Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M2000-097 - ZAMA NETWORKS
M2OOO -097 Zama Networks 12101 Tukwila Intern'l Bi EXPIRED DEC 13 2001 City of Tukwila Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Permit No: M2000 - 097 Type: B --MECH Category: NRES Address: 12101 TUKWILA INTERNATIONAL BL Location: FUEL ISLAND, FLOOR 1, FLOOR 2 • Parcel #: 092304 -9309 Contractor License No: MCKINkk372NO TENANT OWNER CONTACT CONTRACTOR UMC Edition: 1997 ZAMA NETWORKS 12101 TUKWILA INT'L BL, TUKWILA, WA 98168 SABEY DAVID A & SANDRA L 101 ELLIOTT AV W #330, SEATTLE WA 98119 RICK HUDDLE 5005 3 AV S, SEATTLE, WA 98134 MCKINSTRY COMPANY 5005 THIRD AVENUE SOUTH, PO BOX 24567, SEATTLE WA 98134 ***II *k* * * *k* *** ** ** * * * *k*k**k***h* kk****** *k ***** **kkk*k**kkk******k**kkA Permit Description: INSTALL (8) COMPUTER ROOM UNITS, (1) COOLING TOWER (1) PUMP & ASSOCIATED PIPING. ADD (3) SUPPLY FANS #SF 4,5,6 ON M3.01 & SOUND TRAPS. 4•* * **hh*' * *k ***•k **AAk***A******** ***** * k* kk * *� * *AAAA* *,k ** * *+k *k *kk *A**kA 4 ". ^ 00 1 hereby certify that 1 have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. 1 am authorized to sign for and obtain this bus ing permit S i g n a t u r e Da t e q � / .. Print Name.,/, 1.! Tit :jed.t/eir, MECHANICAL PERMIT i � .i lka4- ------ thorii d Signature Date Valuation: Total Permit Fee: (206) 431 -3670 Status: ISSUED Issued: 07/03/2000 Expires: 12/30/2000 Phone: Phone: 206 281 -8700 Phone: 206 -762 -3311 Phone: 206 762 -3311 200,000.00 268.00 This permit shall become null and void If the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. 1 .. CITY OF TUKWILA n Peron. No: M2000.097 Addt Bess•:. 12101 TUKWILA INTERNATIONAL BL Suite: Tenant: ZAMA NETWORKS Type: B -•MECH Parcel #: 092304 --9309 *****A*** * *•k•k * *'k**A*k•k*k *k * ** #k * * *I* Permit Conditions: 1. • No changes will be made to the plans unless approved by the Engineer and the Tukwila Building::bi,vision. All permits, inspection records, and approved plans shall be available at the job site prior to the start: of any con- struction, These documents are to be maintained and ava i 1- able until final inspection approved is granted, ,All construction to ,be done in conformance with approved plans and requirements of the.-Uniform F3u`1 lding,Code ' (1997 Edition) ' a•s amended, Uniform Mechanical Code t1997H Edi't`ion), 'and Wash i;rlgtOn Sate Energy Cotfe ( 1997 Edition) . Va1idSty of Permit, The issuance of a permit or approval of plans specifications, and computations shall not bi pon atrue,d to be a permit for, or a ,n. approval of, any v i o1 Qt io_n >of any of the provisions of the building code or of any. .other ordinance of the jurisdiction, No permit presum1fig to give authority to violate or .cancel the provisions' ; of this .code; she 1 1 be valid. Meanufacturer s installation ,instructions required on. site fdr.:tho .bu'ltdiny inspectors review, Status: ISSUED Applied: 05/ Issued: 07/03/2000 * #. *kk* lF*k/.k tk•kk•k ****A-AA** -1 kAk-kk Project Name/Tenant: 7.--a-v- f•-C t 't I-V-5 Value of Mechanical Equipment: d 200 Site Address • 12!40 t "c v`a..w'.1ct , ..-�' 1 c o ` City State/Zip: si a• • _vv _. 1 9216 1� Tax Parcel Number•' o 2 ` -q3 0� Phone: ( ) - 2 - 9 , 1 w Property Owner: r Street Address: <k� 3 ;n , 101 tkt■ .W ?we. w City State/Zip: Sta. ggltq Fax #: ( ) ZV2 --�i t S 1 Contractor: r . ....Lib Address: ahq. Phone: ( ) 1-6 1. - 33 1 I Street Address: `50 0S t it Pt S • Cit S ate/Zi : s�� �fgl3�} Fax #: ( ) 1c0ti 2t0Z( Contact Person:. -� Y -' k\ J � ��--` l am Phone: ( ) .102--3_311 Street Address: �c& %%.* City State/Zip: ._ — Fax #: ( ) - RA Z -Zia LI_ BUILDINCL W a, ,+ R THORIZED AGENT: Signature: i h ' \`'1/4, \ Date: `S: ,) 00 Print name: __L Phone: ( ) Fax N: ( ....Lib Address: ahq. Clly /State/Zip: CITY OF TUk Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Mechanical Permit Application Application and plans must be complete in order to be accepted for plan ru view. Applications will not be accepted through the mail or facsimile. MECHANICAL PERMIT REVIEW AND APPROVAL REQUESTED: (TO RE FILLED OUT BY APPLICANT) Description of work to be done (please be specific): 1V\ �, t P� c I �i r ev✓` tr Date apcation cept 11/2,99 mech permU.doc \t Date apt)/ cation expires: _10 FOR'` Ff USE ONLY Project Number: M 1000 Permit Number: sa FvG . S tau, i d Current copy of Washington State Department of Labor and industries Valid Contractor's License, If not available at the time of application, a copy of this license will be required before the permit is Issued OR submit Form H-4, "Affidavit In Lieu of Contractor Registration ". Building Owner /Authorized Agent! If the applicant is other than the owner, registered archilect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND l AM AUTHORIZED TO APPLY FOR THIS PERMIT. Expiration of Plan Review - Applications for which no permit is issued within 1 tat) days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 160 days upon written request by the applicant as defined in Section 114.4 of the Uniform Mechanical Code (current edition). No application shall be extended more than once. ✓ Submittal Requirements oor plan and system layout Roof plan required to identify individual equipment and the location of each installation (Uniform Mechanical Code 504 (e)) Details and elevations (for roof mounted equipment) and proposed screening ✓Heat Loss Calculations or Washington State Energy Code Form #H -7 H.V.A.C. over 2,000 CEM (approximately 5 ton and larger) must be provided with smoke detection shut- off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical Code 1009), Specifications must be provided to show that replacement equipment complies with the efficiency ratings and other applicable requirements of the Washington State Nonresidential Energy Code. Structural engineer's analysis is required for new and the replacement of existing roof equipment weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be stamped by a Washington State licensed Structural Engineer. Mechanical Permits COMMERCIAL: Two complete sets of drawings and attachments required with application submittal RESIDENTIAL: Two complete sets of attachments required with application submittal New Sin to Fang' Residence Installation of Gas Fireplace Narrative with specification of equipment and chimney typo. If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney Is in safe condition. lla,?, rn#cpottioa NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. Submittal Requirerrrprrtc Chan a •out or re lacement of existin: mechanical e • ul. ment Narrative of work to be done Includin modification to duct work. NOTE: Water heaters and vents are included In the Uniform Mechanical Code — please include any water. heaters or vents being installed or replaced. Accodnt Cod* 000/34t.030 000/322.100 $44,404 . • • 0**cription PLAN CHECK • NONRCII MECHANICAL • NONOES 0 , A A A**4*4• 4 AA *A* A *A A 4 * A ilks%*0t4 44**A4AA*A 1 , 6 ' A & A 0 ; 4 kst A**4 TV or TUKWILA. HA 2..000°' 0 9 1POISMIT AkkAAAhAAAAAA*4**AkAA**AAAPAAA4A4AAA*4* A %4******AAAAAAAA*A TRANSMIT Number: P9000311 Amount: 260.00 07/03/00 09232 Payment i4obhudt CHECK Notition2 ACKI1fl010V CO Inits TL0 44.4 I. a, ■•• 44• a, .4. I. 04 I. Is 4■4. S • a. a* /44 or a, •. e. .. a. a • • nar 1. ••■ no• a a .• SI S. 4 IS 4.. • • a a a Permit Not M2000-097 Typos 0-MECH MECHANICAL PERMIT tkrcel Nos 092304-9309 ..., Sit* Addr**ss 121()1 TUKWILA INIERN011uNAL ilia • ' Locktions rUFL ISLAND, rum 1, rLook 2 otal rOgilt 260.00 Thi% . T tvyment 260.00 Tctol ALL tot*: 260.00 Oulancot .00 4 ' 4040144044A**4kA.A*440*4A00+4 Amoont 53.60 214.40 0: St IS •1; Iv 0: I a 014 4444 3' 44 a 444. tt *r 44 it a at a W. 41.4 III I 4444 a4 St Ow 44 444 a t . .: , August 16, 2001 Mr. lick Huddle 5005 3rd Ave. So, Seattle. WA 98119 RE: Permit Status M2000.097 12101 Tukwila International Blvd, Dear Mr. Huddle: City of Tukwila In reviewing our current permit files. it appears that your permit for installation of 8 computer room units at Una Networks issued on July 3. 2000, has not received n f innl inspection as of the date or this letter by the City or Tukwila Building Division, Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the building official under the provision of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of'such permit, or il'the building or work authorized by such permit is suspended or abandoned at any time oiler the work is commenced f'or a period of 180 days. Based on the above. ifa final inspection is not called for within ten (10) business days from the date of this letter. the Permit Center will close your file and the work completed to date will be considered non-complying and not in conformance with the Uniform Building Code and /or Mechanical Code, Please contact the Permit Center at (206) 431.3670 if you wish to schedule a final inspection. Thank you for your cooperation in this matter. Sincerely. t a..t 'u ti(/ f'L Kathryn A. Stetson Permit Technician Xc: y . rmlt. Fllr;.No.. M2OQO.Q97., Dunne Gril1in, Building Official Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenrer Boulevard, Suite 11100 • Tukwila, Washington 98188 • Phone: 206.431 -3670 • Fax: 206.431.3665 1 e ins" Co. May 31, 2000 Tukwila Building Division 8300 Southcenter Blvd. Tukwila, WA 98188 Attention: Mr. Bob Benedicto, ph. # 206/431 -3670 Reference: ZAMA Networks McKinstry W.O. # 954 Response to Correction Letter #1 All of the computer room units (CRU's 7 -10, 15 & 16) will have smoke detectors hard -wired to their starters. These will be provided and installed by the electrical contractor. This will meet the requirements of UMC Section 608, Please feel free to contact me at 206- 763 -5399 ext. 2874 if you have any questions. 64 2,V L.- Rick Huddle Project Manager cc: File 954 -004 Dave Howe, McK CORRECTION LTR# orri TUIC+nu JUN - 2 2000 PERMIT UENTEti CORRECTION LTR #_ I 5005 3rd Ave. South * P.O. Box 24567 * Seattle. WA 08124.0567 • (296) 762-3311 MUKIN••372N0 5/ 3x/00 May 24, 2000 Rick Huddle 5005 Third Avenue S Seattle, WA 98119 City of Tukwila Department of Community Development RE: CORRECTION LETTER #1 Development Permit Application Number M2000 -097 Zama Networks 12101 Tukwila International BI Dear Mr. Huddle: This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed of the sane lima and reflected on your drawings. I have enclosed comments from the Building Division. At this time, the Fire Department, Planning Division and Public Works Department have no comments at this time. The City requires that two (2) cluiplute sets of revised plans be resubmitted with the appropriate revision block. If your revision does not require revised plans but requires additional reports or other documentation, please submit two (2) copies of each document. In order to better expedite your resubmittal, a 'revision sheet' must accompany every resubmittal. I have enclosed one for your convenience. Carssetions/revisiontigtgaLhe made n norsnn and will not be •! i !+ !!t ! ! ll:L!i: If you have any questions, please contact me at (206)431.3672. Sincerely, end Brenda Holt Permit Coordinator xc: Pita No. M2000•Q97 Steven M. Mullet, Mayor Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206.431.3670 Fax: 206.431.3665 BUILDING DIVISION REVIEW Date: Project Name: Application #: Plan Reviewer: • Page 1 May 19, 2000 Zama Networks M2000-097 Bob Benedicto Tukwila Building Division 6300 Southcenter Blvd. Tukwila, WA 98188 206 / 431 -3670 1. Air moving systems supplying air in excess of 2000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Show proposed method for compliance with this requirement Re; UMC Section 608, '1 PACE CONSULTING GROUP 5005 3RD. AVENUE SOUTH SEATTLE, WA 98134 FULL COMMERCIAL HVAC LOADS PROGRAM BUILDING MASTER DATA AND DESIGN PARAMETERS: DESIGN OUTDOOR OUTDOOR INDOOR MONTH DRY BULB WET BULB REL.HUM JANUARY MARCH JULY WINTER • 54 61 85 17 ROOF ASHRAE ROOF ROOF SUSP TYPE ROOF # U -FAC COLOR CLG. 1. 5 0.038 PART PART COOL TYPE U -FAC T -D 1. 0.053 17 WALL ASHRAE WALL TYPE GROUP U -FAC 1. G 0.140 PROJECT FILE NAME: PROJECT LOCATION: BAROMETRIC PRESSURE: ALTITUDE; NORTH LATITUDE: MEAN DAILY TEMPERATURE ATMOSPHERIC CLEARNESS GROUND REFLECTANCE: STARTING TIME FOR HVAC ENDING TIME FOR HVAC FLOOR HEAT LOSS COEFFI NUMBER OF UNIQUE ZONES DARK YES HEAT T -D 40 WALL COLOR DARK GLASS SUMMER WINTER GLASS NO. U -FAC. U -FAC. SHD.COEF 1. 0.500 0.500 0.450 2. 0.500 0.500 0.450 GENERAL PROJECT INFORMATION: RANGE: FACTOR: 48 49 67 0 50* 50* 50* 50% INTERIOR SHADING NO NO LOAD CALCULATIONS: LOAD CALCULATIONS; CIENT; IN THIS PROJECT: PROJL . r : CLIENT: DATE: DESIGNER: INDOOR DRY BULB INTERIOR SHD.COEF 0.000 LIGHT 0.000 LIGHT C:ZAMAl2 Tukwila,WA 29.817 IN.HG 96 FEET 47 DEGREES 22 DEG.F 1.00 20 PERCENT 7 AM 8 PM 0.81 BTUH /FT-F 39 ZAMA MCKINSTRY COMPANY 09/21/99 GRAINS IN /OUTDOOR DIFF. CORRECTION 72 -18.42 -36 72 -26.03 -29 72 11.95 -5 70 0.00 TiE CEtVE0 CITY OF ;WW 1. rj�n►��r C f41I MSH ROOM GLASS GLASS CONST WIDTH HEIGHT 1.00 5.20 1.00 7.75 M toseaccri * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE Su.rWARE DEVELOPMENT INC PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 2 * * * * * * * * * * * * * * * * * * * ** GENERAL PROJECT DATA (CONTINUED) * * * * * * * * * * * * * * * * * * * ** BUILDING DEFAULT VALUES: CALCULATIONS PERFORMED: LIGHTING REQUIREMENTS: EQUIPMENT REQUIREMENTS: PEOPLE SENSIBLE LOAD MULTIPLIER: PEOPLE LATENT LOAD MULTIPLIER: PEOPLE OCCUPANCY BASIS: ZONE SENSIBLE SAFETY FACTOR: ZONE LATENT SAFETY FACTOR: ZONE HEATING SAFETY FACTOR: PEOPLE DIVERSITY FACTOR: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: BUILDING DEFAULT CLG. HEIGHT: BUILDING DEFAULT WALL HEIGHT: INTERNAL OPERATING LOAD PROFILES (C'100): BOTH HEATING 1.20 WATTS 1.50 WATTS 250 BTUHS 200 BTUHS 1 PERSON 10t 5t 20% 100% 1 1 1 13.00 FEET 13.00 FEET AND COOLING LOADS PER SQUARE FOOT PER SQUARE FOOT PER PERSON PER PERSON PER 140 SQ.FT RECEIVED CITY OF TUKWII.A MAY 1 0 2000 PEfMIT CENTER REF HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1. C C C C C C C C C C C C C C C C C C C C C C C C 2. C C C C C C C C C C C C C C C C C C C C C C C C 3. C C C C C C C C C C C C C C C C C C C C C C C C 4. C C C C C C C C C C C C C C C C C C C C C C C C 5. C C C C C C C C C C C C C C C C C C C C C C C C 6. C C C C C C C C C C C C C C C C C C C C C C C C 7. C C C C C C C C C C C C C C C C C C C C C C C C 8. C C C C C C C C C C C C C C C C C C C C C C C C 9. C C C C C C C C C C C C C C C C C C C C C C C C 10. C C C C C C C C C C C C C C C C C C C C C C C C ALL DESIGN DATA TAKEN FROM THE 1989 ASHRAE HANDBOOK OF FUNDAMENTALS * ** FULL COMMERCIAL HVAC LOADS PACE CONSULTING GROUP ZAMA * * * * * * * * * * * * * * * * * * * * * * * * ** AIR AIR HANDLER # 1 INPUT DATA: AIR HANDLER DESCRIPTION: TERMINAL TYPE: METHOD FOR CV: SUPPLY FAN TYPE: CALCULATIONS PERFORMED: EXCESS SUPPLY AIR: NUMBER OF TIMES SYSTEM OCCURS: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: EXHAUST CAN EXCEED SUPPLY AIR: LEAVING HEATING COIL TEMP. (DEG.F): DRY BULB TEMPERATURE (DEG.F): COOLING COIL CFM: MISC. BTUH GAIN - SUPPLY SIDE: MISC. BTUH GAIN - RETURN SIDE: COMBINED FAN,MOTOR EFFICIENCY ( %): STATIC PRESS. ACROSS FAN (IN.WG): SUMMER SUPPLY DUCT TEMP. RISE (DEG.F): SUMMER RETURN DUCT TEMP. RISE (DEG.F): WINTER SUPPLY DUCT TEMP. DROP (DEG.F): WINTER RETURN DUCT TEMP. DROP (DEG.F): CHILLED WATER TEMP.DIFFERENCE (DEG.F): HOT WATER TEMP.DIFFERENCE (DEG.F): COOLING VENTILATION METHOD: COOLING VENTILATION VALUE: COOLING INFILTRATION METHOD: COOLING INFILTRATION VALUE: HEATING VENTILATION METHOD: HEATING VENTILATION VALUE: HEATING INFILTRATION METHOD: HEATING INFILTRATION VALUE: VENTILATION IS 100% OF SUPPLY AIR: PRETREATED OUTSIDE AIR: IGNORE PRETREATED LOAD: PRETREATED AIR SUMMER DB TEMP (DEG.F): PRETREATED AIR SUMMER WB TEMP (DEG.F): PRETREATED AIR WINTER DB TEMP (DEG.F): DESIGN OUTDOOR OUTDOOR INDOOR MONTH DRY BULB WET BULB REL.HUM JANUARY 54 48 50% MARCH 61 49 50% JULY 85 67 50% WINTER 17 0 50% PROGRAM BY ELITE SL,.TWARE DEVELOPMENT INC * ** SEATTLE, WA 98134 09/21/99 PAGE 3 HANDLER INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * ** 1st Floor VARIABLE AIR VOLUME SUM PEAK ZONE CFMS DRAW - THRU BOTH HEATING AND COOLING LOADS RESERVE CAPACITY 1 1 1 1 NO 95 55 0 0 0 60 3.000 0.000 0.000 0.000 0.000 0.000 0.000 2 20.000 CFM PER PERSON 0 0.000 2 20.000 CFM PER PERSON 1 1.500 AIR CHANGES PER HOUR NO NO NO 0 0 0 INDOOR GRAINS IN /OUTDOOR DRY BULB DIFF. CORRECTION 72 -18.42 -36 72 -26.03 -29 72 11.95 -5 70 0.00 ig g, * ** FULL COMMERCIAL HVAC LOADS PACE CONSULTING GROUP ZAMA * * * * * * * * * * * * * * * * * * * * * ** * ** AIR AIR HANDLER # 2 INPUT DATA: AIR HANDLER DESCRIPTION: TERMINAL TYPE: METHOD FOR CV: SUPPLY FAN TYPE: CALCULATIONS PERFORMED: EXCESS SUPPLY AIR: NUMBER OF TIMES SYSTEM OCCURS: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: EXHAUST CAN EXCEED SUPPLY AIR: LEAVING HEATING COIL TEMP. (DEG.F) DRY BULB TEMPERATURE (DEG.F): COOLING COIL CFM: MISC. BTUH GAIN - SUPPLY SIDE: MISC. BTUH GAIN - RETURN SIDE: COMBINED FAN,MOTOR EFFICIENCY ( %): STATIC PRESS. ACROSS FAN (IN.WG): SUMMER SUPPLY DUCT TEMP. RISE (DEG SUMMER RETURN DUCT TEMP. RISE (DEG WINTER SUPPLY DUCT TEMP. DROP (DEG WINTER RETURN DUCT TEMP. DROP (DEG CHILLED WATER TEMP.DIFFERENCE (DEG HOT WATER TEMP.DIFFERENCE (DEG COOLING VENTILATION METHOD: COOLING VENTILATION VALUE: COOLING INFILTRATION METHOD: COOLING INFILTRATION VALUE: HEATING VENTILATION METHOD: HEATING VENTILATION VALUE: HEATING INFILTRATION METHOD: HEATING INFILTRATION VALUE: VENTILATION IS 100% OF SUPPLY AIR: PRETREATED OUTSIDE AIR: IGNORE PRETREATED LOAD: PRETREATED AIR SUMMER DB TEMP (DEG PRETREATED AIR SUMMER WB TEMP (DEG PRETREATED AIR WINTER DB TEMP (DEG . F) : .F) ▪ F) : .F) . F) • F) : . F) : . F . F . DESIGN OUTDOOR OUTDOOR INDOOR MONTH DRY BULB WET BULB REL.HUM JANUARY MARCH JULY WINTER PROGRAM BY ELITE Sc,.. TWARE DEVELOPMENT INC * * * SEATTLE, WA 98134 09/21/99 PAGE 4 HANDLER INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * ** 2nd Floor VARIABLE AIR VOLUME SUM PEAK ZONE CFMS DRAW -THRU BOTH HEATING AND COOLING LOADS RESERVE CAPACITY 1 1 1 1 NO 95 55 0 0 0 60 3 .0 0 0 C ITY IV:LA 0.000 0.000 MAY 1 0 7000 0.000 0.000 pP i•10 i ti 0.000 0.000 2 20.000 CFM PER PERSON 0 0.000 2 20.000 CFM PER PERSON 1 1.500 AIR CHANGES PER HOUR NO NO NO 0 0 0 INDOOR GRAINS IN /OUTDOOR DRY BULB DIFF. CORRECTION 54 48 50% 72 -18.42 -36 61 49 50% 72 -26.03 -29 85 67 50V 72 11.95 -5 17 0 50% 70 0.00 1§ ,rte * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SL.rWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 5 * * * * * * * * * * * * * * * * * * * * * * * * ** AIR HANDLER INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * ** AIR HANDLER # 3 INPUT DATA: AIR HANDLER DESCRIPTION: TERMINAL TYPE: METHOD FOR CV: SUPPLY FAN TYPE: CALCULATIONS PERFORMED: EXCESS SUPPLY AIR: NUMBER OF TIMES SYSTEM OCCURS: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: EXHAUST CAN EXCEED SUPPLY AIR: LEAVING HEATING COIL TEMP. (DEG.F): DRY BULB TEMPERATURE (DEG.F): COOLING COIL CFM: MISC. BTUH GAIN - SUPPLY SIDE: MISC. BTUH GAIN — RETURN SIDE: COMBINED FAN,MOTOR EFFICIENCY ( %): STATIC PRESS. ACROSS FAN (IN.WG): SUMMER SUPPLY DUCT TEMP. RISE (DEG.F): SUMMER RETURN DUCT TEMP. RISE (DEG.F): WINTER SUPPLY DUCT TEMP. DROP (DEG.F): WINTER RETURN DUCT TEMP. DROP (DEG.F): CHILLED WATER TEMP.DIFFERENCE (DEG.F): HOT WATER TEMP.DIFFERENCE (DEG.F): COOLING VENTILATION METHOD: COOLING VENTILATION VALUE: COOLING INFILTRATION METHOD: COOLING INFILTRATION VALUE: HEATING VENTILATION METHOD: HEATING VENTILATION VALUE: HEATING INFILTRATION METHOD: HEATING INFILTRATION VALUE: VENTILATION IS 1005 OF SUPPLY AIR: PRETREATED OUTSIDE AIR: IGNORE PRETREATED LOAD: PRETREATED AIR SUMMER DB TEMP (DEG.F): PRETREATED AIR SUMMER WB TEMP (DEG.F): PRETREATED AIR WINTER DB TEMP (DEG.F): DESIGN OUTDOOR OUTDOOR INDOOR MONTH DRY BULB WET BULB REL.HUM JANUARY MARCH JULY WINTER WEST LOBBY VARIABLE AIR VOLUME SUM PEAK ZONE CFMS DRAW —THRU BOTH HEATING AND COOLING LOADS RESERVE CAPACITY 1 1 1 1 NO 95 55 0 0 MEW 4.000 C c F 11008 LA 0.000 0.000 kv 1 0 2000 0.000 0.000 , I liM„ ,;stet" 0.000 0.000 2 20.000 CFM PER PERSON 0 0.000 2 20.000 CFM PER PERSON 1 3.000 AIR CHANGES PER HOUR NO NO NO 0 0 0 INDOOR GRAINS IN /OUTDOOR DRY BULB RIFF. CORRECTION 54 48 50% 75 -24.73 -39 61 49 50% 75 -32.33 -32 85 67 50% 75 5.64 -8 1.7 0 50% 70 0.00 * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SL..rWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 6 * * * * * * * * * * * * * * * * * * * * * * * * ** AIR HANDLER INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * ** AIR HANDLER ## 4 INPUT DATA: AIR HANDLER DESCRIPTION: TERMINAL TYPE: METHOD FOR CV: SUPPLY FAN TYPE: CALCULATIONS PERFORMED: EXCESS SUPPLY AIR: NUMBER OF TIMES SYSTEM OCCURS: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: EXHAUST CAN EXCEED SUPPLY AIR: LEAVING HEATING COIL TEMP. ( DEG.F): DRY BULB TEMPERATURE ( DEG.F): COOLING COIL CFM: MISC. BTUH GAIN - SUPPLY SIDE: MISC. BTUH GAIN - RETURN SIDE: COMBINED FAN,MOTOR EFFICIENCY ( %): STATIC PRESS. ACROSS FAN (IN.WG): SUMMER SUPPLY DUCT TEMP. RISE ( DEG.F): SUMMER RETURN DUCT TEMP. RISE ( DEG.F): WINTER SUPPLY DUCT TEMP. DROP ( DEG.F): WINTER RETURN DUCT TEMP. DROP ( DEG.F): CHILLED WATER TEMP.DIFFERENCE ( DEG.F): HOT WATER TEMP.DIFFERENCE ( DEG.F): COOLING VENTILATION METHOD: COOLING VENTILATION VALUE: COOLING INFILTRATION METHOD: COOLING INFIL'T'RATION VALUE: HEATING VENTILATION METHOD: HEATING VENTILATION VALUE: HEATING INFILTRATION METHOD: HEATING INFILTRATION VALUE: VENTILATION IS 100% OF SUPPLY AIR: PRETREATED OUTSIDE AIR: IGNORE PRETREATED LOAD: PRETREATED AIR SUMMER DB TEMP (DEG.F): PRETREATED AIR SUMMER WB TEMP ( DEG.F): PRETREATED AIR WINTER DB TEMP (DEG.F): DESIGN OUTDOOR OUTDOOR INDOOR MONTH DRY BULB WET BULB REL.HUM JANUARY MARCH JULY WINTER 2ND OFC CONSTANT VOLUME SUM PEAK ZONE CFMS DRAW -THRU BOTH HEATING AND COOLING LOADS RESERVE CAPACITY 1 1 1 1 NO 95 55 0 0 0 60 4.000 0.000 0.000 0.000 0.000 0.000 0.000 2 20.000 CFM PER PERSON 0 0.000 2 20.000 CFM PER PERSON 1 1.500 AIR CHANGES PER HOUR NO NO NO 0 0 0 INDOOR GRAINS IN /OUTDOOR DRY BULB DIFF. CORRECTION 54 48 503r 75 -24.73 -39 61 49 50% 75 -32.33 -32 85 67 5035 75 5.64 -8 17 0 503; 70 0.00 * ** FULL COMMERCIAL HVAC LOADS PACE CONSULTING GROUP ZAMA * * * * * * * * * * * * * * * * * * * * * * * * ** AIR AIR HANDLER # 5 INPUT DATA: AIR HANDLER DESCRIPTION: TERMINAL TYPE: METHOD FOR CV: SUPPLY FAN TYPE: CALCULATIONS PERFORMED: EXCESS SUPPLY AIR: NUMBER OF TIMES SYSTEM OCCURS: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: EXHAUST CAN EXCEED SUPPLY AIR: LEAVING HEATING COIL TEMP. ( DEG.F): DRY BULB TEMPERATURE (DEG.F): COOLING COIL CFM: MISC. BTUH GAIN • SUPPLY SIDE: MISC. BTUH GAIN - RETURN SIDE: COMBINED FAN,MOTOR EFFICIENCY ( %): STATIC PRESS. ACROSS FAN (IN.WG): SUMMER SUPPLY DUCT TEMP. RISE ( DEG.F): SUMMER RETURN DUCT TEMP. RISE (DEG.F): WINTER SUPPLY DUCT TEMP. DROP ( DEG.F): WINTER RETURN DUCT TEMP. DROP (DEG.F): CHILLED WATER TEMP.DIFFERENCE ( DEG.F): HOT WATER TEMP.DIFFERENCE (DEG.F): COOLING VENTILATION METHOD: COOLING VENTILATION VALUE: COOLING INFILTRATION METHOD: COOLING INFILTRATION VALUE: HEATING VENTILATION METHOD: HEATING VENTILATION VALUE: HEATING INFILTRATION METHOD: HEATING INFILTRATION VALUE: VENTILATION IS 100' OF SUPPLY AIR: PRETREATED OUTSIDE AIR: IGNORE PRETREATED LOAD: PRETREATED AIR SUMMER DB TEMP (DEG.F): PRETREATED AIR SUMMER WB TEMP ( DEG.F): PRETREATED AIR WINTER DB TEMP ( DEG.F): DESIGN OUTDOOR OUTDOOR INDOOR MONTH DRY BULB WET BULB REL.HUM JANUARY MARCH JULY WINTER PROGRAM BY ELITE Sc,_rWARE DEVELOPMENT INC * ** SEATTLE, WA 98134 09/21/99 PAGE 7 HANDLER INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * ** 2ND TEMP CONSTANT VOLUME SUM PEAK ZONE CFMS DRAW —THRU BOTH HEATING AND COOLING LOADS RESERVE CAPACITY 1 1 1 1 NO 95 S5 0 0 0 60 4.000 0.000 0.000 0.000 0.000 0.000 0.000 2 20.000 CFM PER PERSON 0 0.000 2 20.000 CFM PER PERSON 1 1.500 AIR CHANGES PER NO NO NO 0 0 0 HOUR INDOOR GRAINS IN /OUTDOOR DRY BULB DIFF. CORRECTION 54 48 50% 75 -24.73 -39 61 49 50% 75 -32.33 -32 85 67 50% 75 5.64 -8 17 0 50% 70 0.00 * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SC.rWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 8 * * * * * * * * * * * * * * * * * * * * * * * * ** AIR HANDLER INPUT DATA * * * * * * * * * * * * * * * * * * * * * * * * ** AIR HANDLER # 6 INPUT DATA: AIR HANDLER DESCRIPTION: TERMINAL TYPE: METHOD FOR CV: SUPPLY FAN TYPE: CALCULATIONS PERFORMED: EXCESS SUPPLY AIR: NUMBER OF TIMES SYSTEM OCCURS: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: EXHAUST CAN EXCEED SUPPLY AIR: LEAVING HEATING COIL TEMP. (DEG.F): DRY BULB TEMPERATURE ( DEG.F): COOLING COIL CFM: MISC. BTUH GAIN - SUPPLY SIDE: MISC. BTUH GAIN - RETURN SIDE: COMBINED FAN,MOTOR EFFICIENCY ( %): STATIC PRESS. ACROSS FAN (IN.WG): SUMMER SUPPLY DUCT TEMP. RISE ( DEG.F): SUMMER RETURN DUCT TEMP. RISE ( DEG.F): WINTER SUPPLY DUCT TEMP. DROP ( DEG.F): WINTER RETURN DUCT TEMP. DROP ( DEG.F): CHILLED WATER TEMP.DIFFERENCE ( DEG.F): HOT WATER TEMP.DIFFERENCE ( DEG.F): COOLING VENTILATION METHOD: COOLING VENTILATION VALUE: COOLING INFILTRATION METHOD: COOLING INFILTRATION VALUE: HEATING VENTILATION METHOD: HEATING VENTILATION VALUE: HEATING INFILTRATION METHOD: HEATING INFILTRATION VALUE: VENTILATION IS 100% OF SUPPLY AIR: PRETREATED OUTSIDE AIR: IGNORE PRETREATED LOAD: PRETREATED AIR SUMMER DB TEMP ( DEG.F): PRETREATED AIR SUMMER WB TEMP ( DEG.F): PRETREATED AIR WINTER DB TEMP ( DEG.F): DESIGN OUTDOOR OUTDOOR INDOOR MONTH DRY BULB WET BULB REI, ,HUM JANUARY MARCH JULY WINTER NOC ROOM VARIABLE AIR VOLUME SUM PEAK ZONE CFMS DRAW -THRU BOTH HEATING AND COOLING LOADS RESERVE CAPACITY 1 1 1 NO 95 55 0 0 0 60 3.000 0.000 0.000 0.000 0.000 0.000 0.000 2 20.000 CFM PER PERSON 0 0.000 2 20.000 CFM PER PERSON 3. 1.500 AIR CHANGES PER HOUR NO NO NO 0 0 0 CRY OF IICWI MAY 1 p?tOO PERM« ceH'turi INDOOR GRAINS IN /OUTDOOR DRY BULB DIFF. CORRECTION 54 48 50% 72 -18.42 -36 61 49 50% 72 -26.03 -29 85 67 50% 72 11.95 -5 17 0 50t 70 0,00 1§ * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SC..£WARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 9 * * * * * * * * * * * * * * * * ** AIR SYSTEM # 1 (1st Floor) ZONE SUMMARY * * * * * * * * * * * * * * * ** ZN. ZONE - DESCRIPTION FLOOR HTG.LOSS NO. PEAK TIME & MONTH AREA O.A. CFM 1ST interior 6886 17,518 8 PM JULY 280 1 2 S.P. 800 2 PM JULY 3 E.P. 3040 10 AM JULY 4 N.P. 800 6 PM JULY 5 Elev. Lobby/ Corr. 660 8 PM JULY 6 W.P. UPS 4108 5 PM JULY ZONE PEAK TOTALS 16,294 TOTAL ZONES: 6 28,166 40 103,374 120 28,166 40 1,679 0 123,302 160 302,205 640 SEN.GAIN O.A. CFM 1,229,821 280 148,839 40 565,007 120 145, 973 40 3,626 0 54,765 160 2,148,031 640 LAT.GAIN HTG.CFM EXH. CFM CFM /SF. 2,940 651 d 0.09 420 1,047 0 1.31 1,260 3,842 0 1.26 420 1,047 0 1.31 0 62 0 0.09 1,680 4,583 0 1.12 6,720 11,232 0 0.69 CLG.CFM CFM /SF. 73,882 10.73 8,942 11.18 33,943 11.17 8,769 10.96 218 0.33 3,290 0.80 129,044 7.92 * ** FULL COMMERCIAL HVAL: LOADS PROGRAM BY ELITE SC MARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 10 * * * * * * * * * * * * ** AIR SYSTEM # 1 (1st Floor) TOTAL LOAD SUMMARY * * * * * * * * * * * * * ** AIR HANDLER DESC: 1st Floor WITH VAV TERMINALS SUPPLY AIR FAN: DRAW -THRU WITH PROGRAM ESTIMATED HORS FAN INPUT: 60% COMBINED FAN AND MOTOR EFF. WITH 3.00 SENSIBLE HEAT RATIO: 1.00 THIS SYSTEM OCCURS 1 AIR SYSTEM PEAK TIME: S PM IN JULY OUTDOOR CONDITIONS: 83 DB, 67 WB, 73.73 GRAINS SUMMER: VENT CONTROLS OUTSIDE AIR ZONE SPACE INFILTRATION OUTSIDE AIR SUPPLY DUCT RETURN DUCT TOTAL SYSTEM SEN.LOSS: SEN.LOSS: SEN.LOSS: SEN.LOSS: SEN.LOSS: SEN.LOSS: ZONE SPACE LAT.GAIN: INFILTRATION LAT.GAIN: OUTSIDE AIR LAT.GAIN: TOTAL LAT.GAIN ON AIR HANDLING AY 107,601 BTUH 194,604 BTUH 36,508 BTUH 0 BTUH 0 BTUH SUPPLY AIR:302,205 / (0.997 X 1.08 X 25) 0 WINTER VENT OUTSIDE AIR (5.69' OF SUPPLY): ZONE SPACE SEN.GAIN: 2,135,411 BTUH INFILTRATION SEN.GAIN: 0 BTUH DRAW -THRU FAN SEN.GAIN: 255,237 BTUH SUPPLY DUCT SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON SUPPLY SIDE OF COIL: SUPPLY: 2,390,648 / (0.997 X 1.10 X 17) 0 SUMMER VENT OUTSIDE AIR (0.49% OF SUPPLY): RETURN DUCT SEN.GAIN: 0 BTUH RETURN PLENUM SEN.GAIN: 0 BTUH OUTSIDE AIR SEN.GAIN: 7,716 BTUH BLOW -THRU FAN SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON RETURN SIDE OF COIL: TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: 6,720 0 6,579 SYSTEM: TOTAL SYSTEM SENSIBLE AND LATENT GAIN: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: WINTER: BTUH BTUH BTUH ( EPOWER OF100.88 HP. IN WATER ACROSS THE FAN TIME(S) IN THE BUILDING INSIDE: 72 DB, 50t RH VENT CONTROLS OUTSIDE AIR 2,843 CFM) 640 CFM) 11,232 CFM) 640 CFM) 0 CFM 338,713 BTUH 2,390,648 BTUH 128,286 CFM) R � TOWAA 640 CFM m 0 7000 T AE 640 CFM) ' ' 0 CFM) 640 CFM) 7,716 BTUH 2,398,364 BTUH 13,299 BTUH 2,411,663 BTUH 200.97 TONS ig * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SL.!'WARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 11 * * * * * * * * * * ** AIR SYSTEM # 1 (1st Floor) PSYCHROMETRIC ANALYSIS * * * * * * * * * * * ** SYSTEM LOAD ANALYSIS LEAVING COIL CONDITION DRAW -THRU FAN MISC LOAD ON SUPPLY SIDE SUPPLY AIR DUCT ZONE LOADS ZONE CONDITION RETURN AIR DUCT RETURN AIR PLENUM MISC LOAD ON RETURN SIDE VENT AIR 640 CFM BLOW -THRU FAN ENTERING COIL CONDITION 13,299 58.629 2,398,364 72.055 128,286 GENERAL PSYCHROMETRIC EQUATIONS USED IN ANALYSIS: PR a TSH • TLH • GTH (BAROMETRIC PR X 1.10 X PR X 0.68 X PR X 4.50 X SUM . GTH • 0.997 X 4.50 X TOTAL SYSTEM LOAD LATENT GRAINS SENSIBLE TEMP CFM 58.476 55.000 255,237 1.815 0 0.000 0 0.000 6,720 0.077 2,135,411 15.185 6,720 58.553 2,390,648 72.000 0 0.000 0 0.000 0 0.000 6,579 0.076 7,716 0.055 0 0.000 PRESSURE OF SITE / STANDARD ASHRAE PRESSURE OF 29.921) CFM X (DB.ENTERING - DB.LEAVING) CFM X (GRAINS.ENTERING - GRAINS.LEAVING) CFM X (ENTHALPY.ENTERINO - ENTHALPY.LEAVING) 13,696 0 0 114,590 128,286 TSH • 0.997 X 1.10 X 128,286 X ( 72.055 - 55.000 ) • 2,398,365 BTUH TLH • 0.997 X 0.68 X 128,286 X ( 58.629 - 58.476 ) . 13,303 BTUH ENTERING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE: WET BULB TEMPERATURE: RELATIVE HUMIDITY (%) : ENTHALPY: 26.45 72.05 60.10 49.96 BTU /LBM LEAVING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE: WET BULB TEMPERATURE: RELATIVE HUMIDITY('): ENTHALPY: 22.27 128,286 X ( 26.449 - 22.269 ) i 55.00 53.44 90.64 BTU /LBM ENTERING HEATING COIL CONDITIONS: DRY BULB TEMPERATURE: 66.98 LEAVING HEATING COIL DRY BULB TEMPERATURE: seceLtveli er r( oF tsft is " (1" PERMo Ct TkR 2,411,667 BTUH 2,404,897 BTUH 2;411,663 BTUH CONDITIONS: 95,00 * ** FULL COMMERCIAL HVAu LOADS PROGRAM BY ELITE SL.rWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 12 * * * * * * * * * * * * * * * * ** AIR SYSTEM # 2 (2nd Floor) ZONE SUMMARY * * * * * * * * * * * * * * * ** ZN. ZONE - DESCRIPTION FLOOR NO. PEAK TIME & MONTH AREA 10 2nd-N1 516 6 PM JULY 11 2nd -E1 108 10 AM JULY 12 2ND -N2 300 6 PM JULY 13 2ND -E2 768 10 AM JULY 14 2ND -W 1476 5 PM JULY 15 2ND -INT 4494 8 PM JULY ZONE PEAK TOTALS 7,662 TOTAL ZONES: 6 HTG.LOSS O.A. CFM 17,866 20 4,132 20 10,296 20 25,758 40 47,788 60 0 180 105,840 340 SEN.GAIN O.A. CFM 93,943 20 20,929 20 54,693 20 143,736 40 279,707 60 798,126 180 1,391,134 340 LAT.GAIN HTG.CFM EXH. CFM CFM /SF. 210 664 0 1.29 210 154 0 1.43 210 383 0 1.28 420 957 0 1.25 630 1,776 0 1.20 1,890 0 0 0.00 3,570 3,934 0 0.51 OnY OFTWQ141 A \v 1 0 2000 PrRM%1 GENTkk CLG.CFM C'M /SF . 5, 644 10.94 1,257 11.64 3,286 10.95 8,635 11.24 16,804 11.38 47, 948 10.67 83,574 10.91 * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SLLIWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 13 * * * * * * * * * * * * ** AIR SYSTEM # 2 (2nd Floor) TOTAL LOAD SUMMARY * * * * * * * * * * * * * ** AIR HANDLER DESC: 2nd Floor WITH VAV TERMINALS SUPPLY AIR FAN: DRAW -THRU WITH PROGRAM ESTIMATED HORSEPOWER OF 65.51 HP. FAN INPUT: 60% COMBINED FAN AND MOTOR EFF. WITH 3.00 IN WATER ACROSS THE FAN SENSIBLE HEAT RATIO: 1.00 THIS SYSTEM OCCURS 1 TIME(S) IN THE BUILDING AIR SYSTEM PEAK TIME 5 PM IN any OUTDOOR CONDITIONS: 83 DB, 67 WB, 73.73 GRAINS INSIDE: 72 DB, 50% RH SUMMER: VENT CONTROLS OUTSIDE AIR WINTER: VENT CONTROLS OUTSIDE AIR ZONE SPACE SEN.LOSS: INFILTRATION SEN.LOSS: OUTSIDE AIR SEN.LOSS: SUPPLY DUCT SEN.LOSS: RETURN DUCT SEN.LOSS: TOTAL SYSTEM SEN.LOSS: SUPPLY AIR:105,840 / (0.997 X 1.08 X 25) m WINTER VENT OUTSIDE AIR (8.64% OF SUPPLY): ZONE SPACE SEN INFILTRATION SEN DRAW -THRU FAN SEN SUPPLY DUCT SEN TOTAL SEN.GAIN ON SUPPLY: 1,552,357 / (0.997 X 1.10 X 17) * ( SUMMER VENT OUTSIDE AIR (0.40% OF SUPPLY): RETURN DUCT SEN.GAIN: 0 BTUH RETURN PLENUM SEN.GAIN: 0 BTUH OUTSIDE AIR SEN.GAIN: 4,098 BTUH BLOW -THRU FAN SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON RETURN SIDE OF COIL: TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: ZONE SPACE LAT.GAIN: INFILTRATION LAT.GAIN: OUTSIDE AIR LAT.GAIN: TOTAL LAT.GAIN ON AIR HANDLING .GAIN: 1,386,620 BTUH .GAIN: 0 BTUH .GAIN: 165,737 BTUH .GAIN: 0 BTUH SUPPLY SIDE OF COIL: TOTAL SYSTEM SENSIBLE AND LATENT GAIN: 35,267 BTUH 70,573 BTUH 19,396 BTUH 0 BTUH 0 BTUH 3,570 BTUH 0 BTUH ( 3,496 BTUH SYSTEM: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: 1,031 CFM) 340 CFM) 3,934 CFM) 340 CFM) 0 CFM) 83,302 CFM) 340 CFM) 340 CFM) 0 CFM) 340 CFM) r k��15Qfto: P c m( O t 4 1 Q .Jti esmo tj e .i t=' 125,236 BTUH 1,552,357 BTUH 4,098 BTUH 1,556,455 BTUH 7,066 BTUH 1,563,521 BTUH 130.29 TONS * ** FULL COMMERCIAL HVAu LOADS PROGRAM BY ELITE SG,rWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 14 * * * * * * * * * * ** AIR SYSTEM # 2 (2nd Floor) PSYCHROMETRIC ANALYSIS * * * * * * * * * * * ** SYSTEM LOAD ANALYSIS LEAVING COIL CONDITION DRAW -THRU FAN MISC LOAD ON SUPPLY SIDE SUPPLY AIR DUCT ZONE LOADS ZONE CONDITION RETURN AIR DUCT RETURN AIR PLENUM MISC LOAD ON RETURN SIDE VENT AIR 340 CFM BLOW -THRU FAN ENTERING COIL CONDITION GENERAL PSYCHROMETRIC EQUATIONS USED IN ANALYSIS: PR a TSH TLH s GTH - (BAROMETRIC PR X 1.10 X PR X 0.68 X PR X 4.50 X TSH 0 0.997 X 1.10 X 83,302 X ( 72.045 - 55.000 ) 0 1,556,456 BTUH TLH r 0.997 X 0.68 X 83,302 X ( 58.617 - 58.491 ) 6 7,067 BTUH SUM GTH i 0.997 X 4.50 X TOTAL SYSTEM LOAD ENTERING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE: WET BULB TEMPERATURE: RELATIVE HUMIDITY (%) : ENTHALPY: 26.44 LEAVING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE; WET BULB TEMPERATURE: RELATIVE HUMIDITY('): ENTHALPY: 22.27 LATENT GRAINS SENSIBLE TEMP CFM 58.491 55.000 165,737 1.815 0 0.000 0 0.000 3,570 0.063 1,386,620 15.185 3,570 58.555 1,552,357 72.000 0 0.000 0 0.000 0 0.000 3,496 0.062 4,098 0.045 0 0.000 7,066 58.617 1,556,455 72.045 83,302 PRESSURE OF SITE / STANDARD ASHRAE PRESSURE OF 29.921) CFM X (DB.ENTERING - DB.LEAVING) CFM X (GRAINS.ENTERING - GRAINS.LEAVING) CFM X (ENTHALPY.ENTERING - ENTHALPY.LEAVING) 83,302 X ( 26.445 - 22.271 ) a 72.04 60.10 49.97 BTU /LBM 55.00 53.45 90.71 BTU /LBM 8,893 0 0 74,409 83,302 1,563,523 BTUH 1,559,083 BTUH 1,563,521 BTUH ENTERING HEATING COIL CONDITIONS: DRY BULB TEMPERATURE: 65.42 LEAVING HEATING COIL CONDITIONS: DRY BULB TEMPERATURE: 95.00 * ** FULL COMMERCIAL HVAC LOADS PACE CONSULTING GROUP ZAMA * * * * * * * * * * * * * * * ** AIR SYSTEM # ZN. ZONE — DESCRIPTION NO. PEAK TIME & MONTH 16 2ND LOBBY 5 PM JULY 17 2ND INT LOB 8 PM JULY 18 3RD INT LOB 8 PM JULY 19 2ND INT VEST 128 8 PM JULY 1,148 ZONE PEAK TOTALS TOTAL ZONES: 4 PROGRAM BY ELITE SLR 'WARE DEVELOPMENT INC * * * SEATTLE, WA 98134 09/21/99 PAGE 15 3 (WEST LOBBY) ZONE SUMMARY * * * * * * * * * * * * * * * ** FLOOR HTG.LOSS SEN.GAIN LAT.GAIN AREA O.A. CFM O.A. CFM EXH. CFM 580 220 220 65,743 240 65,743 500 36,335 240 0 2,365 100 100 0 2,365 100 100 0 1,403 60 60 42,468 500 HTG.CFM CFM /SF. 2,520 2,443 0 4.21 1,050 0 0 0.00 1,050 0 0 0.00 630 0 0 0.00 5,250 2,443 0 2.13 CLG.CFM CFM /SF. 1,885 3.25 123 0.56 123 0.56 73 0.57 2,204 1.92 * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SGi£WARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 16 * * * * * * * * * * * * ** AIR SYSTEM # 3 (WEST LOBBY) TOTAL LOAD SUMMARY * * * * * * * * * * * * ** AIR HANDLER DESC: WEST LOBBY WITH VAV TERMINALS SUPPLY AIR FAN: DRAW -THRU WITH PROGRAM ESTIMATED HORSEPOWER OF 2.31 HP. FAN INPUT: 60% COMBINED FAN AND MOTOR EFF. WITH 4.00 IN WATER ACROSS THE FAN SENSIBLE HEAT RATIO: 0.90 THIS SYSTEM OCCURS 1 TIME(S) IN THE BUILDING AIR SYSTEM PEAK TIME: 5 PM IN JULY OUTDOOR CONDITIONS: 83 DB, 67 WB, 73.73 GRAINS INSIDE: 75 DB, 50* RH SUMMER: VENT CONTROLS OUTSIDE AIR WINTER: VENT CONTROLS OUTSIDE AIR ZONE SPACE SEN.LOSS: INFILTRATION SEN.LOSS: OUTSIDE AIR SEN.LOSS: SUPPLY DUCT SEN.LOSS: RETURN DUCT SEN.LOSS: TOTAL SYSTEM SEN.LOSS: SUPPLY AIR: 65,743 / (0.997 X 1.08 X 25) m ( WINTER VENT OUTSIDE AIR (20.5% OF SUPPLY): ZONE SPACE SEN.GAIN: 42,468 BTUH INFILTRATION SEN.GAIN: 0 BTUH DRAW -THRU FAN SEN.GAIN: 5,846 BTUH SUPPLY DUCT SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON SUPPLY SIDE OF COIL: SUPPLY AIR: 48,314 / (0.997 X 1.10 X 20) is SUMMER VENT OUTSIDE AIR (22.7% OF SUPPLY): RETURN DUCT SEN.GAIN: 0 BTUH RETURN PLENUM SEN.GAIN: 0 BTUH OUTSIDE AIR SEN.GAIN: 4,385 STUN ( BLOW -THRU FAN SEW. GAIN : 0 BTUH TOTAL SEN.GAIN ON RETURN SIDE OF COIL: TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: ZONE SPACE LAT.GAIN: INFILTRATION LAT.GAIN: OUTSIDE AIR LAT.GAIN: TOTAL LAT.GAIN ON AIR HANDLING TOTAL SYSTEM SENSIBLE AND LATENT GAIN: 14,132 BTUH 51,611 BTUH 28,521 BTUH 0 BTUH 0 BTUH 5,250 BTUH 0 BTUH 3,004 BTUH SYSTEM: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: 754 CFM) 500 CFM) 2,443 CFM) 500 CFM) 0 CFM) 0 CFM) 500 CFM) 94,264 BTUH 48,314 BTUH 2,204 CFM) gpIVtA 500 CFM) Or �F E VAILA, MAY 102XI 500 CFM) pEa ii CENTt 4,385 BTUH 52,699 BTUH 8,254 BTUH 60,953 BTUH 5.08 TONS * ** FULL COMMERCIAL HVAL LOADS PROGRAM BY ELITE SL..rWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 17 * * * * * * * * * * ** AIR SYSTEM # 3 (WEST LOBBY) PSYCHROMETRIC ANALYSIS * * * * * * * * * * ** SYSTEM LOAD ANALYSIS LATENT GRAINS SENSIBLE TEMP LEAVING COIL CONDITION DRAW - THRU FAN MISC LOAD ON SUPPLY SIDE SUPPLY AIR DUCT ZONE LOADS ZONE CONDITION RETURN AIR DUCT RETURN AIR PLENUM MISC LOAD ON RETURN SIDE VENT AIR 500 CFM BLOW -THRU FAN ENTERING COIL CONDITION GENERAL PSYCHROMETRIC EQUATIONS USED IN ANALYSIS: PR = TSH = TLH 0TH (BAROMETRIC PR X 1.10 X PR X 0.68 X PR X 4.50 X TSH = 0.997 X 1.10 X TLH = 0.997 X 0.68 X SUM = 0TH = 0.997 X 4.50 X TOTAL SYSTEM LOAD ENTERING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE: WET BULB TEMPERATURE: RELATIVE HUMIDITY (%) : ENTHALPY: 28.90 DRY BULB TEMPERATURE: WET BULB TEMPERATURE;: RELATIVE HUMIDITY( %): ENTHALPY: 22.72 2,204 X ( 76.815 2,204 X ( 66.880 76.82 63.58 48.51 BTU /LBM LEAVING COOLING COIL CONDITIONS: 55.00 54.18 95.06 BTU /LBM 61.353 5,250 3.516 5,250 64.869 3,004 2.011 a 55.000 ) 61.353 ) 55.000 5,846 2.420 0 0.000 0 0.000 42,468 17.580 48,314 0 0 0 4,385 0 8,254 66.880 52,699 76.815 2,204 PRESSURE OF SITE / STANDARD ASHRAE PRESSURE OF 29.921) CFM X (DB.ENTERING - DB.LEAVING) CFM X (GRAINS.ENTERING - GRAINS.LEAVING) CFM X (ENTHALPY.ENTERING - ENTHALPY.LEAVING) 2,204 X ( 28.900 - 22.715 ) _ 75.000 0.000 0.000 0.000 1.815 0.000 DRY BULB TEMPERATURE: O ► W► .A PERMPI c.i CFM 267 0 0 1, 937 2,204 52,698 BTUH 8,253 BTUH 60,951 BTUH 61,125 BTUH 60,953 BTUH ENTERING HEATING COIL CONDITIONS: DRY BULB TEMPERATURE: 59.15 LEAVING HEATING COIL CONDITIONS: 95.00 * ** FULL COMMERCIAL HVAL LOADS PROGRAM BY ELITE SL.rWARE PACE CONSULTING GROUP ZAMA 09/21/99 * * * * * * * * * * * * * * * * ** AIR SYSTEM # 4 (2ND OFC) ZONE SUMMARY ZN. ZONE - DESCRIPTION FLOOR HTG.LOSS SEN.GAIN LAT.GAIN NO. PEAK TIME & MONTH AREA O.A. CFM O.A. CFM EXH. CFM 20 RECPT 5 PM JULY 21 BREAK 5 PM JULY 22 WAR ROOM 285 17,568 5 PM JULY 200 23 OFC 2 PM JANUARY 24 OFC 2 PM JANUARY 25 CONF 39 OFC 5 PM JULY ZONE PEAK TOTALS TOTAL ZONES: 8 300 9,403 360 240 9,324 160 156 5,839 22 156 7,013 22 400 8 PM JULY 480 27 CORRIDOR 138 0 8 PM JULY 20 180 6,502 26 1,855 55,649 1,290 9,529 1,260 360 0 11,825 1,680 160 0 15,271 2,100 200 0 0 7,901 2,940 480 0 893 207 64,871 8,925 1,290 0 DEVELOPMENT INC * ** SEATTLE, WA 98134 PAGE 18 * * * * * * * * * * * * * *•k * * ** HTG.CFM CFM /SF. 349 1.16 347 1.45 653 2.29 5,456 234 217 22 0 1.39 7,240 234 261 22 0 1.67 0 0.00 0 20 0 0.00 6,756 270 242 26 0 1.34 2,069 1.12 CLG.CFM CFM /SF. 494 1.65 614 2.56 792 2.78 283 1.81 376 2.41 410 1.03 46 0.33 351 1.95 3,366 1.81 g, • * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SLL£WARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 19 * * * * * * * * * * * * * * ** AIR SYSTEM # 4 (2ND OFC) TOTAL LOAD SUMMARY * * * * * * * * * * * * * ** AIR HANDLER DESC: 2ND OFC WITH CV (SUM OF PEAKS) TERMINALS SUPPLY AIR FAN: DRAW -THRU WITH PROGRAM ESTIMATED HORSEPOWER OF 3.53 HP. FAN INPUT: 60% COMBINED FAN AND MOTOR EFF. WITH 4.00 IN WATER ACROSS THE FAN SENSIBLE HEAT RATIO: 0.89 THIS SYSTEM OCCURS 1 TIME(S) IN THE BUILDING AIR SYSTEM PEAK TIME: 5 PM IN JULY OUTDOOR CONDITIONS: 83 DB, 67 WB, 73.73 GRAINS INSIDE: 75 DB, 500 RH SUMMER: VENT CONTROLS OUTSIDE AIR WINTER: VENT CONTROLS OUTSIDE AIR ZONE SPACE SEN.LOSS: INFILTRATION SEN.LOSS: OUTSIDE AIR SEN.LOSS: SUPPLY DUCT SEN.LOSS: RETURN DUCT SEN.LOSS: TOTAL SYSTEM SEN.LOSS: SUPPLY AIR: 55,649 / (0.997 X 1.08 X 25) - ( WINTER VENT OUTSIDE AIR (62.4% OF SUPPLY): ( ZONE SPACE SEN.GAIN: 61,046 BTUH INFILTRATION SEN.GAIN: 0 BTUH ( DRAW -THRU FAN SEN.GAIN: 8,927 BTUH SUPPLY DUCT SEN.GAIN: 0 BTUH RESERVE SEN.GAIN: 3,808 BTUH TOTAL SEN.GAIN ON SUPPLY SIDE OF COIL: SUPPLY AIR: 73,781 / (0.997 X 1.10 X 20) SUMMER VENT OUTSIDE AIR (38.3% OF SUPPLY): RETURN DUCT SEN.GAIN: 0 BTUH RETURN PLENUM SEN.GAIN: 0 BTUH OUTSIDE AIR SEN.GAIN: 11,312 BTUH BLOW -THRU FAN SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON RETURN SIDE OF COIL: TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: ZONE SPACE LAT.GAIN: INFILTRATION LAT.GAIN: OUTSIDE AIR LAT.GAIN: TOTAL LAT.GAIN ON AIR HANDLING TOTAL SYSTEM SENSIBLE AND LATENT GAIN: 22,040 BTUH 33,609 BTUH ( 73,584 BTUH 0 BTUH 0 BTUH 8,925 BTUH 0 BTUH ( 7,747 BTUH SYSTEM: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: 491 CFM) 1,290 CFM) 2,068 CFM) 1,290 CFM) 0 CFM) 73,781 BTUH 3,365 CFM) rt ©EIMIL* 1,290 CFM) MAY 0 2O(IU 1,290 CFM) 0 CFM) 1,290 CFM) 129,233 BTUH nrs:�n' ,EtrrEfi 11,312 BTUH 85,093 BTUH 16,672 BTUH 101,765 BTUH 8.48 TONS 18 * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SU,rWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 20 * * * * * * * * * * * * ** AIR SYSTEM # 4 (2ND OFC) PSYCHROMETRIC ANALYSIS * * * * * * * * * * * ** SYSTEM LOAD ANALYSIS LEAVING COIL CONDITION DRAW -THRU FAN MISC LOAD ON SUPPLY SIDE SUPPLY AIR DUCT ZONE LOADS SENSIBLE RESERVE ZONE CONDITION RETURN AIR DUCT RETURN AIR PLENUM MISC LOAD ON RETURN SIDE VENT AIR 1,290 CFM 7,747 BLOW -THRU FAN ENTERING COIL CONDITION GENERAL PSYCHROMETRIC EQUATIONS USED IN ANALYSIS: PR - TSH - TLH GTH - (BAROMETRIC PR X 1.10 X PR X 0.68 X PR X 4.50 X TSH - 0.997 X 1.10 X TLH - 0.997 X 0.68 X SUM - GTH - 0.997 X 4.50 X TOTAL SYSTEM LOAD ENTERING COOLING COIL, CONDITIONS: DRY BULB TEMPERATURE: WET BULB TEMPERATURE: RELATIVE HUMIDITY (%) : ENTHALPY: 29.42 LEAVING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE: WET BULB TEMPERATURE: RELATIVE HUMIDITY( %): ENTHALPY: 22.65 LATENT GRAINS SENSIBLE TEMP CFM 8,925 60.956 3.914 8,925 64.870 3.397 55.000 8,927 2.420 0 0.000 0 0.000 61,046 16.548 3,808 1.032 3,365 X ( 78.067 - 55.000 ) - 3,365 X ( 68.267 - 60.956 ) - 73,781 75.000 0 0.000 0 0.000 0 0.000 11,312 3.067 0 0.000 16,672 68.267 85,093 78.067 3,365 PRESSURE OF SITE / STANDARD ASHRAE PRESSURE OF 29.921) CFM X (DB.ENTERING - DB.LEAVING) CFM X (GRAINS.ENTERING - GRAINS.LEAVING) CFM X (ENTHALPY.ENTERING - ENTHALPY.LEAVING) 3,365 X ( 29.423 - 22.654 ) - - 78.07 64.29 47.49 BTU /LBM 55.00 54.08 94.47 BTU /LBM 407 0 0 2,784 174 3,365 85,094 BTUH 16,671 BTUH 101,765 BTUH 102,164 BTUH 101,765 STUN ENTERING HEATING COIL CONDITIONS: DRY BULB TEMPERATURE: 36.95 LEAVING HEATING COIL CONDITIONS: DRY BULB TEMPERATURE: RECEIVO CRY OF TUKWIIA MAY 1 0 200t1 ?EMI CENTas 95.00 • * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SLI.rWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 09/21/99 (2ND TEMP) ZAMA * * * * * * * * * * * * * * * * ** AIR SYSTEM # 5 ZN. ZONE - DESCRIPTION FLOOR HTG NO. PEAK TIME & MONTH AREA O.A 28 OFC 2 PM MARCH 29 L OFC 10 AM JULY 30 E ENTRY 10 AM JULY 31 L OFC 1 PM JULY 32 E PERIM 10 AM JULY 33 OPEN INT 8 PM JULY 34 CORRIDOR 8 PM JULY 35 OFC 8 PM JULY 36 OFC 8 PM JULY 37 MAIN CORR 8 PM JULY 38 2ND CORE 8 PM JULY ZONE PEAK TOTALS TOTAL ZONES: 11 144 5,797 5,380 21 21 375 23,698 15,310 54 54 4S 4,826 2,752 6 6 425 23,000 13,190 61 61 1044 41,975 40,285 149 149 2324 0 28,102 332 332 380 0 2,457 54 54 150 0 1,814 21 21 150 0 1,814 21 21 737 0 4,763 105 105 1240 0 5,581 0 0 7,014 99,296 121,448 824 824 ZONE SUMMARY .LOSS SEN.GAIN LAT.GAIN . CFM O.A. CFM EXH. CFM PAGE 21 * * * * * * * * * * * * * * * * ** HTG.CFM CLG.CFM CFM /SF. CFM /SF. 216 215 279 0 1.49 1.94 563 881 794 0 2.35 2.12 67 179 143 0 3.98 3.18 637 855 684 0 2.01 1.61 1,566 1,560 2,090 0 1.49 2.00 3,486 0 1,458 0 0.00 0.63 570 0 127 0 0.00 0.33 225 0 94 0 0.00 0.63 225 0 94 0 0.00 0.63 1,106 0 247 0 0.00 0.34 0 0 290 0 0.00 0.23 8,661 3,690 6,300 0 0.53 0.90 RECEIVED crri OF TUKWILA MM 1 0 2000 PERMIT CENTER * ** FULL COMMERCIAL HVAC LOADS PACE CONSULTING GROUP ZAMA * * * * * * * * * * * * * ** AIR SYSTEM # 5 PROGRAM BY ELITE 09/21/99 (2ND TEMP) TOTAL AIR HANDLER DESC: 2ND TEMP WITH CV (SUM OF PEAKS) TERMINALS SUPPLY AIR FAN: DRAW —THRU WITH PROGRAM ESTIMATED HORSEPOWER OF 6.60 HP. FAN INPUT: 60' COMBINED FAN AND MOTOR EFF. WITH 4.00 IN WATER ACROSS THE FAN SENSIBLE HEAT RATIO: 0.94 THIS SYSTEM OCCURS 1 TIME(S) IN THE BUILDING AIR SYSTEM PEAK TIME: 11 AM IN JULY OUTDOOR CONDITIONS: 76 DB, 65 WB, 75.02 GRAINS BECAUSE OF THE DIVERSITY IN ZONE, PLENUM, AND VENT. PEAK TIME IN JULY AT 10 AM IS DIFFERENT FROM HENCE, THE AIR SYSTEM CFM WAS COMPUTED USING A ZONE SUMMER: VENT CONTROLS OUTSIDE AIR WINTER: ZONE SPACE SEN.LOSS: INFILTRATION SEN.LOSS: OUTSIDE AIR SEN.LOSS: SUPPLY DUCT SEN.LOSS: RETURN DUCT SEN.LOSS: TOTAL SYSTEM SEN.LOSS: ZONE SPACE SEN INFILTRATION SEN DRAW -THRU FAN SEN SUPPLY DUCT SEN RESERVE SEN TOTAL SEN.GAIN ON TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: ZONE SPACE LAT.GAIN: INFILTRATION LAT.GAIN: OUTSIDE AIR LAT.GAIN: TOTAL LAT.GAIN ON AIR HANDLING TOTAL SYSTEM SENSIBLE AND LATENT GAIN: 39,881 BTUH 59,415 BTUH ( 47,002 BTUH ( 0 BTUH 0 BTUH SUPPLY AIR: 99,296 / (0.997 X 1.08 X 25) is WINTER VENT OUTSIDE AIR (22.3% OF SUPPLY): .GAIN: 116,534 BTUH . GAIN: 0 BTUH .GAIN: 16,711 BTUH . GAIN: 0 BTUH . GAIN: 3,253 BTUH SUPPLY SIDE OF COIL: SUPPLY AIR :138,108 / (0.997 X 1.10 X 20) SUMMER VENT OUTSIDE AIR (13.1% OF SUPPLY): RETURN DUCT SEN.GAIN: 0 BTUH RETURN PLENUM SEN.GAIN: 0 BTUH OUTSIDE AIR SEN.GAIN: 903 BTUH BLOW -THRU FAN SEN.GAIN: 0 STUN TOTAL SEN.GAIN ON RETURN SIDE OF COIL: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: 8,661 BTUH 0 BTUH ( 5,666 BTUH SYSTEM: SGL2WARE DEVELOPMENT INC * *k SEATTLE, WA 98134 PAGE 22 LOAD SUMMARY * * * * * * * * * * * * * ** INSIDE: 75 DB, S0% RH LOADS, THE ZONE SENSIBLE THE TOTAL SYS. PEAK TIME SEN. LOAD OF 118,144 VENT CONTROLS OUTSIDE AIR 868 CFM) 824 CFM) 3,690 CFM) 824 CFM) 0 CFM) 6,299 CFM) 824 CFM) 146,298 BTUH 136,498 BTUH CITY OF MAY 1 0 2(100 824 CFM) 0 CFM) 824 CFM) 4 E11Mli CENTER 903 BTUH 137,401 BTUH 14,327 BTUH 151,728 STUN 12.64 TONS * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SGL WARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 23 * * * * * * * * * * * ** AIR SYSTEM # 5 (2ND TEMP) PSYCHROMETRIC ANALYSIS * * * * * * * * * * * ** SYSTEM LOAD ANALYSIS LEAVING COIL CONDITION DRAW -THRU FAN MISC LOAD ON SUPPLY SIDE SUPPLY AIR DUCT ZONE LOADS SENSIBLE RESERVE ZONE CONDITION RETURN AIR DUCT RETURN AIR PLENUM MISC LOAD ON RETURN SIDE VENT AIR 824 CFM 5,666 BLOW -THRU FAN ENTERING COIL CONDITION GENERAL PSYCHROMETRIC EQUATIONS USED IN ANALYSIS: PR • TSH • TLH • GTH (BAROMETRIC PR X 1.10 X PR X 0.68 X PR X 4.50 X TSH • 0.997 X 1.10 X TLH • 0.997 X 0.68 X SUM • GTH • 0.997 X 4.50 X TOTAL SYSTEM LOAD ENTERING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE: WET BULB TEMPERATURE: RELATIVE HUMIDITY( %): ENTHALPY: 28.38 75.13 62.86 50.79 BTU /LBM LEAVING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE: WET BULB TEMPERATURE: RELATIVE HUMIDITY( %): ENTHALPY: 22.95 55.00 54.56 97.34 BTU /LBM LATENT GRAINS SENSIBLE TEMP 8,661 62.839 2.029 8,661 64.868 1.328 55.000 16,711 2.420 0 0.000 0 0.000 118,144 17.109 3,253 0.471 138,108 75.000 0 0.000 0 0.000 0 0.000 903 0.131 0 0.000 14,327 66.195 139,011 75.131 PRESSURE OF SITE / STANDARD ASHRAE PRESSURE OF 29.921) CFM X (DB.ENTERING - DB.LEAVING) CFM X (GRAINS.ENTERING - OJRAINS.LEAVING) CFM X (ENTHALPY.ENTERING ENTHALPY.LEAVING) 6,299 X ( 75.131 - 55.000 ) 6,299 X ( 66.195 - 62.839 ) • 6,299 X ( 28.382 - 22.946 ) - • DRY BULB TEMPERATURE; RECEIVED CITY OF TUKWILA bt� 10 2000 PERMIT CENTER CFM 762 0 0 5,389 148 6,299 6,299 139,011 BTUH 14,329 BTUH 153,340 BTUH 153,577 BTUH 151,728 BTUH ENTERING HEATING COIL CONDITIONS: DRY BULB TEMPERATURE: 58.16 LEAVING HEATING COIL CONDITIONS: 95.00 et * ** FULL COMMERCIAL HVAL LOADS PROGRAM BY ELITE SL,.CWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 24 * * * * * * * * * * * * * * * * ** AIR SYSTEM # 6 (NOC ROOM) ZONE SUMMARY * * * * * * * * * * * * * * * * ** ZN. ZONE - DESCRIPTION FLOOR HTG.LOSS SEN.GAIN LAT.GAIN NO. PEAK TIME & MONTH AREA O.A. CFM O.A. CFM EXH. CFM 26 NOC 340 0 43,973 510 8 PM JULY 49 49 0 ZONE PEAK TOTALS 340 0 43,973 510 TOTAL ZONES: 1 49 49 0 HTG.CFM CFM /SF. 0 0.00 RCCWV40 cnv of YuKWILA 1 0 2000 RLRMI T calk° CLG.CFM CFM /SF. 2,642 7.77 0 2,642 0.00 7.77 * ** FULL COMMERCIAL HV L LOADS PACE CONSULTING GROUP ZAMA * * * * * * * * * * * * * ** AIR SYSTEM # 6 AIR HANDLER DESC: NOC ROOM WITH VAV TERMINALS SUPPLY AIR FAN: DRAW —THRU WITH PROGRAM ESTIMATED HORSEPOWER OF 2.08 HP. FAN INPUT: 60% COMBINED FAN AND MOTOR EFF. WITH 3.00 IN WATER ACROSS THE PAN SENSIBLE HEAT RATIO: 0.99 THIS SYSTEM OCCURS 1 TIME(S) IN THE BUILDING AIR SYSTEM PEAK TIME: 5 PM IN JULY OUTDOOR CONDITIONS: 83 DB, 67 WB, 73.73 GRAINS INSIDE: 72 DB, 505 RH BECAUSE OF THE DIVERSITY IN ZONE, PLENUM, AND VENT. LOADS, THE ZONE SENSIBLE PEAK TIME IN JULY AT 8 PM IS DIFFERENT FROM THE TOTAL SYS. PEAK TIME HENCE, THE AIR SYSTEM CFM WAS COMPUTED USING A ZONE SEN. LOAD OF 43,973 SUMMER: VENT CONTROLS OUTSIDE AIR WINTER: VENT CONTROLS OUTSIDE AIR ZONE SPACE INFILTRATION OUTSIDE AIR SUPPLY DUCT RETURN DUCT TOTAL SYSTEM SEN.LOSS: SEN.LOSS: SEN.LOSS: SEN.LOSS: SEN.LOSS: SEN.LOSS: SUPPLY AIR: 0 / (0.997 X 1.08 X 0) in WINTER VENT OUTSIDE AIR (0.00% OF SUPPLY): ZONE SPACE SEN.GAIN: 43,973 BTUH INFILTRATION SEN.GAIN: 0 BTUH DRAW —THRU FAN SEN.GAIN: 5,256 BTUH SUPPLY DUCT SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON SUPPLY SIDE OF COIL: SUPPLY AIR: 49,229 / (0.997 X 1.10 X 17) E SUMMER VENT OUTSIDE AIR (1.85% OF SUPPLY): RETURN DUCT SEN.CAIN: 0 RETURN PLENUM SEN.GAIN: 0 OUTSIDE AIR SEN.GAIN: 591 BLOW -THRU FAN SEN.GAIN: 0 TOTAL SEN.GAIN ON RETURN SIDE OF COIL: TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: ZONE SPACE LAT.GAIN: 510 INFILTRATION LAT.GAIN: 0 OUTSIDE AIR LAT.GAIN: 504 TOTAL LAT.GAIN ON AIR HANDLING SYSTEM: TOTAL SYSTEM SENSIBLE AND LATENT GAIN: PROGRAM BY ELITE 09/21/99 (NOC ROOM) TOTAL 0 BTUH 0 BTUH ( 2,795 BTUH ( 0 BTUH 0 BTUH TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: ( BTUH BTUH BTUH BTUH BTUH BTUH ( BTUH S(... £WARE DEVELOPMENT INC * * * SEATTLE, WA 98134 PAGE 25 LOAD SUMMARY * * * * * * * * * * * * * * * 0 CFM) 49 CFM) 0 CFM) 49 CFM) 0 CFM) 49 CFM) 0 CFM) 49 CFM) 2,795 BTUH 49,229 BTUH 2,642 CFM) @CEIVBD 49 CFM) OFT TUKVIILA tto! 1020(10 -)F,AMIT GENTER 591 BTUH 49,820 BTUH 1,014 BTUH 50,834 BTUH 4.24 TONS It gt * ** FULL COMMERCIAL HVAt PACE CONSULTING GROUP ZAMA * * * * * * * * * * * ** AIR SYSTEM SYSTEM LOAD ANALYSIS LEAVING COIL CONDITION DRAW -THRU FAN MISC LOAD ON SUPPLY SIDE SUPPLY AIR DUCT ZONE LOADS ZONE CONDITION RETURN AIR DUCT RETURN AIR PLENUM MISC LOAD ON RETURN SIDE VENT AIR 49 CFM BLOW -THRU FAN ENTERING COIL CONDITION GENERAL PSYCHROMETRIC EQUATIONS USED IN ANALYSIS: PR - TSH TLH GTH • (BAROMETRIC PR X 1.10 X PR X 0.68 X PR X 4.50 X TSH - 0.997 X 1.10 X TLH - 0.997 X 0.68 X SUM - GTH - 0.997 X 4.50 X TOTAL SYSTEM LOAD ENTERING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE: 72.20 WET BULB TEMPERATURE: 60.20 RELATIVE HUMIDITY(%): 49.87 ENTHALPY: 26.51 BTU /LBM LEAVING COOLING COIL CONDITIONS: DRY BULB TEMPERATURE: WET BULB TEMPERATURE: RELATIVE HUMIDITY (%) : ENTHALPY: 22.23 LOADS PROGRAM BY ELITE ScLrWARE DEVELOPMENT INC * ** SEATTLE, WA 98134 09/21/99 PAGE 26 # 6 (NOC ROOM) PSYCHROMETRIC ANALYSIS * * * * * * * * * * * ** 55.00 53,:38 90.31 BTU /LBM LATENT GRAINS SENSIBLE TEMP 58.243 510 0.285 510 58.528 504 0.282 2,642 X ( 72.204 2,642 X ( 58.810 55.000 5,256 1.815 0 0.000 0 0.000 43,973 15.185 49,229 0 0 0 591 0 72.000 0.000 0.000 0.000 0.204 0.000 1,014 58.810 49,820 72.204 PRESSURE OF SITE / STANDARD ASHRAE PRESSURE OF 29.921) CFM X (DB.ENTERING - DB.LEAVING) CFM X (GRAINS.ENTERING - GRAINS.LEAVING) CFM X (ENTHALPY.ENTERING - ENTHALPY.LEAVING) ▪ 55.000 ) - 58.243 ) H 6 2,642 X ( 26.514 - 22.233 ) - - ENTERING HEATING COIL DRY BULB TEMPERATURE: LEAVING HEATING COIL DRY BULB TEMPERATURE: CM OF T UKWILA !`) 1 0 MU PERMIT :ENTE , CFM 282 0 0 2,360 2,642 2,642 49,819 BTUH 1,015 BTUH 50,834 BTUH 50,715 BTUH 50,834 BTUH CONDITIONS: 70.00 CONDITIONS: 70.00 4 * ** FULL COMMERCIAL HVAt.: LOADS PROGRAM BY ELITE SG,1'WARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 27 * * * * * * * * * * * * * * * * * * * * * * * ** BUILDING ENVELOPE REPORT * * * * * * * * * * * * * * * * * * * * * * * ** ENVELOPE REPORT USING SUMMER U- FACTORS: MATERIAL GROSS GLASS NET -U- AREA x AVERAGE TYPES AREA AREA AREA FACTOR UFACTOR UFACTOR ROOF 1 450.0 0.0 450.0 0.038 17.100 0.038 WALL 1 16960.2 1564.0 15396.2 0.140 2155.467 0.140 GLASS 1 1331.0 N/A 1331.0 0.500 665.500 0.500 2 233.0 N/A 233.0 0.500 116.500 0.500 TOT.GLAS 1564.0 N/A 1564.0 N/A 782.000 0.500 TOTALS 17410.2 N/A 2954.567 0.170 WALL WALL GLASS WALL NET W.AVG GLASS AVG GLASS AVG DIRECTION AREA AREA AREA U -FAC U- FACTOR SHD.COEFF N 2315.4 0.0 2315.4 0.140 0.000 0.000 NE 0.0 0.0 0.0 0.000 0.000 0.000 E 6005.7 611.0 5394.7 0.140 0.500 0.450 SE 0.0 0.0 0.0 0.000 0.000 0.000 9 2328.4 369.0 1959.4 0.140 0.500 0.450 SW 0.0 0.0 0.0 0.000 0.000 0.000 W 6310.7 584.0 5726.7 0.140 0.500 0.450 NW 0.0 0.0 0.0 0.000 0.000 0.000 TOTALS 16960.2 1564.0 15396.2 0.140 0.500 0.450 Cf OF Tl1M,'- + 1 11.0 MAY 1 0 20M PERMIT CENTER * ** FULL COMMERCIAL HVAL LOADS PROGRAM BY ELITE SL (WARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 09/21/99 PAGE 28 * * * * * * * * * * * * * * * * * * * * * * ** TOTAL BUILDING LOAD SUMMARY * * * * * * * * * * * * * * * * * * * * * ** BUILDING PEAKS IN JULY AT 5 PM BLDG. LOAD AREA SEN. TOT DESCRIPTIONS QUAN LOSS LOSS ROOF WALL GLASS VENTILATION INFILTRATION ZONE LOADS PLENUM LOADS FAN & DUCT LOADS 450 15,398 1,564 SKIN LOADS 17,412 187,928 22.46 LIGHTING 41,177 EQUIPMENT 904,150 PEOPLE 159 PARTITION 12,186 VENT 3,643 3,643 INFL 5,987 0 DRAW -THRU FAN BLOW -THRU FAN SUPPLY DUCT RETURN DUCT RESERVE CAPACITY 1,088 0.13 137,102 16.39 49,738 5.95 0 0.00 0 0.00 0 0.00 31,001 3.71 207,806 24.84 409,812 48.99 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 BUILDING TOTALS 836,547 100.00 BUILDING SUMMARY LOAD DESCRIPTIONS 207,806 24.84 409,812 48.99 218,929 26.17 0 0.00 0 0.00 TOTAL BUILDING SUPPLY AIR (BASED ON A 17 TD): TOTAL BUILDING VENT AIR (1.60% OF SUPPLY): TOTAL CONDITIONED AIR SPACE: SUPPLY AIR CFM /SQ.FT. OF CONDITIONED SPACE: SQ.FT OF CONDITIONED AIR SPACE PER TON: TONNAGE PER SQ.FT OF CONDITIONED AIR SPACE: TOTAL HEATING REQUIRED WITH OUTSIDE AIR: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: LAT. GAIN SEN. %TOT LAT. LOSS LOSS GAIN + SEN. GAIN 0 951 0 93,936 0 69,289 0 164,176 TOTAL %TOT GAIN GAIN 951 93,936 69,289 164,176 3.78 0 154,456 154,456 3.55 0 3,391,472 3,391,472 78.04 33,636 44,049 77,685 1.79 0 12,078 12,078 0.28 37,447 43,928 81,375 1.87 0 0 0 0.00 0 457,714 457,714 10.53 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 7,061 7,061 0.16 71,083 4,274,934 4,346,017 100.00 + SEN. GAIN TOTAL %TOT GAIN GAIN 37,447 43,928 81,375 1.87 0 0 0 0.00 33,636 3,773,292 3,806,928 87.60 0 0 0 0.00 0 457,714 457,714 10.53 BUILDING TOTALS 836,547 100.00 71,083 4,274,934 4,346,017 100.00 226,098 3,643 34,313 6.5893 94.7433 0.0106 836.55 362.17 HECEIVOQ CFM CfY OF TUKW CFM 1 0`:' SQ.FT �,� _ ,, 1.t:T1*, CFM /SQ. SQ.FT /TON TONS / SQ.FT MBH TONS 0.02 2.16 1.59 ACTIVITY NUMBER: M2000 -097 DATE: , , 6-2-2000 PROJECT NAME: ZAMA NETWORKS SITE ADDRESS: 12101 TUKWI LA INTERNATIONAL BL Original Plan Submittal Response to Incomplete Letter # __XX Response to Correction Letter # Revision # After Permit Is Issued DEPARTMENTS: Buifft Division 12 /t:occ . (o.( Public Works 0 DETERMINATION OF COMPLETENES, : (Tues., Thurs.) Complete Comments: TUES /THURS ROUTING: Please Route REVIEWER'S INITIALS: frost) PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Incomplete Structural Review Required 62fROVALS OR CORRECTIONS: (ten days) Approved E Approved with Conditions REVIEWER'S INITIALS: PititGUILIXIC Planning Division Permit Coordinator DUE DATELItiltaM Not Applicable No further Review Required DATE: DU DATR 7 4-1L Not Approved (attach comments) Ei DATE; O C ION DE E INA ON: DUE DATE Approved L Approved with Conditions l.._» Not Approved (attach comments) REVIEWER'S INITIALS: DATE: ACTIVITY NUMBER: M2000 -097 PROJECT NAME: ZAMA NETWORKS SITE ADDRESS: 12 TUKWILA INTERNATIONAL BL DATE: 5 -10 -2000 AL Original Plan Submittal , Response to Correction Letter # _____ Response to Incomplete Letter # Revision # After Permit Is Issued DEPARTMENTS: BI R Division El f• tam ❑ Public Works Complete Comments: TUES /THURS ROU NG: Please Route REVIEWER'S INITIALS: 6PPROVAtS OR CORRECTIONS: (ten days) Approved E Approved with Conditions ❑ REVIEWER'S INITI it CORRECTION DET_�,II _ON: Approved Approved with Conditions REVIEWER'S INITIALS: SAN 4ito HERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Fire Prevention {4„ 4 - �- 1-& Structural (Tues., Thurs.) Incomplete ❑ Structural Review Required Planning Division Permit Coordinator m DUE DATE : J 1.20 Not Applicable El El No further Review Required DATE: DUE DATE- Q0 Not Approved (attach comments) ..1111111.■ DUE DATE Not Approved (attach comments) ❑ DATE: Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mall, fax, etc. Date: �2-QO ❑ Response to Incomplete Letter 11 ® Response to Correction Letter # 1 ❑ Revision sl after Permit is Issued JUN • x,2000 Project Name: ZAMA N TWO KS PERMIT CENTER Project Address: Contact Person: tick Huddle Phone Number Summary of Revision: _ 'SEE Alr*tM City of Tukwila Department of Community Development - Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 (206)431 -3670 Plan Check/Permit Number: _M2000-097_ RECEIVED CITY OF TUKWILA Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Sierra on t Q 2' 00 05/24100 City of Tukwila Fire Department Fire Department Review Control #M2000 -097 (510) May 18, 2000 Re: Zama Networks - 12101 Tukwila Intl. Blvd, Steven M. Mullet, Mayor Thomas R Keefe, Fire Chief Dear Sir: The attached set of mechanical plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #1742) H.V.A.C. systems supplying air in excess of 2 000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main supply-air duct served by such equipment. Smoke deectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (UMC 608) Dedicated fire alarm system circuit breaker(s) shall be equipped with a mechanical lockout device. (NFPA 72 (1- 5.2.8.2)) Duct smoke detectors shall be capable of being reset from the alarm panel. (City Ordinance #1742) 2. All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Headq Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: 206.575.4404 • Fax: 206.575.4439 1 g Yours truly, City of Tukwila Fire Department Page number 2 Ordinance #1742) (UFC 1001.3) Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1742) 3. All electrical work and equipment shall conform strictly to the standards of The National Electrical Code. (NFPA 70) An aisle to and working space shall be provided for each electrical panel. An aisle width not less than 24 inches shall provide access to the panel and 30 inches of working space shall be provided directly in front of the panel. (NEC 110- 16(a), NEC 110- 16(c)) Each circuit breaker shall be legibly marked to indicate it's purpose. (NEC 110 -22) 4. Comply with Uniform Fire Code 1997, article 63. Any overlooked hazardous condition and /or violation of the adopted Fire or Building odes does not imply approval of such condition or violation. 5(0 The Tukwila Fire Prevention Bureau cc: TFD file ncd Steven M. Mullet, Mayor Thomas R Keefe, Fire Chief Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 + Phone: 206-57S-4404 • Fax: 206.575.4439 • • • *. • a- ............. .• Tt DEPAIZTMENT'ORLABOR INDUSTRIES -- • - e .• • e • ' •., . 4.• . . • • ••. • • • -+ :7` " " „ . . ;,, ... • „. . , ; • REGISTERED - AS - PROVIDED -- BY LAW AS - 7 • 441,.■ Mt-. as •'•••••• •• • • • • • CONST/CON'T . ,. • ' . .- ST XP'' DATE" - ". * " ' ' ' ' .- - ' .-: • • 1 PC0140AMC111■11. t372N0 .-;._12 /31 /2000: f EFFECTIVE 4MATE ..A 08/20/1963 pii 6.4w.t.,%.4 `as • •• 1.• • .. . A . a • • • , . , , . .• ,.., , . I I• MC t• K/NSTRY : CO .• i , _ ...... .. • ... _ ... ......._ . . .... - -:-. ,........._•-• i • '-. • . ". -7 . ,.. 7.2..,... .-- :,- .:.;.;,:.:,.-•._. ig051RD'-A *8 ... . _ . _. . _ - - ,.., , ... . .. -. , ' - • 8EATTLE 'WA 98124 -, 0 $ 67 • Fo25.032400 (gin • *no „ ; •.; . . • .■• • A,. , .7t , A k. c ..,00.,1 i • ' • ,04. . 0 01 A " "4, . 1, A' s. : '% it.I' ,. • , ..t" r. • ' es,"4 .P 1 ( ! • el". 1• 0 :%, • 0;1 ), . • • ": • : t . .o. ,tei • t. • A., •R , ' m 1 / • r• : • . I 0 :• I. •• ',4 1 • ,, ,- 1, is ^•„•7 •" .. - . .. . s .•. . . 0 •k • tr 1," ' •.,'. 0 0 ,,•,„, Ile, ,;* . *;..er • #, , • f . 7 ,',0 ' • J 12Q 4-Li cztile- • 7tL 01 4•1-14-4-41-4ar aC500 , . • • • - • • : • , • • . • ' e . • . : • • • a e „ • - • . °W.11 d.4 614;ntli4.4;,,IL• ,.A44'24"4 /0//s • •• ' 1 ; ; i i I . I I i I I ; ! i i 1 1 1 i I L ; ; ! ! ; t i i ' i ; I I I i 1 I i 1 i I i i ; ; i ; _ I I j I - -_ 1 L i ! J i ______ L __L._ __L_ -. 7----,. 1 - i I ! !!, i r • 7 1 1' '!; ILI i I, ,!'• F ' • I- -- .; - . — -- I – - " — -- ! --- 1FTiT ,-------- ... hi i.J;, ILLliii; ; .1.;.-1 ._:___„,,, ---r p _ Li I T ----- I - I I I i I I 1 I 1 i 1 : I ! 1 I 1 I I ; , , , 7 - ,--,---- 7 - 1 , -- '17, - i , , 1 + , • _ l • _I - • _IT..7:1 , , f ' 7 Z . _,.. __I --'" _7 - - , --. -, 1 i i I 1 I I 1-11----17 I i ■ 1 . i !II !; • n • .--6-----0 , i ■ , : , . _--'•;1 own nos rimm Mill EMI =III =Ill ( -1".41M , ! 1 I.; ---- - ----- -- - -- ---' -.- -- --= - - 1 -11111111111W -7' j , i / __.-- \ , ill I I 11 ; , 1 -T 1 I I I ; r1 . 1, 1 1111111 ., __ _„.._ . I i ! ,- T i 1 - ' : ! r , , ; ; , _i_._ I I 1 4 t , .i:D1„1 44 \ / -1 -1 11 • DROPS ON CABER ME OF WALKWAY eats a (2) eCWR FOR CONTINUATION SEE 113.1A FOR CONTINUATION 1-1/YFOS N FCR SEE M3.01—' - I/2 FOS & sa 113.01 FOR CORPORATION ARCHITECTUrRE GROUP 112,am- 017 einstr /-- r ears A CUR SUPPORT ON 44" PT WOOD SLEEPERS ON CONCRETE PAD I FUEL STORAGE TANK SEE DETAIL CI1C, PUMP & FILTER A ' "—FUEL TURK BUNKER-SEE ARCH IMGS I FUEL TANKTRUI N FUEL TURK VENTS SEPARATE PERMIT REQUIRED FOR: 0 MECHANICAL 1E PLUMBING 0 GAS PIPING CITY OF TUKWILA BUILDING DIVISION I . ierstand that the Plan CT,C,k: ap are subject to errors and omissions end: approval of piano does not authorize the violation of any adopted code or ordinance. Receipt of con- tractor's copy of approved plans acknowledged. Date Permit No _EIZErameal C40771.7 PERMIT CENTER CITY Of TUKWILA APPR_QYEEL - 3 CONSULTANTS FUEL TURK amanai 4/18/00 IMEP.A28191.1-AEriv PERINIT ISSUE _12,12,19 REVISIONS ISSUE DATE &yew and wain meadd URNS Win eceitlein the arlilnol and tepublided welt of du Sabo, and the name nvey net be dicloated toad er without the edam cancel* 01 Ni. Saber Oceparatl. FILE: itechasibol Contractors and Engineers 500 A As South P.0.13. 24567 Soot* Va. 98124 'hone (298)562-339! Ise (206) 762-2624 IC Colombia 8W Portb4 C. 97218 phone (563) 351-6905 An (503) 551-6903 PRAM 2 Tenant Improvement for Z A AN. A NETWORKS at Intergate West 12201 International Blvd. Tukwila, WA DRAWING TITLE: PROGRESS DATE: 10-07-911 PLOT: PROJECT NUMBER: 35340 DRAWN BY: MEMD BY: DiaL APPROVED BY: DRAWING NUMBER: M.0.2 SITE PLAN PoLL 1 CT SEC,' 4009A, pccom -no0-31, Hp BUILDING ELECTRICAL [F'20 ENEFMM pro .2 OOR ORAN S r r EXHAUST ELBOWS ACOUSOCAL PANELS (2.5. Diu) (or c.c.) 1 NOTE: EXHAUST PIPE INSULATION NOT SHOWN - _ 12. MAXIM 14-51 MUFFLER (BY EC.) 2000 KW GENERATOR VIBRATION ISOLATORS (BY GENERATOR MFG.) STAIRWAY SLECT_RICAL 11,„, !1.20,:( 16 SPAUST FPE 3/4 UP 3/4tW CAP FOR FUTURE WATER FEATURE MAKEUP WATER. N NN, _ GARAGE eir up-- ./` CONCRETE CURE (BY GC.) SECTION B 1 41 1 1 UP M3.01 ACOUSTICAL PANELS (2.5 THINK) MY C.C.) GENERATOR NOISE CONTROL (SECTION VIEW) GENERATOR ROOM AIR INTAKE (T" SECTION A EXIST 4 . 1V UP CONNECT TO EXIST 41 1 / BELOW SLAB GARAGE LEVEL P2 - HVAC PLAN SCALE: yr - SOLID NOSE CONE T ACOUSTICAL BAFFLE DETAIL END VIEW AT SOUND TRAP EZ Al I NUT •n SeAl / .7/ ST-1 4'W UP & EN ST-4' 22 GAUGE PERFORATED STEEL 16 GAUGE SOLID SEPTUM 4 FIBERGLASS INSULATION END VIEW AT RADIATOR RADIATOR TRANSITION ATTENUATOR DETAIL C Twr°,71 rie r HUB DRAI 916.5' SCREENED 0 WALL OPENING (BY G.C.) (2) SUMP PUMP DISCH. TO 3 HUB DRAIN-SE INTO GARAGE DRAIN SYSTEM TO OR/WATER SEPARATOR. 3 PIPE SLEEVE ACOUSTICAL SEALANT —le EXHAUST APE i r PPE INSULATION I (WITH METAL JACKET) 112 SUMP PUMP DISCHARGE ' En; ° (SECTION VIEW) SIC-DO P y SAFE INSULATION 15112241,14■1614Mfail MOM M-41 MUFFLER EC.) (TYP.) Ni01 * FOS & 3/4 CONNECTION TO GENERATOR FUEL PUMP. TE: PROVIDE THROUGH BOLT ER FOR PIPE HANGERS- RUT. ENGINEER TO ROVE HANGER LOCATION & (TYP.) 16 REDUCER MP.) IDE (TYP.) (FfP.) mvali PPE SILENCER OFFSET TO SLAB ORIG. (TYP.) ir UP TEl PI LEVEL (TIP.) ELOCK OUT BY G.C. (TYP.) CONCRETE SLAB ; rn" 1-4=SPI°1 hWER DEC 113 - w TwEXP RE 2001 DRAWING SEE: 18" MUFFLER (WITH METAL JActzgr); t) o on$ E VSX .A 2* PIPE INSULATION PERMIT CENTER APPROVED EXHAUST PIPE PENETRATION DETke PROVED j)JN 0 6 2000 4 DETAIL D AS NO TED EAT (TI NOT TO SCALE •409 am. — aft _ _ rvivn nnrovrt. SABEY CORPORATION ARCHITFCTURF GROUP CONSULTANTS REVISIONS ISSUE DATE Ifeeharicel Conberfors ate Engineers 5005 .96 hes South P.O.Box 24567 Sneak Pk 98124 phone (206) 762-111 RN: (206) 762-2624 MOO FE Cam* Blot Porflon4 On 97218 phone (Sal) 551-6905 (503) 331-6903 PHASE 2 4/24/00 FUEL TANK RELOCATION 4/16/1_,0 1 SSMAKLTAXE12_420 FONT 1581.1E _12=1,,29 Al dewlap and "dam soled epeca*lionii canal* aid the wane map not tie duplicated, wed a= RI. oripinal cad unpublelled work cif the Saw Witted We written canon* al the Saba/ Cawaration. Tenant Improvement t" or ZAMA NET at intergate West 12201 Tukwila International Blvd. Tukwila, ILIA PROGRESS DATE: 10-07-SR ALE: PLOT: PROJECT NUMBER: 35340 DRAWN BY: CHECKED BY: rAil. DRAWING NUMBER: GARAGE LE%EI P2 WAG P1,414 M3.01 gi 113 11 11 Ik Ark • a , a 1 111 is' is 11 11 11 11 11 111 11 111 11 111 • • • 111 11 ji 4 - t 1 ca r CRU_., A , I ,--1-.1,---4 H IC, t Lti.._, ,-- - A • I 0 .1-7 ei 11 ICRu-tol 11P5 HIC AWR UP rL1VS UP up 11 111 + ,1 r , -- - 1 - , ---1-!_t __d Ji. _.... , ,_____ ..„ , „.... ___ 7 — - , --,--- ,-- ---,-!--,-----1 ; , • 1 ---- ..i 111115 ' ■ ',. NB -1 if• 1 MI MI . II --1- r A I .s... MI ITICT id E ___i i- i ill le in 0 i - -p II 0111 11 ' M IN II/ s m 111 1111 11 E n nf,,, tiiilm.'” 11 lir . I i 1 s li c m ai go 111 ' E 1 ,I , 1 I , j 111 1 11 11 11 1 SUPPORT PIPING ON FLOOR I ;' ___I I NI 1 rt iii �m ii m — mgrib. / A • 12 E A' i ! r ! • 5PR VALVE ROCX FF12 RAMP P 1 I I I e 1 1 frC & (2)6VVR DOWN' to COMM- TOWER FOR- C CONTINUATION 11 SEE NO.2 NOTE: COTO TION OF : PIPES RAMP 6' l J , iI 1 1 1 L t F, 1 , K 1.5 2 3 Ik CRU-15 CRU-16 A t2: FC:2ER R2 Fly; M3.1A / 1 .---,4 -1 , -,--, - . , 7 , 111 7 -- / ,1 t -,, , -- il ,-,..t. ;! _.--f ,------1,,---- ---, !, pi r10,1,,L.A21,4, -- I/1 - - - - ■1 , it:. _„, .1 t i ,/,„;\ c2_ D / \ , • , / , , . ,. l---/ [I \ ' 1 , CTEALI‘Jr''iL I T ..--='cLes CY. I 19, 24 1 CRU-6 5 T ' F -21 -------- CRU Fct., 7:12 r 1 ,,ffl I j III Il ill II II Silli. EIE PHASEH Ill A...! ,111 1117 I f___„_"_ 1 'l ,..._.. II t -AREA IP4 l,- , . 1 ' -- . , 111' 1 1, En . 11 1--42.1 II E 11 IE ill? 11 , 1 , -1 i gl ) 1111 Iii - -1 '1 , , 111III IN 11 _ t, : 111' 11, 11 .'s 711 J , _ , L 1 ___L , : , 1 , 1 2-- 1 .-.1-- F - , .----- _ . _ _ __ 1, _t_ _ _ ....,,t t - d - 1 r i .____,,,., ' I FIRST FLOOR PLAN - UNDERFLOOR HVAC SCALE: v-v• CRU-14 6 1-1/2"CWS UP & 1—VAR UP Em 11161 11 NIT /am I A 7 ;, 7.5 taktrON1484 7 rag .,emoec-- coNrea4 REangeo fve. ,itec Mfrs VW 608 FUTURE ELECT : IS [ CITY OF TUKWILA APPROVED juN 0 6 2000 AS OFED ,st.Eex Art 'THROUGH OK %VALL WALK WAY ;UNDER PIPE ( E ) EXPIRED DEC 1 3 NM CONSULTNWS DRAWING NUMBER: SABEY CORPORATION ARCHITECTURE GROUP et yinstry Mechanical Contractors and &givers 5005 5rd he South P.m. 24567 Stalk Ilk 9812f phone (206) 762-1111 for (206) 762-2624 5400 AC Cambia Ad Portlag. Or. 97218 phone (504 551-690.5 fox (505) .151-6903 PHASE 2 _y_21140_0 _MgPiggSa2W.PLEItEitit PEWIT ISSUE _12=If&f. REVISIONS ISSUE DATE II doming. and alba mobrI6 .104 appealing hods cone& tr.. ant unpohlitod volt d Ow Saba, and the mom may not ba dup& abd. and ar without en written CPICint al Um Saba, Corporalio, . Tenant Im ovement for NETWORKS at Intergate Weft 1220! Tukwila International Blvd. Tukwila, W4 DRAWING Tim: FIRST FLOOR PLAN U1412EliFLOOR HVAC rnzeco Recove,om,, PROGRESS DATE: 10,0140 C5'1 01 FILE: 11 '441 PLOT: ' 15818 GesneR PROJECT NUMBER: 35340 DRAWN BY: J.E. CHECKED BY: DX APPROVED BY: 1413 3TVIS & CWR ON 3"CY/S & CWR UP&DN 2 & CYR ON 2TIVS & CWR 11; 1;1 t 1.5 2-1/ & CWR UP 3 & CWR DN ! --' ..- 1 Ft----;-; -- - - - $ L , 2 _ - -TT iFf UPS CM J : 3 5-1090 36xI6 SWG. R,1 TITUS MODEL 300FL OR EQUAL 1-fil I M3.1B 4J rCtIS & CYR UP 3 & CWR UP RES-1•11 _ I E-1090 ; ; cu-51 11 1111 111 I _1 MI II 411 iii M !II II M II II II II! 11 III 11 IN 11 Jo NI n 10x6 SWG w/DBLDEFL. & oBD ( TYP) 1=1 S-1030 3606 SWG. 1505 1400EL 30ORL 00 0000. R7 F 112 6 .) CRU-13 FLIIMIErj L 200 11 tr LC) s 1 - ' TER;14 immurqpipins vi/OBL.. DEFL & OBD , ! _.____. - - _,,, , -- _______, . 7 ,- 1, r 1 1,-,, 'jr "-, I-I-1 - 1 1 - , ' 1 ___151 -1 : OIL_ __Tt-_-___=::_12 ::,; GRILLE _ 1:1:: :; c 4---: =L / :.,,,, ----- , - I r - ' I .. .: of€ GRUE sDE , .E T, : 1,7_,. . T :50 1 0sA -T 'T Ti.fr.- UNDER FLOOR WATER DMI ---- ---' gh , --,- -,----_: ._--,_-.- _,..= ...,_, DETML ‘ggi, ,i 1 I 1 - 1_ 1 1 ' I_ i , -"L , 4EG , I , IP 2 ,,,q,_:47,1 j - I - i i ; 1 : 1___ -1----1 -4- - : : f i. _ _l_ ill F I -- 3 1 rt '1 1 - 14 - 1 i--- i , , , . , , 1 1 i i €,-...,3,1 ._-,p a ,;„; NI I-- --- IMIm 111 UI NI /III HI i H��J , ---, ii 11 kl :4, ii II •r714 140 A li 11 11 NI 1 , 14 FIRST FLOOR PLAN - OVERHEAD HVAC SCALE: Ix - JrIENT S-50(1 y W/SCREENED OPNG. E-1090 0-1090 I 7 1 7.5 100 /-12*0 , -------- II -1g4 1 I 1 I GAP FOR FUME . 1) ■ I i CAP FOR FUTURE trION ■! 111 4 \UP 111 11 IL E II II RITURE ELECT RI Fi13 ( 8 ) UP IN JOISTS > i ------ L ..,--- ---- ----..----- t ' 1 • -F _, _ ■-• - °W1W -(A 7 DRAVAN„TUE: FIRST FLOOR PLAN NOTES: - SMOKE ARE DAMPERS TO BE INTMOCIED OvERREAO 14vAC BOTH ARE ALARM =EN & FM-200 SYSTEM. -AP/RED ANY ONE 555100 CO5 SHIA' OFF THE SMOKE FRE DAMPERS. 320 DEC 01 CITY Of TUKWILA APPROVED JUN 0 6 2000 A NOTED A C , D 13323117/LOINCIIIII crryVVAHLA PLOT: CONSULTANTS SABEY CORPORATION ARCHITECT E GROUP e instry Mechanicol COntradorr UT 5005 30 hve South P.811mr 24867 Shaba Wa 98124 phone (206) 762-3311 lac (206) 762-2624 5450 hE Columbia BAd Portlana Or. 97208 phone (503) 311-6905 fox (593) I51-6903 - ft - PHASE 2 4/21L0,0 _Mgo_r22ErdZAIINOOLLE&O PERMIT ISSUE _1241:29 REVISIONS ISSUE GATE 6.Og id yam ANIMA *waft P.W mini 0. cdgial and unpablind wadi 05 and the name ma, not OS dwicatad, mid or= without the within eancant B Os Salm Corporation. Z A AN A NE TIMM S PROGRESS DATE: 1.47.98 FILE: Tendnt Improvement for at Intergate West 12201 Tukwila international Blvd. Tukwila, 1I0A c i3 PROJECT 000000: 35340 z WY' jE. PERMIT CENTER DRAWN CHECKED BY: DA APPROVED BY: DRAVANG NUMBER: C181 -17, 18, 19, 20 18 and 20 are 100% bock -up um, pas. pima! I -A 0) 3111, Y193 I papuaN UE !Wi_ m 12 N I S6 /s9 C r Sail _ sot St 09 ZL %0£ 9� 9 84011 aa1 I38o11 -solo . 1600 30 5618 941000 091 730011 Snot -- 1 10X1000 89 730011 SALM 1410011 001 130011'5011 94501 010 13000 0111 !4X000 070 13061 SW 94110011 03141330N SNIT . m141 ___ 91 5 09 01 -11113 puns plosloJ ( O£-1k 310) 3 811 9110 00 940 �°1Wn imp reap £- 011 -80 NJ3HN3390 2nd flr. coot. And lobt Centrifugal SPA ,.. . 09 ZL woo £3500 / Z'LPZ s9 J 1 1'2aEl. 0°1 0£ %OF 061-1 aeuNn0N 000-1 908-1 649-1 UB-1 944 900-1 S£ Al 9/N 099Z , =< , L., -...- promo pinXUOJ /01- no9alEMIMP, o0s 0.91 mg rap t2X1Z 1Z X *2 ,, SC X *I KX*Z ...."-A- -,,e- g8g SS ...^.............A .2.-. 001 of 0 g'Af 01x01 9X9 St X tl -� 21 X 2 91 X 91 91 X 91 3 Z9 S£ Al r.t.g. 9/N OYf l 01 °1'1 l -lap einPatiOS DATA AIRS (OAOO -26) forward curved 00001 0ogu0o0 no'1 maP 011 N 30 Al 9 sal S6 /S9 09 / ZL 6•ZZ 0'910 / 6100 /59 °°l CZ %0£ 10§ 0e SC 6s SC : 1 601 11 fi 11PU09 Iy tucctl Joirldwo0 ad 0 l u ot008 60saa /0 01808 N*! ;TlddnS boO buitoo / /Maldn (lull Aosa /nNt 00 9)'k9uo r 3 a0 d c! "?; LI . Suy HP Supply Motor Eff cie cy . . . loon 01 j ! didd"S 00 1 k400 0 0 ICondenser water COT / �J Condenser Heat R emova (� (69/00) 193 tai 6. 6003 da0..omssard_ goo_ tasutpuo3 V I S MX 60 0°°3 (➢Nn) (89/60) 191 003 009009 -....... F oboua1 puw0N (Y) 'N3 Ja 5 (93e1) IroduN a a s wnupr (n3) saw Pool 103 WA - - wars DaleaN Moroi' (93do) a 1. alsrli 00 8 Owl R (mow) cob aN 051000 K e31/.1) 99 093 00 1.1 JS (..pu!) w! ego 0 41996 Xoo0 blaalaa Gno s Nddns I) ('sql) 1110909 10101 ,00 1 11109 1 0210J05 •A 011 ;uovuoass3 1 DIFFUSER (DT)(DG)SCHEDULE I t Y I 03909 *9TI 1 3 £01 1904 t9Ti tYTI I 9 Vi s 9 '0 'I I99'I 0 0 0 'I s % 'I 099 'I 1 g (BSA 10N 03SA 10N S 'I 1 I '01102 410 VOA 300035 362H 30'0ad 'S NI .51113.i 0•1111.1 SWUM 1583 3139 ONIONIS '£ 1 4 1 69 0 0 1 3 0 05 1 0 1 3 0 11 0 0 3 10 11 98 SKIS1000 14 Z 0001 0 NO von MOOS S111 IBA 39 TAMS 326 100 NAV 'I 84011 aa1 I38o11 -solo . 1600 30 5618 941000 091 730011 Snot -- 1 10X1000 89 730011 SALM 1410011 001 130011'5011 94501 010 13000 0111 !4X000 070 13061 SW 94110011 03141330N SNIT moon m91i00R 800 94110011021113000. SNa ii g g gg 22 140004 0211 73000 Soul 011110011 MI 8M Soul I I .. 1X10000211110011 009 I I 934 130011 5101 934 1300 Snot INNNNNaggggNNNNI £- 011 -80 NJ3HN3390 2nd flr. coot. And lobt Centrifugal 0911 douoob ,.. . - 1 INN 061-1 aeuNn0N 000-1 908-1 649-1 UB-1 944 900-1 sEsswssi , =< i i!! u x tie 3215 3003 t2X1Z 1Z X *2 t2 X *2 teX00 SC X *I KX*Z IIIIIIIII1 24 X 24 24 X 24 0X 9 305 300 01x01 9X9 St X tl -� 21 X 2 91 X 91 91 X 91 Y 9X9 01 X 21 OI X 01 91 X 91 1! 91 X 0 1 91 X 91 tI X *1 m MODULAI 011 N 30 Al gmaaa2z-naaglEi I 10§ 09.9 89 10 001 : tim .9 l 110 892 •41X8 g....,..,.... aggarig 9 1 0111 l - 3S 51- 8■H£ -SOS 333H13390 _ 10 0110119 1°3°!0°09 OSSLZ mllodad i £/ 09t S'L .9 high I on/off control tie -in w /generator . g . — £- 011 -80 NJ3HN3390 2nd flr. coot. And lobt Centrifugal 0911 douoob ,.. . - § •0010 6q 9N ag 00 -I, NO300 a 09 , =< -- I EF g 1 (1110 0sa3110199 ladwoa 11°10 9 ,50 0 9100 1 0 011 1 : : ! 7 Ui 0 LU 0 0 Ui -J -J 0 u- m z cc 1 a UI 1 ig a 5 A 2 2 a S 1 3 gag S S a a S S S S S S S S S S S S S 2 • S S N S a a S S S S F S S Jh ag a gig a ighg S 16 t Mks " hig 4 1 Pit 01 0 1 z cc UI z U- > Co UI cc to CO g I 1 • .c U I E 2 .o 40 CO UI a UI = 0 cc 0 z UI I- 0 z 0 Ig S 1 5 S 2 S 4 S R 1 .4. 4 i id 4 111 5 2 8 S • a LU 2 I- 2 gg t§ g § gift a 5g g S a S A • S S 1E 11 gg PI 5 2 F S S F 5 S a A A A F 1 ROOFTOP HEAT AND VENT UNIT (HVU) SCHEDULE SCHEDULE