Loading...
HomeMy WebLinkAboutPermit M2000-196 - ZAMA NETWORKS - PHASE 31 S JUJO4UJ ullmlni I O i Z E OSflJd "BLUEZ 961 City of Tukwila Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Permit No: Type: Category: TENANT OWNER CONTACT CONTRACTOR Signature :_„ Print Name: M2000 -196 8 -MECH NRES Address: 12101 TUKWILA INTERNATIONAL BL Location: 2ND FLOOR Parcel #: 092304 -9309 Contractor License No: MCKIN * *372NO l / .... / I�� A ........,,... Permit: Center A t prized Signature ZAMA NETWORKS - PHASE 3 12101 TUKWILA -INT'L BL, TUKWILA, WA 98168 SABEY DAVID A & SANDRA L 101 ELLIOTT AV W #330, SEATTLE WA 98119 RICE; HUDDLE 5005 3 AV S, SEATTLE WA 98134 MCKINSTRY COMPANY 5005 3 AV S, PO BOX 24567, SEATTLE WA 98134 kk k** k•k•kk *kk•k ******A 4 k• k•** k**k k kk* k4** *k * *k *k **k **kk *k•k *kkkkk Permit Description: ADD 7 CPU 'S (21 -27), AND ONE COOLING UNIT (CT -4). ON SECOND FLOOR. UMC Edition: 1997 Valuation: 225,000.00 Total Permit Fee: 175.81 kk* *•k k*** ** k4kkkk*** ki* kk - k *.k** * **k** *tik•kk***k ** ** * ** **k*****k ** I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the ov 1S ions of any other state or local laws regulating Construction r the pe formance of work. I am authorized to sign for and obtain this ti pi`rnctt. MECHANICAL PERMIT T h i s permit shall become n u l l and void if the work is not commenced within ]80 days from the date of Issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Title: Date: Phone: Phone: Phone: Phone: (206) 431 -3670 Status: ISSUED Issued: 10/06/2000 E „p i res : 04/04:2001 206 281 -8700 206 - 832 -8374 206 762 -3311 i :22 4g Date � 0Is, fop 1 Signature: CITY OF TUKWILA Address: 12101 TUKWILA INTERNATIONAL Ell_ Suite: Tenant: ZAMA NETWORKS - PHASE 3 Type: D-MECH Parcel 0: 092304-9309 ■If ...... 1-WV Permit No: M2000-I96 Status: ISSUED Applied: 09/01/2000 Issued: 10/06/2000 **k******4A*****Ak*AA**A*AA****A*****Ak***k****AkkA*A*****Ak****k****A***AA Permit Conditions: 1. Any exposed insulations backing material shall have a Flame Spread Rating of 25 or less, and material shall bear identi- fication showing the fire performance rating thereof. 2. Plumbing permits shall be obtained through the Seattle-King County Department 'Of Public Health, Plumbing will be Inspected by that agency, including all gas piping (296-4722). 3. Electrical permits, shall be obtained through the Washington 'State Division of tabor Industries and all electrical work will - be ipspe by that agency 4 No changes will be made to the plans unless approved by the EngiOker and the Tukwila Building Division. 5, All permits, inspection records t , and approved plans shall be avail,ableAs,t the Job site prior to the start of any con strUCtion. ,These documents are to be maintained and avail-' ableuntil,final inspection approval is granted. 6, All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition), as amended, Uniform Mechanical Code (1997 Edition), , and WashingtUn State Energy Code (1997 Edition), 7, Validity ,of Permit. The issuance of a permit or approval ,of pia*, specifications, and computations shall not be con- strued to be a permit for, or an approval of, any violation ' of any of the provisions of the building code or of any other, ordinance of the jurisdiction. No permit presuming to give, authority to violate or cancel the provisions of this code shall be valid, 8. Manufacturers installation instructions required on site for the building inspectors review. 1 hereby certify that I. lave reed thee conditions and will 'comply with them as outlined. All provisions of law and ordinances governing this work will bakoomplied with, whether specified herein or not. The granting of this pee10,t does not presume to give authority to violate or atcel the provislops of any other work or local laws regulating cot str'iqtin or the performance of work. Date: 10/1, Project Name/Tenant: - 7 . '� v O ?VW. SA. E ' ! ;,�' ' U ,,,PRIZED AGENT: Value of Mechanical Equipment: 225 oC9tO Site Address : ‘2-1() ` ALw Atk VV").., City Statc g R � Tax Parcel Number: INumber ` Property Owner: r . Signature: Phone: ( ) Street Address: k . .3 Id'i Ftk\ " ' vt w. �C City State/Zip: c. `6. 9 ' Fax #: ( ) ' LVl — 995 Contractor: IN A AV Phone: ( ) 162 -- 3311 Street Address: 1 5005 3 NNE S ‘ Sea Cit Scat• c S L ip: Fax #: ( ) U - Z ( 0 1 - L 4 Contact Person: (p \i at... V\ (564..tna 9 $ 31 Phone: ( 2CV ) <8,S1, <8,S1, - V' � Street Address: . 5COL, . -, , v 1 j ` City State/Zip: Fax #: (, (PL. ) ?LA- - - Z- L i BUILDING • IN E ' ! ;,�' ' U ,,,PRIZED AGENT: Date: c Signature: C9 0 Print name: �C Phone: (• ) Fax #: ( Address: r °i: a s..•`a i f, NR , 5. City /State/Zip: (564..tna 9 $ 31 CITY OF TLThWILA Permit Center 6300 Southcentcr Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Description of work to be done ( lease be , specific): �} � G) Y°‘ 1f .._._.. c„ne. coA; .,, Y C . CT :.. 4 Date appl ion accep -- 11/2/99 asech pennii.doc Date application expires: I F I ' TAFF USE ONLY , Project Number: Permit Number: Nl Mechanical Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. MECHANICAL PERMIT REVIEW AND APPROVAL REQUESTED: (TO RE FILLED OUT BIYAPPLIC ANT) cA Current copy of Washington State Department of Labor and industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is Issued OR submit Form H•4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent: If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PER JURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Expiration of Plan Review • Applications for which no permit is issued within 1 90 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 190 days upon written request by the applicant as defined in Section 114.4 of the Uniform Mechanical Code (current edition). No application shall be extended more than once. Application ken by: (initials) ✓ Submittal Requirements Floor plan and system layout Roof plan required to identify individual equipment and the location of each installation (Uniform Mechanical Code 504 (e)) Details and elevations (for roof mounted equipment) and proposed screening Heat Loss Calculations or Washington State Energy Code Form #H -7 H.V.A.C. over 2,000 CFM (approximately 5 ton and larger) must be provided with smoke detection shut- off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical Code 1009). _ - -- -_ -_ Specifications must be provided to show that replacement equipment complies with the efficiency ratings and other applicable requirements of the Washington State Nonresidential Energy Code. Structural engineer's analysis is required for new and the replacement of existing roof equipment weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be stamped by a Washington State licensed Structural Engineer. Mechanical Permits COMMERCIAL: Two complete sets of drawings and attachments required with application submittal ual99 ad RESIDENTIAL: Two complete sets of attachments required with application submittal NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced, . Submittal Requirements Now Single Family Residence Heat loss calculations or Form H-6. Equipment specifications. Change -out or replacement of existln mg, nlcal equipment Narrative of work to be done, lncludlnA modification to duct work_ installation of Gas fire Narrative with specification of equipment and chimney typo. If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney Is in safe condition. NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please Include any water heaters or vents being installed or replaced. kik hA4A *a *4hkit kA *4Aa4W4W4*64**k •J 00/4451.4*Ahh 1TY, OFt TUKNxLA. WA ' MANUMIT A41.4**141 kid * *4AA.0 *4rk *4* A *0 *;X 4 .** 4,4*A0-,1hA *= *- 1 14AAAA *, AAAAAA4 EpANBMYT: Number a P 900371 Amount: 175.91. I0/06/00 14:19 Peym rt Method i.HCCg Notation: MCKXf1OrgY !nit! ULH If .n • 4t ye rr !. ff. It1 4... R. Al. ■w If f. a. s. ♦. r. Yr 4- r: r. . 4f I..r t. a..f 4.f 4. .{ w ff . .. f. 44 ff r . Permit NO3 P t! r r °It t No: to ,Addrmee, Lovett ion: eyme st ;)hl #00:4*0. At *40 * *4 `Aceauntr Code .000/12;4100 M2000-196 Type: n-•MIscI MECHANICAL PERMIT 092304.9309 12101 TUKWILA ZN'1I:Rtd11 f ZOI FtL nL 200 r ow( rotal i`tau IMO! 1%11.91 Toni d ALL. Hotel 17S.91 naiances .00 A # *A A *A14A*A4 *A4 * **4A *4*r4 *4 AA4*14 A4*44*4AA4A De ut' i p h i on Amount PLAN CHCL'K NUNOES .. 3t. it; MECHANIC:A1. HONOCO 140.6$ •... ' 11 -. 4. w !^ r'. !> .1 W .4 s M K . w_ .... !w rt s . i is ♦� Ir. !1} !f -i .s , ii !t O w 1t Mt tff fl: PERMIT NO.: M2DCDI MECHANICAL PERMIT APPLICATIONS INSPECTIONS ® 00002 Pre - construction ❑ 00050 WSEC Residential Q 00060 WA Ventilation/Indoor AQC Q 00610 Chimney Installation/All Types ❑ 00700 Framing ❑ 01080 Woodstove Q 01090 Smoke Detector Shut Off 01100 Rough -in Mechanical (/❑ 01101 Mechanical Equipment/Controls 01102 Mechanical Pip/Duct insul 01105 Underground Mech Rough -in 01115 Motor Inspection 1400 Fire Final 01800 Final Mechanical 04015 Special -Smoke Control System CONDITIONS 0001 No changes to plans unless approved by Bldg Div 0 0014 Readily accessible access to roof mounted equipment 0016 Exposed insulation backing material 0019 All construction to be done in conformance w /approved plans 0002 Plumbing permits shall be obtained through King Co 0027 Validity of Permit 0003 Electrical permits obtained through L & i 0036 Manufacturers installation instructions required on site "BTU maximum allowed per 1997 WA State Energy Code" 004 i Ventilation is required for all new rooms & spaces "Fuel burning appliances "Appliances, which generate...." "Water heater shall be anchored...," 8 Monel Conditions: TENANT NAME: L — I PhaE e FEES Basic Fee (Y/N) Supplemental Fee (Y/N) Plan Check Fee (Y/N) Furnace/Burner to 100,000 BTU (qty) Over 100,000 BTU (qty) Floor Furnace (qty) Suspended/WallFloor- mounted Heater (qty) Appliance Vent (qty) Heating/Refrrig/Cooling Unit/System (qty) Boiler /Compressor to 3 HP /100,000 BTU (qty) to 15 HP /500,000 BTU (qty) to 30 HP /1,000,000 BTU (qty) to 50 HP /1,750,000 BTU (qty) over 50 HP /1,750,000 BTU (qty) Air Handling Unit to 10,000 dm (qty) over 10,000 On (qty) Evaporative Cooler (qty) Ventilation Fan (qty) Ventilation System (qty) Flood (qty) incinerator — Domestic (qty) Incinerator — Comm /Ind (qty) Other Mechanical Equipment (qty) Other Mechanical Fee (enter SS) Add'l Fees — Work w/o Permit (Y/N) Insp Outside Normal Hours (hrs) Reinspections (hrs) Miscellaneous Inspections (hrs) Add'l Plan Review (hrs) Plan Reviewer: % Permit Tech: Date: q0 Date: :31(30 August 17, 2001 Mr. Rick Huddle 5005 3rd Ave. So. Seattle, WA 98134 Dear Mr. Huddle: City of Tukwila Department of Community Development RE: Permit Status M2000.196 Site Address: 12101 Tukwila International Blvd. In reviewing our current permit files, it appears that your permit for installation of seven CRU's and one cooling unit on second floor at Zama Networks, Phase 3 issued on October 6, 2000, has not received a final inspection as of the date of this letter by the City of Tukwila Building Division, Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the building official under the provision of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the data of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time aRer the work is commenced for a period of 180 days. Based on the above, if a final inspection is not called for within ten (10) business days from the date of this letter, the Permit Center will close your file and the work completed to date will be considered non - complying and not in conformance with the Uniform Building Code and /or Mechanical Code. Please contact the Permit Center at (206) 431.3670 if you wish to schedule a final inspection. Thank you for your cooperation in this matter. Sincerely, R ,oh) Kathryn A. Stetson Permit Technician Xc: Pcrmlt Filo No, .M2Q00'196 Duane Griffin, Building Official Steven M. Mullet, Mayor Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 Phone: 206 • Fax: 206.431.3665 PACE CONSULTING 5005 3RD. AVENUE SEATTLE, WA FULL COMMERCIAL HVAC LOADS PROGRAM BUILDING MASTER DATA DESIGN OUTDOOR MONTH DRY BULB JANUARY MARCH JULY WINTER ROOF ASHRAE ROOF TYPE ROOF $ U -FAC 1. 5 0.033 PART TYPE 1 . GROUP SOUTH 98134 AND DESIGN OUTDOOR WET BULB PART COOL HEAT U -FAC T -D T -D 0.068 17 53 WALL ASHRAE WALL WALL TYPE GROUP U -FAC COLOR 1. G 0.140 DARK GENERAL PROJECT INFORMATION: ROOF SUSP COLOR CLG. DARK YES PARAMETERS: INDOOR REL.HUM PROJECT FILE NAME: PROJECT LOCATION: BAROMETRIC PRESSURE: ALTITUDE: NORTH LATITUDE: MEAN DAILY TEMPERATURE RANGE: ATMOSPHERIC CLEARNESS FACTOR: GROUND REFLECTANCE: STARTING TIME FOR HVAC LOAD CALCULATIONS: ENDING TIME FOR HVAC LOAD CALCULATIONS: FLOOR HEAT LOSS COEFFICIENT: NUMBER OF UNIQUE ZONES IN THIS PROJECT: PROJECT: CLIENT: DATE: DESIGNER: INDOOR DRY BULB CITYOF TUKWILA APPROVED SEP 2 7 2000 AS WILD i MOW! '7.57Z7iER:Cir C: ZAMA TUKWILLA, WA 29.064 IN.HG 53 FEET 47 DEGREES 24 DEG.F 1.00 20 PERCENT 7 AM 8 PM 0.54 BTUH /FT -F 4 MCKINSTRY CO 07/12/00 MSH GRAINS IN /OUTDOOR DIFF. CORRECTION 54 48 40% 74 -9.88 -39 61 49 40% 74 -17.48 -32 95 67 40% 74 20.41 -8 17 0 50% 70 0.00 RECEIVED CITY OF TUKW ILA SEP -1 ZO pW MrV GENtl * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 07/12/00 PAGE 2 * * * * * * * * * * * * * * * * * * * ** GENERAL PROJECT DATA (CONTINUED) * * * * * * * * * * * * * * * * * * * ** BUILDING DEFAULT VALUES: CALCULATIONS PERFORMED: LIGHTING REQUIREMENTS: EQUIPMENT REQUIREMENTS: PEOPLE SENSIBLE LOAD MULTIPLIER: PEOPLE LATENT LOAD MULTIPLIER: PEOPLE OCCUPANCY BASIS: ZONE SENSIBLE SAFETY FACTOR: ZONE LATENT SAFETY FACTOR: ZONE HEATING SAFETY FACTOR: PEOPLE DIVERSITY FACTOR: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: BUILDING DEFAULT CLG. HEIGHT: BUILDING DEFAULT WALL HEIGHT: INTERNAL OPERATING LOAD PROFILES (C •100): BOTH HEATING 1.20 WATTS 50.00 WATTS 255 STUNS 205 BTUHS 1 PERSO 10% 5% 20% 80% 1 1 1 10.00 FEET 10.00 FEET AND COOLING LOADS PER SQUARE FOOT PER SQUARE FOOT PER PERSON PER PERSON N PER 143 SQ.FT REF HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR HR NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1. C C C C C C C C C C C C C C C C C C C C C C C C 2. C C C C C C C C C C C C C C C C C C C C C C C C 3. C C C C C C C C C C C C C C C C C C C C C C C C 4. C C C C C C C C C C C C C C C C C C C C C C C C 5. C C C C C C C C C C C C C C C C C C C C C C C C 6. C C C C C C C C C C C C C C C C C C C C C C C C 7. C C C C C C C C C C C C C C C C C C C C C C C C 8. C C C C C C C C C C C C C C C C C C C C C C C C 9. C C C C C C C C C C C C C C C C C C C C C C C C 10. C C C C C C C C C C C C C C C C C C C C C C C C ALL DESIGN DATA TAKEN FROM THE 1989 ASHRAE HANDBOOK OF FUNDAMENTALS * ** FULL COMMERCIAL HVAC LOADS PACE CONSULTING GROUP ZAMA * * * * * * * * * * * * * * * * * * * * * * * * ** AIR AIR HANDLER # 1 INPUT DATA: JANUARY MARCH JULY WINTER PROGRAM BY EL 07/12/00 HANDLER INPUT AIR HANDLER DESCRIPTION: TERMINAL TYPE: METHOD FOR CV: SUPPLY FAN TYPE: CALCULATIONS PERFORMED: EXCESS SUPPLY AIR: NUMBER OF TIMES SYSTEM OCCURS: LIGHTING PROFILE NUMBER: EQUIPMENT PROFILE NUMBER: PEOPLE PROFILE NUMBER: EXHAUST CAN EXCEED SUPPLY AIR: LEAVING HEATING COIL TEMP. ( DEG.F): DRY BULB TEMPERATURE (DEG.F): COOLING COIL CFM: MISC. BTUH GAIN - SUPPLY SIDE: MISC. BTUH GAIN - RETURN SIDE: COMBINED FAN,MOTOR EFFICIENCY ( %): STATIC PRESS. ACROSS FAN (IN.WG): SUMMER SUPPLY DUCT TEMP. RISE ( DEG.F): SUMMER RETURN DUCT TEMP. RISE ( DEG.F): WINTER SUPPLY DUCT TEMP. DROP ( DEG.F): WINTER RETURN DUCT TEMP. DROP ( DEG.F): CHILLED WATER TEMP.DIFFERENCE ( DEG.F): HOT WATER TEMP.DIFFERENCE ( DEG.F): COOLING VENTILATION METHOD: COOLING VENTILATION VALUE: COOLING INFILTRATION METHOD: COOLING INFILTRATION VALUE: HEATING VENTILATION METHOD: HEATING VENTILATION VALUE: HEATING INFILTRATION METHOD: HEATING INFILTRATION VALUE: VENTILATION IS 100% OF SUPPLY AIR: PRETREATED OUTSIDE AIR: IGNORE PRETREATED LOAD: PRETREATED AIR SUMMER DB TEMP ( DEG.F): PRETREATED AIR SUMMER WB TEMP (DEG.F): PRETREATED AIR WINTER D8 TEMP ( DEG.F): DESIGN OUTDOOR OUTDOOR INDOOR MONTH DRY BULB WET BULB REL.HUM 54 48 40% 61 49 40% 85 67 40% 17 0 50% ITE SOFTWARE DEVELOPMENT INC * ** SEATTLE, WA 98134 PAGE 3 DATA * * * * * * ** * * * * * * * * * * * * * * * * ** ZAMA VARIABLE AIR VOLUME SUM PEAK ZONE CFMS BLOW -THRU BOTH HEATING AND COOLING LOADS RESERVE CAPACITY 1 1 1 1 NO 0 55 0 0 0 60 1.000 0.000 0.000 0.000 0.000 0.000 0.000 2 20.000 CFM PER PERSON 0 0.000 2 20.000 CFM PER PERSON 1 1.500 AIR CHANGES PER HOUR NO NO NO 0 0 0 INDOOR GRAINS IN /OUTDOOR DRY BULB DIFF. CORRECTION 74 74 74 70 -9.88 -17.48 20.41 0.00 -39 -32 -8 * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 07/12/00 PAGE 4 * * * * * * * * * * * * * * * * * * ** AIR SYSTEM # 1 (ZAMA) ZONE SUMMARY * * * * * * * * * * * * * * * * * * ** ZN. ZONE - DESCRIPTION FLOOR HTG.LOSS NO. PEAK TIME & MONTH AREA O.A. CFM 1 SERVERS 5 PM JULY 2 CORR. 8 PM JULY 3 CORR. 8 PM JULY 4 CORR. 8 PM JULY 1 PLENUM 5 PM JULY ZONE PEAK TOTALS TOTAL ZONES: 5 11560 270,654 120 157 424 0 78 211 0 90 244 0 0 - 15,565 0 11,885 255,968 120 -4,118 0 SEN.GAIN LAT.GAIN HTG.CFM CLO.CFM O.A. CFM EXH. CFM CFM/SF. CFM/SF. 2,257,917 1,292 120 0 107,962 108,241 9.34 9.36 882 0 169 42 0 0 1.08 0.27 440 0 84 21 0 0 1.08 0.27 507 0 97 24 0 0 1.08 0.27 0 0 0 0 0.00 0.00 2,255,628 1,292 108,312 108,328 120 0 9.11 9.11 * ** FULL COMMERCIAL HVAC LOADS PACE CONSULTING GROUP ZAMA AIR SYSTEM # * * * * * * * * * * * * * * * ** AIR HANDLER DESC: ZAMA WITH VAV TERMINALS SUPPLY AIR FAN: BLOW -THRU WITH PROGRAM ESTIMATED HORSEPOWER OF 28.39 HP. FAN INPUT: 60% COMBINED FAN AND MOTOR EFF. WITH 1.00 IN WATER ACROSS THE FAN SENSIBLE HEAT RATIO: 1.00 THIS SYSTEM OCCURS 1 TIME(S) IN THE BUILDING AIR SYSTEM PEAK TIME: 5 PM IN JULY OUTDOOR CONDITIONS: 83 DB, 67 WB, SUMMER: VENT CONTROLS OUTSIDE AIR ZONE SPACE SEN.LOSS: INFILTRATION SEN.LOSS: OUTSIDE AIR SEN.LOSS: SUPPLY DUCT SEN.LOSS: RETURN DUCT SEN.LOSS: RETURN PLENUM SEN.LOSS: TOTAL SYSTEM SEN.LOSS: 73,405 BTUH 198,128 BTUH 6,856 BTUH 0 BTUH 0 BTUH - 15,565 BTUH SUPPLY AIR:271,533 / (0.998 X 1.08 X 2) ( 108,313 CFM) WINTER VENT OUTSIDE AIR (0.11% OF SUPPLY): ( 120 CFM) ZONE SPACE SEN.GAIN: 2,259,410 BTUH INFILTRATION SEN.GAIN: 0 BTUH DRAW -THRU FAN SEN.GAIN: 0 BTUH SUPPLY DUCT SEN.GAIN: 0 BTUH TOTAL SEN.GAIN ON SUPPLY SIDE OF COIL: SUPPLY: 2,259,410 / (0.998 X 1.10 X 19) • SUMMER VENT OUTSIDE AIR (0.11% OF SUPPLY): RETURN DUCT SEN.GAIN: 0 STUN RETURN PLENUM SEN.GAIN: -4,118 BTUH OUTSIDE AIR SEN.GAIN: 1,186 BTUH SLOW -THRU FAN SEN.GAIN: 71,944 BTUH TOTAL SEN.GAIN ON RETURN SIDE OF COIL: ZONE SPACE LAT.GAIN: 1,033 STUN INFILTRATION LAT.GAIN: 0 BTUH OUTSIDE AIR LAT.GAIN: 1,925 BTUH TOTAL LAT.GAIN ON AIR HANDLING SYSTEM: TOTAL SYSTEM SENSIBLE AND LATENT GAIN: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** SEATTLE, WA 98134 07/12/00 PAGE 5 1 (ZAMA) TOTAL LOAD SUMMARY * * * * * * * * * * * * * * * ** 73.57 GRAINS WINTER: VENT CONTROLS OUTSIDE AIR ( 2,890 CFM) ( 120 CFM) ( O CFM) ( 108,313 CFM) ( 120 CFM) ( 120 CFM) TOTAL SEN.GAIN ON AIR HANDLING SYSTEM: 2,328,422 BTUH ( ( INSIDE: 74 DB, 40% RH 0 CFM) 120 CFM) 262,824 STUN 2,259,410 BTUH 69,012 BTUH 2,958 BTUH 2,331,380 BTUH 194.28 TONS * ** FULL COMMERCIAL HVAC LOADS PACE CONSULTING GROUP ZAMA * * * * * * * * * * * * * ** AIR SYSTEM If 1 SYSTEM LOAD ANALYSIS LEAVING COIL CONDITION DRAW -THRU FAN MISC LOAD ON SUPPLY SIDE SUPPLY AIR DUCT ZONE LOADS ZONE CONDITION RETURN AIR DUCT RETURN AIR PLENUM MISC LOAD ON RETURN SIDE VENT AIR 120 CFM BLOW -THRU FAN PR - (BAROMETRIC TSH - PR X 1.10 X TLH - PR X 0.68 X GTH - PR X 4.50 X DRY BULB TEMPERATURE: 74.61 WET BULB TEMPERATURE: 59.08 RELATIVE HUMIDITY(%): 39.21 ENTHALPY: 25.72 BTU /LBM DRY BULB TEMPERATURE; WET BULB TEMPERATURE: RELATIVE HUMIDITY( %); ENTHALPY: 20. 55.00 51.21 77.68 94 BTU /LBM PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** SEATTLE, WA 98134 07/12/00 PAGE 6 (ZAMA) PSYCHROMETRIC ANALYSIS * * * * * * * * * * * * * ** LATENT GRAINS SENSIBLE TEMP CFM 49.925 55.000 0 0.000 0 0.000 0 0.000 1,033 0.014 2,259,410 19.000 1,033 49.939 2,259,410 74.000 0 0.000 -4,118 0.000 0 0.000 1,925 0.026 1,186 0.010 71,944 0.605 ENTERING COIL CONDITION 2,958 49.965 2,328,422 74.615 108,313 GENERAL PSYCHROMETRIC EQUATIONS USED IN ANALYSIS: PRESSURE OF SITE / STANDARD ASHRAE PRESSURE OF 29.921) CFM X (DB.ENTERING - DB.LEAVING) CFM X (GRAINS.ENTERING - GRAINS.LEA'!ING) CFM X (ENTHALPY.ENTERINO - ENTHALPY.LEAVING) 0 0 0 108, 313 108,313 TSH - 0.998 X 1.10 X 108,313 X ( 74.615 - 55.000 ) - 2,332,540 STUN TLH - 0.998 X 0.68 X 108,313 X ( 49.965 - 49.925 ) - 2,958 BTUH SUM - 2,335,498 BTUH GTH - 0.998 X 4.50 X 108,313 X ( 25.719 - 20.943 ) - 2,323,407 BTUH TOTAL SYSTEM LOAD - 2,331,380 BTUH ENTERING COOLING COIL CONDITIONS: ENTERING HEATING COIL CONDITIONS: DRY BULB TEMPERATURE: 70.07 LEAVING COOLING COIL CONDITIONS: LEAVING HEATING COIL CONDITIONS: DRY BULB TEMPERATURE: 72.33 *** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 07/12/00 PAGE 7 * * * * * * * * * * * * * * * * * * * * * * * ** BUILDING ENVELOPE REPORT * * * * * * * * * * * * * * * * * * * * * * * ** ENVELOPE REPORT USING SUMMER U- FACTORS: MATERIAL GROSS GLASS NET -U- AREA x AVERAGE TYPES AREA AREA AREA FACTOR UFACTOR UFACTOR WALL 1 6496.0 0.0 6496.0 0.140 909.440 0.140 TOTALS 6496.0 N/A 909.440 0.140 WALL WALL GLASS WALL NET W.AVG GLASS AVG GLASS AVG DIRECTION AREA AREA AREA U -FAC U- FACTOR SHD.COEFF N 1204.0 0.0 1204.0 0.140 0.000 0.000 NE 0.0 0.0 0.0 0.000 0.000 0.000 E 2884.0 0.0 2884.0 0.140 0.000 0.000 SE 0.0 0.0 0.0 0.000 0.000 0.000 S 644.0 0.0 644.0 0.140 0.000 0.000 SW 0.0 0.0 0.0 0.000 0.000 0.000 W 1764.0 0.0 1764.0 0.140 0.000 0.000 NW 0.0 0.0 0.0 0.000 0.000 0.000 TOTALS 6496.0 0.0 6496.0 0.140 0.000 0.000 * ** FULL COMMERCIAL HVAC LOADS PROGRAM BY ELITE SOFTWARE DEVELOPMENT INC * ** PACE CONSULTING GROUP SEATTLE, WA 98134 ZAMA 07/12/00 PAGE 8 * * * * * * * * * * * * * * * * * * * * * * ** TOTAL BUILDING LOAD SUMMARY BUILDING PEARS IN JULY AT 5 PM BLDG. LOAD AREA DESCRIPTIONS QUAN ROOF WALL GLASS SKIN LOADS 6,496 57,839 22.01 LIGHTING EQUIPMENT PEOPLE PARTITION VENT 120 INFL 2,890 DRAW ■THRU FAN BLOW -THRU FAN SUPPLY DUCT RETURN DUCT BUILDING TOTALS 14 578, 000 5 0 120 0 BUILDING SUMMARY LOAD DESCRIPTIONS VENTILATION INFILTRATION ZONE LOADS PLENUM LOADS FAN & DUCT LOADS 6, 496 SEN. %TOT LOSS LOSS 0 0 0.00 57,839 22.01 0 0 0.00 0 0 0 0 6 198,128 0 0 0 0 6,856 2.46 198,128 71.17 73,404 26.37 - 15,565 0.00 0 0.00 BUILDING TOTALS 262,823 100.00 2,958 2,328,421 2,331,379 100.00 TOTAL BUILDING SUPPLY AIR (BASED ON A 19 TD): TOTAL BUILDING VENT AIR (.10% OF SUPPLY): TOTAL CONDITIONED AIR SPACE: SUPPLY AIR CFM / SQ.FT. OF CONDITIONED SPACE: SQ.FT OF CONDITIONED AIR SPACE PER TON: TONNAGE PER SQ,FT OF CONDITIONED AIR SPACE: TOTAL HEATING REQUIRED WITH OUTSIDE AIR: TOTAL TONNAGE REQUIRED WITH OUTSIDE AIR: * * * * * * * * * * * * * * * * * * * * * ** LAT. + SEN. *0 TOTAL %TOT GAIN GAIN GAIN GAIN 0 0 0 0.00 0 32,371 32,371 1.39 0 0 0 0.00 0 32,371 32,371 1.39 0.00 0 53,496 53,496 2.29 0.00 0 2,168,078 2,168,078 93.00 0.00 1,033 1,346 2,379 0.10 0.00 0 0 0 0.00 2.61 1,925 1,186 3,111 0.13 75.38 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 71,944 71,944 3.09 0.00 0 0 0 0.00 0.00 0 0 0 0.00 262,823 100.00 2,958 2,328,421 2,331,379 100.00 SEN. %TOT LAT. + SEN. - TOTAL %TOT LOSS LOSS GAIN GAIN GAIN GAIN 1,925 1,186 3,111 0.13 0 0 0 0.00 1,033 2,259,409 2,260,442 96.79 0 -4,118 -4,118 0.00 0 71 71 3.08 108,313 CFM 120 CFM 11,885 SQ.FT 9.1134 CFM / SQ.FT 61.1741 SQ.FT /TON 0.0163 TONS /SQ.FT 262.82 MBH 194.28 TONS DEPARTMENTS: 0 Bu I g Division Fie Prevention 14 ‘14/00 R ue , i ' -i-oo Public Works Q Structural ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete El Complete Ed Comments: TUES /THURS ROUTI Please Route REVIEWER'S INITIALS: Structural Review Required AP ROVALS OR ORRECTl NS: (ten days) Approved ❑ Approved with Conditions PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M2000 -196 DATE: 9 -1 -2000 PROJECT NAME: ZAMA -- PHASE 3 . SITE ADDRESS: 12101TUKWILA INTERNATIONAL BL _ XX_ Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # _ __Revision # After Permit Is Issued REVIEWER'S INITIALS: DATE: Planning Division Permit Coordinator DUE DATE: 9-5.2000 Not Applicable ❑ ❑ No further Review Required DATE: DUE DATE 10- 3 -200_ Not Approved (attach comments) ❑ CO „R,E,C,,,TO,,,,0„N, PE TERMINATION: DUE DATE Approved IIJ Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWER'S INITIALS: DATE: 4;� City of Tukwila Fire Department Fire Department Review Control #M2000 -196 (510) September 7, 2000 Re: Zama - phase 3 - 12101 Tukwila Intl. Blvd., Suite # Dear Sir: Steven M. Mullet, Mayor Thomas R Keefe, Fire Chief The attached set of mechanical plane have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #1900) H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the ower source of the air - moving equipment upon detection of smoke in the main supply-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (UMC 608) Duct smoke detectors shall be capable of being reset from the alarm panel. (City Ordnance #1900) Dedicated fire alarm system circuit breaker(s) shall be equipped with a mechanical lockout device. (NFPA 72 (1- 5.2.8.2)) All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: 206. 575.4404 • Fax: 206.575.4439 • city of Tukwila Fire Department Page number 2 obtained. (City Ordinance #1900) (UFC 1001.3) Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1742) 2. All electrical work and equipment shall conform strictly to the standards of The National Electrical Code. (NFPA 70) An aisle to and working space shall be provided for each electrical panel. An aisle width not less than 24 inches shall provide access to the panel and 30 inches of working space shall be provided directly in front of the panel. (NEC 110-16(a), NEC 110-16(c)) Each circuit breaker shall be legibly marked to indicate it's purpose. (NEC 110 -22) Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. Yours truly, f 510 The Tukwila Fire Prevention Bureau cc; TFD file ncd Headquarters Station: 444 Andover Park East Steven M. Mullet, Mayor Thomas!? Keefe, Fire Chief Tukwila, Washington 98188 • Phone: 206 - 575.4404 • Fax: 206.5754439 ig • • • • • •• I . • • --DEPARTIVIE" NT•OF LABOR INDU STRIES • • • • • • • • . • . • •• - • • • " • • • 's • • • — REGISTERED . AS PROVIDED BY LAW " • • •••1 • • " • • CONST./CONT:'4..GENERAL':..7 _ • 1. • ‘j • •; • j ‘• r '• • • • • • ' trotkt RECIXPr EXP =, , CCOIYA. AMCKINt.f3,72N0,7.,12 31j2 0 0 Ol*. t EFFECTIVE 4DATEfai.'kiir 08/20/1961; rwrA163641014411 e.k•• Xriika 4.?;114 • :- • ': ' • ' - : ' . . - - -' • MC-1 CO' . . ..2. ...„.. airs. , , ....aaassaa. --.■-• a a .aa • • ...T..- crlEfox=2• "s '' ' ' ."- - . - . • , - - . ''''7 '' ' 5 0 0 5 s-. RD :'-AVE • S .. .................. --,.....,-_-- - - •...... .... , ..... F625441000 (Vol) SEATTLE yA. 98124 7 0 G 7. Jw &-t- 7*t. °. 6/1•AJJ" C. •• • A ly.r.- b.e.4 06-4 "t4c £6-4 OJel,a • L 14.04 ` A. + 441:°11 /a/ • • . • • • .z14 CO 0 z w Cc CO CO O a H- U a 11 Mho 1 4 g S N4h a H Z 1' 41 IA RR P t n 8 419 2 4E) !! 1 1! ! Ill g gi I J g 1 1,1 1 11111 I 1 3s ki hg a 1 I I 8 8 8 8 8 88 nh 8 8 N N N N FEE 888 8 8 I 8 4 8 8 I 8 8 8 8 8 N S 8 S 8 I d k a 5 1 I 1k8 .1 SYMBOLS •C'''''."1 3NON WA ,o- .t =.a /l L PP I 3NON 0- L. Bit 031tN1 O310N WNW I I DRAWING INDEX DESCRIPTION NYid 3lS MJAVd 10ONI ONIMYNO $ .SNOILVIA3NITEN 'ON3O31 NYId 3YAH Zd 13A31 3O0IAl 5 11 H R 0YAH - N71d 30021 GARAGE LEVEL P1 - PLUMBING PLAN 1ST FLOOR PUW -'UNDERFLOOR PLUMING 11 Ni S311103HOS 8 Sfl130 ON18NITId - NY1d NoO13 ONE %SINN- OY3HNSAO - NY1d N00111SI N0110310Nd 321I1 Tl -_ S 10130 NOLLO3102Id 32111 T1 - NY 1100111 PUS NO11O3108d 32111 Tl NYId 1100111ST ro-n 111-11 1011-n I In nT -n VET-I1 0 -n X7'42 v.7_, r1 1•1-Il r8-n YIT -d S0T -d 14-d ST -d 8111 -d LL -S dd LL -rd! LL -Cdi ** )**3 *** CO 0 z w Cc CO CO O a H- U a 11 Mho 1 4 g S N4h a H Z 1' 41 IA RR P t n 8 419 2 4E) !! 1 1! ! Ill g gi I J g 1 1,1 1 11111 I 1 3s ki hg a 1 I I 8 8 8 8 8 88 nh 8 8 N N N N FEE 888 8 8 I 8 4 8 8 I 8 8 8 8 8 N S 8 S 8 I d k a 5 1 I 1k8 .1 SYMBOLS j i mem mai w oo emu sow ✓ Ism 1, I I 1 : 114111 _ ram ii / - 11111111,j 1 , 11 I I I ! !! I i I DROPS ON OTHER. SIDE. OF WALKWAY - 8 - CWS & (2) 6'CWR N FOR CONTINUATION SEE M3.IA 1- 1 /2 & FOR FOR OR CONTINUATION -1/2' FOS''& OR SE M3.01 FOR C 1NT. CT -1 I j FUEL TANK FILL e "Cws & CWR SUPPORT .ON.4 "x4" PT WOOD. SLEEPERS ON CONCRETE P. j P -1A. I CT-2 I I P -18 !nn CONNECT 10 EXISTING (2) FUEL STORAGE TM SEE DETAJIj COOLING TOWER GENCY MAKE -UP WATER CT-4 I PHASE 3 A FUEL TANK BUNKER -SEE ARCH DWGS FUEL TANK VENTS CRC, PUMP k ALTER NPCW WELL COORDINATE LOCATION WITH ARCHITECT fl47cio1 q G SABEY CORPORMION ARCHITECTU[& GROUP CONSULTANTS DRAWING TITLE J4i ns fry Ca,Wctors � Ad 5005 Jrd Ave South P.0aar 24567 Seattle. Wa. 98124 xte (200 762-331l la lac (206) 762 -2624 5400 AE CHN.ambia 81vd FW#AWU 0T ,�) 97218 phone ( 5113 ) 351 -6903 PHASE 3 PERMIT ISSUE 8/21/00 PHASE 2 4/_a/CIO FUEL TANK RELOCATION 4/18/00 j�p fOR CONSI7FUCYION 1 -19 -m2 PEM91T ISSUE 12 -15 -99 REVISIONS ISSUE DATE Al *mew ad writhe material appearing herein ma8bde the adgNd ad unpublished mark at the Sabel C� and the same may not be dupkoted. and ore ',rebore. the erRbn content of the Salm Corpora0ar. Tenant Im— ros$men4 for at Intsrgats (List 12201 Tukwila International Blvd. Tukwila, 10.4 811E PLAN Jig 1 ,t,(-14,14-14" v 'RAMP i EC-1 IS-435 S-500 24x8 SWG. W/DBL DEFL & OBD KRUEGER MODEL 880H OR EQUAL 3RD FLOOR LOBBY TO BE SERVED BY F-2 LEVEL 3 & 4 AC UNIT-c REENHECK MODEL CUBE-14-3 .625" SP., 1/3 HP. /ROOF CURB, BDD, & BIRDSCREEN NOV Lt( .. 1Fre UP TO •dilk 1 111.1-- E-4 `.:0 ca., Di lif .,......,„; .,' \ G•iorODEIL 513 Hp i E-21-15 - \O A, 'J " AA.* CURB, BDD..1 411/ . • NIk i 36, 6/M +II I IIIVRIT MIMI / - 1 / ' iZIFI■ .1 , I I 1 0(1 FDIARIE6S411111 , ,.. ,111111111101kj,12.1•111k, / r BREAK ROOM & CORRIDOR WILL REQ. CEILING AT 8 A.F.F. 3, ( 4 M3.213 (-3"CWS Sc CWR DN SECOND FLOOR PLAN - HVAC SCALE: 1/8" xx 3 ON FLOOR StWS & CWR DN 3"CWS . CW• IN Hp - .....M'Smxr '"' -,- S , 701 , 4_ FM,...,,, - 1 WI - 1.: ';' TmS 3 #mmii 11111 1 ' :4111111,MIN, g__ -Arm -'- ' , 1:: ,' ex. .!-----: . --,- ,, ,x , , 1 _ • :.:.___. t .. ---1--;t • ":"'WM: ; 4 - .-1-1:! V ', (BaDw RAISED FLOOR) ( 6 ) 1. 7 7.5 I 8 _L] A Gi EXPIRED DEC 1 3 Z001 CONSULTANTS *atoned Canimo. tom and Enginows 8005 Jni Ave South P.Olka 24567 Swift Wa 98124 phone (206) 762-3511 lac (206) 762-2824 5400 h Columbia &yd. Portland Or 97218 phone (11.1) 331-6905 ha (504 3.51-6903 2:1 PHASE 3 PERMIT ISSUE _ELLQ_D .I.M1g1).E2 PERMIT ISSUE _12,0,29 REOSONS ISSUE DATE AI drawing. and ninon mated aware* honk conothes cojnal and unpubletted work a/ the Sob" 02=2 and the tome may not be duplicat ed. umel or without the writtan concord c the Satyr Corporation. Tenant Improvement for at Intergata 12201 Tukwila International Blvd. Tukwila, WA PI 0 -°°".. 1 gRAVANcl 5E FL HvAC PROGRESS DATE: 1,444$ FILE BPY OP 11 ' MINI me ilal. 1111 Wie Jig 1 ,t,(-14,14-14" v 'RAMP i EC-1 IS-435 S-500 24x8 SWG. W/DBL DEFL & OBD KRUEGER MODEL 880H OR EQUAL 3RD FLOOR LOBBY TO BE SERVED BY F-2 LEVEL 3 & 4 AC UNIT-c REENHECK MODEL CUBE-14-3 .625" SP., 1/3 HP. /ROOF CURB, BDD, & BIRDSCREEN NOV Lt( .. 1Fre UP TO •dilk 1 111.1-- E-4 `.:0 ca., Di lif .,......,„; .,' \ G•iorODEIL 513 Hp i E-21-15 - \O A, 'J " AA.* CURB, BDD..1 411/ . • NIk i 36, 6/M +II I IIIVRIT MIMI / - 1 / ' iZIFI■ .1 , I I 1 0(1 FDIARIE6S411111 , ,.. ,111111111101kj,12.1•111k, / r BREAK ROOM & CORRIDOR WILL REQ. CEILING AT 8 A.F.F. 3, ( 4 M3.213 (-3"CWS Sc CWR DN SECOND FLOOR PLAN - HVAC SCALE: 1/8" xx 3 ON FLOOR StWS & CWR DN 3"CWS . CW• IN Hp - .....M'Smxr '"' -,- S , 701 , 4_ FM,...,,, - 1 WI - 1.: ';' TmS 3 #mmii 11111 1 ' :4111111,MIN, g__ -Arm -'- ' , 1:: ,' ex. .!-----: . --,- ,, ,x , , 1 _ • :.:.___. t .. ---1--;t • ":"'WM: ; 4 - .-1-1:! V ', (BaDw RAISED FLOOR) ( 6 ) 1. 7 7.5 I 8 _L] A Gi EXPIRED DEC 1 3 Z001 CONSULTANTS *atoned Canimo. tom and Enginows 8005 Jni Ave South P.Olka 24567 Swift Wa 98124 phone (206) 762-3511 lac (206) 762-2824 5400 h Columbia &yd. Portland Or 97218 phone (11.1) 331-6905 ha (504 3.51-6903 2:1 PHASE 3 PERMIT ISSUE _ELLQ_D .I.M1g1).E2 PERMIT ISSUE _12,0,29 REOSONS ISSUE DATE AI drawing. and ninon mated aware* honk conothes cojnal and unpubletted work a/ the Sob" 02=2 and the tome may not be duplicat ed. umel or without the writtan concord c the Satyr Corporation. Tenant Improvement for at Intergata 12201 Tukwila International Blvd. Tukwila, WA PI 0 -°°".. 1 gRAVANcl 5E FL HvAC PROGRESS DATE: 1,444$ FILE BPY OP 11 L — — — af EXPANSION /SEISMIC FLEX CONNECTION FROM EN. #1 GEN. #1 FROM GEN. #2 TO GEN. #2 / REDUCED BACKFLOW PRESSURE N— 2" BYPASS �CwS — —CWR - — SECOND FLOOR DATA CONTROL LOOP WS —CWR FIRST FLOOR DATA CONTROL LOOP CONTAINMENT APE UNDERGROUND BEIWEFN FUEL BUNKER & GENERATOR ROOM ✓ %v TO ISMS FOS LEAK DETECTOR 1 FUEL OIL CRC. PUMP _ CON.ESONC/FARI1CULATE FILTER BUTTERFLY VALVE (TYP) PIPING TO BUILDING 8 NOT TO SCALE \--- AIR SEPARATOR EXPANSION TANK AI VP CWS — — CWR — POT FEEDER Ark ANTI -SIPHON VALVE 2 - NORMAN VENr— LEVEL MONITORING 6 EMERGENCY VENT `FUEL TANK BUNNER SEE SIRUCIURAL DRAWINGS FOR BUNKER CONSTRUCTION. HOLD DOWNS ANT BACKFILL REQUIREMENIS. VFD r -- ---r VFD r VFD LOCATED IN FUEL OIL PIPING_ DIAGRAM I P -1 A I I P -113 I I P -1C IP108I ARRESTOR —r WIIERSRIIAL NORMAL VENT .r FUEL I.I r INTERSTITIAL EMERGENCY VENT OVERFILL PREVENTION VALVE 112 DA X 23'-4' LONG 8.000 GALLON DOUBLE CONTAINMENT STORAGE TANK o-� L& CONDENSER WATER SYSTEM DIAGRAM NOT TO SCALE CFWCK VALVE FRI !DOER 2 "NPCWi HEAT TRACED WATER WELL & PUMP DEC 13 2001 SABEY CORPORATION ARCHITECTU* E GROUP CONSULTANTS ins1ry .4,-....balicar Con tractors and agitator 5005 Sid Ars South P.oJ1or 24567 SeaNLx MM. 98124 photo (206 762-2511 far (206) 762-2624 5400 AE Colombia Ohd Portlan4 Cr 97218 sham (5BT 351 -6903 lar (SOS) 331 -6905 PHASE 3 PERMIT ISSUE 8/21/00 1 FUEL TANK RELOCATION 4/18/00 J°4° 1P. FOR C MINIGTION i -I9 -m2 r leht rssuE- -- 12dEr. REVISIONS ISSUE DATE N & wive and eaten rattarki apptarig hInin canstIhrts the ottani and uputfehed wait d ha Salm lbmamlWn and the tame may not M duplicate. 'yea or ��ertlJ i without the written meant d d the Sahay Corporation. Tenant .Improvement for W '8: T 'AF 4) 14 at intergate West Inv Tukwila International Blvd Tukwila, WA I Z. 00D 1c:::1 EXPIRED DRAWING ME. {( ($ PROGRESS DATE: 10.0149 RUE PUN: PROJECT NUMBER: 35398 SO - 1 ODUII DRAWN BY: J. : PERMIT CENTER CHECKED, BY: art APPROVED BY: DRAWING NUMBER: MS 1 RECEIVED cm l7F 1 DIFFUSER (DT)(DG)SCHEDULE t7T 17 4771 tS7 477! 177! 4571 srz sr71. 972 9 r Z '! 0 1 f 2 '''1 042'1 0231 1011 0771 i V H W /- 1, 'a1aM dl1 BOA 31139110 39.1.1 K9tl - T -- .. 1 •0ea037 70 VW 31810X5 391 3011003 9101,--00v IMO 3111 000915 T 710H31d 169 &memo so 02311 13305 33001593583!01. 5389910 03 TOM moos SKI 93d 39 105 326 1(0 Hai "l ammo 0011133011 M R HOM30.10 seas 30110011 071 13000 9091 301010011 0711130011 500 90 078 130011 5Wl 30110011 0311133M 500 30X100110711 00100011 Oat 131011 900 0010011 03n mat 9101 30010031.= 130011 9110 1002011'009130011 Min 301110011 0711 130011 100 '..' 0/310011 009 130011 5101 0000011 079 13009 51101 07010011 0711 130011 5101 f f s7e 130011 5801 970 02011 S0LL a i i � & f 5 n CF11 O 70F TSP. (ESP + lot. Losses) FM ,1IOT0N (HP) voltage /Phosa e ae�9H� Type of YAP Control I Alum lv.. of Faire I t i S 7 4. 3 0103 09009p003 9804d/o0a39 00j 1esuspuo3 19du10a 7@ 4009 r IMPJA 7wM0 somss lA of -, 1) "la 40004 (BP) 819997 »wod Purrs I ,., 1000ogp'5090eH 734. 00 9 00 0 __. Wm loopo31 1015 aPl001W0001d Fop L� 5311318 4)P90 90191, (S303110 MPH 11 ('S91 74DPN 1 (1033911 47 001•80 are - 1 389-1 MEI 389-1 - Nre-1 020-1 a113-1 10X11 300 3304 24 X 24 L _24X24 *0 8 90 K X tZ 40 X tZ to olto ' m i l l � I f2 X10 9X9 325 3007 01X01 9X9 fl fl 01X01 01 X 9l ', , 91 0 91 9X 9 9X9 00X01 01 X 01 , 91.0 91 fl 11 91 0 91 91 X 9! 91 X 91 IODULAI Olt 193 8911 •01.9 - J ZS b 5 9 b 1X1 'Oa 90 J b b b F. i Z '09.91 I I Ve .91 1pl ll 7630 ANS I t 00000 so 940(19 101019090 SL -0410 -SOS 11331913380' 9 010 1 -AS 9 iii_ 7 ,7173. N' ' 000 00 00 111■11111111113r ' 5L I ti III YN 2Q5 M e}npepps u1A I mormizzaimmla s • Puy 'P 9! Me 033480312 0 -43 I '9c. Ord Z' £/1194 H W F a I 1tr31 nett b Q 3 1 Ya 09► 1090* J §1 2 Discharge Confq arotian Sup. Fan. Confg.(Blow Th0 /Snot Thru) X ij N a i i � & f 5 n CF11 O 70F TSP. (ESP + lot. Losses) FM ,1IOT0N (HP) voltage /Phosa e ae�9H� Type of YAP Control I Alum lv.. of Faire I t i S 7 4. 3 0103 09009p003 9804d/o0a39 00j 1esuspuo3 19du10a 7@ 4009 r IMPJA 7wM0 somss lA of I 13101031 80011 1 -030 1VDOIRL0133 30N 1 11 P10 W0sli 2Q5 M 1031 ON L01/ Fa. I '9c. Ord Z' £/1194 H W F a I 1tr31 nett y Q ` ' s I_O D 9d11 uol *anS 97w91 Discharge Confq arotian Sup. Fan. Confg.(Blow Th0 /Snot Thru) f7� ea04d a PA 07101 dH 4d -._ - - 91101 Pm010N 8004 Awns 0 1390000 1189 9 P191/ 9* PIRS 9 090003 dH wj 49409P093 0103 09009p003 9804d/o0a39 00j 1esuspuo3 W�3 2 001 (*39) A.nod1011 78 -, 1) "la 40004 (BP) 819997 »wod Purrs I ,., 1000ogp'5090eH 734. 00 9 00 0 __. Wm loopo31 1015 aPl001W0001d Fop L� 5311318 4)P90 90191, (S303110 MPH 11 ('S91 74DPN 1 (1033911 47 001•80 ,50 04119 190 00 0. 10 5 '0 011 910909079/9 10 10.7 0 0 19 Ndans 00od 31 -d 0 -13 ( 0-13 0-010P-11 0s W0sli 989d el -d 0 -13 at 1 -13 L -Ztor31 O H W F a n H 0134113 L- Zl04 -37 u059p 39 I HSd1 71 P0 PM 13 i t 1 f I I a a U S 8 I 2 z 1— z W ` 111 a t i fa i DS 1 f 0 w J G W U 0 X 0 J z W IN z Q 0 W w y S g g S fl 12 . lip AO? WR co E 0. • V • m U. 0 V f0 e W W J 0 W s, vI ^ v/ cc 0 z W 0 z V/ g 9 g 1 e 1 N to 1 V S V cc a I g is I 3 ra 3 0 S 3 y J G W U N J J_ o z L d r W Y � 1 S I S� to g S Z S L7 1 S a g p n SS 5 a 1 N a a I I f5 S S S 2 ^� I a S I 12 L N 6S SS SB S L S S S S N S S S S S I 3 N 3 L 8 S S S 1 0 3 S I I n S S S 3 N 11 le S 3 a 3S N R S S 3 S S S y SS 6S 3 S S I R N C. 7S S S M S b 8 S a I L Ir 2. ngs: ROOFTOP HEAT AND SCHEDULE EXHAUST < i PHWR I PHW I PCW NPCW i FOUR CW8 R Vent KI4CrE5ps0 Sanlary and tab Waste (<14vF.Spsi) 11 1t Potable Cold Water (50T ,50psi) II Gerwatsr Exhaust, 1000 F) Fuel 06 Vying (7�F. 25 Psi) Condenser Water (CUOMO Fill nlh 20% inhbied P.THIlln 9bed D.eoHptlon (Twwp.P►ewn) Above grade: Cast Iron Sal Fmk No Hub, St. Below geode: sch. 40 PVC Below lst Floor Cast bon Fiore. Copper OW No Hub. S.V. Above 1st Floor Capper 01W Type L Hard Copper Type L Hard Copper Type l Had Copper Type l Had Copper I Sch.' 40 Black Sted A53A ERW I kneaded 5ch. 40 Black Steel A53A FRW r and leader type I. copper 2 -1/2' and up: Sd. 40 welded Sack Steel A53k FRW C II No Nub So9 No fhb Sol Wrot Copper CAW Wrought Copper Solder Felting& I if Wrought Copper Solder FAtings. wrought Copper Solder Fifeps I 0 1 - I till fill I <E N/R N/R r and under. Nibco sweat tall valve r and under. Nibco sweat bat valve 214' and up: Ye series' 700 Butterfly r and under. Nibco sweat ball valve 21(' and up: Vic series 700 Butterfly r and under. Nibco sweat ball valve 2J4• and up: We series 700 Butterfly I N/R N/ Nlbco threaded ball valve r and under. Nibco threaded ball valve. 214' and up: friibcp iS 2000 Butterfly w /locking lever Balancing waiver Armstrong circuit setter Valves (or Equal) N/R N/R Runoubr r Fiberglass r and under I• Morelos% Outdoonr 1W Fiberglass and add alum Jacket Runoutcc 14• Flbergtass: 2' and under 1• Fbeglass; Outdoors 114' Fiberglass s and add alum. Jacket ti Indoom r fiberglass Outdoors 1' fiberglass with Alum. Jacket r Cal -Si through 1st fk sp.,ce out to end of pipe; loth jacket indan, meta locket N/R Fiberglass will vapor barrier. 1- and under plus short (<121braucbes: W 1 1 /2 r pipe : 3/4' 2 -1 /r pipe and up: 1' Outdoom Blum. jacket I Per 1997 UPC Section 712 Per 1997 UPC Section 712 Per 1997 UPC Section 103.5-3 Per 1997 UPC Section 103.5.3 Per 1997 UPC Section 1035:3 Per 1997 UPC Section 103.5.3 N / R' Pressure test to 60 psi for 30 minutes - -- Ai test to 100 poi 1 Teat Procedure Boxing required for 2r and up, except wit in lr of structure &acing required for 214' and up, except within tr of structure Bracing required for 2%' and up. except within tr a ebucbre Bracing required for 2r and up, except within tr of structure Bracing required for ! 44• " and ' ua. except wihin it of struvt,ea caning required. for 714' and up. except within 12' of structure: I Bracing required ® each penetration: aloe far emansion I Some as FOS&R I Bracing required for 1' and up, except within it of structure I Bracing required for 1 2n and up, except wihin 12' of stmaae $.lsrato .s normal hangers)