HomeMy WebLinkAboutPermit M06-186 - SEATTLE CHOCOLATESSEATTLE CHOCOLATES
1180 ANDOVER PK W
EXPIRED 4 -03 -07
M06 -186
City in? Tukwila
Parcel No.: 3523049085
Address: 1180 ANDOVER PK W TUKW
Suite No:
Tenant:
Name: SEATTLE CHOCOLATES
Address: 1180 ANDOVER PK W,
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 9818S
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: ci.tukwila.wa.us
Owner:
Name: GCC -LCC
Address 1180 ANDOVER PARK W, TUKWILA WA
Contact Person:
Name: ROBERT DAVY
Address 2701 152 AV NE, REMOND WA
Contractor:
Name: TRI MECHANICAL INC
Address: P.O. BOX 444, REDMOND WA
Contractor License No: TRIMEI`044KB
DESCRIPTION OF WORK:
INSTALL HVAC SYSTEM FOR TENANT IMPROVEMENT
Value of Mechanical: 118,675.00
Type of Fire Protection:
Furnace: <100K BTU 0
>100K BTU 0
Floor Furnace 0
Suspended/Wall /Floor Mounted Heater 0
Appliance Vent 0
Repair or Addition to Heat/Refrig /Cooling System..., 4
Air Handling Unit <10,000 CFM 0
>10,000 CFM 0
Evaporator Cooler 2
Ventilation Fan connected to single duct 4
Ventilation System 1
Hood and Duct 0
Incinerator: Domestic 0
Commercial /Industrial 0
doc: IMC- Permit
MECHANICAL PERMIT
Permit Number:
Issue Date:
Permit Expires On:
EQUIPMENT TYPE AND QUANTITY
"continued on next page"
Phone:
Phone: 425 391 -6016
Phone: 425 391 -6016
Expiration Date:05 /02/2007
Steven M. Mullet, Mayor
Steve Lancaster, Director
M06 -186
08/30/2006
02/26/2007
Fees Collected: $1,168.76
International Mechanical Code Edition: 2003
Boiler Compressor:
0 -3 HP /100,000 BTU 0
3 -15 HP /500,000 BTU 0
15 -30 HP /1,000,000 BTU 0
30 -50 HP/1,750,000 BTU
50+ HP/1,750,000 BTU 0
Fire Damper 0
Diffuser 0
Thermostat 1
Wood /Gas Stove 0
Water Heater 0
Emergency Generator 0
Other Mechanical Equipment
M06 -186 Printed: 08 -30 -2006
Permit Center Authorized Signature:
I hereby certify that I have read and
ordinances governing this work will b'7Q
doc: IMC- Permit
City to Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 -431 -3665
Web site: ci.tukwila.wa.us
fried
m iec
Steven M. Mullet, Mayor
Steve Lancaster, Director
Permit Number M06 -186
Issue Date: 08/30/2006
Permit Expires On: 02/26/2007
AA VW � lvv MACi Lal Date: I'J9i 1 a7016
is permit and know the same to be true and correct. All provisions of law and
with, whether specified herein or not.
The grantin • • f this • ermit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating c • tr. or the performance of work. I am authorized to sign and obtain this mechanical permit. /
Signature: Date: $l /
A fff
Print Name:
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is
suspended or abandoned for a period of 180 days from the last inspection.
M06 -186 Printed: 08 -30 -2006
City Old Tukwila
Parcel No.: 3523049085
Address: 1180 ANDOVER PK W TUKW
Suite No:
Tenant: SEATTLE CHOCOLATES
1: ** *BUILDING DEPARTMENT CONDITIONS * **
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206- 431 -3670
Fax: 206 - 431 -3665
Web site: ci.tukwila.wa.us
PERMIT CONDITIONS
* *continued on next page **
`.+
Steven M Mullet, Mayor
Steve Lancaster, Director
Permit Number: M06 -186
Status: ISSUED
Applied Date: 08/21/2006
Issue Date: 08/30/2006
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
4: Readily accessible access to roof mounted equipment is required.
5: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
6: Manufacturers installation instructions shall be available on the job site at the time of inspection.
7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila
Permit Center.
8: All electrical work shall be inspected and approved under a separate permit issued by the Washington State Department
of Labor and Industries (206/248- 6630).
9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
doc: Conditions M06.186 Printed: 08-30-2006
Signature:
Print Name:
doc: Conditions
City &'Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: ci.tukwila.wa.us
V
Steven M. Mullet, Mayor
Steve Lancaster, Director
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws
regulating construction or the performance of work.
Date:
$l706
M06 -186 Printed: 08 -30 -2006
CITY OF TUKWIJ
Community Develop t Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
hilo://www.cltukwile.wa. us
Name: 12-o'7619-4r D I'r-I \{
Mailing Address: 'j :in ( l .A tL&'ts 1.1V
E-Mail Address:
&'& p Q Its -
E-Mail Address:
Contractor Registration Number:
Building Perm o.
Mechanical Permit No.
Plumbing/Gas Permit No.
Public Works Permit No.
Project No.
(For office use only)
17106
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
I SITE LOCATION
PO
p /� U King Co Assessor's Tax No.:
Site Address: 1 k i fnn YL V BYt-Y � 1 --. Suite Number. Floor.
Tenant Name: ACbr fl l (Anne
Anne.01.�PfCa4 New Tenant: K.....Yes El ..No
Property Owners Name: �:7 - ae's - r \ L-1 (i% DC. ) I
Mailing Address: 91610 t lnpMt t to 6CYI' - ut
City
ail.) l�
State
I CONTACT PERSON
Day Telephone: 42S
e rktniK 4 5n U
City state
Fax Number:
I GENERAL CONTRACTOR INFORMATION -
(Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg S) )
Company Name:
Mailing Address:
City
Contact Person: Day Telephone:
Fax Number:
Expiration Date:
State
ARC :D I ECT OF RECORD -All plans must be wet stamped by Architect of Record
1
Company Name:
Mailing Address:
Clay
Contact Person: Day Telephone-
E-Mail Address: Fax Number:
State
94(x8
Zip
)A QSo52.
Zip
Zip
Tip
I ENGINEER OF RECORD - Ati plans mast be wet stamped by Engineer of Record
I
Company Name: 6V\fal. v. l✓C. 99 � �\1 , C. / t� � I
Mailing Address: VU) ��'S v\ 1 fa/ rs 3� tr 1 l �1.�� -TJ
City State Zip
Day Telephone: 7D e (07 2 I CO
Contact Person: 5 i \C_Q C)LA"
E-Mail Address: `e 1/ �►� \ Pff'�L . caw. Fax Number: 2& ( Co — r'7 ? '1 4
Q W diutlwMPOmsMdicm
on IineV- 2006 - Permit Mptia6on.doe
Revised 4-2006
bh
Page 1 of 6
Unit Type:
Qty
Unit Type:
Qtv
Unit Type:
Qty
Boiler /Compressor:
OW
Furnace<100K BTU
Air Handling Unit >10,000
CFM
Fire Damper
0-3 HP /100,000 BTU
Fumace>100K BTU
Evaporator Cooler
Diffuser
3 -15 HP /500,000 BTU
Floor Furnace
Ventilation Fan Connected
to Single Duct
Thermostat
15-30 HP /1,000,000 BTU
Suspended/Wall/Floor
Mounted Heater
Ventilation System
Wood/Gas Stove
30 -50 HP /1,750,000 BTU
Appliance Vent
Hood and Duct
Water Heater
50+ HP /1,750,000 BTU
Repair or Addition to
Heat/Refrig/Cooling
System
Incinerator - Domestic
Emergency
Generator
Air Handling Unit
<10,000 CFM
�{
\
Incinerator — Comm/Ind
Other Mechanical
Equipment
Z
MECHANICAL PERMIT INPwltMATION - 206 - 431 -3670
Mailing Address: 'PO top)Z *44
UpplicaEINIFeem4Applicthn 4 On Iine l -2006 - Permit Appliman.dx
Revised 42006
kb
MECHANICAL CONTRACTOR INFORMATION
Company Name: Q A
'i\ Y W�� \CL � Z�/l L
TLCOwtMk us e Tip
k Rho
rf��
City stat
Contact Person: _DAN 'f Day Telephone: 4'7 ?PIA — bo Lie
E-Mail Address: — Fax Number:
Contractor Registration Number: 'TWA WW. 1* 0 44-• 11-13 Expiration Date: n c i / n24 7 no 7
Valuation of Project (contractor's bid price): $ ttej w
Scope of Work (please provide detailed information): 1 t 1. -16-- WE Pre-. G Ewe
- t - win -wr 1 vicip rtou --- rvtuzrvvn - vivo Sarc
Use: Residential: New _ID Replacement .... 0
Commercial: New ....I Replacement .... 0
Fuel Tvpe: Electric Gas....0 Other:
Indicate type of mechanical work being installed and the quantity below:
Page 4 of 6
`PERMIT APPLICATION NO P a — Applicable to all permits in this acation
Value of Construction — In all cases, a value of construction amount should be entered by the applicant This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING
Signature:
!*�N�1tV I.
Print Name:
Mailing Address:
I Date Application A
os
Dnildinx and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
piumbinv Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing code (current edition).
Date Application Expires:
o€ - /aI/c 7
ted:
lo(c>
Q:IAlplic. casTo nrAppliaUOm On LS\3- -2006 - Permit AppliaMn.doc
Revised 4-2006
bh
.6 6 "• ' D l ate: — 2 l�Ob
Day Telephone: M25- 34/ -466
i/
City
Staff Initials:
�c✓
Page 6 of 6
City of Tukwila
6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
Parcel No.: 3523049085 Permit Number: M06 -186
Address: 1180 ANDOVER PK W TUKW Status: APPROVED
Suite No: Applied Date: 08/21/2006
Applicant: SEATTLE CHOCOLATES Issue Date:
Receipt No.: R06 -01363 Payment Amount: 941.01
Initials: JEM Payment Date: 08/30/2006 08:45 AM
User ID: 1165 Balance: $0.00
Payee: TM-MECHANICAL, INC.
TRANSACTION LIST:
Type Method Description
Amount
RECEIPT
Payment Check 13833 941.01
ACCOUNT ITEM LIST:
Description
Current Pmts
MECHANICAL - NONRES
Account Code
000/322.100 941.01
Total: 941.01
9157 06/30 9710 TOTAL 941.01
doc: Receipt - Printed: 08 -30 -2006
City of Tukwila
6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
Parcel No.: 3523049085 Permit Number: M06 -186
Address: 1180 ANDOVER PK W TUKW Status: PENDING
Suite No: Applied Date: 08/21/2006
Applicant: SEATTLE CHOCOLATES Issue Date:
Receipt No.: R06 -01309 Payment Amount: 227.75
Initials: LAW Payment Date: 08/21/2006 02:03 PM
User ID: 1632 Balance: 5941.01
Payee: TRI- MECHANICAL INC
TRANSACTION LIST:
Type Method Description
Amount
RECEIPT
Payment Check 13802 227.75
ACCOUNT ITEM LIST:
Description
Current Pmts
PLAN CHECK - NONRES
Account Code
000/345.830 227.75
Total: 227.75
8857 08/21 9716 TOTAL 227.75
doc: Receipt - Printed: 08 -21 -2006
Project:
':6997 &hie°Zac
Type of Inspection:
f /N /
Address:
/ /LI O 4N4m't Pc c)
Date Called:
Special Instructions:
Date Wanted:
/0 -.S-O G
P.m.
Requester:
Phone No:
INSPECTION RECORD I /72 7/
Retain a copy with permit ISC
INSPECTION NO. PER
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
Li Approved per applicable codes.
COMMENTS: 1 b
1
i .
lerzfroiS
ri $58.t I EINSPECTION EtE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd:, Suite 100. Call to sechedule reinspection.
Receipt No.:
'Date:
0 Corrections required prior to approval.
Proiest:
43 E4tfl 6 i-104C
Type of Inspection: `,.....
P-ei v iry to j es,—r
Address:
H Si A EInt e. P GO
Date Called:
Special Instructions:
Date Wanted: a.m.
crib
Requester:
Phone No:
e a (,) Gr IS t - ° A 5 0
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
(206)431-
Approved per applicable :tides. 0 Corrections required prior to approval.
COMMENTS:
ificpe tor:
-444
8.00 REtKSPECTIOF4 FEE REQUIREf Prior to inspection, fee must be
aid at 6300 Southcenter Blvd., S e 100. Call to sechedule reinspection.
Receipt No.: !Date:
ACTIVITY NUMBER: M06 -186 DATE: 08 -21 -06
PROJECT NAME: SEATTLE CHOCOLATES
SITE ADDRESS: 1180 ANDOVER PK W
X Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter #
Revision # After Permit Issued
DEPARTMENTS:
CI
Buildi g Division
Public Works
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Comments:
APPROVALS OR CORRECTIONS:
Approved ❑
Notation:
REVIEWER'S INITIALS:
Documemdrouling slip.doc
2 -28 -02
° ERMIT COORD COPY
PLAN REVIEW /ROUTING SLIP
Fire Prevention
Structural
Incomplete ❑
TUES/THURS ROUT NG:
Please Route Structural Review Required
REVIEWER'S INITIALS:
Approved with Conditions
Planning Division
❑ Permit Coordinator ❑
DUE DATE: 08-22-06
Not Applicable ❑
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
No further Review Required
DATE:
DATE:
DUE DATE: 09-19-06
Not Approved (attach comments) ❑
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
License Information
License
TRIMEI *044KB
Licensee Name
TM MECHANICAL INC
Licensee Type
CONSTRUCTION CONTRACTOR
UBI
601709252
Ind. Ins. Account Id
#6
Business Type
CORPORATION
Address 1
PO BOX 444
Address 2
City
REDMOND
County
KING
State
WA
Zip
980730444
Phone
4253916016
Status
ACTIVE
Specialty I
GENERAL
Specialty 2
UNUSED
Effective Date
5/2/1996
Expiration Date
5/2/2007
Suspend Date
Separation Date
Parent Company
Previous License
Next License
Associated License
Bond Information
Bond
Bond
Company
Name
Bond
Account
Number
Effective
Date
Expiration
Date
Cancel
Date
Impaired
Date
Bond
Amount
Received
Date
#6
CBIC
LC0466
05/01/2006
Until
Cancelled
01/01/1980
$12,000.00
03/09/2006
Business Owner Information
Name
Role
Effective Date
Expiration Date
HILDERBRAND, KURT E
01/01/1980
JOHNSON, DAVE
01/01/1980
JENSEN, RONALD
01/01/1980
Look Up a Contractor, Electric; an or Plumber License Detail Page 1 of 2
4d %me
Washington State Department of Labor and Industries
General/Specialty Contractor
A business registered as a construction contractor with L &I to perform
construction work within the scope of its specialty. A General or Specialty
construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
https: // fortress. wa. gov /Ini/bbip /printer.aspx ?License= TRIMEI *044KB 08/30/2006
MECHANICAL SYMBOLS LEGEND (NOT ALL SYMBOLS ARE USED ON THESE DRAWINGS)
SYMBOL
DESCRIPTION
SYMBOL
DESCRIPTION
SINGLE DOUBLE
HVAC
99ET IIAMEJt
MO.1
WORK DEFINITION
LINE LINE
DUCT CONNECTION TO SUPPLY DIFFUSER, REFER TO DETAILS
DUCT CONNECTION TO RETURN GRILLES, REFER TO DETAILS
CONNECTION TO EXHAUST GRILLES. REFER TO DETAILS
SUPPLY AIR (SA) ELEVATION CHANGE (SOLID UNE UP.
BROKEN IE DOWN)
RETURN AIR (RA). RELIEF AIR OR EXHAUST (SOLID UNE UP,
BROKEN IE DOWN)
RISE/DROP WITH 90' ELBOWS (RECTANGULAR DUCTS)
RISE/DROP W/ 45' ELBOWS (RECTANGULAR DUCTS)
RISE/DROP W/ 90' ELBOWS (OVAL DUCTS)
RISE/DROP W/ 45' ELBOWS (ROUND OR OVAL DUCTS)
RISE/DROP W/ 90' ELBOWS (ROUND DUCTS)
RADIUS ELBOW
SQUARE ELBOW WITH TURNING VANES
CTANGULAR BRANCH TAKE -OFF
CONNECTION TO EXISTING
DISCONNECTION FROM EXISTING
GRILLE, REGISTER AND DIFFUSER CALLOUT
INDICATES DETAIL AND SHEET NUMBER WHERE ADDITIONAL
INFORMATION ABOUT DETAIL CAN BE FOUND
MECHANICAL EQUIPMENT CAULOUT; REFER TO
MECHANICAL EQUIPMENT SCHEDULE
INDICATES SECTION AND SHEET NUMBER WHERE
SECTION CAN 8E FOUND
FIXTURE CALLOUT
DETAIL/FLAG NOTE
REVISION SYMBOL
REMOVE EXISTING MECHANICAL EQUIPMENT/WORK
ABBREVIATIONS
1— ' - 18) -40
e 1]- S)
'- ----I
INoN I
0- 111 'Mg is 0
1- 0 0-O Mg
0--3-1 + , •
: •
1--3
-- maim
1-0-0-0 41311 1
Q Q a m V s W E "` 8§ W LE I§ s z, Z Z Z A S g R E 6 o s i t s j
1—
—0 :i OE IV
w #
t
R•1.5W
----1. q
ABOVE FINISH FLOOR
ACCESS PANEL
AOD VENT THROUGH ROOF
AIR HANDLING UNIT
AREA DRAIN
BACK DRAFT DAMPER
CONTROL CONTRACTOR
CABINET UNIT HEATER
DIFFUSER
DOOR GRILLE
DRINKING FOUNTAIN
DUCT THROUGH ROOF
ELECTRIC WATER COOLER
ELECTRICAL CONTRACTOR
ELEVATION
EMERGENCY EYEWASH /SHOWER
EMERGENCY SHOWER
ENTERING AIR TEMPERATURE
ENTERING WATER TEMPERATURE
EXHAUST
EXISTING
EXTERNAL STATIC PRESSURE
RN TUBE RADIATION
FLOOR CLEAN OUT
FLOOR DRAIN
GENERAL CONTRACTOR
GRADE CLEAN OUT
GRILLE
IN JOIST SPACE
INVERT ELEVATION
KITCHEN EQUIPMENT CONTRACTOR
LAVATORY
LEAVING AIR TEMPERATURE
LEAVING WATER TEMPERATURE
MANHOLE
MANUAL VOLUME DAMPER
MECHANICAL CONTRACTOR
MIXED AIR
MOP BASIN
MOTORIZED DAMPER
MOTORIZED LOUVER
NEW
NORMALLY CLOSED
NORMALLY OPEN
NOT IN CONTRACT
OUTSIDE MR
OVERFLOW DRAIN
RETURN AIR
RETURN GRALE
ROOF DRAIN
SHOWER
SINK
SUPPLY AIR
SUPPLY GRRLE
TOTAL STATIC PRESSURE
UNIT HEATER
UNIT VENTILATOR
URINAL
VARIABLE AIR VOLUME
VENT THROUGH ROOF
WATER CLOSET
WALL CLEAN OUT
°---T
45 ��
MIN.
4R /ROUND, ROUND/ROUND
BRANCH TAKE-OFF
RADIUS TEE
SQUARE TEE W/ TURNING VANES
BULLHEAD FEE
TRANSITION - ECCENTRIC (15' MAX. SUPPLY)
RETURN/EXHAUST)
TRANSITION - CONCENTRIC 15' MAX. SUPPLY)
RETURN/EXHAUST)
BOOT TEE SAKE OFF FROM THE BOTTOM OF THE DUCT
BOTTOM OF THE DUCT
45 DEG. RADIUS ELBOW
BELUJOUTH TAKE OFF WITH VOLUME DAMPER
FAKE OFF WITH VOLUME DAMPER
JCT CONNECTOR
VOLUME DA MPER
MOTORIZED DAMPER
BACKORAFT DAMPER
OPPOSED LADE DAMPER
PARALLEL BLADE DAMPER
ACCESS PANEL
DUCT UNER
FUMBLE ACT
j--- V V
L_ wtk--rv-r1
_--)
f3
• DESIG ED BY:
,IN
DRAWN B
RH
DAZE
APPROVED BY
SCALE: c NAVE
SCALE: FILE NAVE
None 1 306252 140.1
PROJECT Noc 3 - 030252
SHEET BRE:
Mechanical
Legend
99ET IIAMEJt
MO.1
I
PLAN VIEW
1 FAN COIL UNIT DETAIL
I NOT TO SCALE
16' -O'
RAI }RA
NORTH ELEVATION
PLAN VIEW
2 FAN COIL UNIT DETAIL
NOT TO SCALE
WEST ELEVATION
ROOF ANGLE
CEILWIG
PREFABRICATED ROOF
CURB
[ROOF
MOTORIZED DAMPER OR
BACKDRAFT DAMPER AS
REQUIRED
DUCT SIZE EQUAL
TO THROAT SIZE
3 RELIEF /INTAKE HOOD DETAIL
NOT TO ��
EXERED
AN -3 Z60 7
• a COM
PennIt No. Afge100
Pan Wet appeoA1 b MOO 10 Own and amill ks&
Amami c, corstrudion
�• loan est auger.
coda ea ordinance ilsolp
Esc
‘6.110/it
City of Wails
BUILDING DIVISION
irdnipia
No changes 6/ nide to dM scope
r ; v; d
teclise a new On submittal
rzy additional pine Anew fees.
a
I; - ;;�, FIITT
—arse
!- i I!11I
Uat
AREA OF WORK THIS PERMIT
(TENANT IMPROVEMENTS -
NEW HVAC)
i
H I
•t s.. s-,.. •
_ . Mm1Ut 1[Dit AST
•
1
2
•
w �
VFW II
;
1
_ sw.
C GhocoEobe Cmr WO I
�= r - � SYSTEM SCHEMATIC 0'�G. _��*� w' ;;: - - - °3 -- ; _ «''; �.:'': ''�.�: ,17
��
1.31..1 . . I Ic • .�
r : d *G). ne.ea o� C I
4, SYSTEM DIAGRAM
NOT TO SCALE
_— — _ 7 ` `\ 7 - - 7- . . \ - . -;N\ ...... F • - —; tj • ; , .` 1�..
�:,-....>*-.:‘----' , �' .. N *\ $ \-- I - - —
c .R
'�, . �: \ \: \ } .
t.tstra gram r -..�, I * -
i s
SITE PLAN
NOT TO SCALE
1
. — j I
. •
,.. f .. — , 1►q ! /"•
•.�
� t i••a - - i..r.
! f • .^..— .....
•
f
..._
.t,
4Y s...
L z • •_•. - i
I
r
I
aw
• s11 -•
•.
VICINITY PLAN:
.
.• ;•■•••• T: s•s •
(E
NORTH
•
f fiD
NORTH
i
; •
2
•
SASS
F1 1=¢
s – •■
a
' = (1'C
t \t_:iLt �J i
i
t
.•a
s n•
•
RECEIVED
TUKWILA
AUG 2 T NO6
PERIN M ER
•
MH *
•
l
WAREHOUSE-PACKAG1NG AREA
PARTIAL AIR CONDITIONING
SEATTLE CHOCOLATES
DESCRIPTION I
•
E RI
I MVO
INoN I
I
PLAN VIEW
1 FAN COIL UNIT DETAIL
I NOT TO SCALE
16' -O'
RAI }RA
NORTH ELEVATION
PLAN VIEW
2 FAN COIL UNIT DETAIL
NOT TO SCALE
WEST ELEVATION
ROOF ANGLE
CEILWIG
PREFABRICATED ROOF
CURB
[ROOF
MOTORIZED DAMPER OR
BACKDRAFT DAMPER AS
REQUIRED
DUCT SIZE EQUAL
TO THROAT SIZE
3 RELIEF /INTAKE HOOD DETAIL
NOT TO ��
EXERED
AN -3 Z60 7
• a COM
PennIt No. Afge100
Pan Wet appeoA1 b MOO 10 Own and amill ks&
Amami c, corstrudion
�• loan est auger.
coda ea ordinance ilsolp
Esc
‘6.110/it
City of Wails
BUILDING DIVISION
irdnipia
No changes 6/ nide to dM scope
r ; v; d
teclise a new On submittal
rzy additional pine Anew fees.
a
I; - ;;�, FIITT
—arse
!- i I!11I
Uat
AREA OF WORK THIS PERMIT
(TENANT IMPROVEMENTS -
NEW HVAC)
i
H I
•t s.. s-,.. •
_ . Mm1Ut 1[Dit AST
•
1
2
•
w �
VFW II
;
1
_ sw.
C GhocoEobe Cmr WO I
�= r - � SYSTEM SCHEMATIC 0'�G. _��*� w' ;;: - - - °3 -- ; _ «''; �.:'': ''�.�: ,17
��
1.31..1 . . I Ic • .�
r : d *G). ne.ea o� C I
4, SYSTEM DIAGRAM
NOT TO SCALE
_— — _ 7 ` `\ 7 - - 7- . . \ - . -;N\ ...... F • - —; tj • ; , .` 1�..
�:,-....>*-.:‘----' , �' .. N *\ $ \-- I - - —
c .R
'�, . �: \ \: \ } .
t.tstra gram r -..�, I * -
i s
SITE PLAN
NOT TO SCALE
1
. — j I
. •
,.. f .. — , 1►q ! /"•
•.�
� t i••a - - i..r.
! f • .^..— .....
•
f
..._
.t,
4Y s...
L z • •_•. - i
I
r
I
aw
• s11 -•
•.
VICINITY PLAN:
.
.• ;•■•••• T: s•s •
(E
NORTH
•
f fiD
NORTH
i
; •
2
•
SASS
F1 1=¢
s – •■
a
' = (1'C
t \t_:iLt �J i
i
t
.•a
s n•
•
RECEIVED
TUKWILA
AUG 2 T NO6
PERIN M ER
•
MH *
•
l
WAREHOUSE-PACKAG1NG AREA
PARTIAL AIR CONDITIONING
SEATTLE CHOCOLATES
♦ DESIGNED BY:
JN
DRAWL BY:
RH
DATE_
8/17/06
APPROVED BY:
JN
SCALE:
None
FRE NA
306252 MO.2
PROJECT No: 3- 030252
SHEET TITLE:
Mechanical
Specifications
9#ET M* ER:
MO
% #
1
2
3
4
5
6
7
1
i
A �
B
SECTION 15010 - GENERAL REQUIREMENTS
PART 1 - GENERAL
D
1.01 FURNISH ALL MATERIALS, EQUIPMENT, TOOLS, AND LABOR RELATED TO THE INSTALLATION OF NE MECHANICAL WORK AS INDICATED ON THE
DRAWING AND SPECIFICATION HEREIN. CONNECT ALL FACIUTIES TO BE INSTALLED FOR A COMPLETELY COORDINATED AND INTEGRATED
MECHANICAL SYSTEM. IT IS THE INTENT AND PURPOSE OF THESE DRAWINGS AND SPECIFICATIONS THAT, UPON COMPLETION OF PROJECT,
THE MECHANICAL INSTALLATION, INCLUDING ALL SYSTEMS, SHALL BE COMPLETE AND OPERABLE IN ALL RESPECTS.
1.02 NEW WORK SHALL BE OF THE HIGHEST INDUSTRY STANDARD. THE GOOD APPEARANCE OF NE FINISHED WORK SHALL BE OF EQUAL
IMPORTANCE WITH ITS MECHANICAL EFFICIENCY. ALL WORK SHALL BE COMPLETED IN ACCORDANCE VAN ACCEPTABLE INDUSTRY PRACTICES.
1.03 THE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND INDICATE THE GENERAL ARRANGEMENT OF MECHANICAL WORK, BUT DO NOT
INDICATE EVERY REQUIRED OFFSET, FITTINGS, OR ACCESSORY. LOCATIONS ARE APPROXIMATE AND SHALL BE SUBJECT TO MINOR
MODIFICATIONS. FIELD VERIFY ALL CRITICAL COMPONENTS AND DIMENSIONS. RECORD MODIFICATIONS ON "AS- BUILT"ORAWINGS.
1.04 CERTAIN VERTICAL AND HORIZONTAL OFFSETS ARE SHOWN IN DUCTS AND PIPING TO INDICATE THE GENERAL POSITION RELATIONSHIP OF
THE SYSTEMS WITHIN THE SPACE AVAILABLE FOR SYSTEM INSTALLATION. PROVIDE ADDITIONAL OFFSETS AS REQUIRED TO COORDINATE WITH
INSTALLATION REQUIREMENTS OF OTHER SYSTEMS.
1.05 ARRANGE AND PAY FOR ALL NECESSARY PERMITS, FEES, INSPECTION SERVICES, TAXES. AND ROYALTIES IN CONNECTION WITH THE
MECHANICAL WORK ON THIS PROJECT.
1.06 ALL WORK, MATERIALS. AND EQUIPMENT SHALL COMPLY WITH THE RULES AND REGULATIONS OF ALL CODES AND ORDINANCES OF THE
LOCAL. STATE, AND FEDERAL AUTHORITIES. SUCH CODES, WHERE APPUCABLE, SHALL TAKE PRECEDENCE OF THESE PLANS AND
SPECIFICATIONS.
1.07 MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2003 EDITIONS OF THE INTERNATIONAL BUILDING
CODE, INTERNATIONAL MECHANICAL CODE, UNIFORM PLUMBING CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE, , THE
NATIONAL ELECTRICAL CODE. 2003 INTERNATIONAL FUEL GAS CODE. AND LOCAL CODES AND ORDINANCES.
1.08 IN THE EVENT OF A CONFLICT OR INCONSISTENCY BETWEEN ITEMS INDICATED ON THE PLANS AND /OR SPECIFICATIONS OR WITH CODE
REQUIREMENTS. THE NOTE, SPECIFICATION, OR CODE THAT PRESCRIBES AND ESTABUSHES THE MORE COMPLETE JOB OR THE HIGHER
STANDARD SHALL PREVAIL.
1.09 THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING CURRENT REQUIREMENTS WITH THE MANUFACTURER OF THE PRODUCTS USED ON
THE PROJECT. NOTIFY THE ENGINEER IF ANY DISCREPANCIES ARE FOUND BEFORE ANY WORK TO INSTALL NE PRODUCT IS PERFORMED.
1.10 WHEREVER MORE THAN ONE (1) MANUFACTURER'S PRODUCT IS SPECIFIED, THE FIRST -NAMED PRODUCT IS THE BASIS FOR THE PROJECT
DESIGN AND THE USE OF ALTERNATIVE NAMED MANUFACTURER'S PRODUCTS OR SUBSTITUTES MAY REQUIRE MODIFICATIONS IN THE PROJECT
DESIGN AND CONSTRUCTION. IF SUCH ALTERNATIVES ARE PROPOSED BY THE CONTRACTOR AND ARE FAVORABLY REVIEWED BY THE
RESPONSIBLE DESIGN PROFESSIONAL. THE CONTRACTOR SHALL ASSUME ALL COSTS REQUIRED TO MAKE NECESSARY REVISIONS AND
MODIFICATIONS TO THE ORIGINAL PROJECT DESIGN INCLUDING ADDITIONAL COSTS FOR EVALUATIONS OF THE MODIFICATIONS BY THE
RESPONSIBLE DESIGN PROFESSIONAL.
1.11 A. SUBMIT THREE (3) COPIES OF SUBMITTAL DATA FOR MECHANICAL MATERIAL AND EQUIPMENT TO THE ENGINEER FOR REVIEW PRIOR TO
ORDERING OR FABRICATION OF THE MATERIAL OR EQUIPMENT.
B. SUBMITTALS WILL BE REVIEWED BY ENGINEERING ECONOMICS. INC. ONLY FOR THE PURPOSE OF DETERMINING THAT THE MATERIALS.
EQUIPMENT AND INSTALLATION METHODS ARE IN ACCORDANCE WITH THE PROJECT DESIGN CONCEPTS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR SPACE REQUIREMENTS. CONFIGURATIONS, PERFORMANCE, BASES, SUPPORTS, STRUCTURAL MEMBERS AND OPENINGS IN
STRUCTURE, AND OTHER APPARATUS THAT MAY BE AFFECTED BY THE MATERIAL.EQUIPMENT OR INSTALLATION.
C. NOTE ANY DEVIATIONS FROM SPECIFIED REQUIREMENTS.
D. ORGANIZE SUBMITTALS TO INCLUDE AS A MINIMUM THE FOLLOWING: COVER SHEET INDICATING GENERAL CONTENTS BY APPUCABLE
SPECIFICATION SECTION NUMBER AND ITEM NAME.
E. THE DATA FOR EACH ITEM SUBMITTED SHALL BE THOROUGHLY EDITED FOR THE SPECIFIC EQUIPMENT AND INTENDED APPLICATION AND
OPERATION.
F. INCLUDE CURRENT PUBUSHED CATALOG AND SPECIFICATION SHEETS PERTAINING TO PROPOSED MATERIAL AND EQUIPMENT. INCLUDE
ELECTRICAL CHARACTERISTICS, WIRING AND CONTROL DIAGRAMS.
G. IDENTIFY EACH ITEM WITH IDENTIFICATION CODE IDENTICAL TO THOSE USED ON THE DRAWINGS AND IN THE SPECIFICATIONS.
1.12 A. LOCATIONS AND SIZES OF EXISTING UTILITIES ARE SHOWN IN ACCORDANCE WITH THE EXISTING BUILDING RECORD DRAWINGS AND
ON- SITE OBSERVATIONS. CHECK AND VERIFY ALL DATA GIVEN. AND VERIFY EXACT LOCATIONS OF ALL UTILITIES PERTAINING TO THE WORK.
B. THE CONTRACTOR SHALL VISIT THE EXISTING BUILDING(S) AND GROUNDS AND FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS.
EXISTING RECORD DRAWINGS ARE AVAILABLE IN THE FACILITIES DEPARTMENT FOR CONTRACTOR REVIEW. NO SUBSEQUENT ALLOWANCE ON
BEHALF OF THE CONTRACTOR WILL BE MADE FOR OMISSIONS, ERRORS, OR NEGLIGENCE ON THE CONTRACTOR'S PART FOR NOT
FAMIUARIZING THEMSELVES WITH EXISTING CONDITIONS.
C. VERIFY AT PROJECT SITE EXACT SIZE. LOCATION. AND CLEARANCES OF EXISTING SERVICES AND MECHANICAL AND ELECTRICAL EQUIPMENT.
D. THE CONTRACTOR SHALL REMOVE. RELOCATE. REPLACE WITH NEW AND /OR RECONNECT ALL EXISTING SERVICES AS REQUIRED BY NEW
CONSTRUCTION.
1.13 CLEARANCES AND ACCESS SHALL BE MAINTAINED ON ALL NEW AND EXISTING EQUIPMENT TO ENSURE PROPER EQUIPMENT MAINTENANCE.
1.14 THE CONTRACTOR SHALL MAKE THEIR OWN PROVISIONS FOR DELIVERY AND SAFE STORAGE OF ALL MATERIALS AND SHALL ASSUME FULL
RESPONSIBIUTY FOR CONDITIONS AND /OR SAFEKEEPING OF MATERIALS, FURNISHED BY OTHERS UPON ACCEPTANCE OF SAME.
1.15 A. THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR SAFETY OF ALL PERSONS ON OR ABOUT THE CONSTRUCTION SITE, IN
ACCORDANCE WITH APPLICABLE LAWS AND CODES. GUARD ALL HAZARDS IN ACCORDANCE WITH THE SAFETY PROVISIONS OF THE LATEST
MANUAL OF ACCIDENT PREVENTION.
B. COORDINATE AND SCHEDULE ALL WORK WITH THE FACILITY INCLUDING CONSTRUCTION ACCESS AND STORAGE. THE CONSTRUCTION
SCHEDULE AND HOURS OF WORK SHALL BE APPROVED BY THE FACILITY PRIOR TO THE START OF CONSTRUCTION.
C. ALL MIMES REQUIRED FOR THE CONTINUOUS OPERATION OF ALL EXISTING FACIUTIES MUST BE MAINTAINED IN SERVICE AT ALL TIMES
EXCEPT AS REQUIRED FOR NEW SYSTEMS CONNECTION. COORDINATE SHUTDOWN WITH RESPONSIBLE FACILITY PERSONNEL
D. ALL SERVICE SHUTDOWNS AND START -UPS SHALL BE SLED A MINIMUM OF 72 HOURS IN ADVANCE AND SUPERVISED BY THE FACILITY
ENGINEERING STAFF.
1.16 ALL REMOVED ITEMS DEEMED TO HAVE VALUE BY THE OWNER SHALL BE DELIVERED TO A PLACE OF STORAGE AT THE SITE AS DIRECTED.
ALL OTHER 11EIVIS MUST BE DISPOSED OF OFF -SITE IN A LEGAL MANNER.
1.17 WHERE EXISTING CONSTRUCTION IS CUT, DAMAGED, OR REMODELED, PATCH WITH MATERIALS TO MATCH IN KIND. QUALITY, AND
PERFORMANCE_
1.18 ALL PIPE AND DUCT SIZES ARE IN INCHES.
1.19 CLEAN ALL NEW SURFACES AND NEW EQUIPMENT AFTER THE COMPLETION OF THE INSTALLATION.
1.20 WARRANTY: THE CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, AND EQUIPMENT FURNISHED AND INSTALLED HEREUNDER
FOR A PERIOD OF 365 CALENDAR DAYS FROM THE DATE OF FINAL ACCEPTANCE CF WORK BY OWNER, AGAINST ALL DEFECTS AND FAULTY
ORKMAANSHIP. PARTIAL OCCUPANCY OF PROJECT SITE BY OWNER SHALL NOT BE CONSTRUED AS FINAL ACCEPTANCE OF KIRK.
CONTRACTOR SHALL REPAIR AND /OR REPLACE ALL DEFECTIVE AND /OR FAULTY WORKMANSHIP, MATERIALS,. AND /OR EQUIPMENT. AND SHALL
REPAIR AND /OR REPLACE ALL OTHER WORK DAMAGED AS A RESULT OF SUCH DEFECTIVE AND /OR FAULTY WORKMANSHIP, MATERIALSS,
AND /OR EQUIPMENT WITHOUT CHARGE TO OWNER DURING WARRANTY PERIOD.
1.21 CONTRACTORS SHALL MAINTAIN RECORDED 'AS-BUILT' INFORMATION ON ALL EXISTING SERVICES/EQUIPMENT RELATED TO THE PROJECT
UNCOVERED DURING CONSTRUCTION AND ALL NEW WORK INSTALLED DURING CONSTRUCTION AND IT SHALL BE CLEARLY MARKED IN COLORED
PENCIL ON A PRINT OF PRODUCT DRAWINGS. RECORDED INFORMATION SHALL INCLUDE ROUTING, ACTUAL LOCATIONS, POINTS OF
CONNECTIONS, ELEVATIONS. OR OTHER INFORMATION THAT DEVIATES FROM THE ORIGINAL DESIGN DRAWINGS. THE CONTRACTOR SHALL TURN
RECORDED 'AS -BUILT' INFORMATION OVER TO ME OMER AT THE COMPLETION OF THE PROJECT.
1.22 PROVIDE PERMANENT. COMMERCIAL QUALITY PRE - PRINTED IDENTIFICATION ON ALL NEW EQUIPMENT, TERMINAL UNITS, VALVES, DUCTWORK,
AND RPM.
•
E
SPECIFICATIONS
•
F
SECTION 15060 - MECHANICAL SUPPORTS
PART 1 - GENERAL
G H
1.01 00 NOT SUPPORT PIPING OR VALVES FROM PIECES OF EQUIPMENT.
1.02 SECURELY FASTEN ALL PIPING AND DUCTWORK WITHIN STRUCTURES TO THE BUILDING CONSTRUCTION BY MEANS OF HANGERS.
SUPPORTS. GUIDE ANCHORS. AND SWAY BRACE SEISMIC RESTRAINTS TO MAINTAIN AUGNMENT, TO PREVENT SAGGING. AND TO
PREVENT NOISE AND EXCESSIVE STRAIN DUE TO MOVEMENT UNDER OPERATING CONDITIONS.
1.03 PIPE SUPPORTS SHALL BE DESIGN TO INCLUDE THE WEIGHT OF THE PIPE AND NE WEIGHT OF THE CONTENTS OF THE PIPE.
1.04 ALL MECHANICAL EQUIPMENT SUPPORTS SHALL BE DESIGNED BY A UCENSED STRUCTURAL ENGINEER AND SHALL COMPLY
WITH THE INTERNATIONAL BUILDING CODE SEISMIC REQUIREMENTS.
1.05 PROVIDE CALCULATIONS AND DETAILS FOR THE SUPPORT AND BRACING OF ALL PIPES. DUCTS. AND CONDUITS. OR PROVIDE
SUPPORT AND BRACING PER OSHPD ANCHORAGE PRE - APPROVAL NO. R -0010. THE SMACNA " GUIDEUNES FOR SEISMIC
RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS" OR OSHPD ANCHORAGE PRE- APPROVAL NO. 0003
THE SUPERSTRUT SEISMIC RESTRAINT SYSTEM FOR PIPES AND CONDUIT".
SECTION 15080 - MECHANICAL INSULATION
PART 1 - GENERAL
1.01 INSULATE DUCT AND BUILT UP PLENUM PER THE LATEST EDITION OF WASHINGTON STATE ENERGY CODE, AND THE
MECHANICAL MATERIALS SCHEDULE.
PART 2 - PRODUCTS
2.01 ALL PIPING AND DUCTWORK INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND
AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS.
PART 3 - EXECUTION
3.01 PROVIDE CONTINUOUS INSULATION AROUND ALL PIPE FITTINGS AND ACCESSORIES. PROVIDE UNBROKEN VAPOR SEAL ON ALL
COLD SURFACES. PROVIDE ONE -PIECE PVC PLASTIC JACKETING ON FITTINGS. ALL HANDLES, PLUGS AND OTHER
MAINTENANCE ITEMS SHALL BE ACCESSIBLE WITHOUT DAMAGING INSULATION.
SECTION 15100, 15400 PIPING / PLUMBING
PART 1 - GENERAL
1.01 PIPE INSTALLATION SHALL COMPLY WITH THE MECHANICAL CONTRACTING FOUNDATION INC'S " GUIDEUNES FOR QUAUTY PIPING
INSTALLATION ", LATEST EDITION. EXCEPT A SPECIFICALLY NOTED, AND THE 2003 UNIFORM PLUMBING CODE.
1.02 INSTALL ALL PIPING TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH THE INSTALLATION WORK OF OTHER TRADES.
THE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE EXACT LOCATION OF PIPING.
PART 2 - PRODUCTS
2.01 PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS.
PART 3 - EXECUTION
3.01 PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO
AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL.
3.02 VALVES. SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS.
3.03 THE PLUMBING CONTRACTOR SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR. WALL SLEEVES.
3.04 PROVIDE VALVES AND OTHER PIPING SPECIALTIES SAME SIZE AS UNE SIZE SHOWN UNLESS OTHERWISE NOTED.
SECTION 15910 - CONTROLS
PART 1 - GENERAL
1.01 EQUIPMENT TO BE FURNISHED WITH STAND ALONE FACTORY CONTROLS TO PROVIDE COMPLETE TEMPERATURE AND
OPERATIONAL CONTROL OF THE UNITS. SEE MECHANICAL SCHEDULE FOR SELECTED EQUIPMENT OPTIONS.
SECTION 15950 - AIR / HYDRONIC BALANCING
PART 1 - GENERAL
1.01 BALANCING OF THE HVAC SYSTEM WILL BE PERFORMED BY A NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)
CERTIFIED BALANCING CONTRACTOR IN ACCORDANCE WITH ASHRAE SYSTEMS HANDBOOK. CHAPTER ON TESTING ADJUSTING,
AND BALANCING. AND NEBB GUIDELINES.
1.02 CONTRACTOR SHALL WORK WITH BALANCER TO CORRECT DEFICIENCIES IN WORK.
1.03 BALANCING CONTRACTOR TO PROVIDE SHEAVES, BELTS AND REBALANCING AS NEEDED TO ACHIEVE THE NECESSARY SYSTEM
PERFORMANCE.
WASHINGTON STATE ENERGY CODE
1416.4 SYSTEMS COMMISSIONING
1416.4.1 SIMPLE SYSTEMS: FOR SIMPLE SYSTEMS, AS DEFINED IN SECTION 1421. AND FOR WAREHOUSES AND
SEMI- HEATED SPACES, HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES, COMPONENTS.
EQUIPMENT AND SYSTEMS ARE CALIBRATED, ADJUSTED AND OPERATE IN ACCORDANCE WITH APPROVED PLANS AND
SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN
ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS
SHALL BE PREPARED AND FILED WITH THE OWNER. DRAWING NOTES SHALL REQUIRE COMMISSIONING IN ACCORDANCE WITH
THIS PARAGRAPH_
1416.4.2.1 DOCUMENTATION: DRAWING NOTES SHALL REQUIRE COMMISSIONING IN ACCORDANCE WITH 71.11S SECTION. DRAWING
NOTES MAY REFER TO SPECIFICATIONS FOR FURTHER COMMISSIONING REQUIREMENTS. PLANS AND SPECIFICATIONS SHALL
REQUIRE TESTS MANDATED BY THIS SECTION BE PERFORMED AND THE RESULTS RECORDED. PLANS AND SPECIFICATIONS
SHALL REQUIRE PREPARATION OF PRELIMINARY AND FINAL REPORTS OF TEST PROCEDURES AND RESULTS AS DESCRIBED
IN SECTION 1416.4.2.2. PLANS AND SPECIFICATIONS SHALL IDENTIFY THE FOLLOWING FOR EACH TEST:
1. EQUIPMENT AND SYSTEMS TO BE TESTED, INCLUDING THE EXTENT OF SAMPUNG TESTS,
2. FUNCTIONS TO BE TESTED (FOR EXAMPLE CALIBRATION, ECONOMIZER CONTROL. ETC.),
3. CONDITIONS UNDER WHICH THE TEST SHALL BE PERFORMED (FOR EXAMPLE WINTER DESIGN CONDITIONS, FULL
OUTSIDE AIR, ETC),
4. MEASURABLE CRITERIA FOR ACCEPTABLE PERFORMANCE.
1416.4.2.2 COMMISSIONING REPORTS
1416.4.22.1 PRELIMINARY COMMISSIONING REPORT: A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND
RESULTS SHALL BE PREPARED. THE PRELMNARY REPORT SHALL IDENTIFY:
1. DEFICIENCIES FOUND DURING TESTING REQUIRED BY THIS SECTION WHICH HAVE NOT BEEN CORRECTED AT THE
TINE OF REPORT PREPARATION AND THE ANTICIPATED DATE OF CORRECTION.
2. DEFERRED TESTS WHICH CANNOT BE PERFORMED AT THE TIME OF REPORT PREPARATION DUE TO CUMA1IC
CONDITIONS
3. CLIMATIC CONDITIONS REQUIRED FOR PERFORMANCE OF THE DEFERRED TESTS. AND THE ANTICIPATED DATE Cr
EACH DEFERRED TEST.
14164.222 FINAL COUMISSH REPORT: A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED
AND FILED WITH THE OTHAER.
1416.4.23 ACCEPTANCE: BUILDINGS OR PORTIONS THEREOF. REQUIRED BY THIS CODE TO COMPLY WITH THIS SECTION. SHALL
NOT BE ISSUED A FINAL CERTIFICATE OF OCCUPANCY UNTIL SUCH TIME THAT THE BUILDING OFFICIAL DENS THAT
THE PRELMNARY COMMSSIONING REPORT REQUIRED BY THIS SECTION HAS BEEN COMPLETED.
•
E2 :
•
k
•
•••
`- 1
t'tO(o" i9'
RECEMD
CITYMTINGVO
:uG2IM
PERNITCENTIEFs
8%
d.
N N
I
U. Q
I
j
1
co
0
2
I
ig
• a
WAREHOUSE-PACKAG1NG AREA
PARTIAL AIR CONDITIONING
SEATTLE CHOCOLATES
I DESCRIPTION I
I
f ISSUE RI
31ea
•°N
1
2
3
4
5
6
7
1
i
A �
B
SECTION 15010 - GENERAL REQUIREMENTS
PART 1 - GENERAL
D
1.01 FURNISH ALL MATERIALS, EQUIPMENT, TOOLS, AND LABOR RELATED TO THE INSTALLATION OF NE MECHANICAL WORK AS INDICATED ON THE
DRAWING AND SPECIFICATION HEREIN. CONNECT ALL FACIUTIES TO BE INSTALLED FOR A COMPLETELY COORDINATED AND INTEGRATED
MECHANICAL SYSTEM. IT IS THE INTENT AND PURPOSE OF THESE DRAWINGS AND SPECIFICATIONS THAT, UPON COMPLETION OF PROJECT,
THE MECHANICAL INSTALLATION, INCLUDING ALL SYSTEMS, SHALL BE COMPLETE AND OPERABLE IN ALL RESPECTS.
1.02 NEW WORK SHALL BE OF THE HIGHEST INDUSTRY STANDARD. THE GOOD APPEARANCE OF NE FINISHED WORK SHALL BE OF EQUAL
IMPORTANCE WITH ITS MECHANICAL EFFICIENCY. ALL WORK SHALL BE COMPLETED IN ACCORDANCE VAN ACCEPTABLE INDUSTRY PRACTICES.
1.03 THE DRAWINGS ARE DIAGRAMMATIC IN CHARACTER AND INDICATE THE GENERAL ARRANGEMENT OF MECHANICAL WORK, BUT DO NOT
INDICATE EVERY REQUIRED OFFSET, FITTINGS, OR ACCESSORY. LOCATIONS ARE APPROXIMATE AND SHALL BE SUBJECT TO MINOR
MODIFICATIONS. FIELD VERIFY ALL CRITICAL COMPONENTS AND DIMENSIONS. RECORD MODIFICATIONS ON "AS- BUILT"ORAWINGS.
1.04 CERTAIN VERTICAL AND HORIZONTAL OFFSETS ARE SHOWN IN DUCTS AND PIPING TO INDICATE THE GENERAL POSITION RELATIONSHIP OF
THE SYSTEMS WITHIN THE SPACE AVAILABLE FOR SYSTEM INSTALLATION. PROVIDE ADDITIONAL OFFSETS AS REQUIRED TO COORDINATE WITH
INSTALLATION REQUIREMENTS OF OTHER SYSTEMS.
1.05 ARRANGE AND PAY FOR ALL NECESSARY PERMITS, FEES, INSPECTION SERVICES, TAXES. AND ROYALTIES IN CONNECTION WITH THE
MECHANICAL WORK ON THIS PROJECT.
1.06 ALL WORK, MATERIALS. AND EQUIPMENT SHALL COMPLY WITH THE RULES AND REGULATIONS OF ALL CODES AND ORDINANCES OF THE
LOCAL. STATE, AND FEDERAL AUTHORITIES. SUCH CODES, WHERE APPUCABLE, SHALL TAKE PRECEDENCE OF THESE PLANS AND
SPECIFICATIONS.
1.07 MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2003 EDITIONS OF THE INTERNATIONAL BUILDING
CODE, INTERNATIONAL MECHANICAL CODE, UNIFORM PLUMBING CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE, , THE
NATIONAL ELECTRICAL CODE. 2003 INTERNATIONAL FUEL GAS CODE. AND LOCAL CODES AND ORDINANCES.
1.08 IN THE EVENT OF A CONFLICT OR INCONSISTENCY BETWEEN ITEMS INDICATED ON THE PLANS AND /OR SPECIFICATIONS OR WITH CODE
REQUIREMENTS. THE NOTE, SPECIFICATION, OR CODE THAT PRESCRIBES AND ESTABUSHES THE MORE COMPLETE JOB OR THE HIGHER
STANDARD SHALL PREVAIL.
1.09 THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING CURRENT REQUIREMENTS WITH THE MANUFACTURER OF THE PRODUCTS USED ON
THE PROJECT. NOTIFY THE ENGINEER IF ANY DISCREPANCIES ARE FOUND BEFORE ANY WORK TO INSTALL NE PRODUCT IS PERFORMED.
1.10 WHEREVER MORE THAN ONE (1) MANUFACTURER'S PRODUCT IS SPECIFIED, THE FIRST -NAMED PRODUCT IS THE BASIS FOR THE PROJECT
DESIGN AND THE USE OF ALTERNATIVE NAMED MANUFACTURER'S PRODUCTS OR SUBSTITUTES MAY REQUIRE MODIFICATIONS IN THE PROJECT
DESIGN AND CONSTRUCTION. IF SUCH ALTERNATIVES ARE PROPOSED BY THE CONTRACTOR AND ARE FAVORABLY REVIEWED BY THE
RESPONSIBLE DESIGN PROFESSIONAL. THE CONTRACTOR SHALL ASSUME ALL COSTS REQUIRED TO MAKE NECESSARY REVISIONS AND
MODIFICATIONS TO THE ORIGINAL PROJECT DESIGN INCLUDING ADDITIONAL COSTS FOR EVALUATIONS OF THE MODIFICATIONS BY THE
RESPONSIBLE DESIGN PROFESSIONAL.
1.11 A. SUBMIT THREE (3) COPIES OF SUBMITTAL DATA FOR MECHANICAL MATERIAL AND EQUIPMENT TO THE ENGINEER FOR REVIEW PRIOR TO
ORDERING OR FABRICATION OF THE MATERIAL OR EQUIPMENT.
B. SUBMITTALS WILL BE REVIEWED BY ENGINEERING ECONOMICS. INC. ONLY FOR THE PURPOSE OF DETERMINING THAT THE MATERIALS.
EQUIPMENT AND INSTALLATION METHODS ARE IN ACCORDANCE WITH THE PROJECT DESIGN CONCEPTS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR SPACE REQUIREMENTS. CONFIGURATIONS, PERFORMANCE, BASES, SUPPORTS, STRUCTURAL MEMBERS AND OPENINGS IN
STRUCTURE, AND OTHER APPARATUS THAT MAY BE AFFECTED BY THE MATERIAL.EQUIPMENT OR INSTALLATION.
C. NOTE ANY DEVIATIONS FROM SPECIFIED REQUIREMENTS.
D. ORGANIZE SUBMITTALS TO INCLUDE AS A MINIMUM THE FOLLOWING: COVER SHEET INDICATING GENERAL CONTENTS BY APPUCABLE
SPECIFICATION SECTION NUMBER AND ITEM NAME.
E. THE DATA FOR EACH ITEM SUBMITTED SHALL BE THOROUGHLY EDITED FOR THE SPECIFIC EQUIPMENT AND INTENDED APPLICATION AND
OPERATION.
F. INCLUDE CURRENT PUBUSHED CATALOG AND SPECIFICATION SHEETS PERTAINING TO PROPOSED MATERIAL AND EQUIPMENT. INCLUDE
ELECTRICAL CHARACTERISTICS, WIRING AND CONTROL DIAGRAMS.
G. IDENTIFY EACH ITEM WITH IDENTIFICATION CODE IDENTICAL TO THOSE USED ON THE DRAWINGS AND IN THE SPECIFICATIONS.
1.12 A. LOCATIONS AND SIZES OF EXISTING UTILITIES ARE SHOWN IN ACCORDANCE WITH THE EXISTING BUILDING RECORD DRAWINGS AND
ON- SITE OBSERVATIONS. CHECK AND VERIFY ALL DATA GIVEN. AND VERIFY EXACT LOCATIONS OF ALL UTILITIES PERTAINING TO THE WORK.
B. THE CONTRACTOR SHALL VISIT THE EXISTING BUILDING(S) AND GROUNDS AND FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS.
EXISTING RECORD DRAWINGS ARE AVAILABLE IN THE FACILITIES DEPARTMENT FOR CONTRACTOR REVIEW. NO SUBSEQUENT ALLOWANCE ON
BEHALF OF THE CONTRACTOR WILL BE MADE FOR OMISSIONS, ERRORS, OR NEGLIGENCE ON THE CONTRACTOR'S PART FOR NOT
FAMIUARIZING THEMSELVES WITH EXISTING CONDITIONS.
C. VERIFY AT PROJECT SITE EXACT SIZE. LOCATION. AND CLEARANCES OF EXISTING SERVICES AND MECHANICAL AND ELECTRICAL EQUIPMENT.
D. THE CONTRACTOR SHALL REMOVE. RELOCATE. REPLACE WITH NEW AND /OR RECONNECT ALL EXISTING SERVICES AS REQUIRED BY NEW
CONSTRUCTION.
1.13 CLEARANCES AND ACCESS SHALL BE MAINTAINED ON ALL NEW AND EXISTING EQUIPMENT TO ENSURE PROPER EQUIPMENT MAINTENANCE.
1.14 THE CONTRACTOR SHALL MAKE THEIR OWN PROVISIONS FOR DELIVERY AND SAFE STORAGE OF ALL MATERIALS AND SHALL ASSUME FULL
RESPONSIBIUTY FOR CONDITIONS AND /OR SAFEKEEPING OF MATERIALS, FURNISHED BY OTHERS UPON ACCEPTANCE OF SAME.
1.15 A. THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR SAFETY OF ALL PERSONS ON OR ABOUT THE CONSTRUCTION SITE, IN
ACCORDANCE WITH APPLICABLE LAWS AND CODES. GUARD ALL HAZARDS IN ACCORDANCE WITH THE SAFETY PROVISIONS OF THE LATEST
MANUAL OF ACCIDENT PREVENTION.
B. COORDINATE AND SCHEDULE ALL WORK WITH THE FACILITY INCLUDING CONSTRUCTION ACCESS AND STORAGE. THE CONSTRUCTION
SCHEDULE AND HOURS OF WORK SHALL BE APPROVED BY THE FACILITY PRIOR TO THE START OF CONSTRUCTION.
C. ALL MIMES REQUIRED FOR THE CONTINUOUS OPERATION OF ALL EXISTING FACIUTIES MUST BE MAINTAINED IN SERVICE AT ALL TIMES
EXCEPT AS REQUIRED FOR NEW SYSTEMS CONNECTION. COORDINATE SHUTDOWN WITH RESPONSIBLE FACILITY PERSONNEL
D. ALL SERVICE SHUTDOWNS AND START -UPS SHALL BE SLED A MINIMUM OF 72 HOURS IN ADVANCE AND SUPERVISED BY THE FACILITY
ENGINEERING STAFF.
1.16 ALL REMOVED ITEMS DEEMED TO HAVE VALUE BY THE OWNER SHALL BE DELIVERED TO A PLACE OF STORAGE AT THE SITE AS DIRECTED.
ALL OTHER 11EIVIS MUST BE DISPOSED OF OFF -SITE IN A LEGAL MANNER.
1.17 WHERE EXISTING CONSTRUCTION IS CUT, DAMAGED, OR REMODELED, PATCH WITH MATERIALS TO MATCH IN KIND. QUALITY, AND
PERFORMANCE_
1.18 ALL PIPE AND DUCT SIZES ARE IN INCHES.
1.19 CLEAN ALL NEW SURFACES AND NEW EQUIPMENT AFTER THE COMPLETION OF THE INSTALLATION.
1.20 WARRANTY: THE CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, AND EQUIPMENT FURNISHED AND INSTALLED HEREUNDER
FOR A PERIOD OF 365 CALENDAR DAYS FROM THE DATE OF FINAL ACCEPTANCE CF WORK BY OWNER, AGAINST ALL DEFECTS AND FAULTY
ORKMAANSHIP. PARTIAL OCCUPANCY OF PROJECT SITE BY OWNER SHALL NOT BE CONSTRUED AS FINAL ACCEPTANCE OF KIRK.
CONTRACTOR SHALL REPAIR AND /OR REPLACE ALL DEFECTIVE AND /OR FAULTY WORKMANSHIP, MATERIALS,. AND /OR EQUIPMENT. AND SHALL
REPAIR AND /OR REPLACE ALL OTHER WORK DAMAGED AS A RESULT OF SUCH DEFECTIVE AND /OR FAULTY WORKMANSHIP, MATERIALSS,
AND /OR EQUIPMENT WITHOUT CHARGE TO OWNER DURING WARRANTY PERIOD.
1.21 CONTRACTORS SHALL MAINTAIN RECORDED 'AS-BUILT' INFORMATION ON ALL EXISTING SERVICES/EQUIPMENT RELATED TO THE PROJECT
UNCOVERED DURING CONSTRUCTION AND ALL NEW WORK INSTALLED DURING CONSTRUCTION AND IT SHALL BE CLEARLY MARKED IN COLORED
PENCIL ON A PRINT OF PRODUCT DRAWINGS. RECORDED INFORMATION SHALL INCLUDE ROUTING, ACTUAL LOCATIONS, POINTS OF
CONNECTIONS, ELEVATIONS. OR OTHER INFORMATION THAT DEVIATES FROM THE ORIGINAL DESIGN DRAWINGS. THE CONTRACTOR SHALL TURN
RECORDED 'AS -BUILT' INFORMATION OVER TO ME OMER AT THE COMPLETION OF THE PROJECT.
1.22 PROVIDE PERMANENT. COMMERCIAL QUALITY PRE - PRINTED IDENTIFICATION ON ALL NEW EQUIPMENT, TERMINAL UNITS, VALVES, DUCTWORK,
AND RPM.
•
E
SPECIFICATIONS
•
F
SECTION 15060 - MECHANICAL SUPPORTS
PART 1 - GENERAL
G H
1.01 00 NOT SUPPORT PIPING OR VALVES FROM PIECES OF EQUIPMENT.
1.02 SECURELY FASTEN ALL PIPING AND DUCTWORK WITHIN STRUCTURES TO THE BUILDING CONSTRUCTION BY MEANS OF HANGERS.
SUPPORTS. GUIDE ANCHORS. AND SWAY BRACE SEISMIC RESTRAINTS TO MAINTAIN AUGNMENT, TO PREVENT SAGGING. AND TO
PREVENT NOISE AND EXCESSIVE STRAIN DUE TO MOVEMENT UNDER OPERATING CONDITIONS.
1.03 PIPE SUPPORTS SHALL BE DESIGN TO INCLUDE THE WEIGHT OF THE PIPE AND NE WEIGHT OF THE CONTENTS OF THE PIPE.
1.04 ALL MECHANICAL EQUIPMENT SUPPORTS SHALL BE DESIGNED BY A UCENSED STRUCTURAL ENGINEER AND SHALL COMPLY
WITH THE INTERNATIONAL BUILDING CODE SEISMIC REQUIREMENTS.
1.05 PROVIDE CALCULATIONS AND DETAILS FOR THE SUPPORT AND BRACING OF ALL PIPES. DUCTS. AND CONDUITS. OR PROVIDE
SUPPORT AND BRACING PER OSHPD ANCHORAGE PRE - APPROVAL NO. R -0010. THE SMACNA " GUIDEUNES FOR SEISMIC
RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS" OR OSHPD ANCHORAGE PRE- APPROVAL NO. 0003
THE SUPERSTRUT SEISMIC RESTRAINT SYSTEM FOR PIPES AND CONDUIT".
SECTION 15080 - MECHANICAL INSULATION
PART 1 - GENERAL
1.01 INSULATE DUCT AND BUILT UP PLENUM PER THE LATEST EDITION OF WASHINGTON STATE ENERGY CODE, AND THE
MECHANICAL MATERIALS SCHEDULE.
PART 2 - PRODUCTS
2.01 ALL PIPING AND DUCTWORK INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND
AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS.
PART 3 - EXECUTION
3.01 PROVIDE CONTINUOUS INSULATION AROUND ALL PIPE FITTINGS AND ACCESSORIES. PROVIDE UNBROKEN VAPOR SEAL ON ALL
COLD SURFACES. PROVIDE ONE -PIECE PVC PLASTIC JACKETING ON FITTINGS. ALL HANDLES, PLUGS AND OTHER
MAINTENANCE ITEMS SHALL BE ACCESSIBLE WITHOUT DAMAGING INSULATION.
SECTION 15100, 15400 PIPING / PLUMBING
PART 1 - GENERAL
1.01 PIPE INSTALLATION SHALL COMPLY WITH THE MECHANICAL CONTRACTING FOUNDATION INC'S " GUIDEUNES FOR QUAUTY PIPING
INSTALLATION ", LATEST EDITION. EXCEPT A SPECIFICALLY NOTED, AND THE 2003 UNIFORM PLUMBING CODE.
1.02 INSTALL ALL PIPING TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH THE INSTALLATION WORK OF OTHER TRADES.
THE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE EXACT LOCATION OF PIPING.
PART 2 - PRODUCTS
2.01 PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS.
PART 3 - EXECUTION
3.01 PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO
AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL.
3.02 VALVES. SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS.
3.03 THE PLUMBING CONTRACTOR SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR. WALL SLEEVES.
3.04 PROVIDE VALVES AND OTHER PIPING SPECIALTIES SAME SIZE AS UNE SIZE SHOWN UNLESS OTHERWISE NOTED.
SECTION 15910 - CONTROLS
PART 1 - GENERAL
1.01 EQUIPMENT TO BE FURNISHED WITH STAND ALONE FACTORY CONTROLS TO PROVIDE COMPLETE TEMPERATURE AND
OPERATIONAL CONTROL OF THE UNITS. SEE MECHANICAL SCHEDULE FOR SELECTED EQUIPMENT OPTIONS.
SECTION 15950 - AIR / HYDRONIC BALANCING
PART 1 - GENERAL
1.01 BALANCING OF THE HVAC SYSTEM WILL BE PERFORMED BY A NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)
CERTIFIED BALANCING CONTRACTOR IN ACCORDANCE WITH ASHRAE SYSTEMS HANDBOOK. CHAPTER ON TESTING ADJUSTING,
AND BALANCING. AND NEBB GUIDELINES.
1.02 CONTRACTOR SHALL WORK WITH BALANCER TO CORRECT DEFICIENCIES IN WORK.
1.03 BALANCING CONTRACTOR TO PROVIDE SHEAVES, BELTS AND REBALANCING AS NEEDED TO ACHIEVE THE NECESSARY SYSTEM
PERFORMANCE.
WASHINGTON STATE ENERGY CODE
1416.4 SYSTEMS COMMISSIONING
1416.4.1 SIMPLE SYSTEMS: FOR SIMPLE SYSTEMS, AS DEFINED IN SECTION 1421. AND FOR WAREHOUSES AND
SEMI- HEATED SPACES, HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES, COMPONENTS.
EQUIPMENT AND SYSTEMS ARE CALIBRATED, ADJUSTED AND OPERATE IN ACCORDANCE WITH APPROVED PLANS AND
SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN
ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS
SHALL BE PREPARED AND FILED WITH THE OWNER. DRAWING NOTES SHALL REQUIRE COMMISSIONING IN ACCORDANCE WITH
THIS PARAGRAPH_
1416.4.2.1 DOCUMENTATION: DRAWING NOTES SHALL REQUIRE COMMISSIONING IN ACCORDANCE WITH 71.11S SECTION. DRAWING
NOTES MAY REFER TO SPECIFICATIONS FOR FURTHER COMMISSIONING REQUIREMENTS. PLANS AND SPECIFICATIONS SHALL
REQUIRE TESTS MANDATED BY THIS SECTION BE PERFORMED AND THE RESULTS RECORDED. PLANS AND SPECIFICATIONS
SHALL REQUIRE PREPARATION OF PRELIMINARY AND FINAL REPORTS OF TEST PROCEDURES AND RESULTS AS DESCRIBED
IN SECTION 1416.4.2.2. PLANS AND SPECIFICATIONS SHALL IDENTIFY THE FOLLOWING FOR EACH TEST:
1. EQUIPMENT AND SYSTEMS TO BE TESTED, INCLUDING THE EXTENT OF SAMPUNG TESTS,
2. FUNCTIONS TO BE TESTED (FOR EXAMPLE CALIBRATION, ECONOMIZER CONTROL. ETC.),
3. CONDITIONS UNDER WHICH THE TEST SHALL BE PERFORMED (FOR EXAMPLE WINTER DESIGN CONDITIONS, FULL
OUTSIDE AIR, ETC),
4. MEASURABLE CRITERIA FOR ACCEPTABLE PERFORMANCE.
1416.4.2.2 COMMISSIONING REPORTS
1416.4.22.1 PRELIMINARY COMMISSIONING REPORT: A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND
RESULTS SHALL BE PREPARED. THE PRELMNARY REPORT SHALL IDENTIFY:
1. DEFICIENCIES FOUND DURING TESTING REQUIRED BY THIS SECTION WHICH HAVE NOT BEEN CORRECTED AT THE
TINE OF REPORT PREPARATION AND THE ANTICIPATED DATE OF CORRECTION.
2. DEFERRED TESTS WHICH CANNOT BE PERFORMED AT THE TIME OF REPORT PREPARATION DUE TO CUMA1IC
CONDITIONS
3. CLIMATIC CONDITIONS REQUIRED FOR PERFORMANCE OF THE DEFERRED TESTS. AND THE ANTICIPATED DATE Cr
EACH DEFERRED TEST.
14164.222 FINAL COUMISSH REPORT: A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED
AND FILED WITH THE OTHAER.
1416.4.23 ACCEPTANCE: BUILDINGS OR PORTIONS THEREOF. REQUIRED BY THIS CODE TO COMPLY WITH THIS SECTION. SHALL
NOT BE ISSUED A FINAL CERTIFICATE OF OCCUPANCY UNTIL SUCH TIME THAT THE BUILDING OFFICIAL DENS THAT
THE PRELMNARY COMMSSIONING REPORT REQUIRED BY THIS SECTION HAS BEEN COMPLETED.
•
E2 :
•
k
•
•••
`- 1
t'tO(o" i9'
RECEMD
CITYMTINGVO
:uG2IM
PERNITCENTIEFs
8%
d.
N N
I
U. Q
I
j
1
co
0
2
I
ig
• a
WAREHOUSE-PACKAG1NG AREA
PARTIAL AIR CONDITIONING
SEATTLE CHOCOLATES
MATERIALS SCHEDULE
ITEM
MATERIAL
DESCRIPTION
JOINING
METHOD
REFERENCE
STANDARDS
INSULATION THICKNESS
NOTES
REFRIGERANT HOT
GAS PIPE
TYPE L ARC
REFRIGERANT GRADE
BRAZED
ELECTRICAL
1" ELASTOMERIC
FOAM
COOLING
BHR/
REFRIGERANT SUCTION
PIPE
TYPE L ARC
REFRIGERANT GRADE
BRAZED
NOTES
1" ELASTOMERIC
FOAM
1f0160_ H ®
CONDENSATE PIPE
A
RA
FC -01
3
-
.
SUPPLY AIR DUCTWORK
RECTANGULAR
GALVANIZED STEEL, LOCK
!FORMING QUALITY WITH
A ZINC COATING OF 1.25
OUNCES PER SQUARE
FOOT ON EACH SIDE
PER APPLICABLE SMACNA
DUCT MANUAL ALL JOINTS
TO BE SEALED WITH GASKETS
OR LISTED MASTIC TYPE DUCT
SEALANT (NO DUCT TAPE)
SMACNA
I
-
GAUGE PER APPLICABLE SMACNA
DUCT MANUAL, USE +1'
PRESSURE CLASS
DUCT SOUNOUNING FTBERGI DUCT DING COATED
(WHERE INDICATED TO PREVENT FIBE EROS AT
ON THE DRAWINGS) VELOCITIES UP TO 4000 FPM
64.170
ASTM -C1071 I
I
i'
K VALUE= _27 O 75' F
DENSI 3.27
FT
FAN COIL UNIT SCHEDULE
CODE
CODE
MANUFACTURER
MODEL
OVERALL
DIMENSIONS
HON_
BOXG
STYLE
MB (4P)EFY
CFM
MIN.
0.A.
I ESP I
(IN.
WG)
ELECTRICAL
TOTAL
COOLING
BTU/HR
COOLING
BHR/
EAT
{f)
LAT
{
EQUIPMENT
WEIGHT
LBS
NOTES
NOTES
1f0160_ H ®
PH
A
RA
FC -01
MITSUBISHI
PEFY- P72NMHU -E
18.53x49.22x44.13
RFOT
1,950
200
0.3
208
3
4.94
64.170
431980
70 50
221
1, 2, 3, 4.
5
FC -02
MITSUBISHI
PEFY- P54NMHU -E
14.97x47.25x35.43
RTOF
1,400
140
0.3
208
1
3:78
48.130
430
33.430
70
48
155
1, 2, 3. 4.
5
FC -03
MITSUBISHI
PEFY- P54NMHU -E
14.97x47.25x35.43
RTOF
1,400
140
0.3
200
1
3.78
48.130
33.430
70 j 48
I
155
1, 2. 3, 4.
5
FC -04
MITSUBISHI
I PEFY- P72NMHU -E
1&53x49.22x44.13
RFOT
! 1,950
200
0.3
_
208
3
4.94
64,170
43.980 J 70 I 50
221 L1.2.3.4.
5
AIR COOLED CONDENSING UNIT SCHEDULE
CODE
GRILLE /REGISTER/DIFFUSER SCHEDULE
COOE
MANUFACTURER MANUFACTURER
AND MooEt
j
ACTUAL
COOLING
MBH
RELIEF /INTAKE HOOD SCHEDULE
MOUND
TYPE
I DAMPER
1
� I MANUFACTURER
AND MODEL
NOTES
r TYPE
MA
T'SP
I THROAT I HOOD SIZE
N. x IN. IN. x IJ.
I
;a
(
FIELD
NOTES
2
IH -01
GREENHECK - FABRA HOOD
; TUTUS VOOEL 300 RS
INTAJCE H000
1,950
.07
20720' 1 28'/28'
52
144.0
2
208/3
I11-02 GREENHEOC - FABRA HOOD
672
INTAKE HOOD
2.800
.07
I
20730' ; 28738'
i
I 65
2
2FI -03 HOC - FABRA HOOD
INTAKE HOOD
1.950
.07
20720' 28728'
1 52
} 2
RH -01 ! GREENHEOC - FA8RA HOOD
RELIEF HOOD
6,700
.07
20784' 28'/92'
, 150
1, 2
•
AIR COOLED CONDENSING UNIT SCHEDULE
CODE
GRILLE /REGISTER/DIFFUSER SCHEDULE
COOE
MANUFACTURER MANUFACTURER
AND MooEt
j
ACTUAL
COOLING
MBH
I Ry1 1 FACE TYPE
t
MOUND
TYPE
I DAMPER
1
MATERIAL
NOTES
NOTES
A
: TUTUS MOOEL 300 RS
I FC -02 & FC -03
i
12' FIBS NECK SIZE FL DUC
FIELD
STEEL
2
43.8
8
; TUTUS VOOEL 300 RS
I FC -01 & FC -04
I
2 PLUS NECK SIZE
FIELD
STEEL
i
2
144.0
AIR COOLED CONDENSING UNIT SCHEDULE
CODE
MANUFACTURER -
MITSUBISHI
MODEL NUMBER:
SERVES
INDOOR FAN
COIL UNITS
NOMINAL
COOLING CAP
MBH BTH/H
ACTUAL
COOLING
MBH
ELECTRICAL
(LBS)
g g t ti
EER
NOTES
VOLTS/PH
I
MCA
CU -01
PURY P144TGMU
FC -01 & FC -02
144.0
112.4
208/3
43.8
672
61
10.1
INSTALL ON GRADE
CU -02
PURY- P144TGMU
FC -03 & FC -04
144.0
112.4
208/3
43.8
672
61
10.1
INSTALL ON GRADE
• DESIGNED OY:
R1
CRAM 811`
RH
•
OAIE
8/17/06
APPROVED 8Y
%IN
SCALE:
As Noted
FRE NAME:
306252 M1.1
3140
PROJECT No: 3- 030252
SEET DILE:
Partial
Mechanical
Floor 1
SHEET KAMM
M1.1
•
•
ISSUE RECORD 1
I DESCRIPTION I
•
3140
.0NI
•
1
2
3
4
5
6
7
A
SPECIFIC SCHEDULE NOTES:
1. AMBIENT TEMPERATURE IS 95 DEG. F FOR SUMMER.
2. EER RATING CALCULATED FOR SYSTEM BY MANUFACTURER.
3. REFRIGERANT R410A.
4. PROVIDE REQUIRED CLEARANCES AROUND EQUIPMENT PER MANUFACTURER.
• •
B
048 18
1, ASE:I tC?E ICE -PACKAGING
20'/20' UP
TO IH -01
1/16 =
GENERAL SCHEDULE NOTES:
1. ALL MATERIALS REQUJIRED FOR THIS PROJECT MAY NOT BE LISTED N SCHEDULE
2. REFER TO UEO MiCAL SPECIFICATIONS AND APPLICABLE STANDARDS FOR FURTHER INFORMATION.
GENERAL SCHEDULE NOTES:
1. MAX NOISE CRITERIA NC SHALL BE NC = 30 UNLESS NOTED OTHERWISE.
2. SEE DRAWINGS FOR au me NECK SSE (DIFFUSER INLET TO BE SAME SIZE AS FLEX DUCT)
3. PROVVE BORDER TYPE TO WATCH COUNG
4. PROVIDE 2444 OR 24x12 PANEL FOR LAY - -1N CELLNG APPUCATION.
C
32 48 FT.
20'/20' UP
TO IH -03
20'/30' UP
TO IH -02
20'/84' UP
TO RH -01
COOS
NEW WALL
1 PARTIAL WAREHOUSE PLAN ce
Scale: 1n6 -1 -0
D
NORTH
LEADER PONT'S P 10 s (91°19614 °N °RUINING)
TO G-R-D Ar
•
\-USE MIEN MORE THAN
ONE AEN11CAL G-R-D IS
NECK SIZE / USED IN DE SAME AREA.
E
� NEW WALL AT
MEZZANINE
•
n
n
F
•
1/16" = 1' -0"
SPECiF1C SCHEDULE NOTES:
1. CAPACITY LISTED IS BASED ON DESIGN CONDITIONS. 70' F EAT D8/59' F VYB COOLING.
2. FACTORY ADDED ECONOMIZER BOX (RFOT= RETURN AIR FRONT, OUTSIDE AIR TOP.
RTOF = RETURN AIR TOP, OUTS AIR FRONT.
3. SEE AIR COOLED CONDENSING UNIT SCHEDULE FOR SYSTEM EER.
4. MIXING BOXES COMPLETE YAM 1" FILTER FRAME AND FILTER.
5. MINIMUM OSA BASED ON 12,000 SF WAREHOUSE FLOOR AREA x 0.05 CFM/SF PER
WASHINGTON STATE VENTILATION CODE.
6. R410A REFRIGERANT.
SPECIFIC SCHEDULE 140TES.
1. PROVIDE BACKORAUFT DAMPER_
2. PROVIDE CURB PER DETAIL 3 SHEET 110.1.
3. PROWDE REQUIRED CLEARANCES AROUND EQUIPMENT PER MANUFACTURER
•
G
170f =
0 4 8 18 32 48 FT.
APR - 3 2001
2 PARTIAL ROOF PLAN ce
�l. 1n6"=1
SPECIFIC NOTES THIS SHEET:
PROVE CONDENSATE PIPING CONNECTION, 1 -3S2'
CONNECTION FROM DRAIN PAN (1 -Ys' NOMINAL PIPE) AND
TRAP (PER MANUFACTURER). CONNECT TO EXTERNAL
CONDENSATE PUMP AND ROUTE CONDENSATE DISCHARGE TO
EXH 4ED
NORTH
C4
1
I
I
IMC 307.2.1 Condensate disposal.
Condensate from all cooling coils and
evaporators shall be conveyed from the drain
pan outlet to an approved place of disposal.
Condensate shall not discharge into a street,
alley or other areas so as to cause a nuisance.
•
•
L 2
■ �-- - -- , • `,.
,
•
4O(trt
CI
REONED
TY
AUG 21 I
PERAITCENTEk
1E
z
z
_
H
z
0
0
I--
a_
z
0
< 0
Z
o N
3
0
oo $
03
03
ao
t
s
si
E.
WAREHOUSE-PACKAGING AREA
SEATTLE CHOCOLATES