HomeMy WebLinkAboutCOW 2014-04-14 Item 4C - Powerpoint Presentation Shown at Meeting - Facilities Needs Assessment and Feasibility StudyRIC
City of Tukwila
Facilities Needs Assessment
and Feasibility Study
Phase 2 City Council Check -in
eiguismi I.EF :111 BERK
a I & ii I a f3 w i k
5 STRATEGY s, ANALYSIS a COMMUNICATIONS
/4i
Introduction
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 2 COUNCIL CHECK -IN
Today's Topics
Council Interviews: Did we hear you right?
Overview of Process
Review of Phase 1 - Assessing Needs
Expectations for Phase 2 - Assessing Facilities
Expectations for Phase 3 - Assessing Alternatives
Expectations for Phase 4 - Phasing & Funding Plan
Review Project Workplan
Interview Themes
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 2 COUNCIL CHECK -IN
Council seeks a plan that:
Fulfills the City's commitment to public safety.
Provides a comprehensive, defensible
assessment of needs.
Includes prioritization.
Accommodates current financial realities.
01-
Has buy -in and support, not driven by one or
two perspectives.
Is reflective of community needs.
3
Interview Themes
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 2 COUNCIL CHECK -IN
Council desires a process that:
Enables collaboration among internal
stakeholders.
Establishes agreement on needs first.
Makes the analysis transparent and
conservative.
Uses clear, concise, evidence -based visuals to
communicate findings and recommendations.
Cultivates public and partner support.
4
Phase 1
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 2 COUNCIL CHECK -IN
1x1����l1yy�
Identify
current use
1
Estimate
current space
needs (2014)
Facilities
Planning
Target (2040)
5
Phase 2
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 2 COUNCIL CHECK -IN
ASSESSING FACILITIES
Inventory
y
City Hall
6300 Building
Minkler Building
George Long Shops Building
Golf and Parks Maintenance
Southcenter PD
Neighborhood Resource Center
Evidence and Records Storage
Fire Station 51
Fire Station 52
Fire Station 53
Fire Station 54
Community Center2
•
•
•
Develop Criteria
y
Assess
• • • 'a •
• • • • •
• • • • •
• • • • •
• • • • •
• • • • •
• • • • •
• • • • •
• • • • •
• • • • •
• • • • •
• • • • •
• • • • •
6
Phase 3
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 2 COUNCIL CHECK -IN
parrImraniatmilia
Criteria Alternatives Assessment
a -rxr LJ
QUO ✓ x 00
Ox0✓
0 ✓x0
Preferred
Development
Option
Phase 4
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 2 COUNCIL CHECK -IN
PHASING & FUND
•
Risk Assessment
Optimal Solution
Outreach
Stakeholder Engagement
Phasing & Funding Plan
Next?
Plan Implementation
PHASE 5:
Facility Design
8
Work.Ian
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 2 COUNCIL CHECK -IN
2013
2014
July
Aug
Sept
Oct
Nov
Dec
Jan
April
May
June
July
August
z
W
IMCMIIM
PHASE ONE
aPM Team
7/16
ADepartment Heads
Kick-Olt /122
Steering A A Steering
Cmte f11 11. te 112
8/23 9/13
Councilmemher Interviews
• •
•..•
Compile Information on Existing Facilities
rAssess Current Space Needs
operating &
Capital Funding
Protect Future Space Needs
t f
itualion Assessrnerd
}esi ;n Enga;;Omcnt Plan
About the
project
1. Inventrxy of Fxisting Facilities
2. Operating & Capital Funding Situation
Assesstrtent
:3. Curren) Space Needs Assessment
4, Ou [reach & F ngafemenl Plan
Steering
CrnR 113
12/23
Assess Facililies :iuitahili
Council I
Sessions
Work Se<_sion 1/13
ASE TWO
PM Team
2/12
AStan
Feedback
Steering
Cmte 114
Ne;!ds Irrsiil ication
PHASE THREE PHASE FOUR
/Dm learn PM Team
ADepartment
Head Workshop
VSteering
Crn le 115
Co Matrix
Fundin ,lssessment
P asing & PriurliLnI of Plan
nCif
Risk Assessment
F i
Ch
in Work Session
9 What are
L the needs
E E
Work Session Work Session Adoption
Community
Workshop
Assessrneril of 1. Feasibility
existing facilities Study
suitability and
cored iIion.
Plan LP
Overview
1. Risk Assessment
2. Phasing & Fund -
ing flan
3. Orafl Report
4. Final Report
9
Next Ste • s
City of Tukwila
Facilities Needs Assessment and Feasibility Study
PHASE 2 COUNCIL CHECK -IN
1. Questions? Concerns?
2. Phase 2 findings to be presented and
discussed at Council Presentation on
April 28.
10