Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M06-105 - YELLOW FREIGHT
YELLOW FREIGHT e 12855 48 AV S M06 -105 doc: IMC- Permit CITY OF TUKV/ II A DEPT. OF COMMUNITY D _V: '_CflM :NT 6300 SOUTHCENPER LLVD. TUKWILA, WA 98183 Parcel No.: 0004800013 Address: 12855 48 AV S TUKW Suite No: Tenant: Name: YELLOW FREIGHT Address' 12855 48 AV S, TUKW ILA WA Owner: Name: YELLOW FREIGHT SYSTEM INC Address' 10990 ROE AVE, OVERLAND PARK KS Contractor: Name: ENVIROMECH Address: 4320 196TH. SW #B632, LYNNWOOD, WA Contractor License No: ENVIR**088DK Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall /Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig/Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial MECHANICAL PERMIT **continued on next page** PERMIT CENTER Permit Number: Issue Date: Permit Expires On: Phone: Contact Person: Name: NEIL ALLEN Phone: 206 391 -9715 Address: 4735 E MARGINAL WY S, BLDG 1202 SP B -2, SEATTLE WA Phone: 425 - 745 -1919 Expiration Date: 12/31/2006 M06 -105 09/18/2006 03/17/2007 DESCRIPTION OF WORK: REMOVE EXISTING CONDENSING UNIT, AIR/HANDLER UNIT, PIPING, BOILER AND DUCTWORK AND INSTALL 9 ROOFTOP CONDENSING UNITS AND 9 HIGH EFFICIENCY GAS -FIRED FURNACES WITH RELATED DUCTWORK AND REFRIG. PIPING. Fees Collected: $500.08 Value of Mechanical: $30,000.00 Type of Fire Protection: International Mechanical Code Edition: 2003 EQUIPMENT TYPE AND QUANTITY Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15-30 HP /1,000,000 BTU 0 30 -50 HP/1,750,000 BTU 0 50+ HP/1,750,000 BTU 0 Fire Damper 0 Diffuser 5 Thermostat 4 Wood /Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 M06 -105 Printed: 09-18 -2006 doc: IMC-Permit Permit Center Authorized Signature: 41,JAi L17/4.A/ Signature: / Y/ ( ea..,_ Print Name: /0E /L , 47 7 F1 / Permit Number: M06 -105 Issue Date: 09/18/2006 Permit Expires On: 03/17/2007 Date: 4-4?-04. I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit. Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M06 -105 Printed: 09 -18 -2006 CITY OF TUKWIl A DEPT. OF CC' ;. ;U;:ITY DEC LCPMENT 6303 C UTti.:c:N( FILLVD. TUI<W.LA, WA 5 itb8 1: ***BUILDING DEPARTMENT CONDITIONS * ** 4: Readily accessible access to roof mounted equipment is required. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. doc: Conditions PERMIT CONDITIONS * *continued on next page** PEPr IT ENTER Parcel No.: 0004800013 Permit Number: M06 -105 Address* 12855 48 AV S TUKW Status: ISSUED Suite No: Applied Date: 05/24/2006 Tenant: YELLOW FREIGHT Issue Date: 09/18/2006 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, Inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the Washington State Department of Labor and Industries (206/248- 6630). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. M06 -105 Printed: 09- 16-2006 Signature: / y f t 4( ° a1� doc: Conditions I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Print Name: Ak_/z_ ,e ArGLE4I Date: 9 — /t - C M06 -105 Printed: 09 -18 -2006 CITY OF TUKWII PS Community Development Department Public Works. Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** Site Address: /Less 48 vie Ave, Tenant Name: YELL W ARE /G/!T Property Owners Name: /E1-4.0l1/ PRE /6 Mailing Address: / 9990 ROE .4VE , E -Mail Address: NE/L.4 Le E /ROMEO /d , COM Contact Person: /fr/L AL EN q: \Yumiu *Aix &Naga permit application (7-1001) Rnvilad: 6195 M Page King Co Assessor's Tax No. : Suite Number: Floor: New Tenant: ❑ .... Yes �No ©vc,PG.gAJa l K City xs State State Stale D iX(3 Name: NE /2. 1741...E A/ Daypip z (2e4) 39/- 97fl Mailing Address:473S E. Mq.Pr /4/..4.t- h4 y S. R /174, /20.2 SEA 1a/,q. 9?/34 Oty State ZIP Fax Number 0A/4) I'S 2 -7936. Company Name: EN /ROME f{ Mailing Address: 4775 E. M.S9,PI /,v,¢4. IA y 5, 84.06./247, Sa. Q -2 SEA, 24/A, 99/34 CRY Sane Zip Day Telephone•4.ZOe )i9 / 97/5 E-Mail Address: J✓E /LA cf Env/Romeo/ s CoM Fax Number. �..24Q 76 ;L - / 9 Th, Contractor Registration Number: E,J V /R # # ©R ,Qnr Expiration Date: /2/3//04 **An original or notarized copy of current Washington State Contractor License must be presented at the ' e of permit issuance* Company Name: Mailing Address: Oty Contact Person: Day Telephone: E -Mail Address: Fax Number. Company Name: Mailing Address: ale Contact Person: Day Telephone: E -Mail Address: Fax Number. Unit Type Qty- Unit Type: Qt Jnit'fiype:_: Qty Boiler/Compressor: Qty Fu mace<100K BTU 9 Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Fumace>100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15-30 HP /1,000,000 BTU Suspended/WaII/Floor Mounted Heater Ventilation System Wood/Gas Stove 30-50 HP/1,750,000 BTU Appliance Vent Hood and Duct Water Heater 501- HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Emergency Generator � I Air Handling Uuit <10,000 CFM Incinerator — Comm/Ind Other Mechanical Equipment MECHANICAL CONTRACTOR INFORMATION Company Name: EN /A20/V1EGf' Mailing Address: 47.3.5 E, M/l,?G /N.4L ?4//t y S. .62.o6. 'o z SP.B -2 .SE yt4#. 98134 City State Zip Contact Person: /l/E /L ,S Day Telephone: (7, 4A).19/ - 77/S • E -Mail Address: NE/LA C ENV /R04 rn vt Fax Number: (xb/o) 74Z Contractor Registration Number: EN V /R t # ORROK Expiration Date: /2404, * *An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** 0 0 Valuation of Project (contractor's bid price): a ' ° . 3 0 00 , Scope of Work (please provide detailed information): ,&Ae,wE Ex, 5 ,t1& Co v4ENS1NG T/N/T /91R /77ANO.e.ER t%'/r; /9P /N6, 4o,z.ER ,4,VD 17dr :T/Y,,R,!' 4,420 /N.5, —,x . 9 Rcr reer C.oNdEA[ 47i/r 04.1/75 f/Nn 9 .=/r .EFF /C /ENC y acts ',RED /�/.PN,9GES Wires /eF- 7.4TE0 acTWORK G.4S Pin /N& Asvo ge,cRiG. 4'P /N! Use: Residential: New ....0 Replacement ❑ Commercial: New .... Replacement El Fuel Type: Electric ❑ Gas ...0' Other. Indicate type of mechanical work being installed and the quantity below: Value of Construction -In all cases, a value of construction aznount should be entered by the applicant. This tigwe will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNE Signature: Print Name: AUTHORIZED AGENT: ` Date: tr ,z4 - D 6 Day Telephone: Mailing Address: City Date Application Expires: ( (IZ1 Date Application. Accepted: Li I - 4:Warms p w diwgaPeTtit espy a (7-2004) Revised 64-05 Payee: ENVIROMECH ACCOUNT ITEM UST: Description City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 MECHANICAL - NONRES PLAN CHECK - NONRES RECEIPT Parcel No.: 0004800013 Permit Number: M06 -105 Address: 12855 48 AV S TUKW Status: PENDING Suite No: Applied Date: 05/24/2006 Applicant: YELLOW FREIGHT Issue Date: Receipt No.: R06 -00728 Payment Amount: 500.08 Initials: 3EM Payment Date: 05/24/2006 03:23 PM User ID: 1165 Balance: $0.00 TRANSACTION LIST: Type Method Description Amount Payment Check 7284 500.08 Account Code Current Pmts 000/322.100 406.06 000/345.830 94.02 Total: 500.08 5309 05/24 9716 TOTAL. 500.08 doc: Receipt Printed: 05 -24 -2006 Project: Type of I specti n: Address: Date ailed: Special Instructions: .3 f7 C/ Then ( 1 1 4 Date Wanted: i // i Requester: mit Phone No: 2,6g- 3 7/-97x INSPECTION NO. (hVSPECTION RECORD //� Retain a copy with permit / Yia " / PERMIT NO CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (2 431 -3670 E . proved per applicable codes. D Corrections required prior to approval. COMMENTS: te Date: 11 L] $58.00 NSPECTIO FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. Receipt No.: Date: Proje 7((6t» Kiel .t Type of lnspe ion: 7'9/ 0 2 2, ,/.( Address: Date Called: Special Instructions: Date Wanted: J O l4'- y a� r m. Requester: Phone No: 2 INSPECTION RECORD Retain a copy with permit INSPECf1ON NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 COMMENTS: (206)431 -36 Approved per applicable codes. Corrections required prior to approval. 4 17 $58.00 REINSPECTIOII FEE RE , UIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. Receipt No.: Date: Projec(� // � Type [o, �Jf'!/k/ys��/p e J gt L IOn: �� /� Address: % .Date S %tA'f'/, Calle L!>>/� SpeciaiInstructions: Date Wanted: SS Requester. Phone No: #'INSPECTION RECORD Retain a copy with permit INSPECTION NOi!. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Corrections required prior to approval. 3 COMMENTS: 17 $51 00 REINSPECTIOf FEE REQUIRED. Prior to in pettiQn, feg,rattsE paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. Receipt No.: Date: 431 -367 (20 June 13, 2006 Neil Allen 4735 East Marginal Way S Building 1202, Space B -2 Seattle, WA 98134 RE: CORRECTION LETTER #1 Development Permit Application Number M06 -105 Yellow Freight —12855 — 48'" Avenue S Dear Mr. Allen: This letter is to inform you of corrections that must be addressed before your development permit(s) can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time, the Fire, Planning and Public Works Departments have no comments. Buildine Department: Ken Nelsen, 206 -431 -3677, if you have questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2)complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, i thmitilk Brenda Holt Permit Coordinator Encl PAplanning \brenda\M06- 105ection Ib #1doc bh Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 -431 -3665 Building Division Review Memo No further comments at this time. Date: June 12, 2006 Project Name: Yellow Freight mechanical permit applications Application #: M06 -105 Plan Reviewer: Ken Nelsen, Senior Plans Examiner Tukwila Building Division Ken Nelsen, Sr. Plan Examiner An initial Building Division plan review has been conducted on the subject permit application. Please address the following comment with revised plans and /or other applicable documentation. 1. The substantial alteration to replace the single condensing unit system to the proposed nine unit system, will require that complete retum air ducts be installed. This is because the existing return air plenum is within a combustible ceiling space contrary to I.M.C. Section 602. Provide revised plans for a ducted retum air system. ACTIVITY NUMBER: M06 -105 DATE: 09 -08 -06 PROJECT NAME: YELLOW FREIGHT SITE ADDRESS: 12855 48 AV S Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: Bui ng vision Public Works Complete Comments: APPROVALS OR CORRECTIONS: Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 kis PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ Planning Division ❑ Permit Coordinator ❑ DUE DATE: 09-12-06 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROU ING: Please Route Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: DATE: DUE DATE: 10-10-06 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ,,PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M06 -105 DATE: 05 -24 -06 PROJECT NAME: YELLOW FREIGHT SITE ADDRESS: 12855 48 AV S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter it Revision # After Permit Issued DEPARTMENTS: • 111* Builti I Division Public Works 511 q 5 .7 6f 6 Fire Prevention LAl Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Y Incomplete Li Comments: TUES/THURS ROUTING: Please Route d Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28-02 Planning Division ❑ Permit Coordinator ❑ DUE DATE: 05-25-06 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: No further Review Required DATE: DUE DATE: 06-22-06 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) Z Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only II r �, CORRECTION LETTER MAILED: & / -ale /� Departments issued corrections: Bldg /Q Fire ❑ Ping ❑ PW ❑ Staff Initials: i stri City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite # 100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.cl.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 9' 2 0 6 Plan Check/Permit Number: A/1 0/a — !d ❑ Response to Incomplete Letter # Fr Response to Correction Letter # / ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Y E,/ Loki/ /?C/ G F/T Project Address: /,24-,$' — 4-1"" ALE- C. Contact Person: /(/F t L RL LE t J Phone Number: 6206 3 9/ 97/5 Summary of Revision: Wa st di) 5 AS ifkge",F t ran Sheet Number(s): M ¢ f 445 "Cloud" or highlight all areas of revision Including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on mlostap \applicationsVbnns- applications on line\evision submittal Created: 8 -13 -2004 Revised: Steven M. Mullet, Mayor Steve Lancaster, Director RECEnto CRY OP U7 SEP 0 8 2005 PERMIT CENTER License Information License ENVIR * *951PP Licensee Name ENVIROMECH Licensee Type CONSTRUCTION CONTRACTOR UBI 601354268 Ind. Ins. Account Id 88858100 Business Type CORPORATION Address 1 PO BOX 80326 Address 2 City SEATTLE County KING State WA Zip 98108 Phone 2067621960 Status ACTIVE Specialty 1 AIR CONDITIONING Specialty 2 PLUMBING Effective Date 10/17/2005 Expiration Date 10/17/2007 Suspend Date Separation Date Parent Company JOINT ENVIRMNTL MECHANICAL INC Previous License ENVIR * *088DK Next License Associated License Business Owner Information Name Role Effective Date Expiration Date TIMMONS, GRETCHEN PRESIDENT 10/17/2005 TIMMONS, GENE VICE PRESIDENT 10/17/2005 Look Up a Contractor, Electric; an or Plumber License Detail Page 1 of 2 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date https: // fortress .wa.gov /lni/bbip /printer.aspx ?License = ENVIR * *951PP 09/18/2006 • • v 16,1 1,1 r-r-r HA? -15"1- ? o 0 F r. { • fi ., T E. tet 1°- icoo' ` `a 90Nt' z 11 K , • a 1 LOT 38 LF_G� A L PE FirO I-1 That portion of revised Lot 3. as shown on City of Tukwila 8oendary Lieu Adjustment No. 9 4-DIA. as recorded under King County RecsMirp No. 9 Northwesterly 01 the fcllOw•w described : •• BEGINNING at the most Southerly coraar of saki revised Lot 3. THENCE North 49°.24' 00' .West alone the Sotithweseerty Ise 01 said rsrrisod 547 -29 tees to t S TRl1E POINT OF BEGINNING ig Iris Ma&•&ed THENCE Norsk 40' 30' 00' East.- 549.3e Ise% more Or l sd,'te ►ti+e No+therh► boundarti of said rev'see Lot 3, and the terminus of this deaoribed iwe- , 1 rr Ill l � Lot 3, a distar.c* oI 5 6t 11 SEPARATE REQUIRED PM GT Ptinli y of Tina 6 J1LDING DIVISION •r pient:Wir‘ Mari Wow appnxel is subject b aims and made* Amami of oxistzuction docununls does not auulollai V* violation of any =mind code ar ordnance, A 9f approvedFe �j and conditions is acknornisdei. oom 9 fib' C6 QyofT BUILDING DIVISION c, %.c ' ' L VAPLA C .E PERMIT CENTIEfs C . ,• � M A/1ZTR0MECR 4 73S E MA.Q.S i NAX. 1vA y.51 _.;9' /, 4.D //V6 /24.Z, .fa9cE 8-2 , A/A- 98/34 CONDENSING UNIT SCHEDULE FURNACE SCHEDULE MANUFACTURER MANUFACTURER MODEL NO- HEATING CFM HEAT/COOL CFM OUTSIDE AIR EXT. IN w G<. ELECTRICAL REFRIGERANT COIL MCA MAX FUSE REMARKS MBH INPUT MOH OUTPUT VOLT • HZ HP MODEL NO. TOTAL BTUNH SENS. , BTUH ED8/EWB f F -tq,b MANE ( 60 56 1400 700 0.5 120 1 d0 t/2 (2) TXCH048 427 32.0 80/63 12.8 15 2ND FLR, F -2 TRANE TUX1C080A 8 2 74 1800 p, § 0.5 120 120 1 1 Islals 3/4 1 2 TXCB048 47.7 37.1 8 8 18.4 20 2ND FLR (SE) F -3o b TRANS ( TUX1C080A 56 1400 0.5 (2 F - 7277 TSC004$ 32.0 12.8 15 2NO FLR N (+� F -4 TRANE TUX1C080A 74 1000 0.5 120 1 3/4 TXC8048 51.5 39.4 1&4 20 1ST FLR (SE) F -5 TRANS TUX1C080A 80 74 1800 250 0.5 120 1 60 3/4 TXC8048 47.7 37.1 80/63 18.4 20 1ST FLR (CTR) F -6 TRANS TUX1C080A 80 74 1950 550 0.5 120 1 60 3/4 TXC8048 514 41.9 80/63 1&4 20 1ST FLR (SW) F -7 TRANS TUX1D100A 100 93 1950 1000 0.5 120 1 60 3/4 TXC8060 514 41.9 80/63 18.4 20 1ST FLR (NW) UNIT TOTAL 1792 26 524 550 F -7 BREAK /CONF 796 30 20/PERSON 780 CONDENSING UNIT SCHEDULE AREA SO FOOT MANUFACTURER MODEL NO TOTAL MIBH AMBIENT Y STAGES ELECTRICAL �1CA MAX FUSE REMARKS ' VOLT • HZ EGRESS CU -Io.b TRANS TTY (2) 42.7 90 2 460 3 60 13.0 &7 15 2ND FLR, (NE) CU -2 TRANS TTA304$A4 47.7 90 1 460 3 60 110 &7 15 2ND Flit (SE) CU -3o.b TRANE TTA (2) 42.7 90 2 460 3 60 13.0 8.7 15 2ND FLR (NW) CU -4 TRANS TTA3o 4 51.5 90 1 460 3 60 13,0 10.8 20 1ST FLR (SE) CU -5 TRANE TTA3046A4 47.7 90 1 460 3 60 13.0 &7 15 1ST FLR (CTR) CU -6 TRANE TTA300814 53.4 90 1 460 3 60 13.0 10.8 20 1ST FIR (SW) CU -7 TRANE TTA3060A4 53.4 90 1 460 3 60 13.0 10.8 20 1ST FLR (NW) 0.05/S0 FOOT 5 (1st CENTER) OFFICE 1704 20/PERSON 240 UNIT TOTAL 1794 AIR UNIT SYSTEM SPACE AREA SO FOOT CALCULATED OCCUPANT VENTILATION TOTAL RATE (CFM/UNIT) TOT. VENTILATION TOT. VENTILATION REQUIRED (CFI) SUPPUED (CFI) F -1 STORAGE (2nd NE) UTILITY 588 116 .,_ 0.15/S0 FOOT 88 0.05/SQ FOOT 6 EGRESS 0.05 /S0 FOOT 27 TOILET 5 FIXTURES 75/FIXTURE 375 OFFICE IIIIIIIIIIIIIIIII 840 6 20/PERSON 120 UNIT TOTAL IIIIIII 1 2400 6 616 650 F-2 OFFICE 1150 8 20/PERSON 160 (2nd SE) UNIT TOTAL 1150 160 200 8 F-3 STORAGE (2nd NW) UTIUTY OFFICE 616 242 429 0.15/SQ FOOT 105 12 60 0.05 /SQ FOOT 3 20/PERSON MULTIPURPOSE 803 40 15 /'PERSON 600 UNIT TOTAL 2090 43 777 800 F-4 EGRESS 176 0.(M/S0 FOOT 9 ( 1st SE) TOILET 500 75/FIXTURE 900 OFFICE 616 20/PERSON 80 UNIT TOTAL 1292 989 1 000 F -5 EGRESS 90 0.05/S0 FOOT 5 (1st CENTER) OFFICE 1704 20/PERSON 240 UNIT TOTAL 1794 245 250 F -6 EGRESS 438 0.05/S0 FOOT 22 ( Sw) UTIUTY 40 0.05/SQ FOOT 2 OFFICE 994 8 20/PERSON 140 BREAK /CONF 320 18 20/PERSON 360 UNIT TOTAL 1792 26 524 550 F -7 BREAK /CONF 796 30 20/PERSON 780 (1st MW) TOILET 167 2 FIXTURES 75/F1XTURE 130 DISPATCH /OFFICE 297 2 20/PERSON 40 UNIT TOTAL 1292 41 970 1000 • OUTSIDE AIR SUMMARY • NOTES: 1. PROVIDE WITH COIL GUARDS, 5 YR COMPRESSOR WARRANTY, 7 DAY PROGRAMMABLE T -STAT 1MTH SWITCHING SUBBASE. MOUNT ON TAPERED RAILS ON METAL ROOF, DISC SIMTCH BY ELECT. 2. CAPAOTIES FOR TIMNNNED UNITS ARE PER UNIT. NOTES` 1. ALL UNITS TO HAVE OUTSIDE AIR AS SCHEDULED. 2. COIL MATCHED TO CONDENSING UNIT. 3. PROVIDE WITH 1" T.A. FILTERS IN R/A DUCT SIDE ACCESS HOUSING, HI -EFF. FLUE /COMBUSTION AIR COMPONENTS, 10 YR HEAT EXCHANGER WARRANTY. 4- CAPAOTIES FOR 'MANNED UNITS ARE PER UNIT. PROVIDE TWINNING KIT FOR F1 AND F3. 5. ALL UNITS ARE TO BE MOUNTED ON ANGLE NtON STANDS NTH BOTTOM PLENUM AND RETURN AIR INLET. SEQUENCE OF OPERATION 1. SPACE PROGRAMMABLE T -STAT FOR EACH UNIT (ZONE) SHALL CYCLE STAG ES OF HEATING /COOUNG TO MAINTAIN SPACE TEMPERATURE AT ITS SETTING. 2 SUPPLY FANS SHALL OPERATE CONTINUOUSLY DURING OCCUPIED HOURS. 3. 4. 5. RELIEF AIR CONTROL DAMPER SHALL MODULATE TO MAINTAIN INDOOR/OUTDOOR STATIC PRESSURE DIFFERENTIAL AT ITS SETTING (0.10' 1NG). OUTSIDE AIR CONTROL DAMPERS SHALL MODULATE DURING THE COOLNG CYCLE (0 /A BELOW 551 BY COMPARING R/A TO 0/A TEMPERATURES & SELECTING OPTIMUM POSITION FOR FREE COOUNG. MECHANICAL REFRIGERATION VALI STILL BE AVAILABLE. UNITS SHALL STOP & LOCAL ALARM SOUND SHOULD SMOKE BE DETECTED IN RETURN AIR PLENUMS. r r � I (1 ! o •. 0 ; 5 LU 2 W ti HVAC CONSTRUCTION DRAWINGS - - ya" f .r • : a REVI S OMS► M1 gee c Sag le 4 MISC. HVAC SYSTEM REPAIRS YELLOW TRANSPORTATION TUkWILA WASHINGTON 12855 48TH AVE. S 40 PLAN NOTES 1 1. REMOVE EXISTING BOILER AND ALL ACCESSORIES, GAS AND HW PIPING. CONTROLS AND POWER IN ENTIRETY. 2. REMOVE EXISTING BOILER FLUE N ENTIRETY, CAP AND SEAL ROOF PENETRATION. REMOVE EXISTING INDOOR MULTIZONE (9 ZONE) AIR UNIT IN ENTIRETY INCLUDING 3. SUPPLY AND RETURN. OUTSIDE AND RELIEF AIR DUCTWORK, CONDENSATE. REFRIGERANT AND HW PIPING,. CONTROLS AND POWER WIRING. REMOVE EXISTING ROOF MOUNTED CONDENSING UNIT, ASSOOATED REFRIGERANT 4. PIPING. CONTROLS AND POWER WMRI4G IN ENTIRETY. PATCH AND REPAIR ROOF AS REQUIRED. SEAL AU. UNUSED ROOF PENETRATIONS. REMOVE EXISTING HW PUMP. AMR SEPARATOR, EXPANSION TANK, CHEMICAL 5. TREATMENT SYSTEM AND OTHER ACCESSORIES AND COMPONENTS ALONG MATH 16. ALL RELATED PIPING IN ENTIRETY. REMOVE EXISTING ZONE CONTROLS AND ASSOCIATED CONTROL YNRING ON BOTH 6. FLOORS FOR ALL 9 ZONES IN ENTIRETY. PROVIDE BLANK STAINLESS STEEL 18. COVERPLATE FOR ANY UNUSED CONTROLLER LOCATIONS IN FINISHED SPACES. 7. 8v EXISTING OUTSIDE AIR H000 AND CURB TO REMAIN FOR REUSE IN NEW HVAC SYSTEM(S). APPROXIMATE SIZE 68x24. CONTRACTOR TO INSPECT AND NOTIFY OWNER OF ANY DEFICIENOES. CLEAN EXTERIOR RUST (IF ANY) AND PAINT WITH COLD GALVANIZING COMPOUND. EXISTING RELIEF AMR HOOD AND CURB TO REMAIN FOR Re.USE IN NEW HVAC SYSTDA(S). APPROXIMATE SZE 77x24. CONTRACTOR TO INSPECT AND NOTIFY OMANER OF ANY DEFICIENCIES. CLEAN EXTERIOR RUST (IF ANY) AND PAINT MATH COLD GALVANIZING COMPOUND. INSTALL NEW CONDENSING UNITS LEVEL ON ROOF ON TAPERED RAILS. FIELD 9 LOCATE PER MANUFACTURER'S REQUIREMENTS & EXISTING CONDITIONS. NEW REFRIGERANT PIPING FIELD ROUTED BETWEEN FURNACE AND RESPECTIVE 10. CONDENSING UNIT SIZED PER MFGR. CAULK & SEAL WALL PENETRATION. CONNECT REFRIGERANT PPING TO DX COIL PER MANUFACTURER'S RECOMMENDATIONS WITH ALL ACCESSORIES RECOMME7NDED. SUPPORT ROOF MOUNTED PIPING ON WOOD BLOCKING. NEW GAS FIRED FURNACE AND DX COOUNG CON.., FOR EACH NEW ZONE. SEE 11. SCHEDULES FOR SIZING AND ZONING REQUIREMENTS. FIELD LOCATE UNITS. CONNECT NEW SUPPLY & RETURN TO EXISTING CONNECTION POINTS. PROVIDE FABRIC FLEXIBLE CONNECTION ON SUPPLY AND RETURN OF EACH UNIT. PROVIDE BOTTOM AND SIDE RETURN FOR UNITS 5 TONS OR GREATER OR AS REQUIRED BY MANUFACTURER. ELEVATE UNITS ON ANGLE IRON STANDS. FIELD VERIFY AND FIELD ROUTE DUCTWORK. CONNECT OUTSIDE AIR & RETURN DUCTS. FIELD ROUTE AS REQUIRED. EXTEND 3/4" TRAPPED CONDENSATE(S) FROM EACH FURNACE AND DX COIL AND 12. TERMINATE OVER EXISTING FLOOR DRAIN. MECHANICAL GENERAL NOTES INSTALLATION SHALL BE IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE, WASHINGTON STATE ENERGY CODE AND ALL STATE AND LOCAL OROINANCES. DUCT INSTALLATION TO BE IN ACCORDANCE WITH SMACNA STANDARDS. ALL NEW DUCTWORK TO BE SHEETMETAL CONSTRUCTED TO SMACNA LOW PRESSURE STANDARDS. DUCT SAS SHOWN ARE SHEETMETAL SIZES. ALLOWANCE HAS BEEN MADE FOR 1/r LINER W4 LOW PRESSURE DUCTS. COORDINATE ALL W ORIC WITH OOS11NG CONDITIONS, BUILDING STRUCTURE, & OTHER TRADES AS REQUIRED TO PROPERLY INSTALL ALL SYSTEMS AS INTENDED, *THIN THE CONFINES OF SPACE AVAILABLE & WITHOUT INTERFERENCES. NEW EQUIPMENT TO BE LOCATED WITH REGARD TO EXISTING STRUCTURAL RESTRAINTS. COORDINATE EXACT PLACEMENT OF MECHANICAL EQUIPMENT TO AVOID OVERLOADING EXISTING STRUCTURE. OBTAIN SERVICES OF STRUCTURAL ENGINEER FOR ANY STRUCTURAL CONCERNS. VERIFY CLEARANCES N ALL AREAS. ROUTE DUCT & PIPING AS REQUIRED. BEN JOISTS AS ACTUAL JOB CONDITIONS REQUIRE. FIELD VERIFY ALL CONDITIONS KEEP DUCTWORK HIGH AS POSSIBLE. NOTIFY OV NER OF ANY CONFUCTS THAT MIGHT EFFECT PROSECUTION OF THE WORK PRIOR TO INSTALLATION. TEST AND BALANCE NEW EQUIPMENT PER NEBB STANDARDS. COORDINATE WORK AS REQUIRED TO MAINTAIN MANUFACTURER'S RECOMMENDED SERVICE CLEARANCES FOR ALL EQUIPMENT. ALL CONTROLS TO BE MANUFACTURER'S STANDARD DEVICES ELECTRIC/ELECTRONIC. ALL CONTROL MING IS TO BE INCu*ED TO ACCOMPUSH THE INTENDED SEQUENCE OF OPERATION. ALL NEW POWER VINING, INCLUDING WA R NG & CONDUIT. DISCONNECT SWITCHES AND CIRCUIT BREAKERS, REQUIRED FOR NEW MECHANICAL EQUIPMENT SHALL BE PROVIDED IN ACCORDANCE WITH THE NEC AS PART OF THE WOW OF THE CONTRACTOR. CONDENSATE PIPING & TRAPS TO BE STANDARD WEIGHT PVC WITH SOLVENT CEMENT JCANTS. TRAP CONDENSATE FULL SIZE OF UNIT DISCHARGE & TERMINATE OVER FLOOR DRAIN IMTH AIR GAP. • • 13. CONNECT TO EXISTING GAS LINE AND EXTEND GAS TO EACH UNIT AND CONNECT WITH GAS COCK, DIRT LEG AND UNION. FIELD VERIFY AND FIELD ROUTE. EXTEND NEW FLUE AND COMBUSTION AIR FROM HIGH EFF10ENCY FURNACES TO 14. WALL OR ROOF MOUNTED CONCENTRIC TERMINALS. FLASH, CAULK AND SEAL WEATHERTIGHT. 2 -1/2' UNLESS NOTED OTHERWISE. INSTALL NEW 7 -DAY PROGRAMMABLE THERMOSTAT WITH SWTCHMIG SUBBASE 15. FOR EACH NEW ZONE. USE EXISTING CONTROL DEVICE LOCATIONS WHERE POSSIBLE. PROVIDE NEW WIRING APPROPRIATE FOR NEW SYSTEM. REUSE OLD HARING ONLY IF APPROVED BY EQUIPMENT MANUFACTURER. NEW HARING MAY BE RUN CONCEALED ABOVE CEILINGS W4 PLENUM RATED CABLE. 17. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. .32. CONNET TO EXISTING RETURN AIR OPENING/DUCT AS REQUIRED. MANUAL DAMPER, BALANCE TO CFM SHOWN. BLANK OFF EXISTING COMBUSTION AIR OPENINGS WITH SHEETMETAL & INSULATE MA TH 1 RIGID FIBERGLASS. REMOVE EXISTING CONTROL PANEL & ALL ASSOOATED MIRING. CONTROL DAMPER. CFM'S AS SHOWN. 28x36 0/A DN TO AIR PLENUM. 60x20 HORIZONTAL R/A PLENUM BELOW FURNACES. CONNECT TO EXISTING DUCT UP TO OUTSIDE AIR HOOD. CONNECT TO EXISTING DUCT UP TO RELIEF HOOD. 28x26 ON TO HORIZONTAL AIR PLENUM BELOW FURNACES. SHIELDED OUTSIDE AIR STATIC PRESSURE SENSOR. INDOOR AIR STATIC PRESSURE SENSOR. OUTDOOR AIR TEMPERATURE SENSOR. RETURN AIR TEMPERATURE SENSOR. REMOVE EXISTING T -STAT & INSTALL WALL COVER PLATE. REMOVE AND REPLACE EXISTING WALL T -STAT. COND DRAIN. ANCHOR TO FLOOR. SLOPE 1720' IAN UNIFORM. REFRIGERANT PIPING TO BE TYPE ACR WITH BRAZED JOINTS OR PRECHARGED FLEXIBLE COPPER TUBING INSULATE ENTIRE SUCTION LINE WITH 3/4' UNICELLULAR INSULATION, ALL JOINTS SEALED. PAINT EXTERIOR PORTIONS WITH UV RESISTANT PAINT. HIGH EFFICIENCY EQUIPMENT FLUES TO BE SCHEDULE 40 PVC MATH SOLVENT CEMENT * JOINTS PER MANUFACTURER REQUIREMENTS. PROVIDE CONCENTRIC ROOF OR WALL TERMINAL AND FIASHNNGS. NEW CONDENSING UNITS SHALL BE MOUNTED LEVEL ON CONCRETE PADS N * ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. NEW WALL/ROOF PENETRATIONS SHALL BE DRILLED. FLASHED AND CAUUCED AND SEALED MIEATHERTIGHT. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION AND REPAIR NECESSARY TO TRANSPORT AND INSTALL NEW EQUIPMENT AND TO REMOVE OLD EQUIPMENT AND ACCESSORIES. ALL REPAIRS SHALL RESTORE TO EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING,, PATCHING AND FLASHING AND ROOF REPAIRS. CONTRACTOR IS RESPONSIBLE FOR At. DAMAGES ASSOOATED WITH CONSTRUCTION ACTINTY AND SHALL RESTORE THE BUILDING DING TO EXISTING COMMONS. CONTRACTOR IS RESPONSIBLE FOR EQUIP ENT TRANSPORT. HOISTING AND HANDUNG. ALL ITEMS NOTED TO BE REMOVED SHALL BE REMOVED N ENTIRETY ALONG MATH ALL RELATED ACCESSORIES. DUCT. PIPING. MIRING AND OTHER DEIACES. ALL ITEMS TO BE REMOVED SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED PER ALL STATE AND LOCAL REGULATIONS UNLESS 01HERNISE DIRECTED BY THE OWNER. rM'ILE NOT ANTIOPA1ED, ANY ASBESTOS ABATEMDAT WORK IS SPECIFICALLY EXCLUDED FROM THE SCOPE OF THIS PROJECT. DO NOT DISTURB ANY SUSPECT MATERIALS. NOTIFY OWNER IMMEDIATELY SHOULD SUSPECTED MATERIALS BE ENNCOUN1ERED OR INADVERTENTLY DISTURBED. CEASE WORK AND WAIT FOR INSTRUCTION FORM AN INDUSTRIAL HYGIENIST SHOULD ANY SUSPECT MATERIALS BECOME FRIABLE. EQUIPMENT SHALL BE BY MFGR AS NOTED OR ACCEPTABLES EQUNVALE NT EQUIPMENT BY ALTERNATIVE MAJOR MFGR. 4 GAS PIPING TO BE SCHEDULE 40 BLACK STEEL, SCREWED FITTINGS, LUBRICATED PLUG -COCK SHUTOFF VALVES. THE INTENT OF THESE DOCUMENTS IS TO PROVIDE A DESIGN AND INSTALLATION CRITERIA FOR REPLACEMENT OF EXISTING HVAC EQUIPMENT AS DESCRIBED. THIS INFORMATION FURNISHED IS LARGELY BASED ON UMITED STE OBSERVATION. DOSING DRAWINGS AND INFORMATION FROM OTHERS. THEY ARE INTENDED TO INDICATE DESIGN CONCEPTS ONLY AND ARE NOT GUARANTEED TO BE 100% ACCURATE OR ALL NCLUSIVE NOR DO THEY SHOW EACH AND VERY DEVICE OR AT DITHER DO THEY SHOWN EACH AND EVERY ITEM REQUIRING REMOVAL OR RELOCATION. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS. P4CLUDING BUT NOT UMITED TO LOCATION, SZE AND CONDITION OF EXISTING EQUIPMENT, DUCTWORK, PIPING, CONTROLS AND ELECTRICAL. PRIOR TO COMMENCING MARK AND HOi THESE CONDITIONS MAY EFFECT PROSECUTION OF THE WORK OF THE CONTRACT. THE CONTRACTOR SHALL TURN OVER TO THE OWNER. WORKING HVAC SYSTEM(S) COMPLETE IN EVERY RESPECT. NOTE THAT THIS BUILDING WILL BE OCCUPIED DURING THE COURSE OF THE PROJECT. THE CONTRACTOR SHALL WORK WI TH THE FACILITY TO MIINRMIZE DISRUPTION & MAINTAIN REASONABLE COMFORT CONDITIONS DURING THE COURSE OF CONSTRUCTION. CONTRACTOR SHALL PROVIDE TEMPORARY HEATING /CXOOU NG AS REQUIRED TO MAINTAIN THESE CONDITIONS. ANY SYSTEM DOWNTIME ME SHALL BE COORDINATED IN ADVANCE WITH THE FACILITY AND THEY SHALL DETERMINE WHEN AND FOR HOW LONG A DOWN TIME IS ACCEPTABLE. IN GENERAL, EXCEPT FOR CONTROLS WORK, ALL MAMMON AND SYSTEM RENOVATION WORK IS TO OCCUR N THE EXISTING IAECHANICAL ROOM. CONTRACTOR TO PROVIDE ADDITIONAL ENGINEERING AS REQUIRED TO COMPLETE 'DESIGN BUILD' DRAMMNGS TO MEET ALL CODE SUBMITTAL REQUIREMENTS. CONTRACTOR SHALL VERIFY ACTUAL INSTALLED SYSTEMS * ANY BUILDING MODIFICATIONS. NOTIFY OWNER/ENGINEER OF ANY ZONING DISCREPANCES. PROVIDE RETURN AIR SMOKE DETECTOR SHUTDOWN FOR ALL UNITS. SEE ELECTRICAL CONTROL DAMPERS TO BE RUSKIN CD-50 AIR FOE LOW LEAK DAMPERS VAIN ELECTRIC ACTUATORS 11, 0 F-4 F -5 • FIRS FLOOR t- F".4 Y W • ...WIL -. f 1 • 7 KEY PLAN, gam or - r-r 3 t � n r += .3..,2L ::,- • . Th. ._. • • 1 1 -- • i 1 s Z - 3 ,r 1 • • SECOND FLOOR • MK: F -1 1 3 I• -up ?,=4“ v, j r PERIM Car e» •IM RECEIVE- Monk AO. a. ••■ Z WAWCONS ary Ric 1 3 m 4 1- ti o LU N IX a 5 41 T 4 LLI IT< 2 HVAC CONSTRUC'T1ON DRAWINGS SBA FLUE GAS TERMINAL COMBUSTION AIR TERMINAL PVC FLUE GAS AND COMBUSTION AIR PIPING - SEE MANUFACTURER'S SIZING CHART MECHANICAL ROOM GAS & CONDENSATE PIPING PLAN SCALE: 1/4* - 1' -0' TYPICAL FURNACE PIPING CONNECTIONS SCALE: 1/4' i' -p 72' REF. LIQUID PIPING REF. SUCTION PIPING 11 CONDENSATE PIPING TO APPROVE LOCATION TERMINATE FLUE VENTS AND # COMBUSTION AIR INTAKES AT TERMINATE FLUE VENTS AND S70EWALl \ COMBUSTION AIR INTAKES AT SIDEWALL 11 !! !! L . I W . kt!.m �7 [2• - I I 4x4 SLEEPERS BENEATH CU-6 - SPAN STRUCTURE BELOW REFRIGERANT rThG TO GF -06 WALL OF MECH SPACE MOW STAIRS ROOF MIME LOADING DOCK AREA PVC FLUE GAS AND COMBUSTION AIR PIPING. REFER TO MANUFACTURER'S SIZING CHART WITH REGARD TO LENGTH AND NUMBER OF ELBOWS ALLOWED. SA PLENUM � 1111 - All TYPICAL CASED DX COIL TYPICAL GAS FURNACE S PIPING RA PLENUM MECHANICAL ROOF PLAN (PARTIAL) WALE: lir e. PIPING TO BE SIZED PER MANUFACTURER'S RECOMMENDATIONS WITH REGARD TO LENGTH AND NUMBER OF ELBOWS REQUIRED (TYPICAL) } 'TERMINATE FLUE VENTS AND COMOUST10N AMR INTAKES AT SIDEWALL . a_ M: • j • y r 16:0() EXISTING MEIER. SECTION AT CU-6 ON ROOF SCALE: WOK x >.< C 660 MBH CONNECTED ill IE= MIONINIFIN r L3j 1 — _1 i I Z 2 x20 6 i 7I 1 32x`•., w•w. w• w R /M SCALE: 1/4 - 1' -0' rwAu OF MECH ROOM x >G RKA I ... A.' .., ,, I �tE,= WA (7'39) MECHANICAL ROOM DEMOLITION PLAN MECHANICAL ROOM GAS & CONDENSATE PIPING PLAN o 22x1 4 a 11 30x16 24x24 76x24 0/A UP (ETR) 28x2 ILA 1eoo 32x13 • 11% • 10 , p �Tp ' 10 32x1 • 0p © ry 20x12 DPI MECHANICAL ROOM DUCTWORK PLAN 4600MAX 1000MIN (fr, LOCATE CU -6 ON ROOF BEHIND MECH. ROOM LOCATE CU'S Mk 36" FROM WALL AT GRACE ( TWICAL OF 5) 2800 r. LOCATE CU-2 & CU-5 BEICATH STAIRS CONDENSING UNIT PLAN R/A 1 i is ; s .._ ; LA§ 11 *ft • 22 REFRIGERANT LIQUID AND SUCTION PIPING TO FURNACES IN MECH. ROOM r• , CO 51 RISE 76146 R/A ON (ETR) 76x26 RLF UP (ETR) • • PEW l I i �- IAESc 1ar ISM AS900111ED P.M MO 0110111011111 10 E tOG11111 M liEDYwPx MOM CONEIC0016 10 EMUS 011G711011[ AIO PIPING 1p E ME MIN 14 MOM %An' ALL Min CONDIMONS AND FELD MOE PAO FIELD MAN i HVAC CONSTRUCTION DRAWINGS Mune MIS DalE al* REVISIONS I .E► .a ZI Qi Z 0 co Z Q N 0 I -NG J W y i M3 1 NEW TRANSFER — _.- 225 GRILLES (2) - SHOEMAKER 900T 1185 CFM r- -9 < CAP oFF EXISTING DUCT IN CEIUNG - SPACE AND MAKE \ READY FOR >: REMOVE EXISTING AND INSTALL CEILING TILE RESULTANT MIN OSA DAMPER SETPOINT = 1260 CFM (16% OF TOTAL CFM FOR ALL FLOOR 1 FURNACES) 150 250 REMOVE EXISTING AND INSTALL CEILING TILE y 7 ♦` \I _A 225 DX•. 4 REMOVE EXISTING AND INSTALL CEILING TILE 14x10 ---- 1 8 0 -------2 0 x N 935 i'? i :; • } • i ' .FIRST FLOOR EXISTING SYSTEM RETURN AIR REVISION SCALE: 3/16" = 1' -0" 1 • • • - - • 1 M OLI cos scE r r` v ••∎ , rte /II t tea- O IT& NaiIEs CCO EC110M5 10 REAM Art SYS1D1 s orcA*D ARE IN RESPONSE 10 A CORREC1ON 1101110E ISSUED ON S/13 REGARDING P'ER•iT NOD # -105► 1NE EASING iE11RA1 Pumas was NEGIAMED 10 SE 01ME6/ 10 A RCM REAM AID STS, Z►w4 .+ DATE MAY 2 2()06 REVISIONS TE 91705 REVISION SUBMITTAL SHEET P10 1 iSSUE M4 • NEW TRANSFER GRILLES (2) — SHOEMAKER 900T 1185 CFM RUN NEW R.A. DUCTS TIGHT TO CEDING — PAINT TO MATCH =CEILING 14x.8 ----1 SHOEMAKER MODEL 907 20x10 RET AIR GRILLE —1 002 CFM (2 TYP) R;A A 54 22 _ Y 20x10 NEW 36x60 DUCT DROPPED DOWN BELOW EXISTING CEILING NEW RA GRILLE -- SHOEMAKER 900T 785 CFM NEW 20x20 RA GRILLE — SHOEMAKER 907 -- 1500 CFM 6 > TOTAL RETURN AIR ALL NEW GRILLES = 6384 CF REQUIRED TOTAL R.S /OS FOR FURNACES Fla, Fib F2, F3a & F3b = 7400 CFM. CONNECT 16x16 DUCT TO NEW R.A. DUCT AT THIS POINT SECOND FLOOR EXISTING SYSTEM RETURN AIR REVISION SCALE: 3/76" = 1' -0" REQUIRED TOTAL RA /OSA FOR FURNACES Fla, Fib, F2, F343 do F3b = 7400 CFM. RESULTANT MIN OSA DAMPER SETPOINT = 1016 CFM (137L OF TOTAL CFM FOR ALL FLOOR 2 FURNACES) REVISION SuBMrrrAL SHEET ORMAN lAfki DATE MAY 2 2006 • • • • 1