HomeMy WebLinkAboutPlanning 2014-04-24 ITEM 4 - BOULEVARD TOWNHOMES - STAFF REPORTCity of Tukwila
Jim Haggerton, Mayor
Department of' Com Mu n ity Development Jack Pace, Director
STAFF REPORT TO THE BOARD OF ARCHITECTURAL REVIEW
DEPARTMENT OF COMMUNITY DEVELOPMENT
Prepared April 10, 2014
HEARING DATE: April 24, 2014
STAFF CONTACT: Jaimie Reavis, Assistant Planner
NOTIFICATION: • Notice of Application posted on site and mailed to surrounding properties
and agencies with jurisdiction on January 24, 2014.
• Notice of Public Hearing published in the Seattle Times, posted on site, and
mailed to surrounding properties and agencies with jurisdiction April 10,
2014.
FILE NUMBERS: L13 -0063 (Public Hearing Design Review)
PL14 -001 (Land Use Project File)
PROJECT NAME: Boulevard Townhomes
ASSOCIATED FILES: PRE13 -017 (Pre - Application Meeting)
APPLICANT: Omied Pazooki
OWNER: Ali and Shellie Sadr
REQUEST:
Request for approval of a Public Hearing Design Review application for
development of five townhomes. The existing home will be demolished and
five new homes are proposed along with associated access, parking, utilities,
and landscaping.
LOCATION: 3726 Southcenter Blvd. (tax parcel number 0043000197)
COMPREHENSIVE
PLAN DESIGNATION/
ZONING DISTRICTS:
High Density Residential (HDR)
SEPA COMPLIANCE: This project is exempt from State Environmental Policy Act review per
WAC 197 -11 -800 (2) (E) Other Minor New Construction.
PUBLIC COMMENTS Comments were submitted by email from Dana Dick, Manager of the Valley
View Sewer District, in response to the Notice of Application. Comments
JR Page 1 of 15
W: \Users\Jaimie \BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
04/16/2014
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax: 206-
431 -3665
5
included the need to make sure that (1) a permit is obtained from Valley
View to cap the existing side sewer; and (2) a permit is obtained from Valley
View to upsize the new side sewer to six inches.
RECOMMENDATION: Staff recommends approval with conditions of the Public Hearing Design
Review application.
ATTACHMENTS:
A. Boulevard Townhomes Project Narrative (applicant's response to design review criteria)
B. Plans: Architectural site plan Sheet 1 of 4; Boundary /Topographic Survey; Grading and Storm
Drainage Plan; Landscape Planting Plans L1 -L2.
C. Colored Elevations (architectural plan sheets 2 -4)
JR Page 2 of 15
6 W: \Users\Jaimie \BOULEVARD TOWNHOMES\SR L13- 0063_ PL14 - 001_ BoulevardTownhomes_4- 13- 14.doc
04/16/2014
Project Site and Surrounding Development
Three Tree Townhomes
Ambassador Gardens
Single Family Home and
Garage
Light Rail Station
Villages at South Station
JR Page 3 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
7
FINDINGS
PROJECT DESCRIPTION
The project proposal is to develop five townhome units
located in two structures. A triplex will be located on the
east side of the site, and a duplex will be located on the
west side. The two structures are separated by a combined
pedestrian and vehicular courtyard area. Private recreation
space for the units in the project is located in backyard
areas and in the balconies of each unit, and common
recreation areas include the front yard and the rear yard
along the north property line.
Plan sheets submitted for this project label the townhome
units differently. The numbering at right is how the
individual units are referred to in this report.
VICINITY /SITE DESCRIPTION
Site Description
The project site is made up of one 10,300 square foot parcel
located on the north side of Southcenter Blvd between Tukwila
International Blvd and 40th Ave S. The property is located
within the High Density Residential (HDR) zoning district,
which allows up to 22 dwelling units per net acre. For
townhouse development in the HDR zone, the allowable
density is based on one unit per 2,000 square feet of parent lot
area. The unit lot for each townhome is allowed to include
common access easement areas.
Existing Development
The project site is developed with one single family home built in 1959 that is proposed to be demolished.
Surrounding Land Uses
The project site is surrounded on all sides by property zoned HDR. Sound Transit made streetscape
improvements to Southcenter Blvd. during construction of the Tukwila Light Rail Station, including new
sidewalks, bike lanes, and landscaping. Since the opening of the light rail station, owners of nearby
multifamily developments have made improvements to and rebranded their properties to reflect their close
proximity to the station. Some examples of this include the Villages at South Station located across the
street from the project site and developments to the east of the project site including the Courtyard at
South Station and the Boulevard at South Station.
The property located to the west of the existing driveway is the Ambassador Gardens apartments, made
up of 56 units within four two -story buildings. To the north of the project site is a development called the
JR Page 4 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
8
Three Tree Townhouses, made up of one building containing 10 townhouses and a structure for covered
parking.
Existing development on the property to the east includes a single family home and a detached parking
garage. This property was the subject of code enforcement action in October 2013 due to the unsecured,
neglected, and dilapidated condition of the structures and accumulation of garbage and junk vehicles. The
site has since been secured and was purchased by a new property owner in March 2014. Department of
Community Development has received enquiries regarding redevelopment of this site.
To the south of the project site are the Villages at South Station, a large apartment complex built in 1984
and made up of 12 buildings containing 122 units. This development borders the Link Light Rail Station
property, which is to the west.
Topography
The Grading and Storm Drainage Plan (Sheet C3 in
Attachment B) shows that there is an increase in
elevation from a grade of approximately 297 to 302 as
you move from the back of the sidewalk up to the
grade on which the existing house sits. You can see the
picture at right that a retaining wall was constructed
along the front of the property adjoining the project site
to the east.
Vegetation
Vegetation on the project site currently consists of grasses, shrubs, and a mature, multi -stem deciduous
tree located along the west property line of the project site.
Access
The existing driveway that currently provides access to the parking area for the single family home is part
of the parcel that contains the townhomes immediately to the north of the project site. This driveway will
remain as -is to continue to provide access to the existing townhomes. The applicant for the Boulevard
townhomes project attempted to gain an easement to use the existing driveway for access to the Boulevard
Townhomes project, but he was not successful at contacting and coming to agreement with the adjacent
property owner. A new driveway providing direct access to the Boulevard Townhomes will be
constructed off of Southcenter Blvd to provide a combined vehicular and pedestrian access. A staircase
will be located on either side of the new driveway to connect the sidewalk along Southcenter Blvd with
pedestrian paths leading to the front doors of each of the units which face Southcenter Blvd.
Decision Criteria — Design review
Townhouse development in Tukwila is restricted to the Medium Density Residential (MDR) and High
Density Residential (HDR) zoning districts. According to 18.14.060, design review by the Board of
Architectural Review is required for all multi - family structures over 1,500 square feet in size. Per TMC
18.60.050 (C), townhouse development is subject to the design criteria contained in the Townhouse
Design Manual, which is available online at http:// www. tukwilawa.gov /dcd/dcdplan.html. The following
is a discussion of project consistency with the applicable design review criteria.
JR Page 5 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
9
I. SITE PLANNING
Streetscape — the transition from public to private spaces
The transition from the streetscape of Southcenter Blvd to the private townhomes proposed in this
project is achieved through a combination of topography, landscaping, fences, and patterned
pavement. Pedestrian - oriented entries include steps connecting from the sidewalk along
Southcenter Blvd to the pedestrian pathways leading to front doors of the units facing Southcenter
Blvd. A tree is proposed on each side of the driveway, which helps create a gateway into the site.
From the street front of Southcenter Blvd, the landscaping otherwise transitions from lawn located
in the majority of the front yard area to areas with groundcover, shrubs, and trees extending up to
the front of the buildings.
The two units facing Southcenter Blvd (units 1 and 4) have their front doors facing the street. The
building elevations facing Southcenter Blvd have been designed to include horizontal and vertical
modulation so that the height of each building steps up from street front starting with the front
porch, to the roofline of the entry facade, to the roofline of the main portion of the building. This
vertical and horizontal modulation is illustrated best in Attachment C, colored elevation sheet 3 of
4 (see left side of top sketch labeled "East Elevation Triplex) and 4 of 4 (see left side of top sketch
labeled "Interior Courtyard East Elevation Duplex). Cultured stone is proposed on the facade, in
the area to the left and the right of the front door of both of the end units. The cultured stone on
either side of the front door of the end units projects out from the facade to appear as columns to
which the brackets for the porch are attached. Use of the cultured stone and the porch structures on
the end units serve to make the front entries to these units distinctive.
The project proposes to use patterned pavement as a way to indicate a transition from the sidewalk
to the private townhome development, as well as to indicate the location of the front entries of
units that do not face Southcenter Blvd. The front doors to these units are located within the
shared auto court, and have also been designed with cultured stone and architectural porch
elements to indicate front entry areas.
Natural Environment
Existing vegetation on the project site includes a multi -stem deciduous tree located in the front
yard, a large shrub located on the east side of the existing driveway, and shrubs typical of front
yard landscaping located at the front of the existing house. The general topography of the site will
remain the same, with the steepest slope located in the area from the back of the sidewalk to the
front property line, and a very gradual slope up from the front to the rear property line. However,
the project proposes to lower the site approximately four to five feet in order for the new driveway
to meet the grade requirements for Fire Department vehicle access. The grading will require
removal of the existing vegetation and construction of retaining walls along the west property line
and portions of the north and east property lines. The retaining walls will be less than four feet
high, and will be topped with four foot tall cedar fencing. Cedar fences will separate the project
site from properties to the east, west, and north, and will be used to separate the backyards of the
individual units from one another, as well as to separate the front yard landscape area from the
backyard areas of units 1 and 4.
JR Page 6 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
10
Circulation (Pedestrian and Vehicular)
The site design connects the front entries of units 1 and 4 facing Southcenter Blvd with the public
sidewalk using four foot wide concrete pathways leading from the front doors of the units to a
small set of stairs that tie into the sidewalk. There is one pathway on each side of the driveway.
The proposed driveway width is 20 feet, and it will incorporate both pervious and patterned
pavement. The design intent of using the patterned pavement, as illustrated on the architectural site
plan, is to signify shared pedestrian and vehicle use of the driveway area, and to provide a visual
cue to show where the front entries of units 2, 3, and 5 are located within the shared auto court.
The specific material to be used has not yet been determined by the applicant, and staff
recommends a condition of approval to allow the pavement materials and pattern to be determined
administratively as part of review of the construction permit.
Parking
Tukwila parking regulations contained in TMC 18.56.065 require two off - street parking spaces for
each dwelling unit which contains up to three bedrooms. Parking for residents of the Boulevard
Townhomes project will be within the attached two -car garage for each unit.
Solar Orientation
The front yard of the development is located on the south side of the project site. Lawn within the
front yard will provide flexibility for residents to use the space to take advantage of the area's solar
orientation. The trees proposed at the front entry to the project site are deciduous, and at maturity
can be expected to provide shade within the front yard during the summer months, while allowing
sunshine into the front yard in the winter. Pine trees proposed at the sides of the front yard will
provide green color to the area during the winter months, while still leaving the yard open and
exposed to the sun. Roof eaves are used on all sides of the townhome structures, and these
overhangs will work both to shield the structures from the high summer sun and expose them to
the lower winter sun.
Crime Prevention
Several design features of the Boulevard Townhomes support the concept of Defensible Space to
reduce opportunities for crime. The slope up within the first 10 feet from the sidewalk to the
property line provides a physical barrier between the public sidewalk and the private development.
The patterned pavement within the driveway provides a visual separation between the public
sidewalk and street of Southcenter Blvd; anyone within the driveway area or using the steps to get
to building entries can clearly be assumed to be either a resident or a visitor to the site. Cedar
fencing proposed along the sides, rear, and behind the landscaped areas of the front yard will
separate the private recreation space for each unit from common areas. The landscape design also
helps to reinforce the transition from the public realm to the private development, with trees on
either side of the driveway demarking the entry to the private development, and an increase in the
variety and quantity of plantings as you move toward the building entries.
Windows are located on all building elevations. Balconies at the second story of units 1 and 4 look
out over Southcenter Blvd., and windows on the west elevation of the triplex and the east
elevation of the duplex have been located to allow surveillance of the courtyard area, to provide
design attention to this area, and with privacy in mind to prevent residents from being able to look
in to the other units in the development.
JR Page 7 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
11
The original project submittal included recessed entries for all the units. This type of building
modulation is typically encouraged; however, Tukwila Police staff suggested removing the
recessed entries within the shared auto courtyard to avoid creating hiding areas. Due to the small
size of this project, the Tukwila Police staff advised adequate lighting levels can be achieved using
building- mounted lights and the requirement to submit a lighting plan was waived. The location of
proposed building- mounted lighting is shown on the colored elevations in Attachment C. Wall
sconces are proposed to light front door, back door, and garage entries. Recessed can lights are
proposed underneath the front porch structures of all of the units, as well as underneath the
building modulations that project over the garage doors within the shared driveway /courtyard area.
Staff recommends as a condition of approval that exterior lighting at front entries and within the
courtyard area shall be on a common meter, and lights shall be on a timer to provide uniform
lighting levels within common areas at night. An existing street light located at the back of the
sidewalk on the eastern portion of the site will provide lighting within the front yard, including the
steps and driveway area adjacent to the street.
II. BUILDING DESIGN
Neighborhood Compatibility
The area in which the project is located was part of the Thorndyke annexation which occurred in
1989. Surrounding developments were constructed prior to annexation under King County
development regulations. The single family development to the east is much lower density than
what's allowable in the HDR zone, and can be expected to be redeveloped in the future. The
townhouse development that borders the project site on the north is consistent with the allowable
density in the HDR zone. The Ambassador Gardens apaituients to the west and The Villages at
South Station to the south have a higher number of units per acre than is allowable in the HDR
zone for non - senior housing. Adjacent multifamily structures are two- stories. The proposed
townhomes are three stories and 36 feet in height at their highest building elevation.
The new townhomes will sit at a lower grade than the townhomes to the north and the Ambassador
Gardens to the west. The Villages at South Station is separated from the project site by the right of
way area and improvements of Southcenter Blvd. The Ambassador Gardens is separated from the
project site by its surface parking area for its residents, as well as by the access drive for the Three
Tree Townhomes. The amount of distance between the project site and these properties makes
neighborhood compatibility with these developments of less importance than the compatibility of
the proposed townhomes with the adjacent townhomes to the north. The lower grade proposed for
the project site will help the new townhome structures to fit in better with the existing two -story
townhomes, so as not to create the feeling that the new homes will be looming over the existing
townhomes. The location of the backyard areas and the shared courtyard between the new duplex
and triplex provides breaks that will allow the existing townhome development to receive sun
exposure along its southern elevation. The existing townhome unit does not have any windows on
its south elevation, reducing impacts to privacy.
The duplex and triplex structures have been designed with horizontal and vertical modulation,
helping to break up the mass of both of the buildings, and providing a transition in height along
the street frontage of Southcenter Blvd, starting from the porch at the front entries of the end units
JR Page 8 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
12
facing the street, up to the pitched roofline of the 1 '/2 — 2 story front entry modulation, up to the
rooflines of the gabled roof.
The architectural style of the new townhomes is consistent with that typical of Craftsman style
residential development in Tukwila and the Pacific NW more broadly. Facade materials including
wood siding and cultured stone are similar to that used at the Villages at South Station, the Three
Tree Townhomes, and other residential development within the Thorndyke neighborhood.
Building Entrances
The main entrance to the units facing Southcenter Blvd have been designed with a modulated
entry feature that includes a front door recessed from the building face, and a front porch structure
combined with cultured stone on either side of the door to frame the front door entry. The cultured
stone is added to the base of the modulated entry, and wraps around the base of both the duplex
and triplex within the shared courtyard area. Small, pitched porch roofs are located over the front
entries to units 2, 3, and 5 to provide architectural detailing that signals the main entryways to
units accessed off the shared courtyard area. The use of front doors painted with accent colors is
common in townhome developments to help articulate the individuality of each unit, and to add
visual interest through limited use of bright colors. Staff recommends a condition of approval to
require that accent colors be used for the front doors.
Building Elevations
The architectural style of the duplex and triplex are the same, incorporating pitched roof forms,
horizontal and vertical modulation, and the same colors and materials. Each structure will read as
a unified building mass. The arrangement of windows, horizontal modulation at the upper stories,
location of balconies, and the arrangement of different siding patterns and colors are used in the
design to express the individuality of each unit. The end units facing Southcenter Blvd include a
protrusion, or modulated area that comes out from the main three -story portion of the building to
make a front entry that is well articulated and completes the end units in a way that adding a front
door to the side of the three story structure would not have accomplished.
Windows
Windows on facades facing Southcenter Blvd, and most of the windows facing the shared
courtyard area will be multiple -pane windows. The intent is to focus the multiple -pane design
detail on those units closest to Southcenter Blvd. Units 3 and 5 towards the back of the project will
not have the multiple pane windows. Trim will be added around all windows on both the duplex
and the triplex. The east elevation of Unit 4 lacks a window pattern and could include more
windows to match the design character of the rest of the development. Staff recommends a
condition of approval to require additional windows on the second story of the east elevation of
Unit 4. Staff shall take into consideration the floorplan of Unit 4, and the location of additional
windows with respect to privacy.
Building Massing
The building modulation proposed is different for each townhome unit. This helps to create visual
interest on the building exterior and to reduce the mass of the duplex and the triplex structures.
JR Page 9 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
13
Materials and Colors
Proposed materials include a variety of Hardi -panel siding patterns, including horizontal siding,
horizontal bevel siding, and batten board siding. Each unit has a different arrangement of the
siding patterns, with the exception of adjacent units 2 and 3, which have the same arrangement of
batten board siding on the first floor and horizontal siding on the second and third stories. Window
placement, modulation, and the paint colors used within the modulation areas differ between these
two units. The project uses variegated "El Dorado" or equal colored cultured stone on the facades
facing Southcenter Blvd., as well as at the base of the units within the shared courtyard area.
For all units, the color palette is
proposed to be the same. The
color palette is intended to be a
mix of gray -blue and brown hues
to look similar to the house
pictured at right. Some
differences from the picture are
that the darker color (see "Black
Russian" ColorLife paint sample
on Attachment C) will only be
used on the first story of the
duplex and the triplex, and it will
not be used on the garage doors. The second and third stories will be painted with the lighter gray -
blue "Marathon" color. Some of the building modulation areas at the second and third stories are
also painted the "Marathon" color, but most of the modulation areas are the light brown "Aurora"
color. Trim around the windows, doors, and the belly band, eaves, and brackets will be painted the
darker brown "Shinto" color. Staff recommends the applicant add more color to the development
and individuality to the units by painting the front doors of the units with an accent color.
Garage Design
Garages are proposed to be metal, and will include windows as shown in the Colored Elevations
(Attachment C). The garage doors are proposed to be painted with the brown hues of the project's
color palette. The pattern of windows used for the garages, and the distribution of the brown paint
colors on the garage doors will vary from unit to unit.
III. LANDSCAPE /SITE TREATMENT
Landscape Design and Design for Screening and Separation
In the landscape design for the Boulevard Townhomes, the plantings are arranged to focus
attention to entrances to the project site and to the individual units, to soften the built environment,
to reduce the appearance of paved area by adding greenery, and to provide for screening and
separation.
A deciduous tree is proposed on either side of the driveway to act as a gateway feature at the
project site entry. Trees, shrubs, and groundcover are clustered near the front of the end units
facing Southcenter Blvd, helping to focus design attention to the face to the project and leaving
lawn area at the front of the front yard to allow flexible use of this area by the townhome residents.
JR Page 10 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
14
Shrubs within the front yard area wrap around the sides of the end units into the courtyard area.
These shrubs, combined with additional shrubs adjacent to each of the unit entries in the courtyard
area are designed to soften the character of the built environment. Trees, shrubs, and groundcover
at the end of the driveway area also soften the courtyard environment and provide a screening
function that helps obscure the retaining wall and fence located along the north property line from
view, as well as to help screen the wall of the adjacent townhome structure to the north.
An ornamental pear tree is located in the backyard of each unit, along with several shrubs. Some
of the shrubs in backyard areas are shown on Landscape Plan sheet 1 of 2 where you could expect
townhome residents to construct fences. Additionally, the "mulch only" areas within the
backyards do not meet the landscape regulations for Type I perimeter landscaping areas (per TMC
Chapter 18.52), where living groundcover is required to cover 90% of the landscape area within
three years. Staff recommends two conditions of approval related to the sideyard perimeter
landscape areas within the backyards of the units: (1) to require that shrubs and trees within the
backyard areas be coordinated with backyard fence locations at the time of planting; and (2) to
require groundcover be planted to cover 90% of the landscaped area within three years.
Outdoor Space Design
Private outdoor space for each unit is located within the backyard area. Common outdoor space
area is located in the front yard of the project and the rear yard areas on the north side of units 3
and 5. The lawn area of the front yard can accommodate temporary use of portable outdoor
furniture to allow residents to watch street activity, picnic, etc. The rear yard areas on the north
side of units 3 and 5 are large enough to allow gardening activities or small play equipment.
Additionally, the small size of the project limits the number of vehicles that will be using the
courtyard area, and could allow for short-term use of the shared courtyard area for recreation uses.
IV. MISCELLANEOUS STRUCTURES / STREET FURNITURE
Lighting
Lighting proposed for the Boulevard Townhomes consists of wall sconces at
building entries and recessed can lights within porch structures and
underneath the building modulation overhang areas within the shared
courtyard area. A picture of the design of the proposed wall sconces is
provided at right. The existing street lamp at the back of the sidewalk along
Southcenter Blvd. will provide lighting within the front yard area.
Fencing, Walls, and Screening
Retaining walls less than four feet high will be
located along the west property line, and portions of
the north and east property lines. Retaining walls will
be visible to residents of the Boulevard Townhomes
within backyard areas, and will be visible to the
public along the west and east property lines. The
material proposed for the retaining wall is split -faced
concrete modular units that include a brown sand
color (see picture at right). The four foot high cedar
JR Page 11 of 15
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
04/16/2014
15
fence proposed along the top of the retaining wall on the west, north, and east sides of the project
will be more visible from surrounding properties, and the wood material and natural wood color of
the fence proposed are consistent with the architectural design of the Boulevard Townhomes. A
six -foot tall cedar fence will be used to separate the project's front yard area from the backyards on
units 1 and 4.
Service Areas
Waste Management was consulted during review of this project to determine the type of trash and
recycling containers that will be used for the Boulevard Townhomes. Each unit will have
individual containers for trash and recycling. Staff recommends that the codes, covenants, and
restrictions (CCR's) for the townhomes include language to require that trash and recycling
containers for each unit must be stored in each unit's garage and brought to the street for pick up
on trash day.
It is expected that the postmaster will require mailboxes for this project to be combined in a cluster
with those of the Three Tree Townhomes and located in the same area as the existing mailbox at
the southwestern area of the project site.
Street Furniture
There is no street furniture proposed as part of this project.
Conclusions - Design Review
1. Site Planning
The site design uses topography, landscaping, fences, and patterned pavement to transition from
the public streetscape of Southcenter Blvd to the private residences. The end units of the
townhomes facing Southcenter Blvd are designed with the front door facing the street. Pathways
connect from the front doors of these units to the sidewalk along Southcenter Blvd. The other units
within the development have their front entries accessed off the shared auto court. Patterned
pavement is proposed within this area to indicate where the front entries are located, and to
communicate shared vehicular and pedestrian use of the area. Some of the pavement materials
used within the shared driveway will be pervious. Staff recommends the specific type of treatment
(i.e., pavers, grasscrete, porous pavement, etc.) be determined administratively as part of the
construction permit.
Each unit will contain three bedrooms and a den. Each unit has a two -car garage accessed from the
shared courtyard area to accommodate resident parking. Windows on the west elevation of the
triplex and the east elevation of the duplex allow surveillance of the shared courtyard area.
Lighting in this area will consist of wall sconces adjacent to the front doors and the garage doors,
and recessed can lights within porch structures and underneath the building modulation overhang
areas. Staff recommends as a condition of approval that exterior lighting at front entries and within
the courtyard area shall be on a common meter, and lights shall be on a timer to provide uniform
lighting levels within common areas at night.
JR Page 12 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
16
Each unit will have individual containers for trash and recycling. Staff recommends that the CCRs
for the townhomes include language to require that trash and recycling containers for each unit
must be stored in each unit's garage and brought to the street for pick up on trash day. The
mailboxes for this project will be combined in a cluster with those of the Three Tree Townhomes
and located in the same area as the existing mailbox at the southwestern area of the project site.
The design of the mailboxes will be similar to the existing mailbox enclosure.
2. Building Design
Site grading to bring the level of the project site down approximately four feet will increase the
compatibility of the new three -story townhome structures with existing two -story multifamily
development to the north. The architectural style of the new townhomes is consistent with that
typical of Craftsman style residential development in Tukwila and the Pacific NW more broadly.
Facade materials including wood siding and cultured stone are similar to those used at the Villages
at South Station, the Three Tree Townhomes, and other residential development within the
Thorndyke neighborhood. Building design includes vertical and horizontal modulation to break up
the mass of each of the buildings. Windows with trim are proposed on all building elevations.
Multi -pane windows are located on building elevations closer to the street. The east elevation of
Unit 4 lacks the window pattern and could include more windows to match the design character of
the rest of the development. Staff recommends a condition of approval to require additional
windows on the second story of the east elevation of Unit 4. Staff shall take into consideration the
floorplan of Unit 4 and the location of additional windows with respect to privacy.
The arrangement of windows, horizontal modulation at the upper stories, location of balconies,
different siding patterns, and color are used to express the individuality of each unit. Porch
structures over building entrances and cultured stone are used to give design attention to the front
entries of the individual townhome units. The color palette is intended to be a mix of gray -blue
and brown hues. Staff recommends use of accent colors on the front doors to the townhome units
to add variety to the color scheme of the development, and to provide a design element unique to
each dwelling.
Building- mounted lighting and an existing street light on Southcenter Blvd will provide
illumination for the project. Proposed building- mounted lighting includes wall sconces in front
entry and garage areas, and recessed can lighting at front entries and underneath building
modulation areas over the garages. Staff recommends as a condition of approval that exterior
lighting at front entries and within the courtyard area shall be on a common meter and a timer to
provide uniform lighting levels within common areas at night.
3. Landscape and Site Treatment
The plantings in the landscape design for the Boulevard Townhomes are arranged to focus
attention to entrances to the project site and to the individual units, to soften the built environment,
to reduce the appearance of paved area by adding greenery, and to provide for screening and
separation. Trees, shrubs, and groundcover are clustered near the front of the end units facing
Southcenter Blvd, leaving lawn area at the front to allow flexible use of this area by the townhome
residents. Landscaping is designed within the shared courtyard to indicate unit entries and to
soften the hardscape of the courtyard area.
JR Page 13 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
17
The backyard of each unit is proposed to have a tree and shrubs. Landscaping in backyard areas is
shown on Landscape Plan sheet 1 of 2 where you could expect townhome residents to construct
fences. Additionally, the "mulch only" areas within the backyards do not meet the landscape
regulations for Type I perimeter landscaping areas (per TMC Chapter 18.52), where living
groundcover is required to cover 90% of the landscape area within three years. Staff recommends
two conditions of approval related to the sideyard perimeter landscape areas within the backyards
of the units: (1) to require that shrubs and trees within the backyard areas be coordinated with
backyard fence locations at the time of planting; and (2) to require groundcover be planted to
cover 90% of the landscaped area within three years.
Private outdoor space for each unit is located within the backyard area. Common outdoor space
area is located in the front yard of the project and the rear yard areas on the north side of units 3
and 5. Additionally, the small size of the project limits the number of vehicles that will be using
the courtyard area, and could allow for short-term use of the shared courtyard area for recreation
uses.
4. Miscellaneous Structures and Street Furniture
Each unit will have individual containers for trash and recycling. Staff recommends that the CCRs
for the townhomes include language to require that trash and recycling containers for each unit
must be stored in each unit's garage and brought to the street for pick up on trash day.
It is expected that the postmaster will require mailboxes for this project to be combined in a cluster
with those of the Three Tree Townhomes and located in the same area as the existing mailbox at
the soutwestern area of the project site.
Recommendations
Staff recommends approval of the design review application for the Boulevard Townhomes, subject to the
following conditions:
CONDITIONS OF APPROVAL
1. Patterned pavement is proposed with this project as a low impact development feature and to
delineate pedestrian pathways. The specific type of treatment (i.e., pavers, grasscrete, porous
pavement, etc.) shall be determined administratively as part of the construction permit.
2. Exterior lighting at front entries and within the courtyard area shall be on a common meter,
and lights shall be on a timer to provide uniform lighting levels within common areas at night.
3. Codes, Covenants, and Restrictions (CCR's) for the townhomes shall include language to
require trash and recycling containers for each unit tot be stored in each unit's garage.
4. Additional windows shall be added to the second story of the east elevation of Unit 4 to
achieve consistency in the level of character of the rest of the development. The addition of
windows shall be reviewed administratively at the time of the building permit submittal. Staff
shall take into consideration the floorplan of Unit 4, and the location of additional windows
with respect to privacy.
5. Accent colors shall be used on the front doors to the townhome units to add variety to the color
scheme of the development, and to highlight the entrances.
JR Page 14 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
18
6. The location of shrubs and trees within the backyard areas shall be coordinated with backyard
fence locations at the time of planting.
7. Groundcover shall be added to backyard areas of the units to cover 90% of the landscape area
within three years.
Information Items
1. Contact the Tukwila Fire Department for addressing and to assign correct unit numbers. The unit
numbers shown are out of sequence.
2. A separate demolition permit with utility lines capping is required.
3. Prior to issuance of the demolition and the building permits for the new townhomes the property
owner shall sign with notary, a Sensitive Areas Ordinance Hold Harmless Agreement. The
agreement will be recorded at King County, after city's approval signatures. (Submit signed
agreement at least ten (10) days prior to issuance of the building permit, as City must have time to
process this document).
4. A Hold Harmless Agreement for work inside the City Right of Way shall be executed prior to any
work inside the City Right of Way.
5. Segments of the two pedestrian accesses with stairs leading to the townhomes and located inside
the City right -of -way behind S 154th Street sidewalk shall be owned and maintained by the
development. Same applies to the portion of the access road behind the sidewalk.
6. A geotechnical report is required due to presence of steep slopes.
7. Perimeter retaining wall requires some clarification. The 6" wide concrete retaining wall depicted
on the architectural drawing sheet 1 of 4 terminates at the NE corner of the property, while the
civil and landscaping plans show the wall terminating in the back of unit 5 (unit E on the
architectural plan) using a rockery symbol. The wall turns at an angle at the NW property corner
on the architectural plans only but not on civil and landscaping plans.
8. The storm drainage for the bottom portion of the access driveway shall be modified to prevent
runoff from the access driveway sheet flowing into the right of way and across the sidewalk.
9. It appears that there is more than 2,000 square feet of pollution generating impervious surface is
being created by this project, therefore water quality measures are required. Applicant shall
contact Ryan Larson, PW Surface Water Engineer at 206 431 -2456 to discuss this issue.
10. Project is subject to Traffic Concurrency; Traffic Concurrency Certificate Application shall be
submitted to Public Works with $600.00 fee.
11. Transportation Impact Fee applies to the future Building Permit(s) in the amount of $1,013.88 per
dwelling. See Pavement Mitigation and Transportation Impact Fees Bulletin no. A3.
12. Pursuant to the Tukwila 'Underground Ordinance', all utilities shall be placed underground.
13. Provide approved plan sheet(s) from Valley View Sewer District.
14. Provide approved plan sheet(s) from Water District 125.
JR Page 15 of 15 04/16/2014
W: \Users\Jaimie\BOULEVARD TOWNHOMES \SR L13 -0063 PL14 -001 BoulevardTownhomes 4- 13- 14.doc
19