Loading...
HomeMy WebLinkAboutPermit M01-121 - AVIATION PARTNERSMO1-.121 Aviation Partners 3215 S 116 St ., City of Tukwila' Permit No: M01 -121 Type: B -MECH Category: NRES Address: 3215 S 116 ST Location: Parcel #: 092304 -9066 Contractor License No: MECHANICAL PERMIT (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Status: ISSUED Issued: 08/06/2001 Expires: 02/02/2002 TENANT AVIATION PARTNERS Phone: 3215 S 116 ST, TUKWILA WA 98188 OWNER BEDFORD PROPERTIES INC 12720 - GATEWAY DR., SUITE 107, SEATTLE WA 98168 CONTACT ALAN WELLS Phone: 253 939 -9495 899 WEST MAIN, AUBURN, WA 98001 **•*** k** * ** *•k *** **'k **** * ****** ******* tit *k ** *** * *k * ** **** * **** Permit Description: Z re 2 0 0 . to w N � . .�-- '`� end',, ■ .., W O : Permit er Authorized Signature Date I hereby certify that I have read and examined this permit and know the u.a same t o be true and correct. All provisions of law and ordinances D 0, governing this work will be complied with whether specified herein or not. w O ; D 0 0 N 0 1- W . F _Cr-6-el Title: 1 ✓- �h.fa� u. WI co Z ; O ~ ' Z INSTALL 1 ADDITIONAL 4 TON COOLING GAS HEAT ROOF TOP A /C.AND ASSOCIATED DUCT UMC Edition: 1997 Signature: Print Name: Valuation: Total Permit Fee: * * * * * *, * * *. ** iii** * * ** * * * * * * * * * * * * * * * * ** *• * * * * * ** tit * * *•k * ** *tit ** **tit * * * * * * * * * * * * * ** 6,000.00 59.81 The granting of this permit does not presume to give authority to violate or "cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building p rmit. Date: .4 6 , 2---c PEA/ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period. of 180 days from the last inspection. Signature: CITY OF TUKWILA Address: 3215 S 116 ST Permit No M01-121 Suite: Tenant: AVIATION PARTNERS Status: ISSUED Tvpe: B-MECII , Applied: 07/17/2001 .Parcel #: 092304-9 Issued: 08/06/2001 gele*********** k*.k.k.Vkleit.k.k i k*** A . A VA.*** k A t k fr k i c h i fi e k****.4*Pi k***4-4.r k Permit Conditions 1. Readily acceJssible access to roof mounted equipment is required. . Any exposed insulations-backing material shall have a Flame Spread Rating of 25 or 'less, and material shall bear identi- ', fication showing the fire performance rating thereof. 3. Plumbing permits shall be obtained through the Seattle-King County Department of Public Health. Plumbing will be inspected by that agency, including all gas PiPin9 Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be :inspected, by that agency (248-66u). 5 No changes will be made 'totheP1an:! unless approved by the Engineer Tukwila,Building'Division. 6. Alljpermitssi inspection records, and approved plans shall be available a t job site prior to the start of any con- strUction. 'These documents are to be maintained and avail- , ableuntil ,final inspection approval is granted. 7 . Alliconstruction to be done in conformance with approved plan sand recitiirements of the Uniform Building Code (1997 Edition) as 'aMended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 8. Vall of -Permit. The issuance of a Permit or approval of ,plans . specifications, and computations shall not be con- strued be a permit for, or an approval of, any violation of any of"the.provisions of the building code or of any " other ordinance the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall he valid. ' . r.., . Manufacturer's installation instructions required on site for the building inspector. review S;Jlereb)i certify thatin.have read these Conditions and will comply • with them are a outlined All provisions of law and orOinances governing , , this work will be complied' with whether specified herein or not The .granting of this permit does notpresilMe to give authority to Violate or cancel the provisions of any other work or local laws :regulating constructio/ or the performance of work. ''• • Trint Name: Date: Project Name pant: r /gnDrtl i /iggi, '3 13bF74et. Value of Mechanicaluipment: 4 Site A ddress : Print name: City State /Zip: Tax Parcel Number: Address:. 7 f44it✓ City/State/Zip. A c.t1F ), �.gt. 9 s o I . Property Owner: 400 ice -5717L Ir k. Au 4Ale.6� ter« / p,-.,7 .r 4 Phone: ) 7g3- �z79 Street Address: • 2- //j City-Slate/Zip: Fax #: ( ) Contractor: Phone: . ( .2 6-3 ) Street Addre s: X 99" ZA..) e r l City State/Zip: u i.:t,7,4 ..e .14 , , ion, Fax #: ( ) Contact Pe le City State/Zip: .4'zrP zA/- 4 1. r e44 9-g-z) W 1 Phone: ( ) Fax #: ( ) 9:39- -9/9 Street A dress: (S' 4- e }E f "BUILDINGIOWNER:OR'AUTHORIZED AGENT: Signature: ',d Gt ` ee- --) Date: 7 ,/ �/, /f7 Print name: Phone: (� ) "04,. Fax #: ( ) Address:. 7 f44it✓ City/State/Zip. A c.t1F ), �.gt. 9 s o I . 11/1/99 nwecb pennit.doc CITY OF IKWILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 !OR STAI L USE ONLY Project Nur, . Permit Number: Mechanical Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. MECHANICAL PERMIT REVIEW AND APPROVAL: REQUESTED: (TO BE FILLED OUT 'BYAPPLICANT) Description of work to be done (please be specific): / .9 J 7o4J cs» z- �.��.,- c -•gs •ys- �-- Current copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent: If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PER JURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 114.4 of the Uniform Mechanical Code (current edition). No application shall be extended more than once. Date application accepted: ? -/ 7o/ Date application expires: /- /q - O2 Application taken by: (initials) ✓ Submittal Requirements Floor plan and system layout Roof plan required to identify individual equipment and the location of each installation (Uniform Mechanical Code 504 (e)) Details and elevations (for roof mounted equipment) and proposed screening Heat Loss Calculations or Washington State Energy Code Form #H -7 . H.V.A.C. over 2,000 CFM (approximately 5 ton and larger) must be provided with smoke detection shut- off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical Code 1009). Specifications must be provided to show that replacement equipment complies with the efficiency ratings and other applicable requirements of the Washington State Nonresidential Energy Code. Structural engineer's analysis is required for new and the replacement of existing roof equipment weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be stamped by a Washington State licensed Structural Engineer. Mechanical Permits COMMERCIAL: Two complete sets of drawings and attachments required with application submittal NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. RESIDENTIAL: Two complete sets of attachments required with application submittal 11/2/99 ndscp,U.doc Submittal Requirements New. Single Family Residence Heat loss calculations or Form 11-6. Equipment specifications. Change - out or replacement of existing mechanical equipment Narrative of work to be done, including modification to duct work. Installation of Gas Fireplace NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. Narrative with specification of equipment and chimney type. If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney is in safe condition. *A****A******.A*A****-A* YettY', W. ' TRANSMIT 1*NSKT.:Tt440)0.1' :.A1Mountt 59.81 08/06/01 09:10 1 Notation: IECS INC Init: SKS ., ,._. ......„.,....-, ,.: : • 1 No; M01-121 Type: O-MECH MECHANICAL PERMIT ila No: 092304-9066 • 1e 3215 S 116 ST Total Fees:,. 39.81 1;i'ttPay,mentj 59.81 Total ALL Pmts.; 59.81 Oalanee: .00 ?" ,Dea Amount PLAN CHECK - NONRES 11.96 000/322. = .MECHANICAL NONRES 47.85 IVV4N71 . = .... , 1 •?-• tfe; • () 7779 00/07 9716 TOTAL 5941 Project: . Type f.Inspe t ddress: 1 Date called: g 1 Special • instructions: r Date wante • 8 a/ Requester: P ifur o Ire: (4) 355 -aal/ INSPECTION NO.. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd,: #100,' Tukwila, WA 98188 Approved per applicable codes. INSPECTION RECORD Retain a copy with permit (206)431- 3670. Corrections required prior to approval. COMMENTS: i .' Inspector: 7.00 REINSPECTION FJ E REQUIRED. Prior inspection, fee must be paid at 6300 Southcenter Blvd. Suite 100. Call to s hedule reinspection. e ceipt No: ate: a Date: Pr ect: ' ._/_,-. a/ a 7% Tc of Inspection: tbt_ c1q — i I'M Address: ' ' N ; . :' . 5 r- Date tall 9 Rib 01 Special instructiOns: .. . • 1 4 7 rz. . 1 EV • • R5ou7sterk Phone: t, INSPECTION RECORD Retain a .copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter1310,..#100, Tukwila, WA 98188 s 5g..Approved per applicable codes. COMMENTS: — ficA0 1 P■ oeik`,),e- -c - 1-kt Insp Receipt :No: Acid V 7 Corrections required prior to approval. Date: ate: PERMIT NO. (206)431-3670 INSPECTION FEE ItQUIRED. Prior to nsjfection, fee must be paid Southcenter Blvd., Suite 100. Call to schedu reinspection. 4 !STING OFFICE A1.bC.7VW21.= Mil 1 rs 1 /y " \ 3411"x20 GA STL STNS • 24" O.C. TO I0' AFF, %" GYP. BD EACH SIDE, R- II 8ATT INSTIL. EXISTING OFFICE ALIGN tUALL W/ W NDOW rn • *.. .0%.1113 MEANS of DISGONN ,T ISPC 'SECTION 30(9.2 • 'Flail OS ` - czUtCE. IZIECEVTA.CLE • • f l • ALITOMAit 6HEP-MDSTAT • I , i S W/ 1'V1I (4, -5EL)E bat - C4FJ4431-.G OF 73EI J4 XIT WA r ~ j1/pEs LOSea H-- - r V OFFICE I 1 I r- vI1 NEW 6' CAB (TtA 1141 YI m i c a 1n m Imw "w rti6 I lar.w STOREFRONT TO MATCH EXISTING - -J J in .1041 Cs-AS`. " A/ 4 L TIC LAM LW SINK ALIGN WALLS S' -0" 'ILEE COPY EXISTING OFFICE EXISTING OFFICE (ENLARGED) __/ ECEIVED CI OF TUKWILA PERMIT CENTER UNIT DIMENSIONS GAS HEAT / ELECTRIC COOLING PACKAGE SUPPLY GAS ENTRY 1 /2" [13 mm] NPT 7 (183 mm] 2" [51 mm] FLUE OUTLET COMBUSTION AIR INLET 9 [243 mm] 6 [173 mm] BASE GAS ENTRY 44 [1121 mm] Rheem Manufacturing Company 46 11181 mm) 24 [616 mm] BURNER ACCESS COMPRESSOR/ CONTROL BOX ACCESS 2" [51 mm] 3 TO 6 TON 18" [457 mm) 75 [1918 mm] 9 [233 mm] 72 01 0 [1835 mm) . .6 TO 21.1 kW] MODELS 11 BASE ELECTRICAL ENTRY 14 [367 mm] 35" (889 mm) POWER ENTRY [238 mm] CONTROL ENTRY 2" [51 mm] BOTTOM VIEW [ ] Designates Metric Conversions • 1�' , UNIT DIMENSIONS GAS HEAT / ELECTRIC , .. , COOLING PACKAGE 31 16" [792 mmj 3 [97 mm] SUPPLY COVER SUPPLY AND RETURN DIMENSIONS [ 1 Designates Metric Conversions 76 [1937 mmj RETURN COVER o. • • • 00 I - fi • SUPPLY 19 AIR [486 mm] 4:1 • '4 RETURN AIR FILLER PANEL. • 00 $ r 12 [311 mm] 76 [1937 mm] 5 (140 mm 3 TO 6 TON [10.6 TO 21.1 kW J MODELS COIL/FILTER ACCESS 48 [1221 mmj BLOWER ACCESS 511/ (136 mm) CONDENSATE DRAIN 3 /4" [19 mm] NPT FEMALE 6 [174 mm ] 19 4 486 mm] [125 mm] 12 [311 mm] 13 [602 mm] • 35" [889 mm] Rheem Manufacturing Company 5 Model No. RKMA- ELECTRICAL PHYSICAL Phase Ph Compressor Full Load Amperes (FLA) Minimum Circuit Ampacity Amperes Fuse or HACR Circuit Breaker Drive Type • • Filler Recommended No. and Size (mm x mm x mm1 Outdoor Coil R22 Oz. [g1 Weight Frequency (Hz) Voltage (Volts) Rated Load Amperes (RLA) Locked Rotor Amperes (LRA) Fan Mo Blower Motor Minimum Amperes Maximum Amperes Area Sq. Ft. ISq. m] No. Rows CFM [L /s l Net Lbs. [kg) Ship Lbs. [kg] A048CK08 3-60-208/230 13.5/13.5 120 2.0 3.0 22/22 30/30 35/35 Direct (2) 1 x 16 x 25 [25 x 406 x 635] 16 11.5421 2.00 3700 [1746] 176 [4990] 580 [263.11 587 [266.3] A048CK10 3 -60- 208/230 13.5/13.5 120 2.0 3.0 22/22 30/30 35/35 Direct (2) 1 x 16 x 25 [25x406x635] 16.6 [1.542] 2.00 3700 [1746] 176 [4990] 580 [263.1] 587 [266.3] A048CK13 3-60-208/230 13.5/13.5 120 2.0 3.0 22/22 30/30 35/35 Direct (2) 1 x 16 x 25 [25 x 406 x 635] 16 [1.542] 2.00 3700 [17461 176 [4990] 585 [265.4] 592 [263.5] A048C108 3-60-208/230 13.5/13.5 120 2.0 2.8 22/22 30/30 35/35 Belt (2) 1 x 16 x 25 [25 x 406 x 635] 16 [1.542] 2.00 3700 [1746] 176 [4990] 580 [263.1] 587 [266.3] A048CL10 3 -60- 208/230 13.5/13.5 120 2.0 2.8 22/22 30/30 35/35 Belt (2)1 x 16 x 25 [25x406x635] 16 [1.542] 2.00 3700 [1746] 176 [4990] 580 [263.1] 587 [266.31 A046CL13 3-60-208/230 13.5/13.5 120 2.0 2.8 22/22 30/30 35/35 Belt (2) 1 x 16 x 25 [25 x 406 x 635] 16 [1.542] 2.00 3700 [1746] 176 [4990] 585 [265.4] 592 [268.5) A048CM08 3 -60- 208/230 13.5/13.5 120 2.0 3.4 23/23 30/30 35/35 Belt (2) 1 x 16 x 25 [25 x 406 x 6351 16 [1.5421 2.00 3700 [1746] 176 [4990) 580 [263.1] 587 [266.3] A048CM10 3- 60- 208/230 13.5/13.5 120 2.0 3.4 23/23 30/30 35/35 Belt (2)1 x 16 x 25 [25 x 406 x 635] 16 [1.542) 2.00 3700 [17461 176 [4990] 580 [263.1] 587 [266.3] A048CM13 3-60-208/230 13.5/13.5 120 2.0 3.4 23/23 30/30 35/35 Belt (2) 1 x 16 x 25 [25 x 406 x 635] 16 [1.542) 2.00 3700 [1746] 176 [4990] 580 [263.1) 587 [266.3] 3- 60-460 7.4 49.5 1.0 1.4 12/12 15 15 Belt (2)1 x 16 x 25 [25 x 406 x 635] 16 [1 2.00 3700 [1746) 176 [4990] 580 [263.1) 587 [266.31 ` A0481X08 A048DL10 3 -60 -460 7.4 49.5 1.0 1.4 12/12 15 15 Belt (2) 1 x 16 x 25 (25x406x635] 16.6 [1.542] 2.00 3700 [1746] 176 [4990] 580 (263.1 ] 587 [266.3) A048DL13 3-60-460 7.4 49.5 1.0 1.4 12/12 15 15 Belt (2) 1 x 16 x 25 [25 x 406 x 635] 16 [1.542] 2.00 3700 [1746] 176 [4990] 585 [265.4] 592 [268.5] A048DM08 3 -60 -460 7.4 49.5 1.0 1.6 12 15 15 Belt (2) 1 x 16 x 25 [25 x 406 x 635] 16.6 [1.542] 2.00 3700 [1746] 176 [4990] 580 [263.1) 587 [266.3] A048DM10 3 -60 -460 7.4 49.5 1.0 1.6 12 15 15 Belt (2)1 x 16 x 25 [25 x 406 x 635] 16 [1.542] 2.00 3700 [1746] 176 [4990] 580 [263.11 587 [266.3) ( 48DM13 3 -60 -460 7.4 49.5 1.0 1.6 12 15 15 Belt (2)1 x 16 x 25 [25 x 406 x 635] 16 [1.542] 2.00 3700 [1746] 176 [4990] 580 [263.1] 587 [266.3] A048DKO8 3 -60 -460 7.4 49.5 1.0 2.0 13 15 15 Direct (2)1 x 16 x 25 [25 x 406 x 635] 16 [1.542] 2.00 3700 [1746] 176 [49901 580 [263.1] 587 [266.3] A048DK10 3-60-460 7.4 49.5 1.0 2.0 13 15 15 Direct (2) 1 x 16 x 25 [25 x 406 x 635] 16 [1.542] 2.00 3700 [1746) 176 [4990] 580 [263.1] 587 [266.3] A048DK13 3-60-460 7.4 49.5 1.0 2.0 13 15 15 Direct (2) 1 x 16 x 25 [25 x 406 x 6351 16 [1.542] 2.00 3700 117461 176 [4990] 580 [263.1] 587 [266.3] A048JK08 1 -60- 208/230 23.7/23.7 129 2.0 3.0 35/35 45/45 50/50 Direct (2)1 x 16 x 25 [25 x 406 x 635] 16 [1.542] 2.00 3700 [1746] 176 [4990] 580 [263.1) 587 [266.3] A048JK10 1- 60- 208/230 23.7/23.7 129 2.0 3.0 35/35 45/45 50/50 Direct (2)1 x 16 x 25 [25 x 406 x 635) 16 [1.542] 2.00 3700 [1746) 176 [4990) 580 [263.1) 587 [266.3] A048JK13 1 -60- 208/230 23.7/23.7 129 2.0 3.0 35/35 45/45 50/50 Direct (2)1 x 16 x 25 [25x406x635] 16 [1.542) 2.00 3700 [1746] 176 [4990) 585 [265.4) 592 [268.5] A PHYSICAL &E LECTRICAL DATA -HIGH EFFICIENCY (Cont. [ ] Designates Metric Conversions NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. RKKA - /RKMA- Heating Input MBTUH [kW] Heating Output MBTUH [kW) AFUE California Seasonal Efficiency Temp Rise °F [ °C] A036JK08 80 [23.4] 62.5 [18.3] 80 75.5 30 -60 [16.5 -33.5) A036JK12 120 [35.2] 94.5 [27.7) 80 76.5 50 -80 [28.0 -44.5] A042JK08 80 [23.4] 62.5 [18.3] 80 75.5 30 -60 [16.5 -33.5) A042JK12 . 120 [35.2) 94.5 [27.7] 80 76.5 50 -80 [28.0-44.5] 48JK08') 80 [23.4] 62.5 [18.31 80 75.5 30 -60 [16.5 -33.5] A048JK10 100 129.3] 78.5 [23.0) 80 75.5 40 -70 [22.0-39.0] A048JK13 135 [39.6] 106.5 [31.2] 80 76.5 50 -80 [28.0-44.5) A060JK10 100 [29.3) 78.5 [23.0] 80 75.5 40 -70 [22.0-39.0] A060JL10 100 [29.3] 78.5 [23.01 80 75.5 25 -55 114.0 -30.51 A060JK13 135 (39.6] 106.5 [31.2] 80 76.0 40 -70 [22.0 -39.0) A060JL13 135 [39.6) 106.5 [31.2] 80 76.0 40 -70 [22.0 -39.0] RKKA- C CFM (L /s) N Net Total N Net Sens N Net Latent S SEER E EER S Sound Rating (db) A036 1 1200 [566) 3 36 [10.56) 2 26.5 [ [7.741 9 9.5 [ [2.78) 1 10.2 9 9.40 7 78.0 1400 [661] 4 42 [12.30] 3 32 [ [9.36) 1 10 [ [2.93] 1 10.0 ^ ^ 9 9.05 7 78.0 A048 1 1600 (755) 4 48 114.10] 3 35.5 [ [10.38] 1 12.5 [ [3.661 1 10.4 9 9.80 7 78.0 AU 2 2000 [944) 6 60 [17.55) 4 44 [ [12.90] 1 16 [ [4.69) 1 10.1 9 9.30 7 78.0 A072 2 2200 [1038] 7 70 [20.40) 4 49.5 [ [14.55] 2 20.5 [ [6.01) - - 9 9.50 8 83.0 A073 2 2200 (1038) 7 72 [21.10] 5 51.5 [ [15.09] 2 20.5 [ [6.01) - - 9 9.80 8 83.0 A085 2 2850 [13451 8 85 [24.90) 6 63.4 [ [18.60) 2 21.6 [ [6.30] - - 9 9.10 8 83.0 Net Total Net Sens Net Latent SEER EER Sound Rating (db) MBTUH [kW) MBTUH [kW] MBTUH [kW] A036 1200 [566) 36 [10.56] 27 [7.92] 9 [2.64] 12.0 10.5 78.0 1400 [661] 40.5 111.85] 31 [9.06] 9.5 [2.78) 12.0 10.4 78.0 A048 1600 [755] 48 [14.101 35.5 [10.38] 12.5 [3.66] 12.0 10.4 78.0 1-- A660 1900 [897] 58.5 [17.10) 43 [12.60] 15.5 [4.54] 12.0 10.5 83.0 Heating Input Heating Output Steady California Temp Rise RKKA - /RKMA- MBTUH (kW] MBTUH [kW] State Seasonal °F 1°C) Efficiency % Efficiency A036'K08 80 [23.4] 62.5 [18.3) 78.1 75.5 30 -60 [16.5 -33.5] A036 *L08 80 [23.4] 62.5 [18.3] 78.1 76.0 35 -65 (19.5 -36.0] A036•K12 120 [35.2] 94.5 [27.7) 78.8 76.5 50 -80 [28.0 -44.5) A036'L12 120 [35.2) 94.5 [27.7) 78.8 76.5 50 -80 (28.0 -44.5) A042'K08 80 [23.4] 62.5 [18.3) 78.1 75.5 30 -60 [16.5 -33.5] A042'L08 80 [23.4] 62.5 [18.3] 78.1 75.5 30 -60 [16.5 -33.5] A042'K12 120 [35.2] 94.5 [27.7] 78.8 76.5 50 -80 [28.0 -44.5] ' 2 120 [35.2] 94.5 [27.7] 78.8 76.5 50 -80 [28.0 -44.5] ' OB 80 [23.4] 62.5 [18.3) 78.1 75.5 30 -60 [16.5 -33.5] Ai481.08 80 [23.4] 62.5 (18.3) 78.1 75.5 30 -60 [16.5 -33.5] A0481K10 100 [29.3] 78.5 [23.01 78.5 75.5 40 -70 [22.0 -39.0) A0481L10 100 [29.3) 78.5 [23.01 78.5 75.5 30 -60 [16.5 -33.5] A0481(13 135 [39.6) 106.5 [31.2] 78.9 76.5 50 -80 [28.0 -44.5] A0481.13 135 [39.6] 106.5 [31.2] 78.9 77.0 50 -80 [28.0 -44.5] - A060'K10 100 [29.31 78.5 [23.0] 78.5 75.5 40 -70 [22.0 -39.0] A060'L10 100 [29.3] 78.5 [23.0] 78.5 75.5 25 -55 [14.0 -30.5] A0601K13 135 [39.61 106.5 [31.2] 78.9 77.3 40 -70 (22.0 -39.01 A0601L13 135 (39.6] 106.5 (31.21 78.9 76.0 40 -70 [22.0 -39.0] RKKA- A072/A073 "10 100 [29.3] 78.5 [23.0] 78.5 75.5 20 -50 [11.0 -28.0) RKKA- A072/A073 "13 135 [39.6] 106.5 [31.2] 78.9 75.0 30-60 [16.5 -33.5] RKKA-A085'L13 135 [39.6) 106.5 [31.2) 78.9 75.0 20 -50 (11.0 -28.0] RKKA•A085'L13T 13 5/74.25 [39.6/21.7P' 106.5/58.5 (31.21/17.141 78.9/78.9 75.0 20-50 [11.0-28.0] COOLING PERFORMANCE DATA STANDARD EFFICIENCY COOLING PERFORMANCE DATA -HIGH EFFICIENCY HEATING PERFORMANCE DATA - SINGLE PHASE HEATING PERFORMANCE DATA . o or Y Voltage; L or M Drive Package 10 14tifem Manufacturing Company i.�A ��ti.• THREE PHASE signates Metric Conversions e1 ttvi. 4:4" 14+4 :4.4,44 lt h 5�k +. i'z{s:.v:Y�S`X V'�N(!3}t•4:f+':4S: anti. �l�1$' atv' AYA 'J.tYAi'jrYhY1� a:l L3 Heating Input Heating Output Steady California Temp Rise RKKA - /RKMA- MBTUH (kW] MBTUH [kW] State Seasonal °F 1°C) Efficiency % Efficiency A036'K08 80 [23.4] 62.5 [18.3) 78.1 75.5 30 -60 [16.5 -33.5] A036 *L08 80 [23.4] 62.5 [18.3] 78.1 76.0 35 -65 (19.5 -36.0] A036•K12 120 [35.2] 94.5 [27.7) 78.8 76.5 50 -80 [28.0 -44.5) A036'L12 120 [35.2) 94.5 [27.7) 78.8 76.5 50 -80 (28.0 -44.5) A042'K08 80 [23.4] 62.5 [18.3) 78.1 75.5 30 -60 [16.5 -33.5] A042'L08 80 [23.4] 62.5 [18.3] 78.1 75.5 30 -60 [16.5 -33.5] A042'K12 120 [35.2] 94.5 [27.7] 78.8 76.5 50 -80 [28.0 -44.5] ' 2 120 [35.2] 94.5 [27.7] 78.8 76.5 50 -80 [28.0 -44.5] ' OB 80 [23.4] 62.5 [18.3) 78.1 75.5 30 -60 [16.5 -33.5] Ai481.08 80 [23.4] 62.5 (18.3) 78.1 75.5 30 -60 [16.5 -33.5] A0481K10 100 [29.3] 78.5 [23.01 78.5 75.5 40 -70 [22.0 -39.0) A0481L10 100 [29.3) 78.5 [23.01 78.5 75.5 30 -60 [16.5 -33.5] A0481(13 135 [39.6) 106.5 [31.2] 78.9 76.5 50 -80 [28.0 -44.5] A0481.13 135 [39.6] 106.5 [31.2] 78.9 77.0 50 -80 [28.0 -44.5] - A060'K10 100 [29.31 78.5 [23.0] 78.5 75.5 40 -70 [22.0 -39.0] A060'L10 100 [29.3] 78.5 [23.0] 78.5 75.5 25 -55 [14.0 -30.5] A0601K13 135 [39.61 106.5 [31.2] 78.9 77.3 40 -70 (22.0 -39.01 A0601L13 135 (39.6] 106.5 (31.21 78.9 76.0 40 -70 [22.0 -39.0] RKKA- A072/A073 "10 100 [29.3] 78.5 [23.0] 78.5 75.5 20 -50 [11.0 -28.0) RKKA- A072/A073 "13 135 [39.6] 106.5 [31.2] 78.9 75.0 30-60 [16.5 -33.5] RKKA-A085'L13 135 [39.6) 106.5 [31.2) 78.9 75.0 20 -50 (11.0 -28.0] RKKA•A085'L13T 13 5/74.25 [39.6/21.7P' 106.5/58.5 (31.21/17.141 78.9/78.9 75.0 20-50 [11.0-28.0] COOLING PERFORMANCE DATA STANDARD EFFICIENCY COOLING PERFORMANCE DATA -HIGH EFFICIENCY HEATING PERFORMANCE DATA - SINGLE PHASE HEATING PERFORMANCE DATA . o or Y Voltage; L or M Drive Package 10 14tifem Manufacturing Company i.�A ��ti.• THREE PHASE signates Metric Conversions e1 ttvi. 4:4" 14+4 :4.4,44 lt h 5�k +. i'z{s:.v:Y�S`X V'�N(!3}t•4:f+':4S: anti. �l�1$' atv' AYA 'J.tYAi'jrYhY1� a:l L3 COOLING PERFORMANCE DATA STANDARD EFFICIENCY COOLING PERFORMANCE DATA -HIGH EFFICIENCY HEATING PERFORMANCE DATA - SINGLE PHASE HEATING PERFORMANCE DATA . o or Y Voltage; L or M Drive Package 10 14tifem Manufacturing Company i.�A ��ti.• THREE PHASE signates Metric Conversions e1 ttvi. 4:4" 14+4 :4.4,44 lt h 5�k +. i'z{s:.v:Y�S`X V'�N(!3}t•4:f+':4S: anti. �l�1$' atv' AYA 'J.tYAi'jrYhY1� a:l L3 Load Express: Load CalctMbon Software General Job Job Description: Building Owner. Program User: Comments: Program was Run: Dataset Name: Alternative 1 AIt1 Geographical Data Location: - Weather Fie: Seattle, Washington Latitude: 47 deg Elevation: 386 ft 7/ 3/01 at 6:51:46 PM C:ICDSILOADEXPIDATAIPRLARY.LE Design Data Summer Dsn Dry Bub Summer Dsn Wet Bull Winter Design Dry Bull Density -Sp Heat Prodi Design Simulation peri 80.0 deg F 64.0 deg F 26.0 deg F 1.0988 Btu- min/(hr ft3-F) Apr To Nov Version 2.2 Title Page Building Peak Data Month/Hour. Jul / 15 Cooling Capacity: 163.8 Mbh Cooling Sensible: 152.8 Mbh Sensible Heat Ratio (SHI 0.933 Heating Capacity -66.7 Mbh NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE, TO THE _QUALITY, OF THE DOCUMENT. Load Express: Load Calculation Software Setternative - 1 Ntl Air Handler Type 1 BYPASS Zone 1 Type Commercial Retail Zone/Air Handier Descriptions Descripdon AHU1 Description Zonel • Version 22 Zone/Air Handler Descriptions NOTICE: IF THE DOCUMENT IN THIS .FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. - • J Load Express: Load Ca culation Software Alternative 1 Alt1 General Job Data Weather Location: Seattle, Washington Weather Region: Northwest CIg Simulation Start Month: Apr CIg Simulation End Month: Nov Zone Data Alternative Number 1 Zone Number. 1 Floor Width: 47 ft Floor Length: 38 ft Ceiling Height: 10 ft FIr4o -Flr Height: 10 ft No. of Dup Zones: 1 Ceiling U - Factor. 0.00 Btu/(hr F Floor Calculation Type: Slab -On -Grade Floor Loss Coefficient: 0.00 Btu/(hr - F ft) Floor Perimeter Length38.00 ft W H ft ft WALL 1 47 x 10 GLASS 1 25 x 8 WALL 2 37 x 15 WALL 3 37 x 15 WALL 4 47 x 15 ROOF 1 47 x 38 Type 4" H.W. Concrete, 2" Ins Single Coated 1/8 in. 8" Common trick, 2" Ins 8" H.W. blk, 2" Ins Frame wall, 5" Ins 4" Wood deck, 8" Ins, SusClg 1 -2 Story Office Building Opening Time: Building Closing Time: Building Direction: Clg Sensible SF: Cooling Dry Bulb: Relative Humidity: Heating Dry Bulb: People Density: People Activity: People Sensible Load: People Latent Load: Misc. Equip. Type: Misc. Equip. Sensible Loac Misc. Equip. Latent Load: Misc. Equip. Sensible to R/ Lighting Intensity: 0.12 Dark 1.00 0.10 Dark 0.11 Dark 0.05 Dark 0.04 Dark 0 RA 0 Plenum 8 am CIg Latent SF: 0 6 pm Htg Sensible SF: 0 0 People Diversity: 100% 0.00 Bldg Simulation Type: Cooling and Heating 75 deg F 50% 68 deg F 32 people General Office Space 250 Btuhlpers 255 Btuh/pers Std appliances 0.50 Btuh 0.00 Btuh 0 Btuh 6.00 Watt/ft2 North West East South North Yes Version : Zone Input 0 Ballast Factor: 4.00 % Percent Light to RA 50 % Vent Type: General Office Space Vent Cool Design: 20.00 cfm/pers Vent Heat Design: 20.00 cfm/pers Supply Cool Design: 0 cfm Supply Heat Design: 0 cfm Infiltration Type: Pressurized, Tight Construction Infilt. Cooling Desig 0.00 achlhr Infilt. Heating Desig 0.00 ach/hr Room Exhaust: 195.00 cfm Lighting Type: ecessed fluorescent, not vented U- Factor Color Percent ( %) Direction Susp Cell Tdt Cool Adj Heat Adj Dimension % Glass Shading Coeff Shad Spc Temp Spc Temp deg F deg F 0 0 0 O 0 0 Area 0 0 0 0 0 0 0 0 0 O 0 0 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. 0.00 0.85 Exte 0.00 0.00 0.00 0.00 iAir Handler 1 Fan Configuration: Fan & Molar Efficiency: Cooing Supply Air Temp: Healing Supply Air Temp: lYtitvinium Relative Humidity: Supply Fan Static Pressure: Return Fan Static Pressure: BYPASS AHU1 Draw 56.00% 55.00 deg F 0.00 deg F 50 % 2.50 in H2O 2.00 in H2O Supply Duct Location: Supply Duct Insulation: Supply Duct Temp Rise: Retum Duct Insulation: Return Duct Temp Rise: Terminal Type: Total Cool Airflow: Total Heat Airflow: Zone(s) Connected: Return Air R4 Duct Insulation 0.3 degFTD R4 Duct Insulation 0.3 deg F TD BYPASS 0 cfm 0 cfm 1 Version 22 A'r Handler Input NOTICE IF THE DOCUMENT IN THIS,FRAME IS LESS CLEAR THAN :T THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Load Express: Load Calculation Software ve 1 Design Heating: Airflow (cfm) Space Total Heating Coil Total Outside % O.A. Sensible Sensible Entering Leaving Humidification Ak Handler 0/Type Btuh Btuh DB DB Btuh BLDG BLOCK - 20,112.50 - 66,704.80 - 17,056.0 BLDG PEAK - 20,112.50 - 66,704.80 - 17,056.0 1 BY PASS 3,684.11 640.00 17.37 - 20,112.50 - 66,704.80 60.70 72.97 - 17,056.0 Design Cooling: Airflow (cfm) Cooling Cooling Coil Total Outside % OA Total Sensible S.H.R. Entering Leaving ft2lton cfmlton cfmIft2 Total Air Handlw fiType Btuh Btuh DB WB DB W tons B 130.81 13.7 BLDG BLOCK 163,838.00 152,805.00 0.93 BLDG PEAK 163,838.00 152,805.00 0.93 130.81 13.7 1 BY PASS 3,684.11 640.00 17.37 163,838.00 152,805.00 0.93 91.15 66.34 53.04 51.29 130.81 269.8 2.1 13.7 Building Peak Load Components Cooling (Btuh) Heating () Mohr. Sobs Cond Internal OA +M Misc Total Cond OA +Inf Misc Total Bldg 7115 5,075.3 3,956.0 143,188.0 6,389.1 5,229.9 163,838.0 - 20,112.5 - 29,536.3 - 17,056.0 - 66,704.8 Air Hand 1 7/15 5,075.3 3,956.0 143,188.0 6,389.1 5,229.9 163,838.0 - 20,112.5 - 29,536.3 - 17,056.0 - 66,704.8 Zone 1 7/15 5,075.3 3,956.0 143,188.0 6,389.1 158,608.0 - 20,112.5 - 29,536.3 - 17,056.0 -66,704.8 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN _ THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. versio2.2 Peak Load Information Load Express: Load Calculation Software Psychrometric Stabs Points - Alternative 1 Aiti Air Hand 1 AHUT Space Air Hand Rehm Pk Heat Pick Retum Fan Return Ab Outdoor Air Retum/Outdoor Air Mix Blow Through Fan Entering Col Leaving Co Draw Through Fan Supply Dud Heat Gain Supply Air Percent Outside Air Space Sensible Heat Ratio (SHR) Col Mew Dry Bub Wet Bub Temp Diff. ( deg F ) ( deg F ) ( deg F ) 75.0 60.7 93.5 80.0 91.1 91.1 53.0 17.37 % 0.946 3,684 cfm 66.9 64.0 66.3 66.3 51.3 55.0 52.1 17.2 1.3 0.0 1.6 0.3 Version 22 Psychrometrics NOTICE IF THE THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. .... Load Express: Load Calculation Software Smnslbla Load Profile (Mbh) Alternative 1 Alt1 Hour 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Air Hand 1 18 18 14 12 10 10 11 128 130 135 140 144 .148 151 153 153 153 152 37 32 28 25 22 20 Bldg 18 18 14 12 10 10 11 126 130 135 140 144 148 151 153 153 153 152 37 32 28 25 22 20 Zone 1 12 10 8 7 5 5 8 121 125 129 134 139 143 146 148 148 148 147 32 27 23 20 17 15 NOTICE: IF THE DOCUMENT IN THIS ,FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Version 2.2 Sensible Load Profile Load Express: Load Calculation Software Peak Load Summary - Altsmative 1 Ak Hand 1 AHU1 Areas ( ft2 ) Floor 1,786.0 SlabOnG/ExFtr: Roof: SkyCight: WaM: Wall Giese: Partition: 38.0 1,786.0 0.0 2,085.0 200.0 0.0 Space Sens Load Spc Sens Ld W/Sfty Fctr Cod Airflow Cool Airflw W /Sfty Fctor Cooing Check Cod Check W/Sfty Fctr Heat Airflow Heat Ai 1 w W /Sfty Fctr 81,098.9 Btuh 81,098.9 Btuh 3,684 cfm 3,684 cfm 2.06 cfm/ft2 2.06 cfm/ft2 3,684 cfm 3,684 cfm Version 2.2 Peak Load Summary Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr: Outside Air. OADB: WB: RELHUM: 7 / 15 80 64 41.8% NOTICE: W THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OFTHE DOCUMENT. Cooling Coil Peak Heating Coil Peak Total Load ( Bttrh) Sens Load Percnt of Tot ( Btuh) (%) Peak Tot Sens ( Btuh) Percnt of Tot (X► ENVELOPE LOADS Solar Skyight Solar 0.00 0.00 0.00 Glass Solar 5,075.33 5,075.33 0.00 Sub Total 5,075.33 5,075.33 3.10 0.00 0.00 Conducted Skyight 0.00 0.00 0.00 Roof 817.34 817.34 - 2,625.42 Glass 478.69 478.69 - 9,161.88 Wal 2,659.94 2,659.94 - 7,900.82 Partition 0.00 0.00 0.00 SlabOnG/Ex Ir 0.00 0.00 - 424.36 Sub Total 3,955.97 3,955.97 2.41 - 20,112.50 30.15 INTERNAL LOADS Lights 127,574.00 127,574.00 0.00 People 15,613.60 7,453.56 0.00 Misc 0.47 0.47 0.00 Sub Total 143,188.00 135,028.00 87.40 0.00 0.00 MISC LOADS Outside Air 6,389.13 3,51623 - 29,536.30 Humidification 0.00 0.00 - 17,056.00 Infiltration 0.00 0.00 0.00 Sup. Fan Heat 6,578.77 6,578.77 0.00 Ret. Fan Heat 5,263.02 5,263.02 0.00 Duct Heat Pkup 2,428.91 2,428.91 0.00 Load Express: Load Calculation Software Peak Load Summary - Altsmative 1 Ak Hand 1 AHU1 Areas ( ft2 ) Floor 1,786.0 SlabOnG/ExFtr: Roof: SkyCight: WaM: Wall Giese: Partition: 38.0 1,786.0 0.0 2,085.0 200.0 0.0 Space Sens Load Spc Sens Ld W/Sfty Fctr Cod Airflow Cool Airflw W /Sfty Fctor Cooing Check Cod Check W/Sfty Fctr Heat Airflow Heat Ai 1 w W /Sfty Fctr 81,098.9 Btuh 81,098.9 Btuh 3,684 cfm 3,684 cfm 2.06 cfm/ft2 2.06 cfm/ft2 3,684 cfm 3,684 cfm Version 2.2 Peak Load Summary Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr: Outside Air. OADB: WB: RELHUM: 7 / 15 80 64 41.8% NOTICE: W THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OFTHE DOCUMENT. Load Express: Load Calculation Software Peak Load Summary - Alternative 1 AM Air Hand 1 AHU1 Exhaust Heat Si b Total OV/UNDR Sizing Grand Total W/Safety Factor -9,040.76 -9,040.76 11,619.10 8,748.17 7.09 0.00 -48,592.30 69.85 0.00 -66,704.80 -66,704.80 0.00 0.00 163,838.00 152,805.00 163,838.00 152,805.00 • Version 2.2 Peak Load Summary NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Load Express: Load Calculation Software Peak Load Summary • Alternative 1 Att1 Bldg 1 Anus ( f 2 ) Floor: StsbOnGlExFt: Skylight Waa: Wai Glass: Partition: 1,786.0 38.0 1,786.0 0.0 2,085.0 200.0 0.0 etsamataitor Version 22 Peak Load Summary Heating Coil Peak Outside Air OADB: 26 ienvosvd Cooling Coil Peak Peaked at Time: Mohr. 7 / 15 Outside Air: OADB: 80 WB: 64 RELHUM: 41.8% NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Cooling Coil Peak Heating Coil Peak Total Load Sens Load Percnt of Tot Peak Tot Sens Percnt of Tot ( Btuh) ( Bath) (%) ( Btuh) (%) ENVELOPE LOADS Solar Skylight Solar 0.00 0.00 0.00 Glass Solar 5,075.33 5,075.33 0 Sub Total 5,075.33 5,075.33 3.10 0.00 0.00 Conducted Skyiglrt 0.00 0.00 0.00 Roof 817.34 817.34 - 2,625.42 Glees 478.69 478.69 - 9,161.88 Wai 2,659.94 2,659.94 - 7,900.82 Partition 0.00 0.00 0.00 SlabOnGlExFk 0.00 0.00 - 424.36 Sub Total 3,955.97 3,955.97 2.41 - 20,112.50 30.15 INTERNAL LOADS Lightis 127,574.00 127,574.00 0.00 People 15,613.60 7,453.56 0.00 Misc 0.47 0.47 0.00 Sub Total 143,188.00 135,028.00 87.40 0.00 0.00 MISC LOADS Outside Air 6,389.13 3,51623 - 29,536.30 Humictification 0.00 0.00 - 17,056.00 Infiltration 0.00 0.00 0.00 Sup. Fan Heat 6,578.77 6,578.77 0.00 Ret. Fan Heat 5,263.02 5,263.02 0.00 Duct Heat Pkup 2,428.91 2,428.91 0 Load Express: Load Calculation Software Peak Load Summary • Alternative 1 Att1 Bldg 1 Anus ( f 2 ) Floor: StsbOnGlExFt: Skylight Waa: Wai Glass: Partition: 1,786.0 38.0 1,786.0 0.0 2,085.0 200.0 0.0 etsamataitor Version 22 Peak Load Summary Heating Coil Peak Outside Air OADB: 26 ienvosvd Cooling Coil Peak Peaked at Time: Mohr. 7 / 15 Outside Air: OADB: 80 WB: 64 RELHUM: 41.8% NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Load Express: Load Calculation Software Peak Load Summary - Alternative 1 Alt1 Bldg 1 Exhaust Pleat Bub Total OVAJNDR Sig Orand Total IN/Safety Factor -9,040.76 -9,040.76 11.619.10 8,746.17 7.09 0.00 0.00 163,838.00 152,805.00 163,838.00 152,805.00 0.00 -46.592.30 69.85 0.00 -66,704.80 -66,704.80 Version 22 Peak Load Summary NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT _ _ _ I' Load Express: Load Calculation Software Peak Load Summary - Alternative 1 Alt Zone 1 Zonal Aroma ( ft2 ) Floor: SlabOnG/ExFlr: Roof: Skyight Wall: Wall Glass: Partition: 1,786.0 38.0 1,786.0 0.0 2,085.0 200.0 0.0 Space Sena Load Spc Sera Ld W/Sfty Fctr Cod Airflow Cod Airltw W /Sfty Fctor Cooing Check Cool Check W/Sfty Fctr Heat Airfknv Heat Ak11w W/Sfty Fctr { 80,963.6 Btuh 80,963.6 Btuh 3,684 cfm 3,684 cfm 2.06 cfm/ft2 2.06 cfm/ft2 3,684 cfm 3,684 cfm Version 2.2 Peak Load Summary Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr. Outside Air: OADB: WB: RELHUM: 7 / 15 80 64 41.8% NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Cooling Coil Peak Heating Coil Peak Total Load ( Bhdi) Sens Load Percnt of Tot ( Btuh) (%) Peak Tot Sens ( Brun) Percnt of Tot r%) ENVELOPE LOADS Solar Sky fight Solar 0.00 0.00 0.00 Glass Solar 5,075.33 5,075.33 0.00 Sub Total 5,075.33 5,075.33 3.20 0.00 0.00 Conducted Skyight 0.00 0.00 0.00 Roof 817.34 817.34 2,625.42 Glass 478.69 478.69 - 9,161.88 Wall 2,659.94 2,659.94 - 7,900.82 Partition 0.00 0.00 0.00 SlabOnG/Fk 0.00 0.00 - 424.36 Sub Total 3,955.97 3,955.97 2.49 - 20,112.50 30.15 INTERNAL LOADS Lights 127,574.00 127,574.00 0.00 People 15,613.60 7,453.56 0.00 Misc 0.47 0.47 0.00 Sub Total 143,188.00 135,028.00 90.28 0.00 0.00 MISC LOADS Outside Air 6,389.13 3,51623 - 29,536.30 Humidification 0.00 0.00 - 17,056.00 Infiltration 0.00 0.00 0.00 Sup. Fan Heat 0.00 0.00 0.00 Ret Fan Heat 0.00 0.00 0.00 Duct Heat Pkup 0.00 0.00 0.00 I' Load Express: Load Calculation Software Peak Load Summary - Alternative 1 Alt Zone 1 Zonal Aroma ( ft2 ) Floor: SlabOnG/ExFlr: Roof: Skyight Wall: Wall Glass: Partition: 1,786.0 38.0 1,786.0 0.0 2,085.0 200.0 0.0 Space Sena Load Spc Sera Ld W/Sfty Fctr Cod Airflow Cod Airltw W /Sfty Fctor Cooing Check Cool Check W/Sfty Fctr Heat Airfknv Heat Ak11w W/Sfty Fctr { 80,963.6 Btuh 80,963.6 Btuh 3,684 cfm 3,684 cfm 2.06 cfm/ft2 2.06 cfm/ft2 3,684 cfm 3,684 cfm Version 2.2 Peak Load Summary Heating Coil Peak Outside Air: OADB: 26 Cooling Coil Peak Peaked at Time: Mo/Hr. Outside Air: OADB: WB: RELHUM: 7 / 15 80 64 41.8% NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Load Express: Load Calculation Software • Peak Load Summary - Aftemetive 1 Aftl Zone 1 Zonel Extmust Heat Sub Total OVIUNDR Sizing Orand Total W/Safety Factor 0.00 0.00 6,389.13 3,51823 4.03 0.00 0.00 156,608.00 147,575.00 158,608.00 147,575.00 0.00 -46.592.30 69.85 0.00 -66,704.80 -66,704.80 Version 22 Peak Load Summary NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. _ DEPARTMENTS: 7ERMIT COORD COPY � PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER M01 -121 DATE: 07 -17 -01 PROJECT NAME: AVIATION PARTNERS - BOEING SITE ADDRESS: 3215 S. 116T SUITE NO: 121 Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # AFTER Permit Is issued Buil §ng Division Fire Prevention %dfra 'A_ 1 -0-01 ublic Works ❑ Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Ef Incomplete n r- u Planning Division Permit Coordinator n 0 DUE DATE: 07 -19-01 Not Applicable ❑ Comments: TUES /THURS ROUT NG: Please Route Structural Review Required REVIEWER'S INITIALS: V'RROUILOOC 5/TI APPROVALS OR CORRECTIONS: (ten days) Approved ❑ Approved with Conditions REVIEWER'S INITIALS: n No further Review Required n DATE: DUE DATE 08 -16 -01 Not Approved (attach comments) n DATE: CORRECTION DETERMINATION: DUE DATE Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) n REVIEWER'S INITIALS: DATE: L'.tx'+t•..uF;'Tim �;;,�,.:.' «�; t Ail�y;'r�.`.:. ; n1:.A:��i. "iz�``n >'riin7 §r:r: J'. ii lk�;it�:':.. F625- 052 -(XX) (8/97) f REGISTERED AS PROVIDED BY LAW AS CONST CONT SPECIALTY REGIST. # EXP. DATE CCCG SEATTMI038NR 11/04/2001 EF'ECTIVEr DATE!,:; :.08/19/1997 SEATTLE/ INC,; ,PO .,.BOX 192,52: I : , YlN :.. ., : %� ��, SEATTLE ..WA;:v,98109- 1252;, • Signature • Issued by DEPARTMENT OF LABOR AND INDUSTRIES • • Please Remove And Sign Identification Card Before Placing In Billfold ra A Q WALL SCHEDULE NEW 3 /8 "x24GA. STEEL 51U05 9 24" O.G. W/ 58" GYP. BD EACH SIDE TO CEILING. ROOM SCHEDULE cfzg BUILDING DATA BUILDING CODE: UBC 1991 ZONING: M -I TYPE CONSTRUCTION: III -N SPRINKLED OCCUPANCY GROUP: B OFFICE, SI WAREHOUSE TENANT AREAS: OFFICE (NET) =2928 SF.: 29 OCCUPANTS WAREHIOUSE=4422 SF. = 9 OCCUPANTS FLOOR: WALLS: CEILING: 2,3,4 FLOOR: EXISTING CARPET (CLEAN) W/ NEW RUBBER BASE ON NEW WALLS (MATCH EXISTING) WALLS: RE -PAINT AND PAINT GYP. BD. (EGGSHELL ENAMEL) CEILING: EXISTING SUSPENDED ACOUSTICAL DOOR SCHEDULE IS NOTE: MATCH EXISTING 3'- 0"x8' -0" S.G. OAK W/ OAK JAMB W/ 1 V2" (SAFETY GLASS INSULATED), PAIR BUTTS (Be) LOCKSET, WEATHERSTRIP, CLOSER, THRESHOLD, AND WALLSTOP. 2,3 3' -0 "x8 -0" S.C. OAK W/ OAK JAMS, 2 PAIR BUTTS, LOCKSET, WEATHER- STRIP, THRESHOLD AND WALLSTOP. 1llINDOU'SCHEDULE @(MATCH EXISTING) A GENERAL NOTES 1 NEW 12" DEEPx 42" HIGH PLASTIC LAMINATE COUNTER 2. PATCH AND REPAIR AS REQUIRED, MODIFY HVAC, SPRINKLER AND LIGHTING AS REQUIRED, LIGHTING CODE TENANT AREA NEW CARPET W/ RUBBER BASE (MATCH EXISTING) PAINT GYP. BD. (EGGSHELL ENAMEL) EXISTING SUSPENDED ACOUSTICAL 2,928 SFx I:!= 3513. WATTS ALLOWED EXISTING: 2'x4' 3 -TUBE FLUORESCENT PARABOLIC: 23x88= 2024 WATTS EXISTING: 2 - =TUBE WALL MOUNTED (RESTROOM): 2x88= Ilb WATTS NEW: NEW: NORTH 2'x4' 3 -TUBE (TS) PARABOLIC: 14x8S= 1232 WATTS RECESSED COMPACT FLUORESCENT: 2x25= 50 WATTS 3482 WATTS IDUUJAMISN 72.1VEI SITE PLAN N.T.S. TENANT AREA ■- 1111%111/X11►® ®Iu1 1 1= 1�1 � �1 ■.11 �11�� i1►,� 111111 11�1!lIMNIIU ___ ■ IIX111oNLJ_1111M 1 �1C�II_11 111111 1 �•U II1111� ■ �■J1 �i1I/1►_���111111 _ _= IIU® ®1- 1111111 innlic 11 /1► � ®111111 ■ ®I ® ®1® ' ®1■�01111�i I EXISTING ■! ®1m ®r®,/1,��® GYP.BD. .__I_ � ®1111�I1 1 � *fo7 ®11M11�111 EXISTING ■ ®r�21► ®1�°�1 a®0 GYP. BD. NEW WALL TO'10 ". APP. NEW GRID NOTE. INSULATION ON TOP OF CEILING TO MATCH EXISTING (2-19). REFLECTED CEILING PLAN SCALE I/8" P-0" (=To E . 116. NEW GRID VICINITY MAP N.T.S. CE) HL 'OP{ III understand that the Plan Check approvals are `subject to errors and omissions and approval of clans deer t neri violation' of adopted code nct or au o ze the Receipt of con- any tractors copy of approved plans acknowledged. Ltril By Date Permit No. R V S ONS MADE TO NO CHANGES SHALL BE 1 1., 1Y SCW'E OF 1 , ?,K WITHOUT PRiO AFFROVAL OF TUKVu1LA BUILDING D ", RDITION A NEW REVIEW FEES. h D e o M Y r INCLUDE ADDITIONAL PLAN SEPARATE PERMIT REQUIRED FOR: ❑ MECHANICAL l e ELECTRICAL 1 PLUMBING GAS PIPING CITY OF TUKWILA BUILDING DIVISION EXISTING DOOR TO REMAIN 7 NEW COUNTER TOP 42" HIGH 0' I' 4' INFILL OPENING I REMOVE EXISTING DOOR - EXISTING HANDICAPPED ACCESSABLE ENTRY GRAPHIC SCALE 32' - r - REMOVE EXISTING OVERHEAD DOOR I 1 (FIX M UP POSITION) AND INSTALL NEW STOREFRONT TO MATCH EXISTING EXISTING OFFICE EXISTING OFFICE EXISTING OFFICE 5' 1-11G4 WALL WITH IB" HIGH GLASS ABOVE EXISTING OFFICE 3%. "x20 GA STL STUDS • 24" O.C. TO 10". APP, es" GYP. BD'. EACH SIDE, R -II BATT NSUL. EXISTING OFFICE ALIGN WALL W/ WNDCW - - NEW 6' CAB NEW.FENCN FCR SECURED STORAGE (EY TENANT) NEIIJ`4 " -iGH WALL W/ (OAIU ALIGN WALLS 9, EXISTING OFFICE EXISTING OFFICE (ENLARGED/ DEMOLITION /TENANT IMPROVEMENT PLANS SCALE I /5' • 40' 48' ®_, EXISTING WALL NEW STEEL STUD WALL TO UNDERSIDE OF, CEILING EXISTING WALL TO BE REMOVED. NEW DOOR LIGHT SWITCH ,ONE-WAY ILLUMINATED EXIT SIGN 2' X 4' NEW OR RELOCATED 3'; TUBE FLUORESCENT 2' X 4' EXISTING 3 -TUBE FLUORESCENT TO REMAIN NIGHT LIGHT FOR SECURITY ON ® ALL TIMES N10 /-izI `P CC) -{CD CB) h Q b.. 0 CD 0 EXISTIILT UP CONC. PA T NEL - EXISTING OVERHEAD DR TO REMAIN IN THE UP POSITION, LOCKED 'DRYVIT' W/ MESH ON pia" GYP. SHEATHING (OVER ke ON VERT.) (U:0.09) EXISTING COLUMN NEW STOREFRONT GLAZING TO MATCH EXISTING (U•m.48) NEW CONC. BULKHEAD TO MATCH EXISTING EXISTING WALKWAY NEW STOREFRONT PARTIAL ELEVATION SCALE 1/8" I' -0" DETAIL SECTION A SCALE: 30 • I' -0" TENANT SPACE FRAMING a 24" O.C. MATCH EXISTING METAL STUDS e 24" O.G. W/ BATT INSUL. ALL TO MATCH EXISTING Its ;9Q9 il 90009 (1 SUSPENDED ACOUSTICAL TILE CEILING.. W/ R -19 INSULATION BATT °•" GYP: BD 3 i" METAL STUDS e 24" O.C.' W/ R -11 BATT IN5UL. W/ CAP TO MATCH EXISTING 'e" GYP. BBD MIL. PANTED BLACK FASTENED a MAX 6" OC. SOND CAULK PRIOR TO ATTACHNG GTP. BD. STEEL STUD BRACE • O.C. TO ROOF FURLN - ATTACH TO TOP GF WALL AND PURL IN cM r INTERIOR WALL DETAIL MOl BATT INSJLATION VERIFY W/ ENERGY CALCS. TYP. OFFICE WALL FRAMIN2 W/ BATT NSULATION 3 1/2" x 25 GA. STEEL STUDS e 24" 0/C 5/8" GYP. BD. EACH SIDE 0-0" 1 SECTION NOTE: I. USE IN SEISMIC AREA AS REO'D BY CODE 2. SUPPORTING WIRES TO BE 5 GA • 4' -0" 0/C CONNECTED TO BOTTOM CHORD OF TRUSS W/ 11/4" EYE SCREWS. EMBED I" MIN. CROSS PoJNJER MAIN RUNNER 1'SEISM G LC BRACiN BLOCK' e FOAM TAPE GRID e WALL PAINT EXTERIOR FLAT BLACK ATTACH 120110 t TRACK TO CONC. FLOOR IU/ POWDER DRIVEN ANCHORS AT. 24" 00. 2 I/2" RIBBER BASE a CARFET 22 WIDE SOUND BATTS.E4 SIDE WALL e SOUND WALL O WALL S Z SCALE: I -I/! I' -0" i INSULATION 4 O LIGHT FIXTURE PROTECTION SCALE: I -I/2" • 1'40" STALL 122 GA.VERTICAL WIRE CONNECTED TO MAN RUNNER 1 TO STRUCTURE ABOVE. INSTALL A SECTION CF RIGID STEEL CONDUIT WNERTICAL WIRE R.NNING THRU CENTER OF PIPE. PIPE TO RUIN FROM TOP OF TEE TO BOTTOM Cf STRUCTURE ABOVE. WRAP END GF VERTICAL WIRE AROUND PIPE BOTTOM. SEE ATTACHED TABLE FOR PIPE SIZE. NSTALL 12 GA WIRE CR055 BRACING M EA PLANE CF MAN RUNNER e 12' -0" 0/0 • 45 ANGLE M BOTH DIRECTIONS W/THE FIRST POINT 12171404 6' -0" FROM EA. WALL TABLE FOR PIPE SIZNG - EI1T CONDUIT - ACCEPTANCE TO 4' -0" 3 4 " - EMT CONDUIT- ACCEPTANCE TO 5' -2" I" - EMT CONDUIT- ACCEPTANCE TO 6' -6" 1 - EMT CONDUIT- ACCEPTANCE TO 8' -2" I'1 - EMT CONDUIT - ACCEPTANCE TO 9' -10" 2 EMT CONDUIT- ACCEPTANCE TO 16' -6" 3" - EMT CONDUIT- ACCEPTANCE TO 20' -2" 4" - EMT CONDUIT- ACCEPTANCE TO 26' -0" 1057 OF THE ABOVE 15 TYPICALLY STOCKED N 10' LENGTHS. COUPLINGS ARE AVAILABLE WHERE NECESSARY. VALUES ARE BASED UPON STANDARD CALCULATIONS AND 0A4 BE SUBSTANTIATED BY AND ENGNEERNG FIRM. FOR WALLS GREATER THAN 8'- 0" N WIDTH WITHOUT AN INTERSECTING WALL, PROVIDE 12ga. WIRES SPLAYED e 45' TO AN EYE SCREW • ROOF AND TOP CF WALL CONT. METAL TRIM. 5/8" GYP. BD. (TYPE' 7P • FIRE RATED WALLS) ACOUSTICAL BLANKET • SOUND WALL. CAULK GYP. BD. TO FLOOR a ALL 501140 AND NSUL. WALLS 1/2" GYP. BD. OR CEILING TILES BRACED OR STRAPPED TOGETHER TO PROVIDE AIR 0 /01447 ENCLOSURE W /INSULATION' ABOVE,- STEEL STUD 12124M10401 45 1212054/12005 PARABOLIC LENSED FLUORESCENT FIXTURE FOR RECESSED: LIGHTS IN' INSULATED SUSPENDED CEILINGS G;' SECTION SECTION SECTION U) e--I c C' J T -2 0 z 0 g 06/30/01 _018:36 am CI \CATAR724 3AVPT0Prtr, T -2:dwa „_ / NEW SOFFIT TO MATCH EXISTING NEW I" GLAZING IN ALUM. FRAMES (U•0.48) TO MATCH EXISTING NEW CONCRETE BULKHEAD TO MATCH EXISTING (FORA INSIDE) NEW vO_ i I — IIIU — � 1 EXISTIILT UP CONC. PA T NEL - EXISTING OVERHEAD DR TO REMAIN IN THE UP POSITION, LOCKED 'DRYVIT' W/ MESH ON pia" GYP. SHEATHING (OVER ke ON VERT.) (U:0.09) EXISTING COLUMN NEW STOREFRONT GLAZING TO MATCH EXISTING (U•m.48) NEW CONC. BULKHEAD TO MATCH EXISTING EXISTING WALKWAY NEW STOREFRONT PARTIAL ELEVATION SCALE 1/8" I' -0" DETAIL SECTION A SCALE: 30 • I' -0" TENANT SPACE FRAMING a 24" O.C. MATCH EXISTING METAL STUDS e 24" O.G. W/ BATT INSUL. ALL TO MATCH EXISTING Its ;9Q9 il 90009 (1 SUSPENDED ACOUSTICAL TILE CEILING.. W/ R -19 INSULATION BATT °•" GYP: BD 3 i" METAL STUDS e 24" O.C.' W/ R -11 BATT IN5UL. W/ CAP TO MATCH EXISTING 'e" GYP. BBD MIL. PANTED BLACK FASTENED a MAX 6" OC. SOND CAULK PRIOR TO ATTACHNG GTP. BD. STEEL STUD BRACE • O.C. TO ROOF FURLN - ATTACH TO TOP GF WALL AND PURL IN cM r INTERIOR WALL DETAIL MOl BATT INSJLATION VERIFY W/ ENERGY CALCS. TYP. OFFICE WALL FRAMIN2 W/ BATT NSULATION 3 1/2" x 25 GA. STEEL STUDS e 24" 0/C 5/8" GYP. BD. EACH SIDE 0-0" 1 SECTION NOTE: I. USE IN SEISMIC AREA AS REO'D BY CODE 2. SUPPORTING WIRES TO BE 5 GA • 4' -0" 0/C CONNECTED TO BOTTOM CHORD OF TRUSS W/ 11/4" EYE SCREWS. EMBED I" MIN. CROSS PoJNJER MAIN RUNNER 1'SEISM G LC BRACiN BLOCK' e FOAM TAPE GRID e WALL PAINT EXTERIOR FLAT BLACK ATTACH 120110 t TRACK TO CONC. FLOOR IU/ POWDER DRIVEN ANCHORS AT. 24" 00. 2 I/2" RIBBER BASE a CARFET 22 WIDE SOUND BATTS.E4 SIDE WALL e SOUND WALL O WALL S Z SCALE: I -I/! I' -0" i INSULATION 4 O LIGHT FIXTURE PROTECTION SCALE: I -I/2" • 1'40" STALL 122 GA.VERTICAL WIRE CONNECTED TO MAN RUNNER 1 TO STRUCTURE ABOVE. INSTALL A SECTION CF RIGID STEEL CONDUIT WNERTICAL WIRE R.NNING THRU CENTER OF PIPE. PIPE TO RUIN FROM TOP OF TEE TO BOTTOM Cf STRUCTURE ABOVE. WRAP END GF VERTICAL WIRE AROUND PIPE BOTTOM. SEE ATTACHED TABLE FOR PIPE SIZE. NSTALL 12 GA WIRE CR055 BRACING M EA PLANE CF MAN RUNNER e 12' -0" 0/0 • 45 ANGLE M BOTH DIRECTIONS W/THE FIRST POINT 12171404 6' -0" FROM EA. WALL TABLE FOR PIPE SIZNG - EI1T CONDUIT - ACCEPTANCE TO 4' -0" 3 4 " - EMT CONDUIT- ACCEPTANCE TO 5' -2" I" - EMT CONDUIT- ACCEPTANCE TO 6' -6" 1 - EMT CONDUIT- ACCEPTANCE TO 8' -2" I'1 - EMT CONDUIT - ACCEPTANCE TO 9' -10" 2 EMT CONDUIT- ACCEPTANCE TO 16' -6" 3" - EMT CONDUIT- ACCEPTANCE TO 20' -2" 4" - EMT CONDUIT- ACCEPTANCE TO 26' -0" 1057 OF THE ABOVE 15 TYPICALLY STOCKED N 10' LENGTHS. COUPLINGS ARE AVAILABLE WHERE NECESSARY. VALUES ARE BASED UPON STANDARD CALCULATIONS AND 0A4 BE SUBSTANTIATED BY AND ENGNEERNG FIRM. FOR WALLS GREATER THAN 8'- 0" N WIDTH WITHOUT AN INTERSECTING WALL, PROVIDE 12ga. WIRES SPLAYED e 45' TO AN EYE SCREW • ROOF AND TOP CF WALL CONT. METAL TRIM. 5/8" GYP. BD. (TYPE' 7P • FIRE RATED WALLS) ACOUSTICAL BLANKET • SOUND WALL. CAULK GYP. BD. TO FLOOR a ALL 501140 AND NSUL. WALLS 1/2" GYP. BD. OR CEILING TILES BRACED OR STRAPPED TOGETHER TO PROVIDE AIR 0 /01447 ENCLOSURE W /INSULATION' ABOVE,- STEEL STUD 12124M10401 45 1212054/12005 PARABOLIC LENSED FLUORESCENT FIXTURE FOR RECESSED: LIGHTS IN' INSULATED SUSPENDED CEILINGS G;' SECTION SECTION SECTION U) e--I c C' J T -2 0 z 0 g 06/30/01 _018:36 am CI \CATAR724 3AVPT0Prtr, T -2:dwa „_