Loading...
HomeMy WebLinkAboutReg 2014-05-05 Item 5B - Ordinance - Amendment to 223 Andover Park East Development Agreement with South Center WA (Washington Place)COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's review Council review 04/28/14 DCS agreement with South Center 05/05/14 DCS 04/28/74 ❑ Motion M4g Date • Resolution • Ordinance ❑ Bid .Award 14 ft, Date '►t Public Hearing ❑ Other Aft Date AN Date Alts Date AN Date 5/5/14 ITEM INFORMATION ITEM No. 57 STAFF SPONSOR: DEREK SPECK ORIGINAL AGENDA DATE: 04/28/14 AGENDA ITEM TITLE Approve an amendment for the 223 Andover to the Park East development development. agreement with South Center WA, LLC C,VJ E•.[,ORA' AL Discussion 04/28/74 ❑ Motion M4g Date • Resolution • Ordinance ❑ Bid .Award 14 ft, Date '►t Public Hearing ❑ Other Aft Date AN Date Alts Date AN Date 5/5/14 ANDate 04/28/14 SPONSOR ❑ Council a Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire • IT ❑ PeR ❑ Police • PlV SPONSOR'S This item is to amend the development agreement for the property at 223 Andover Park SUMMARY East, formerly the Circuit City site, to facilitate a new development known as Washington Place. The Council is being asked to hold a public hearing and to consider and approve the ordinance and amendment to the development agreement. RI :VII :WED II N' ❑ COW Mtg. ❑ Utilities Cmte DATE: 04/15/14 /1 CA &P Cmte ❑ F &S Cmte ❑ Transportation Cmte ❑ Parks Comm. ❑ Planning Comm. COMMITTEE CHAIR: DUFFIE ❑ Arts Comm. RECOMMENDATIONS: SPONSOR /ADMIN. COMMITTEE Mayor Forward to Committee of the Whole COST IMPACT / FUND SOURCE Ex1i NDITuRI REQUIRFD AMOUNT BUDGETED APPROPRIATION REQUIRED $ $ Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 04/28/14 MTG. DATE ATTACHMENTS 04/2.8/1.4 Informational Memorandum dated 4/23/14 Proposed Ordinance Proposed Amendment to the Development Agreement Technical Memorandum for Parking Analysis by T ranspo Group dated 4/2/14 Letter from ACE Parking Schematic design plans Minutes from the Community Affairs and Parks Committee meeting of 4/15/14 5/5/14 See as listed above 57 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: City Council FROM: Derek Speck, Economic Development Administrator DATE: April 23, 2014 SUBJECT: Washington Place Development Agreement Amendment [New memo composed after Community Affairs and Parks meeting] ISSUE The owners of 223 Andover Park East would like to construct a building with a hotel and apartments or condominiums and have requested an amendment to an existing development agreement in order to modify the City's zoning and sign code requirements for this project. BACKGROUND In March 2013 the City executed a development agreement with South Center WA, LLC so that the owner of 223 Andover Park East (the former Circuit City site) could construct a building up to 180 feet tall and that included apartments or condominiums. Since that time, the developer has continued to refine the project plan. Recently, the developer submitted an application for the City's design review process which is tentatively scheduled to be considered by the Board of Architectural Review (BAR) on May 22, 2014. As currently proposed, the project does not meet certain zoning and sign code standards. Therefore, the City Council would need to approve an amendment to the development agreement allowing modifications to those standards to enable the BAR to consider the project. DISCUSSION Due to the unique nature of this project, there are three areas in which the project needs flexibility from our zoning code: number of parking stalls, area of open space, and building height. Additionally, the proposed project needs flexibility regarding the sign code, especially regarding building mounted signs. Parking — As shown in the table below, the proposed project would include 370 residential units, 189 hotel rooms, and 499 on -site parking stalls. The developer hired the Transpo Group to estimate the parking demand and their technical analysis is attached. Transpo estimated a daily peak parking demand of 340 stalls for the residential units and 118 stalls for the hotel for a combined total of 458 stalls resulting in 40 extra stalls. The City's current zoning would require 939 stalls. Staff recognizes that this parking standard was based on a suburban, low -rise, non- transit oriented development style of apartment building and is excessive for a project in the core of the Urban Center. As currently proposed, 59 INFORMATIONAL MEMO Page 2 the Southcenter Plan and related TUC zoning changes would require 594 parking stalls. Under that code, the project would be short 96 stalls. The key question is whether the proposed project includes sufficient parking. It is a challenging question because this type of multi - family development doesn't exist anywhere in South King County. The main concern is that if the project has insufficient parking that the residents or hotel guests would park on adjacent Tots without permission. Although staff would feel more comfortable if the project included more parking, staff acknowledges that adding a floor to the parking garage would be very expensive. It is commonly accepted that the cost of constructing a parking garage is approximately $30,000 per stall. It is possible that the cost would make the project financially not viable. The following are reasons why the parking may be sufficient: (a) The Transpo Group's estimate may reflect the actual demand. Transpo Group based its estimate of parking demand for the residential units on King County's Right Size Parking Calculator, which is a tool designed for these types of projects. The developer also plans to charge the residential tenants separately for parking stalls which may reduce the number of vehicles tenants use. The hotel guests may not all need parking since the hotel will operate an airport shuttle and some rooms may be contracted for airline employees who would not have cars. (b) Some other successful high -rise apartment buildings have similar or less parking. Many apartments and hotels in Seattle have even fewer parking spaces than proposed for this project. However, Seattle has significantly more amenities and jobs within walking and transit of those other apartments. Seattle also has some paid street parking and paid private parking Tots which can serve as extra parking. (c) The developer has a strong interest to ensure sufficient parking. Without it, they may have a hard time getting financing or a hotel operator. (d) The developer and property manager can implement a valet parking service when demand exceeds supply. As currently configured, the project could fit an additional 44 parking stalls on site if valet service is implemented that stacks the cars. Attached is a letter from ACE Parking describing how this plan could work. (e) The risk to adjacent properties if there is insufficient parking or if the developer doesn't implement a valet parking service would be relatively minimal. This site is not close to a single family residential neighborhood and commercial property owners could have cars towed if necessary. Parking Comparison Developer Proposal City Requirement Units Daily Peak Parking Demand Stalls Current Proposed Residential Studio 154 308 154 One bedroom 150 300 150 Two bedroom + den 63 126 95 Three bedroom , 3 6 6 Subtotal 370 I 340 411 740 405 2 60 INFORMATIONAL MEMO Page 3 Hotel 189 118 88 1 199 1 189 Subtotal 559 458 j 499 939 ; 594 Hotel adjustment 1 (57) Stacked valet stalls ' 44 559 , 458 j 543 939 1 537 That being said, staff still believes that the residential parking requirements proposed for the Southcenter Plan are the minimum necessary for this project. Those requirements would be 1 stall per studio, one stall per one bedroom, 1.5 stalls per two - bedroom, and 2 stalls per three - bedroom unit. Regarding the hotel parking, the proposed Southcenter Plan would require one stall per hotel room. Transpo's analysis has merit; however, staff supports a maximum reduction from one stall per hotel room to 0.7 stalls per hotel room based on Tukwila's general hotel occupancy level of 70 %. Using the proposed Southcenter Plan for the residential parking requirement, assuming a 70% occupancy level for the hotels with one stall per occupied hotel room, and counting 44 stacked stalls enabled by valet parking, the project would exceed the required on -site parking by six stalls. It would be necessary for the valet plan to be approved by the City Administration and Fire Marshall to ensure the stacking would comply with the need for Fire access and be operationally feasible. Open Space— The City's current zoning code requires 200 square feet of recreation space per residential unit for use of the residents which would total 74,000 square feet, which would be nearly equivalent to 50% of the lot area. The City's proposed Southcenter Plan zoning would require 10% of the residential floor area to be "open space" which would equal 20,800 square feet, which is nearly the equivalent of one entire floor. Plus, the proposed Southcenter Plan would require 25 square feet per hotel room, which would be 4,725 square feet. The project as proposed has over 14,000 square feet of common space for the hotel primarily related to the hotel lobby, bar /cafe, swimming pool, second floor roof deck, and meeting rooms. If counted as "open space ", the common space easily exceeds the 25 square feet per guest room requirement. The project as proposed has over 16,900 square feet of common area space for the residential portion. Most of the common space is on the nineteenth floor which includes a clubhouse with a flexible room comprising a kitchen and area for meetings, lounging, dining and playing games. It also has an exercise room, a hot tub, and an outdoor area with seating /lounging, barbecue grills, and an outdoor fireplace. The ground level includes a residential lobby, an outdoor pet area, and a fifteen foot wide tree lined sidewalk with bench seating. Given the location of this project, there is significant indoor and outdoor space for socializing and recreation within walking distance such as an exercise club, a bowling alley, the largest indoor mall in the Pacific Northwest, sidewalks, the Green River bike and pedestrian trail, the Interurban bike and pedestrian trail, and Bicentennial Park. 3 61 INFORMATIONAL MEMO Page 4 Staff supports the amount of common space as proposed by the developer and recommends that the development agreement treat the common space as open space with a minimum requirement of 25 square feet per hotel room and 45 square feet per residential unit. Building Height— In early 2013 the City approved a development agreement for this project to entitle the building to be up to 180 feet in height. That was based on a seventeen story building which did not include a clubhouse on the roof. The project has evolved from that earlier concept and now includes eighteen stories plus the roof top clubhouse. In addition, the developer is negotiating an agreement to operate the hotel as a Four Points by Sheraton and Sheraton has requested some additional height on the second floor (mezzanine level) so the meeting rooms can have higher ceilings. Staff supports entitling the building for additional height up to 190 feet. This site is in the core of Tukwila's Urban Center and is a good location for more urban type of development. Higher ceilings provide a higher quality experience for the meeting rooms and the roof top club house is an amenity that improves the entire project. Since the intent of the additional 10 feet is to enable higher ceilings and the clubhouse, the proposed amendment to the development agreement would not allow residential units or hotel rooms on the nineteenth floor. Signage — The developer has proposed signs that exceed the size currently allowed by the City's sign code on the north and west faces and on the canopy above the main hotel entrance and apartment entrance on the east side as shown in the attached elevations and renderings. North Face: The developer originally proposed a wall sign of 840 square feet, which is shown in the attached elevations. Assuming the project has a public entrance on the north side, the sign code allows a sign up to 150 square feet. West Face: The developer originally proposed a wall sign of 840 square feet. Assuming the project has a public entrance on the west side, the sign code allows a sign up to 150 square feet. East Face Canopy:. The proposed sign lettering is 3.5 feet in height whereas the sign code allows lettering up to one foot in height. Although the developer has not requested signs on the parking garage, the sign code would allow two signs on the north face of the parking garage and two signs on the west face of the parking garage. Each of the four signs could be up to 288 square feet. It is unlikely that signs on the parking garage would be clearly in view from Baker Boulevard or other public street. The City's sign code was created in the context of our current built environment without specifically anticipating large and tall buildings like this project. As such, limiting the wall face signs to 150 square feet is too conservative. Larger signs may improve wayfinding, marketability of the property, and competiveness of our Urban Center. The City of Seattle does not allow signs at the top of downtown high rises but the City of Bellevue does. Bellevue limits its signs on tall buildings to a maximum of 300 square feet. Staff supports allowing larger signs for this project because the wall faces are considerably taller and larger than contemplated in the sign code and the larger signs can still be aesthetically pleasing as long as the signs are of the channel letter design as proposed. 4 62 INFORMATIONAL MEMO Page 5 When this item was discussed at the Community Affairs and Parks Committee (CAP) on April 15, 2014, staff recommended applying the formula from the MIC /H district which was developed for large, industrial buildings. Based on that formula, the north face sign could be up to 733 square feet and the west face sign up to 561 square feet. At least one member of CAP expressed concerns about applying the MIC /H formula to buildings in a more retail area and setting a precedent for other properties. Based on that discussion. staff recommends a formula similar to the formula in the Master Sign Program section of the sign code (TMC 19.32.060) that would allow each of the two signs to be up to 6% of the exposed building face to a maximum of 500 square feet. Given the size of the walls, the effect would be to cap the signs at 500 square feet each. Those signs would be about 60% of the size shown in the attachments. In addition, staff recommends requiring the wall signs to be channel - type letters (as shown), disallowing projecting signs, corner projecting signs, and special incentive signs for the parking garages. Staff also recommends approving canopy edge signs up to 3.5 feet tall. Staff recognizes that the community may have reservations about entitling this project to the parking, open space, building height, and signage as described. This is a pioneering project from which we will learn a lot about parking demand in our Urban Center core. Given the City's vision to have a transit - oriented neighborhood utilizing the commuter rail station, bus transit center, Interurban and Green River bike trails, and nearby jobs and amenities, this is a good opportunity to push the envelope to encourage development. This project is a unique opportunity to encourage transit oriented development with a higher end multi - family residential component than currently exists in Tukwila. Since this type of product does not currently exist, it is difficult to prove the market demand in order to get financing. It is a unique confluence of factors such as the property owner's knowledge and commitment to the local area, a large enough site to enable some surface parking, the EB -5 financing structure, and the hotel participation that makes this project a possibility. The project exemplifies many of the goals reflected in the City's vision for the core of the Urban Center. If the project is successful, it may inform future adjustments to Tukwila's zoning and sign codes. Public Notification -- Official notice of the public hearing was published in the Seattle Times on April 14, 2014. The Community Affairs and Parks Committee discussed this item at their meeting on April 15, 2014. The City also held an open house on April 16, 2014 at Albert Lee Appliance for the public to meet with the developer and city staff and discuss the project and proposed amendments to the development agreement. Staff mailed invitations to the nearby businesses and property owners. FINANCIAL IMPACT The proposed amendment to the development agreement has no direct budget impact for the City. The developer has also asked for the City to approve a multi - family property tax exemption and other financial incentives. Staff is still researching those options and will return to Council at a future date, possibly in May or June. 5 63 INFORMATIONAL MEMO Page 6 RECOMMENDATION The Council is being asked to hold a public hearing at the Committee of the Whole meeting on April 28, 2014 and approve an amendment to the development agreement at the May 5, 2014 Regular Meeting. ATTACHMENTS Proposed ordinance Proposed amendment to development agreement Technical memorandum with parking analysis by Transpo Group dated April 2, 2014 Letter from ACE Parking Washington Place schematic design plan set 6 64 City of Tukwila Washington Ordinance No. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, RELATING TO DEVELOPMENT AGREEMENTS AUTHORIZED PURSUANT TO CHAPTER 18.86 OF THE TUKWILA MUNICIPAL CODE; APPROVING AND AUTHORIZING THE FIRST AMENDMENT TO THE 223 ANDOVER PARK EAST DEVELOPMENT AGREEMENT WITH SOUTH CENTER WA, LLC, A WASHINGTON LIMITED LIABILITY COMPANY; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, RCW 36.70B.170, et seq. and Tukwila Municipal Code (TMC) Chapter 18.86 authorize development agreements between the City and persons having ownership or control of real property in order to establish development standards to govern and vest the development use and mitigation of real properties; and WHEREAS, the City of Tukwila and South Center WA, LLC entered into a Development Agreement for the 223 Andover Park East Development effective the 19th day of March, 2013 and approved by Ordinance No. 2399, and WHEREAS, the City of Tukwila and South Center WA, LLC wish to enter into a First Amendment to Development Agreement for the 223 Andover Park East Development, a copy of which is attached hereto as Exhibit A; and WHEREAS, as required pursuant to TMC Section 18.86.050, a public hearing was conducted on the 28th day of April 2014 to take public testimony regarding this First Amendment to the Development Agreement as proposed; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY ORDAINS AS FOLLOWS: Section 1. The First Amendment to the 223 Andover Park East Development Agreement by and between the City of Tukwila and South Center WA, LLC, a copy of which is attached hereto as Exhibit A, is hereby approved and the Mayor is authorized and directed to execute said First Amendment to Development Agreement on behalf of the City of Tukwila. W. Word ProcessIngl0rdinances1223 APE DA-First Amendment 4-22-14 DS:bjs Page 1 of 2 65 Section 2. Corrections by City Clerk or Code Reviser. Upon approval of the City Attorney, the City Clerk and the code reviser are authorized to make necessary corrections to this ordinance, including the correction of clerical errors; references to other local, state or federal laws, codes, rules, or regulations; or ordinance numbering and section /subsection numbering. Section 3. Severability. If any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application to any person or situation should be held to be invalid or unconstitutional for any reason by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remaining portions of this ordinance or its application to any other person or situation. Section 4. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City, and shall take effect and be in full force five days after passage and publication as provided by law. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2014. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk APPROVED AS TO FORM BY: Shelley M. Kerslake, City Attorney Jim Haggerton, Mayor Filed with the City Clerk: Passed by the City Council: Published: Effective Date: Ordinance Number: Exhibit A: First Amendment to Development Agreement by and between the City of Tukwila and South Center WA, LLC for the 223 Andover Park East Development W: Word Processinglardinances1223 APE DA -First Amendment 4 -22 -14 DS:bjs 66 Page 2 of 2 FIRST AMENDMENT TO DEVELOPMENT AGREEMENT BY AND BETWEEN THE CITY OF TUKWILA AND SOUTH CENTER WA, LLC FOR THE 223 ANDOVER PARK EAST DEVELOPMENT THIS FIRST AMENDMENT TO DEVELOPMENT AGREEMENT (the "First Amendment ") is made and entered into this day of May, 2014, by and between the CITY OF TUKWILA ( "City "), a non - charter, optional code Washington municipal corporation, and SOUTH CENTER WA, LLC, a Washington limited liability company ( "Developer "). I. RECITALS WHEREAS, the City and Developer entered into that certain Development Agreement relating to the 223 Andover Park East Development, dated March 19, 2013 (the "Development Agreement "); and WHEREAS, Developer has continued to refine the design of the proposed development; and WHEREAS, Developer has requested an amendment to the Development Agreement in order to proceed with the proposed development; and WHEREAS, due to the benefits as described in the Development Agreement the City desires the proposed development to proceed; and WHEREAS, as required pursuant to TMC 18.86.050 the City conducted a public hearing on the 28th day of April 2014 to take testimony regarding this First Amendment to the Development Agreement; and WHEREAS, the City Council, pursuant to City Ordinance No. approved this First Amendment to the Development Agreement as proposed and authorized execution of this First Amendment to the Development Agreement; and WHEREAS, the Parties desire to enter into this First Amendment to the Development Agreement upon the terms and conditions as set forth herein, NOW, THEREFORE, in consideration of the mutual promises set forth herein and the long -term benefit to both the City and the Developer, the Parties hereby agree as follows: 1 67 11. AGREEMENT 1. Building Height: Section 4.3 of the Development Agreement is hereby amended so the maximum height for 50 percent of the site shall be 190 feet. The building(s) may have no more than nineteen (19) floors. The nineteenth floor may be used for common area open space such as a clubhouse, rooftop deck, other common areas, a green roof and mechanical equipment but may not be used for residential units or hotel guest rooms. The remaining requirements of Section 4.3 remain in full force and effect. 2. Open Space: The building(s) shall have common open space of at least 45 square feet per residential unit and 25 square feet per hotel room. Common open space may include areas such as apartment lobby, hotel lobby, restaurant/bar, meeting rooms, business centers, bike storage, pet walk area, exercise room, hot tub and /or sauna, swimming pool, movie or video watching room, clubhouse including kitchen, dining and bar areas, and outdoor seating and barbeque areas. Space for the exclusive use of residents will count toward the residential open space requirement. Space for the exclusive use of hotel guests will count toward the hotel open space requirement. Space accessible to both residents and hotel guests may be counted for either requirement, at the election of the Developer. 3. Parking: The required minimum amount of on -site parking shall be 0.7 stalls per hotel guest room, one stall per studio unit, one stall per one bedroom unit, one - and -a -half stalls per two bedroom unit, and two stalls per three bedroom unit. Parking stalls that are stacked, in which some cars could be blocked by other cars, may be counted toward the required minimum number of parking stalls provided that the location of the stalls has been approved by the City's Fire Marshal and a shuttle and valet parking plan has been approved by the City administration. The Fire Marshal may approve a drive aisle width between stacked cars less than required by TMC 18.56.090. 4. Signage: The proposed development may have signage according to the City's sign code (TMC 19.20) with the following modifications: a) Canopy -edge signs may be up to 3.5 feet in height and may have up to two rows of letters. b) Projecting signs and corner projecting signs per TMC 19.20.050 are not allowed. c) Special incentive signs for parking garages are not allowed. d) Permanent building mounted wall signs: The building may have up to two flush- mounted wall signs. One sign may be placed on the northernmost wall and one on the westernmost wall regardless of 2 68 whether those walls have exterior public entrances. The maximum allowable message area for the wall signs may be an area up to six percent of the exposed building face to a maximum of 500 square feet. The flush- mounted wall signs may not be cabinet or box signs and must be channel -style letters and may be internally lit and /or halo -lit. 5. This First Amendment shall be recorded against the Property as a covenant running with the land. 6. Except as amended herein, the terms and provisions of the Development Agreement remain in full force and effect. In Witness Whereof, the parties have caused this First Amendment to be executed, effective on the day and year set forth on the first page hereof. CITY OF TUKWILA, a Washington municipal corporation By: Jim Haggerton Its: Mayor Date: Attest/Authenticated: Approved as to Form: Christy O'Flaherty, MMC, City Clerk City Attorney SOUTH CENTER WA, LLC, a Washington limited liability company By: Omar Lee Its: Manager Date: 3 69 STATE OF WASHINGTON ) )ss COUNTY OF On , 20 , before me, the undersigned, a Notary Public, personally appeared JIM HAGGERTON, personally known to me (or proved to me on the basis of satisfactory evidence) as the person whose name is subscribed to the within instrument, and acknowledged to me that he executed the same in his authorized capacity as MAYOR OF THE CITY OF TUKWILA, and that by his signature on the instrument the entity upon behalf of which he acted, executed the instrument. WITNESS my hand and official seal. Print Name: NOTARY PUBLIC in and for the State of Washington, residing at My commission expires: STATE OF WASHINGTON ) )ss COUNTY OF ) On , 20 , before me, the undersigned, a Notary Public, personally appeared OMAR LEE, personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument, and acknowledged to me that he executed the same in his authorized capacity, as MANAGER OF SOUTH CENTER WA, LLC, and that by his signature on the instrument the entity upon behalf of which he acted, executed the instrument. WITNESS my hand and official seal. Print Name: NOTARY PUBLIC in and for the State of Washington, residing at My commission expires: 4 70 /transpoGRouP WHAT TRANSPORTATION CAN SE. TECHNICAL MEMORANDUM Date: April 2, 2014 TG: 14027.00 To: Omar Lee — Washington Tower LP From: Kevin L. Jones, P.E., PTOE — Transpo Group cc: Subject: Washington Place Mixed -Use — Parking Analysts:;.;. Eric Guion, AIA — Group West Companies PLLb This memorandum presents our estimate of daily peak parking demand for the subject project as well as compares this estimate to (1) the number of required parking stalls based on the City of Tukwila's existing and proposed zoning codes and (2) the proposed parking supply. Project Description We understand the project site is located at 223 Andover Park East in Tukwila near existing shopping, restaurants and entertainment and within walking distance of the existing Green River Trail. It is also located near the future Tukwila Transit Center and within walking distance of the future Tukwila Sounder Station. The proposed project would include the demolition of a 40,580- square foot (sf) building formerly occupied by Circuit City and construction of a 19 -story mixed -use building with 370 apartment units and 189 hotel rooms. The project would include a mix of apartment unit types rented at local market rates. The number of studios and one- to three - bedroom apartment units is summarized below along with the average size and anticipated monthly rent for each unit type: • 154 studio units averaging 353 sf and rented at approximately $790 /month • 150 one - bedroom units averaging 578 sf and rented at approximately $1,000 /month • 63 two- bedroom plus den units averaging 996 sf and rented at approx. $1,550 /month • Three three - bedroom units averaging 1,511 sf and rented at approximately $1,900 /month We understand the hotel will be branded as a "4Points by Sheraton." It will include a shuttle program, providing transportation for guests to /from Sea -Tac International Airport which is located less than five miles to the west. Given this proximity and provision for shuttle service, the hotel plans to contract with the airlines and reserve rooms for pilots, flight crew, etc. An average annual room occupancy rate of 70 percent is anticipated based on similar hotels. The project would also provide 208 surface parking stalls and 290 garage parking stalls for a total of 498 stalls. We understand the monthly price for residential parking would be approximately $150 per stall and this price would be in addition to the monthly rent. Parking Demand Peak parking demand was estimated differently for the residential and hotel components of the project. For the residential component, we used the King County Multi- Family Residential Parking Calculator (www.rightsizeoarkinq.orq) to calculate the estimated number of parking stalls that would be used per apartment unit. The calculator is a map -based statistical model that estimates parking use for a particular parcel based on local data collected at over 200 existing multi- family developments in 2012. The calculator was created by King County Metro using grant monies awarded from the Federal Highway Administration (FHWA) Value Pricing Program and takes into consideration surrounding factors such as existing population, employment, and transit service concentrations. In using the calculator, we first selected the parcel representing the project site. Next, we entered the number, size and anticipated monthly rent for each apartment unit type along with the monthly price per stall for residents of the building. Although it would be reasonable to increase the existing transit Transpo Group 11730118th Avenue N.E., Suke 600 Kirkland, WA 98034 425 -821 -3665 Fax 425- 825 -8434 71 service concentration recognizing the nearby investments in the Tukwila Transit Center and Tukwila Sounder Station, we did not to ensure a reasonably conservative estimate of future residential parking demand. As, shown 1n the - attached,; the,tool estimates that; the residential lcomponent of the:.proposed> development would generate, on average,,la daily peak parking demand of approximately 0`.92 vehicles per - apartment unit, This translates to approximately 340 vehicles with a total of 370 apartment units. The tool reports this estimate as strong (accurate) for the parcel in which the project site is located. The average parking rate published in Parking Generation (Institute of Transportation Engineers [ITE], 4th Edition, 2010) for "Hotel" was used to estimate peak parking demand for the hotel component. The average weekday peak period parking demand is 0.89 vehicles per occupied room (see attached) and based on an anticipated average annual room occupancy of 70 percent, it Is estimated that the hotel would generate a daily peak parking demand of approximately 118 vehicles (189 x 0.70 x 0.89 = 118). This is considered a conservative estimate because it does not account for the planned shuttle program nor the strategy to reserve rooms for those in the airline industry, two elements not incorporated in the average ITE parking rate that would likely result in less parking demand than would be generated otherwise. Combining our parking demand estimate for the hotel with our estimate for the residential component, we anticipate the proposed mixed -use development would generate a peak parking demand of approximately 458 vehicles (340 + 118 = 458). Parkinq Analysis The City's existing zoning code requires two parking stalls for each apartment unit with up to three bedrooms and one stall for each hotel room plus one stall for employees for each 20 rooms, rounded to the next highest figure. As such, the City would require 740 stalls (370 x 2 = 740) for residential parking and 199 stalls ((189 x 1) + (189 / 20) = 199) for hotel parking, a total of 939 stalls. This total supply is approximately 481 more stalls (939 - 458 = 481) than the estimated total daily peak parking demand described above. We understand the City has proposed changes to the existing zoning code as it relates to the Tukwila Urban Center District in which the project site is located. These changes would require fewer parking stalls than with the existing zoning code. For example, Table 4 of the Planning Commission's Recommend Draft Chapter 18.28 (October 2012) recommends one parking stall for each studio or one - bedroom unit, 1.5 stalls for each two- bedroom unit, two stalls for each unit with more than two bedrooms, and one stall for each hotel room. If approved, the City would require 404 stalls ((304 x 1) + (63 x 1.5) + (3 x 2) = 404) for residential parking and 189 stalls (189 x 1 = 189) for hotel parking, a total of 593 stalls. This total supply is approximately 135 more stalls (593 - 458 = 135) than the total daily peak parking demand. With the project proposing a total of 498 parking stalls, we estimate that this supply is approximately 40 more stalls (498 - 458 = 40) than the estimated total daily peak parking demand. Based on the average parking rate in Parking Generation for "Hotel," it is worth noting that the proposed supply would accommodate the peak parking demand even if the hotel was 90 percent occupied and without the strategies to reduce hotel parking demand described earlier2. 1 The proposed code would require approximately 64 more residential parking stalls than the estimated residential peak parking demand. Assuming these additional stalls would require more structure parking, these stalls would be responsible for approximately 10,800 kg in annual greenhouse gas emissions (carbon dioxide equivalent) from construction and maintenance and approximately 288,600 kg in greenhouse gas emissions (carbon dioxide) from vehicle use of residents, as calculated by the King County Multi - Family Residential Parking Calculator. 2 Based on projections, it is unlikely that room occupancy would exceed 90 percent with any regularity but if this was to occur, the owner is committed to provide valet parking service to off -set the incremental increase in parking demand. MI transpo i cuP 72 2 Conclusions Conservatively, we estimate the proposed project would generate a daily peak parking demand of approximately 458 vehicles, less than the proposed parking supply and significantly less than what the City's existing and proposed zoning codes would otherwise require. Peak parking demand would likely be even less as we did not adjust our estimate to reflect the future transit concentration of the area nor the hotel's planned services geared toward guests (air travelers, pilots, flight crew, etc.) affiliated with the nearby airport. KLJ/ Attachments: Screen Shots from King County Multi - Family Residential Parking Calculator Excerpt from Parking Generation for "Hotel° Trtranspoc; 3 73 74 Screen Shots from King County Multi- Family Residential Parking Calculator U I;iny County Muni -family x 4- • 4 C L vo.m.rightsizeparking.orrg Right Size King County Mufti - Family Residential Parking Calculator Parking rite' a for ;tiara P111Lderess 0223100090 3 ALLIDELL'ER NAHL: V10100 0 5ui:diny 5. Parking 5aenficatiore 53enoti EfMWOa { 51- c1 r61tNg t3dl.f.t t11lvin!e Use 5s.ia. ,. 140 854 0.62 !. Curti inn cn „3,t..I,t.I,. aar4iq impacts the cliP I VMMnks bel a. I epreaern Nglanal ay9t3 a Y11Ueb ,lremt:elrl t41NY) to pudding and pedim3 cIli 08 s ttrsae tepee 6501 Iha I1 Iewll va'.uas for vApth ad palling use Woo ;re esBmated 3e9 below the bJraiclett gUdaace on unhrmme4 and Winnable housal optTone rcurci AVEMAGE IIESIDE171HAL OF UNITS RE4r Of AREA (SO Fr) 5tsttaa5 954 me 353 1OERRUOr15 _Y.i60 s1,Ot}0 576. 2850800115. ... 63 81,5501 959: _. ...._ 3.. 61,0T: tt. s- 6EtlRnoous TOTAL 370 81,014 208,343 1511 n011DER OF TV FORDABLE Lail! S t LQ11t11LY PWICE I'ER STALL 11] 10 0159 Haw an unbundled }priced) parking influence parki rag hind t ratios? 1:ie pa; kln3ftlnrl r3105 uelO at L'J ILL Wed 'at g sresel unDUndied R3llA'l¢ r:Ices ba- eci on mice' !matron an7 r - I nirdstrnen0i resnlling 40:17 I.niinii lrlg Rl .LLD I1 YlrtrlW Raker Biv 1 l 6iLLPi kL-6 Pariung,Nnit Ratio (Nu[nbber of Stalls) <.5 stars `,. ._.._.'"'r= 1.S alas Ciok.;r 131a•3 thkrr Etyrf El I.:timid-el Win' m Screen Shots from King County Multi-Family Residential Parking Calculator King County Multi-Family X '7-'4 ri vmw.rightsizeparking org Right Size King County Multi-Family Residential Parking Calculator Parking 1 Parcel Selected •k pt 1 Annoton 02231001190 ll[10S1-F1 YORK E 93Ing 0 VI) tido; &P11 Population: • (ArTZ.lif6SV. V1 t2 II r JObS'. Conconnanan LOW lb iih121 1 " titz, Transit Service: ii Lanco.nonm Low to Olin saa Location VI; rartristal 0.92 s&tose ¶ toiatiat-',. ol itisaeck, tstaaim ass Sea 0.S2 40,n0 51,862 P ouIIki carpttrtaatlan saltuar Eastgato, Factona or Fauntloroy 66,252 b cancantralunt 3imear Downtown Bellevue or frernent 1,276 Iran" seoice c'.mcentralita, mai ar Crossroads or Surion City Canter " isaagaillot Parking/Unit Ratio (Number of Stalls) < Stalls >=15Stals Belot Blvd Elvd E 'On Wender Bea SI a:m[1,er 11V.1 SLR mkt til-at Shantler ' nR Ccunly Multi• Family Screen Shots from King County Multi- Family Residential Parking Calculator en I'f www.rightdzeporking.org (Right Size King County Mutts - Family Residential Parking Calculator Parking t I Enter a location 1 Parcel Selected ■ 6223/C069J l'aq.ANCP01141PANK E 40109 See rscol 146,964 t c kS'ny & P:rk ay Lu: tiur �"r +fita'ro^�s n+a roc tier, itTS EsBmafoA Parking Use Ratan: Tatar Molts: Surface Parking Total Capital Calls {Land & Construdlont_ Ltonthly Costs our Residential It IIndeding OSLO. .Annual GHG Emission from ConstrudWn and IAaintenance fkp CO2e1. Structure Parking Total Cantle! Costs (Lana 3 Constructiani; IAon1h11 Costs per Rest3an11al Une rIncluding 0814)' AnnuoP GE-PG Emissions from Conahuction and 0.ramlenanco (kg CO2cI ESBmate 6 Annual 1131 of 9uil3ing Rea,•eetS GHG Emlaalons horn Vehlde Liao of Residents (kg CO7i. Esinulee E'lL•1Iiaq 1From 011.3011 0.92 seen* '�f (akpet cr r Re [ata ete .e L1 a.. 0.92 ParkArl lnpacts Congaree To Wier l r 1} 0.92 1.092 342 494 52010,430 5'_,323.533 579 $93 24.262 20907 09910590 37.110.357 0157 5156 58,115 59.099 3192.821 4 502 522 1.582.275 1.670.080 Parking/Unit Ratio (f,iunter of Stalls) e.5 94a1s ? 1 r L. wed st/dpdarBlvd Slrnree,r Alva ri'tia' o 1 :1. tranrlrr :i1; r9 Str r Air InAt Land Use: 310 Hotel Average Peak Period Parking Demand vs. Occupied Rooms On a: Weekday Location: Suburban Statistic ; Peak Period Demand Peak Period 12:00 -1:00 p.m.; 7:00-10:00 p.m.; _ 11:00 p.m. -5 :00 a.m. Number of Study Sites 20 Averar e Size of Study Sites 315 occupied rooms Average Peak Period Parking Demand 0.89 vehicles per occupied room Standard Deviation 0.31 Coefficient of Variation 35% 95% Confidence interval 0.75 -1.02 vehicles per occupied room Range _ 0.61 -1.94 vehicles per occupied room 85th Percentile 1.08 vehicles per occupied room 33rd Percentile 0.72 vehiclesper occupied room P = Parked Vehicles Weekday Suburban Peak Period Parking Demand 800 R2 " -- 700 - �- �_ - --- -__ 600 - 500 400 300 200 100 0 -- • • • 0 200 400 600 800 x = Occupied Rooms • Actual Data Points Institute of Transportation Engineers 78 Fitted Curve 1761 - - - Average Rate Park'ng Gerteragoo, 4th Editicrt EVERY THANK YOU EARNED. Scott A. Jones Chairman Keith Jones Managing Principal John Baumgardner Vice Chairman & CEO Steve Burton President Founding Member of the National Parking Association our mission By valuing our employees, listening to our clients, and operating under the ideals of moral integrity, quality, and accountability, we will lead the parking industry in service and financial results for our clients. April 14th, 2014 To Whom It May Concern, The purpose of this letter is to inform the City of Tukwila about the additional parking space that can be created by implementing valet parking at the proposed new hotel. After reviewing the design of the property and working with hotel management, we have come up with a scenario where valet would be provided and accommodate additional vehicles while also leaving dedicated parking for the apartment complex, allowing residents to self park at all times. Under this scenario we are assuming that valet services would be provided 24/7. We propose leaving some of the surface parking and levels 2, 3, and 4 of the garage open to the residents of the apartment complex. Valet and hotel parking would be dedicated to the 1st floor of the garage, as well as a small portion of the surface area parking. Under this scenario, we would be able to completely stack the 1st floor maximizing the amount of vehicles that could be parked. Access would be restricted to only valet team members. Under this scenario we believe we could at the very least fit an additional 44 full -sized vehicles in the valet area. When we stack vehicles there are several processes we use. One is installing small heavy -duty secure key boxes that would store the keys of vehicles that are blocking other vehicles in. When a valet retrieves a vehicle, they would access the key box to retrieve the keys of the blocking vehicle. Another method is to keep all keys in a central location. Under this method, we tag the tickets of the vehicles that are blocked in with the ticket number of the vehicle blocking it. If a vehicle is requested that is blocked in, the valet knows to also grab the keys to the vehicle that is blocking it in. We would like to keep the valet area restricted to valet use only. This means that valet would only use the valet designated areas of the garage. At no time would a valet stack or double park a vehicle in the apartment parking section of the garage. Ace Parking Management has extensive experience in the valet parking industry. In the greater Seattle area alone we run multiple luxury hotels, as well as, several large corporate valet assist programs. This gives us the expertise necessary to maximize space in the garage. With over 300 professionally trained employees in the area, it also allows us to staff a location in a moment's notice, if needed. For further questions or concerns, please feel free to contact me directly. I can be reached by email at nick hutsen@aceparking.com or through my direct office line at 206 - 903 -1219. Sincerely, Nick Hutsen Regional Director ace parking management, inc. 645 Ash Street San Diego, CA 92101 tel 619.233.6624 fax 619.233.0741 www.aceparking.com 79 22' 2Z-0' RAMP UP ILEVEL 1- 27 additional vehicles c c II ci c DASHED LINE OF VALET PARKING , --t- - c c c c c c cc'c c c C c C cI c CC C IC c c 23 l7.71.45•ff SACM ---.1-,- ccoccccocc ,•",t cc cc c c c c cclt Surface Level- 17 additional spaces c C c c C c c c r---- DASHEL CCESS rucirr 80 1,71411.1.,11.4 \ C C C C c c C "r. 2 Parking Analysis Assume Valet Parking Hotel Site Valet 44 Site Surface Parking 17 Garage - Lower Level 71 Total Hotel Parking 132 (Total required is 0.7 per guestroc Apartments Site Surface Parking 164 Garage - Lower Level 18 Garage - 1st floor 85 Garage - 2nd floor 85 Garage - 3rd floor 59 Total Apartment Parking 411 Total Apartment Parking Required per South Center Plan Total Parking Provided with Valet Total Parking Recommended by City Staff Note: Project includes 6 more stalls than recommended by City Staff 405 543 537 81 WASHINGTON PLACE HOTEL / APARTMENTS SCHEMATIC DESIGN April 23, 2014 Ob GROUP WEST COMPANIESPuc •WASHINGTON PLACE• 223 ANDOVER PARK EAST•TUKWILA, WASHINGON GROUP WEST COMPANIES PuC •WASHINGTON PLACE 223 ANDOVER PARK EAST•TUKWILA, WASHINGON GROUP WEST COMPANIES PlIC •WASHINGTON PLACE • 223 ANDOVER PARK EAST.TUKWILA, WASHINGON GROUP WEST COMPANIESPUC •WASHINGTON PLACE • 223 ANDOVER PARK EAST•TUKWILA, WASHINGUN 00 CO GROUP WEST COMPANIESPUC •WASHINGTON PLACE • 223 ANDOVER PARK EAST•TUKWILA, WASHINGON 14T - 11" 12 STALLS San' EACH EXISTING BUILDING TO BE DEMOLISH 5' UTILITY EASEMENT GREASE TRAPS 0 80' -0" 80' 6'- 0' 115' - 6" 80' 0' 10 STALLS 8 e.v EACH 1O STALLS ®S.0" EACH IO STALLSOS'O EACH 80' -0 O STALLS ®e.O EACH 91' -0' FASTING POWER TRANSFORMER TO BE REMOVED SIGNAGE T C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C 218'6" C C C L330' -6" C C C C C c C C C C C C C C C C C C C ••I1•••• STALLS -:2 -0"' —_ 22' r " —� :22' 0 7 22 -0 MEC 400 SR L I ▪ I F- L ▪ -" L____ r L r IL r L__- L- L _▪ +t r IL - -� ✓ — ��--- �� - - -� -- - J L LAUNDRY /H.K EMPLOYEE BREAKRM 536 SF RAMP UP RISER PUMP ROOM OWNING C C C C C C C II C C C r rr rr L___ JL___JL___JL___J DASHED LINE OF VALET PARKING 1,935 SF STREET BENCH RAMP DOWN BUSINESS CENT R 360 S °J.\ rr- 1r -1r - Jr- -1 J - -J - -J - -J _ _ PAN RY EX RCISE 4 SF L MAINTENANCE BIKE STORAGE RONT OFFFI 575 S` ONE WAY 111111U•• S. STALLS 6WO' EACH si C C ', C \ C C \ C ', C C \ C FIRE COMMA CENTER • IMIMI MM � ae MAIL ROOM 212 SF MANAGEME T OFFICE 490 SF 0' -0" 16' 12' ACCESS EASEMENT 20' EASEMENT (RAILROAD) BUILDING ABOVE 5' UTILITY EASEMENT 61' -0" 6' -0 90' 0" S STALLS ®a -0. EACH 1057...9, EACH 0 50' OSIToE PLAN 100' 10 STALLS ® v -O EACH 90' 0" 6' -0 90' 0" ,O STALLS 9.-7 EACH 6' -0 27' -0' C C C ■L 10' UTILITY EASEMENT .It SIGNAGE NEW STREET LIGHT (TYP.) NEW STREET TREE NEW CONCRETE SIDE WALK 15' - 11" STALLS ®SAL EACH 1 STALLS ®8's EACH LANDSCAPE AREA PEDESTRIAN PATH LOADING AREA ISSUE A 1 Dale 1 Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/27/2014 04/28/2014 KEYPLAN PHASE PROJECT NUMBER GWA N0. PROJECT LJ UZ <w - N2 Z LL 1- Q z = J < 0 0 C_ a� UJ W 0 a� N CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826-4447 FAX: (206) 826-0446 W W W.GROUPWESTCOMPANIES.COM I SHEET TITLE AND NUMBER A2.01 /11111111 IuuIt i SECOND LEVEL PLAN STUDIO EXTENDED 2 BED + DEN A THH 2 BED +'DEN A TGI TF 2 BED + DEN A TE 2B =D + DEN A Two TC STUDIO WIDE TB O TB O T9 ve ISSUE 1 Date 1 Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/27/2014 HEYPLAN PHASE PROJECT NUMBER GWA N0. PROJECT W • z • Wc ^J LL zo H Q z• � '= J VJ • 0 CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826.4447 FAX: (206) 826-0446 W W W.GROUPW ESTCOMPAN IES.COM SHEET TITLE AND NUMBER A2.03 3RD LEVEL PLAN 0-0 -J 0-11 G-0 G -F G -E G-D G-C RAMP DOWN C C G-A TC Y RAMP UP STUDIO EXTENDED TJ 2 BED + DEN AI 2 BED + dEN A TH 2 liED + DEN A IT G TF 2 BED + DEAN A TEE 2 BED + DEN A TD vG) 0 2 BED CO // NER STE 1`G — J TA 0 0 0 1- 1- w W 0 O T10 ISSUE A Date Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/27/2014 KEYPLAN PHASE PROJECT NUMBER GWA N0. PROJECT W U Z Q w J2 a. H ZD I- Q Z• � = W J < 0 O w Ce W J O 0 < 1- M N CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 8264447 FAX: (206) 826 -4446 W WW.GROUPWESTCOMPANIES.COM SHEET TITLE AND NUMBER A2.04 G -K G-G G -F G -E G-D G -8 O4TH LEVEL PLAN STUDIO EXTENDED TJ 2 BED + DEN A TI TH 2EiED + DEN A 2 BED +D61A TG TF TE 2 BED + DEN A 2 BED COMER STE TB n Tt0 ISSUE 1 Date Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/27/2014 HEYPLAN PHASE PROJECT NUMBER GWA 140. PROJECT w U Z Q w J Zo • Q Z• � = J w • O w h w J O < 1— 04 CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826.4447 FAX: (206) 826-4446 W W W.GROUPW ESTCOMPAN IES.COM SHEET TITLE AND NUMBER A2.05 2 BED + DEN A 2 BED +D1ENA ED + DEN A 2 BED + DEN A TC TB MAID K ICE K K K K K K QQ QQ IL, Li K K 2 0 0 1- w J w 1- O 2 STUDIO EXTENDED TJ 05TH LEVEL PLAN T-0 TH TG) TF TD TC 2 BED CORNER STE TB TA T T2 T5 T6 T7 T8 T9 T10 ISSUE 1 Date 1 Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/27/2014 HEYPLAN PHASE PROJECT NUMBER GWA N0. PROJECT w Q • w J z D_ • Q z• � = J u W • 0 h W O < 1— 04 CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826.4447 FAX: (206) 826-0446 W W W.GROUPW ESTCOMPAN IES.COM SHEET TITLE AND NUMBER A2.06 PLOrrED m Lo 0 o) 00 N 28' -9" 23' -0" 23' -0" 27' -0" 23' -0" 23' -0" TB.1 '-3" 21' -6" TA 59' -0" 29' -0" 4' -3" N K K N K QQ 27' -0" 2BED +D NA QQ 2 BED + DEN A 2 BED + EN A ED + DEN A ■ . fU LEI STUDIO XTENDED 2 BED + DEN A TJ 06- 1.1ToH LEVEL PLAN 2 BED + NA 2 BED + DEN A TG', TH 2 BED + D A TF TE ED + DEN A TD) TC) 2 BED CO' NER ST (TB) TA.1 TA T2 T3 T5 T6 T7 T8 T9 T10 ISSUE 0 Date Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 KEYPLAN PHASE PROJECT NUMBER GWA N0. PROJECT W U z Q W J d /0 V < z— I J W u) < O CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826 -4447 FAX: (206) 826-4446 W W W.GROUPWESTCOMPANIES.COM SHEET TITLE AND NUMBER A2.07 28' -9" 23' -0" 23' -0" 27' -0" 23' -0" 23' -0" STD STUDIO 1 BED ° 1 BED STD STD 27-0" STD STUDIO (SIM) TB.1 TB 59' -0" TA 4' -3" 21' -6" 29' -0" 4' -3" �= �� ' Y r i -611L� 0 CO CO 0 0 0 I- 1-1- (1)0) 0 I- I- CO CO 0 0 0 D I- I- CO CO 0 w T2 T3 T4 CO CO 1 & mIo STUDIO STUDIO 1 BED 0 Mil []11 n °- I ` milli • nI IIG 1J= ' 1 I!1=' 1k: a � '�T∎,ICC I Y�fi' J�...J L�A J .f' J� II�4 0 w T6 w� 0 + T7 o � w m o N STUDIO STD EXTENDED STUDIO ;TM) TJ r-012 TH LEVEL PLAN 1 BED TI 1 1 BED TH STD STD STUDIO STUDIO 1 BED TG) 1 BED TE STD STD STUDIO STUDIO TD 1 BED TC 1 BED CORNERl TB TUDI A.1 TA T8 T9 T10 ISSUE A J Date 1 Description .03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/2712014 KEYPLAN PHASE PROJECT NUMBER GWA N0. PROJECT W � U z Q w -J z H Q z• � J W < 0 O CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826-4447 FAX: (206) 826-4446 W W W.GROU PW ESTCOMPANIES.COM I SHEET TITLE AND NUMBER A2.08 PLOTTED rn N 28' -9" STD STUDIO 23' -0" 1 BED 23' -0" 1 BED 27' -0" STD STD STUDIO STUDIO 23' -0" 1 BED 23' -0" 1 BED 27' -0" TB.1 4' -3 ", 21' -6" TB 29' -0" TA 4' -3" RimmEm N O V N 0 W m w r� 0 0 0 I- H N T2 0 m 0 W m T3 STUDIO (SIM) ICI 16111111 STUDIO STD EXTENDED STUDIO TM; TJ 1 BED 03 3TH LEVEL PLAN 1 BED TH STD STD STUDIO STUDIO 1 BED TG) (—IF) 1 BED TE STD STD STUDIO STUDIO TD 1 • 1 BED TC 1 BED 1 CORNER TB' TUDI TA.1 TA 0 0 1 1- T5 0 W m (T6 z 0 T7 0 CO T8 T9 T10 ISSUE A Date J Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/27/2014 KEYP LAN PHASE PROJECT NUMBER GWA NO. PROJECT UJI-- • W J 2 a Z F- Q z- //= J W N • 0 O CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826-4447 FAX: (206) 826-4446 W W W.GROUPWESTCOMPANIES.COM I SHEET TITLE AND NUMBER A2.09 28' -9" STD STUDIO 23' -0" 1 BED 23' -0" 1 BED 27' -0" STD STD STUDIO STUDIO 23' -0" 1 BED 23' -0" 27-0" TB.- 1 TB 59' -0" 4' -3" . 21' -6" 29' -0" 4' -3 ", itir 1� 1111E LC) N N LC) N T1 D 0 O 0 0 1- I— I- 1=wm 1111 T2 0 w m T3 0 W m 16-1-4' 4i 0 I- I- I- C./) Cn is II [O1mv07 N 0 w m 1 BED TD STUDIO (SIM) • SCI C al 1 STUDIO STD EXTENDED STUDIO TM TJ 1 BED 1 BED TH G34 -16TH LEVEL PLAN STD STD STUDIO STUDIO 1 BED (TG) TF 1 BED TE STD STD STUDIO STUDIO TD 1 BED TC 1 BED TB CORNER STUDIO TA.1 TA T8 T9 T10 ISSUE 1 Date 1 Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 HEYPLAN PHASE PROJECT NUMBER GWA 140. PROJECT w� Qw J 0 ✓ < z- I w J u) • O w h ce — 0 < 1- 00 N CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826-4447 FAX: (206)826-4446 W W W.GROUPW ESTCOMPAN IES.COM I SHEET TITLE AND NUMBER A2.10 TB.1 TB TA 4STUDIO EXTENDED TM 2 BED + DEN A TJ 2 BED + DEN A TH 2 BED + DEN A (TG) TF 2 BED + DEN A 01 7 TH LEVEL PLAN TE 2 BED + DEN A (TD TC 2 BED + DEN TB ORNER STE TA.1 TA ISSUE 1 Date 1 Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/27/2014 HEYPLAN PHASE PROJECT NUMBER GWA 140. PROJECT w� U z Q w J zc 1- Q z• � = J u) w • O w w J O < 1- 01 04 CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826-4447 FAX: (206) 826-4446 W W W.GROUPW ESTCOMPAN IES.COM SHEET TITLE AND NUMBER A2.11 3 BED + DEN TB.1 TB TA 2 BED+ DEN C 2 BED+ DEN C 0 W Q J :OJAIIIIMI Le. I,III, T1 m z w T2 m 03 z w w N T3 T4 T5 2 BED+ DEN A I� 1 i gI f75L41 , ,. NEM II STUDIO EXTENDED TM`i TJ 3 BED + DEN TI 2 BED + DEN B ( G) TF BED + DEN B TE if,18 TH LEVEL PLAN 3B TC + DEN CORNER S UITE TI TA.1 TA 03 z W 0 m T6 N T7 T8 T9 T10 ISSUE Date Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/27/2014 KEYPLAN PHASE PROJECT NUMBER GWA N0. PROJECT w� U z Q w J z 0_ 1- Q z• � = J uw w h ce W J 0 < I— m N CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826.4447 FAX: (206) 826-4446 W W W.GROUPW ESTCOMPAN IES.COM SHEET TITLE AND NUMBER A2.12 28' -9" 23' -0 " 23' -0" 27' -0" 23' -0" 23' -0" 27' -0" TB.1 59' -0" 21' -6" 29' -0" NICA L ARTIFICIAL TURF. ARTFICIAL TURF EXCERCISE ROOM • -v N O C N 0 N MECHAN UN IT ICAL APARTMENT CLUB (Dna CEO) • • • HOT TUB ROOM U3ROOoF LEVEL PLAN TH 60' -4" ( G) 40' -0" TFl (TE) (TD 46.-11" TB TA.1 T1 T2 T3 T4 T5 T10 ISSUE D Date Description 03/07/2014 DESIGN REVIEW SUBMITTAL 03/20/2014 03/27/2014 KEYPLAN PHASE PROJECT NUMBER GWA N0. PROJECT LU U Z Q w J Zc • Q z• - '= J CO I I— • O CONSULTANT REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMONT AVE. N SUITE 314 SEATTLE, WA 98103 PHONE: (206) 826-4447 FAX: (206) 826-4446 W W W.GRW PWESTCOMPANIES.COM SHEET TITLE AND NUMBER A2.13 Washington Place Residence & Hotel 4/23/2014 Residential Tower Hotel 1 GBA Residential Fir Elev Building Area # of Unit Std. Studio (347 sf) Studio Ext. (377 sfl Corner Studio (400 sf) Studio Wide (434 sfl 1 BR (565 sf} 1 BR Urban (575 sf} 1 BR Large (657 sf) 1 BR XLG (742 1 BR + Den (739 sfl 2 BR Corner (1165 sf} 2 BR Crnr + Den (958 sf) 2 BR +pen A {912 sf} 2 BR +Den B (1267 sf) 2 BR+ Den C (1235 sf) 3 BR + Den (1492 sfl 3 BR + Den Crnr (1550 sf) Building Area # of Unit 1st floor level 29.50 7,793 SF - - - 12,604 - 20,397 SF 2nd floor level i 41.50 11,583 SF 7 Units 1 1 5 - - 10,887 - 22,470 SF 3rd floor Level 52.50 12,418 SF 11 Units 1 1 1 8 - - 9,219 21 Units 21,637 SF 4th floor level 61.66 12,418 SF 11 Units 1 1 9 - - 9,219 21 Units 21,637 5F 5th floor level 70.82 12,539 SF 11 Units 1 1 9 - - 9,535 21 Units 22,074 SF 6th floor level 79.98 12,539 SF 11 Units 1 1 9 - - 9,535 21 Units 22,074 SF 7th floor level 89.14 12,539 SF 19 Units 8 1 8 1 1 - - 9,535 21 Units 22,074 SF 8th floor level 98.30 12,539 SF 19 Units 8 1 8 1 1 - - 9,535 21 Units 22,074 SF 9th floor level 107.46 12,539 SF _ 19 Units 8 1 8 1 1 - - 9,535 21 Units 22,074 SF 10th floor level 116.62 12,539 SF 19 Units 8 1 8 1 1 - - 9,535 21 Units 22,074 SF 11th floor level 125.78 12,539 SF 19 Units 8 1 8 1 1 - - 9,535 21 Units 22,074 SF 12th floor level 134,94, 22,175 SF 35 Units 15 1 1 15 1 1 1 - - 22,175 SF 13th floor level 144.10 22,175 SF 35 Units 15 1 1 15 1 1 1 - - 22,175 SF 14th floor level 153.26 22,175 SF 35 Units 15 1 1 15 1 1 1 - - - - 22,175 SF 15th floor level 162.42 22,175 5F 35 Units 15 1 1 15 1 1 1 - - 22,175 5F 16th floor level 171.58 22,175 SF 35 Units 15 1 1 15 1 1 1 - - - - 22,175 SF 17th floor level 180.74 21,975 SF 35 Units 15 1 1 15 1 1 1 - - 21,975 SF 18th floor level 189.90 21,975 SF 14 Units 1 1 1 6 2 2 _ 1 = - 21,975 SF 19th floor level {Club &Roof} 199.06 5,180 SF 5,565 SF Club Roof 208.22 291,990 SF 370 Units 130 17 6 1 130 6 7 1 6 9 5 41 6 2 2 1 108,674 189 Units 401,049 5F Totafttudio Units 154 Tota 1 Bedroom Units 17io Total[R Units 63 3BR Units Residential Parking Development Hotel Parking Requirement TOTAL REQ'O Garage Building Area Total Parking Shown Studio Unit 154 1 /APT UNIT 154 1 /Hotel Unit 132 Stalls Lower Leve 17369 Lower Level 61 1 BR Unlit 150 1 /APT UNIT 150 15T Level 27280 1st Parking Level 85 2 BR + Den 63 1,5 /APT UNIT 95 2ND Level 27280 2nd Parking Level 8S 388 3 2 /APT UNIT 6 380 Level 17366 3rd Parking Level 59 Surface Parking 208 Valet 44 Total 370 405 Stalls 132 Stalls 537 - Total Gara 89,295 Total Parking Shown 542 WOE e Dale OsscrMian 0347+2014 DESIGN REVIEW SUBMITTAL 03/262014 Oy2TOO14 MYRIAM PHASE PROJECT-RUBBER GWA NO. PROJECT CONSuLrANI REGISTRATION GROUP WEST ARCHITECTS, INC., P.S. 3601 FREMOHT AVE.H SURE 314 StATTtE, WA 95103 PHONE : 1296) 926-4447 FAX: {205) 926-4445 MM'N.GROUPMIESTCOMPANI!S.COM SKEET TITLE AND MINTIER A2.14 LIGHT CHERRY METAL SOFFIT S1GNAGE SIZE 840 SF BRUSHED BRONZE WINDOW FRAME SURREY BEIGE METAL PANELS CONCRETE CAP RED BRICK VENEER RASE CONCRETE BASE NORTH 1 i116" = 1' -0" 1111 iorm r- ■• ■ 1 03 r_ EL A 14 N. ter. � �.. nm11 11 11 U..11_IE_L 1'•. !! ■ • • ■■ 11 NUR ■ • •-•• 1111111 — ! • • •- ®' • ■ ■■ 6.4 �,. ■ . �1 ■ ■■ 11 ■_ ■ ■__ 11 LI 111 1' ■ ■■■ 11® :11 r 1 t ■■■ 11 1 11 11 Q1 • 11 1 11 ■,1 SANDSTONE METAL PANELS SATIN ALUMINUM WINDOW FRAME COPPER PENNY ACCENT FACADE IiIIIIIIIl g TOTAL AREA OF NORTH WALL 43,9ooSF — ..rangy — — =XI -IS IT -21-6 —e ISSUE 'v Dare Dessualos 038712014 E€SGN REVIEW SLIOWITAL HETPLASI MESE Pt wet Status PROJECT FRA SER WARM Project Numbrr mama LLJ 0 Z Q 0 z J U)H 0 CC+YSULT:.NT REGIVES'ON w aQ GROUP WEST ARCHITECTS, INC., P.S. 3001 FREMONT AVE. N. SUITE 314 SEATTLE WA 9070s PHONE' P6}83E1B03 FAIL MEI S2644413 S EELi 111 Alb KINBER NORTH F1 FVATION A3.03 SANDSTONE METAL PANELS SATIN ALUMINUM WINDOW FRAME BRUSHED BRONZE WINDOW FRAME SURREY BEIGE METAL PANELS COPPER PENNY ACCENT FACADE CONCRETE CAP LIGHT CHERRY METAL SOFFIT 111111 11 11 11 11 11 11 11 11 . 1, , 11 -� P__Ji_JI_II IIII 1_ J1,.�I�. 11 _V _1_-- . ! I _ II �� ?� -, Ii E r i i� rf r or ■■ IN ■■ i1 �. ® s 11 11 = 11 11 .... — EEC gyp_ _! ■ �■M1 _ ■ 1111 1 • 1 F' 1_ lc N I ■ 1 _�_, _! 1_11 1 Ik.., 1 i i' 1.1 11h I a 01 1 i —. — —� ,, 11L�, 1 01 11 .Ap11 �1 iiiijnn n rij L ! 11!11 11 11 1111 Co CD 111411 -IhFi1 mu 11 11 li 0:1 Ell al II il m 1`• LcOm NI Li 11. 111 111 11 IN AM ® uu • E■ 11 11 ■1 ■1 SOUTH 1,16•= 1`0' - - -: - ISSUE 6 Dem Daxnpxx 039772014 DESIGN REVIEW SDSMRTAL NEYPLAN PRASE � Propel Status PROJECT WNW GYM NO PT upset Number PROJECT L1J J uJ - cr Z O < O Cl- < Z 2 Li} 0 CLtiSUL7ANi REGISR1ArON GROUP WEST ARCHITECTS, INC., P.5. 3601 FREMONT AVE N. SUITE 714 SEATTLE, WA 90103 PHONE: 1209] 838-1662 FAX {2013/ 026 -4416 SIEETTIRF AND NUMBER SOUTH ELE'VATIDN A3.02 !PLOTTED 6-142011,0SIYAY be — 1011-61 2 WEST 1l18 "= 1` -0' METAL SCREEN PANEL - 1 1 I • 1 u L II L 11 AM= 7 L 0 ; Wir SHEA. NENNENNE NNENNEEM •• ®iu••• NuNNNiii ■■■■ =■ wENNNi ■.■■■■■ TOTAL AREA OF WEST WALL 32,412 SF IEEE_ SIGNAGE SIZE 84o SF LIGHT CHERRY METAL SOFFIT SATIN ALUMINUM WINDOW FRAME STAIN ALUMINUM WINDOW FRAME BLUE GRAY GLASS BRUSHED BRONZE WINDOW FRAME SURREY BEIGE METAL PANELS CONCRETE CAP RED BRICK VENEER BASE CONCRETE BASE / r' 11 11 . 1 1 METAL SCREEN PANEL 1 11 Iii- '111•NIA II —11=1111111111111• R ■ I /WO MOM t 1 1II MEM _I 1r 1- en Lei n V i — 3� — dCW-61 — — — — V.1-$ — —w --& — `}ret—s — TOTAL AREA OF EAST WALL 32,412 SF 1 EAST 1116" = 1I-0" SIGNAGE SIZE 2' HIGH SIGNAGE SIZE 3.5' HIGH — ISSUE • a.. D301772014 ❑E51GN REVIEW SIiBINTIAL Kb-SPUN PHASE P roject Sieber PROJECT NUMBER MIIO. Project Number PROJECT LJ1 {� Z < w J w Z a O <L ¢ g w� <0 CONSULTANT IGCi183RAT6N GROUP WEST ARCHITECTS, INC.. P.S. 7001 FREMONT AVE 11 SUITE 314 SEATTLE, WA 58103 P NpryE {TGE) 838.1062 FAL 1208) 8203616 REEF TILE ONO I R EAST 1 WEST ELEVTION A3.01 0 z m u, co 01 m U1 v VI 7:1 0 0 g BEDROOM (9'- 10 "x9' -10 ") ■ v CLOSET LIVING /DINING (15' -9 "x24' -7 ") MASTER BEDROOM (16' -8 "x11' -10 ") CLOSET BATH Fo- 0 0 0 0 CLOSET KITCHEN BATH TUB O 1 TWO BEDROOM + DEN C 1,235 sf 1 1�1 Illw i LIVING /DINING (15' -9 "x10' -10 ") MASTER BEDROOM (18' -6 "x10' -6 ") WALK -IN CLOSET CLOSET 0 0 BATH KITCHEN BEDROOM (10' -0 "x13' -3 ") BATH CLOSET TUB DEN (8'- 0 "x9' -2 ") TWO BEDROOM + DEN A 912 sf TUB BATH C OSET MASTER BEDROOM (10'=10 "x13' -10" ) WALK -IN CLOSET LIVING /DINING (21' -10 "x21' -0 ") CLOSET KITCHEN BEDROOM (12'-0"x12'-9") TWO BEDROOM CORNER SUITE 1,165 sf cf TUB WALK -IN CLOSET CE O TUB BATH BATH KITCHEN DEN (9'- 0 "x7' -3 ") TUB WALK -IN CLOSET MASTER BEDROOM (15' -8 "x13' -0 ") BEDROOM (15' -4 "x10' -9 ") LIVING /DINING (15' -4 "X12' -1 ") 11 BEDROOM (11' -4 "x12' -1 ") THREE BEDROOM + DEN 1,492 sf 112 Community Affairs & Parks Committee Minutes April 15, 2014 — Page 2 C. Foster Golf Links Marketing Plan Update Staff provided an update on the status of the Foster Golf Links (FGL) Marketing Plan that was originally presented at Committee in November 2013. Strategies in the Marketing Plan were identified as: 1) Retain and strengthen core customers; 2) Engage lapsed golfers; and 3) Attract new customers. Items of note that address these strategies were described as follows: • The Rewards Card program was launched on April 1, and 178 Rewards Cards have already been sold. Councilmember Seal asked what the expectation for sales is, and staff indicated that 600 card sales is realistic, but 1200 is possible. • FGL has created 9 Get Golf Ready (GGR) instructional programs designed to engage new and lapsed golfers. The first classes begin at the end of April. • FGL has developed a Junior Golf Academy through the PGA that will begin in June. • FGL will partner with the Parks youth programs to incorporate golf into their Summer Camps. Lessons will take place at the Community Center. • FGL has purchased a Verti -Drain aerator to begin the Fairway Aeration and Topdressing Program. INFORMATION ONLY. D. Ordinance: Renewing Moratorium on Medical Cannabis Collective Gardens Staff is seeking Council approval of an ordinance that would renew the moratorium on medical cannabis collective gardens and dispensaries through May 19, 2015, which if approved would be the fourth renewal. Staff's position is that it needs additional clarity from the Washington State Legislature before local land use controls can be developed for safe and effective regulation. It is expected that the State will provide that clarity in a future session, either by merging the medical cannabis and recreational marijuana regulations into a combined system, or by establishing a separate regulatory system for medical cannabis. Also of note, on March 31, 2014, the State Court of Appeals ruled that medical marijuana, including participation in collective gardens, is illegal and thereby affirmed the City of Kent's authority to prohibit collective gardens. UNANIMOUS APPROVAL. FORWARD TO MAY 12, 2014 COMMITTEE OF THE WHOLE. E. Briefing on Recreational Marijuana License Applications to the State Staff provided information on the status of licensing for recreational marijuana producers, processors and retailers in the City. As of February 18, the State Liquor Control Board listed 36 producer, processor or retailer applications for locations in Tukwila, representing 22 unique addresses. As of today's date, this list has been reduced to 26. None of these properties meet both state and City regulation. The five proposed locations that are allowed per the zoning the City adopted in September 2013 are within 1,000 feet of Briscoe Park, making them disallowed under State rules. There have been significant delays in the licensing process and the City cannot yet fully assess potential impacts from recreational marijuana uses. INFORMATION ONLY. F. Development Agreement Amendment: 223 Andover Park East with South Center WA, LLC Staff is seeking Council approval of an amendment to an existing development agreement with South Center WA, LLC for the construction of the Washington Place project at 223 Andover Park East. The project plan has undergone some changes since the original development agreement was approved by Council in March 2013, and the application for design review is scheduled to be considered by the Board of Architectural Review (BAR) on May 22, 2014. The project as currently proposed does not meet certain zoning and sign code standards, so City Council approval to amend the development agreement would need to occur for BAR to consider the project. This 113 Community Affairs & Parks Committee Minutes April 15, 2014 - Pape 3 project is a unique opportunity to encourage transit - oriented development with a higher -end multifamily residential component that does not otherwise exist in Tukwila. Council and staff have previously recognized that this is a pioneering opportunity that may inform future adjustments to Tukwila's codes. Committee discussions on the four main areas in which the project proposal does not meet code are summarized as follows: Open Space The project proposal includes approximately 20,000 square feet of open space in the form of common areas for residents and hotel guests, including a large clubhouse on the top floor. In addition, the development would include a 15 foot wide tree lined sidewalk with bench seating. Under current zoning, 74,000 feet would be required, nearly half of the lot area. 25,525 square feet would be required under the the City's proposed Southcenter Plan. Staff recommends the developer's proposal for open space due to the location of this project and numerous indoor and outdoor amenities nearby. The Committee agreed with this modification. Building Height The existing development agreement allows the building to be up to 180 feet in height. The modified proposal now includes eighteen stories and a rooftop clubhouse for the use of residents as well as some additional meeting room height on the second floor mezzanine. Staff recommends allowing the additional height request of up to 190 feet because these are project enhancements. The Committee agreed with this modification. Signage The size proposals for signage exceed the current sign code. Signs on the north and west faces would be 840 square feet, while current code allows 150 square feet. The hotel canopy entrance sign would have letters 3.5 feet in height, while the current code allows 1 foot in height. The City's sign code did not anticipate buildings of this size and scale and 150 feet is very limited in the context of wayfinding and marketability. For comparison, some wall faces at the mall are allowed signs up to 500 square feet and buildings in the MIC /H District may have signs up to 1,500 square feet depending on wall size. If the criteria used in MIC /H were applied to this project, the north face sign could be up to 733 square feet and the west face sign up to 561. Staff recommends allowing larger signs due to the scale of the project, and suggest applying the MIC /H criteria as one reasonable strategy to reach compromise. The Committee did not agree to the use of MIC /H criteria for signage due to the incomparable uses in that zone. Councilmembers affirmed the uniqe needs of this project and would like to accommodate a compromise between code requirements and the developer's proposal. They requested that staff bring alternatives for calculating appropriate signage in a manner scalable to the building, amenable to the developer, and fair to other business owners in the zone to the Committee of the Whole discussion. Parking The proposed project includes 498 parking stalls. The current code requires 939, but the proposed Southcenter Plan code changes under separate consideration would require 594 stalls for this project. A technical analysis conducted by the Transpo Group estimated a daily peak parking demand of 458 stalls (340 for the residential units and 118 for the hotel.) Because there are no similar developments in South King County, the actual parking need is unknown. Staff recommends following the proposed Southcenter Plan parking requirement for residential and assuming a 70% occupancy level for the hotel, resulting in a total of 537, or 39 more than the proposal includes. Representatives for the owner indicated that the addition of these spaces would necessitate a different structural design with significant impact to the ability of this project to move forward. 114 Community Affairs & Parks Committee Minutes April 15, 2014 - Page 4 Since the last discussions between the City and the owners on the matter of parking, Ace Parking Management, Inc. submitted a letter claiming that 44 additional spaces could be created by implementing valet parking service for the hotel. Staff intends to review this new information further before revisiting their recommendation. The Committee did not make a recommendation on parking but supports the analysis of the valet proposal prior to the Committee of the Whole discussion. FORWARD TO APRIL 28 COMMITTEE OF THE WHOLE WITH ADDITIONAL INFORMATION AS DESCRIBED ABOVE. III. MISCELLANEOUS Meeting adjourned at 7:26 p.m. Next meeting: Tuesday, April 29, 2014 Committee Chair Approval Minutes by LH, Reviewed by DS 115