Loading...
HomeMy WebLinkAboutPermit M06-274 - DORGAN RESIDENCEDORGAN RESIDENCE 1302441 AV M06 -274 Parcel No.: Address: Suite No: City of Tukwila Tenant: Name: DORGAN RESIDENCE Address: 13024 41 AV S , TUKWILA WA Owner: Name: Address: 7341600052 13024 41 AV S TUKW DORGAN LAWRENCE J 13024 41ST AVE S , SEATTLE WA Contact Person: Name: LAWRENCE DORGAN Address: 13024 41 AV S , TUKWILA WA Contractor: Name: OWNER AFFIDAVIT - LAWRENCE J DORGAN Address: Contractor License No: DESCRIPTION OF WORK: REVEAL OF PERMIT M05 -167: INSTALL RADIANT FLOOR HEATING SYSTEM AND BASEMENT RADIATOR Value of Mechanical: $0.00 Type of Fire Protection: SMOKE DETECTORS Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System. Hood and Duct Incinerator: Domestic Commercial/Industrial doc: IMC -10/06 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206431 -3665 Web site: htto.: / /www.ci.tukwila.wa.us MECHANICAL PERMIT EOUIPMENT TYPE AND OIIANTITY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *continued on next page ** Permit Number: Issue Date: Permit Expires On: Expiration Date: Phone: Phone: 206 227 -3237 Phone: Steven M. Mullet, Mayor Steve Lancaster, Director M06 -274 11/20/2006 05/19/2007 Fees Collected: $88.00 International Mechanical Code Edition: 2003 Boiler Compressor: 0-3 HP /100.000 BTU 0 3-15 HP /500,000 BTU 0 15 HP /1,000,000 BTU 0 30-80 HP /1,750,000 BTU 0 50+ HP/1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 1 M06 -274 Printed: 11 -20 -2006 City of Tukwila Permit Center Authorized Signature: I hereby ce governing Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206- 431 -3670 Fax: 206 -431 -3665 Web site: httn: / /www.cttukwila.wa.us I have read and will be compli ��II�GA iX permit and know the same to be true and correct. All provisions of law and ordinances er specified herein or not. The presume to give authority to violate or cancel the provisions of any other state or ocal I laws regulating coast on or - pe a work. I am authorized to sign and obtain this mechanical permit. �`� Si - Date: ' e10 Print Name: L_( r 17: c PCJr This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Steven M. Mullet, Mayor Steve Lancaster, Director Permit Number: M06 -274 Issue Date: 11/20/2006 Permit Expires On: 05/19/2007 Date: ti l v"L( doc: IMC -10/06 M06 -274 Printed: 11 -20 -2006 Parcel No.: 7341600052 Address: Suite No: Tenant: 13024 41 AV S TULIP/ DORGAN RESIDENCE 1: ** *BUILDING DEPARTMENT CONDITIONS * ** v tv City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206431 -3670 Fax: 206431 -3665 Web site: http : / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M06 -274 Status: ISSUED Applied Date: 11/20/2006 Issue Date: 11/20/2006 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: Except for direct -vent appliances that obtain all combustion air directly from the outdoors; fuel -feed appliances shall not be located in, or obtain combustion air from, any of the following rooms or spaces: Sleeping rooms, bathrooms, toilet rooms, storage closets, surgical rooms. 6: Equipment and appliances having an ignition source and located in hazardous locations and public garages, PRIVATE GARAGES, repair garages, automotive motor -fuel dispensing facilities and parking garages shall be elevated such that the source of ignition is not less than 18 inches above the floor surface on which the equipment or appliance rests. 7: Water heaters shall be anchored or strapped to resist horizontal displacement due to earthquake motion. Strapping shall be at points within the upper one -third and lower one -third of the water heater's vertical dimension. A minimum distance of 4- inches shall be maintained above the controls with the strapping. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 9: All electrical work shall be inspected and approved under a separate permit issued by the Washington State Department of Labor and Industries (206/248 - 6630). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. * *continued on next page ** doc: Cond -10/06 M06-274 Printed: 11 -20 -2006 ss City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: httn: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting o s permit does of presume to give authority to violate or cancel the provision of any other work or local laws regulating construction,& tl performanc of work. Signs Print Name: f i u —YSI`C -. /_ \J D ate : 0166 doc: Cond -10 /06 M06 -274 Printed: 11 -20 -2006 E -Mail Address: Contact Person: E-Mail Address: Contact Person: E-Mail Address: Contact Person: E -Mail Address: CITY OF TUKWILA Community DevelopmerLdepartment Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www. ci. tukwila wa us QMpplicationsWorm.-Appliwtim, On LineV -2006 • Permit Appliration.doo Rwimd: 91006 be Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "Please Print " Site Address: (3429 9 15r Pt 5 Name: Ltdfr ( Mailing Address: 1362.9 t.{ giv S _ King Co Assessor's Tax No.: 1779 1(( OC Z_ Suite Number. New Tenant: Cit . Fax Number: State State State Floor: Tenant Name: Property Owners Name: (...-s" dt ✓1 CC ) • e'it^ Mailing Address: () OI e— 1 15 T f j-. S 'Nati k N 9a 19 City t, " state .... Yes ❑ ..No CONTACT PERSON wbo do we Con tact when your permit U ready m be ksu Day Telephone: W1)0? State Zip GENERAL CONTRACTORmFORMATION ±:(Contractor 1nforatstioii for Mechaalest (pi 4) fet Plumbing And Gas Piping (pg 5)) Company Name: UV" k t- Mailing Address: city Day Telephone: Fax Number: Contractor Registration Number: Expiration Date: Zip ARCtir CT O?RECORD lens must bewet stamped by Architect Company Name: Mailing Address: city Day Telephone: Fax Number: Zip ENGINEER OF, RECORD All plans must be wet stamped by Engineer of Record " Company Name: Mailing Address: City Day Telephone: Fax Number: Zip Page 1 of 6 i t ++• f���'TM��$" ! "S "T.��.'°;+� :F r +� H r a { �� l y Existmg �� Av dn ternrltemode t itionto Il 1 ached ag �u 112 Uncovered Del } Valuation of Project (contractor's bid price): S Scope of Work (please provide detailed information): piel el itckfric 2141 SF Grle 44,44 int Existing Building Valuation: S Will there be new rack storage? ❑.... Yes ❑-No If yes, a separate permit and plan submittal will be required. PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) For an Accessory dwelling, provide the following: Lot Area (sq R): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: - Compact: Handicap: Will there be a change in use? ❑ Yes Er No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None [j Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? Yes No If "yes', attach list of materials and storage locations on a separate 8 -1/2 "s 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department Q: Applicatiomtranu- Applicatio.s On Line 3 -2006 - Permit Application.doc Revised: 9-2006 H, Page 2 of 6 1 r T1713120 WORKS TERMITINF^KMATION Scope of Work (please provide detailed information): Please refer to Public Works Bulletin #1 for fret and estimate sheet. Water District ❑...Tukwila ❑...Water District #125 ❑...Water Availability Provided Sewer District ❑...Tukwila El ...sewer Use Certificate ❑... ValVue 0... Sewer Availability Provided Septic System: ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑...CivilPlans (Maximum Paper Size -22 "x34 ") ❑ -.Technical Information Report (Storm Drainage) ❑...Bond ❑..Insurance ❑..Easement(s) Proposed Activities (mark boxes that apply): ❑...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right-of-way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right-of-way Non Right-of-way ❑ ...Total Cut cubic yards ❑ ...Total Fill cubic yards ❑...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑...Frontage Improvements ❑—Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation _ Domestic Water ❑ ...Permanent Water Meter Size... ❑...Temporary Water Meter Size.. ❑ ...Water Only Meter Size ❑ ...Sewer Main Extension Public ❑ ...Water Main Extension Public _ Q Mpplic.tiomWmms-AppticatiOm On LineV -2006 - Permit Appliution.doc Revised; 92006 bh Call before you Dig: 1-800-424-5555 ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line ❑ .. Highline ❑ .. Renton WO WO WO # Private Private 206- 433 =01r ❑ .. Geotechnical Report ❑ .. Maintenance Agreement(s) ❑ .. Work in Flood Zone ❑ .. Storm Drainage ❑...Renton ❑...Seattle ❑ .. Right-of -way Use - Profit for less than 72 hours ❑ .. Right-of-way Use — Potential Disturbance 0...Deduct Water Meter Size ❑...Traffic Impact Analysis 0... Hold Hannless — (SAO) 0... Hold Harmless — (ROW) ❑ .. Grease Interceptor ❑ .. Channehzation ❑ .. Trench Excavation ❑ .. Utility Undergrounding FINANCE INFORMATION Fire Line Size at Property Line ❑...Water ❑...Sewer Monthly Service Billing to: Name: Number of Public Fire Hydrants) ❑...Sewage Treatment Day Telephone: Mailing Address: ZP Water Meter Refund/Billing: Name: Mailing Address: City State Day Telephone: City State Zip Page 3 of 6 Unit 'bile: : Unit Type: :: Qty:" :Unit Type: Qty BQitertComFreSSO -, Qty . Fumace<IOO BTU - Air Handling Unit >10,000 CFM Fire Damper 0-3 HP /100,000 BTU Futnace> 100K BTU - Evaporator Cooler Diffuser 3 -IS HP /500,000 Bill Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /I,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP/I,750,000 BTU Repair or Addition to Heat/Refrig/Cooling - System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator— Comm/Ind MECHANICAL CONTRACTOR INFORMATION Company Name: Mailing Address: City State tip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ Scope of Work (please provide detailed information): 1 t I A g,la 1 .s4. •4...4 I / -I .JI 1. Use: Residential: New ..,. ❑ Replacement .... ❑ Commercial: New .... ❑ Replacement .... ❑ Fuel Type: Electric 0 Gas ....0 Other: • Indicate type of mechanical work being installed and the quantity below: Q :ApplialiSSJForms-Appliatioa On LineV -7006 - Penult Appliwioq doo Revised: 9-2006 en Page 4 of 6 Fixture Type: ' Qty Fixture Type: Qty .. , Fixture .Type.: ., : Qty - Fixture Type: Bathtub or combination bath/shower Drinking fountain or water cooler (per head) Wash fountain Gas piping outlets Bidet Food -waste grinder, commercial Receptor, indirect waste Clothes washer, domestic Floor drain Sinks Dental unit, cuspidor Shower, single head trap Urinals Dishwasher, domestic, with independent drain Lavatory Water Closet Building sewer or trailer park sewer Rain water system — per drain (inside building) Water heater and/or vent Additional medical gas inlets/outlets — six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Repair or alteration of water piping and/or water treating equipment Repair or alteration of drainage or vent piping Medical gas piping system serving one to five inlets/outlets for specific gas I:UMBING AND ,GAS PIPING DERMIT 206 -431: 4 67t i PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: Contact Person: E-Mail Address: City State Zip Day Telephone: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Plumbing work (contractor's bid price): $ Valuation of Gas Piping work (contractor's bid price): $ Scope of Work (please provide detailed information): Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quan ity below: QMppliwimutFmmoApplintian On LineU.006. Permit Applicstion.doc Reviled: 97006 nn Page 5 of 6 Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDIN • OWN R OR ED AGENT: Signa � bate: 20/66 G 4 c „ Aei1 C e c53Ctf^ Day Telephone ) R >7 Mailing Address: 12czv & tr /4 VC S 4 City �t,l/a � 111 1 ? -16 f3 state Print Date Application Accepted: Date Application Expires: D / 19 l Staff Initials: 1 1:7 I Q'.UpplicatiauWame- Applications On Lineu -2006 - Permit Appliation.doc Revised; 9.2006 Ni Page 6 of 6 RECEIPT NO: R0641857 Initials: User ID: Doc: RECSEIS -08 1165 Payee: LAWRENCE J DORGAN SET TRANSACTIONS: Set Member Amount D06 -447 129.50 M06 -274 88.00 TOTAL: 129.50 ACCOUNT ITEM LIST: Description se,/ City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206-431-3665 Web site: http: //www.ci.tukwila.wa.us BUILDING INVESTIGATION MECHANICAL - RES PHOTOCOPIES /DUP SERVICES STATE BUILDING SURCHARGE SET RECEIPT ti. Payment Date: 11/20/2006 Total Payment: 217.50 SET ID: 5000000626 SET NAME: Tmp set/Initialized Activities TRANSACTION LIST: Type Method Description Amount Payment Cash 217.50 TOTAL: 217.50 Account Code Current Pmts 000/322.800 116.00 000/322.100 88.00 000/341.690 9.00 000/386.904 4.50 TOTAL: 217.50 1896 11/20 9716 TOTAL 217.50 Project: Type of nsAection: Addres7 1 / 4!_ ate Called: Special Instructions. Date Wanted: a .t� 2 m ' Requester: Phone No: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 1 -36 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: ot 70 $58.00 REINSPECTION ltE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. Receipt No.: Date: '.$ a''+ r '!.+..w.A;t<!�':�.Ca. ^qi" " -., n.,G�f•.r,Crt.uc, ■ tea lgigta tea th rior sa?'cv `� era shell be mode to the scope es' r>v"- `;;C:. D�cGs�� C r • � o' • NIL MU COON I spool b,,,4,e. to rut and tilt el canteens% tents nose oat abut ,nolanon ordlienes Reed e oate: �� _y os 7 III G DIVISION CfYOFru NOV 202006 4 PER'::1T Cc`NTER CITY OF A OCT 3 1 2OO PERMIT CENTER A4d,22Kf REFLECTIX, INC. The Insulation For All Seasons P.O. Box 108 • Markleville, IN • USA • 46056 Phone: (765) 533-4332 or (800) 879-3645 Fax: (765) 533-2327 • Web: www.reflectixinc.com E-mail: customerservke@reflectixinc.com • Residential • Commercial • Agricultural • Industrial A F; A Amwsca ausitOpatnan IT. . . . N " for the Homeowner Copyright 2002 gelled Inc. • All RIghts Reserved. • Fl h1319r ts of h Reflectix Insulation CITY OF TUKWILA OCt 3 1 2005 WWW. REFLECTIXINC.COM THE INSULATION FOR ALL SEASONS! REGEWED oily op' rukvvo NOV 2 0 2006 P;+:,74,,irr CENTER REFLECTS 97% RADIANT HEAT RADIANT FLOOR APPLICATION Reflectix' is a perfect choice for insulating below radiant floor heaters. The aluminum foil reflects 97% of the heat energy that strikes it. The use of Reflectix' will ensure that you are getting the best performance possible from the radiant floor system by reflecting heat that would normally be lost below the radiant heater. INSTALLATION UNDER OR BETWEEN WOOD JOISTS Method 1.) Standard Edge Material • Carefully read over the Safety Tips on page 13 before starting. • Unroll and staple Refledix' Standard Edge under floor joists. • Seal the joints and outer edges with Reliedix' Foil Tape. Method 2.) Staple Tab Material L • Carefully read over the Safety Tips on page 13 before starting. • Using Refledix' Staple Tab Insulation, Install the Insulation between the floor joists. Allow 4 ". 6 "`below the heating coils or as recommended by manufacturer instruction. • Staple into joists as shown In illustration above. • Seal ends using Reflect* Foil Tape. Contact one of our Customer Service Agents for more information on additional Radiant Floor Applications such as: Radiant Heating in a Concrete Floor, Radiant Heating with a Subfloor, and Radiant Heating Over a Wood Floor. 10 I The Ultra -Fin System uses 1 /2" (5/8" O.D. underfloor joist spaces, 1, here heat aluminum fins. The fins transfer the heat, and warm convection. The heated air warms the heat throughout the living space above. Rick Anderson Rick's Plumb/jog & Heating, Spooner tnlo 1 ,d;li;tGi nt lLr v tc3a- >� Al Bruno t ti i Fuel, Red Hook, N ' Ultra -Fin is a hydronic radiant floor heating system designed specifically for wood frame housing. While other types of radiant floor systems exist for similar use, Ultra -Fin presents important advances in cost effectiveness and efficiency. tiVT:"1[S j tubing to circulate hot water throughout the froth the tubing is conducted to attached the air in the joist spaces, creating hot air floor uniformly, and the floor radiates gentle Lt: i!C 14C :•1" t,.l .a led i:': iti'..'.. Michael S. Bailey, Halifax, Traditional radiant floor systems are based on heat contact transfer technology, where hui water tubing makes direct contact with floor layers. Compared to Ultra -fin, this technology is lethargic and complex, often requiring extra Ilooi layers or concrete. Ultra -fin creates new efficiency with a simple innovation: it uses radiant hot -water heat to create hot air convection in the joist spaces beneath the existing floor, converting the entire floor system into a giant heat radiator. The result is uniform warmth and comfort -at a cost and convenience difficult to match . Wayne & Tricia Samson, Victoria, BC Canada ,,. 111. t, - . , .:: :i!; a s Ken &Sc Brenda Tamlin Ultra -Fin doesn't require special flooring to conduct or distribute heat, and the uniform quality of Ultra -Fin's heat doesn't damage or limit the use of hardwood flooring. UUt Ultra -Fin delivers more heat w ith a cooler floor compared to other radiant systems. Natural convection between floor and ceiling provides uniform heating, blocks chilling drafts and eliminates hot and cold spots. With the entire floor acting as a radiator, each room warms up quickly, effectively and efficiently. e Test Results t.... .ti Ultra -Fin's radiant heat doesn't blow dust and germs through your house like forced air. No blowing air means no noisy fans, and no pings, clicks or other noises associated with expanding or contracting heat ducts. Ultra -Fin doesn't interfere with furniture placement or drapes, and it won't clash with home decor. Zone controls (thermostats) in individual rooms allow the heat to be regulated locally, pro\ idins maximum energy savings. lapprmlmately, amends upon %%aler temp.. II a mednp, ett 1Na ter Tem 150° Tempeture 150 60 - - 180° Measured IOU Output 27.3. /sq ft 41.6 BT 3 33A BTU /sq ft J -._ _. • 46.5 BTU /sq ft - 85' 96 67° 1.1 " k... Easy ; ffti a- Ultra -Fin makes it easy to install an efficient, cost- effective heating system in any wood frame home. The Ultra -Fin System is installed in three steps: 1" holes are drilled through the floor joists approximately 3" below the floor sheathing under each room, at specified intervals according to the Ultra -Fin healing plan. ? 1/2" (5/8" O.D.) tubing is passed through the holes, starling and ending at the tubing manifold. The aluminum Ultra -Fins are attached to the tubing in each joist space using pop rivets. Requires less than 1/3 the tubing of other types of radiant heating systems. In most cases, heating loops are able to start and end at the boiler. x Allots each room to have separate thermostat (zone control), permitting variable room temperatures. Toll Free Phone: 1- 888 - 565 -2267. Toll Free Fax: 1- 888 - 565 - 2228 Local Phone: 250 -544 -0226 , � _ _s Requires less labour to install. Does not require special construction meastiwc (e.g. over building a house to accommodate concrete floor slabs). Is 100% compatible with hardwood flooring. a IMO aiei MY !OM!M I• ` _ �_ „...===== , 5111111111111111111111111 `W-,*,n- Areas tsilh rtieater heat loss and small rooms (ei .r ?. small kitchens and bathrooms) will require reduced tubing spacing. Foie: M06- 27 Y 35mm Drawing #1-/ CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Permit Center /Building Division: 206 -431 -3670 Public Works Department: 206 - 433 -0179 Planning Division: 206 -431 -3670 STATE OF WASHINGTON) ) as. COUNTY OF KING t .,ctwe , Q (42 AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION 1. I have made application for a building permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a building permit for work which Is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this building permit to be exempt under No. I a) and will therefore not be performed by a registered contractor. I understand that I may be waiving certain rights th . mig t otherwi ave under state law in any decision to engage an unregistered contractor to perform construction fo%% %%%%%%%%% %%% 4;11 JR a r � 1 , al 1 5 c, 7.6 1 3 -29 r r a 0 i .e.:: \applications\8 -2004 affidavit in lieu of contractor registration [please print] PERMIT NO.: states as follows: �e MO, 2-1 Signed and sworn to before me this a day of No✓e'm (2 r 20 O NOTARY' PUBLIC in and for the State of Washington, - rai l / Residing at 4AJ t t I,.ct , County. Name as commissioned: a in -e ,A (wet /C My commission expires: 0S -1 0 18.27.090 Exemptions. This chapter shall not apply to: 1. 2. An authorized representative of the United States Government, the State of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district or other municipal or political corporation or subdivision of this state; 3. Officers of the court when they are acting within the scope of their office; 4. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 5. Any construction, repair or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 6. The sale or installation of any finished products, materials, or articles of merchandise which are not actually fabricated into and do not become a permanent fixed part of the structure; 7. Any construction, alteration, improvement or repair of personal property, except this chapter shall apply to all mobile, manufactured housing. A mobile/manufactured home may be installed, set up, or repaired by the registered or legal owner, by a contractor licensed under this chapter, or by a mobile/manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW; 8. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 9. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 10. Any work or operation on one undertaking or project by one or more contractors, the aggregate contract price of which for labor and materials and all other items is less than $500.00, such work, or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in all instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into \applicationsl&2004 affidavit in lieu of contractor registration contracts of amounts less than $500.00 for the purpose of the evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he is a contractor, or that he is qualified to engage In the business of contractor, 11. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except then any of the above work is performed by a registered contractor, 12. An owner who contracts for a project with a registered owner; 13. Any person working on his own property, whether occupied by him or not, and any person working on his residence, whether owned by him or not but his exemption shall not apply . to any person otherwise covered by this chapter who constructs an improvement on his own property with the intention and for the purpose of selling the improved property; 14. Owners of commercial properties who use their own employees to do maintenance, repair, and alteration work in or upon their own properties; 15. A licensed architect or civil or professional engineer acting solely in his professional capacity, an electrician licensed under the laws of the state of Washington, or a plumber licensed under the laws of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the licensee is operating within the scope of his license; 16. Any person who engages; in the activities herein regulated as an ` employee `9f a registered contractor with wages as his 'sole compensation; 17. Contractors on highway projects who have been prequalified as required by chapter 13 of the Laws of 1961, RCW 47.28.070 with the department of transportation to perform highway construction, reconstruction, or maintenance work. OUJI`IER 4 CONTRACTOR: LARRY DORGAN 13024 41ST AVE S TUKWILLA, WA (206) 221 -3231 SITE ADDRESS: 13024 41ST AVE 9 TUKWILLA, WA LEGAL D ESCRIPTION A PORTION OF LOTS 1, 2 43 OF BLOCK 2, TRACT 56 OF TI-4E UNRECORDED SUBDIVISION OF RIVERSIDE INT. TRACTS, RECORDS OF KING COUNTY, WASHINGTON TAX LOT * 1241600052 NEAT: GAS FIRED FORCED 1-IOT AIR LOT COVERAGE: 6,259 SQ. FT. LOT / 1.638 SQ. FT. COVERED = 14% OPEN SPACE AREAS: MAIN FLOOR: LOUDER FLOOR 1,140 SQUARE FEET 1001 SQUARE FEET TOTAL AREA: . 2,141 SQUARE FEET UNHEATED GARAGE AREA:. 192 SQUARE FEET GENERAL NOTES: ALL WORK TO CONFIRM TO ALL AP'LICA3LE CODES AND ORDINANCES OF T1-E CITY OF TUKWILLA CONTRACTOR TO VERIFY ALL DIMENSIONS !=BEFORE COMMENCING WORK illy • IATI ( l`j I I'I Ii I C I I C I Inch 1/16 .11 IIIUIIlIII Ilii1�UIIIIIIdIIIiIIIIIILILI. 2m' LOT I SITE PLAN I "= 20' . NII 3I... I I:. �,� 134' -5" NORTH LOT LINE EXISTING DRIVEWAY . I34' -5" SOUTH LOT IIi I G��[i.iIlIIJ II II JIJI iJ li u IJIJ1 J �Cllulii i I1IIIII1IIIII 6 e t . w0I L( J.1JIIIIIIIIIIJIIIIi!IIIIIIIII. _... 60' -1" . LOT 3 64': EXISTING GARAGE '16' 1 -10 . EtEVIEWE� FOR CODE COMPLIANCE Gov • _ 3 2.005 )RGAN RESIDENCE FE PLAN . 13024 41ST AVENUE S TUKWILLA, WA 206 - 2211323 RAWING 1 AAPQ C� pf Tukw tcT01�1 RI lI1nT CITY OF TUKWILA OCT 3 12005 PERMIT CENTER • ylrCED CITY t}F 1 UKWIL NO V 2 0 2006 ''- ':. "'T •ENTEEj