HomeMy WebLinkAboutUtilities 2014-05-05 Item 2A - Resolution - Reject All Bids for CBD Sanitary Sewer Rehabilitation / 2013 Andover Park Sewer RepairCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Mike Cusick, PE, Senior Program Manager DATE: May 2, 2014 SUBJECT: CBD Sanitary Sewer Rehabilitation & 2013 APW TO APE Sewer Repair Project No. 91140203 Resolution to Reject All Bids ISSUE Reject the bid for the CBD Sanitary Sewer Rehabilitation and 2013 APW TO APE Sewer Repair. BACKGROUND The project was advertised for bids on March 31 and April 7, 2014, and one (1) bid was opened on April 14, 2014. The Engineer's Estimate was $621,721.00. Shoreline Construction Co. submitted the only bid of $860,106.08, which is $238,385.08 over the Engineer's Estimate (and does not include a 10% contingency). ANALYSIS In order to award the project to Shoreline Construction Co., the City would need to increase the project funding by approximately $300,000.00 to pay for the higher bid and the associated increased contingency. The proposed Resolution will reject the bid and re- advertise the project after implementing any cost saving revisions. BUDGET AND BID SUMMARY Engineer's Shoreline's Estimate Bid Budget Construction (Bid Amount incl. tax) $ 621,721.00 $ 860,106.08 $ 700,000.00 Contingency (10 %) 56,778.17 78,485.50 Total $ 678,499.17 $ 938,591.58 $ 700,000.00 RECOMMENDATION Council is being asked to approve the Resolution rejecting the bid for the CBD Sanitary Sewer Rehabilitation Project and consider this item on the Consent Agenda at the May 19, 2014 Regular Meeting. Attachments: Draft Resolution Bid Tabulation W:IPW EngIPROJECTSIA- SW Projects\CBD Sewer Rehabilitation (91140203)1Consffuctionllnfo Memo UC Memo Reject- Accept Bids 4- 18- 14.docx 1 AFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REJECTING ALL BIDS SUBMITTED FOR THE COMMERCIAL BUSINESS DISTRICT SANITARY SEWER REHABILITATION AND 2014 ANDOVER PARK WEST TO ANDOVER PARK EAST SEWER REPAIR PROJECT. WHEREAS, sealed bids were solicited for the Commercial Business District (CBD) Sanitary Sewer Rehabilitation and 2014 Andover Park West (APW) to Andover Park East (APE) Sewer Repair Project; and WHEREAS, bids were opened and read aloud by the City Clerk on April 14, 2014; and WHEREAS, a budget was set for the construction of the sewer improvements; and WHEREAS, the one responsive bid received was over the budgeted amount for the construction of the CBD Sewer Rehabilitation and 2014 APW to APE Sewer Repair Project; and WHEREAS, the City reserved the right to reject all bids in its call for bids, and RCW 35.23.352 provides for the rejection of any or all bids by resolution of the City Council; and WHEREAS, the City wishes to reject the bid due to budget limitations; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: All bids are hereby rejected due to budget limitations. W: \Word Processing \Resolutions \Reject bid for CBD Sanitary Sewer Rehabilitation 4 -29 -14 MC:bjs Page 1 of 2 2 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2014. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk De'Sean Quinn, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Shelley M. Kerslake, City Attorney W: \Word Processing \Resolutions \Reject bid for CBD Sanitary Sewer Rehabilitation 4 -29 -14 MC:bjs Page 2of2 3 M. CUSICK, PE 14- Apr -14 CBD SANITARY SEWER REHABILITATION PROJECT NO. 91140203 ENGINEER PAGE 1 CONTRACTOR BID SCHEDULE A RH2 SHORELINE BID SCHEDULE ITEM ITEM QUANTITY UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT REPAIR FROM APE TO APW QUANTITY UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT Al MOBILATION 1 LS $ 18,120.00 $ 18,120.00 $ 20,000.00 $ 20,000.00 A2 TRAFFIC CONTROL 1 LS $ 4,200.00 $ 4,200.00 $ 10,000.00 $ 10,000.00 A3 TRENCH SAFTY SYSTEM 1 LS $ 672.00 $ 672.00 $ 20,000.00 $ 20,000.00 A4 TEMP EROSION CONTROL 1 LS $ 1,800.00 $ 1,800.00 $ 5,000.00 $ 5,000.00 A5 BYPASS CLEANING 1 LS $ 19,200.00 $ 19,200.00 $ 10,000.00 $ 10,000.00 A6 DEWATERING 1 LS $ 18,720.00 $ 18,720.00 $ 60,000.00 $ 60,000.00 A7 DEWATERING CONVEYANCE 1 LS $ 4,800.00 $ 4,800.00 $ 10,000.00 $ 10,000.00 A8 12' PVC PIPE 56 LF $ 162.00 $ 9,072.00 $ 600.00 $ 33,600.00 A9 LIGHT WEIGHT BACKFILL 400 TONS $ 48.00 $ 19,200.00 * $ 50.00 $ 20,000.00 A10 6" HMA PATCH 111 SY $ 60.00 $ 6,660.00 $ 150.00 $ 16,650.00 A 11 FOUNDATION MATERIAL 10 TONS $ 42.00 $ 420.00 $ 50.00 $ 500.00 Al2 SEAL COAT & RESTRIPING 1778 SY $ 6.00 $ 10,668.00 $ 7.00 $ 12,446.00 A13 RESTORATION 1 LS $ 24,000.00 $ 24,000.00 $ 20,000.00 $ 20,000.00 A14 POST CONSTRUCTION INSPECTION 1 LS $ 600.00 $ 600.00 $ 3,000.00 $ 3,000.00 TOTAL $ 138,132.00 TOTAL $ 241,196.00 ** SALES TAX $ 13,122.54 SALES TAX $ 22,913.62 TOTAL $ 151,254.54 TOTAL $ 264,109.62 BID SCHEDULE B RH2 SHORELINE BID SCHEDULE ITEM ITEM QUANTITY UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT APE MANHOLE INSTALLATION QUANTITY UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT B1 MOBILATION 1 LS $ 4,800.00 $ 4,800.00 $ 12,000.00 $ 12,000.00 B2 TRAFFIC CONTROL 1 LS $ 6,000.00 $ 6,000.00 $ 20,000.00 $ 20,000.00 B3 TRENCH SAFTY SYSTEM 1 LS $ 840.00 $ 840.00 $ 10,000.00 $ 10,000.00 B4 DEWATERING 1 LS $ 1,800.00 $ 1,800.00 $ 5,000.00 $ 5,000.00 B5 TEMP EROSION CONTROL 1 LS $ 12,960.00 $ 12,960.00 $ 27,000.00 $ 27,000.00 B6 DEWATERING CONVEYANCE 1 LS $ 2,400.00 $ 2,400.00 $ 10,000.00 $ 10,000.00 B7 10' PVC PIPE 10 LS $ 132.00 $ 1,320.00 $ 1,300.00 $ 13,000.00 B8 MANHOLE FOUNDATION 1 LS $ 960.00 $ 960.00 $ 1,000.00 $ 1,000.00 B9 48" MANHOLE AND COVER 1 EA $ 7,200.00 $ 7,200.00 $ 15,000.00 $ 15,000.00 B10 48" MANHOLE EXTRA DEPTH 4 VF $ 210.00 $ 840.00 $ 100.00 $ 400.00 B11 LIGHTWEIGHT BACK FILL 95 TONS $ 48.00 $ 4,560.00 $ 50.00 $ 4,750.00 B12 9" HMA PATCH 16 SY $ 90.00 $ 1,440.00 $ 700.00 $ 11,200.00 B13 HMA OVERLAY RE- STRIPING 225 SY $ 30.00 $ 6,750.00 $ 80.00 $ 18,000.00 TOTAL $ 51,870.00 TOTAL $ 147,350.00 SALES TAX $ 4,927.65 SALES TAX $ 13,998.25 TOTAL $ 56,797.65 TOTAL $ 161,348.25 CBD SANITARY SEWER REHABILITATION PROJECT NO. 91140203 ENGINEER PAGE 2 CONTRACTOR BID SCHEDULE C RH2 SHORELINE BID SCHEDULE ITEM ITEM QUANTITY UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT CIPP LINING QUANTITY UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT C1 MOBILATION 1 LS $ 28,500.00 $ 28,500.00 $ 20,000.00 $ 20,000.00 C2 TRAFFIC CONTROL 1 LS $ 12,000.00 $ 12,000.00 $ 85,000.00 $ 85,000.00 C3 PRE - CLEANING VIDEO INSPECTION 1 LS $ 4,960.00 $ 4,960.00 $ 3,300.00 $ 3,300.00 C4 CLEAN AND PREP SEWER 1 LS $ 9,920.00 $ 9,920.00 $ 3,300.00 $ 3,300.00 C5 VIDEO INSPECTION PRIOR TO CONSTRUCTION 1 LS $ 4,960.00 $ 4,960.00 $ 3,300.00 $ 3,300.00 C6 PROVIDE WASTEWATER BYPASS 1 LS $ 13,888.00 $ 13,888.00 $ 1,000.00 $ 1,000.00 C7 10" CIPP LINER 663 LF $ 57.00 $ 37,791.00 $ 48.00 $ 31,824.00 C8 10" CIPP LINER 3305 LF $ 60.00 $ 198,300.00 $ 55.00 $ 181,775.00 C9 LATERAL REINSTALLATION 4 EA $ 575.00 $ 2,300.00 $ 235.00 $ 940.00 TOTAL $ 312,619.00 TOTAL $ 330,439.00 SALE TAX $ 29,698.81 SALE TAX $ 31,391.71 TOTAL $ 342,317.81 TOTAL $ 361,830.71 BID SCHEDULE D RH2 SHORELINE BID SCHEDULE ITEM ITEM QUANTITY UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT MANHOLE REPAIR D1 MOBILATION 1 LS $ 2,760.00 $ 2,760.00 $ 5,000.00 $ 5,000.00 D2 TRAFFIC CONTROL 7 EA $ 720.00 $ 5,040.00 $ 1,500.00 $ 10,500.00 D3 RECHANNEL MANHOLES 5 EA $ 1,200.00 $ 6,000.00 $ 1,500.00 $ 7,500.00 D4 MH PREPARATORY WORK 4 EA $ 540.00 $ 2,160.00 $ 1,500.00 $ 6,000.00 D5 CHIP GROUT PIPE PENETRATIONS 8 EA $ 840.00 $ 6,720.00 $ 2,000.00 $ 16,000.00 D6 ROOT CONTROL 3 EA $ 300.00 $ 900.00 $ 1,000.00 $ 3,000.00 D7 REMOVE EXISTING DROP CONNECTION 2 EA $ 360.00 $ 720.00 $ 3,000.00 $ 6,000.00 D8 INSTALL DROP CONNECTION 3 EA $ 1,440.00 $ 4,320.00 $ 3,500.00 $ 10,500.00 D9 REPLACE LADDER 2 EA $ 480.00 $ 960.00 $ 1,000.00 $ 2,000.00 TOTAL $ 29,580.00 TOTAL $ 66,500.00 SALES TAX $ 2,810.10 SALES TAX $ 6,317.50 TOTAL $ 32,390.10 TOTAL $ 72,817.50 *CITY CORRECTION OF AMOUNT RH2 ** CITY CORRECTION OF TOTAL SHORELINE * ** ON JAN. 15 RH2 PROVIDED THE CITY WITH WITH THE AMOUNT OF $621,721.00 01 BID SCHEDULE A $ 151,254.54 BID SCHEDULE B $ 56,797.65 BID SCHEDULE C $ 342,317.81 BID SCHEDULE D $ 32,390.10 TOTAL $ 582,760.10 * ** $ 264,109.62 $ 161,348.25 $ 361,830.71 $ 72,817.50 $ 860,106.08