl POC � ����30 "r � I��^ Ark I . - c►so.l LJ. � - -- -I X{7 N CFM .330 CFM 30 CFM" 34x70 E 452 22" >: 30 DOOR GRILLE WTTH 11 111 22" X 30 X 2' FILTER RACK � C / v 1 2 x1 M452 D N 1 250 CFM o 250. m 0 � - 0 . , , CFM' MOUNTED ON INSIDE OF DOOR F CHLINE, ►R CONTINUATION SE 1 12 . 8_ °- — 12'-o" FTU 2 40 12 0 1M16 M542 - 3 • 5 8 SYM A RENUMBER DRAWING AS BUILT - ADDED LOAF LSAF RECONFIGURATION LSAF CONTROL ROOM REVISION J #982188 J #711075 BY WLS WLS HGI /WC HGI /MLD APPROVED DATE 1.30.87 7.11.93 7.28.00 5.01.02 SON REVISION SCALE: 1/8" = V-0" 13.1 PARTIAL FIRST FLOOR PLAN APPROVES DATE osi.ErazrzAw EXPIRES. 12/1311. CEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN B.A. NEHTA CHECKED R. GLADNEY ENGINEER W. BOLLIG CHECKED R. GEHRING APPROVED R. GEHRING ATE 3.24.85 10.26.86 10.20.86 11 SUBTITLE TITLE MECHANICAL MASTER DUCTWORK BUILDING 2 -80 2 -81 BLDG. 0 cfi 10( �R3 l_ D 2 WAD �Fao LEGEND COL. DA- DE/8 -17 PLANT 2 SEE 2 -80 -MO FOR LEGEND GENERAL NOTES 1. ALL DUCTWORK SHALL BE PROVIDED WITH SEISMIC RESTRAINTS IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. 2. DUCT DIMENSIONS LISTED ARE "FREE AND CLEAR" INSIDE DIMENSIONS. E> RECTANGULAR RADIUS ELBOW WITH TURNING VANES. ® RECTANGULAR RADIUS ELBOW WTM TURNING VANES. SEE M452 ENLARGED MEZZANINE PLAN FOR CONTINUATION. REFERENCE DRAWINGS 2- 80 -1M17 PLAN VIEW DUCTWORK 2- 80 -TM505 SECTIONS & DETAILS 2- 80 -1M518 ELBOWS ON CONTROL PANELS 2- 80 -M1M17 MEZZ DUCTWORK 2 -80 -M452 ENLARGED MEZZANINE PLAN CONSTRUCTION NOTES TIE -IN TO EXISTING LOAF WEST HIGH BAY DUCTWORK. CLEAN ROOM RETURN AIR DUCTS TO BE ROUTED INSIDE WALL STUCTURE. /wag- la O ® • 0 M11 2 80 BLDG. KEY PLAN se. NIS ISSUED FOR CONSTRUCTION JOB NO. DWG N0. wiLA JUN 1 7 2002 REVISIONS BY Harris Group Inc. 1 M1 6 REVISION "C" ONLY DATE 5.01.02 DRAWN: 2HECKED: ENGINEER: WJB WBB MLD ,TER CURRENT REVISION SYMBOL DATE J #711975 G 5.01.02 SHEET 2- 80 -1M16 COMP N0. PROJECT 11081.00 CHECKED: RB LSAF CONTROL ROOM REVISION BY APPROVED DATE SCALE: 1/8" = 1 -0" �BOE /NG° 1EXPIRES 12/13/03 APPROVED BY. 10 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION, IS APPROVED DEPT. DATE DRAW SLOAN CHECKED ENGINEER CHECKED APPROVED PPROVED 10.01.93 SUBTITLE TIRE MECHANICAL MASTER DUCTWORK .9 9 DH DI BUILDING 2 -80.M1 COL. DE— DJ /8 -17 >9r efat JUL — 8 2882 NOtL.D Lult LEGEND GENERAL NOTES SEE 2- 80 -M452 FOR MECHANICAL EQUIPMENT AND HVAC PIPING ABOVE CONTROL ROOM MEZZANINE. REFERENCE DRAWINGS CONSTRUCTION NOTES PLANT 2 DWG N0. 2 80 BLDG. KEY PLAN SCALE MS PRO DRAWN: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEEP M 1M 1.2 JOB NO 163180 A 2- 80 —M1M12 RECEIVE4 'K>✓OF TGKWk[A JUN 1 7 2002 rERMIT CENTER ISSUED FOR CONSTRUCTION I BY Harris Group Inc. REVISION "A" ONLY DATE PROJECT 5.01.02 11081.00 ENGINEER: CHECKED: MLD RB DATE 5.01.02. COMP NO. E> rTh M1M12 M452 MATCHLINE - SEE M1M16 - � I WIND TUNNEL I I —J UP TO ROOF L i H { H =k _ J H a r il 12" COMMON BUILD UP = _ = Ht = MATCHLINE - SEE M1 M11 { i ALDS I — ANECHOIC CHAMBER H I l II I l t/ 1/ fl 11 V U V 111 al {r 1i If 11 U {I {I If 1( r ! 1! V yl tl .! 11�+ 1! if it 1111111! V {t if t i t it In f{ i{ II i t 11 l 5 L \I {t1 / Y7 it ITV Vil t1�11�1�t t! 11 II 11 �! 11,.11! 111 1111 V 17 II 11 }I U x moa a( ...._._ _____ ...,.. ir- ..,,, Ij ____ , .,_ >, DAf:)TIAI DI ANI ' � _, _� _______ _ � �• _ ____ LSAF CONTROL ROOM REVISION BY APPROVED DATE SCALE: 1/8" = 1 -0" �BOE /NG° 1EXPIRES 12/13/03 APPROVED BY. 10 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION, IS APPROVED DEPT. DATE DRAW SLOAN CHECKED ENGINEER CHECKED APPROVED PPROVED 10.01.93 SUBTITLE TIRE MECHANICAL MASTER DUCTWORK .9 9 DH DI BUILDING 2 -80.M1 COL. DE— DJ /8 -17 >9r efat JUL — 8 2882 NOtL.D Lult LEGEND GENERAL NOTES SEE 2- 80 -M452 FOR MECHANICAL EQUIPMENT AND HVAC PIPING ABOVE CONTROL ROOM MEZZANINE. REFERENCE DRAWINGS CONSTRUCTION NOTES PLANT 2 DWG N0. 2 80 BLDG. KEY PLAN SCALE MS PRO DRAWN: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEEP M 1M 1.2 JOB NO 163180 A 2- 80 —M1M12 RECEIVE4 'K>✓OF TGKWk[A JUN 1 7 2002 rERMIT CENTER ISSUED FOR CONSTRUCTION I BY Harris Group Inc. REVISION "A" ONLY DATE PROJECT 5.01.02 11081.00 ENGINEER: CHECKED: MLD RB DATE 5.01.02. COMP NO. l O 00 1 li --��- 1 r r 1 All _„/---- - I on INLET • II a ilk JNE - SEE MIM15 I 0 x x M1M16 M452 I I I I I L_J r p I r EL- L . TRICAL RO I r I WIND TUNNEL I -1-- I MEZZANINE —� I llWlW i ■ 1 1 I H I I I 11 W z I I I COMMON BUILDUP AREA I I ill I- i I MATCHLINE - SEE M1M12 SYM REVISION LSAF CONTROL ROOM J #711975 BY HGI /MLD APPROVED DATE 5.01.02 SY REVISION n PARTIAL MEZZANINE PLAN SCALE: 1/8" = 1' -0" APPROVED DATE (ILAGFATAEZNG° [XPIRES 12/13/0 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED. BY DEPT. DATE DA DC DE 2.08.02 4.12.02 S.10. #E /3- CZ MASTER DUCTWORK BUILDING 2 -80 COL. DA- DE/8 -17 GENERAL NOTES SEE 2- 80 -M452 FOR MECHANICAL EQUIPMENT AND I-MAC PIPING ABOVE CONTROL ROOM MEZZANINE. of TOO � u 1 . ,s y(,1E� LEGEND REFERENCE DRAWINGS CONSTRUCTION NOTES moa-ra6 PLANT 2 2 80 BLDG. KEY PLAN SCNE N 5 ISSUED FOR CONSTRUCTION SHEET M1M16 JOB NO. DWG N0. Harris Group Inc. 11081.00 711975 2- 80 -M1M16 RECEIVED CITY OF TUKWI�q JUN 1 7 2002 PERMIT CENTER COMP NO. EQUIPMENT LIST REF NO. DESCRIPTION ADE ik AC UNIT: 02- 080506AC RO —G09 VW EF EXHAUST FAN: H1 SYM A LEAF CONTROL ROOM REVISION J #711975 BY HGI /MLD APPROVED DATE 5.01.02 SY REVISION APPROVED DATE 12 IN SCALE: 1/8 "= 1' -0" g LArzaFzAw. EXPIRES 12713/03 10 ACCEPTABILITY DRAWN N D10 01.93 THIS DESIGN AND /OR CHECKED SPECIFICATION IS. APPROVED 1:NUINE':k APPROVED BY DEPT. DATE. NECKED APPROVED APPROVED UBTITLE TITLE MECHANICAL MASTER DUCTWORK BUILDING 2 -80 COL. DE— DJ \8 -17 INSTALL PLACARD " CAUTION - 300# AIR RELIEF ". CONSTRUCTION NOTES INSTALL VENT 2' -0" ABOVE ROOF AND GOOSENECK OVER TO PREVENT RAINWATER ENTRY. LEGEND REFERENCE DRAWINGS a(0 O ® m 0 O Ewa FM1 0 0 DA 2 -81 BLDG. 2 80 BLDG. PLANT 2 KEY PLAN sum Rrs DRAWN: .CHECKED: WJB WBB CURRENT REVISION. SYMBOL J #711975 SHEET DWG No A RFM12 JOB No. 163180 2- 80 —RFM12 RECEIVED CITY OF TUKWILq JUN 1 72002 PERMITCENTER ISSUED FOR CONSTRUCTION REVISIONS BY Harris Group Inc. REVISION "A" ONLY DATE PROJECT 5.01.02 11081.00 ENGINEER: CHECKED: MLD RB DATE 5.01.02 COMP N0. MATCHLINE SEE SHEET A166 24X24 I - - - -- LARGE INTAKE REF: STRUCTURE � HIGH ROOF - I - _ I I 1 AI IL i 1 M 0 RFM12 A528 2 "0 A300 VTR i► i ,,-- v PLAN VIEW SYM A LEAF CONTROL ROOM REVISION J #711975 BY HGI /MLD APPROVED DATE 5.01.02 SY REVISION APPROVED DATE 12 IN SCALE: 1/8 "= 1' -0" g LArzaFzAw. EXPIRES 12713/03 10 ACCEPTABILITY DRAWN N D10 01.93 THIS DESIGN AND /OR CHECKED SPECIFICATION IS. APPROVED 1:NUINE':k APPROVED BY DEPT. DATE. NECKED APPROVED APPROVED UBTITLE TITLE MECHANICAL MASTER DUCTWORK BUILDING 2 -80 COL. DE— DJ \8 -17 INSTALL PLACARD " CAUTION - 300# AIR RELIEF ". CONSTRUCTION NOTES INSTALL VENT 2' -0" ABOVE ROOF AND GOOSENECK OVER TO PREVENT RAINWATER ENTRY. LEGEND REFERENCE DRAWINGS a(0 O ® m 0 O Ewa FM1 0 0 DA 2 -81 BLDG. 2 80 BLDG. PLANT 2 KEY PLAN sum Rrs DRAWN: .CHECKED: WJB WBB CURRENT REVISION. SYMBOL J #711975 SHEET DWG No A RFM12 JOB No. 163180 2- 80 —RFM12 RECEIVED CITY OF TUKWILq JUN 1 72002 PERMITCENTER ISSUED FOR CONSTRUCTION REVISIONS BY Harris Group Inc. REVISION "A" ONLY DATE PROJECT 5.01.02 11081.00 ENGINEER: CHECKED: MLD RB DATE 5.01.02 COMP N0. SYM REVISION LSAF CONTROL ROOM J#711975 OS HGI /MLD APPROVED DATE 5.01.02 SYM RENSION BY (11 PARTIAL MECHANICAL ROOF PLAN SCALE: 1/8" = 1' -0" 10 ACCEPTABILITY THIS.. DESIGN.. AND /OR SPECIFICATION IS APPROVED. • DEPT. DATE DRAWN W. BOULDS CCOECK€D W. BRITTAIN ENGINEER M. DAVIS CHECKED R. BERRY � APPROVED DATE 3.21.02 3.29.02 4.05.02 SUBTRLE TITLE S: /D -m?- MECHANICAL MASTER DUCTWORK DA DB CONSTRUCTION NOTES INSTALL EXHAUST 36" ABOVE ROOF AND GOOSENECK OVER TO PREVENT RAINWATER ENTRY. DC BUILDING 2 -80 COL. 9- 17 /DA -DE GENERAL NOTES 1> BIRD SCREEN, 1/4" WIRE MESH. LEGEND SEE DRAWING 2 -60 -M0 FOR LEGEND REFERENCE DRAWINGS 2 80 BLDG. KEY PLAN scaE xrs RECEIVED ciry of rwcwlu JUN 1 7 2002 PERMIT CENTER JUL - 2L ,S ►TED ISSUED FOR CONSTRUCTION PLANT 2 URRENT REVISION SYMBOL HEET RFM16 OB N0. WG N0. Harris Group Inc. 11081.00 711975 2- 80 -RFM16 DATE 5.01.02 COMP NO. 1 i l T ^ ( MATCHLINE, SEE SHEET RFM15 4. , - =>6"0 RESTROOM EXHAUST i C -- _/' \ THRU ROOF — RFM16 A528 — — — _ _ ___.� RFM16 A528 / I=> THRU A ROOF E> THRU ROOF 4" SAN VTR THRU ROOF RFMa6 A528 MATCHLINE, SEE SHEET RFM11 j 47;& ' 25:1 RFM16 A528 r - - ->l MATCHLINE, SEE SHEET RFM12 SYM REVISION LSAF CONTROL ROOM J#711975 OS HGI /MLD APPROVED DATE 5.01.02 SYM RENSION BY (11 PARTIAL MECHANICAL ROOF PLAN SCALE: 1/8" = 1' -0" 10 ACCEPTABILITY THIS.. DESIGN.. AND /OR SPECIFICATION IS APPROVED. • DEPT. DATE DRAWN W. BOULDS CCOECK€D W. BRITTAIN ENGINEER M. DAVIS CHECKED R. BERRY � APPROVED DATE 3.21.02 3.29.02 4.05.02 SUBTRLE TITLE S: /D -m?- MECHANICAL MASTER DUCTWORK DA DB CONSTRUCTION NOTES INSTALL EXHAUST 36" ABOVE ROOF AND GOOSENECK OVER TO PREVENT RAINWATER ENTRY. DC BUILDING 2 -80 COL. 9- 17 /DA -DE GENERAL NOTES 1> BIRD SCREEN, 1/4" WIRE MESH. LEGEND SEE DRAWING 2 -60 -M0 FOR LEGEND REFERENCE DRAWINGS 2 80 BLDG. KEY PLAN scaE xrs RECEIVED ciry of rwcwlu JUN 1 7 2002 PERMIT CENTER JUL - 2L ,S ►TED ISSUED FOR CONSTRUCTION PLANT 2 URRENT REVISION SYMBOL HEET RFM16 OB N0. WG N0. Harris Group Inc. 11081.00 711975 2- 80 -RFM16 DATE 5.01.02 COMP NO. SYM A . RENUMBER DRAWING AS BUILT - ADDED LSAF B PROVIDE DATA HOUSE C REROUTE CONDENSATE D LSAF RECONFIGURATION M62 M503 ANECHOIC CHAMBER SEE 102 -t80- 4072 -M7 FOR PIPIT FL a DI PROPANE TANK -REF (SIM) 3 /4 " - HWS, DN 3 /4 "- HWR,'DN SEE M452 t® CUH 3 ; � 1M62 M513 3 � Q 1 1 =' r I2 1 2 HWR __� (SIM) d Fnt 1M62 M513 1M62 M513 REVISION 1 J #D6210335 J #982188 BY WLS WLS WDB WDB HGI /LJC 2" C 4" STM 1 DRIP APPROVED WDB DATE 1.30.87 7.11.93 5.24.96 7.28.00 SYM LSAF CONTROL ROOM MATCHLINE FOR CONTINUATION SEE 1M66 L-- REVISION J #711975 BY HGI /MLD H H APPROVED k Q Y� - -X 8' -0" HIGH FENCE DATE 5.01.02 H PROPANE HEAT EXCHANGER SEE DETAIL FLOOR PIPING PLAN SCALE: 1/8 " =1' -0" N BO b Iw ® „ ORAL S M621M502 Os 121131 ' E OWL EPTABILITY BA M EHTA D 32 4.85 THIS DESIGN AND /OR CHECKED SPECIFICATION IS APPROVED R. GIADNEY .10.26.86 ERGIREER APPROVED BY DEPT. DATE W. BOLLIG CHECKED R. GEHRING APPROVED R. GEHRING APPROVED 10.20.86 10.26.86 MOD.- SUBTITL TITLE MECHANICAL MASTER / DCE.9 DF HVAC PIPING CONSTRUCTION NOTES INSTALL 1 1/2" STEAM PIPING TO EXISTING PROPANE HEATER. INSTALL 3/4" CONDENSATE RETURN FROM EXISTING PROPANE HEATER. PROVIDE WALL PENETRATION. SEAL WALL PENETRATION PER BOEING CONSTRUCTION SPECIFICATION SECTION 7910. ® INSTALL DOWNDRAFT UNIT HEATER. BOTTOM OF UNIT HEATER TO BE INSTALLED AS HIGH AS POSSIBLE. INSTALL 3/4" HOT WATER SUPPLY AND 3/4" HOT WATER RETURN PIPING. INSTALL 3/4" FLOW CONTROL VALVE IN HOT WATER RETURN PIPING. © INSULATE ALL NEW EXTERIOR STEAM AND CONDENSATE PIPING PER BOEING CONSTRUCTION SPECIFICATION 15260. HEAT TRACE ALL NEW EXTERIOR STEAM AND CONDENSATE PIPING PER BOEING CONSTRUCTION SPECIFICATION 15261. ® DO NOT BLOCK LADDER ACCESS TO ROOF. INSULATE MS AND FIR PER BOEING CONSTRUCTION SPECIFICATION 15260. DI BUILDING 2 -80 COL. DE- DJ/8 -17 g TUK'WILA IR0 JUL - 8 2802 HE NOTED LEGEND SEE 2 -80 -M0 FOR LEGEND GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(OR MORE) IN THE DIRECTION SHOWN_ 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW CO 10' INTERVALS 2 " -3" DIA. PIPE ® 15' INTERVALS 4 " -6" DIA. PIPE B 20' INTERVALS REFERENCE DRAWINGS PLANT 2 2 80 BLDG. KEY PLAN ISSUED FOR CONSTRUCTION DRAWN: C19ECKED: WJB WBB CURRENT REVISION J #711975 SHEET JOB N0. DWG N0. SYMBOL 1M62 REVISIONS BY Harris Group Inc. DATE 5.01.02 760015 2- 80 -1M62 RECEIVED CITY OF TUKWILA JUN 1 7 2002 PERMIT CENTER REVISION "E" ONLY PROJECT 11081.00 ENGINEER: CHECKED: MLD RB DATE 5.01.02 COMP N0. SYM A ISSUED FOR CONSTRUCTION J #972197 - LSAF RECONFIGURATION LSAF CONTROL ROOM REVISION 21.9 J #982188 J #711975 HGI /VEY HGI /WC HGI /MLD APPROVED DATE 5.22.98 7.28.00 5.01.02 SYM REVISION 20.4 PARTIAL FLOOR PLAN SCALE: 1/8" = V-0" BY APPROVED DATE 18.8 il 17.1 D1 DA .4 -9 ACCEPTABILITY THIS. DESIGN. AND /OR SPECIFICATION IS APPROVED DATE DRAWN ANKLIN 12.15.97 5.18.98 A. NAPIER ENV IN A A IA E. YOOSEFIAN CHECKED 12.15.97 MOD. -lacy SUBTITLE TI E MECHANICAL MASTER HVAC PIPING BUILDING 2 -80 COL K -P/1 -3 CIU Of O9EU Du1 JUL - 8 2002 AS NOTED LEGEND SEE 2 -80 -M0 FOR LEGEND - GENERAL NOTES SEE COIL CONNECTION DETAILS ON SHEET 2- 81 -M530. 2. ALL HVAC PIPING SHALL BE A MINIMUM OF 18'-0" ABOVE FINISHED FLOOR. 3. SEE DRAWING 2- 81 -M525, M526 FOR PIPE HANGER DETAILS 4. SEE DRAWING 2- 80 -M321, M322, M323 FOR SYSTEM PIPING DIAGRAM 2 -81 BLDG. REFERENCE DRAWINGS CONSTRUCTION NOTES 1�INSTALL HOT WATER SUPPLY AND RETURN TO LSAF AHU- DD /11, FAN TERMINAL UNITS, UNIT HEATERS AND CABINET UNIT HEATER. 2�INSULATE HWS AND HWR PER BOEING CONSTRUCTION SPECIFICATION 15260. PLANT 2 2 80 BLDG. KEY PLAN SCALE HIS ISSUED FOR CONSTRUCTION APR D, • DRAWN: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB N0. REVISIONS BY Harris Group Inc. 1 M65 972197 -00 REVISION "B" ONLY DWG NO. 2- 80 -1M65 �m Of T JUN 1 7 2002 ,RMIT CENTER DATE PROJECT 5.01.02 11081.00 ENGINEER: CHECKED, MLD RB DATE 5.01.02 COMP NO. Ii i 1 ( 1 1" I �� 1 1 /4 "UP CONT. ON O DWG. 2- 80 -M450 A. 1M65 M538 .. w IpriirW-ne L4 ° H W 7 . r 1 1 1 PIX 1 4) WA 01 VESTIBULE 11 1 3 I 1 \ 1 '- (lYP i I / CENTPAI- BUILDUP / & COMMON AREA - N1/ - I 1 i T iill = J' —I I I STARS #2 I I v v * v ME O I IL 0 \ \ ! f' f CRANE TRAVEL AREA /I r allilli r ,. �� 3" MPS 3" MPS 3" CHWR 3" CHWR 3" CHWS 1 I JANITOR/ i I SUPPLY I , A - -- 71L:�l v 100/1M/n _ •\ • i / \ \ • \ J• , \ \ \ \ III 3" - 1ii . Z 3 -HWR o � � -- � t I �� ELEVA MACHINE 1 a R ROOM I _ °I 1 1 a•rf z OPEICI r I II! W . NE NI I = , L --, I to - cn -.. _ FM= Tr GE j I r (ter CORRIDOR 2 "Pc I II 2 -80 BLDG (INTF) SEE 1M61 - \ (II � 1 i ll I „w„,„„ 1 \ I _ SYM A ISSUED FOR CONSTRUCTION J #972197 - LSAF RECONFIGURATION LSAF CONTROL ROOM REVISION 21.9 J #982188 J #711975 HGI /VEY HGI /WC HGI /MLD APPROVED DATE 5.22.98 7.28.00 5.01.02 SYM REVISION 20.4 PARTIAL FLOOR PLAN SCALE: 1/8" = V-0" BY APPROVED DATE 18.8 il 17.1 D1 DA .4 -9 ACCEPTABILITY THIS. DESIGN. AND /OR SPECIFICATION IS APPROVED DATE DRAWN ANKLIN 12.15.97 5.18.98 A. NAPIER ENV IN A A IA E. YOOSEFIAN CHECKED 12.15.97 MOD. -lacy SUBTITLE TI E MECHANICAL MASTER HVAC PIPING BUILDING 2 -80 COL K -P/1 -3 CIU Of O9EU Du1 JUL - 8 2002 AS NOTED LEGEND SEE 2 -80 -M0 FOR LEGEND - GENERAL NOTES SEE COIL CONNECTION DETAILS ON SHEET 2- 81 -M530. 2. ALL HVAC PIPING SHALL BE A MINIMUM OF 18'-0" ABOVE FINISHED FLOOR. 3. SEE DRAWING 2- 81 -M525, M526 FOR PIPE HANGER DETAILS 4. SEE DRAWING 2- 80 -M321, M322, M323 FOR SYSTEM PIPING DIAGRAM 2 -81 BLDG. REFERENCE DRAWINGS CONSTRUCTION NOTES 1�INSTALL HOT WATER SUPPLY AND RETURN TO LSAF AHU- DD /11, FAN TERMINAL UNITS, UNIT HEATERS AND CABINET UNIT HEATER. 2�INSULATE HWS AND HWR PER BOEING CONSTRUCTION SPECIFICATION 15260. PLANT 2 2 80 BLDG. KEY PLAN SCALE HIS ISSUED FOR CONSTRUCTION APR D, • DRAWN: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB N0. REVISIONS BY Harris Group Inc. 1 M65 972197 -00 REVISION "B" ONLY DWG NO. 2- 80 -1M65 �m Of T JUN 1 7 2002 ,RMIT CENTER DATE PROJECT 5.01.02 11081.00 ENGINEER: CHECKED, MLD RB DATE 5.01.02 COMP NO. SYM A RENUMBER DRAWING AS BUILT - ADDED LOAF PROVIDE DATA HOUSE REROUTE CONDENSATE LSAF RECONFIGURATION 1 1/2 "MPS 1 1/4 "C FROM 2 1/ CONDENSATE CP e 1 RETURN UNIT REVISION 07 ( J #D6210335 J #982188 BY WLS WLS WDB WDB HGI /WC APPROVED WDB 13.1 DATE 1.30.87 7.11.93 5.24.96 7.28.00 SYM LSAF CONTROL ROOM REVISION J #711975 BY HGI /MLD APPROVED DATE 5.01.02 2 SCALE: 1 /8 "= 1 -0" � I v iii ® 6055 Cie 00' BIptYAL f0 ACCEPTABILITY THIS DESIGN AND /OR R GLADNEY SPECIFICATION IS APPROVED APPROVED. BY DEP, DATE W. BOLLIG CHE KED R. GEHRING APP OVED R. GEHRING DRAWN N.H. MEHTA Res 12/13/0 10 APPRO DATE 3.24.85 10.26.86 10.20.86 10.26.86 SUBTRLE TITLE DD RECEIVED CITY OF TUKWILA JUN 1 7 2 002 PERMIT CENTER HVAC PIPING BUILDING 2 -80 MECHANICAL MASTER COL. DA- DE /8 -17 CONSTRUCTION NOTES INSTALL HOT WATER SUPPLY AND RETURN PIPING TO UNIT HEATERS. CONNECT TO EXISTING PIPING WHICH WAS PREVIOUSLY STEAM AND CONDENSATE. INSTALL HOT WATER SUPPLY AND RETURN CONTROL PIPING AT UNIT. HEATER. E:>-INSPECT AND FLUSH EXISTING STEAM /CONDENS■TE PIPING AND COIL PRIOR TO TIE -IN TO HOT WATER SUPPLY /RETURN PIPING. RELABEL EXISTING PIPING AS HOT WATER SUPPLY (PREVIOUSLY CONDENSATE) AND HOT WATER RETURN (PREVIOUSLY STEAM). ® INSTALL 3" HOT WATER SUPPLY AND RETURN PIPING. INSTALL DOWNDRAFT UNIT HEATER. BOTTOM OF UNIT HEATER TO BE INSTALLED AT 14 -0" AFF. © INSTALL 3/4" HOT WATER SUPPLY AND 3/4" HOT WATER RETURN PIPING. INSTALL 3/4" FLOW CONTROL VALVE ON HOT WATER RETURN PIPING. INSTALL CHILLED WATER SUPPLY AND RETURN TO AHU- DD -11. ®INSTALL HOT WATER SUPPLY AND RETURN TO AHU- DD -11, FAN TERMINAL UNITS, DOWN DRAFT UNIT HEATERS AND CABINET UNIT HEATER. REMOVE TEMPORARY CHILLED WATER SUPPLY AND RETURN TO RELOCATED AHU -DF 10 AND CAP AT VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. �REMOVE TEMPORARY HOT WATER SUPPLY AND RETURN TO AHU -5 AND RELOCATED AHU -DF -10 AND CAP AT VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. INSULATE CHILLED WATER SUPPLY /RETURN AND HOT WATER SUPPLY /RETURN PER BOEING CONSTRUCTION SPECIFICATION SECTION 15260. INSTALL PHASE 1 PIPING UP TO EDGE OF TUNNEL SEE SK -1M62 AND SK -1M66 FOR TEMPORARY PIPING TO AHU -5 AND AHU- DF -10. INSTALL 1" CLEAR WATER DRAIN (CONDENSATE) FROM AHU- DD -11. TIE CONDENSATE DRAIN INTO SANITARY DRAIN PER M545. - 2 -81 BLDG. CITY Of TUKWIA APPROYED JUL - 8 2002 AS 60110 L0113C DP /SICNJ GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(08 MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW B 10' INTERVALS 2 " -3" DIA. PIPE B 15' INTERVALS 4 " -6" DIA. PIPE ® 20' INTERVALS REFERENCE DRAWINGS 17 PLANT 2 KEY PLAN 0 ISSUED FOR CONSTRUCTION SCAB N. JOB NO. DWG N0. 2 80 BLDG. Va � C DRAWN: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET REVISIONS BY Harris Group Inc. E 1 M66 760015 REVISION "E" ONLY 2- 80 -1M66 DATE PROJECT 5.01.02 11081.00 ENG NEER: CHECKED: MLD RB DATE 5.01.02 COMP N0. ; � Pr • ��� AAA FOR UNIT HEATER PIPING SEE DETAIL 1M66 M513 /. � UH ' A 15 �i ,, - ' � s " , HWR 3/4" ° ' Awes t I )(7 1 OW - iorezo FOR UNIT HEATER t PIPING SEE DETAIL ® 1M66 M513 Ix Pr ____i x, i L ww www • MATCHU i I5 NE FOR COM SEE 1M65 N ( - "R 2 ) iYfs VII UH Aft g I♦la .._ 0 ILI Il /1�) T I I I 1 M66 M513 UH DB 11 1 unwrc� �+-3" MPS i 0— LI I � � CR�I • �� is� ���� „ � 1 M oy M Rri�r�� iti' w_� ��iirirr� - 0 UH III /2HWSU21V2 L - - -� 1 1/2 " -V, ill i 13 ® - 1,11 II lilt SEE _ M 545 4 `��, - 2" PC TO IM IMF Ilit -- y I I 0 1 2"-ao M54 I 1 " -cLO, DN TO S AN, S EE M 5 45 FTU �� ■ _ k - Q ` PHASE 1 Ii HAS 2 �/ 1 1 2 1 2" CHW, �o �. „1 , _ l ► I �► I.,.. T RA %;'SEE UH 1 M66 M513 ` �I_` `” N TY 7 (s,,,,0 . _ , �'� - - 1 M66 M513 I! 2 1 2" r ■� HWS �- -� .. ,,,,Y�n�I,�� , — y In \ \ ��mic \ 2 -FIWS `t6 CHWS �CHWR r .. --1 � l �'rL I FF ' , Bpi I L_ ....m.1 L —� 9 } _ .:'��■ .` PO�`� $ �� L 1 \ a �+l -2" HWR 3 n , �s . . 3 / 4 " - HWS, DN SEE M452 11 ► 3/4" -HWR, DN ' SEE M452 3/4 HWS, DN 11 (SEE -452 Q 3/4" -HWR, DN SEE M452 3/4° -HWS, DN SEE' M452 113 E 1M61 . 1!--- I / Q� / ' I I H ; 1 S N \� N 2 1/2 1/2 N ECC FOB(1Y) n ,- 7 \E� 8 111 111 ; •.__ (( STM i �— DOWN TO AHU- DD -11, 6 FOR CONT. SEE M452 1 1/2 CLD, UP TO 6 FUNNEL DRAIN, SEE M452 (( 3/4° -HWS, DN SEE M452 11 4" STM 3/4" -HWR, DN 2_ a0.d fl ' I 1I __ _ I I I r _I - MATCHLINE FOR CONT. SEE 2- 80 -1M62 LI nnD DIDINIO DI AM __ SYM A RENUMBER DRAWING AS BUILT - ADDED LOAF PROVIDE DATA HOUSE REROUTE CONDENSATE LSAF RECONFIGURATION 1 1/2 "MPS 1 1/4 "C FROM 2 1/ CONDENSATE CP e 1 RETURN UNIT REVISION 07 ( J #D6210335 J #982188 BY WLS WLS WDB WDB HGI /WC APPROVED WDB 13.1 DATE 1.30.87 7.11.93 5.24.96 7.28.00 SYM LSAF CONTROL ROOM REVISION J #711975 BY HGI /MLD APPROVED DATE 5.01.02 2 SCALE: 1 /8 "= 1 -0" � I v iii ® 6055 Cie 00' BIptYAL f0 ACCEPTABILITY THIS DESIGN AND /OR R GLADNEY SPECIFICATION IS APPROVED APPROVED. BY DEP, DATE W. BOLLIG CHE KED R. GEHRING APP OVED R. GEHRING DRAWN N.H. MEHTA Res 12/13/0 10 APPRO DATE 3.24.85 10.26.86 10.20.86 10.26.86 SUBTRLE TITLE DD RECEIVED CITY OF TUKWILA JUN 1 7 2 002 PERMIT CENTER HVAC PIPING BUILDING 2 -80 MECHANICAL MASTER COL. DA- DE /8 -17 CONSTRUCTION NOTES INSTALL HOT WATER SUPPLY AND RETURN PIPING TO UNIT HEATERS. CONNECT TO EXISTING PIPING WHICH WAS PREVIOUSLY STEAM AND CONDENSATE. INSTALL HOT WATER SUPPLY AND RETURN CONTROL PIPING AT UNIT. HEATER. E:>-INSPECT AND FLUSH EXISTING STEAM /CONDENS■TE PIPING AND COIL PRIOR TO TIE -IN TO HOT WATER SUPPLY /RETURN PIPING. RELABEL EXISTING PIPING AS HOT WATER SUPPLY (PREVIOUSLY CONDENSATE) AND HOT WATER RETURN (PREVIOUSLY STEAM). ® INSTALL 3" HOT WATER SUPPLY AND RETURN PIPING. INSTALL DOWNDRAFT UNIT HEATER. BOTTOM OF UNIT HEATER TO BE INSTALLED AT 14 -0" AFF. © INSTALL 3/4" HOT WATER SUPPLY AND 3/4" HOT WATER RETURN PIPING. INSTALL 3/4" FLOW CONTROL VALVE ON HOT WATER RETURN PIPING. INSTALL CHILLED WATER SUPPLY AND RETURN TO AHU- DD -11. ®INSTALL HOT WATER SUPPLY AND RETURN TO AHU- DD -11, FAN TERMINAL UNITS, DOWN DRAFT UNIT HEATERS AND CABINET UNIT HEATER. REMOVE TEMPORARY CHILLED WATER SUPPLY AND RETURN TO RELOCATED AHU -DF 10 AND CAP AT VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. �REMOVE TEMPORARY HOT WATER SUPPLY AND RETURN TO AHU -5 AND RELOCATED AHU -DF -10 AND CAP AT VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. INSULATE CHILLED WATER SUPPLY /RETURN AND HOT WATER SUPPLY /RETURN PER BOEING CONSTRUCTION SPECIFICATION SECTION 15260. INSTALL PHASE 1 PIPING UP TO EDGE OF TUNNEL SEE SK -1M62 AND SK -1M66 FOR TEMPORARY PIPING TO AHU -5 AND AHU- DF -10. INSTALL 1" CLEAR WATER DRAIN (CONDENSATE) FROM AHU- DD -11. TIE CONDENSATE DRAIN INTO SANITARY DRAIN PER M545. - 2 -81 BLDG. CITY Of TUKWIA APPROYED JUL - 8 2002 AS 60110 L0113C DP /SICNJ GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(08 MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW B 10' INTERVALS 2 " -3" DIA. PIPE B 15' INTERVALS 4 " -6" DIA. PIPE ® 20' INTERVALS REFERENCE DRAWINGS 17 PLANT 2 KEY PLAN 0 ISSUED FOR CONSTRUCTION SCAB N. JOB NO. DWG N0. 2 80 BLDG. Va � C DRAWN: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET REVISIONS BY Harris Group Inc. E 1 M66 760015 REVISION "E" ONLY 2- 80 -1M66 DATE PROJECT 5.01.02 11081.00 ENG NEER: CHECKED: MLD RB DATE 5.01.02 COMP N0. — MATCHLINE, SEE UGM 116 I — I \ g STORAGE ! WIND TUNNEL 1 ; { ` � k N �� MATGHLINE, SEE UGM 111 I._ >_ 1t)tII1111tl ll tl 1i 11 i! r t al ;1 P t i t f \i1 ll ll !S ImtI — It 11 %l 1 t 71 i411 \( 11i 1! 1 /111 4! {: if 111 r ! V Ir \I V U 1f If I/ 1/ V 11 51 ll 1! 1! 11 Il 11111111111111 I1 /1 f1111f 11 /111 !11111 Il %5 !t 1111 .'51{111 if V Il II 1f If 1! II 11 la it V/ If 11 V 1� Il Ir vl 07 1/ , , , f/ V I! y i If {lll _ t 11 °— — � _ J i-t A l OE1111HI I COMMON BUILD UP " ALDS L ANECHOIC CHAMBER = __ STORAGE SAN (P I SEE 1v1 PED), UP 12 H "_ fl fl ll I1 It fl itl 11 11 15 /1 1 %1 It ll !1 )l fl i f 1! V 1f tl 1! 1/ 1/ f! 1f V V 1l II III = 1 fl It ll ll 1f 11 V ll al 1! 1 V V T.,..4 ........... I 1{ f f fl f1 ! 11 1 1 1\ 11 II 111+ e 11 11 111_ I I{t/ Ii1L I :A iIL ....... 11 / If !V If It ll 1115 '� /l !t It Il l4 11 !tt 1 11 1{ 7 / ILLI.I l 111 / V 1! 1/ {/ 11 1! If 1! tl f "" 1, ` ' IIIII AN (PUMPED) SANITARY LIFT STATION \ 1 i II t � \� \ �/ , m 0 x . . ,irf. ■ x cA1Y Of VM41 eon JUt - 8 2 PARTIAL PLAN VIEW °� � ` _ _ �� SYM A AS BUILT LSAF CONTROL ROOM REVISION J#711975 BY HPN APPROVED DRS DATE 2.24.98 5.01.02 SYM REVISION BY APPROVED DATE ii CALF. I/8 =1 — 0 AC R FE DERSPIEL DA 511.93 THIS DESIGN AND / OR SPECIFICATION IS APPROVED. APPROVED BY DEPT. DATE SUBTLE TITLE MECHANICAL MASTER DF DH DI DJ 0 02 PLUMBING PLAN BUILDING 2 -80 DE— DJ/8 -17 E RECEIVED ^ITY OF TUKWIL4 JUN 1 7 200Z -.RMIT CENTER LEGEND GENERAL NOTES >t SEE 2— YD —C314 FOR STORM /SANITARY SEWER. 2 80 BLDG. KEY PLAN SCKE NB PP •VED *SG /lee 00081: -- ' ECK.. W WBB REFERENCE DRAWINGS CONSTRUCTION NOTES TIE SAN (PUMPED) INTO LIFT. STATION. SEE 2- 80 —C314. CURB REVISION SYMBOL J #711975 ISSUED FOR CONSTRUCTION HEFT' UGM112 JOB NO. REVISIONS BY Harris Group Inc. DATE 5.01.02 F NOOINEER: PLANT 2 ' 2- 80- UGM112 REVISION "B" ONLY PROJECT 11081.00 CHECKED: RB 5.01.02 SYM A AS BUILT LSAF CONTROL ROOM 3"VTR REVISION J #711975 BY HPN HGI /MLD APPROVED DRS DATE 2.24.98 5.01.02 SY REVISION BY 13.1 APPROVED DATE PARTIAL PLAN VIEW SCALE: 1/8 " =1' -0" elA ireriEsAw. — BONAL ea- EXPIRES 12/13/e3 ACCEPTABILITY DRAWN R. F THIS DESIGN AND /OR CHECKED SPECIFICATION IS APPROVED ENGINEER ` APPROVED BY DEPT. DATE CHECKED APPROVED APPROVED DATE 6.11.93 SUBTITLE TITLE 1612- YD -0523 UMPED SAN (FORCE MAIN) SAN LIFT STATION M1 DE MECHANICAL MASTER PLUMBIN PC'J BUILDING 2 -80 DA- DE/8 -17 LEGEND GENERAL NOTES SEE 2- YD -C314 FOR STORM /SANITARY SEWER. CONSTRUCTION NOTES RELOCATE UNDERGROUND PLANT AIR TO ACCOMMODATE CONSTRUCTION. BRING UP INTO, AND OUT OF 6" WALL, OVERHEAD AT COL DB/11. 1> ROUTE TO MISS PILE CAP. REFERENCE STRUCTURAL DRAWING 2- 80 -516. SEE DWG 2- 80- UGM116R FOR REVISION TO UNDERGROUND AIR PIPING. REFERENCE DRAWINGS (0 2 -81 BLDG. 2 80 BLDG. RECEIVeD CITY OF 7uKwlu JUN 1 7 2002 PERMIT CENTER PLANT 2 KEY PLAN HIS ISSUED FOR CONSTRUCTION JOB NO. DWG NO. REVISIONS BY Harris Group Inc. REVISION "B" ONLY A P VED DATE PROJECT 079r 5.01.02 11081.00 DRAWN: CHECKED: ENG NEER: CHECKED: WJB WBB MLD RB CURRENT REVISION SYMBOL B DATE p J #711975 B 5.01 02 SHEET UGM 116 2- 80- UGM116 COMP NO. T O 1 _�/ 1 X 1 I Cal LJ L Mr/ arIIIIII/A al/AV .. 4 � ..., 99 1 /1. . J/C/ /7/ Ar AMPIONGIIP,o, � 4 1 $ 0 I 4 PA I ILA I . 20 STANDPIPE DOWN I 2 A1N INLET AREA TRANSPORTATION } CLEAN I s �3"VDR � 1 i /2" I/ ' i? , ��/ VESTIQULE - f FCO y " ,ie 4�/! C1 SEE 1M116 FOR � „ CONTINUATION 4 'SAN UP ` It sL 4" SAN QL 1.1^10f1 If r /�rol►�M226% III" .41/ • I . + I i � MATCHLINE, . T� - = ELE ROM ( WIND TUNNEL q 4 2" UP TO SINK �� 1 1 2 V .3 SAN UP h � 2 "SAN UP , ) 2" UP :TO WATER 1 _ HEATER DRAIN b� 11 2" PUMPED SAN, UP SEE 1M116 I II I L _ 2 "SAN UP CU IBL J O — r. I S R ti N CONTROL ROOM 4" VTR STORAGE U( COMMON BUILDUP AREA 1 II I 1 MATCHUNE, SEE UGM112 SYM A AS BUILT LSAF CONTROL ROOM 3"VTR REVISION J #711975 BY HPN HGI /MLD APPROVED DRS DATE 2.24.98 5.01.02 SY REVISION BY 13.1 APPROVED DATE PARTIAL PLAN VIEW SCALE: 1/8 " =1' -0" elA ireriEsAw. — BONAL ea- EXPIRES 12/13/e3 ACCEPTABILITY DRAWN R. F THIS DESIGN AND /OR CHECKED SPECIFICATION IS APPROVED ENGINEER ` APPROVED BY DEPT. DATE CHECKED APPROVED APPROVED DATE 6.11.93 SUBTITLE TITLE 1612- YD -0523 UMPED SAN (FORCE MAIN) SAN LIFT STATION M1 DE MECHANICAL MASTER PLUMBIN PC'J BUILDING 2 -80 DA- DE/8 -17 LEGEND GENERAL NOTES SEE 2- YD -C314 FOR STORM /SANITARY SEWER. CONSTRUCTION NOTES RELOCATE UNDERGROUND PLANT AIR TO ACCOMMODATE CONSTRUCTION. BRING UP INTO, AND OUT OF 6" WALL, OVERHEAD AT COL DB/11. 1> ROUTE TO MISS PILE CAP. REFERENCE STRUCTURAL DRAWING 2- 80 -516. SEE DWG 2- 80- UGM116R FOR REVISION TO UNDERGROUND AIR PIPING. REFERENCE DRAWINGS (0 2 -81 BLDG. 2 80 BLDG. RECEIVeD CITY OF 7uKwlu JUN 1 7 2002 PERMIT CENTER PLANT 2 KEY PLAN HIS ISSUED FOR CONSTRUCTION JOB NO. DWG NO. REVISIONS BY Harris Group Inc. REVISION "B" ONLY A P VED DATE PROJECT 079r 5.01.02 11081.00 DRAWN: CHECKED: ENG NEER: CHECKED: WJB WBB MLD RB CURRENT REVISION SYMBOL B DATE p J #711975 B 5.01 02 SHEET UGM 116 2- 80- UGM116 COMP NO. A RECORD DRAWING LASE RECONFIGURATION LSAF CONTROL ROOM 1M111 M540 REVISION 11 • ,a 111111111111 ■ dl I Ai t I N 1 1/4" M 1 /2" 1M111 FUSELAGE PRESSURE TEST AIR, TYPI AL 1 EACH CHAMBER 1M111 1M525 � bah 111 8" GATE VA , FOR PIPING A MUFFLERS IN THIS AREA SE PLAN DETAIL 1/4" QUICK DI CONNECT SOCKET, TYP IF 3 FOR 100 PSI AIR up. END OF MAIN DRIP, SEE D , IL A 1M 4" BALL VALVE 12 "VAC, BOP 14 -2" AFF M526 al FV -4 L ► � ; w ice & VIA 2" /� ri I�t I�� 4 t I —�l I�y ) 7 , 3' A(10) 1M111 1M527 A(3001 =VAC c HI 1 i / 17 L SEE PARTI P.AN DETAIL 3 1M111I1M 3 /4 "CW UP THRU ROOF SEE SHEET RFM61. 1/2 3/4" HOSE BIBB CONN (2 TYP) 28 1" WALL PENETRAT ON SLEEVE FOR H IRAULIC PIPING, BELOW DUCT. FOR HEIGHT SEE DI AIL Allik 3 /4 "CW 1M111 1M525 19X19 I Ilk IS* Migh 1M111 1M52. MI v S ill ®® I�il�� COMPRESSED AIR VALVE /ILTER STATION I SERVIN3 CHAMBER DOORS. A I 1 IF 1 1/4 1 1/4" SEE DETAIL 1/4" 1/2"; DUP EX SEE DETAIL CONN VAC L 1 1/4" BOP 141' -6" OW 1 1/4" 1 1/4" 1 1/4" HOSE BIBB 4' -8" AFF 1 1/4" ROUTE PIPING TO CLEAR OVERHEAD CRANE SERVICE AREA BOP 12' -0" AFF WALL PENETRATION FOR HYDR/)ULIC PIPING am, ■ 1 1/4" 1 1/4"11 525 12" 12" A(300) 12", BOP 133' -0 " -F BOP EL 120' -0'' EXPIRES 1 5 O0 N APPROX 28' -0" i po ■ :i 0 6000 SCFtd VACUUM PUMP--"? l BOP 12' -0" AFF VAC SUPPO T W SEISMIC BRACING 1/2" CW LINE DN TO TRAP PRIMER. 120' -0" 10 0 FOR CONTINUATION SEE DETAIL 3 1M 1 1/4" OIL FILTERS, AIR DRYER AND PRESSURE REDUCING STATION FOR 100 PSI INSTRUMENT AIR TO CONTROL VALVES, AND 15 TO 20 PSI INSTRUMENT AIR TO HVAC ALONG WALL SEE SHT M314 FOR DIAGRAM OF INSTALLATION SEE MECH DWG 2- 81 -1M113 FOR CONTINUATION FOR AIR PIPING THIS AREA SEE PLAN DETAIL EXIST 4" CW J #982188 J#711975 1M525 BY DG HGI /LJC HGI /MLD 1 r APPROX 14' -0" APPROVED KP. APPROX 17' -6" DATE 2.1.95 7.28.00 5.01.02 1/2' 1/2" SY 1 1/2" FV -i FV -2 &VIA REVISION FR - 1 4iIFHl� FP. -1 4" 0 PIPE AT 20' -0" AFF BY 12 • A(300) -4A FV -5 V -1 IN F FLO•' PLAN 1/8=1-0" unr 12'. APPR MATCHLINE SEE 1M115 DATE 12rv'A "6'NGf/ A TO POINT OF CONNECTION AT COLD WATER LINE ABOUT 40 -0" "NORTH OF COLUMN DD 1/2" CW DN TO TRAP PRIMER SERVING FLOOR DRAIN. SEE SHT. 1M111 FOR CONTI- NUATION. DRAWN ACC PTABILITY D. MINGA THIS DESIGN :AND /OR CHECKED SPECIFICATION IS APPROVED D GEONANGA ENGINEER APPROVED BY DEPT. DATE K. RAMSEY CHECKED PPROVED APPROVED DATE P. WOLF G. SMITH P. LONG 0 . DC TITLE • 9f SUBTITLE 12" PPE BOP 2' -0" AFF BUILDING 2 -80 MECHANICAL MASTER COL. DC- DJ/17 -22 FII F = 205R0111 X 11 LEGEND FLOOR PLAN UTILITIES PIPING CITY Of ROO ,APPROVED JUL - 8 2082 MS WILD RECEIVED CITY OF TUKWILA JUN 1 7 2002 PERMIT CENTER 8' 4' 1. SEE SHEETS M1a, M1b AND M1c FOR MECHANICAL LEGEND AND ABBREVIATIONS. GENERAL NOTES (EXISTING) INDUSTRIAL ACOUSTICS CO.. (IAC) SILENCER, MODEL 12 -PA -2 -104 REPLACED WITH (NEW) IAC SILENCER, MODEL 18- PFCL -36, ADD ADDITIONAL MAKE -UP FITTINGS AND CONTROL VALVES PER DETAIL 1M111 1M527 2. SEE SHEET M314 COMPRESSED AIR AND VACUUM SYSTEM DIAGRAM FOR REFERENCE. E> 1/2" AIR DN SERVING CHAMBER DOOR. ® DO NOT SECURE PIPING, PIPE SUPPORT AND RELATED ACCESSORIES TO ANECHOIC OR REVERB CHAMBER EXTERIOR WALL. 1/2" COLD WATER DN IN WALL FOR TRAP PRIMER. SEE DWG. 1M112 FOR REFERENCE. CONSTRUCTION NOTES 12> INSTALL 12" 300# FLANGED GATE VALVE WITH GASKETS. VALVE IS BEING RELOCATED, SEE 2- 80- 1M112R. 2 -81 BLDG. GRAPHIC SCALE PLT 2 RK = 4.6.93 8 1. Maa -Ia. L� Dom_ ISSUED FOR CONSTRUCTION 2 -80 BLDG. KEY PLAN SCALE MS PRO D AWN: CKED: MDH WJB CURRENT REVISION J #711975 SHEET JOB NO. REVISIONS BY Harris Group Inc. PL -2 -92064 16' SYMBOL 1M111 DWG No. 2- 80 -1M111 REVISION "B" ONLY DATE 5.01.02 ENGINEER: MLD DATE 5.01.02 COMP NO 32' PROJECT 11081.00 CHECKED: RB SYM REVISION '3" -A300 TO 2 -81 SEE 2- YD -M134 PT 1 LSAF CONTROL ROOM J #711975 1 1 2 " -A300 POCK SET 125 PSI 300 -100 SET 100 PSI V- 3_LSAF BLEED 3 VALVE .t. 12 " -A30 AUXILARY 6" CONNECTION FOR GE /UPS RIG - SEE DWG 2- YD -M621 t " -IA, FUTURE 1 I PT 1 12 " -A300 VENT VENT CV- 3_LSAF DRAIN VALVE 1 " -IA 100 PSI SEE 2- 8O -1M112 4 " -A300 C 3' -A300 TO IMF < 3 " -A3003"-A300_. SEE 2- YD -M134 1 WI 12 " -A300 2- YD -M134 TO INTO 8 " -A300. CSEE BY HGI /MLD APPROVED `A- T 5.01.02 V- 9_LSAF V- 8_LSAF V- 6_LSAF V- 7_LSAF 12x8 " -A300 PI I I Y b I I SECONDARY VENTURI 600 kW ELECTRIC HEATER ACCEPTABILITY THIS .DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY b PRIMARY VENTURI LOW TEMP SILENCER HIGH TEMP SILENCER ""l p rim:4* w. MUFFLER ON LTC ROOF Mb2- VENTT VENT VENT VENT RUPTURE DISC 2" -A300 DRAIN VA SUBTITLE TITLE 8 -SRV LVE 5.01.02 4.12.02 . � S.IaOZ VE S.4'3.02 MECHANICAL MASTER �0" TO LTC \ \ 10 " -A300 \ / TO LTC / 300 PSI -12" SUPPLY LINE FROM COMPRESSORS 12 " -A300 \SEE 2- YD -M621 300 PSI AIRLINE CIRCUIT BUILDING 2 -80 LEGEND SEE 2 -80 -MO FOR LEGEND, SYMBOLS AND ABREVIATIONS GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES INSTALL 12" 300# RF FLANGE, BLIND FLANGE AND GASKET. REFERENCE 1M112. INSTALL 12" 300# RF FLANGED SPOOL PIECE IN LOCATION WHERE VALVE WAS REMOVED. REFERENCE 1M112. INSTALL 12 " -A300 TO LSAF. CONNECT INTO EXISTING 12 " -A300 ON ROOF. REFERENCE 1M112. ® INSTALL 12" LSAF ISOLATION GATE VALVE (LABEL AS V- 1_LSAF). REFERENCE 1M112. INSTALL 10" LSAF CONTROL BUTTERFLY VALVE FLANGED SPOOL PIECE ('4'-0" LONG, LABEL AS V- 2_LSAF). REFERENCE 1M112. © INSTALL 3" LSAF BY -PASS BALL CONTROL VALVE ( LABAL AS V- 3_LSAF). REFERENCE 1M112. INSTALL A300 PIPING FROM EXISTING MUFFLER ON ROOF TO EXISTING G.E. TEST RIG. TIE INTO EXISTING 12 " -A300 ON ROOF. REFERENCE 1M112. ® INSTALL 6" MUFFLER CONTROL GLOBE VALVE (LABEL AS V- 4_LSAF). REFERENCE 1M112. [2:>- INSTALL 1 1/2 " -A300 FROM 8 " -A300 TO EXISTING A300 SERVICE LOCATED AT SOUTHEAST CORNER OF, ANECHOIC CHAMBER. REFERENCE 1M112. 1AINSTALL 3 " -A300 TO PRESSURE REDUCING STATION. LABEL PIPING AS INSTRUMENT AIR BEYOND PRESSURE REDUCING STATION. INSTALL 3 " -IA TO NEW LSAF CONTROL ROOM. INSTALL 1 " -IA TO CONTROL VALVES AND CONNECT TO EXISTING IA SERVICE LOCATED AT SOUTHEAST CORNER OF ANECHOIC CHAMBER. REFERENCE 1M112. MOUNT IA CONTROL VALVE CV- 2_LSAF AND CV- 3_LSAF ON 3/4" PLYWOOD NEAR V- 2_LSAF. REFERENCE 1M112. MOUNT IA CONTROL VALVE CV- 4_LSAF ON 3/4" PLYWOOD NEAR EXISTING MUFFLER. REFERENCE 1M112. INSTALL 12" INTF ISOLATION GATE VALVE. (LABEL AS V- 0_INTF). REFERENCE 1M111. v 3u L- 82 1182 is D OTED L RE^EIVED CITY OFTUKWILA JUN 1 7 2002 PLANT 2 ISSUED FOR CONSTRUCTION SYMBOL SHEET M321. Harris Group Inc. 11081.00 DATE JOB NO. J #711975 COMP NO. DWG N0. 2- 80 -M321 5.01.02 TO 2 -81 BLDG AHU'S 6 —HWR 2- 81 —M320 REVISION 3" —HWR > 2- FROM 2 -80 BLDG AHU, FT'S, UH'S RECORD DRAWING J #972197 -00 LOAF CONTROL ROOM J #711975 HGI /WC HGI /MLD APPROVED 7.28.00 5.01.02 1x3/4 2x1 1/2 1x3/4 1 1/4x1 1 G 4 REVISION 6 "x3" APPROVED 6 "x4" SUCTION DIFFUSER W/ STRAINER, TYP. 2 AUTO AIR VENT ? EXPIRES 12/13/03 '. 6" HWR — 300 GPM EXP TANK T -2 1/2" 4" STEAM 2- 80 —M322 6.3.98 4x2 1/2 (TYP) FROM 2 -81 BLDG AHU'S DOMESTIC TM WATER SYSTEM VV TO BUILDING 2 -81 2 1/2" CW 2- 81 —M321 . V .A FT 7-37 M > DOMESTIC NW 1 1 4' HWC RECIRCULATING FROM BUILDING 2 -81 EXP TANK T-.3 SECOND FLOOR 2 -80 BUILDING 2 1 2 "CW • FLOOR DRAIN I><1 C 1 1/2" P -9 FLOOR DRAIN POT FEEDER `e SAMPLE CO 4 NN. - Y FLOOR DRAIN 2 1/2" CW 2x1,1/2 2x1 1/4 2 1/2" HW I l 1 3/4" 2x1 1/4 FIRST FLOOR 2- 80— BUILDING HEX -2 Le_ I $ VACUUM BREAKER AIR SEPARATOR LIMIT OF VENDOR SUPPLY FOR THE PACKAGED DOUBLE WALL HEAT EXCHANGER 3/4" 3 "x1 1/2" ► , i 1 2 1 1800 LB /HR FLOOR DRAIN Y 3/4" RELIEF VALVE SET AT 50 PSIG r , y FLOOR DRAIN y FLOOR. DRAIN �3/4" CAPPED STUB 6" HWS — 300 GPM 3/4" PRESSURE REDUCING VALVE SET AT 15 PSIG MV M_ • ►/ n ►/ WATER METER WM -2 PUMP VACUUM BREAKER ACCEPTABILITY ISFRANKLIN . I o 10 16.97 THIS DESIGN AND /OR CHECKED SPECIRCATION IS APPROVED A. NAPIER 5.18.98 E NGINEL R APPROVED BY DEPT. DATE E. YOOSEFIAN 10.16.97 CHECKED C. SPRAGUE 6.3.98' APPROVED L COSTELLO 6.3.98 APPROVED R. McNIESH CONDENSATE RECEIVER TANK '1 1 CRU -1 3/4" PW 3" VENT THRU ROOF CONDENSATE RETURN SKID TLE MECHANICAL MASTER 4x1 \ 4x1 1" CONTROL VALVE PUMP II 2 1/2x2 PROCESS / �\ WATER \ 2- 80 —M321 2 1/2" CONTROL VALVE C 4" STEAM 2- 80 —M322 3/4" / 3/4" COND 2 -80 —M322 \ n 6, CONSTRUCTION NOTES INSTALL HOT WATER SUPPLY AND RETURN PIPING, TO AHU— DD - 11, FAN TERMINAL UNITS (4) VAV TERMINAL UNIT, UNIT HEATERS (5) AND CABINET UNIT HEATER. 1" STEAM 2 -80 —M322 2 2 1/2" COND TO SITE UTILITIES CONNECTION SUBTITLE STEAM, CONDENSATE & HEATING WATER PIPING DIAGRAM BUILDING 2-80 CATI 04 TOO ,}UL ° 820112 KG �p121 PLANT 2 ISSUED FOR CONSTRUCTION PR DRAWN: CH WJB CURRENT REVISION J #711975 SHEET JOB N REVISIONS BY Harris Group Inc. • M323 972197 -00 DWG No. 2 -80 —M323 REVISION "A" ONLY DATE PROJECT C 5 01.02 11081.00 KED: ENG NEER: CHECKED: WBB MLD RB SYMBOL DATE A 5.01.02 COMP NO. r2EFEIVED "" ^� TUKWILA J UN 1 7 2002 :WAIT CENTER 4 2x8,/4 2x8/4 2x3/4 2x8/4 2 I 2x8/4 2x3/4 1�1 2x8/4 3/4" -HWS 3/4" -HWS CKI 3/4" -HWS 3/4" -HWS REVISION LSAF CONTROL ROOM Jft711975 BY HGI /MLD 2" -HWS 2" -HWR V 101 APPROVED - AUTO AIR VENT AT HIGH POINT 1 IIP— '4 3/4" DRAIN AUTO AIR VENT -. AT HIGH POINT T 'I � 1 111 — '2-3/4" DRAIN FT 7v1 - AUTO AIR VENT AT HIGH POINT `8• T Ilt ICI t 1 II 1 .3 / 4" DRAIN AUTO AR VENT g AT HIGH POINT T AUTO AIR VENT AT HIGH POINT 2x3 /4 p p (�I ► I K D 4 T Ir- 2 x8/ 4 3/4" -HWS 101 III — 1 1 -3 / 4" DRAIN 2x1 1/2 AUTO AIR VENT AT HIGH POINT 1 1/2x3/4 (pH. q A f ba p �{ T 11— 2x8/4 3/4" -HWS I ,, I Y Ilr-- I 1 1 -3 / 4" DRAIN DATE 5.01.02 SY 3x2 3x2 v FT 2�2 3x1 1/2 3/4" DRAW I. 1 1/2" -HWR REVISION 3" -HWS 3x1 1/2 AUTO AIR VENT AT HIGH POINT EDI 3" -HWR T T HC APPROVED DATE 1 x3/4 I 3/4" -HWS /�' AU A VENT , T AT 0 1GH IR POINT T I•r 1 III 'It 3/4" DRAIN UH A 15 E A - AUTO AIR VENT nn T AT HIGH POINT �4 T T 3/4" -HWS cr I IIB - 1 41-3/4" DRAIN AUIR VENT g AT H IG POINT 1 1/2x3/4 T>KT T 11� 1 1 /2x3/4 3/4" -HWS A I 1 Ilr— '! 3/4" DRAIN 1 1 / --D /4 cp I 1*1 I9 1 /-- AUTO AIR VENT . AT 11101 POINT `9 - . T 111— 1 1/2x3/4 3/4" -HWS I 1 lit 3/4" DRAIN AUTO HIG I g AT 1 1/2x3/4 ct1 — TVf J DK. T I T 1 N, 1 1 — 1 1 /2x3/4 3/4" -HWS T cp 1 1 111 - '2-3/4" ORAN el,fireate N R VENT D4 (mCPIRGS 3x1 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT 3x1 AUTO AIR VENT T AT HIGH POIN 1 x3/4 y � q 9,- D I 1 Dt� 11' T , DATE DRAWN W. BOULDS VE 1x3/4 1x3/4 - 3/4" -HWS DATE 3" -HWS 3" -HWR 3.13.02 B. BRITTAIN 3.27.02 SUBTITLE TR 3.13.02 4.12.02 )0.02 5: /so�MECHANICAL MASTER 3/4" -HWS )I 1 'I'_ '2- 3/4" DRAIN TO 2 -80 BLDG AHU, FTU'S, UH'S & CUH 3" -HWS 2- 80 -M323 T AUTO AIR ON] T AT HIGH PO N r T IP 1 IIF- 11 3/4" DRAIN UH E 16 HEATING' WATER PIPING DIAGRAM BUILDING 2 -80 LEGEND GENERAL NOTES HOT WATER SUPPLY AND RETURN PIPING INSULATION PER BOEING CONSTRUCTION SPECIFICATION 15260. UNIT HEATER CONVERTED FROM STEAM HEATER TO HOT WATER HEATER. REFERENCE DRAWINGS MOTOR AND SOLENOID CONTROLS 2 -80 -0543 DETAILS CONSTRUCTION NOTES EXTEND TEMPORARY PIPING AS REQUIRED BASED ON RELOCATED • AHU -DF -10 DESIGN. SEE SK- 03238, SKIM62 AND SK -1M66. INSTALL TEMPERATURE CONTROL VALVE FROM RELOCATED AHU -DF -10 PRIOR TO COMMISSIONING AHU- DD -11. SEE SK- M323A. PHASE 1 CONSTRUCTION ACTIVITY. ® PHASE 2 CONSTRUCTION ACTIVITY. PLANT 2 ISSUED FOR CONSTRUCTION SHEET M323A RECEIVED CIN OF TUHWILA JUN 1 7 2002 11081.00 JOB No. 711975 DWG NO. 2 -80 -M323A PERMIT CENTER JUN ' 7 7002 . `ER Harris Group Inc. COMP NO. ti SYM A LSAF CONTROL ROOM ROOF SA9000 MAX / 2240 MIN MEZZANINE CEILING E RAG REVISION 6 CUSTOMER OFFICE ZONE -1 RECORD DRAWING J #982188 J #711975 BY HGI /LLC HGI /MID HARDWIRE W/ SA SMOKE ALARM FAN STARTER SA TEMP (ADT) (DIV 16) START SPEED PROOF AIRFLOW j TEC I I SPACE HIGH LOW VAV HTG CMCS I TEMP AIRFLOW AIRFLOW DAMPER START COIL AI AI AO DI H c L APPROVED r AI DATE 3.01.02 5.01.02 SYM D -1 AO DO AO J COWS — CHWR- -I-- IHWRd CLG COIL REVISION HTG COIL HWS — SA SA SA FILTER CHANGE HARDWIRE W/ FAN STARTER I TEC I SPACE HIGH LOW VAV HTG CMCS TEMP AIRFLOW AIRFLOW DAMPER START COIL L AI AI I Ai AO DO AO RAG MIX TEMP CONTROL ROOM NORTH ZONE 3 m v r� r— r— RAG SA SA SA APPROVED • DATE H - � �1- AO OA / DAMPA /RERS EXH j TEC I SPACE HIGH LOW VAV HEG I CMCS -I TEMP AIRFLOW AIRFLOW DAMPER START COIL I L AI AI AI A O DO AOJ p rdtzE:eev® INTERLOCK DAMPERS 16) U U - U U O N OI NI cv SA SA SA 1j HIGH BAY RA- r CMCS - -- J SPACE HIGH LOW VAV HTG I TEMP AIRFLOW AIRFLOW DAMPER COIL START Ai AI I Imo I CONTROL ROOM SOUTHEAST CORNER ZONE 2 3 MNM f HWS HWR APPR TEC 0 L DRAWN W. BOULDS AO 1Y I j TEC -I I f I SPACE HIGH LOW VAV HTG CMOS - I TEMP AIRFLOW AIRFLOW DAMPER START COIL to • N SA SA LE AI AI AO b DATE SUBTITLE 2.25.02 TITLE AIL HWS ms �--pb— HWR FILTER CHANGE DPT\ 95% HEPA FILTER CONTROL ROOM SOUTH ZONE 4 800 CFM \CLEAN ROOM S/A M324A AF SA 1240 CFM J I U U M M SA SA SA SA S AIRFLOW/ CONTROL DIAGRAM AHU -DD -11 BUILDING 2 -80 ROOF /CLEAN ROOM TT / \ \M324A \ HIGH BAY AIR 1M12 / 1M16 MEZZANINE; 4or 1 a CEILING RAG a TOO JUL - 8 zeal ks SOtED � D X10+1 MECHANICAL MASTER PLANT 2 LEGEND GENERAL NOTES REFERENCE DRAWINGS 2 -80 -M324A AIRFLOW CONTROL DIAGRAM AHU -00 -11 2- 80 -M324B SEQUENCE OF OPERATION CONSTRUCTION NOTES DRAWING HAS BEEN COMPLETELY REVISED FOR LSAF CONTROL ROOM RELOCATION. 2. COORDINATE WITH BOEING FOR CONTROL SYSTEM DESIGN. 6 s 10 1VAL' 0 ACCE "TABILITY THIS DESIGN AND /OR SPECIFICATION IS 'APPROVED APPROVED BY DEP, DATE C ' D ENGINEER M. DAVIS CHECKED RECEIVED CITY OF TUKWILA JUN 1 7 2002 PERMIT CENTER ISSUED FOR CONSTRUCTION REVISIONS BY Harris Group Inc. REVISION "A" ONLY R D DATE PROJECT 5.01.02 11081.00 DRAWN: CHECKED: ENGINEER: - CHECKED: WJB WBB MLD RB CURRENT REVISION SYMBOL DATE J #711975 A 5.01.02 SHEET JOB NO. DWG NO. M324 982188 2- 80 -M324 COMP NO. Fi -5 M324 /CLEAN ROOM TT \M324 \ 800 CFM CEILING REVISION ROOF 'CV RA C° LSAF CONTROL ROOM J11711 BY HGI /MLD APPROVED DATE 5.01.02 WOMENS RESTROOM MENS RESTROOM SYM REVISION JANITORS CLOSET 350 CFM 350 CFM BY APPROVED DATE SA 6 CLEAN ROOM e 100 CAM TRANSFER GRILL IN INTERIOR DOOR I FXPIRFS 12/1 3/d.� CLEAN ROOM VESTIBULE RAG RAG ZONE 5 RAG RAG ZONE 5 ROOF CEILING 1 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE HWR DRAWN BOULDS � 26.02 3.29.02 3.01.02 4.12.02 G -- /a.o2.MECHANICAL MASTER PROVE TITLE r — CMS LSAF WEST HIGH BAY LSAF EAST HIGH BAY LSAF WALKWAY (TYP). 120V - J 0_ - - (SETPDINT 65'F) UH UH E 16 H 16 B H 11 DB DE UH UH E 16 A 15 SEQUENCE OF OPERATION (UH —XX): SYSTEM DESCRIPTION: • THIS SYSTEM CONSISTS OF A HOT WATER UNIT HEATER FOR SPACE HEATING. START - UP: 100 CFM • WITFI THE LOCAL MANUAL MOTOR STARTER (MMS) IN THE ON POSITION, THE UNIT HEATER FAN MAY BE ENERGIZED/ DE- ENERGIZED THROUGH THE 1200 IN -LINE THERMOSTAT. HEATING: • THE SPACE IN -ONE (LINE VOLTAGE) THERMOSTAT SHALL START AND STOP (CYCLE) THE UNIT HEATER FAN MOTOR, THROUGH THE MOTOR STARTER CONTACTORS AT ITS MMS, TO MAINTAIN SPACE SETPOINT TEMPERATURE OF 65 DEG F (ADJUSTABLE). • THE HOT WATER SOLENOID VALVE (TCV) SHALL BE WIRED IN CIRCUIT WITH THE UNIT HEATER FAN TO OPEN WHEN FAN IS ENERGIZED AND CLOSE WHEN THE FAN IS DE- ENERGIZED. • SEE ELECTRICAL DRAWINGS FOR WIRING DIAGRAM. SUBTITLE AIRFLOW / CONTROL DIAGRAM AHU -DD -11 BUILDING 2 -80 TRUSS LEVEL 'I� UNIT HEATER CONVERTED FROM STEAM HEATER TO HOT WATER HEATER. 2 -80 -M324 AIRFLOW CONTROL DIAGRAM AHU -DD -11 2- 80 -M3248 SEQUENCE OF OPERATION AHU -DD -11 2- 80 -E534 DETAILS (MOTOR AND SOLENOID CONTROLS) CONSTRUCTION NOTES BALANCE CLEAN ROOM TO PROVIDE POSITIVE PRESSURE OF .05" W.G. COORDINATE WITH BOEING FOR CONTROL SYSTEM DESIGN. LEGEND GENERAL NOTES REFERENCE DRAWINGS C Tr OC O JUL - 8 2002 Is IvWIcU - stc* PLANT 2 ISSUED FOR CONSTRUCTION DWG N0. • CURRENT REVISION SYMBOL SHEET M 324A JOB NO 11081.00 711975 2- 80 -M324A RECEIVED CRY OF TL'KVJIUI JUN 1 7 2002 PERMITCENTER Harris Group Inc. DATE 5.01.02 COMP NO. SYM DESCRIPTION: THE HVAC AIR -SIDE AND WATER -SIDE SYSTEMS FOR THE BOEING 2 -80 BUILDING SHALL BE CONTROLLED AND MONITORED FROM THE CENTRAL MANAGEMENT CONTROL SYSTEM (CMCS). THE CMCS SHALL BE A DIGITAL CONTROL SYSTEM NETWORKED WITH MODULAR BUILDING CONTROLLERS (MBC) AND TERMINAL EQUIPMENT CONTROLLERS (TEC). SEQUENCE OF OPERATION (AHU—DD-1 1): SYSTEM DESCRIPTION: • THIS SYSTEM IS A VARIABLE AIR VOLUME (VAV), AIR HANDLING UNIT (AHU) WITH CHILLED WATER COOLING COIL, HOT WATER HEATING COIL, OUTDOOR AIR ECONOMIZER AND SUPPLY AIR FAN. THE SUPPLY FAN IS PROVIDED WITH A VARIABLE FREQUENCY DRIVE (VSD). THIS SYSTEM SHALL BE CONTROLLED FROM THE CMCS. • THE AHU SERVES THE LSAF CONTROL ROOM, CUSTOMER ROOM, CLEAN ROOM AND VENTILATION FOR THE GENERAL HIGH BAY AREA. • THE CLEAN ROOM WILL BE SUPPLIED FROM THE MAIN SA PLENUM THROUGH A SINGLE DUCT VAV UNIT (VAV -1) AND 95% HEPA FILTER (AF -7) BOOSTED BY SUPPLY FAN SF -10. • THIS SYSTEM ALSO INCLUDES 4 PARALLEL FAN POWERED TERMINAL UNITS (FT) WITH HOT WATER HEATING COILS AND SHALL BE CONTROLLED FROM THE CMCS. START -UP (DD -11): • WITH THE SUPPLY FAN MOTOR STARTER SWITCH AT ITS VFD IN THE "AUTO" POSITION, THE AHU SUPPLY FAN MAY BE ENERGIZED/ DE- ENERGIZED THROUGH ITS MOTOR STARTER CONTACTOR BY: 1.). A START /STOP COMMAND ISSUED BY AN OPERATOR FROM THE CMCS; 2.) THE PRE - PROGRAMMED OCCUPANCY SCHEDULE; OR 3.) NIGHT OVER -RIDE AT SPACE TEMPERATURE SENSOR. • THE CMCS SHALL ENERGIZE SUPPLY FAN (SF -10) PRIOR TO ENERGIZING AHU FAN. • THE CURRENT SENSOR SWITCHES (IS) SHALL INDICATE SUPPLY FAN RUN STATUS AT THE CMCS. • WHEN THE AHU IS ENERGIZED, THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED UNTIL THE RETURN AIR TEMPERATURE (TT) IS A MINIMUM OF 68 DEGREES F (ADJUSTABLE), THEN THE DAMPER MAY OPEN. • WHEN THE AHU IS DE- ENERGIZED OR SAFETY SHUTDOWN OCCURS, THE CMCS SHALL POSITION THE RETURN DAMPER OPEN, THE OUTSIDE AND EXHAUST AIR DAMPERS CLOSED, AND THE VALVES CLOSED. SAFETY: • SHOULD PARTICLES OF COMBUSTION BE SENSED, THE DUCT - MOUNTED SMOKE DETECTORS (HAS - SUPPLIED UNDER DIVISION 16) SHALL DE- ENERGIZE THE AHU SUPPLY FAN, CLOSE THE SUPPLY AND RETURN AIR DAMPERS, AND INDICATE AN ALARM AT THE SIEMENS FIRE ALARM PANEL. SMOKE DETECTORS SHALL BE LOCATED IN THE SUPPLY AND RETURN AIR PLENUMS AND SHALL BE HARDWIRED TO THE FAN MOTOR STARTER. (THE SMOKE DETECTORS ARE PROVIDED AND HARDWIRED UNDER DIVISION 16.) A MANUAL RESET AT THE AHU SMOKE DETECTORS MUST BE RESTORED TO ENERGIZE THE AHU FAN FOLLOWING A SMOKE DETECTION SHUTDOWN. • THE LOW -LIMIT TEMPERATURE OWITCH (TSL) SHALL DE- ENERGIZE THE AHU SUPPLY FAN AND INDICATE AN ALARM AT THE CMCS SHOULD THE TEMPERATURE FALL BELOW 35 DEGREES F (ADJUSTABLE). THE TSL SHALL BE HARDWIRED TO THE FAN MOTOR STARTERS. THE CMCS SHALL OPEN THE HEATING CONTROL VALVE TO 100% DURING A TSL ALARM CONDITION. AHU SUPPLY FAN CONTROL: • SUPPLY FAN: THE CMCS, SENSING THE DIFFERENTIAL PRESSURE TRANSMITTER (PT) LOCATED IN THE SUPPLY AIR DUCT, SHALL CONTROL THE SUPPLY FAN SPEED THROUGH THE VSD TO MAINTAIN SUPPLY PRESSURE OF 1.0 INCH W.G. (ADJUSTABLE). THE PT SHALL BE LOCATED IN THE SUPPLY AIR DUCTWORK AS SHOWN ON THE DRAWINGS. REVISION LSAF CONTROL ROOM J #711975 HGI /MLD APPROVED DATE 5.01.02 SYM AHU COOLING AND HEATING CYCLES: • THE CMCS, SENSING SPACE TEMPERATURE SENSORS (TT), SHALL RESET THE SUPPLY AIR TEMPERATURE (TT) SETPOINT AND THE MIXED AIR TEMPERATURE (TT) SETPOINT BASED ON A RESET SCHEDULE. THE RESET SCHEDULE SHALL BE DETERMINED BASED ON SPACE TEMPERATURE (TT) WITH THE GREATEST COOLING LOAD DEMAND. b.) 67 - 65 - 63 - 61 _ 59 - 57 - 55 - 53 - FT SPACE COOLING AND HEATING CYCLES: — + HEATING & COOLING I (HW, CHW,I & ECONO) I I I I I I I I I I 68 70 72 74 76 78 SPACE TEMP ('F) NV GREATEST DEMAND FOR COOLING AHU COOLING LOAD RESET SCHEDULE AHU—DD-1 1 • AHU COOLING AND HEATING: THE CMCS SHALL CONTROL THE CHILLED WATER VALVE, THE ECONOMIZER CYCLE, AND THE HOT WATER VALVE IN SEQUENCE TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT SUBJECT TO MINIMUM OUTSIDE AIR REQUIREMENTS. 1.) AHU COOLING (OUTDOOR AIR ECONOMIZER): a.) WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE (TT) BETWEEN 55T AND RITE (ADJUSTABLE), THE CMCS SHALL OPEN THE EXHAUST AIR DAMPER AND MODULATE THE OUTSIDE AND RETURN AIR DAMPERS CORRESPONDINGLY TO MAINTAIN MIXED AIR TEMPERATURE SETPOINT (ADJUSTABLE). WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE BETWEEN 60'F AND 75T (ADJUSTABLE), THE CMCS SHALL FULLY OPEN THE OUTSIDE AIR AND EXHAUST AIR DAMPERS AND CLOSE THE RETURN AIR DAMPERS. c.) WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE (TT) LESS THAN 55T OR GREATER THAN 75F (ADJUSTABLE), THE CMCS SHALL POSITION THE OUTSIDE AIR DAMPER TO MAINTAIN MINIMUM OUTSIDE AIRFLOW SETPOINT • FT SPACE COOLING: THE CMCS, SENSING THE SPACE TEMPERATURE (TT), SHALL MODULATE THE FT PRIMARY AIR DAMPER (M) ON THE FT UNIT TO MAINTAIN SPACE TEMPERATURE SETPOINT OF 74 DEGREES F (ADJUSTABLE). • FT SPACE HEATING: THE CMCS, SENSING SPACE TEMPERATURE (TT), SHALL MODULATE THE FT PRIMARY AIR DAMPER ON THE FT UNIT TO ITS PREDETERMINED MINIMUM SETTING AND SHALL START THE UNIT FAN AND MODULATE THE HOT WATER VALVE (TCV) TO MAINTAIN SPACE TEMPERATURE SETPOINT OF 70 DEGREES F (ADJUSTABLE). \ \ \\ I T + HEATING ZERO 4- COOLING I (HW) BAND (PRIMARY AIR) 68 70 72 74 76 78 SPACE TEMP (T) FT —XX (TIP.) REVISION BY APPROVED DATE _ 100 - - MIN CLEAN ROOM SUPLY FAN OPERATION (SF -10): • CLEAN ROOM SUPPLY FAN (SF -10) AND FAN TERMINAL UNIT (FT -43) SHALL ACT AS A SERIES TYPE FAN TERMINAL UNIT. FAN SHALL OPERATE CONTINUOUSLY DURING OCCUPIED 'SCHEDULES. SYSTEM RETURN VOLUME DAMPER (MANUAL) SHALL BE POSITIONED TO PROVIDE .05 INCHES W.G. POSITIVE PRESSURE IN THE CLEAN ROOM AND VESTIBULE. FILTER CHANGEOUT (AF -7): • THE DIFFERENTIAL PRESSURE GAUGE/ TRANSMITTER (DPS) SWITCH, LOCATED ACROSS THE CLEAN ROOM HEPA FILTER, SHALL INDICATE FILTER CHANGEOUT ALARM AT THE CMCS WHEN THE FILTER PRESSURE DIFFERENTIAL SETPOINT (ADJUSTABLE) IS REACHED. MORNING WARM -UP MODE: • THE AHU SYSTEM WILL START 60 MINUTES (ADJUSTABLE) PRIOR TO THE OCCUPIED SCHEDULE', IF THE CMCS DETERMINES MORNING WARM -UP IS REQUIRED BASED ON DEVIATION FROM SPACE SETPOINT OF 72T (ADJUSTABLE) UNOCCUPIED MODE • NIGHT OVERRIDE: IF NIGHT OVERRIDE IS INITIATED AT THE SPACE THERMOSTAT, THE CMCS WILL OPERATE THE AHU SYSTEM UNDER OCCUPIED OPERATING CONDITIONS FOR A PERIOD OF 1 HOUR (ADJUSTABLE) • NIGHT SETBACK: IF THE SPACE TERMPERATURE FALL BELOW 55'F (ADJUSTABLE), THE CMCS SHALL ENERGIZE THE LOCAL FT TO MAINTAIN SPACE TEMPERATURE OF 55'F (ADJUSTABLE) ACCEPTABILITY This DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN W: BOULDS EKED W. BRITTAIN gLAratErAw. sZ PIRES 12/13/93. l APPROVED., 2.26.02 Jae SUBTITLE TITLE MECHANICAL MASTER SEQUENCE OF OPERATION AHU -DD -11 BUILDING 2 -80 LEGEND GENERAL NOTES REFERENCE DRAWINGS 2- 80 -M324 AIRFLOW /CONTROL DIAGRAM AHU -DD -11 2- 80 -M324A AIRFLOW /CONTROL DIAGRAM AHU -DD -11 CONSTRUCTION NOTES 1. COORDINATE WITH BOEING FOR CONTROL SYSTEM DESIGN. MO a- I PLANT 2 CITY Of TLIKWILA MO JUL - 8 ?002 AS WED ISSUED FOR CONSTRUCTION CURRENT REVISION SHEET M324B JOB N0. DWG N0. 11081.00 SYMBOL DATE 711975 2- 80 -M324B RECENED CiTV of TUKwiLA JUN 1 7 2002 PERMIT CENTER Harris Group Inc. COMP NO. 5.01.02 SYM A M450 M538 8" CHI�yS- 8" CH NR r- 6 HWS- -� FOR CONI SEE 2 -80 RECORD DRAWING • 20.4 3/4" DN FOR CONT SEE 2-80-1M 15 LSAF CONTROL ROOM L L_1 1 1/4" )N FOR COAT SEE 2 -80 -1 A165 M 50 M538 OF"'2"PW - 2M115 REVISION 61 a TWR(ABAND,` =•� CTWS(ABAND) -•] r •0 I II -3/4 "A ISSUED FOR CONSTRUCTION J #972197 - 00 J #992190 - 00 J #711975 L0 CC TI ISF- I(f- BY HGI /VEY HGI /RB HGI /MLD 0. CH L_ E R ROOV 2" APPROVED CU 01 6" HWR DATE 11 16.98 03.15.01 5.01.02 2 SY 2" M450 M538 3/4 CW4 CO CC N NI 3 U 2 0_ a AUTOMATIC AIR VENT REVISION D4 �2 1/2" A o •\ Gn 'g'► •I` 'Z4 < D M450 M538 = x I 1.3 2 U U !n i 2---t L O I N s! III 1 i I0 �• -1 16 8" CHWS 8" CHWR 6 HWS 3/4" A 2 1/2" PRESSURE REDUCING VALVE 1 "CW DN. FOR CONT SEE 2- 80 -1M115 1/2" PW TO DX -1� SEE 2- 80 -2M115 CHILLER ROOM SCALE: 3/8 " =1' -0" APPROVED DATE • QI 138 REDUCED PRESSURE BACKFLOW PREVENTER 3/4 "A 4 "MPS 2 "A (I) 2M65 M450 n 2 1/2 eL_AraPEzoma. RELIEF VALVE () PW - I -I-I -I -I I f MATCHLINE SEE DRAWING 2- 80 -M501 EXPIRES 12/137©2 637 `Ai APPROVED BY CEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE DRAWN S. FRANKLIN CHECKED A. NAPIER INGINtER E. YOOSEFIAN CHECKED G. FRANEK APPROVED J. SPRAGUE APPROVED T. NELSON 10.27.97 5.1 B.98 10:27.97 4.13.98 5.22.98 5.22.98 2"FD 3" MPS DN TO FLOOR DRAIN SUBTITLE TRL MECHANICAL MASTER 10 3 17.1 CHILLER ROOM PIPING PLAN BUILDING 2 -80 LEGEND FLEX CONNECTION I f:(1 BUTTERFLY VALVE GENERAL NOTES D SEAL PIPING AT WALL PENETRATIONS ALONG COLUMN LINE 17 PER SPECIFICATION 7270 "FIRESTOPPING ". CONSTRUCTION NOTES INSTALL HOT WATER SUPPLY AND RETURN TO LSAF AHU- DD /11, FAN TERMINAL UNITS, UNIT HEATERS AND CABINET UNIT HEATER. INSULATE HOT WATER SUPPLY AND RETURN PIPING PER BOEING CONSTRUCTION SPECIFICATION 15260.. GM OF TtOL APPROVED JUl - 8 2002 ahS ■OIEO tLUl1� D �� PLANT 2 ISSUED FOR CONSTRUCTION PPR D DATE PROJECT 5.01.02 11081.00 DRAWN: C ENGINEER: CHECKED: WJB WBB MLD RB CURRENT REVISION SYMBOL B DATE J #711975 B 5.01.02 SHEET JOB NO. NO. W RERIOIONO BY Harris Group Inc. M450 982188 REVISION "B" ONLY 2- 80 -M450 -IiY CEIVEO ()F T('HWILA JUN 1 7 2002 PERMIT CENTER COMP NO. LSAF CONTROL ROOM M452 M542 REVISION J#711975 BY HGI /MLD APPROVED Tj 1 M452 M452 M452 M541 DATE 5.01.02 SYM 1 1 /2 " -HWR, SEE 1M6 1 1 /2 " -HWS, SEE 1M6 SCALE: 1/4" = V - 0" 12x6 SA, 20x20 RA 20x20 RA MEI_ RA 22x52 SEE NOTE 2 => 24x24 ACCESS HATCH (BETWEEN DAMPER MOTOR AND SMOKE DETECTOR) © DUCT SUPPORT AT PENETRATION M452 M544 OA 24x54 EA 34x70 SEE NOTE 2 => 24x24 ACCESS HATCH FAN / VAV SUPPORT IYP 4 PLACES) '� 11/.. (5'PLACES) 12x12, [lN • 20x20 uiii =I,I 11 M452 M543 16X14 (DUCT PEN., 4 PLACES) 1 1 /2 " - CHWS, SEE 1M66_ 1 1 /2 " - CHWR, SEE 1M66 —� REVISION 1 " E - E C LD, TN 1M6. O') ENLARGED ME77ANINE PI AN DETAIL M544 APPROVED DATE 20x20 RA DUCT SUPPORT AT PENETRATION (4 PLACES 8 PLACES) (4 PLACES) M452 M544 7 -2" 2' -6" 1 6' -10" (EDGE FTU, 5 PLACES) 5 PLACES) (DUCT PEN., 4 PLACES) M1M12, M1M16 M452 SIM g 11 FYPIRFR 1 5111/8 APPROVED BY B2- CEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED. DEPT. DATE DRAWN W. BOULDS CHECKED W. BRITTIAN ENGINEER M. DAVIS CHECKED R. BERRY APROVE M544 2.21.02 3.29.02 4.05.02 4.12.02 S (092. SUBTITLE TITLE S"./a a2_MECHANICAL MASTER ENLARGED MEZZANINE PLAN LSAF CONTROL ROOM BUILDING 2 -80 COL. DC- DE.9/10 -13 LEGEND FOR LEGEND SEE 2 -80 -MO GENERAL NOTES 1. ALL DUCTWORK SHALL BE PROVIDED 081-1 SEISMIC RESTRAINTS IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. 2. DUCT DIMENSIONS LISTED ARE "FREE AND CLEAR" INSIDE DIMENSIONS, E> 1" THICK SOUND ATTENUATION LINING IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. ELBOW WITH TURNING VANES. RECTANGULAR RADIUS ELBOW WITH TURNING VANES. © EXTERIOR INSULATION APPLIED TO MEZZANINE LEVEL DUCT IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. E> FLEXIBLE BOOT FOR VIBRATION ISOLATION IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15240. ® AIR TIGHT FILTER HOUSING FOR 20x20x1 FILTER IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15885. F9 SPUTTER WITH TURNING VANES IN ACCORDANCE MEN BOEING CONSTRUCTION SPECIFICATION SECTION 15910. => AIR TIGHT DUCT. ACCESS HATCH PER BOEING CONSTRUCTION SPECIFICATION SECTION 15910. REFERENCE DRAWINGS 2- 80 -M1S16 PARTIAL MEZZANINE FRAMING PLAN CONSTRUCTION NOTES .DIFFERENTIAL PRESSURE TRANSMITTER. TIE OUTPUT INTO BOEING CMCS. SEE 2- 80- M324B. AAN--1A6 PLANT 2 cTY OF TUKWOLA APPROVED JUL - 8 2882 AS MOED �I e t DlvlsloN ISSUED FOR CONSTRUCTION 1 CURRENT REVISION SHEET JOB NO DWG N0. SYMBOL M452 711975 Harris Group Inc. 11081.00 2 -80 -M452 RECEIVED CITY OF TUKWILA JUN 1 7 2002 PERMIT CENTER DATE 5.01.02 COMP NO. RECORD DRAWING LSAF CONTROL ROOM REVISION UPDATED PER 2— YD —M556 RECORD DRAWING J #972198 J #711975 BY D.G. 901 /LAJ HGI /MLD M556 APPROVED K.R. DATE 2.01.95 1.08.01 5.01.02 2' -9 (REF) 12" TO PRIMARY AIR SOURCE MUFFLER SYM :ft=1 >11wIr 0.11' 9 1/2" 4' -6 1/2" 12" TO PRIMARY AIR SOURCE MUFFLER 10" TO SECOND RYA AIR SOURCE MUFFLER SEE SHEET 1M526 FOR CONTINUATION SEE 2- 81 -M113 MAKE PENETRATION WEATHER PROOF REVISION 10" TO SECONDARY AIR SOURCE MUFFLER 7' -2 1/4- BD -1 STRUCTURAL SUPPORT PLATFORM BY MECHANICAL CONTRACTOR 6" 2'X12 "X10" } 1 ;;i'IUM =i> . ii ?C BLOW -OFF BURGESS - MANNING MUFFLER (DA 3 -12 MODEL) (SUPPORT FROM WALL) 4' -1 1/2" (REF) V-5 P -1 PARTIAL ELEVATION SCALE: 1/4 " =1' -0 1M528 V -5 ABOVE V -4 BELOW APPROVED 6" ti 2" V -3 8 "WAFER BUTTERFLY (NO) JAMESBURY REVERBERATION CHAMBER 3 " -A300 MUFFLER (V -3 ABOVE) _ 7 fa d =11:0 {I.�= - -- — - 8"WAFER BUTTERFLY (NO) JAMESBURY \ --12 "VAC NOTES: 1. ROUTE PIPING CLOSE TO SOUTH WALL ALONG COLUMN DJ TO CLEAR ROADWAY SOUTH OF BUILDING. 2. VACUUM LINE NOT SHOWN FOR CLARITY. PARTIAL DETAIL PLAN (3 SCALE: 1/4 " =1' 0" 2- 80- 1M111, 2- YD -M125, 2- YDM134 1M528 DATE R -1 (V -2 ABOVE) g LAtinerEzAv. EXPIRES 1.2/13/x3 12 "VAC S E o u_ EPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. 12 " -A300, FOR CONTINUATION SEE DWG. 2- 80- 1M111, 2- YD -M134 —12" -VAC, FOR CONTINUATION SEE DWG..2- 80 -1M111 AIR FLOW (TYP) DATE DRAWN .1. HAINES J� S ENGINEER D. GEONANGA CHECKER G. SMITH APPROVED K. RAMSEY APPROVED P. LONG 12 " -A300, FOR CONTINUATION SEE DWG. 2- YD -M134 12" -VAC, FOR DETAILS SEE DWG. 2- 80 -1M111 ATE 4.14.93 FINISH GRADE SUBTITLE RE SECTIONS AND DETAILS PIPING & EQUIPMENT 2 -80 LEGEND 1. SEE SHEETS MO, M1A, M1B & M1C FOR MECHANICAL LEGEND AND ABBREVIATIONS. 2. FOR MECHANICAL PIPING GENERAL NOTES, SEE DWGS. 2- YD -M2a AND 2- YD -M2b. GENERAL NOTES REFERENCE DRAWINGS 2- YD -M2A & B GENERAL NOTES 2- YD -M134 PLUMBING CONSTRUCTION NOTES 1�INSTALL 12" 300# FLANGED GATE VALVE WITH GASKETS. VALVE IS BEING RELOCATED, SEE 2- 80- 1M112R. PLANT 2 G 18 UNDWNA JUL - 8 2002 AS NOIEU 1LD71K3 D ISSUED FOR CONSTRUCTION ie DRAWN: CHECKED: WJB WBB CURRENT REVISION J #711975 SHEET JOB N0. DWG REVISIONS BY Harris Group Inc. 1M528 PL -2 -92121 SYMBOL B REVISION "B" ONLY DATE 5.01.02 ENG NEER: MLD 2- 80 -1M528 R ECEIED CITY Of TU JUN 1 7 2092 PERMIT CENTER DATE COMP NO. PROJECT 11081.00 CHECKED: RB 5.01.02 IOY17 ImUSnRn Tnu /n9 1R OF SYM A PRESSURE RELIEF VALVE SET AT 125 PSI, VENT THRU ROOF FROM 3 " -A300 AIR MAIN 1" DRAIN VALVE SHUT OFF VALVE PRESSURE REGULATOR 300 -100 PSI SET 100 PSIG LSAF CONTROL ROOM PRESSURE ALARM SWITCH 4" DRY PIPE VALVE / ANGLE VALVE � 8'-0" 3 /4 "CGLOBE VALVE A.A.F. 3/4 "UNION W/1/2" ORIFICE. FLOW EQUAL TO ONE SPRINKLER HEAD - 3/4" PLYWOOD MOUNTING BOARD ATTACHED TO WALL COMPRESSED AIR DROP DETAIL SCALE: NTS REVISION PRESSURE RELIEF VALVE 5' -0" A.A.F. 4' -0" A.A.F. 2 "— RECORD DRAWING J #982188 FIRE PROTECTION RISER DIAGRAM DETAIL SCALE: NONE 4711975 FLOW SWITCH 3/4" GLOBE VALVE BY HGI /LJC HGI /MDH Doi (I� DRAIN CUP APPROVED I U�IDa OS &Y VALVE 1 ANGLE VALVE 4" ALARM CHECK VALVE 1' -0" A.A.F. 1M2661M513 DATE 7.28.00 5.01.02 1 " -IA TO 12 " -A300 CONTROL VALVES BLEED VALVE 3/4" 100 PSI AIR FOR CONT. SEE 1M116 PRESSURE REGULATING VALVE PAINT TO MATCH ADJACENT AREA 3 " -IA TO LSAF CONTROL ROOM PRESSURE REGULATOR 100 PSI - SERVICE PRESSURE SET ® 100 PSIG SYM 6 1M1121M513 3/4" UNION W/1/2" ORIFCE. FLOW EQUAL TO ONE SPRINKLER HEAD REVISION SCALE: NTS VEi JJ oIATIC AIR 3/4" PLYWOOD MOUNTING BOARD ATTACHED TO COLUMN OR WALL DETAIL SCALE: NONE 4 -WAY FROM ALL GRVD CPLGS ARE AIR PRESSURE REGULATOR - OF THE FLEXIBLE TYPE FLOW SWITCH 10" VIC FLG ADAP MAIN 100 PSI- SERVICE PRESSURE ' —r HORZ 2" PIPE STAND ° 10X8 GRVD RED (VIC #50) ATTACHED TO CMU WALL FLEX CPLG FLEX CPLG - PAINT TO MATCH FLGD JOINT (TYP) 6X0 -6 GG ma ?� 8X0 6 GG DRAI N ADJACENT AREA DPV ALV VIC FLG ADAP : ! 8" VIC FLG ADAP VALVE 2" PIPE STAND ATTACHED TO 6" ALV DPV VALVE SHUT OFF AIR FLTER -- PRESSURE REGULATOR SLAB (2 PLACES) 2" CLEARANCE 300 -100 PSI SLAB I �-- 2" CLEARANCE ���— 2 CLEARANCE --- 9 - - -- ft - -- —� COMPRESSED AIR DROP APPROVED 3/ 3/ 4 DATE 0Nj 0 N 3 1M 12 M 13 PRESSURE RELIEF VALVE SET AT 200 PSI 015 il E00C VJS 3/ 1 SO (A TI O P. V 1- PIPING CONFIGURATION AT UNIT HEATER PIPING AT FAN TERMINAL UNIT / VAV / CABINET HEATER SIMILAR DETAIL 1M62, 1M66 M513 p irastezAw® ELEVATION LOOKING NORTH SECTION SCALE: 1/4 " =1' -0" ACCEPTABILITY THIS.'. DESIGN AND /OR SPECIFICATION IS APPROVED DEPT DATE DRAWN J. RICHARDS ENGINEER NECKED APPROVED APPROVED A 1M266 M513 DATE SUBTITLE TITLE MECHANICAL MASTER BUILDING 2 -80 6" FIREWC_.K 90° FLEX CPLG 4 -WAY 6 "00 ELEVATION LOOKING SOUTH SECTION SCALE: 1/4 " =1' -0" LOW SPEED AEROACOUSTIC FACILITY SECTIONS AND DETAILS PLANT 2 4 -WAY 1M2621,0513 LEGEND GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES PRESSURE REGULATOR AND RELIEF VALVE. REPLACE WITH LIKE EQUIPMENT. SUBMIT TO ENGINEER FOR APPROVAL. MO»24 CITY Of TUYWI.A APPROVED JUL - 8 2002 AS NOIED RECEIVED CITY OF TUKWILS JUN 1 7 2002 PERMIT CENTER ISSUED FOR CONSTRUCTION of JOB N0. DWG NO. REVISIONS BY Harris Group Inc. DRAWN: . CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET M513 REVISION "A" ONLY 982188 2- 80 -M513 DATE PROJECT 5.01.02 11081.00 ENGINEER: CHECKED: MLD RB DATE 5.01.02 COMP N0. SYM CONDENSATE DRAIN PAN DETAIL 4 ONLY c, o c c RECORD DRAWING J #982188 A LSAF CONTROL ROOM 4711975 P rt ► 1 PRESSURE/ TEMPERATURE TEST PLUG (TYP) L- TRAP UNION (TYP) CONDENSATE DRAIN PIPE SEE DETAIL 3 SHEET M541 AHU COOLING COIL CONNECTION SCALE: N.T.S. M 541 AHU COOLING COIL CONNECTION • ►4 ►t • BY HGI /LJC HGI /MLD APP DATE 7.28.00 5.01.02 SY THERMOMETER (TYP) 0 -100F PRESSURE GAUGE (1 / - 0-100 PSIG (TYP.) AUTOMATIC F AIR VENT (TYP.) CONTROL VALVE DRAIN VALVE W/ HOSE CONNECTION & CAP (TYP.) SCALE: N.T.S. 1M66, M452 M541 DETAIL 1 ONLY CHWR _l, I La] - Z CHWS \ STRAINER ISOLATION VALVE (TYP) BALANCING VALVE CONDENSATE DRAIN PAN TRAP UNION (TYP) AUTOMATIC AIR VENT V I\ ash ►a V /CONDENSATE DRAIN PIPE SEE DETAIL 3 SHEET M541 AHU HOT WATER COIL CONNECTION n SCALE: N.T.S. 1M66, M452 M541 SDF CHECKED C. MAAS APPRO R. BERRY I-RR MO5. 1 9/ PRESSURE / TEMPERATURE TEST PLUG (TYP) �Y -- HWS STRAINER / DRAIN I — W/ HOSE VALVE CONNECTION & CAP (TYP.) B RAWN PTABILITY FG THIS DESIGN. AND /OR -' SPECIFICATION IS APPROVED APP ROVED BY CONTROL VALVE I I . P l B HWR BALANCING VALVE ISOLATION VALVE (TYP) APP D DATE 7.29.98 1.1.99 7.29.98 1.4.99 1.4.99 SUBTITLE MISCELLANEOUS DETAILS M541 982188 2- 80 -M541 COMP N0. REVISION 0 SUPPLY AIR BALL VALVE WATTS #B -6080 1/2" WALL MOUNTED DUPLEX AIR OUTLET SCALE: NONE UNION (TYP) VACUUM BREAKER STRAINER TEE (TYP) 1M1161M541 / PRESSURE GAUGE 0 -100 PSIG (TYP.) II1 >a AHU HEATING COIL CONNECTION SCALE: N.T.S. M541 1/4" QUICK DISCONNECT SOCKET, PARKER 822E 1/4" QUICK DISCONNECT BODY X 3/8" MPT STEAM CONTROL VALVE EL. 3' -6" AFF STEAM PRESSURE REDUCING VALVE 125 PSIG TO 15 PSIG I1 REVISION Z LPS B FLOOR DRAIN ENCASE END WITH CONCRETE BY APPROVED DATE RUN TO FLOOR OR ROOF DRAIN SLOPE SHALL BE MIN. 1/4" PER FT OF RUN AIR GAP: 2 TIMES PIPE 0 (MAX. = 2 ") EXISTING PVC OR CAST IRON PIPE TO BE PLACED OUT OF SERVICE END CAP TO MATCH EXISTING PIPE TYPE EQUAL TO 1/2 STATIC PRESSURE RATING OF UNIT PLUS 1" � PLUG CONDENSATE P TRAP DETAIL SCALE: N.T.S. M 541 AHU DRAIN PAN ON A DRAW THRU UNIT: EQUAL TO STATIC PRESSURE OF UNIT; ON A BLOW THRU UNIT: EQUAL TO 0" PIPE SIZE SAME AS UNIT DRAIN CONNECTION ALL INNER DIAMETER OF PIPE 12" MIN AND ENCASE END WITH CONCRETE OR NON - SHRINK GROUT TO ENSURE A PERMANENTLY WATERTIGHT SEAL. EXISTING CONCRETE OR CLAY PIPE TO BE PLACED OUT OF SERVICE MO- TYPICAL STORM / SANITARY SEWER TYPICAL STORM / SANITARY SEWER PVC OR CAST IRON END CAP DETAIL 4 CONCRETE OR CLAY END CAP DETAIL 5 NOT TO SCALE M 541 NOT TO SCALE M541 TDLE MECHANICAL MASTER 1 1/4 "C FROM INTF 2 1 /2 "CHWSJ 2 1/2 "CHWR 2" PCt 1 1/2 "MPS TO INTF STEEL PLATE FOR TEMPORARY PLUG BLOCKING. STEEL PLATE TO BE REMOVED WHEN LINE IS ABANDONED EXISTING FIRE MAIN. CONTRACTOR VERIFY MAT'L AND O.D. PRIOR TO CONSTRUCTION ROMAC STYLE "EC 501" END CAP COUPLING BUILDING 2 -80 T N NOT TO SCALE ENLARGED PLAN ov 111‘ CA 0 ,00 B 20112 D ot..9 PLANT 2 H Cfl \\ \\� /// MINIMUM 20 SQ. FT. OF STEEL \� \ PLATE SOIL BEARING AREA I P,-)..6 %/ EXIST PIPE TO .‹ BE REMOVED I. 3 "0 TYPICAL EXISTING WATER LINE END CAP FOR CONSTRUCTION SEQUENCING DETAIL n NOT TO SCALE J M541 ISSUED FOR CONSTRUCTION W RE090IORS BY Harris Group Inc. �pppp DRAWN: CH WJB CURRENT REASON J #711975 SHEET JOB NO. DWG N0. 1M66 M541 TOP OF EXISTING GRADE 1 KED: WBB SYMBOL 2 1/2" RECEIVED CITY OF TUKWILA JUN 1 7 2002 PERMITCENTER DATE 5.01.02 ENGINEER: MLD A DATE CHWR CHNWS REVISION "A" ONLY PROJECT 11081.00 CHECKED: RB 5.01.02 r SYM A LSAF CONTROL ROOM REVISION RECORD DRAWING J #982186 J #711975 BY HGI /UC HGI /MLD APPROVED DATE 7.28.00 5.01.02 SEM REVISION SECTION SCALE: 1/4" = 1' -0" APPROVED DATE 1M12, 1M16, M4521M542 Q�BOE /N6° o' A AC EPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE VEY CHECKED C. MAAS APPROVED R. BERRY 12.24.98 12.31.98 TNLE HVAC SECTIONS BUILDING 2 -80 ,i;t6 MECHANICAL MASTER PLANT 2 SEE 2 -80 -M0 FOR LEGEND GENERAL NOTES 1. ALL DUCTWORK SHALL BE PROVIDED WITH SEISMIC RESTRAINTS IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. 2. DUCT DIMENSIONS USTED ARE "FREE AND CLEAR" INSIDE DIMENSIONS: 3� 1" THICK SOUND ATTENUATION LINING IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. L 4 > ELBOW WITH TURNING VANES. RECTANGULAR RADIOS ELBOW WM-I TURNING VANES. © EXTERIOR INSULATION APPLIED TO MEZZANINE LEVEL DUCT IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. FLEXIULE BUVI FOR VIBRATION ISVIA1TUN IN ACCUHUAINCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15240. C � AIR TIGHT FILTER HOUSING FOR 20x20x1 FILTER IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTOR 15885. SPLNTER WITH TURNING VANES IN ACCORDANCE WITH BOEING:. CONSTRUCTION SPECIFICATION SECTION 15910. => 24 "x24" AIR TIGHT DUCT ACCESS HATCH PER BOEING CONSTRUCTI.DN SPECIFICATION SECTION 15910. REFERENCE DRAWINGS 2- 80 -M1S16 PARTIAL MEZZANINE FRAMING PLAN CONSTRUCTION NOTES SUPPORT FAN TERMINAL UNIT, VAV BOX, SUPPLY FAN AND AIR FILTER HOUSING WITH UNISTRUT AND SPRING VIBRATION ISOLATORS. RECEIVED CITY OF TUKWILA JUN 1 7 2002 PERMIT CENTER ISSUED FOR CONSTRUCTION SHEET JOB NO. DWG N0. REVISIONS BY Harris Group Inc. 'APP VED DATE P 5.01:02 11081.00 DRAWN: C CHED: ENGINEER: C WJB WBB MLD RB CURRENT REVISION SYMBOL DATE J #711975 A M542 982188 2 -80 -M542 REVISION "A" ONLY COMP NO. 5.01.02 S-6" 2' -0" 7' -0" 3 • -0 " ,• -0 • Mk v 8' -10" , ---1 J 20x20 L \ 1r r" 1- � - i I i - I II.� _ 1 1 � 1 N� 24x24 MIN ■ - �� " Z1X9 o i 'D _..,12 © VD 6 F � I I II�'� 0 10x10 i 70x34 RA r, SEE NOTE 21� j ` pM � tD�11 DUCT SUPPORT ©AT PEN 10 C t 0 �U ®2 `.�. r 4x12 ®() (TYP) DUCT SUPPORT i 8 0 NECK m MI (PP) l -AZ \ / \ / \ / \/\ $ AEA ©�� 14x16 - ,� - - - -- 1\ -� -� j r 22x36 640 CFM ' p� \ �- / � - . M542 M544 f i II / �� �� � 'V ® - - - SD - ' �I �® , 20x20 RA BIM _ � Y GT� PLENUM RETURN --A,--.- � 29x70 RA -(FAR SIDE) M542 M544 1I' �� 8x14 # C r Tr : - 4x4;; Aa Q � RG m 0 m 0 Mj m ml (BEYOND) I 1 ,7 N DUCT SUPPORT (SIM). 2 AT PENETRATION (TYP) 1 Fr ® x10 m i, 8x10 m v 11 • : • ■ • C II • I M542 M544 M542 M544 0 rilli SYM A LSAF CONTROL ROOM REVISION RECORD DRAWING J #982186 J #711975 BY HGI /UC HGI /MLD APPROVED DATE 7.28.00 5.01.02 SEM REVISION SECTION SCALE: 1/4" = 1' -0" APPROVED DATE 1M12, 1M16, M4521M542 Q�BOE /N6° o' A AC EPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE VEY CHECKED C. MAAS APPROVED R. BERRY 12.24.98 12.31.98 TNLE HVAC SECTIONS BUILDING 2 -80 ,i;t6 MECHANICAL MASTER PLANT 2 SEE 2 -80 -M0 FOR LEGEND GENERAL NOTES 1. ALL DUCTWORK SHALL BE PROVIDED WITH SEISMIC RESTRAINTS IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. 2. DUCT DIMENSIONS USTED ARE "FREE AND CLEAR" INSIDE DIMENSIONS: 3� 1" THICK SOUND ATTENUATION LINING IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. L 4 > ELBOW WITH TURNING VANES. RECTANGULAR RADIOS ELBOW WM-I TURNING VANES. © EXTERIOR INSULATION APPLIED TO MEZZANINE LEVEL DUCT IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. FLEXIULE BUVI FOR VIBRATION ISVIA1TUN IN ACCUHUAINCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15240. C � AIR TIGHT FILTER HOUSING FOR 20x20x1 FILTER IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTOR 15885. SPLNTER WITH TURNING VANES IN ACCORDANCE WITH BOEING:. CONSTRUCTION SPECIFICATION SECTION 15910. => 24 "x24" AIR TIGHT DUCT ACCESS HATCH PER BOEING CONSTRUCTI.DN SPECIFICATION SECTION 15910. REFERENCE DRAWINGS 2- 80 -M1S16 PARTIAL MEZZANINE FRAMING PLAN CONSTRUCTION NOTES SUPPORT FAN TERMINAL UNIT, VAV BOX, SUPPLY FAN AND AIR FILTER HOUSING WITH UNISTRUT AND SPRING VIBRATION ISOLATORS. RECEIVED CITY OF TUKWILA JUN 1 7 2002 PERMIT CENTER ISSUED FOR CONSTRUCTION SHEET JOB NO. DWG N0. REVISIONS BY Harris Group Inc. 'APP VED DATE P 5.01:02 11081.00 DRAWN: C CHED: ENGINEER: C WJB WBB MLD RB CURRENT REVISION SYMBOL DATE J #711975 A M542 982188 2 -80 -M542 REVISION "A" ONLY COMP NO. 5.01.02 SEE NOTE 2 34x70 AHU' D -11 °h 1 2 9 7riP' _ - - 34x70 RA BEYOND l7l�fl 20x20 RA 131111' I 29x70 OPEN FACE RA o �_N 1110;20x20RA X11 r+ -6060 Nip " x1 � I�r�p1A0)•� ►.1 4x10 'n 'j' 6x10 ��� ►� V v /I�Irrz x10 14x8 4212 �- 48 10x8 ! =�I 8 4x12 10x8 08 14x8 4x12 10x8 6x10 ti 30x3C SEE NOTE 2 DUCT SUPPORT AT PENETRATION (TYP) SIM M543 M544 M543 -J� 350 CFM 10x10 L.J — 08 NECK 08" NECK 350 CFM REVISION LSAF CONTROL ROOM 4711975 BY HGI /MLD M543 APPROVED DATE 5.01.02 SY DE DD 12' -6" 9' -8" (REF) REVISION SECTION SCALE: 1/4" = (' -0" BY L—D APPROVED A528 DATE 1M12, 1M16, M452 M542 gLASOE /NG B A528 RES 12/13/a ACCEPTABILITY THIS THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DDB) DATE M. DAVIS CHECKED R. BERRY APPROVED ✓JAI SE SUBTITLE 3.11.02 3.29.02 TITLE 4.05.02 4.12.02 C. io.OZ- .5: /3.O2.MECHANICAL MASTER HVAC SECTIONS BUILDING 2 -80 LEGEND SEE 2 -80 -MO FOR LEGEND GENERAL NOTES 1. ALL DUCTWORK SHALL BE PROVIDED WITH SEISMIC RESTRAINTS IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. 2. DUCT DIMENSIONS LISTED ARE `FREE AND CLEAR" INSIDE DIMENSIONS. ® 1" THICK SOUND ATTENUATION LINING IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. EXTERIOR INSULATION APPLIES TO MEZZANINE LEVEL DUCT IN C> ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. SPUTTER WITH TURNING VANES IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15910. �6 AIR TIGHT DUCT ACCESS HATCH PER BOEING CONSTRUCTION SPECIFICATION SECTION 15910. D 1/4" WIRE MESH BIRD SCREEN. REFERENCE DRAWINGS 2- 8 -MTS16 PARTIAL MEZZANINE FRAMING PLAN CONSTRUCTION NOTES MO a-(ad PLANT 2 ISSUED FOR CONSTRUCTION JOB N0. DWG N0. co CURRENT REVISION SYMBOL SHEET M543 711975 2 -80 -M543 RECEIVED CITY OF TUKWILA JUN 1 7 2002 KERN, CENTER Harris Group Inc. 11081.00 DATE COMP NO. 5.01.02 NMI 7 It / -- TYPICAL FTU / VAV PER PTO / VAV SUPPORT SPACING • E e7 P1000 UNISTRUT SUPPORT / BRACING (TYP) P1D01C UNISTRUT AT CORNER STRUT (TYP) 1/4"4 THREADED ROD LG AS RED'D. VIBRATION ISOLATGR (TYP) - 4 -5/160 ADHESIVE ANCHOR (TYP) P2073A UNISTRUT \ T— POST BASE (TOP) REVISION SAF CONTROL ROOM 4711975 BY HGI /MLD 4' -0" (CENTERED OVER FTU / VAV) — 1 AIR INLET d FTU / VAV SUPPORT DETAIL SCALE: 1 1/2" = 1' -0" APPROVED MEZZANINE SLAB 5/160 ADHESIVE ANCHOR (TYP) BACKFILL GAP WITH INSULATION (TOP) DUCT SUPPORT AT PENETRATION DETAIL SCALE: 1 1/2" = 1' -0" DATE 5.01.02 r SY HEATING COIL REVISION ' -- P1001C UNISTRUT AT CORNERS CONTROL BOX (FAR SIDE) BY APPROVED G MEZZANINE SLAB � �I DATE G 1 M452, M542, M543 M544 1" GAP (T(P) MEZZANINE SLAB o . DUCT TO ANGLE. (TYP) si_lfrOE /iVG ANGLE TO ANGLLE \ z ERP.R.S 12/13/,3 5/164 ADHESIVE ANCHOR (TYP) BACKFILL GAP WITH INSULATION (TYP) 5/ TYP DUCT SUPPORT AT PENETRATION DETAIL SCALE: 1 1/2" ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS. APPROVED APPROVED BY 8" OR 20" ® SIM 3' -6" 1'- A 1 GAP (TYP) MEZZANINE SLAB ad . TYP 5/16 "0 ADHESIVE ANCHOR, 2 1/2" MIN EMBED, MIN 2 PER SIDE 3/8 "0 THRU ANGLE (TOP) DRAWN DATE SUBTITLE W. BOULDS 4.01.02 4.03.02 TITLE M. DAVIS 4.05.02 CHECKED 1. 4.12.02 Pu�S s.10.07.... PROVED �� ' :/3•m2 MECHANICAL MASTER 3 2 DUCT TO ANGLE 1 -3 O B B L3x2x3 /16xLG AS REQ'D, 45' MITER (W) M452, M542, M543 M544 5/16 "0 ADHESIVE ANCHOR, 2 1/2" MIN EMBED, MIN 2 PER SIDE 3/8 "0 THRU ANGLE ( M452, M542 M544 N TO L3x2x3 /16xLG AS REQ'D, 45' MITER (TOP) DETAILS BUILDING 2 -80 LEGEND FOR LEGEND SEE 2 -80 -M0 GENERAL NOTES 1 1/2" EXTERIOR INSULATION APPLIED TO MEZZANINE LEVEL DUCT IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. REFERENCE DRAWINGS CONSTRUCTION NOTES Mo- PLANT 2 ISSUED FOR CONSTRUCTION SHEET M544 JOB O. DWG NO. RECENED CITY OF TUKWII..G JUN 1 7 2002 PERMIT CENTER Harris Group Inc. 11081.00 SYMBOL DATE 5.01.02 711975 2 -80 -M544 COMP N0. SYM INTF BLDG. 7�POC *. /.e -11 N 12 " -A300 1 -� POC AT TEE ..� EL. 21' -9" ABOVE GRADE fL EL. 19" 1 7" ABOVe GRADE 1 " -IA (FUTURE 11�'� " P J M � 1 " -IA 3 " -IA - AI 00 3 " -A300 12 " -A300.` 300 °1- _ SET 125 PSI SET 0 300 -100 100 PSI PSI C EL 4' - ABOVE GRADE PIPE SUPPORT SECTION SCALE: 1/8" = 1' -0" REVISIO LSAF CONTROL ROOM J #711975 BY HGI /MLD APPROVED CL EL 3C ABOVE GRADE DATE 5.01:02 1M112 M546 SYM B REVISION SOUTH ELEVATION SCALE: 1/8" = 1' -0" SECTION SCALE: 1/8" = 1' -0" APPROVED DATE ANECHOIC CHAMBER BLDG. 2 NOTE: A300 PRV AND RUPTURE DISC PIPING NOT SHOWN FOR CLARITY. SEE 2- YD -M621 FOR A300 PRV AND RUPTURE DIC PIPING. 1M112 M546 C c1,2BOE /NG° TOP OF PARAPET EL +/- 29' -5 12 " -A300 1/4 A ADJUSTABLE SUPPORT DETAIL SCALE: 1/2" = DO NOT CUT HOLE IN CARRIER PIPE i0 "0 SCH 80 PIPE 1/4 "0 WEEP HOLE FOOTING, 24 "x24 "x12" #4® 12" EW, T & B 1 M546 1M1121M546 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE NEW CONTROL ROOM STRUCTURE DRAWN W. ROULDS CHECKED W. BRTTTAIN ENGINEER M. DAVIS CHECKED R. BERRY PROV APPROVED DATE 4.10.02 5.01.02 4.17.02 4.22.02 Sa0.02 S /8-03 SUBTITLE TITLE FIRST FLOOR EL 0' -0" MECHANICAL MASTER SECTIONS AND DETAILS BUILDING 2 -80 oa-rovo LEGEND SEE DRAWING 2 -80 -MO FOR LEGEND GENERAL NOTES REFERENCE DRAWINGS SEE 2- 80 -M321 FOR AIR SCHEMATIC OF A300 TO ANECHOIC CHAMBER. CONSTRUCTION NOTES 1�INSTALL 12" 300LB RF FLANGE WITH GASKET AND BLIND FLANGE AT 24" EAST or 12 " -A300 SUPPLY PIPING. INSTALL FLANGE SPOOL PIECE WHERE 12" FLANGED GATE VALVE WAS 7cEMOVED. RELOCATE 12" FLANGED GATE VALVE TO PROVIDE ISOLATION TO 2 -80 -INTF. REFERENCE 1M112R, 1M111. "INSTALL 12 " -A300 TO LSAF. CONNECT FROM EXISTING 12 " -A300 SERVING 2 -81 -INTF TO EXISTING 12 " -A300 LOCATED ON ROOF THAT SERVES 2- 80 -LSAF. INSTALL 3 " -A300 FROM 12 " -A300 TO PRESSURE REDUCING STATION AND PROVIDE 1 " -A300 11E -IN TO EXISTING 1" SS SERVING LUBE CART. INSTALL 8 " -A300 FROM EXISTING 12 " -A300 ON ROOF ON ROOF TO EXISTING 8 " -A300 SERVING EXISTING G.E. TEST RIG. © INSTALL 6 " -A300 FROM . EXISTING 12 " -A300 ON ROOF TO EXISTING AIR MUFFLER. INSTALL EXISTING PNEUMATIC OPERATED 6" GLOBE VALVE (RELOCATED). REFERENCE 2- YD- M621R. INSTALL 1 1/2"-A300 FROM B " -A300 (G.E. TEST RIG) TO EXISTING 1 1/2 " -A300 LOCATED AT COLUMN DJ -11. ® INSTALL INSTRUMENT AIR SUPPLY TO PNEUMATIC VALVE STATION (CV- 2_LSAF, CV- 3_LSAF) LOCATED NEAR CONTROL VALVE. V- 2_LSAF -AND PNEUMATIC VALVE STATION (CV- 4_LSAF) LOCATED ON THE ROOF NEAR CONTROL VALVE V- 4_LSAF: TIE 1 " -IA INTO EXISTING INSTRUMENT AIR LINE LOCATED AT COLUMN DJ -11. CAP EXISTING INSTRUMENT AIR SUPPLY AT TOP ELBOW LOCATED AT COLUMN DJ -11. RELOCATE LSAF MANUAL 12" SHUT -OFF GATE VALVE. REFERENCE 2- YD- M621R. RELOCATE LSAF 12" PNEUMATIC OPERATED BUTTERFLY VALVE SPOOL PIECE. REFERENCE 2- YD -M621. . Di LSAF 1 1/2" SOLENOID OPERATED BYPASS BALL VALVE. REFERENCE 2- YD -M621. RELOCATE LSAF 6" PNEUMATIC OPERATED GLOBE VALVE. REFERENCE 2- YD -M621. INSTALL 3 " -IA TO LSAF CONTROL ROOM. REFERENCE 10112 AND 10116. INSTALL 1" ISOLATION BALL VALVE AND CAP FOR FUTURE PRESSURE TRANSDUCER. PLANT 2 ISSUED FOR CONSTRUCTION SHEET M546 NO. DWG N0. 711975 RECENEO CITY OF TUi(WILA JUN 1 7 2002 PERMIT CENTER Harris Group Inc. 11081.00 DATE 5.01.02 2- 80 -M546 COMP NO. sr A PRIMARY 575 PSI FROM NBF A300 FROM 2 -64 A300 FROM CUB A300 FROM BSWT > A140 > (10) FROM 2 -64 A LSAF CONTROL ROOM SVC301 Q X BOV301 OIL SEP REVISION DRYER (16.5) 16 "A300 BTWT YARD 100 SCFM 2 "IA 2 -85 80 SCFM 8 "A140 4940 6 "A FILTER DRAWING OF RECORD 4982179 4711975 BV3o 0 R 0 BY HJI /LAJ HGI /MLD BPV302 DRYER BV302 27 FT. STORAGE BPV 301 D4 BOOSTER 1000 PSI V8 4M V5 (MOV) DD4D j J14 12" 8" 43 4" 2 -116 (15/20) LB /SEC APPROVED -iv V210 DATE BOV 302 1.08.01 5.01.02 SCV 302 PRV 450 Ft" STORAGE v 000 BV 303 2000 Ft STORAGE 203/4 SYM 1I _1 I 2"IA T 3/4 "IA CUB 625 SCFM 3" V226 BV304 16 "A300 2 -83 (1.5/1.5) LB /SEC PA 3/4 "A300 2 -62 233 SCFM " V227 6" REWSION 8" 2 -84 (20/20) LB /SEC U/G \ 6 j V123 (23.0) 8A1000 1 "A1000 Q 0 U/G BLDG 2 -83 U/G EAST UTILIDOR EAST UTILIDOR BSWT 25 SCFM BLDG 2 -83 U/0 V253 BY 2 -88 (20/20) LB /SEC BTWT (10/10) LB /SEC 2" V228 D4 APPROVED BTWT (20/20) LB /SEC 8" 8" cD 57000 Ft STORAGE 12 "A300 2 -88 950/950 BSWT (0/0) LB /SEC 2 -83 240 SCFM 8" V252 12 "A300 4" V231 V 8" v1o1 PRV /BPV102 if V44 2 -116 12 SCFM 12" BTWT 270 SCFM 2 -81 (1/1) LB /SEC S V23�_ 2 -80 LSAF (26/36) LB /SEC AV AV V- 1_LSAF V- 2—LSAF 12" MM D4 D 1 . (Jr -H I 3" Y v -1 LSAF BSWT (24/24) LB /SEC 4" V144 V143 3" 2 -84 11 SCFM 4" MOV 8A1000 12A1000 8 " EAST UTILIDOR 2 -88 (0/0) LB /SEC '1 " 2 -83 40 SCFM 12" CEPTABILITY THIS DESIGN AND /0R SPECIFICATION IS APPROVED APPROVED BY DEP, DATE 12" JJ CHECKED tU HEW NEER SHS CHECKED RB APPROVED RB APPROVED LJC 12" 2-84 ( LB /SEC 2 -80 I NTF (5/30) 2 -116 j -p4-►I ( V214 LB /SEC V213 aTE 11.17.98 11.17.98 11 .13.98 2.8.99 2.8.99 2.8.99 SUBTITLE D " v- 116" TO G.E. TEST RIG 2 -80 CTR 87 SCFM. TITLE V221 MUFFLER MECHANICAL MASTER V- 4 V225 2 -81 227 SCFM V222 2" 2 1/2" A1000 > LEGEND Mop- ► (FUTURE) L117 SCFM] V223 V224 2 -65 ~ 1 (FUTURE) i (FUTURE) L 233 SCFM] 1 233 SCFMI J L J BLOCK FLOW DIAGRAM COMPRESSED AIR SYSTEM PLANT 2 YARD TO NBF (XX /XX) DEMAND & PEAK FLOWS IN POUNDS PER SEC. FROM CONSOLATION STUDY 300# AIR COMPRESSOR NBF /PLT H FEB. 13, 1995 XX PLANT 2 EST. DEMAND SCFM GENERAL NOTES REFERENCE DRAWINGS CONSTRUCTION NOTES ISSUED FOR CONSTRUCTION DRAWN:. CH CKED: WJB WBB CURRENT REVISION I SYMBOL 47119751 A SHEET JOB NO. DWG N0. M3 982179 2 —YD —M3 REVISIONS BY Harris Group Inc. REVISION "A" ONLY DATE PROJECT 5.01.02 • 11081.00 ENG NEER: . CHECKED: MLD RB DATE 5.01.02 COMP NO. TYPE A' BLOCKING FOR 11 1/4', 22 /2', 30° VERTICAL BENDS TABLE 3 MAXIMUM DEFLECTION FULL LENGTH MECHANICAL JOINT PIPE B PRESSURE (PSI) S D L PIPE SIZE DIAMETER (IN) TEST PRESSURE (PSI) VERTICAL BEND (DEGREES) NO. OF CU. FT. OF CONC. BLKG. SIDE OF CUBE (FEET) DIA. OF SHACKLE ROD (INCHES) DEPTH OF RODS IN CONC. (FT.) 4" 300 111/4' 8 2.0 5/8 1.5 6" 250 221/2' 11 2.2 5/8 2.0 8" 250 30' 17 2.6 5/8 2.0 6" 300 111/4' 11 2.2 5/8 2.0 3 6 221/2' 25 2.9 5/8 2.0 10" 11" 30' 41 3.5 5/8 2.0 8" 300 111/4' 16 2.5 5/8 2.0 10" 11" 221/2' 47 3.6 5/8 2.0 6 12 30'. 70 4.1 3/4 2.5 12" 250 111/4' 32 3.2 5/8 2.0 221/2' 88 . 4.5 7/8 3.0 30' 132 5.1 7/8 3.0 TYPE 'B' BLOCKING FOR 45° VERTICAL BENDS TABLE 3 MAXIMUM DEFLECTION FULL LENGTH MECHANICAL JOINT PIPE B PRESSURE (PSI) S D L PIPE SIZE DIAMETER (IN) TEST PRESSURE VERTICAL BEND (DEGREES) NO. OF CU. FT. OF CONC. BLKG. SIDE OF CUBE 'EET) DIA. OF SHACKLE (INCHES) • DEPTH OF RODS IN CONC. (FT.) 4" 300 45' 30 3.1 5/8' 2.0 6" 250 45° 68 4.1 5/8" 2.0 8" 250 45' 123 5.0 5/8" 2.0 12" 250 45' • 232 6.1 3/4 2.5 TABLE 2 TABLE 3 MAXIMUM DEFLECTION FULL LENGTH MECHANICAL JOINT PIPE FITTING SIZES PRESSURE (PSI) REQUIRED THRUST BLOCK BEARING AREAS (SQ. FT) FOR WATER FITTINGS (© 280 PSI SIZE OF PIPE DEFLECTION ANGLE MAXIMUM DEFLECTION RADIUS OF CURVE PROD BY SUCCESSION OF JOINTS 11 1/4' BEND 22 1 /2' BEND 45° BEND 90' BEND TEES & PLUGS (18 -FT LENGTH) (20 -FT LENGTH) (18 -FT LENGTH) (20 -FT LENGTH) 4" 4' -09" 15.5" 17.5" 250' 280' 4" & 6" . 280 1 2 3 6 4 6" 3' -33" 13.5" 15" 290' 320' 8" 280 2 3 6 10 7 8" 2' -40" 10" 11" 390' 440' 10" 280 2 4 8 16 11 10" 2-40" 10" 11" 390' 440' 12" 280 3 6 12 22 16 12" 2' -40" 10" 11" 390' 440' GALV. COUPLINGS & TIE RODS. SEE JOINT RESTRAINT NOTES THIS SHEET 2 TURNBUCKLES THREAD 6" --- UNDISTURBED SOIL CONCRETE 4 TURNBUCKLES THREAD 6" - UNDISTURBED SOIL CONCRETE HORIZONTAL FITTING (PER PLANS) WATER LINE (PER PLANS) HORIZONTAL FITTING (PER PLANS) WATER LINE (SIZE PER PLANS) UNDISTURBED SOIL 6" MIN. SPECIFIED BEDDING UNDISTURBED SOIL FORM SIDE OF THRUST BLOCK FORM THRUST BLOCK TO CENTERLINE OF FITTING TYPICAL THRUST BLOCK AT HORIZONTAL FITTINGS NOT TO SCALE BEARING AREA REQUIRED FOR THRUST BLOCKING. SEE TABLE 2 FOR BLOCKING BEARING AREA (SQ. FT.) f FINISHED GRADE BLOCKING FOR VERTICAL BEND. SEE TABLES FOR TYPE "A" OR TYPE "B" BLOCKING THIS SHEET DEPENDING ON "ANGLE" OF TEE. HORIXONTAL THRUST BLOCK TO VERTICAL THRUST BLOCK CONCRETE POUR LINE 2- 3/4 "4 TIE ROD LOOPS (ONE SHOWN) W/ TURN BUCKLES ANGL INSTALL BLOCKING FOR VERTICAL BEND L. PRIOR TO THE PLACEMENT OF THE ZON HORIZONTAL THRUST BLOCK UNDISTURBED SOIL TYPICAL THRUST BLOCK AT ANGLED TEE NOT TO SCALE LEAVE ADEQUATE SPACE FOR REMOVAL OF BOLTS, FITTINGS, ETC. FORM SIDES OF THRUST BLOCK CONC. THRUST BLOCK SEE APPLICABLE "TABLE 2 OF THRUST BLOCK BEARING AREAS" TYPICAL BLOCKING FOR HORIZONTAL FITTINGS OR VERTICAL UP BENDS NOT TO SCALE HORIZONTAL THRUST BLOCK 3000 PSI CONC BEARING AREA REQUIRED FOR HORIZONTAL TEE THRUST BLOCK, SEE TABLE 2 FOR BLOCK BEARING AREA (SQ. FT.) SEE TYPICAL BLOCKING FOR HORIZONTAL FITTING DETAIL MON JOINT PIPE WITH U.S. PIPE FIELD LOK GASKET (CONTINUES) "-TRIM MON DUCTILE IRON BEND WITH U.S. PIPE FIELD LOK GASKET HORIZONTAL BEND JOINT RESTRAINT DETAIL NOT TO SCALE MECHANICAL JOINT VALVE WITH 1100 MEGALUG FOLLOWER GLANDS BOTH SIDES MON JOINT PIPE WITH U.S. PIPE FIELD LOK GASKET (CONTINUES) SEE TYPICAL BLOCKING FOR HORIZONTAL FITTING MON JOINT PIPE W/ U.S. PIPE FIELD LOK GASKET (CONTINUES) PLUG OR /-MJ D.I. PIPING HORIZONTAL VALVE JOINT RESTRAINT DETAIL NOT TO SCALE MECHANICAL PIPE AND PLUG =1=1=4 HORIZONTAL DEADEND JOINT RESTRAINT DETAIL NOT TO SCALE MON JOINT PIPE WITH U.S. PIPE FIELD LOK GASKET (CONTINUES) MECHANICAL TEE WITH 1100 MEGALUG FOLLOWER GLANDS AT ALL JOINTS OR TRIM MON TEE WITH U.S. PIPE FIELD LOK GASKET AT ALL JOINTS. 2' (MIN) 0 4 MON JOINT PIPE WITH U.S. PIPE FIELD LOK GASKET (CONTINUES) 2' MIN) H SEE TYPICAL BLOCKING FOR HORIZONTAL FITTING DETAIL MON JOINT PIPE WITH U.S. PIPE FIELD LOK GASKET (CONTINUES) HORIZONTAL TEE JOINT RESTRAINT DETAIL NOT TO SCALE MECHANICAL REDUCER OR SOLID SLEEVE WITH 1100 MEGALUG FOLLOWER GLAND BOTH SIDES HORIZONTAL REDUCER OR SOLID SLEEVE JOINT RESTRAINT DETAIL NOT TO SCALE MON JOINT PIPE - WITH U.S. PIPE HELD LOK GASKET (CONTINUES) SEE TYPICAL DETAIL FOR TYPE "A" AND "B" BLOCKING FOR VERTICAL BENDS SEE TYPICAL BLOCKING FOR HORIZONTAL FITTINGS OR VERTICAL UP BENDS VERTICAL DOWN BEND AND OFFSET NOT TO SCALE TRIM MON DUCTILE IRON BENDS WITH U.S. PIPE FIELD LOK GASKET MON JOINT PIPE WITH U.S. PIPE FIELD LOK GASKET (CONTINUES) LEGEND GENERAL NOTES JOINT RESTRAINT NOTES 1. ALL MECHANICAL JOINT RESTRAINT DEVICES SHALL BE SERIES 1100 MEGALUG FOLLOWER GLAND RESTRAINT MECHANISM MANUFACTURED BY EBAA IRON SALES INC. EACH SERIES 1100 MEGALUG SHALL BE LISTED AND STAMPED BY UNDERWRITERS LABORATORIES, INC., CATEGORY HJKF "FITTING RETAINER TYPE" WITH A DEFLECTION ANGLE OF FIVE DEG. (3" THROUGH 12 "). EACH SERIES 1100 MEGALUG SHALL BE APPROVED & STAMPED BY FACTORY MUTUAL (3" THROUGH 12 "). 2. ALL CLASS 52 MON JOINT PIPE SHALL HAVE A U.S. PIPE FIELD LOK GASKET AT EACH BELL. 3. ALL TRIM MON DUCTILE IRON FITTINGS SHALL HAVE U.S. PIPE FIELD LOK GASKET AT ALL BELLS. 4. FOR VALVES, JOINT RESTRAINT SHALL BE SAME AS A DEADEND. REFERENCE DRAWINGS CONSTRUCTION NOTES moa--ta6 CITY OF TUKWILA APPROVED JUL - 8 2882 AS NOIED LCf491G DAMN RECEIVED CRV OF TUKIMIA JUN 1 7 2002 PERMIT CENTER I FOR REFERENCE ONLY FACILITY DESIGN BY MCI /RSM FACILITY DESIGN BY HGI /RSM DATE s.o DATE 5.01.02 SYM REVISION DRAWING OF RECORD J #972179 HGI /DED APPROVED 1.08.01 SYM REVISION BY APPROVED DALE e)L Atsuzezdv,w. ACCEPTABILITY T. ROSLING THIS DESIGN AND/OR CHECKED SPECIFICATION 1 S APPROVED S. FRANKLIN ENGINEER DATE D. DORMIER APPROVED BY DEPT. CHECKED TKN 2.16.98 SUBTITLE 12.15.97 01,28.98 2.16.98 APPROVED LTC 2.16.98 APPROVED RML 2.16.98 STANDARD DETAILS TIRE MECHANICAL MASTER PLANT 2 YARD PLANT 2 CURRENT REVISION SYMBOL DATE 982179 1.08.01 SHEET M553 JOB NO, 972198 COMP N0. DWG NO. 2- YD -M553 SYM DRAWING OF RECORD 5" STORTZ CUBIC YARD \ \A / \ `87 \ CRUSHED STONE / \ 7 / HYDRANT DRAINAGE CONCRETE THRUST BLOCK PER TABLE 2 // i 4 FABRIC AROUND GEOTEXTILE CRUSHED \ % / \ \ \ / \ \ / \ /i STONE \ \ \,�\ 2-3/4" ASPHALT VALVE. SHACKLE RODS REVISION 3 -WAY FIRE HYDRANT ASSEMBLY DETAIL NOT TO SCALE NEW PIPE SYSTEM TO BE PIGGED, PRESSURE TESTED, CHLORINATED, AND FLUSHED. IIIiII l / / / //mss TEMPORARY MEGALUG RESTRAINT TEMPORARY MJ CROSS IN VERTICAL POSITION 3 EACH MJ PLUGS W/ ONE TAPPED FOR TESTING. NEW LINE JUST BROUGHT INTO SERVICE /AIil ' w i/ //ail . F IV AS NEW D.I.P. W/ MON JOINT AND FIELD LOK GASKET TYPICAL PLAIN END PIPE PIGGING, PRESSURE TESTING, CLORINATION, FLUSHING AND FINAL TIE -IN SERVICE DETAIL NOT TO SCALE J #982179 IN SERVICE BY HGI /DED \ \ / /\ /\ 3 MIN. // TEMPORARY MJ CAP & MEGALUG. NEW LINE ALL READY TESTED AND IN SERVICE. NEW SOLID SLEEVE W/ MEGALUGS NEW LINE ALL READY TESTED AND IN SERVICE APPROVED /i SEE FIRE HYDRANT NOTES THIS SHEET 10 "x6" TEE (MJxMJxFL) ASPHALT PAVEMENT DATE 1.08.01 10 MAX. 6" DI CL 52 PIPE (MJ) W/ MEGALUG RESTRAINTS (LENGTH AS REQUIRED) – SYM a MULLER A- 2074 -16 (FIxMJ) 6" MINIMUM COMPACTED BEDDING CONCRETE THRUST BLOCK PER TABLE 2 REVISION \ \ / \ �� \\ MUELLER ADJUSTABLE TYPE INDICATOR POST A -20800 BURY LINE TO MATCH GRADE MUELLER GATE VALUE A -2075 W/ STUFFING BOX SIZE PER PLAN NEW PIPE SYSTEM TO BE PIGGED, PRESSURE TESTED, CHLORINATED, AND FLUSHED. TEMPORARY MEGALUG RESTRAINT TEMPORARY MJ • CROSS IN VERTICAL POSITION 3 EACH MJ PLUGS WI ONE TAPPED FOR TESTING. NEW LINE JUST BROUGHT INTO SERVICE APPROVED DATE TESTING IOPENI TEMPORARY MJ PLUG NEW. LINE ALL READY TESTED AND IN SERVICE. NEW SOLID SLEEVE W/ MEGALUGS %? NEW D.I.P. NIPPLE MEGALUG NEW LINE ALL READY TESTED AND IN SERVICE POST INDICATOR VALVE DETAIL NOT TO SCALE IIIiII �ZAN. III _ II %//// /A IN SERVICE TYPICAL MECHANICAL JOINT PIGGING, PRESSURE TESTING, CLORINATION, FLUSHING AND FINAL TIE -IN SERVICE DETAIL NOT TO SCALE Q�BOE /NG° o- \\ VALVE EXTENSION REQUIRED WHEN VALVE NUT IS 3' BELOW ff Ii FINISHED GRADE. (SEE DETAIL) �h�fl►hl =� 4 1/4"0, 1/8" MIN THK 1/8" MIN THK STEEL PLATE FOR TEMPORARY PLUG BLOCKING. STEEL PLATE TO BE REMOVED WHEN LINE IS ABANDONED EXISTING 10" CAST IRON FIRE MAIN O.D 11.60+ (CONTRACTOR TO VERIFY PRIOR TO CONSTRUCTION) ROMAC STYLE "EC 501" END CAP COUPLING ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY GATE VALVE W /VALVE BOX DETAIL NOT TO SCALE DEPT. !�— 2" SQUARE 1" METAL STOCK AS REQUIRED 3/8" SET SCREW 2 1/4" INSIDE MEASUREMENT 2 -1/4" DEPTH VALVE NUT EXTENSION DETAIL NOT TO SCALE TYPICAL EXISTING WATER MAIN CUT, CAP, AND PLUG DETAIL FOR CONSTRUCTION SEQUENCING NOT TO SCALE DATE DRAWN T. ROSLING ECKED - S. FRANKLIN ENGINEER D. DORMIER CHECKED M. OLSON APPROVED L. COSTELLO APPROVED R. TONG . T , —TWO –PIECE CAST IRON VALVE BOX, RICH VALUE CO., STANDARD 8" TOP SECTION WITH REGULAR BASE SECTION. LENGTH TO FIT. PLUG PIPE W D ITH CON EAD.ENDC CR OF ETE EXISTING \ /.' 12.15.97 1.15 99 1.15.99 1.08.99 2.08.99 2.08.99 VALVE OPERATION NUT EXTENSION NOTE: EXTENSIONS ARE REQUIRED WHEN THE VALVE NUT IS MORE THAN THREE (3) FEET -BELOW FINISHED GRADE. EXTENSIONS ARE TO BE A MINIMUM OF ONE (1) FOOT LONG, ONLY ONE EXTENSION TO BE USED PER VALVE. NOTE: ALL EXTENSIONS ARE TO BE MADE OF STEEL SIZED AS NOTED, AND PAINTED WITH TWO COATS OF CARBON ELASTIC (ATCO #2221) AS SPECIFIED BY PRESERVATIVE PAINT CO. OR AN APPROVED EQUAL. SUBTITLE TITLE MUELLER GATE VALVE A -2074 SIZE PER PLAN TOP OF EXISTING GRADE MECHANICAL MASTER STANDARD DETAILS PLANT 2 YARD FIRE HYDRANT NOTES: MDR STAMP WITH 1/4" MINIMUM 20 SQ. FT. OF STEEL LETTERING PLATE SOIL BEARING AREA "COLD WATER" OR "FIRE WATER" STAMP WITH 1/4" LETTERING SEC. XXX" SEE BOEING FOR VALVE NUMBER 1. HYDRANTS SHALL BE MUELLER UL /FM #A -423 OR CLOW MEDALLION UL /FM #F -2545. 2. HYDRANTS SHALL CONFORM TO AWWA SPECIFICATIONS C502 -54, BE UL /FM APPROVED, SHALL BE COMPRESSION TYPE AND SHALL HAVE TWO PIECE BREAKING FLANGE WITH BREAKING THIMBLE AT THE GROUND LINE OR STEM; SHALL HAVE A SELF OILING DRY BONNET WITH FACTORY FILLED RESERVOIR HOLDING APPROXIMATELY 8 OUNCES OF OIL. OIL RESERVOIR SHALL BE SO DESIGNED AS TO GIVE A COMPLETE LUBRICATION OF STEM EACH TIME THE HYDRANT IS OPERATED. THE UPPER STEM SHALL HAVE A BRASS SLEEVE. 3. HYDRANT SHALL BE EQUIPED WITH TWO 2 1/2" N.S.T. HOSE PORTS AND ONE 5" STORTZ. PUMPER DISCHARGE PORT, AND SHALL HAVE A 1 1/4" PENTAGON OPEN – LIFT OPERATING NUT. HYDRANTS SHALL HAVE A 6" MJ BOTTOM CONNECTION AND 5 1/4" MAIN VALVE OPENING, AND SHALL HAVE 18" ABOVE GRADE LEVEL TO THE CENTER OF THE PUMPER DISCHARGE PORT. 4. HYDRANT INSTALLATINS TO BE PER THE CITY OF TUKWILA STANDARD PLAN WS -4 AND REQUIREMENTS OF TUKWILA MUNICIPAL CODE 14.24 AND CITY ORDINANCE. PLANT 2 YARD VALVE- NAME PLATE DETAIL NOT TO SCALE CITY Of PROVED JUL - 8 2002 AS y0IE0 FOR REFERENCE ONLY FACILITY DESIGN BY HGI /RSM DATE 5.01.02 CURRENT REVISION 982179 SYMBOL SHEEP M -: JOB N0. DWG No. ac„ VALVE BOX LID 5 7/8" I.D. 972198 2– YD –M554 4 "x4" 0.05" THICK ANODIZED ALUMINUM PLATE (4) 1/8" RIVET TYPICAL RECEIVEC CITV CF TUKWILA JUN 1 7 2002 PERMIT CENTER DATE 1.08.01 COMP N0. SY A (?1 M62 11v1591 I 300 PSIG I---• RECORD DRAWING LSAF CONTROL ROOM REVISION arg VOLUME /, BOOSTER ❑S VENT E V44 - 14 3/4" -c-- PROPANE TANK J #982179 J #711975 BY HGI /HEW HGI /MLD / ITEMS SHOWN ARE PART OF VALVE ASSEMBLY E> 0 12" A300 FOR CONTINUATION SEE DWG 2- YD -M134 - 80 -1M112 8 " -A300 8 " -A300, SEE 2- 80 -1M112 R. 12 " -A300 EL 3' -6 3/4" ABOVE GRADE 8 "x6" ,-POC TYP 2 V101 PRV102 V44 4" 4" EL 2' -11 ABOVE GRADE CONTROL VALVE DIAGRAM SCALE: N.T.S. M621 PROPANE PUMP CCEPTABILITY THIS DESIGN AND /0R SPECIFICATION IS APPROVED APPROVED BY - DEPT. DATE APPROVED SOUTH WALL OF LASF DATE 1.15.99 5.01.02 1 I 1 T OSNIONER STEAM HEATED PROPANE VAPORIZER 20' -0" FILTER DETAIL PLAN , N SCALE: 1/4 " =1' -0" M134 M621 5Y AUXILIARY REGULATOR FOR TESTING (NOT USED) REVISION PI C7 0 IN D4 HIGH PRESSURE REGULATOR V101 DG 9' - 7" ± 985 PSIG TO NEW �ti -143 v V -144 -1985 PSIG FROM 2 -117 v f 985 PSIG TO LASF D4 E> T 20' -0" 4 1 3 - 8" I I I L 8 "x4" IN ' \ VERTICAL I I 8 " -A1300 (0 /0 ) I ' i 8 " -A1000 (0 /0) TO NBF STAHL /GE HEATER 16' -6" BY APPROVED 7 -0 3/8" 3' -. 10' -1 5/8" DATE Cj2" -A300 EL 10' -0" ABOVE GRADE V44 PRVi02 A1000 A30�U_/G)TO N8F, 01WT, AND,2 -85 12" 4300 (U /G) TO NBF, BTWT, AND 2 -85 SECTION SCALE: 1/4 " =1' -0" M621 M621 Z,LAirateziw. M621 \-1 3' -6 " ABO GRADE EXPIRES 12/13/03 LASF ROOF EXISTING PIPING A300 aft sim M621 C EL 2' -11" ABOVE GRADE 12 "x8" 8" RUPTURE DISC SECTION SCALE: 1/4"=1 - 1E- 12 -A300 EL 10' -0" ABOVE GRADE 12.22.98 2.08.99 12.12.98 2.08.99 2.08.99 L COSTELLO 2.08.99 12 "x8" RED TEE CAP SAFETY VALVE RELIEF PIPING (RUPTURE DISC PIPING SIMILAR) V143 V144 SUBTITLE TITLE DETAIL SCALE: N.T.S. PSV V -27 V101 PRV10 V44 M621 6 EL 2' -11" ABOVE GRADE rAM M621 MECHANICAL MASTER M621 MO la CL-1- 2 -A300 (U /G) TO NBF, BM, AND 2 -85 VENT TO ATMOS VENT PIPE l VALVE OUTLET COMPRESSED AIR REDUCING STATION SECTION AND DETAILS PLANT 2 YARD r LEGEND GENERAL NOTES 1. FOR MECHANICAL PIPING GENERAL NOTES, SEE DRAWINGS 2- YD -M2a AND 2- YD -M2b. 2. FOR MECHANICAL PIPING LEGEND AND SYMBOLS, SEE DRAWING 2- YD -MO. REFERENCE DRAWINGS 2- 83 -OM110 2 -YD -M3 2- YD -M3b 2- YD -M134 2- YD -M325 1� 2- 83 -E533 2- YD -E84 2- 83 -E535 2- 83 -E536 CONSTRUCTION NOTES INSTALL 12" 300# RF WELD NECK FLANGE WITH GASKET AND BLIND FLANGE. INSTALL 12" 300# RF WELD NECK FLANGED SPOOL WHERE 12" INTF ISOLATION GATE VALVE WAS LOCATED. REFERENCE 2- 80- 1M112. PLANT 2 ISSUED FOR CONSTRUCTION P3 DRAWN: MDH HECKED: WJB CURRENT REVISION SYMBOL J #711975 SHEET M621 JOB N0. DWG O. PLUMBING PLAN COMPRESSED AIR BLOCK DIAGRAM HIGH PRESSURE AIR DIAGRAM PLUMBING PIPING HP AIR SYSTEM PRV INSTR. LOCATION PLAN PLC -117 I/O SCHEMATICS BHT. 1 120/208V & GROUND PLC -117 I/O SCHEMATICS SHT. 3 PLC -I17 i/0 SCHEMATICS SHT. 4 RECEIVED CITY OF TUKWLLq JUN 1 7 2002 PERMIT CENTER REVISIONS BY Harris Group Inc. 982179 REVISION "A" ONLY DATE 5.01.02 ENGINEER: MLD 2- YD -M621 DATE 5.01.02 COMP NO. PROJECT 11081.00 CHECKED: RB RETURN /EXHAUST (RE) FAN - EXHAUST FAN (EF) - SUPPLY FAN CFM (SF) T.S.P. IW GH SCHEDULE FAN RPM MOTOR TYPE MAKE & MODEL OV FPM ( ) WEIGHT (LBS) FAN WHEEL DIA (INCH) ) REMARKS (SEE EQUIPMENT NOTES) MARK NUMBER COOLING COIL (SEE COOLING COIL SCHEDULE) LOCATION BHP DRIVE HP VOLTS PH Hz m T.S.P. INCH W.G. AHU -1 RPM 5400 1 1/4 1246 Hz ArIlk 3 480 3 60 CABINET FAN PACE CABINET FAN SIZE A18 1534 INCLUDED W /AHU -1 18 1/4 430 v AI Clik RE -1 AHU -2 CC -1 6400 1 1/2 1429 - - 5 480 3 60 • CABINET FAN PACE CABINET FAN SIZE A18 1845 INCLUDED W /AHU -2 18 1/4 C I�> 1936 AX 480 AHU -3 60 6680 1 3/4 1534 HC -2 6300 5 480 3 60 CABINET FAN PACE CABINET FAN SIZE A18 1964 INCLUDED W /AHU 3 18.1/4 18 1/4 leir AIM 1836 AHU 4 5 12000 1.0 988 RE -3 AF -3 5 480 3 60 CABINET FAN PACE CABINET FAN SIZE A24 1968 INCLUDED W /AHU 4 24 1/4 �1� XV ® 24 1/4 REVERB ROOM - 25000 2.5 685 - - 20 480 3 60 UTILITY FAN PACE SIZE 44 2194 2445 44 1/2 W /DRAIN FITTING AT BOTTOM OF SCROLL W ® 1- ANECHOIC ROOM - 25000 2 600 - - 15 480 3 60 UTILITY FAN PACE SIZE 44 2200 2445 44 1/2 ® AT BOTTOM / OF SCROLL NG 1 ©® . TOILET ROOMS MY 1600 .75 1295 ANECHOIC CHAMBER 24 1/4 1/2 120 1 60 CENT ROOF EX GREENHECK CUBE 140 -7 3 85 14 16x16 0 TO 0 CURB ® © ® TOILET ROOMS LSAF RESTROOMS 180 .25 1400 MY DIRECT TRACT: 277 1 60 CABINET FAN GREENHECK CSP 218 16 _ MOUNT ABOVE TOILET ROOM CEILING 0 MI 60 TOILET ROOMS - 1280 .80 1725 - - 1/2 120 1 60 CABINET PAN GREENHECK SO -120 -A 720 75 12 MOUNT ABOVE TOILET ROOM CEILING � 1500 CLEAN ROOM LSAF MEZZANIN 800 1.75 1757 �� .5 ��� BELT .75 .- 480 _ _�.����u� 480 120 120 3 3 _ - - 1 60 60 -- 60 SQUARE, INLINE COOK BEET 150- Q H' - 287 ........................ 1500 + + 10 ...... 1170 ®� ++ 75 WITH VIBRATION ISOLATORS 22 ® VSD BY OTHERS. COORDINATE REQ'MTS. W /CMCS CONTRACTOR .......... /IT � + DB.2/21 LSAF CONTROL ROOM LSAF MEZZANINE 6960 2050 0.5 1.0 330 1267 0.9 0.65 _ BELT BELT 2 3/4 4 FC -. ROOF EXHAUSTER TRANE A� SIZE 21A PENN VENTILATOR, DX10B DD -11 iti : + +.w� LOCKERS ROOF © DB.9/17.3 ELECTRICAL EQUIPMENT ROOM ROOF 7880 0.125 1800/ 1200 1.55 BELT 2 480 3 60 ROOF EXHAUSTER PENN VENTILATOR, DX309 -2 SPEED, 2WINDING - EF MECHANICAL EQUIPMENT ROOM ROOF 865 0.125 960 0.05 BELT 1/4 120 1 60 ROOF EXHAUSTER PENN - VENTILATOR, IJX9B EF 6 INST. VAN STAGING ROOF 10,000 1.5 694 4.1 BELT 5 480 3 60 ROOF EXHAUSTER GREENHECK, CUBE 360 HP - - - - 0 CHILLER ROOM ROOF 3100 0.6 - 1.20 BELT 1 1/2 480 3 60 ROOF EXHAUSTER PENN VENTILATOR - - - 22x22 DUCT CONNECTION ELECTRICAL SHOP 2ND FLR ROOF 3440 0.5 560 0.48 BELT 1 / 2 120 1 60 - PENN- VENTILATOR MODEL' DX24B - A AIR HANDLING UNIT (AHU) SCHEDULE MARK NUMBER UNIT SERVED AIR FLOW (CFM) MARK NUMBER LOCATION MAKE & MODEL SERVICE SUPPLY FAN SECTION MOTOR RETURN FAN SECTION (SEE FAN SCHEDULE) AIR FILTER (SEE FILTER SCHEDULE) COOLING COIL (SEE COOLING COIL SCHEDULE) STEAM /HOT WATER HEATING COIL (SEE HEATING COIL SCHEDULE) OPERATING WEIGHT (LBS) 5400 PLEATED NON- WOVEN COTTON REMARKS (SEE EQUIPMENT NOT TYPE OF SYSTEM WHEEL DIA. (INCH) CFM ACTUAL AIR T.S.P. INCH W.G. OV FPM RPM HP VOLTS PH Hz ArIlk ROOF PACE CABINET FAN SIZE A18 REVERB CHAMBER 18 1/4 5400 3 1/2 1535 1766 5 430 3 60 RE -1 AF -1 CC -1 HC -1 5250 m SET MIN. OA AT 150 CFM CONSTANT VOLUME 25 -30 500 ROOF FAN SIZE A18 PACE CABINET ANECHOIC CHAMBER 18 1/4 6400 4 1845 1936 7.5 480 3 60 RE -2 AF -2 CC -2 HC -2 6300 :H e ©� SET MIN. OA AT 240 CFM CONSTANT VOLUME 500 AIL ROOF PACE CABINET FAN SIZE A20 CONTROL ROOM 18 1/4 6680 2 1/4 1836 1569 5 480 3 60 RE -3 AF -3 CC -3 HC -3 9600 ® PLEATED TYPE SET MIN OA AT 300 CFM CONSTANT VOLUME (4) 20x16x2 (8)-25x 16x2 0.28 0:28 ROOF FAN SIZE A24 PACE CABINET WORK AREA 24 1/4 12,000 2 3/4 1968 1279 10 480 3 60 RE -4 AF -4 - HC -4 9670 ®� SET MIN. OA AT 600 CFM CONSTANT VOLUME 0 Aank 1- PACE CABINET SIZE A18 REVERB CHAMBER 18 1/4 4120 2 1106 1324 3 480 3 60 AF -5 3100 1 ©® . VARIABLE VOLUME MY AL 1 PACE CABINET FAN SIZE A24 ANECHOIC CHAMBER 24 1/4 12,100 2 1952 1157 7.5 480 3 60 AF -6 - 3720 1 2 VARIABLE VOLUME MY DG 15 T RANE ALBS ROOM 853 1/4 115 60 CC -GH /15 - - - CONSTANT VOLUME m 1 LSAF MEZZANINE TRANE CABINET FAN SIZE 21B LSAF CONTROL ROOM 27 9000 3.14 1500 1576 10 480 3 60 - AF -8 CC -DD -11 HC -DD -11 5005 6 SET MIN. OA AT 200 CFM VSD BY OTHERS. COORDINATE REQ'MTS. W /CMCS CONTRACTOR DD -11 AIR FILTER (AF) SCHEDULE MARK NUMBER UNIT SERVED AIR FLOW (CFM) FILTER REMARKS MEDIA TYPE EFFICIENCY PERCENT MAX FV (FPM) (QTY SIZE (INCHES) PRESSURE DROP IN WG CLEAN DIRTY AHU -1 5400 PLEATED NON- WOVEN COTTON 25-30 500 (3)- 16x20x2 (3) 20x20x2 0.28 0.90 FARR 30-30 m AHU -2 6400 PLEATED NON- WOVEN COTTON 25 -30 500 (3)- 16x20x2 (3)- 20x20x2 0.28 0.90 FARR 30 -30 ® Alk AHU -3 6680 PLEATED NON- WOVEN COTTON 25 -30 500 2�- 20x20x2 2, 16x25x2 - 20x25x2 2 22;- 16x20x2 0.28 0.90 FARR 30 -30 lar m AHU 4 12000 PLEATED NON - WOVEN COTTON 25 -30 500 0.28 0.90 FARR 30 -30 0 (9)-20x25x2 0 AHU -1A 4120 PLEATED NON WOVEN COTTON 25 -30 500 (3)- 16x20x2 (3)- 20x20x2 0.28 0.90 FARR 30-30 0 :H e 12100 NON--WIVE 0 IN PLEATED TYPE 25-30 500 (9)-20x25x2 0.28 .��� 0.90 FARR 30-30 _��� AM CLEAN ROOM v 800 _ PLEATED TYPE _ 95 295 (1)- 24x24x6 0.50 0.90 PUROLATOR DEFIANT L> e AHU-DD-11 9000 PLEATED TYPE 25 -30 330 (4) 20x16x2 (8)-25x 16x2 0.28 0:28 0.90 0.90 FARR 30-30 w SY A RECORD DRAWING LSAF RECONFIGURATION LSAF CONTROL ROOM ECN -01 REVISION J11982188 J#711975 4711975 BY D.G. HGI /LJC HGI /MLD HGI /MLD APPROVED K.R. DATE 2.1.95 7.28.00 5.01.02 6.05.02 SYM REVISION BY APPROVED DATE �so,Fivc. ACCEPTABILITY THIS DESIGN MID/DR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN R. DECEIT CHECKED D. GEONANGA - ENGINEER D. GEONANGA CHECKED G. SMITH APPROVED P. LONG APPROVED DATE 04 - 14 - 93 SUBTITLE TITLE MECHANICAL MASTER v\bl. t21 EQUIPMENT SCHEDULES BUILDING 2 -80 LEGEND 1. SEE SHEETS M1a, M1b AND M1c FOR MECHANICAL LEGEND AND ABBREVIATIONS. GENERAL NOTES 1 DRAW -THRU UNIT, TOP HORIZONTAL DISCHARGE, AIRFOIL, BACKWARD INCLINED, DWDI, BELT DRIVE. 2� UNIT SHALL BE WEATHERPROOFED FOR OUTDOOR INSTALLATION. SWSI, AIRFOIL, BACKWARD INCLINED CLOCKWISE ROTATION, TOP WITH VARIABLE SPEED BOTTOM HORIZONTAL DISCHARGE, BELT DRIVE. ® SWSI, AIRFOIL, BACKWARD INCLINED CLOCKWISE ROTATION, BOTTOM HORIZONTAL DISCHARGE, BELT DRIVE WITH VARIABLE SPEED MOTOR, UNIT SHALL BE WEATHERPROOFED FOR OUTDOOR INSTALLATION. ▪ DRAW THRU, HORIZONTAL DISCHARGE FC FAN, TOP INTAKE, BELT DRIVE, ECONOMIZER AND FILTERS. © PROVIDE WITH COMBINATION MIXING BOX AND VEE FILTER SECTION: WITH 6" FLAT FILTER SECTION. ® DRAW THRU UNIT, DOWN DISCHARGE AIRFOIL, BACKWARD INCLINED, DWD1, BELT DRIVE. AIR FILTER 7 TO CLEAN ROOM. PLANT 2 CITY Of TUKWRA APPROVED JUL - 8 2002 RECEIVED V c�rr of ruKVnu AS MIIUJ JUN 1 7 2002 PERMITCENTER ISSUED FOR EGN - 01 APPROVED J., D'WN: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB NO DWG N0. REVISIONS BY Harris Group Inc. M2a PL- 2- 92064 REVISION " C" ONLY 2- 80 -M2 DATE PROJECT 6.05.02 11081.00 ENGINEER: CHECKED: MLD RB DATE 6.05.02 COMP N0. AIR DIFFUSER / REGISTER / GRILLE (AIR) SCHEDULE MARK NUMBER TYPE MATERIAL FINISH INLET /NECK SIZE, ,INCHES) FACE SIZE (INCHES) MAX. TP INCH AG. MAX. NOISE COEFFICIENT MAXIMUM SET CFN REMARK CD SQUARE CEILING DIFFUSER STEEL CD 12x12 24x24 .033 - 300 TITUS M BORDER OTYPE 3CD CD SQUARE CEILING DIFFUSER STEEL j 16x16 24x24 .059 14 700 TITUS DARNER OTYPE 3CD CD SQUARE CEILING DIFFUSER STEEL 7 15 "0 24x24 .055 25 860 TITUS MODEL TMS /D\ 4 ,/ SQUARE CEILING DIFFUSER STEEL El> 20x20 2424 .059 16 1300 TINS MODEL MCD BORDER TYPE 3 All SQUARE CEILING GRILLE STEEL 1� 30x30 31 3/4x31 3 4 / / .017 20 3200 TINS A 272 BLADE SERIES MODEL 272RS CD 6 SQUARE CEILING GRILLE STEEL Di> 10x10 2424 .033 - 400 TINS MODEL MCD, BORDER TYPE 3 (USED IN TOILET ROOM) m v SQUARE CEILING DIFFUSER STEEL 7� 1 0 "m 24x24 .037 74 330 TITUS BORDER O T D Y E P L E T 3 5 0 NY SQUARE CEILING DIFFUSER STEEL _ 1 8 "0 24x24 . 049 15 250 TINS MODEL TMS BORDER TYPE 3 Ak v SQUARE CEILING DIFFUSER STEEL 1 10 "0 24x24 .05 14 350 TENS MODEL NS BORDER TYPE 1 Ak CEILING DIFFUSER STEEL OFF WHITE OFF WHITE 48" NECK x 11 1/8 .062 12 200 TITUS EAST HIGH EL BA TMR826 0 v SIDEWALL SUPPLY GRILLE STEEL 1� 36x12 37 1/4x13 1/4 .011 - 880 MODEL 2R2RSLADE SERIES \ NOT USED . v SIDEWALL SUPPLY GRILLE STEEL - 14x12 15 3/4x14 3/4 .058 21 750 MODEL AERO SERIES 0 © SIDEWALL SUPPLY GRILLE STEEL 1 I� 36x12 37 1 4x13 1/4 / .011 7 880 TINS AERO BLADE SERIES > NOT USED MODEL 272RS 0 SUPPLY GRILLE STEEL OFF WHITE 12x10 - .01 30 400 71TUS MODEL 272RL © SUPPLY GRILLE STEEL OFF WHITE - 6x6 .016 30 100 TITUS MODEL NT SURFACE MOUNT, . BORDER TYPE 1 . VW S UPPLY DIFFUSER STEEL OFF WHITE i6 53 Oi 30 725 SURFACE MODEL T SURFACE MOUNT 0 © SUPPLY DIFFUSER STEEL OFF WHITE 6x6 7 01 30 100 SURF MCD SURFACE MOUNT Vir SUPPLY DIFFUSER STEEL OFF WHITE 8x8 - .01 30 250 TITUS MODEL MCD SURFACE MOUNT 0 v CEILING SUPPLY GRILLE STEEL 2'- 0 "x3' -0" 36x24 37 3 4x25 3/4 / .015 <12 2160 TITUS AERO BLADE SERIES MODEL 272RS 0 v DISCHARGE GRILLE ALUM OFF WHITE 12x10 12x10 .006 11 : 350 TTTUS MODEL 50F, EGG CRATE GRILLE, SURFACE MOUNT, STD CORE, CLEAN ROOM DISCHARGE 0 © DISCHARGE GRILLE ALUM OFF WHITE 8x6 8x6 .01 10 100 TITUS MODEL 50F, EGG CRATE GRILLE, SURFACE MOUNT, STD CORE, VESTIBULE DISCHARGE ® v CEILING EXHAUST REGISTER STEEL 1 48x20 41 11 16x20 11/16 / .165 29 6250 A G-1 EGGCRATE RETURN MODEL U WITH AG -15 OPPOSE BLADE DAMPER SURFACE MOUNT ® v CEILING RETURN REGISTER STEEL 1� 48x14 49 11/16x20 11/16 .020 20 1350 TITUS EGGCRATE BLADE MP URFACER AG -15 OPPOSE BLADE DAMPER SURFACE MOUNT 0 © CEILING RETURN GRILLE STEEL 1 D 12 x12 13 11/76x13 11/16 .033 10 35(:) STUN EGGCRATE RETURN MODEL SOf WITH AG -15 DAMPER. LAY -IN MOUNT Alla Mir CEILING RETURN GRILLE STEEL - 48x24 47 3/423 3/4 .016 16 2200 TITUS EGGCRATE RETURN MODEL 50F WITH AG -15 DAMPER. LAY -IN MOUNT 0 EXHAUST GRILLE STEEL t� 50x26 51 11/16x27 11/16 .238 31 8400 TITUS EGGCRATE RETURN MODEL 50F. SURFACE MOUNT. ® VW EXHAUST GRILLE STEEL Y' 50x20 51 11/16x21 11/16 .016. 18 2240 BTUS EGGCRATE SURFACE MOUNT,RENRN MODEL 50F. 0 v RETURN GRILLE STEEL OFF WHITE 32x20 - .01 30 3000 SURF MODEL 30R SURFACE MOUNT m v RETURN GRILLE STEEL OFF WHITE 6x6 - .01 30 100 TINS MODEL 25RL 0 v RETURN GRILLE STEEL OFF WHITE 12x12 - .01 30 500 TINS MODEL 30RL 0 v RETURN GRILLE STEEL OFF WHITE 6x6 - .0 1 30 100 TINS MODEL 3ORL m 0 RETURN GRILLE STEEL OFF WHITE 24x48 .013 10 2000 TITUS R TA DAR ECG CRATE SCE, LAY IN BORDER, STANDARD CORE 0 v RETURN GRILLE STEEL OFF WHITE - 24x24 .013 10 1500 TINS MODEL 50F, EGG CRATE STYLE, LAY IN BORDER, STANDARD CORE (LSAF CUSTOMER OFFICE) m 0 RETURN GRILLE STEEL OFF WHITE 12 .013 14 200 TITUS MODEL 23RL, SURFACE MOUNT CLEAN ROOM RETURN A. v RETURN GRILLE ALUM OFF WHITE 8x6 8x6 .01 10 100 S TUN MODEL ST SURFACE MOUNT, STD CORE, VESTIBULE CLG & RESiit00M . v - - - 24x24 - - 1600 TINS MODEL 272FLS (OR EQUAL) 0 © - - 16x6 620 TITUS MODEL 272FLS (OR EQUAL) 0 v TRANSFER GRILLE STEEL OFF WHITE _ 12x8 .002 20 100 TINS MODEL WOOL, EGG CRATE STYLE, SURFACE MOUNT W /AUXILLIARY FRAME, VESTIBULE DOOR COOLING COIL (CC) SCHEDULE MARK NUMBER UNIT SERVED CR1 COIL FACE AREA SQ. FT. TOTAL MBH EAT 'F LAT 'F MAX. WATER ROWS FINS PER INCH COIL CONN. IN MAX. PRESSURE DROP REMARKS DB WB DB WB EWT'F LWT'F GPM AIR - IN WG TUBE -FT H7 ® ® AHU -1 5400 13 180 73.6 58.2 46.4 45.4 42 52 36 10 10 1.5 0.94 4,47 PACE COIL MODEL N0. 1010 CW- 36.0X52. A -23/10 ® AHU 2 6400 13 216 73.7 59.6 48.0. 47.0 42 52 43 8 10 2.0 1.12 4.62 PACE COIL MODEL N0. 810 CW- 36.X52. A23J10 ® �` AHU -3 6680 16 240. 73.8 ......,.'vim 57.9 48.0- 47.0 42 ... -....' 52 . 48 6 10 2.R .59 g.75 PACE COIL MODEL N0. . • I.. -. � •. CC ANU -DD -11 9000 19.4 224. 78 64 57- (1) -24x36 45 55 45 4 9 2.5 0.33 8.5 COIL INSIDE WHO -DO -11 dr y H 1 AC -GH /15 853 310 IAC MODEL LFS - A� 10 (1)- 24x36 0.90 1066 6400 - - 33 i:L:L •■in , 52 52 45 30 20 310 IAC MODEL LFS v - . EF -2 3'- 0 "x6' -0" 10 (3) -24x36 1.36 1389 25000 - 22 INTAKE /EXHAUST AIR PENTHOUSE SCHEDULE - INTF MARK NO. LOCATION SERVICE DIM. INCH CFM MANUFACTURER /MODEL REMARKS LENGTH WIDTH HEIGHT PH -2 ROOF 20.4/1 CHILLER ROOM 36 . 32 24 3100 RUSKIN - PH-3 ROOF 17.5/2 EF -03 80 48 36 7880 RUSKIN - PH-4 ROOF 17.5/2 EF -D4 24 24 18 865 RUSKIN 22 PH -5 ROOF 19/3.5 AHU-3 BLDG 2 -80 7242 2'- 0 "x4' -0" 36 ,6680 RUSKIN - PH-6 ROOF 19/3.5 AHU -3 BLDG 2 -80 72 42 36 6680 RUSKIN - 18 260 SAC MODEL LFS AM EF -1 3'- 0 "x6' -0" 7 (3) -24x36 1.28 EIRE [SMOKE DAMPERS YARN R9, SF YICE s -- WAR= / mow_ REMARKS W1(I1S) FSO -D E, 09RRIROR 14414 RDSKIN.•MOREL FSD 60 AHU- DO -11, IN F$D 10 ELEVATOR MACHINE RM 12/.1 RUSKIN, MODEL F5D - 60 BLDG 2 - 80 (1M15) FSD15 ELEVATOR 10/10 RUSKIN,`MODEL POD -60 2' 0" FSD16 LIBRARY 18/18 RUSKIN, MODEL FSD -60 0.19 FSD -17 N.E. CORRIDOR 18/18 RUSKIN, MODEL FSD -60 30 FSD -18 LOBBY 10/10 RUSKIN, MODEL FSD -60 BLDG 2 -80 22 310 IAC MODEL LES SA RF -1 INTAKE/EXHAUST AIR PENTHOUSE SCHEDULE - LSAF MARK SERVICES LOCATION DIMENSIONS PERCENT FREE AREA REMARKS W L H - (DD /11) AHU- DO -11, IN ROOF 2' 0" 4' -6" 3' -0" 54 RUSKIN PHM, 24 "x54" THROAT OPENING x 36" HIGH WITH on ELF 375X STATIONARY LOUVERS 2 SIDES, 24 "x54" © (DE /12) AHU- DD -11, EXHAUST ROOF 2' 0" 4' -6" 3' -0" 54 RUSKIN PHM, 24'x 4" H• OA 'PE IN x - 3." ID IT MODEL ELF 3'750 STATIONARY LOUVERS 2 SIDES, 36 "x72" SOUND ATTENUATOR (SA) SERVICE SCHEDULE ATTENUATOR BANK SIZE LENGTH F EE T QUANTITY WIDTHxHEIGHT (INCHES) MAXIMUM PD IN /H20 MAXI FV ,,,,,• '' AIR QUANTITY CFM MINIMUM REQUIRED ACOUSTIC RATING dB RE 10 - t 2 W OCTAVE BAND CENTER FREQUENCY HERTZ APPROX WI (LOS) REMARKS MARK NUMBER RATING 63 125 250 500 1000 2000 4000 8000 0 v AHU -1 3'- 0 "x4' -0" 10 (1) -36x48 0.19 450 5400 - 21 30 48 53 53 45 34 22 310 IAC MODEL LES SA RF -1 2'- 0 "x4' -0" 7 (1) -24x48 0.30 675 5400 - 15 25 43 48 49 35 26 18 260 SAC MODEL LFS AM EF -1 3'- 0 "x6' -0" 7 (3) -24x36 1.28 1389 25000 - 16 26 44 49 50 35 25 17 920 INC MODEL LFS e AHU 4 -2 2'- 0 "x3' -0" 10 (1) -24x36 0.90 1066 6400 - 21 29 47 53 53 46 36 23 310 IAC MODEL LFS RE -2 2'- 0 "x3' -0" 10 (1)- 24x36 0.90 1066 6400 - 23 33 50 52 52 45 30 20 310 IAC MODEL LFS v - . EF -2 3'- 0 "x6' -0" 10 (3) -24x36 1.36 1389 25000 - 22 32 48 52 52 44 28 18 920 IAC MODEL LFS AEL Iiiff AHU -IA 2'- 0 "x3' -0" 7 (1) -24x36 0.32 686 4120 - 13 24 40 48 49 35 28 18 310 IAC MODEL LFS 0 AHU -2A 3'- 0 "x4' -0" 10 (2)- 24x36 0.82 1008 12100 - 21 29 47 53 53 46 36 23 610 IAC MODEL LFS 0 AHU -4 2'- 0 "x3' -0" 7 (1)- 24x36' . ': 0.67 1000 6000 - 16 26 44 49 50 35 25 17 310 IAC MODEL LFS N AHU -4 2'- 0 "x3' -0" 7 (1) -24x36 0.67 1000 6000 - 16 26 44 49 50 35 25 17 310 IAC MODEL LFS e AHU -3 2'- 0 x4' -0" 5 (1) -30x48 0.81 1133 6800 - 16 21 35 41 41 28 20 14 260 IAC MODEL LFS - - ELEC SHOP / 1183 - - - - - - - - - - - - - - - - 35 -4D NC REQ'D _ U:•.Y / 11: - - - - - - - - - - - - - - - - 30 -35 NC REQ'D An Ur AHU - DD - 11 4' - 0 x 3 - E 5 (2) - 2442 0.05 515 6960 11 14 25 30 28 16 13 13 292 IAC MODEL LFM SYM A ISSUE FOR CONSTRUCTION UPDATE EQUIPMENT SCHEDULE REVISED SCHEDULES LSAF RECONFIGURATION LSAF rONTROL ROOM REVISION 4982188 4711975 DG DWM HGI /LJC I IGI /MLD APPROVED GS/ KR KR MP DATE 5 -11 -93 10.15.93 7.28.00 5.01.02 SYM ECN - 01 REVISION 24711 BY HGI /LCC APPROVED DATE 6.05.02 AntillE2PAW NOTE: 1. PROVIDE ACCESS DOOR(S) ON EAST SIDE FOR ACCESS TO MOTOR OPERATED DAMPERS LOCATED AT ROOF. ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION. IS APPROVED APPROVED BY DEPT. DRAWN K. BUN CHECKED D. GEONANGA 5NGINLk.R DATE D. GEONANGA CHECKED G. SMITH APPROVED K. RAMSEY APPROVED P. LONG DATE 04 - 14 - 93 SUBTITLE TIT MECHANICAL MASTER EQUIPMENT SCHEDULE BUILDING 2 -80 LEGEND Moa- a6:, 1. SEE SHEETS M1a, M1b & M1c FOR MECHANICAL LEGEND AND ABBREVIATIONS. GENERAL NOTES E> COORDINATE WITH ARCHITECTURAL FINISH. PLANT 2 AP JOB NO. DWG NO COY OF 9 A JUL - 8 2002 AS NOIES 6 ISSUED FOR ECN - 01 ICA OVED DRAWN: CHECKED: MB' WBB CURRENT REVISION SYMBOL J #711975 SHEET M2b RECEIVED ary of Tuxwlu JUN 1 7 2002 PERMIT CENTER REVISIONS BY Harris Group Inc. PL -2 -92064 REVISION "E" ONLY 2- 80 -M2b DATE 6.05.02 ENG NEER: MLD DATE COMP N0. PROJECT 11081.00 CHECKED: RB 6.05.02 PUMP SCHEDULE PUMP NO. LOCATION SERVES FUNCTION GPM HEAD FEET RPM HP ELECTRICAL WEIGHT LBS. MANUFACTURER MODEL REMARKS VOLTS PHASE Hz F & T 1 5 90 ARMSTRONG WITH INTEGRATED VACUUM BREAKER -3 F & T 1 5 105 ARMSTRONG WITH INTEGRATED VACUUM BREAKER HC -4 F & T 1 5 885 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 5 DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. ST 6 DRIP LEG INVERTED BUCKET VW 5 75 P 4 SANITARY SEWER PUMP COL 8.5 /DC.5 LSAF RESTROOM SANITARY SEWER TRANSFER 32 6 3,450 2 480 3 60 - BARNES XSGV DUPLEX SYSTEM, EAST SIDE 2 -80 BLDG 0.06 TAG NO SERVICE SIZE MFR MODEL NO REMARKS ST -8 DRIP LEG 1/2" STEAMGUARD SG -B -02 234.7 ST -9 COIL P-5 CHILLER ROOM COL 18.8/DA.4 AHU'S WATER SECONDARY CHILLED 1,100 70 1,760 30 480 3 60 1,105 TACO TA1524 DOUBLE SUCTION SPLIT CASE WITH VFD P-6 CHILLER ROOM COL 18.8/DA.4 AHU'S SECONDARY CHILLED WATER PUMP 1,100 70 1,760 30 480 3 60 1,105 TACO TA1524 DOUBLE SUCTION SPLIT CASE WITH VFD P -7 MECH EQUIP ROOM COL 18/DB.9 AHU'S, UH & FT BOXES HEATING HOT WATER PUMP • 300 70 1,760 10 480 3 60 440 TACO FE3010 BASE MQUNTED END SUCTION WITH VFD P 8 MECH EQUIP ROOM COL 18/DB.9 AHU'S, UH & FT BOXES HEATING HOT WATER PUMP 300 70 1,760 10 480 3 60 440 TACO FE3010 BASE MOUNTED END SUCTION WITH VFD P _ 9 MECH EQUIP ROOM COL 18/DB.9 HOT WATER RECIRC DOMESTIC RECIRC. HOT WATER 10 20 1,760 1/2 120 1 60 20 B &G - IN -LINE CIRCULATING SUPPLIED BY HEX -2 VENDOR STEAM TRAP (ST) SCHEDULE MARK NUMBER - SERVICE TYPE PRESSURE (PSIG) PRESSURE (PSIG) LBS /HR (MIN) REMARKS ST HC -1 F & T 1 5 60 ARMSTRONG WITH INTEGRATED VACUUM BREAKER IMO JIM 0 HC -2 F & T 1 5 90 ARMSTRONG WITH INTEGRATED VACUUM BREAKER -3 F & T 1 5 105 ARMSTRONG WITH INTEGRATED VACUUM BREAKER HC -4 F & T 1 5 885 ARMSTRONG WITH INTEGRATED VACUUM BREAKER ST 5 DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. ST 6 DRIP LEG INVERTED BUCKET VW 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. ® DRIP LEG INVERTED BUCKET 1 5 75 ARMSTRONG INTEGRATED SENSOR TO INDICATE TRAP CONDITION BY LED. 30 - - - 1 6 1 1/2" 0.06 TAG NO SERVICE SIZE MFR MODEL NO REMARKS ST -8 DRIP LEG 1/2" STEAMGUARD SG -B -02 234.7 ST -9 COIL 3/4" STEAMGUARD SG -B -09 6 ST -10 - 1/2" STEAMGUARD SG -B -03 AHU-4 ST -11 COIL 3/4'' STEAMGUARD SG -B -11 - 8 234.7 295 - - - 1 6 2" 0.08 PACE MODEL #61L SD- 37.5X68 © HEATING COIL (HC) SCHEDULE - STEAM AND HOT WATER MARK NUMBER UNIT SERVED CFM COIL FACE AREA SQ. FT. COIL FACE VELOCITY (FPM) TOTAL MBH (MIN) EAT 'F LAT 'F STEAM HOT WATER Na OF ROWS (MIN) FINS PER INCH COIL CONN. IN PRESSURE DROP REMARKS DB DB PSIG TEMP LBS /HR GPM EWT DEG F LWT DEG F AIR-IN WG ACK AHU -1 5400 9.75 415 16 70.5 - 8 234.7 20 - - - 1 6 1 1/2" 0.05 PACE MODEL #61L SD -6X52 VW AHU -2 6400 10.83 492 2 6 70.2 - 8 234.7 30 - - - 1 6 1 1/2" 0.06 PACE MODEL #61L SD -6X52 © STEAM AHU -3 6680 11.28 430 30.4 69.3 - 8 234.7 32 - - - 1 6 1 1/2" 0.03 PACE MODEL #61L SD -6X57 © 45 (GPM) AHU-4 12000 19.1 530 285 69.4 - 8 234.7 295 - - - 1 6 2" 0.08 PACE MODEL #61L SD- 37.5X68 © HC AHU -DD -11 9000 16 468 249 60 86 - - - 25 180' 160° 1 - 1 1/2" 0.06 - D -11 TEMPERATURE CONTROL VALVE (TCV) SCHEDULE MARK NUMBER EQUIPMENT SERVED SERVICE AP ACROSS VALVE (PSI) CAPACITY GPM OR LBS /HR SIZE (INCHES) CV REMARKS ASCO 8342G1 AHU -1 CHILLED WATER 5 36 (GPM) 1 1/4 16 MODULATING PNEUMATIC ACTUATOR ® /TCV\ AHU -1 STEAM 7 20 LBS /HR 1/2 0.58 MODULATING PNEUMATIC ACTUATOR 2 Ala AHU -2 CHILLED WATER 5 43 (GPM) 1 1/2 19 MODULATING PNEUMATIC ACTUATOR lir FISHER AHU-2 STEAM 7 30 LBS /HR 1/2 0.72 MODULATING PNEUMATIC ACTUATOR (TCV 4 AHU -3 CHILLED WATER 5 48 (GPM) 1 1/2 21.2 MODULATING PNEUMATIC ACTUATOR © AL AHU -3 STEAM 7 35 LBS /HR 1/2 1.10 MODULATING PNEUMATIC ACTUATOR AHU -4 STEAM 7 295 LBS /HR 7,6 MODULATING PNEUMATIC ACTUATOR • AHU -DD -11 - HOT WATER 8 25 (GPM) 1 8.8 MODULATING ELECTRIC ACTUATOR 0 -DD -11 CHILLED WATER 6 45 (GPM) 1 18.4 MODULATING ELECTRIC ACTUATOR v AHU 300# COMPRESSED AIR CONTROL VALVE SCHEDULE - LSAF MARK NUMBER DESCRIPTION PART NUMBER CV-- 2_LSAF VALVE, 4 -WAY 2 -POS, 120VAC SOLENOID ASCO 8342G1 CV- 3_LSAF VALVE, 4 -WAY 2 -POS, 120VAC SOLENOID ASCO 8342G1 CV- 4_LSAF VALVE, 4 -WAY 2 -POS, 120VAC SOLENOID ASCO 8342G1 V- O_INTF VALVE, GATE, 12" MANUAL Li V- 1_LSAF VALVE, GATE, 12" MANUAL EWT DEG F V- 2_LSAF VALVE, BUTTERFLY, 10 ", AIR OPERATED 40 GAL. V- 3_LSAF VALVE, BALL, 3 ", AIR OPERATED MAX WPD FT W V- 4_LSAF VALVE, GLOBE, 6 ", AIR OPERATED 60 V- 6_LSAF VALVE, AIR OPERATED FISHER VEEBALL V- 7_LSAF VALVE, 3 ", HYDRAULICALLY OPERATED FISHER V- 8_LSAF VALVE, 3 ", HYDRAULICALLY OPERATED FISHER V- 9_LSAF VALVE, AIR OPERATED FISHER VEEBALL WATER HEATER SCHEDULE MARK N0, LOCATION SERVES CAPACITY RECOVERY ELEMENT WATTAGE MANUFACTURER /MODEL ELECTRICAL MANUFACTURER MODEL REMARKS VOLTS I PHASE Hz Li I L2 L3 EWT DEG F LSAF MEZZANINE COL. DC -10 LSAF RESTROOMS CONTROL ROOM 40 GAL. 30 GPH DUAL ELEMENT 4000 /4000 MAX WPD FT W 480 3 60 14.4.0 I 8.3A 8.3A A.O. SMf H DEL 40 2.0* 0 30 180 160 21 72 144 15.0 10 TEMTROL FC -10 FAN COIL UNIT SCHEDULE - HEATING MARK NO. SERVICE LOCATION FAN FILTERS HOT WATER HEATING COIL MANUFACTURER /MODEL T-1 CCOLER ROOM R OOM CHILLED E M ATER CFM E.S.P. in W.C. FAN RPM BHp MOTOR HP DRIVE % EFFICIENCY EWT DEG F LWT DEG F EAT DEG F LAT DEG F CAPACITY MBH GPM MAX WPD FT W 4.7 FCU 01 CHILLER ROOM CCOLERSOOM 2600 1.0 1241 1.52 2.0* BELT 30 180 160 21 72 144 15.0 10 TEMTROL FC -10 EXPANSION TANK SCHEDULE - 2 -80 CHILLER ROOM EQUIP NO. LOCATION SERVES CAPACITY GALLONS WEIGHT LBS. MANUFACTURER MODEL T-1 CCOLER ROOM R OOM CHILLED E M ATER 53 550 B &G B -200 ... T-2 CHILLER COL 182.7 HEATING WATER SYSTEM 105 1000 B &G 0 -400 " -r.„.3 -r.„.3 3 CHILLER fj00M COL 18 2.7 ( DOMESTIC HOT WATER 4.7 53 AMTROL 52-12-C SYM A NOTE: 1750 RPM, 480 VOLTS, 3- PHASE, 60Hz. NOTES: 1. PUMP WEIGHT DOES NOT INCLUDE THE INERTIA BASE. 2. PUMPS WITH VFD DRIVES SHALL HAVE VFD COMPATIBLE MOTORS. RECORD DRAWING LOAF CONTROL ROOM ECN -01 REVISION 4972197 -00 J/1711975 J #711975 BY HGI /LJC HGI /MLD HGI /MLD APPROVED DATE 7.28.00 5.01.02 6.05.D2 SY REVISION BY APPROVED DATE ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE C. MAAS CHECKED C. MAAS APPROVED L COSTELLO APPROVED DATE 7.28.00 7.28.00 7.28.00 7.28.00 7.28.00 SUBTITLE EQUIPMENT SCHEDULE BUILDING 2 -80 MECHANICAL MASTER PLANT 2 SHEET JOB N0. CITY Of TUKWILA APPROVED JUL - 8 2002 AS NAILD !3{J1LEING D'nrtRDOU ISSUED FOR ECN - 01 DRAWN: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 REVISIONS BY Harris Group Inc. M2e 972197 -00 DWG NO. 2- 80 -M2e aTV oFiul JUN 1 7 2002 PERMIT CENTER REVISION "B" ONLY DATE PROJECT 6.05.02 11081.00 ENGINEER: CHECKED: MLD RB DATE COMP NO. 6.05.02 LNN1 MATCHLINE, FOR CONTINUATION SEE 1 2D' -0" 20, -0" (REF) 1C -0" 8' -0" (REF) 12'-0" 12 -0" 1M12 M517 16 d) 0 In KW 1 ! ,_ i i 33 FM ` 33 j (( 0 ' Alc Q 33� jri! FM is:�_ ; OF 0 �250 Ciu - �VYY 2 m IC CFM - .. I ,6x6 93 CFM till ��[�7 I` k = '3b�1LL'8 _iYlii•I1` II 6E4M45A2 N 1� i%ii1 2 V :., ts` -_ C:1. v.y...i..K_ ; � o '�FTU -2 -42 SE :��15.. :.�..S �S ;. i�3 _.�L1�:11 1M ... y j R � f ' FOR CONTINUATION SEE 1M11 12” U TO ROOF ACUUM PUMP u. _ e ms_ 316x6 3_CFM X 4824 RG .x 1 / I I � � � i 1 _ r '�, : , - ,� „ ,rvtr ,i y r �r ,r,; �, Ie ,. . ,r ,�i ,. �r , ri ,r 4 _ I } ,r ,r A f = L I: ! f � � Li 1M12 M543 0,,,11.. N 1 1.1P 4 -. 16x6 oz/oz A A AA. — —_ 'r- TAITT - A - A A A r117 ANVIVAI V ' 11 V'," V V - - - - - 97 CFA' -I -11 ,2,411' ' C IAC - _ ENE 20 12 11 11 M - I j I I I 12 1 _. . 7, AA AAAA iA r\ fl \ tyvvvvvv.,, • 1j I !,,, \., • ::_f- --, 1 ..=11 ii\AO;i00, ,I , 1! SYM A RENUMBER DRAWING AS BUILT - ADDED LSAF LSAF RECONFIGURATION RECORD CHANGE LSAF CONTROL ROOM REVISION 11) J #982188 J #711975 DY WLS WLS HGI /LJC RFG HGI /MLD APPROVED RFG DATE 1.30.87 7.11.93 7.28.00 4/17/01 5.01.02 SYM ECN - 01 REVISION JH711975 BY HGI /MLD APPROVED DATE 6.05.02 SCALE: 1/8 " =1' -0" PARTIAL PLAN VIEW .OE7iV ( DRAWN B.A. MEHTA CHECKED R. GIADNEY - ENGINEER W. BOLLIG CHECKED R. GEHRING APPROVED R. GEHRING ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE APPROVED DATE 3,24.85 10.26.86 10.20.86 10.26.86 SUBTITLE TIME MECHANICAL MASTER DUCTWORK .9 DH BUILDING 2 -80 COL. DE— DJ/8 -17 a (a RECEIVED LM Of TUKWIL4 JUN 1 7 2002 PERM, SENIVA CM Ok D4ED 1UL _ g 289 IEO LEGEND SEE 2 -80 -MO FOR LEGEND GENERAL NOTES D, RECTANGULAR RADIUS ELBOW WITH TURNING VANES. SEE M452 FOR CONTINUATION. 2. ALL DUCTWORK SHALL BE PROVIDED WITH SEISMIC HAZARD LEVEL (SAL) "A" OF THE SEISMIC RESTRAINT MANUAL- GUIDLINES FOR MECHANICAL SYSTEMS DATED 1998, AS PUBLISHED BY SMACNA AND LOCAL CODES. REFERENCE DRAWINGS 2 -80 -M452 ENLARGED MEZZANINE PLAN LSAF CONTROL ROOM CONSTRUCTION NOTES 2 -81 BLDG. — 2 80 BLDG. PLANT 2 KEY PLAN SCAM IPS ISSUED FOR ECN -01 APP ":O D DRA CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB NO DWG N0. REVISIONS BY Harris Group Inc. 1M12 REVISION "D" ONLY DATE 6.05.02 ENGINEER: MLD DATE 2-80--1M12 COMP NO. PROJECT 11081.00 CHECKED: RB 6.05.02 SYM A RENUMBER DRAWING AS BUILT – ADDED LSAF B LSAF RECONFIGURATION C LSAF CONTROL ROOM D ECN -01 REVISION oI 1M16 M517 X22 48x24 RG 2000 CFM 12x6, D,N 48x24 NG 2000 CFM (TYP 3) SEE M452 DO 1 O" 5' -10 3/13, O so Aso 10 CFM�. ) CFM CFM- (— TIXIMI ROO 1® 24x24 1000 CFM 2 x24 RG 10xE: 1Ox 124, ■IYd't II 1•1111•11=ROVIIIINI ♦ 314771.47r' t i BCD •Allirk m` toxs I FM 330 FM c30 M� 1P-Nr Sao Kara 00 CFM FTU -2 -39 200 GEM LOW) - i 1 REMOVABLE CLOSURE PANEL FROM FLOOR TO TOP OF A/C UNIT SG -4 62 CFM 10x12 10 "0 22" X 30" DOOR GRILLE WITH 22" X 30" X 2" FILTER RACK MOUNTED ON INSIDE OF DOOR J #982188 J #711975 J #711975 BY WLS WLS HGI /UC HGI /MW HGI /MLD APPROVED 16 DATE 1.30.87 7.11.93 7.28.00 5.01.02 6.05.02 SY CLOSURE STRIP TO TOP OF A/C UNIT 16x6 93 CFM 8" DIA REVISION _t CONTROL PANEL,IYP. SCHARGE HOOD (8) APPROVED I I MATCHLINE, FOR CONTINUATION SE BO DATE (TYP 3) PARTIAL FIRST FLOOR PLAN SCALE: 1/8" = 1' -0" 3) Q1B /N6m � 12' -8° (TYP 3) (TYP 3) (TYP 3) 1 161M543 D9i , 0 " APPROVED BY DEPT. DATE W. ROLLIG CHECKED R. GEHRING APPROVED R. GEHRING APPROVED ACCEPTABILITY DA . NM EHTA DATE THIS DESIGN AND /OR C HECKED SPECIFICATION IS APPROVED R. GLADNEY ENGINEER 10.26.86 10.20.86 10.26.86 M542 SUBTITLE TITLE D3 MECHANICAL MASTER DUCTWORK BUILDING 2 -80 COL. DA- DE/8 -17 2 -81 BLDG. RECEIVEp CITY OF 7UKWI„ JUN 1 7 2002 LEGEND SEE 2 -80 –MO FOR LEGEND GENERAL NOTES 1. ALL DUCTWORK SHALL BE PROVIDED WITH SEISMIC RESTRAINTS IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. 2. DUCT DIMENSIONS LISTED ARE "FREE AND CLEAR" INSIDE DIMENSIONS. E> RECTANGULAR RADIUS ELBOW WITH TURNING VANES. ® RECTANGULAR RADIUS ELBOW WNH TURING VANES. SEE M452 ENLARGED MEZZANINE PLAN FOR CONTINUATION. REFERENCE DRAWINGS 2- 80 -1M17 PLAN VIEW DUCTWORK 2- 80 -1M505 SECTIONS & DETAILS 2- 80 –TM518 ELBOWS ON CONTROL PANELS 2- 80 –M1M17 MEZZ DUCTWORK 2 -80 -M452 ENLARGED MEZZANINE PLAN CONSTRUCTION NOTES TIE –IN TO EXISTING LSAF WEST HIGH BAY DUCTWORK. CLEAN ROOM RETURN AIR DUCTS TO BE ROUTED INSIDE WALL STUCTURE. caw u(0 PLANT 2 2 80 BLDG. KEEY M PLAN Q ISSUED FOR ECN -01 REVISIONS BY Harris Group Inc. JOB NO. DWG N0. CHECKED: WBB REVISION "D" ONLY DATE 6.05.02 2- 80 -1M16 PROJECT 11081.00 ENGINEER: CHECKED: MLD RB DATE 6.05.02 COMP N0. SYM A LSAF CONTROL ROOM ECN -01 REVISION J #711975 J #711975 BY HGI /MLD HGI /MLD APPROVED DATE 5.01.02 6.05.02 SYM REVISION APPROVED DATE PARTIAL MECHANICAL ROOF PLAN SCALE: 1/8" = 1' -0" p razezArig ° DATE 3.21.02 3.29.02 4.05.02 4.05.02 5.10.02 5.13.02 SUBTITLE TITLE MECHANICAL MASTER DUCTWORK 2� FOR STRUCTURAL FRAMING SEE 2 -80 -5166. DD BUILDING 2 -80 COL. 9- 17 /DA -DE RECEIVED CITY OF TUKWILP JUN 1 7 2002 PERMIT CENTER r LEGEND SEE DRAWING 2 -80 -MO FOR LEGEND a c� GENERAL NOTES BIRD SCREEN, 1/4" WIRE MESH REFERENCE DRAWINGS CONSTRUCTION NOTES INSTALL EXHAUST 36" ABOVE ROOF AND GOOSENECK OVER TO PREVENT RNiNWATER ENTRY. ACCEPTABILITY THIS .DESIGN AND /OR - SPECIFICATION.. IS APPROVED APPROVED BY DEPT. DATE W. BOULDS CHECKED W. BRITTAIN - ENGINEER M. DAVIS CHECKED R. BERRY APPROVED S. BERGSTROM APPROVED L..COSTELLO PLANT 2 2 - 80 BLDG. KEY PLAN sca F: Nrs ISSUED FOR ECN -01 CURRENT REVISION J #711975 SHEET JOB NO. DWG NO. CAT" OF TUKWILA APPROVED JUL - 8 2002 AS NO1ED RS/0N SYMBOL RFM16 11081.00 711975 2- 80- RFM16 Harris Group Inc. DATE COMP N0. 6.05.02 p ,, _ ■ - I MATCHLJNE, SEE SHEET RFM15 I I I i j I I — {' .> — — - , I \, I i — 1 I „,,,, ,...--1 , ,..- - = i 6 DAUST BARU ROOF / RFM16 A528 . I � _ --- I l --1 I —, ; I I — E>3” SAN VTR THRU ROOF 3" SAN VTR THRU ROOF `- 4 SAN VTR THRU ROOF----- I � ! I — — / RFM16 A528 MATCHLINE, SEE SHED" RFM11 I \ I RFM16 A528 I 1 i _____ SEE SHEET RFM12 MATCHLINE, SYM A LSAF CONTROL ROOM ECN -01 REVISION J #711975 J #711975 BY HGI /MLD HGI /MLD APPROVED DATE 5.01.02 6.05.02 SYM REVISION APPROVED DATE PARTIAL MECHANICAL ROOF PLAN SCALE: 1/8" = 1' -0" p razezArig ° DATE 3.21.02 3.29.02 4.05.02 4.05.02 5.10.02 5.13.02 SUBTITLE TITLE MECHANICAL MASTER DUCTWORK 2� FOR STRUCTURAL FRAMING SEE 2 -80 -5166. DD BUILDING 2 -80 COL. 9- 17 /DA -DE RECEIVED CITY OF TUKWILP JUN 1 7 2002 PERMIT CENTER r LEGEND SEE DRAWING 2 -80 -MO FOR LEGEND a c� GENERAL NOTES BIRD SCREEN, 1/4" WIRE MESH REFERENCE DRAWINGS CONSTRUCTION NOTES INSTALL EXHAUST 36" ABOVE ROOF AND GOOSENECK OVER TO PREVENT RNiNWATER ENTRY. ACCEPTABILITY THIS .DESIGN AND /OR - SPECIFICATION.. IS APPROVED APPROVED BY DEPT. DATE W. BOULDS CHECKED W. BRITTAIN - ENGINEER M. DAVIS CHECKED R. BERRY APPROVED S. BERGSTROM APPROVED L..COSTELLO PLANT 2 2 - 80 BLDG. KEY PLAN sca F: Nrs ISSUED FOR ECN -01 CURRENT REVISION J #711975 SHEET JOB NO. DWG NO. CAT" OF TUKWILA APPROVED JUL - 8 2002 AS NO1ED RS/0N SYMBOL RFM16 11081.00 711975 2- 80- RFM16 Harris Group Inc. DATE COMP N0. 6.05.02 p POC -7 FOB 2" C MATCHLINE, FOR CONTINUATION SEE 1M66 (BIM) — FTU UH ink 4' STM , 1/2" -HWR 1 M6` M513 - 1 /2" C, DRIP 1M62 M513 ____-_,T1 1 1 /2 " -HWS 3 /4 " - Hws, DN f � T POC 1 co I � I I —! '_ ' -_ t� - --1 I ( SIM) ® CUH � 3/4" -HWR, DN S EE M452 s tl .. +, 1) -40 - a1 , .. L'. C ' UH I ( UH I E 16 4 1/2" i FOB ECC, FOB / 4 \ 1 1M62 M513 F I" Q = N � DE 9 2 HWR I" I 1 M62 M513 I � �'\ _- I __ ii 1 `aS �,U ..R..l`I\S i 1` ._ - � . 1 - i�..siLti; a» i.a �.»LS' \i1a —� _�,3.iS A.•l� 1 e 6MHO „ t Li SMH nnnr. ii n Iri F-rsr. I 7 — , 15 I 'kL Id t„,________,.,„__ --4 I — 1 i � i I I I i t i n n r i I .. I ) 1111 __ J g I1 1 .-. -- ___ I � _ I3 , 1 .I ! JL M62 M503 - - -- n II A A /IA /1.il A A A A /IX/IAA/II, • _ - _ - I ! 1 6p 1 i / i ' 5 UH I h I UH ilk ! 'l r \II , -,J1 ANECHOIC CHAMBER - - Ir 111111 • C I/ It If 13 I, I/ I/ It It lt If I/ It It I/ M 1M62 M513 1 ( � ' I l !�. I� 1 1 t it i I f t!r 11 II "I tr 1!1 yi ti � .y1/ .. - -- Y }^ % .- 1 2 ' STM3 4 1r 4" 1 2" STM -E u 11 I 1I "i '�, ' ___ I � If1f u�: G ll 1 POC Qj I -.. / / 3 / ; 6 _ - J I 1,r !; SEE 102 -C80- 4072 -M7 FOR PIPING FLOW DIAGRAM. i i1 PROPANE raM f // I I TANK REF ._l PROPANE ® �! 11 1 HEAT l i -i — - EXCHANGER . POC, ,, ■ Ai li r ._ -' _` _ - J . MY ( F SEE DETAIL 1 � . II M6 M502 FLOOR PIPING PLAN I r _ _ 1 SCALE 1/8 " =1' -O" 1U a� 0 30- - 8 28J r - P SYM A RENUMBER DRAWING AS BUILT - ADDED LSAF PROVIDE DATA HOUSE REROUTE CONDENSATE LOAF RECONFIGURATION 2 "x3/4" REVISION 17 J0D6210335 J #982188 BY WLS WLS WDB WDB HCI /LJC APPROVED WDB DATE 1.30.87 7.11.93 5.24.96 7.28.00 SYM LOAF CONTROL ROOM ECN -01 REVISION ( 1 / J 71197 50711975 BY HGI /MLD HGI /MLD APPROVED (J DATE 5.01.02 6.05.02 gifintrEzioma® ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY 10 DEPT. DATE DRAWN DATE B:A. MEHTA 3.24.85 CHECKED R. GLADNEY ` 10.26.86 ENGINEER W. BOLLIG CHECKED R. GEHRING 10.20.86 APPROVED R. GEHRING APPROVED 10.26.86 SUBTITLE TITLE MECHANICAL MASTER HVAC PIPING DH E. DI RECE IVED JUN 1 7 2002 TUN 1 7 2002 BUILDING 2 -80 COL. DE— DJ/8 -17 RERMIT CENTER LEGEND SEE 2 -80 -MO FOR LEGEND GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(08 MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW 0 10' INTERVALS 2 " -3" DIA. PIPE @ 15' INTERVALS 4"-6" DIA. PIPE @ 20' INTERVALS REFERENCE DRAWINGS CONSTRUCTION NOTES [>-INSTALL 1 1/2" STEAM PIPING TO EXISTING PROPANE HEATER. INSTALL 3/4" CONDENSATE RETURN. FROM EXISTING PROPANE HEATER. PROVIDE WALL PENETRATION. SEAL WALL PENETRATION .PER BOEING CONSTRUCTION SPECIFICATION SECTION 7910. INSTALL DOWNDRAFT UNIT HEATER. BOTTOM OF UNIT HEATER TO BE INSTALLED AS HIGH AS POSSIBLE. INSTALL 3/4" HOT WATER SUPPLY AND 3/4" HOT WATER RETURN PIPING. INSTALL 3/4" FLOW CONTROL VALVE IN HOT WATER RETURN © INSULATE STEAM AND CONDENSATE PIPING UP TO THE VAPORIZER PER BOEING CONSTRUCTION SPECIFICATION 15260. >.HEAT TRACE EXTERIOR STEAM AND CONDENSATE PIPING OP TO THE VAPORIZER PER BOEING CONSTRUCTION SPECIFICATION 15261. ® D0`. BLO Ca." 0 INSULATE AS AND HWR PER BOEING CONSTRUCTION SPECIFICATION 15260. PLANT 2 2 80 BLDG. KEY PLAN ISSUED FOR ECN -01 App•. VED D. CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 SHEET JOB N0. DWG N0. REVISIONS BY Harris Group Inc. 1 M62 760015 2- 80 -1M62 REVISION "F" ONLY DATE 6.05.02 ENGINEER: MLD DATE 6.05.02 PROJECT 11081.00 CHECKED: RB COMP NO. SYM A RENUMBER DRAWING AS BUILT - ADDED LSAF PROVIDE DATA HOUSE REROUTE CONDENSATE LSAF RECONFIGURATION 1 1/2 "MPS 1 1/4 "C FROM 2 1/' CONDENSATE CP RETURN UNIT REVISION 1Th J06210335 J#982188 BY WLS WLS WDB WDB MAX APPROVED WDB a DATE 1.30.87 7.11.93 5.24.96 7.28.00 SYM LSAF CONTROL ROOM ECN -01 REVISION J#711975 J8711975 BY HGI /MLD 001 /ML0 13.1 APPROVED SCALE: 1/8 "= 1' -0" DATE 5.01.02 6.05.02 g ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRA N B.A. MEHTA CHECKED R. GLADNEY ENAINEER W. BOLLIG CHECKED R. GEHRING APPROVED R. GEHRING APPROVED TE 3.24.85 10.26 86 10.20.86 10.26.86 SUBTITLE 1THE DA HVAC PIPING tato 0 BUILDING 2 -80 MECHANICAL MASTER COL. DA- DE/8 -17 2 -81 BLDG.- RECEIVED CITY OF TUKWiLP JUN 1 7 2002 PERMITCENTER LEGEND SEE 2 -80 -MO FOR LEGEND GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(00 MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW N 10' INTERVALS 2 " - DIA. PIPE B 15' INTERVALS 4 " -6" DIA. PIPE ED 20' INTERVALS REFERENCE DRAWINGS. CONSTRUCTION NOTES INSTALL HOT WATER SUPPLY AND RETURN PIPING TO UNIT HEATERS." CONNECT TO EXISTING PIPING WHICH WAS PREVIOUSLY STEAM AND CONDENSATE. INSTALL HOT WATER SUPPLY AND RETURN CONTROL PIPING AT UNIT HEATER. INSPECT AND FLUSH EXISTING STEAM /CONDENSATE PIPING AND COIL PRIOR TO TIE -IN TO HOT WATER SUPPLY /RETURN PIPING. RELABEL. EXISTING PIPING AS HOT WATER SUPPLY (PREVIOUSLY CONDENSATE) AND HOT WATER RETURN (PREVIOUSLY STEAM). - - ® INSTALL 3" HOT WATER SUPPLY AND RETURN PIPING. INSTALL DOWNDRAFT UNIT HEATER. BOTTOM OF UNIT HEATER TO. BE INSTALLED AT 14' - AFF. © INSTALL 3/4" HOT WATER SUPPLY AND 3/4" HOT WATER RETURN PIPING. INSTALL 3/4" FLOW CONTROL VALVE ON HOT WATER RETURN PIPING. INSTALL CHILLED WATER SUPPLY AND RETURN TO AHU- DD -11. ® INSTALL HOT WATER SUPPLY AND RETURN TO AHU- DD -11, FAN TERMINAL UNITS, DOWN DRAFT UNIT HEATERS AND CABINET UNIT HEATER. g�REMOVE TEMPORARY CHILLED WATER SUPPLY AND RETURN TO RELOCATED AHU -DF 10 AND CAP AT VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. REMOVE TEMPORARY HOT WATER SUPPLY AND RETURN TO AHU -5 AND RELOCATED AHU -DF -10 AND CAP AT VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. INSULATE CHILLED WATER SUPPLY /RETURN AND HOT WATER SUPPLY /RETURN PER BOEING CONSTRUCTION SPECIFICATION SECTION 15260. [2> INSTALL PHASE 1 PIPING UP TO EDGE OF TUNNEL. SEE SK 1M62 AND SK -1M66 FOR TEMPORARY PIPING TO AHU -5 AND AHU- DF -10. INSTALL 1" CLEAR WATER DRAIN (CONDENSATE) FROM AHU- DD -11. TIE CONDENSATE DRAIN INTO SANITARY DRAIN PER M545. co CD PLANT 2 2 80 BLDG. K NT PLAN 0 ISSUED FOR ECN -01 SHEET JOB NO. DWG N0. REVISIONS BY Harris Group Inc. CHECKED: WBB CURRENT REVISION SYMBOL J #711975 I M66 REVISION "F" ONLY DATE 605.02 ENG NEER: MLD 760015 2- 80 -1M66 DATE COMP N0. PROJECT 11081.00 CHECKED: RB 6.05.02 i I 7 j j - I w z o 1.. ; T „ 2 FOR UNIT HEATER PIPING SEE DETAIL 1 13 M66 M5 UH A15__ \ b r - 3/4 HWR D-- T 3/4" mi T• �� -' FOR UNIT HEATER PIPING SEE DETAIL N 1M66 M513 , I I sl i1 I e 1 � l UH ® 13 l I i I .. 344 ( P 2 1 1 / 8 "RG 0 , 2 1- 1M (I 11\ ® F j , I • be /16 L _ , ,'1 I I r I "."2./2.72:727,,Z,±7, 7:: `•� / DH • 1 1/2 HWR ' 2x1 1 / 2 1 1/2 HWS 1- _ 'I DB 9 vn® l I , r1 " � I EE M„45 I 2" PC TO IMF IN /Ia am® H - - I(..,,,\ I- -+ ( 1 I ! , PHASE 1 1 P HAS E � N 1 A)2"- TR AP r : . CLD —1" -CLD, DN TO SAN, SEE 1 [; is ' I { I m j I .0 I j I I yi 1 SEE M 545 i w _ 10 T + jy p �(SIM) 0 s POC �� < " !� i 1 M66 M513 , -- --F II ,/ 2 1 1/2 CLAWS '. 2 1/2" CHWS -+ 2 1/2" CHWR ®��. 10 2-MWS. -.. �, 1 I ' I 3 HWR 3' HWS+- r — q 1rV 1/2 N ECC FOB(e 1� � 0 3/4 - HWS, RN i 1 I 1 � 1 'Ag,1 i 1 SSE M 3 ® /4e SEE M452 1/x1 C I ! _ 3 4 "' H pN ) S�E fg 452 �.. I 3/4 HWR ON r. SEE M452 4 , HWS, SN I� < C3/ -SEE M452 1 1 3/4" -HWR, DN Ij;� SEE M452 IT Ir. 3/4" -HWS DN I l > SEE M452 / \ ° 3/4 ,. I I ^ ; I I A A / " I / 3" STM (_ _ _:... _ r , I I � 1 1 \_ T DOWN TO A - DD -11, 1� FOR CONT. SEE M452 1 1/2"-OLD, UP TO FUNNEL DRAIN, SEE M452 4 STM 1 1. I -HWR, ON tl 4 2_ 11,, MATCHLINE FOR CONT. SEE 2- 8O -1M62 LI nnQ I9IpI(MIC pl AM eL SYM A RENUMBER DRAWING AS BUILT - ADDED LSAF PROVIDE DATA HOUSE REROUTE CONDENSATE LSAF RECONFIGURATION 1 1/2 "MPS 1 1/4 "C FROM 2 1/' CONDENSATE CP RETURN UNIT REVISION 1Th J06210335 J#982188 BY WLS WLS WDB WDB MAX APPROVED WDB a DATE 1.30.87 7.11.93 5.24.96 7.28.00 SYM LSAF CONTROL ROOM ECN -01 REVISION J#711975 J8711975 BY HGI /MLD 001 /ML0 13.1 APPROVED SCALE: 1/8 "= 1' -0" DATE 5.01.02 6.05.02 g ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRA N B.A. MEHTA CHECKED R. GLADNEY ENAINEER W. BOLLIG CHECKED R. GEHRING APPROVED R. GEHRING APPROVED TE 3.24.85 10.26 86 10.20.86 10.26.86 SUBTITLE 1THE DA HVAC PIPING tato 0 BUILDING 2 -80 MECHANICAL MASTER COL. DA- DE/8 -17 2 -81 BLDG.- RECEIVED CITY OF TUKWiLP JUN 1 7 2002 PERMITCENTER LEGEND SEE 2 -80 -MO FOR LEGEND GENERAL NOTES 1. SLOPE ALL PIPE 1/4" PER 10'(00 MORE) IN THE DIRECTION SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW N 10' INTERVALS 2 " - DIA. PIPE B 15' INTERVALS 4 " -6" DIA. PIPE ED 20' INTERVALS REFERENCE DRAWINGS. CONSTRUCTION NOTES INSTALL HOT WATER SUPPLY AND RETURN PIPING TO UNIT HEATERS." CONNECT TO EXISTING PIPING WHICH WAS PREVIOUSLY STEAM AND CONDENSATE. INSTALL HOT WATER SUPPLY AND RETURN CONTROL PIPING AT UNIT HEATER. INSPECT AND FLUSH EXISTING STEAM /CONDENSATE PIPING AND COIL PRIOR TO TIE -IN TO HOT WATER SUPPLY /RETURN PIPING. RELABEL. EXISTING PIPING AS HOT WATER SUPPLY (PREVIOUSLY CONDENSATE) AND HOT WATER RETURN (PREVIOUSLY STEAM). - - ® INSTALL 3" HOT WATER SUPPLY AND RETURN PIPING. INSTALL DOWNDRAFT UNIT HEATER. BOTTOM OF UNIT HEATER TO. BE INSTALLED AT 14' - AFF. © INSTALL 3/4" HOT WATER SUPPLY AND 3/4" HOT WATER RETURN PIPING. INSTALL 3/4" FLOW CONTROL VALVE ON HOT WATER RETURN PIPING. INSTALL CHILLED WATER SUPPLY AND RETURN TO AHU- DD -11. ® INSTALL HOT WATER SUPPLY AND RETURN TO AHU- DD -11, FAN TERMINAL UNITS, DOWN DRAFT UNIT HEATERS AND CABINET UNIT HEATER. g�REMOVE TEMPORARY CHILLED WATER SUPPLY AND RETURN TO RELOCATED AHU -DF 10 AND CAP AT VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. REMOVE TEMPORARY HOT WATER SUPPLY AND RETURN TO AHU -5 AND RELOCATED AHU -DF -10 AND CAP AT VALVE AFTER NEW LSAF CONTROL ROOM CONSTRUCTION IS COMPLETE. INSULATE CHILLED WATER SUPPLY /RETURN AND HOT WATER SUPPLY /RETURN PER BOEING CONSTRUCTION SPECIFICATION SECTION 15260. [2> INSTALL PHASE 1 PIPING UP TO EDGE OF TUNNEL. SEE SK 1M62 AND SK -1M66 FOR TEMPORARY PIPING TO AHU -5 AND AHU- DF -10. INSTALL 1" CLEAR WATER DRAIN (CONDENSATE) FROM AHU- DD -11. TIE CONDENSATE DRAIN INTO SANITARY DRAIN PER M545. co CD PLANT 2 2 80 BLDG. K NT PLAN 0 ISSUED FOR ECN -01 SHEET JOB NO. DWG N0. REVISIONS BY Harris Group Inc. CHECKED: WBB CURRENT REVISION SYMBOL J #711975 I M66 REVISION "F" ONLY DATE 605.02 ENG NEER: MLD 760015 2- 80 -1M66 DATE COMP N0. PROJECT 11081.00 CHECKED: RB 6.05.02 SYM A 1M1 1M1 ADD PLANT AR FOR HOIST PROVIDE DATA HOUSE REVISION PROCURE HORIZONTAL BANDSAW RELOCATE /INSTALL EQUIPMENT DISC. /RECONNECT SPRINKLER SYSTEM 7� �1 J #939046 -01 J #949022 -01 4740050 -00 J #05010661 BY MCGRATH SMM JOG BOJ WDB v ? 1 APPROVED WDB WDB WDB WSJ WOO DATE 5.26.93 6.9.94 9.16.94 4.12.95 5:24:95 SYM LSAF RECONFIGURATION LSAF CONTROL RCJM ECN -01 REVISION J #982188 J #711975 J #711975 BY HOI /LJC HGI /MLD HGI /MLD S. MCGRATH WDB CHECKED APPROVED APPROVED APPROVED DATE 7.28.00 5.01.02 6.05.02 ?Lda'4E /NG® ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED. BY DEPT. DATE DRAWN S. MCGRATH DATE 5.25.93 5.25.93 5.25.93 5.25.93 SUBTITLE TIT PLUMBING ci 9 REFERENCE DRAWINGS SEE 2- 8D -M321 FOR AIR SCHEMATIC OF A300 TO ANECHOIC CHAMBER. BUILDING 2 -80 MECHANICAL MASTER COL DE- DJ/8 -17 INSTALL 12" 300LB RE FLANGE WITH GASKET AND BLIND FLANGE AT 24" EAST OF 12 " -A300 SUPPLY PIPING. [2:›- INSTALL FLANGE SPOOL PIECE WHERE 12° FLANGED GATE VALVE WAS REMOVED (REFERENCE 1M112R). RELOCATE 12" FLANGED GATE VALVE TO PROVIDE ISOLATION TO 2- 80 -INTF (REFERENCE 1M111). INSTALL 12 " -A300. TO. LSAF. CONNECT FROM - EXISTING 12"-A300 SERVING 2 -81 -IMF TO EXISTING 12 " -A300 LOCATED ON ROOF THAT SERVES 2- 80 -LSAF. ® INSTALL 3 " -A300 FROM 12 " -A300 TO PRESSURE REDUCING STATION AND PROVIDE 1 " -A.300 TIE -IN TO EXISTING 1" SS SERVING LOBE CART. RECEIVEC CITY OF TUKN,,�q JUN I. 7 2002 PERMIT CENTER LEGEND SEE DRAWING 2 -80 —MO FOR LEGEND GENERAL NOTES CONSTRUCTION NOTES >.. INSTALL 8 " -A300 FROM EXISTING 12 " -A300 ON ROOF TO EXISTING 8 " -A300 SERVING EXISTING G.E. TEST RIG. ©INSTALL 6"-A300 FROM EXISTING 12 " -A300 ON ROOF TO EXISTING AIR MUFFLER. INSTALL EXISTING PNEUMATIC OPERATED 6" GLOBE VAL RELO TED). REFERENCE 2- YD- M621R. ALL ' RUB AI' . °P `. P 'VATIC T LVE ION (NEAR V- 2_LSAF),.PNEUMATIC OPERATED VALVES (V- 2_LSAF, 0- 3_LSAF) PNEUMATIC OPERATED VALVE ON ROOF (V- 4_LSAF) AND TIE INTO EXISTING INSTRUMENT AIR LINE LOCATED AT COLUMN DJ -11. CAP EXISTING INSTRUMENT AIR SUPPLY AT TOP ELBOW LOCATED AT COLUMN DJ -11. INSTALL INSTRUMENT AIR SUPPLY TO LSAF CONTROL ROOM. INSTALL 2" -SAN (PUMPED) FROM NEW LIFT STATION (REF UGM116, 1M116) TO EXISTING LIFT STATION (REF UGM112). ROUTE PIPING DOWN TO HOFFMAN BOX AS REQUIRED TO CLEAR NEW CABLE TRAY ROUTING TO ANECHOIC CHAMBER. REFERENCE 1Al2. DISCONNECT EXISTING 3/4" AIR PIPING TO AIR. FUEL AND CONTROLS. DISCONNECT FROM. UNION - IN DROP BACK FAR ENOUGH TO ALLOW INSTALLATION OF NEW - 3/4' -IA. INSTALL NEW 3/4 " -IA TO EXISTING AIR, FUEL AND PURGE CONTROLS. POINT OF CONNECTION (POC) IS AT 3/4" ONION. 2 -81 BLDG.— 2 80 BLDG. PLANT 2 KEY PLAN INS ISSUED FOR ECN -01 AP OVER. SDB / LJC D• WN: CHECKED: MDH ' WJB. CURRENT REVISION SYMBOL J #711975 SHEET JOB NO. DWG N0. 0 REVISIONS BY Harris Group - Inc. cro DATE 6.05.02 1M112 982188 2- 80 -1M112 REVISION "H" ONLY PROJECT 11081.00 ENGINEER: - CHECKED: MLD RB DATE 6.05.02 COMP N0. - I SECONDARY CONTAINMENT PAN 3/4" 3/4 " -IA TO HOFFMAN BOX 2" 1 IA TCHLIN , FOR MA E F CONTINUATION SEE 1 16 Mi 12 1M519 1/2" 11/2" -__/ - ■ I til �I 3/4 " -A OVERHEAD \t�Z Z��Y' - YS .'\ IN - - STORAGE I M ` w NEW HORIZONTAL BANDSAW M "I 3" IA 3" / .� , n I I WIND TUNNEL I _ ..1 oc , ___ I I I \ ( III .. - - I IA T - - -) R - AI : . 1 1 \ \CC1n\C\ 1[,.i,_ 'ttS� ∎\Z \Z ZL1ZC ``tt«'�Zl HOFFMAN BOX. EI�OROPS - Si FPS EAR NG SUPPLY � (ID , — ._.,., t i II ,. 1/2" AAN BOX �r rr !F sr tr us. tr sr r� - s I ©41 (p, 1/2" �I - l 11 a C trs rv,, I s r rr —, _> I I i j 1 '. " J - I _.... 1M11 1M112 M541 ^ 11i v1 /2n, 1 I11 I ' j..., I 1. L I� 12" VAC „J„. T I 1 I �- -; 1 i t l - I I wE>,,2DOWN 11 !I i i = _ II = ! I ' - -+ - ERIS I. - SUMP. SEE 102 -OBO -4072 M DOWN TO PRESS. RED.STATION SEE DETAIL © FOR DETAIL - I I COMMON BUILD UP 1 1/2” CW I ,.., -- 3 /4-BRFIN ALDS 1 11 I � 1M112 M513 - ANECHOIC CHAMBER `Il ( l I� "t - C7 25 AIR HOSE e - THIS EA 3/4" TUB FROND • •-, I [w SHOP WILL CONNECT AT APPROX.THIS LOCATION ;, e " 33/4 IA , DN I�. w Q / i I �i • - 3/4" IA , T� LUB - 1 I I , I STORAGE j "„, ! 1 �{q / CART V �_ I . - Poo -- Q`^ In_„ TO AIR, FUEL AND PURGE� CONTROLS Lt 300# AIR MUFFLER ON ROOF ' [/�riI __ p. ' I ) j _ - ,-� S " P300 O N ROOF I ° 1 " - A300 i .,, POC �... L I© -` POC 12x6 12 1 2 TO CV A300 • 4 % � I ti t rl 3 1 1 M 2 M513 I 11 ' d POC C ..--L x •, 12" A300 -EC 1 , _ - FP ! 4, - t4 - 4 , ', n %i , '•;s(;'! { i ir ` +rin n.�'r n i : +n "n s nnrsrr itri� � r +i ® 10" . r(i , iiisil . • r/-. .� I , , �;_� '..t , ,� -� ,: ;, ; � :� 3 x :-,. , • s . fit. . tt tr X t POC 12 „-73"-A300 u ° -- I I ! ,I ! A350 -F - " _______0_ _. j r 1 IA (< �_ `� 1" IA - ' ,�1. POC 1 -IA " -A300 12 A305 tkll - 1 1.0., '-- 1 IA _12" A305 ■ • - 12 " A30 - 1 POC IN RISE 2 I- I � I � I � I � 8" F.P. RISERS 1_LSAF 12 " -A300 I V-2 _LSAF 1 1/2" CW FROM SITE. SEE M134 t - ' -'�\ f =.1 lin 1 t - _. . _.. - r j i 1 8 "STAINLESS I STEEL I I AIR (6001 r I 11 I I POC IN RISE :: GE, HOT I TEST RIG • 12 " -A300i ® RI 4 A 1' -IA Z YD =; ,_ 1M112 M546 r ' SEE 2-YD-M134 v 0 1M112 M546 I I I 11 HEATER 1M112 2—YD—M621 ) 4111111P* 1 a (0 = PLAN VIEW q tr BR N _ I _ ,.11 . f . I, x ,81 SCALE: 1/8 " =1' - 0" 3 � it 9 „1 SYM A 1M1 1M1 ADD PLANT AR FOR HOIST PROVIDE DATA HOUSE REVISION PROCURE HORIZONTAL BANDSAW RELOCATE /INSTALL EQUIPMENT DISC. /RECONNECT SPRINKLER SYSTEM 7� �1 J #939046 -01 J #949022 -01 4740050 -00 J #05010661 BY MCGRATH SMM JOG BOJ WDB v ? 1 APPROVED WDB WDB WDB WSJ WOO DATE 5.26.93 6.9.94 9.16.94 4.12.95 5:24:95 SYM LSAF RECONFIGURATION LSAF CONTROL RCJM ECN -01 REVISION J #982188 J #711975 J #711975 BY HOI /LJC HGI /MLD HGI /MLD S. MCGRATH WDB CHECKED APPROVED APPROVED APPROVED DATE 7.28.00 5.01.02 6.05.02 ?Lda'4E /NG® ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED. BY DEPT. DATE DRAWN S. MCGRATH DATE 5.25.93 5.25.93 5.25.93 5.25.93 SUBTITLE TIT PLUMBING ci 9 REFERENCE DRAWINGS SEE 2- 8D -M321 FOR AIR SCHEMATIC OF A300 TO ANECHOIC CHAMBER. BUILDING 2 -80 MECHANICAL MASTER COL DE- DJ/8 -17 INSTALL 12" 300LB RE FLANGE WITH GASKET AND BLIND FLANGE AT 24" EAST OF 12 " -A300 SUPPLY PIPING. [2:›- INSTALL FLANGE SPOOL PIECE WHERE 12° FLANGED GATE VALVE WAS REMOVED (REFERENCE 1M112R). RELOCATE 12" FLANGED GATE VALVE TO PROVIDE ISOLATION TO 2- 80 -INTF (REFERENCE 1M111). INSTALL 12 " -A300. TO. LSAF. CONNECT FROM - EXISTING 12"-A300 SERVING 2 -81 -IMF TO EXISTING 12 " -A300 LOCATED ON ROOF THAT SERVES 2- 80 -LSAF. ® INSTALL 3 " -A300 FROM 12 " -A300 TO PRESSURE REDUCING STATION AND PROVIDE 1 " -A.300 TIE -IN TO EXISTING 1" SS SERVING LOBE CART. RECEIVEC CITY OF TUKN,,�q JUN I. 7 2002 PERMIT CENTER LEGEND SEE DRAWING 2 -80 —MO FOR LEGEND GENERAL NOTES CONSTRUCTION NOTES >.. INSTALL 8 " -A300 FROM EXISTING 12 " -A300 ON ROOF TO EXISTING 8 " -A300 SERVING EXISTING G.E. TEST RIG. ©INSTALL 6"-A300 FROM EXISTING 12 " -A300 ON ROOF TO EXISTING AIR MUFFLER. INSTALL EXISTING PNEUMATIC OPERATED 6" GLOBE VAL RELO TED). REFERENCE 2- YD- M621R. ALL ' RUB AI' . °P `. P 'VATIC T LVE ION (NEAR V- 2_LSAF),.PNEUMATIC OPERATED VALVES (V- 2_LSAF, 0- 3_LSAF) PNEUMATIC OPERATED VALVE ON ROOF (V- 4_LSAF) AND TIE INTO EXISTING INSTRUMENT AIR LINE LOCATED AT COLUMN DJ -11. CAP EXISTING INSTRUMENT AIR SUPPLY AT TOP ELBOW LOCATED AT COLUMN DJ -11. INSTALL INSTRUMENT AIR SUPPLY TO LSAF CONTROL ROOM. INSTALL 2" -SAN (PUMPED) FROM NEW LIFT STATION (REF UGM116, 1M116) TO EXISTING LIFT STATION (REF UGM112). ROUTE PIPING DOWN TO HOFFMAN BOX AS REQUIRED TO CLEAR NEW CABLE TRAY ROUTING TO ANECHOIC CHAMBER. REFERENCE 1Al2. DISCONNECT EXISTING 3/4" AIR PIPING TO AIR. FUEL AND CONTROLS. DISCONNECT FROM. UNION - IN DROP BACK FAR ENOUGH TO ALLOW INSTALLATION OF NEW - 3/4' -IA. INSTALL NEW 3/4 " -IA TO EXISTING AIR, FUEL AND PURGE CONTROLS. POINT OF CONNECTION (POC) IS AT 3/4" ONION. 2 -81 BLDG.— 2 80 BLDG. PLANT 2 KEY PLAN INS ISSUED FOR ECN -01 AP OVER. SDB / LJC D• WN: CHECKED: MDH ' WJB. CURRENT REVISION SYMBOL J #711975 SHEET JOB NO. DWG N0. 0 REVISIONS BY Harris Group - Inc. cro DATE 6.05.02 1M112 982188 2- 80 -1M112 REVISION "H" ONLY PROJECT 11081.00 ENGINEER: - CHECKED: MLD RB DATE 6.05.02 COMP N0. SY A ECN -01 REASIAN < 3"-A300 TO 2 -81 SEE 2- YD -M134 < 3"-A300 TO INTF SEE 2- YD -M134 C 12 " -A300 TO INTF< 8 " -A300 SEE 2- YD -M134 LOAF CONTROL ROOM J #711975 4711975 P I PI I DRAIN VALVE 4 " -A300— 3 " -A300 BY HGI /MLD HGI /MLD APPROVED I 10 DATE 5.01.02 6.05.02 V- 9_LSAF V -8 LSAF V- 6_LSAF ►� V -7 LSAF 12 " -A300 X V- 0_INTF PRIMARY VENTURI SECONDARY VENTURI 600 kW ELECTRIC HEATER OC� 2 " -VIR LOW TEMP SILENCER HIGH TEMP SILENCER 12x8 I i - 1 " -IA SY REVISION V- 1_LSAF ° /1 a 300 -100 PSI SET 125 PSI PRV PRV I PPT I 1 12x10 BY APPROVED DATE 3 " -IA 12 " -A300 POC POC AUXILARY 6 CONNECTION FOR GE /UPS: RIG - SEE DWG ���LLL 2- YD -M621 i3LawrAF7Aw. 6 " -A300 M UFFLER ON LTC ROOF �-� 8 V- 4_LSAF A CV- 3_LSAF ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. VENT VENT VENT — I — VENT RUPTURE ISC D 12' -A300 TO AIR, GAS AND PURGE CONTROLS 3/4" -IA �� 3/4 " -IA SEE 2- 80- 1M112> MO)' I :ue DATE DRAWN MDH C C W. BOULDS MLD'' CHECKED R. BERRY APPROVED S. "BERGSTRO APPROVED L COSTELLO 1' 3.27. 4.20.02 5.01.02 4.12.02 5.10.02 5.13.02 a 8' -SRV I DRNN VE VAL TILE 10" TO LTC \ 10 " -A300 TO LTC 300 PSI -12'.. SUPPLY LINE FROM COMPRESSORS 12 " -A300 . SEE 2- YD -M621. 1 -IA 100 PSI SEE 2- 80 -1M112 LSAF AREA SEE 2- 80- 1M112> 3 " -IA 100 PSI SUBTITLE MECHANICAL MASTER REFERENCE DRAWINGS 300 PSI AIRLINE CIRCUIT BUILDING 2 -80 RECEIVED GIN OF TUi(WIIA JUN 1 7 200Z PERMIT CENTER LEGEND SEE 2 -80 -MO FOR LEGEND, SYMBOLS AND ABREVIATIONS GENERAL NOTES CONSTRUCTION NOTES > INSTALL 12" 300# RF FLANGE, BLIND FLANGE AND GASKET. REFERENCE 1M112. I INSTALL 12" 300# RF FLANGED SPOOL PIECE IN LOCATION WHERE VALVE WAS REMOVED. REFERENCE 1M112. INSTALL 12 " -A300 TO LSAF. CONNECT INTO EXISTING 12 " -A300 ON ROOF. REFERENCE 1M112. INSTALL 12" LSAF ISOLATION GATE VALVE (LABEL AS V- 1_LSAF). REFERENCE 1M112. INSTALL 10" LSAF CONTROL BUTTERFLY VALVE FLANGED SPOOL PIECE (.4' -0" LONG, LABEL AS V- 2_LSAF). REFERENCE 1M112. INSTALL 3" LSAF BY -PASS BALL CONTROL VALVE (LABAL AS V- 3_LSAF). REFERENCE 1M112. INSTALL A300 PIPING FROM EXISTING MUFFLER ON ROOF TO EXISTING G.E. TEST RIG. TIE INTO EXISTING. 12 " -A300 ON ROOF. REFERENCE 1M112 ® INSTALL 6" MUFFLER CONTROL GLOBE VALVE (LABEL AS V- 4_LSAF). REFERENCE 1M112. TALL 3"-A300 TO PRESSURE REDUCING STATION. LABEL. PIPING AS INSTRUMENT AIR BEYOND PRESSURE REDUCING STATION. INSTALL 3 " -IA TO NEW LSAF CONTROL ROOM. INSTALL 1 " -IA TO CONTROL VALVES AND CONNECT TO EXISTING IA SERVICE LOCATED AT SOUTHEAST CORNER OF ANECHOIC CHAMBER. REFERENCE 1M112. MOUNT IA CONTROL VALVE CV- 2_LSAF AND CV- 3_LSAF ON 3/4" PLYWOOD NEAR V- 2_LSAF. REFERENCE 1M112. MOUNT IA CONTROL VALVE CV- 4_LSAF ON 3/4" PLYWOOD NEAR EXISTING MUFFLER. REFERENCE 1M 112. INSTALL 12" INTF ISOLATION GATE VALVE. (LABEL AS V -0 INTF). REFERENCE 1M111. INSTALL 1" ISOLATION BALL VALVE WITH VENT RELIEF. .VENT EXHAUST TO SOUTH EXTERIOR WALL. SEE 1M112. INSTALL 3 /4 " -IA TO EXISTING AIR, FUEL AND PURGE CONTROLS. SEE 1M112. PLANT 2 ISSUED FOR ECN -01 CURRENT REVISION. SYMBOL J #711975 SHEET M321 JOB NO. 711975 DWG NO. Harris Group Inc. 11081.00 2- 80 -M321 DATE COMP N0. 6.05.02 RECORD DRAWING LSAF CONTROL ROOM ECN -01 REVISION SA9000 MAX / 2240 MIN J #982188 J #711975 J #711975 HGI /LLC HGI /MLD HGI /MLD APPROVED 3.01.02 5.01.02 6.05.02 CHWS — AI U N% CLG HTG HARDWIRE W/ COIL COIL FAN STARTER REVISION FILTER CHANGE MIX RA TEMP AIRFLOW SOUND ATTENUATOR PLENUM RA 6960 CFM I 1 HWR SUBTITLE MECHANICAL MASTER APPROVED M. DAVIS THIS DESIGN AND /OR CHECKED SPECIFICATION IS APPR0005 B. BRITTAIN /311•1331111331 11111111111111111111 CHECED' R. BERRY APPROVED S. BERGSTROM APPROVED L. COSTELLO DATE 2.25 02 5.0 02 2.25.02 5.10.02 5.10.02 5.13.02 BUILDING 2 -80 HIGH BAY AIR 1M12 / 1M16 PLANT 2 JOB N0. DWG. N0. ROOF HARDWIRE 0/ SA SMOKE ALARM FAN STARTER TEMP (ADT) MEZZANINE CEILING I RAG 6 (DIV 16) TEC I 1 SPACE HIGH LOW VAV HTG CMCS 1 TEMP AIRFLOW AIRFLOW DAMPER START COIL 1 L Al Al Al L, U U U U CD CD CV LO Nj Nd SA SA SA SA CUSTOMER OFFICE ZONE 1 1 SPACE HIGH LOW VAV HTG 1 CMCS TEMP AIRFLOW AIRFLOW DAMPER START COIL I L AI AI AI AO DO AO 1 TEC I CO CM •--• HWS HWR U U U U LC, l o l M M1 r, RAG SA SA SA SA SA b CONTROL ROOM NORTH ZONE 3 r— r— 1 — OA /RA /EXH DAMPERS START -SPEED PROOF SA SA SA 40� 1;1 AO L 7 RAG c.J INTERLOCK 5/ DAMPERS (DIV 16) TEC CMCS - - --11 SPACE HIGH LOW VAV HTG I I TEMP AIRFLOW AIRFLOW DAMPER COIL START I L AI AI A I AO AO DO HIGH BAY HWS HWR 1 SPACE HIGH . LOW VAV HTG 1 CMCS 1 TEMP AIRFLOW AIRFLOW DAMPER START COIL L AI AI AI AO DO AOJ TEC U U U U CD N N1 CV SA SA SA b CON7:ROL ROOM SOUTHEAST CORNER ZONE 2 a ) N1 N1 SA SA w FILTER CHANGE HEPA 800 CFM \ CLEAN ROOM S/A \ FILTER / M324A / AF L SA 1240 CFM TEC SPACE HIGH LOW VAV . HTG CMCS -I TEMP AIRFLOW AIRFLOW DAMPER START COIL AI 1;1 AI AO DO AO . z z U U U U U I Lu U- o o )R l )R RAG SA SA SA SA SA SA Gn�NRV D0 B 7a� 10 ':11 CONTROL ROOM SOUTH ra ZONE 4 i ROOF CLEAN ROOM 1T M324A MEZZANINE CEILING RECEIVED CITY OF TUHWILa JUN 1 7 2002 PERMIT CENTER APPR LEGEND GENERAL NOTES REFERENCE DRAWINGS 2 -80 —M324A AIRFLOW CONTROL DIAGRAM AHU —DD -11 2- 80 —M324B SEQUENCE OF OPERATION CONSTRUCTION NOTES DRAWING HAS BEEN COMPLETELY REVISED FOR LSAF CONTROL ROOM RELOCATION. 2. COORDINATE WITH BOEING FOR CONTROL SYSTEM DESIGN. Mo ISSUED FOR ECN -01 REVISIONS BY Harris Group Inc. DRAW. WJB CURRENT. REVISION 471 1975 SHEET CHECKED: WBB M324 982188 2-80--M324 REVISION "B ONLY DATE PROJECT 6.05.02 11081.00 ENO NEER: CHECKED: MLD RB DATE COMP NO. 6.05.02 SYM A DESCRIPTION: THE HVAC AIR -SIDE AND WATER -SIDE SYSTEMS FOR THE BOEING 2 -80 BUILDING SHALL BE CONTROLLED AND MONITORED FROM THE CENTRAL MANAGEMENT CONTROL SYSTEM (CMCS). THE CMCS SHALL BE A DIGITAL CONTROL SYSTEM NETWCRKED WITH MODULAR BUILDING CONTROLLERS (MBC) AND TERMINAL EQUIPMENT CONTROLLERS (TEC). • THIS SYSTEM IS A VARIABLE AIR VOLUME (VAV), AIR HANDLING UNIT (AHU) WITH CHILLED WATER COOLING COIL, HOT WATER HEATING COIL, OUTDOOR AIR ECONOMIZER AND SUPPLY AIR FAN. THE SUPPLY & RETURN/ EXHAUST FAN ARE PROVIDED WITH A VARIABLE FREQUENCY DRIVE (VSD). THIS SYSTEM SHALL BE CONTROLLED FROM THE CMCS. SEQUENCE OF OPERATION (AHU— DD -11): SYSTEM DESCRIPTION: • THE AHU SERVES THE LSAF CONTROL ROOM, CUSTOMER ROOM, CLEAN ROOM AND VENTILATION FOR THE GENERAL HIGH BAY AREA. • THE CLEAN ROOM WILL BE SUPPLIED FROM THE MAIN SA PLENUM THROUGH A SINGLE DUCT VAV UNIT (VAV -1) AND 95% HEPA FILTER (AF -7) BOOSTED BY SUPPLY FAN SF -10. • THIS SYSTEM ALSO INCLUDES 4 PARALLEL FAN POWERED TERMINAL UNITS (FT) WITH HOT WATER HEATING COILS AND SHALL BE CONTROLLED FROM THE CMCS. START -UP (DD -11): • WITH THE SUPPLY FAN MOTOR STARTER SWITCH AT ITS VFD IN THE "AUTO" POSITION, THE AHU SUPPLY FAN MAY BE ENERGIZED/ DE- ENERGIZED THROUGH ITS MOTOR STARTER CONTACTOR BY: WHEN THE SUPPLY FAN IS ENERGIZED/ DE- ENERGIZED, THE RETURN/ EXHAUST FAN SHALL BE STARTED/ STOPPED THROUGH A HARDWARE INTERLOCK (PROVIDED BY AHU VENDOR). • • • • ECN -01 1.). A START /STOP COMMAND ISSUED BY AN OPERATOR FROM THE CMCS; 2.) THE PRE - PROGRAMMED OCCUPANCY SCHEDULE; OR 3.) NIGHT OVER -RIDE AT SPACE TEMPERATURE ENSI THE CMCS SHALL ENERGIZE SUPPLY FAN (SF -10) PRIOR TO ENERGIZING AHU FAN. THE CURRENT SENSOR SWITCHES (IS) SHALL INDICATE SUPPLY FAN RUN STATUS AT THE CMCS. WHEN THE AHU IS ENERGIZED, THE OUTSIDE AIR DAMPER SHALL REMAIN CLOSED UNTIL THE RETURN AIR TEMPERATURE (TT) IS A MINIMUM OF 68 DEGREES F (ADJUSTABLE), THEN THE DAMPER MAY OPEN. WHEN THE AHU IS DE- ENERGIZED OR SAFETY SHUTDOWN OCCURS, THE CMCS SHALL POSITION THE RETURN DAMPER OPEN, THE OUTSIDE AND EXHAUST AIR DAMPERS CLOSED, AND THE VALVES CLOSED. SAFETY: • SHOULD PARTICLES OF COMBUSTION BE SENSED, THE DUCT - MOUNTED SMOKE DETECTORS (XAS - SUPPLIED UNDER DIVISION 16) SHALL DE- ENERGIZE THE AHU SUPPLY & RETURN/ EXHAUST FANS, CLOSE THE SUPPLY AND RETURN AIR DAMPERS, AND INDICATE AN ALARM AT THE SIEMENS FIRE ALARM PANEL. SMOKE DETECTORS SHALL BE LOCATED IN THE SUPPLY AND RETURN AIR PLENUMS AND SHALL BE HARDWIRED TO THE FAN MOTOR STARTERS. (THE SMOKE DETECTORS ARE PROVIDED AND HARDWIRED UNDER DIVISION 16.) A MANUAL RESET AT THE AHU SMOKE DETECTORS MUST BE RESTORED TO ENERGIZE THE AHU FANS FOLLOWING A SMOKE DETECTION SHUTDOWN. • THE LOW -LIMIT TEMPERATURE SWITCH (TSL) SHALL DE- ENERGIZE THE AHU SUPPLY & RETURN/ EXHAUST FANS AND INDICATE AN ALARM AT THE CMCS SHOULD THE TEMPERATURE FALL BELOW 35 DEGREES F (ADJUSTABLE). THE TSL SHALL BE HARDWIRED TO THE FAN MOTOR STARTERS. THE CMCS SHALL OPEN THE HEATING CONTROL VALVE TO 100% DURING A TSL ALARM CONDITION. AHU SUPPLY FAN & RETURN/ EXHAUST FAN CONTROL: • SUPPLY FAN: THE CMCS, SENSING THE DIFFERENTIAL PRESSURE TRANSMITTER (PT) LOCATED IN THE SUPPLY AIR DUCT, SHALL CONTROL THE SUPPLY FAN SPEED THROUGH THE VSD TO MAINTAIN SUPPLY PRESSURE OF 1.0 INCH W.G. (ADJUSTABLE). THE PT SHALL BE LOCATED IN THE SUPPLY AIR DUCTWORK AS SHOWN ON THE DRAWINGS. • RETURN/ EXHAUST FAN: THE CMCS, SENSING THE SUPPLY AND RETURN/ EXHAUST FAN AIRFLOWS (FE), SHALL CONTROL THE RETURN/ EXHAUST FAN SPEED THROUGH THE VSD TO MAINTAIN RETURN/ EXHAUST FAN AIRFLOW BASED ON THE FOLLOWING CALCULATION: RA/ EXH CFM = SA CFM - 2040 CFM -\ 1 T HEATING T ZERO --I COOLING - �T 1 HW BAND PRIMARY AIR LSAF CONTROL ROOM REVISION J #711975 J #711975 BY HGI /MLD HGI /MLD APPROVED DATE 5.01.02 6.05.02 SYM AHU COOLING AND HEATING CYC_ES: • THE CMCS, SENSING SPACE TEMPERATURE SENSORS (TT), SHALL RESET THE SUPPLY AIR TEMPERATURE (TT) SETPOINT AND THE MIXED AIR TEMPERATURE (TT) SETPOINT BASED ON A RESET SCHEDULE. THE RESET SCHEDULE SHALL BE DETERMINED BASED ON SPACE TEMPERATURE (TT) WITH THE GREATEST COOLING LOAD DEMAND. 67- z 65 - t t v 63 - cn 61 _ R w 59 _ 1- 57 D :: 55 = 53 - 100 --� z I \ aW \ L`1° w I \ \ REVISION HEATING & COOLING I (HW, CHW,I & ECONO) 1 I I I I 1 I 68 70 72 74 76 SPACE TEMP CO W/ GREATEST DEMAND FOR COOLING AHU COOLING LOAD RESET SCHEDULE AHU—DD-1 1 • AHU COOLING AND HEATING: THE CMCS SHALL CONTROL THE CHILLED WATER VALVE, THE ECONOMIZER CYCLE, AND THE HOT WATER VALVE IN SEQUENCE TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT SUBJECT TO MINIMUM OUTSIDE AIR REQUIREMENTS. 1.) AHU COOLING (OUTDOOR AIR ECONOMIZER): a.) WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE (TT) BETWEEN 55'F AND 60'F (ADJUSTABLE), THE CMCS SHALL OPEN THE EXHAUST AIR DAMPER AND MODULATE THE OUTSIDE AND RETURN AIR DAMPERS CORRESPONDINGLY TO MAINTAIN MIXED AIR TEMPERATURE SETPOINT (ADJUSTABLE). b.) WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE BETWEEN 60 °F AND 75'F (ADJUSTABLE), THE CMCS SHALL FULLY OPEN THE OUTSIDE AIR AND EXHAUST AIR DAMPERS AND CLOSE THE RETURN AIR DAMPERS. c.) WHEN THE CMCS SENSES THE OUTSIDE AIR TEMPERATURE (TT) LESS THAN 55'F OR GREATER THAN 75'F (ADJUSTABLE), THE CMCS SHALL POSITION THE OUTSIDE AIR DAMPER TO MAINTAIN MINIMUM OUTSIDE AIRFLOW SETPOINT FT SPACE COOLING AND HEATING CYCLES: • FT SPACE COOLING: THE CMCS, SENSING THE SPACE TEMPERATURE (TT), SHALL MODULATE THE FT PRIMARY AIR DAMPER (M) ON THE FT UNIT TO MAINTAIN SPACE TEMPERATURE SETPOINT OF 74 DEGREES F (ADJUSTABLE). • FT SPACE HEATING: THE CMCS, SENSING SPACE TEMPERATURE (TT), SHALL MODULATE THE FT PRIMARY AIR DAMPER ON THE FT UNIT TO ITS PREDETERMINED MINIMUM SETTING AND SHALL START THE UNIT FAN AND MODULATE THE HOT WATER VALVE (TCV) TO MAINTAIN SPACE TEMPERATURE SETPOINT OF 70 DEGREES F (ADJUSTABLE). 68 70 72 74 76 7B SPACE TEMP co FT —XX (TYP.) APPROVES 78 DATE 100 MIN CLEAN ROOM SUPLY FAN OPERATION (SF -10): • CLEAN ROOM SUPPLY FAN (SF -10) AND FAN TERMINAL UNIT (FT -43) SHALL ACT AS A SERIES TYPE FAN TERMINAL UNIT. FAN SHALL OPERATE CONTINUOUSLY DURING OCCUPIED SCHEDULES. SYSTEM RETURN VOLUME DAMPER (MANUAL) SHALL BE POSITIONED TO PROVIDE .05 INCHES W.G. POSITIVE PRESSURE IN THE CLEAN ROOM AND VESTIBULE. FILTER CHANGEOUT (AF -7): • THE DIFFERENTIAL PRESSURE GAUGE / TRANSMITTER (DPS) SWITCH, LOCATED ACROSS THE CLEAN ROOM HEPA FILTER, SHALL INDICATE FILTER CHANGEOUT ALARM AT THE CMCS WHEN THE FILTER PRESSURE DIFFERENTIAL SETPOINT (ADJUSTABLE) IS REACHED. MORNING WARM -UP MODE: • THE AHU SYSTEM WILL START 60 MINUTES (ADJUSTABLE) PRIOR TO THE OCCUPIED SCHEDULE, IF THE CMCS DETERMINES MORNING WARM -UP IS REQUIRED BASED ON DEVIATION FROM SPACE SETPOINT OF 72°F (ADJUSTABLE) UNOCCUPIED. MODE • NIGHT OVERRIDE: IF NIGHT OVERRIDE IS INITIATED AT THE SPACE THERMOSTAT, THE CMCS WILL OPERATE THE AHU SYSTEM UNDER OCCUPIED OPERATING CONDITIONS FOR A PERIOD OF 1 HOUR (ADJUSTABLE) • NIGHT SETBACK: IF THE SPACE TERMPERATURE FALL BELOW 55°F (ADJUSTABLE), THE CMCS SHALL ENERGIZE THE LOCAL FT TO MAINTAIN SPACE TEMPERATURE OF 55 °F (ADJUSTABLE) elfirtzeztaw® ACCEPTABILITY I DRAWN O ULDS 0 0 26.02 THIS DESIGN AND /OR HECKED SPECIFICATION IS APPROVED W BRITTAIN 129:02 ENGINEER APPROVED BY DEPT. DATE N. DAVIS . 3.01.02 CHECKED R. BERRY 4.12.02 APPROVED S. BERGSTROM APPROVED L. COSTELLO 5.10.02 5.13.02 SUBTITLE TITLE, MECHANICAL MASTER SEQUENCE OF OPERATION AHU -DD -11 BUILDING 2 -80 LEGEND GENERAL NOTES REFERENCE DRAWINGS 2- 80 -M324 AIRFLOW /CONTROL DIAGRAM AHU -DD -11 2- 80 -M324A AIRFLOW /CONTROL DIAGRAM AHU -DD -11 CONSTRUCTION NOTES 1. COORDINATE WITH BOEING FOR CONTROL SYSTEM DESIGN. Mop. ► a c� PLANT 2 ISSUED FOR ECN -01 CURRENT REVISION J #711975 SHEET JOB NO. DWG: NO 711975 SYMBOL M324B RECEIVED CITY OF TUKWI{q. JUN 1 7 2002 PERMIT CENTER Harris Group Inc. 11081.00 2- 80 -M324B DATE 6.05:02 COMP SYM A LSAF CONTROL ROOM ECN -01 REVISION FTU AVAEW 20x20 RA P PI O • M452 M513, 20x20 RA 16X14,. 22x52 OA SEE NOTE 2 22x52 EA SEE NOTE 2 L J AHU D -11 RA 46x40 SEE NOTE 2 © DUCT SUPPORT AT PENETRATION M452 M544 12, DN' 8 PLACES) 4 PLACES) 7 2' - 6" (EDGE FTO, 5 PLACES) 5 PLACES) (5 PLACES) M452 M544 DUCT SUPPORT AT PENETRATION (8 PLACES) M452 M544 J #711975 J #711975 BY HGI /MLD HGI /MW APPROVED DATE 5.01.02 6.05.02 M452 M541 M45541 M452 SCALE: 1/4" = 1' -0" ENLARGED MEZZANINE PLAN L I v L_� DETAIL SY REVISION i + J () E/ 1 " -CLD, DN S EE 16166 BY APPROVED DATE 20x20 RA DUCT SUPPORT AT PENETRATION (4 PLACES) M452 M544 M1M12, M1Mt6 M452 (4 PLACES) M452)M543 4' -8" (DUCT PEN., 4 PLACES) 6' - 10" (DUCT PEN., 4 PLACES)r SIM p rgaLsrAf.e. .9 ACCEPTABILITY W BOULDS Y 21.02 THIS DESIGN AND /OR CHOCKED CA IS ROVED W ' 3.29.02 I N41NLLR APPROVED SPECIFI BY TION DEP DATE DAVIS BRITTIAN CHECK R. BERRY 4.12.02 5 P BER G STROM ,V) 5.10.02 APPROVED' L. COSTELLO 5.13,02 4.05.02 SUBTITLE TITLE LEGEND FOR LEGEND SEE 2 -80 —MO GENERAL NOTES ENLARGED MEZZANINE PLAN I CURRENT REVISION' J #711975 LSAF CONTROL ROOM I SHEET BUILDING 2 -80 MECHANICAL MASTER COL. DC- DE,9/10 -13 1. ALL DUCTWORK SHALL BE PROVIDED WITH SEISMIC RESTRAINTS IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. SUPPLY PLENUM DUCT, RETURN DUCT AND SILENCER TO BE SUPPORTED FROM MEZZANINE FLOOR WITH STRUT SUPPORTS. 2. DUCT DIMENSIONS. LISTED ARE FREE AND CLEAR INSIDE DIMENSIONS. 1" THICK SOUND ATTENUATION LINING iN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. ® ELBOW WITH TURNING VANES. RECTANGULAR RADIUS ELBOW HUH TURNING VANES. © EXTERIOR INSULATION APPLIED TO MEZZANINE LEVEL DUCT IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290.. FLEXIBLE BOOT FOR VIBRATION ISOLATION IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15240. ® AIR TIGHT FILTER HOUSING FOR 20x20x1 FILTER IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15885. L SPUTTER WITH TURNING VANES IN. ACCORDANCE WTD1 BOEING CONSTRUCTION SPECIFICATION SECTION 15910. • E> AIRTIGHT DUCT ACCESS HATCH PER BOEING CONSTRUCTION SPECIFICATION SECTION 15910. DUCT SOUND ATTENUATOR, (2) 24 "x42 "x5' -0 "L, INDUSTRIAL ACOUSTICS COMPANY MODEL NO. 5 —LFM- 24x42. SUPPORT ATTENUATOR FROM MEZZANINE FLOOR WITH UNISTRUT. REFERENCE DRAWINGS 2- 80 —M1S16 PARTIAL MEZZANINE FRAMING PLAN CONSTRUCTION NOTES DIFFERENTIAL PRESSURE TRANSMITTER. TIE OUTPUT INTO BOEING CMCS. SEE 2- 80— M324B. Mod- (& CITY NE TA4TN M JUL 8 2682 { S rk i i.0 — V1510 RECEIVED " CITY OF TUf(YnL4 JUN 1 7 0002 PERMIT CENTER ISSUED FOR ECN -01 PLANT 2 M452 Harris Group Inc. 11081.00 711975 2- 80 -M452 COMP NO. SYM A RECORD DRAWING LSAF CONTROL ROOM ECN -01 SHUT OFF VALVE 4" DRY PIPE VALVE —1 " —IA TO 12 " —A300 CONTROL VALVES — 3/4 " —IA TO AIR, FUEL AND PURGE CONTROLS f3 " —IA TO LSAF CONTROL ROOM 1"—IA 1/2" EXHAUST TO SOUTH WALL EXTERIOR 3/4" PLYWOOD MOUNTING BOARD ATTACHED TO WALL PRESSURE RELIEF VALVE SET AT 125 PSI, VENT THRU ROOF FROM 3"—A300 AIR MAIN� 1" DRAIN VALVE PRESSURE REGULATOR 300 -100 PSI SET B 100 PSIG COMPRESSED AIR DROP DETAIL SCALE: NTS DRAIN � CUP REVISID PRESSURE ALARM SWITCH 3 /4 "CGLOBE VALVE 5' -0" A.A.F. 3/4 "UNION W/ /2" ORIFICE. FLOW EQUAL TO ONE SPRINKLER HEAD A.A.F. 3/4" 100 PSI AIR PRESSURE RELIEF VALVE FOR CONY. SEE 1M116 O ANGLE .� VALVE —A FIRE PROTECTION RISER DIAGRAM DETAIL SCALE: NONE 4982188 4711975 4711975 FLOW SWITCH 3/4" GLOBE VALVE BY HGI /LJC HGI /MDH HGI /MLD APPROVED OS &Y VALVE ANGLE ` — VALVE 1M266 M513 DATE 7.28.00 5.01.02 6.05.02 4" ALARM CHECK VALVE 1 -0" A.A.F. PAINT TO MATCH ADJACENT AREA SY PRESSURE REGULATING VALVE PRESSURE REGULATOR 100 PSI — SERVICE PRESSURE SET B 100 PSIG 6 34112 M513 REVISION 8' 0" A.A.F. 3/4" UNION W/1/2" ORIFICE. FLOW EQUAL TO ONE SPRINKLER HEAD 4' -0" A.A.F. PIPING CONFIGURATION AT UNIT HEATER PIPING AT FAN TERMINAL UNIT / VAV / CABINET HEATER SIMILAR DETAIL SCALE: NTS APPROVED 3/4" PLYWOOD MOUNTING BOARD ATTACHED TO COLUMN OR WALL FROM AIR MAIN DRAIN VALVE SHUT OFF VALVE COMPRESSED AIR DROP DETAIL SCALE: NONE DATE PRESSURE RELIEF VALVE SET AT 200 PSI AIR FILTER PRESSURE REGULATOR 300 - 100 PSI 3 1M112111/4913 PRESSURE REGULATOR 100 PSI—SERVICE PRESSURE PAINT TO MATCH ADJACENT AREA DPV 7 1M62, 1M66 M513 Q�BOE /NG' D' SLAB - - ELEVATION LOOKING NORTH SECTION SCALE: 1/4 " =1' -0" ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED, BY DEPT: DATE 4 —WAY ALL GRVD CPLGS ARE OF THE FLEXIBLE TYPE HORZ 2" PIPE STAND ATTACHED TO CMU WALL FLED JOINT (TYP) ALV 2" PIPE STAND ATTACHED TO SLAB (2 PLACES) 2" CLEARANCE A 1M2661M513 J. RICHARDS CHECKED LNbINttN CHECKED APPROVED APPROVED DATE SUBTITLE TIT MECHANICAL MASTER 6 "GG FLEX CPLG 6X0 -6 GO VIC FLG ADAP 6" ALV 2" CLEARANCE LOW SPEED AEROACOUSTIC FACILITY SECTIONS AND DETAILS BUILDING 2 -80 6" FIRELOCK 90' FLEX CPLG- 4 —WAY - - ROOF ' - -- 4 —WAY ' -- 4 —WAY • FLOW SWITCH 10" VIC FLG ADAP ELEVATION LOOKING SOJ SECTION SCALE: 1/4 " =1' -0" LEGEND PLANT 2 ( 1M262 M513 APPR.I ED SHEET' • JOB NO. 10X8 GRVD RED (VIC #50) FLEX CPLG -BOO 6 GG 6" VIC FLG ADAP —DPV 2" CLEARANCE GENERAL NOTES 1" APOLLO FULL PORT BALL VALVE WITH DRAIN, BRONZE BODY WITH LOCKABLE HANDLE, PART NO. SK- 105 -27. REFERENCE DRAWINGS CONSTRUCTION NOTES PRESSURE REGULATOR AND RELIEF VALVE. REPLACE WITH LIKE EQUIPMENT. SUBMIT TO ENGINEER FOR APPROVAL. ISSUED FOR ECN -01 REVISIONS BY Harris Group Inc. M513 982188 RECEIVED Y GF TUKWIIA JUN 1 7 2002 -tRMIT CENTER DATE 6.05.02 DRAWN: • CHECKED: ENGINEER: CHECKED: WJB WBB MLD RB CURRENT:. RENSION SYMBOL p D ATE J #711975 B 6.05.02 DWG NO. 2- 80 -M513 REVISION "B" ONLY COMP N0. PROJECT 11081.00 SYM A x10'. Bx10 MEZZANINE PLENUM RETURN - ®1 D b --- -- - ®10 °0 M542 M544 52x22 EA SEE NOTE 2 44x13 RA OPENING -- (NEAR SIDE FAR SIDE (m 10x10 DUCT SUPPORT AT PENETRATION - 4x12 10x10_ B 0 NECK RECORD DRAWING LSAF CONTROL ROOM ECN -01 22x36 6� CFM TUNNEL REVISION I • I 4)982188 4711975 J #711975 BY HGI /LJC HGI /MLD HGI /MLD RG APPROVED DATE SY 7.28.00 5.01.02 • 6.05.02 CONTROL REVISION SECTION SCALE: 1/4" = 1' -0" BY (SIM) M5421M544 APPROVED DUCT SUPPORT AT PENETRATION (TYP) DATE M542 1 1 M544 CUSTOMER g LaParAtrzAre A 1M12, 1M16, M452 M542 8' -10" APPROVED BY 7'- (TYP) STORAGE ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION. IS APPROVED DEPT DATE 3' - 0" DRAWN F. GONZALEZ CHECKED S. FRANKLIN ENGINEER VEY CHECKED C. MAPS APPROVED R. BERRY APPROVED DATE 8.13.98 12.23.98 8.13.98 12.24.98 12.31.98 SOMBRE ( MECHANICAL MASTER HVAC SECTIONS BUILDING 2 -80 LEGEND SEE 2 -80 -MO FOR LEGEND GENERAL NOTES 1. ALL DUCTWORK &TAU. BE PROVIDED WITH SEISMIC RESTRAINTS IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. 2. DUCT DIMENSIONS LISTED ARE "FREE AND CLEAR" INSIDE DIMENSIONS. E> 1 THICK SOUND ATTENUATION LINING IN ACCORDANCE WON BOEING CONSTRUCTION SPECIFICATION SECTION 15290. ® ELBOW WITH TURNING VANES. L c.> RECTANGULAR RADIUS ELBOW WION TURNING VANES. EXTERIOR INSULATION APPLIED TO MEZZANINE LEVEL DUCT IN ACCORDANCE. WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. ED> 'FLEXIBLE BOOT FOR VIBRATION ISOLATION IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15240. ® AIR TIGHT FILTER HOUSING FOR 20x20x1 FILTER IN ACCORDANCE - WITH BOEING CONSTRUCTION SPECIFICATION. SECTION 15885. SPLITTER WTN TURNING VANES IN ACCORDANCE WTTH BOEING CONSTRUCTION SPECIFICATION SECTION 15910. => 24 "x24" AIR TIGHT DUCT ACCESS HATCH PER BOEING CONSTRUCTION SPECIFICATION SECTION 15910. REFERENCE DRAWINGS 2- 80 -M1S16 PARTIAL MEZZANINE FRAMING PLAN CONSTRUCTION NOTES SUPPORT FAN TERMINAL UNIT, VAV BOX, SUPPLY FAN AND AIR FILTER HOUSING WITH UNISTRUT AND SPRING VIBRATION ISOLATORS. RECEIVED CITY OF TUKW!LA JUN 1 7 2002 PERMITCENTER ISSUED FOR ECN -01 El REVISIONS BY Harris Group Inc, N REVISION "B" ONLY APP VED D• . N: CHECKED: WJB WBB CURRENT REVISION SYMBOL J #711975 DATE 6.05.02 ENGINEER: MLD DATE PROJECT 11081.00 CHECKED: RB PLANT 2 DwG ND. SHEET M542 JOB NO 982188 2 -80 -M542 COMP N0. 6.05.02 • 22x52 OA SEE NOTE 2 I6 !OPEN RA 22x52 EA © v SEE NOTE 2 3x46 6x1 OPEN O ,RA ......�.. 6x10 08 8x10 -20x20 RA 20x20. 08 '8x14 U U :x10 20x20 RA o x1 U0 w gy ?4 6x12 8 M543 A528 EZZANINE 20x20 RA 30x30 SEE NOTE 2 DUCT SUPPORT AT PENETRATION (TYP) M543' M544 . PLENUM mm l - • • TOILET M543 ECN -01 REVISION LSAF CONTROL ROOM Jft711975 4711975 BY HGI /MLD HGI /MLD M543 A528 APPROVED CONTROL DATE 5.01.02 6.05.02 SYM REVISION SECTION SCALE: 1/4" = 1' -0" tl APPROVED CUSTOMER DATE 1M12, 1M16, M4521M542 B f � - J A528 4x12 350 CFM 08" NECK tip+ 0 ACCEPTABILITY THIS DESIGN AND /OR SPECIHCATION IS APPROVED APPROVED BY DEPT. DATE JL 1 / CLEAN FiL._J I TG 1 00' FM RG 35I,C=M 9 ^— — — -- DRAWN W. BOULDS. CHECKED B. BRITTAIN ENGINEER M. DAVIS CHECKED R. BERRY APPROVED S. BERGSTRO APPROVED L. ,OSTELO 08 NECK DATE 3.11.02 3.29.02 4.05.02 4.12.02 5.10.02 SUBTIRE TrtLE 5.13.02 MECHANICAL MASTER 10x10 HVAC SECTIONS BUILDING 2 -80 J-I F1RST FLOOR EL 100' -0" LEGEND SEE 2 -80 -MO FOR LEGEND GENERAL NOTES 1. ALL DUCTWORK SHALL BE PROVIDED WITH SEISMIC RESTRAINTS IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. 2. DUCT DIMENSIONS LISTED ARE "FREE AND CLEAR" INSIDE DIMENSIONS. E> 1" THICK SOUND ATTENUATION LINING IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. �> EXTERIOR INSULATION APPLIED TO MEZZANINE LEVEL DUCT IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15290. �5 NOT USED. © AIR FIGHT DUCT ACCESS HATCH PER BOEING CONSTRUCTION SPECIFICATION SECTION 15910. E> 1/4" WIRE MESH BIRD SCREEN. REFERENCE DRAWINGS 2- 8 -M1S16 PARTIAL MEZZANINE FRAMING PLAN CONSTRUCTION NOTES ANGLE DUCT STIFFENER ACROSS OPEN SIDE OF DUCT. Mop. - la PLANT 2 ISSUED FOR ECN -01 CURRENT REVISION SYMBOL J #711975 SHEET M543 JOB N0. DWG N0. ' ` TUNWII.N JUN 1 7 2002 e,.e+il't CENTER 11081.00 711975 2- 80 -MA43 Harris Group Inc. DATE COMP NO. 6.05.02. • 1/4 "0 THREADED ROD LG AS RED'D. VIBRATION ISOLATOR (TYP) 4 - 5/160 ADHESIVE ANCHOR (TYP) P2073A UNISTRUT \ T 1 POST BASE (TYP) REVISION - LSAF CONTROL ROOM 4711975 A ECN -01 J11711975 HGI /MLD HGI /MLD APPROVED SCALE: 1 1/2" = 1' -0" MEZZANINE SLAB FTU / VAV SUPPORT DETAIL 5.01.02 6.05.02 REVISION CONTROL BOX (FAR SIDE) - P1001C UNISTRUT AT CORNERS APPROVED M452, M542, M543 M544 ��aEO.vcm BACKFILL GAP WITH INSULATION (TYP) 3/8 ° 0 THRU ANGLE ANGLE TO ANGLE 5/16 "0 ADHESIVE ANCHOR, 2 1/2° MIN EMBED, MIN 2 PER SIDE DRAW W. BOULDS CHECKED B. BRITTAIN NGINttk M. DAVIS CHECKED R. BERRY ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY 16" OR 26 ° @SIM (ANGLE DIM) (DUCT DIM) 4.01.02 4.03.02 4.05.02 4.12.02 5.10.02 5.13.02 SUBTITLE M452, M542 MECHANICAL MASTER 3/8 "0 THRU ANGLE (TYP) DETAILS BUILDING 2 -80 PLANT 2 711975 11081.00 COMP NO. 6.05.02 P1000 UNISTRUT SUPPORT / BRACING (TYP) P1001C UNISTRUT AT CORNER STRUT (TYP) O AIR NLET 4' -0" (CENTERED OVER FN / VAV) 5/160 ADHESIVE ANCHOR (TYP) SCALE: 1 1/2" = 1' - 0" HEATING COIL DUCT SUPPORT AT PENETRATION DETAIL 1" GAP (TYP) DUCT TO ANGLE 1 -3 (TYP) ANGLE TO ANGLE TYP 5/160 ADHESIVE ANCHOR (TYP) SCALE: 1 1/2" = 8" OR 20" 0 SIM 1 GAP (TYP) DUCT SUPPORT AT PENETRATION DETAIL 5/16 "0 ADHESIVE ANCHOR, 2 1/2" MIN EMBED, MIN 2 PER SIDE MEZZANINE SLAB 2 M544 L3x2x3 /16xLG AS REQ'D, 45' MITER (TYP) DUCT TO ANGLE 1 -3 (TYP) M452, M542, M543(M544 LEGEND FOR LEGEND SEE 2 -80 -MO GENERAL NOTES 1/2° EXTERIOR INSULATION APPLIED TO MEZZANINE LEVEL DUCT IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. REFERENCE DRAWINGS CONSTRUCTION NOTES Moa. I a67 DO RA PePPROVED J U L 8 2882 AS POlLS ISSUED FOR ECN -01 RECEIVED CITY OF TUKWILA JUN 1 7 2002' PERMIT CENTER 2 -80 -M544 I■ / I TYPICAL F1TJ / VAV I I� \O PER FTU / VAV SUPPORT SPACING MP ...y 1/4 "0 THREADED ROD LG AS RED'D. VIBRATION ISOLATOR (TYP) 4 - 5/160 ADHESIVE ANCHOR (TYP) P2073A UNISTRUT \ T 1 POST BASE (TYP) REVISION - LSAF CONTROL ROOM 4711975 A ECN -01 J11711975 HGI /MLD HGI /MLD APPROVED SCALE: 1 1/2" = 1' -0" MEZZANINE SLAB FTU / VAV SUPPORT DETAIL 5.01.02 6.05.02 REVISION CONTROL BOX (FAR SIDE) - P1001C UNISTRUT AT CORNERS APPROVED M452, M542, M543 M544 ��aEO.vcm BACKFILL GAP WITH INSULATION (TYP) 3/8 ° 0 THRU ANGLE ANGLE TO ANGLE 5/16 "0 ADHESIVE ANCHOR, 2 1/2° MIN EMBED, MIN 2 PER SIDE DRAW W. BOULDS CHECKED B. BRITTAIN NGINttk M. DAVIS CHECKED R. BERRY ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY 16" OR 26 ° @SIM (ANGLE DIM) (DUCT DIM) 4.01.02 4.03.02 4.05.02 4.12.02 5.10.02 5.13.02 SUBTITLE M452, M542 MECHANICAL MASTER 3/8 "0 THRU ANGLE (TYP) DETAILS BUILDING 2 -80 PLANT 2 711975 11081.00 COMP NO. 6.05.02 P1000 UNISTRUT SUPPORT / BRACING (TYP) P1001C UNISTRUT AT CORNER STRUT (TYP) O AIR NLET 4' -0" (CENTERED OVER FN / VAV) 5/160 ADHESIVE ANCHOR (TYP) SCALE: 1 1/2" = 1' - 0" HEATING COIL DUCT SUPPORT AT PENETRATION DETAIL 1" GAP (TYP) DUCT TO ANGLE 1 -3 (TYP) ANGLE TO ANGLE TYP 5/160 ADHESIVE ANCHOR (TYP) SCALE: 1 1/2" = 8" OR 20" 0 SIM 1 GAP (TYP) DUCT SUPPORT AT PENETRATION DETAIL 5/16 "0 ADHESIVE ANCHOR, 2 1/2" MIN EMBED, MIN 2 PER SIDE MEZZANINE SLAB 2 M544 L3x2x3 /16xLG AS REQ'D, 45' MITER (TYP) DUCT TO ANGLE 1 -3 (TYP) M452, M542, M543(M544 LEGEND FOR LEGEND SEE 2 -80 -MO GENERAL NOTES 1/2° EXTERIOR INSULATION APPLIED TO MEZZANINE LEVEL DUCT IN ACCORDANCE WITH BOEING CONSTRUCTION SPECIFICATION SECTION 15145. REFERENCE DRAWINGS CONSTRUCTION NOTES Moa. I a67 DO RA PePPROVED J U L 8 2882 AS POlLS ISSUED FOR ECN -01 RECEIVED CITY OF TUKWILA JUN 1 7 2002' PERMIT CENTER 2 -80 -M544 SYM A ECN —01 SECTION SCALE: 1/8" = 1' -0" INTF BLDG. 3 " —IA TO LSAF CONTROL ROOM REM0ION LSAF CONTROL ROOM J #711975 t -410411110,2, IPP MY — NEW CONTROL ROOM STRUCTURE IV- 1_LSAF (FUTURE PRESSURE 15 TRANSDUCER 1077V 3_LSAF 100 PSI SEED — 125 PSI 300 -100 PSI - 3 �POC AT TEE+ EL. 19 -7 - ABOVE _GRADE 3/4 " —IA TO AIR, FUEL AND URGE CONTROLS J #711975 BY HGI /MLD HGI /MLD APPROVED / POC *POC D 1 " —IA A300 IF 19 = %111 ).. CL EL. 30' - ABOVE GRADE 12 " —A300 CE EL 21' -9" ABOVE GRADE 1 " —IA 3 " —A300 12"—A300 Z C EL 4' -6" ABOVE GRADE PIPE SUPPORT DATE 5.01.02 6.05.02 M546 1/2" DRIP LEG (2 PLACES) SY B 1M1121M546 REVISION 014 SOUTH ELEVATION SCALE: 1/8" = 1' -0" SECTION SCALE: 1/8" = 1 -0" APPROVED ANECHOIC CHAMRE 13 BLDG. V-4 LSAF — it NOTE: A300 PRV AND RUPTURE DISC PIPING NOT SHOWN FOR. CLARITY. SEE 2— YD —M621 FOR A300 PRV AND RUPTURE DIC PIPING. 12 " -A300, SEE 2— YD —M134 1M11 M546 c 1M1121M546 0 _470,EreAw. TOP OF PARAPET EL +/— 29' -5 * POC I 11 L 12 " —A300 1/4 T.O. ROOF EL 24' -2 "± ADJUSTABLE SUPPORT DETAIL SCALE: 1/2" = 1' -0" ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN W. BOULDS C HECKED W. BRITTAIN ENGINEER M. DAVIS CHECKED R. BERRY APPROVED S. BERGSTROM APPROVED L. COSTELLO '1 T ft j T 1 11 DATE 4.10.02 5.01.02 4.17.02 4.22.02 5.10.02 5.13.02 DO NOT CUT HOLE IN CARRIER PIPE 10 "0 SCH 80 PIPE 1/4 "0 WEEP HOLE FOOTING, 24 "x24 "x12" #4W 12" EW, T & B M546 SUBTITLE TITLE FIRST FLOOR EL. 0' -0" MECHANICAL MASTER Moa -ia� SECTIONS AND DETAILS BUILDING 2 -80 LEGEND SEE DRAWING 2 -80 -MO FOR LEGEND GENERAL NOTES REFERENCE DRAWINGS SEE 2- 80 —M321 FOR AIR SCHEMATIC OF A300 TO ANECHOIC CHAMBER. CONSTRUCTION NOTES INSTALL 12" 300LB RF FLANGE WITH GASKET AND BLIND FLANGE AT 24" EAST OF 12 " —A300 SUPPLY PIPING. INSTALL FLANGE SPOOL PIECE WHERE 12" FLANGED GATE VALVE WAS REMOVED. RELOCATE 12" FLANGED GATE VALVE TO PROVIDE ISOLATION TO 2 -80 —INTF. REFERENCE 1M112R, 164111. 31 INSTALL 12 " -A300 TO LSAF. CONNECT FROM EXISTING 12 " -A300 SERVING 2 -81 —IMF TO EXISTING 12 " —A300 LOCATED ON ROOF THAT SERVES 2 -80 -LSAF. INSTALL 3 " —A300 FROM 12 " —A300 TO PRESSURE REDUCING STATION AND PROVIDE 1 " —A300 TIE —IN TO EXISTING 1" SS SERVING LOBE CART. INSTALL 8 " —A300 FROM EXISTING 12 " —A300 ON ROOF ON ROOF TO EXISTING 8 " —A300 SERVING EXISTING G.E. TEST RIG. © INSTALL 6 " —A300 FROM EXISTING 12 " —A300 ON ROOF TO EXISTING AIR MUFFLER. INSTALL EXISTING PNEUMATIC OPERATED 6" GLOBE VAL/ "ELO , ED):: ERE 2— YD— M621R. TRU NT AIR SUPPLY TO PN UM .11 ALVE STATION. (CV- 2_LSAF, CV- 3_LSAF) LOCATED NEAR CONTROL VALVE V- 2_LSAF AND PNEUMATIC VALVE STATION (CV -4_LSAF) LOCATED ON THE ROOF NEAR CONTROL VALVE V- 4_LSAF. TIE 1"—IA INTO EXISTING INSTRUMENT AIR LINE LOCATED AT COLUMN DJ -11. CAP EXISTING INSTRUMENT AIR SUPPLY AT TOP ELBOW LOCATED AT COLUMN DJ -11. RELOCATE LOAF MANUAL 12" SHUT —OFF GATE VALVE. REFERENCE 2— YD— M621R. RELOCATE LSAF 12" PNEUMATIC OPERATED BUTTERFLY VALVE SPOOL PIECE. REFERENCE 2— YD —M621. I- RELOCATE LSAF 1 1/2" SOLENOID OPERATED BYPASS BALL VALVE. REFERENCE 2— YD —M621. RELOCATE LSAF 6" PNEUMATIC OPERATED GLOBE VALVE. REFERENCE 2— YD —M621. 1 INSTALL 3" —IA TO LSAF CONTROL ROOM. REFERENCE 164112 AND 164116. INSTALL 1" ISOLATION BALL VALVE AND CAP FOR FUTURE PRESSURE, TRANSDUCER. Taw GTY APPROVEb JUL - 8 2002 JUN 1 7 200Z (HjICU .:iaTER PLANT 2 ISSUED FOR ECN -01 CURRENT,. REVISION'. J #711975 SHEET JOB O. DWG ND. SYMBOL M546 Harris Group Inc. 110811.00. 711975 2- 80 -M546 DATE COMP N0. 6.05.02