Loading...
HomeMy WebLinkAboutPermit M06-060 - SAHALE SNACKS090 'Id OZI S LIVE SNDVNS TWHVS Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Value of Mechanical: $3,915.00 Type of Fire Protection: City thy Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 -431 -3665 Web site: ci.tukwila.wa.us 1023049006 3417 S 120 PL TUKW SAHALE SNACKS 3417 S 120 PL, TUKWILA WA SABEY CORPORATION 201 ELLIOTT AVE. WEST, SUITE 400 Contact Person: Name: NEIL ALLEN Address: 4735 EAST MARGINAL WY S, SEATTLE WA Contractor: Name: SABEY CONSTRUCTION INC. Address: 12201 TUKWILA INTERNATIONAL BLVD, SEATTLE WA Contractor License No: SABEYCI033KM Expiration Date:01 /06/2007 DESCRIPTION OF WORK: PROVIDE AND INSTALL B -VENT FLUE PIPING FOR SNACK OVEN EXHAUST Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall /Floor Mounted Heater 0 Appliance Vent 1 Repair or Addition to Heat/Refrig /Cooling System Air Handling Unit <10,000 CFM 0 >10,000 CFM 0 Evaporator Cooler 0 Ventilation Fan connected to single duct 0 Ventilation System 0 Hood and Duct 0 Incinerator: Domestic 0 Commercial /Industrial 0 doc: IMC- Permit MECHANICAL PERMIT Permit Number: Issue Date: Permit Expires On: EQUIPMENT TYPE AND QUANTITY * *continued on next page ** Phone: Phone: 206 391 -9715 Phone: 206 - 281 -4700 Steven M Mullet, Mayor Steve Lancaster, Director M06 -060 04/11/2006 10/08/2006 Fees Collected: $201.56 International Mechanical Code Edition: 2003 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood /Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment... 0 M06.060 Printed: 04 -11 -2006 Permit Center Authorized Signature: doc: IMC- Permit City Tukwila Print Name: Nk/L r .422n/ Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206- 431 -3665 Web site: ci.tukwila.wa.us ∎o r Steven M. Mullet, Mayor Steve Lancaster, Director Permit Number: M06-060 Issue Date: 04/11/2006 Permit Expires On: 10/08/2006 Date: 0V' "/ G I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit. Signature: ol> �� — Date: -!/ 614 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M06 -060 Printed: 04 -11 -2006 doc: Conditions City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 1023049006 Address: 3417 S 120 PL TUKW Suite No: Tenant: SAKALE SNACKS 1: ** *BUILDING DEPARTMENT CONDITIONS * ** PERMIT CONDITIONS Permit Number: M06 -060 Status: ISSUED Applied Date: 03/28/2006 Issue Date: 04/11/2006 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Readily accessible access to roof mounted equipment is required. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All plumbing and gas piping work shall be Inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the Washington State Department of Labor and Industries (206/248- 6630). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The Issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: The oven installation shall comply with Chapter 21 of the International Fire Code 2003 Edition. 13: Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not Imply approval of such condition or violation. 14: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. * *continued on next page ** M06 -060 Printed: 04 -11 -2006 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: y ir % a&A, Print Name: Aka ,P 4/ /Af/ Date: doc: Conditions M06 -060 Printed: 04 -11 -2006 CITY OF TUKWILA& Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Site Address: 3 4/ 7 5 /.2.0 i P.C. Tenant Name: _S.4N.' -E 374. 1 9C/e E Property Owners Name: SAYE y - .T, vTE.PGATE ERST COtoG. Mailing Address: /22O/ Tu /!w/L A TNT /7/ VD. 7r/KW /LA City Name: /✓E /L Aizni Company Name: Mailing Address: q:PPen.n. pima« thange0permit •ppliutioe (7-2004) Reas.e: 64-05 tae Page I Building Permit go. Mechanical Permit No Public Works Permit No. Pro No- - xar Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** King Co Assessor's Tax No.: I DZ W4 — 't W(-/ Suite Number: Floor: / 'Sr Cm New Tenant: i21.. Yes ❑ ..No tea state CONTACT PERSON Day Telephone: o.Zi96) 39/ - 9 7/S Mailing Address: 4735 E. 44.4 Js4vy 5, sC.477x.E /1/.4. 98/54 State Zip E -Mail Address: /✓C- /L .4 e ,Ew /ROA4EC//. Conn Fax Number: (20& 7.2 —/ 9 134 GENERAL CONTRACTOR INFORMATION (Mechanical Contractor info n back page) S4/3,<V Con/c74ftcT /On/ / z.20 / T KW /L.4 .TNT. ge VO. TUKW/L A City Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Exp Date: * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** 14/4. State ARCHITECT OF RECORD —All plans must be wet stamped by Architect of Record Company Name: Mailing Address: Cay Contact Person: Day Telephone: E -Mail Address: Fax Number. State ENGINEER OF RECORD — All plans mu st be wet stamped by Engineer of Record Company Name: Mailing Address: zp State 9 /G 8 Zip 9R!68 zip ZIP City Contact Person: Day Telephone: E -Mail Address: Fax Number. Valuation of Project (contractor's bid price): $ Existing Building Valuation: $ Scope of Work (please provide detailed information): Will there be new rack storage? ❑ ..Yes ❑ .. No If "yes ", see Handout No. for requirements. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single- family building footprint (area of the foundation of all structures, plus any decks ova 18 inches and overhangs greater than 18 inches) 'For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: 'Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: 0:0pema p0011/4-c dAeawbmnn 4ppilradun ( Revised 64-05 u Page 2 Handicap: Will there be a change in use? ❑ ....Yes ❑ ..No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑.. Sprinklers ❑..Automatic Fire Alarm ❑..None ❑ . Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ .. Yes ❑_No If "yes ", attach list of materials and storage Locations on a separate 8 -1/2 x II paper indicating quantities and Material Safety Data Sheets. Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC' ]'Floor 2 Floor 3 Floo Floors _ - Basement Accessory Structure' Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck Valuation of Project (contractor's bid price): $ Existing Building Valuation: $ Scope of Work (please provide detailed information): Will there be new rack storage? ❑ ..Yes ❑ .. No If "yes ", see Handout No. for requirements. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single- family building footprint (area of the foundation of all structures, plus any decks ova 18 inches and overhangs greater than 18 inches) 'For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: 'Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: 0:0pema p0011/4-c dAeawbmnn 4ppilradun ( Revised 64-05 u Page 2 Handicap: Will there be a change in use? ❑ ....Yes ❑ ..No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑.. Sprinklers ❑..Automatic Fire Alarm ❑..None ❑ . Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ .. Yes ❑_No If "yes ", attach list of materials and storage Locations on a separate 8 -1/2 x II paper indicating quantities and Material Safety Data Sheets. Scope of Work (please provide detailed information): Water District ❑...Tukwila ❑... Water District #125 ❑ ...Water Availability Provided Submitted with Application (mark boxes which applvl: ❑...Civil Plans (Maximum Paper Size -22" x 34 ") ❑...Technical Information Report (Storm Drainage) ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right-of-way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right-of-way Non Right -of -way ❑...Total Cut ❑...Total Fill cubic yards cubic yards ❑...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ ...Permanent Water Meter Size... WO# ❑...Temporary Water Meter Size .. WO# o ...Water Only Meter Size WO# ❑ ...Sewer Main Extension Public _ Private o ...Water Main Extension Public Private y:Upe,ma pWVa oangeetpennit applicuioa ( Revised: 64-O5 bh Call before you Dig: 1400- 424 -5555 Please refer to Public Works Bulletin #1 for fees and estimate sheet. ❑ .. Highline ❑...Renton Sewer District ...Tukwila ❑ ... ValVue ❑ .. Renton ❑...Seattle ❑...Sewer Use Certificate 0... Sewer Availability Provided ❑ .. Approved Septic Plans Provided ❑...Septic System - For onsite septic system, provide 2 copies of a current septic design approval by King County Health Department. ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line ❑ .. Creotechnical Report ❑...Traffic Impact Analysis ❑ .. Maintenance Agreement(s) ❑...Hold Harmless ❑ .. Right-of-way Use - Profit for less than 72 hours ❑ .. Right-of-way Use — Potential Disturbance ❑ .. Work in Flood Zone ❑ .. Storm Drainage FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑ ...Water ❑ ...Sewer ❑ ...Sewage Treatment Monthly Service Billing to; Name: Mailing Address: bay Telephone: City state Zip Water Meter Refund/Billing: Name: Day Telephone: Mailing Address:. City state lip Page 3 ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑ ...Deduct Water Meter Size Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Fumace <I00K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Fumace>100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Water Heater 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Emergency Generator Air Handling Unit <10,000 CFM Incinerator - Comm/1nd Other Mechanical Equipment : MECHANICAL`PERMIT INFO NATION - 206-431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: EN V /A'0Ai MCf/ Mailing Address: 4735 ,E: 4'%,QG/A.644- T-J�,Py S SE.srnE - *4. 96/24 City State Zip Contact Person: /1yE /L ,QI I FA/ Day Telephone: @.06%) 3 9/ - 971, E -Mail Address: Fax Number: o •ZDG ) 4 2 - / 936 Contractor Registration Number: £v v!R ©SROK Expiration Date: /2 - 51- t9G **An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance " Valuation of Project (contractor's bid price): $ 3, 9 /S, Q0 Scope of Work (please provide detailed information): P.pov /OS RA/z7 //UST.a._Z. B - Y.c.0 r / /3,ohvia SN.4c/ OVEN Sxff ausr Use: Residential: New ....0 Replacement ❑ Commercial: New .... ❑ Replacement ❑ Fuel Type: Electric ❑ Gas....[K Other: Indicate type of mechanical work being installed and the quantity below: PERMIT APPLICATIO NO T ES = Applicable to all permits in th Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O� - RI Signature: Print Name: Mailing Address: Date Application Accepted: i Hm , cc, a1tpenaea pas0¢ cbwgn■perait .ntk.t oa (7 -2004) Revised: 6-3-05 ba' Page 4 Date: 3 ".z 7 Day Telephone: City State Date Application Expires: 01 i L n City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 1023049006 Address: 3417 S 120 PL TUKW Suite No: Applicant: SAHALE SNACKS Receipt No.: R06 -00410 Payment Amount: 201.56 Initials: )EM Payment Date: 03/28/2006 10:57 AM User ID: 1165 Balance: $0.00 Payee: ENVIROMECH TRANSACTION LIST: Type Method Description Amount Payment Check 7012 201.56 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES RECEIPT Account Code Current Pmts 000/322.100 167.25 000/345.830 34.31 Permit Number: M06 -060 Status: PENDING Applied Date: 03/28/2006 Issue Date: Total: 201.56 3970 03/28 9716 TOTAL 201.56 doc: Receipt Printed: 03 -28 -2006 Project: Type of Inspection: Address: 1.'4" t J 110 PI Date Called: 1D(P • Special Instructions: Date Wanted: ut4 . a.m m. Requester: Phone No: 2(1a I q 1+Is 3 INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 a. s s ee .i 4 AT: .. !'s'''f2i11 s* taii.. ibir ' }3 (2 r 6),4,31;-36 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: o 40 rAd cc: t' it (l i i } ( Inspect Date 4 /, $58.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. !Receipt No.: !Date: Project: Type of Inspection: Address: �� /� Date Called: Special Instructions: Date Wanted: a.m %— Requester: Phone No: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (2 t • )431.367 Approved per applicable codes. V' Corrections required prior to approval. COMMENTS: F,"•-e _ Si 4 -d e le) 4.41.,C-1, /ilti // (#iIC. 7 /- I Ce-n dr2 S S Ce- / / ri $58.00 REINSPECTION EE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. 'Receipt No.: Date: Project: cANAIZ SN S Type of Ins coon: PNfi Addres : 3 /7 5. ,2 PL— Date Called: Special Instructions: (19// 1-2.— A%° � Date Wanted _ / 6 a / l' m. Requester: Phone No 0.2 b 4 /- 2? /a INSPECT NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERM (206)431 -367 El Approved per applicable codes. 14 Corrections Corrections required prior to approval. COMMENTS: Inspector' $58.' REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. 'Receipt No.: 'Date: Project: i / 5 hate- 3 via cks Type of Inspection: F; re- Fiv,c, Address: Suite' #:3,/7 5 /Z0 PJ Contact Person: Special Instructions: Phone No.: Needs Shift Inspection: f (/ /7& Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: 1 INSPECTION NUMBER 444 Andover Park East. Tukwila. Wa. 98188 K Word /Inspection Record Form.Doc INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT Approved per applicable codes. 12/2/05 1)106— 060 PERMIT NUMBERS 206 - 575 -4407 n Corrections required prior to approval. COMMENTS: inec_A Fire_ F'na / - oK Inspector: i /O $80.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be at 444 Andover Park East. Call to schedule reinspection. Receipt No.: Date: q /r /o Hrs.: ,C Date: T.F.D. Form F.P. 85 h.aERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M06 -060 DATE: 03 -28 -06 PROJECT NAME: SAHALE SNACKS SITE ADDRESS: 3417 S 120 PL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: in' � 4.1t Building Division Public Works ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Documents/routing sl ip.doc 2 -28-02 III 100 - Fire Prevention Structural Incomplete ❑ TUES/THURS ROU NG: Please Route Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: ❑ Permit Coordinator ❑ DUE DATE: 03-30-06 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ❑ No further Review Required DATE: DUE DATE: 04-27-06 Not Approved (attach comments) ❑ DATE: Planning Division Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License SABEYCI033KM Licensee Name SABEY CONSTRUCTION INC Licensee Type CONSTRUCTION CONTRACTOR UBI 601532164 Verify kers Com Woro Premium Status Ind. Ins. Account Id 33122102 Business Type CORPORATION Address 1 12201 TUKWILA INTL BLVD Address 2 4TH FLOOR City SEATTLE County KING State WA Zip 981685121 Phone 2062814200 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 5/14/1997 Expiration Date 1/6/2007 Suspend Date Separation Date Parent Company I Previous License DASCOC•066KD Next License SABEYC1953RE Associated License Look Up a Contractor, Electrician or Plumber License Detail ISO Topic Index I Contact Info ,,,,,; " Search Home i Safety J C laims & insurance ;; Workplace Rights r Trades & Licensing Look Up a Contractor, Electrician or Plumber Printer Friendly Version Find a Law or Rule I Get a Form or Publication General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. License Information iv Page 1 of 3 https: // fortress .wa.gov /lni/bbip/Detail.aspx ?License= SABEYCI033KM 04/11/2006 1 { } • • S • 7 t 1 411111•11•0"..t. •V�•.•r•••.�.- +•►.....•r•r•. e- .n�•r.w.r...w��w• wws/•s ...W.•� ..+�u.•�..�. r MY ..•.... . 4.•0.00. •.. ....• /1 ti•r. .,... •••• ... •••• .M "I.. •Y• -n ••• w• .•K•4i•• 1••M•/..•••••• +•..... ••••• - a. ra.. s ac o l . � «rM 1��.�+ ••��•+•••►••• r ••• •.••. F...b.••. • ...Jr- ..rr n vt k) 1 k.''' ttl tu h y ? ' ki 1 k 1 4 � h � `t Q1, i r w1••2•• •••M••••M••MI•�MIrMy.•••• .. •N '... .•• Ili... ...••!i•..T:•ley.Ilnf.•••.•k Mb” Ia• •.1•• •••••• •. •••. l ...••• M...••• •∎• M •. A•.. Q . ` 71 tt) 44. • u . � ._.• ••••• • •ry.•./fps.11,yltr•• ♦ •.lr..f..r1.'♦N- •ANY/' .e • � { + i • • ..- sb.a ►.s-aa woes*. L+daM *am mams. - .tel. 1r 0 r ••44..1,*••••••••••• ••••••••• •■. •••••••• «..w•r■• - -- 11•wa..v ••.M •••r • 4•. t. .. . r•••••• • ••••••.•••••••!71WW••••∎•∎ ••••••..∎10••ww•4•. • • • •.•••••••••..w..4'. - •••••• ....... ". ri • . . Paw -• ....••• • • r ••■• .. ••••••••••••••••/.• • •• • . • . • . .•.• ••••a•..J.. 4. .6 •-• - •■• � • - MYY•�• f.+•••••rYr•►`►••i•� ••• ......•. •.•.. r••..•....•• • WJI••r •►•• Owe .I1i•f••••• ••... •/.• N••. pLAW %JA'Y # 8A41L4/0 !� CP gl Of •• • •.• -• • • •....a a...••�..... ,. f { 1 cto N ‘ki 1 v) ‘r) Lkt ki ) k •ter .• a•►.•M.■••• •.r••* .... moo •• ••••1111••••••MFMn1•11111111111i ....►•tea► - Jj•••+L JU ii 1 i f { { T 4 ■ A 1 i 1 PROJECT TEAM TENANT: Sahale Snacks GENERAL CONTRACTOR: P.O. Box 9345 Sabey Construction Seattle, WA 98109 12201 Tukwila Int. Blvd Fourth Floor ARCHITECT: Seattle, WA 98168 Burgess Weaver Design Group 1326 - 5th Avenue, Suite 500 STRUCTURAL ENGINEER: Seattle. Washington 98101 ENW Engineers Northwest, Inc. P.S. Tel: 206.587.7120 6869 Woodlawn Ave. NE Fax: 206.587.7122 Seattle, WA 98115 ATTN: KIP KOLODZIEJSKI Tel: 206- 525 -7560 Fax: 206- 522 -6698 BUILDING OWNER: ATTN: DANIEL M. LAKE Sabey Corp. 12201 Tukwila Int. Blvd MECHANICAL ENGINEER: Fourth Floor TBD - Bidder Design Build by G.C. Seattle, WA 98168 Tel: 206 277 -5271 ELECTRICAL ENGINEER: Fax: 206 -281 -0920 TBD - Bidder Design Build by G.C. ATTN: SANDRA SUSKIC FIRE /LIFE SAFETY ENGINEER: TBD - Bidder Design Build by G.C. LEGAL DESCRIPTION LEGAL DESCRIPTION: PORTION OF GOV LOT 15 IN SW 1/4 OF SECTION 10 -23 -04 BEGIN NW CORNER OF SW 1/4 TH S 01 -46 -02 W 107.22 FT TH S 87 -33 -12 E 512.24 FT TO POINT OF BEGINNING TH S 87 -33 -12 E 214.16 FT TH N 78 -40 -52 E 415.05 FT TO WLY MARGIN OF E MARGINAL WAY TH S 16 -31 -41 E 241.92 FT TH S 28 -02 -57 E 104.42 FT TH S 17 -01 -47 E 100.50 FT TH S 11 -19 -15 E 13.28 FT TH N 58 -13 -58 W 473.87 FT TH S 01 -46 -02 W 37 FT TH N 88 -13 -58 W 307.80 FT TH N 01 -46 -02 E 373.93 TO POINT OF BEGINNING- LOT 1 OF CITY OF TUKWILA BOUNDRY LINE ADJUSTMENT NO L2000 -042. TX PARCEL ID i 102049069 DRAWING INDEX \ ISSUED I 1 L J 0 0 o < N. CV i (V 1 ■ 12 j { . GENERAL X X X G.0.0 COVER SHEET / PROJECT INFORMATION . X X X 1 G.0.1 PROJECT NOTES - t a } --•-- I • ARCHITECTURAL / 1NTERQRS X : X X; A.0.1 SITE PLAN _. X X X 1 A.1,1 DEMO ON PAN _ x r x X A.2A 1 CONSTRUCTION PLAN X ! X , X; ! A.28.1 REFLECTED CEILING PLAN X ' X ' A.2C.1 POWER AND EQUIPMENT PLAN X ' X_ _X ! , 1 ; A.9.1 DOOR SCHED SIDEUGFiT SHEDULE / puAILS X XiX! _/ 4 , A.9.2 DETAILS STRUCTURAL X X j 5.1 STRUCTURAL PLANS, SECTIONS AND NOTES • • Esc _; _ •.x.' SEE EXIT LETTER DATED 3 -2 -06 FOR FUTURE EXmNG REQUIREMENTS FOR OCCUPANCY COUNT SEE A.2A.1 AREA OF BUILDING SECTION. 26.860 SF. IBC ALLOWABLE IS 35.423 FOR F1 USE WITH SPRINKLER AND SETBACK BONUS'. EXISTING 2 HOUR 1 EXISTING 2 HOUR SEPARATION 40 FOOT DEAD END PER IBC 1016.3 EXCEPTION 2 SEPARATION REQUIRES SPRINKLER SYSTEM TO COMPLY WITH IBC 903.3.1.1 USE CLASSIFICATION: NTS EXISTING 2 HOUR SEPARATION GENERAL NOTES 1. CONTRACTOR SHALL COMPLY WITH THE CURRENT "GENERAL CONDITIONS," AND BUILDING STANDARDS AS PROVIDED BY THE BUILDING OWNER. 2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF DIFFERENT TRADES. 3. DO NOT SCALE DRAWINGS. CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS. 4. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE OWNER AND ARCHITECT FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWING ONLY WILL NOT SATISFY THIS REQUIREMENT 5. ALL MODIFICATIONS, REQUIRING OWNER OR ARCHITECT APPROVAL WILL NOT BE VALID UNLESS AUTHORIZED IN WRITING BY OWNER AND /OR ARCHITECT. 6. WITHIN FIVE (5) BUSINESS DAYS OF START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY IN WRITING BOTH THE ARCHITECT AND OWNER OF ANY ITEMS WHOSE ESTIMATED DELIVERY TO THE SITE WOULD BE LATER THAN THAT REQUIRED FOR TIMELY INSTALLATION IN THE CONSTRUCTION SEQUENCE SUBSTITUTION OF ALTERNATE ITEMS WITH SHORTER LEAD TIMES, PAYMENT OF RUSH FABRICATION OR DELIVERY CHARGES OUT OF SEQUENCE INSTALLATION, OR DELAY OF INSTALLATION OPTIONS TO BE AT THE SOLE APPROVAL OF OWNER OR ARCHITECT. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WORK AND MATERIALS IN ACCORDANCE WITH THE LATEST LOCAL BUILDING CODES AND ORDINANCES. 8. CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS AND CONDITIONS AND SHALL REPORT ANY CONFLICTS OR QUESTIONS FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK. DO NOT SCALE THE DRAWINGS. 9. THE USE OF WORD "PROVIDE" SHALL ALWAYS MEAN, "FURNISH AND INSTALL, CONNECT, OR SECURE" AS REQUIRED. 10. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURERS WRITTEN INSTRUCTIONS AND TRADE ASSOCIATES ACCEPTED STANDARDS. 11. CONTRACTOR SHALL PROVIDE A WRITTEN CONSTRUCTION SCHEDULE. THIS SCHEDULE SHALL INCLUDE DELIVERY LEAD TIMES OF CONSTRUCTION ITEMS, AND START AND COMPLETION DATES OF EACH PHASE. THE CONTRACTOR SHALL UPDATE AND PROVIDE SUCH SCHEDULE ON A BIWEEKLY BASIS. 12. WORK MUST BE SCHEDULED WITH THE BUILDING MANAGEMENT TO AVOID DISRUPTION TO THE TENANTS. 13. ACCESS TO AND FROM THE PROJECT SITE, SPECIAL CONDITIONS, NOISY WORK, TIMING OF WORK, INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICES. RELOCATION OF EXISTING EQUIPMENT, CASEWORK, FIXTURES. FITTINGS, ETC.. MUST BE COORDINATED WITH THE BUILDING MANAGEMENT. 14. ADEQUATE CLEANUP, PROTECTION AND PLACEMENT OF ANY CEILING TILES AND /OR OTHER DISRUPTION TO THE ADJACENT TENANT IMPROVEMENTS MUST BE REPLACED BEFORE BUSINESS HOURS OF THAT TENANT IN ORDER THAT THE OCCUPANT WILL NOT BE INCONVENIENCED IN THE NORMAL CONTINUATION OF THEIR OFFICE HOURS. 15. EACH SUBCONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO ADJACENT WORK AND SHALL REPAIR SAID DAMAGE AT THEIR OWN EXPENSE. THIS INCLUDES ALL AREAS ON THE PREMISES SUCH AS: COMMON HALLWAYS, FREIGHT ELEVATOR VESTIBULES, ETC. 16. SCHEDULE THE USE OF THE ELEVATOR WITH BUILDING MANAGEMENT. 17. UPON COMPLETION OF ALL CONSTRUCTION, THE CONTRACTOR SHALL SUPPLY THE LANDLORD WITH ONE SET OF "RECORD" AS -BUILT DRAWINGS. 18. ALL MATERIALS TO BE NEW UON. 19. PATCH ALL DISTURBED AND /OR DAMAGED AREAS AS REQUIRED TO ACCOMPLISH NEW WORK AND AS REQUIRED FOR FINISHED APPEARANCE_ 20. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY BACKING. BLOCKING, AND FRAMING FOR UGHT FIXTURES, ELECTRICAL FIXTURES. CASEWORK AND ALL OTHER ITEMS REQUIRING IT. 21. CONTRACTOR TO COORDINATE ALL FIRE ALARM WORK WITH BUILDING OWNER. 22. ALL PAINT AND FINISH MATERIAL COLORS SHALL MATCH ARCHITECT'S CONTROL SAMPLES AND REQUIRE ARCHIT'ECT'S REVIEW PRIOR TO INSTALLATION. SUBMIT TO ARCHITECT THREE (3) COPIES FOR REVIEW. 23. CONTRACTOR SHALL FURNISH SHOP DRAWINGS FOR REVIEW ON CABINETWORK, MILLWORK AND ANY OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATION. SUBMIT TO ARCHITECT THREE (3) COPIES FOR REVIEW. 24. REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE DRAWINGS SHALL BE COMPLETELY PROVIDED AS IF DRAWN IN FULL. 25. THROUGHOUT THE DRAWINGS ARE ABBREVIATIONS WHICH ARE IN COMMON USE. THE UST OF ABBREVIATIONS PROVIDED IS NOT INTENDED TO BE A COMPLETE UST. THE ARCHITECT WILL DEFINE THE INTENT OF ANY IN QUESTION. ..+....p +EIIie..a s...ai EXITING LETTER ll D m S D r J ( 0SP01 :!CN li:h :' .W16 )•I1. bob Eellydicto (11N ul TL k:yIi(l yu31d,rg Oflitral :OW Soul/Kernel R lfukwtla, WA 9S1S8 pear Mi. Benedic1a Per ow convert:snob today, iA cu junct oa wph !hr Sahtalc'rostra Improvement Project (pc -Pmt M D05 -467) Sabey Corporation aelalowI.4� that when the adjacent t ^.zpty warehouse spice is occupied by another tenant effecting the egress for ducrs ktbeled - A - and °R" we wt11 eonatruct the rode required mans ng If I can ao,wcr any further qutrtiors pk:IS: Act me lawny (206127? -5249. S.M WY CORPO A I IUN 7/ki.„2 Makcl Baum Senior VPor Operations (206) 27 7- 5249 c. Allen )ohennezen Kip Kolodziejski REALIitATt OtVt(OPM[NT CON$f %ICTSONtAR < MITICTU*F IpVESTININTS SYMBOLS ELEVATION REFERENCE SYMBOL 0 DETAIL ID SECTION Rit- tRENCE SYMBOL DETAIL REFERENCE SYMBOL OIL SHIT D 0NN ANN?! I E. 20' - �. ANGLE g AT C CENTERLINE SHEET NO. sloes eor m rrwr 1:201 7.in. FIR(" settee.. o...Q a,7atae ;r r GRID UNE SYMBOL 1 ` k / T' ( Pan* Ms. CliFfili kInriO° t i 111271 0008 SYMBOL OW maw a001a11r Its 40.4t In ass ad ed Omp•mal cull mMew ilsO44401 Om am fate vIci ekr a arY acs> Ind Isle v vgrame. MUM r a mats c F1ec_ Cap, and =daft • admoMmege 4_ w olrE - • ' - " City ITS bode IMAM oa l 011 1.16 Jai a730,ffla.■ r.,e 236.162.99Si I.,,ah,C rar•satit,corn INDICATES FINISHED t SURFACES TO ALIGN DRAWING TITLE BAR DETAIL IDENTI FICATION DRAWING TITLE GRAPHICAL SCALE O TJT� o� FLOOR ELEVATION SYMBOLS 92' -0" +1' -0" NOMINAL FLOOR � ELEVATION HEIGHT (ABOVE /BELOW) BUILDING SPACE / ROOM ID OFFICE --Nil-- SPACE NAME -. -- SPACE NUMBER C DOCUMENT SHEET SYMBOL - KEYED SHEET NOTES G1 - •.---- G Z NG S1rInt80L A •.... REVISION NUMBER INIMIIICIO Mar c1Wr Gras if erron CIO d 71ii SUILIDINf' 0lV6KI1 ARCH / ANTERIOR ABBREVIATIONS ADJ - ADJUSTABLE AFF - ABOVE FINISH FLOOR ALT - ALTERNATE ALUM ALUMINUM APC - ACOUSTICAL PANEL CEILING APPROX - APPROXIMATE ARCH - ARCHITECTURAL ACT - ACOUSTICAL CEILING TILE AV - AUDIO VISUAL BLDG - BUILDING BOT - BOTTOM CAB - CABINET CL - CENTER LINE CLG - CEILING CLR - CLEAR COL - COLUMN CONC - CONCRETE CONE - CONFERENCE DEMO - DEMOLITION EPT -- DEPARTMENT F - DRINKING FOUNTAIN DIA - DIAMETER DIFF - DIFFUSER DIM - DIMENSION DTL - DETAIL DW - DISHWASHER DWG - DRAWING EA - EACH EL - ELEVATOR ELEC - ELECTRICAL ELEV - ELEVATION EQ - EQUAL EQUIP - EQUIPMENT EXT - EXTERIOR FA - FIRE ALARM FD - FLOOR DRAIN FE - FIRE EXTINGUISHER FEC - FIRE EXTINGUISHER CABINET FFE -- FINISH FLOOR ELEVATION FIN - FINISH FLUOR - FLUORESCENT FLR -- FLOOR FO -- FACE OF FOIC -- FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FTIC - FURNISHED BY TENANT, INSTALLED BY CONTRACTOR FURR -- FURRING GA - GAUGE GC - GENERAL CONTRACTOR GL - GLASS GWB - GYPSUM WALLBOARD HC - HANDICAPPED HDW - HARDWARE HM - HOLLOW METAL (STEEL FRAME) HR - HOUR INCL - INCLUDED OR INCLUDING INFO - INFORMATION INSUL - INSULATION LAV - LAVATORY LF - UNEAR FOOT MATL - MATERIAL MAX - MAXIMUM MDF - MEDIUM DENSITY FIBERBOARD A. DEFINITIONS; MECH MEZZ MFR MIN MISC MTD MTL N/A NIC NTS OC OFF OPNC OVHD P PART PERF PERIM PERP PLAN PLYWD QTY (R) RA RCP REC REF REFR REL REV RM RO RTD SCHED SF SHT SIM SPEC SPKLR SPKR SQ STD STL STOR STRL STRUC �M TEL TEMP THK TO TOS TYP UON UPS VCT VIF W/ WC WD W/O DEFINITIONS AND DIMENSIONS 1. 'TYPICAL" OR "TYP" INDICATES IDENTICAL COMPLETE SYSTEM FOR THE CONDITION NOTED. 2. "SIMILAR" OR "SIM." INDICATES COMPLETE SYSTEM AND COMPONENTS THE CHARACTERISTICS FOR THE CONDFON NOTED. 3. AS REQUIRED" INDICATES CONTRACTOR SHALL PROVIDE COMPONENTS COMPLETE THE NOTED SYSTEM AS INDICATED IN THE PROJECT DOCUME 4. "ALIGN" INDICATES ACCURATELY PROVIDE FINISH FACES OF MATERIALS TRUE. AND PLUMB RELATION ADJACENT MATERIALS. B. DIMENSIONS: - MECHANICAL - MEZZANINE - MANUFACTURER - MINIMUM - MISCELLANEOUS - MOUNTED - METAL - NOT APPLICABLE - NOT IN CONTRACT - NOT TO SCALE - ON CENTER - OFFICE - OPENING - OVERHEAD - PAINT - PARTITION - PERFORATED - PERIMETER - PERPENDICULAR - PLASTIC LAMINATE - PLYWOOD - QUANTITY - RELOCATED -- RETURN AIR - REFLECTED CEILING PLAN - RECESSED - REFERENCE - REFRIGERATOR - RELOCATE - REVISION OR REVISED - ROOM - ROUGH OPENING - RATED - SCHEDULE - SQUARE FEET /FOOT - SHEET - SIMILAR - SPECIFICATION - SPRINKLER - SPEAKER - SQUARE - STANDARD - STEEL - STORAGE - STRUCTURAL - STRUCTURAL - SYMMETRICAL - TO BE DETERMINED - TELEPHONE OR TELECOM - TEMPERED - THICKNESS - TOP OF - TOP OF SLAB - TYPICAL - UNLESS OTHERWISE NOTED - UNINTERRUPTED POWER SUPPLY - VINYL COMPOSmON TILE - VERIFY IN FIELD - WITH - WATER CLOSET - WOOD - WITHOUT 1. DIMENSIONS ARE INDICATED TO THE FACE OF FINISHED SURFACE AT ALL NEW AND EXISTING CONSTRUCTION. CENTER OF COLUMNS OR GRID UNES UNLESS OTHERWISE NOTED. 2. AUGNMENT OF PARTITIONS AND FINISHES AS SCHEDULED SHALL BE STRAIGHT. TRUE & PLUMB. DIMENSIONAL LAYOUT SHALL BE IN THE FOLLOWING PRIORITY ORDER. A. STRUCTURAL DRAWINGS B. LARGE SCALE DETAILS C. SMALL SCALE DETAILS D. ENLARGED PLANS AND SECTIONS E. FLOOR PLANS .3. MINIMUM DIMENSIONS FOR ACCESSIBILJTY CLEARANCES AND BUILDING CODE REQUIREMENTS SHALL BE MAINTAINED. COMPARABLE TO REQUIRED TO NTS. IN STRAIGHT, 4. FLOOR ELEVATIONS ARE INDICATED AT THE FACE OF THE STRUCTURAL SLAB, UNLESS OTHERWISE NOTED. 5. VERTICAL DIMENSIONS ARE INDICATED FROM THE FLOOR ELEVATION TO FACE OF FINISHED MATERIAL.., UNLESS NOTED ABOVE FINISH FLOOR - "AFT". 6. CEIUNG HEJGHTS ARE INDICATED FROM THE FLOOR ELEVATION TO THE FACE OF SUSPENDED ACOUSTIC CEIUNG GRID OR FACE OF FINISH MATERIAL FOR OTHER CEJUNG TYPES. UNLESS OTHERWISE NOTED. 7. DOCUMENTS ARE DRAWN DIAGRAMATICALLY. AND SCALED DIMENSIONS ARE APPROXIMATE. DIMENSIONS SHALL INDICATE REQUIRED SIZE. CLEARANCES, AND RELATIONSHIPS ARE INDICATED BY DIMENSIONS AS NOTED. PROJECT SITE DATA ZONING: M!C /M MANUFACTURING INDUSTRIAL CENTER /HEAVY AREA: 46.20388 ACRES BUILDING AREA BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 BUILDING 6 98.564 S.F. "07.489 S.E 201.360 S_ F. ?5.010 55. 2'7.355 S_ F. 5..352 S.F. TOTAL AREAL 745. • SEISMIC ZONE: 3 PARK 7NG REQUIREa: OFD Z: 35.226 S.= x 2 -5/' .000 It•AtA►FAC JRI1'rG: 56 ;2 S_= _ X ' /'.a0i0 MIAREI+OUSc". • ; 54. S. = . X • /2.30C t At► G ✓ _ AREA OF WORK 38 56' 77 S 726 S'& S • BUILDING SUMMARY PROJECT ADDRESS. SAHALE SNACKS INTERGATE EAST BLDG. 2 3311 S. 120TH PLACE TUKWILA. WA 98168 2. APPLICABLE CODES & ORDINANCES: A BUILDING CODES INTERNATIONAL BUILDING CODE - 2003 8 REGULATIONS & ORDINANCES NFPA C ACCESSIBILITY INTERNATIONAL BUILDING CODE - 2003 ICC /ANSI 117.1 ACCESSIBLE & USABLE BUILDINGS AND FACILITIES - 2003 3. GENERAL BUILDING DESCRIPTION: TYPE OF CONSTRUCTION: - VB FIRE RESISTIVE SYSTEM: SPRINKLERED OCCUPANCY TYPE: F1 FOOD PROCESSING 4. FIRE RESISTIVE CONSTRUCTION REQUIREMENTS: CORRIDORS: 1 HOUR SPRINKLERS SHALL COMPLY WITH IBC 903.3.1.1 AND NFPA13 REQUIREMENTS OF QUICK RESPONSE HEADS 5. EXITS: APPROXIMATE AREA OF CONSTRUCTION: 12.105 TOTAL APPROXIMATE SUITE AREA: 19,992 OCCUPANT LOAD FACTOR: 100 NUMBER OF TOTAL PROPOSED OCCUPANTS: 200 NUMBER OF EXITS REQUIRED: 2 MINIMUM EGRESS WIDTH REQUIRED: 3' -8". 3' -0" 0 DOORS COMMON PATH OF TRAVEL: 75' 6. PROJECT DESCRIPTION: NON- STRUCTURAL INTERIOR TENANT IMPROVEMENT. NEW PARTITIONS. DOORS. FINISHES. STREET MAP I • Severfy P Arbor l: L.I.+e ?a : l : ; Eveneril i '1y4t Rive for - Boulevard Park �J::f•'1 r.'e:g.ha s'aA Boulevard Pa* SoulY2 : 13"44:11' e ���Ieeas fad . �i. i;lnfid! 111 Ale Coer t C4:J � � . ea s, L ,► 'r - 'P ' S e rat:: 0 ° .1:4 _ Pr.* 5: -Ise: Riverton Latona :. MANAGEMENT NOTES 7 1A 1) r!�7cnr.�so . »3', l7' . ,"`: Tamil, 6 0 m 4,. s Allentown # 4 • a . 1 Skyway . s,.. ' CO 25 J ,,. f - <1 Pia Fester • 2 ro s 144th SAW '.Dlidies" ea, r : fir 3A ▪ • Tukwila - o- Bryn Mawt-Sityway KEY PLAN / FLOOR PLATE/ EGRESS PLAN - 1- PLJAAR'> MEDY•1114, c EC*IIICIIl. AND FIRE P VTEC ION JRllIII1GS ARE SJPPLENDITARY TO THESE DpIIRIGS THE CI NTiR ICAO R 9iA11 COORDIMTE THE IOW OF EPCH CONSULTING MINER R WITH TFESE COMM NO Tit TENANT Y PAN ENT SIECIIQQi:6 AND 94IL1 NOTIFY THE ARDOECT OF ALL 1RiH A maTel REQUEST a OR CIAISTATIOIL ma RORK mstoluED M COIFUCt AITH WEN EMMA= OR Tit lawIT MOW SPECTICAT06 SHALL BE =REM Br THE comma ro AT WO EX1 1& To THE OME , TEUMItiT OR THE MOIL #IECT. 2 MEWS A. ALA W1 I1 9D11 ON T4 DRAMPCS QELAaR1E TO Min (X1011016 6 GAIN AS TIE E3T MEEK! 40 U D� UMW ONMICI E OF .Y_ 1tf ODMWM SHILL FED iEWY MIK CO1011016 AID I300W6 AND 9Mt1 'CRP' THE ARDIRFST Cr Mg 36CREPACES OR =MI6 ADP v AfITCTS6 1( ECM PIM 10 PIMOZBINC wF! 1!E sail cr Nei( AFFrxiED. iscrour 10 IIOIFY UTIOUT MOOR 10 CONSTRUVION 13 LOCJ1TE PAR 11Ol6 =NIT 41 Ag. 31108MED. FL..e. AID SOMME w = MIIG mast OTR ON 'If arum or a mow MAJOR AS 9HAil 3 MUMS 'zf IOW =044CIN 944 9E WSPONSOLE v R ammo, AND AMFICATICM 7 THE >wORU OF Aim '1s ND A IE =RAKE - '1E JAS Alw 4 F *UMW ROME aiE alINCIOR AT Ai„i, %ETIi0EN OF ►1E %MED OBIEWS AS RECUMED ar 4 0301340C AUltoir- S A if =RCM 9111._ IMIESROR AD Ali}" _0W416 OF 9RMMIT __ IEC>►AE'J L AD ELEC1 LOWS Me Q1/E DEW =MOS alMIR 1 0 ALM OR C3Jrin OF 3/015 Of 5**. NOW IRE MOOW OF # »JR 1 0 IIIFGMING UAL e !IE 030 9E,L. E AESPOISMI wR pgo./Ic MILL a.oOOIC AS AMMO FOR *:.0 NE MUM IMAREC G 11: 0319MICIOR 901: E MLR& IOW AMR. MRIBIEW w AXORINCE AIM 1E Myzmelees a< le JAN SORB MIN OF ME 011 w IC Apt anaciek ▪ EOM mom owl 1411,014004 ALE 9 KIM SILL E COMM IR0101 a 111:0111111BLISID A ME pcmC We 911111 COMP,;- elk 0,1 w'RJosi jars, IL RE 0141 uR SOIL Iles! SIRS 40 zaamoas ac ru OPINES FIR 1101.04. 6011 M. ells 14014113t 1111114113 16 fear 6 _ SNIP ARMS OWL PIOCESIIIIc _ it fIoNIL G at 01111111001 S RL MOM SUM IIPOOS r 14113 01A1011C COSOCIOIL • " :25' u. L■• f1.1.---1 L 1 A Tenant Improvement for SABEY CORPORATION 12201 TUKWILA INTERNATIONAL BLVD FOURTH FLOOR SEATTLE, WA 98168 S A H ALE SNAC KS• axAtic ofrrfn Tenant SAHALE SNACKS INTERGATE EAST 3417 S. 120TH PLACE TUKWILA, WA 98168 Burgess Design Inc. DBA: All reproduction & intellectual property rights reserved c 2004 Approved by: REVIEWED FOR CODE COMPLIANCE CE A ononvcn APP F 2 Of �la RI itt r)Tlur. nnrrgnni CONSTRUCTION WORK SHALL NOT PROCEED UNTIL THE BUILDING OWNER / REPRESENTATIVE AND BUILDING TENANT HAVE GIVEN THEIR APPROVAL T`► THESE CONSTRUCTION DOCUMENTS. APPROVAL BY THESE PARTIES SHALL BE INTERPRETED AS APPROVAL OF DRAWINGS FOR CONTENT, FINISH SELECTIONS. SCOPE OF WORK. AND ALL DIMENSIONS REGARDED BY EITHER PARTY AS BEING NECESSARY TO THEIR OPERATIONS. USE OF rriE SPACE. FURNISHINGS. AND TENANT EQUIPMENT AND FURNITURE INSTALLATIONS_ CONSTRUCTION AND /OR INITIATION OF CONSTR'JCTION. AUTHORIZED BY THE BULL DING OWNER FROM THESE CONSTRUCTION DOCUMENTS. SHALL BE INTERPRETED BY THE DESIGNER AS APPROVAL IN FULL OF THESE CONSTRUCTION DOCUMENTS BY BOTH THE auILDING OWNER / REPRESENTATIVE AND THE TENANT. P• _ s sec PERMIT SET i_ REVIS"REVIS4°N �.._ REGISTEIRED ARCHITECT 7 1% KIP G. KOf OOZWJSIG STATE OF WASHINGTON NOV 14 a" u, n-rn. S • =• » • r;: ' r71► :- -.. , :7•-* b_ urgess_weaver 1326 Mtn Aver,uc Suite S00 Seattle Washington 98101 2 0 6 5 8 7 710 T 206 587 7 22 F 12/30/05 02/10/06 03/02/06 Dote: COVER SHEET PROJECT INFORMATION ory MALI 28 r- man caw, G.0.0 1 +:.• -_. yn ...a+w 9rrl- Ro.:'` __...+�. �<a:_......+ '.9..,.� •c . •. . i'- »� ..r3:�is ."!�' a•.:� : - ►..''�.'•�11.i i • 1 v c 1 1 ca A > V ch "n L LA— O N N N h CO m tD w O Q N A 1 L a t s 4 1 1 6 • \\\ \\\ \\\\ CH 1 1 1 tf 11 us 4 ■ 1 '4 1 • / " • T ,.• i L 4 1. z C 0 t .— ,! r 0. of 1 -f 1 4 11 • Z I- /J i I • • •