Loading...
HomeMy WebLinkAboutPermit M02-205 - STATE FARMM02 -205 State Farm 7100 Fort Dent Wy re w 00 NO CO LU Nw w0 2 ga d w Z IIJ 0 O ww 1- - �O W (1) = F- O Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: 4600 S 134 PL, SEATTLE, WA Contractor: Name: HOLADAY PARKS, INC. Address: 4600 S 134 PL, SEATTLE, WA Contractor License No: HOLADP1379NO DESCRIPTION OF WORK: ADD 1 NEW EXHAUST FAN, REWORK DUCTWORK AND DIFFUSERS AT 4 VAV'S AND 1 AC UNIT, REBALANCE SYSTEM. Value of Construction: City of Tukwila \ 0 \ep{'1v11> Department of Community Development 16300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 2954900440 7100 FORT DENT WY TUKW STATE FARM 6840 FORT DENT WY, TUKWILA, WA JOHN C RADOVICH LLC 2000 124TH AVE NE #B 103, BELLEVUE WA PEGGY PEEL Type of Fire Protection: Uniform Mechnical Code Edition: att/tAAp/u _,& I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. Permit Center Authorized Signature: The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulatin t cti rte erform nce of work. I am authorized to sign and obtain this mechanical permit. Si Date: \\ l l --0 Print Name: doc: Mech • MECHANICAL PERMIT $7,000.00 Fees Collected: MO2 - 205 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 206 248 -8747 Phone: 206 248 -9700 Expiration Date: 09/01/2003 MO2 -205 10/23/2002 04/21/2003 Date: // $ 72.69 1997 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Printed: 11 -07 -2002 .x. a. i ^N4^Its.f i'.!'t!'S'uY. Cr++dk gt$M Vxf+Ht.tS Value of Construction: Type of Fire Protection: doc: Mech City of Tukwila r Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2954900425 Address: 6840 FORT DENT WY TUKW Suite No: Tenant: Name: STATE FARM Address: 6840 FORT DENT WY, TUKWILA, WA Owner: Name: JOHN C RADOVICH LLC Address: 2000 124TH AVE NE #B 103, BELLEVUE WA Contact Person: Name: PEGGY PEEL Address: 4600 S 134 PL, SEATTLE, WA Contractor: Name: HOLADAY PARKS, INC. Address: 4600 S 134 PL, SEATTLE, WA Contractor License No: HOLADP1379NO DESCRIPTION OF WORK: ADD 1 NEW EXHAUST FAN, REWORK DUCTWORK AND DIFFUSERS AT 4 VAV'S AND 1 AC UNIT, REBALANCE SYSTEM. Permit Center Authorized Signature: MECHANICAL PERMIT Permit Number: MO2 -205 Issue Date: /D -z 3 -a z Permit Expires On: 5/- 2/ -03 C Phone: Phone: 206 248 -8747 Phone: 206 248 -9700 Expiration Date: 09/01/2003 $7,000.00 Fees Collected: Uniform Mechnical Code Edition: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating ••n . io •I e peormanc of work. I am authorized to sign and obtain this mechanical permit. Signature: �� 1, c.- Date: / D Print Name: C n1-(Lp t_ Haf C i ,-; This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. MO2 -205 Printed: 10 -23 -2002 Date: /7''0 $72.69 1997 Response to Correction Letter # DEPARTMENTS: Q Buildir ivision Public Works ❑ NISI Ptl_ I a .11 -0 Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete E Incomplete REVIEWER'S INITIALS: Documentshouting slip.doc 2.211 -02 PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: MO2 -205 DATE: 10 -16 -02 PROJECT NAME: STATE FARM ca. FORT DENT III SITE ADDRESS: 6840 FORT DENT WAY X Original Plan Submittal Response to Incomplete Letter # Revision # After Permit Is Issued Planning Division Permit Coordinator DUE DATE: 10-17-02 Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route [r Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: DUE DATE: 11 -14 -02 APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: _,_•'-.—..__............»N.. w+ nrtnv* x, �r....,..+ e,+....+ �v... v+ w.. r..., w+»...... .wnr.�+�szyv+x.:..�....rvR..s.s. w....�.+.r.,.wr....�. «..,... .� ACTIVITY NUMBER: N102 -205 DATE: 10 -16 -02 PROJECT NAME: STATE FARM aa. FORT DENT III SITE ADDRESS: 6840 FORT DENT't WAY X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued DEPARTMENTS: Building Division Public Works PLAN REVIEW /ROUTING SLIP Fire Prevention Structural ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2.28.02 Incomplete ❑ Approved with Conditions 4Ifk ❑ Approved Notation: REVIEWER'S INITIALS: Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required • Planning Division Permit Coordinator DUE DATE: 10-17-02 Not Applicable ❑ f DATE: DUE DATE: 11 -14-02 DATE: o Not Approved (attach comments) ❑ Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: PERMIT NO.: /l,, D ©' MECHANICAL PERMIT APPLICATIONS INSPECTIONS ❑ 2 Pre- construction ❑ 50 WSEC Residential ❑ 60 WA Ventilation/Indoor AQC ❑ 610 Chimney Installation/All Types ❑ 700 Framing ❑ 1080 Woodstove 1090 Smoke Detector Shut Off 1100 Rough -in Mechanical ❑ 1101 Mechanical Equipment/Controls ❑ 1102 Mechanical Pip/Duct Insul ❑ 1105 Underground Mech Rough -in ❑ 1 115 Motor Inspection 1400 Fire - Final 1800 Mechanical - Final ❑ 4015 Special -Smoke Control System CONDITIONS • 10001 No changes to plans unless approved by Bldg Div ❑ 10002 Plumbing permits shall be obtained through King Co 10003 Electrical permits obtained through L & I 10005 All permits, insp records & approved plans available ❑ 10014 Readily accessible access to roof mounted equipment 10016 Exposed insulation backing material 10019 All construction to be done in conformance w /approved plans it t* 10027 Validity of Permit 10036 Manufacturers installation instructions required on site ❑ 10041 Ventilation is required for all new rooms & spaces ❑ 10042 Fuel burning appliances ❑ 10043 Appliances, which generate.... ❑ 10044 Water heater shall be anchored.... Additional Conditions: TENANT NAME: (2)Gt,4 F FEES Basic Fee (Y/N) Supplemental Fee (YIN) Plan Check Fee (Y/N) Furnace/Burner to 100,000 BTU (qty) Over 100,000 BTU (qty) Floor Furnace (qty) Suspended/Wall/Floor- mounted Heater (qty) Appliance Vent (qty) Heating/Refrig/Cooling Unit/System (qty) — Boiler /Compressor to 3 HP /100,000 BTU (qty) to 15 HP /500,000 BTU (qty) to 30 HP /1,000,000 BTU (qty) to 50 HP /1,750,000 BTU (qty) over 50 HP /1,750,000 BTU (qty) Air Handling Unit to 10,000 cfrn (qty) over 10,000 cfm (qty) Evaporative Cooler (qty) Ventilation Fan (qty) Ventilation System (qty) Hood (qty) Incinerator — Domestic (qty) Incinerator — Comm /Ind (qty) Other Mechanical Equipment (qty) Other Mechanical Fee (enter S$) Add'l Fees — Work w/o Permit (Y/N) Insp Outside Normal Hours (hrs) Reinspections (hrs) Miscellaneous Inspections (hrs) Add'1 Plan Review (hrs) Plan Reviewer: Permit Tech: Date: It 111 1 Date: I D - l - 02 ce ~ W U 0 cn W= J I — W O gQ . co 3 W 1- O 0 ON 1— ww 11 z ACTIVITY NUMBER: NO2 -205 DATE: 10 -16 -02 PROJECT NAME: STATE FARM Ca. FORT DENT III SITE ADDRESS: 6840 FORT DENT WAY X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued DEPARTMENTS: Building Division Public Works Complete ❑ Documents/routing slip.doc 2.2802 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) TUES /THURS ROUTING: Please Route ❑ Struct REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Incomplete Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: w Required ❑ No further Review Required ►.� IY\5) DATE: REVIEWER'S INITIALS: Planning Division Permit Coordinator DUE DATE: 10 -17-02 Not Applicable ❑ DUE DATE: 11-14-02 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ Notation: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Ce -J 00 N W = J I— W LL � W I— O Z I— W U� O W W H LI. ti U 0 Z P e c NarytelTe - L am! �� _ fl �, / Value of91e -769�� Site Ad r �, ` a - ^ 1n 8 , 715, u r—^ Cit�'-�{ate/Zip: 1": I ( x ,tzt LJtX a. r ok Tax Par Number gs - y �� 7 9h P l 0 " 3 76 Pro er O n : • �i A t r rshp s i�u�1('�1� P. Phone: (, , ) (_ L,D4,76 St Address: , ao Do - I Lt-1 IV D3 City ate/Zip: � j cab" n,c e YD U5 Fax #: ( ) Contr ctsr ID ma O. 41 8 .Lfi� J 1 Phone: L /� /, ..a.,., - L , V tr: Ads r•ss: 1 II / ,'� it State/Zip: Fax #: (af(Jr0 n f) K , / J2 20 0 ' tact Person : ( j) Phone: 1. 6 6 p2 ! ' ? _ 2 7 G � aC 0 Vet i re • . / L) �� . c!'G e C /)Z Fax ##(......4.(e,) - ov -�/ y �' 8,700 BUILD/ OWNS' • ' A ORIZED AGENT: ` U Signatu e: ': ,}� t Date: ,v__ito• - 6Z Fax #: ( ) , 1 _ a Pr �nam - t r ^e• ‘At' Phone: (ry�� ) 7U/� A t r rshp s i�u�1('�1� P. f co,, CITY OF "' Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Mechanical Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. MECHANICAL PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE FILLED OUT BY APPLICANT) Description • work to be done (please be specif,i ): Current copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued OR submit Form H-4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent: If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 114.4 of the Uniform Mechanical Code (current edition). No application shall be extended more than once. Date application accepted: Date application expires: Application taken by: (initials) 09/10/2002 DY2s ✓ Submittal Requirements Floor plan and system layout Roof plan required to identify individual equipment and the location of each installation (Uniform Mechanical Code 504 (e)) Details and elevations (for roof mounted equipment) and proposed screening Heat Loss Calculations or Washington State Energy Code Form #H -7 H.V.A.C. over 2,000 CFM (approximately 5 ton and larger) must be provided with smoke detection shut- off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical Code 1009). Specifications must be provided to show that replacement equipment complies with the efficiency ratings and other applicable requirements of the Washington State Nonresidential Energy Code. Structural engineer's analysis is required for new and the replacement of existing roof equipment (including commercial kitchen hoods) weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be stamped by a Washington State licensed Structural Engineer. Mechanical Permits COMMERCIAL: Two complete sets of drawings and attachments required with application submittal NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. RESIDENTIAL: Two complete sets of attachments required with application submittal Submittal Requirements New Single Family Residence Heat loss calculations or Form H -6. Equipment specifications. 09/10/2002 miscpmt.doc Change -out or replacement of existing mechanical equipment Narrative of work to be done, including modification to duct work. Installation of Gas Fireplace NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. Narrative with specification of equipment and chimney type. If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney is in safe condition. City of Tukwila < Rep mil Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2954900440 Address: 7100 FORT DENT WY TUKW Suite No: Tenant: STATE FARM PERMIT CONDITIONS Permit Number: MO2 -205 Status: ISSUED Applied Date: 10/16/2002 Issue Date: 10/23/2002 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (206- 835 - 1111). 4: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 5: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 6: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: Print Name: doc: Conditions Ll n ( -- \ ,- e- L 1- lord,.; Date: 1 1 7 MO2 -205 Printed: 11 -07 -2002 City of "Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2954900425 Address: 6840 FORT DENT WY TUKW Suite No: Tenant: STATE FARM doc: Conditions r L , v, PERMIT CONDITIONS MO2 -205 Permit Number: MO2 -205 Status: APPROVED Applied Date: 10/16/2002 Issue Date: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (206- 835 - 1111). 4: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 5: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 6: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating Instruction or the performance of work. Signature: Print Name: Date: /0 D:3 - Printed: 10 -23 -2002 II a (n Z F Lu i-0 w D O 0 0 1— W w. H v O . .Z co O Z TRANSACTION LIST: ACCOUNT ITEM LIST: doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 2954900425 Permit Number: MO2-205 Address: 6840 FORT DENT WY TUKW Status: APPROVED Suite No: Applied Date: 10/16/2002 Applicant: STATE FARM Issue Date: Receipt No.: R020001504 Payment Amount: 72.69 Initials: SKS Payment Date: 10/23/2002 01:18 PM User ID: 1165 Balance: $0.00 Payee: HOLADAY- PARKS, INC Payment Check 134467 72.69 Current Pmts Amount MECHANICAL - NONRES PLAN CHECK - NONRES Type RECEIPT Method Description Description Account Code 000/322.100 58.15 000/345.830 14.54 Total: 72.69 1926 1C1tzit 97i.; Tt7TAt- r c': 10 -23 -2002 Pr 77 �: F� /4! TYP / cl ` / n. - 1W—C711 G. Add ess: 'fo /li �1T Date Calle // 7 - o� Special Instructions: A) y J Date Wanted: a.m. ./< -00- P.m. Requ estr: 70 Phon No: aoto)/ co _30,,...: K Approved per applicable codes. INSPECTION RECOR. Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -367 El Corrections required prior to approval. COMMENTS: O 7;; F' Inspec Date/ 2. -0 $47.00 REINSPECTION OE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: nri • Project; 51 — e F a r M Ty of Inspection: 1 tUC1 li ■ V \ Adlelsoo r"VY !xho_ �� Date Callq /_ /LJ _ D 2 Special Instructions: C o( Cog Q ( Date Wanted: �� YD Z .m. Requeste Phone %2o& Oa _ 3oK3 • NSPECTION RECORC) Retain a copy with permit INSPECTION NO. PERMIT NO. ICI a� -ao5 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 3670 COMMENTS: $47.00 REINSPECTION F REQUIRED. Prior to in •ectlon, fee must be paid at 6300 Southcenter B d., Suite 100. Call t• chedule reinspection. Date: ate: Approved perr applicable codes. Corrections required prior to approval. COMMENTS: Type 4.1sispectiory _ ro 1 ,(/ 1 ' 1 _ . / SiiE.: "N. _ZZA PO'Y'' / 2 t Gt - c// ii ........t/s A P-f C, IV S. i LLcb Date Wanted: //- 3 6) a.m. C Requester: „....._ ‘ Yr L.C . , 353 .2' t... Projt fic r tv-1 Type 4.1sispectiory _ ro 1 ,(/ 1 ' 1 _ . / Address - mob lion - Foe* 1/t ka Date • Called - - (). 7 Special Instructions: Date Wanted: //- 3 6) a.m. C Requester: „....._ ‘ Yr L.C Phone , jao - er50 353 A INSPECTION RECOR Retain a copy with p e r m i t INSPECTION NO. PERM CITY OF TUKWILA BUILDING DIVISION .• 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431-3670 , ....fgA per applicable codes. Corrections required prior to approval. tor: Ad jDate: 4 e"), — Z) $47.00 REINSPECTION FE REQUIRED. Prior t inspection, fee must be paid at 6300 Southcenter BI d., Suite 100. Call /o schedule reinspection. Receipt No.: Date: Aie I certify that this is a true copy of Holaday- Parks, Inc. Contractors License. DEPARTMENT OF LABOR AND INDUSTRIES F625-052-000 (8/97) REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL CC01 HOLADPI379N0 09/01/20037 EFFECTIVE,'DATE f .: ' ` 01/21/198 HOLADAY PARKS INC PO BOX 69208 SEATTLE WA 98188 RECEIVED SEP 0 7 2001 IA -PARKS INC. O i This 21st day of September 2001. A notary in the State of Washington. My commission expires 01/15/2003. oprZki Z W re im J O 0 • O J = F- N u_ WO 2 g Q D. = a H W Z � I— O Z F- W U � O - W W O W Z U = O~ Z Tl #47224 UNIVERSITY OF PHOENIX BASS OF DESIGN 1- 111 47206 UNIVERSITY OF PHOENIX BASIS OF DESIGN. 1 DESIGN CRITERIA 1 1997 UBC, WAC 51 -40 CRITERIA SOURCE WA. STATE BUILDING CODE COUNCIL 2 1997 UMC, WAC 51-42 Wk STATE BUILDING CODE COUNCIL 3 1997 UFC, WAC 51 -44, 51 -45 WA STATE BUILDING CODE COUNCIL 4 1997 UPC, WAC 51 -46, 51 -47 Wk STATE BUILDING CODE COUNCIL 5 1997 WSEC (WAC 51 -11) Wk STATE BUILDING CODE COUNCIL 6 1997 WSVIAQ CODE (WAC51 -13) WA. STATE BUILDING CODE COUNCIL 7 OSA DESIGN TEMP = 83 DB, 57'F WB ASHRAE WA. ST., APRIL. 1986 8 ISA DESIGN TEMP = 70'F HEATING, 75'F COOLING 1997 WSEC, SEATTLE SUPPLEMENT 9 AC -1 SUPPLY AIR TEMP = 5T AC -1 CRITICAL VENT RATIO - 0.51 AC -1 MISC EQUIP LOAD (WATTS /GROSS SF) = AC -1 LIGHTING LOAD (WATTS /GROSS SF) = 1 FINAL KLOAD, 11/12/98 FINAL KLOAD DATED 11/12/98 2.5F1NAL KLOAD DATED 11/12/98 2 FINAL KLOAD DATED 11/12/98 10 ITEMIZED EQUIPMENT LOADS A. EQUIPMENT LOADS PER 6/14/99 FAX. WARREN KLIMPKE, 6/14/99 TELECON 11 PEOPLE DENSITY: A. PEOPLE QUANTITIES PER 6/14/99 FAX. WARREN KLIMPKE, 6/14/99 TELECON 12 VENTILATION REQUIREMENTS 20 CFM PER PERSON 1997 WSVIAQ CODE TABLE 3 -4 13 WALL DATA: U - 0.14 (ALL WALLS) FINAL KLOAD DATED 11/12/98 14 GLASS DATA. k PUNCHED GLASS: U =0.64, SC = .45 B. CURTAINWALL GLASS: U =0 64, SC = 45 BUILDING STANDARD BUILDING STANDARD 15 VALUE ENGINEERING: PER THE ATTACHED FAX, ITEMS WERE VALUE ENGINEERED OUT OF THE PROJECT SCOPE. SPECIFIC AREAS, AS LISTED, MAY SACRIFICE COMFORT AND NOISE. FAX FROM MIKE FEY, FCUSHEE, DATED 6/8/99. 16 TUNNEL CORRIDOR: FOUSHEE TO LOWER TUNNEL LID BELOW EXISTING DUCTWORK. SEE M -1. TEI_ECON 6/3/99, MIKE FEY, FOUSHEE BJ GIRL, DAVE MORSE, HP WARREN KLIMPKE, HOFFMAN DIETZ 17 PROJECT SPECIFICATIONS: DUE TO COST CONSIDERATIONS, CERTAIN ITEMS IN THE PROJECT SPECIFICATIONS, APOLLO DEVELOPMENT STANDARDS FOR UNIVERSITY OF PHOENIX, DATED OCT. 14 1998, WILL NOT BE MET. THESE ITEMS ARE DESCRIBED IN THE VALUE ENGINEERING FAX AND THE HP PROPOSAL HP PROPOSAL, BASE E.D OPTION DATED MAY 18, 1999 FAX FROM MIKE FEY, FOUSHEE, DATED 6/8/99. 18 EXHAUST FANS: ELIMINATE THE BREAK ROOM EXHAUST FAN AND THE FACULTY ROOM EXHAUST FAN BJ GIRL, HP PROJECT MANAGER Tl #47224 UNIVERSITY OF PHOENIX BASS OF DESIGN 1- pE.S.0 44 L W] t1; sc.A I 14M1 ' .6C "VAC 54 -40 CSC' - ERi::A SOURCE r`A STATE El.9. DING CO11E C I AIC I. 2 114111 LI C.. NAG 51 -42 NA STATE BOLDING. COLE C a,t r. t 3 , 7•1 LNG. NAG 5r -44. 51-45 M STATE BLDG CODE C. <1,.WC R • A141 J.C. r%A% 5:-46. 51-47 M 5 TA'= ELt_D'*6 CODE :.',MC IL. 5 T , SEC 'MAC 51- it eiA STATE BiAL:r+1G CODE C ►Git_ 6 7441 ro5A4AQ C..'DE MAG5 - L) nA STATE BLAILD3i5 CODE W.N.Gii .7 OSA DE5BGt4 TEWVP = 63'F D8 61•- r6 A +4'.AE NA. 5'. APRIL., !48b 8 "SA ^c -,{ 1ttip = 10'F HEA - 1116 - 4'F COOL Otte' -Garti]ord 4 CUfL4 UCO2 LIGHTING !r•. ^SJSROrf• < f)=1,2 441 1.6EC 0 VOC ROY..•! LIGHTING (NATISIGR 5 5F) =135 497 /GEL H STLJVY km 1.166 )'NT -S GROSS SF; =1 :491 r6E.G 12 TtPtZED E3AN?E14T LOADS ' A EACH R - OVER-CAD AND PAC '1112149 TELECON, WARRE KU " 13 PWOR_E DE NS4 T Y: Vocational Rooms 1350.21occp Vc .otkanol Rooms 24.1 =15 occp Stua. Roo 12 =4 «'p 7/1214• TE EECON. WARREN KL NiFI E 14 v '>.ATICN REOIA ! T5 20 CFM PER PERSON EXCEPT I "TOTED 15 (FM F'E R PE.ON IN VOCATIONAL ROOMS 1441 INSV1AQ CODE TABLE 3-4 5 WALL. DATA U = 0i4 (ALL WALLS) Eilt':LDING STANDARD 1b GLASS DATA_ A. PUtKkW 6LA55 U=0b4, 5C = 45 B. CURTA Nr ALL GLASS. 1)=O.14, SC = 28 EIULDING STANDARD 911,1_ U STANDARD Il 3 HEAT FL-1=5 USED TO PREVENT AC UNIT FROM EXCEEDING CAPACITY DURING DESIGN CON:: AS DESCRIBED IN THE 7/2/9q FAX TO FOUSHEE rt:R HP PROPOSAL is NO SOUND LINER OR SOUND LINED SHEET PETAL SIMILAR TO FIRST FLOOR PER SIG_ - _ e, T rC T. -. -- , A'; Lx 9 - ' , ' 5;-, -;P F' :, .�A-_ 0.; =r. =" t T1 #47198 HYUNDAI BASIS OF DESIGN DE skit CRITERIA _ CikTERA S C I 1197 UPC', MAC 51 -4a If& STATE Bo R tG :]QE COIMC4 2 1997 LOW.._ *AC 51 -42 *A STA E BILitIL341MG _ UJDE C.Gr.AC& ' 937 LOC. RAC 51 -44. 51 -45 *Ai SLATE � S _ IDE CCR Act. " 4 • 397 UPC. mac 51- 46. 51-47 _ *.k S E B tt' C . ]OE :0."1._:LL 5 19•7 es T= (' 5 - .A ST,a'E 3,11. "INS _OCE CC•JnC& 6 '997 w CODE (MACS' - 13) *A S T +'E BIJIL.OHb.'. :OM C v.:rAYC7L 7 OSA DESIGN TEMP = 82'F D8. 66°F 118 ' 337 *SEC. SEA7L :.1.1PW' x if .T 8 :SA XSCaAI TEIP - 771 PEfA?.NG, 75T COOLING ii7 *SEC. SEATTLE SuPP_E me s 9 AC- ■ SL•f LY AIR TEMP = 53 AC- I CW^T Vf_tr RAT10 = 51 Lighting Lcod ( *ATS / SF) = t_2 1 •°AL K.."3. r ..AL K_CAD V - r.a,L IC_OAD 10 I'T'WZED EQ ;,PYEYT LOADS A. 1 'C Per Workstat.Gn B. P8X Roor, 1 Server and Teaes:n ne Equip w ke Fe 5/5/99 Teecon M:I.e ; el 5/5/99 Teeco'. I1 PEOPLE DENSITY: A. Open .Office Neor 1/indo. 14 .or, scot :orts 8 CONFERENCE ROCAS I / 20 Si C. 1 Person Per *.;rkStotan 1997 WSVIAQ COCE (roL51 -13) 1997 *SAN) CODE (WIC 51 -13) ft ke Fe1 5/5/99 Telecon t2 VENP1A1'ON REOLREMEN.TS 20 CFM PER PERSON '997 WSVAQ CODE TABLE 3 -4 13 WALL WA. U = 0.14 (ALL WALLS) B.u;d:rg Buildn 9 B. 'ding 14 GLASS DATA_ U - 0.64, SC - 0.45 (ALI WALLS) 15 ROOF DATA_ U. 0.05 16 NUMBER OF ZONES: 3 ... - ' p. 17 PBX Room: Cooling Fon M...e Ft. 5/7/9'. Telecon FT LAN ROOM: EXHAUST FAN T1. #61022 - STATE FARM BASIS OF DESIGN 1 DESIGN CRITERIA CRITERIA SOURCE I I4q'1 USC, WAC 51 -40 WA. STATE BUILDING CODE COUNCIL 2 1497 UMC, WAG 51 -42 WA. STATE BUILDING CODE COUNCIL 3 1991 UFC, WAG 51 -44, 51 -45 NA, STATE BUILDING CODE COUNCIL 4 1997 UPC, i4AC 51-46, 51 -47 WA. STATE BUILDING CODE COUNCIL 5 2002 WSEC (WAG 5I -u) WA. STATE BUILDING CODE COUNCIL 6 2000 WSVIAO CODE (NAC5I -I3) NA. STATE BUILDING CODE COUNCIL l OSA DESIGN TEMP = 83 °F DB. 61'F i C 1991 WSEC, SEATTLE SUPPLEMENT 8 ISA DESIGN TEMP = 10 °F HEATING, 15'F COOLING KR/ IrtSEC, SEATTLE SUPPLEMENT 9 AC -I SUPPLY AIR TEMP = 53° AC -1 CRITICAL VENT RATIO = 51 LIGHTING LOAD (WATTS(GROSS SF) = L2 FINAL KLOAD FINAL KLOAD FINAL KLOAD 10 ITEMIZED EQUIPMENT WADS A-1 PC PER WORKSTATION OR 25 WATTS/5F B.LAN ROOM: (3) RACK MOIIR4TS (CABITRONS) PER H -P PROPOSAL PER ARCH. DRWG_ 11 -3 11 PEOPLE DENSITY: A.PER ARCHITECTURAL DRAWINGS B.PER ARCHITECTURAL DRAWINGS C.I PERSON PER OFFICE MARVIN STEIN DATED 10/2/02 MARVIN STEIN DATED 10/2/02 PER H-P PROPOSAL 112 VENTILATION REQUIREIENTS 20 CFM PER PERSON 2000 WSV1AQ CODE TABLE 3-4 13 WALL DATA: U = 0.14 (ALL WALLS) BUILDING BASIS 14 GLASS DATA: U = 06 4, SC = 0 45 (ALL WALLS) BUILDING BASIS 15 ROOF DATA: U= 0.05 BUILDING BASIS 16 WMBER OF ZONES: (5) VAVS / (3) AC UNITS PER H-P PROPOSAL FT LAN ROOM: EXHAUST FAN PER ARCH. DRAG. 11 -3 IS AC -4 t AC -5: EXISTING ZONING TO REMAIN - PER H -P PROPOSA;_ 41?14 IIPIVERSirF OF PHaEN.X 9 " OF Yi?RK L RELOCATE I VAV BOX 2. 41ST ALL 3 IrEP4 VAV BOXES. 3. 461ALL 3 ROOFTOP LT4TS. 4. DIFFUSERS, RA65, DS AS •4O.91 5. CCINTROL FOR 3 I84 AND 2 EX/51:1 VAVS. ROOF TOP LN i S AS SINOYEI NAYS TO USE (.02 SEtf6ORS. Fttlef TOP UNITS TO BE CONTROLLED ED BY BAS) TI. 61022 STATEFARM SCOPE OF MORK I. RELOCATE (3) VAV BOX SENSORS t (2) AC UNIT SENSORS 2. DEMO AND INSTALL RC THORK AID DIFFUSERS PER PLAN. 3. INSTALL 1431 EXHAUST FAN AND OUGTk 3RK FOR LAN ROOK 4. RAE (5) VAV BOXES AND N AG UNIT. 5. AC-3 t AC-4 DUCTWORK, DIFFIFiRS, AND BALANCE TO REMAIN AS EXISTING - NOT IN SCOPE OF WORK. MO-OS DESIGN CRITERIA L REVD AT= I VAV 60X FROI4 NTN4N TENANT SPACE. 2. I16TALL 2 1464 VAV 3C�c - S 3. INSTALL COOLING PA:t 4. INSTA-L IFF415FRF t RAYS. 5 CONTROLS FOR 3 VAV BOXES t COOLING FAN T.I. #47201 CLINIOUE BASIS OF DESIGN 1 1997 UBC. WAD 51 -40 2 1997 UMC, WAC 51 -42 3 1997 UFC, WAC 51 -44, 51 -45 4 1997 UPC, WAC 51 -46, 51-47 5 1997 WSEC (WAC 51 -11) 6 1997 WSYWO CODE (WAC51 -13) 7 OSA DESIGN TEMP 82'F DB, 6I F WB 8 ISA DESIGN TEMP = 70•F HEATING, 75'F COOLING 9 AC -1 SUPPLY AIR TEMP = 53' 10 AC -1 CRITICAL VENT RATIO - .51 11 Lighting Load (WATTS /GROSS SF) = 1 ? 12 ITEMIZED EQUIPMENT AND PEOPLE LOADS A. Open Office 205: 2 people 2 PCs B_ Office 204: 1 Person. 1 PC C.Office 203 1 Person. 1 PC D.Recption 207: 1 Person, 1 PC E. Open Work 205: 1 Person. 1 PC, 1 Copier F Phone System in either training storage 208 closet 209 G Kitchen 210: Refrigerator. Dishwasher, Microwave. Coffee Mice Fey 5/17/99 Telecon Maker 'Ake Fey 5/17/99 Telecon H Vocational Room 211: maximum 30 people Pebecco Davidson, JCR 5/17/99 Telecon 13 VENTILATION REQUIREMENTS 20 CFA PER PERSON 14 WALL DATA. U = 0.14 (ALL WALLS) 15 GLASS DATA: U - 0.64. SC - 0.45 (Gloss 1) 16 ROOF DATA: U= 0.05 17 NUMBER OF ZONES: 4 8 No Server /Computer Room in this Space CRITERIA SOURCE WA_ STATt_ BUILDING CODE COUNCIL WA. STATE BUILDI':. CODE COUNCIL WA. STATE BUILDING CODE COUNC.'_ WA. STATE BUILDING CODE COON(:; WA. STATE BUILDING CODE C.NJNCIL *A. STATE BUILDING D. COUNCIL 1997 WSEC. SEATTLE SUPPLEMENT 1997 WSEC, SEATTLE SUPPLEMENT FINAL KLCAD FINAL KLJAD 1997 WSEC (WAC 51 -'1) Mike Fey, Foushee 5 /17/99 Telecon Mike - ey. Foushee 5/17/99 Telecon Mike Fey. Foushee 5/1 7/99 Telecon Mike Fey. Foushee 5/17/99 Telecon Mike Fey, Foushee 5/1 7/99 Telecon or wolk Mike Fey. Fo..shee 5/17/99 Telecon 1997 WSVIAO CODE TABLE 3 -4 8uil .jing .8wlding Building HP Proposal Mike Fey, Focshee 5 ' c econ J.I. '41201 SCOPE I. RELOCATE 3 EXISTING VAV BONES. 2. INSTALL I NEW VAV BOX. 3. DIFFUSERS, RAGS, t DB AS SFICW`N, 4. INSTALL I DUCT HEATER 5. CONTROLS FOR VAV BOXES. 111 41206 UNIVERSITY GE PHOENIX SCOPE OF WORK I. INSTALL 13 N8'1 VAV BOXES. 2. RELOCATE 5 EXISTING VAV BOXES. J. INSTALL 2 I4iI SPLIT SYSTEM COOLING UNIT5. 4. INSTALL 2 NEY4 FIRE/SMOKE DAMPERS. DUCTBOARD, DIFFUSERS, RAGS, RA BOOTS, VAV INLET BOOTS AS INDICATED 6. CONTROLS INCLUDE CO2 SENSORS AS INDICATED. L • 5 III6Cf AIR TIF-!E' '4 ,�. L NrE 1_7` 11160 1146 12 IAA `, Ptx "tcWtt :,fterT1 ta1A s: d56& A XotTELYJ4A fAr.AwING ' 1 + Jt" SASEO E4IA 4 YS - rE c .,bC. r : ;Pt . A111 PILE: POT rE Ell'+ 71. 5Se2F`T. L rr'c Nfot v & : Es: S 2 kE '( A'zrj ?ft. . AY 3G •ES 3 RA- - - ' _'cttS :lG fCAK1� FC4r , .. rfS '0_ t2Y 5.66 O 5✓zN I. &SCE MR =TAP 14' GOD. "G - 3' FEA")i& 2 Lic*, -. - 12 riAT(5 P SOJART s00T 3. F Ce..E DE.460Y CCI:WEL Pe 21/74 P:1;;MT 'SSE ARCA7a.T.FJIL DRAr4NCf� 4 V1?C •LATON 2'O.Tr t.Ett'S c; CJWI PER PERSON_ 5. LAf:AT DR 2 . .-a FERK T SS.E AR s.fTEGT,FtA . rAzAreO5 6. DESrii :.01'1 ES r4 ' TNf PAWN% ODES: 1447 IBC. :x11 AC, 441 '&C A4i i6VC GtE %En Vv./ BG 2 RAGS. D :- ./,LAS DUGTHOAR_ FOR 'PC Z'YS na2-205 PENDING CITY APPROVAL APPROVED FOR CONSTRUCTION 'LQ�2 �C $ R ECEIVED CITY OF TUKWiI.A OCT 1 6 2002 PERMIT CENTER opprr: dots: 4 U \� 1 Lei c w 3 0 v` v c � C) J a cs dote of last revision: 0/14/02 M -0.1 cadd file name: 2 z Z 0 L20S0I l - I.J - .I J�I�f� f1 , tQ C °£1` 11 fh = �1 _3�y1!,Ittrll ® v_ 7G ATEO In_xIO CD . ~f1; .350 12x'2 - OP 315 8.3 CC I5 tTP1) = a MIN. DISTANCE TO FIRST RUNOUT= 3'� \ ��: OCC -, BEFORE 'I L F -= 1 Hint V AV BOX MR STRAIGHT 2' -0• 1 1 DUCr F4EAif 5 R L TRAN.7 MAX ANGLE = 22'' 10..0 --? -- 1i IMP lbw NOTES: I. DUCT HEA;ER ' '4CT : SREC.TLY GCNNECTED TO A VAV BOX OUTLET, REOUIRE 3' -C "' OF STRA'GHT DUCT ON HEATER !NLET. 2. BOX INLET FLEX - O BE MAX. OF 4 IN LE1i AND ONE 45 TURN (NOT WITHIN 2 OF BOX NLET.) O DETAIL - VAV 50/ ,t4/ELEC. HEAT Scale: NTS NAVDET - II /16 /G8) G • 1 • Rd:a:A EDI - 11_ I I' • { -47 F -. 3 %• 'OxfO GD 12 260 _ c. t sar MIR ' STRA N R"GA7ED / OPENING ON GM SIDES F r gig!: i3x15,SL 20xL3 801111 ( __R 3.1; - 1 • - -f 10' ROO 1H -- -- tOxtiJfA t 1 ,-.. rc' 330(TYP4) . - J _ I . 9 I ® 111111 , � �IIIIIIIIfl111I11111111 t--- , 111 ■ STA a ' .• 15>�5 CD EIS 8x8_ GD 2 � ` - J GD IOxio GD - r 310 '® - ; 1=„5 I� r_ •_ I 1== Pp' 0606 - I I; P JE:AS„ 3 "*P - - - � -3 � � • -1 - 14x14 CD = i ( r- i - _,J G _ _ -, _ 1 GD 4° E - J� 2G+ci4,1__,Ct+ 12.24 RA oRI_LE 12x24/5L V 129 _ I !Ere& • 605(7/8.3). -. -- J CEILING 11 3 xt 7/5i_ 5A r + 312,E RA LP tt /Z 3 O i - .:: -- 12.9 _ - „...- OPENING ON TOP DETAIL - 12x24 RETURN AIR HOOT Scale: I" = 1 7- 3Ox1 7•`_i - 1 E . / , \5p/ T� +111,+ Q -- 1 1. AEE 2CS P - C� J JP 'a AG-3 j 1 S { ti - 4_ '- - INSTALL SENSOR ON INSULATED BASE IN t --65-a-,',72) 8x &G2_ 36x1051 - IY�Y -2^4 ! / - � � OF OPEN±Ci 1 � - 1N5 • >N5!OV - _ i \ = CezarL - r. - '- I • - , -1 , s ue x24 -rr_' "_- .: ' : • vAC v-2z]_ I 1NSILt T TOM. a ^31CL.'. aJ . :' 74. 1 ° . 1 EL:VA-p -T• D1V�1E4 . I I SEE D(L5Ii2 5FEET M -D_Z i SD 2 1 I' ' II -, rkEr ' Y L IN OF DUCT - r T _ r > 1 � -; ��`'j /�7pl z nfx3 e t S 45 T 2 '• :By 13x1 �Q IIx15,SL RA BOOT -15x11- OPENSNG -ON TOP _! j I , � - {{yy 1pmt ®- 1 � 1 2 ' m I _ .._ =W. • :17C, • 1 I -Ti 24x24 RA GRILLE N ' 3 24" MIN. Ibx24/5L • 0 • 1 ' - SELECTOR SKTCH 3',2x bi5d >? 9 ! on r._ 20 36. OPENING 3 DB r€13 20x20 BAROMETR'C RELIEF DAMPER :N ROOF l _ � x° 0D k P9 - I �� 1�1 117i /fl I [Z1 2 20x20 R &lP 3- IO'm7P 265 TY P.3) CEILING 6x�C�S►i,�i ti � - � - 9(x7/8.0 ` DETAIL - 24x24 RETURN AIR HOOT Scale: I" = I' -O" :,,E,- 1 + " r 1"---4. I = J_ Tim . I � -} mot _ x ° - - --- exa G2 1 ll[7 J - - - n 1 A Y, i! ) a,P acs(TrP. 0' W -4' BOO. ft:r rlE BOTTOM SOP- - 7 14.14 TG/P (TYP2) 10x10 GD NOTE: ZONE 204, 213, 219, AND 22rT0 HAVE 002 SENSC .e5 LOCATED ABOVE OR NEXT TO TEMPERATURE SBSORS / � - 16x24 OPENING 'x10 co i 241 I S AL SLOPE TCrt4 -- -• - - -- ` 16x'675L -7 1 16x16/51_ LP TO EFr2 • L: • 1 - -- IOx10 G\�� 240 20+13 t. IOx10 G� - 210(rrP2) - 3) 'I - r 1 . - I 1 \1 � � ▪ _ T J1 _cffICE 8x9 m il - - rl 1 2 'OI' akle•5L - 2 AG °2� - `, I _l- ' - -- - x +.6LPTG EF -I -� - UP TO AG -2 4, • za 13 I - Exl &r j_ u :,Ill =r" L 3 -_ 15!3 1 n unt.l , E • 3 - 53x9 C-1, !2 711! �YP3) ∎1 3+13 4- X8 - • .0 5,53 ^ AZ_A ' F • ',SA?_ ARE - tadO' • ' N. 280 - " -- - IuP 1.46 -4 Y J/ 1111111111 t I • - 1 I0 -dOGD 310 MD4OB 30x12JS SA IP TO AC-4 L" T f ( • 4\ O - - -1 - LI 1 rt I I0x10 GO ` `- 325 - c ,1_ 4: DXIO CV tOxO ( > I I B_ -�_= - i fc =230 tit, -I -f - - El TOP ioiNA_ 26 CD P.2) . ♦ •JliT:P !'IltiI111 = �_- 12- 3I1 t i= C Clflllllt s .� • 1 l�tll�•. � 1 \j -LE Kp c=;I ! 1 - I' 2457,'P2J x10 I 1 i"Ip -0 14 -3 _ -4 M ' _ CEILING SPACE REQUIREMENTS 8' -6• TO g' -I" ELEC TRICAL 9' -I• TO 9' -5 FIRE PROTECTION 9' -5" AND ABOVE HVAC SECOND FLOOR HVAC PLAN • DE' PIA" N Scale: 1/8"- T -O' O -t E f2x'1G? I - 1 1 '5C J- f . _ :2 -- • • , -- -� II5o -2 - 8i �MII %' y -, - -' _ - - _ 36x11 OP311% -i _ 1 z. // °� • �v .7.,...-_.- X� " I - 4 .27 - - - i Z -+I �a I • - 56.'015L RA / t• ,- Sx8 C 30x11 SL 9 ' 1 � 1 2t0(T . - , yTO 4C -5 b -f ---..--7-7,' 9 � . - - - i a --- r. s , V-22071 s s d Ili I • -<> E EL civrr stw sofa_ i.c p APPROVED FOR CONSTRUCTION CT' OP T1.11 Aio2 - 2,as DEtno IL ▪ e • ! tft icz CI ate of last revision: cncid file BOTTOM OF STEEL ELEVATIONS CNA_ R_ T PROJECT NAME: 'art Dent III PROJECT NUMBER: _ 42067 DRAWING DATE: 122/98 11/12/98 LAST UPDATE: 2nd Floor AFF to Bottom Of Steel Dimensions in Inches (Roof Frcming) STEEL SIZE: 33 30 27 24 21 20 18 16 14 12 10 8 -{ GRID T_O S_ _ 27' -6" Numbered 169.00 1,36 00 139.00 142 00 145.00 148.00 149 00 151.00 153.00 1' 00 137 00 1 59.00 ' 51 0 1 ' 55.501 154 75 27'-1/2" Numbered 163.50 130.50 133.'",0 136.50 139.50 142.50 143.50 145.50 147 50 149.50 151.5 150.75 '53.50 157.75 _4_, 26 3/4" NU - bered 162.75 1 29.75 1.32.75 135 75 1.38 /5 141 75 142 75 144 75 146 75 148 75 26' - -5 1 /2" Numbered 156.50 123.50 126 50 129 50 _132.50 135.50 136.50 138.50 140 �•0 142.50 1 44.50 1 46_50 _, 148 50 145.00 - 1 26' -2" Numbered 153.00 120.00 123.00 12.6 00 129 00 1 32.00 133.00 135.00 137 00 1 39.00 141 00 143.00 27 Lettered 161 00 128.00 1. 31.00 134 00 157 00 140 00 141 00 140.25 14.5(10 142.25 145 CO 144.25 147 00 146.25 149 .`,0 148 25 47 c?0 151 00 ' 1 53.30 26 -1 1 3J_4" Lettered 160.25 127.25 130 25 1 136.25 139 26' -5 !L2" Lettered 154.00 121.00 124.00 .33.25 127 00 130.00 -25 133.00 1 34 CO 136 00 138 .)0 140.00 50.25 d4 ',0 _ 1 52 2.5_ 146.70 26' -2" Lettered 150.50 ' 1 7.50 120.50 123.50 126.50 129.50 130 50 132.50 134 53 136.50 1.58.50 40 50 142 L:0 J l - I.J - .I J�I�f� f1 , tQ C °£1` 11 fh = �1 _3�y1!,Ittrll ® v_ 7G ATEO In_xIO CD . ~f1; .350 12x'2 - OP 315 8.3 CC I5 tTP1) = a MIN. DISTANCE TO FIRST RUNOUT= 3'� \ ��: OCC -, BEFORE 'I L F -= 1 Hint V AV BOX MR STRAIGHT 2' -0• 1 1 DUCr F4EAif 5 R L TRAN.7 MAX ANGLE = 22'' 10..0 --? -- 1i IMP lbw NOTES: I. DUCT HEA;ER ' '4CT : SREC.TLY GCNNECTED TO A VAV BOX OUTLET, REOUIRE 3' -C "' OF STRA'GHT DUCT ON HEATER !NLET. 2. BOX INLET FLEX - O BE MAX. OF 4 IN LE1i AND ONE 45 TURN (NOT WITHIN 2 OF BOX NLET.) O DETAIL - VAV 50/ ,t4/ELEC. HEAT Scale: NTS NAVDET - II /16 /G8) G • 1 • Rd:a:A EDI - 11_ I I' • { -47 F -. 3 %• 'OxfO GD 12 260 _ c. t sar MIR ' STRA N R"GA7ED / OPENING ON GM SIDES F r gig!: i3x15,SL 20xL3 801111 ( __R 3.1; - 1 • - -f 10' ROO 1H -- -- tOxtiJfA t 1 ,-.. rc' 330(TYP4) . - J _ I . 9 I ® 111111 , � �IIIIIIIIfl111I11111111 t--- , 111 ■ STA a ' .• 15>�5 CD EIS 8x8_ GD 2 � ` - J GD IOxio GD - r 310 '® - ; 1=„5 I� r_ •_ I 1== Pp' 0606 - I I; P JE:AS„ 3 "*P - - - � -3 � � • -1 - 14x14 CD = i ( r- i - _,J G _ _ -, _ 1 GD 4° E - J� 2G+ci4,1__,Ct+ 12.24 RA oRI_LE 12x24/5L V 129 _ I !Ere& • 605(7/8.3). -. -- J CEILING 11 3 xt 7/5i_ 5A r + 312,E RA LP tt /Z 3 O i - .:: -- 12.9 _ - „...- OPENING ON TOP DETAIL - 12x24 RETURN AIR HOOT Scale: I" = 1 7- 3Ox1 7•`_i - 1 E . / , \5p/ T� +111,+ Q -- 1 1. AEE 2CS P - C� J JP 'a AG-3 j 1 S { ti - 4_ '- - INSTALL SENSOR ON INSULATED BASE IN t --65-a-,',72) 8x &G2_ 36x1051 - IY�Y -2^4 ! / - � � OF OPEN±Ci 1 � - 1N5 • >N5!OV - _ i \ = CezarL - r. - '- I • - , -1 , s ue x24 -rr_' "_- .: ' : • vAC v-2z]_ I 1NSILt T TOM. a ^31CL.'. aJ . :' 74. 1 ° . 1 EL:VA-p -T• D1V�1E4 . I I SEE D(L5Ii2 5FEET M -D_Z i SD 2 1 I' ' II -, rkEr ' Y L IN OF DUCT - r T _ r > 1 � -; ��`'j /�7pl z nfx3 e t S 45 T 2 '• :By 13x1 �Q IIx15,SL RA BOOT -15x11- OPENSNG -ON TOP _! j I , � - {{yy 1pmt ®- 1 � 1 2 ' m I _ .._ =W. • :17C, • 1 I -Ti 24x24 RA GRILLE N ' 3 24" MIN. Ibx24/5L • 0 • 1 ' - SELECTOR SKTCH 3',2x bi5d >? 9 ! on r._ 20 36. OPENING 3 DB r€13 20x20 BAROMETR'C RELIEF DAMPER :N ROOF l _ � x° 0D k P9 - I �� 1�1 117i /fl I [Z1 2 20x20 R &lP 3- IO'm7P 265 TY P.3) CEILING 6x�C�S►i,�i ti � - � - 9(x7/8.0 ` DETAIL - 24x24 RETURN AIR HOOT Scale: I" = I' -O" :,,E,- 1 + " r 1"---4. I = J_ Tim . I � -} mot _ x ° - - --- exa G2 1 ll[7 J - - - n 1 A Y, i! ) a,P acs(TrP. 0' W -4' BOO. ft:r rlE BOTTOM SOP- - 7 14.14 TG/P (TYP2) 10x10 GD NOTE: ZONE 204, 213, 219, AND 22rT0 HAVE 002 SENSC .e5 LOCATED ABOVE OR NEXT TO TEMPERATURE SBSORS / � - 16x24 OPENING 'x10 co i 241 I S AL SLOPE TCrt4 -- -• - - -- ` 16x'675L -7 1 16x16/51_ LP TO EFr2 • L: • 1 - -- IOx10 G\�� 240 20+13 t. IOx10 G� - 210(rrP2) - 3) 'I - r 1 . - I 1 \1 � � ▪ _ T J1 _cffICE 8x9 m il - - rl 1 2 'OI' akle•5L - 2 AG °2� - `, I _l- ' - -- - x +.6LPTG EF -I -� - UP TO AG -2 4, • za 13 I - Exl &r j_ u :,Ill =r" L 3 -_ 15!3 1 n unt.l , E • 3 - 53x9 C-1, !2 711! �YP3) ∎1 3+13 4- X8 - • .0 5,53 ^ AZ_A ' F • ',SA?_ ARE - tadO' • ' N. 280 - " -- - IuP 1.46 -4 Y J/ 1111111111 t I • - 1 I0 -dOGD 310 MD4OB 30x12JS SA IP TO AC-4 L" T f ( • 4\ O - - -1 - LI 1 rt I I0x10 GO ` `- 325 - c ,1_ 4: DXIO CV tOxO ( > I I B_ -�_= - i fc =230 tit, -I -f - - El TOP ioiNA_ 26 CD P.2) . ♦ •JliT:P !'IltiI111 = �_- 12- 3I1 t i= C Clflllllt s .� • 1 l�tll�•. � 1 \j -LE Kp c=;I ! 1 - I' 2457,'P2J x10 I 1 i"Ip -0 14 -3 _ -4 M ' _ CEILING SPACE REQUIREMENTS 8' -6• TO g' -I" ELEC TRICAL 9' -I• TO 9' -5 FIRE PROTECTION 9' -5" AND ABOVE HVAC SECOND FLOOR HVAC PLAN • DE' PIA" N Scale: 1/8"- T -O' O -t E f2x'1G? I - 1 1 '5C J- f . _ :2 -- • • , -- -� II5o -2 - 8i �MII %' y -, - -' _ - - _ 36x11 OP311% -i _ 1 z. // °� • �v .7.,...-_.- X� " I - 4 .27 - - - i Z -+I �a I • - 56.'015L RA / t• ,- Sx8 C 30x11 SL 9 ' 1 � 1 2t0(T . - , yTO 4C -5 b -f ---..--7-7,' 9 � . - - - i a --- r. s , V-22071 s s d Ili I • -<> E EL civrr stw sofa_ i.c p APPROVED FOR CONSTRUCTION CT' OP T1.11 Aio2 - 2,as DEtno IL ▪ e • ! tft icz CI ate of last revision: cncid file MAX. d 12x12 CD 315 Mft PiSTAN(,E TO FIRST RUN , = 3 VA. BOX ' RA10,- 2' 0* \ i ( DI '* OUC I' -4F_A TI 1 •11 1- X A'`.41 >LE = 2'2 • I ;t NO IFS: I. DUCT '•EATFRS NT C'IREt X (2 TO A VA/ BoA OUIJA': YECRL; i RE " OF ••••ZA DUCT ON HEAT 1" ,LE 2 BOX s .ET r I_ EX TO BE Mt UF 4 N I 4N9 4 TURN (NC ■• BOX ''LET) TA - VAV E3ox //ELEC. HEAT NTS NAVDET - 3x/3 CO Of ICAO OP 255 , 7,1 - F --- _ 4-- i?" ,70,1 _±_t - ‘ ,...t_t_._ ...,,... i .,.•. 9 !F__ t, . - 1- - — : , i -- '---, ;-- -.1-i7-5 - 10,<I0 G0 I '' , " & * '1-- - 350 t 1 i I -- /- 1/ -*' ' -- : . 1 f . .- ,-.- ..-,, - U_ • __ -.,...r - i 2 --, 1 118 - CD r WNW/ < - . t i if.,_ ri _ I 9...a0GATED .7. -FX:7k-•,- , ■i ' !, - i **.: T A ,-,..■ -t_ t bxe - e,r) 1 .-4._-.7R . : 20: ; : : ,. Fii;-': :35 -,-,, • .1 : - • ..1.,,,,,,._ ,,, 1 EN - - - In• ' JIMMIES, _1 i: . EF Ii :T4ii4 7_ - - 71 1 45 ' CD 10x10 - - --Th' ! t ° 260 0...CT ON 307- 1 S E3EFORE • 4k,„, ----1 - -OFF5 STRA,G13.-1 - I ' I, " S 74-24 - I 1C7 VF -- _ - ; „t- - - - 11100' t0 GE).- tOx 2C1,.4-GGN I s e _ 1 I 7 --- 12e24 ( 7ft_184.,_ - 1. Lis 1.4x4 12 Li LJ MIN _ _ ac4)-- • 150 I2x24 - 206 -;Ni k: 1 LAO \ 10x10 CD ___ 250 - 2- 6 xE, W enctEf).;.< - 05 fleg - 70.0 - -. - 20.13 CEILING ROA DETAIL - 12x24 RETURN AIR BOOT Scale. I" 14x24 OPENING ON TOP . t 1 7=2 \ 30x SA - _ - Fop AG-3 - IN5Cf_ tYP•tiq5K3.: -7 H021/914AL 5-1Ai T. Tat-i cf 28eu EL EL ATION. 5EL DETAILS 112 SrIEL P2-0.2 _It W CO4 1kCV boxto CO '210 310 43 I 1 ____i 1 , 4 114 - 7, - .. ! 6x6 W - 4 1 - tsr-s --i.L EiO5 .- -4 i - I- , --- ' -2-- 1 --:- ' - - - ON T9P dit;7 - - - ' 6th GO II of 0 ‘11 11111111MINDIC/1111111111 '2x:2 CD 305tTYP2) INSTALL SENSOR ON 1H9A:A rEt) BASE P JSO IN TOP OF RIG' :--- SD-2-51 -:.•• , _L.:_t, * r 'NOM - .g§,-) =1H 1 imatr '2-1 71 ---I I , - - Liy , ---- ire' • - r 111-1 : g,' , , f )' ____. Piiii -1--------42 I2'' - - . 2 ,,, 5 _,, / 4 F„___i /C"1= 1 1- 1 - 111i1 - 11 - 111,110 . 11101 _ . - TExIb GD • E _ - . - ' 2 N. 26 OF coRR, _ZANG t- 3' 24x24 RA GRILLE tt)-2-2 -- 1 5,5/St - I I - ,1•3` - .." - " N 6 75 5;26 - - "55- ;5xtt C`.PEN, • tillipti1/4 = TZ T 20x20 R.A6iP NOTE: ZONES 204, 213, 219, AND 221 TO NAVE CO2 SENS0 LOCATED ABOVE OR NEXT TO TEMPERATURE SE5-..70R5 24' MIN 18x24/SL 3-;0 26" 3) Ti CElL NO DETAIL - 24x24 RETURN AIR BOOT Scale: I" GI) - . -,- ) l4x14 TG/P 10340 f;f5 2 3f-x40 OPE134 TOP-XtE-MG-11t,,011[_t 37 7 • -4 i x16/5L IP TO EF72 f 13x24 7PE1 r-SELEGTOR C.44 ' =1 , 7 7 2....),804 i _ 11 N r - - t:' , 141.14 61 O _ - • -- - , - , 10,50 CD 250 _ - 10 CD rg • 7: : 2-18 /rie ! VIRS 1 - _ _ \E-. ! 2 - F41 • End, 1 -, (- L- _ ,,, _ - - Fce,....;\ 1 ( .., 0 • --- L.. -J - ' - ' . •1 - 042 ALP 1 61c6 OT(P 5 R.f _2` - ,retxIGQC-0 , TOM OF 757 — I 1 ? . A _ e - ) : -7- - 1 .1 - 20x20 BAR.OMEIRlG L RE L SF 0'S-SEER IN ROOF 21.1S 0811 J t I - - ; 6 7 AL G - ,L,_ ..7; El -x- .: ---=, . 17.. . 7 1927 F:::E . ,-.0 ?,„,.._, d - ,--- - i L r - 1- I ' I Li"' TO G- • ' ' 4 -1,.. .,- _ -4f.'• 1 ,. N " _ „-, 470_ ._ .._ .:- 5, , • s _ __;,_._ - r-- ■ 1 --___„ . _ , xelz /5. __--,.._ i. 10, ... , - , 14- ---- - )P ,0 , -='a - 11-, 16x161t LIP TO Ef -1 - "---- _- --- LP TO AC-2 _ 12 --- 7 15.15 - F.543 - r - 1 5(TYP_3) - 7 .1x13 1,1/1111 I 1&1 - II 2 10x10 CO 310 2_xl(„ RA = 40' SA IP TO AG-4 • • 20C, - I.\ _ I • i /3 TO 1 I TO cl'-5* AND ABOVE SECOND FLOOR HVAC PLAN 1/8'm I - I p/p V q g t2SL • • _ CEILING SPACE REQUIREMENTS - I 5F 7 F ."-- _.+. _1 _ $rf,• R5 ii0CPEN:156 ON 1 ELECTRICAL FIRE PROTECTION HVAC 1ff -4 r - T 3 - .12:02c..R ' 3001 .----1± - 1 Ly , -I ---: 7; ess - - co . :1 .'-i- "' 4 ----- 15--1.1 .1_11rt ---- -----1-1- - i-,- ) i I ! r r I , ', ! \ , - [__ _ ... , f , = ----- ! - - - -.) 4 -- --- - •Cx 0 CO 4 - - - -,-.rvip - ---;:a ,- LA -4- t . I — , E -- —7U1 Er, -- - I - i 1 C.E'■ NG; I= E!-- _ , .A.; - : 1 4i exe GO TiLEE 159 • I2x12 GO -34°(TYP - — - - - 3Eu'O52 _ RA _ 10 AG-5 _ - - TO AG-5 c P 9-- 2) --, -35 •_-_, I --- 2= -- .-..- . i - , . i.1 1 6oa -- ' 4 ; i I .---' -4 _ STEEL FRi-v-•= \ 5..".E TR NEVAi ''''.EN 7.7.- , :_ - :_s; 7 ': , ..:?•, , .F.;', - -7 OD, - o5 APPROVED FOR CONSTRUCTION , 1400 (0 p i„olk_O RECEIVED CM OF ro. OCT 1 6 2002 PERMIT CENTER / PENDING CITY APPROVAL approved: dote: 1 11111111mm cadd file name: uj M-2 date of last revision: 4/02 4206-7M2 T TON/1 '.)-- 3 l '_1) C - -';‘, r -'R NAME: - Dent II - " Num9EP - PAWING :/ '67 fl/1 1F 2 '32/98 _. 01 I 1 ' 1 2/98 1 t . ., ,', F to I - ;reel 0 r, , ,,, ,- 7 -, • - ches ,..'oor -_E_ ',1ZE. 3 0 2 7 : - 20 18 16 10 GRJ) 1 0 s ' r, Numbr, 169(O ' '‘.-, , - io on • 12 0„ tr 00 %'---• GO ' 51 00 • '', 1 00 2 NunThered 1,3 50 ' ' ) n ' '• t ' 0 ' ".., !,,- ' - ? ,(3 1 o ' 45 "_ 1 7 L I • ) - ', 0 1 1 3/4 N,, ' 2 75 • . l : 5 il ,', 75 iz )5 44 75 l" ' 4 ',, - 5 1/2 "J•irt, 1 •6 50 • 5 '', ' 26 50 _ 3 5'' ' '2.50 56.50 3859 •1 IL, 3 00 ' 1 ' ' 1.3 00 ' , ' '9 or) , .3 - )O 5__ H ; :, '; • I3 Or) .5 00 '61 00 '..) '31 00 ' ' 2 ' 5 7 e:' 1:: : 0 :.) : :7 00 ' + -, :•- i 1 00 300 , • . I•ere - ,1 25 • ,0 -,-, ,• L 25 ■ T. --, ' it; 2 • • 025 225 ' , 30C 8 0D :i ci :_.,:t.t,red • u : - • , :, , 3 '.'C 10 - ' 2250 ' Y. '--, ' - MAX. d 12x12 CD 315 Mft PiSTAN(,E TO FIRST RUN , = 3 VA. BOX ' RA10,- 2' 0* \ i ( DI '* OUC I' -4F_A TI 1 •11 1- X A'`.41 >LE = 2'2 • I ;t NO IFS: I. DUCT '•EATFRS NT C'IREt X (2 TO A VA/ BoA OUIJA': YECRL; i RE " OF ••••ZA DUCT ON HEAT 1" ,LE 2 BOX s .ET r I_ EX TO BE Mt UF 4 N I 4N9 4 TURN (NC ■• BOX ''LET) TA - VAV E3ox //ELEC. HEAT NTS NAVDET - 3x/3 CO Of ICAO OP 255 , 7,1 - F --- _ 4-- i?" ,70,1 _±_t - ‘ ,...t_t_._ ...,,... i .,.•. 9 !F__ t, . - 1- - — : , i -- '---, ;-- -.1-i7-5 - 10,<I0 G0 I '' , " & * '1-- - 350 t 1 i I -- /- 1/ -*' ' -- : . 1 f . .- ,-.- ..-,, - U_ • __ -.,...r - i 2 --, 1 118 - CD r WNW/ < - . t i if.,_ ri _ I 9...a0GATED .7. -FX:7k-•,- , ■i ' !, - i **.: T A ,-,..■ -t_ t bxe - e,r) 1 .-4._-.7R . : 20: ; : : ,. Fii;-': :35 -,-,, • .1 : - • ..1.,,,,,,._ ,,, 1 EN - - - In• ' JIMMIES, _1 i: . EF Ii :T4ii4 7_ - - 71 1 45 ' CD 10x10 - - --Th' ! t ° 260 0...CT ON 307- 1 S E3EFORE • 4k,„, ----1 - -OFF5 STRA,G13.-1 - I ' I, " S 74-24 - I 1C7 VF -- _ - ; „t- - - - 11100' t0 GE).- tOx 2C1,.4-GGN I s e _ 1 I 7 --- 12e24 ( 7ft_184.,_ - 1. Lis 1.4x4 12 Li LJ MIN _ _ ac4)-- • 150 I2x24 - 206 -;Ni k: 1 LAO \ 10x10 CD ___ 250 - 2- 6 xE, W enctEf).;.< - 05 fleg - 70.0 - -. - 20.13 CEILING ROA DETAIL - 12x24 RETURN AIR BOOT Scale. I" 14x24 OPENING ON TOP . t 1 7=2 \ 30x SA - _ - Fop AG-3 - IN5Cf_ tYP•tiq5K3.: -7 H021/914AL 5-1Ai T. Tat-i cf 28eu EL EL ATION. 5EL DETAILS 112 SrIEL P2-0.2 _It W CO4 1kCV boxto CO '210 310 43 I 1 ____i 1 , 4 114 - 7, - .. ! 6x6 W - 4 1 - tsr-s --i.L EiO5 .- -4 i - I- , --- ' -2-- 1 --:- ' - - - ON T9P dit;7 - - - ' 6th GO II of 0 ‘11 11111111MINDIC/1111111111 '2x:2 CD 305tTYP2) INSTALL SENSOR ON 1H9A:A rEt) BASE P JSO IN TOP OF RIG' :--- SD-2-51 -:.•• , _L.:_t, * r 'NOM - .g§,-) =1H 1 imatr '2-1 71 ---I I , - - Liy , ---- ire' • - r 111-1 : g,' , , f )' ____. Piiii -1--------42 I2'' - - . 2 ,,, 5 _,, / 4 F„___i /C"1= 1 1- 1 - 111i1 - 11 - 111,110 . 11101 _ . - TExIb GD • E _ - . - ' 2 N. 26 OF coRR, _ZANG t- 3' 24x24 RA GRILLE tt)-2-2 -- 1 5,5/St - I I - ,1•3` - .." - " N 6 75 5;26 - - "55- ;5xtt C`.PEN, • tillipti1/4 = TZ T 20x20 R.A6iP NOTE: ZONES 204, 213, 219, AND 221 TO NAVE CO2 SENS0 LOCATED ABOVE OR NEXT TO TEMPERATURE SE5-..70R5 24' MIN 18x24/SL 3-;0 26" 3) Ti CElL NO DETAIL - 24x24 RETURN AIR BOOT Scale: I" GI) - . -,- ) l4x14 TG/P 10340 f;f5 2 3f-x40 OPE134 TOP-XtE-MG-11t,,011[_t 37 7 • -4 i x16/5L IP TO EF72 f 13x24 7PE1 r-SELEGTOR C.44 ' =1 , 7 7 2....),804 i _ 11 N r - - t:' , 141.14 61 O _ - • -- - , - , 10,50 CD 250 _ - 10 CD rg • 7: : 2-18 /rie ! VIRS 1 - _ _ \E-. ! 2 - F41 • End, 1 -, (- L- _ ,,, _ - - Fce,....;\ 1 ( .., 0 • --- L.. -J - ' - ' . •1 - 042 ALP 1 61c6 OT(P 5 R.f _2` - ,retxIGQC-0 , TOM OF 757 — I 1 ? . A _ e - ) : -7- - 1 .1 - 20x20 BAR.OMEIRlG L RE L SF 0'S-SEER IN ROOF 21.1S 0811 J t I - - ; 6 7 AL G - ,L,_ ..7; El -x- .: ---=, . 17.. . 7 1927 F:::E . ,-.0 ?,„,.._, d - ,--- - i L r - 1- I ' I Li"' TO G- • ' ' 4 -1,.. .,- _ -4f.'• 1 ,. N " _ „-, 470_ ._ .._ .:- 5, , • s _ __;,_._ - r-- ■ 1 --___„ . _ , xelz /5. __--,.._ i. 10, ... , - , 14- ---- - )P ,0 , -='a - 11-, 16x161t LIP TO Ef -1 - "---- _- --- LP TO AC-2 _ 12 --- 7 15.15 - F.543 - r - 1 5(TYP_3) - 7 .1x13 1,1/1111 I 1&1 - II 2 10x10 CO 310 2_xl(„ RA = 40' SA IP TO AG-4 • • 20C, - I.\ _ I • i /3 TO 1 I TO cl'-5* AND ABOVE SECOND FLOOR HVAC PLAN 1/8'm I - I p/p V q g t2SL • • _ CEILING SPACE REQUIREMENTS - I 5F 7 F ."-- _.+. _1 _ $rf,• R5 ii0CPEN:156 ON 1 ELECTRICAL FIRE PROTECTION HVAC 1ff -4 r - T 3 - .12:02c..R ' 3001 .----1± - 1 Ly , -I ---: 7; ess - - co . :1 .'-i- "' 4 ----- 15--1.1 .1_11rt ---- -----1-1- - i-,- ) i I ! r r I , ', ! \ , - [__ _ ... , f , = ----- ! - - - -.) 4 -- --- - •Cx 0 CO 4 - - - -,-.rvip - ---;:a ,- LA -4- t . I — , E -- —7U1 Er, -- - I - i 1 C.E'■ NG; I= E!-- _ , .A.; - : 1 4i exe GO TiLEE 159 • I2x12 GO -34°(TYP - — - - - 3Eu'O52 _ RA _ 10 AG-5 _ - - TO AG-5 c P 9-- 2) --, -35 •_-_, I --- 2= -- .-..- . i - , . i.1 1 6oa -- ' 4 ; i I .---' -4 _ STEEL FRi-v-•= \ 5..".E TR NEVAi ''''.EN 7.7.- , :_ - :_s; 7 ': , ..:?•, , .F.;', - -7 OD, - o5 APPROVED FOR CONSTRUCTION , 1400 (0 p i„olk_O RECEIVED CM OF ro. OCT 1 6 2002 PERMIT CENTER / PENDING CITY APPROVAL approved: dote: 1 11111111mm cadd file name: uj M-2 date of last revision: 4/02 4206-7M2 FIRE /SMOKE DAMPER SCHEDULE CSC ,# AREA . MAKE MODEL �'VLE rf 2 ' N^:E CT I G EE tvE r 3 NN YP Lc " :�' ;A +B ,_) ' : ? REMARKS \.t VOLTS /eH FSD 1 -1 1ST `JCR' - RUSKIN FSD6C - 26 "z - 17" M =:37, :20/1 0 ® ®lam FSD 1- 1ST SOUTH RUSKIN FSD60 - 30x20 = - 17" '.1A233 722/1 (I 3 ®} ®® FSD 1 -3 1ST RETURN RUSKIN FSD36 - 34x24 - 17" EMI 120/1 0 l'_'l00® FSD 1 -4 ELEV. M.AC- PV RUSKIN , SD36 - - - - 1 17" MA223 120/1 O 0 0400® FSD 1-5 TOILET RUSKIN FSD36 - 14 - 1 7" MA.220 1 20/1 0 c300® FSD 1-6 ELEV. 1,142H FM RUSKIN FSD36 - 1 6x 16 - 17" MA220 129/1 (1D ®®( ® FSD 1 -7 CORR.DGR RC SKIN rSD36 - -C2 - E•3 - 20" MA220 12C/1 @ 01721:2© FSD 1 -8 NOT USED RUSKIN FSD36 - 10 - 0 - - MA220 120/1 (D 1 0 . FSD 1-9 CORRIDOR RUSKIN FSD36 -C2 - 3,3 - 20" '.1A220 120/1 j ,:1)©0 FSD 1-10 1ST LOBBY RUSKIN FSD36 -C: - ' 4 - : 1 » - ; = MA220 ' 20/1 : ( - FSD 1 -11 1ST LOBBY RUSKIN FSD36 - 10 "a - `4A220 120/1 D 3OCr O FSD 1 -10 1ST LOBBY RUSKIN FSD36 VOC-2 2'x13 - • -._` MA220 120/1 @ 0(._.J, ;.,, FSD 1 -11 NOT USED - - - - _ 2 ' ) 1 - - ( T ) 0C - 53, (i) FSD 2 -1 2ND NORTH RUSKIN FS060 - =0x209 - I - " 41 120/1 ';J l_Jcc.® FSD 2 -2 2ND SOUTH RUSKIN FSD60 - 2.:9x16 e - 1 7' MA•20 120/1 IJ OOOO FSD 2- 3 2ND RETURN RUSKIN FSD36 - °Dx213 - 17" EM D 120/1 ® .. 4O0© FSD 2 -4 2ND RETURN R'T;SKIN FS036 - __ -.20 - 17" EM 10 120/1 0 ® ® ®( ) FSD 2 -5 2ND 'CORRIDOR RUSKIN F -IC2 - - P _ -' - 17" MA n 130 T •'@ FSD 2 -6 2ND LOBBY RUSKIN - .;D36 - F., 17" OP-` 6 I 1fI ®0O® FSD 2 -7 2ND CORRIDOR RUSKIN 1 F - % - " - 17" ',IA22T 120/1 'TO ®C )(-6-) FSD 2 -8 2ND CORRIDOR RUSKIN FTP_''6 - - 2 - - 1 7' :'A22D 120/1 ::I 0® ®( FSD 2 -9 2ND CORRIDOR RUSKIN FSD36 -C2 - 8x8 - 17" MA220 120/1 0 ® ®®® 1ST FLOOR ZONE VAV TERMINAL BOX SCHEDULE ZONE AREA SERVED BOX SIZE BOX SIZE KW .A -e,-1 r DESIGN = RIM. _ tG', -R :M _ '_ =RIM. v•1X ('L ' 275 -R.M. VIN (2) 6 . E • 3) A VET' i t4` /ENT :O 5; - , Fvl _ _ -- W - GS Z ? ?i1 201 1 -1 LTC -, 705 CFR -EH- 218 -2 -_- 236 _.FR -EI; -1018 E._ ?35 590 - _ ' ;.5 - ....:.E. _ - - -- - I 'L 25 - 3 CF=,._ - 2'J/ 10 CFR - LH -0806 2:: 265 65 _ : - - - - 2 -5 - (:U -2 ' 15 14. i COMP LAB -6 = =R -EH -1018 '305 365 345 _:T 25 Office 210 390 785 785 265 265 60 - 5 --2 - CFR -EH -0811 _50 660 y , 65 - -- - ' - 1 -6 OPEN OFFICE CFR _H 101 1 410 :' , , 5 __ , -EH -1018 _ ; '65 - yU • . 7 C=D ---+ -'221 • 745 •O' 5 390 :95 =- - - ... 1 A - -8 :ORR - fr, e 203 CRP -_'i -7306 400 4C0 '75 1R5 1 35 - 75 - 1a -.3 VOC-2 - 1 - 1 H - : , ' , . ; CFR -EH -1018 • -._` ':30 5:O 'C i : - - - _ , __ - 2 ' ) 1 - •12 95 FR-EH- E06 315 15 T - 90 _= •F,a -- _ - -, _ 2' 1 ;ffice 205 . - LH - , ,L 1 7 OPE:v v- - ::E 'OS CRR- EH,D8' 1 13C -'0 195 965 - 5 - - _ ',.,, ., 7-1H- 87 , 2 ,C: ,45 CFR -FH -0811 15 ^C) ;-_ -- • nn 213 Office 219 FH 713 910 910 265 265 - P _ -' DEC �- • 470 _ _ 130 - __ - _ __ I , , ,' 1rp F., 1 OP-` 6 :' _/5 _FR -EH-1018 - . 80 4'_ - 5 247 - 5 - - _ .. 'fk C, . a ... .' -. -. u7 1 -15 -7 ' 65 Cr R L • 13 7 265 -= 336 9 C t LO r , . I I, )�y • 70 - _. - -1 65 - R -LH -0611 `.. 525 315 -J . : _ F,. .. „ _ i7 . _ : - CFR -EH -'718 , 365 = iT _` _" 20 5.00 ,� ;,1.. VDC 1 - - - 219 Conference 223 FH- '9•'” 815 815 430 165 - ? ;=F•: - ,- F 930 CF -EH 1O'8 '5 335 4 _ = 2: -- _ 1 7j 480 2 305 • 20 Reception Desk - =R ; H -0911 -315 - '016 - 5 22: .._5 _- a 2 C 221 Copy /Work 202 ' :; =x `,C:Hi111,,, ; 7A. - 610 " PAL:xVA, 665 1A I ,. ,,I 165 21 T.,.1 740 �P _-1_ •18 - 22 STVUT - i I: :P -:■-'- 911 025 - 6 25 •iZ5 1 -23 V:D., -_ CFR -EH -1018 37, .117 ij _35 1 - 24 C- .t- c•1: LOHB` -FR -E - ..° .100 '000 _?•J o5 - 1 -25 FACULI CFR - EH - 01511 355 L5 625 _ _ - - . 1 "PRIAA kAAt" cr:. mil',; ;n , .,Al l Ice rn,, ^,or,..1 2ND FLOOR ZONE VAV TERMINAL BOX SCHEDULE VAV ZONE AREA SERVED BOX SIZE VALE C'M KW .A -e,-1 •.:;K -: DESIGN = RIM. RIM. MA (I`. RIM. �ALVF v (3) ,ENi (4) .'ENT - IF ti rAI•1 DEM SPEED KW ' .TGS DT Z ? ?i1 201 open office -.. i -..LH - -122 4 ' 705 ;,` 1'; /PH 595 236 , . 8 RVER RM. 3.00 VFC18F -1 ;.5 202 Open Cff,ce ,. I < -EH -0811 195 I 'L 25 1 65 5:, 2'J/ 10 I - 3.25 50 17 _' J- ,_ 0' O ■f - „ I a -EH -0806 :65 :,;5 (:U -2 ' 15 14. i ,1:10 .5 3 50 372 =.=3W ;'30/1 204 Office 210 R -EH - 1018 785 785 265 265 60 - 840 - 2 4 7 205 rH -EH -1018 ll :65 '6 ' - - 2._ 206 .1 6 , -EH -1018 LEFT TO RIGHT (LtoR) ; '65 h'' yU • . - ' 2 207 CL _.,_ !'2 H � 00 175 1 A - 228 - fr, e 203 2 LH :)71 ;5 :75 85 1 35 - - 1a 279 ' I • , ; : n a l Room - 1 - 1 H - : , ' , . ; • 715 2.35 500 -, - _ 2 ' ) e . r e n c e f H -., ' I ; 95 295 9, 150 , • 0 - 2' 1 ;ffice 205 . - LH - , ,L 1 7 'OS , , • �_ 60 965 - 5 211, ',.,, ., 7-1H- 87 , 1,_ ,45 'dT 15 ^C) ;-_ -- • nn 213 Office 219 FH 713 910 910 265 265 60 - 970 - 21 7 1 I , , ,' 1rp F., 90 :' _/5 - _ .. 'fk C, . a ... .' -. -. u7 :G(1 , -. ' 65 _ -, 9 C t LO r , . I I, )�y • 70 .''n 'J 65 3i F,. .. „ LH -0811 5;) -eG • 5`� .. _ `, -EH- 1 2, .4 ,� ;,1.. , t,,'. - - 219 Conference 223 FH- '9•'” 815 815 430 165 130 220 930 7 220 Conference 228 1 ;' He', 480 480 305 165 155 - 515 7 221 Copy /Work 202 ' :; =x `,C:Hi111,,, ; 7A. l' -',S' III-' - (`I !Al ( IRI,,,,, 610 " PAL:xVA, 665 1A I ,. ,,I 235 n.. ,.". i. .,.u, 165 120 - 740 7 7 .. 1o,i DUCT HEATER SCHEDULE H A <'_A SERtvED '.cE '!. M ODEL KW -LFCTPICAL r S _ _ CONT. .OLT. REMARKS AFL0w C -;_ 7:7EDN ARFANGEV,.'4T VOLTS /PH SIG - 2 -1 -v -2 9 _:E_'A F_O 1.520 S.i Z ? ?i1 i 20x' 3 I T 22 :15 OD 24 `�' 2 3 P TO L 1'; /PH I I . FY , . t RVER RM. ANL VFC18F -1 ;.5 == -1 C ) AIR F LO'n I (Riot_) 25 781 '30/1 2'J/ 10 I . „ 2;. ' 50 17 _' J- ,_ 11( 1 j) Ri GHT TO LEF AIR FLOW ICI I: /DArA PM, TRANNi 'WI (:U -2 ' 15 14. i ,1:10 0 .5 0 2: 372 =.=3W ;'30/1 - I x2Ox1 GREENHECK So 1320 0.30 1433 1032W 120/10 1-) 75 I® ® 1 LEFT TO RIGHT (LtoR) D.X. FAN COIL SCHEDULE (SPLIT SYSTEM) J - ,d 4, SER` --'== L tr :N n? A SERVED 4K l_ MOGUL MAI . "I -I `111 REMARKS i 1'I i,', . . 7 KN f I ECM! ! = T „� •DHT •.'-E:K .,8 - -5 1.520 ��� :15 ; M C., M SP •1 .,'�. - 1i- 1'; /PH '. :A . FY , . t RVER RM. ANL VFC18F -1 ;.5 == -1 C ) .5 =J 25 781 '30/1 2'J/ 10 I . „ 2;. ' 50 17 _' J- ,_ 11( 1 j) ' 2 ICI I: /DArA PM, TRANNi 'WI (:U -2 ' 15 14. i ,1:10 0 .5 0 2: 372 =.=3W ;'30/1 - I x2Ox1 GREENHECK So 1320 0.30 1433 EXHAUST FAN SCHEDULE J - ,d 4, SER` --'== MAKE MODEL L 'AN PERFORMANCE DATA VOLT TS A''GT. - B,. REMARKS C,M S.? RPM HP -_ C ROOM •.'-E:K .,8 - -5 1.520 C 6 :15 1 '20/10 100 \ 1) 41® E F - 2 EL_ . M.:._I -. -I•A ?_ -',1-2' SO-B 600 2.4 407 1/6 '20/10 00 i rI I ,1, •.J `J == -1 15 _R A.1.. ," R,.' - EENHECK : - =J _.375 781 35W 2'J/ 10 75 0® n) -_ 13 FLR MM. TV - TIHECK _SP -275 - :_ 2 3'5 :31 775W '20/10 , 5 O ® , EF -.r H'. 7 .DAi PBX M -_ , -_,s ':SP- 260 50 0 2: 372 =.=3W 120 /'a •,J 1 IEF -4 LAN AREA #227 GREENHECK CSP -265 1320 0.30 1433 1032W 120/10 1-) 75 I® ® SPLIT SYSTEM CONDENSING UNIT SCHEDULE J - ,d vKf_ M')DE NIT 'E ;Nu; t 1 1' -:- . ,.; !UHT BS MAi:KS . T.. /r V!'� ' T 1 1 - 1 . • - A N L ' 7 3 0 1 7 C I iC -1 250/1 I1 30 ITO) :a1 - 7 ,.";I ' - gn,.1 ; . . ,, - 2 230/' 14n i `0 LESS TI-IAN 3 SOFT. M42.- .D 3 TO 6 SOFT. MA230 6 TO 10 SOF EM1C 10 TO 25 S ." MA.4'9 EACH ADDITIONAL 25 SOFT !• - ROOFTOP AIR CONDITIONING UNIT /HEAT PUMP SCHEDULE 1 At4A A, -9 - 2 A :• Al, -4 AC -5 5651'. ;4, t91ti.; +A4t y _. .. " Y 1'S�ist ' ' .' 2 AA .. 62 1 51A'1. FAjie e1 ", fct2 R ei 9,;t 11. . �- )rC .364.. 4 `s .1$3 4 Y • 4.1 IJ .M= - 9, b7 CJ SINE-'_2 POW'_'? POINT CONNECTION. EC TO PROVIDE DISCONNI CT. O COMPLETE WITH FIELD INSTALLED. FACTORY SUPPLIED LOW AMBIENT KIT Ol SINGLE POWER POINT CONNECTION LC T) PROVIDE DISCONNECT. ® OPTIONS TO INCLUDE: THERMAL EXPANSION VALUE. 03 I15V. 1.5 AMP CONDENSATE PUMP, BECKETT MODEL CU- 19LS - -IUL, ® i 1 EI_D VERIF'' 'HAT CONDENSATE PUMP IS RFOIJIPED. 0 HAS TO MONIT,1R CONDENSATE ALAPM SW'TTH. 0 NO SPRING 'JP. NEOPRENE ISOLATION REI;.! VVED. _•M - ro9 -I" - -o • 5 =3 RUSKIN FIRE DAM=E' x C,,T TiRESTAT A = < 10" A = 9" 0 ALL SMOKE DETECTION AND DAMPER WIR BY EC ANJ PPE LIFE SAFETY CONTRACTOR ® ELECTRONIC 'USABLE LINK OPTION OR 2Oi)MANDA= E "F;=E STAT" OPTION (165 F CLOSURE 03 REFER TO MFGR'S LISTED INSTALLATION STR,;CTIONS FOR ACTUAL CONNECTION DETAILS. 04 SLEEVE TO BE 16 GAGE GALVANIZED SHEET METAL. O QUALIFICATIONS: UL555 CLASSIFICATION AND LABELING `• A 1-1/2 HR 'PE DAMPER UL555 LEAKAGE RATED (SMOKE) DAMPER CLASSIFIC.ATIOI, AND LABEL LEAKAGE CLASS II O DUCT ACCESS PANELS SHALL BE PROVIDED AT EACH FSD AND LOCATED SUCH THAT UL LABEL IS VISIBLE FOR INSPECTION, PER UBC 713.10, 713.12, & UL555. ACTUAT:-..; DAMPER AREA AND 453 F HI LIMIT) MIHP '3 1.3 FURNISHED BY M C. SEPARATE POWER CONNECTION HY E.C. " AV L'E.-' - .kY.e•x :- 6= WALL THICKT,_SS + 3" C= MIN. MIN DAMPER LENGTH= A +B +C (17" STD. WHEN A -6 20" STD WHEN A =9") ' 41 9111E V W..i.> r•. IN on ='_ T. MC E L DEMO IN STATEFARM TI r54 LJ E: 1 i SFAALI ElE Pg1011[ J Al ^ SY E YET A. 0►PE , - - ,At'; .e11►. 6E t"fii d" e ^`t LFE 5.1.Fe t CONTwe. T R. PRE L::' SP4tTt COIn'RACTGR grill£ i'ROMC POWER TO Siack.i iTE.B afS ANC C'E'ECIOPS C =55 , °L': A_ _N.' A`. r_ .A LARM SYSTEM ° LJP'P" 0.4 `V . XTECTaR; i+. !; D BY v = . s'YC �• _ & il; CONTRACTOR M Z.. TO stOLNT SMENM IETECTORIN OUCIMPCARIK .E: A4 :MIT AS . : OLAR€D. tie" 'N'S AC-1. 2€. Cif OCTAL. ` 120 VAZ = ';7N: T% i• E.0 S IRAN% ": 8L AiiI CT CONNt: :•ED ITC - r.&S'E Sr - _ r VJ " °C Ca= wJTER CO? N'ECri'DN N' REDUCED PRESSIJPf ask ;rx'VENTOR PROVIDED AKO tASTA'!"ED BY P.C. CPT10Ns '1K,cikE I JCZ , JA i;k+'r 9L LB 19RC: ECC €; M Zf R :NC •A= r'NANt_AL COOLING ARE CAPABLE OF OPEPAIING Site "mE'' JT75LY. CPTKO+S Y, JD% FACTOR" CLi.B QP1109.3 . 4C, C71'4TRI_:iS CAAAtit E Or S;,IRc. Y A:= 1 EMFERtAT; RE. RESET. _`PiK 1 sr _ _ "_ D . C' T HEATER t9Id9 4.0•X „r : _ CPDONS ' G. QE, t'O "JRIZEB 122 'IR L.AM. - _R 'C CLOSE O,.R :NG NTE SETBACK. ^PTt1011 Nt_Xlf. - TPA* ;A9e' ? FACTOR! �_R8, 100% _CONDVvZER. AC -2C & 42-2: ', HAVE HOT WATER HEATING °C'_''1. AC -20 & -21 RETURN CAM?ER SHALL BE A UL555S RATIO DAMPER. _,RTION 04 LLDE: 14EAI P.AO.' MTH LICTRIC BACM -8t o "it CTIMCIt fe :A WS r'= ✓ " 5 27 5 17 - LA; 53 ' ?J U E.C. TO PROVIDE POWER & DISCONNECT. DUCT HEATER TLPPUED WITH: CONTROL TRANSFORMER, MERCURY CONTACTOR, AND AIRFLOW SWITCH. .3 CONTROLS CONTRACTOR TO SEQUENCE AS SECOND STAGE OF HEAT PER SHEET M -0_ RECESSED TERMINAL BOX REQUIRED (FOR NSTALLATION ON DUCT BOARD OR SOUND LINED SHEET METAL). 1 E C SHALL •P2V :DE MANJAL MOTOR STARTER WITH OVERLOAD PROTECTION. 2 FAN 'S CONT ROLLED BY 'LINE- VOLTAGE T -STAT. T -STAT FURNISED BY M.C., INSTALLED BY E.C. 3, AI: JMAT'C MOTOR STARTER WITH HOA SWITCH PROVIDED AND INSTALLED BY :"...C. E_C. SHALL POWER COIL CIRCUIT. 141 DISCONNECT PROVIDED AND INSTALLED BY E.C. S E \FAUST FAN F:JRNISHEJ 'WITH BDD. 8 6 FAN FURNISHED WITH SPEED CONTROLLER, WIRED BY E.G. 7 EXHAUST FAN CONTROLLED BY B.A.S. TO MAINTAIN 8O' SETPOINT BY C.C. 4,2 !dTx 25.1 M a05 J MASTER VAV TERMINAL BOX SCHEDULE (FAN POWERED BOX) Z ITN..• _4,4 1O iR -£,i9 1 1'24 :M!i•J -Ti. .•?t Die Tk -r}t 666 1119E _1__ :sR - W'5 - ';iPO TEC :tR -y..N 61 ARC - 1EC '81 :ib?t . :FR -_H • DI : ',APO iCL :FP - CH _•918 'Tit o T;', :FR -EN 318 FT+ -EH - - -EH 32' ='.IY c; - TEC :FR -EH 22' '42• • 224 - 42= '230 '430 _ 640 :FR -EH _':2tR0- TEL -':!P'J -T= xk -EH - 2 4v1R0 - TEC NIRO - T E _•VPO - -'MRO- IE.; 2 FR_:., ;FR -EH ,FR -EH -EH - EH ', E 2 " 2 -LO L0 - _0 '2 - LO •L0 .. -,144 T 3 ID 2: "PRIM MIN" SCHEC'.ULED VALUES EQUAL CIRCON 10 MUM HEATING IR FLOW". 3: VALVE MIN" SCHEDULED VALUES EQUAL CIRCON M NIMI'M COOLING AIR FLOW" AND "MINIMUM . NG AIR = _C`W' THIS VALUE CORRESPONDS WITH THE PRESSURE TRANSDUCER LOWER LIMIT OF .04" WC OF "A:' ED' VELOCiTV PRESSURE ACROSS THE FLOW MEASURING DEVICE AS DE- ERM'NED FROM DATA PUBLISHED BY THE VAV 'V.CA MAN' FACTHREp •1`a i ' N S "M to x= t- _ &C 'tC SOD '� 8 L, ) 18 (2 F ;N. It 'T 3 '6 /2 '/2 j /4 /4 7 _ c . t Ot ALL HEATERS 5.9 •IW AND SMALLER TO BE 272./1., -'.EA.TERS 6.2 KW AND LAP3ER TO BE 460V/30 ALL FAN I1C'ORS ARE 277V/10. ALL TERMTi t C ARE SINGLE POINT ROW= =% CO'ANECT`ON. .) DISCONNECT RROV :DEJ AND 'NSTALL ED BY E.C. 0 HEATERS APE ON O SCHARGE OF UNIT- © 277 TO 24 VAC CONTROL TRANSFORMER. 05 HEATERS SHALL HAVE VERC. CONTACTORS. 06 DOC CONTRC, SYSTEM S CAPABLE OF PROGRAMI A 5 DEGREE DEAD BAND BETWEEN HEATNG AND COC:LNG. 07 ALL VAV BOx =S TO COME N /THREE POSITION R: ;.RY SW:S.;H OPTION ® ROOM SENSOR PLSH BUTTON SHALL BE USED 7C OVERRi;:E DE= VENT CFM SET-'NG TO VALUE IN VENT • COLUMN (SEE SEQUENCE OF OPERATO`,t). 09 STARTER TO HAVE 1" S :NTLINER PER GENERAL NOTES, "EMF.8A.RT HEAT IS BY C.C. VAV BOXES ': REMA :T7 OFF DUPING CONSTRUCT FILTERS PROVIDED WITH BOXES TO REMAIN .N FACE DURING :.'RMAL OPER:A7 :ON. •F S C_. NE:OT'AT_S KITH HP TO USE VAV BOXES FOP, TEMPORARY HEAT JUR" ,.: CCNSTR:,CT.G A. POST CONSTRUCTION F LTERS NIL BE REQUIRED AT ADD COST. 2: "PRIM M N" SCHEDULED VALUES EQUAL- CIRCON 'MaxIMLM - EATING AIR FLOW" 3: 'VALVE MIN" SCHEDULED VAL_U::S FO AL CIRCON "MtNIMIIM C IDLING AIR FLOW" ANT) " MINIMUM ,: A' n,,; A,R =LOW THIS VALUE CORRC :;PONDS Wi1H THE PRESSURE TRANSDUCER IC':VFR UMIT OF 04" WC. OF "AMPLF'ED" VELOCITY PRESSURE ACROSS THE FLOW MEASURING DEVICE AS DETERMINED FROM DI '1 H; ' LISTED BY THE VAV :•OX MANUFACTURER. 4. 'VENT" SCHEDI `✓ALUES EQUAL CIRCON "MINIMI'M I RUIN 11A FLOW THIS IS THE MINIM .1 GUANT -1' OF OUTSIDE AIR RECUIRED DURING NORMAL OCCUPIED MODE. 5: "VENT il'RIDE" CHEDULED VALUES EQUAL CIRCON "MINIM M T?ESH AIR FLOW OVEIR'DF:." TH :S THE M'NiU V QI ANTITY OF TS::DE AIR R QI:IREC DURING VENT OVERIDE ROOM CENSOR PUSI'TTUTTON SHALL BE UTILIZED TO OVERIDE PEFAUI T 'VENT" CFM TO '`VENT O / RIDE" CFM ,REFERENCE SE( . NCE OF OPERATIONS) 7: EXISTING VAV BO OX PREVIOUSLY PERMITTED. DUCTWORK TO BE MODIFIED TO NEW LAYOUT. REBALANCE DIFF'ISERS. RESCHEDULE VAV BOX SETTINGS. APPROVED FOR CONSTRUCTION AMP'S F V' 4.442 1 .' • 1 .L_AN e.EV■T4N1 5r0V2 _€3? : "APL. .i� OPPROW OCT 2 3 2002 U Mite) 4. 'VENT" SCHEDULED VALUES EQUAL CIRCON "MINIMI M FRESH AIR ELDN." THIS IS THE MINIMUM C ANTICV CF cL 2F A•R REQUIRED OUR NORMAL '_OCCUPIED MO_IE ij X 7''1 5: "VENT O'RIDE" SCHEDULED VALUES EJU'AL CIRCON "MINIMUM ,- RES. AIR FLOW OVERIDE." THIS IS THE MINIM ;; T OJ-j DL AIP 0i IPED DURING VENT OVERIDE PERIOD. ROOM SENSOR PUSHBUTTON SHALL BE UTILIZED TO OVERIDE DEFAULT 'VENT" CFM TO VENT O'R :DE" CFM. ,REFERENCE SEQUENCE OF OPERATIONS) 6: E.C. TO PROVIDE TWO 12CVAC CONTROL CIRCUITS PER FLOOR 7: SHELL & CORE VAV PREVIOUSLY PERMITTED RECEIVED Cr 7FrLfv:;,W OCT 1 62002 PERMIT CFNTEp PERIOD. PENDING CITY APPROVAL appro ved: w dote: v7101 2 0 I E'I' T S Y '2? a F- n Z codd the name: N C V W 44 CO Z 0 U yA z Z � V N J dote of lost revision: 10 /14/02 M 4206 0 n CL 0 0 D > 20 J S 20" A = = A = 9" ROOFTOP AIR CONDITIONING UNIT /HEAT PUMP SCHEDULE 1 At4A A, -9 - 2 A :• Al, -4 AC -5 5651'. ;4, t91ti.; +A4t y _. .. " Y 1'S�ist ' ' .' 2 AA .. 62 1 51A'1. FAjie e1 ", fct2 R ei 9,;t 11. . �- )rC .364.. 4 `s .1$3 4 Y • 4.1 IJ .M= - 9, b7 CJ SINE-'_2 POW'_'? POINT CONNECTION. EC TO PROVIDE DISCONNI CT. O COMPLETE WITH FIELD INSTALLED. FACTORY SUPPLIED LOW AMBIENT KIT Ol SINGLE POWER POINT CONNECTION LC T) PROVIDE DISCONNECT. ® OPTIONS TO INCLUDE: THERMAL EXPANSION VALUE. 03 I15V. 1.5 AMP CONDENSATE PUMP, BECKETT MODEL CU- 19LS - -IUL, ® i 1 EI_D VERIF'' 'HAT CONDENSATE PUMP IS RFOIJIPED. 0 HAS TO MONIT,1R CONDENSATE ALAPM SW'TTH. 0 NO SPRING 'JP. NEOPRENE ISOLATION REI;.! VVED. _•M - ro9 -I" - -o • 5 =3 RUSKIN FIRE DAM=E' x C,,T TiRESTAT A = < 10" A = 9" 0 ALL SMOKE DETECTION AND DAMPER WIR BY EC ANJ PPE LIFE SAFETY CONTRACTOR ® ELECTRONIC 'USABLE LINK OPTION OR 2Oi)MANDA= E "F;=E STAT" OPTION (165 F CLOSURE 03 REFER TO MFGR'S LISTED INSTALLATION STR,;CTIONS FOR ACTUAL CONNECTION DETAILS. 04 SLEEVE TO BE 16 GAGE GALVANIZED SHEET METAL. O QUALIFICATIONS: UL555 CLASSIFICATION AND LABELING `• A 1-1/2 HR 'PE DAMPER UL555 LEAKAGE RATED (SMOKE) DAMPER CLASSIFIC.ATIOI, AND LABEL LEAKAGE CLASS II O DUCT ACCESS PANELS SHALL BE PROVIDED AT EACH FSD AND LOCATED SUCH THAT UL LABEL IS VISIBLE FOR INSPECTION, PER UBC 713.10, 713.12, & UL555. ACTUAT:-..; DAMPER AREA AND 453 F HI LIMIT) MIHP '3 1.3 FURNISHED BY M C. SEPARATE POWER CONNECTION HY E.C. " AV L'E.-' - .kY.e•x :- 6= WALL THICKT,_SS + 3" C= MIN. MIN DAMPER LENGTH= A +B +C (17" STD. WHEN A -6 20" STD WHEN A =9") ' 41 9111E V W..i.> r•. IN on ='_ T. MC E L DEMO IN STATEFARM TI r54 LJ E: 1 i SFAALI ElE Pg1011[ J Al ^ SY E YET A. 0►PE , - - ,At'; .e11►. 6E t"fii d" e ^`t LFE 5.1.Fe t CONTwe. T R. PRE L::' SP4tTt COIn'RACTGR grill£ i'ROMC POWER TO Siack.i iTE.B afS ANC C'E'ECIOPS C =55 , °L': A_ _N.' A`. r_ .A LARM SYSTEM ° LJP'P" 0.4 `V . XTECTaR; i+. !; D BY v = . s'YC �• _ & il; CONTRACTOR M Z.. TO stOLNT SMENM IETECTORIN OUCIMPCARIK .E: A4 :MIT AS . : OLAR€D. tie" 'N'S AC-1. 2€. Cif OCTAL. ` 120 VAZ = ';7N: T% i• E.0 S IRAN% ": 8L AiiI CT CONNt: :•ED ITC - r.&S'E Sr - _ r VJ " °C Ca= wJTER CO? N'ECri'DN N' REDUCED PRESSIJPf ask ;rx'VENTOR PROVIDED AKO tASTA'!"ED BY P.C. CPT10Ns '1K,cikE I JCZ , JA i;k+'r 9L LB 19RC: ECC €; M Zf R :NC •A= r'NANt_AL COOLING ARE CAPABLE OF OPEPAIING Site "mE'' JT75LY. CPTKO+S Y, JD% FACTOR" CLi.B QP1109.3 . 4C, C71'4TRI_:iS CAAAtit E Or S;,IRc. Y A:= 1 EMFERtAT; RE. RESET. _`PiK 1 sr _ _ "_ D . C' T HEATER t9Id9 4.0•X „r : _ CPDONS ' G. QE, t'O "JRIZEB 122 'IR L.AM. - _R 'C CLOSE O,.R :NG NTE SETBACK. ^PTt1011 Nt_Xlf. - TPA* ;A9e' ? FACTOR! �_R8, 100% _CONDVvZER. AC -2C & 42-2: ', HAVE HOT WATER HEATING °C'_''1. AC -20 & -21 RETURN CAM?ER SHALL BE A UL555S RATIO DAMPER. _,RTION 04 LLDE: 14EAI P.AO.' MTH LICTRIC BACM -8t o "it CTIMCIt fe :A WS r'= ✓ " 5 27 5 17 - LA; 53 ' ?J U E.C. TO PROVIDE POWER & DISCONNECT. DUCT HEATER TLPPUED WITH: CONTROL TRANSFORMER, MERCURY CONTACTOR, AND AIRFLOW SWITCH. .3 CONTROLS CONTRACTOR TO SEQUENCE AS SECOND STAGE OF HEAT PER SHEET M -0_ RECESSED TERMINAL BOX REQUIRED (FOR NSTALLATION ON DUCT BOARD OR SOUND LINED SHEET METAL). 1 E C SHALL •P2V :DE MANJAL MOTOR STARTER WITH OVERLOAD PROTECTION. 2 FAN 'S CONT ROLLED BY 'LINE- VOLTAGE T -STAT. T -STAT FURNISED BY M.C., INSTALLED BY E.C. 3, AI: JMAT'C MOTOR STARTER WITH HOA SWITCH PROVIDED AND INSTALLED BY :"...C. E_C. SHALL POWER COIL CIRCUIT. 141 DISCONNECT PROVIDED AND INSTALLED BY E.C. S E \FAUST FAN F:JRNISHEJ 'WITH BDD. 8 6 FAN FURNISHED WITH SPEED CONTROLLER, WIRED BY E.G. 7 EXHAUST FAN CONTROLLED BY B.A.S. TO MAINTAIN 8O' SETPOINT BY C.C. 4,2 !dTx 25.1 M a05 J MASTER VAV TERMINAL BOX SCHEDULE (FAN POWERED BOX) Z ITN..• _4,4 1O iR -£,i9 1 1'24 :M!i•J -Ti. .•?t Die Tk -r}t 666 1119E _1__ :sR - W'5 - ';iPO TEC :tR -y..N 61 ARC - 1EC '81 :ib?t . :FR -_H • DI : ',APO iCL :FP - CH _•918 'Tit o T;', :FR -EN 318 FT+ -EH - - -EH 32' ='.IY c; - TEC :FR -EH 22' '42• • 224 - 42= '230 '430 _ 640 :FR -EH _':2tR0- TEL -':!P'J -T= xk -EH - 2 4v1R0 - TEC NIRO - T E _•VPO - -'MRO- IE.; 2 FR_:., ;FR -EH ,FR -EH -EH - EH ', E 2 " 2 -LO L0 - _0 '2 - LO •L0 .. -,144 T 3 ID 2: "PRIM MIN" SCHEC'.ULED VALUES EQUAL CIRCON 10 MUM HEATING IR FLOW". 3: VALVE MIN" SCHEDULED VALUES EQUAL CIRCON M NIMI'M COOLING AIR FLOW" AND "MINIMUM . NG AIR = _C`W' THIS VALUE CORRESPONDS WITH THE PRESSURE TRANSDUCER LOWER LIMIT OF .04" WC OF "A:' ED' VELOCiTV PRESSURE ACROSS THE FLOW MEASURING DEVICE AS DE- ERM'NED FROM DATA PUBLISHED BY THE VAV 'V.CA MAN' FACTHREp •1`a i ' N S "M to x= t- _ &C 'tC SOD '� 8 L, ) 18 (2 F ;N. It 'T 3 '6 /2 '/2 j /4 /4 7 _ c . t Ot ALL HEATERS 5.9 •IW AND SMALLER TO BE 272./1., -'.EA.TERS 6.2 KW AND LAP3ER TO BE 460V/30 ALL FAN I1C'ORS ARE 277V/10. ALL TERMTi t C ARE SINGLE POINT ROW= =% CO'ANECT`ON. .) DISCONNECT RROV :DEJ AND 'NSTALL ED BY E.C. 0 HEATERS APE ON O SCHARGE OF UNIT- © 277 TO 24 VAC CONTROL TRANSFORMER. 05 HEATERS SHALL HAVE VERC. CONTACTORS. 06 DOC CONTRC, SYSTEM S CAPABLE OF PROGRAMI A 5 DEGREE DEAD BAND BETWEEN HEATNG AND COC:LNG. 07 ALL VAV BOx =S TO COME N /THREE POSITION R: ;.RY SW:S.;H OPTION ® ROOM SENSOR PLSH BUTTON SHALL BE USED 7C OVERRi;:E DE= VENT CFM SET-'NG TO VALUE IN VENT • COLUMN (SEE SEQUENCE OF OPERATO`,t). 09 STARTER TO HAVE 1" S :NTLINER PER GENERAL NOTES, "EMF.8A.RT HEAT IS BY C.C. VAV BOXES ': REMA :T7 OFF DUPING CONSTRUCT FILTERS PROVIDED WITH BOXES TO REMAIN .N FACE DURING :.'RMAL OPER:A7 :ON. •F S C_. NE:OT'AT_S KITH HP TO USE VAV BOXES FOP, TEMPORARY HEAT JUR" ,.: CCNSTR:,CT.G A. POST CONSTRUCTION F LTERS NIL BE REQUIRED AT ADD COST. 2: "PRIM M N" SCHEDULED VALUES EQUAL- CIRCON 'MaxIMLM - EATING AIR FLOW" 3: 'VALVE MIN" SCHEDULED VAL_U::S FO AL CIRCON "MtNIMIIM C IDLING AIR FLOW" ANT) " MINIMUM ,: A' n,,; A,R =LOW THIS VALUE CORRC :;PONDS Wi1H THE PRESSURE TRANSDUCER IC':VFR UMIT OF 04" WC. OF "AMPLF'ED" VELOCITY PRESSURE ACROSS THE FLOW MEASURING DEVICE AS DETERMINED FROM DI '1 H; ' LISTED BY THE VAV :•OX MANUFACTURER. 4. 'VENT" SCHEDI `✓ALUES EQUAL CIRCON "MINIMI'M I RUIN 11A FLOW THIS IS THE MINIM .1 GUANT -1' OF OUTSIDE AIR RECUIRED DURING NORMAL OCCUPIED MODE. 5: "VENT il'RIDE" CHEDULED VALUES EQUAL CIRCON "MINIM M T?ESH AIR FLOW OVEIR'DF:." TH :S THE M'NiU V QI ANTITY OF TS::DE AIR R QI:IREC DURING VENT OVERIDE ROOM CENSOR PUSI'TTUTTON SHALL BE UTILIZED TO OVERIDE PEFAUI T 'VENT" CFM TO '`VENT O / RIDE" CFM ,REFERENCE SE( . NCE OF OPERATIONS) 7: EXISTING VAV BO OX PREVIOUSLY PERMITTED. DUCTWORK TO BE MODIFIED TO NEW LAYOUT. REBALANCE DIFF'ISERS. RESCHEDULE VAV BOX SETTINGS. APPROVED FOR CONSTRUCTION AMP'S F V' 4.442 1 .' • 1 .L_AN e.EV■T4N1 5r0V2 _€3? : "APL. .i� OPPROW OCT 2 3 2002 U Mite) 4. 'VENT" SCHEDULED VALUES EQUAL CIRCON "MINIMI M FRESH AIR ELDN." THIS IS THE MINIMUM C ANTICV CF cL 2F A•R REQUIRED OUR NORMAL '_OCCUPIED MO_IE ij X 7''1 5: "VENT O'RIDE" SCHEDULED VALUES EJU'AL CIRCON "MINIMUM ,- RES. AIR FLOW OVERIDE." THIS IS THE MINIM ;; T OJ-j DL AIP 0i IPED DURING VENT OVERIDE PERIOD. ROOM SENSOR PUSHBUTTON SHALL BE UTILIZED TO OVERIDE DEFAULT 'VENT" CFM TO VENT O'R :DE" CFM. ,REFERENCE SEQUENCE OF OPERATIONS) 6: E.C. TO PROVIDE TWO 12CVAC CONTROL CIRCUITS PER FLOOR 7: SHELL & CORE VAV PREVIOUSLY PERMITTED RECEIVED Cr 7FrLfv:;,W OCT 1 62002 PERMIT CFNTEp PERIOD. PENDING CITY APPROVAL appro ved: w dote: v7101 2 0 I E'I' T S Y '2? a F- n Z codd the name: N C V W 44 CO Z 0 U yA z Z � V N J dote of lost revision: 10 /14/02 M 4206 0 n CL 0 0