HomeMy WebLinkAboutReg 2014-05-05 Item 4F - Contract Supplement #3 - Cascade View Safe Routes to School with David Evans and Associates for $24,075COUNCIL AGENDA SYNOPSIS ------ ----------- --------------- Meeting Date Prepared b 05/05/14 BG Ala or's review 44tC-- Council review ITEM INFORMATION ITEM No. 4.F. 35 STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA a VIE: 05/05/14 AGENDA ITEM TITLE Cascade View Safe Routes to School David Evans & Associates Supplemental Agreement No. 3 CATEGORY E Discussion Meg Date 11 Motion Date 05/05/14 Resolution Mtg Date Ordinance Mtg Date Bid Award Mgg Date I Public Hearing E Other Mtg Date Mtg Mtg Date SPONSOR E Council C Mayor C HR ODCD Finance Fire IT C P&R Police PIF SPONSOR'S David Evans and Associates is currently the design consultant for the Cascade View Safe SUMMARY Routes to School Project. Additional design is need for the drainage system and assistance with the WA State Dept. of Historical Preservation due to the age of the adjoining cemetery parcel. The cost of this additional design work is $24,075.00 and will be covered by right- of-way budget. Council is being asked to approve Supplement No. 3 with David Evans & Associates for $24,075.00. REVIEWED BY El COW Mtg. El CA&P Cmte C F&S Cmte Cmte El Arts Comm. E Parks Comm. COMMITTEE CHAIR: Transportation Cmte E Utilities DATE: 04/28/14 E Planning Comm. ALLAN EKBERG RECOMMENDATIONS: SPONSOR/ADMIN. COMMITTEE Public Works Department Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $24,075.00 $162,000.00 $0.00 Fund Source: 103 RESIDENTIAL STREETS (PG 3, 2014 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 05/05/14 MTG. DATE ATTACHMENTS 05/05/14 Informational Memorandum dated 04/25/14 Page 3, 2014 CIP Supplemental Agreement No. 3 to Contract No. 13-043 Minutes from the Transportation Committee meeting of 04/28/14 35 36 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee ~.xx FROM: Bob Giberson, Public Works Director BY: Dave Sorensen, P ject Manager DATE: April 25, 2014 SUBJECT: Cascade View Safe Routes to School Project No. 91210301, Contract No. 13'043 Supplemental Agreement No. 3 ISSUE Execute Contract Supplemental Agreement No. 3 with David Evans and Associates, Inc. to provide a contrac time extension and cost increase for design services for the Cascade View Safe Routes to School Project. BACKGROUND The design services contrac for $38,783 with David Evans Associates for the Cascade View Safe Routes to School Projec began February 21,2O13 and will expire June 1.2O14. Supplement No. 1 was for additional Right-of Way work and Supplement No. 2 was for a time extension only. Supplement No. 3 is needed for additional time to complete the right-of- way negotiations and subsequently design services costs have also increased for this Safe Routes to School Project. DISCUSSION The design contrac warrants additional funds for the added design expense for the following reasons: • Expanded scope of the drainage system and performing underground utility locates within the p jgCt area. • Adding Historical Research Associates to develop an Archeological Monitoring Plan and assist with Tribal Consultation. This plan was required by the Washington State Department of Historical Preservation as a condition of our P ject's 05-05 approval. Without this approval the p ject cannot move forward. • Redesign of the trail to provide more separation from the cemetery parcel. • Adding bid assistance by David Evans Associates, Inc. during the bidding process. FINANCIAL IMPACT The cost negotiated for this increase with David Evans Associates, Inc. for $24,075.00 is reasonable for the size and scope of this project and iGwhhiO budget. Contract Budget Design Contract $38'783.00 $84.000.00 Additional Design Work (Supp. No. 3) 24.075.00 0.00 Right-of-Way (Supplement NC, 1) 25.075.00 78.000.00 Totals $88,533.00 $162,000.00 The remaining design budge is intended to be used to meet the education/encouragement component of the gran award. RECOMMENDATION Council is being asked to approve Supplemental Agreement No. 3 to Contrac No. 13-029 in the amount of $24,075.00 with David Evans and Associates for the Cascade View Safe Routes to School P ject and consider this item on the Consent Agenda at the May 5, 2014 Regular Meeting. Attachments: 2014 CIP 3 Consultant Agreement Supplement No. 3 with Exhibits W:11PW Eng1PROJECTS \A- RW 8, RS Projects1Sate Routes to School - Cascade View (91210301)1Design \April 2014 SupplementiDocs to TC 38 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Cascade View Safe Routes to School Project No 91210301 Construct an off-street, paved shared use path, sidewalks, and a traffic circle at 33rd Ave S and S 140th St. DESCRIPTION: This route was identified in the Walking Audit prepared for the Cascade View school zone. S 140th St is one of the high priority missing sidewalk areas prioritized as part of the Walk and Roll Plan. Enhance safety for students walking to Cascade View Elementary School and encourage transportation choices JUSTIFICATION: ' ' fnrCoocadaVlewneighborhuudesidents. STATUS: Phase I is construction of an off-street, paved shared use path betw en S 137th St and S 140th St. Phase II includes a traffic circle at 33rd Ave S/S 140th St. Also includes sidewalks on the east side of 33rd Ave S between S 140th St & S 144th St and the north side of S 140th St between Military Rd S and 34th Ave S. MAINT. IMPACT New trail, traffic circle, and sidewalks will need to be maintained. COMMENT: WSDOT Safe Routes to School State grant for $428K for Phas I. Funding for Phase II in beyond will be part of a future grant application. FINANCIAL Through Estimated in $000's 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL EXPENSES Phase II Design 55 29 183 267 Land(F0VV ) 78 78 Conot MgmL 45 126 171 Construction 250 530 780 TOTAL EXPENSES 0 133 324 0 0 0 0 0 839 1.2e6 FUND SOURCES Awarded Grant 133 295 428 School District Grant Portion 29 29 Proposed Grant 750 750 Mitigation Expected 0 City Oper. Revenue 0 0 0 0 0 0 0 0 89 89 TOTAL SOURCES 0 133 324 0 0 0 0 0 839 1,296 2014 2019 Capital Improvemen Program 40 ILA'W. City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: CONTRACT FOR SERVICES Amendment #3 Between the City of Tukwila and David Evans and Associates, Inc. That portion of Contract No. 13-043 between the City of Tukwila and David Evans and Associates, Inc. is amended as follows: Section II SCOPE OF WORK: Additional scope of work attached (See Exhibit A) Section III DURATION OF AGREEMENT: Contract duration is extended through 7/31/2014. Section IV PAYMENT: Supplement #3 provides additional payment in the amount of $24,075 shall be added to the contract (See attached Exhibit B cost estimate), for a new maximum amount payable of $88,533. All other provisions of the contract shall remain in full force and effect. Dated this day of , 2014 CITY OF TUKWILA CONTRACTOR Jim Haggerton, Mayor ATTEST/AUTHENTICATED Printed Name/Title: APPROVED AS TO FORM nae./ re-/ City Clerk City Attorney CA: 2012 Page 1 of 1 41 42 Exhibit A Scope of Services for the City of Tukwila Cascade View Elementary Safe Routes to School Supplement No. 3 Supplement No. 3 modifies the original agreement dated February 22, 2013, and Supplements 1 and 2 with the following revisions. Additional Task 1.0, 3.0, and 4.0 Scope of Service items are listed below. The new Task 6.0 Scope of Service item was added. TASK 1.0 PROJECT MANAGEMENT The original contract duration was anticipated to be 4 months, but the contract duration was extended an additional 10 months and is expected to continue for an additional 3 months to complete the design. This work element continues with preparing monthly invoices, and coordination with the subconsultant. Deliverables: • Monthly progress reports and invoices (13 additional; both in hard copy only). TASK 2.0 BASE MAPPING Due to the drainage system being proposed for this project, the CONSULTANT shall call a utility locate company to mark utilities within the project limits. If needed, the CONSULTANT shall survey these marks and update the existing base map. Deliverables: • Updated existing base map for design use. TASK 3.0 ENVIRONMENTAL Based on comments received from the Washington State Department of Archaeology and Historic Preservation Office (DAHP), archaeological monitoring is necessary due to the trail's close proximity to a historic period cemetery. The CONSULTANT shall develop an Archaeological Monitoring Plan. It will include contact information for project personnel as well as DAHP personnel contact infoi illation. The CONSULTANT shall assist the City with Tribal Consultation by preparing a letter to initiate consultation, and shall help follow up in the form of participating in a phone call(s) with the Tribes as requested. Follow up will not exceed one hour. If it exceeds this amount, the scope and budget will be revised accordingly. Deliverables: • Archaeological Monitoring Plan (Draft and Final). • Tribal Consultation Letter (Draft and Final). TUKA00000009 000000N 0030Coniraci\Supplement 3Exhibit A _DEA Scope CVSRS Suppl 3 2014_0423.1.10ex Supplement No. 3 Page 1 Cascade View Elementary Safe Routes to School Scope of Services 43 Assumptions: • Construction monitoring is not included in this Supplement. • An Archaeological Monitoring Report is not included in this Supplement. TASK 4.0 DESIGN The following items were assumed in the original agreement: • A drainage technical information report or memorandum is not required. • Stormwater quality and detention is not anticipated for the project. • Detention and water quality is not required. • The City will handle all utility companies' coordination. However, as the project design developed, revisions to these assumptions were required. This Supplement requests additional budget to perform the following tasks: • The CONSULTANT shall incorporate into the final design a modular wetland vault for stormwater treatment at the church parking lot as requested by the City. • The CONSULTANT shall coordinate with Seattle City Light to request relocation of the power pole guy anchor. Additional budget is also being requested for the following two items: • The redesign of the trail based on the City's comments to relocate the trail to provide more separation to the cemetery parcel. • The larger than anticipated drainage system. TASK 6.0 BID ASSISTANCE The CONSULTANT shall provide bid assistance. This shall include the following: • Addressing Contractor's questions. • Preparing one addendum. • Attending bid opening. • Verifying contractors' bid proposal and references. • Preparing award recommendation letter. Deliverables: • Addendum (electronic [pdf file] copy). • Contractor Bid Verification (both electronic [pdf file] and hard copy). • Award Recommendation Letter (both electronic [pdf file] and hard copy). • Upload of addendum, plans, and specifications to Builders Exchange, www.bxwa.com. • 10 sets of plans (11"x17) and specifications. P:t\TUKA00000009000000N,0030ContractSupplement 3'Exhibit A DEA Scope CVSRS Suppl 3 2014_042.3docx Supplement No. 3 Page 2 Cascade View Elementary Safe Routes to School Scope of Services 44 Attachment B City of Tukwila Cascade View Elementary Safe Routes to School Cost Estimate Supplement No. 3 David Evans and Associates, Inc. Classification Hrs. x Rate = Cost 1 Managing Professional Engineer (MGPE) 35.0 $ 183.00 $ 6,405 2 QA/QC Manager (MGPE) 5.0 $ 183.00 $ 915 3 Design Engineer (DEEN) 41.0 $ 100.65 $ 4,127 4 Sr. CADD Technician (SCAD) 21.0 $ 118.95 $ 2,498 5 Project Surveyor (PLSU) 8.0 $ 125.05 $ 1,000 6 Party Chief (PCHF) 8.0 $ 85.40 $ 683 7 Instrument Person (INST) 8.0 $ 76.25 $ 610 8 Environmental Planner (ENVP) 4.0 $ 106.75 $ 427 9 Executive Administrator (EXAD) 13.0 $ 97.60 $ 1,269 10 Administrative Assistant (ADMA) 16.0 $ 86.93 $ 1,391 Total Hrs. 159.0 Salary Cost Direct Expenses Plans Utility Locate Mileage Subtotal No. Unit Each Cost 10 sets @ $15 /set $ 150 1 LS $2,000 $ 2,000 150 miles @ $0.56 /mile $ 84 $ 19,325 2,234 David Evans and Associates Total $ 21,559 Subconsultants: Historical Research Associates Subconsultant Total Costs 2,516 Hours Totals 2,516 Total Costs $ 24,075 Page 1 of 2 P.\e TUKA00000009 1000000N\0030Contract \Supplement 3 1Exhibit B_DEA Budget CVSRS Suppl 3 2014_0414.xlsx Printed: 4/13/2014, 9:04 PM 45 David Attachment B City of Tukwila Cascade View Elementary Safe Routes to School Hour Estimate Supplement No. 3 t 2 3 4 5 6 7 8 9 10 Evans and Associates, Inc. Task Work Item Managing Professional Engineer (MGPE) QA/QC Manager (MGPE) Design Engineer (DEEN) Sr. CADD Technician (SCAD) Project Surveyor (PLSU) Party Chief (PCHF) Instrument Person (INST) Environmental Planner (ENVP) Executive Administrator (EXAD) Administrative Assistant (ADMA) DEA DEA HRA Total Dire(;i LaiJOr o $183.G ". a1QO.t's5 }9H?5 $1i�- v ra.:t X106 "a „? ?.F,:, 14693 Total '. Do s Do tar D Total hrs Total hrs Total hr s To hi s To hrs To Total hrs hrs Total hrs Total hrs Total hrs Total Total Total i Total 29 24 1.0 Project Management 10 13 6 53:6203,€il ?0 2.0 Base Mapping 8 8 8 2,2 °, 522P4 3.0 Environmental 1 4 5 5610 52,516 53.126 4.0 Design '. 233.257 Modular Wetland Vault 10 1 10 2 53,257 Coordination with SCL 2 2 23 5366 5306 Trail Redesign 2 1 10 10 52,74: 52!45 Additional Drainage Design 5 2 20 8 7 42 11 159 54,854 54854 6.0 Bid Assistance 5 1 1 1 3 51.` Task 1 Total 35 5 41 21 8 $ $ 4 r 13 16 019,325 X2,536 X21,841: Expenses 52,234 5'234 PROJECT WORK TOTALS 35 5 41 21 8 8 8 4 13 16 159 $ 21,559 $ 2,516 $ 24,075 Page 2 of 2 P:\ t\ TUKA00000009 \000000N \0030Contract \Supplement 3 \Exhibit B_DEA Budget CVSRS Suppl 3 2014_0414.xlsx Printed: 4/13/2014, 9:04 PM TRANSPORTATION COMMITTEE - Meeting Minutes April 28, 2014-5:15p.nn.— Foster Conference Room x~�^ Tukwila City of � ������y/��� �� Transportation Committee PRESENT Councilmembers: Allan Ekberg, Chair; Dennis Robertson, Kate Kruller Staff: David Qine, Bob Giberson, Robin Tischmak, Gail Labanara, Dave Sorensen, Laurel Humphrey Guest: Chuck Parrish, Resident CALL TO ORDER: Committee Chair Ekberg called the meeting to order at 5:17 p.m. I. PRESENTATIONS No presentations. U. BUSINESS AGENDA A. Bid Award: Interurban Avenue South (South 143rd Street to Fort Dent Way) Staff is seeking Council approval to award a bid to Walsh Construction Co., LLC in the amount of $7.597.833.39 for construction of the Interurban Avenue South (South 145m Street to Fort Dent Way) Project. This project will include construction of curbs, gutters, sidewalks, illumination, storm drainage, street reconstruction, and other roadway improvements. Walsh was the lowest of seven bids and is $1'508.720.81 under the Engineer's estimate. As of today, WSDOT Local Programs has given notice of approval of this bid award. The project budget includes $80.000.00 from the Storm Water Quality Retrofit Program 412 fund for the construction of storm water facilities. Councilmembers and staff discussed the funding as shown on the CIP page, which is subject to change once the Transportation Improvement Board Grant is adjusted due to the bid award and the construction management budget is finalized. Staff reported that the bidder who came in second has filed a bid protest which is currently under review by the City Attorney. UNANIMOUS APPROVAL. FORWARD TO MAY 5, 2014 REGULAR CONSENT AGENDA. B. Resolution: Temporary 25 MPH Speed Limit for Interurban Avenue South Construction Zone Staff is seeking Council approval of a resolution that would establish a 25 mile per hour speed limit on |nteruban Avenue South between Fort Dent Way and South 143m for the duration of the construction of the roadway improvements which is anticipated to be from June 2014 to October 2015. Traffic control for this construction is unlikely to be able to accommodate the current vehicle speed limit of 35 nnph, and a temporary reduction in speed is recommended for driver, padectrion, and construction worker safety. Adoption of this resolution will provide the regulation to enable enforcement of the temporary reduced speed limit. UNANIMOUS APPROVAL. FORWARD TO MAY 5, 2014 REGULAR CONSENT AGENDA. C. Supplemental Agreement No. 3: Cascade View Safe Routes hzSchool Staff is seeking Council approval of Supplemental Agreement No. 3 to Contract No. 13-043 with David Evans and Associates, Inc. in the amount of $24.075.00 for the Cascade View Safe Routes to School Project. This supplemental agreement is needed for additional time to complete right-of-way negotiations and additional design costs due in pa�to the Archeological �� Monitoring Plan and Tribal Consultation requirements of the Washington State Department of Historical Preservation. Funds are available from the right-of-way phase and the Transportation Committee Minutes April 282O14— Page 2 48 project remains within budget. Staff is working with Seattle City Light regarding an illumination request for the new paved path between South 137~ and South 140"' Streets. UNANIMOUS APPROVAL. FORWARD TO MAY 5, 2014 REGULAR CONSENT AGENDA. III. SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBD) Meeting Robin Tischmak presented to the Regional Project Evaluation Committee regarding the Strander Boulevard/Southwest 27th Extension Project, which was approved by SCATBd to advance through the PSRC Regional Competition process. In addition, the City has submitted the TIGER grant application for the Strander Blvd Project and expects to know the result by the end of the year. Bob Giberson noted two presentations from the April meeting, PSRC NextGen Study, and Washington State Road Usage Charge Assessment. Copies were distributed to Committee members. IV. MISCELLANEOUS The Committee asked for updates on the following items: WSDOT Activity on Klickitat Drive Hillside. WSDOT is seeking emergency relief funds for the recent s|iUe, which may also include funds for repair of the City-owned pedestrian walkway. WSDOT plans to excavate the hillside and install additional drainage and large boulders. Staff is looking into a mitigation plan for any loss of trees during repair work. The Committee asked if work could include a rebuild of the hillside stairway that used to exist. Staff will check. 51st Avenue South/Klickitat Dr Stop Sign. WSDOT has indicated guard rail relocation will occur next month and stop sign removal is expected this summer. South 144th Street and 42"u Avenue South Intersection. The next steps are consultant se|ention, currently in progrosa, to begin the design work with construction expected in 2015. South 144''' Street Bridge over /-5. Staff is working on a proposal to WSDOT to address the sidewalk safety concerns. Council and staff discussed a variety of options. Transportation Benefit District. The City explored this funding mechanism in 2013, but put it on hold due to the King County TBO, which failed at the April 22, 2014 Special Election. Committee members expressed an interest in renewing this discussion with an emphasis on the sales tax option rather than a vehicle license fee. Committee Chair Ekberg will mention this discussion at Committee of the Whole to determine Council direction for pursuit of this issue. He requested that any new informational memo include information about revenues at different sales tax percentage options. Meeting adjourned at 6:22 p.m. Next m nQ: Monday, May 12, 2014 ~` �~ Committee Chair Approval Minutes by LH, Reviewed by GL.