HomeMy WebLinkAbout2014-04-18 - Open House - Thorndyke Elementary Safe Routes to School (4pm-6pm)- Safe Route I
_ _ ! City Limits
COME TO AN OPEN HOUSE
Thorndyke Elementary Safe Routes to School Project
As you are probably aware, construction is coming to your
neighborhood this summer. Tukwila Public Works is working
to improve pedestrian safety along South 150th Street between
Tukwila International Boulevard and 42nd Avenue South.
The project will include road widening and repaving,
curbs, intersection improvements, drainage and gutters,
along with sidewalks on the south side of the street.
The City of Tukwila is holding an informational Open House
where you can see project maps and graphics, and learn more
about the overall project and construction schedule.
Please drop by on Friday, April 18, between 4:00- 6:OOPM
at Thorndyke Elementary School, 4415 South 150th Street
If you cannot attend but would like further project information,
please feel free to contact Project Manager Grant Griffin by phone
at 206 - 431 -2446, or by email at Grant.Griffin @TukwilaWA.gov.
ROW
6.50
WIDENING &
SIDEWALK
ROADWAY CL
ROW CL
11.00 11.00
THRU LANE I THRU LANE
oioi,,41/oiyiaioio
L.WIDENING &�
THICKENED
EDGE
PROPOSED TYPICAL SECTION
THORNDYKE ELEMENTARY SAFE ROUTES TO SCHOOL
CITY OF TUKWILA, WASHINGTON
VARIES 20' TYP
ROW
PIVOT POINT
Not to Scale
Vicinity Map
1 �
]
S 152nd $t
S 159th St
S 156th St
1
St
S 160th St
S1
4th St
Thorndyke Elementary School
Safe Routes to School
City of Tukwila Public Works Department
6300 Southcenter Boulevard, Suite 100, Tukwila, WA 98188