Loading...
HomeMy WebLinkAboutPermit M2000-017 - QWEST COMMUNICATIONS• "• • ,•• • - • , • , „ ,„ M2000-017 WEST COMMUNICATIONS 6101 So. 18011h St. SEE ALSO: D2000-013 ••••"', ; • • •' -; • ,•• Gity uwa � fie, () ����{ er 1 ._?0 of a f Tkil '� (ZOd) 431 -3870 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MECHANICAL PERMIT Permit No: M2000 -017 Type: B -MECH Category: NRES Address: 6101 S 180 ST Location: Parcel 4: 352304 -9120 Contractor License No: MACDOM *248J9 TENANT OWNER CONTACT CONTRACTOR OWEST COMMUNICATIONS 6101 S 180 ST, TUKWILA WA 98188 LA PIANTA LTD PARTNERSHIP PO BOX 88050, TUKWILA WA 98138 DAVID NEHREN 7717 DETROIT AV, SEATTLE WA 98106 MACDONALD MILLER CO 7717 DETROIT SW, SEATTLE, WA 98106 Status: .ISSUED Issued: 06/16/2000 Expires: 06/11/2001 Phone: Phone: (206) 575 -3200 Phone: 206 -768 -4128 Phone: 206 763 -9400 **************************************** k*** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: INSTALLATION OF PACKAGED ROOFTOP A/C UNITS, AIR DISTRIBUTION DUCTWORK WITH VAV TERMINAL UNITS, EXHAUST FANS, STEAM BOILERS WITH FEED PUMPS AND PIPING, HUMIDIFIERS, PLUMBING FIXTURES AND PIPING. 2 PACKAGED AC UNITS, AIR DISTRIBUTION DUCTWORK, HUMIDIFIERS AND STEAM PIPING (FROM EXISTING EOUIPEMENT), AND EXHAUST SYSTEM. ADD 3 MOTORIZED DAMPER, 6 FIRE SMOKE DAMPERS AND 1 EXHAUST FAN. UMC Edition: 1997 Valuation: Total Permit Fee: 800,000.00 774.69 *********************.******* * * * * ** * * * * * * * * * * * * * * * * * * * * * ** ** * * * * * * * * * * * ** r- - 1 1r�.+y�/ Permit Center Au'th rized Signature Date I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building perm Signature: Print Name: Date: ze- d .� 490 -� ,,4ezi - Title: _.1?"v TM CL r M . d ef- This permit shall become null and void if the work is not commenced within 180 days from the date of Issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. City of Tukwila (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MECHANICAL PERMIT Permit No: M2000 -017 Type: B -MECH Category: NRES Address: 6101 S 180 ST Location: Parcel 4: 352304 -9120 Contractor License No: MACDOM *248J9 TENANT OWNER CONTACT CONTRACTOR (WEST COMMUNICATIONS 6101 S 180 ST. TUKWILA WA 98188 LA PIANTA LTD PARTNERSHIP PO BOX 88050, TUKWILA WA 98138 DAVID NEHREN 7717 DETROIT AV, SEATTLE WA 98106 MACDONALD MILLER CO 7717 DETROIT SW, SEATTLE, WA 98106 Status: ISSUED Issued: 06/16/2000 Expires: 04/22/2001 Phone: Phone: (206) 575 -3200 Phone: 206- 768 -4128 Phone: 206 763 -9400 ******************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: INSTALLATION OF PACKAGED ROOFTOP A/C UNITS, AIR DISTRIBUTION DUCTWORK WITH VAV TERMINAL UNITS, EXHAUST FANS, STEAM BOILERS WITH FEED PUMPS AND PIPING, HUMIDIFIERS, PLUMBING FIXTURES AND PIPING. 2 PACKAGED AC UNITS, AIR DISTRIBUTION DUCTWORK, HUMIDIFIERS AND STEAM PIPING (FROM EXISTING EQUIPEMENT), AND EXHAUST SYSTEM. UMC Edition: 1997 Valuation: Total Permit Fee: 800,000.00 592.06 ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Center A OM Oa orized Signature Date I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance • work. I am authorized to sign for and obtain this bu11dlno bar Signature: Print Name: _.1.�.y Date: 1 - Or'-v0 Title: P(LM'-ftA4Qj. This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. City of Tukwila (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Permit No: Type: Category: M2000 -017 8 -MECH NRES MECHANICAL PERMIT Address: 6101 S 180 ST Location: Parcel #: 352304 -9120 Contractor License No: MACDOM*248J9 TENANT OWNER CONTACT CONTRACTOR OWEST COMMUNICATIONS 6101 S 180 ST, TUKWILA WA 98188 LA PIANTA LTD PARTNERSHIP PO BOX 88050, TUKWILA WA 98138 DAVID NEHREN 7717 DETROIT AV, SEATTLE WA 98106 MACDONALD MILLER CO 7717 DETROIT SW, SEATTLE, WA 98106 Status: ISSUED Issued: 06/16/2000 Expires: 12/13/2000 Phone: Phone: Phone: Phone: (206) 575 -3200 206 - 768 -4128 206 763 -9400 *' k* k**********• k**• k**********•k**• k: k** k**• k* •k *k**k ******* * ***** ******k*k *k *tilt *** Permit Description: INSTALLATION OF PACKAGED ROOFTOP A/C UNITS, AIR DISTRIBUTION DUCTWORK WITH VAV TERMINAL UNITS, EXHAUST FANS, STEAM BOILERS WITH FEED PUMPS AND PIPING, HUMIDIFIERS, PLUMBING FIXTURES AND PIPING. UMC Edition: 1997 ** * * ** ** `U U • Valuation: Total Permit Fee: * * *** ***** ** ** **k** *•k * *•k * *4i***k:k•k*** *fit ** Permit enter Authorized Signature Date 800,000.00 447.94 * * * * * * * *** *k** I hereby. certify that I have read and examined this permit and know the same toi be true and correct. All provisions of law and ordinances governing.. this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws{ regulating construction or the performanc= of wo . I am authorized to sign for and obtain this bu1 ing�e 4v..- (� SIgnature : F Date : -87 er- MMI Print Name :_ • 4" (1 Q .Title : Qa .Y.!.l1S,e�_'x, This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the Dist inspection. Address: 6101 S 180 ST Suite: Tenant: OWEST COMMUNICATIONS Type: B-MECH Parcel #: 352304 -9120 CITY OF TUKWILA Permit No: M2000-017 Status: ISSUED Applied: 01/20/2000 Issued: 06/16/2000 ***************4********* *********** k*k ** k* *•k *•k *-k *•k *•k *•.t ** k k* *•k•k* **•k *A.* k* k Permit Conditions: .1, :No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 2. All permits, inspection records, andepproved plans shall be - available at the ,loo site prior to the start of any con- struction. :TJtese adocuments are to be maintained _and avail- - able until final inspection approval is granted, All construction to :be done in conformance with approved plans and requirements of the Uniform Building Code (1997 'Edition) ee amended, Uniform Mechanical Code (1997 Edition), and Washington State Cnergv'Code 11997 Edition), Velidity'of Permit. The issuance of a permit or approval-of ,plenspecif lcations, and "computations shall not be con,. strueA; to be a permit for, or an approval of, any violation ;of any of. the provisions of the building code or of any other ordlnence of the ,jurisdiction. No permit presuming to giv,e}= authority to violate or cancel the provisions. of this :code shell be valid, 5. Manufacturers installation instructions required on site fo'r,., the building inspectors review. 6, '* *`FIRE DEPARTMENT CONDITIONS*** 7, 'The ottrached set of plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns 8. .H, V..A. C: milts rated at greater than 2,000 cfm require, eutoshutdown devices. These devices shall be separately zoned ln'the alarm panel and local U.4, central station super;vlslon 1s required. (City Ordinance #1900) H. V, A. C. systems supplying airy in excess of 2,000 cubic feet per minute- to enclosed spaces within buildings shall. be equipped with an automatic shutoff. Automatic shutoff shall be al comp11 hed by interrupting the power source of the air - moving equipment upon detection of smoke in the main supply -air duct served. by such equipment, Smoke detectors shalt be labeled:by enH approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (UMC 608) 10, Duct smoke detectors shall be capable for being reset from the alarm panel. (City Ordinance #1900) 1.1. Remote alarm annunciation indication is required if the control panel is not visible from the main entrance, (City Ordinance #1900) 12. In areas that are not continuously occupied, automatic smoke detection shall be provided at each control unit(s) location to provide notification of fire at that location. .(NFPA 1 -5,6) 13. The installation of wiring and equipment shall be in 4 `accordance with N.F.P.A. 70 Article 760, Fire Protective. ;Signaling 'Systems. (NFPA When the control panel is located inside a room, the door to`the room shall have a sign with one7inch letters which reads "Fire Alarm" or "Fire Alarm Control''. (City Ordinance #1900) Dedicated fire alarm system circuit breaker(s) shall be equipped with a mechanical lockout device. (NFPA 72 (1- 5.2.8.2)) ,All new fire alarm systems or modifications to existing systems shall have the written approval of the Tukwila Fire Prevention Bureau, No work shall commence until a fire department permit has been obtained. (City Ordinance #1900) (UFC 1001.3) 7 : ;Contact the Tukwila Fire Prevention.j3ur.eau to witness all required inspections and tests. (LWC 10.503) (City Ordinance #1900 and: #1901) 18 ..duct debeot.or,s,she:ll send a supervisory signal only upon activation; 49. Any overlooked hazardaus condition and /or' violation.. of the adopted F i ro or qu 1'l d i ng Codes does -, not imply: approve l of such condi`tion'`or ',violation 2n. The plant were, reviewed by - ,.,511;x,° If you have any questions, please call the. Tukwila Fire Prevention Stir at (0d0 575. -4407. 1 hereby: hart 1fy �`thet I have read ;these conditions and w1 l 1..; comp 1y with the`re;_es.`outlined. All`.. provisions of law and ordinenoes governing the work =w111.: be complied with,: ,'whether specif ied herein or not, The gram( l ng ©f;. this permit does: not: presume to give authority to v i o,l ete;(1ar cenoe l : the Provisions of env .other work or local laws regulating construction or'the perform noe of work, Date: 11.4 4110 tri y! CITY OF ' 'KWI LA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 R SIAit USE ONIY Project Number: rizo Perit Number: Mechanical Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. Lic.,en /f4a&6 Project Name/Tenant: �.. ,-- Q WE5r OMNt1141IC�A/ ivel5 Valli of Mechanical Equipment: 4s00)OA� Site Address : ik ,�— City State/Zi /D( �a /� � / /Kcv1 r WA 99lb Tax Parcel Number: 34230 i O Property Owner: // (.4., Cs ' 6 rvt r)., u �1 ,64.7_ 0 r, S Phone: (303 ) •- Li if 5-_ 7/30 Street Address: City State/Zip: /39SZ bEavez We5r Rktoy -.PL. o4 5'� 6rto�.oEI4 GO f>O5v/ t Fax #: ( ).. 3o3 s 77Z x" Contractor: A 7� n ,� ( "`AG Do A 0 1" ` t I_ L C2— Phone: t; 6) - 763 -- 2YOO Street Address: ?` 7 5�� 1 PIC, �y St91/ Fax #: (Zoe) - 767- 677,3 Contact Person: ��� 840 Avt n Phone: (206) - 74Q -- 49/Z8 Street Address: �� t r U � A .F City eat -4 i9: Fax #: (246 )w 76.* •,r 4,/9( MECHANICAL PERMIT REVIEW AND APPROVAL RE UESTED: (TO BE FILLED OUT BY APPLICANT) Descri.tfon of.wor to be done (please be spe iffc): h %// air cdt04'; Current copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued OR submit Form 11-4, "Affidavit in Lieu of Contractor Registration ". Building Owner/Authorized Agent: If the applicant Is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized latter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal, I HEREBY CERTIFY THAT / HAVE READ AND EXAMINED TiIIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND / AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 NER OR TH 0 ZED AGENT: Signature: / 1.. . Date: 1 /1$ 00 Print Hama: Ac f . d /4 e 11 r er Phone: ( 206) -763 q+co Fax A: (2.04) ?67 6773 Address: ?717 DG +va i -1 .she Sw City /state/zip: ,4 tbb sad Expiration of Plan Review - Applications far which no permit is issued within 180 days following the date of application shall expire by limitation, The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 114,4 of the Uniform Mechanical Code (current edition), No application shall be extended mare than once, D if e ap lication a_ pted: IND 0 9 • .11/1/99 • owls pormadoc Date apppli£600 pire� leo Ao 0 Appli tlon talon initials) v. Mechanical Permits COMMERCIAL: Two complete sets of drawings and attachments required with application submittal ✓ Submittal Requirements Floor plan and system layout ✓ Roof plan required to identify individual equipment and the location of each installation (Uniform Mechanical Code 504 (e)) Details and elevations (for roof mounted equipment) and proposed screening ✓ Heat Loss Calculations or Washington State Energy Code Form #H -7 W.V.A.C. over 2,000 CFM (approximately 5 ton and larger) must be provided with smoke detection shut- off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical Code 1009). 1 Specifications must be provided to show that replacement equipment complies with the efficiency ratings and other applicable requirements of the Washington State Nonresidential Energy Code. IStructural engineer's analysis is required for new and the replacement.of existing roof equipment weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be stamped by a Washington State licensed Structural Engineer. NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. RESIDENTIAL: Two complete sets of attachments required with application submittal SUl►m►Il.t ertu►r rr►►►'nl S New Single FamllyResidence Heat Toss calculations or Form 11-6. Equipment specifications. Chan &out or re lacement of existin mechanical e' ul ' ment • Narrative of work to be done Includin: modification to duct work. Installation of Gat Fireplace Narrative with specification of equipment and chimney type. If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney Is In safe condition, NOTE: Water heaters and vents are included In the Uniform Mechanical Code ; please Include any water heaters or vents being =installed or replaced, ocia,.•45 ix w2w 00 00 �W (1) LL w �d 2� W 2. �F c�� 9f **' ***** ********'* *** ** ***** ** ** * ** ***fit *** ** **fir *fit'**'lit * #** tITY OF TUKWILA. WA ** t, * * * * * * ** * * ***** ** * ** * * ** * * * *** ter * ** ter* tit ** TRAM M :XT Number't 89600410 Amount: 182.63 12/20/00 12: 'Pow/mint Methods CHECK NOtatians MACDORNALD MILLER Xnita TL =4, `Hermit .No: M2000-017 Tvoos 9-MECH MECHANICAL PERMXT 1>irc11 No :" 352304 -9120 to Addr;dua s 6101 8 180 8T Total Foes: 774.6 ****** * * * ** * ** **** *4* ** * * * * * **** ***** * *** * * ** *** ** ** *** *** ** Account Cadet Description I *$oun 000/3 45.680 PLAN CHECK . NDNRE8 26.6 .000/322.100 MECHANICAL » NUNRE6 136.0 M.-• ... -- '.U. ---. .... .M _. M w.. .1....., --.,. .i... A1. M.. ................ W... PW DCD 26.63 PW yyD CD 156.00 CHECK 102.63 12/26/00 19 03:54 0097 0953'. TOTS * * * * * *** * * * * * * * * * * *** * * * * * * * ** * * ** *illy* *_ ** * * * * * * * ** **'lac * * * * * ** *k xY? fib':: TtlKW;1L,A W H `' .. ( r TKANtit4� 1 *, *4 *; * * * ** *;r.* * * * * * * ** *. * * * * *` r ** * * ** * * * ** * ** * *** * * * *4 *** i' AN>P.NI'1'� lumbt r : ' 89600404 Anmount :, 144.12 1.2/08/00 i2 :07 atiath 'lathed: CHECK Notation: MACDDNALI) MILLER twit': . `Perieit Nos M2000-017 `rvna: 0-MCCH MECHANICAL PERMIT Parcel Not 252304 -9120 its Address: 6101 8 _1e0 5r rots l Feast 592.0E ihi a ;P V*1tht 144.12 Total ALL Pmts: 592.06 Wanes: .00 * * ** ** * *** ** * ** *fir*** *,k** *+ ***** A *** * * * * ** * ** *** *+k** * ** *# * **** 4A,r count Code Oeaariation Amount 00.0/345.530 PLAN CHECK - NUNNEO 23.417 000/322.100 MECHANICAL M NONRES 120.25 " . 444444:44,*'*• *.* - • ANS04-11.: KNItiC NA - 4' skoii 4.4 44 A '* 4 k liAiltA**4-4$1kAkA*44.4-i.4.A R9)00302 Amount : 447..94 06/16100 10:20 Isiv#Hadt ;:141ICK Not at ion t MACDONALD: MILLEN - :Ertl tx 4.4 *4 ‘21/ V, OF SS ea 41 11.1 111.• 411. i• 111. Se, •S,. if . vat .6. 1412600, 01 7. Ty 00% 0 -Nit fW, 14FC.i1iAN 1 I'I Pait 111 l' rottt •oof fhit 'sent 447.94 Tvtal ALL Pattirs Oa] areevo 447.94 • 447.94 • .00 *44toise,*14****A* al itiktu*ohki****Iiiitiet*Af$4,#e*A**411,4***4***hteti***** Count Loth) Desvr ipt; 000/1445.030 PLAN C.HCCK • ?AMR 000/322.100 14ILCHANICAL NONIth:13 4;. It 0110 St., • 8.114 *It 4.• e., *V 111 • 0* It,' s 4, .10. SR • • ••• 114 1, 410 •• IPS A tU3Ltflt 09.59 • 310.35 ..!;,..: a , PERMIT NO.: MW00-• 017 MECHANICAL PERMIT APPLICATIONS INSPECTIONS ❑ 00002 Pre- construction ❑ 00050 WSEC Residential ❑ 00060 WA Ventilation/Indoor AQC ❑ 00610 Chimney Installation/All Types ❑ 00700.,Framing ❑ 01080 Woodstove 01090 Smoke Detector Shut Off ❑ 01100 Rough -in Mechanical ❑ 01101 Mechanical Equipment/Controls ❑ 01102 Mechanical Pip/Duct Insul 01105 Underground Mech Rough -in 01115 Motor Inspection 1400 Fire Final 01800 Final Mechanical 04015 Special -Smoke Control System CONDITIONS a 8 TENANT NAME: 0027 0003 0036 0001 No changes to plans unless approved by Bldg Div 0014 Readily accessible access to roof mounted equipment 0016 Exposed insulation backing material 0019 All construction to be done in conformance w /approved plans 0002 Plumbing permits shall be obtained through King Co 0027 Validity of Permit 0003 Electrical permits obtained through L & 1 0036 Manufacturers installation instructions required on site "BTU maximum allowed per 1997 WA State Energy Code" 0041 Ventilation is required for all now rooms & spaces "Fuel burning appliances "Appliances, which generate..,." "Water heater shall be anchored...," Additional Conditions: FEES Basic Fee (Y/N) Supplemental Fee (Y/N) Plan Check Fee (YIN) Furnace/Burner to 100,000 BTU (qty) Over 100,000 BTU (qty) Floor Furnace (qty) Suspended/Wall/Floor- mounted Heater (qty) Appliance Vent (qty) Heating/Refrig/Cooling Unit/System (qty) Boiler /Compressor to 3 HP /100,000 BTU (qty) to 15 HP /500,000 BTU (qty) to 30 14P /1,000,000 BTU (qty) to 50 HP/1,750,000 BTU (qty) over 50 HP/1,750,000 BTU (qty) Air Handling Unit to 10,000 cfm (qty) over 10,000 cfm (qty) Evaporative Cooler (qty) Ventilation Fan (qty) Ventilation System (qty) Hood (qty) Incinerator — Domestic (qty) Incinerator — Comm/1nd (qty) Other Mechanical Equipment (qty) Other Mechanical Feu (enter SS) Add'I Fees — Work w/o Permit (Y/N) Insp Outside Normal Hours (hrs) Reinspections (hrs) Miscellaneous Inspections (hrs) Add'l Plan Review (hrs) Plan Reviewer: Permit Tech: reamloomorrwoirre Date: 2c Date:, j Z 16 CO - PERMIT NO.: KUM- 017 :'' 'Eye 4I TENANT NAME: 621.1,—.^›, - GENCu i3� GENTEl t MECHANICAL PERMIT APPLICATIONS INSPECTIONS ❑ 00002 Pre - construction 0 00050 WSEC Residential ❑ 00060 WA Ventilation/Indoor AQC ❑ 00610 Chimney Installation/All Types ❑ 00700 Framing ❑ 01080 Woodstove ❑ 01090 Smoke Detector Shut Oft 0 01100 Rough -in Mechanical B 01101 Mechanical Equipment/Controls 01102 Mechanical Pip/Duct Insul 01105 Underground Mech Rough -in 01115 Motor inspection 1400 Fire Final 01800 Final Mechanical 04015 Special -Smoke Control System CONDITIONS 0 0001 No changes to plans unless approved by Bldg Div 0 0014 Readily accessible access to roof mounted equipment ❑ 0016 Exposed insulation backing material (] 0019 All construction to be dono in conformance w /approved plans ❑ 0002 Plumbing permits shall bo obtained through King Co 0027 Validity of Permit 0003 Electrical permits obtained through L & 1 0036 Manufacturers installation Instructions required on site "BTU maximum allowed per 1997 WA State Energy Code" 0041 Ventilation is required for all now rooms & spaces "Fuol burning appliances "Appliances, which generate,,,," "Water heater shall bo anchored..,," 8 Addlt o ag l Cogdltiona: FEES Basic Fee (Y/N) Supplemental Fee (Y/N) Plan Check Fee (Y/N) Furnace/Burner to 100,000 BTU (qty) Over 100,000 BTU (qty) P1( :r Furnace (qty) Suspended/Wall/Fioor- mounted Heater (qty) Appliance Vent (qty) Heating/Refrig/Cooling Unit/System (qty) Boiler /Compressor to 3 HP/ 100,000 BTU (qty) to 15 HP /500,000 BTU (qty) to 30 HP /1,000,000 BTU (qty) to 50 HP /1,750,000 BTU (qty) over 50 HP/1,750,000 BTU (qty) Air Handling Unit to 10,000 cfm (qty) over 10,000 cfm (qty) Evaporative Cooler (qty) Ventilation Fan (qty) Ventilation System (qty) Hood (qty) Incinerator — Domestic (qty) Incinerator — Comm/Ind (qty) Other Mechanical Equipment (qty) Other Mechanical Fee (enter SS) Momiulmmmms Malmomommmo Add'! Fees — Work w/o Permit (Y/N) Insp Outside Normal Hours (hrs) Reinspections (hrs) Miscellaneous Inspections (hrs) Add'! Plan Review (hrs) Plan Reviewer: Permit Tech:,., Date: t2- 4,- woo Date: i� p INSPECTION NO, CITY OF TUKWILA BUILDING DIVISION INSPECTION RECORD Retain a copy with permit PERMIT NO. ,6300 Southcenter Blvd, #100, Tukwila, WA 98186 431 -3 Project: ,_ Type of I • ction: AIN Addre s: Date cal Ie .""""""""� Spec -a instructions: 5 Ji( Date wa • - • . 4. 4..-0 A Requester: Phone: pproved per applicable codes. affections required prior to approval. $401, + ' EINSPECTIO at 6300 Southcenter Blv . Suite 100. Call to schedule ,reins 'ection. Date: G!r r —,.- erE REQUIRED. Prior to Inspection, fee must be paid Receipt No: Date: INSPECTION RECORD Retain a ropy with permit INSPECTION NO, CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter BIvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431.367 • oject: g of -111 041( A )14 Ty of Ins . ection: 1. ' • • Address :. r I' / 5r Date c. led: to 6 /n ,....., Special instruct4oz, , 6' 0° Date w . nted Ph � ne:. 7— (0 7 Appro4ed per applicable codes. COMMENTS:: Corrections required prior to approval. • Inspector: 4 L- Q $47.00 REINSPECTI • N FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reins' ectlan. Date: Receipt No: Date: ig� ,.. ' - -•• Z # e kli OECTION RECORD Retlitit a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 9818 PERMIT NO, (206)431 Project: Ap .4 '...■.0.011 Type of inspection: _ .ost or 44. ,, --,- Add es : - jet. AI # Date calle;. Spec al instructions: ' Date wanted' ... Ai e Ciiii■ • Requester: Phone: Approved per applicable codes. (5Corrections required prior to approval. JAIL - # Date: cw• O 40.0 $47.00 REINSPECTIO REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100, Call to schedule reins ection. Receipt No: It • •• • • • ' '• • * Date: - • •.F ":" -K". 4 $ 4 II INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 981 PERMIT NO. Cy (206)431-3 Project: L (.0f1 d'r Ty . e of inspec I • n: L44 Y , t !..4L P. 4 Address: D/ 6• %P '' Date called: - 12) * Special instructions: I " Uo rI cl dal �'I' V -00Y1i Date wanted: '� a, a.m. . �-� � Requester: �I- G.til.rG.. Phone: Zb(n -1 P710-41' Approved per applicable codes. COMMENTS: Corrections required prior to approval. 3clor: Or Date: 2. $4 .10 REINSPECT, Q , 441i' iE ' EQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter ti vd. lie 100. CaII to schedule ruins ection. Date; Receipt No. ' r PCnittif City of Thkwila Fire Department TUXWILA FIRS DIPARTKINT FINAL APPROVAL FORK Project Name Ott7 Ce 7A"fL /N I 1 /,O/ $* Address 0/ . / G) 57 John W. Rents, Mayor. T t"nias P. Keefe, The Chief Permit No./ Retain current inspection schedule Needs shift inspection 7 / ' �� Suite # ...Z , Approved without correction notice Approved with correction notice issued Sprinklers: / Fire Alarm: ii J' A ' '‚ ' ' 0' /v N 51) . Hood & Duct: d Halon: Monitor: j,7777—Die A i /1r Pre -Fire: Permits: .P6' 45/7, Authorized Sig titure FINAL4APP. FRM Dat T.F.D. Form F.P. 85 Ington 98188 • Phone: (206) 5754404 • Fax (206) 57$4439 • INSPECT! '. N NO. INSPECTION RECORD Retain a copy with permit PERMIT NO, CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd-, #100, Tukwila, WA 9818 (206)431 -3670 Project: - .40. T . of I spection: ' 'IV �� L 0. 'h rt Address: .�, • gal'`' 5 +, Date called: z - 2 -ov Special fey reW`5f'en ad-01/1 pi&a Sr' can I 30 I'ri cid Date wanted: - �1► /2- 3. .m. Requester: u, Phone: 8177_(075 _ yq Ej Approved per applicable codes. Corrections required prior to approval. $4740 REINSPECT! a N FEE REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter 4lvd, Suite 100. CaII to schedule rein_pection. Receipt No: Date: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 9818 INSPECTION RECORD Retain a copy with permit PEMMIt NO (206)431.367 P oject: T pe of Inspection: a- .44‘ Address: r f Special instructions: Date called: "._2» "U Date wanted: Requeste : Phone: 2. L "' LI P pproved per applicable codes. COMMENTS: Corrections required prior to approval. Inspect Date: $47,00 REINSPECTION FEE REQUIRED, Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reins.ection. Receipt No: Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 1:r Ql t PERMIT NO. (206)431 -3670 P ject: Ty . e of Inspection: Address: l � " /8O - ,,.yf Date called: I 0 - 11Z;) — (-.., ,� . . .. Special instructions: Date wanted: ' .)--t `(�C •.m. w► t Phone: Li 2. ?.> — L 1 . /' Approved per applicable codes. Corrections required prior to approval. COMMENTS: % - .r or ... _ ,� . . .. . r it t ' t .... L. /Ar,i , t / . /' M116 -A '40 id . 4111114191g .1M0.11111111111111111 MEW -.1-.L.. - ' ..... ' -a MIMI Ail Inspector: r/14_ % //�.. $47,00 REINSPECTION "EQUINE!), Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reins.ectlon, Date: 1 Receipt No: Date: • _. 1Tk '63 0§ (4)6 INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 9818 INSPECTION RECORD Retain a copy with permit PERMIT NO, (206)431-3670 Projec A Type of I ection: At 4'w 4 Address. Date called: Special instructions: ,l Si— 7.--•.)4 ,, za...4 1).., „L.,. Date wanted: Requester: Phone: pproved per applicable codes. Corrections required prior to approval. $47,00 REINSPECTION FEE REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd. Suite 100. Call to schedule reins ' ection. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit PERMIT NO. (206)431 -3670 P oject: P r1n Type of Inspection: (- Address: C. I T1 • Da a called: '- Ls- (JO . VSpecial instructions: f Lt,' 1`tiSPecrlc -t1 'l 3 1C. Q L_ I NI Date wanted: %- .I f":! - c t p.m. Request¢r: -..t Ph ne: El Approved per applicable codes. COMMENTS: gi-Corrections required prior to approval. Inspector. Date: 0 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must he paid at 6300 Southcenter Blvd, Suite 100. Call to schedule reins action. Receipt No: Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Sduthcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 Project: Type of Inspecti ' n: — Addref�s: 0 / (' l gO fd Date called: g 7/� ev Special instructions: / t J - 4 ` t Date wanted: a.m _ / p.m. 7 ✓Requester: Phone: .�. Approved per applicable codes. Corrections required prior to approval. %— l3Jar` IMMO Inspector: i I _ J.J>r .. Datn: may. REI SPECTION vREQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd, Suite 100. CaII to schedule reins ection. Date: [Receipt No: . • • INSPECTION RECORD Retain a ropy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 tt e T T{ p ofInspection: i Address: h ... ¥- Date ca Ied: r:.� , j Special Instructions: Re. - I ALI- VLz. (Jun oz._ „vi e A C c v R. 0 wanted: - ' � U equ ster: Phone: ,. El Approved per applicable codes. OCorrections required prior to approval. COMMENTS: Date: 0 $47.00 REINSPECTION FEE REQUIRED. Prior to Inspection, fee must be pald at 6300 Southcenter Blvd. Suite 100. Call to schedule rains ction. Receipt No: Date: f f , I • 1 ' • • . • • • 1 0 INSPECTION RECORD Retain a ropy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 (206)431-3670 Project: Type of inspection' • - i tt We (r Address: �y Pate ailed: r'y Special instructions: - -'VAC. Date wanted: - I -� Cs a.m. •.tn. Request r: t Phone: Approved per applicable codes. corrections required prior to approval. ,'C te7 1,194 ' r /ft/ Ins 0 147.00 REINSPECTION FEE REQ IRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd. Suite 100. Call to schedule reins'ection. Receipt No: Date: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 981 INSPECTION RECORD Retain a copy with permit PERMIT NO. (206)431 -3670 Project: Type of Inspe io Address: •• IP 00" 'Date called: 5 , eclat Instructions: Date wanted: a I. Requester: Phone: Approved per appllcable codes. Corrections required prior to approval. $47.00 REINSPECTION ' E REQUIRED. Prior to inspection, fee must be paid at 6300 Multicenter Blvd. Suite 100. Call to schedule reins s =coon, INSPECTION RECORD Retain a copy with permit INSPECTION NO CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 9818 PERMIT NO. (206)431.3670 Project: 0 Type of Inspection: Address; ^ _ b Date called. Special instructions: Date want_.: AN • .m. Requester: Phone: -Approved per applicable codes. Corrections required prier tr approval. COMMENTS: tip S * t% U C Inspector: 0 $47 ;00,REINSPECTION fEE at 6300'outhcenter Blvd. S Receipt No: Date: QUIRED. Prior to Inspection, fee must be paid ite 100. CaII to schedule reins 'ection. Date: et ;12 INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 9818 INSPECTION RECORD Retain a copy with permit PERMIT NO. (206)431 -3670 Pr ,%e v Type of In! meal - A /Aye Ai0 ! [ ycJr v� Date called: pa ca._., Special instructions: WO / 3 - ` � Otiield Z.— C M/.pi jAispec --07 Date wanted: a,. r /�oCp m.J Requester: Phone: d t 47 Approved per applicable codes, COMMENTS: Corrections required prior to approval. Inspector: j r. Date: Airi. _ . $47,00 REINSPECTIO SEE REQUIRED. Prior 10 inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reins.ectlon, Receipt No: Date: INSPECTION RECORD Retain a copy with permit INSPretION NO, CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 (206)431-3670 Project: GI v-t) 4- Type of Inspection: iht" /ilia , __. .%.- ......-,4 Address: 7) .....), 0 044 ° .400 Da e called: -,../ t oo --- Special instructions: e,/ .3...i....• c.-- 5 It Date anted: ' •41 -e-,z, a.m. .rn Requester. • k_ Mope: ,- - '- 9 , . Approved per applicable codes, Corrections required prior to approval. COMMENTS: NW° , __. .%.- ......-,4 .g..,...' .• L."1411°,111,A1 044 ° .400 -■L --..L ... a ... ., , , ii.• .1 lir Inspector: Date: dd 0 $47.00 REINSPECTION E REQUIRED. Prior to Inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reins action. INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 • 'fact: / v T pe of Inspection: 4 S. Arn a A,&es . • ,. s to calle • rr Lo Special instructions: Date want d: .... ob. . a,m.'' �. ". i`w► y P one: TrApproved per applicable codes. El Corrections required prior to approval. COMMENTS: / v *Ai 4 S. Arn a d 4 f t7 L l4 C... C O �/ Z., ,l ry E. MD • rr Lo am a 1r If y / o Ia $47,00 REINSPECTION FEE REQUIRED. Prior 10 Inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100, Cali to schedule reins.ection, Date: ;12 ON NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 ,,,� CTION RECORD Retain a copy with permit PERMIT NO. (206)431 -3670 Special instructions: Date wa te': 0 uester: Approved per applicable codes. J Corrections required prior to approval. COMMENTS: E 5 dGe ry /0, .F; /7=1 I I I I ".A',W11 I I I I I I $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, tea must be paid at 6300 Southcenter Olvd. Suite 100. Call to schedule reins ection. Receipt No: Date: OCT -18 -2000 14E0 10:14 AM 011 NOSKINS a■mim•rOC7 i7 '02 37: 03PM IlASC .f�NA1- E:r1.� v. MASON INDUSTkIES, Inc. A4r1u4ecturWi d Nbrotlen Control Products 3O MAN* &Ire *101 W. Crescent Ave. , Cult. 0 Nerve/� e. NY 1171)8 Aneh.hn, " A f1A01 VAIX i11/34S711 VA>! 1714%A37� >>9 TUX 911-44I4 FAX ENO, 220036830 76 PI 03 Cgtt11RIE0 F0q RSTYPCE Joe 1114.E: QWEST _ CUiiOMER: ,HOSKINS CO ANC H cu5 -o aR P.O.. Joe NO.! _ 101 MA¢ON 8.0.; 16311 0WO. No.; vyF- 39310 DEM., BoLT DOWN KEUIREO; ONE _ YA.G; SXHG -COG me;w —a 12 GAGE STRAP ,v EP WIDE 412 TEK iCRI:w (3) PER LOCATION 3 ON UNIT 3 ON CUR STEEL SPRING CUPS TOP AND BOTTOM (BY MASON) NEOPRENE ACOUSTICAL SEAT (BY MASON) ern��OVIVE'O UKW /lA OCT 2 ', 7000 utiNrett CONTINUOUS WOOD' NAILER (BY MASON) RECTANOULAR SPRING REMOVAL AND ADJUSTMENT PORT WITH COVER PLATE (BY MASON) WOODEN PORT FRAME (BY MASON ADJUSTMENT BOLT CHAIR ASSEMBLY (BY MASON) C,11 HOSIGI S COMW N1 13033 Laka C'1y Way NI! Soothe, WA 9$I2S442a 2(16.366-1100 FAX 166.1376 SIDE ELEVATION • . • • 1•, ,• ' •, (2) 1/8' FILLET WELDS, 4' LONG AT EACH WINDOW • r'- OOT-18 -2000 WED 10:16 AM OBI HOSKINS • -••OCT 17 't 27: 24P ti MASCO, �Nr H Ir`,� 111$10 Ram or:w 1101 W. Gwent St SSA. a r�xl"516/34-o379 rNi 1i Tf� %eM �t UM M-rle4 MASON INDUSTkIES, Inc. hiontiltschows of IW elles Control Predicts FAX NO, 2063663076 F. 05 r) 5 ismommeramor CERTIFIED FOR 400 NAMe: • ...... Ct1.Crovem: C.M. HOSKINS CO, CU+iTOME,P : __ JOSNO.: MASON tat 183Z1 DWG. NO.: VUF- 3R3i1_ mommumm■ 0.16 TM'R 5XHt3•C90 Equipment overturning calculations based an seismic load applied et a twittcal angle. SEISMIC OVERTURNING CALCULATIONS As defined in the 1997 Uniform Building Code, Chepter16, Section 1832, the seismic Horizontal force, FPh, may be Calculated using the following formula: ap •lr ` t + 3 h l jy painsr , 0 t J Except that: Fph shall not be toes than F oMmim • O.7Catt Wp and need not be more than Where: Wp Equipment operating weight as • Component Amplification Factor, refer to UDC Table 18-0. Pip Component Response Modification Factor, refer to UBC Table 16.0. Cr • Seismic CoeMdent, refer to UPC Table 18-I, 16-0, and 18.8. Ir = Importance Factor, refer to UBC Table 18 -K. hx = Component Attachment Elevation with respect to grade. hr • Structure Roof Elevation with respect to grade. Convert from Design Strength to Allowable Stress Design: F,hto lA Vertical Uplift Force Pw(•I a 1l3•Font,l (in some cases Fortrt 0) 4 b2 b1---- •---- ••••••••- • ,_Ir0to ••••••••••••• 01, —IT Iw pr.I h ••.• 1.-•rM ••••••••••••••■•••• • •ti.-•••4,••••• -s.w. Consider load applied in any horizontal direction Transverse component a Foh w CoSfP aj..gplilt I°! A2ahOr Igcgl112, W -F FM CUrB +h*(b1_Fati*In B+h� 11 N.f_.. xri t1, 21) 1,, `` 2 '11. e t cam r p v I ,l t ti 110 W I� F, F �Coa6'+h b11 #rri Fph(maii 4CiIpWp. C.1f, HOSKINS CUMIf',tM 13033 Luke City Way NI! 2011466.) 00 Fax 36b 3076 131 • Maximum length between isolators b2 Maximum width between isolators h = Center of gravity height N • Number of Isolators with cross bracing n • Number of anchor locations Longitudinal component • Po, "ltinO g . + n+ 111.19>rh ,.•r. —.0 a Where 4, a. 2rN 2 bsi and 1 rr • *b a auace7. t 'RC lout """"1 -1 ,0117 ,e0 1 o�hoF�� 2000 PERMIroo p ..•. .4'4%. " Foh ooeB , Foot sin B • b2 b1---- •---- ••••••••- • ,_Ir0to ••••••••••••• 01, —IT Iw pr.I h ••.• 1.-•rM ••••••••••••••■•••• • •ti.-•••4,••••• -s.w. Consider load applied in any horizontal direction Transverse component a Foh w CoSfP aj..gplilt I°! A2ahOr Igcgl112, W -F FM CUrB +h*(b1_Fati*In B+h� 11 N.f_.. xri t1, 21) 1,, `` 2 '11. e t cam r p v I ,l t ti 110 W I� F, F �Coa6'+h b11 #rri Fph(maii 4CiIpWp. C.1f, HOSKINS CUMIf',tM 13033 Luke City Way NI! 2011466.) 00 Fax 36b 3076 131 • Maximum length between isolators b2 Maximum width between isolators h = Center of gravity height N • Number of Isolators with cross bracing n • Number of anchor locations Longitudinal component • Po, "ltinO g . + n+ 111.19>rh ,.•r. —.0 a Where 4, a. 2rN 2 bsi and 1 rr • *b a auace7. t 'RC lout """"1 -1 ,0117 ,e0 1 o�hoF�� 2000 PERMIroo p O0T -18 -2000 WED 10:16 AM CM HOSKINS OCT 17 ' 0fsi 07 :05PM MASS, RMAHUM MASON INDUSTRIES, Inc, MbrwhcfwMn of Walks *oft Pr.grcfs 3SO Sabre OIhN 2101 ILK Oruarl 1L Cut* b Meormg47111 A /�t�c &. U7w/ FAM bte /340 -0111 rAtl 7rNT1i u/ 7USI N -11N4 FAX NO, 2063663076 P, 06 P,6/0 cemiricb Toll roe NAMi- WEST ... cus7oMiR. HOBKINA CO. I4IC CUSTOM:I P.0 100 NO; MASON 0.0.; 371 --- CW . NO.: WF•49372 TAti: i s>�l�G Moodmurri shear eaLIocaUon, Toftmirrlize the values Bn0 a for Eaulp +a to Curb :, Disdieu Sa.od on maximum Pt and maximum shear Ps. Pt » Tension on Woatlon Pe • Shear on location n wow •' Numbar of anchor per Ioaat'on T • Tension per anchor w Pt/n,erav V v Shaw par anchor • PNn.wtw 1 V(allow) • (eN a x Sn211990 Table 01) - (aewWit 906 Table N1) a kM, ISven s 3.0 7 ..tx . 1,o redivw Na„ p-ia�uw Io M ' Tun0 r .� -� 1• I. • v 1 s Cutb to etnictura: SEISMIC OVERTURNING CALCULATIONS dU u 0 WW yield N sandals(' o Tan "t 0/41478A1U) Or 'y act 2 ou 4 1000 ;due l< WIELD CAPACITY Per —'' 0ej yrspi L• Lenpth of Weld (Inahos) To Tendon per Inch of W.Id a Pt& V•heer prr In of Wald • PaIL A,'loweblo Load en Weln • 21000 II 0.707 x Wild Alm Actual Lord • enrt(T0+. VI Factor of Sorry • A'lo*ehl• Loe1/041rel toad C,:I, tlCSK N% COMPAN1 13035 t.nhu CIE,1Vay NI, SOSitl4, WA 9412 1413 20641;5.1100 I:uM 364,5016 ONO. 1••• • 001 -18 -2000 WED 10:17 AN 01 HOSKINS 'ea _t37I51 MA$r"" .41NF11•€IM___ MASON INDVdTAIES, Inc. MttswMoturws W WAN* Gone* Products CIO Rehm No 2101 W, Croaint awls 0 1480oe11ce, NY 11718 Artaloirn, CA 11!,01 031/ 3464122 f14/93.2727 FAX 131 /341.0t11 FAX 714 / 833.573/ Ta . Calculation for* Etolp. to Curb 14120 2.50 1,90 0,36 1:00 1.00 1.00 ,35328 3709 21197 15141 0 302.25 132.75 55,00 10 182444 44056 0.69 0.61 14.11 -!b 3000 1514 19 50! 3 112 TskScat, 379 829 0.05 0.61 0P" Caa Jp. ttx+w Ppm mat/ it FO N" bi" t>z•� 1" 1'or Tai(theta) thata(rad)' thdls(41.1 ► Pt• Pu+ Pr Ts VI 1ta 'type of Author* Tjown V,u,.. ()seek Tearion++ Check shy Who* of Weld Wald 81w" *All pubic Load" Mud Loot, Pere of 3 ftty' tl• A* Unity Check.+ Curb to Stt 101&0 2.50 ,1.50 0.48 '1.00 1.00 1.00 $776 5436 31066 22190 + 0 332.25 132,75 7'9.00 10 182644 4036 0.69 0.61 34,11 •1353 4519 2219 ;3311 555 FAX NO, 2063663076 P. 08 P. 9/8 30B NAME: QWEST CUSTOMER: 110SKINS CO, _ B.O.. NUMBER: 16371. OAT! 1@17!3X3 !o1K -1 14 s ai1Q •C90 octttx H4u pme�tt to SLR SLR to Pier 14720 2.50 1.50 0,48 1.00 1,00 1.00 47104 4946 28262 20187 0 312,25 132.95 55.00 10 JM42644 4056 0.65 0.61 34,78 •565 ;1509 901 757 4 812 irk Sums/ 379 829 16110 2,50 1.50 0.48 1,00 1,00 1.00 51776 5436 31066 22190 0 382.25 132,73 55.00 10 112644 44056 0.69 0.61 34,71! .621 1857 2219 1440 555 4 S/8" Kwik Boll 1625 3125 C.11,1107.11INS 0.111',%rit 13035 Lithe Cilyy Way NR S'. iltlu, WA 08121.4123 206.365.1 100 I'nx 36649076 04qQP r ,,Kul ocr Z a �" X000 PIMU 21ran4 Sttr•113rllU1 11.11.T plug NW! Screws, ICAO *.port 47&•S202, Table 1 Mirhnwt) 12 tlaakt Thir.lmosa Shoat WW1 itttchawat Dillwtatcr, 7" lit+NbaINCnl, Kwlk Dolt 11, ICIO Sepik OR-1637/1999, 'Dbl. 3 Stow Ag rsJPtte, tc"3000 psi concrete, WlthoutUOC Inspection Nate: Anchorage calculations are based an Kwlk'DWI It Other anchor bolus are used than must be selected by others to meal tequlred tension and shear forces and installation requirements, •U8INQ 70ru lISC7'RODES !'AMC 9t1 mines) FOAM 447270 RdQW81,0_61,21 1M1I„ 44014 10/17/00 u No. 29527 r` 1NP. 3/31/03 tt�./: ,,o0' .r,,rGA , • OOT- 18-2000 WED 10114 AM CM HOSKINS a._•.,ii.00T 17 '00 MAP-4, IM ...._ ifi MASON INDUSTRIES, Inc, MMnifietwwi 11 Vardtfan Control products MO rtsbrn D M RS N. War SL, K Na a MY 1176e AAnaah CA4,1 5111/ y FAX si *r _FAX SSs Tom 96-0404 FAY. NO. 2063663076 CERTIFIEC FOR 400 NAME ST CUSTOMER C.M. HOSKINS CO,INC CUSTOMER P.O. .382 JOs N0. _...._......�,..,, MASON E.O. .16371 D. NO. WF. 35369 REQUIRED tit TAG SX1.1G -090 ,ter^'• P. 02 P. ?i3 MASON TYPE RSC - ROOFTOP SPRING ISOLATION CURB OSHPD APPROVAL NUMBER R -0207 DEFLECTION ISOLATION UNIT: OPERATING WEIGHT: CURET WEIGHT: TOTAL WEIGHT: YI7ANE SXHG•C90 14,720 lb*. 1,460 Ibs. ,18 Ibs. • 4 Typical Window Location Typical Anchcr.Location ~�YYMi.I Fph Fph cos t3 FPh S�� NMI 41 - --M- -- b 1 o11ry of TUKKWILA OCT 2 4 2000 PERMIT CENTER -■•■.•■• C.M, HOSKIN4 COMNANt 13033 I,uko City Way NE ltontdu, WA V8123..1428 206466.1 MO Fail 166.3076 Fp.,. - 09. Fpv ♦I .l,•__- fl l eme MfNVIU I.IIn11llolrmsw M..111■•■•••• 1110 W h OM NON A h1 = Maximum Larggt1h ailwaon Isolators o 382 1I4` b2 1 Maximum Wldttl. BetWeen Isolators n 132 3/4 h s Center of Gravity Haight =55 N = Number of Isolators With Croats Bracing is 10 n = Number of Weld Ioc.Uons = 20 } • P• . WELT '!,G INSPECTION I(raZan & Associates, Inc. REPOritNO.: 2877 Mzez — '17 GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE: 16 OCT r�� PROJECT#: 066 - (Y_,i3 4/ PROJECT: ': - )t r i TZ !U/a/U'j /0N /4r'U✓d Hf.7JT LOCATION; YRAZAN PROJECT MANAGER: CONTRACTOR: ALLZI1/4 PERMIT NO: INSPECTOR: �- /24/7'OS JURISDICTION: elf y or 71.1 ia 'ii 4A WEATHER: L7. 2A ,,J TEMP: STRUCTURAL STEEL FIEL(�/ SHOP WELDING 'hf V.7 ❑ MATERIAL ID ❑ U.T. ❑ M.7 ❑ P.T. items) inspected: ____\62,22210/0 C emir? /1(1uy AJ4- 7'U &n. uJ k't)UF 7OP A4i c 4)1 4„V.c4 /':1,,%1) M) ... , .. PL 0)6- 7.7 .... �. _� Location nikwitt T cor '� -.R_ (t'' Weldor qualification/certification verified for: .160.071: t1.1_W41 (.. Z.l - WIC A.....• Xe ,yd z_11.4 Or Position: FLAT , VERITCAL HORIZONTAL OVERHEAD lik Filler Motal: �....4 / , Cii Procou: AW FCAW GMAW SAW 0 Other: f ' Wald Typo: C.P. RP. PLUG ® Other: ������ (2S Weld BIzo 3/18" 1/4" 13/18" 3/8" IX Other: .......1l��.( c r (Z Codes: WSG• 1 AISC TITLE 21 TITLE 24 UBC ASME Ii NOTES EI DISCREPANCIES I % COMPLETE J /fit` o'�ts, /ti c ,Sil i �.?�/_B x;44 � W rx1 /,�'} AQ1 a ' '2..�__ uc�r .ac lEf4aI�f2a2r 1 ii11ati lf.�_ca �I 1/.I .I�G'.z, .,'_la�/y-i'� Iporb�"`•-, -�, r4 ,1 ►SW� � STRac n4 at/ . , CSC R7 44 ,427.1 O 1 L DR!L'E 7SLILIC /WC .1....._....._.. . aru h.)..G1__... To the best of my knowledge. the abo Superintendent/Representative: AS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. Technician: 215 West Dakota Avenue, Clovis, Ca 93612 4231 Foster Ave., Bakersfield, CA 93308 1025 Lone Paint Are. ##G, $ty; CA 95351 545 Parrott St., San Jose, CA 95112 123 Commerce Circle, Sacramento, CA 95815 • (559) 348-2200 • (661)633.2200 • (209') 572.00 • • (408) 271.2200 • (916) 564 -2200 226 N. Sherman, Ste. A, Corona, CA 9288 • (909) 549.1188 1501 15th Street NW, #106, Auburn, WA 98002 • (253) 939-2500 • , 383 Equestrian Cr., Poi:1strA .Yt- 98370 • (360) 598.2'26 • • • • • 13434 N. E. 177th Place, Woodinville, WA 98072 • (425) 485.5519 ••.,. • ;•. OCT- 24-2000 TUE 08 :20 AM FAX 140. 425 778 5538 P1,02 A/(Wa7— 0/7 "06_, ENGINEERING Memo Ton Ryan Johnson From Greg Gul len CCs Oates October 23, 2000 Re: Owes! Building Mechanical Bracing In Transformer & UPS Room I have reviewed the mechanical duct bracing at the battery room and the electrical equipment room. The bracing In the electrical equipment room appeared to be adequate in my opinion. After review of the UPS battery room mechanical duct bracing, I Instructed the mechanical oontractor to brace the south duct lateral at grid 7.6 —F to the existing concrete ohort wall directly to the east. At this same location at the north lateral I asked the contractor to braoe this lateral to the vertical duct that Is attached to the wall on grid E 111 Mein 8trs+rt, Bull 100 Edmonds, WA 99020 (425) 7788500 Cage OS i IS t ltoa� c G ENGINEERING facsimile transmittal m2,40A9-017 :CG Engineering PLLC :111 Main Street, Suite 106 : Edmonds, WA 98020 : Telephone: 425 / 9754500 Facsimile: 425 1778-5536 JUL 282000 Q V MMUNlry �� c: © 6. C.0 46a-) ram .0 ire 431 `— Of: Gay o� ru,Cwlc,4? To �13.EA ...._.._. To: 0 Fax; Fax: Of �.�,,: �R (a CaU►�t1.E..i oats: 7/zeloo + ■ roil ne Pages: (Including Cover) 5 An Requested 0 For Review O Plane Comment 0 Please Ropy 0 Urgent Nol s: 90/10 'd 9E99 8LL 9Zt 'ON Xdd Wd 0E0 NJ 0002-8Z-1nr ' C � 0 ENGINEERING ' 111 Maln Strout, Suite 106 Edmonds, WA 98020 Phone: 425,718.8500 Fax: 425.778.5536 design Clarification Memo Qwest Project hkwnlla Cyber Center Project Nal818t13 DCM No 6 1b: Dave Larson, City of Tukwila Inspector From Greg A. Gulden CC: Marlene Kingman, KDC Jim Craft, Kajima Data July 28, 2000 Dave, as requested per our telcon on 7/24/00, I have Included the stamped detail on the selsmlo support of the 8d' diameter round HVAC duct, Wo used this detail in the field to show the installation personnel what was required for bracing. After your call last week i reviewed the installation in the field of the VAV boxes, Tho seismic calculations enclosed show the level of forces required for seismic bracing, The mechanical contractor has supplied me with computer images of the 1" x 16 gauge strapping connection to the top chord of the steel roof Joists used to brace the VAV boxes at the unsupported ends from the main duct, According to my calculations, this connection is adequate to transfer eoismic forces to the roof structure. In summary, no more than (7) VAV boxes should be supported by the dual 16 gauge bracing system discussed above. The single braces at the end of the seven VAV boxes should be angled to the roof structure opposing each other (1.e, one brace at each and of the seven connected VAV boxes). The Tine of seven VAV boxes should be attached with the 2" x 2 " 16 gauge angle at the top of the VAV boxes tying the assembly together. If you have any questions, please call. 90/20 'd 9£99 8LL 9at 'ON Xdd Wd 6z;£0 INd 000x- 8Z -1nr CA&C coN ,Jccrm to 4 of TRuSs PANEL P 14-;, 'r40 CA .' ,' outioNa AV V or Oar fit. n" cAocir, •••■••••••■••■••~11~1~~~111 VIIMINV 1~1MP.MINH I 7,1? &old, Mst CN+P" c/A t.0 if' di p1144, tdP'6147 s�r�celeex • �70otlb Dkr wat,K VAY tr 2s# KAI' M4 4IP4C+ f$4■b, mu. e,itcvst•e+cwct Mona' LR?VTh , SUPPoel To 60" QvaT •tr wage/ .3o/ Org• DuGT guAll ,r a vos, Mrp AT 577114, AO oP M.C. Q0/O$. IIM _ ENGINEERING 111 Main Swot, Suite 106 r.,,..90 /EO ”r'd �nn., n 9E99 811 9ZV 'ON VA SCALE 1 Abs I° h177824' B C/,IC 9„ Dv?' ex-11 Wd 6Z:8O Rid oOOZ- eZ -1nr Gflr c. !L `�•: i� Al t4. rooxt.e. ,r► (') vA v tpc,05ts As r2-6tlicooep or►• 17 Jukdy 1000 VAV btsx (ao Fi tcq l4 r Above. p ocL- r Ilo 11'4 fri ilk ' oP RAF- �� {�� 7°II C• AYsl Nl h)60. 7a P•64, r ex /clo -, * lNr: GLr5. 1, o Ca. 1 o, tC_ J r= j, o fi.,, x 5, b Fr it C,d)o. X.l.°1 ( #. Wp t.` p P, 1.4 G)re.4C.* foo.46 C 6:51( boo) 2•o e. op- 4,*• T74-4*0 44,41 1.0 /5' M 1' `t CA4Ar.roe- CG Engineering 111 Main Street, Suite 106, Edmonds, WA 98020 CQcsdv shcct.xls SO /170 'd 9E99 ell 9317 '0N Xdd Shcct Wd 0E0 INd o002- 8e -1nr cNE.,• lG �ti�a, x /1/ t d, 6596 45.1 of &Scre,pc1"s 744,141. 50,446111 r 07 e 04005 (413 1' /945 s AP 40146 4. / 4, -J/•) faro 9144 moo' 77f ✓/l d rawdezliej. Corjn1dc.71NJca °MeM 7004-07,44,, S0/..b tic, ,*7111% AlLa A7 /2 7 ,4,_ cr,6r 7D' ci 1deD , /4r d, v GF 4 n7,4$ l,yl Nin oie 7 091/ 60) S CG Enemegring Main Street, Suite 106, Edmonds, WA 98020 9699 811 SD 'ON Xdd Wd O6 , 6O I zd 000z- 8z -1nr Mechanical Summa n • 91 _ : .: •:I . r:r. ..: .I . twitio I : • u MECH -SUM 1997 Washington Stale Nonresidential Energy Code Compliance Forms First Edition . June, 1998 Project Info Project Address Nest Communications Date 1/19/00 Caption? tu/h 6101 south 180th St For Building Dept. Use SEER or EER Tukwila, WA 98188 Applicant Name: David ttehren Applicant Address: 7717 detroit Ave. SW, Seattle, WA 98106 Applicant Phone: 206- 763 -9400 Project Description Electric rooftop packaged cooling only units with vav air distribution Briefly describe mechanical system system. type and features. Compliance Option 0 Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications, Use separate MECH•SUM for simple & complex systems,) Equipment Schedules The following information Is required to be Incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill In the required Information below. Cooling Equipment Schedule ID Brand Brand Name' Model No.' Caption? tu/h Total CFM OSA CFM or Econo? SEER or EER 'POP Location sTU "l" IS Trans axttoc9o4 1080000 45000 2000 9.60 11.50 mot sTU -11 Trans TCD330A4 324000 0300 4800 9.90 11.20 soot 12000 0.75 5.00 UPS Room 1Y -4 Oreonheok 09- 260 -20 6500 Venting Equipment Schedule equip. ID Brand Name' Model No.' Cepacit Dturti Total CFM c m or Econo? Input With Output Btuh Effciency', Oreenheak O8-130 -4 1130 0.50 0.25 Support Area iY -2 Oreenheak O8- 200.20 4500 0.75 2.00 Zlootrlanl Room SY -3 Oreenheak 00- 360.80 12000 0.75 5.00 UPS Room 1Y -4 Oreonheok 09- 260 -20 Fan Equipment Schedule quip, ID Brand Name' Model No.' CFM Sp' HP /BHP Flow Controls Location of Service iY -1 Oreenheak O8-130 -4 1130 0.50 0.25 Support Area iY -2 Oreenheak O8- 200.20 4500 0.75 2.00 Zlootrlanl Room SY -3 Oreenheak 00- 360.80 12000 0.75 5.00 UPS Room 1Y -4 Oreonheok 09- 260 -20 6500 0.75 2.00 Battery Room 'If available, applicable. a As tested according to Table 14.1, 14.2 or 14.3. 3 If required. ' COP. HSPF, Combustion Efficiency, or AFUE, as M 20t7i017 RECEIVED CI1Y OF TUKWILA JAN 2 0 2000 PERMIT CENTER 1997 Wa tnntnn States Nnnrasidanlial_Enarav Cnda_Cnmr.•I+rctnce Fnrm Mechanical - Compl• Systems Checklist MECH -COMP 1997 Washington State Nonresidential Energy Code Compliance Forms First Edition • June, 1998 Project Address (Nest Communications Date 1 /1g /00 The following additional information Is necessary to check a mechanical permit application for a complex mechanical system for compliance with the mechanical requirements In the Washington State Nonresidential Energy Code. Use the checklist as a reference for notes added to the mechanical drawings (see the MECH- CHK checklist for additional system requirements). This Information must be on the plans since this is the official record of the permit. Having this information in separate specifications alone Is NOT an acceptable alternative, For Building Department Use Applicability (yes, no, n.a.) Code Section Component information Required Location on Plans Building Department Notes ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY ' a' 1431.1 Field assem. sys. Provide calculations 1432 Controls n.a, 1432.1 Setback & shut -off Indicate separate systems or show Isolation devices on •tans Mall • , reset control n.a. Indicate automatic resat n.a. 1432,2,2 H dronlc s stems Indicate automatic reset n.a. 1433 Economizers Indicate economizer on equipment schedule or provide calculations to ustl exem • lion n.a. 80 • orate air s s, Indicate se • orate s stems on • Ions n.a. 1438 Slmut, htg, & clg, Indicate that simultaneous heating and cooling Is prohibited, unless use of exception Is ustifled Other tni. 1430 Heat recovery Indicate heat recovery on plans; complete and attach heat recoverylculallons MECH•MOT or Equl , Schedule with h , r • m, (Aden �^ n.a. 1437 Elec, motor auto. n.a. 1438 Variable n _sye,, Indicate variable flow on fan and • urn • schedules nn an rn a nr anti niia■finnnn. nrnv . a awn ant nn! Decision Flowchart 1 sot s owc o o • o arm no tow 1 o rep roments o to " omp ox = ys omll o pt on app y to tho project, Refer to the Indicated Cvde sections for more complete Information on the requirements, / ,\ ' Sulks, 1431.3 / opsot orllw I,ol Wsterbv ► ply Y� Htuws sstttnt Impostor, Rem \ thntnTbsn Controls Roquutd \ 600,0W Utuu,/ No littllun 1431,1 prW• Yts C+Isuluant or Alie blod i Obi TOO Anwvt purls \.1'qupn1ntl, Inpus k Wtpol \ . Rrgvutd AN \ bl,Win \ YK: M M£ I tp uNpM / Zants / btiUtu 14) LEI Supply Air Rost; Controls Rrquurd (continued on back) RECO/0, , CITY OF 11,A JAN 2 0 2000 PERMIT CENTER b' • Electric Motors . • • •r . : f, .r :: .: r . •: e• •.: • rr • • II MECH -MOT 1997 Washington Stale Nonresidential Energy Code Compliance Forms First Edition • June, 1998 Project Address Overt Communications Date 1/19/00 Complete the following for all design A & B squirrel -cage, T -frame Induction permanently wired polyphase motors from 1 hp to 200 hp having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the exceptions below applies). Motor No, or Location HP Type (open /closed) Boiler Room Boiler Room <1 hp <1 hp closed closed Boi1e.� -r. _ ...�... Room Boiler Room <1 hp <1 hp closed closed Er -1 <1 hp lr 2 sr -E 5 1_ sr -s 2 For Building Department Use Description of Application or Use Synch. Speed Boiler Burner Slower Min.Nom. Full load Efficiency -ommwoommerawr ttxhault ran Serving support Area ixhaust ran nerving 1elsotrical equipment Room Exhaust ran nerving Battery Room Exhaust ran Serving UPS Room Minimum Nominal Full -Load Efficlenc p 1,0 1.6 2,0 5.0 7,6 15 20 26 30 ..� 3._ 0 0 e otors lose, Mors 3,600 1,800 1,200 3,000 1.800 1,200 E tblen % scion 'e • 82,6 80,0 75.5 82,6 r,0 82,5 84.0 84.0 82.6 84,0 86.6 84.0 64,0 85.5 84.0 84.0 05 84,0 88,5 88,5 86.6 8 ,6 85,5 87.5 87,5 87,5 87.6 87.5 88.5 88.6 88.5 89,6 89,6 88.5 89.5 90.2 89.5 89.5 89. 89.5 91.0 90.2 90.2 91.0 90.2 90.2 91.0 91.0 90.2 91.0 90.2 91.0 91.7 91.7 9.0 92.4 91.7 91.0 92.4 92.4 01.0 92.4 91.7 91.7 93.0 93,0 91.7 93.0 03.0 92.4 93.0 93.0 92.4 93.0 03.0 93.0 93.6 93.6 93.0 93.6 93.6 93.0 94.1 93.6 93.0 94.1 93.6 93.0 94.1 94.1 93.6 94.5 94.1 93.6 94.5 94.1 94.5 94.5 94.1 93.6 95.0 94.5 94.5 95.0 95.0 94.5 95.0 94.5 95.0 95.0 95.0 50 60 75 1 00 1 25 1 50 200 Exceptions: 1. Motors In systems designed to use more than ono speed of a multl•speed motor. 2. Motors already Included In the efficiency requirements for HVAC equipment (Tablas 14.1 or 14.2). 3, Motors that are an integral part (I,o, not easily removed and replaced of specialized process equipment (i.e. equipment which requires a special motor, such es an explosion. proof motor), 4. Motors integral to a listed piece of equipment for which no qualifying motor has been approved (i.e. if the only U,L, listing for the equipment Is with a Iess•efficient motor and there is no energ•efficient motor option). For motors claiming an exception, Ilse motor and note which exception applies. at:CEiVEQ CITY OF TUKWII A JAN 2 0 z000 ig I 1997 VtIcahinoton State Nonresidential Smarm Code Comolsece Form Mechanical Permit Nonresidential PIls Checklist MECH -CHK 1997 Washington State Energy Code Compliance Forms First Edition -June. 1998 Project Address (west Communications 1Date 1 /19 /b0 The following information Is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Itnformation Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401.1424) 1411 Equipment performance yus 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule M.01 yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M.01 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans M2.01/. 03 yes 1412.2 Deadband control Indicate 3 degree deedbend minimum yea 1412.3 Humidity control Indicate humidistat P2.01/. 03 no 1412.4 1412.4.1 Automatic setback Dampers Indicate thermostat with night setback and 7 diff, day types Indicate damper location and automatic controls 142.01 / , 06 yes �` �` • • 1412.5 Heat pump control Indtcato microprocessor on thermostat schedule .1. 1412.0 Combustion htg, Indicate modulating or staged control yes 1412.7 Balancing Indicate balancing features on plans H2.01/, 03 yes 1422 Thermostat Inlorlo�ckk 'Equipment Indicato thermostat interlock on plans schedule i N. of no 1423 Economizers 1413 Atr economizers a 1413.1 Operation Indicate 100% mobility on schedule �~ ~11, 1413.2 ontrol 1Integrated Ind ate controls abto to evaluate outside air .1. 1413 <3 oporalton ' uct n t s stems Indicate capabil ty for port al cooling 1414 yea 1414,1 'UM se® ng • Ind coto soot no nocossory yes 1414.2 ' uct Insutat on 7.11 Trirarl rite 1f1f11...r • r . a . 1415,1 P p ng nsulat .n (i ' PITT . • i1fi• . 1717117iTTir . I. g yea 1424 = operate o r sys. Ind cote separate systems on plans 443.01 , 03 yes ech, = um, orm omptaled and attached. Equipment schedule with types, Input/output, efficienc , elm, h., economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440.1454) 1 40 = ory co water ht t . toe, water heater ([Tit i'•,11 . f.rrMFtltFlnllIllIllIlIlMIIIUIIII "i wt.o contro a n • cage automat c s ut•o' 1 .0 °ate' r oo d 1452 (reserve ) 1453 Pool heater contro a Ind cote ow lc end 55 degree contro 1454 Pop covers Ind cafe vapor retardant cover 1454 Pools 90* ' woes In. sate R. 2 poo cover no a rc e. or any MISS on. nrov 4 e elm ana on! CITY pF TUKWII.a JAN 2 0 2000 PERMIT CENTER lg . • 1 • 41 • .1 Envelope Summary 1997 Washington State nonresidential Energy Code Compliance Forms \ • 1 _ : . 1 _ 1 ] 1 • . S . 1 pug Climate Zon. 1 - • 11 ENV -SUM First Edition. June 1998 Project Info Project Address ()west Communications Date 1/19/00 6101 South 180th St For Building Department Use Tukwila, WA 98188 Applicant Name: q - ri11 out this line on );NV -SUM1 Applicant Address: s - rill out this line on ENV-SUM1 Applicant Phone: 6 - ri11 out this lino on PIV -sUM1 Project Description 0 New Building 0 Addition (d Alteration C:1 Change of Use Compliance Option 0 Prescriptive 0 Component Performance (See Decision Flowchart (over) for qualifications) [) ENVSTD 0 Systems Analysis Space Heat Type 0 Electric resistance All other (see over for definitions) Glazing Area Calculation Nota: Below grade) waits may be included In the Dross Exterior Wall Area f they are Insulated to file lovel required for opaque walla. Total Glazing Area Electronic version: these values are automatically taken from ENV•UA•1. (rough opening) Gross t:xteriar vertical & overhd divided by Wall Area times 100 equals % Glazing s X 100 . Concrete/Masonry Option 0 yes Check hsre N using this option and if project meats all requirements for the Concteto/Masonry Option, si no Soo Decision Flowchart (*vat) for qualifications. Enlar raqufremants for each qualifying assembly below. Envelope Requirements (entor values as applicable) Fully heated/cooled space Minimum Insulation R.voluos Roofs vor Attlo na All Other Roofs 21, 0 Opaquo Walls 11.0 Below Grado Walls na Floors Ovor Unconditioned 8paco na 8tabe•on•Orado 10.0 Radiant Floors na Maximum U•(actors Opaque Doors 0.600 Vertical Glazing 0.000 Overhead Giazing ns Maximum SHOO (or SC) Vertical /Overhead Glazing 1.000 'Refer to Section 1310 for qualifications and requirements Notes: OS Opaque Concrete /Masonry Wall Roquiremonts Insulation on Intorlor • maximum U•factor Is 0,19 Insulation on oxttrrlor or Integral • maximum U•factor Is 0.25 If protect quoliflos for Concroto /Masonry Option, list walls with HC 9.0 UtulftioF below (othor walls must moot Opaque Wall roquiremonts), Uso descrIptlone and values from Toblo 20•Sb In the Coda, Wall Description (Including insulation R•valuo dr position) U•factor M 2000'OI'7 'V* • RECEIVED CITY OF TUKWILA JAN 2 0 2000 PERMIT CENTER • fl• r:l Envelope Summer ack) 1 ..: ,• •• • ^r - • 11 Climate Zone ENV -SUM 1997 Washington Stale Nonresidential Energy Code Compliance Forms First Edition, June 1998 Decision Flowchart for Prescriptive Option Use this flowchart to determine if project qualifies for the optional Prescriptive Option. If not, either the Component Performance or Systems Analysis Options must be used. 1102 Space Heat Type: For the purpose of determining building envelope requirements, the following two categories comprise all space heating types: Other: All other space heating systems including gas, solid fuel, oil, and propane space heating systems and those systems listed in the exception to electric resistance, (Continued at right) All 'rY %Ws R.11 Oitala 0<?) ItntlrfiaYti' no 0104 All Yetleuarl IrsttiladP Brim ad Ms ad) R.10 Cowie AN($ R.11 tddavQnde veils (cet) R.11 Rivet aver dtia R30 Ail Ohs Ws R.21 F410 ROO toms F410 Cone Boas 0000 °oliiro ©itaia M9i9 Own Vet 01 Aron % U U 9-CC 0110% 000 1.46 110 10.204 Q76 1,40 1,03 20.3316 090 1.00 o. 304016 000 1,26 0.46 p' 6 441936''N), no ate' i Yei Ail Instkidot hided? IootilAitanyw*s (Moeany v U0.26 t3a18Wgi veils (alh) Iid10 l Fbotlt out Arius MO IAlt dtnr rah R21 Roos as treat sp R10 3Atwa gain 11.10 'Ricky! loos R10 !Cpagkadoos 0000 Oteirg Qiiteia Kt? Ik % U U 00.1o% 000 1,46 1,00 1010% Q78 t40 1,00 162076 096 1,00 010 ' 2025% 000 1,00 0.96 no ; yea 1 } �'! N Maid ast Mettle Ptsistate „,> 1-130 7 Yea Electric Resistance: Space heating systems which use electric resistance elements as the primary heating system including baseboard, radiant. and forced air units where the total electric resistance heat capacity exceeds 1.0 Wirt° of the gross conditioned floor area. Exception: Heat pumps and terminal electric resistance healing In variable air volume distribution systems. gamy - d{1kn Merle ISO \ tb4FwM .Y. y� Y Maarry s 1 ) U0.10 Wooly cw ve Ii (Ad) RI 0 Oda getto vas (WV R.19 Fbc>r arvw alas R95 A l dhor tab R30 Roos war triad RO0 esiso eds R10 Ftdal Son RI10 Crap cbos U000 Gezira Weis Mot? Geary Va1. 01 Arm 0 U a-Cc 0020'!6 040 Q00 100 Vas no Cixrp:narl Pufannence leptons Ardyils f al vWis R.19 m IriUtieCte% 6tts f1f3' V' YOS 1tptgaVltlls R.19 Odor vairreNn ((d) RI10 Odav0nds veils (dh) R1O • Mott aver Ptics F436 All Ply' Ws ROO Roars war urat R.'10 Stebsoly ids R.10 Ruder! toms R.10 Ants dgas U000 ' Oadrg Opals Mot? Oatkv Vet, CH Area% U 0 6H3C OM% 0.40 090 1,00 vos Concrete asonr 0 • bons' Assembly Description Wall Heat Capacity (HC) Assy.Tag MC" Area (at) 111====. MC x Area -ro CITY known r JAN' 2 0 2000 Pt1RMIT MITER • t e area weighted heat capacity (HC) of the total above grade wall is a minimum of 9.0, the Concrete Masonry Option may be used. "For framed walls, assume HC =1.0 unless calculations are provided; for all other walls, use Section 2009. TRACE® load 700 version 3.0 Oct Name: Qweet Office Support Area Dataset Name: C, 1CD81 LOAD321PROJECTS 1QweetOffice2.Ide Location: Seattle Building Owner: Owes! Program User: Roe Company: MM Comments: Load Caic'e 0112/27/99 Location: Latitude: Longitude: Time Zone: Elevation: Barometric Pressure: Air Density: Air Specific Heat: Density - Specific Heat Product: Latent Heat Factor: Enthalpy Factor; Project Name: Qwest - Office Support Area Dataset Name: C: 1CDSU „OAD321PROJr:CTSlQwestOffice2 ,Ids Seattle, Washington 47,0 deg 122.0 deg 8 386 ft 29.5 in Hg 0.0749 lb/cu ft 0.2444 Btu /lb' °F 1,0988 Btu /h.cfm. °F 4,836.9 Btu.min /h,cu ft 4.49133 Ib,min /hrcu ft Design Simulation Period: Cooling Load Methodology: Heating Load Methodology: By MacDonald•Miiier June through TETD -TA1 UATD Summer Design Dry Bulb: Summer Design Wet Bulb: Winter Design Dry Bulb: Summer Clearness Number: Winter Clearness Number; Summer Ground Reflectance: Winter Ground Reflectance: November 82 'F 88 'F 24 'F 0.95 0.95 0.20 0.20 O O O srf;EIVi;.; JAN 2 u 'On PERMIT CENTER TRACE® Load 700 v3.0 calculated at 03:09 PM on 01/17/2000 System Checksums By MacDonald - Miller System RTU -11 COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Air: OADB/WS/HR: Space Sens. + Lat. Btu/h Envelope Loads Skylite SoIr 0 Skylite Cond 0 Roof Cond 0 Glass Solar 5,767 Glass Cond 998 Wail Cond 214 Partition 0 Exposed Floor 0 Infiltration 7,524 Sub Total Imo 14,603 Internal Loads Lights 36,197 People 42,339 Misc 82,683 Sub Total *_!' 160,219 Ceiling Load .353 Outside Air 0 Sup. Fan Heat Rot. Fan Hut Duct Heat Pkup owuNDR Sizing 0 exhaust Heat Terminal Bypass Grand Total in* 174,389 7/14 81 /88/74 Plenum Plenu Net Sensible Latent Total Btu /h Btu/h Btu /h 0 0 5,548 0 0 188 6,737 0 0 0 353 0 0 •6,920 640 0 .190 0 0 8,548 6,787 998 403 0 0 7,624 20,240 35,197 42,339 0 82,883 0 160,219 0 0 58,631 14,946 0 0 0 0 840 0 0 0 252,685 Percent Of Total (1)' 0.00 0.00, 230 2.28 0,39 0,18 0,00 0,00 2,08 8,01 13.93 18.78 32.72 63.41 0,00 22.41 5,91` 0.00 0.00 ; 0.00 0,26 0.00 100.00 CLO SPACE PEAK Mo /Hr; 7 / 15 OADB: 82 HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Space Percent Space Peak Sensible Of Total , Space Sons Blum (1) ; Btum 0 0.00 0 0 0.00 0 0 0,00 0 6,393 3,65 0 1,086 0.71 .7,371 390 0,28 .8,272 0 0:00 0 0 0:00 0 2,788 1.83 . 17,610 9,864 8,38 - 31,152 35,197 23,18 ' 0 24,289 15.08: 23,445 82,683 54,46 0 142,149 93,61 23,445 49 0,03: .3,323 0 0,00 0 0.00 0.00 0.00 0 0,00 .48,671 0,00 0,00 161,852 100.00 COOLING COIL SELECTION Total Capacity Sens Cap, Coil Atr1I Enter DB/WB /HR ton MBh MBh cfm 'F 'F grlib Main Cig 23.2 278,0 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 23.2 278,0 211.5 0.0 0.0 0,305 0 0 77.7 62.7 62.7 0.0 0,0 0.0 0.0 0.0 0.0 Leave DB/W8 /HR 'F °F gr /Ib 60.0 40.8 43,0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest • Office Support Area Dataset Name: C: tCDSWLWAD321PRO JECTSIQwestOffice2.1ds •50,702 Coll Peak Tot Sans Stu/h 0 0 - 12,614 0 •7,371 •10,967 0 - 17,610 . 48,361 0 23,445 0 23,445 0 0 0 0 .48,671 694 0 Percent Of Total ( %) 0.00 0,00 17,17 0.00 10,11 15.05 0.00 0,00 24.02 88,34 0,00 .32,16 0.00 .32,16 0,00 0.00 0.00 0.00 0.00 66.77 .0.95 0.00 .72,893 100.00 Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft' (%1 6,816 0 0 4,497 0 0 1,984 172 9 Series Fan - Powered VAV TEMPERATURES CIg Htg SADB 53.2 75.8 Plenum 74.8 66.3 Retum 74,8 68.3 Ret/OA 77,7 24.0 Fn MtrTD 0.2 0.0 Fn BIdTD 0,5 0.0' Fn Friot 1.5 0.Q Vent Intl' Supply Mlnclm Return Exhaust Rm Exh AuxII AIRFLOWS Cooling 2,726 382 8,327 0 8,889 3,088 0 0 Heating 0 382 8,030 0 382 382 0 0 ENGINEERING CKS Cooling Heating 43,1 0.0 1,09 1.10' 273,16 251.00 • 47,79 •34,95 97 % OA cfmlft' olmlton ft' /ton 8tu/hr.ft' No. People HEATING COIL SELECTION Capacity CoII AIM Ent Lvg M6h cfm 'F 'F Main Htg -80.2 6,939 65.3 75.8 0.0 0 0.0 0.0 -77,9 2,720 24.0 50,0 0.0 0 0.0 0,0 •45.2 3,088 12,1 33.3 0.0 0 0.0 0.0 •203.3 RECEIVED Aux Hig Preheat Reheat Humldif Opt Vent Total LA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:09 FBEMIQ1r 7iQR0 Zone Checksums By MacDonald- Miller Support -Conf N 1 COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADB/WB /HR: Envelope Loads Skylite 8olr Skyiite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total a•) Internal Loads Lights People Mlsc Sub Total ■ ■s Ceiling Load Outside Air Sup. Fan Heat Rel. Fan Hut Duct Heat Pkup OVIUNOR Siting Exhaust Heat Terminal Bypass Grand Total ass Space Sens. + LM. Btu /h Plenum Sensible Btu/h 0 0 0 0 0 888 0 0 0 0 0 0 0 0 673 673 888 3,686 7,200 6,620 18,416 •33 0 0 17,066 0 0 0 33 0 0 433 83 0 149 Plenum Latont Blum 7/14 81/68/74 Net Percent Total Of Total Btu /h ( %) 0 0 888 0 0 0 0 0 873 1,339 3,688 7,200 0 6,629 0 16,416 0 0 7,470 1,386 0 0 0 0 83 0 0 0 28,682 0,00 0.00 2.80 0.00 0.00 0.00 0.00 0.00 2.62 6.02 13.81 28.98 20.72 61.62 0.00 28.03 6,12 0.00 0.00 0.00 0,31 0.00 100.00 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 81 HEATING COIL PEAK Mo /Hr: 13 / OADB: 24 Space Percent Space Peak Sensible 01 Total Space Sens Btu /h ( %) Bluth 0 0.00 0 0,00 0 0,00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 226 1,88 220 1,66 0 0 0 0 0 •1,666 •1,688 3,688 26.80 0 4,410 31.82 4,410 6,629 39,90 f 0 13,626 08.31 4,410 6 0.03 ' •306 0 0.00; 0 0,00 0.00 0.00 0 0.00 •8,979 0.00 0.00 13,859 100.00 •4,441 Coll Polk Tot Sons Btu/h 0 0 •1,603 0 0 0 0 •1,668 •3,089 0 4,410 0 4,410 0 0 0 0 0 •8,070 62 0 •6,577 Percent Of Total (%) 0.00 0.00 26,95 0.00 0.00 0.00 0.00 0,00 28.00 66.04 0,00 • 79.08 0.00 • 79.08 0.00 0.00 0,00 0.00 0.00 125.16 .1,11 0.00 100.00 TEMPERATURES Clg Htg SADB 53.2 75.0 Plenum 74.8 68.3 Return 74,8 68.3 Ret/OA 79,0 24.0 Fn MtrTD 0.2 0,0 Fn BIdTD 0.6 0.0 Fn Frict 1.8 0.0 Vont Intl, Supply Mlnclm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 380 0 32 32 877 677 0 0 810 392 0 0 32 32 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Bens Cap. Coil AIM Enter DBIWBIHR ton MBh MBh cfm 'F 'F grub 2.5 0,0 0.0 29,4 0.0 0,0 2.5 29.4 20.4 0,0 0.0 576 0 79,0 64.0 66.6 0.0 0.0 0,0 0.0 0,0 0,0 Leave DBIWBIHR 'F 'F or/lb 50,0 45,6 39.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest - Office Support Area Dataset Name: C:% CDSU .OAD321PROJECTS1QwestOfce2.Ids Floor Part ExFIr Roof Wall AREAS Gross Total Glass h' ( %) 540 0 0 540 0 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 82.3 0.0 cfm/ft • 1,07 1.07 cfm/ton 236.09 tt' /ton 220.70 Btulhrf' 54.35 •39,86 No. People 18 HEATING COIL SELECTION Capacity Coil AIrfI Ent Lvg MBh cfm 'F 'F •6,1 577 65.4 75,0 0.0 0 0.0 0.0 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total .10,3 0.0 .5.1 0.0 .21.5 360 24.0 60,0 0 0.0 0.0 392 12.1 31.1 0 0.0 RECEIVED CITY Of TUX • . LA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03 :16 PKRIAMM1140 Zone Checksums By MacDonald - Miller Support-Cunt N 2 COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Alr. OADB/WB /HR: Envelope Loads Skytito Solt Skylito Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■■ , Internal Loads Lights People Misc Sub Total nib> Coiling Load Outside Air Sup, Fan Heat Rot. Fan Heat Duct Heat Pkup OVIUNDR Sizing Exhaust Heat Terminal Oypass Grand Total we* Space Plenum Plenum Sens. + Lat. Sensible Latent Btu /h Btu /h Bluth 0 0 0 0 0 294 0 0 0 0 0 0 0 297 297 294 1,825 0 3,173 2,437 0 7,235 0 .14 14 0 0 0 7,517 0 •270 3� 66 7/14 81 /80 / 74 Not Total Btu /h 0 0 294 0 0 0 0 207 590 1,625 3,173 0 2,437 0 7,235 0 0 3,207 802 0 0 0 0 38 0 0 0 11,760 Percent Of Total ( %)` 0.00 0.00 < 2,50 0.00 0,00 0.00 0.00 0,00 2,62 5.02 13,81 28.98 ; 20.72 81,52 0.00 28.03 , 6,12 ; 0,00 0,00 ; 0.00 0.31 0,00 100.00 CLO SPACE PEAK Mo /Hr: 7 118 OADB; 81 HEATING COIL PEAK Mo/Hr; 13 / 1 OADB: 24 Space Percent Space Peak Coll Peak Percent Sensible Of Total , Space Sons Tot Sons Of Total Bluth ( %) ; Btu /h Btu /h (%) 0 0.00 • 0 0 0,00 0 0.00. o 0 0.00 0 0.00 0 482 28,95 0 0.00. 0 0 0,00 0 0,00 ' 0 0 0.00 0 0.00 ' 0 0 0,00 0 0.00 0 0 0,00 0 0,00 0 0 0,00 101 1,66 , •890 4800 28.00 101 1.86 .890 •1, 353 56.04 1,825 26.60 0 0 0.00 1,944 31.82 : 1,044 1,944 .79.08 2,437 39.90 , 0 0 0.00 8,006 08,31 . 1,944 1,944 •70.08 2 0.03 -135 0 0.00 0 0,00 . 0 0 0.00 0.00; 0 0.00 0.00 . 0 0,00 0,00 ; 0 0,00 0 0.00 ' .3,078 -3,078 125.16 0.00 : 27 •1.11 0,00: 0 0,00 6,108 100.00 .1,957 .2,458 100.00 TEMPERATURES CIg Htg SADO 53,2 75.0 Plenum 74.8 88.3 Roturn 74.8 88.3 Ret/OA 79,0 24.0 Fn MtrTD 0,2 0,0 Fn BIdTD 0,8 0,0 Fn Frict 1,8 0,0 Vont Infil Supply Minim Roturn Exhaust Rm Exh AuxII AIRFLOWS Cooling 169 14 254 0 269 173 0 0 Heating 0 14 284 0 14 14 0 0 ENGINEERING CKS Cooling Heating 82.3 0,0 1.07 1.07 236,00 220.79 54.35 49.86 8 % OA cfm/ft' cfm /ton It'/ton Btu /hril' Nu. People Main CIg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sons Cap. Coil AIrfI Enter DB/WB /HR ton MBh MBh cfm 'F 'F gr /lb 1.1 12,9 0,0 0,0 0,0 0.0 1.1 12.9 9.0 0.0 0,0 254 0 0 79.0 64,0 66.6 0,0 0.0 0,0 0,0 0.0 0.0 Leave DB/WB /HR •F °F gr /lb Floor 50.0 45.6 39,0 Part 0.0 0.0 0.0 ExFIr 0.0 0.0 0,0 Roof Wall Project Name: Owes( - Office Support Area Dataset Name:C:1 COS1LOA032 1PRO.IECTSiQwestOffice2.1ds AREAS Gross Total Glass ft' ( %) 236 0 0 238 0 0 0 0 0 HEATING COIL SELECTION Capacity Coll AIrfI Ent Lvg MBh cfm 'F' 'F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -2.7 0,0 -4.6 0,0 -2.3 0,0 -9.5 254 65.4 75.0 0 0,0 0.0 159 24.0 50.0 0 0.0 0.0 173 12.1 31.1 R�CEIVEO 0.0 t-:(1y el- r(ty. ?' s JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:1giitlignelgtil R000 Zone Checksums By MacDonald - Miller Support-Control Rm COOLING COIL PEAK Peaked at Time; Mo/Hr: Outside Air: OADB/WB /HR: Envelope Loads 8kylflo Sol, Skylfe Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total W» Internal Loads Lights People Miso Sub Total 0.» Ceiling Load Outside Air Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total ■■) Space Sens. + Lat. Btu/h 0 0 0 0 0 0 0 840 1 841 4,608 9,000 46,078 69,683 -41 0 0 80,484 Plenum Sensible Btufh 0 0 833 0 0 0 833 0 0 41 0 0 •2,684 103 0 -1,607 Plenum Latent Btu/h 7/14 81/66 /74 Not Total Btu/h 0 0 833 0 0 0 0 841 1,674 4,608 9,000 0 40,078 0 69,083 0 0 9,349 6,674 0 0 0 0 103 0 0 0 76,384 Percent Of Total ( %) 0.00 0,00 1.09 0.00 0.00 0.00 0,00 0.00 1.10 2.10 6,03 11.78 60.32 78.14 0,00 12.24 7.30 0.00 0.00 0,00 0,14 0.00 100.00 CLG SPACE PEAK Mo /Hr. 7 / 15 OADB: 82 Space Sensible Bluth HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Percent , Risk Of Total Space Sens (%) Blum 0 0.00 ' 0 0 0.00 0 0 0.00 0 0 0,00. 0 0 0,00; 0 0 0,00 0 0 0.00: 0 0 0,00 0 312 0,66 •1,988 312 0.66 -1,968 4,608 8,15 : 0 6,513 9.76 6,613 46,076 8163 0 56,108 99,44 6,613 0 0.01 •145 0 0,00 , 0 0.00 0.00 0.00 ; 0 0.00 ' •21,520 0.00 0.00 66,513 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airfi Enter D8IW8 /HR ton MBh MBh cfm 'F 'F gr /Ib Main CIg 7.0 84,0 72.8 Aux Cla 0.0 0.0 0.0 Opt Vent 0,0 0.0 0.0 Total 7.0 84.0 2,352 0 0 76.1 61.2 58.0 0.0 0.0 0,0 0.0 0.0 0.0 Leave DI tWBIHR 'F 'F gr /lb 50.0 48.1 47.7 0.0 0,0 0.0 0.0 0.0 0.0 Project Name: ()west - Office Support Area Dataset Name: C: ICDSWAD3ZPROJECTSQwestOffice2 .Ids •18,111 Coll Peak Tot Sons Btu /h Percent Of Total (1) 0 0.00 0 0.00 •1,879 9,80 0 0,00 0 0,00 0 0,00 0 0.00 0 0.00 -1,958 9.91 •3,837 19.41 0 5,513 0 6,613 0 0 0 0 0 - 21,520 780 - 19,767 Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' ( %) 675 0 0 675 0 0 0 0 0 0.00 •27.89 0,00 •27.89 0.00 0,00 0.00 0.00 0.00 108.87 •0.39 0.00 100,00 TEMPERATURES CIg Htg SAOB 53.2 78,0 Plenum 74.8 66.3 Return 74.8 88.3 Ret/OA 76,1 24.0 Fn MtrTD 0,2 0.0 Fn BtdT0 0.5 0.0 Fn Frict 1.5 0.0 Vont Infil Supply Minofm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling 450 41 2,365 0 2,395 491 0 0 Heating 0 41 2,355 0 41 41 0 0 ENGINEERING CKS Cooling Heating % OA 19.1 0,0 cfmlft' 3.49 3,49 ofm /ton 336.28 'Piton 96.40 Btu/hr'ft' 124,48 •65.81 No. People 23 HEATING COIL SELECTION Capacity Coll Alrfi Ent Lvg MBh cfm 'F 'F •25,1 2,355 65.3 75,0 0.0 0 0.0 0.0 •12.9 450 24.0 50.0 0.0 0 0.0 0.0 •6.4 491 12.1 31.1 0.0 0 0.0 0.0 •44.4 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total CEIVEO CITY OF TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PM on 01/17/2000 PERMIT CENTER Zone Checksums By MacDonald- Miller Support- Corridor COOLING COIL PEAK Peeked at Time: Mo/Hr: Outside Air: OADB/WB/HR: Spaco Sens. + Lat. Btu /h Plenum Sensible Bluth Plenum Latent Btu/h Envelope Loads Skylie SoIr 0 0 Skylite Cond 0 0 Roof Cond 0 0 Glass Solar 0 0 Glass Cond 0 0 Wall Cond 0 0 Partition 0 Exposed Floor 0 Infiltration 1,919 Sub Total ■■> 1,919 0 Intomat Loads lights 4,503 0 People 1,649 Mlsc 0 0 0 Sub Total ■■> 8,153 0 0 Coiling Load •80 80 Outside Air 0 0 0 Sup, Fan Heat Rot, Ran Heat 0 Duct Heat Pkup -270 OVIUNDR Sizing 6,618 Exhaust Heat 71 0 Terminal Bypass 0 0 Grand Total ow> 14,610 -119 0 7/14 81 /06/74 Net Total Btu/h 0 0 0 0 0 0 0 0 1,919 1,919 4,503 1,649 0 6,163 0 5,100 683 0 0 6,618 71 20,453 Percent Of Total , (1) 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 9.38 9.38 22.02 8,06 0,00 30.08 0.00 24,98 2.86 0,00 0.00; 32.36 0.35 0.00 100.00 CLG SPACE PEAK. Mo /Hr: 7 / 15 OADB: 82 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Spaco Percent Space Peak Coll Peak Percent Sensible Of Total Space Sons Tot Sens Of Total Btu /h (%) ' Btu /h Btu /h (%) 0 0.00 ' 0 0 0,00 0 0.00 , 0 0 0.00 0 0,00: 0 0 0.00 0 0,00 : 0 0 0,00 0 0,00 0 0 0.00 0 0.00 0 0 0.00 0 0.00 0 0 0.00 0 0.00 ' 0 0 0.00 710 5,61 -4,466 .4,466 104.13 710 5.61 -4,466 .4,466 104,13 4,603 36,65 0 0 0.00 825 6.51 0 0 0.00 0 0.00 0 0 0.00 6,328 42,06 0 0 0.00 11 0.09 0 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0.00 ' 0 0.00 0.00 , 0 0.00 6,618 52.24 0 0 0.00 0.00 177 -4.13 0,00 0 0.00 12,608 100.00 •4,466 -4,289 100.00 Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Coil Alrfl Enter DB/WB /HR Leave DB/WB /HR cfm •F 'F gr /Ib 'F 'F gr /Ib Total Capacity Sens Cap, ton MBh MBh 1,3 15.2 92 0,0 0,0 0,0 0.0 0.0 0.0 1.3 15.2 246 0 81.4 66,3 0.0 0.0 0.0 0.0 74.0 0.0 0.0 50,0 44.3 34.7 0,0 0.0 0.0 0,0 0.0 0.0 Project Name: Qwest - Office Support Area Dataset Name:C:tCQStL OA032tPRQJECTStQwestOfce2 ,Ids Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' (%) 1,320 0 0 0 0 0 0 0 0 TEMPERATURES CIg Htg SAOB 53,2 75.7 Plenum 74.8 68,3 Return 74.8 68.3 ReUOA 81.4 24.0 Fn MtrTD 0,2 0.0 Fn BIdTD 0.5 0.0 Fn Frlct 1,6 0.0 Vont In1Ii Supply Mincfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling 528 92 628 0 820 820 0 0 Heating 0 02 028 0 02 92 0 0 ENGINEERING CKS Cooling Heating 100.0 0.0 0.40 0.40 416.19 1,040.48 11.53 -26,11 3 % OA cfm /ft' cfm/ton ft' /ton Btu /hrft' No. People HEATING COIL SELECTION Capacity Coil AIrMI Ent Lvg MBh cfm 'F 'F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -6.8 0.0 -16.1 0.0 -12.5 0.0 -34.5 528 63,9 75.7 0 0.0 0.0 628 24.0 6Q.0 0 0,0 0.0 620 12.1 41.3 0 0.0 0.0 RECEIVED CITY OF TUKWII.A JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PM on 01/17/2000 PERMIT CENTER Zone Checksums By MacDonald- Miller Support -Gen'I Office 0 1 COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADB/WB/HR: Envelope Loads Skylite Sol, Skylite Cond Roof Cond Glass 8olal Glass Cond Wall Cond Pinition Exposed Floor Infiltration Sub Total ■■> Internal Loads Lights People MIsc Sub Total ■■> Ceiling Load Outside Alr Sup, Fan Hut Rot. Fan Heat Duct Hut Pkup OV /UNDR Sizing Exhaust Hut Terminal Bypass Grand Total ■in• Space Sens. + Lat. Btu/h 0 0 0 0 0 0 0 110 110 601 277 901 1,779 .6 0 0 1,883 Plenum Sensible Btu/h 0 109 0 0 0 109 0 0 Plenum Latent Btu/h 7/14 81/68/74 CLG SPACE PEAK Mo /Hr: 7 / 16 OADB: 81 Net Percent Space Total Of Total Sensible Btu/h ( %) Btu/h 0 0 109 0 0 0 0 110 218 601 277 0 901 0 0 1,779 6 0 0 0 266 167 0 0 -77 0 0 4 0 40 0 2,423 4 0 0 0 0.00 0.00 4,48 0.00 0,00 0,00 0.00 0.00 4,63 9.01 24.79 11.43 37.19 73,41 0.00 10.66 6,88 0.00 0.00 0.00 0.16 0.00 100.00 0 0 0 0 0 0 0 0 37 37 Percent Of Total ( %) 0,00 0,00 0,00 0.00 0.00 0.00 0.00 0,00 2,21 2,21 601 35,47 164 9.08 001 63,20 1,656 97,75 1 0.04 0 0.00 0,00 0.00 0.00 0 0,00 0.00 0.00 1,694 100.00 HEATING COIL PEAK Mo /Hr: 13/ 1 OADB: 24 Space Poak Coll Poak Percent Space Sens Tot Sons Of Total Btu/h Btufh ( %) 0 0 0 0 0 0 0 0 •266 •266 0 0.00 0 0.00 •246 34,17 0 0,00 0 0.00 0 0.00 0 0:00 0 0:00 •266 35.62 •600 69.70 0 0 0.00 154 154 •21,47 0 0 0.00 154 164 •21.47 •81 0 0,00 0 0 0.00 0 0.00 0 000 0 0.00 •381 •381 63,09 10 •1.41 0 0.00 -643 .717 100,00 COOLING COIL SELECTION Total Capacity Sens Cap. Coll Airfl Enter D81W8 /HR tan MBh MBh cfm 'F 'F grlib Main CIg 0.2 Aux Clg 0.0 Opt Vent 0.0 2.7 0.0 0.0 Total 0.2 2.7 2.3 0.0 0.0 70 76,0 61.0 67,6 0 0,0 0.0 0.0 0 0.0 0.0 0.0 Project Name: Qwest • Office Support Area Dataset Name: C:1 CDS1LOAD321PROJECTSlQwestOffice2 .Ids Leave DBlW8IHR 'F 'F gr /ib Floor 60.0 47.1 44.0 Part 0.0 0,0 0.0 ExFlr 0,0 0.0 0.0 Roof Wall AREAS Gross Total Glass ft' ( %) 88 0 0 88 0 0 0 0 0 TEMPERATURES CIg Htg SADB 53.2 75.0 Plenum 74,8 66.3 Return 74.0 86,3 RN/OA 76.0 24.0 Fn MtrTD 0,2 0.0 Fn BIdTO 0.5 0,0 Fn Frlct 1,5 0,0 Vont infii Supply Mlncfm Return Exhaust Rm Exh Awn AIRFLOWS Cooling Heating 12 0 5 5 71 71 0 0 76 6 18 6 0 0 0 0 ENGINEERING CKS Cooling Heating 17,4 0,0 0.80 0.80 317.71 396,20 30.29 -14.96 1 % cfm/ft' cfm/ton 1tl /ton Btulhr,tt' No. Peo Io HEATING COIL SELECTION Capacity Coll Alrfi Ent Lvg MBh cfm 'F 'F Main Htg Aux Iitg Preheat Reheat Humidlf Opt Vent Total •0.7 0,0 -0.4 0.0 •0.2 0.0 .1.3 71 66,6 76,0 0 0.0 0,0 12 24.0 60,0 0 0,0 0.0 18 12.1 31.2 0 0.0 0.0 RECEIVED CITY OF TUKWII.!, JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PM on 01/17/2000 PERMIT CENTER Zone Checksums By MacDonald - Miller Support-Gen'I OHlce#2 COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Air: OADB/WS/HR: Envelope Loads Skylite Bair Skyllte Cond Roof Cond Glass Solar Glass Cond Wall Cond Partillon Exposed Floor Infiltration Sub Total mix Internal Loads Lights People Milo Sub Total ■■» Ceiling Load Outside Air Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OV /UNDR Siring Exhaust Heat Terminal Bypass Grand Total ail) Space Sens. + Lat. Muth 0 0 0 0 0 0 0 0 110 110 801 277 901 1,779 -6 0 0 Plenum Senslblo Btu/h 0 0 109 0 0 0 Plenum Latent Bluth 109 0 0 0 0 0 5 0 7/14 81 /68/74 Net Total Btuih 0 0 109 0 0 0 0 110 218 801 277 901 1,779 0 0 256 187 0 0 -77 0 0 4 0 4 0 0 0 Percent Of Total ( %) 0.00 0,00 4,48 0,00 0,00 0.00 0,00 0,00 4.63 9.01 24.79 11,43 37.19 73.41 0.00 10.68 6.88 0.00 0.00 0.00 , 0,15 0.00 1,883 40 0 2,423 100,00 CLG SPACE PEAK Mo /Hr: 7 / 18 OADB: 81 Space Sensible Btu/h 0 0 0 0 0 0 0 0 37 37 Percent Of Total ( %) 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.21 2,21 001 35.47 164 9.08 901 83.20 1,656 97.75 1 0,04 0 0.00 0.00 0,00 0.00 0 0.00 0.00 0.00 1,694 100,00 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Peak Space Sons Btu /h 0 0 0 0 0 0 0 0 -255 •255 0 154 0 164 •61 0 -381 -543 Coil Peak Percent Tot Sons Of Total Btu /h (1) 0 0.00 0 0.00 -245 34,17 0 0.00 0 0.00 0 0.00 0 0,00 0 0,00 •265 35.82 •500 80,79 0 0,00 154 -21,47 0 0,00 164 -21,47 0 0.00 0 0.00 0 0.00 0 0.00 0 0,00 -381 63.09 10 -1.41 0 0.00 •717 100.00 L nt l pply ncfm turn haust Bxh xll TEMPERATURES Clg Htg SAM 53.2 78.0 Plenum 74.8 88.3 Return 74.8 88.3 ReVOA 78.0 24.0 Fn MtrTD 0,2 0.0 Fn BIdTD 0.5 0.0 Fn Frlct 1,8 0.0 IOW AIRFLOWS Cooling 12 0 78 18 0 0 Heating 0 6 71 0 8 6 0 0 ENGINEERING CKS Cooling Healing 17,4 0.0 0,80 0,80 317.71 396.20 30.29 -14,08 1 % OA cfm/ft' cfm /ton II'/ton Btulhrlt' No. People Total Capacity ton MBh Main Clg 0.2 2,7 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.2 2.7 COOLING COIL SELECTION Sens Cap. Coll AIrfI Enter DBIWB /HR MBh cfm 'F 'F gr /Ib 2.3 70 76.0 61.0 57.6 0.0 0 0.0 0.0 0,0 0.0 0 0,0 0.0 0.0 Leave DBIWBIHR "F 'F grllb Floor 50.0 47,1 44.0 Part 0.0 0.0 0.0 ExFIr 0.0 0.0 0.0 Roof Wall Project Name: Qwest Office Support Area Dataset Name: C:\ CDSt1. OAD32\PROJECTS1QwestOffice2.Ids AREAS Gross Total Glass ft' ( %) 88 0 0 88 0 0 0 0 0 HEATING COIL SELECTION Capacity Coll AIrfI Ent Lvg MBh cfm 'F 'F •0.7 71 65.6 75.0 0.0 0 0.0 0.0 •0.4 12 24.0 50.0 0,0 0 0.0 0.0 •0.2 18 12.1 31.2 0.0 0 0.0 0.0 •1.3 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total RECEIVED CITY OF TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PM on 01/17/2000 PERMIT CENTER Support-Office 0 1 Zone Checksums By MacDonald - Miller COOLING COIL PEAK Peaked at Time: Mo/Hr Outside Air. OADB/WB /HR: Space Sons. + Lat. Btu /h Plenum Sensible Btu/h Envelope Loads Skylite Solr 0 0 Skylite Cond 0 0 Root Cond 0 192 Glass Solar 0 0 Glass Cond 0 0 Wall Cond 0 0 Partition 0 Exposed Floor 0 Infiltration 194 Sub Total me) 194 192 Internal Loads Lights 1,065 0 People 491 Mime 2,130 0 Sub Total a» 3,885 0 Ceiling Load •9 9 Outside Air 0 0 Sup, Fan Heat Rot, Fan Heat 0 Duct Heat Pkup •101 OVIUNDR Sizing 0 Exhaust Heat 7 Terminal Bypass 0 Grand Total ■•) 3,870 47 Plenum Latent Btu/h 7/14 81/66/74 CLG SPACE PEAK Mo /Hr: 7 / 16 OADB: 81 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Not Percent Space Percent Space Peak Total Of Total . Sensible Of Total Space Sons Btu/h (%) Btu/h ( %) Btu/h 0 0,00 0 0,00 : 0 0 0,00: 0 0,00 , 0 192 3.94 0 0.00 0 0 0.00; 0 0.00' 0 0 0,00: 0 0,00: 0 0 0.00 0 0,00 ' 0 0 0,00: 0 0,00 ' 0 0 0.00' 0 0.00 0 104 3,98: 66 1,87 • .463 387 7.93 68 1,87 •463 1,066 21.82 ' 1,065 30.12 ' 0 491 10.06. 273 7,72 : 273 0 2,130 43,84 ' 2,130 60,25 0 0 3,886 75.62 • 3,467 98,09. 273 0 0.00 ' 1 0,04 ' •96 0 453 9.29 , 0 0,00 ! 0 348 7,13 ° 0.00 0 0.00 ' 0.00 0 0,00 : 0,00 ; 0 0.00 . 0 0,00 •857 0 7 0,13 , 0,00 ; 0 0 0,00 ' 0,00 0 4,880 100.00 ' 3,535 100.00 ' •1,133 COOLING COIL SELECTION Coll AIrfI Enter DBIWB /HR cfm 'F 9F gr/Ib Total Capacity Sens Cap. ton MBh MBh Main CIg 0.5 6,4 4.7 Aux CIg 0.0 0.0 0.0 Opt Vent 0.0 0.0 0,0 Total 0.5 5.4 147 76.8 60.9 57.1 0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR 'F °F gr /ib 50.0 47.4 45.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest > Office Support Area Dataset Name: C: 1COSU- OA0321PROJECTS1GlwestOffice2 .Ids Coil Peak Tot Bens Blu /h 0 0 -434 0 0 0 0 0 .463 .887 0 273 0 273 0 0 0 0 .857 18 0 -1.453 Percent Of Total ( %) Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' ( %) 156 0 0 156 0 0 0 0 0 0.00 0.00 29.89 0.00 0.00 0.00 0.00 0.00 31,16 61,04 0.00 •18,78 0.00 •18,78 0.00 0.00 0.00 0.00 0.00 68,97 •1.24 0,00 100,00 TEMPERATURES CIg Htg SADB 63.2 76.0 Plenum 74.8 66.3 Return 74,8 66.3 RIIIOA 76.8 24,0 Fn Mtn!) 0.2 0.0 Fn BIdTD 0.6 0,0 Fn Friel 1,5 0,0 Vont Infll Supply Mlncfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 22 9 147 0 157 31 0 0 Heating 0 9 147 0 9 9 0 0 ENGINEERING CKS Cooling Heating 14,8 0,0 0,94 0.94 320.21 348,71 34.41 •18.55 1 % OA cfm/ft, ofmllon fN /ton Blu /hrft' No. People HEATING COIL SELECTION Capacity Coil AIM Ent Lvg MBh cfm 'F 'F -1.6 147 65.5 75.0 0.0 0 0.0 0.0 •0.6 22 24.0 50.0 0.0 0 0.0 0.0 •0.4 31 12.1 31.2 0.0 0 0,0 0.0 •2.6 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total RECEIVED CITY OF TUKWILA TRACE0 toad 700 v3.0 calculated at 03:161tr 14017 PERMIT CENTER Zone Checksums By MacDonald- Miller Support -Office #2 COOLI Peaked at Time: Outside Air: Envelope Loads Skylite Solr Skyllte Cond Roof Cond Gloss Soler Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total so> Internal Loads Lights People Miss Sub Total ■•> Ceiling Load Outside Air Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OVIUNDR Siang Exhaust Heat Terminal Bypass Grand Total ■■> Space Sens. + Lat. Btu/h 0 0 0 0 0 0 0 0 194 104 1,066 401 2,130 3,685 -0 0 0 3,870 NO COIL PEAK Mo /Hr. 7 / 14 OADB/0/13/HR: 81 / 86 / 74 Plenum Sensible Btu /h 0 0 192 0 0 Plenum Latent Btu/h 192 0 0 0 0 0 9 0 0 0 •161 7 0 0 0 47 0 Not Total Btu/, 0 0 192 0 0 0 194 387 1,066 491 2,130 3,685 0 463 348 0 0 0 7 0 4,880 Percent Of Total (1) 0.00 0.00 3,94 0.00 0.00 0.00 0.00 0,00 3,98 7.03 21.82 10,06 43,84 76,62 0,00 9,29 7,13 0,00 0,00 0.00 0.13 0.00 100.00 CLG SPACE PEAK Mo /Hr: 7 / 16 OADB: 81 Space Sensible Btu /h Percent Of Total ( %) 0 0,00 0 0.00 0 0.00 0 0.00 ; 0 0,00 ; 0 0,00 0 0.00 ; 0 0.00 66 1.87 60 1.87 1,065 30.12 273 7.72 2,130 60.25 3,487 98:09 1 0,04 0 0,00 0.00 ; 0.00 0.00 0 0,00 0,00 0.00 3,536 100.00 Main Clg Aux Cig Opt Vent Total COOLING COIL SELECTION Total Capacity Bens Cap. Coll AIM Enter DBIWDIHR ton MO MBh cfm 'F 'F gr /lb 0.5 5.4 4,7 147 76.8 60.9 57,1 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0,0 0.5 5.4 Leave 08/W13IHR "F 'F gr /Ib 50.0 47.4 45.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest - Office Support Area Dataset Name: C :ICDS1t.0AO32∎PROJECTS1QwestOfl ce2.lds HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Space Peak Space Sens Bluth 0 0 0 0 0 0 •463 .453 0 273 0 273 •98 0 -857 •1,133 Coll Peak Percent Tot Sens Of Total Btu /h (%) 0 0.00 0 0.00 -434 29.89 0 0,00 0 0.00 0 0.00 0 0,00 0 0,00 •463 31,16 -887 81.04 0 0.00 273 -18,78 0 0,00 273 -18.78 0 0.00 0 0,00 0 0,00 0 0.00 0 0.00 -857 68,97 18 •1,24 0 0,00 -1,453 100.00 Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft" (%) 156 0 0 156 0 0 0 0 0 TEMPERATURES Clg Htg SADB 53.2 75.0 Plenum 74,8 66.3 Roturn 74.8 68,3 Ret/OA 75.8 24,0 Fn MtrTD 0.2 0.0 Fn BIdTD 0.5 0.0 Fn Frlct 1.5 0.0 Vent Infil Supply Mincfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 22 0 9 9 147 147 0 157 31 0 0 9 0 ENGINEERING CKS Cooling Heating 14.8 0,0 0.94 0,94 329.21 348.71 34,41 46.85 1 •% OA otmlll' cfmlton fN /ton Dtulhrft' No. People HEATING COIL SELECTION Capacity Cell Alrfl Ent Lvg MBh cfm 'F 'F •1.6 147 65.5 75.0 0,0 0 0,0 0.0 •0.6 22 24.0 50.0 0,0 0 0,0 0.0 -0.4 31 12.1 31.2 0.0 0 0.0 0.0 -2.6 r CITY OF TOM"' Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total JAN 2 0 2000 TRACE® toad 700 v3.0 calculated at 03:16 PAf1M Zone Checksums By MacDonald - Miller Support•Office #3 COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADB/WS/HR: Envelope Loads Skylfe Solr Skylite Cond Roof Cond Glass Solar Glass Cond 0 Wall Cond 0 Partition 0 Exposed Floor 0 Infiltration 194 Sub Total * ■> 104 Internal Loads Lights 1,085 People 491 Misc 2,130 Sub Total ■E. 3,885 Ceiling Load •9 Outside Air 0 Sup, Fan Heat Rot. Fan Heat Duct Heat Pkup OVIUNDR Sizing 0 Exhaust Heat Terminal Bypass Space Sens. + Lat. Btu/h Plenum Sensible Btu /h 0 0 0 0 0 192 0 0 0 0 Plenum Latent Bluth 192 0 0 0 0 0 9 0 0 •181 7 0 0 0 Grand Total Imo 3,870 47 0 7/14 81/86/74 Net Percent Total Of Total Btu /h ( %) 0 0.00 0 0.00 192 3.94 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 194 3,98 387 7.93 1,085 491 2,130 3,885 0 463 348 0 0 0 7 0 21.82 10.08 43.04 75.52 0,00 9,29 7.13 0.00 0.00 0.00 0.13 0.00 4,880 100.00 CLG SPACE PEAK Mo /Hr: 7 / 18 OADB: 81 Space Sensible Stun, HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Percent Space Peak Of Total Space Sons (%) ' Btu /h 0 0,00 0 0 0.00. 0 0 0.00 ' 0 0 0,00 0 0 0.00; 0 0 0.00 0 0 0.00 0 0 0,00 0 06 1.87. •453 88 1,87. •483 1,085 30,12 273 7.72 2,130 80,25 3,487 98.09 1 0.04 0 0.00 0.00; 0.00 0,00 0 0.00 0.00 , 0.00 3,535 100.00 Total Capacity ton MBh Main Clg 0.5 6.4 Aux Cig 0.0 0.0 Opt Vent 0,0 0.0 Total 0.5 5.4 COOLING COIL SELECTION Sens Cap. Coil Alrfl Enter OB/WB /HR MBh cfm 9F 'F gr /Ib 4.7 147 0.0 0 0.0 0 75.8 0.0 0.0 60.9 0.0 0,0 57.1 0.0 0.0 Leave DBIWB /HR 'F 'F gr /lb 50.0 47,4 45.2 0.0 0,0 0.0 0.0 0.0 0.0 Project Name: Qwest - Office Support Area Dataset Narna.0 :1Ct7SIOAD321PROJEBTv wetACtfice2 .Ids 0 273 0 273 •96 0 -857 •1,133 Coll Peak Tot Sans Btu/h Percent Of Total ( %) 0 0,00 0 0,00 -434 29.89 0 0.00 0 0,00 0 0,00 0 0.00 0 0,00 •453 31,16 •887 81.04 0 0,00 273 -18.78 0 0.00 273 -18,78 0 0,00 0 0,00 0 0.00 0 0.00 0 0,00 •857 58,97 18 •1.24 0 0.00 100.00 -1,453 Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft' ( %) 156 0 0 156 0 0 0 0 0 TEMPERATURES Clg Htg SADB 53,2 75.0 Plenum 74.8 88.3 Return 74,8 88.3 Ret/OA 78,8 24.0 Fn MtrTO 0.2 0.0 Fn BIdTD 0.6 0.0 Fn Friel 1,8 0.0 Vent Infil Supply Mincfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 22 0 9 9 147 147 0 0 157 9 31 9 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 14.8 0.0 cfnr /ft' 0,94 0.94 cfm/ton 329.21 Elton 348.71 Btu /hrft' 34.41 •16.65 No. Pen i� e 1 HEATING COIL SELECTION Capacity Coll Alrfl Ent Lvg MBh cfm 'F 'F Main Htg •1,6 147 65.6 75.0 Aux Htg 0.0 0 0,0 0,0 Preheat •0.6 22 24.0 60.0 Reheat 0.0 0 0.0 0.0 Humidif •0.4 31 12.1 31.2 Opt Vent 0.0 0 0.0 0.0 Total -2.6 RECEIVED CITY OF TUKWILA TRACE® Load 700 v3.0 calculated at 031'6 PM oon P1/ /2000 • • PERMIT CENTER Zone Checksums By MacDonald- Miller Support•Office#4 COOLI Peaked et Time: Outside Alr: Envelope Lads Skylite Solt Skyilte Cond Roof Cond Glass Solar Glass Cond Will Cond Partition Exposed Floor Infiltration Sub Total ■■> Internal Loads Lights People Miso Sub Total ■■> Ceiling Load Outside Alr Sup. Fan Heat Net. Fan Heat Duct Heat Pkup OVIUNDR Siting Exhaust Heat Terminal Bypass Grand Total l» Space Sens. + Lat. Btu/h 0 0 0 0 0 0 0 0 194 194 1,065 491 2,130 3,685 .9 0 0 3,870 NG COIL PEAK Mo /Hr: 7 / 14 OADB/WB /HR: 81 / 66 / 74 Plenum Sensible Btu /h 0 0 192 0 0 0 Plenum Latent Btu /h 102 0 0 0 0 0 9 0 0 0 •161 7 0 0 0 47 0 CLG SPACE PEAK Mo/Hr: 7 /16 OADB: 81 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Not Percent • Space Percent Space Peak Coll Peak Percent Total Of Total ; Sensible Of Total Spice Sens Tot Sens Of Total Btu /h (%) , Btu /h ( %) ; Btu /h Btu /h (%) 0 0,00 0 0,00 0 0 0,00 0 0,00: 0 0.00 , 0 0 0,00 192 3,94 ` 0 0,00 ' 0 •434 29,89 0 0.00 , 0 0,00. 0 0 0,00 0 0.00 ; 0 0,00 : 0 0 0,00 0 0.00 ' 0 0,00 ' 0 0 0,00 0 0,00 ' 0 0.00 ; 0 0 0,00 0 0.00 0 0.00 , 0 0 0,00 194 3.98 ' 66 1.87 •453 •453 31.16 387 7.93 • 68 1,87 •483 •687 61.04 1,065 21,82 . 1,006 30,12 0 0 0:00 491 10,06 ' 273 7.72 , 273 273 •18,78 2,130 43,64 • 2,130 60,26 ' 0 0 0,00 3,685 75.62 ' 3,407 98,09 ' 273 273 •18.78 0 0.00 - 1 0.04 ' •96 0 0.00 453 9.29 : 0 0,00 ; 0 0 0,00 346 7.13 0.00 ' 0 0.00 0 0.00 0,00 0 0.00 0 0.00 ' 0.00 0 0,00 0 0.00 ' 0 0,00 ' .857 .857 58,97 7 0,13 0,00: 18 •1,24 0 0.00 ; 0.00 ' 0 0.00 4,880 100.00 ' 3,535 100,00 . .1,133 .1,453 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap, Coll AIr1I Enter DB/WB /HR ton MBh MBh cfm 'F 'F grllb 0,5 5,4 4,7 147 75,8 60.9 57.1 0.0 0,0 0.0 0 0.0 0,0 0.0 0.0 0.0 0,0 0 0.0 0,0 0,0 0,5 5.4 Leave DB/WB /HR 'F 'F grub 50.0 47.4 45.2 0,0 0,0 0.0 0.0 0,0 0.0 Project Name: Qwest - Office Support Area Dataset Name: C: 1CDSUAAD321 PROiECTSiQwestOffl462.1tIs Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' (Vol 156 0 0 158 0 0 0 0 0 TEMPERATURES Clg Htg SADB 53.2 75.0 Plenum 74.8 66.3 Return 74.8 66,3 Ret/OA 75.8 24,0 Fn MtrTD 0,2 0,0 Fn BIdTD 0,5 0,0 Fn Frict 1,6 0,0 Vent Intl, Supply Mlncfm Return Exhaust Rm Exit Auxll AIRFLOWS Cooling Heating 22 0 9 0 147 0 167 310 0 147 0 9 9 0 0 ENGINEERING CKS Cooling Heating 14,8 0.0 0.94 0,94 329,21 348.71 34,41 .16.55 1 % OA ofm /it' cfm/ton fl'Iton Blulhrdt' No. People HEATING COIL SELECTION Capacity Coll Airfl Ent Lvg MBh cfm 'F 'F .1,6 147 65,5 75,0 0.0 0 0.0 0.0 •0.6 22 24.0 50.0 0.0 0 0,0 0,0 •0.4 31 12.1 31,2 0.0 0 0.0 0.0 -2.6 CITY CA- FUKWlI.A Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PM orPOMW2000i f Zone Checksums By MacDonald-Miller Support- OfficeCubicles COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Air: OADB/WO/HR: Envelope Loads Skylie Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■■> Internal Loads Lights People Miso Sub Total ■■> Ceiling Load Outside Air Sup. Fan Heal Rot, Fan Heat Duct Heat Pkup OV /UNDK Slaing Exhaust Heat Terminal Bypass Grand Total ■■> Space Sens. + Lat. Btu /h 0 0 0 0 0 0 0 0 932 932 5,106 2,354 10,212 17,671 .45 0 0 Plenum Sonslblo Btum 0 0 923 0 0 0 Plenum Latent Btu/h 923 0 0 0 0 0 45 0 0 0 •774 31 0 0 0 18,558 226 0 7/14 81 /88/74 Net Total Blu /h 0 0 923 0 0 0 0 032 1,855 5,106 2,354 10,212 17,671 0 2,174 1,689 0 0 0 31 0 Percent Of Total ( %) 0.00 0,00 3,94 0.00 0.00 0.00 0.00 0,00 3.98 7,93 21,82 10.08 43.84 75.52 0,00 9.29 7.13 0.00 • 0,00 0.00 • 0.13 0.00 • 23,401 100.00 CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 81 Space Sensible Btu/h 0 0 0 0 0 0 0 318 318 Percent Of Total (%) 0,00 0.00 0,00 0,00 0.00 0,00 0.00 0.00 1.87 1.87 6,106 30.12 1,308 7.72 10,212 60.25 18,825 98.09 6 0.04 0 0.00 0.00 0.00 0,00 0 0,00 0.00 0.00 16,940 100.00 HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 •2,170 -2,170 0 1,308 0 1,308 •462 0 Coil Peak Tot Sens Btu /h 0 0 .2,082 b 0 0 •2,170 -4,262 0 1,308 0 1,308 0 0 0 0 -4,107 -4,107 86 0 •5,432 Percent Of Total ( %) 0.00 0.00 29,89 0.00 0.00 0.00 0.00 0,00 31,15 61,04 0.00 •18.77 0.00 •18.77 0,00 0,00 0.00 0.00 0,00 58.97 •1.24 0,00 4,965 100.00 TEMPERATURES CIg Htg SADB 83,2 75.0 Plenum 74.8 68.3 Return 74.8 66.3 Ret/0A 75,8 24,0 Fn MtrTD 0.2 0,0 Fn BIdTD 0.5 0,0 Fn Frlct 1,5 0.0 Vent Inlil Supply Mlncfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 105 0 46 45 706 708 0 0 751 45 150 45 0 0 0 0 ENGINEERING CKS Cooling Heating 14.8 0.0 0.94 0,94 329.21 348,71 34,41 •18,55 6 % cfm/ft' cfm /ion (!' /ton Btu/hrft' No. People Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coll AIrfI Enter DBIWB /HR ton MBh MBh cfm 'F 'F gr /Ib 2.2 25.7 0.0 0.0 0.0 0.0 2.2 25.7 22.3 0.0 0.0 704 0 0 75.8 60.9 57,1 0.0 0.0 0.0 0.0 0.0 0.0 Leave DO/WO/HR 'F 'F gr/Ib Floor 50.0 47.4 45.2 Part 0.0 0.0 0.0 ExFIr 0.0 0.0 0.0 Roof Wall Project Name; Qwest - Office Support Area Dataset Name: C: kCDSU LOAD3VPROJECTS\QwestOffice2.Ids AREAS Gross Total Glass ft' ('h) 748 0 0 748 0 0 0 HE Main Htg Aux Htg Preheat Reheat Humldif Opt Vent Total ATING COIL SELECTION Capacity Coll AIrfI Ent Lvg MBh cfm 'F 'F •7.4 0.0 •3.0 0.0 -2.0 0.0 .12.4 706 65.5 75,0 0 0.0 0.0 105 24.0 50,0 0 0.0 0,0 150 12.1 31.2 0 0.0 0.0 CITY OF TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PM on 01/17/2000 PERMIT CENTER Zone Checksums By MacDonald - Miller Support- Reception COOLING COIL PEAK Mo /Hr: 7 / 14 OADB/WB/HR: 01 1 66 / 74 Peaked at Time: Outside Air: Envelope Loads Skylie Soir Skylie Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■■> Internal Loads Lights People Misa Sub Total ■■> Ceiling Load Outside Air Sup, Fan Heat Ret. Fan Heat Duct Heat Pkup OVIUNDR Sizing Exhaust Heat Terminal Bypass Grand Total ■•> Space Sens, + Lat. Blum Plenum Plenum Sensible Latent Btu /h Btu/h 0 0 0 0 0 888 6,787 0 998 0 57 70 0 0 898 7,719 059 Net Total Btu/h 0 0 888 6,787 998 127 0 0 898 8,678 4,916 0 4,915 2,893 2,893 4,916 0 0 4,915 12,722 0 0 12,722 .44 44 0 0 0 0 2,003 1,829 0 0 .848 0 0 0 29 0 20,398 20 0 0 0 184 0 25,262 Percent Of Total (%) 0,00 0.00 3,62 22,83 , 3.96 0.60 0,00 0.00 3.66 34.36 19,45 11,46 19.45 60,36 , 0.00 7.93 7.24 ' 0.00 0.00 0.00 0.12 0.00 100.00 CLG SPACE PEAK Mo /Hr: 7 / 14 OADB: 81 Space Sensible Btu /h 0 0 6,787 998 67 0 0 306 7,127 Percent Of Total (%) 0.00 0,00 0.00 31.06 6,37 0,31 0,00 0.00 1.65 38,38 4,916 26.47 1,607 8.66 4,915 28.47 11,437 6119 6 0.03 0 0,00 0.00 0.00 0.00 0 0.00 0.00 0.00 18,570 100.00 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Peak Space Sens Btu /h 0 0 .7,371 •1,674 0 0 .2,089 •11,134 0 1,607 0 1,607 .734 0 0 •10,261 CoII Peak Percent Tot Sens Of Total Btu /h (%) 0 .2,004 0 .7,371 •3,425 0 0 -2,089 •14,888 0 1,607 0 1,607 0 0 0 0 0 0 83 0 .13,199 0.00 0.00 16,18 0,00 65.86 26,96 0,00 0,00 16.82 112,80 0.00 .12.18 0.00 .12,18 0.00 0.00 0.00 0,00 0.00 0.00 •0.63 0.00 100.00 TEMPERATURES CIg Htg SADB 83,2 80.1 Plenum 74,8 88.3 Return 74,8 66.3 Ret/OA 76.6 24.0 Fn MtrTD 0.2 0.0 Fn 81dT0 0.5 0.0 Fn Frict 1.6 0.0 Vent Info Supply MIncfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 98 43 774 0 817 140 0 0 Heating 0 43 774 0 43 43 0 0 ENGINEERING CKS Cooling Healing 12.5 0,0 1.07 1.07 334.12 310.92 38.59 43.30 8 % cfmlft' cfm /ton ft'/ton Btu/hr.ft' No. People COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airfl Enter DBIWB /HR ton MI3h MEfh cfm 'F 'F or/lb Main CIg 2,3 27.8 Aux CIg 0.0 0,0 Opt Vent 0.0 0,0 Total 2.3 27.8 24.3 772 0.0 0 0.0 0 75.6 60.7 56,6 0.0 0,0 0.0 0.0 0.0 0,0 Project Name: Awest - Office Support Area Oataset Name: C: 1CDS1L OA0321PROJECTS►QwestOffice2.1ds Leave DB(WB /HR 'F 'F or/lb Floor 50,0 47,4 45.2 Part 0.0 0,0 0.0 ExFIr 0.0 0.0 0.0 Roof Wall AREAS Gross Total Glass ft' ( %) 720 0 0 720 740 0 0 172 23 HEATING COIL SELECTION Capacity Coil AIrfI Ent Lvg MBh cfm •F 'F •12.6 774 65.3 80,1 0.0 0 0.0 0,0 -2.8 96 24,0 50,0 0.0 0 0.0 0.0 -1.5 140 12,1 28.0 0,0 0 0.0 0.0 -16.8 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total REEV0 CITY OF TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PM on 01/17/2000 PERMIT CENTER • Zone Checksums By MacDonald - Miller Support - Shower /Locker COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADB/WB /HR: Envelope Loads Skylite Solt Skyllte Cond Roof Cond Glass Solar Gloss Cond Wall Cond Partitlon Exposed Floor Infiltration Sub Total ■s) Internal Loads Lights People Milo Sub Total ■w, Calling Load Outside Air Sup. Fan Haat Rat. Fan Heat Duct Heat Pkup OV /UNDR Siting 7,811 Exhaust Heat Terminal Bypass Space Sens. + Lat. Bluth 0 0 0 0 0 82 0 0 194 267 1,066 3,737 0 4,801 -9 Grand Total ■■> 12,560 Plenum Sensible Btu /h 0 0 192 0 0 47 239 0 0 0 0 Plenum Latent Bluth 7/14 81/88/74 Net Total Btu /h 0 0 192 0 0 109 0 0 194 496 1,066 3,737 0 0 0 4,801 0 0 3,006 343 0 0 -159 0 7,611 0 32 0 32 0 0 121 18,190 Percent Of Total ( %) 0,00 0,00 1,19 0.00 0,00 0,67 0,00 0.00 1.20 3,06 6.68 23.08 0.00 29.66 0.00 18,67 2,12 0.00 0.00 48,40 0.20 0.00 100.00 CLG SPACE PEAK Mo /Hr: 7 / 21 OADB: 71 Space Sensible Btu /h 0 0 0 0 0 383 0 0 -40 344 1,066 2,289 0 3,353 0 7,611 11,210 100.00 Percent Of Total ( %) 0.00 0.00 0.00 0,00 0,00 3,42 0.00 0,00 -0,36 3,07 9.60 20.42 0.00 29.91 0.01 0.00 0.00 0.00 0.00 67.01 0.00 0.00 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Peak Space Sons Btu /h 0 0 0 0 0 -1,818 0 -453 -2,271 0 2,289 0 2,288 -136 0 -3,476 -3,693 Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0 -434 0 -2,983 0 0 -463 -3,869 0,00 0.00 8.62 0.00 0.00 50,20 0,00 0.00 8,98 76.80 0 0.00 2,289 -45.42 0 0.00 2,289 -46.42 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 -3,478 68.98 18 -0,36 0 0.00 -5,038 100.00 Total Capacity Ion MBh Main CIg 0,8 9.6 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.8 9.6 COOLING COIL SELECTION Bens Cap. Coil AIrfI Enter DB/WBIHR Mt3h cfm 'F 'F gr /lb 5.6 0.0 0.0 145 0 0 81.4 66.3 74.0 0.0 0.0 0.0 0.0 0.0 0.0 Leave DBIWB /HR 'F 'F gr /lb 50.0 42.5 28,8 0,0 0,0 0.0 0.0 0.0 0.0 Project Name: Qwest - Office Support Area Dataset Name: C: 1CDSLLOAD321PROJECTS1QwestOftice2 .1ds Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' ( %) 166 0 0 156 0 0 492 0 0 TEMPERATURES CIg Htg SADB 53.2 75.0 Plenum 74.8 68.3 Return 74.8 88.3 Ret/OA 81.4 24,0 Fn MtrTD 0.2 0,0 Fn BIdTO 0.5 0.0 Fn Frlct 1,6 0.0 Vent Infil Supply MIncfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 467 0 9 9 487 487 0 0 478 9 478 0 0 9 0 ENGINEERING CKS Cooling Heating 100,0 0.0 2,99 2,99 687,13 196.10 61.19 - 169,31 9 % OA cfm /h' cfmlton ft' /ion Btu /hr'ft' No. People HEATING COIL SELECTION Capacity Coil AlrfI Ent Lvg MBh cfm 'F 'F 467 65.5 76.0 0.0 0 0.0 0,0 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -13.3 0.0 -8.2 0.0 -26.4 467 24.0 50.0 0 0.0 0.0 476 12.1 37.0 0 0.0 0.0 RECVED GIN OF TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PM on 01/17/2000 . • PERN.1T,C .NTER Zone Checksums By MacDonald - Miller Support -Snack COOLING COIL PEAK Peaked at Time: Mo/Hr. Outside Air. OADBIWB/HR: Envelope Loads Skyilte SoIr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond PartMon Exposed Floor Infltration Sub Total ■■* Internal Loads Lights People Miso Sub Total of Gelling Load Outside AIr Sup, Fan Heat Rat. Fan Heat Duct Heat Pkup OVIUNDR Sizing Exhaust Heat Tannins' Bypass Grand Total ■s> Space Sens. + Lat. Blu /h Plenum Sensible Btu/h 0 0 0 0 0 385 0 0 0 0 33 25 0 0 389 422 410 Plenum Latent Btu/h 7/14 81/68/74 Net Totes Blu/h 0 385 0 0 58 0 0 389 831 2,130 0 2.130 8,580 8,580 3,195 0 0 3,195 13,904 0 0 13,904 •19 19 0 0 0 0 8,482 064 0 0 .447 0 0 0 70 0 70 0 0 0 14,307 51 22,251 Percent Of Total ( %) 0.00 0.00 1.73 0.00 0.00 0.28 0,00 0.00 1.75 3,74 9.57 38.56 14.30 82.49 0.00 29.13 4.33 0,00 0,00 0,00 0.31 0,00 100.00 CLG SPACE PEAK Mo/Hr: 7 / 17 OMB: 80 Space Sensible Btu/h 0 0 0 119 0 0 108 224 Percent Of Total ( %) 0.00 0,00 0.00 0.00 0.00 1.20 0,00 0.00 1.07 2:28 2,130 21.64 4,290 43.59 3,195 32.46 9,814 97.70 3 0,03 0 0.00 0.00 0,00 0.00 0 0.00 0.00 0.00 9,841 100.00 COOLING COIL SELECTION Coil Alrfi Enter DO/W8/HR cfm 'F 'F gr /lb Total Capacity Sens Cap. ton MBh MBh Main CIg 2.0 24.6 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 2.0 24.5 14,8 0.0 0.0 407 0 0 79.9 64.9 69.4 0.0 0.0 0.0 0.0 0.0 0,0 Leave DBIWBIHR 'F 'F gr/lb 50.0 42.9 30.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest • Once Support Area Dataset Name: C; ICDS1L OAD321PROJECTS10westOffice2.1ds HEATING COIL PEAK Mo/Hr: 13 / 1 OADB; 24 Space Peak Space Sens Blu/h 0 0 0 0 •981 0 0 -905 •1,886 0 4,290 0 4,290 •252 0 -5,325 •3,154 Coll Peak Percent Tot Sens Of Total Blu /h ( %) 0 0 -888 0 0 -1,578 0 0 -905 -3,350 0 4,290 0 4,290 0 0 0 0 0 -5,325 36 0 0.00 0.00 19,97 0,00 0.00 38.24 0.00 0.00 20.81 77.02 0.00 •08.64 0.00 •98.64 0.00 0.00 0.00 0.00 0.00 122.46 •0.83 0.00 -4,349 100.00 Floor Part ExFIr Roof Wall AREAS Gross Total Glass fN ( %) 312 0 0 312 0 0 260 0 0 TEMPERATURES CIg Htg SADB 53.2 75.0 Plenum 74.8 68.3 Retum 74.8 66,3 Rot/OA 79.9 24,0 Fn MtrTO 0,2 0.0 Fn BIdTD 0,5 0.0 Fn Frlct 1.5 0.0 Vent Inftl Supply MIncfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling 312 10 410 0 420 331 0 0 Heating 0 19 410 0 19 19 0 0 ENGINEERING CKS Cooling Heating 76.1 0.0 1.31 1,31 201.02 152.96 78,45 -49.80 18 % OA clmlfN cfm/ton fN /ton Btulhr.ft' No. Peoplo HEA Main HIg Aux Htg Preheat Reheat Humidlf Opt Vent Total TING COIL SELECTION Capacity Coll Airfl Ent Lvg MBh cfm 'F 'F •4.3 0.0 -8.9 0.0 -2.4 0.0 -15.6 410 65.6 75,0 0 0.0 0.0 312 24.0 50.0 0 0.0 0.0 331 12.1 22.6 0 0.0 0.0 RECEIVED V. JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PBAtIOfirM/10f19000 Zone Checksums By MacDonald-Miller Support- Tofets COOLING COIL PEAK Peaked at Time: Mo/Hr: Outskle Air: OADB/1.1%1B/NR: Envelope Loads Skyllle Solr Skyllte Cond Roof Cond Glass Solar 0110 Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■■> Internal Loads Lights People Miso Sub Total ■e> Ceiling Load Outside Air Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total •a• Space Sens. + Lat. Btu/h Plenum Sensible Btu /h 0 0 0 0 0 379 0 0 0 0 02 47 0 383 448 428 2,099 1,236 0 3,334 •19 0 Plenum Latent Btu/h 7/14 91/66/74 Net Total Bluth 0 0 370 0 0 109 0 383 872 0 2,099 1,236 0 0 0 0 0 3,334 19 0 0 0 2,682 202 0 0 -135 0 176 176 30 0 3,938 30 0 0 0 Percent Of Total ( %) 0.00 0.00 622 0,00 0.00 1,60 0:00 0.00 628 , 11.99 28,89 17.00 0,00 46,88 0.00 35.26 , 4,02 0,00 0,00 ; 2,43 0,41 0.00 CLG SPACE PEAK Mo/Hr. 7 / 19 OADB: 76 HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Space Percent Spaco Peak Coll Peak Percent SonsIblo Of Total Space Sena Tot Sons Of Total Btu/h (%) Btu/h Btu/h ( %) 0 0,00 0 0 0.00 0 0.00 ' 0 0 0,00 0 0,00 0 -888 21.38 0 0.00. 0 0 0.00 0 0.00 ' 0 0 0,00 317 9.83 ' .1,018 .2,083 74.40 0 0,00 0 0 0,00 0 0,00 0 0 0.00 13 0,39 .892 .802 22.26 330 10.03 .2,710 .4,730 118,00 2,099 83,71 0 0 0.00 686 20,83: 886 688 .17.12 0 0.00 0 0 0.00 2,785 84,64: 686 888 .17,12 3 0.08 .648 0 0,00 0 0.00 0 0 0,00 0,00 ' 0 0.00 0,00 ' 0 0.00 0.00: 0 0.00 170 6,38 ' 0 0 0.00 0.00 , 36 -0,88 0.00 0 0,00 339 0 7,286 100.00 3,205 100.00 -2,872 .4,000 100.00 COOLING COIL SELECTION Total Capacity Bens Cap. Coll Airfi ton MUh MBh cfm Main CIg 0.7 7.8 Aux CIg 0,0 0.0 Opt Vent 0.0 0.0 Total 0.7 7.8 6,1 123 0,0 0 0.0 0 TEMPERATURES CIg Htg SADB 63,2 85.7 Plenum 74.8 68,3 Return 74.8 88.3 RN/OA 81,4 24,0 Fn MtrTD 0,2 0.0 Fn BIdTD 0.5 0,0 Fn Frlct 1,5 0,0 Vont Infll Supply Mlnofm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 137 18 137 0 166 10 0 Heating 18 137 18 18 0 ENGINEERING CKS Cooling Heating % 100.0 0.0 cfmlll' 0.46 0.46 cfmiton 211,23 II'llon 473.16 Blulhr,ft' 25.36 .30,00 No. Peo le 3 Enter DBIWB /HR Leave Df91WB /HR 'F 'F gr /Ib °F 'F gr /Ib Floor 81.4 68.3 74.0 50.0 43.7 32.8 Part 0.0 0.0 0.0 0.0 0.0 0.0 ExFIr 0.0 0.0 0.0 0.0 0.0 0.0 Roof Wall Project Name: ()west - Office Support Area • Dataset Name: C:1 COSU. OAD321PROJECTS1QwestOffice2.1ds AREAS Gross Total Glass ft' ( %) 308 0 0 308 492 0 0 0 0 HEATING COIL SELECTION Capacity Coil AIrfI Ent Lvg MBh cfm •F •F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total .2.7 0.0 -3.9 0.0 .6 0.0 •9.2 137 67.8 85.7 0 0.0 0.0 137 24,0 50.0 0 0.0 0.0 156 12.1 36,2 0 0.0 0.0 RECEIVED CITY OF TUKWD JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:16 PM on 01/17/2000 PERMIT CUM eh TRACE® Load 700 version 3.0 Proj ct Names Gwest•Equlpmsnt Space Drtaset Name: C :1CDSIOAD32TROJECTS1Owest2,1dt< Location: Seattle Building Owner: Owost Program User: Roe Company: MM Comments: Location: Latitude: Longitude: Time Zone: Elevation: Barometric Pressure: Air Density: Air Specific Heat: Density-Specific Heat Product: Latent Heat Factor: Enthalpy Factor; Seattle, Washington 47.0 dog 122.0 deg 8 388 ft 29.6 In, Hg 0,0749 lb/cu ft 0.2444 Btu /Ib. °F 1.0988 Blu /h,cfm• °F 4,836.9 Btu,min /h.cu ft 4.4953 Itrmin /hrcu ft Design Simulation Period: Cooling Load Methodology: Heating Load Methodology; Protect Name: Qwest•Equipment Space D&taset Name: C:1 CDS1t.QAP321PRGJECTS1Qwest2•Ids By MacDonald.MHNer Summer Design Dry Bulb: Summar Design Wet Bulb: Winter Design Dry Bulb: Summer Clearness Number: Winter Clearness Number: Summer Ground Reflectance: Winter Ground Reflectance: June through November TETD -TA1 UATD • 82 °F 80 °F 24 °F 0,95 0.95 0.20 0,20 CITY OF TUKWILA JAN 2 0 2000 PERMIT CENTER TRACE® Load 700 v3.0 calculated at 03:36 PM on 01/17/2000 • w Zone Checksums By Macdonald - Miller RTU COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADB/WB/HR: Envelope Loads Skylfe Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■» Internal Loads Lights People Miso Sub Total ■.) Ceiling Load Outside Mr Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OVIUNDR Sizing Exhaust Heat Terminal Bypass Space Sons. ; Lat. Btu/h 0 0 0 0 0 884 0 7,884 8,448 28,468 0 727,683 764,041 •1,037 0 0 Plenum Sensible Btu/h 0 4,732 0 0 1,027 8,789 0 0 0 1,037 0 0 - 44,938 389 0 Plenum Latent Btu/h 7/15 82/68/71 Net Total Btu/h 0 0 4,732 0 0 1,891 0 7,584 14,208 28,458 0 0 727,683 0 754,041 0 0 6,501 96,940 0 0 0 0 389 0 0 Parcont Of Total • CLG SPACE PEAK Mo/Hr: 7 / 18 OADB: 81 Space Sensible Btu /h 0,00 ' 0 0,00: 0 0,54 0 0.00: 0 0,00 ; 0 0,22 t 1,016 0.00 , 0 0,00 0 0,87. 2,842 1.83 ' 3,857 3,03 0.00 83.43 88.46 0.00 0,75 11.12 0.00 0.00 0.00 0.04 0.00 Percent Of Total ('A) 0,00 0.00 0.00 0.00 0,00 0,13 0.00 0.00 0,38 0.51 20,458 3.50 0 0.00 727,683 96.13 754,041 99.62 -1,016 4.13 0 0,00 0.00 0.00 0.00 0 0,00 0.00 0.00 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Poak Space Sans Btu/h 0 0 0 0 •5,139 0 0 •11,428 •16,568 0 0 0 •379 0 •207,743 Grand Total was 761,453 •37.753 0 872,079 100.00 766,882 100.00 - 224,890 Main Clg Aux Cig Opt Vent Total Total Capacity ton M8h 79.9 959,3 0.0 0.0 0.0 0.0 79.9 959.3 COOLING COIL SELECTION Sons Cap. Coll AIrtI Enter DBIWB /HR MBh cfm 'F 'F gr /Ib 949,9 0,0 0.0 40,897 0 69,2 54.7 41.7 0.0 0.0 0.0 0.0 0.0 0.0 Coil Poak Percent Tot Sens Of Total Bluth (%) 0 •8,856 0 0 • 10,808 0 0 - 11,428 •30,892 0 0 0 0 -9,798 0 0 0 •207,743 142 0 0,00 0.00 3,57 0,00 0.00 4.27 0,00 0,00 4,80 12,44 0.00 0.00 0.00 0.00 0.00 3,95 0.00 0,00 0,00 83,67 •0,06 0.00 - 248,289 100,00 TEMPERATURES Clg Htg SADB 53,2 75.0 Plenum 89,2 69,7 Return 69,2 69.7 ReUOA 89.2 89.6 Fn MtrTD 0,2 0,0 Fn BIdTD 0,5 0,0 Fn Frict 1,6 0.0 Vont InBI Supply Minim Return Exhaust Rm Exit Auxii AIRFLOWS Cooling Heating 104 194 228 228 40,897 40,897 0 0 41,123 41,123 420 420 0 0 0 0 ENGINEERING CKS Cooling Heating % OA 0.5 0.5 cfm/fP 10,65 10.55 cfm /ton 611,59 ft'Iton 48.49 Btu/hr' t' 247.40 40,47 No. Poo le 0 Leave OBIWBIHR 'F 'F gr /Ib Floor 60,0 45.3 38.1 Part 0,0 0,0 0.0 ExFIr 0,0 0.0 0.0 Roof Wall Project Name: Qwest- Equipment Space . ' Dataset Name: C: lCGSiLOAt 732iPROJECTS`Qwasl2.1ds AREAS Gross Total Glass h' (v /u) 3,676 0 0 3,876 0 1,653 0 HEATING COIL SELECTION Capacity Coll Airfl Ent Lvg MBh cfm 'F 'F Main Htg -248.3 40,897 69.5 75,0 Aux Htg 0.0 0 0.0 0,0 Preheat 0,0 0 0.0 0.0 Reheat 0.0 0 0.0 0,0 Humidif -9,4 420 12.1 44.3 Opt Vent 0.0 0 0.0 0.0 Total 457.6 RECEIVED CITY OF TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 PM on 01/17/2000 PERMIT aNTER Zone Checksums By MacDonald - Miller RTU - 2 COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 18 Outside Alr: OADB/WB /HR: 81 165 / 60 Envelope Loads Skylie Solr Skyike Cond Roof Cond Glass Solar Glass Cond Wail Cond Pettitlon Exposed Floor Infiltration Sub Total •■) Internal Loads Lights People Misc Sub Total moo Ceiling Load Outside AIr Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OVIUNDR Slang Cahouet Heat Terminal Bypass Space Sens. + Lat. Btu/h 0 0 0 687 228 1,041 0 0 8,491 8,347 24,674 0 676,774 700,348 •912 0 0 Grand Total sus 707,782 Plenum Sensible Btu/h Plenum Latent Btu/h CLG SPACE PEAK Mo /Hr, 7 / 15 OADB: 82 Net Percent , Space Total Of Total Sensible Blum (1) Btu/h 0 0 0.00: 0 0 0 0,00 0 6,048 6,048 0,74. 0 0 687 0,07 - 868 0 228 0,03 ; 239 1,246 2,288 0.28 887 0 0.00 0 0 0.00 0 8,401 0.80 2,769 7,293 16,830 1,93 4,663 0 24,674 3.03 24,674 0 0.00 0 0 0 876,774 83,22 676,774 0 0 700,348 86.24 700,348 912 0 0,00 •937 0 0 8,663 0,69 0 90,162 11,10 0 0 0,00 •41,798 0 0.00 , 0 0,00 0 343 0 343 0,04 0 0 0 0,00 •33,249 0 812,066 100,00 703,983 HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Percent Space Peak CoII Peak Percent Of Total Space Sons Tot Sons Of Total ( %) Btu /h Btu/h (94) 0.00 0.00 0.00 0,09 . 0.03 0,13 0,00 0,00 0,39 0.66 3.49 0.00 98.00 99,49 •0,13 0.00 0.00 0.00 0,00 0,00 0,00 0.00 100.00 Total Capacity ton MEh Main CIg 74.4 893,3 Aux Clg 0.0 0,0 Opt Vent 0.0 0,0 Total 74.4 893.3 COOLING COIL SELECTION Sens Cap. Coll Airfl Enter DO/WE/HR MUh cfm 'F 'F gr/lb 885.4 0.0 0.0 38,037 0 0 69.3 54.8 41.7 0.0 0.0 0,0 0.0 0.0 0,0 Leave DB!WB /HR 'F 'F gr /Ib 0 0 0,00 0 0 0.00 0 •8,222 3,66 0 0 0.00 •996 .996 0,43 .6,274 .11,030 4.76 0 0 0,00 0 0 0.00 •10,616 •10,816 4,58 •18,886 .30,862 13.33 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 •380 0 0.00 0 .9,098 3.03 0 0.00 0 0,00 0 0,00 - 191,728 •191,720 82,80 139 .0.06 0 0,00 .208,980 .231,548 100,00 Floor 50,0 45,3 38.1 Part 0.0 0,0 0.0 ExFIr 0.0 0,0 0.0 Roof Wall Project Name: Qwest - Equipment Space ` Dataset Nara: C: ICt )SiLOAD32■PRO,fECTS1Qwest2.1ds AREAS Grose Total Olass Ili ( %) 3,600 0 0 3,600 0 0 1,740 21 1 TEMPERATURES Clg Htg SADB 53.2 75.0 Plenum 69.2 69.7 Return 89.2 69.7 Ret/OA 69.3 89,8 Fn MtrTD 0.2 0.0 Fn BIdTD 0,5 0,0 Fn Frlct 1,8 0,0 Vont Infil Supply MIncfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 180 180 210 210 38,037 38,037 0 0 38,247 38,247 390 390 0 0 0 0 ENGINEERING CKS Cooling Healing 0.6 0,6 10.67 10.67 610.99 48,36 248.13 -86,73 0 % OA cfmltt' cfm/ton It' /ton Btu /hrft' No. People HEATING COIL SELECTION Capacity Coll Alrtl Ent Lvg MBh cfm 'F 'F •231.6 38,037 69.5 75.0 0.0 0 0,0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -8.7 390 12.1 44,3 0.0 .240.2 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total RE &IVEV 0.0 CITY OF TUKWI JAN 2 0 2000 PERMIT CENT r. TRACE® Load 700 v3.0 calculated at 03:36 PM on 017/2000 Zone Checksums By MacDonald - Miller RTU - 3 COOLING COIL PEAK Mo /Hr: 7 / 18 OADBIWB/HR: 81 / 85 / 68 Peaked at Time: Outside Alt Envelope Loads Skylfte Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ••> Internal Loads Lights People Misc Sub Total ••> Ceiling Load Outside Air Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup OVIUNDR Sizing Exhaust Heat Terminal Bypass Grand Total ••• Space Sons, + Lat. Btu/h 0 0 0 0 0 1,068 0 0 Plenum Sensible Btu/h 0 0 8,048 0 0 1,245 8,497 7,888 7,293 24,574 0 0 878,774 700,348 •911 911 0 0 Plenum Latent Blum 0 0 0 0 0 0 .41,747 342 0 707,001 •33,201 Not Total Btu/h 0 0 8,048 0 0 2,313 0 0 8,497 14,857 24,574 0 878,774 700,348 0 0 5,569 90,057 0 0 0 0 342 0 0 Percent Of Total (k) ' 0.00 0.00 0.75 0.00 0,00 0,20 0,00 0,00 0,80 1.83 3,03 0,00 83.31 88,34 0.00 0.69 11,10 0,00 0,00 0,00 0.04 0.00 0 811,173 100.00 CLG SPACE PEAK Mo /Hr: 7 /18 OADB: 81 Space Sensible Btu /h 0 0 0 0 0 1,068 0 0 2,840 3,708 Porcent Of Total (•A) 0,00 0,00 0.00 0,00 0.00 0,15 0,00 0.00 0.38 0,53 24,874 3,49 0 0.00 875,774 96,11 700,348 99.80 .911 •0.13 0 0,00 0.00 0.00 0.00 0 0.00 0.00 0.00 703,144 100.00 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Peak Space Sons Btu/h 0 0 0 0 •8,410 0 0 .10,615 •18,024 0 0 0 .370 0 .192,343 •208,737 Coll Peak Tot Sens Btu/h 0 •8,222 0 0 .11,165 0 0 • 10,815 .30,001 0 0 0 0 .9,098 0 0 0 .192,343 139 0 Percent Of Total (4) 0.00 0.00 3.55 0.00 0.00 4,83 0,00 0,00 4,59 12.97 0,00 0.00 0.00 000 0.00 3,93 0,00 0,00 0.00 83.16 -0,08 0.00 •231,304 100.00 Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coll AIrfI Enter DBIWB /HR ton MBh MBh cfm 'F 'F gr /lb 74,4 0,0 0.0 892.3 0,0 0.0 74.4 892.3 884,4 0.0 0.0 37,993 0 0 69.3 54,7 41.7 0,0 0.0 0.0 0.0 0.0 0.0 Leave DBIWB /HR 'F 'F gr/lb Floor 50.0 46,3 38.1 Part 0.0 0.0 0.0 ExFIr 0.0 0,0 0.0 Roof Wall Project Name: Awest- Equipment Space Dataset Name: C; \CDS11.0AD321PROJECTSQwest2.lds AREAS Gross Total 3,600 0 0 3,600 1,740 Glass h' ( %) 0 0 0 0 TEMPERATURES Clg Htg SADB 83.2 75,0 Plenum 69.2 69.7 Return 89.2 89,7 Rat/OA 69.3 89,8 Fn MtrTO 0.2 0.0 Fn BIdTD 0,8 0.0 Fn FrIct 1,5 0,0 Vont Infil Supply Mlncfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 180 180 210 210 37,093 37,903 0 0 38,203 38,203 390 390 0 0 0 0 ENGINEERING CKS Cooling Heating 0.5 0.5 10.55 10.85 510,95 48,41 247,88 •88.88 0 % OA cfm /ft' cfm/ton ft'/ton Btu/hrft' No. People HEATING COIL SELECTION Capacity Coil Alrfi Ent Lvg MBh cfm 'F 9F Main Htg •231.3 37,993 69.5 76,0 Aux Htg 0.0 0 0.0 0,0 Preheat 0.0 0 0.0 0,0 Reheat 0.0 0 0.0 0.0 Humidif •8.7 390 12.1 44,3 Opt Vent 0.0 0 0,0 0.0 Total •240.0 RECEIVED CITY OF TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 FibioRtipiR0 Zone Checksums By MacDonald - Miller RTU -4 COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 /16 Outside Alr: OADBANB /HR: 81 / 65 / 68 Envelope Loads Skylite Soir Skylite Cond Roof Cond Glees Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total m■> Internal Loads Lights People Miso Sub Total ■ ■' Ceiling Load outside Air S yap. Fan Heat Rot. Fan Hut Duct Heat Pkup OVIUNDR Stzlnp Exhaust Heat Terminal Bypass Grand Total ems Space Sens. + Lat. Btulh Plenum Sensible Btulh 0 0 0 0 0 8,947 0 0 0 0 1,050 1,224 0 0 6,388 7,439 7,171 24,164 0 664,611 888,875 .890 0 Plenum Latent Btu/h Net Total Btu/h 0 0 8,947 0 0 2,274 0 0 8,388 14,810 0 24,164 0 0 0 664,511 0 0 888,675 896 0 0 0 5,476 88,566 0 0 0 0 •41,052 337 0 895,218 - 32,647 0 337 0 0 Percent Of Total , (1) 0.00 0,00 0.78 0.00 0.00 0,29 0,00 0.00 0.80 1,83 3,03 0,00 83.31 86.34 0.00 0.69 11,10 ; 0.00 0.00 0.00 0.04 0.00 CLG SPACE PEAK Mo /Hr: 7 / 16 OADB: 81 Space Percent Sensible Of Total Btu /h ( %) 0 0.00 0 0.00 0 0,00 0 0.00 0 0.00 1,060 0.15 0 0,00 0 0.00 2,590 0,38 3,840 0.53 24,184 3.49 0 0,00 684,511 98,11 688,875 99.80 •898 •0,13 0 0,00 0,00 , 0.00 0.00 0 0.00 0,00 0,00 0 797,654 100.00 691,425 100.00 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Peak Coll Peak Percent Space Sens Tot Bons Of Total Bluth Btu/h (%) 0 0 0.00 0 0 0.00 0 •8,085 3,55 0 0 0.00 0 0 0,00 •5,310 •10,079 4,83 0 0 0.00 0 0 0,00 40,438 •10,438 4,59 .15,767 40,601 12.97 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0,00 •364 0 0,00 0 •8,947 3.93 0 0.00 0 0.00 0 0,00 •189,137 .189,137 83.16 137 .0.06 0 0,00 •205,258 •227,446 100.00 TEMPERATURES CIg Htg SADB 53.2 75.0 Plenum 69.2 69.7 Return 69,2 89.7 Rot/OA 89,3 89.5 Fn MtrTD 0,2 0,0 Fn BIdTD 0.5 0,0 Fn Frict 1.8 0.0 Vent In11I Supply MIncfln Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 177 177 207 207 37,380 37,380 0 0 37,688 37,588 384 384 0 0 0 0 ENGINEERING CKS Cooling Heating 0.5 0.5 10.55 10,55 510.95 48,41 247,86 •86,68 0 % cfm/ft, ofmlton (t' /ton Dtulhr.ft' No. People COOLING COIL SELECTION Total Capacity Sens Cap. Coil AIrfI Enter DB/WB /HR ton MBh MBh cfm °F 'F or/lb Main CIg 73.1 877,4 Aux CIg 0.0 0,0 Opt Vent 0.0 0.0 Total 73,1 877,4 869.7 0.0 0.0 37,360 0 0 69,3 54.7 41,7 0.0 0.0 0.0 0.0 0.0 0.0 Leave DBIWBIHR 'F •F gr /Ib 60.0 45.3 38.1 0.0 0.0 0.0 0.0 0.0 0.0 Protect Name: Oweat- EquIpment Space Dataset Name: C: 1CDS8.OAD321PROJECTS1Qwest2.Ids Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' ( %) 3,640 0 3,640 0 1,711 0 HEATING COIL SELECTION Capacity Coil AIrfI Ent Lvg MBh cfm 'F 'F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total •227.5 0.0 0.0 0.0 -8.5 0.0 -236.0 37,360 69.6 75.0 0 0.0 0,0 0 0.0 0,0 0 0.0 0.0 384 12.1 44.3 0 0.0 0.0 RECEIVED CITY OF TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 PM on 01/17/2000 PERMIT CENTER Zone Checksums By MacDonald- Millar RTU -5 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 15 Outside Air: OADBIWB /HR: 82 / 88 / 71 Envelope Loads Skylfo Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■■s Internal Loads Lights People Mlsc Sub Total i'> Codling Load Outside Air Sup. Fan Heat Rot, Fan Heat Duct Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total +mo Space Plenum Sens, ♦ Lat. Sensible Btu/h Btu/h 0 0 0 0 0 3,834 658 0 239 0 220 288 0 0 8,142 0,269 4,122 17,956 0 0 493,768 0 511,721 0 •698 698 0 0 0 0 .30,527 262 0 517,282 •28,444 Plenum Latent Bluth CLG SPACE PEAK Mo /Hr; 7 / 15 OADB: 82 Net Percent Space Total Of Total Sensible Btu/h ( %) Btu/h 0 0.00 0 0 0.00. 0 3,834 0,88 0 858 0.11 , 658 239 0,04 239 608 0.09 220 0 0,00 0 0 0,00 ' 0 5,142 0.87. 2,023 10,382 1,76 ' 3,140 17,955 3.03 : 17,955 0 0.00 , 0 0 493,766 83.32 493,768 0 611,721 86,35: 611,721 0 0.00 ' .698 0 4,408 0.74 0 65,863 11.11 ' 0 0,00 0 0.00 0 0.00 ' 0 0 202 0.04 , 0 0 0,00 Percent Of Total ( %) 0.00 0.00 0,00 0.13 : 0.05; 0:04 0.00 0.00 0.39 081 3,49 0.00 90,03 99.53 •0.14 0.00 0.00 0.00 0.00 ; 0.00 0,00 1 0.00 0 692,625 100,00 614,163 100.00 HEATING COIL PEAK Mo /Hr; 13 / 1 OADB; 24 Space Peak Coll Peak Percent Space Sons Tot Sens Of Total Btu/h Bluth (%) 0 0 0.00 0 0 0.00 0 4,018 3,81 0 0 0.00 •998 •998 0.60 •1,307 •2,845 1.71 0 0 0,00 0 0 0.00 •7,760 •7,768 4,88 •10,059 •17,816 10.58 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 •200 0 0,00 0 -8,648 3.99 0 0.00 0 0,00 0 0.00 • 142,377 •142,377 86.48 76 •0.05 0 0.00 • 152,636 •166,565 100,00 TEMPERATURES CIg Htg SADB 53.2 75.0 Plenum 89,2 89.8 Return 89.2 69,8 Ret/OA 69.2 69.5 Fn MtrTO 0.2 0.0 Fn BIdTD 0.8 0.0 Fn Frict 1.5 0.0 Vont Infll Supply Mincfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 132 132 153 163 27,782 27,782 0 0 27,935 27,935 285 285 0 0 0 0 ENGINEERING CKS Cooling Heating 0.5 0,5 10.66 10.68 511.41 48,42 247,83 •65.74 0 %• OA cfm/ft' ofm /ton ft'lton Btu/hr.ft' No. People COOLING COIL SELECTION Total Capacity Sens Cap, Coil Airtl Enter DBIWB /HR ton MBh MBh cfm 'F 'F gr /lb Main CIg 64.3 651.9 Aux CIg 0,0 0.0 Opt Vent 0.0 0.0 Total 54.3 651.9 645.5 0.0 0.0 27,782 0 0 69.2 54.8 41.7 0.0 0.0 0.0 0.0 0.0 0.0 Leave DO/WO/HR 'F 'F gr /Ib 60.0 45.3 38.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest•Equipment Space Datasel Name: C: iCDS1LOAD32■PROJECTS1Qwest2.lds Floor Part ExFir Roof Wall AREAS Gross Total Glass h' ( %) 2,630 0 0 2,630 0 0 464 21 5 HEATING COIL SELECTION Capacity Coll Airfl Ent Lvg MBh cfm 'F 'F •166.6 27,782 69.5 75.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0,0 -6.4 285 12.1 44.3 0.0 0 REc1,0 0.0 CL •172.9 y OF TU14Wiu. Main Htg Aux Htg Preheat Reheat Humldlf Opt Vent Total JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 pORMARillik • Zone Checksums By MacDonald - Miller RTU 6 COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Alr OADB/WB /HR: Envelope Loads Skylite Soh Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■■> Internal Loads Lights People Mlsc Sub Total ag•* Ceiling Load Outside Air Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total ■ ■> Space Sans. + Lat. Btu /h Plenum Sensible Btu /h Plenum Latent Btu /h 7/16 82 /66 /71 Net Total Btuth 0 0 0 0 0 0 0 6,229 8,229 0 0 0 0 0 0 653 858 1,212 3,511 3,511 0 0 7,498 7,498 11,562 6,887 18,449 29,160 0 29,150 0 0 801,637 0 0 801,837 830,787 0 0 830,787 •1,155 1,155 0 0 0 0 8,427 121,644 0 0 •58,390 0 0 0 434 0 434 0 0 0 Percent Of Total (%) 0.00 0.00 0,64 0.00 0.00 0.12 0.36 0.00 0,77 1.89 2.98 0.00 81.99 84.97 0.00 0.66 12.44 0.00 0.00 0.00 0.04 0.00 841,195 •47,915 0 977,740 100,00 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 82 Space Sensible Btu /h 0 0 0 0 553 3,511 0 3,285 7,349 Percent Of Total ( %) 0.00 0.00 0.00 0.00 0.00 0.07 0,42 0.00 0.39 0.88 29,150 3.48 0 0.00 801,037 95.78 830,787 99,26 •1,155 •0.14 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 836,982 100.00 Total Capacity ion MBh Main CIg 89,6 1,075,5 Aux CIg 0,0 0.0 Opt Vent 0.0 0.0 Total 89.6 1,075.5 COOLING COIL SELECTION Sens Cap. CoII Alrfl Enter QB/Wd /HR ML3h cfm 'F 'F gr /lb 1,066.9 0.0 0.0 61,318 0 0 Project Name: Qwest- Equipment Space Detasct Name:C:,CDSttLOAD33.PRQJECTS Qwest2.ldo 69.2 66.0 46,6 0.0 0.0 0,0 0.0 0.0 0.0 Leave DB/WB /HR 'F 'F gr /Ib HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 •3,291 -1,765 0 •12,592 •17,838 0 0 0 0 -310 0 - 264,001 - 281,949 Coll Peak Tot Sons Btu /h 0 0 -9,773 0 0 •0,799 •1,755 0 • 12,692 • 30,920 0 0 0 0 0 - 10,703 0 0 0 - 264,001 116 0 - 305,697 Percent Of Total ('1.) Floor 52.0 47.9 43.5 Part 0.0 0.0 0.0 ExFIr 0.0 0,0 0.0 Roof Wall AREAS Gross Total Glass ft' ( %) 4,271 730 0 4,271 1,059 0 0 0 0 0.00 0.00 3.20 0.00 0,00 2.22 0.57 0.00 4,12 10,12 0.00 0.00 0.00 0.00 0.00 3.53 0.00 0.00 0.00 86.39 •0,04 0.00 100.00 TEMPERATURES CIg Htg SADB 55.2 76.0 Plenum 89,2 89.8 Return 89.2 69.8 Ret/OA 89,2 69.8 Fn MtrTD 0.2 0.0 Fn BIdTD 0.5 0.0 Fn Frict 1.6 0.0 Vent InfII Supply MInalm Return Exhaust Rm Exh Aux!' AIRFLOWS Cooling Heating 214 214 249 249 51,318 61,318 0 0 51,568 61,568 463 463 0 0 0 0 ENGINEERING CKS Cooling Heating 0.4 0.4 12,02 12.02 572,58 47.65 251,85 -74.81 0 % cfmlft' cfm/ton h' /ton Btu /hrft' No. People HEATING COIL SELECTION Capacity Coil AIrfl Ent Lvg MBh cfm 'F 'F -305,6 61,318 69.6 76.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 •13,9 463 12.1 55.5 0,0 0 0.0 0.0 •319.6 RECEI Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total KWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 PMaAUQt/dF1 4 Zone Checksums By MacDonald- Miller RTU - 7 COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADB/WB /HR: Space Sens. + Lat. Btu/h Envelope Loads Skyiite Solr 0 Skylite Cond 0 Roof Cond 0 Glass Solar 0 Glass Cond 0 Wsll Cond 653 Partition 868 Exposed Floor 0 Infiltration 8,468 Sub Total s■> 9,876 Internal Loads Lights 29,624 People 0 Miso 811,914 Sub Total ■■> 841,438 Ceiling Load •1,143 Outside Air 0 Sup, Fan Heat Rot. Fan Heat Duct Heat Pkup OV /UNDR Sizing 0 Exhaust Heat Terminal Bypass Plenum Sensible Btu/h 0 0 8,304 0 0 867 8,961 Plenum Latent Btu/h 7/15 82/68/71 Net Total Btu /h 0 0 8,304 0 0 1,210 886 0 8,458 16,836 0 29,624 0 0 811,914 0 841,438 0 0 7,248 108,231 0 0 0 0 429 0 0 0 0 1,143 0 0 •50,172 420 0 Grand Total ■■> 860,171 - 41,639 0 974,183 Percent Of total , (y,) 0.00 • 0,00= 0,85 0.00 0.00; 0,12 0,09 , 0.00 0,87 1.73 3,03 0.00 83.34 80.37 0.00 0.74 11,11 0.00 0.00 0,00 0,04 0.00 100.00 CLG SPACE PEAK Mo/Hr: 7 / 15 OADB: 82 Space Sensible Btu /h 0 0 0 0 553 866 0 3,327 4,746 Percent Of Total (1) 0.00 0.00 0.00 0.00 0.00 0.07 0.10 0.00 0,30 0.66 29,624 3.49 0 0.00 611,914 98.08 841,438 99.57 -1,143 -0,14 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 845,042 100.00 Total Capacity ton MBh Main CIg 89.3 1,071.6 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 89.3 1,071.6 COOLING COIL SELECTION Sens Cap. CoII AIrfI MBh cfm 1,061.1 0.0 0.0 45,660 0 0 Enter DBIWB /HR Leave DB/WB /HR 'F 'F gr /Ib 'F 'F gr /lb 69,2 54.8 41.7 0.0 0.0 0.0 0,0 0.0 0.0 50.0 45.3 38.2 0.0 0,0 0,0 0.0 0.0 0.0 Project Name: Qwest- Equipment Space Dctaset Namar: C: 1COS1t .OAA321PROJECTS1MNest2.lds HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Space Peak Space Sons Btu /h 0 0 0 0 0 -3,291 •433 0 - 12,763 •16,477 0 0 0 0 •354 0 •234,030 •250,661 Coll Peak Tot Sens Btu/h 0 0 -9,892 0 0 -6,797 -433 0 - 12,763 •29,876 0 0 0 0 0 - 10,931 0 0 0 - 234,030 133 0 Percent Of Total (1) 0.00 0.00 3.60 0.00 0,00 2.47 0.16 0.00 4.64 10.88 0.00 0.00 0.00 0.00 0.00 3,98 0.00 000 0.00 86,19 -0.05 0.00 - 274,703 100.00 Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' ( %) 4,325 180 0 4,325 0 0 1,059 0 0 TEMPERATURES CIg Htg SADB 53,2 75.0 Plenum 89.2 69,7 Return 89.2 69.7 Ret/OA 89,2 69,5 Fn MtrTO 0.2 0.0 Fn BIdTD 0.5 0.0 Fn Frict 1,6 0,0 Vont Intl! Supply Mlncfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 216 216 252 262 46,660 46,680 0 0 45,912 45,012 469 489 0 0 0 0 ENGINEERING CKS Cooling Heating 0,6 0.6 10.56 10,56 511,31 48.43 247.75 -65,92 0 % cfm /ft' cfm /ton ft' /ton Btu/hr.ft' No. People HEATING COIL SELECTION Capacity Coll Alrfi Ent Lvg MBh cfm 'F 'F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -274.7 0.0 0,0 0.0 -10.4 0.0 -285.1 45,660 69.5 75.0 0 0,0 0.0 0 0.0 0.0 0 0.0 0.0 469 12.1 44.3 0 0,0 0,0 CITYOF60TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 ~ya'f0 •... Zone Checksums By MacDonald- Miller RTU - 8 COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside AIr. OADB/WS/HR: Envelope Loads Skyllte Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wail Cond Partition Exposed Floor Infiltration Sub Total ■■s Internal Loads Lights People Mlsc Sub Total •■> Calling Load Outside Air Sup, Fan Heat Rot. Fan Heat Duct Heat Pkup OV /UNDR SIsing Exhaust Heat Terminal Bypass Grand Total ■■) Space Sens. + Lat. Btu/h 0 0 0 0 0 2,188 0 0 7,916 10,101 29,098 0 822,192 852,090 •1,084 0 0 881,108 Plenum Sensible Btu/h Plenum Latent Btu /h 7/18 81/85/68 CLG SPACE PEAK Mo /Hr: 7/17 OADB: 80 Not Portent Space Percent Total Of Total Sensible Of Total Btu/h (%) Btu/h ( %) 0 0 0.00 0 0.00 0 0 0,00 0 0,00 7,354 7,354 014 0 0.00 0 0 0,00 , 0 0,00 0 0 0.00 0 0,00 2,466 4,852 0,47 2,630 0.30 0 0.00. 0 0,00 0 0.00 0 0.00 7,916 0,80: 2,844 0,33 9,820 19,920 2.01 5,383 0.83 0 29,898 3.02 29,898 3.49 0 0.00 0 0,00 0 0 822,192 83.14 822,192 98,00 0 0 852,090 88.17 862,090 99.49 1,084 0 0.00 ' •1,052 •0,12 0 0 8,784 0.69 , 0 0.00 109,889 11.09. 0.00 0 0 0.00 , 0,00 - 50,848 0 0.00 0.00 0 0.00 0 0.00 407 0 407 0,04. 0.00 0 0 0 0,00 0.00 •39,537 0 988,890 100.00 866,420 100.00 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Peak Space Sons Btu /h 0 0 0 0 0 •6,762 0 0 - 12,914 •19,880 0 0 0 0 •454 0 - 234,119 •254,239 Coil Pask Porcont Tot Sons Of Total Btu /h (%) 0 0 • 10,002 0 0 -13,935 0 0 - 12,014 •38,851 0 0 0 0 0 • 11,070 0 0 0 - 234,119 171 0 0.00 0.00 3,55 0,00 0.00 4,94 0,00 0.00 4,68 13.07 0,00 0.00 0.00 0.00 0,00 3,93 0.00 0.00 0.00 03,06 •0.00 0.00 - 281,869 100.00 TEMPERATURES CIg Htg SADB 53.2 75,0 Plenum 69.2 89.7 Return 69.2 89.7 ReVOA 89.3 89.5 Fn MIrTD 0,2 0.0 Fn BIdTD 0.6 0.0 Fn Friel 1,5 0.0 Vent InfII Supply Mlncfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 219 219 268 256 46,275 48,276 0 0 48,630 48,630 476 475 0 0 0 0 ENGINEERING CKS Cooling Heating % 0,6 06 cfm/ft, 10.57 10.67 cfm/ton 610.49 ft' /ton 48,32 8tulhr.ft, 248,36 •00.77 No. Poo le 0 Total Capacity ton MBh Main Cl g 90,7 1,087.8 Aux CIg 0.0 0.0 Opt Vent 0,0 0,0 Total 90,7 1,087.8 COOLING COIL SELECTION Sens Cap. Coil AIM Enter DBMINIHR Leave DB/WBIHR MBh cfm 'F 'F gr /lb 'F 'F gr/lb 1,078.2 0.0 0.0 46,276 0 0 69.3 54.7 41.6 0.0 0.0 0.0 0.0 0.0 0.0 50.0 46.3 38.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest- Equipment Space Dataset Narthe. C; tCDS1LOAP321PROJECTS1Qwest2.1ds Floor Part ExFIr Roof Wall AREAS Gross Total Glass fti ( %) 4,380 0 4,380 0 0 2,172 0 0 HEATING COIL SELECTION Capacity Coll AIrfI Ent Lvg Mfih cfm 'if 'F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -281.9 0.0 0.0 0.0 -10.6 0.0 -292.4 46,275 69,5 75.0 0 0.0 0,0 0 0,0 0,0 0 0.0 0.0 475 12.1 44.3 ROEMilb CITY OF TUKKWIL 0,0 JAN 2 0 2000 PERMIT CENTER TRACE® Load 700 v3.0 calculated at 03:36 PM an 01/17/2000 Zone Checksums By MacDonald - Miller RTU - 9 COOLING COIL PEAK Peeked at Time: Mo /Hr: Outside Air: OADBNVB /HR: Envelope Loads Skyllte Solr 8kyllte Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total mu» Internal Loads Lights People Mime Sub Total am) Ceiling Load Outside Air Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OVIUNDR Sizing Exhaust Heat Terminal Bypass Space Plenum Plenum Sens. + Lat. Sensible Latent Btu /h Blu /h Btu /h 0 0 0 0 0 7.322 1073 0 456 0 8,785 10,460 0 7,908 18,300 17,771 29,098 0 822,192 862,090 •879 0 7/18 81 /65/88 Not Total Blum 0 0 7,322 1,173 456 19,214 0 0 7,905 38,071 0 29,898 0 0 0 822,192 0 0 852,090 879 0 0 0 6,778 110,784 0 0 0 0 0 •51,346 330 0 Grand Total ■■> 869.610 42,368 0 330 0 0 Percent Of Total ('h) 0.00 0.00 . 0,73 0,12 0.06 1.91 0,00 0.00 0,70 3,59 2.97 • 0.00 81,73 ' 84,70 . 0.00 0.67 ; 11.01 0.00 0.00 0,00 0.03 0,00 0 1,006,031 100.00 CLG SPACE PEAK Mo/Hr: 7 / 10 OADB: 81 Space Sensible Btu /h HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Percent Space Peak Of Total , Space Sons ( %) Btu /h 0 0,00 0 0 0.00. 0 0 0.00 ' 0 1,173 0.14 0 468 0.05 ' -1,993 8,765 1.01 •17,268 0 0,00 0 0 0.00 0 3,211 0.37 • - 12,914 13,600 1,67 42,163 29,898 3,46 0 0 0.00 0 822,192 05.07 0 852,000 98,63: 0 -879 •0.10 ' •778 0 0.00 , 0 0,00 0.00 0,00 0 0.00 - 223,790 0,00 0.00 864,816 100,00 •256,732 Coll Peak Tot Sens Bluth 0 0 •9,951 0 •1,993 - 37,042 0 0 •12,914 •61,000 0 0 0 0 0 •11,070 0 0 0 •223,790 292 0 - 298,467 Percent Of Total ( %) COOLING COIL SELECTION Total Capacity Sens Cap. Coll Airfi Enter DBIW8IHR ton MBh MBh cfm 'F 'F gr /Ib Main CIg 92.2 1,106,6 Aux CIg 0.0 0.0 Opt Vent 0.0 0,0 Total 92.2 1,106.6 1,097.1 0.0 0.0 46,729 0 0 69.4 54.8 41.7 0.0 0.0 0.0 0.0 0.0 0.0 Leave DBIWBIHR 'F 'F or/lb 50,0 45.3 38.1 0,0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest- Equipment Space Dataset Name: Cti33S11.0A032tPROJECTStQwost2 .!do . 4 •, Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft, ( %) 4,380 0 0 4,380 0 0 5,832 42 1 0.00 0.00 3.38 0.00 0,87 12,49 0,00 0.00 4,38 20.88 0,00 0.00 0.00 0.00 0.00 3,73 0.00 0.00 0.00 75.49 •0.10 0.00 TEMPERATURES CIg Htg SADB 53.2 75.0 Plenum 89.4 69.4 Return 69.4 69.4 Ret/OA 69.4 89.2 Fn MtrTD 0.2 0,0 Fn BIdTD 0.6 0,0 Fn Frict 1.5 0.0 Vent Infll Supply Mlncfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 219 219 258 268 46,729 48,729 0 0 40,984 48,984 475 476 0 0 0 0 ENGINEERING CKS Cooling Heating 0.5 0,6 10.87 10.67 606.71 47,50 262.60 •70.10 0 OA afmlft' cfmlton R' /ton Btulhr.ft' 100.00 No. People HEATING COIL SELECTION Capacity Coll AIr1I Ent Lvg MBh cfm 'F 'F •296,5 46,729 69.2 75.0 0.0 0 0.0 0,0 0.0 0 0,0 0.0 0.0 0 0,0 0.0 -10,6 476 yz1R.1 44,3 0,0 r:j}v 4rE'0,0 -307.0 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total JAN 2 0 ' .j PERMtT Cdr, �::, TRACE® Load 700 v3.0 calculated at 03:36 PM on 01/17/2000 Zone Checksums By MacDonald•Miller RTU -10 COOLING COIL PEAK Peaked at Time: Mo/Hr: Outside Air: OADBIWBIHR: Envelope Loads Skyiite Sotr Skyike Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total al) Internal Loads Lights People Milo Sub Total ■i) Coiling Load Outside Air Sup. Fan Heat Rel. Fan Heat Duct Heat Pkup OVIUNDR Sizing Exhaust Heat Terminal Bypass Grand Total •o> Space Sens, + Lat. Btu/h 0 0 0 0 0 0 4,268 4,268 16,219 0 418,611 433,729 -812 0 0 437,376 Plenum sensible Btu /h 0 0 2,721 0 0 0 2,721 Plenum Latent Btu/h 7/14 81 /88/74 Net Total Btu/h 0 0 2,721 0 0 0 0 0 4,268 6,979 0 15,219 0 0 418,611 0 433,720 0 0 10,850 55,894 0 0 0 442 0 0 0 0 812 0 0 - 25,818 442 0 - 22,043 0 607,795 Percent Of Total (%) 0.00 0,00 0.54 0.00 0.00 0,00 0,00 0.00 0,84 1.37 3,00 0.00 82,42 85.41 , 0,00 2.18 10,97 0.00 0.00 0,00 0.09 0.00 CLG SPACE PEAK Mo /Hr: 7/15 OADB: 82 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Percent Space Peak Coil Peak Percent Sensible Of Total Space Sens Tot Sons Of Total Btu/h ( %) ; Btu/h Btu /h (%) 0 0,00 ' 0 0 0.00 0 000 0 0 0.00 0 0,00 ' 0 .5,107 3,38 0 0,00 : 0 0 0.00 0 0,00 ; 0 0 0.00 0 0,00 ' 0 0 0,00 0 0.00 ; 0 0 0,00 0 0.00 ' 0 0 0,00 1,715 0.39 ; 4,674 4,574 4.38 1,715 0.39 ' 4,574 .11,680 7.74 16,219 3.60 ' 0 0 0,00 0 0.00 0 0 0,00 418,511 98,24 0 0 0,00 433,729 99.74 0 0 0.00 .598 4,14 ' -136 0 0,00 0 0,00 : 0 •16,904 11,20 0.00 ; 0 0,00 0.00 0 0.00 0.00 ; 0 0.00 0 0,00 ' - 122,381 .122,381 81.12 0.00 ; 98 -0,08 0.00 0 0,00 100,00 • 434,846 100,00 ' - 129,090 .150,867 100.00 Total Capacity ton MBh Main CIg 46.6 558.6 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 46,6 558.6 COOLING COIL SELECTION Sens Cap. Coll AIM Enter DQIWB /HR MBh cfm 'F 'F gr /Ib 548.3 0.0 0,0 23,496 0 0 69,3 55,7 45,2 0.0 0.0 0,0 0.0 0.0 0.0 Leave DO/WS/HR °F 'F gr /Ib Floor 50.0 46.3 41.3 Part 0.0 0.0 0.0 ExFIr 0.0 0.0 0.0 Roof Wall Project Name: Qwest- Equipment Space 0wiosst• Qlarro:C:1C DSU,.OAt?321PROJECTMvest2,tds AREAS Gross Total Gass ft' ( %) 2,230 0 0 2,230 0 0 0 TEMPERATURES CIg Htg SADB 53,2 75,0 Plenum 89.1 89.8 Return 89,1 89.8 Ret/OA 89,3 89,2 Fn MtrTD 0,2 0,0 Fn BIdTD 0,5 0,0 Fn FrIct 1,5 0.0 Vont In11I Supply Mlncfm Return Exhaust Rm Exh Aux!' AIRFLOWS Cooling Heating 334 334 130 130 23,490 23,498 0 0 23,828 23,828 484 464 0 0 0 0 ENGINEERING CKS Cooling Heating 1.4 1.4 10.54 10.54 504.77 47.90 250,64 -72,31 0 % OA cfm/f1" cfm /ton ft'/ton 81ulhr.f' No, People HEATING COIL SELECTION Capacity Coll AIM Ent Lvg MBh cfm 'F 'F 23,496 69.2 75.0 0 0,0 0,0 0 0.0 0,0 0.0 r'454 ' 12.1' 44,3 0 0.0 0,0 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total .150.9 0.0 0,0 0.0 -10.3 0.0 .161.2 ,fv9EtVt.Q1O PERMIT CENTER TRACEIO Load 700 v3.0 calculated at 03:36 PM on 01/17/2000 •Me,w • Zone Checksums By MacDonald - Miller RTU -12 COOLING COIL PEAK Peaked at Tlme: Mo/Hr: Outside AIr: OADBIWB/HR: Envelope Loads Skyllte Sol, 8kyNte Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor infiltration Sub Total ■■> Internal Loads Lights People Miso Sub Total ■■> Ceiling Load Outside Air Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OV /UNDR Sling Exhaust Heat Terminal Bypass Space Sens, + Lat, Btu /h Plenum Sensible Blu /h 0 0 0 0 0 3,808 0 0 0 0 0 0 0 5,050 5,959 3,808 21,297 0 0 0 0 856 0 585,871 608,988 •856 0 0 0 - 36,130 619 0 Grand Total ■■) 612,071 - 30,847 Plenum Latent Btu/h 7/14 81/86 /74 Net Total Btu /h 0 0 3,808 0 0 0 0 0 5,959 0,787 21,297 0 0 585,671 0 606,968 0 0 15,324 77,040 0 0 0 0 619 0 0 0 710,617 Percent Of Total , (%) 0,00 0.00 , 0,54 0.00 0.00 0.00 0.00 0,00 0,84 1,37 3,00 0,00 82,42 85,41 0.00 2.16 10.97 0.00 0.00 , 0.00 0,09 0.00 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 82 HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Space Percent Space Peak Coll Peak Percent Sensible Of Total Space Sons Tot Sens Of Total Bluth (%) Bluth Btu/h (%) 0 0.00 ' 0 0 0.00 0 0.00 ; 0 0 0.00 0 0.00 ' 0 -7,148 3.38 0 0,00 0 0 0.00 0 0.00 ' 0 0 0,00 0 0.00 , 0 0 0,00 0 0,00 0 0 0.00 0 0,00 0 0 0,00 2,400 0,30 •9,109 •9,109 4,38 2,400 0,30 •9,199 - 18,345 7,74 21,297 3.50 0 0 0.00 0 0,00 0 0 0.00 585,071 96.24 ' 0 0 0.00 606,968 99,74 0 0 0.00 •837 -0.14 •189 0 0,00 0 0,00 0 - 23,655 11.20 0.00 ' 0 0,00 0.00 ' 0 0,00 0,00 , 0 0,00 0 0.00 • =171,262 - 171,262 81.12 0,00 , 137 4.08 0,00 ' 0 0.00 100.00 • 608,531 100.00 - 180,850 •211,126 100.00 Main Clip Aux CIg Opt Vent Total Total Capacity ton MBh 65,1 781.7 0.0 0.0 0.0 0.0 65.1 781.7 COOLING COIL SELECTION Sens Cap. Coll AIrfI MBh cfm 767.3 0.0 0.0 32,881 0 0 Enter DB(W6 /HR Leave DBIWBIHR 'F 'F crib 'F 'F gr /lb Floor 69.3 55,7 45.2 60.0 46.3 41.3 Part 0.0 0,0 0.0 0,0 0.0 0.0 EWFlr 0.0 0.0 0.0 0.0 0.0 0.0 Roof Wall Project Name: Qwost'Equipment Space Datasp(Mgpye; t,• ;10pS104.D321PR0,lCCTSlgwest2 Ids ■• „ AREAS Gross Total Glass ft' ( %) 3,120 0 0 3,120 0 0 0 TEMPERATURES Clg Htg SADB 53.2 75.0 Plenum 69,1 608 Rotum 89.1 89.8 ReUOA 89,3 89,2 Fn MtrTD 0,2 0.0 Fn BIdTD 0,5 0.0 Fn Frict 1,5 0,0 Vont Infll Supply MIncfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 488 488 182 182 32,881 32,881 0 0 33,063 33,063 650 650 0 0 0 0 ENGINEERING CKS Cooling Heating 1.4 1.4 10,54 10,54 504.77 47.90 250,54 -72.31 0 % cfm /ft' cfm /ton fl'/ton Btu/hr.ft' No. People HEATING COIL SELECTION Capacity Coil AIrfI Ent Lvg MBh cfm 'F 'F -211.1 32,881 69.2 76,0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0,0 0.0 -14.5 650 12.1 44.3 0.0 0 0.0 0,0 -225.6 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total RECEIVED JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at offt#300 6W&IIIM /2000 Zone Checksums By MacDonald - Miller RTU • 13 COOLING COIL PEAK Peaked at Time: Mo/Hr: Outskte Air: OADB/WB/HR: Envelope Loads Skylite Solr Skyiits Cond Root Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total •■> internal Loads Lights People Miso Sub Total um> Coiling Load Outside Air Sup. Fan Host Rel. Fan Host Duct Heat Pkup OV /UNDR Siting Exhaust Heat Terminal Bypass Space Sens. + Lat. Btu/h Plenum Sensible Btu/h 0 0 0 0 0 3,808 0 0 0 0 0 0 0 0,959 6,969 3,808 21,297 0 0 585,671 0 608,968 0 -856 856 0 0 0 Grand Total ••> 612,071 0 - 38,130 619 0 - 30,847 Plenum Latent Btu /h 7/14 81/66/74 Not Percent Total Of Total Btu/h ( %) 0 0 3,808 0 0 0 0 0 8,959 9,787 21,297 0 0 585,671 0 808,968 0 0 15,324 77,940 0 0 0 019 0 0 0.00 0.00 0,54 0,00 0,00 0.00 0,00 0.00 0,84 1,37 3,00 0.00 82.42 85 "41 0,00 2.16 10,97 0.00 0.00 0.00 0.09 0.00 710,617 100,00 CLG SPACE PEAK Mo /Hr: 7 / 15 " OADB: 82 HEATING COIL PEAK Mo/Hr; 13 / 1 OADB: 24 Space Percent Space Peak CoII Peak Percent Sensible Of Total , Space Sens Tot Sens Of Total Btu/h (1) ; Btu /h Btu /h (1) 0 0.00 , 0 0 0,00 0 0.00. 0 0 0.00 0 0,00 ' 0 -7,148 3.38 0 0,00 , 0 0 0.00 0 0.00; 0 0 0.00 0 0,00 0 0 0.00 0 0.00 ; 0 0 0.00 0 0.00 " 0 0 0.00 2,400 0,39 ; 4,199 •9,199 4.38 2,400 0.39 ' •9,199 •18,345 7.74 21,207 3,60 ' 0 0 0.00 0 585,871 06.24 ' 0 606,968 09.74 0 •837 -0.14 ' -189 0 0.00 ' 0 0,00 0,00 0,00 0 0,00 •171,262 0.00 0.00 608,531 100.00 Main CIg Aux CIg Opt Vent COOLING COIL SELECTION Total Capacity Sens Cap. CoII AIrfI Enter DBIWB /HR ton MBh MBh cfm 'F 'F gr /lb 65.1 0.0 0.0 Total 65.1 781.7 0.0 0.0 781.7 767,3 0,0 0.0 32,881 0 69.3 55.7 46,2 0.0 0,0 0.0 0.0 0.0 0.0 Leave DB/WBIHR °F °F gr /lb 50,0 46.3 41.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest- Equipment Space Oatxept ( Vin► ac;; V;PSU,.0A1)321PRO,tt?CTS%Awest,2 k •• • • •180,650 0 0 0 0 0 - 23,656 0 0 0 - 171,262 137 0 0.00 0.00 0.00 0,00 0.00 11.20 0.00 0.00 0.00 81,12 •0.08 0,00 - 211,126 100.00 Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' ( %) 3,120 0 0 3,120 0 0 0 0 0 TEMPERATURES CIg Htg SADB 63,2 75.0 Plenum 89,1 69.8 Return 89.1 69.8 ReUOA 89.3 69.2 Fn MtrTD 0.2 0,0 Fn BIdTO 0.5 0.0 Fn Friel 1,5 0.0 Vent Infll Supply Mincfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 408 468 182 182 32,881 32,881 0 0 33,083 33,083 850 850 0 0 0 0 ENGINEERING CKS Cooling Heating 1.4 1.4 10,54 10,54 504.77 47,90 250.54 •72,31 0 OA cfm/ft, cfm/ton ft,/ton 6tulhr' t' No, People HEATING COIL SELECTION Capacity Coil Airfl Ent Lvg MBh cfm 'F 'F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total -211.1 0.0 0.0 0.0 -14.5 0.0 -225.6 32,881 69.2 75.0 0 0.0 0.0 0 0,0 0.0 0 10.0 0.0 6 -;AM 44.3 ci '.F wtos.o JAN 2 0 2000 PERMIT CENTER TRACE® Load 700 v3.0 calculated at 03:36 PM on 01/17/2000 RTU -14 Zone Checksums By MacDonald- Miller COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81188 / 74 Envelope Loads Skylfe Solr Skylite Cond Roof Cond Class Solar Glass Cond Wall Cond Partition Exposed Floor infiltration Sub Total ■r> Internal Loads Lights People Misc Sub Total ■■> Ceiling Load Outside Air Sup. Fan Hest Rot. Fan Heat Duct Heat Pkup OV /UNDR Sizing Exhaust Hat Terminal Bypass Space Plenum Plenum Sens. + Lat. Sensible Latent Btu/h Btu/h Btu /h 0 0 0 0 0 4,896 0 0 0 0 0 0 0 0 7,349 7,349 4,808 28,283 0 722,233 748,498 -1,056 1,056 0 0 Net Total Btu /h 0 0 4,698 0 0 0 0 0 7,349 12,044 0 28,263 0 0 0 722,233 0 0 748,498 0 0 18,897 96,113 0 0 - 44,555 0 0 0 763 0 763 0 0 0 Grand Total s» 754,789 - 38,040 076,314 Percent Of Total (%) 0.00 0.00 0,84 0.00 0.00 0,00 0.00 0,00 0,84 1.37 3,00 0.00 82,42 85,41 0,00 2.16 10.97 0.00 0,00 0.00 0,09 0,00 100.00 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 82 Space Sensible Btu /h 0 0 0 0 0 0 2,959 2,959 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Percent Space Peak Of Total ; Space Sens (1) : Btu /h 0.00 ' 0 0,00 ; 0 0,00 0 0.00 0 0.00 ' 0 0,00 0 0.00 , 0 0.00 0 0.39 •11,344 0.39 : - 11,344 28,263 3,50 0 0.00 722,233 96,24 748,496 99,74 •1,032 -0.14 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 750,424 100,00 0 0 0 0 -233 0 - 211,195 - 222,773 Coil Peak Tot Sens Btu /h 0 0 -8,812 0 0 0 0 0 •11,344 - 20,157 0 0 0 0 - 29,171 0 0 0 - 211,195 169 0 Percent Of Total ( %) 0.00 0,00 3,38 0.00 0.00 0,00 0,00 0.00 4.36 7,74 0.00 0.00 0.00 0.00 0.00 11.20 0.00 0.00 0,00 81.12 •0,06 0.00 - 280,354 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Alr(I Enter OBIWB /HR ton MBh MBh cfm 'F 'F gr /Ib Main CIg 80.3 963.9 Aux CIg 0,0 0.0 Opt Vent 0.0 0.0 Total 80.3 983.9 946.2 0.0 0.0 40,548 0 0 69.3 55,7 0.0 0.0 0.0 0.0 45,2 0.0 0.0 Leave DO/WO/HR 'F 'F gr /Ib 50.0 46.3 41.3 0,0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest- Equipment Space Dataset Namo: C: \CDS\LOAD321PROJECTS \Qwest2.lds Floor Part ExFIr Roof Wall AREAS Gross Total Glass fl' ( %) 3,848 0 0 3,848 0 0 0 0 0 TEMPERATURES CIg Htg SADB 53,2 75.0 Plenum 69.1 69.8 Return 89.1 69.8 Ret/OA 89.3 69.2 Fn MtrTD 0.2 0.0 Fn didTD 0,5 0.0 Fn Frlct 1.b 0,0 Vent Infil Supply Mlncfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 677 677 224 224 40,548 40,548 0 0 40,772 40,772 802 802 0 0 0 0 ENGINEERING CKS Cooling Heating 1.4 1.4 10.54 10.64 504.77 47,90 250.54 •72.31 0 % OA cfm /ft' cfm /ton ft' /ton Blulhr t' No, People HEATING COIL SELECTION Capacity Coll AIrtI Ent Lvg MBh cfm 'F "F -260.4 40,548 89,2 75.0 0 0.0 0.0 0 0.0 0,0 0 0.0 0.0 802 12.1 44.3 0 0.0 0.0 Main Htg Aux Htg 0.0 Preheat 0.0 Reheat 0.0 Humidif -17.9 Opt Vent 0.0 Total -278.2 RECEIVED CITY OF TUKVou: JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 PM on 01/17/2000 PERMIT CENTEk Zone Checksums By MacDonald- Miller RTU•15 COOLING COIL PEAK Peaked at Time: Mo/Hr: 7 / 14 Outside Air: OADB/WB/HR: 81166 / 74 Envelope Loads Skylite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total..) Internal Loads Lights People Misc Sub Total ■■) Ceiling Load Outside Air Sup. Fan Heat Rat. Fan Heat Duct Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Space Sens. ♦ Lat. 8tu/h Plenum Sensible Btu /h 0 0 0 0 0 3,744 0 0 0 0 0 0 0 6,880 6,880 3,744 20,942 0 575,910 698,862 -842 0 Plenum Latent Bluth Net Total Btu /h 0 0 3,744 0 0 0 0 6,860 9,604 0 20,942 0 A 0 575,910 0 0 598,852 842 0 0 0 16,068 78,641 0 0 0 0 0 - 35,528 608 0 Grand Total no) 801,870 - 30,333 0 698,773 0 608 0 0 Percent Of Total (%) 0.00 0.00 0,64 0.00 0.00 0.00 0,00 0,00 0.84 1.37 3,00 0.00 82,42 85,41 0.00 2,16 10.97 0.00 0.00 0.00 0.09 0.00 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 82 Space Sensible Btu/h Percent Of Total ( %) 0 0.00 0 0,00 0 0.00 0 0,00 0 0.00 0 0,00 0 0,00 0 0.00 2,360 0,39 2,360 0,39 20,942 3.60 0 0.00 676,910 96.24 896,852 99.74 -823 -0.14 0 0,00 0.00; 0.00 0.00 0 0.00 0.00 0,00 100.00 ' 598,389 100.00 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Peak Coll Peak Percent Space Sens Tot Sens Of Total Btu /h Btu/h ( %) 0 0 0.00 0 0 0.00 0 -7,027 3.38 0 0 0.00 0 0 0,00 0 0 0,00 0 0 0,00 0 0 0.00 4,048 -9,048 4,36 -9,048 - 18,073 7.74 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -186 0 0.00 0 - 23,261 11.20 0 0.00 0 0.00 0 o.on - 168,407 - 168,407 81.12 134 -0.06 0 0,00 - 177,639 - 207,607 TEMPERATURES Cig Htg SADB 53.2 76.0 Plenum 89.1 69.8 Return 89.1 89,8 Ret/OA 69,3 69.2 Fn MtrTD 0.2 0.0 Fn BidTD 0.5 0.0 Fn Friel 1.8 0.0 Vent Infil Supply MInclm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 480 460 179 170 32,333 32,333 0 0 32,512 32,512 639 839 0 0 0 0 ENGINEERING CKS Cooling Heating 1.4 1.4 10.54 10.54 504.77 47.90 250,54 -72.31 0 % cfm/ft' cfm/ton It'lton Btulhr'H' 100.00 No. People Total Capacity ton MBh Main Cig 64.1 768.7 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 64,1 708.7 COOLING COIL SELECTION Sens Cap. Coll Airfl Enter DB/WBIHR MBh cfm "F "F gr /ib 754.5 0.0 0.0 32,333 0 0 69.3 54.7 45.2 0.0 0.0 0.0 0.0 0.0 0.0 Leave DBIWBIHR "F "F gr /Ib 50,0 46.3 0.0 0.0 0.0 0.0 41.3 0.0 0.0 Project Name: Qwest- Equipment Space Dataset Name: C:\ CDS\t.OAD32\PROJECTS1Qwest2.Ids Floor Part BOW Roof Wall AREAS Gross Total 3,088 0 0 3,068 0 Glass ft' ( %) 0 0 0 0 HEATING COIL SELECTION Capacity Coll AIrfI Ent Lvg MBh cfm "F "F Main Htg -207,6 32,333 69.2 75.0 Aux Htg 0.0 0 0,0 0.0 Preheat 0.0 0 0.0 0,0 Reheat 0.0 0 0.0 0,0 Humidif -14.2 639 12.1 44.3 Opt Vent 0,0 RECE4 Eo 0.0 Total -221.8 JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 oiiTd1 /§1300 • Zone Checksums By MacDonald - Miller Corridor 01 F14 COOLING COIL PEAK Peaked at Tune: Mo/Hr: Outside Air: OADD/WB/HR: Space Sens. + Lat. Btu/h Envelope Loads 8kylite Solr 0 Skylite Cond Roof Cond Glass Solar Glass Cond Wail Cond Partition Exposed Floor Infiltration Sub Total ■e* Internal Loads Lights People Miso Sub Total m■> Ceiling Load Outside Alr Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OVIUNDR Siting Exhaust Heat Terminal Bypass Grand Total ■■) Plenum Sensible Btum 0 0 0 0 411 0 0 0 0 1,262 429 0 0 2,948 4,200 840 1,285 0 0 0 0 1,285 0 159 -169 0 0 0 6,624 0 •478 0 203 7/14 81/88 /74 Plenum Net Percent Latent Total Of Total Btu/h Btu/h (%) 0 0.00 0 0,00 411 4,92 0 0.00 0 0,00 1,681 20,12 0 0,00 0 0.00 2,948 36.29 6,040 80.34 1,265 16.14 0 0,00 0 0 0.00 0 1,286 16,14 0 0,00 0 2,527 30,20 0 0,00: 0 0.00 0 0,00 0 0,00 0 •478 •6,72 0 0 0,00 CLG SPACE PEAK Mo/Hr: 7 / 17 OADB: 80 HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Space Percent Space Peak Coll Peak Percent Sensible Of Total . Space Sons Tot Sens Of Total Btulh ( %) Blu /h Btu /h ( %) 0 0,00 ' 0 0 0,00 0 0.00. 0 0 0.00 0 0.00 ' 0 •576 2.83 0 0.00 . 0 0 0.00 0 0.00; 0 0 0.00 2.016 38.18 • -8,826 - 10,991 54,13 0 0,00 ' 0 0 0.00 0 0,00 ' 0 0 0,00 1,925 30,38. •8,739 •8,739 43,04 3,943 74,54 - 17,284 - 20,308 100.00 1,205 23.91 0 0 0,00 0 0.00 ' 0 0 0.00 0 0.00 ' 0 0 0,00 1,285 23.91. 0 0 0,00 82 1.65 •1,754 0 0:00 0 0,00 , 0 0 0,00 0.00 ' 0 0.00 0,00 , 0 0.00 0.00: 0 0,00 0 0.00 0 0 0,00 0,00 ' 0 0.00 0.00 0 0.00 8,354 100.00 • 5,289 100.00 -19,018 •20,308 100.00 TEMPERATURES CIg Htg SADB 65.0 70.1 Plenum 71,4 85.1 Return 71.4 65.1 Ret/OA 76.4 24.0 Fn MtrTD 0,0 0.0 Fn BIdTD 0.0 0.0 Fn Friel 0,0 0,0 Vont Infil Supply Mincfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling Heating 148 0 173 173 321 0 0 0 494 0 321 0 0 0 0 0 ENGINEERING CKS Cooling Heating 46,2 0,0 0,87 0,00 480.98 532.20 22,55 •8418 0 % OA cfm/ft' cfm /Ion U' /ton Btu/hrfl' No. People Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0,7 8.4 0,0 0.0 0.0 0.0 0.7 8.4 COOLING COIL SELECTION Sens Cap. Coil AIrfI Enter DB/WOIHR Leave DB/WBIHR MBh cfm 'F `F gr /Ib 'F 'F gr /Ib 6.9 294 76.4 64.0 70.8 0.0 0 0,0 0.0 0.0 0.0 0 0.0 0.0 0.0 55.0 54.6 63.8 0,0 0.0 0.0 0,0 0.0 0.0 Project Name: Qweat•Equipment Space Dataset Name: C: 1CDSiLOAD321PROJECTS \Qwest2.Ids Floor Part ExFir Roof Wall AREAS Gross Total Glass n' ( %) 371 0 0 371 0 1,891 0 HEATING COIL SELECTION Capacity Coll AINI Ent Lvg MBh cfm 'F 'F Main Htg •19.0 0 0.0 0.0 Aux Htg 0.0 0 0.0 0,0 Preheat •5,1 148 24.0 55,0 Reheat 0.0 0 0.0 0.0 Humidif 0.0 0 0,0 0,0 Opt Vont 0.0 0 0.0 0,0 Total .24.1 RECEIVE° CITY OF TUKW"+ JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 PM on 01/17/2000 PERMIT CENTER. Zone Checksums By MacDonald - Miller Corridor 02 416•FIE COOLING COIL PEAK Mo/Hr: 7 / 14 OADB/WB/HR: 81 / 86 / 74 Peaked at Time: Outside Air, Envelope Lads Skylito Sotr SkyIc Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total us> Intemai Loads Lights People Misc Sub Total ■■o Ceiling Load Outside Alr Sup. Fan Heat Rot, Fan Heat Duct Heat Pkup OV!UNDR al�cing Exhaust Heat Terminal Bypass CLO SPACE PEAK Mo /Hr: 7 / 15 OADB: 82 Space Plenum Plenum Net Percent Space Percent Sens. + Lat. Sensible Latent Total Of Total Sensible Of Total , Btu/h Btu/h Btu/h Bluth ( %) Btu /h (%) 0 0 0 0,00 0 0,00 0 0 0 0,00 0 0,00 0 173 173 7.72 ` 0 0,00 0 0 0 0,00 0 0.00 , 0 0 0 0,00 ' 0 0.00 0 0 0 0,00 0 0,00 0 0 0.00: 0 0,00 0 0 0,00 ' 0 0,00 821 821 27.07 480 48.84 821 173 704 35.30 480 48.84 532 0 632 23,74 ' 532 60.88 0 0 0.00 , 0 0.00 0 0 0 0 0,00: 0 0.00 632 0 0 632 23,74 532 60.88 87 47 0 0.00 35 3.30 0 0 0 1,004 47.43. 0 0.00 0 0.00 ' 0,00 0 0 0,00 0.00 0 0 0.00. 0,00 0 0 0,00 ; 0 0.00 -147 0 •147 4.58 0.00 ; 0 0 0 0.00, 0,00; Grand Total ago 1,220 •41 0 2,243 100.00 1,047 100.00 COOLING COIL SELECTION Total Capacity Bens Cap. CoII Alrfl Enter DB/WBIHR ton MBh MBh cfm 'F 'F gr /ib Main Clg 0,2 2.2 1,8 64 81.2 66.2 73,8 Aux Clg 0,0 0.0 0,0 0 0.0 0.0 0-0 Opt Vent 0,0 0.0 0.0 0 0.0 0.0 0.0 Total 0.2 2.2 Leave DB/WBIHR 'F 'F gr /Ib 55.0 54,8 64.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest- Equipment Space Pataset Name: C :1CDSIOAD321PROJECTSIQwest2.lds HEATING COIL PEAK Mo/Hr: 13 / 1 OADB: 24 Space Peak Space Sons Btu /h 0 0 0 0 0 0 0 • 1,840 - 1,840 0 0 0 •739 0 0 •2,578 Coil Poak Tot Sens Btu /h 0 0 -242 0 0 0 0 •1,840 •2,082 0 0 0 0 0 0 0 0 0 0 0 0 -2.082 Percent Of Total ( %) Floor Part ExFIr Roof Wall AREAS Gross Total 166 0 0 156 0 Glass ft; (%) 0 0 0 0 0,00 0.00 11.84 0,00 0.00 0,00 0,00 0,00 88,38 100,00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0,00 0,00 100.00 TEMPERATURES Clg Htg SAM 55.0 70,1 Plenum 71.4 58.1 Return 71.4 85,1 Ret/0A 81.2 24,0 Fn MtrTO 0,0 0.0 Fn BIdTO 0,0 0.0 Fn Frlct 0.0 0,0 Vent Infll Supply Mincfm Return Exhaust Rm Exh Auxtl AIRFLOWS Cooling 82 38 84 0 101 99 0 0 Hooting 0 36 0 0 0 0 0 0 ENGINEERING CKS Cooling Heating 982 0.0 0.41 0.00 339,81 834,64 14.38 40.18 0 % OA cfm /ft' ofmlton fNlton 8lulhr.fN No. People HEATING COIL SELECTION Capacity Coll AIM Ent Lvg MBh cfm 'F 'F Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total .2.6 0.0 -2 1 0.0 0.0 0.0 -4.7 0 0,0 0.0 0 0.0 0.0 62 24.0 55.0 0 0.0 0.0 0 0,0 0.0 0 0.0 0.0 RECEIVED CITY OF TuKwp.,- TRACE® Load 700 v3.0 calculated at 03 :3 PM o 019/1T /20 Q0 PERMIT CENTER Zone Checksums By MacDonald-Miller Corridor 03 E14.84.5 COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Alr: OADBIWB /HR: Envelope Loads Skylke Solr Skylfe Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■■> Internal Loads Lights People Miso Sub Total r.) Ceiling Load Outside Air Sup, Fan Heat Ret, Fan Heat Dual Heat Pkup OWUNDR Sling Exhaust Heat Terminal Bypass Grand Total ■■o Space Sena. 4, Lat, Btu/h Plenum Sensible Btu/h Plenum Latent Btu/h 7/14 81 /86/74 Net Total Btu/h 0 0 0 0 0 0 0 1,887 1,887 0 0 0 0 0 0 0 0 0 0 0 0 0 6,788 0,788 6,788 1,887 0,856 6,806 0 8,808 0 0 0 0 0 0 6,808 0 0 5,808 730 .730 0 0 0 0 11,002 0 0 0 0 0 0 0 •1,804 0 1,604 0 0 0 13,304 .447 0 24,459 Percent Of Total (1/.) CLG SPACE PEAK Mo /Hr; 7 / 18 OADB; 82 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Percent Space Peak Coll Peak Percent Sensible Of Total Space Sons Tot Sens Of Total Btu /h (1) ; Btu /h Btu /h ( %) 0.00 , 0 0,00 • 0 0 0,00 0.00 ; 0 0.00 o 0 0.00 7.72 • 0 0.00 ; 0 •2,842 11,84 0,00 , 0 0.00 0 0 coo 0,00 ' 0 0,00 0 0 0.00 0,00 , 0 0.00 • 0 0 0,00 0.00 ; 0 0.00 0 0 0,00 0,00 • 0 0.00 • 0 0 0.00 27,87 : 5,233 46.84 ' •20,082 •20,082 88,38 36,30: 5,233 46.84 •20,082 •22,703 100.00 23.74 5,808 60.88 0 0 0.00 0.00 : 0 on : o 0 0.00 0,00 ' 0 0,00 ' 0 0 0.00 23.74. 5,808 60.88 ' 0 0 on 0.00 377 3.30 ' •8,053 0 0.00 47.43 , 0 0.00 0 0 0.00 0.00 , 0.00 ' 0 0,00 0,00 ; on , 0 0.00 0.00 ' 0.00 . 0 0,00 0.00 . 0 0,00 . 0 0 0.00 •6.50 ; 0.00 ' 0 0,00 0,00 : 0.00 0 0,00 100.00 11,416 100.00 •28,114 •22,703 100.00 TEMPERATURES Clg Htg SADB 55.0 70.1 Plenum 71.4 55.1 Return 71.4 58,1 RetJOA 81.2 24.0 Fn MtrTO 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frlct 0,0 0,0 Vent Infil Supply Mlncfm Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 680 397 893 0 1,096 1,077 0 0 awrammerale Heating 0 307 0 0 0 0 0 0 ENGINEERING CKS Cooling Heating 98.2 0.0 0.41 0.00 339.81 834.54 14.38 .30.15 0 % cfmlll' cfmllon ft'llon Blu /hrtt' No. People Total Capacity ton MBh Main Clg 2,0 24.5 Aux Clg 0.0 0,0 Opt Vent 0.0 0.0 Total 2.0 24.5 COOLING COIL SELECTION Sens Cap, Coll AIM Enter DB/WB /HR Leave OBIWB /HR MBh cfm 'F 'F gr /Ib 'F 'F grlib 19.6 0.0 0.0 699 0 0 81.2 66.2 73.8 0.0 0.0 0.0 0,0 0,0 0.0 55.0 54.8 64.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest•Equipment Space Dalaset Name: C:\ COS\LOAD321PROJECTS \Qwe::t2.Ids Floor Part ExFIr Roof Wall AREAS Gross Total Glass fi' ( %) 1,701 0 0 1,701 0 0 0 0 0 HEATING COIL. SELECTION Capacity Coil Airfl Ent Lvg Mk3h ctm 'F 'F •28.1 0 0.0 0.0 0.0 0 0.0 0,0 .23.2 680 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0,0 0.0 0 0.0 0.0 •51.3 RECEIVED Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total • .• JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 PNF8,14W4 2000 Corridor #4 8.8 /E -F Zone Checksums By MacDonald- Miller COOLING COIL PEAK Peaked at Time: Mo/Hr, Outside Air: OAOB/WB/HR: Envelope Loads Skylite 8olr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■■» Internal Lads Lights People Misc Sub Total ■s) Ceiling Load Outside AIr Sup. Fan Heat Rot. Fan Heat Duct Heat Pkup OVIUNDR Sizing Exhaust Heat Terminal Bypass Grand Total us> Space Sens, + LM. Btu/h 0 0 0 0 0 0 0 0 724 724 0 0 0 0 78 0 828 Plenum Sensible Btu/h Plenum Latent Btulh 7114 81/88/74 Not Total Btu/h 0 0 0 0 887 887 0 0 0 0 0 0 0 724 887 1.411 0 0 0 0 0 0 0 0 0 -78 0 Q 0 833 0 0 0 628 0 -118 0 0 0 -118 0 0 Percent Of Total ( %) , CLG SPACE PEAK Mo /Hr: 7 /18 OADB: 81 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Percent Space Peak Coll Peak Percent Sensible Of Total Space Sens Tot Sons Of Total Btu/h (%) Btu /h Btu /h ( %) 0.00 ' 0 0.00 ' 0 0 0,00 0,00. 0 0,00 : 0 0 0.00 28,91: 0 0,00 ' 0 -677 23,98 0,00. 0 0,00 . 0 0 0,00 0,00 ; 0 0.00 ' 0 0 0.00 0,00 ' 0 0,00 , 0 0 0.00 0.00 ; 0 0,00 ; 0 0 0.00 0,00 0 0.00 0 0 0,00 28.38 634 44.49 , -2,147 4,147 78,02 55,30 ; 634 44,49 -2,147 -2,023 100.00 0.00 ' 0 0.00 0 0 0.00 0.00 , 0 0.00. 0 0 0,00 0.00 0 0.00. 0 0 0,00 0,00 ; 0 0.00 ' 0 0 0,00 0.00 ' 40 3.38 ' -882 0 0.00 24,81 0 0.00 , 0 0 0.00 0.00 ' 0.00 ; 0 0.00 0.00 1 0.00 ' 0 0.00 0.00 ; 0,00 ; 0 0.00 24.53 ' 628 52,18 ' 0 0 0.00 -4.64 ' 0.00 ; 0 0.00 0.00 ; 0.00 • 0 0,00 1,428 490 0 2,551 100,00 1,200 100,00 -3,008 -2,823 100,00 Main Clg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil AIr1I Enter DB/WB /HR Leave GB/WO/HR ton MBh MBh cfm 0.2 1.9 0.0 0,0 0.0 0,0 0.2 1.9 'F 'F gr /ib 'F 'F °r/lb 1,6 37 81,4 66.3 74.0 0.0 0 0.0 0,0 0.0 0.0 0 0.0 0.0 0.0 55.0 48.6 41.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest•Equipment Space Dataset Name: C: 1COSWLWAD321PROJECTS1Qwest2.1ds Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' ( %) 182 0 0 182 0 0 0 0 0 TEMPERATURES CI() Htg SADB 55.0 70,1 Plenum 71.4 55.1 Return 71,4 55,1 Ret/OA 81.4 24.0 Fn MtrTO 0.0 0.0 Fn OldTD 0.0 0,0 Fn Frict 0,0 0,0 Vent Inttl Supply Mlncim Return Exhaust Rm Exh Audi AIRFLOWS Cooling 73 42 73 115 116 0 0 Heating 0 42 0 0 0 0 0 ENGINEERING CKS Cooling Heating 100.0 0.0 0.40 0.00 453,74 1,134,35 10,58 40.15 0 % cfm/ft' cfm/ton ft' /ton Btulhrft' No. People HEATING COIL SELECTION Capacity Coil AIrfl Ent Lvp MBh cfm 'F 'F 4.0 0 0.0 0.0 0 0.0 0.0 73 24.0 55.0 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total 0.0 -2.5 0.0 0.0 0.0 .5.5 RECEIVED CITY OF TUKW 1. JAN 2 0 Z000 TRACE® Load 700 v3.0 calculated at 03:36 PM on 01/17/2000 ERM T CENTEk Zone Checksums By MacDonald - Millar Corridor 05 F18.5.9.3 COOLI Peaked at Time: Outside Air: Envelope Loads 8kylite 8olr Skylite Cond Roof Cond Ohms Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total ■■> Internal Loads lights People Mtsc Sub Total ■ ■s Ceiling Load Outside Air Sup, Fan Heat Ref. Fan Heat Duct Heat Pkup OV /UNDR Sizing Exhaust Heat Terminal Bypass Grand Total •a) Main Clg Aux Cig Opt Vent Total Space Sens, + Lat. Btu/h 0 0 0 1,256 0 0 4,778 8,030 2,048 0 2,048 258 0 0 8,335 NO COIL PEAK Mo/Hr: 7 / 14 OADB/W13/HR: 81 / 88 / 74 Plenum Sensible Btu/h 0 0 688 0 0 1,323 Plenum Latent Btu/h 1,988 0 0 0 0 0 -268 0 0 0 0 -774 0 0 0 957 0 Net Total Btu/h 0 0 888 0 0 2,578 0 0 4,776 8,018 2,048 0 0 2,048 0 4,092 0 0 0 0 •774 0 13,384 Percent Of Total (%) 0.00 0,00 4.97 0,00 , 0,00 19:28 0.00 0:00 35,07 59,91 16.30 0.00 0,00 15,30 0.00 30.68; 0,00 0.00 0,00 0.00 •5,78 0.00 100.00 CLG SPACE PEAK Mo/Hr: 7 / 17 OADB: 80 Space Sensible Btu/h Percent Of Total ( %) 0 0.00 0 0,00 0 0.00 0 0,00 0 0.00 2,335 30.60 0 0.00 0 0.00 3,117 40,83 6,452 71.43 2,048 28,83 0 0.00 0 0.00 2,048 28,83 133 1,74 0 0.00 0.00 0,00 0.00 0 0,00 0,00 0,00 7,833 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coll Airfl Enter DO/WO/HR ton M8h M8h cfm 'F 'F gr /Ib 1.1 13,4 0.0 0.0 0.0 0.0 1.1 13.4 11.1 0,0 0.0 430 0 77.0 64.3 71.1 0,0 0.0 0.0 0.0 0.0 0.0 Leave DB/WB /HR 'F 'F gr /lb 55.0 63.9 61,1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Owest•Equipment Space Pataset Name: G: 1CDSU.OAD32.PROJECTSIQwest2.1ds HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Spaco Peak Spaco Sons Btu/h 0 0 0 0 -4,508 0 0 - 28,308 •32,814 0 0 0 0 •2,840 0 0 •35,854 Coil Peak Tot Sons Btu /h 0 0 -932 0 0 -8,096 0 0 •28,306 - 37,333 0 0 0 0 0 0 0 0 0 0 0 0 Porcont Of Total ( %) 0,00 0.00 2,60 0.00 0,00 21.88 0.00 0.00 75:82 100.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0,00 0.00 0.00 •37,333 100.00 Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft, ( %) 600 0 0 600 0 0 1.525 0 0 TEMPERATURES CIg Htg SADB 55.0 70.1 Plenum 71.4 55.1 Return 71.4 65.1 ReVOA 77.0 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0,0 0.0 Fn Frict 0.0 0.0 Vont Infll Supply MIncfm Return Exhaust Rm Exh AuxII AIRFLOWS Cooling 240 280 483 0 743 520 0 0 Hosting 0 600 0 0 0 0 0 0 ENGINEERING CKS Cooling Heating 51,8 0,0 0.77 0.00 415,20 537,94 22,31 •73.05 0 % ofmlft' ofmlton ft' /ion Otu/hrll' No. People HEATING COIL SELECTION Capacity Coil Alrfi Ent Lvg MBh cfm "F 'F •35.7 0 0.0 0.0 0.0 0 0.0 0.0 •8.2 240 24.0 55,0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -43,8 RECEIVED CITY OF TUKWILA Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 KfiRiVritii4500 Zone Checksums By MacDonald- Miller Corridor #6 F/9.3.9.7 COOLING COIL PEAK Peaked at Time: Mo/Hr: 8 / 14 Outside Air: OADB/WBIHR; 80/88 / 74 Space Plenum Plenum Not Percent Sens. + Lat. Sensible Latent Total Of Total Btu /h Btu/h Btu/h atu/h (•h) Envelope Loads Skyllte Solr 0 0 0 0.00 0 0.00 Skyllte Cond 0 0 0 0.00 0 0,00 Roof Cond 0 284 284 3.14 0 0,00 Glass Solar 3,091 0 3,091 38,85 3,789 87,84 Glass Cond 100 0 190 2,25 138 2,43 Wall Cond t107 1,253 2,380 27.98 1,078 19,35 Partition 0 0 0.00 0 0.00 Exposed Floor 0 0 0,00 0 0,00 Inflltralion 1,038 1,038 12,28 523 9.38 Sub Total ■s> 6,424 1,518 8,941 82.30 5,505 08,81 Internal Loads . Lights 0 0 0 0,00 ' 0 0.00 People 0 0 0.00 0 0.00 MIsc 0 0 0 0 0,00 0 0.00 Sub Total so> 0 0 0 0 0.00 , 0 0.00 Ceiling Load 129 .120 0 0.00 66 1.19 Outside Alr 0 0 0 1,775 21.05 t 0 0.00 Sup. Fan Heat 0 0.00 ; 0.00 ' Rel. Fan Heat 0 0 0.00 , 0,00 Duct Heat Pkup 0 0 0,00 ; 0.00 OVIUNDR Sizing 0 0 0,00 , 0 0,00 Exhaust Heat .283 0 .283 •3,35 0,00 , Terminal Bypass 0 0 0 0,00 0,00 Grand Total ■■) 5,552 1,106 0 8,434 100.00 ° 5,572 100.00 CLG SPACE PEAK Mo /Hr: 9 / 14 OADB: 77 HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Percent Space Peak Sensible Of Total Space Sons Btu/h (%) Btu/h 0 0 0 •998 •3,020 0 0 •7,078 - 11,093 0 0 0 0 •1,420 0 0 - 12,513 CoII Peak Tot Sens Btu /h 0 •488 0 •998 •5,531 0 0 •7,078 •14,070 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total ( %) 0.00 0.00 3,31 0.00 7,08 39.31 0,00 0.00 50,29 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0,00 .14,070 100,00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.7 8.4 0,0 0.0 0.0 0,0 0,7 8,4 COOLING COIL SELECTION Sons Cap, Coil AIrfl Enter DBIWB /HR Leave DB(WB /HR MBh cfm "F "F gr/lb "F "F gr /Ib 7,6 0.0 0.0 318 0 74.4 0,0 0.0 63.1 69.9 0.0 0,0 0.0 0.0 55.0 54.2 62.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Qwest•Equipment Space Dataset Name: C: \CDSU,OADMPROJECTSQwest2.Ids Floor Part ExFir Roof Wall AREAS Gross Total Glass ft' ( %) 300 0 0 300 0 0 1,008 21 2 TEMPERATURES Clg Htg SADB 66.0 70,1 Plenum 71.4 65,1 Return 71.4 66,1 Rot/OA 74.4 24.0 Fn MtrTD 0,0 0.0 Fn BIdTD 0.0 0.0 Fn FrIct 0.0 0.0 Vont Infli Supply MIncfm Return Exhaust Rm Exit Auxll AIRFLOWS Cooling 120 70 338 0 408 190 0 0 Healing 0 140 0 0 0 0 0 0 ENGINEERING CKS Cooling Heating 35,5 0,0 1.13 0.00 480,98 426.84 28.11 45.34 0 % clmlft' cfmlton ft'Iton Btu/hr.ft' No. People HEATING COIL SELECTION Capacity Con Aim Ent Lvg MBh cfm 'F 'F •12.5 0 0,0 0.0 0,0 0 0.0 0.0 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total •4.1 0.0 0.0 0.0 -16.6 120 24.0 55.0 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 RECEIVE CITY OF TUKWII.G JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03:36 P 10L7 Zone Checksums By MacDonald - Miller Truck Dock COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADBIWB/HR: Envelope Loads Skylite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Psrtl!Ion Exposed Floor Infiltration Sub Total am) Intema! Loads Lights Peoplo Miso Sub Total as) Ceiling Load Outside Air Sup. Fan Heat Rot, Fan Heat Duct Heat Pkup OVIUNDR Siting Exhaust Heat Terminal Bypass Grand Total ■s> Space Plenum Sens, ♦ Lat. Sensible Btu /h Bluth 0 0 0 0 0 78 30,617 0 •87 0 303 492 0 0 •268 30,637 570 1,242 0 0 0 0 1,242 0 166 •158 0 0 0 0 -470 0 31,935 -58 0 Plenum Latent Btu/h 8/9 89/61/87 Nat Total Blu /h 0 78 30,517 •87 855 0 •258 31,107 Percent Of Total ( %) 0.00 0.00 0,28 98,39 •0.27 2,70 0.00 0.00 •0.81 98.25 1,242 3.92 0 0.00 0 0 0.00 0 1,242 3.92 0 0.00 0 -220 -0.69 0 0.00 0 0.00 0 0.00 0 0,00 0 -470 -1.48 0 0 0.00 0 31,660 100,00 CLO SPACE PEAK Mo /Hr: 7 / 9 OADB: 89 Space Sensible Bluth Percent Of Total (1) 0 0.00 0 0,00 0 0,00 30,888 95.68 •102 •0 32 410 1.27 0 0,00 0 0,00 •238 •0,74 30,935 95.90 1,242 3,85 0 0,00 0 0,00' 1,242 3,85 81 0.25 0 0.00 0.00 0,00 0.00 0 0.00 0.00 0,00 32,258 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 2.6 31.7 0.0 0.0 0.0 0.0 2.6 31.7 COOLING COIL SELECTION Sens Cap. Coil AIrfI Enter DBIWB /HR MBh cfm 'F 'F gr /Ib 31.8 0,0 0.0 1,941 0 0 71.2 81.6 67.5 0.0 0,0 0.0 0.0 0.0 0.0 Leave DBIWB/HR •F 'F gr /Ib HEATING COIL PEAK Mo /Hr: 13 / 1 OADB: 24 Space Peak Space Sons Blu/h 0 0 -3,840 -2,398 0 0 •17,172 •23,407 0 0 0 •1,723 0 0 •25,131 Coil Peak Tot Sens Blu/h 0 •585 0 •3,840 •8,122 0 0 - 17,172 •20,699 0 0 0 0 0 0 0 0 Percent Of Total (1) 0.00 0.00 2.12 0.00 14,38 19.18 0,00 0.00 64.32 100.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0,00 0.00 0.00 - 28,699 100.00 Floor 55.0 55.0 65.5 Part 0.0 0.0 0.0 ExFIr 0.0 0.0 0.0 Roof Wall Project Name: Qwest- Equipment Space Oataset Name: C: 1CDSILOAD321PROJECTS \Qwest2.Ids AREAS Gross Total Glass 8i (° /v) 364 0 0 364 0 0 1,159 160 14 ■ TEMPERATURES CIg Htg SADB 55.0 70.1 Plenum 71.4 55.1 Return 71.4 55,1 Rot/OA 71,2 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0,0 0.0 Vont Infll Supply Mincfm Return Exhaust Rm Exh Auxll AIRFLOWS Cooling Heating 148 0 170 340 1,957 0 2,127 315 0 0 0 0 0 0 0 ENGINEERING CKS Cooling Heating 7,4 0.0 5.38 0.00 741.81 137,97 86.98 -82.67 0 OA cfmlfN cfm/ton ft' /ton BtWhr.fo No. People HEATING COIL SELECTION Capacity Coil AIr1I Ent Lvg M8h cfm 'F 'F -25.1 0 0.0 0.0 0,0 0 0.0 0,0 •5,0 146 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -30.1 Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total RECEIVED CITY OF TUKWILA JAN 2 0 2000 TRACE® Load 700 v3.0 calculated at 03 :3V ei e1gjj' 00 A-18-2000 TUE 08:22 PM CG 1 I NEER I NG FAX N0. ~"778 5536 P. 02 CC 99162. STRUCTURAL CALCULATIONS FOR: QWEST COMMUNICATIONS SEISMIC BRACING E 9/ 6 / EL1 L SUBMITTED TO: MacDonald. Miller 7717 Detroit SW Seattle, WA, 98106 BY: CG ENGINEERING 111 MAIN STREET, SUITE 106 EDMONDS, WASHINGTON 98020 (425) 778 - 8500 M2Ooo ori RECEIVED CITY OF TUKWILA JAN 2 0 2000 PERMIT CENTER i JAN-18-2000 TUE 08:22 PM CG'1 I NEER I NG (CQWEST COMMUNICATIONS" 6101 South 180" Street Tukwila, Washington 98188 FAX N0, 4'`4778 5536 P, 03 SECTION NO. 3 SECTION TITLE: ;OUIPMENT SUPPORT & BRACING DF PT ON „ EOUIPMENT 1` PP 8c • SECTION INDEX _PAGES C LCULATIO S OS • MO w OD VP RECEIVED CI YJ F T JKWIl I~... -... -. JAN 2 0 2000 PERMIT CENTER J414-18 -2000 TUE 08:22 PM CG '-'rTINEEPING FAX N0, 4,.778 5536 P. 04 , E/SA/1 /G 8 2 4 a,t/G ,.) -4/sP ytl,_. 4/47,Wot•_k 44-4,0 1-0016 c.44,e, , vac (32-2) C Ude (32.3) ' fl 644. SvMLy hue.r e PLf✓' � 'SO !'LP • - 30 /l Q VN7 c` mote 646 ,4e/ /JG av4s y /D' 4'44- oWANGG'" AWL. 1.471MAL tsu 20 Nag v40 2,0 Pl.l= VAV &-Als to Ermw .7e. IGO e .,�v LIN�.L fe'�ri is 30 PL F 100 PLg Logri7414,0,01AJcirolvdra MAUL. Ise A7' et op, 4e0" buo- ,i /9 /move •400.c. Mb , 00P MUM 47 .29 ' Athol- 044. A7"7 /cuter - aJ/LL D4 xvtcny aro # rf7 14777M "VAL /»1. rA4 pr ° aP '' 3' WP A ve ,O% �� i . 3I 2c J 3pao R, wl1,1 ei C/der •47 34' /NT'tvt V4b4 .7Ca eWp < , 140 W 17(,30,0) Joao ' ?2,7 < 4(31)00)(34o0 473 P ;7 < 3%O :pa 1.0 ' ,33 Ip . 1.0 A i l , f3,0 L1% 177S l .1r . 21.01 Wp ' (Oo PLF) 301 3aoo no Ate y: k.ARR1 C /A /it./ 1 -47 -OP ate • CITY WUNI JAh CG Engineering 111 Main Street, Suite 106, Edmonds, WA 98020 Ct icnla.x15 UAW PERMIT CENTER JAN -18 -2000 TUE 08:23 PM CG,,JINEERING I3Io* 7X7* — 4 FAX N0, 4`778 5538 C4/3Ltr 71271.1/0A1 a 027 /LOa 4= /3/0 /,d P. 05 A'i7Pfat Ais7' Tr) Jowl. 446, iv ,e eArvidir-mla0 /N /70.. .4/0640 APY AJCisriAtA 00 1141‘&04-el CG Engineering .111 Math Street, Suite 106, Edmonds, WA 98020 CQcalc.xls RECEIVED CITY OF TUKWILA JAN 2 0 2000 PERMIT CENTER 4 3I /"l7 -Da acs ""--r--"TI ,Yo. JAN -18 -2000 TUE 08:23 PM CG -"` t I NEER 1 NG .. •• w.r ••••••••l •rr . FAX NO, 4; 778 5536 P.06 AMA , MacDonald - Miller a GNISSircertrery _ ii miummiremmitawr _room munimmitsbahinviiiiiii mommummotamomparmam. 1 tummum nournetuarrefoonpoirmi immilm.1.16.__7=z;fiatitmomelm*ummpram,„ii, immumorm u-iligliallammaremillu irr�k.'1 •�. 1 M1Ir M� �I I ■1 UURI ■$ /RI■ URa*u um mum ■ IuL.;2 7,5s ■ '�Rr i i► & I■ 1'' li a ■ • 1, 11101711 rim m." Im m1.. sr■. ; :.Q .;•r � + �►`�ri 1 IV KIN • o NM .GI SRS . '4-z IMml MU/ ' F MESEMPIIM lawamiAtimmu! s k►A°wrg. uttttt�utttttt��ra�r ,...o .ill. t �.. 6u j ' • I...s a ..... .r. . .ir ,, mAim mi lM w wwaw +? rm � jmiiiiiimiiiUiiiSUiiia v...• ..... ^ i LA G 'Ft I _ . u ♦ Y .♦.� .w.w..„ _ , L.__ 111 1 I" ' IIV Mini ir - –II ..i. — 1 :mmilim -kr-1 Mu i.1IA::l1Y ■ 1 WIN zoto =I -- _ __L... .«.,,.. , _ _ _ , —I ... i ..... __. - .. .., _____L____..._, .... »,. •�,.._...,_..._......_ _...J... J...,.. .. . • .. li C''R1.... 1 ......... T_ ..,.,.. ..I...l.r..... i f 4. _. .. . • L. ... l, 1 0 . •• . s. ti JAN -18 -2000 TUE 08:23 PM CG '"`rINEERING Uwe: .comPanY I , s, };. •. • • .f !R • '.► R FAX 70: Greg Gulilen CCU Engineering Re. QWE8T CyberCentor Phone 426778 -8600 Fax Phone 425 -778 -5536 c FAX N0. 11141.4\778 5536 208 787 8773; Jan•14.00 i:22PM; as Number of FROM: Phone Fax Phon 1/14/00 P. 07 Page 1 a es includln cover sheet 4 Dove Nehren MacDonald- Miller Co. ?717 Detroit SW Seattle, WA 98106 (206) 768 4128 206 7684129 REMARKS;, 0 Urgent 21 Por your review C❑ Reply ASAP 0 Please Comment Greg, I have enclosed cut sheets on the boiler skids and on the VAV boxes Installed above the rack area. As noted In my o.mali from 1/10/00 to Chevy! "60" dia supply duct at 48 lbs. per linear foot, with 30 Ib. rings at th point connections (10 feet on center). The boiler skids are L 116" X W 88" X H 90" and welg t 8000 lbs. operating each. We should have a 4" concrete pad around the units, with 12" clear nce around the skid." also enclosed a print of the new location for RTU.11 (Supper area AC Unit) for your review (north of Grid D, end East of grid 8. Thanks for your assistance, and please call If you have any qu •tIono. Sincerely, Dave Nehren ,. : ». ....5... 1 f • • . . •T .... RECEIVED CITY OF TUKWILA JAN 2 0 2000 PERMIT CENTER 4,01 4 ... • 1 JON -18 -2000 TUE 08:24 PM CG ' OINEEEING FAX NO 4'T'778 5536 P, 10 �'JIND LQ,pb CAl,.CIJ[.�'rJt SCPe)A SCA.Xx TWerAl #0o, 7e perochlare ,LA4G1 z r 7� trmY 44e'71. L4ncresr 7,a , 4E6Tk' 1416, TYPICA e.oviths.4 oC Sexmws exws») Mert1M 11At. (mitt 116'•04 rrf`TM �r -r t�i• }'-4' It' -!t 44' /4 ! tp4 r•-• V.' '� rmuumtntrlrnan 1.11 rnuttnutt irnut rmtt laal i r . c►uiunnuw:nuu Ir uuulwluuuml rant, wiry �'� I .1 r `auk 1111 J1t U l .' *� �1 171q (111111 • iii��� 1{u uor • I r�!11(f' nmminrm 1 ,1111 q :I't';.dll 1.-;-.7:-..-..-,;-.4 1 • ._ 11 W 111.11W,11r 111CY. IIpII11rJ I C'.Inlllll: �.y ■■• Ll(. Illulllltltl inn WfUUonnrn N 1nn11!11111{11111111111 •n u11W111111 IWultllutlltlluui 10Ut11ttll000IUw . tutUin III iiUUUf uiallI Iuo UAW! 0lllllljr, NON 1'611 tn. r.t' RECEIVED CITY OF TUKWIR.A RdOP FRAMING -. PL/AN Foie VNITS CG Engineering 111 Main Street, Suits 106, Edmonds, WA 98020 CQcalc.'cls JAN 2 0 2000 PERMIT CENTER COO 1-la: -04 Oatc to. No. ■ JAN- 182000 TUE 08:24 PM CG IINEERING FAX N0. 4r`778 5536 P. 11 -ra/rUMtZt/ Ys.( Mel° 1 1 b7UDS /, 4S° '.2C ___ wig_ Psgs.sgf (saw; /620 vac) uez (4o -1) P = Cc Co, gro Z>~, PA C74 )(l.a)(1414)(1.0) P= IS Ps1 r_LaYte,t? a cC wlt %4 t4Emor t _tty? �rnr4 C 4/4")( 4' 10 =104.5')(4,17s'/) t• 40 'p,11. c4,1 0,74 kxPa9inte f3, 8o #w d. 7.r /b -fir a /2 7A4ce I4-N) WAGl..I6t.cm T� �.3 w /4,4 PSG iAdtk 16.7 Jn/ = I wind [eon, w A ' gD ,° 0044421/.5. PSP) +� 1 904 it rk/a r61t/ id/d0 Lfita RECEIVED COY OF TUKWILA JAN 2 0 2000 EY; MIT CENTER Chkd Duo CG Engineering 111 Main Street, Suite 106, Edrnonds, WA 98020 COCNIa. h sat JAN -18 -2000 TUE 08:24 PM CG "" °tINEERING FAX N0, '778 5536 P. 12 844cC Des/G$) 'D/lcc /N /yzoice (/�ri�L feete -) (a) a ?do' (a) = / 2. so fib C.Cs+ p rr•sxi e+^.■ C.Jt os W r Seer 0/.1 Lk, . 8,z5'( /) = 11,67/ Or: wr 4 xS` Fen. aft Ate' In/,91.14 Et /4 7 oAl NEPAL. AT' *We 24" 175. w ....osR.+.o...m■ 24 • .e#4 r /WA, 574/05 "ROM A'7"reGrhet3 siva-v/40r sce9Jt co loo zczo 24#4c. at is RsP RECEIVED CITY OF TUKWIIA JAN 2 0 2000 PERMIT CENTER —(h CG Engineering 111 Main Street, Suite 106, Edmonds, WA 98020 CQcnlc *llcct.xh Ate ♦ ...1$,Q0 sue lob Na, Shcct� col JAN -18 -2000 TUE 08:24 PM CG r'?1NEERING FAX N0, 4' 778 5536 P. 13 ALLOWABLE WALL HEIGHTS iC SECTIONS L 120 DEFLECTION SECTION 5 pot 12in 15 psf 16in 24in _ 12in 20 psf 15in 24in 12in 25js/ 16in 241n 12in 30 psf 16in 24in 12in 40 osf 16in 24in 12in 16in 24in 1581020 1581018 1511418 1581014 12' 3' 13' 3' 14' 2' 15' 1' 11' 2' 12' 0' 12'10' 13' 6' 9' 9' 10' 8' 11' 2' 12' 01 8' 0' 9' 2' 9' 9' 10' 5' 7' 9' 6' 0' 8' 4' 7' 3' 8'11' 7' 9' 9' 6' 8' 3' 7' 9' e' 4' 8111' 9' 6' 7' 0' 7' 7' 8' 1' A' 7' 6' i' 6' 7' 7' 1' 7' 6' 7' 2' 7' 9' b' 3' 5' 10' 6' 6' 7' 0' 7' 8' 8' 0' 51 8' 6' t' 6' 6' 7' 0' 6' 9' 7' 3' 7' 9' 6' 3' 6' 1' 6' 7' 7' 1' 7' 6' S' 3' 5' 9' 6' 2" 6' 7' 6' 1' 6' 7' 7' 1' 7' 6' 5' 7' 6' 0' 6' 5' 6'10' 4' 7' 5' 2' 5' 7' 6' 0' 2501020 2501018 2501C18 2501014 17' 1' 18' 5' 19' 9' 21' 2' 15' 6' 16' 9' 17 11: 19 2 13' 7' 14' 8' iS' 8' 16' 9' 11'10' 12' 9' 13' 8' 14' 8' 10' 9' 9' S' 11' 7' 10' 2� 12' 5' 1010' 13' 4' 11' 7' 10' 9• 11' 7' 12' 5' 13 4' 9' 9' 10' 6' 111 3' 12 1' 8' 6' 9' 2' 9'10' 10 7 10' 0' 10' 9' 11' 6' 12' 4 9' 1' 9' 9' 10' 6' 11' 3' 7' 7' 8' 6' 9, 2' 9' 9 9' 5' 10, 2' 10'10' 11' 7 8' 6' 9' 2' 9'10 10' 7' 611• 7' 11; 8' 7' 9 2' A' 6' 9' 2' 010' 10 7 7' 4' 6' 0' A' 4' 6' 11' 811. 710' 9 7 8 4' 3501016 3501016 3501014 22' 2' 24' 0' 25' 9' 27' 7' 20' 2' 21' 9' 23' 4' 25' 0' 17' 7' 19' 0' 20' 5' 21'10' 15' 4' 16' 7' 17'10' 19' 1' 13'11' 12' 2' 15' 1' 13' 2' 16' 2' 14' 2' 17' 4' 15' 2' 13'11' 15' 1' 18' 2' 17' 4' 12' 8' 13' 8' 14' 6' 15' 9' 10' 8' 12' 0' 12'10' 13' 9' 12'11' 14' 0' 15' 0' 16' 1' 11' 8' 12' 9' 13' 8' 14' 7' 9' 6' 1011' 11'11' 12' 9' 12' 2' 13' 2' 14' 2' 15' 2' 10' A' 12' 0" 12'10' 13' 0' 6' 8' 10' 0' 11' 2' 12' 0' 10' 8' 12' 0' 12'10' 13' 9' 0' 2�._...7' '.._ 10' 7' 8' 6' 11' A' 10' 2' 12' 6' 1011' 3581020 3581018 388IC16 3581014 2.2' 9' 24' 6' 20' 6' 28' 4' 20' 6' 22' 5' 24' 0' 25' 9' I8' it 19' 7' 21' 0' 22' 6' is. 0' t 4' 4' 12' 6' 17' 1' 15' 6' 13' 7' 16' 4' 16' 8' 14' 6' 19' 8' 17'10' 15' 7' 14' 4' 15' 8' 16' 8' 17'10' 13' 0' 14' 1' 15' 1' 16• 2' 10'11' 1V 4' 13' 2' 14' 2' 13' 4' 14' 5' 15' 5' 16' 7' 11'11' 13' 1' 14' 0' 15' 0' 9' 9' 11' 2' 12' 3' 13' 2' 12' 6' I1 7' 14' 0' 15' 7' 1011' 12' 4' 13' 2' 14' 2' 611" t' 10' 3' 11' 6' 12' 4' 10' 11' 12' 4' 13` 2' 14' 2' 9' 5' 1010' 12' 0' 1210' O' 7' 8' 610' 10' 6' 11' 3' 4001020 4001018 4001018 , 4001014 24' 7' 26' r 26' ' so. 8 22' 4' 24'2' 26, 0' 2710 19' 6' 21'2' 22, 8' 24' 17' 1' 16'0' 1910 213 15' 6' 13' 5' 16'9' 1 6' 16, 0' 16' 9' 194 1610 15' 6' I6: 9' 16, 0 194 14' 1" 15'3' 16, 4' 17' 11' 6' 13'4' 14, 3: 194 14' 6' 15'7' 16, 6' 1711 12' 9' 1`'2' I5 2' 16' 10' 5' 12: 13, 3. 142 13' 5' 14'8' 19 9' 1610' 11' 8' 13'4' 14' 3. 15' 9' 8' 9011; 12, 6' 13' 11' 6' 13'4' 14 3' 15' 10' 1' 1'1' 11, 0: 1311 8' 3' 9'6' 11: 4' 122 6001C20 6O0ICi6 60410 8 60010t4 34' 1' 3O'11' 39, 8' 42 7 30'11' .'13' 7' 38' p0� 38 9 27' 0' 20' 4' 31' I. 33 0 23' 7' 25' 7` 27' 6' 29 6 21' 0' 17' 2' 23' 3' 20' 4' 25' O' 21�tO' 2810 Ill. 21' O' 23' 3' 25' 0' 2810 18' 2' 21' 1' 22' 8' 24 4 14'10' 17'10' 1010' 21 3 by 9' 21' 7' 23' 2' 2411 16' 3' 16' 7' 21' 1' 22 7 13' 3' 15'11' 18' 5' 19 9 17' 2' 0' 4' 21'10' 23 5 14'10' 17'10' 1910; 21 3 12' 1' 11, 7' 17' 4' 16 7 14'10' 17'10' 10;10; 21 3 12'10' 18: 6' 18' 0' 19 4 10' 6' 11: 7' 1S' 0' 1610 6001020 8009014e 6001C1A 8001014 43' 2' 46'10' 50' 4' 54' 1' 30' 2' 42' 7' 45' 0' 49' 2' 34' 1' 37' 2' a9'I i' 42'11' 27'10' 32' b' 34'11' 37' 6' 14' 1' 10' 8' 20' 4' 23'11' 31' 6' 27' 6' 34' 1' 29' 9' 24' 1' 29' 4' 31' 6' 34' 1` 20'10' 26y'� 5' 26' 0' 30'11' 17' 0' 4p' 0' 2S' 2' 27' 0' 21' 0' 20' 3' 29' S' 31' 7' 16' 8' 22' 8' 2L' 9' 28* 9' 15' 2' t6' 6' 23' 4' 25' 1' 10' 8' 23'11' 21' 8' 29' 9' 17' 0' 20' 9' 25' 2' 27' 0' 13'11' 16'11' 21'11' 23' 7' 17' 0' 20' 0' 2S' 2' 27' 0' 14' 0' 11'11' 27'10' 24' r 12' 0' 14' b' 19'11' 21' 6' ALLOWABLE WALL HEIGHTS IC SECTIONS (' LJ240 DEFLECTION ••. CCCHON 4 001 1 • _ •-� 40 oltl 121n i8 n 24in 1 1,a 41n 1 n I6 41n 12tH ' 0: ' 1 • 6' 6' 7' 0' 1111n • 8' 11' 6' 4' 241n 4' 6• 4' 1 Q• 6' 2 5' 6' 12in 4' 4• S' 9' 6' 2' 9' 7' 161n Ma 4' 10• 4, 3• b' 3' 4' 7' 8' 7' 4'10' 6' 0' S' 2' 12th 4' 139• 9' 6' 7' 6' 0' 19to 24in 4' S• 3' 14• 4' 9' 4' 2 S' 1' II: b' S' 811330 S 58 I O d 14 Sd l 9' 9' 10' 6' 11' 2' 1 ' 0' 6' 10• 7' 9' 9' 6' 8' 4' 1 ' 2' 6' 1 l • 10' 10' Y' 8 6' • 7' 3• 7' I' d' ' 6' 1 • ' 4" 6' 7' , • ' 1' ' • 7' 8' ' ' 6' 1 • b' 7• 8, 7' 4' 0• 7' 1' 6' S' 7' 6' 6'10' 4, Q'y' ' 1.1 7' 0' 2501020 p� 2501;116 !Mt!15' C14 13' 7' 14' 6' 8' 15' 0' 12' 4' 10' 9' 13' ' 11' 7' 3 14' 3' 12' S' 15' 3' 13' 4' 9' 5' 10, 2' 10'10' 11' 7' 0' 0' ' 6' 9' 2' 0' O 8' 10' 8' 7' 10' 7' I. 2' 8' 6' 7' 0' • 92 • 64 110'17. ' • 8' 11' 9' 7 ' 0' �' 4 7' 1Q' 5' 4 7' 11' 68 9' • 9' 0' w 10' 3' 11' 1' III: 12' 9' 7, 2' 79 p' 4' 0'11' 9' 4' 1D' I' '10' 11' 7' 6' 3' BY 7' 3' ,7' 9' 5' 2' 6' 10' q' 6' 10' 2' 7' 5' 80 6' 7• 0' 2' 0' 8' 10' S' 11' ' 12' 8' 6' 9' 5' 11' 7'4 • 84 • 7' 14' 0' 14' 6' 4 7' 4 6' p' 7' 8' 1' 6' 8' 3' 10' 2' 6' 1 ' 10'11' S' 6� 6' 9' 74 7'10' 8' 4' 8' 9' 9' S' iD' 2' 10') t' 6' 2' 8, 4' 07 89 ' ' 1' 6' 2' P 7' 6' 8' 8' 0' 8' 1,' 8' 7' 7' 6 9' 3' o' ' 8' f i' I. i' 3500pppp bOC10 801016 �01C%4 17' 7' 19' O' 20' 6' 21'10' I6' 0' 1 '111 �1 17' 3' 13' 1' 18' 6' 18' 2' 19'10' 17' 4' ' ' 13' 2' 14 2' 15' 2' 11' i' 0' 6' 12' 0' 10' 5' 12' 1 ' 11.1. ' ' 13' 9' 11' 1' 10' 1' 12' 0' 10'10' 1210' 11' 6' 13' 0' 11' 6' 8' 9' 0' 6' 10' 2' 10'11' 3681 2 35 I 1 (G�Si 16 55.14 18' 1' 9' 7' 21' 0' 22' b' 10' 6' 14' 4' 17' 9' 1S' p' 19' 1' 16' 6' 20' b' 17'!0' I ' 6' 13' 1' l4, 6' i6' 7' ' 4' 0' 1 ' 12' 4' 10' 9' 13, 2' 11' 6' 14' 2' 12' 4' 11' 4' 10' 4' 12' 4' 11' 2' iJ' 2' 12' 0' 14' 2' 12'10' 9' 0' 9' 9' 10' 6' 11' ' 10' 7' 11' 5' 11' 3' 1 , ' 9' 7' 101 4' 11 1' 11'11' 8' 4' 9' 1' Q' p' 1 ' ' 0' 11' 10' p' 11' b' 12' 4' 0' 0' 7' i9' 9' ' p' 10' V 9' 2' 11' 3' 9' 10' 9' 0' 9' 0' 10' 6' 11' 3 8' 2' 7' 7' 8'10' 7' 4' 1' d' 6' `' 10' 2' 11' ■•• 20 9' 6' 17' • ` ' • ' ' 1 ' ' tu' ;1 12' 3' 11' 2' 13' 4' 12' 1' 14' 3' 13' 0' 15' 4' 13'11' 9' 9' 10' 7' 11' 4' 12' 2' 11' 6' 12' 4' 13' 3' 14' 2' 10' 4' IV 3' 12' 0' 12'11' 9' 1' 9' 9' 10' 0' 11' 3' 10' 9' 11' 7' 12' 0' 13' 4' 9' 0' 6� ' 10' 7' 0' 3' 11' 4' 9' 11' 12' 2' 10' 7' 9' 91 10' 7' 11' 4' I2' 2' 8' 19' 7' 9' 7 8' 4' 10' 3' 9' 0' 11' 0'' J' a' e. 400101. 4001014 ' ' 24' 4' 9 20' ' 1 ' 0' 1a' 1' 19' 4' 1 , i$' • 1610' 14' 3' 1 ' 6' 15' 4' 1 ' 4' 6COIC2Q MIL2d'7' 6041016 6001C 14 27' 0' !III' 33 9' 24' 7' 21' 5' 23'3' 28' 7' 25' 0 30 r 26' 10 19' 9' 204' 21'%O 2J b 17' 0' 14'10' 18'3' 16;1 1910' 17� 4' 21' J 15' 7' 17' 0' 15' 5' 15�S' 16'9' 1910 13' 0 21' 3 19' 4' 13' 6' 14'0' 15' 9' 10 10 IS' 9' 17' 1' 18' S' 16' 9 14' 4' 15'P 16' 3' 17 11 12' 6' 13'7' 14' 7' 15' 0' 14'10' 16'1' 17' 4. t d 7' 13' 6' 11' 9' 14'8 12'9' 15' 9' 13. 9. 1610 14' 9' 13' 6' 14'6' 18. 9. 1810 12' 3' 10' 6' 1J. 3' 11'7' 14. 3. 12' 5. 15 4 I J 5 5001020 6001C16 0001C16 800►C 14 34' 3' 37'2' 39 :11: 4 211 31' 1' 27' 2' 33'9' 29'6' 33' 3• 31' 6' 39 0' 3 4 1 23' 9' 28'' 2' 6' 2 9 9 21' 7' 18110' 'S' 20'6' 25' 2� 211t' 2 7 0' 23' 7 21' 7' 19' 7' 238' 2I'3' 2S: 2' 42,10 2 7 0 2 4 7 17' 0' 18;7' 19 11: 21' 5 20' 0' 21'9' 23' 4' 25 1' 16' 2' 16'9 21' 2' 2 2 9' 15' 2' 17�Y I8' 6: 1911 16'10' 20'8' 2111 2 3 7 17' 0' 13'11' 18s7: 16,'2 1911: 17, 5' 21' b 16 8 17' 0' 18'7' t0 i! 21 5 14' 9' 12' 0' 18'10' 14'8' 16'� 1� 15'It 19' G. 17 0' 1, Htlghte Daat4 on properly attached sheathing on each flange Oyer the entire length of the stud. 2. Lateral load multiplied by 0.75 for strength doterminotlon per N51 A4,4 3. Htlghte for 14 and 1¢ 9uage etude based on F w8Ohsl. 4. End reactionolood (ps0 "54ocing(In)•Hsighl from iroble(ft) /24. Check web crippling table for allowoblo reaction. 5. Htlghle booed on web punch -outs a minimum of 1.5 times the web height from the edge of booting. (Soo pogo 39 for dotal) JAN 2 0 /mot ffECE11,ti. ore or n /G O s 0/,PoaA 7/4)14 P Rbtl7 CkN15 iota -17- • 4 JAN -18 -2000 TUE 08:25 PM CG rLIINEERING FAX NO. 4r X778 5536 P. 14 Grc• rev' flo�l�e�l�} TL/ S7�Z }M/NG Me-ma 5X g Icft)( /2) (.754) (44 581 iN' �ti • �l 5 *0)(4, /2s•r+) t 62 e (62y' / .51; 1,47kr AID 4" w167 • s (C &S'6 rf xl x Y • s /% /42 s .5 ,. _ PLP'X I9•sj, 'j 324 (21 X /66)0,22 ihd) O Pr's)(4,334') 4 6s. pc.p. 0,2701 ✓' m03/3"/ Ad 4 (spy, /04sa4 144 td-4 1 ..00(e)(8,51w2)4 IT ram sr It" f EZ g (It Om) MI)($122I , 307 In ✓ 8,s' uArnurtIC1 doff. . Warr V Jcf7C4C. eftifrOfrie MVO/3(flu , .• chose., ::::I_:I.1.:1.: carol/bomb, • Z'C. o+ 4.+p RECEIVED CITY OF TUKWII.A JAN 2 0 2000 PERMIT CENTER WW Dow Na, wog CG Engineering 111 Main street, Suite 106, Edmonds, WA 98020 CQantc ihQct.x14 3.0 JAN-19-2000 WED 12 :02 PM CG '"'" I NEER I NG "QWit ST COMMUNICATIONS" 6.101 South 1&Y" Street Tukwila, Washington 98188 FAX NO, 4(`778 5536 SECTION TITLE: GR.A'yiTY DESIGN 3 CTION INDEX VIT DESXQN CALC�,r1LATIONS r P. 01 SECTION NO.1 Pii1 , bikVe Nt� erg 1, oo 1,0 vonw..w —...r ••••••••■••••••• RECEIVED Nedii•,r•w•,r••••• CI AN 24 OOO w PCRMITC rreTr '' 4 JAN -19- -2000 WED 12:02 PM CG r' INEERING u�,rr Gntn.fxrY tE4reiJ FAX NO 42 78 5536 1.11'a. %.M; • 1,S2 �.Lt*. 1.t91 I:4LO t. I ti OS* * K 1440 1$ CO are„ 1,4 'Two a 144$ +t. van ge(.5�..,�. ""'bh tts, ;tr Now i.e.° • ZS PIF terve. 1.6 * (L6 p ) ((1t) • OI.ATZNG (AMC a 6, F 4 2C PiP 41L. a SS PAR b s?. LOAD (b7 PIa) t l) a Ca Engineering 111 Main Street. Suite 106, Edmonds. WA 98020 0•..11. Data atj t�)p Date; 10b-1•19.: 000 0 0216210 Shoot 1.0 PI E EIVEC CITY OF TUKWILA JAN 2 0 2000 PERMIT CENTER JAN -19 --2000 WED 12:03 PM CG 'r'"' I NEER I NG (• Avzty nozNG v►vs-r w?' 16,'1 "' (uNt ..+ Gv44%) FAX N0, 42 ?78 5536 P, 03 5616 Pg.av ».US QA4L, smear ;et V,Vx Y PoToo, 14/1: trt. t‘ s: viz 36 1►t.16 M w. ny u Yh.say•6.4 L m 0,G1<Is Gi Aryl rim... )0ae �t Ls RV to t a „ Wit % M t! /61ir Iv ck s Lc iA 4 42 Ake W• 1 1#0 /LP w.l a 10 it'll 1a.Zi:4' MI1 w ltl % 3.104 Sl *6 t V0 144 % wLt w ;, w, fir') 54 • a),6 i /13 4.7‘1 iN • 2.s, 0 7, 05K 1`i0 i4" • west Uulldln: C[3 Engineering, 111 Main Street. Suite 106, Edmonds. WA 98020 8: 30 Chkd: CITY of TUEKWlt.a JAN 2 0 2000 -w PERMIT CENTEf Unto: Ja 9. 9 2.10 Sheet 1,0,.._._..? ..... FAX NO, 4178 5536 P. 04 20,00 II Mmax w 42.79 WI at 12.0711 from loll Omax -- 1,2478 In at 12,0211 from Loft JAN 2 0 2000 PERMIT CENTER _l. 1-,7 IMO., 0 JAN -19 -2000 WED 12:03 PM CG'''GINEERING tL ?o' WIT Le P G F W1 3 +5 d NJ' ?. Ita NO es 0,45'4 • FAX N0, 778 5536 P, 05 1t1,NAso a Ga,7 w. Kr 260 o 1. s 7 t 041 % ( ft., wy Wofaa 74L ( /i.NO) w,rr Fula, $E •4+0U west Uullding W 4,11i6 Ns son smsra— and mom -- ,.,,vows mom smawda mum vmrto►tr,L's∎.r t1 s/ M ROC TUKWILA JAN 2 0 2000 PER 13 ; J(3 Date: 0 0 Chkd; CV Engineering 111 Main Street. Suite 106. Edmonds. WA 9S020 Date: Job No. Shec 9914 1.0 OH • 9 • GIN JAN--19 -2000 WED 12:03 PM CG'' !G I NEER I NG FAX N0, t 778 5536 P. 08 so • 0,77'k 0.83 k . , , , , 4 1 , , . . , 4 . , , 1 4,4 .1 0,00 k/It ' rrrrrrrrrrrrrrrrrrrrrrrrr °'°0w" °.01 kin r r / i r r , , r l r i r r , , 01101 wtt . •,rr•• ( , •.r H r L i{ 1j •r 1 ,+r•� j )� COS MIrrriir��rfrrii/ i� /it /1 ��;'rg-fT73-71-ii tlrtr IU;1o'"" 30,0011 WNW • 02.71 MI 11 12.02 ft from loft Omax • •1.4007 In al 14,24 ft from loft Stu 0.030k Vmox 1 loft ■ 0.090 k Roe 4.100k Vmnx0 rt•4,100k RECEIVED CITY OF TUKWILA JAIL 2 0 2000 PERMIT CENTER •wf"w• 1111. 1111 , IM.. • Y .q JAN-19 -2000 WED 12:03 PM CG;I""+tG I NEER 1 NG FAX N0, 4''"1778 5536 07 ....••■• 0. 00k'I lrrtrrtrtrttrrrrr10 rrirttt�0 ,o0wll 0,04 kin rjrrirtr�r trrr rIrirririrrirrrrir rirrir1r11ir11710.041Q 30.00 It Mmax.6.01 k.lI 01 120811 Itom Ian Omox • 0,0780 In al 14,4611 Irom bolt RI.1.374 k Vmax 0 loft a 1,074 k At a 0,601 k Wax 4 1110.881k RECEIVED CITY OF TUKWIt.A JAN 2 0 2000 PERMIT CENTER 1,00 JAN -19 -2000 WED 12:03 PM CG'"GINEERING L 3o' ,,Jt % 01s 7,egw Py s MmA GO.N', /sr w IJ L 9, FAX 140, 4'778 5536 P. 08 %,ga &be i4 N (/,4Q) C1' AW%`'r/ L bps W t s t0 Our Ws, a i0 Its Pau 1.59s Mwtivw Stec ti or t%y . % 110 AI y PI i N. 87 w wait 13utldln 13 ; JO Chkd; .; 4544 RECEIVED CITY OF TUKW►La JAN 2 0 2000 PERMIT CENTER CG F,ngineerin$ 111 Main Street. Suite 106. Edmonds. WA 98020 JAN -19 -2000 WED 12:03 PM CGT'GIVEERING FAX N0, 4 778 5536 P. 09 ors •V .•r Ar. 7.07k 0.9 k . r , /s•u� uur ' obi wit irirrrrtrrrr °.01w" 1;4;11;' ii ri i rr ir w1 W iww � tra,o8 NI 30.0011 Mmas<■ 00.40 k•ft at 12.0211 from Intl Qmalr. •104009 In at 14.00 n from loll MI *8.440 k Ar ■ 0,949 k Vmnx 4 Ieft.6.440 k Vmax O rt • 0,040 k RECEIVED CITY OP TUKWILA JAN 2 0 2000 M +.4 , ,Y w.• mom, PERMIT CENTER .•o.. +......,..v *IS M ..•....•• t,0Q9. . • • •, • . „ •••• r.‘""or • — — . • JON-18 2000 WED 12:03 PM OG r'sGINEERING FAX NO ' N776 5536 P, 10 i.e. • 41.11411111M•10111•00 ILO Olt a+.00•■••■•=0.00.00 10000•00m0•00080.0 •0 • 00*•••••■••■•••• 0000•0000.810 0,03 Wft 17177-1 "1-771-1-7 0 33 vvyyr1trttrrvyrtvt, 0,04 Wli ;T;1111 ITT IIITTITT11117; 1 aukift , , 1111111111111111M•1111•1•111111MMIMINIMINENIMMISIIIIII 30,00 ft Mmax a 31,00 k41a1 11,90 It from loft Oman w .14924 In at 13,04 ft from left • • , • ."., • 214,370 k Vmax lift 4570 k Mt* 111,1511k Vmfui 0 It • 2.115 k RECEIVED CITY OF TUKWII,A JAN 2 0 2000 PERMIT CENTER a••• 40,10 0 00 00 JAN -19 -2000 WED 12:04 PM CG'—'GINEERING FAX NO, 4'778 5536 P, 11 P, pa Pr *4l • Py Pe P. pr 11 I I b, i it 3 i ns,. 2,164 p` a ti. Pi " 3•94" es is IA Ili' • /10.2 k. aT ( s.14•) xrtiso a 1304 en4 100 1 A 4 • 400104. 0 G�t,w t L*4431 . WI at 14,s /t.P W1,s 0•0b 144,E t' '4' LL' '� iz.1 w titre W 2,• ft 6t 3 tin Pia 4►00. * i.19K u 9►HIk pa u 14111 P.) » 4141* 4 1,10714 s 611164‘ • 114 C•4114 + 1•601 'limo* st ►«.r• A"Is *oar (4.k. iv') 2•4.6,3 115'Q r,. W (R t 4'ko i moo 1•,04 •1i+80) tV` W1•yK'T4r RECEIVED CITY OF TUKWILA JAN 2 0 2000 PERMIT CENTER QWast iuildin By: ]O Chkd: CG Engineering 111 A40in Street, Suite 106. Edmonds. WA 98030 palm it IA 0 Date: j la r2. 09163.10 Sheet 1.0 la 19 -2000 WED 12:04 PM CG. ' INEERING FAX NO. 4'' 778 5536 P. 12 4.11142.010k 0.9,k44n 3.0Tk VI?!IT rrr rr It lrr r rr rrir d'06W 1 I,i 1 111l 1=1• i1' Ti Y1 cos wit 00,0011 ,I �♦ �.,rri w ■■■■■■■•■■■■■••w Wok .190.17 kit 11132.04 It from fofl Dux • .2.00481t111 20.42 ft from loft RI. 13,000 k Vmnx 0 1111 ■ 13,000 k 'Rrw12,109k Vmax9it•12,100k RECEIVED CITY OF TUKWILA JAN 2 A 2000 PERMIT CENTER •ry+ wwr.w...w..w o 110)1 JAN -15 -2000 WED 12:04 PM CG'''IINEERING .��. IOWA 7.4T k 1.37k . .. .I 0,18 900 ' 0,18 Mt FAX NO, 4 ''!778 5536 P, 13 8,87k 7.0Tk 1.tS k 1 Ark o, l8wrtriirll��tlirirt�trWitiiyi "a Wit 0,08Wft11t,1/T1 / �1� 1 1t V11 r // i•i «�i�iI 1�tt1r OAewri 80.00 rt Mmax • 278,14 k•kt at 33.0611 from loft Omax • .2,0707 In at 60,9011 from 1alt Nu 18.333k Re•1t1.160k Vmox • fott • 16,303 k Vmax 9 rt a 10,160 k . 11 %•Y t t•• • CITY OF�TUKwrt.A JAN 2 0 2000 PERMIT CENTER •■•• N #I .. .tION.••, 1 • NI a JAN -19 -2000 WED 12:04 Ph( CG -' 'r I VEER I NG FAX N0, 4"'778 5536 P. 14 (BeA.M V CASE a 0,066 I6Ltr w1 O, it. N.i,,w vii 4' 7,9331 4 41.61' y, 9 ' P1 4 . 4 0 4 * 1.111I‘ s 6.9 L1 14 Pis 1,314' P� >r 4 #060' 143i"' 7441 Pr s hsd g t b IN . 4 s" + 1004 4 * `h e s * Mr■l►$ ti Z y 3 11. • Por (.1■4 14 `) Viit4 = 11GSD 144 `;/ 131,1) 1100 P."y Oh . ) Qwest Euildin RECEIVED CITY OF TUk " n JAN 2 0 ?000 P RMIT CP:1\11 . J4 Date: Date: CG &llal/leering 111 Main Street. Suite t06. Edmonds. WA 98020 nb No. Shcet 1.0 62.10 1 4AN -19 -2000 WED 12,04 PM CG - %INEERING FAX NO. ''\778 5538 15 ..... M W 8,57k 1.3 *k 7.47k 1.41k 1,5ik 7,Olk " Wit r+it_rrrrr r�r t rrto,tawf� 0,08 MI rr r r rrrr rrrr r iir r tr tiir rt.i o."wtt Mmax a 242.89 k41 at 08.9411 from 10t Om4x ■ 4,9254 In M 00.7811 from left RIO 10.013k Vmak O loft so 10110 k Fit w 19.90 k VmMOr1 :19.081k CITY QF TuKWILA JAN 2 0 2000 PERMIT CENTER .rwwwwww.w.++rw + e• w rnr..w_ w..rl,•wr „r, . f /„ 1,0 fa 4AN-19 -2000 WED 12:04 PM CG '"'G I NEER I NG FAX NO, 4'F�'778 5536 1111111 1011 11 uiiibioiillilii ioiiiiii1�1 Iiiiiiiiiii1Iiiiibiii lIUUIUhIIIIuIIII1111111Illr� .IIIIIIIIIHuIIIIIIIIII P, 16 • 3 ��m mni imi�uirn1mwmuumuim1nus1 m MINIM Iuiuuim1111111111 11ii111:i • RECEIVED Ct Y OF TUJKWILA JAN2O20 P:RMIT CENTER Ma 2 1 JAN -19 -2000 WED 12:04 PM CG "t1INEERING 1111111 1!1111 11111 1111111 1111111 11111111111111111111111 !11111111111 X1111111111111111111111; 1111111 III111111II111111' IIIIIIr1111111111I1111111111111111 t' tcitnin ut FAX NO, go 778 5536 P, 17 x 3 w'LA* 2. 6 L eorti Mop 111111U11111111111111111111111111111111111111111111111 111111111110100111111111111111111111111111111111111 .�_�..___ - 111111 "III' 111111 11111 111111 wlu I1 at , I(.. 1 /S, ••II kij RECEIVE CITY OF TUK JAN20 000 PERMIT CEN "f ER JAN -19 -2000 WED 12:05 PM CG - rINEERING nns 7` vtS3aig 0101.. .........+...■r 01..141 ........•■.. origimourirumgarrao .......••■•• 0101.. _...__�, FAX N0, 1 ..........a ... a. 1110•IIIINSIMINIMP.11 778 5536 P, 18 Zig ......_.1..11•. 0101.. ••■•••■•••■■•■ RECEIVED CITY QF TUKWII.A JAN 2 0 2000 PERMIT CENTER . , . 4AN--19--2000 WED 12:05 PM CG' I VEER I NG FAX NO Ilr'\778 5536 QwSsT Weight, Clearance & Rigging Dial n • Commercial Rooftop Air Conditiotli, J11its- Item; Al Qty: 14 RIGGING NOTES: P. 19 November 29, 1009, 1.17» ittuelrwl011 ipmpsd an !hi urdt lrmopbd. 2. The w■yM shams rspssaM t1is r Wca1 w+it ggti* WOOhtj for the tNl samosa POINT WITOHTO • 1 2 - 3 4 0 0 1010 1010 1010 1430 1440 1110 10 1010 11100 1000 X/Y r 4' 100' 110' 10' 110•/113• 110'/1iN air/ 4' 1 10" atm .,. Ormw..7136....14 Frw* d UrOi Ouar•ra Lkn 000" / 104" oe• ipso/ 4' corem of Gm* Cnp a CENTER OP GRAVITY AND CLEARANCES FLO a Fwhistled by Pane / Install° • y Others • Trani Submittal .p • ps' • RECEN CITY OF TUKWItj JAN 2 0 2000 PERMIT CENTER Pogo 8 of 34 JAN--19 -2000 WED 12:06 PM CG» I VEER I NG FAX NO. 4""778 5536 P, 01/13 p .top 0 tt'S 11rtve ?sieve 4 Pei. I /31/97 mat!rtw(,, 4 eurvtRt,et Pad 14 NA i3t 16 LA. w,L,wNtit A , P4E.td LA) L2 b 't 16 ,Ng ,1- II.gt .4. I, Li -= L 1, '4 '►E+eei. ' 6i,+ r twa 41 Ala0 S■tAI. dtA■• Del.aV4 014041E PAUrt 1`d 7M44 AODbtaeru•rr Oki AN Ill ttfivte aer.UO,N Or44 VO►•44410 LAC V*1014.. oft,tbAw *6 v. as PI, f 35 Ps,') (1o') ( u') VNe r' 'NW 114 ••t Ai, • eyees4*ita0ji,l 13 39 °/o ()west 13uilding • RECEIVED C$TY OF TUKWILA JAN 2 0 2000 PERMIT CENTER 8 ; 10 Dato: Dow ..2.No. Sheet Chkd1 CG Engineering 111 Main Street. Suite 106. Edmonds, WA 98020 99162.10 1.01°1 JAN--19 -2000 WED 12:06 PM CG ""` f I NEER I NG R�eYs■G$ Pw. «a = 105.6 K A6�t�w Aollat t*iwlfi a i' ILl.t Arica !. Jel•, S4 / 35. i lk,L FAX N0. tr 778 5536 P. 02/13 s9' x CQE 114%4 C'd4,1208"W 7111 MO eae:A /E-16 Pe4666146 w/ coikorkid, 4 L 7Ee1. ro uS 457 ivi/ JC, U. if /14 090e.- *ta r c• Aef404.4L? f, ditus 1ee much• PMT /26 -moll m. Al d t1, Oi4. exit bif 1 0.41I4'i 9,' # d Nor" ► Alge- r. • Qwest Rulldin • RECEIVED CITY QF TUKWIt i JAN 2 0 2000 9Y: IQ Daso: Chkd: Dam CG Engineering 1 l 1 Main Strum. Suite 106. Edmonds. WA 98020 JAN -19 -2000 WED 12:06 PM CG'`''G I NEED I NG To specify your title block on these five lines, use the SETTINGS selection on the main menu and enter your title block information will be printed on each page, rtew: slO* uta�rvcrnls�nvaa13.22.» too0,W.3 t~r± _ n(GCuC Description EMBEDDED PLATE FAX NO. 4'"` :778 5536 P. 03/13 Title : 0sgnrt Descrlptlon 1 Scope Job Dote: 4;31 PM, 11 JAN 00 Steel Column Base Plate Pap h General Infarmrstion Loads Axial Load X•X Axis Moment Plate Dimensions Pluto Length Pieta Width Plato Thickness Support Pier 91 :e Pier Length Pier Width Calculations are designed to AISC 9th Edition ASO and 1997 UDC Requirements 106.60 k 0.00 k•tt 14.000 in 14000 In 0350 In 80.000 In 60.000 In Steel Section Section Length Section Width Flange Thtoknosa Web Thickness Allowable Stresses Concrete Po Base Plats Fy Load Duration Factor Anchor Bolt Data Dist. from Plato Edgo Bolt Count par Side Tenalon Capacity Bolt Aria TOAx5x1 /4 0,000 In 8.000 in 0.250 In 0.250 In 3,000.0 psi 36.00 kit 1.330 1.500 In 2 5,600 k 0.442 1n2 Oasopiote OK Concrete bohring Stress Actual Boerfng Stress Allow per ACI 10,15 Allow per AISO JO Plate Bending Stress Aatusi lb Max Allow Plate Fb Tension bolt Force Actual Tension Alkrwobto Thickness OK 535.8 psi 3,570.0 psi 2,703,0 pal Searing Stress OK 00■$71,7 pal 08,010.0 p11 Solt Tenalon OK 0.000 k 6.500 k Pull Soaring t No Dolt Tension CITY AF TUKWII.A JAN 2 0 2000 PERMIT CENTER I II ,JAN -19 -2000 WED 12:06 PM CG-- NGIVEERING FAX NO 1"^ 778 5536 P. 04/13 Gat. 6.114 u a (1 IL r4 ExttrtN&6 T5 grt S% PAIL ►�1 1. its ptAso.: (,, orx cc ves) (6o') ( aa') .1 75.6 w PAase e 5 o� seasom t1.4.4 qt. 46 id%6 (e.trs +swb) 410 y N4 PI Asa Y614dl 1l�it�h tNYW i a *XL lttAsr*) 1. t,S' lL" ar A 120 3, is e.+ CGo pe a 11A Fa s tt'b %� Pi t %1.b. )ti . .I 10.7'1 p.« AsAsoly a Z, S'1 /42' (M r +) Alt eat I/ O.i lo,1-1 Krs r q, ax .•mot, RECEIVED CITY OF TUKWH.. JAN 2 0 2000 PERMIT CEtTFf. Qwost Auildin Chkd: JG Data: it, CO engineering 11 L Main Street, Suite 106. Edmonds. WA 98020 Date: 1. • o. 9916/.10 Shat 1,020 +• 4AN- 19.2000 WED 12:06 PM 0G- !GINEERING FAX NO. r 778 5536 P, 05/13 Li im v A b i4 At. (L) GUX $e, 1.14ANNtt.j YO (41.001‘ Q enffl•dtltt /11416ta•v To" 2 15.1 r.04 4 (a) (lease") ss to 6.5 ;, 'TS 6NnM�ti4 1j A ;5.14141 Tb (a)(o 6� iny* �.oq,mL(W.491 •�)2) 13'9,5 ;Al � ,■ .� .wn.�r +, GNAAtnirt., R,SR r� i 4 (a)43,01 ___ a 13.11 ••L Tb tAlYNo4 r ,g /71376. trig /110, N_ ' a.vi iA (31,:' )1 ) 115(.4 2.17 4. (i&,* (11104■N riu lioa• 0 w IsR 12 iTte 230.1./41. sr t17. 16.1.b. 1" c, s 8, DI Kax usa (a) CG x 10,5 RECEIVED UWIHA JAN 2 0 2000 Qwest Building B ; JO Chkd: CG Engineering 111 Main Stmt. Suite 106. Edmonds. WA 98020 Dates Dates Job No;� 9 i 62.10 PERMIT CENTER Shunt 1.0 PS JAN - 19--2000 WED 12:08 PM CG`''-'`'G I VEER I NG "QWEST COMMUNICATIONS„ 6101 South 1801h Street Tukwila, Washington 98188 SECTION TITLE: RAL D PESCRIPTIM • FAX NO. )778 5536 P, 01/15 SECTION NO. 2 11.201.-14.211_ • . ON 4AN- 19-2000 WED 12:09 PM CG '-`'r I NEER I NG 1.!34 Ldr4OS (ICevrbcA M 1 •11 •• po R. 1, ,L �► t./ did • 1. 9 X715 • & s. " 1.0 • 44. el • 1 ►0 r r 2,6 FAX N0, 41778 5536 P. 02/15 111' VOMGO tAr•bn(, ----•— 614V30*) 4 (11(164'31 / 8n, to go ----- ----►' `3 4 Ls/ S b ear (111"/6 f r i r te._. -._..0 Who meta4. assert. ••■■ UI E 1% 04111 De11Ar t,oAOb Li___ a1 A 1 auq, G Ipysr� ��Iw...� • 1. . 11�!•11••.11•�• J5.9 PIP — 3,2s OSP - a,v PIP • ••1 1.111111 ••• 111 •• • •.M it 0 I I Y • Jo tvr. A at, s d N • 1 b to *am. sty Is V ROOK L1. vs. Asa Pbor CG Ens'ineurins 111 Main Street, Suite 106. Edmonds. WA 98020 Sheet 2.001,,_ 1' ' RECEIVED CITY OF fUK'a' JAN 2 0 ?OM PERMIT CENTk 4AN-19 -2000 WED 12:09 PM 0G "GINEERING FAX N0, 4'778 5536 P. 03/15 A-rEtLNL ANYkt.*4SI dF Mkt.ta, Vr►s*I's b 1. P MEC . urt21 + GuaO, = Ib,U k S1Aut.lV.tAi. 4r6B(. ]l 1694 grCet.. Crur+sN(r = 1.L10, a9.1 w $lteritar . PoRt:le uac. 14 52•2 tis ISOK� rp ,apC_T.p l,f, 36r„ Wr o.WfaWr 4 macNMnar.4IL, oautra,aNT ( „s 1p=i„ so ZONQ 3) (Noy- at$awP 4‘. a1at,iLarv) (aooR et,avArroN) 0,48 ( 30%9 v Qwest Auildin Ay. Chkd: 1G ,.» CG Engineering 111 Main Street. Suite 106. Edmonds. WA 98020 Data: o t t Date: Sheet j.002 RECEIVE; CITY OF TU* JAN 2 0 7nno PERMIT CEN t JAN -19 -2000 WED 12:09 PM CG "''GINEERING FAX NO, 4`. 778 5536 P. 04/15 toaac,S. (4.14% /uAt2 r ) 2 /5 c.o‘, �.L " OV.,1.� (Y- 4: fit c.'r,T.hJ 11.0.1 0 1E1.41._ a t q II vi- d6iY0N PO4 1,61.1+14 A04.4 (d1,(. (5') = 80, li k � w r bit ftlttttl./ • W160 s !i0• it 1t', 111 ii,C4 17.0tr 1+.• Pr) tOsbO %.bt) '1' C. ■444 • 9" .Qwout Duildln t 3 3. bi M. • aT (44WwtA4t.t) ar1.441 i43 ($11%et t01.vw a 53,1 h• N* (It: *type r) 8u mow. sewpwwwime R[tat4 w44..11 v S0.9K /0" a 414 NN 1.14‘a 1* * 4,7 /;pi uw g6 A-' WgW Mbea 4 ,J Daro: Chkd: CO F,nginaanir g 111 Main Street. Suite 106, Edmonds. WA 98020 4 JAN 2 0 2000 PERMIT CENTER JAN -19 -2000 WED 12:09 PM CG ° "m,GINEERING FAX NO. 4 "- 778 5536 P. 05/15 Tube Steel Section with openings cut into it Element Height Width A x Ax d 37.44 - 0.146484 - 7.353516 •3,8 3.8 AdA2 0.0 •13,9 -13.9 1 90.900 0,0 0.0 TS8x8x1 /4 8 5 9.36 4 missing top fl 0.3125 •3 •0.9375 0.15625 missing bet fl 0.3125 -3 •0,9375 7.84375 Totals 7.485 29.94 •27.70203 90,889827 Section properties Bar x 1(total) Stop Shot 4.00 63.2 15,80 15.80 Service Loads Axial Load in Column 20 kips Moment In Column 20.57143 kip feet e fa 2.672011 lb 15.62689 T- 30.85714 Kips Pb 27,93 Ute O/$ n e/a-eil" W let,p p I, ./ P. ....erm'L. g. - p4.4.6, • RECEIVE° CITY OF TIMM r JAN 2 0 2000 PER IT (' , Roof top Tube steel pro etties� ay: =4 CCC "4' Date 1/18/00 ()west Tukwila CG Engineering 111 Main Street, Suite 106, Edmonds, WA 98020 lob No. 99162.10 shat 4 JAN -19 -2000 WED 12:09 PM CG""'GINEERING et to 6r p s4 tiAlt S r it t ss 5 :u nwittit w10 Svos° FAX N0, 4' 778 5536 t P. 06/15 d,c.(1145. 041 �C0.1.1 I40," e 0,3'tm 11 .•• �% 4.15D ♦4.eq•I 0,6644 don344 1 b� = 4,e33 r b 051-0 D 1 r A It r •1110.117 (If A10 (IN,l0 ( 01114 w /•v) 1 ".41".M.".1..1.44. I 4,41C0 d rd d i t E* %I .d , 4, 0.4.4 1, ) 6.411$$ 1'1,1 Lo 04 SPAN a X10 KI i0 ,c 1 40 $l 013 K 7.0 t; x11.36 ZUS west 13u11ding % 4 sld- (r.4r (O&') ••3141 MEP 0,SIS 0.04 01444 14.4F 0.'410 I1I4 0,6• ti t.•I' 0.'411 1(•6 f O,'I 61 I46F 0.443 wi. 0,646 $46R 114.40wAet.e SI ;S$14 4,610 •/o amt, treats es 0,4oa Kip 0,640 Y.t.P 0, tr'ii+fa I41,0 0,100 • It.4 P 0, 4•0 Mr6P 0000 0 0 1f.1.r 0.960 t'i' 0 ,6 80 1‘.‘„F O. cpko kL+R 014 W 0%144 , otedvi Let °/v ,tt.I • /,e k •10 t,,i °fa CITY' OF TIUKWILA *wog JAN 2 0 2000 tos 0(0 By: )G Date: Chkd: Date; PERMIT CENTER CO F.ngineerin►g 111 Main Street, Suite_IQN. Edmonds, WA 98020 X04 °. Sheet 99.1@•1° 3.0 a w 4AN -19 -2000 WED 12:09 PM CG"11'GINEERING FAX O. 778 5536 P, 07/15 • • • 4, • i 40641 01.41, , . 1 y4. 4141.:. . 4 4. 04 i .1 0 1 .,. 1 0.60 Wit Iff1f17filii'' I /lint /11Y117/171711'f 2,1tik 9.8ak 14...1._..,_..... fl IiYo.6owll 240,00 tt Mmnx d F,3:1:„14 k41 it 121,80 ft from 1011 Omnx a .1782.1040 In at 110,00 tI from 1011 01. Roaoffon • 0,000 k &L Avaotlon • 86.673 k Total Moulton * 85,973 k bL Rot%cUon 00,000k LL RoaoUon * 80.973 k Total Aviation • 85,973k RECEIVED CITY QF TUUKWILA JAN 2 0 MO PERMIT CENTER war,* ••• 4141 4011, • JAN -19 -2000 WED 12:09 PM OG, GINEEEING FAX NO, 42'778 5536 P. 08/15 o.tie kilt rrrrtrrlrr rrtrrlrr t rirtrr / / /lrtrirrrr/'rrirri°48" 120.00 ft /Amax 2 1404,59 WI at 59,09 II from left Dmwt • •025.7026 In at 59.99 II from loft DI. Reaction • 0.000 k DL Reaolton +. 0,000 k LL. Reaction • 45.519 k LL Reaction a 45,519 k Total Reaction a 45,519 k Total Reeoslon a 45.519 k RECEIVED JAN 2 0 2000 PORMIT CENTER JAN -19 2000 WED 12:10 PM OG , '"G INEER I NG FAX NO, Pr' - 778 5536 P, 09/15 ....■..rrr.wrr .0 ....�rr■■ 4, 1' I r.......r+`+.M I+ °•' ttirttttrtrtrritrirtirtir'', t; ;;1�ritirrrrtr0e8wrt 2.1n 9.erk 8.6tk 0.4Tk 28800 it • • r. •••rw • MmM a 7048,14 k4t at 130,73 ft iram raft Omax s .2617.8485 In Al 132,491100111100 Ot. Houton r 0,000 k 1.1. ReacCon II 100,778 k Total RoactIon 100.778 k oL Aanctton s 0.000 k flaactlan :107,000 k Total Radon • 107,088 k ..ero.w. _. ._ .w ._p_ .,_, CITY QF TtUKWILA IAN 2 0 2000 PERMIT CENTER . «.... p.,001 t 14Ab140 rt6in A.) r 1 L* ,, s v.. v. • ijI!IJiiIIIIlllh1iIiIlluhIiillIllhiillh1I . ._ kill 11 i , r .,..„. A „iclu 01 0 iiir:Is. rpm :i4 cl 1; Nrow rif; Imp ii h, _ ..._, ilk. IRZfigtO 71iO4: ',wog: !ahem imiirio ..grog_ l..oily Winn' Minn tt� 1U o, CD 6 ! - N iv i; g•ES4 ! i liO g 0 a 1 Ih „W1AO S A gtF24st61 GA46V4, AT :MN of A *ArHnAbrh S,Reat es W4s ?StfoAni0), fr a Roof 61AD boAA wAS CA1,4vLAr40 w% • AttuwrwGe 041 -New 14,14e141124 041 M4 ADove 1. oovs met 14 0+43,c 1— c.rt.K.e INn`wtBA !+I ft) trJ1 D4124, /tNAt1's=r Or 2.00ij $flows oyeKsrrs£ss o, cooto r 14 20Ne «., o•4 «""'I$ = � AscaarsEs » 0' /o tszt Pi L 4 5'.o” 1r !s oc,tg. ko '"a -o4 q'►Nla.) 77/4r 0 d 0 CZ 1 .r pleop twtfr cirr) c t c.nr>3 Pte• cgrowaL mos (•- t% 11V✓ C/r f .:!'7 rf/f Core i"'N Y '�..' 1 4..L o. ♦ ..w .. . r st) Gvrrittist o 4, TRL.urn 11.1PpLia g 10 veleapte UN172 We1014V, ...A110144,. 4) ROOF 9 ,.l. Ate +w 1 f:'zx I . . G00 LI`v Z r.4,. F. CN°+s4.) ry� Gl3i»WCR £j T RU .,P PI.aiaK -r0 t nmec e. t/lJ P? LCY.•a+'fON �.1...t.. 50t'f"DR't'b •/ Wt= 1hNT5. ‘40 "'Of it '4,1 6:11 To ,440vJAP..0 Noriico 4 wettcPc0 fete Aomfilt-114 w/o* 1.12,04 �} 0100 'ri' • GA P4 4 of 14 Pie W 11i11J iol Pr P w,0.0 41114.4.I Pgf- r71201.049 a D1 d•�' I,t L_. If r I?•' 3d ', lg • ROOF- PIAPHIc AC-IM IP.r: AHwT Pr :air y4v IA CooN4C;1.N1Or4 W..S1..4".)INC -t 1 ■. • wune.4l) DPI 1 wt -l.rn Pg.AI 4ntjrir 11/4491-c. per' 4 `.., TO ."mow ve.R40 1 ye -rem, H55- ?".D C: At.v. 4fTe t. G 4ANCI. NI -no ,p 'i P D`E W'.t,.D TO F.x. /e;' 4, MIN. (w1TH 1-71.I?4t14 F'EPt:M; •T1::R tia 1.et6 TNAW r /'). At4 i CA/CP ir.l TtNe4 LAO? Ih TO IK „SGT FO{i �!RC�C'E.It' P A htrl!? �OWN�.^Tt0�19 ,.� RLL"F h NOT' i0 UI.T. G01!r:8«(7 The. PEKFC. s=it NNC.e. cTr hE RAC Pe. K PAP.HkA:.M Gf aNC$ O n � »•YM •rat�.►v.. I •ai aPPR01/�a 111..1. N�..p1►�a, �,Gd�t�N'..G'f�CN�a. ,_•• -•• + 4 41- rAI- 1-tNLW15. ��! H WEEP tai 'TP �✓• 'ii.ATE 1 -W I� Irl1P LIN 011 8' L WW.TO .4-acupOr. �■119 1.06/Pc 12.1 12.0 "c, ,'iCNAARK$ • (_P f.GNNe27 C., .4,e'UtAr GfhV • F' T 490.e. N TON � t T.Fi.w. 17106 LAP CONNeGTION • 1 • . • JAN -19 -2000 WED 12:10 PM CG '° "GINEERING Type HSB -36 DIAPHRAGM SHEAR VALUES (q) (Lbs /L,F) AND FLEXIBILITY FACTORS (F) FAX NO, 4' 778 5536 P. 12/15 PRIME PAINTED OR OALVANIZEO Gage Side Lap Conrocaon i. ` 4 p, IT ..' ' ,.,I. 1 • ' f - -•" q • •• ' F p "- " " "° q • ••" • ' ' "j•' ' span 5.0" 6'.0• 7'•0" • 8'•0" I 9''0' 1 10'•0" .•, +�y t ' *- .>• 370 230 9.3+ 12.4+ 35.111 ' 88.8R 430 I 290 a 4+ t0,4+ 35,111 80.68 490 ! 410 6,5+ 6.6+ 35,18 89.6R 700 690 S,4+ 1 5,1+ 35 111 86,8A ' 340 11.4+ 31 2R 400 10.1,• 31 211 490 6.8+ 31.28 740 5.4+ 31 2A • _ i:i • '4-yy 220 ' ,310 149• 138 - 77 9R 28 111 280 j 300 124- 12.2 - 77 9A 28.IA 390 1 480 6 8- 6 9- 77 9R 28,1R 660 I . 760' CO - 5.4- 77.9R 26.1A 22 BPg24 "c /c 260 5.5+ 155.7R 310 6.04• 165.98 490 5.8+ 155,9A "' 800 ' $,2+ 155.9R 430 5.0. 58.10 480 4,7+ 50,18 620 5,3 •. 58,18 600 5.1 + 66,18 240 6.9h 1308 300 8.0+ 1308 430 6 34• 1308 800 5.3+ 1308 400 240 j 380 81+ 84+ 75+ 46.98 i 1111 40.1A 460 ' 300 1 440 1 5.7 + 734. 89+ 46.68 111A 40 in 5 :0 ( 420 1 500 , 5,8+ 6.5+ 8,2+ ' 46.8A 1118 40,18 I 880 1 630 1 600 1 S.2+ 5,3•,. 5,4+ 48,68 1118 40.1A 230 1 10.3+ 97 an 200 1 1 8.7+ 07.48 ' 420 1 6.8+ I 91 411 1 070 1 5,2+ 97,48 BP@12 "cIc TSW @ 24" C/C TSW @ 12" c/c 20 8P EP 24" c/c 9 """' -' F -"' "''•' q _'�' �F �, -„ -, q ,, , F ,I.. ' ;. q '' , F 390 ...6,7+ 90,04 "450, 5 3 + 90,OR ; 520 1.4+ OUR � 780 4,9+ 90,011 870 4,5 + 32,4A 730 4,8 + 32148 790 4.9+ 32,48 890 4,8+ 32.4R 380 6,8+ 7511 440 5,9+ 75A 840 5,0+ 7511 750 4,9+ 75A 1 610 360 S,7+ 8.2+ 2711 54.3A 1 600 ( 430 5.4+ 7 2+ • 64.38 500 520 5,4+ C2+ 7: 04,30 ' 840 750 4,8+ 4.9+ I 27A 64,38 I 5,30 7 2+ 23,211 600 6,7+ i 232R 1 830 5,9+ 23.28 840 5,0+ 23,28 350 10.2+ 96.38 420 8,8+ 56,3A 520 I 5.3+ 50,38 520 4,9+ 58,38 470 9,0+ 20,30 • 530 1 8,3+ 20.38 010 6,24- 20,3A 060 9.1+ 20,38 320 12.5+ 5011 380 , 10,74. 50A 540 0,3+ 50A 080 4,8+ 6011 420 11 2+ 15R 480 10,1+ 1811 610 5.4+ 188 900 5,1+ IOA 290 I 19.1 - 45,OR ; 950 1 12.8- 454A 520 8,3 - 45,OR 890 4,0- 48.011 380 13.7- 182A , , 440 12,3 -- 10,28 810 co. 18,28 960 5.1- 16,2R 8P @ 12" c/c •r NW 1124" c/o TM 6@ 12x" C/C 18 BP f 24" c/c ~F � ..•Irr" d,1 - .•rw�4 .,. "I /.,"", F ;; ;«:..;;1t, ;N;; ' F , .^. , ,,, .- 17,.7, Q ' 6,3+ 38,28 • I 030 5,0 + 38,28 •, 800, 4,9+ "• •8.2R , •. 10 ?Q 6.7'f� 38,2R w -104(. 4.4 + 36.2R r7.�;f$7 . 5.4+ 38.2R '7.re" 1,4 + 19.50 • 4,6+ 13.78 1110 4.4 + 13.7R 1120 4.3+ 3.7R ,',1470 , 6.1 + 13,7R :250 4.1 + 13.7R nob 0 5.1+ 13,7R 1 • • 'O 4,$ + N 7.0R , ' 400 ' ,T+ 7,OR -.1,440 4.4 1' 7.0R 1890 4,4+ 7.0R 1090 4.1 + 7,0R "."x820' ... 3,7 + 7.0A ' • 6,7+ 31,88 720 5,74. 31.111 760 6.5+ 31,88 1010 6.1 + 31,4R '1010 4.5+ 31.68 :`,147.0', 4.7+ 31.4011 ulw� 1• 5.0+ 10.28 :7,-coo." 5,6+ 16.211' 970 5.2+ 16.2R 1420 4,3+ 18.111 1200 4,3+ 16.28 �, ?020 3.6 + 18.10 5,3+ 11,48 030 5,0+ 11.411 060 4,0+ 11,411 1200 6,3+ 11,3R ,1160 4.4+ 11,48 :1660 4.5+ 111.33R J Jd 5,04• 6.811 , ;'"1178 4.o+ 5.011 1220 4,6+ 5,8R 1760 4.0+ 5,8R 1460 4,1+ 5.8R • 2410 3.4 + 5.8R 7,9+ 27.38 630 7,2+ 27,311 730 5,8+ 27.38 920 6,0+ 28,98 ip4o 4,54 _27.38 1380 4.0+ 26.9R rw.ad, 7.0+ 13.99 .I ,' 780 7,2+ 13.98 920 5,6+ 13.98 1310 4,2+ 13,5R 1290 4,4+ 13,94 1930 3,5 + )3 88 t 6,8+ 9.5I 500 6,4+ 0,0R 560 6,4+ 9188 1080 5.2+ 9,7R nip 4,5+ 9.6R • .• 1650 4,4+ 9.7R 'd, ' 8,6+ 5.0R ", 1003 6,2+ 5.0R 1120 5,1+ 5.0R 1630 3.9+ 5.OR 1420 4,3+ 5,011 2270 3.3 + 5.08 490 10,0+ 23.88 500 9,0+ 23,OR 720, 8.0+ 23,88 800 5,7+ 23.58 1090, 4.5+ 23.88 ' 11330•, 4.3+ 23.5R "4,64: O ' 12,28 rar '660c' 9.1+ 12.28 900` 5 8+ 12.2R 1240 4.0+ 12.1R 1350 4.3+ 12.28 1860, 3.3 + 12.1A 840 5,7+ 8,6R 710 0,1+ 6.011 , 840, 5.8+ 8,811 990 6.1 + 8.5R 1150;,;"x1100 4,7+ 8.611 " `1400,; 4.2+ 8,,5111 �w, On O.5+ 4.4R ',"7'550:: 6.0+ 4.411 " 1070, 5.5+ 4,4R 1520 3,8+ 4,3R 1430 4.5+ 4,4R 2180 ... 3,2 + 4.3R 440 12.5+ 21,211 600 11.1+ 21,28 , 730 0,0+ 21,28 „ 81,0 5,5+ 20.911 4.44. 2,911 ',:' 12001 4.2+ 20.001 I 55f• 12.b'+ 10.58 1•"e , . of 11.44 10,88 , 91 -ti 5.9+ 10.88 ' 1180 3.9+ 10.78 1420 4.3+ 10,88 ' 1810 3,2 + 1 10.7R 590 10,9+ 7.BR 840 10,2 .a 7.6% 830 4,1+ 7,e11 , 930 4.0+ 7.611 1190 4.7+ 1611 ' .1390 4.1+ 7.5R • • • r 10,8+ 3,911 1•••• eob, 10,2+ 3.9R "1040 ' 5.9+ 3,9R 1440 3.8+ 3.9R 1470 4 6 + 3.9R 2110 3.2 +' 3,9R 400. 15,3+ 19,1% 450 13,6+ 10.18 ,; 750 '0,0+ , 1,4,,1R .770 6.4+ 18. R., '1!250 4.3+ 19,18 ,;; 12/0. 4.0+ 1.,.11 OI '11 5.11.1. 9.7R ,,, 8119 14,1+ � 9,7A ' "1130 6,O+ 9.711 1140 3,84• 9.7R 1520 4,2+ 9,7R -17 0 -,4, 3.1 + 530 134+ 8,911 HO 12,8+ 6,911 ,` 030, 5,34• , 1 8,91 " •" 070, 4.8+ 6,811 . `1260. 4,70 6.9A 8P ® 12" c/c TSW OP 24" o/c SSW r 24" c/c , , „.'.- F '•- ;�'/I•w-Q--;; �' F ' - " 7 TSW ®12" 00 SSW 1P 12 " o /c ,A,1340.; 4.0+ , ., HQ 13.5+ 3,811 , + -y,g 12.5+ 3,50 •,1410• 6.1+. 3,5R •1370 3.7+ 3.5R ;;,1540 4.6+ 3,6R :goo: ,�.... 3.1+ -3.5R F 41;414 I, ••' /ae— F 16 BP Q9 24" c/c BP 4D 12" cic 7 'r,r,17 , ,, �I Op F $.1 19.68 TSW c 24" c/c 1110; 6,4 + 19.58 7 1:46,8 4,9+ 19,5R "..)09 4.5 + 19.511 7r2i 50' ......,. 3 8 + 19.58 F . v... w 4 " R ,.c::tQ ; -'" F ' 7177.,," ," F 88W(�24 "c /c _ -- - - - - -- " TSW (� 12 C/c SSW @12'c /c 4 5 WELD PATTERN TO SUPPORTS 7 • VERCO MANUFACTURING C0.•• CITY OF it ";, J fier /'1 •' PERMIT CEN .410 Pi 4AN -19 -2000 WED 12:11 PM CG'4GINEERING FAX N0. 49'`\778 5538 P. 13/15 5frit144 t ')iaat. S T. rArre.itzotz, (Y- wzo...) Ct.vwx+? crass) tel 3o' (AUraei.) V (ifalm aool) • (Oil towt.a .. 0411S Kz.a) ( JLo') + cll. 1e r 103.1 /I- V444 a ( Ira rid)) i4'1(J01) " 60) 0019 (9.14Wz) (0, /y ) 4 IW,1K (30•1o')(lZ ie %r) (4∎2 ") r7, aaq e • _.23,7w ILVIi C ISM _ ) I0Irs5 P6 .7r AA0 Nis Puri.4F•,'6•1311 * f (.l0S.'i If" �� 141) a- (141.9n) _ m 1 9H • � i. ■ � L.IAq w � r �.�w+ . 3o/ Sw (poem.) •Otto Pao) ( I' /W") /►L C 1)'') i.'a too Art) t p 5 ti, L k 1 1W (Mlep.Na1 s (►r* 04lp) (,) (►'+') + ( 110 Pt,M) (11(Iw.1ts1) et I4. tear QL It,/ iii) (191) (Cool • 2%1%4 6414* l % ? 4,0•i%)( 0.0(111)(3 01) = 3H w wu�t euildin CC Engineering 111 Main Street. Suite 106. Edmonds. WA 98020 e. CITY OF TUKW" JAN 2 0 2000 PERMIT CENTEh JAN -19 -2000 WED 12:11 PM CG "GINEERING FAX N0, 4'""'\778 5536 36i r14 %411. 'o* r 6Atsd 3a' 341 P. 14/15 V (e11l01 1,e0b) = 0,751 kt.!' 1)474 ICUs) (me i) + 8.6'4 V►w = 04001 Moos) ar+lrt • Z1 = inL (/:d•vw i1.004 440 a (1 _ _ _F /H,1K� (l,yi_ 100 P$_ Pu /t IRtidditt+ V 141.10 (1wi 1p1 r • 11 id. ti W C /ANk'i,) is i (150 94') (1 =� N /1�' i►�0 M•) f 5 3, W (.11116raNd) a OM. Po' )(7) (Iwo) Ito 9 r (79(,N,'1v1'� R.41011 A {, A. 011 Kt (14 a1<) (h') (4.1) ■ :AO' t. ¢ Lo,ir lac• ) 1,.!)(1$'l) Poi) v 7/4 Qwest Buildin CO Engineering ill Main Street. Suite 106. Edmonds. WA 98020 I N 1►, 6 w B : JO Chkd: / /a 1 Date: Job No 99 L6,7.10 Sheet 2.01 a RECEI�' CITY OF 7 JAN 2 0 JAN-19-2000 WED 12:11 PM 0G-cmGINEERING FAX NO, 4?r--,778 5536 P, 15/15 o 1a,sti 6A. 9 k es (0 AD t4t.1�•) ` 1,111 kbP) (tt,a')' /6 41•1.5') 7 5,'3 ,,bee Love" 14009 I°6• AO /‘ado motoirwtS JAN 2 0 2000 Qwest Building 13y: JG Chkds CV Engineering 111 Main Street, Suite 106, Edmonds, WA 98020 PERMIT CENTER Dam Dates JO No, Sheet 99162.10 1.01s PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M2000 -017 DATE: 12- 8-2000 PROJECT NAME: QWEST COMMUNICATIONS SITE ADDRESS: ..110:11:_1180 SUITE NO: Original Plan Submittal Response to Incomplete Letter Response to Correction Letter # �_`__ ,X.Revision # 2 After Permit Is Issued DEPAR EN'S: Building Divi ion 12 -I �,i�G d' Public Works C� Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETE : (Tues., Thurs.) DUE DATE: 12 -14 -2000 Complete El Comments: _ Incomplete ❑ Not Applicable ❑ TUES /THURS ROUTING: Please Route [If Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OK RO RECTIONS: (ten days) DUE DATE 1 -11 -2000 Approved Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWER'S INITIALS: DATE: CQ,BRECTION DETERMINATION; DUE DATE Approved Ej Approved with Conditions Not Approved (attach comments) ri REVIEWER'S INITIALS: DATE: YyRUU1t DOC PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M2000 -017 DATE: 1.2- 012000, PROJECT NAME: QWEST CYBER CENTER SITE ADDRESS: 6101 S 180 ST SUITE NO: �..�_.... Original Plan Submittal Response to Incomplete Letter #_ Response to Correction Letter # , XX Revision # 1 _..__ After Permit Is Issued ' ►. TS Bui • n Divisig9 15Ki • Public Works ❑ FiPik M rAWe- l iii Z 127 �Structural Planning Division Permit Coordinator DETERMINATION OF COMPL TE ENESS: (Tues., Thurs.) Complete E2' Comments: Incomplete ❑ DUE DATE: 12 -05 -2000 Not Applicable ❑ TUES /THURS ROUTING: Please Route REVIEWER'S INITIALS: Structural Review Required No further Review Required DATE: Approved : (ten days) DUE DATE - 2-2000 Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWER'S INITIALS: CORRECTION DETERMINATION: DUE DATE Approved E Approved with Conditions ❑ Not Approved (attach comments) E REVIEWER'S INITIALS: DATE: _ DATE: vn VIULOUII.DOC t PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M2000 -01.7 DATE: 1-211-2000 PROJECT NAME: 'WEST_ COMMUNICATIONS ....XX Original Plan Submittal Response to Incomplete Letter # .o,..,.,.. ,,,..,.,_Response to Correction Letter # Revision # — After Permit Is Issued. Public Works t Fire Prevention Mx, I -25` Structural ❑ Planning Division Permit Coordinator E A Complete Comments: (Tues., Thurs,) Incomplete ❑ DUE DATE: 1.2. 4J O0 Not Applicable ❑ TOES /THURS ROU INC: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS QR, CORRECTIONS: (ten days) DUE DATE 2 -22 2000 Approved ❑ Approved with Conditions ❑� Not Approved (attach comments) El REVIEWER'S INITIALS: DATE: c_Q,KRECTION DETERMINATION; DUE DATE_ Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) REVIEWER'S INITIALS: DATE: WRROUTE.POC 5/99 • v • • • •. .�1 PROJECT NAME: QweE: P ERMI1 ,0:. 12.000-01 7 Site Address: (D1 Di S t 8O --- Original Issue Date: Lo.-1(0-00 REVISION LOG Revision No.. Summary of Revision: Date Received Staff Initials Date Issued `Staff Initials /� �� : R • • _ � ,� �•_ PC- • r •. u�W of 1 R cei edB . (please print) Revision No. Date Received I Staff Initials Date Issued Staff initials Summary of Revision: �7:r, IAEA 11•11. 11 � IRMI i[1 _ 1� +. ! .u, �. ', ,�►._. lam_ ,,.► •.. _�'' Receives: y: ( please print) Revision No. ' ' Date . Received I Staff Initials Date Issued Staff Initials Summary of Revision: Summary of Revision: Received By: Received By: (please print) Summary of Revision: Received By: (please print) Revision No. Date Received Staff Initials Date Issued Staff Initials Summary of Revision: Received By: please pr City of Tukwila Department of Community Development - Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 (206)431 -3670 Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 0 Plan Check/Permit Number: Q Response to Incomplete Letter # J Response to Correction Letter # igiL Revision # Z. after Permit is Issued 00 0 -- vra_ PtCErVEO , cItY OF it DEC "' 6 Z000 PERMIT CENTER Project Name: (f/ Project Address: Contact Person: Summary of Revision: Sheet Number(s): 'V t• 0 ( Cdr "Cloud" or highlight all areas of revision including dale of revision Received at the City of Tukwila Permit Center by: VBntercd in Sierra on 17,43 • 1 JAN 16 '96 09259AM TUK141 DCDiPW CITY OF TUKWILA 6300 SOUTHCEN'TER BOULEVARD TUKWILA, WA 98188 * * REVISION SUBMITTAL * * DAZQ/1fOL/ 00 PROM= NAME ADDRESS CONTACTPERSON MINVISOP-01% ENOINEER P.2 PHONE221211ALHAL....., tjiej3 PIAN-CtIECK/PERMIT NUMBER AL2,12Q12z.91.7 ■WWW•earnain•■••••=4••■•• goIMINNI/e1MIN■marswommao■140■11111•0■M•11•111111111111=M1■111117114114.41111111m10■1 ,(TgNUMBER(s) 9. .1 2. - or highlight oil uoss ofrsMons and data revisions, SUBWITED TO: 111111111.■ DEC - 1 2000 ....agamasteop REVISION Na Cit,y of Tukwila Steven M. Mullet, Mayor Fire Department Thomas P. Keefe, Flre Chief Fire Department Review Control #M2000 -017 (512) January 25, 2000 Re: Qwest Communications - 6101 South 180th Street Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #1742) H.V.A.C. systems supplying air in excess of 2000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an shutoff. Automatic shutoff shall be accomplished he by interrupting the power source of the air - moving equipment upon detection of smoke in the main supply-air duct served by such equipment. Smoke deectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturers installation instructions. (UMC 608) Local U.L. central station supervision is required. (City Ordinance #1742) Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #1742) All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #1742) (UFC 1001.3) Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: 206.575.4404 • Fax: 206•S7S•4439 City of Tlikwila Steven M. Mullet, Mayor Fire Department Thomas R Keefe, Fire Chief Page number 2 Call the Tukwila Fire Department at 575 -4407 for approval of any system shut down. Have job site address, name and the Tukwila Fire Department Job Number available to confirm shut down approval. (City Ordinance #1742) Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1742) 2. All electrical work and equipment shall conform strictly to the standards of The National Electrical Code. (NFPA 70) 3. This review limited to speculative tenant space only - special fire ermits may be necessary depending on detailed description of intended use. Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. Yours truly, /A The Tukwila Fire Prevention Bureau cc: TFD file ncd Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: 206•S7S•4404 • Fax: 206.575.4439 • MIMI WM .4 4 • 11 44 Mr* MOB *NS Detach And Display Certificate DEPARTMENT OF LABOR AND INDUSTRIES REGISTERED AS PROVIDED BY LAW AS COM coNer GENERAL MIST. # MCP DATE CC01 . ,NA:CDP14,248J9' 08/01/2000 EfFECTIVICDTE.:, 04/29/1976 MACDONALD MILLER CO 7717 DETROIT AVE SW . SEATTLE WA 98106 q!) *04,,ase }.,aSles,a,7..111}rttlasaVirts:I±S. , nolnimemossolmrs • Mulch And Display Willow f • e, 0 11•1111•MMITI. I 4 1 • BMW' • Ora O.. 1,111111 011tqa • 0114i1/(4).'00;crayep(-7A P4 /4"4( 1441P°r41 ollismitio, iik, 6000/pi 0 ott, .64 1,, . 01:, ......t. si... , *0. r.• oini.v. ,s. 41:-: 01 P 'NUN% 0 '0 HVAC GENERAL NOTES 1. THE HVAC SYSTEM FOR THIS PROJECT IS BASED ON THE FOLLOWING CRITERIA: ROOF "U" VALUE (BTUH /S.F.'F) = 0.05 WALL "U" VALUE (BTUH /S.F.'F) = 0.14 FLOOR "U" VALUE (BTUH /S.F.'F) = NA GLASS "U" VALUE (BTUH /°i.F.'F) = 1.1 GLASS SHADE COEFF. = 0.9 LIGHTING (WATTS /S.F.) = 1.2 MISC. EQUIP. (WATTS /S.F.) = 60 PEOPLE DENSITY (PEOPLE /S.F.) = 1/300 COOLING INDOOR DESIGN TEMP ('F) = 70 (CABINET AREA), 74 (SUPPORT AREA) COOLING OUTDOOR DESIGN TEMP ('F) = 82/66 HEATING INDOOR DESIGN TEMP ('F) = 70 HEATING OUTDOOR DESIGN TEMP ('F) = 24 2. THESE PLAITS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 3. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 1997 EDITIONS OF THE UNIFORM MECHANICAL CODE, UNIFORM BUILDING CODE, UNIFORM FIRE CODE AND LOCAL CODES AND ORDINANCES. 4. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 1997 UMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12 BELOW STRUCTURAL SYSTEM. 5. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 6. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS. - DUCT WRAP, WHERE INDICATED, SHALL BE 2.0" 0.6 LB /CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUMINUM FOIL VAPOR BARRIER. - SOUND LINING, WHERE INDICATED, SHALL BE 1" 1.5 LB /CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 4000 FPM. - DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT. 7. FLEXIBLE DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON - PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEXIBLE DUCTS SHALL ONLY BE USED VMERE SHOWN ANN SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 8. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 16 OF THE 1997 UBC. 9. PROVIDE FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 7 OF THE 1997 UBC. PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 7 OF THE 1997 UBC. INSTALL FIRE DAMPERS AND CEILING FIRE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REWMENTS OF THE CODE. 10. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 11. PROVIDE SUPPLY DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL HEATING, COOLING, OR VENTILATION EQUIPMENT DELIVERING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH SECTION 6 OF THE 1997 UMC. POWER WIRING AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE, ELECTRICAL CONTRACTOR.': 12. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE" "LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED'BY THE HVAC CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. 13. HEAT TRACING OF PIPING, WHERE INDICATED, SHALL BE PROVIDED AND INSTALLED BY THE HVAC CONTRACTOR. THE HVAC CONTRACTOR IS TO COORDINATE THE HEAT TRACE POWER WIRING WITH THE ELECTRICAL CONTRACTOR. 14. ALL MOTOR STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY THE ELECTRICAL. CONTRACTOR. 15. ALL EXISTING AC UNITS, FANS, RELIEF HOODS, DUCTWORK, AND T'STATS SERVING THE IP CABINET AREA ARE TO BE DEMOLISHED BY THE MECHANICAL. CONTRACTOR. SALVAGE REQUIREMENTS PER THE OWNERS DISCRETION. PACKAGED ELEC /ELEC MR CONDITIONING UNIT SCHEDULE HVAC ABBREVIAnONS ABBY FULL NAME ABBY FULL NAME ABBY FULL NAME A COMPRESSED AIR LINE ESP EXTERNAL STATIC PRESSURE NOM NOMINAL AC AIR CONDITIONING UNIT EXH EXHAUST OA OUTSIDE AIR AFF ABOVE FINISHED FLOOR EXTR EXTRACTOR OBD OPPOSED BLADE DAMPER BDD BACKDRAFT DAMPER FD FIRE DAMPER OD OUTSIDE DIMENSION BOD BOTTOM OF DUCT FLA FULL LOAD AMPS RA RETURN AIR BOTT BOTTOM FOB FLAT ON BOTTOM REG REGISTER (GRILLE WITH DAMPER) BTU BRITISH THERMAL UNITS FDT FLAT ON TOP REQ'DREQUIRED BTUH BRITISH THERMAL UNITS PER HOUR G GAS LINE RIO ROUGH IN ONLY BWG BOTTOM WALL GRILLE GALV GALVANIZED SA SUPPLY AIR BWR BOTTOM WALL REGISTER GC GENERAL CONTRACTOR SL SOUND LINING CAP CAPACITY GPM GALLONS PER MINUTE SM SHEET METAL CFM CUBIC FEET PER MINUTE GR GRILLE SP STATIC PRESSURE CHM, CHILLED WATER RETURN GAB GYPSUM WALL BOARD STL STEEL CHAS CHILLED WATER SUPPLY HG HOT GAS LINE SUC SUCTION LINE COMB COMBUSTION HP HORSE POWER SUSP SUSPENDED CONN CONNECT MYR HOT WATER RETURN TOD TOP OF DUCT CAR CONDENSER WATER RETURN HWS HOT WATER SUPPLY TV TURN VANES CWS CONDENSER WATER SUPPLY ID INSIDE DIMENSION TWG TOP WALL GRILLE DB DUCT BOARD LIP LIQUID LINE TAR TOP WALL REGISTER CHEF DIFFUSER M-M MACDONALD- MILLER TYP TYPICAL DMPR DAMPER MBH ONE THOUSAND BTUH UND UNLESS NOTED OTHERWISE DN DOWN MCA MINIMUM CIRCUIT AAPACITY VD VOLUME DAMPER EC EGGCRATE MIN MINIMUM , 'VOLTAGE PHASE d DUCT DIAMETER EER ENERGY EFFICIENCY RATIO MT MOUNT' ELEV ELEVATION MUA MAKE -UP AIR MFG A MMEL NO. DAMPER SYMBOL DESCRIPTION LEGEND SYMBOL DESCRIPTION A CLA55 II, GREE ECK CMB V Y HOUR VTICOINATIO FIRE /SMOKE DAMPER MODEL FSD N -22 OR EQUAL llh HOUR VERTICAL COMBINATION FIRE /SMOKE DAMPER CLASS I, GREENHECK MODEL TM-33 OR EQUAL /-_ t» HOUR HORIZONTAL COMBINATION 060 /SMOKE DAMPER �- CVSS 11, GREENHECK MODEL FSD -22 OR EQUAL 0- 1Yi HO UR HORIZONTAL COMBINATION FIRE /SMOKE DAMPER D CLASS I, GREENHECK MODEL FSD -33 War '0 CLASS IIRG E IEC MODEL 2&T glE1 52200E HOUR VERTIC CO MBINATION FI/SMOKAPE R CLASS R. GREEN HECK MODEL FSD RE -28 OR EE QUADML CLASS I, GREENHECK MODEL FSD -28 R OR EQUAL DAMPER =Ira= HORIZONTAL COMBINATION FIE /SMOKE VERTICAL SMOKE DAMPER CUSS II, GREENHECK MODEL SMD -22 OR EQUAL /,_ VERTICAL SMO DAMPER v CLASS I, GREENH ECK MODEL SMD - OR EQUAL 9 DA T DUCT ACCESS - BY MECHANICAL CONTRACTOR ACCESS DOOR - 7.1.' x 18" MINIMUM THROUGH BUILDING CONSTRUCTION - GENERAL CONTRACTOR g HOR CURIN STYLE VERICAL FIRE DAMPER 00 <) GREENH DF -150A OR EQU 1. HOUR CURTAIN MYLE HORIZONTAL FIRE DAMPER H. 1Y GREENHECK DFD -150A OR EQUAL FD /� 3 HOUR CURTAIN SME VERTICAL FIRE DAMPER ��- GREENHECK DFD -350A OREOUAL 3 HOUR CURTAIN S HORIZONTAL FIRE DAMPER HFD O'''''`' GREENHECK DFD -355A ttLE OR EQUAL FD '0''' GREENHECK OR BACKDRAFT DAM H ORIZ A 606 VERT AIRFLOW BDD � GREENHECK ES -10 PER O R EQUAL BAKDRAFT DAME VERT M AIRFLOW BDD '22'22` GR ES - R OR EQT UAL WITH HORIZ BAROMETRIC IEF DAMPER (.05 OPNG PRESSURE SHOWN) BAR 0 RUSKIN CBD2 REL OR EQUAL /\��,"., MOTORIZED CONTROL DAMPER ITY l ' T T" �/� "' °' "' GREENHECK MODEL VCD- 23/VCD -33 OR EQUAL I 4DPR0 D ' K you FIRE LIFE - SAFELY MOTORIZED CONTROL DAMPER v GREENHECK MODEL VCD -33 OR EOUAI RI L - 3 =i VOLUME DAMPER / '' .9 1 ` I '' L VD SHOP FABRICATED WITH LOCKING QUADRANT ._ - KIm'tA:: Ct `• GENERAL NOTES: FIRE DAMPER REQUIREMENTS: FUSIBLE LINK BLADES OUT OF AIRSTREAM ON MEDIUM PRESSURE DUCTS CLASP -cuss n , DUCT LEGEND DESCRIPTION SYMBOL DESCRIPTION SYMBOL BARE S000620TAL 14/12 SM ROUND SHEETMETAL WRAPPED W/ INSULATION (1 ° ) 120W 50UNDLINE SHEETMETAL (1 LINING) 14/12 SLSM FLEX DUCT 120 SHEETMETAL WRAPPED W/ INSULATION (1 ") 14/ 12 S26 DUCTBOARD (1" F IBERGLASS) 14/12 DB FSD -1 FSO -2 FLEX CONNECTOR mmmmm BARE ROUND SHEETMETAL 120 POWERED DAMPER SCHEDULE SYMBOL PACKAGED ELEC /ELEC MR CONDITIONING UNIT SCHEDULE UNIT NO DAMPER STYLE MFG A MMEL NO. NOTES TITUS MOD UNIT N0. AREA SERVED TRANS MODEL NO. Nem TONS HEATING KW STG CFM ESP FAN OA HP CFM EER / IPLV ELECTRICAL VOLT /PH WT MCA LBS NOTES FSD -1 FSO -2 E GREENHECK CFSD -22 TUNNEI. MT GREENHECK CF5D -22 (TUNNEL MT) 1 RTU -1 RTU -2 COMPUTER RACKS COMPUTER RACKS SXHGC604 SXHGC904 90 90 - - - - 45000 45000 2.0 2.0" 80 2000 80 2000 9.6/11.5 9.6/11.5 460/3 460/3 330 18000 330 18090 1,2,3.4,5,6.8.9 1.2,3.4,5,6.8,9 FSD -3 FSD -4 E E GREENHECK CFSD -22 (TUNNEI. MT GREENHECK CFSD -22 (TUNNEI. MT) 1 1 24/24 RTU -3 RTU-4 COMPUTER RACKS COMPUTER RACKS SXHGC904 SXHGC904 90 90 - - - - 45000 45000 2.0" 2.0" 80 2009 80 2000 9.6/11.5 9.6/11.5 460/3 460/3 330 18000 330 18000 1.2,3.4.5,6.8,9 1,2,3.4.5.6,8.9 FSD -5 FSD -6 A GREENHECK CFSD -22 (TUNNEL MT) GREENHECK FSD -22 (VERTICAL MT) 1 1 RTU -5 RTU -6 COMPUTER RACKS COMPUTER RACKS SXHGC904 SXHGC904 90 90 - - - - 45000 45000 2.0" 2.0" 80 2000 80 2000 9.6/11.5 9.6/11.5"460/3 460/3 33068900223.5.5.6.8.9 330 18000 1.2,3.4.5.6.8.9 FSD -7 050-8 A A GREENHECK FSD -22 (VERTICAL MT) GREENHECK F5D -22 (VERTICAL MT) 1 1 RTU -7 RTU -8 COMPUTER RACKS COMPUTER RACKS 5XHGC904 5XH'GC900 90 90 - - - - 45000 45000 2.0 2.0" 80 2000 80 2000 9.6/11.5 9.6/11.5 460/3 460/3 330 18000 330 18000 1.2,3.4,5,6.8,9 1.2,3.4.5.6,8,9 FSD -9 FSD -10 9 E GREENHECK FSD -22 (VERTICAL MT) GREENHECK CF5D -22 (TUNNEL MT) 1 1 RTU -9 RTU -10 COMPUTER RACKS COMPUTER RACKS SXHGC604 SXHGC004 90 90 - - - - 45000 45000 2.0" 2.0" 80 2000 80 2000 9.6/11.5 9.6/11.5 460/3 460/3 330 18000 330 18000 1.2,3.4.5.6.8,9 1 2,3,4.5.6.8.9 RTU -11 RTU -12 RTU -13 SUPPORT AREA COMPUTER RACKS COMPUTER RACKS TCD330A4 S%HGC904 SXHGC904 27 90 90 - - - - - - 8300 45000 45000 N;t1 7.5 4800 80 200G 80 2000 9.9/11.2 9.6/11.5 9.6/11.5 460/3 460/3 460/3 78 5000 330 18000 330 18000 1.4,6.7.9 1.2.3.4.5.6.8,9 1.2,3.4,5.6,8.9 F5D -11 FSD -12 FSD -13 E A A GREENHECK CFSD -22 (TUNNEL MT) GREENHECK FSD -22 (VERTICAL MT) GREENHECK F5D -22 (VERTICAL MT) 1 1 1 F5D -14 FSD -15 B A GREENHECK FSD -33 (VERTICAL MT) GREENHECK FSD -22 (VERTICAL MT) 1 1 n RTU -14 RTU -15 COMPUTER RACKS COMPUTER RACKS 5XHGC904 50000904 90 90 - - - - 45000 45000 2.0 2.0" 80 2000 80 2000 9.6/11.5 9.6/11.5 460/3 460/3 330 18000 330 18000 1,2,3.4,5,6,8,9 1,2.3.4.5,6,8,9 FSD -16 FSD -17 B A GREENHECK FSD -33 (VERTICAL MT) GREENHECK FSD -22 VERTICAL T 1 1 /Z\ + RTU -16 RTU -17 SWITCH GEAR AREA SWITCH GEAR AREA TCD600A4 TCD600A4 50 50 - - - - 20000 20000 1.7" 1.7" 20 1000 20 1000 8.6/8.9 8.6/8.9 46C/3 460/3 128 6245 128 6245 1 4 6 9 10 1.4.6,9.10 FSD -18 FSD -19 A A GREENHECK FSD -22 (VERTICAL MT) GREENHECK FSD -22 OIRTICAL MT) GREENHECK FSD -22 (VERTICAL MT) 1 1 NOTES: 1. EMERGENCY POWER AND DISCONNECT SWITCH BY ELECTRICAL CONTRACTOR 2. PROVIDE WITH 1007 MODULATING EXHAUST (40 HP), STATITRAC BOLDING PRESSURIZATION CONTROLS, HIGH EFF FILTERS, VAV SUPPLY AIR CONTROL, V.'S WITH BYPASS AND INPUT LINE REACTORS, HOT GAS BYPASS, HIGH EFF MOTORS, EXTENDED GREASE LINES, ACCESS DOORS, TRANS COMMUNICATIONS INTERFACE 3. ECONOMIZER OPERATION NOT REQUIRED DUE TO INCREASED ENERGY USAGE FOR BUILDING (WSEC SECTION 1433.8, EXCEPTION 1.8) 4. PROVIDE WITH MASON RSC SPRING ISOLATION CURB (2 DEFLECTION) WITH ACOUSTICAL PACKAGE 5. PROVIDE 12" TALL SM EXTENSION ABOVE SUPPLY AIR OPENING (84/45) FOR MOUNTING OF HUMIDIFICATION UNITS 6. PROVIDE SUPPLY AIR DUCT SMOKE DETECTORS. SHUTDOWN WIRING BY FIRE ALARM CONTRACTOR 7. PROVIDE WITH 2 -STAGE EXHAUST (2 0 1 HP), HIGH EFF FILTERS, ECONOMIZER, VAV SUPPLY AIR CONTROL, WEI'S WITH BYPASS AND INPUT LINE REACTORS, HIGH EFF MOTORS, EXTENDED GREASE LINES, ACCESS DOORS. TRANS COMMUNICATIONS INTERFACE 8. METAL SUPPORT STRUCTURE BELOW UNITS AND UNIT SCREENING BY GENERAL CONTRACTOR 9. PAINT UNITS TO COLOR AS SPECIFIED IT EC ED BY ARCHITECT TO MATCH SCREEN WALL 2 � 10. PRO VIDE WITH HIGH EFFICIENCY FILTER -259. MANUAL A 5. 0 L OS DAMPER, CONSTANT VOLUME. DOWN FLOW CONFIGURATION AND NO HEAT FSD -20 FSD -21 A - NOT USED NOT USED - - FSD -22 FS0-23 - - NOT USED NOT USED - - FSD -24 - GREENHECK VCD -33 2 MD-1 MD -2 K K GREENHECK VCD -33 GREENHECK VCD -33 2 2 MD -3 MD -4 K K GREENHECK VCD -33 GREENHECK VCD -33 2 2 MD -5 MD -6 K K GREENHECK VCD -33 GREENHECK VCD -33 2 2 MD -] MD -8 K K GREENHECK VCD -33 GREENHECK VCD -33 2 2 MD -9 MD -10 K K GREENHECK VCD -33 GREENHECK VCD -33 2 2 MD -11 MD -12 K K GREENHECK VCD -33 GREENHECK VCD -33 2 2 MD -1} MD -14 K K GREENHECK VCD -33 GREENHECK VCD -33 2 2 n / " EXHAUST FAN SCHEDULE MD -15 MD -16 K K GREENHECK VCD -33 GREENHECK VCD -33 z 2.3 MD -17 MD -18 K K UNIT N0. EF -I SERVICE AND LOCATION SUPPORT AREA MANUFACTURER 8 MODEL ND. GREENHECK GB -180 -3 TYPE MUSH CFM 2290 ESP 0.5 VOLT/ PHASE 120/1 RPM 794 HP 1/3 BDD Y WT/ LBS 101 NOTES 1,2,4,6 GREENHECK VCD -33 GREENHECK VCD -33 2 MD -19 K MD -20 K GREENHECK VCD -33 2 NOTES: 1. FIRE /SMOKE DAMPER - TWO POSITION WITH SPRING RETURN 1 - FIRE RATING, LEAKAGE CLASS, AND BLADE STYLE AS LISTED IN MODEL NUMBER - OPEN WHEN BLDG IN NON FIRE ALARM MODE, NORMALLY (SPRING) CLOSED /:POWERED OPEN S EF -2 ELECTRICAL ROOM GREENHECK GB- 200 -20 MUSH 4500 0.75 460/3 1029 2 _ Y 120 1 2 4 7 EF -3 EF -4 UPS ROOM BATTERY ROOM GREENHECK GB- 360 -50 GREENHECK GB- 260 -20 MUSH MUSH 12000 6500 0.75 0.75 460/3 460/3 571 667 _ 5 2 Y Y 320 240 1 2 4 7 1 2 3 4,5 EF -5 EF -6 TRANSFORMER RM. TOILET ROOM GREENHECK GB- 420 -50 GREENHECK GB -80-6 MUSH MUSH 16000 400 0.5 0.5' 460/3. 120/1 457 1244 5 1/6 Y Y 331 60 1 4,8,9 1 4,6 EF -7 BATTERY R001/ GREENHECK G8- 200 -10 MUSH 4000 0.5 480/3 888 1 Y 107 7 2 3 4 5 DIFFUSER /GRILLE SCHEDULE SYMBOL MANUFACTUER 8 MODEL NUMBER SIZE TYPE NOTES TITUS MOD AS NOTED SURFACE MT DIFFUSER O TITUS MCD AS NOTED LAY IN MT DIFFUSER OCFM TITUS FLOWBAR FL AS NOTED SLOT DIFFUSER SL PLENUM BY M1 O TITUS 300 RL AS NOTED DOUBLE DEF. SA GRILLE M TITUS 350 ZFL AS NOTED SURFACE MT RET /EXH ALUM, WITH OBD ® 9 ITUS 350 ZRL AS NOTED SURFACE MT RET /EXH STEEL, WITH OBD ED TITUS 8R 12/24 PERF RETURN /EXH FRAME PER CEILING TYPE TITUS BR 24/24 PERF RETURN /EXH FRAME PER CEILING TYPE A 3 2 CABLE CONNECTS TO CL OF TRUSS PANEL POINT (TYP) - 165F LINKAGE TEMPERATURE (UND) - 120V DAMPER ACTUATOR, MODEL MA -418 OR MA -230 (013A) BASED ON TORQUE RED'S FOR NOTES: DAMPER SIZE, LOCATED EXTERNAL TO DAMPER SLEEVE (UND) 1. MOTOR STARTER BY MECHANICAL CONTRACTOR - INTERLOCK WITH FIRE ALARM SYSTEM BY FAC 2. UNIT REQUIRES DISCONNECT AND EMERGENCY POWER BY ELECTRICAL CONTRACTOR MOTORIZED CONTROL DAMPER - 24V DAMPER ACTUATOR, LOCATED EXTERNAL TO DAMPER SLEEVE (UND) - DAMPER ACTUATOR BY CONTROLS CONTRACTOR 3. UNIT REQUIRES MANUAL SHUTOFF INSIDE ROOM BY ELECTRICAL CONTRACTOR 4. PROVIDE WITH ADJ. DRIVES, BOO, BS.' ROOF CURB BY MA 5. FAN TO OPERATE CONTINUOUSLY - T159 POSITION DAMPER WITH SPRING RETURN (UND) ELECTRICAL CONTRACTOR TO INTERLOCK MOTORIZED DAMPER TO EF -5. MOTORIZED DAMPER TO 6. START /STOP OPERATION DURING OCCUPIED HOURS BY CONTROLS CONTRACTOR T'STAT (SET AT 90 DEG F, MT AT 48" AFF) PROVIDED BY CONTROLS CONTRACTOR PEN WHEN EF -5 IS ENERGIZED. Q1 8. INTERLOCK TO LINE VOLTAGE T'STAT BY ELECTRICAL CONTRACTOR. T'STAT PROVIDED BY NIECHANICAL CONTRACTOR T'STAT ON AT 70 DEG F OR ABOVE OFF AT 140 DEG F OR. ABOVE. T'STAT HONEYWELL 9T775A1027 OR EQUAL. /1\ 9. ELECTRICAL CONTRACTOR TO INTERLOCK CK MOTORIZED DAMPER MD -17 TO EF -5. M 0 /AEI Ait. 1:11 31111M. DURODYNE CRIPPLE ROPE GRIP FOR X, CABLE, EACH END 2xY FLATBAR CINCH BAND, FULL CIRCUMFERENCE 1/1 MIN 1/2 MAX SLOPE 7x19 GALV AIRCRAFT CABLE ' NOM. BREAKING STRENGTH = ]000 LBS PROVIDE LATERAL SUPPORT TO 60, DUCT ® EVERY 30' OF DUCT RUN, ® ENDS, t 0 EITHER SIDE OF ALL BEN LATERAL BRACING DETAIL FOR 600 DUCT NO SCALE TRANSFORMER DRAWING SHEET INDEX SHEET NUMBER DESCRIPTION SHEET NUMBER DESCRIPTION MO.1 MO.2 M2.1 M2.2 M2.3 HVAC SCHEDULES AND GENERAL NOTES M2.04 HVAC SCHEDULES AND DETAILS M2.05 PARTIAL FLOOR PLAN - WEST - HVAC M2.06 PARTIAL FLOOR PLAN - CENTRAL - HVAC M3.1 PARTIAL FLOOR PLAN - EAST - HVAC PARTIAL ROOF PLAN - WEST - HVAC PARTIAL ROOF PLAN - CENTRAL - HVAC PARTIAL ROOF PLAN - EAST - HVAC DETAILS - HVAC X12000 - o 17 ride the 1 Qwest QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER D 0935 - 1091291 - 00 DRAWN BY NEHREN CHECKED BY D. NEHREN C 11 �nn MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 L A 05 -01 -00 PHASE A REVISION 05 - 04 - 00 05 -24 -00 • 10 -30 -00 11 -15 -2000 PHASE RI REVISION . ADDENDUM 81 - BATTERY ROOM REVISION RECORD DRAWING EXPIRES: 6 -18 -2001 I BALI 0n�win96 065 written 6096209 236900 herein W Y not t i ti s tl or tl lsclosetl w�tno�l °tne w�ltten nsent oe ine n�c nitect. QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER SCHEDULES 8 LEGENDS - HVAC RECORD DRAWING sPGFP:Ep crr. nrv :'L :. :r.�IL.n JUN 2 5 2001 en OF rU3WIU 4PPRO4FD DEC - 1 2000 NOILD • HVAC SHEET NUMBER RECORD DRAWING AA f17 fff MacDonald Seattle. _ ride QWEST 13952 PARKWAY, GOLDEN ATTN. PHONE: FAX: FAX PROJECT... D-0935-1091291-00 DRAWN D. NEHREN CHECKED D. NEHREN NO . � > ,/,,. / / � . Company 7717 Detroit Wa Phone: (206) Fax: (206) �L ppp �] (t§ COMMUNICATIONS DENVER , CO FRED (303) / ZOZ\ ( J 3 l NUMBER B �' DATE • 11 -15 -2000 ,SC, RY A6 o¢/Y ' f"72. C, ' R f " / �� /� / /�� / / '/ A Miller Inc. Ave. S.W. 903 98 98 106 -1 A 3 763 -9400 767 -6773 �L f f .I •F u I - - - - -- C WEST BUILDING 5 3 80401 MAI D ES I L 445-713C 445 -7225 - .ISSUE ION RECORD DRAWING . $/ sq�'��rG2 s11sW at 0.. 0 CONTROLS/RESPONSIBILITY MATRIX VAV TERMINAL BOX SCHEDULE VAV TERMINAL BOX SCHEDULE DESCRIPTION EMS SS TC T' STATI NON EMS NTERLOCK 24 H'•THER PROVIDED BY INSTALLED BY POWER WIRING BY CONTROLS WIRING BY NOTES UNIT NO. TRANS MODEL N0. INLET SIZE TOTAL CFM VALVE MAX CFM MIN HEATER kWp DT CFM VOLT PH STGS FAN HP VOLT /PH NOTES SPD UNIT N0. TRANS MODEL N0. INLET SIZE TOTAL C VALVE MAX CFM MIN HEATER kWp DT CFM VOL /P STGS FAN HP VOLT /PH NOTES SPD EQUIPMENT AIR HANDLING UNITS - OCCUPIED AREAS • • - - - - MC MC EC CC 9.15.16,18.21 149 VCCE 42 16 4200 4200 630 3.4 002 VCCE 42 16 4200 4200 630 3.4 BOILERS HUMIDIFIERS • - - - - - - - - - MC MC M C MC EC EC CC CC 16 20 /I\ 150 151 VCCE 42 VCCE 42 16 16 3150 4200 3150 4200 630 630 - - - - - - - - - - - - - 3,4 - 3.4 003 VCCE 42 004 VCCE 42 16 16 4200 4200 4200 4200 630 630 - - - - - - - - iaa - 3,4 3,4 3,4 3,4 EXHAUST FANS - OCCUPIED AREAS EXHAUST FANS - ELECTRICAL ROOM • - - - - • - - - - - 6 MC MC MC MC EC EC CC EC 17 1,16,17 / n 152 153 VCCE 42 VCCE 42 16 76 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 005 VCCE 42 006 VCCE 42 16 ���e 4200 4200 630 ��eaa eees - - - E %HAUST FANS - UPS ROOM VAV BOXES - - • • - - - - . - - - 1.1C MC MC MC EC EC EC CC 10, 16, 17 154 155 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 007 VCCE 42 VCCE 42 1 6 16 EECCIMECENe111MMeeeMseae 4200 I��- eetssee�e 3.4 3.4 MISCELLANEOUS ITEMS EQUIPMENT MOTORS - - - MC MC EC CC 156 157 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4. - 3,4 009 VCCE 42 010 VCCE 42 16 16 4200 4200 4200 4200 630 630 34 3,4 DISCONNECT SWITCHES . 120V RECEPTACLES e e� - - - - - e® - EC MC EC EC E - - 158 159 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 011 VCCE 42 012 ■13112210=i1E1M11101121MIIIMME121 16 4200 4200 630 -00 seas 3,4 3 DIVISION 15 VALVES AND DAMPER MOTORS DIVISION 15 LINE VOLTAGE T•STATS - - - - - - - - - - - - CC /MC CC CC/MC EC EC EC CC CC 160 161 VCCE 42 VOCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 O13 �����- 01i. �����_sass� ee e��e se 3.4 a 3. DDC CONTROL SYSTEM (LOW VOLTAGE) FIRE DAMPERS - - - - - - - - - - - - CC MC CC MC EC - CC - 162 163 VCCE 42 VOCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 015 VCCE 42 016 VCCE 42 ■32MEIIIIMECLEe MIEMZE2121=1112Ee eeeMseae eesseae 3.4 3.4 FIRE SMOKE DAMPERS HEAT TRACING - - - - - - - - - - - - MC MC MC MC EC EC EC - 164 165 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 EWE= VCCE 42 =:13:= VCCE 42 11111111MEECIIIICH111• IMMEECIINCII=11111113201 eesseae sasseaeEMEIRMINMI 3.4 CRANE PICKS VAR F DRIVES {VFD'S) PROVIDED - - - - - - MC MC - C - EC - 166 167 VCCE 32 VCCE 42 14 16 3150 3150 3150 3150 480 630 - - - - - - - - 3,4 =3E= VCCE 42 020 VCCE 42 021 VCCE 42 022 VCCE 42 ilMEECEINCE12311e 16 16 16 4200 4200 4200 4200 4200 4200 630 630 630 .®® e•ssee■e=11:11== - - ® - - - 3 4 - 3,4 - 3.4 AL L OTHER VFOUSNCY DUCT SMOKE DETECTORS SHUTDOWN OF MECHANICA _ _ CC CC CC CC EC EC CC FAC 16 168 169 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - 3,4 3.4 OTHER SMOKE DETECTORS LOUVERS (50% FREE AREA MIN) ATTACHED TO DUC - - - - - - - - - - - - EC MC EC MC EC - EC - 17 ( Y 170 171 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 . VCCE 42 .. VCCE 42 111111111:111E113111012=11111131•11111•11sesseaa1111101MININ 16 ZE111=221Me eeeMseae 3. 4 LOUVERS (50X, FREE AREA MIN) INSTALLED INTER ALL OTHER LOUVERS (507 FREE AREA MIN) - - - - - - - - - - - - MC GC MC GC - - - - I] tt 172 173 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 0�� . VCCE 42 16 16 ��e tE 630 �sesseae eeeMseae 3 3 4 GRATES t75X FREE AREA MIN) STRUCTURAL STEEL RTU SUPPORTS (LEVEL) - - - - - - - - - - - - GC GC GC GC - - - - 174 175 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 027 VCCE 42 028 VCCE 42 16 16 4200 4200 4200 4200 630 630 - - - - - - 3 ROOFTOP MECH EQUIP METAL CURBS (LEVEL) CONCRETE HOUSEKEEPING PADS (LEVEL) - - - - - - - - - - - - MC GC MC GC - - - - 176 177 VCCE 42 VCCE 42 16 16 3150 3750 3150 3150 630 630 - - - - - - _- - - - - - - S.4 - 3,4 'E VCCE 42 VCCE 42 4200 4200 �e�eee�see�e 630 �eee�seae 34 3. 4 GENERATOR MUFFLER AND SILENCER GENERATOR EXHAUST PIPING - - - - - - - - - - - - EC EC EC EC - - - - 178 179 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 - - - - - - - - - - - - - 3,4 - 3,4 0•1 111111.13MECSMEM 11111113EMEN111721331:EINIMEM 4200 4200 MEECINIII2E121 4200 - eesseeMeMICI■ eessee■e 3 . 4 GENERATOR FUEL TANK - SKID MT TANK GENERATOR FUEL TANK - STORAGE TANK - - - - - - - - - - - - EC EC EC EC - - - - 180 181 VCCE 42 VCCE 42 16 16 3150 3150 3150 3150 630 630 D® VCCE 42 =MEM VCCE 42 M1111021111rEll MEEMEECCI 4200 4200 e e e•eMseaM eessea 3 GENERATOR FUEL PIPING CHEMICAL TREATMENT - - - - - - - - - - - - EC MC EC MC - EC - CC 182 183 VCCE 42 VCCE 42 16 16 4200 4200 4200 4200 630 630 - - - - - - - - - - - - - 3,4.NOT USED - 3.4 IIIMMENII VCCE 42 MIIIMEINII VCCE 42 ■EMZECEI ■iENZIE121 4200 4200 e e eeeMsee■e eesseeemeinomm 3. 4 DOC CONTROL PANEL - - - - - - CC CC EC CC /� A1/\ 184 185 186 VCCE 42 VCCE 42 VCCE 42 16 16 16 4200 3150 3150 4200 3150 3150 630 630 630 - - - - - - - - - - - - - 3,4 - 3.4 � / <X i =:iiMSIERINEM 038 VCCE 42 039 VCCE 42 041 VCCE 42 VCCE 32 044 VCCE 42 045 VCCE 32 046 VCCE 32 oa7 VCCE 32 •®'• ����®i 050 VCCE 42 15 16 16 14 i6 14 14 1a i6 KM 4200 4200 4200 4200 4200 ■-■.® 42 00 4200 4200 4200 4200 4200 4200 42 00 630 630 630 630 630 630 630 .® _a w ee eeeMsee■e ® ® 1® - seep �aa - - - 3 . 4 3.4 - 3 . 4 3, 4,NOT USE 3,a 3.4,NQT VS 4 07 USE 3,a,N u5E - N Z TES PROGRAMMABLE T T•STAT MT AT 48" AFF 788 VCCE 42 VCCE 42 16 3150 3150 3750 3150 630 630 -_ - - -_ -_ -_ _- 3,4 O o 4 AO JUSTABE SAT WITH LOCKING COVER. 5. LOW v09_TAGE T•STAT 6 LINE VOLTAGE T'STAT . 7. WALL SWITCH e. MANUAL WALL TIMER SWITCH 9. MODULATE UNITS AS REQUIRED TO MAINTAIN SPACE STATIC PRESSURE SETPOINT OF 0.05 SWITCH R 4 0. SHUTOFF TIMEC 11 STANDALONE OCK OPERATION SEPARATE 44 BUILDING EMS 12. ENABLE UNIT FOR 24 HOUR OPERATION 13. FACTORY INSTALLED. 14. FIELD INSTALLED. . SUPPLY DROP CLOSED UNIT NOT OPERATING 15 17. ALL EXHAUST AND INTAKE DAMPERE4 OPENINGS INTO THE CONDITIONED BUILDING SHOULD BE POWERED CLOSED DURING BUILDING UNOCCUPIED HOURS 18. SMOKE DETECTOR 3#4300wN OF UNIT PER UMC AND LOCAL JURISDICTION REQUIREMENTS 190 181 VCCE 42 VFPE 1111 16 8 855 780 205 4.5 16.6 855 277/1 2 1/3 277/1 2 77/1 277/1 HI 1,2,4,5 HI 1,2,4 HI 1,2,4 192 183 VFPE 0607 VFPE 243(7 6 • 12 520 7390 475 1270 240 600 3.0 18.0 18.1 40.8 520 1390 277/1 460/3 2 3 1/8 3/4 194 195 VFPE 0607 VFPE 1715 6 10 315 660 285 660 90 120 3.5 4,0 35.5 19.2 315 860 277/1 277/1 3 1 1/8 1/3 277/1 272/1 HI 1,2,4 LO 1,2,4 1 � 198 199 V � VFPE 2430 VFPE 1111 ®�� w 12 8 1600 815 7470 745 - 1 0�� 80 200 3.0 8.5 8.0 32.9 880 1800 815• 460 i 3 277 HI 7,2,4 ` 7 3 3/4 1/3 277/1 277/1 H1 7,2,4 H1. 1,2,4 _ 051 VCCE 42 052 VCCE 42 053 VCCE 42 054 VCCE 42 i6 16 16 '16 4200 4200 4200 4200 4200 4200 4200 4200 630 630 630 a® - - - - - - - ® - - - - - - 3,4 3,4 - 3.4 - 3,4 200 201 VFPE 1720 ' VFPE 2430 10 • 12 1250 1780. 1140 1615 170 240 12,0 14'.0 30.2 24.7 7250 1780 460/3 460/3 3 3 1/2 3/4 277/1 277/1 MO 1,2,4 HI 1,2,4 202 VFPE 1111 8 720 650 360 8.0 28.2 720 460/3 2 1 277/1 10 1,2.4 11m 055 VCCE 42 VCCE 42 16 Mi:EM®" 4200 4200 M: 630 E:E1 •e1111111=1see11111:11 3,4 3,4 204 VFPE 1715 10 980 880 430 5.5 18.1 610 880 277/1 460/3 2 I 277 1 121 277/1 LO 1,2,4 MO 1,2,4 1 MEM= VFPE 2430 058 VCCE 42 MIMENIZEII 16 4200 IMININIECCIII� 4200 630 I� ®®.'• -. � -. © - ©LI - ®Q® - 1.2 ,4 - 3,4 19. REFRIGERANT MONITORING OF ROOM BY CC 20. MODULATE HUMIDIFIERS TO MAINTAIN SPACE RELATIVE HUMIDITY OF 451;, i- 10 %, LOCATE IN REPRESENTATIVE AREA FOR UNIT SERVING SPACE 21. RAMP ALL OPERATING UNITS TO MAINTAIN AVERAGED DUCT STATIC PRESSURE SETPOINT (,.D" ADJUSTABLE). MODIFY AS REQUIRED FOR UNITS SERVING SPECIFIC AREAS BASED ON POLLED AVERAGE OF VALVE POSITION FOR ASSOCIATED VAV BOXES. FUTURE VCCE 42 16 3200 3200 630 - - - - - - - 3,4 1 059 VCCE 42 060 VCCE 42 061 VCCE 11 062 VCCE 42 16 16 8 i6 16 16 16 16 16 16 10 16 14 4200' 4200 600 4200 4200: 4200 4200. 4200. 4200 4200 1750 4200 2000 4200 4200 600 4200 4200 4200 4200 4200 4200 4200 7045 4200 2000 630 630 170 630 630 630 '630 630 '630 630 '170 830 480 . 17.0 - - - - 30.1 - - - - - - - 1150 - - - ® - - - 460 3 - - - - - - - 3 - - - ®® 1111 - - - - - 3,4 - 3.4 - 3,4 FUTURE FUTURE VCCE 42 VCCE 42 i6 16 3200 3200 3200 3200 630' 630 - - - - - - - - - - - - - 3,4 - 3,4 FUTURE FUTURE VCCE 32 VCCE 32 t4 14 3200 3200 3200 3200 630 630 - - - - - - - - - - - - - 3.4 - 3,4 1 + 063 VCCE 42 064 VCCE 42 065 VCCE 42 066 VCCE 42 087 VCCE 42 066 VCCE 42 069 VCCE 324 070 VFPE 7]20 071 VCCE 42 072 VCCE 32 3 ,5 - 3,a 3 ,4 3,4 - 3,4 3,4 3, 4,NDT USES MD 7.2,4 FUTURE FUTURE VCCE 32 VCCE 24 14 12 3200 2000 3200 2000 630 360 - - - - - - - - - - - - - - 3,4 - 3.4 FUTURE FUTURE VCCE 24 VCCE 24 12 t2 2000 2000 2000 2000 360 360 - - - - - - - - - - - - - 3,4 - 3.4 4 1 NOTES: i 1. DISCONNECT BY ELECTRICAL CONTRACTOR. - 3,4 2. SERIES FAN POWERED TERMINAL UNIT WITH HEAT, SIZE AS LISTED. PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE: - E,FNDED DAMPER 1/2 DIAM. SHAFT - FACTORY INSTALLED 1" THROW -AWAY FILTERS - CONTROLS BY CONTROLS CONTRACTOR - 1" MATT -FACED UNIT INSULATION 1 - VARIABLE SPEED FAN CONTROL 073 VCCE 42 0 VCCE 42 16 16 4000 4200 4000 4200 630 630 - - - - - - - - - - - - - 3,4 - 3,4 075 VCCE 42 076 VCCE 42 i6 16 3600 3600 3600 3600 630 077 VCCE 42 078 VCCE 42 18 16 4200 3600 4200 3600 830 630 . - - - - - - - - - - - 3.4 - 3,4 - H EAT STAGING A FAN CONTROL THROUGH FACTORY WIRED RELAYS - AUTO RESET 130 F HIGH LIMIT ',TAT 3. C1 ING ONLY TERMINAL UNIO HEAT, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE: - NTROLS BY CONTROLS COCTOR - RATING BY ELECTRICAL CONTRACTOR ELECTRIC HEATER AND CONTROLS AND REPLACE WITH NEW 4.5 KW ELECTRIC HEATER AND CONTROLS. NOTE TO ELECTRICAL: - 460V /3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V /1PH POWER TO THE FAN MOTOR. 080 VCCE 42 16 4200 4200 630 061 VCCE 42 082 VCCE 42 16 16 4200 4200 4200 4200 630 630 - - - - - - - - - - - - - S.4 - 3,4 083 VCCE 42 16 4200 4200 630 00 4200 - - 087 VCCE 42 088 VCCE 42 16 16 4200 4200 4200 4200 8830 630 - - - - - - - - - - - - - 3.4 - 3.4 089 VCCE 42 090 VCCE 42 1 4200 1 4200 4200 4200. 630 630 091 VCCE 42 092 VCCE 42 1 4200 1 4200 4200 4200 630 830 - - - - - - - - - - - - - 3,4 - 3.4 093 VCCE 42 094 VCCE 42 1 4200 1 4200 4200 4200 630 630 - - - - - - - 3,4 095 VCCE 42 096 VCCE 42 1 4200 1 4200 4200 4200. 630 630 - - - - - - - - - - - - - 3,4 - 3.4 097 VCCE 42 098 VCCE 42 1 4200 1 4200 4200. 4200. 630 630 I - - - - - - - - - - - - - 3.4 _ 3.4 4 1 099 VCCE 42 100 , VCCE 42 1 4200 1 4200 4200 42001 630 630 - - - - - - - - - - - - _ 3,4 - 3,4 IEXPIRES: 6 -18 -2001 I 101 VCCE 42 102 VCCE 42 1 '4200 1 4200 42001 4200'. 630 630 - - - - - - - - - - - - - 3,4 - 3,4 103 VCCE 42 104 VCCE 42 1 3160 4200 3150'. 4200 630 630 3,4 105 VCCE 42 106 VCCE 42 1 4200 1 4200 4200 4200 630 630 - - - - - - - - - - - - - 3,4 - 34 107 VCCE 42 108 VCCE 42 1 4200 1 4200 4200 4200. 630 30 - - - - - - - - - - 3.4 3,4 109 VCCE 42 110 VCCE 42 1 4200 1 4200 4200 4200 30 30 - - - - - - - - - - 3,4 3,4 -' AIl tlrnwln8s a d vrtten teNal ntainetl herein , yy not t tl CoUC9tetl, s tl n i tllscl d ® rthout the written nseM of the archtect. 111 VCCE 42 172 VCCE 42 1 4200 1 4200. 4200 4200 30 30 - - - - - - - - - - 3.4 3,4 113 VCCE 42 114 VCCE 42 1 4200 , 4200 4200 4200 30 30 - - - - - 3,4 RECEIVED CT'OF TUKWILA DEC - i ?000 PERMIT GRNTFA 115 VCCE 42 116 VCCE 42 1 4200 1 4200 4200 4200 30 30 - - - - - - - - - - 3,4 3,4 117 VCCE 42 118 VCCE 42 t 4200 1 4200 4200 4200 30 30 - - - - - - - - - - 3,4 3,4 119 VCCE 42 120 VCCE 42 1 16 4200 4200 4200 4200 30 630 - - 3,4 121 VCCE 42 122 VCCE 42 16 4200 4200 4200 4200 630 6 0 -�� - • H 3.4 24 VCCE 42 16 4200 4200 630 ® 4 ® 1111.1111.1=1 QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTEP „....∎. -.-., r-� 25 VC 42 126 VCCE 42 16 1 4200 4200 4200 4200 630 630 - - - - - - - 3 4 - 3,4 27 VCCE 42 128 VCCE 42 1 4200 4200 4200 4200 630 630 - - - - - - - - - 3,4 - 3,4. 129 VCCE 42 30 VCCE 42 1 4200 4200 4200 4200 630 630 - - - - - - - 3,4 - 3,4 131 VCCE 42 132 VCCE 42 1 1 4200 4200 4200 4200 630 630 - - - - - - - - - 3,4 - 3,4 133 VCCE 32 13 VCCE 42 1 3150 4200 3150 4200 830 fi30 - 3, 135 VCCE 4 4200 4200 630 _ - - 3.4 137 VCCE 2 138 VCCE 42 4200 4200 4200 4200 630 630 - - - - - 3,4 139 VCCE 42 140 VCCE 42 1 4200 4200 4200. 4200. 630 630 - - - - - 3,4 141 VCCE 42 142' VCCE 42 1 4200 4200 4200 4200 630 630 - - - - - - - - - 3'4 - 3 43 VCCE 42 144 VCCE 42 1 1 4200 4200 4200 4200 630 630 - - - MEM VCCE 42 MiZEINI VCCE 42 147 VCCE 42 1 1=i2MILECEI 76 ESIMINEECCIMMECI 3150 4 200 ' 3750 830 - eegseeIe -1111111111e - - - sees - - - - 3 3 .4 3.4 en OF rU3WIU 4PPRO4FD DEC - 1 2000 NOILD • HVAC SHEET NUMBER RECORD DRAWING AA f17 SERVICE YARD B TC I o. �. I 1 = ► �1� 1®` g' � r 113 e� = 7� aE name A r 60� DUC400P r , AT . -0' ABOVE *AB. I: II A IMMTU —( 3 I - I -1 $' lid - i' Pria Ano AIWA 48/42 d a �17�1 — aw l o 2/4D { CLEAR ENING Ut ACo ON TOP OF DUCT 36' CLR MIN ABOVE 72/27 (2 SL) UP TO RTU -n LOADING DCCK= 10" UP TO 10/10 SLSM AT EF -6 NEW 12/12 EXTENDED TO WALL 1.1b 180t STORAG ROOPf, 14 400 CF 14 14 600 P. 2) TUTU -17 6V/28 (7 1 IIP T!1 RTII IFSD -201 14 80 CFM EACH 2 48'L6GTH -2 SLOT -2" WID 25 CFIN EACH 48, SLOT NOTE ENUM TO BE FABRICA D BY irMEFIMPTENZEIMET IL_ E TRH ,n ROOM OFFICE e (_ l BATTERY ROOM !Li !L=''` rJ!i L/j [Lk" RAMP - HANDICAP MAP ROOM A 2) 2/8 PARTIAL FLOOR PLAN — WEST CALE: Ye =1' -0 DRAWING NOTES: O MOTORIZED DAMPER TO CLOS WHEN ASSOCIATED RTU IS NE OT IN OPERATION. MT DAMPER AS LOW E N C E ACC IN DROP FOR MAINTENANCE ACCESS (TYP 14) 2O LOCATE T'STATS OR VAV BOXES IN RATE RA GRILLE IN CEI FlELD. "F CALIB SETA TO IN TAIN 7P F IN IP CABINET AR O3 FIELD VERIFY ACTUAL FILE SERVER CONFIGURATION. DIFFUSER TO DISCHARGE SUPPLY AIR IN FROM OF FILE. SERVERS. O DAMPER ONLY OPENS IF SWITCH ROOM AC'S ARE INOPERABLE. ASSOCATED DAMPERS (MD -18 19) AT AC UNIT DROPS TO CLOSE IN THIS MODE. EE DETAIL EXISTING TOILET ROOMS - NC \M000 o i Iy � MY OF TUKC:AA VPROVEO JUL 3 )0'1 MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 west. QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER D 0935 - 1091291 - 00 DRAWN BY D. NEHREN D. NEHREN NO DATE .ISSUE. 10 -30 -00 - 11 -15 -00 BATTERY ROOM REVISION .RECORD DRAWING IEXPI225: 6 -18 -2001 I ® All d' 2 8g2 dber22 co cot d, d or se tosed without the written nsent o6 the nrch�tect. QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYE1ERCENTER PARTIAL FLOOR PLAN - WEST - HVAC MMEREIMMEMEMINIIIM RECORD DRAWING I Ie r CR1 L. .......' A JUN 2 5 2001 M 2.OD&D1 GFNFRAL NOTES: O j MOTORIZED DAMPER TO CLOSE WHEN ASSOCIATED RTU NOT IN OPERATION. MT DAMPER AS LOW AS TENAN A LE DROP FOR MNNTENANCE ACCESS. (TYP. 14) O2 LDCATE T -STATS FOR VAV BOXES IN RA GRILLE IN CEILING. FIELD CALIBRATE SETPOINT ,T MAINTAIN 70F t7F IN IP CABINET AREA. O3 FIELD RFY ACTUA FILE SERVER CONFIGUVERATION. DIFFUL SER TO OISf.HARGF 4 PARTIAL FLOOR PLAN — CENTRAL SCALE: Ye =1 -0 111: Illb 1 11: Ill: ` t; t� O la 1111 tio so Km ' -14 El CM' simmuesompmeamm & MD - j + �� TRANSFORMERS , 46/36 BIRDSCREEN OPN'G IN BOTTOM OFg - -' -' -- -' 46736 FIR INTAKE t DUCT AT 12 AFF 400 UP TO HOOD - 411144 LINED DUCT DOWN TO FLOOR , EFS a _ H MIDI 1 IC u'rzuzu rr Iffir/ r ®r0re33 ; g L ; .�' g g - �� ; ` - -� - - T4 1 (4W 2) 2qd 20A —-` 18 18 500 CFM EA.. - ter , III�� I�V �� - �066 wi-ajl 1:11 ,FSDAB .... • FSD//9 _- T- {SDM73 ,.__. ..: MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106-1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445-7225 PROJECT NUMBER 0- 0935 - 1091291 -00 D. NEHREN west DRAWN BY D. NEHREN CHECKED BY NO DATE ,ISSUE • 11 -15 -00 • RECORD DRAWING !EXPIRES: 0 -16 -2001 I ® he l ve n� n or sc losed v�thDUt the written consent of the orch�tect. ECEIVED Cf1V D OF TUKWRA DEC - , 2001] PERMIT CENTER QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER PARTIAL FLOOR PLAN - CENTRAL - HVAC SHEET NUMBER. RECORD DRAWING • i n nn ►s cs ►`'s A I.03t i rr MINK , p "ET EIMIL MIEWM911== l ipoppip NAIII 31111 'ILL 2 El 0 t=! .� =iil� 2 I �I 1 1 - k t� t� t � ��r� ito. . wpm MEI 1113.521 ISV " I M O ' 7 1 0 I 10I i 4-3I TEO II Eiral fitTilV fffiF•1�r IF•1� " Iffi�. Li Li. 14x1 800 NP 4) 5.6 L 1 `. l \ =m . ,30/62' 7 CLEAR 1+ OPENIN0_0 N TOP U•-Tt - 4 9 0E-HC 'WOVE OP ENIN 0E- OVE -17th � 12 24 E C 275 CFM 30/8 (TYP 3) BOT ®17 AFF LEAVE OPEN BDT WITH BS ® 1100 CFM EACH • alh SEE DETAIL ■;; 1.. -_ 200 -IYRE� Jes- �J/ENT-. UP VENTIpN =qS` BOILERS r - -1 48/36 COMBUSTION r _41R INTAKE HOOD I -- WITHLINED DUCT - -_� I ON TO WITHIN 17 L - - J OF FLOOR 1 t ~II 48/36 COMOU$,TION_ F 1 WII .INTAKE HOOD w _ - WRH LINED DUCT - -- 'ON TOWITHIN 12 - -- -- r -0F CEILING I � j OT 0 600 ANGLE D O 30' -TOWARDS DOCK DOORS GENERAL NOTFS • _- Oj MOTi2ED A DMPE CLOSE WHE ASSOCIATE RTU [NOT IN O PERATION. MT DAMPER AS LOW AS POSSIBLE IN DROP F(NPOR MAINTENANCE ACCESS. . 14) O 2 LOCAT-STS FOR VAV BOxES IN RA E GR ILLE TA IN CEILING. FIELD CALIBRATE TPINT MAINTAIN 7QF t7F IN SE IP O CABINET 70 ARF1 Q3 FIELD VERFY ACTUAL FILE SERVER CONFIGURATION. DIFFUSER TO DISCHARGE SUPPLY AIR IN FRONT OF FILE SERVERS. 4O LOCATE MOTORIZED DAMPER AT DISCHARGE FROM. RTU -11. SPRING CLOSED ON LOSS OF POWER TO RTU -t1. O 5 MOTDRIZED DAMER TO OPEN O N L065 O P F POWER TO RTU -11. 4 1 I 2 EC % 24 12 EC 0-CEM PARTIAL FLOOR PLAN — EAST SCALE: Ye =1' -0 24 12 EC 168 200-VP TO WITHIN - -4LF OF EE -1. THEN TRANSITION TO , 17/17 SLSM & OP TO 18/18 12 24 EC 60 CFM G7Ty Gf (�rFItA QD '� 0• ED DEC - 2000 MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 D- 0935 - 1091291 -00 DRAWN BY D. NEHREN CHECKED BY D. NEHREN QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PfiOJECT NUMBER.' NO DATE ISSUE - 11 -15 -00 RECORD DRAWING EXPIRES: 6 -18 -2001 I e All tlraw ngs and wr (ten term( nto ned heron y not be dup toted, s d or disclosed rlthiiut the written nsent of the nrchtect. QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 MEMEIMMINIMMEIMIE QWEST CYBERCENTER PARTIAL FLOOR PLAN - EAST - HVAC flECE CR1' OF N DEC - 1 2.000 �ERMIL CEi:TEP SHEET NUMBER RECORD DRAWING I RTU -2 PARTIAL ROOF PLAN — WEST SCALE: Ye =1' -0 330 MCA 0 0600 /3PH DISCONN CT BY EC (TYPICAL OF 14 UNITS) DISCHARGE CONDENSATE DIRECTLY TO ROOF WITH (2) 1Y: DIA - C 0 EP TRAPS SEE DET0 H -15 1 ( X / \ H -1 1 2O/7 RTU -15 1 1 X / \ J ///--- 10D LB/HR HUMIDIFIER LOCATED / IN THE SUPPLY CUCT DISCHARGE 18' TALL METAL SUPPORT STRUCTURE - ABOVE RUOF BY GC (TYP 7 LOCATIONS), WELD MASON SPRING CURB TO METAL SUPPORT. WALK ON GRATING ON METAL SUPPORT STRUCTURE, 3' WIDE MIN (BY GC) (TYP 14 UNITS) 1 BELOW UNIT (TYP 14 UNITS) IF UNITS NOT RUN ON ECONOM,ZER CYCLE DEMO AND REMOVE EXISTING UNRS FROM ROOF. CAP SUPPLY AND RETURN OPENINGS WITH INSULATED ( R - 21 ) SM COVER MID SEA AIRTIGHL. DEMO ALL DUCTWORK MN E;', UNIT (TYP OF 22 UNITS EAST OF GRID 4). 11 11 11 11 1 H -14 1 ///'''FOR DETAIL OF ROOFTOP / EQUIPMENT- SCREEN WALL SEE DETAIL L I - -H -2- _I GM.' OF IU1■1ilU APPRO'4D DEC - 1 2000 RTU -14 � 1 ride the 1 Q w E St QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER D 0935 - 1091291 - 00 DRAWN BY D. NEHREN MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 CHECKED BY D. NEHREN NO DATE ISSUE . 05 -01 -2000 11 -17 -2000 PHASE III REVISION • RECORD DRAWING (EXPIRES: 6 -18 -2001 I ®All tlrawin and written nater contninetl herein i yy not i tl Co Cated, s tl or tllsclosed without the written nsent of the architect CM OF UKwILA oFr. - ; 2000 7EPMI CE, QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENiER PARTIAL ROOF PLAN - WEST - HVAC MEIMEMEMIIIIMEMINI RECORD DRAWING •An A A \/ X M;111111M A 11 11 1 H-13 1 r L DEMO AND REMOVE EXISTING UNITS FROM ROOF. C. SUPPLY AND RETURN OPENINGS WITH INSULATED (R-21) SM COVER AND SEAL AIRTIGHT EAST 0 GRID 3 — FIELD VERIFY COUNT) L \ / X / R.-13 I 6 H-3 I 1 RTU-3 A RELOCATED 11 r \/ L 1 J r L SEE DETAIL RTU-12 1 RTU-4 1 11 2 0 D 7 420 PARTIAL ROOF PLAN — CENTRAL SCALE Ye =1 —0 A I EE-- 1 0 1 H-7 1 r 1 J r 4 \/ ( 8 RELOCATED I RTU-7 1 r 1 7.1 GIN OF tiwo.,6 APP1■01.•1/, It DEC - 211011 I/ E \/E 1 A N I r,4 ride the 1 Qwest 1111111111111111■111•11111111111 QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445-7130 FAX: (303) 445-7225 PROJECT NUMBER,, D DRAWN BY D. NEHREN - CHECKED BY ' D. NEHREN MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106-1903 Phone: (206) 763-9400 Fax: (206) 767-6773 05-01-2000 11-17-2000 NO DATE ISSUE PH.E II REVISION RECORD DRAWING DAU 04,7%1F., DEC -- 1 ?WA PERM! CEA 111111=111111■IMMINIII QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 11314131113111111111■111111111 QWEST CYBERCENTER PARTIAL ROOF PLAN - CENTRAL - HVAC BEIMEMIXEIMIIIMME RECORD DRAWING rig I EF -3 r A I H -7 I / RELOCATED RTU -7 I ith EF -4 1 0 f 20'IYPE -IPS -2 FLUE VEM 3' / ABOVE ROOF. PARTIAL ROOF PLAN - EAST SCALE: Ye =1' - ( /(2Ouuu / 7 rTh I A NI OF ! pi (6,U A DEC - ; ,,,90 MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 ride the 1 QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER D - 0935 - 1091291 - 00 DRAWN .,,BY D. NEHREN CHECKED -BY' D. NEHREN NO DATE ISSUE Vv 05 -01 -2000 11 -17 -2000 PHASE II REVISION RECORD DRAWING 1 EXPIRES: 6 - - 2001 I s `. ®A'I tlrnwings o d xr'tten terinl ontnNed herein y not be dup s d or disclosed wilhout� the written nsent of the architect. RECEIVED CRY OF TIIKWILA DEC - 12UUll PERM0 ,.NT, QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER PARTIAL ROOF PLAN - EAST - HVAC SHEET : NUMBER - - RECORD DRAWING A A') ne 1 RTU -10 I RN -9 RELOCATED RTU -11 , 1,- 1 J r -1 M IN . 6.000 LBS. 1 1 11 . I I� 1 �I / X -11 -11 11 II 7 X / \ . _ 0 1 L J H 1 L ' 1 1 ' - 10 1 _._ . H -9 _J __, .._.. MCA ®. 4BOV /3PH - -'- � DISCONNECT BY EC DI I EF -3 r A I H -7 I / RELOCATED RTU -7 I ith EF -4 1 0 f 20'IYPE -IPS -2 FLUE VEM 3' / ABOVE ROOF. PARTIAL ROOF PLAN - EAST SCALE: Ye =1' - ( /(2Ouuu / 7 rTh I A NI OF ! pi (6,U A DEC - ; ,,,90 MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 ride the 1 QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER D - 0935 - 1091291 - 00 DRAWN .,,BY D. NEHREN CHECKED -BY' D. NEHREN NO DATE ISSUE Vv 05 -01 -2000 11 -17 -2000 PHASE II REVISION RECORD DRAWING 1 EXPIRES: 6 - - 2001 I s `. ®A'I tlrnwings o d xr'tten terinl ontnNed herein y not be dup s d or disclosed wilhout� the written nsent of the architect. RECEIVED CRY OF TIIKWILA DEC - 12UUll PERM0 ,.NT, QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER PARTIAL ROOF PLAN - EAST - HVAC SHEET : NUMBER - - RECORD DRAWING A A') ne r L 1,- 1 J — - j 1 , I ; 1! r L 7 J 1 1 1 z L 1 RTU -5 I 1 RTU -6 I A I EF -3 r A I H -7 I / RELOCATED RTU -7 I ith EF -4 1 0 f 20'IYPE -IPS -2 FLUE VEM 3' / ABOVE ROOF. PARTIAL ROOF PLAN - EAST SCALE: Ye =1' - ( /(2Ouuu / 7 rTh I A NI OF ! pi (6,U A DEC - ; ,,,90 MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 ride the 1 QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER D - 0935 - 1091291 - 00 DRAWN .,,BY D. NEHREN CHECKED -BY' D. NEHREN NO DATE ISSUE Vv 05 -01 -2000 11 -17 -2000 PHASE II REVISION RECORD DRAWING 1 EXPIRES: 6 - - 2001 I s `. ®A'I tlrnwings o d xr'tten terinl ontnNed herein y not be dup s d or disclosed wilhout� the written nsent of the architect. RECEIVED CRY OF TIIKWILA DEC - 12UUll PERM0 ,.NT, QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER PARTIAL ROOF PLAN - EAST - HVAC SHEET : NUMBER - - RECORD DRAWING A A') ne ROOF OPNG DUCT SIZE CURB SIZE DUCT SIZE + 4 ROOF CAP DETAIL SCALE NTS FLUE SIZE 10 12 22 20 362 DIM. I DIM. SIZE 42 20 20 22 52 62 72 2 102 1 132 132 1334 182 182, 2022 2022 35 CURB OD 1 1 1 VENT CAP SHOULD EXTEND 2 FE M IN ABOVE THE POINT WHERE THE VENT PASSES THRU ROOF AND AT LEAST 10 FEET AWAY FROM ANY PORTION OF THE BLDG EXTENDING ABOVE ROOF TI ) L CEILING -I CLASS "B" FLUE INSTALLATION DETAIL SCALE: NTS O FIELD CALIBRATE PSTAT SETPOINT TO MAINTAIN 70' ® RACK. SCHEMATIC SUPPLY /RETURN DIAGRAM SCALE: NTS ACCESS STAIR AT END TO VAV TO VAV TO RA TO RA RAISED FLOOR VENT CAP STORM COLLAR ROOF FLASHING 2x8 MINIMUM ROOF CURB GENERAL CONT RACTOR LOCATE FLUE 10' - 0" MIN FROM OUTSIDE AIR IN TAKE ME(ALBESTOS IPS -2 PIPE. MAX SIZE 24 . UL RATED OF 4 TO COMBUSTIBLES. THREE SCREWS MIN PER JOIN1 GALV PIPE RETURN MR DUCTS SUPP, AIR DUCT LOOP, VAV uHns, A RUN -OUTS SPACE UTILIZATION DIAGRAM SCALE: NTS SCALE: N.T.S. MIN T.O. STEEL 29.0' s GRID A ,ao cDUxc l�'EL 0.0 FLOOR LEVEL i'8 SECTION THRU BOILER ROOM SCALE: NTS PRE FINISHED METAL SMOOTH BAND AGG PANEL ROOFTOP EQUIPMENT — SCREEN WALL 64/64 RAJ I I EXTE D DUCTWORK OUT TO THE POIM WHERE NO UNE OF SIGHT EXIST FROM BOTTOM OF RA UNIT AND OUT FROM ORNINGS b 64/84- A lir ACCESS DECK GRATING B.O. CEILING ® 14' TYPE C VERTICAL MOUNTING --600-SA BOO 16'AFF k' PLAN VIEW SCALE: MS ■/ ■ r) A ■ \ SECTION SA /RA DROPS SCALE: NTS TAYLOR PRE FINISHED METAL PANEL WITH APPLIED BATTENS COMBINATION FIRE /SMOKE DAMPER tM r g INSTALLATION INSTRUCTIONS oc S E ERS ,IF Nr sECUREO TO NLxUiSwluD EE O sxLE NEr 6" tw, CENTER. / a' DIA. is. wE N 3/1 SEE NOTES 2 AHD 3 FOR JOINT DETAIL. „/r x n x ,6 CADI GE . N TS. ro i w T I ; DTucfER M 6TS ' s ; SieE RS ' 1 IFE (sEE 4 uN OVERLW -) N01 R� :N L MRr ERD ANGLE IS T x�CEG z r� �EUEO 5 5 !s A BAR s IP BIR sLIPjIP L RENaaR¢D eaR nIP (GLUT) �I�S a w OOR tt ' ER fN T W Cx N ,2 iGHi L ArD w UTN NLLM �Exlrc sIU e[ R �7a % a' .x / G E �x �E'AxRi �,. GP RD./ Y'. I,ETER L s RLM s NGLE RAWER tt A,uLTIPIE AssEWLr ""' GE 36"xa6 6 �E Kti E bt�OP x R tFi O�RC [�OxCREi NuL�GiOxILEWGSixBE iE x Prm+IDED eETwE AD.1Aa T As wsr. ^u�DUCr�aLAR CIXwttI",,t,V NLiELD. "."Sn Sr,,L WpORTAMTT KR , d ui ,To OR DOWER DIRECTLY TD WALE. OR - iittE�DwoE N r wT w To xswE FREE rtwE,eur. Ea Wi art of fLA . NOTEr VITZ EACCESSIB�E FOR INSPE�CTIOx 4; sEFLIguGN TO uixE EIRE FIRE SMOKE DAMPER INSTALLATION SAL S 1 1/7 ALL THREAD ® 12FT. SPACING CABLES ®45 EVERY 30 FT PLUS AT ALL 90' E SECTION THRU SA DUCT GOO SA SCALE: N.T.S. SEAL SCREW OR LAG FAN TO CURB ROOF CURB B GENERAL CONT TRACTOR 11= TED FLEX HUNG AS STRAIGHT AS POSSIBLE 2' -0" MAX COMPRESS SOUNDL P 1/7 TO SLI IMO BDD NOTE EXACT BDD AND CURB SIZE MUST PE CHECKED FROM EQUIPMENT SUBMITTALS. FINAL RE E FIBILRY FOR CORRECT BDD AND CURB SIZE WILL BE INSTALLER'S EXHAUST FAN INSTALLATION DETAIL SCALE: NTS DIFFUSER INSTALLATION DETAIL SCALE: NTS FAN BASE SIZE ADDITIONALI SUPPORT 2X8 MINIMUM SCREW OR NAIL BDD TO ROOF SOUNDLINING DN pROP ONLY TAKE OFF WITH VOLUME DAMPER DIFFUSER CAN DIFFUSER CONNECTION PER MANUFACTURER REQUIREMENTS AS NEEDED TYPICAL CURB SECTION SCALE 6" =1' -0" ROOFTOP EQUIPMENT — SCREEN WALL ORD arr cF ruxv' E aP�nl:EU DEC - l 2000 MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 ride the 1 Qwst QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER DRAWN <BY'. R. VILLANUEVA CHECKED..BY D. NEHREN NO DATE - ISSUE .05 -01 -2000 . 11 -15 -2000 PHASE II REVISION RECORD DRAWING I EXPIRES: 6 - - 2001 I ®All drawings nntl written nnterml contalnetl ' herein yy not be tlup s d or tllsclosed r. `.hout written nsent of the architect. RECENED CRY OF TUKWILA. EC-INN ,RIND GENT r: -. QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER DETAILS -HVAC SHEET NUMBER RECORD DRAWING I At) (11 2 Ax UNIT SERVICE NO A LOCATION INVERTED BUCKET INVERTED BUCKET T -3 T -4 T -5 RTU -6 - ROOF RTU -7 - ROOF T -6 T -7 T -8 T -9 T -10 RTU -9 - ROOF RTU -10 - ROOF T -11 T -12 T- T- T- T -17 T -21 RTU -1 - ROOF RTU -2 - ROOF RTU -3 - ROOF RTU -4 - ROOF RTU -5 - ROOF RTU -8 - ROOF NOT USED RTU -12 - ROOF RTU -13 - ROOF RTU -14 - ROOF RTU -16 - ROOF RTU -17 - ROOF BOILER ROOM MANUFACTURER MODEL NO ARMSTRONG 8807 ARMSTRONG 880T ARMSTRONG 880T ARMSTRONG 880T ARMSTRONG 880T ARMSTRONG 880T ARMSTRONG 880T ARMSTRONG 880T ARMSTRONG 880T ARMSTRONG 8807 ARMSTRONG 8807 ARMSTRONG 880T ARMSTRONG 880T STEAM TRAP SCHEDULE TYPE OF TRAP INVERTED BUCKET INVERTED BUCKET INVERTED BUCKET INVERTED BUCKET INVERTED BUCKET INVERTED BUCKET INVERTED BUCKET INVERTED BUCKET INVERTED B KET ORIFICE CAPACITY CONNECTION PRESSURE NOTES SIZE LB /HR SIZE PSI 3/16' 3/16" 3/16" 3/16" 3/16" 3/16" 3/16" 3/16" 3/16" 3/16" 1 4 200 200 1 /2' 5 PSI 5 PSI 200 1/2" 5 PSI 200 1/2" 5 P51 200 200 200 3/1 6' 3/16" 1/2" 5 PSI 1/2' 5 PSI 1/2" 5 P51 200 200 1/2' 5 PSI 1/2" 5 PSI 200 1/2' 5 PSI INVERTED BUCKET INVERTED BUCKET 200 1/2" 5 PSI 13 INVERTED BUCKET 3/16" T-14 ARMSTRONG =807 INVERTED BUCKET 3 16" r \r R� :'7.�: 16 ARMSTRONG 880T INVERTED BUCKET 3/16" 1/2" ARMSTRONG 881T 200 1/2" 5 PSI 200 1/2" 5 PSI 200 200 830 1. SIDE INLET AND OUTLET WITH INTEGRAL STRAINER AND THERMIC VENT BUCKET FITTING GENERAL NOTES 1. PIPING MATFRIAI SCHFDUI F. PIPING, STEAM STEAM - INSIDE STEAM - OUTSIDE S17F 5. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS. MATER JOINT SCH 40 BLK STL THREADED, SOCKET WELD SCH 40 BLK STL GROOVED, WELDED STEAM CONDENSATE 1/2 - 2' SOH 80 BLK STL THREADED 2. PIPING, INSUTATION SCHEIN ' PIPING PIPE INSULATION INSULATION CONDUCTIVITY TYPE 517E T`'PE THICKNESS RANGE 1/2" - 2' FIBERGLASS 1 -1/2" 0.27 - 0.30 2 -1/2" - 6' FIBERGLASS 2" 0.27 - 0.30 1/2" - 2" FIBERGLASS 2' 0.27 - 0.30 W/WEATHER COVERING 2 -1/2" - 6" FIBERGLASS 2" 0.27 - 0.30 W/WEATHER COVERING STEAM CONDENSATE - OUTSIDE 1/2" - 2' FIBERGLASS 1/2" W/WEATHER COVERING - ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS. - PROVIDE A COVERING FOR ALL FIBERGLASS INSULATION WITHIN THE BUILDING. - PROVIDE A WEATHER RESISTANT COVERING FOR ALL FIBERGLASS INSULATION OUTSIDE OF THE BUILDING. 3, THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE MECHANICAL CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 4. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 1997 EDITION OF THE UNIFORM MECHANICAL CODE. 6. SLOPE ALL INDIRECT DRAINS AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 7. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH THE 1997 UNIFORM MECHANICAL CODE AND 1997 UNIFORM BUILDING CODE. 8. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 9. PROVIDE SHUT -OFF VALVES AT ALL EQUIPMENT CONNECTIONS. 10. PROVIDE UNION, GROOVED OR FLANGED CONNECTION AT EQUIPMENT FOR FUTURE REMOVAL AND SERVICING. FITTING EQUIPMENT SCHEDULE NO, DESCRIPTION B -1 B -2 STEAM BOILER SYSTEM - PRECISION BOILERS, 2110 MBH INPUT, 50 BHP, 1400 LBS OF STEAM AT 12 PSI OPERATING PRESSURE, BOILER 15 PSI ASME RATED, NATURAL GAS FIRED POWER BURNER REQUIRES 14 "WC NATURAL GAS SUPPLY, LOW PRESSURE STEAM BOILER, WITH 30 PSI ASME RELIEF VALVE, STEAM PRESSURE GAUGE, OPERATING CONTROL, HIGH FIRE CONTROL, MANUAL RESET HIGH LIMIT, BOILER FEED PUMP CONTROL, PRIMARY LOW WATER CUTOFF, MANUAL RESET AUXILIARY LOW WATER CUTOFF, BOILER FEED SYSTEM WITH TANK, PREHEATER AND DUPLEX PUMP5, SLOWDOWN TANK, CHEMICAL FEED, 120/60/1, 30 AMP SINGLE POINT CONNECTION. SYSTEM TO BE SKID MOUNTED AND PREPIPED. ELECTRICAL TO PROVIDE DISCONNECT TO EACH BOILER S.D. HU -1 -10 STEAM HUMIDIFIER - ARMSTRONG MODEL HEMS -92-M. 100 LBS /HR AT 10 PSI, 11/32" HU -12 -15 ORIFICE, ELECTRIC M9182A HONEYWELL OPERATOR WITH NORMALLY OPEN VALVE OPERATION, HIGH LIMIT DUCT HUMIDISTAT, TWO 84' STEAM DISTRIBUTION MANIFOLDS MODEL 91M-7, INCLUDES STRAINER, INVERTED BUCKET TRAP, FAT TRAP FOR MANIFOLD. 1209/1/60, AMP. HU -11 WAS NOT USED. DPE -1 -2 DRIP PAN ELBOW - KUNKLE MODEL 0299 -H, S1 NPT, WITH 1/2' DRAIN CONNECTION 3" NT PIPE CM. ECT HU-16 STEAM HUMIDIFIER - ARMSTRONG MODEL HEMS -92-M. 63 LBS /HR AT 8 PSI, 9/32 HU -17 ORIFICE, ELECTRIC M9182A HONEYWELL OPERATOR WITH NORMALLY OPEN VALVE OPERATION, HIGH LIMIT DUCT HUMIDISTAT, TWO 6 "'STEAM DISTRIBUTION MANIFOLDS MODEL9M -3, INCLUDES STRAINER, INVERTED BUCKET TRAP, F8T TRAP FOR MANIFOLD, 1209/1/6. AMP. GAS PRESSURE REDUCING VALVE SCHEDULE UNIT N0. GR -1 GR -2 MANUFACTUR 8 MODEL N0. ER EOUIMETER 243 -12 -2 EOUIMETER 243 -12 -2 GAS SCFH 2100 2100 BODY SIZE 1 -1/2 1 -1/2 ORIFICE VALVE SIZE ANGLE 3/4 3/4 INLET PRE55 2 PSI 2 PSI MET 14 14 "WC SPRING COLOR BLUE BLUE NOTES NOTES: PLUMBING FIXTURE CONNECTION SCHEDULE WC -1 WC -2 UR -1 L -1 5 -1 S -2 JS -1 DF -1 SH -1 CM-1 RB -1 FIXTURE WATER CLOSET - KOHLER K -4350, FLOOR MT FLUSH VALVE, BEMIS /1955X-00 SEAT LESS COVER, WHITE, ZURN 2-6000 - WS-1 SERIES 1.6 GAL FLUSH VALVE, NO SEEP WAX SEAL, CLOSET BOLTS, NUTS, d WASHERS. HANDICAP WATER CLOSET - KOHLER K -4368, FLR MT FLUSH VALVE. 17 1/2" HIGH WTR CLOSET. BEMIS g1955C -0F SEAT LESS COVER, WHITE, ZURN 7- 6000 -V5 -I -ADM SER 1.6 GAL FLUSH VLV, NO SEEP WAX SEAL, CLOSET BOLTS, NUTS, d WASHERS. (FLUSH HANDLE TO POINT TO WIDE PART OF STALL) HANDICAP URINAL - KOHLER K- 5016 -T SIPHON JET. W/ 2- 6003- W5 -1 -ADA SERIES 1.0 FLUSH VALVE. WHITE. (MOUNT WITH RIM 17" AFF) HANDICAPPED LAVATORY - KOHLER K- 2196 -4 COUNTER TOP 4" CENTER LAVATORY. WHITE. 0 /KOHLER K- 15199 -P CP SINGLE LEVER FAUCET W /JAMECO 629 1 1/4" CP GRID DRAIN. BRASSCRAFT CR -19C STOPS, FLUIDMASTER B1F20 20' CONNECTORS. OFFSET 1 1/4' CP 17 GA P -TRAP. (PROVIDE TRURBRO HAND! LAV -GUARD INSULATION KIT (102 W/1105) BAR SINK - DAYTON D- 11515 -1 STAINLESS STEEL SINK W/ CHICAGO 50-E3 CP FAUCET, B 8 K 131 -202 JR BASKET STRAINER, BRASSCRAFT CR -19C STOPS, FLUIDMASTER 81020 20" CONNECTORS.6 1/2 CP 17 GA P -TRAP. SINK - JUST DL- 1933 -8-00, STAINLESS STEEL SINK W/ KOHLER K- 15171 -P CP SINGLE LEVER FAUCET, JUST J -35 CP SINK STRAINERS, BRASSCRAFT CR -19-C STOPS, FLU 000006ER B1020 20" CONNECTORS, 1 1/2 CP 17 GA P -TRAP. FURNISH W/ IN- SINK -ERATOR MODEL 77 GARBAGE DISPOSAL. 3/4 HP SPLIT PHASE MOTOR, 120 2/1 PHASE 7.6 FLA- JANITOR SINK - MUSTEE 64 24x24 MOP SINK, W /CHICAGO 897 CP SERVICE FAUCET, MUSTEE 65.700 HOSE 8 WALL BRACKET_ HANDICAP WATER COOLER - ELKAY EBFSA -4, STANDARD FINISH, W/ BRASSCRAFT CR- 1920 -AC QUARTER TURN SUPPLIES. t 1/4" CP 17 GA P -TRAP, 115 V/1 PHASE. 4.8 FLA, 8.0 GPH, HANDICAP SHOWER - FIBER -FAB 63H1, WHITE W /GRAB BARS FOLD -UP SEAT(SPECIFY LEFT OR RIGHT) FIBER - FAB S -SH SHOWER ROO, KOHLER K- 15701 -KS. RITE -TEMP PRESSURE BALANCE VALVE, W /KT- 15121 -4-CP TRIM, DELTA RPW1111HFD. W/24" GUIDE BAR, 60" METAL BRAIDED FLEX HOSE, PUSH BUTTON 2.5 GPM HAND SPRAY, INLINE VACUUM BREAKERS, SWIVEL CONNECTOR CP SUPPLY ELBOW.' 101BR CP BRASS SHOWER DRAIN. COFFEE MAKER - ROUGH -IN, SHUT-OFF VALVE BRASSCRAFT CR -19-C QUARTER TURN WITH HANDLE. REFRIGERATOR BOX - GUY GRAY BIM875, SHUT -OFF VALVE IN 16 GAUGE STEEL BOX WITH WHITE EPDXY FINISH, ROUGH -IN AND CONNECT WITH COPPER TUBING. LOCAL CONNECTION WASTE 1 1/2" 1 1/2` 2" VENT 2" 2' 1 1/2" 1 1/2' 1 1/2' 1 1/2' 1 1/2" 1 1/2" HOT 1/2 1/2' 1/2" 1/2" COLD 3/4' 1/2' 1/2" 1/2' 1/2" 1/2" 1/2" 1/2 DRAIN FIXTURE CONNECTION SCHEDULE N0. FD -1 FD -2 FD -3 FD-4 FS -1 DRAIN FLOOR DRAIN - JR SMITH 2005 -A, CAST IRON BODY, 5" ADJUSTABLE, NICKEL BRONZE STRAINER. FUNNEL FLOOR DRAIN - JR SMITH 2005 -A. W /NICKEL BRONZE TOP 5" DIA, CAST IRON BODY, AND 4" DIA FUNNEL 3580 -NB. SPRINKLER ROOM DRAIN - JR SMITH 2233, CAST IRON BODY LESS GRATE, WITH SLOTTED SEDIMENT BUCKET_ FLOOR DRAIN - JR SMITH 2005 -A, CAST IRON BODY, 5' ADJUSTABLE, NICKEL BRONZE STRAINER_ FLOOR SINK - COMMERICAL ENAMELING 910 -2-C, 12,12'X10 ", A.R.E. INTERIOR d GRATE, 1/2 GRATE. WITH ANTI- SPLASH INTERIOR BOTTOM DOVE STRAINER, INSTALL FLOOD LEVEL RIM FLUSH W /F FLR. LOCAL CONNECTION WASTE VENT STORM 2" PLUMBING EQUIPMENT SCHEDULE ND. EWH -1 ELECTRIC WATER HEATER - AO SMITH ORE -80, GLASS -LINED 80 GALLON, 9 KW INPUT AT 480 VOLT /3 PRASE. RECOVERY OF 46 GALLONS PER HOUR AT 80 F TEMPERATURE RISE, 40 F ENTERING WATER / 120 F LEAVING WATER, SET THERMOSTAT AT 120 F, 1 1/4" INLET /OUTLET, 3/4' RELIEF. OPERATING WEIGHT OF 1090 LBS. EWH -2 ELECTRIC WATER HEATER - AO SMITH DRE -80, GLASS -LINED 80 GALLON, 9 Kw INPUT AT 480 VOLT /3 PHASE, RECOVERY OF 46 GALLONS PER HOUR AT 80 F TEMPERATURE RISE, 40 F ENTERING WATER / 120 F LEAVING WATER. SET THERMOSTAT AT 120 F, 1 1/4" INLET /OUTLET, 3/4' RELIEF. OPERATING WEIGHT OF 1090 LB5. EXT -1 EXPANSION TANK - AMTROL THERM- X -TROL MODEL ST -T2, 4.4 GALLON VOLUME, MAXIMUM ACCEPTANCE VOLUME OF 3.2 GALLONS, BLADDER TYPE, PRECHARGE OF 65 PSIG. OPERATING WEIGHT 10 LBS. SERVES WATER HEATER EWH-1. EXT -2 EXPANSION TANK - SAME MODEL AS EXT -1. SERVES WATER HEATER EWH -2. WCP -1 WATER CIRCULATING PUMP - GRUNFOS UP15 -18SU, 2 GPM AT 6 FT HD. 1/25 HORSEPOWER, 120 VOLT /1 PHASE, STAINLESS STEEL CONSTRUCTION FOR DOMESTIC WATER, WITH TIMER CONTROL. WCP -1 WATER CIRCULATING PUMP - SAME MODEL AS WCP -1. BFP -1 BACKFLOW PREVENTER - WILKINS 9755, 1 1/2 SIZE, REDUCED PRESSURE PRINCIPLE ASSEMBLY, COMPLETE WITH PRESSURE DIFFERENTIAL RELIEF VALVE LOCATED BETWEEN TWO INDEPENDENTLY OPERATED SPRING LOADED CHECK VALVES, BRONZE BODY CONSTRUCTION, TWO RESILIENT SEAT BALL VALVES AND FOUR RESILIENT SEATED BL TEST COCK, AND A 'Y' STRANER. W /AIR GAP AG -5 FORM 1/2' SIZE, OPERATIN G WEIGHT 30 POU HT -1 HEAT TRACE - THERMON 8 FLX -2, SELF - REGULATING HEAT TRACE FOR FREEZE PROTECTION PROVIDE ONE PASS ON ALL EXPOSED STEAM CONDENSATE PIPING. 277 VOLT / 1 PHASE. DOMESTIC WATER PRESSURE REDUCING VALVE SCHEDULE UNIT NO. PRV -1 PRV -1A MANUFACTURER WILKINS WILKINS SERIES MODEL# 500 500 SIZE 2 -i /2" 2 -1/2" GPM 80 80 PRESSURE INLET 150PN 150PS1 OUTLET 75PSI 75PSI FALL OFF PRESSURE 5PS1 SPSI NOTES NOTES rn 9fl f)O OI 7 PIPING MATERIAL SCHFDII F• PIPING, IDGATIDN MATERIAL JOINT COLD WATER UNDERGROUND COPPER /0 BRAZED COLD WATER ABOVE GROUND COPPER /M LEAD FREE SOLDER HOT WATER ABOVE GROUND COPPER /M LEAD FREE SOLDER RAIN LEADERS ABOVE GROUND CAST IRON NO HUB STORM DRAINS UNDERGROUND CAST IRON NO HUB WASTE ALL CAST IRON NO HUB ABOVE GROUND COPPER /DWV LEAD FREE SOLDER VENT ALL CAST IRON NO HUB ABOVE GROUND COPPER /DWV LEAD FREE SOLDER INDIRECT WASTE ALL COPPER /DWV /M LEAD FREE SOLDER 2. PIPING, INSIIIATION SCHFDOI E: PLUMBING GENERAL NOTES PIPING PIPE INSULATION INSULATION CONDUCTIVITY TYPE S17F TYPE THICKNESS RANGE UNDERSIDE OF ROOF DRAIN BODIES ALL FIBERGLASS 1/2" - OVERHEAD RAIN LEADERS ALL FIBERGLASS 1/2' - VERTICAL RAIN LEADERS - NOT REQUIRED - OVERHEAD COLD WATER ALL FIBERGLASS 1/2' - COLD WATER WITHIN WALLS - NOT REQUIRED - HOT WATER AND RECIRC 1/2 " -2" FIBERGLASS 1 " 0.24 - 0.28 2' - 6" FIBERGLASS 1 1/2' 0.24 - 0.28 COIL CONDENSATE PIPING ALL 280000EX 1/2' ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS. - ELASTOMERIC INSULATIONS WHICH MEET THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. - PROVIDE A VAPOR BARRIER COVERING ON ALL ROOF DRAIN, RAIN LEADER, AND COLD WATER PIPING INSULATION. - PROVIDE A COVERING FOR ALL INSULATION EXPOSED TO SIGHT WITHIN THE BUILDING. 3. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE PLUMBING CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 4. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 1991 EDITION OF THE UNIFORM PLUMBING CODE. 5. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS. 6. SLOPE ALL RAIN LEADER, STORM, AND WASTE PIPING AT 22 UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING PIPING AT LESS THAN 22 (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 7. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH SECTION 316 OF THE 1991 UNIFORM PLUMBING CODE. PROVIDE EARTHQUAKE SWAY BRACING AT 40' INTERVALS FOR ALL PIPING WHICH IS 2 1/2" AND LARGER AND HUNG FURTHER THAN 12" BELOW THE STRUCTURE. 8. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 9. FOR EXACT ROUGH -IN LOCATIONS AND ELEVATIONS OF PLUMBING FIXTURES REFER TO ARCHITECTURAL DRAWINGS. 10. PROVIDE LOOSE KEY STOPS OR ANGLE VALVES AT ALL FIXTURES 11. PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS. 12. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. 13. CLEANDUTS SHALL BE INSTALLED SO THEY ARE EASILY ACCESSIBLE. 14. PLUMBING EQUIPMENT, VALVES AND TRAP PRIMERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. 15. THE PLUMBER SHALL. PROVIDE AND LOCATE ALL REQUIRED FLOOR, WALL, AND FOOTING SLEEVES. 16. HEAT TRACING OF PIPING, WHERE INDICATED, SHALL BE PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR. THE PLUMBING CONTRACTOR IS TO COORDINATE THE HEAT TRACE WIRING SUPPLY WITH THE ELECTRICAL CONTRACTOR. 17. TRENCHING, BACKFILLING, AND COMPACTING FOR UNDERGROUND PIPING SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR UNLESS STATED OTHERWISE IN CONTRACT DOCUMENTS. PLUMBING LEGEND SYMBOL DESCRIPTION ABBREVIATION 0 BALANCING VALVE BALV 14 BACKFLOW PREVENTER BFP fil CHECK VALVE CV GATE VALVE GV GLOBE VALVE GLV DV BALL VALVE BV PRESSURE REDUCING VALVE PRV COLD WATER CW HOT WATER PIPING HW HOT WATER CIRCULATING HNC NP NON- POTABLE WATER NP TEMPERED WATER TW STORM DRAIN BELOW GRADE SD SANITARY SEWER ABOVE GRADE SANITARY SEWER BELOW GRADE SS RL RAIN LEADER ABOVE GRADE RL ORL OVERFLOW RAIN LEADER ORL VENT PIPING O VTR VENT THRU ROOF VTR FLOOR CLEAN OUT FCO of WALL CLEAN OUT WCO IND INDIRECT DRAIN ND GAS PIPING LOW PRESSURE MG GAS PIPING MEDIUM. PRESSURE MG HG LPG O GAS PIPING HIGH PRESSURE LIQUID PROPANE GAS FLOOR DRAIN HOSE BIBB HG LPG VACUUM VAC AW ACID WASTE AW ACID VENT AV OXYGEN COMPRESSED AIR DE DEIONIZED WATER DE FD HB PLUMBING ABBREVIATIONS ABBY FULL NAME ABBY FULL NAME A COMPRESSED AIR LINE HAR HOT WATER RETURN AFF ABOVE FINISHED FLOOR HUMS HOT WATER SUPPLY AV ACID VENT LPG LIQUID PROPANE GAS AW ACID WASTE IE INVERT ELEVATION BFP BACKFLOW PREVENTER MH MANHOLE CB CATCH BASIN MG MEDIUM PRESSURE GAS CI CAST IRON OFD OVERFLOW DRAIN CO CLEAN OUT ORL OVERFLOW RAIN LEADER CW COLD WATER POC POINT OF CONNECTION CV CHECK VALVE PRV PRESSURE REDUCING VALVE DCBP DOUBLE CHECK BACKFLOW PREVENTER RD ROOF DRAIN ELEV ELEVATION RL RAIN LEADER F FIRE SD STORM DRAIN FCO FLOOR CLEAN OUT SS SANITARY SEWER FO FLOOR DRAIN TOG TOP OF GRATE G NATURAL GAS (LOW PRESSURE) TP TRAP PRIMER GI GREASE INTERCEPTOR UNO UNLESS NOTED OTHERWISE GLV GLOBE VALVE V VENT HB HOSE BIBB VTR VENT THRU ROOF HW HOT WATER - W WASTE HNC HOT WATER CIRCULATING WCO WALL CLEAN OUT WH WALL HYDRANT CITY OF TDIU DEC - ) 20( lU MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106-1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 D- 0935 - 1091291 -00 DRAWN . BY J. GAMACHE/ M. HOUSMAN CHECKED BY D. NEHREN w s tLR QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER' NO DATE ISSUE . 05 -01 -2000 05 -04 -2000 • 09 -20 -2000 • 11 -15 -2000 . PHASE II REVISION • PHASE III REVISION • PHASE III REVISION • RECORD DRAWING I EXPIRES: 6 -18 -2001 I ®All Llrnrings and rr'tten te rinl ntninetl herein 0 y not fie tl d or FAL rthD,rtnthe written nsent of the nrchitect. tl RECEIVED ^.RY OF TUI(WILA I >00Q xERMI1 :ENTER QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 OWEST CYBERCENTER SCHEDULES d LEGENDS - PLUMBING RECORD DRAWING • UP TO.. FCO', W UP TO r w. r: H - F- r t LJ- rri 71 i �\ �L4 " W UP TO WCO fIGONNECT a" W TO EXISTING- W (E) $'Nowm,SME- CUTRN,:ti AT R TOR NEW CONSTRUCTION L MIN. wIOTH z• o" J IXISTINO OILET /S EXISTING '. Y2 CIe .2=REM OOM TO REMAIN VTUP Y I —% rt , 6 W [E) CONNECT - r - W TO EXISTING £"-I/- , 0 - -- V:t OP 1`i i _.- 02 f _1_1 PARTIAL FLOOR PLAN – WEST SCALE: Y =r -0 (la 2 Do 0 017 j -\1 0 I, -ji A GTO' OF 1114,10 DEC - 7 20001 EXISTING 11'i CW TO REMAINS I II, I P _ �I= QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER.. D 093 - 1091291 - 00 DRA.WN °BY J. GAMACHE CHECKED 'BY M. HOUSMAN NO DATE ISSUE Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 w e s to .05 -01 -2000 • 05 -04 -2000 • 11 -15 -2000 PHASE 11 REVISION PHASE III REVISION RECORD DRAWING I EXPIRES: 6 -18 -2001 I r_1 AU drn.mos P d .r tten tenPl ntP nea here;n mi be a�oi�aiea ses or as�losed without the rrtten nsent of the arch tect. REC r i CI OF T UKWItP DEC - 1 2000 Pew) icrv(Eh QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 ()WEST CYBERCENTER PARTIAL FOUNDATION PLAN - WEST - PLUMBING SHEET NUMBER...- RECORD DRAWING IP%4 114 LJ L. ..j 1 . — 7 7 . . ' . r h 4 ! . , 7 . . __1, . . - i, 1 , ' - T1 7 7• ; ! ' >, ; -4, . 4 _ , , . ____.! .. : - x - - ; ; i 1 ; 1 ■ ; ; ; I-- - - --1- /1 1 ----L - - - -1 - r7/F ; - Tt T -- - - - ------,-- - - 1- -N - -- - - -- - - , 7 E ll-117- 7 -1-- 1, --- --- - -- - ---- - - -- - ; -, ■ 1 \ \ \ 1 -2 \ L - - 1 \;1 ' ' -1 F 11 \ -' ' 1 1 1 1 ' 4 , ' \ - , . r - - . . . 1 • • ; - --,----: ; . , 1 1 ! FT ±,—_-2,,----, , ; T1 ; — , 1 ; 11 1 : :_.—] ' 7 71 1 == : _ ' - — 4 - -,-,_:„ , - ,L___.-- r-- I ' I----I T.T, T 1 , , :', TT• I': : L ; PROVIDE , si_Ap mum .k ---. ---- "4 L : ; i AS REOUIRED FOR NEW ,C NST RUCTIO N , , , , -- , , , 1 I: - r ',:', , t i - . 1 ' — u,'"Df" 2 • ' : : I- --1 I - -- --- T I- -4- -1- --I--- - ,/,T __T___ --T- 1 +47,- I T1Ti -- A :- — If , il . 1 1 1 1 :____— : 1 ,-,4 ,--T L __. _ ,-, ,-1 ' _ - -- -' ,-, - - -- - --'' - - - - CONNECT , ,,,, ,i , ■ : EXISTING ,1,1/2" CW TO REMAIN ,- , , i t 1 ,-, HI ; 1 ! ' d , r , , 1' L- , CAP ALL W PIPING BE6OW: alDR SERVING EXISTING TCALET; BOOM 1 i CAP 7 CW AT SCALE: Ya =1 I PARTIAL FLOOR PLAN — CENTRAL Aii) )nor? A 1,(Fv FDi ANI „ . "1 CAP " Li 4 ' t - 4 - I MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle. Wa 98106-1903 Phone: (206) 763-9400 Fax: (206) 767-6773 11111111111111111E1111MERNIENSIMI D-0935-1091291-00 J. GAMACHE M. HOUSMAN west, IM1111111=11111111■11111 ()WEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445-7130 FAX: (303) 445-7225 PROJECT NUMBER DRAWN B, 1=1111111111111111111111111111111111 NO DATE ISSUE . 05-01-2000 • 11-15-2000 . PHASE REVISION • RECORD DRAWING 11111111111•11111111111111111111111111111 I EXPIRE. 6-113-2ool ] DEC - UP 1111111■11=111MMINI QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 IZThEEMMMMMIMMOMI QWEST CYBERCENTER PARTIAL FOUNDATION PLAN - CENTRAL - PLUMBING SHEET NUMBER , RECORD DRAWING In 1 ri• s , \ 1 ;4 1-4 t, 7 , , _ - 77 r PARTIAL FLOOR PLAN — EAST SCALE Y8 =1 1 , - I'l ; ,;;;;; ;;;;;;;;;;;;;--;;;;;;;;;;-;;;;;;;;;;;;;;;;;;, ;,;;;;;; ;;;; ; ; ; -; ; , ; ZO ;,;;;; . - - - -I -; - . - -: ■ - ■ :- - - a rs .,,,,, n ito i , , , ;;; ;;; ;,-;;; ■■;,;;;;. ; ..,,,,, ;. ; ; 4 . , . ---. ,,- 141i Ill . il '''; ' ----- 7 Fi ._ , _____,:,.___ 1_ ____ ', _.1 i ,---- -- _,_ , r - , --,-- -- - 7 - ! _P. I' , ) , , r, , ' -- II II ..—.I:_,.../..I-___ ' ' ' I ' II -;;;;; 2.--,-,II"---v Z G 1 _ __',-=',.,. __-:-.. I ._,,T,',,,.T I .4 r• - ,,g-------------...,.,.4. , , , : 7 , , _J, : Fca z , ' -- Fec , ,-,--- . 1 1 - 4 .. _ — ---, r5.4 _cw, -- --- 2 SERVICE TO-REMA / I i 1 : ] - J ' L 006 CONNE% ; TO 1115JIN EXISTING W PRIM TO 18, ALLATIO _ UP TO FCC) 2 UP TO WCO TO 1 1 21W, '1 W TO WCO 7, 1 SUP TO WCO & SiNN 1 CIIY or DEC - aCA A MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106-1903 Phone: (206) 763-9400 Fax: (206) 767-6773 ride the 1 we s 111111111111=1111•11111111■11111111N1 QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445-7130 FAX: (303) 445-7225 PROJECT NUMBER ' D DRAWN BY J. GAMACHE CHECKED' BY I M. HOUSMAN NO DATE ISSUE . 05-01-2000 .11-15-2000 I EXPIRES: 6 I 1111•11111■1111111111111111111M1 i1111111111111111■•=111111 QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 [11111318M1111■11•1111 QWEST CYBERCENTER PARTIAL FOUNDATION PLAN - EAST - PLUMBING RECORD DRAWING r•ti rr t . PHASE II REASION -RECORD DRAWING cry DEC 2110 , ERMIT CEN ER MIT -- HANDCAR DCM SHUAE FGGM R TO REMAIN IL— PARTIAL FLOOR PLAN — WEST SCALE: Ye =1' -0 DE SHEET METAC SHOUD AROUND L ROOF DRAIN BODIES & HORIZONTAL & VERTICAL IN I LEADER & OVERFLOW PIPING IN IP AREA (TYPIUL) 1 3; 4 E. 1 Bk BC I BE 412000 EXISTING 6' RL N, PROVIDE SHOUD Re. (E) UP TO ROOF DRAIN ON VERTICAL PI G WITH WEEP HOLES AT N & OVERFL[�V ROOF DRAM. BOTTOM BEY} REMOVE UVATORY, PIPING & CAP DOMESTIC WATER ALL APPURTENANCES CAP ,WASTE PIPING 71 0ELt3lY�51>�� & VENT A�THIS POINT ' - a a L r� COOLER TO REMAIN REMOVE & }�2EPIACE - WATER • - I CAP &SEAL ALL FIObR- DRAINS & DOMESTIC WATER PIPING IN IP CABINET AREA TER ' tY CW POC I' 13" NW DC ' O Mi Y ig CW I 11 VERIFY PIPING TO EXISTING; I IF STING /TWI TO REMAI %C\ LOCATION N L00R S IQi & `AP I & CAP P7NG BELOW FLOOR �SSP_EYISTING DOMESTIC .� WATER�CER - TO R O Y tV 6' IC/ (E) UP TO ROOF DRAIN & OVE RFLOW ROOF DRAIN 0 • — I - -� 1.1 �XS71NG ESTIC WATER, WAST ,__ Q ra PIPING SE N G TOILEf ROOMS TE- 0 `'__ m q - m,, l •� I 0 II' x. 6 m 011 MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER 0 0935 - 1091291 - 00 DRAWN BY J. GAMECHE CHECKED BY D. NEHREN NO DATE ISSUE . 05 -01 -2000 - 05 -04 -2000 11 -15 -2000 1 EXPIRES: 6 -16 -2001 1 ®Nl tlrnrngs o d vr'tten terlal ntnined ' herein y not be dCp {etl, s d or tllsclosed v�ihout The wr;tten nsent of the nrch�tect. QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER PARTIAL FLOOR PLAN - WEST - PLUMBING SHEET NUMBER RECORD DRAWING PHASE II REVISION • PHASE III REVISION • RECORD DRAWING EOBI ED CRV R OF TUIMqLP. NEC EXISTING 6" RL DN, PROVIDE SHOUD ON VERTICAL PIPING WITH WEEP HOLES AT BOTTOM BELOW SLAB . R (E) UP TO ROOF GRAIN • OVERFLo ROOF DRAIN• PROVIDE SHEET METAL CONTAINMENT SHO AROUND ALL ROOF GRAIN ROOIF &HO I NTAL & VERRCAL RAIN LEADER &OVERFLOW PIPING N W AREA (TYPICAL) F 5 • .I T LAS 91P1NG�IAIN IU HLMAIN> r4 it REMOVE FLOOR SINOVENT & CAP WASTE PIPING BELOW FLOOR ■ -- - - REMOVE - LAVATORY, PIPI - ALtpAPP.RY£NANCES, - CAP}IWASTE _ II BELOW'SLAD {- RL TO 9 . u— G- RL -(E)- UP- .- TOdROOF -.DRAI 6 & OVERFLOW ROOF IDRAIN PROVIDE SHEET METAL CONTAINMENT SHOUD AROUND ALL ROOF [RAIN BODIES & HORIZONTAL & VERTICAL A A(12_DDO 017 RAIN LEADER & OVERFLOW PIPING IN ELETRICAL /UPS AREA ® N PARTIAL FLOOR PLAN — CENTRAL SCALE: Ye" =1• -0 REMOVE WATER COOLER,PIP_ING & AIL ApPURTENANCES�'AP'W RING —Ln; 1.---BELOW SppH EXISTING 6" RL DN , PROVIDE SHOUD ON VERTICAL PIPING WITH WEEP HOLES AT BOTTOM BELOW SLAB (Y OF T UI 'I " DEC - 7 7000 - "c7rTI - 44141N 9-cFREMAIN (ffMWE- ELEC-TR10 WATf�. - p i EA RIPING & AL'L APPURTENANCtS t- I __ J lll l I ALL AP MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 D- 0935 - 1091291 -00 J. TATE w e s to QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN_ FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER DRAWN BY D. NEHREN NO DATE... ISSUE .05 -01 -2000 •11- 15 -2DOD PHASE 11 REVISION RECORD DRAWING IEXPIRES: 6 -18 -2001 I ®All dra.Ings a d vr'tten terial ntamed herein yy not be dcp s d or disclosed wlthoui� the Britten nsent of the architect. CT' OF TUIC/■!A DEC ; 2010 NRMO GEN 6, QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER PARTIAL FLOOR PLAN - CENTRAL - PLUMBING RECORD DRAWING Ark EL Y V DN WEDGMNI - 2 -SERVICE-ON -} 1 1Y LUE TYPE PS (TYP OF 'VTR , FOR ADDITIONAI. INFORMATION i�sEE DEraL 4 ' i r.= V DN N� • • 1 �Zr V /e IR HAND = REMOVE SERVICE SINK, PIPING pc ALL I CAP WASTE PIPING BELOW S AB CCM CW DN Y wCO RC Ilk EGO ROWSE SHEET CONTAINMENT SHOUD ARM ALL Ra OF DRAIN BODIES & HORIZONTAL & VERTI RAIN E rER & e;j'ERFLiW PIPING IN IP AREA .CAL IN G TO STING AIR HANDLER 11 4 r'r ?' VTR YL_WCO UNDER SINK CAP�Y 1 LS TOO OJT TEIDW F 40 REMOVE: T O AIR HANDLER' MG UPROBF-= EE SHEET - PT.06 at) T EMOVE FLOOR SINK_MENTI & GAP - I ASTE PIP[ G BEIIOw -FLOOR A 1 ZAL A 2I PS SUPPLY_ 4200 MBH CONNECTED LOAD a 1. Ill.i �I:ISY1tAG GAS TO RE 1I EMOVE D MESTIC f -1 C { Y N WATER 'IPING &f:ALL APP[ GAS MAINS I• REMOVE GAS FIRED WATER HEATER f [REMOVE FLOOR SINK. VENT & CAP I1 TE WASTE PIPING BELOW FLOOR P� �� a cs.' r u _ 6" RL (E) UP TO ROOF DRAIN & OVERFLOW ROOF DRAIN - PRWIDE- SHEET - METAL- CENJTMNMENI- SIIO[f - ATFDUNB — c'� ALE ROOF DRAIN BODIES & HORIZONTAL & VERTICAL RAIN LEADER & OVERFLOW PIPING IN IP AREA (TYPICAL) REMOVE LAVATORY, PIPING & ALL APPURTENANCES, CAP WASTE PIPING BELOW' — SLAB Y V DN 111 GAS PIPING MAIN TO T —J BELOW --,- W.TE „_ REMAIN WASTE PIPING EMOVF F ODR SINK VFNT ASTE PIPING BELOW FLOOR A EXISTING 1Y' CW SERVICE DN Y EXISTING 6 RL DN, P)jOVIDE SHOUD ON VERTICAL PIPING WHH W €EP HOLES AT BOTTOQ RFl Ow vAR - - - - - ,- - a � RIPINGJ.IAIN -_ - • r-G�- ✓ c • I - -_ ✓ — 1 q - _ - -.- _ e�.R — - 4_ - 4 •_ —. a •_ • E GAS PIPING TO EXISTING AIR HANDLER REMOVE GAS PIPING TO EXISTING AIR HANDLER REMOVE GAS PIPING TO EXISTING AIR HANDLER GAS PIPING MAIN TO REMAIN 21L -MG. UP THROUGH ROOF, SEE SHEET P2.06 FOR CONTINUATION PRV -1/1A - OCR CONNECT Y CW TO EXISTING IORL `EXISTING CW SERVICE DN - ' 6" RL (E) UP OO DRAIN OVERFLOW RO TO R DRF AIN CAP & SEAL ALL ROOK DRAINS & DOMESTIC WATER PIPING IN IP CABINET AREA ' i • [STING fi - RL - Z( OVERFLOW TO REMAIN SCALE: Ye =t• -0 OVIDE SHEET ME, CONTAIMMENT SHOUD AROUND L ROOF DRAIN BODIES & HORIZONTAL & VERTICAL N - PF'ING I 4RL (E) UP TO ROOF DRAIN , . g ".JVERFLQy/ R00 4 NCO F I A B ■ i, ���►. 4, .•� ! E d N. .S I sHW - I 4 FCO REMOVE GAS PIPING TO EXISTING AIR HAND REMOVE GAS PIPING TO EXISTING PARTIAL FLOOR PLAN — EAST 6' RL Nor TO ROOF DRAIN OVE RROW ROOF DRAIN EXISTING 6 RL TO REMAIN REMOVE GAS 2Z0 t Yz' CW DN TO PLUMBING GROUP CW CIO 410 j' PIPING MAIN-\ I ' t I! REMOVE GAS l ■ it r w{ 8 Ii— - IN A Z UP CW ON TO PLUMBING GRO WCO REMOVE DOMESTIC WATER PIPING & ALL APPURTENANCES REMOVE WALL CAN UT, CAP WASTE PIPING BELOW LE- SLAB EXISTING 6" RL DN, PROVIDE SHOUD ON VERTICAL PIPING WITH WEEP HOLES AT BOTTOM BELOW SLAB 6' RL (E) UP TO ROOF DRAIN & OVERFLOW k00F DRAIN ' CO MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 w s to QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER 0 0935 - 1091291 - 00 DRAWN BY J. TATE CHECKED -BY D. NEHREN DATE .A . 05 -01 -2000 t1 -15 -2000 NO ISSUE . PHASE II REVISION - RECORD DRAWING I...Es: 6 - 18 - 2001 I ® AR drawings n d wr tte� n terinl ntn ned heren yy nit be dcp s d or dsclased wlthout� the rrltten nsent of the nrchtect. ECEIVFD CTTY R OF TUKWILA DEC - r 200 PER111T CENTER QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER PARTIAL FLOOR PLAN - EAST - PLUMBING SHEET 'NUMBER RECORD DRAWING on nn 4 \ I PARTIAL FLOOR PLAN — WEST SCALE: Ye = /ri 2 OOOoti ST 1 A HEAT TRACE & INSULATE (TYP) cm IOE n!r,�,run DEC - 7 a w _ a 7717 Detroit Ave. S.W. ride the 1 QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER D 0935 - 1091291 - 00 DRAWN BY. J. TATE CHECK'ED BY D. NEHREN MacDonald Miller Company, Inc. Seattle, Wa 98106 -1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 we s to NO DATE ISSUE . 05 -01 -2000 • 05 -04 -2000 • 09 -19 -2000 • 11 -15 -2000 PHASE II REVISION • PHASE III REVISION - PHASE III REVISION • RECORD DRAWING IE%PIRES, 6 -18 -2001 ®All dronngs antl xr�ttert naterml contained heren yy n.>t be d Cp s d or disclosetl r�thout� the irritten nsent of the architect. RECENED IXIY OF TOi(WILc DEC 'RAMO CENT., QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST'CYBERCENTER PARTIAL ROOF PLAN - WEST - PLUMBING SHEET NUMBER RECORD DRAWING A D F ( E 5 S 2" VTR -•-o 6 ±' 1 Rio-3 j SLOPE 1. HU-3 Aft ( 6 1 SIM TYPICAL STM COND 1 PARTIAL FLOOR PLAN — CENTRAL SCALE Ya = 1 1Y: HEAT TRACE & /INSULATE (17P) 7 ) Air) nirv)-6/7 1Y: S T SLOPE 1. CITY OF TUD,WI1, . AC DEC - 7 23;0 ( 8 ride the I M HOUSMAN MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle. Wa 98106-1903 Phone: (206) 763-9400 Fax: (206) 767-6773 D-0935-1091291-00 D. N EHR EN west. 11111011111111111•1111■111111111111 QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445-7130 FAX: (303) 445-7225 PROJECT NUMBER DRAWN BY NO DATE ISSUE . 05-01-2000 • 11-15-2000 . PHASE II RWISION • RECORD DRAWING EXPIRES: 6-18-2001 I 111111111111111111111111111=1111111111111111181 .rry'SM DEC - 1 ?1100 PERM CENTER 111•11111111111111111=011111111111111111111 QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 EMEEMEMOMMENIE °WEST CYBERCENTER PARTIAL ROOF PLAN - CENTRAL - PLUMBING InEMEM21111MOMMEMEI RECORD DRAWING rm Oft ■■•■■ A C , B - E 8 g CORD , FLUE DNi SLOF'E 1 STM SLOPE 1% r 1 , 9 FLUE DN TYPICAL /' sTm CORD HEAT TRACE ex /INSULATE (TYP) I I II 1 I I a STEAM DOWN I I ' II II \_121, MG DN TO MECHANICAL ROOM, .. SEE SHEET F'2.02 FOR CONTINUATION ! PARTIAL FLOOR PLAN — EAST SCALE Ye .1'-0 1 0 A ' C.) 2Yx" MG DN TO SEE "SHEET -P2.03 1 2 OEC MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle. Wa 98106-1903 Phone: (206) 763-9400 Fax: (206) 767-6773 ride the 1 f1111111111111111111=1111141111 ()WEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445-7130 FAX: (303) 445-7225 PROJECT NUMBER ' D DRAWN" BY M HOUSMAN CHECKED BY NEHREN NO DATE ISSUE vv e s . 05-01-2000 • 11-15-2000 • . PHASE REVISION • RECORD DRAWING I EXPIRES: S-18-2001 I IMIIIIIIIMM111111111111111111111MI 11■111111111•11111111111111111111111 QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 Z1EMEMIE1111111111111M QWEST CYBERCENTER PARTIAL ROOF PLAN - EAST - PLUMBING RECORD DRAWING re r1" crry DEC - 2uuti ,ERMIIT CENT, SHEET NUMBER EXT ENDED Du CT SCREENED OUTLET /// �J � �R�IL_ 1 cAS VENT 1 VZ' GAS PDX AIR HANDLING UNIT HUMIDIFIER PIPING ELEVATION DETAIL NO SCALE 3 VENT HUMIDIFIER SEE DETAI 73 FOR 9/ PIPI r RELIEF POC FLANGED PDC B - 1 1 SHUTOFF VALVE CHECK VALVE LOPE 1% 2 ERFLOw — �DRAN POC BOILE FEEOW SYSTE - STEAM SUPPL1 tR 111111 SLOPE TRAP SEE ROOF, PLAN FOR NUMBER Y. STEAM CONDENSATE SLOPE TO TERMINATE AT ROOF DRNN MAKEUP WATER r -- u0+1H)I 2t 1 r VENTS POL P ROOF FLASHING SLOPE 7 Y" SLOPE 19. S vEM— i POC VENT I P3.0 BOILER PIPING DETAIL NO SCALE /SHUTOFF VALVE CHALK VALVE SLOPE 1 / 0P 9. DRAIN POC E M POC � 1 � 1 ,r II II J FLOOR SINK r OVER LOW DRNN POC7� BOILER / FEEDWATER SYSTEM HUMIDIFIER PIPING DETAIL NO SCALE SCREENED OUB.ET JI�u<R L J r4 4" FLANGED POC Y RELIEF PO lY 1 B -2 I NOTES 1. SEE EWTPNENT SCHEDULE FOR HUMIDIFIER 6 ACCESSDRIES SUPPLIED 2. PIPTNG HETVEEN EgUIPNENT, SUPPLIED 41NSTALLED Hr MECHANICAL CONTRACTOR. 1 GR -2 I Y ro FIXTURES PRESSURE REDUCING STATION DETAIL NO SCALE GAS PRESSURE REGULATING VALVE PIPING DETAIL NO SCALE HOLE PIPE SrRAP - ELCEN p405 SIZE LARGER THAN PIPE SET ROOF. W NOT NAIL TO ROOF r PRESSURE GAUGE (71'1.) P BLDG WATER SUPPLY — GAT VALVE (lYP) UNION (iTP) STRAI PRESSURE. REDUCING AL. SET AT 75 PSI SEAL W/ ELSOMERIC SEALANT 4 x 6 TREATED WOO BY MECHANICAL CONT RACTOR GAS PIPING GAS PIPING SUPPORT AT ROOF NO SCALE M COLD WATER SUPPLY EXPANSION TANK HOT WATER CIRCULATING PUMP r VACUUM BREAKER OF REQUIRED)] HOT WATER RECIRC LINE N HOT WATER SUPPLY TO BUILDING INSULATING PAD OF REQUIRED) SECURE TO STRUCTURE T h P RELIEF VALVE ELECTRIC WATER HEATER DRAIN VALVE Y RELIEF ELEC. WATER HEATER PIPING DETAIL NO SCALE 1Y,\ PREVEZ Oi AIR GAPS GATE VALVE (ttP) TO FIXTURES UNION (TYP) STRAINER 0 RELIEF TO DRAIN BUILDING WATER SUPPLY SPRING LOADED O 1 INSTALL WITH RED PRESSURE BACKFLOW PREVEI.TER UCED (RPBP) ONLY c rgI ABOV AIN CENTER -LANE OE F MAIN M OTE: OUNT TRAP PRIMER VALVE ONE FOOT ABOVE FINISHED FLOOR FO EVERY 20 FEET OF PRIMER LINE LENGTH FIN FLR NO SCALE NO SCALE HUT —OFF VE PRESSURE SIDE VAL TRAP PRIMER VALVE FLOOR SLAB Y V UP 4 VACUUM BREATHER PORTS GRAVITY FEED SIDE / DIBTRIBUTION UNIT FOR MULTIPLE. TRAP PRIMER LINES SLOPE 2% MIN MP) MULTIPLE GRAVITY FEED TRAP PRIMER DETAIL FIRE SPRINKLER BLOWDOWN DRAIN DETAIL INLINE SOFT -ISC CHECK VALVD E ( ttP ) 0 BACKFLOW PREVENTER STATION DETAIL NO SCALE MacDonald Miller Company, Inc. 7717 Detroit Ave. S.W. Seattle, Wa 98106 - 1903 Phone: (206) 763 -9400 Fax: (206) 767 -6773 w e s t. QWEST COMMUNICATIONS 13952 DENVER WEST PARKWAY, BUILDING 53 GOLDEN, CO 80401 ATTN. FRED MAIDESIL PHONE: (303) 445 -7130 FAX: (303) 445 -7225 PROJECT NUMBER D 0935 - 1091291 - 00 DRAWN 13,Y J. TATE CHECKED BY D. NEHREN DATE .A1 . 05 -01 -2000 11 -15 -2000 NO ISSUE PHASE II REVISION • RECORD DRAWING EXPIRES: 6-18 -2001 I ®Afl drar,ngs and rotten nnteriaL cantoinetl herein yy not be tl s d or disclosed rithout�ihe mitten nsent of the architect. CRY OF DEC - i ?no eEP111 T t2.. _r. QWEST COMMUNICATIONS SEATTLE CYBER CENTER 6101 SOUTH 180th ST. TUKWILA, WA. 98188 QWEST CYBERCENTER DETAIL - PLUMBING EMOINEEMEIMMEIMIN RECORD DRAWING 1"fA 0141