Loading...
HomeMy WebLinkAboutPermit M2000-274 - BOEING #9-101M2000 -274 Boeing 9 -101 9725 E Marginal Wy h City of Tukwila Community Development / Public Works • 6300 Southcen!er Boulevard, Suite 100 • Tukwila, Washington 98188 Permit No: M2000 -274 Type: B -MECH Category: NRES MECHANICAL PERMIT Address: 9725 EAST MARGINAL WY S Location: Parcel #: 000340 -0018 Contractor License No: BOEINC*294ML TENANT OWNER CONTACT CONTRACTOR BOEING #9.101 9725 EAST MARGINAL WY S, TUKWILA, WA 98188 BOEING PO BOX 3707 M/S 1F-09, SEATTLE WA 98124 GARY TALLER PO BOX 3707 M/S 89 -15, SEATTLE, WA 98124 BOEING COMPANY PO BOX 3707, M/S IF -09, SEATTLE, WA 98124 Status: ISSUED Issued: 12/13/2000 Expires: 06/11/2001 Phone: (206) 43.1 -3670 Phone: 206-544 -2975 *************,**,*************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: RELOCATING (3) FUME HOODS AND (1) EXHAUST FAN. UMC Edition: 1997 * * * * * * * * * * * * * * * ** ************************* * * * * * * * * * * * * * * * * * * * * * * * ** * * * * ** -7 rw. 12—i& Permit Cente uthorized Signature Date I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the perf•rma. of work. I am authorized to sign for and obtain this biilding Signature :___ Valuation: Total Permit Fee: Date • / 2 4, 061C) � r r r 10,000.00 68.88 Print Name: Title: This permit shall become null and void if the work is not commenced within 180 days from the data of issuance, or if the work 1s suspended or abandoned for a period of 180 days from the last inspection. CITY OF TUKWILA Address: 9725 EAST MARGINAL WY S Permit No: M2000-274 Suite: Tenant: BOEING #9-101 Status: ISSUED Tyoe: B-MECH Applied: 12/01/2000 Parcel #: 000340-0018 Issued: 12/13/2000 *****************kk*****A**********14**k*Wkk*kk*k*kk*****k*kk*k*********** Permit Conditions: 1. Electrical permits shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (248-6630). 2, No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division, 3. All permits, inspection records, and approved plans shall be available at the job site prior to the start of any con- struction- These documents are to be maintained and avail- able until final inspection approval is granted. 4i All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). S. Validity of Permit. The issuance of a permit or approval of planSt specifications, and computations shall not be con- strued to be a permit for, or an approval of, any violation, of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the previsions of this code shall be valid, 6. The attached set of plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 7. Sprinkler protection shall be extended to all areas where required, including all enclosed areas, below obstructions and under overhangs greater than four feet wide. (NEPA 13-4-5.5.3.1) 8. All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and ell modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Feotory Mutual, Industrial Risk Insurers, Kemper or any other representative designated and/or recorgnized by the City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #1901) 9. Calculated sprinkler systems shall be designed with a 10 PSI cushion for low reservior conditions. (City Ordinance #1901) 10. All electrical work and equipment shall conform strictly to the standards of The National Electrical Code. (NFPA 70) 11. THESE PLANS WERE REVIEWED BY INSPECTOR 510. IF YOU HAVE ANY QUESTIONS, PLEASE CALL THE TUKWILA FIRE PREVENTION OUREAU AT (206)575-4407, Og I'hereb Y certify that 1 have read these conditions and will comply With them as outlined. All provisions of law and ordinances governing his work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other work or local laws regulating construction or t e performance of work. ature: - - - Print Name: Date: / �C? t� Project Name/Tenant: vsA Valu g e y jtFal Equipment: Site Address : 9�a,.s F, ►� , �� s ty State/Zip: cad .s, (I Tax Parcel Number: 06o 3 Q - Ool p Phone: ( ) Property Owner: p C th� Street Address: City State/Zip: Fax #; ( Contractor: r C3,v G t'^� Phone: ( ) Street City State/Zip: Fax #: ( ) Contact Person: /r (r ar T I i (r- Phone: ( 0 stAi_a 9 Street Addres K d /3ox 3x / ., City State/Zip: MS 4 l - - lL Se4 9fra Fax #: ( CITY OF TL, WILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Mechanical Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. MECHANICAL PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE PILLED OUT BY APPLICANT) Description of work to be d y ne (please be ( specific): / f / t2& tpG1 i n _. 3J . _ I�tK+Z !mss and . (ii 6X4^ t4S Fa *AZ_ Signature: Print name: Address: Date l t /25 meal pens u.duc ation accepted: :I BUILDING OWNER OR AUTHO Z_' AGENT: D. a applirt I TAFF USE ONLY Project Number. 21 X1J ��� Permit Number: M Current copy of Washington State Department of Labor and Industries Valid Contractor's license. If not available at the time of application, a copy of thts license will be required before the permit is issued OR submit Form H.4, "Affidavit in Lieu of Contractor Registration ", Building Owner /Authorized Agent: If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal, I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Expiration of Plan Review • Applications for which no permit is issued within 180 days following the date of application shalt expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 189 days upon written request by the applicant as defined in Section 114.4 of the Uniform Mechanical Code (current edition). No application shall be extended more than once. Applica on n by; (initials) ✓ Submittal Requirements Floor plan and system layout Roof plan required to identify individual equipment and the location of each installation (Uniform Mechanical Code 504 (e)) Details and elevations (for roof mounted equipment) and proposed screening Heat Loss Calculations or Washington State Energy Code Form #H -7 H.V.A.C. over 2,000 CFM (approximately 5 ton and larger) must be provided with smoke detection shut- off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical Code 1009). Specifications must be provided to show that replacement equipment complies with the efficiency ratings and_other applicable requirements of the Washington State Nonresidential Energy Code. , . Structural engineer's analysis is required for new and the replacement of existing roof equipment weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be stamped by a Washington State licensed Structural Engineer. M�chanicat COMMERCIAL: Two complete sets of drawings and attachments required with application submittal NOTE: Water heaters and vents are included in the Uniform Mechanical Code.. please include any water heaters or vents being installed or replaced. RESIDENTIAL: Two complete sets of attachments required with application submittal Submittal Requirements New Single Family Residence Heat loss calculations or Form H -6. Equipment specifications. Chan: a -out or re lacement of existing mechanical equipment Narrative of work to be done Includin ' modification to duct work. Installation of Gas Fire lace Narrative with specification of equipment and chimney type. If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney is in safe condition. NOTE: Water heaters and vents are Included in the Uniform Mechanical Code — please Include any water. heaters or vents being installed or replaced. ft****44414**************** k*** ** ** ************A******* CITY or : WA' Z9 —20 TRANbM1 i , ******04********************* **h****** ******************** TR A N S 'Nu SMmbOri R9600407. Amount s 60.68 12/1.3/00 1:1449 ' . .:. Piviitnt CASH NotA t ion: GARY TALLER In t: ILO '. , .;.. t*Nos M2000*274 TY001 II -MECH MECHANICAL PERMIT i$Rromt Nos : 000:340-00LO ti:.:14(10•401 s '9721 EAST MARGINAL WY S 1 ot a i 66.66 Thisi .:1 68.00 Total ALL Pmts 60.88 Dui uncit: .00 **************** 4********************************************* ApO001t. .6ode Donor, ut ton Amount ,000/845.830 PLAN CHECK - NONRES 13.70 0022.100 MECHANICAL NONO ES 55.10 4110 , rif;n0 3 971,0 T TAL 48.fle • • • PERMIT NO.: Mt:MI" r... if MECHANICAL PERMIT APPLICATIONS INSPECTIONS ❑ 00002 Pre•construction 0 00050 WSEC Residential 0 00060 WA Ventilation/Indoor AQC 0 00610 Chimney Installation/All Types 0 00700 Framing ❑ 01080 Woodstove 01090 Smoke Detector Shut Off 0 Off 01100 Rough-in Mechanical 01101 Mechanical Equipment/Controls 01102 Mechanical Pip/Duct Insul 01105 Underground Mech Rough-in 01113 Motor Inspection 1400 Fire Final 01800 Final Mechanical 04015 Special-Smoke Control System CONDITIONS 0001 No changes to plans unless approved by Bldg Div ❑ 0014 Readily accessible access to roof mounted equipment 0016..: Exposed insulation backing material 0019 All construction to be done in conformance w /approved plans ❑ 0002 Plumbing permits shall be obtained through King Co 0027 Validity of Permit 0003 Electrical permits obtained through L & 1 0036 Manufacturers Installation instructions required on site © "BTU maximum allowed per 1997 WA State Energy Code" 0 0041 Ventilation Is required for all new rooms & spaces id "Fuel burning appliances "Appliances, which .cnerate...." "Water heater shall be anchored.,.." *V dltionul Conditions; • TENANT NAME: FEES Basic Fee (YIN) Supplemental Fee (Y/N) Plan Check Fee (Y/N) Furnace/Burner to 100,000 BTU (qty) Over 100,000 BTU (qry) Floor Furnace (qty) Suspended/Wall/Floor-mounted Heater (qty) Appliance Vent (qty) Headng/Refrig/Cooling Unit/System (qry) Boiler /Compressor to 3 HP /100,000 BTU (qry) to 15 HP /500,000 BTU (qry) to 30 HP /1,000,000 BTU (qty) to SO HP /1,750,000 BTU (qty) over SO HP /1,750,000 BTU (qty) Air Handling Unit to 10,000 cite (qry) over 10,000 cite (qty) Evaporative Cooler (qty) • Ventilation Fan (qty) Ventilation System (qry) Hood (qty) Incinerator — Domestic (qty) Incinerator — Comm/ind (qty) Other Mechanical Equipment (qty) Other Mechanical Fee (enter SS) Add'! Fees — Work w/o Permit (Y/N) Insp Outside Normal Hours (hrs) Reinspections (hrs) Miscellaneous Inspections (hrs) Add'I Plan Review (hrs) Permit Tech: Plan Reviewer: Date: Date: tit Project: /0 u�/nf '� .,.,� Type of Ins ction: g4 4 C C, Address: 6 7 '72 l «' A) DateIled. Date Special instructions: / I Will be Ai % /`ft) ; f 5 Date tad: 1 a.m, m, ae� s er: f�P.Vir Phone: Approved per applicable codes. CO NTS: Receipt No; INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 ri AL IP (Inspector: r� Date: Date: (206)431 -3670 Corrections required prior to approval. Q $47.00 REINSPECTION FEE REQUIRED, Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reins action, ACTIVITY NUMBER: M2000 -274 PROJECT NAME: BOEING #9 -101 SITE ADDRESS: _9725 E.MARGINALAWY S SUITE NO: _Original Plan Submittal DATE: 12-0 1- 2000 Response to Incomplete Letter # Response to Correction Letter # _Revision # After Permit Is Issued Of PARTMENI: B ng Division !� 12• .pp Public Works DETERMINATIQN OF COMPLETENESS: (Toes,, Thurs.) Complete Comments: Fir Pntio S ructural Incomplete ❑ PERMIT COORD Cpp PLAN REVIEW /ROUING SLIP Planning Division Permit Coordinator DUE DATE: 12 -0 5 -2000 Not Applicable ❑ TUES /THURS ROUT! G: Please Route Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) Approved ❑ Approved with Conditions REVIEWER'S INITIALS: COQ tECTION DETERMINATION DUE DATE Approved Ej Approved with Conditions ❑ Not Approved (attach comments) Ej REVIEWER'S INITIALS: DATE: Imam uDoc DUE DATE 1- 2 -20Q_Q Not Approved (attach comments) ❑ DATE: �g FROM OE 1 NG TAx Polo on.1011 I bi71 1 1011'$U'111 l 2066S546A2 2000.01 -27 DEPARTMENT OP LABOR AND INDUSTRIES REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL REGIST. # EXP. DATE CCO1. BOEING *294ML 01/01/2001 EFFECTIVE* DATE ' 07/13/1971 BOEING COMPANY, THE PO BOX 3707 MAIL STOP IF-09 SEATTLE WA 98124 -2207 •-- ()o I,1 itd 1 ?412} Cnillis:blu ••—� -- I REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL MOIST. # EXP. DATE CC01 BO *INC *294ML 01 /01 /2001 EFFECTIVE DATE 07/13/1971 BOEING COMPANY, THE Po BOX 3707 MAIL STOP IF -09 SEATTLE WA 98124 -2207 tatucm by DtLPARTh1UNT uN LABOR AND tnu1.'9 "rulus 10151 #0S8 1 ,, • Please Remove And Sign ldentitieutiun Card Before Placing In Billfold .4.. x :;. . VICINITY MAP AREA MAP GENERAL NOTES DRAWING INDEX BUILDING ADDRESS: 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY CITY OF TUKWILA MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS. 1. VERIFY ALL DIMENSIONS AND CONNECTIONS BEFORE ANY WORK. 2. NOTIFY FACILITY ENGINEERS SHOULD EXISTING CONDITIONS REQUIRE DESIGN REVISIONS. 3, COORDINATE WORK WITH OTHER CRAFTS. 4. RETURN THIS SAME SET TO JOHN MURDOCH AT BUILDING 9 -52.1 COLUMN C /3, AFTER COMPLETION OF THIS CONSTRUCTION. SHEET N0. DRAWING NO. SHEET TITLE RE DATE AT 9- 101 -A1 TITLE SHEET 1M11 9- 101 -TM11 MECH. MASTER - HVAC FLOOR PLAN G 11.29.00 1M18 9- 101 -1M18 • MECH. MASTER - HVAC FLOOR PLAN F 11.18.00 r - r ■ ' r = r E =i�ri� m = PROJECT SITE 1M19EXH 9- 101- 1M19EXH MECH. MASTER - HVAC FLOOR PLAN B 11.22.00 FROM DOWNTOWN SEATTLE o❑ (5� o ,0 \v� 1M24A 9- 101 -1M24A MECH. MASTER - HVAC FLOOR PLAN A 11.22.00 1M25 9- 101 -1M25 MECH. MASTER - HVAC FLOOR PLAN A 11.22.00 M590 9- 101 -M590 MECH. MASTER - SECTIONS & DETAILS 11.18.00 0i ADO % / 0 it 9- s\ OT \ \ m° I':A.„----- c<= 1T v ®�� 1 P A0 1� � o oq :, t� c y ss 9 EXIT XIT �O�!y 158 ozBOw LO ` s J '' d B iNG A RD • Ili y A / 3 f / r < / ' / Exlr PROJECT \9 - 06 9 778 11: 9 i '1 � 1 1 f 5 ❑ s - ss � `O � ® 9 - 67 MFC • 9 5o 9 — 1 0 1 � `' 9 -98 - , s -ss . s -so q o > PROJECT CHECKLIST CHECK BOX ® THESE DRAWINGS CONFORM TO THE 1997 U.B.C., U.F.C., U.P.C., AND THE WAC 51 -20 AS ADAPTED OR AMENDED BY LOCAL ORDINANCES AND COMPLIANCE WITH CITY OF TUKWILA ZONING. ❑ ROOMS LABELED PER OCCUPANCY PER U.B.C. TABLE 10 -A. BUILDING FLOOR NUMBER ON PRINT FOR AREA OF CONSTRUCTION. ❑ ® NUMBER OF PRINTS REQUIRED FOR PERMIT PACKAGE: ❑' 1. TENANT IMPROVEMENT (STRUCTURAL): ❑ 5 SETS OF ARCHITECTURAL DRAWINGS ❑ 5 SETS OF STRUCTURAL DRAWINGS ❑ 5 SETS OF STANDARD DETAILS ❑ i SES OF ENGINEERING CALCULATIONS ❑ SES OF SETS OF CONSTRUCTION SPECIFICATION ❑ 2. TENANT IMPROVEMENT (NON ®4 SETS OF ARCHITECTURAL DRAWINGS ❑ 4 SETS OF STANDARD DETAILS ❑ 4 SETS OF ENERGY CALCULATIONS ❑ 4 SETS OF CONSTRUCTION SPECIFICATIONS W 2 SETS OF STRUCTURAL CALCULATIONS ❑ 3. TENANT IMPROVEMENT (REVISION), 2 SETS. ® 4. MECHANICAL, 4 COMPLETE SETS. ❑ 5. FIRE PROTECTION /SPRINKLERS, 3 COMPLETE SETS. ® BRIEF PROJECT NARRATIVE: RELOCATE TEST EQUIPMENT FROM A LAB IN THE 21 -01 BUILDING. SCOPE INCLUDES RELOCATING (3) FUME HOODS, (1) EXHAUST FAN, AND INSTALL (1) FLOOR SINK. IN ADDITIIrN, MECHANICAL SCOPE INCLUDES CONNECTING RELOCATED EQUIPMENT TO COMPRESSED AIR, INDUSTRIAL CITY WATER, VACUUM, AND CHILLED WATER. 0 CO CODE SUMMARY LAND USE CODE TUKWILA BUILDING CODES 1997 U.B.C., U.F.C., U.P.C., AND THE WAC 51 -20 AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. OCCUPANCY GROUP GROUP B AND GROUP F, DIVISION 1 (OFFICE AND FACTORY) CONSTRUCTION TYPE TYPE II, NON-COMBUSTIBLE SEPARATION 60 FEET (MINIMUM ALL SIDES) FLOOR AREAS: 713829 BUILDING GROSS 1,1 16,306 TUNNEL 50,910 FIRST FLOOR 713,829 MEZZANINE 55,689 295,878 BUILDING HEIGHT 111 FT. MAXIMUM STORIES 2 s 12o I� understand thatt e subject to errors and plans does not authcrize adopted code or ordinance. tractor's copy of appro \ By �..,II I 7h Chen. approve... are omissions and approval of the violation of any Receipt of con- d eta s acknowledged. I m ■ FROM SEATTLE - TACOMA DEVELOPMENTAL j / , /,�,y ///e / / / % % /O /. ����� // = � 9� �� � \ - s V , �� )► \ 599 EAST MARGINAL WAY TUKWILA CORPORATE PARK 9s AIRPORT CENTER FROM KENT & AUBURN NO SCALE ExIT t57 \ s0a � •' g_ �� 9-101 BUILDING LOCATION �� �_ NO SCALE Date b - Permit No. V OCCUPANT LOAD: OVERALL (NO CHANGES - JOB SPECIFIC +27 OCCUPANTS CON HANDICAPPED REQUIREMENTS BARRIER FREE DE / FIRE PROTECTION FULLY AUTOMATIC , F/S CLASS 1 SPRINKLERS THROUGHOUT y -� u„ -` ��' SEISMIC ZONE SEPARATE PERMIT REQUIRED FOR: 0 MECHANICAL [f E1.ECTRIC.QL gPLUMSING dGAS PIPING CITY OF T D K SION BUILDING REVITONS crrvc -,--.:F. a D C TTI." S .I_L BE t, I. 1 e OF v T WITH OU T I I ' DEC 1\ L c = TUKWILA BUILDI ; 1Dit i s r I,e n Nr r PERMR x 23 2� SYM REVISION BOEING SHARED SERVICES GROUP BUILDING 9 -101 RELOCATE TEST EQUIPMENT - MECHANICAL (J #190106 -18) BY APPROVED DATE SYM REVISION BY BOEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON 98108 APPROVED DATE g ) LAW.17.4FATAW m ACCEPTABILITY THIS DESIGN .AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN DATE G.MILLER 10.20.97 NGINEAR CHECKED APPROVED SUBTITLE TITLE TITLE SHEET BUILDING 9 -101 CURRENT REVISION 190106 -18 SHEET JOB N Al SYMBOL 190106 -18 DATE COMP N0. C VEC F EI TUKWILA 1 2000 CENTER STAIR #1 DISK SANDER TUBEAXIAL FAN RATED TO 3500 CFM @2 ESP W/A 5 HP 450 V, PREMIUM EFFICIENCY MOTOR DRILL PRESS I 2250CF 80/12 I DRILL P'ESSI METER 2250 CFM 40/12 62/24 60/24 34/20 (24) 180 DIFFUSER 833 CFM EA. BOD EL 15' -8" 0 POET ® BOD EL. 12' -4" 52/24 10 "4 DUCT - L-- I���111 K� ;' 60/24 (9000 CFM RETURN) T A AT : TO 400 CFM 0 1.25 ESP W/A 1 HP 460 V, PREMIUM EFFICIENCY MOTOR 80 TO 140 ECCENTRIC TRANS. W/24 SPOOL PIECE CONN. TO 140 TUBEAXIAL FAN (TYP 2) 6000 CFM 45/24 21/48 34/20 BOD EL 15' -8" 40/24 1M11 M532 10 4 DUCT 1000 CFM (TYP 6) - 36/22 4552 —M3 `�y2250CFM 80/12 50/16 50/16 30/22 20/36 32/20 I/ 1 2250 CFM \ END OF SHEAR WALL 50/22 TO AHU MS 54/24 FLEX DUCT BOD EL 15' -10" 54/24 lir AXIAL FAN PACE #27D- 8.5H -7R41 ti 10000CFM ® 3/4" S.P. 3 HP, 4800 BOD EL 21' -0" 32/20 78/24 22/14 I( ) 22/14 64/24 32/24 AHU #5 20,000 CFM SYM A TORIT #ECB -1 ENV. CONTROL BOOTH (SANDING BOOTH) W /(3) 5 HP, 460 V, FANS PRODUCING 1 500 CFM (100% R CIRC.) —' OA 62/46 1 M 1 1 1 9 5 2 - OVEN MOD 2250CFM 18/24 2250CFM REF: AVIONICS SILENCER INSTALL ENVIR. BOOTH TUBEAXIAL FAN RATED TO 2000 CFM @ 1.75" ESP W/A 5 HP 460 V, PREMIUM EFFICIENCY MOTOR 150 @ BOD EL. 12' -4" BOD EL 11' -8" REVISION 5'0 TO EQUIP TYP A/C #1 ' TRANE" SIZE 41, 20,000CFM M 3 3 /8 "SP, 25HP, 48OV,30 J #747139 -03 J #137126 -12 J #757251 -01 BY KGP SLB /RWS KGP /RWS 18/18 EXHA .. THROUGH 9- 22/18 EAAAL THROUGH 9 4552 -143 APPROVED EJC EJC ST 03 ROOF ST 03 ROOF • DATE 3 -9 -95 10 -9 -95 BOD EL 15' -8" SYM VACATE ESS 1M RELOCATE TEST EQUIPMENT SEE DWG 109 - 103 -4002 M1 FOR SPRINKLER CONNECTION. 4552 —M3 REVISION EXPLOSION PANEL LAG TO 9 -103 WALL JO 180376 -00 J #190106 -18' M 2250 CFM FLOOR PLAN SCALE: 1 /8 "= 1' -0 "" BY APPROVED DATE HARRAH RWS 5.5.99 KGP 11/29/00 -TORIT CABINET DUST COLLECTOR MODEL 124, FOR ALUMINUM ONLY 10 HP, 460 A, 3 ph, 60 Hz W/ MECH. SHAKER 10"0 DUCT THRU BLOCK & BRICK WALL BOD EL 18' -0" LJ ? /•G' 0/A 10000CFM 120 1/8/50 1/2 200 NECK DIFFUSER 1425 CFM (TYP 1C; ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY SEE DETAIL DEPT: DATE SHEAR WALLS - FILTER SECTION SEE DETAIL 1M11 4559 —M3 1 M1 4559 —M3 SECURITY BARS 0/A 62/46 SEE DWG. 83- BMAC -1 DRAWN K. PENROD HECK - ENGINEER - AP PROVED DATE 5.25.94 SUBTITLE TITLE LEGEND: - 2" WIDE x 11 GA LOOP HANGER GENERAL NOTES: 1. AIR HANDLING UNIT SUPPLY DUCTWORK TO BE INSULATED. 2. EXISTING AIR HANDLING UNITS AND DUCTWORK BEING REUSED WILL BE REPAIRED AND CLEANED BEFORE INSTALLATION. 3. CMCS HUMIDISTATS FOR CLEAN ROOM EXPANSION AREA LOCATED IN .AHU # & #8 RA. CONSTRUCTION NOTES: P REMOVE THE NEW YORK BLOWER TUBEAXIAL FAN COMPLETE WITH INLET AND DISCHARGE TRANSISTIONS AND REINSTALL IT ON THE EXISTING FAN PLATFORM AT COLUMN M/12. vflw + ASBESTOS NOTIFICATION: A good faith survey of the work area has been conducted and asbestos containing material was not discovered that would be involved in the construction of this project. Do not remove, damage or disturb any asbestos material adpcent to the work area. Please contact Boeing Facilities Ddeparlmenl if asbestos containing material is damaged or discovered that is required NO' to be removed to support work. �� \ 11K +11 C1T I , 10 The following materials in the area adjacent to this job are PQ KEY PLAN assumed to be positive. for asbestos: FLOOR TILES . sou NINE INSULATION 0 5' lt1'L" F N'. t1lt'RT' ` c FIRST FLOOR HVAC PLAN BUILDING 9 -101 q),J Ja s O n i 1012 ®® 1111:1M 11420 30 ® ®® JEIMMICI 1 M37 1MAD 3 11442 E -© ®� CITY bF 7NUEIM I N DEC 12000 PERMIT CENTER 1M10 11416 1M28 CURRENT REVISION 190106 -18 SHEET JOB SYMBOL 190106 -18 DATE 11/29/00 COMP NO 1M10 1M11 1M12 1M13 1M14 1M15 1M16 1M17 � W19 1M20 1M21 {.ply ���/ „0—,9 (dll) „0 —,9 t - 1M22 1M23 1M24 1M25 1M26 1M27 1M28 1M29 1M30 1M31 1M32 1M33 1 1M18 I in NU - ® 4553 -M3 NE "" AIR EXTRACTOR (TYP.) a g 26/14 •� 80 F I ' I.I {.ply 1 �/ „0—,9 (dll) „0 —,9 t - �' FRIG/ �KiI / ' 0 x 1 0, 1RN 2a DISC 18/12 BELOW SANDER _ 20" NECK DIFFUSER 1425 CFM, TYPICAL (8) PLACES DIFF 643CFM 321CFM VCBC -20 1750 CFM • I 8A ,,- 80 I DUST COLL TORIF 81 BAND SAW — 11 80 —� 35/23 R. 80 'M f �x9 EI _ II 15x15 9x9 x9 N 1 ■ — — 8 24x12 GRILLES ( ) ®1500 CFM A DIFF RETURN 291CFM 875CFM 1 iii DIFF DIFF - 291CFM 291CFM _. r-;11 80 15x15 RETURN 875CFM 9x9 -' ' .. 1 22/14 SN 1/2 .. 11 0.A. SEE DWG 109- 101 - 4553 -85 � 'I . •• ••^ - - -- R7 FOR DUCTWORK FEEDING MEZZANINE OFFICE AREA SEE DET. 1M18 M3 8/18 18 /8 80 80 - 15/12 ,_ 1 ',_ " \ 9 x 9 DIFF • ® ® /) AFIU #9 f DIFF 291CFM � — I 291 " 188 - -0 9x9 64 /24 SO B.O. D o �I DIFF 291CFM NENN TURNING VAN E IL 2000 CFM , — I BOD 15' -10" AFF 1♦ • 78/24 - - t- (2) 36x18 GRILLES A 1800 CFM EA. ® :'k. I I \X / \. 64/24 20 -6 DUCT �1 LEE! 26/24 ) EL. ...j B.O. 1M18 4553 - M2 , - MI 16' -O" -BUD 15-70' AFF EXHAUST GRILLE 2 /24 64/24 u 60/24 55/24 1 1: 12 M3 ON 16x12" STU e 14x10" DIFFUSER AHU #25 20000 CFM v rr U CFM �' WALL TRANSFER FAN NOM 225 CFM MAN BARRED 11� 18 18 � 18/12 ii UP STAIR #9 - " DN UP mu I _ - -- LJ e e e e e ° 1_- 11 1 II1II — tom � - � � MN K 1 . r I I Mils Ail RAG 102 EXHAUST DUCT 78/72 OM EF01L12A A T ROOF. -1 0 CFM - air #0111 CF _— 12x12 GRILLE SOUND BAFFL ENCLOSURE FOR LS SE DETAILS SEE SKETCH N0. 35D0832086 ef� RD CE (T1P 180 2) 60/36 NECK FROM TO LING DIFFUSE MAN EIARREu�� EXHA EF01L12A ROOF MEI C =IV n� ► G' 19 100 CFM ���� l` �r. 1I _ IIM18 4560 -M6 RAG . e ° i 8/72 , . e____ J - -- U ST .._ 20/12 ! '' ...0 16/18 —� • 140 _ f e • • e o f e SAR - 1, 36/12 / 1250 CFM ifkl I. a � 00 DI — VIII M I //� 180 um alai 111 or HP ii t, 01 ....... 14 ... wou • MEIN I I II I 240 VD VD - Trrrrrrr n 1 1 1 1 1 1 1 1 1 1 I II I 5 ' 11111111111 1lLLLLLLL UP 1 1 uC — YD � 1, 000 \, P - 0 0C�I 80 • o e [ -- e 8l /9f e m ° e 20 "0 22 GA GALV. LONGITUDINAL WELDED SEAM DUCT WORK prr_ t �l`� 8l /OZ I. L.A__I 1 NEW LNOR DU AC— 3 1 AHU 1127 1 I (REF ABOVE) �• I 11 �� i a I /5 • WO `'_------..._ 36/18 UP SEE nWG WIN i x' SECURITY BAR, SE DWG. 83- BMAC -1 FILTER SECTI 120 1/8 x 50 FROM AHU #11 HUMIDIFIER, SEE SHT. 4558 -M1 18/ ll/.°nz=c nn Ll PS /00 109 -101- 4565 -M1 i PL AN SCALE: 1/8" = 1' -0" I 1(0 II' SYM REVISION A RELOCATE BLUE STREAK B INSTALL DUCT TO SANDER PER JOB 147003 -00 DMV C ADDED EXHAUST SYSTEM D AS BUILT BY J#747479 - 01 SPR APPROVED DATE KGP 2 -11 -94 F 4 -4 -95 Jff747479 -01 SPR 7/28/95 2/5/96 SYM REMSION RELOCATE TEST EQUIPMENT 34190106 - 18 BY APPROVED DATE KGP 11/20/00 B®E /A/ FACILITIES DEPARTMENT ACCEPTABILITY THISOE9CN AND/OR SPECIFlCAl10N IS APPROVE APPROVED BY DEPT. DATE EDDIE EDDIE P . DUARTE CHECKED ENGR. CHECKED APPROVED DATE 2 -11 -94 SUBTITLE PLAN — DUCTWORK TITLE BLDG. 9 -101.1 LAST REVISION I SYMBOL SHEET 1M18 DATE OF JOB NO. DWG NO 4/12 P OF 2) :XHAUST GRILLE 00 CFM 4/24 FACE TYP OF 2) APPROVED AAR 'HANIICAI EA ACTFR LEGEND: GENERAL NOTES: CONSTRUCTION NOTES: REMOVE EXISTING 64" X 48" EXHAUST DUCTWORK FROM THE INLET TEE AND OPPOSED BLADE DAMPER ASSEMBLY BACK TO THE EXHAUST FAN. SEND REMOVED DUCT WORK TO SALVAGE. FABRICATE AND INSTALL A 20 "0 X 64" X 48" X 36" LONG 20 GA GALV. TRANSITION PIECE TO THE END OF THE 64" X 48" EXHAUST DUCT. ROUTE NEW 20 "0, 22 GA GALV. LONGITUDINAL WELDED SEAM DUCT WORK TO THE NEW TRANSITION PIECE FROM THE NEWLY RELOCATED TUBEAXIAL FAN. SUPPORT THE NEW 20 "0 DUCT AT 10' INTERVALS. USE BEADED SLEAVE JOINTS AS PER SMACNA STANDARDS TO JOIN DUCT ECTIONS. (fl 2OOO 2,1q ASBESTOS NOTIFICATION A GOOD FAITH SURVEY OF THE WORK AREA HAS BEEN CONDUCTED AND ASBESTOS CONTAINING MATERIAL WAS NOT DISCOVERED THAT WOULD BE INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. DO NOT REMOVED, DAMAGED OR DISTURB ANY ASBESTOS MATERIAL ADJACENT TO THE WORK AREA. PLEASE CONTACT BOEING FACILITIES DEPARTMENT IF ASBESTOS CONTAINING MATERIAL IS DAMAGED OR .DISCOVERED THAT IS REQUIRED TO BE REMOVED TO SUPPORT WORK. THE FOLLOWING MATERIALS IN THE AREAS ADJACENT TO THIS JOB ASSUMED TO BE POSITIVE FOR ASBESTOS: NONE 1M39 1M40 1M40 1M42 144 1M45 W44 1M43 1M46 1M34 1M35 1M36 1M37 1M38 ���pRONf QCC 750 9 -101.1 KEY PLAN • rni .1 - N /A_i 1 n r _O z2 RECEIVED 23 crr DP TuKava.A EC - 1 2000 ERMIT CENTER F 11/18 Q 1n1 -1M1R 1M10 11411 1M12 1M13 1M14 1M15 1M16 1M17 1M18 j M 1 9 i119i 1M20 1M21 1M22 1M23 1M24 1M25 1M26 1M27 1M28 1M29 1M30 1M31 1M32 1M33 SYM A CONSOLIDATE QA LAB 35000 RELOCATE TEST EQUIPMENT 5'0 160 310CF y- REVISION J #190106 -06 J4190106 -18 FAN IN UNE Oar 0 } /BY^ 1 /12P NOOK AIX -IOI PENN -NONT. Pl. BO CITE BY CH KGP APPROVED DN STAIR # UP CRUX 11 11 DATE 11.7.00 11/22/00 XH 109 -101 -4460 M2 PLAN SCALE: 1 /8" = 1' -0" SYM REVISION BY APPROVED DATE I1 g ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE CHECKED • ENGINEER CHECKED RWS APPROVED 12.18.97 TITLE HVAC EXHAUST DUCTWORK PLAN BUILDING 9 -101 LEGEND: GENERAL NOTES: 1. FOR HVAC DUCTING OF THIS AREA SEE DRAWING 1019 CONSTRUCTION NOTES: RE- INSTALL THE FUME HOOD MOVED FROM THE 21 -01 THAT SERVICED THE BLUE -M OVEN. SUPPORT THE WEIGHT OF THE HOOD FROM THE CONCRETE STRUCTURE IN THE CEILING BUT BRACE THE HOOD FROM SWAYING OFF OF THE FLOOR WITH B -LINE B -24 FRAMING CHANNEL. BALANCE EXHAUST FLOW TO 1000 CFM. RE- INSTALL THE FUME HOOD MOVED FROM THE 21-01 THAT SERVICED THE BATCH OVEN. SUPPORT THE WEIGHT OF THE HOOD FROM THE CONCRETE STRUCTURE IN THE CEILING BUT BRACE THE HOOD FROM SWAYING OFF OF THE FLOOR WITH B -LINE B -24 FRAMING CHANNEL. BALANCE EXHAUST FLOW TO 1600 CFM. . RE- INSTALL THE FUME HOOD MOVED FROM THE 21 -01 THAT SERVICED THE PLATEN PRESS OVEN. REPAIR DAMAGE TO HOOD CAUSE FROM RELOCATING THE OVEN. SUPPORT THE WEIGHT OF THE HOOD FROM THE CONCRETE STRUCTURE IN THE CEILING BUT BRACE THE HOOD FROM SWAYING OFF OF THE FLOOR WITH B -LINE B -24 FRAMING CHANNEL. BALANCE EXHAUST FLOW TO 1200 CFM. ® ROUTE 12 "0 22 GA GALV. LONGITUDINAL WELDED DUCT WORK FROM THE HOOD. USE 5 GORE 900 ELLS WITH CENTERLINE RADIUS OF 18 ". USE BEADED SLEAVE JOINTS AS PER SMACNA STANDARDS TO JOIN DUCT WORK. ROUTE 16 "0 22 GA GALV. LONGITUDINAL WELDED DUCT WORK FROM THE HOOD. USE 5 GORE 900 ELLS WITH CENTERLINE RADIUS OF 24 ". USE BEADED SLEAVE JOINTS AS PER SMACNA STANDARDS TO JOIN DUCT WORK. © ROUTE 14 "0 22 GA GALV. LONGITUDINAL WELDED DUCT WORK FROM THE HOOD. USE 20 GA. GALV. 5 GORE 900 ELLS WITH CENTERLINE RADIUS OF 21". USE BEADED SLEAVE JOINTS AS PER SMACNA STANDARDS TO JOIN DUCT WORK. TIE ALL (3) EXHAUST DUCTS INTO A SINGLE 20 "0, 22 GA GALV. MAIN EXHAUST DUCT. USE 20 GA GALV. 45' LATERAL TAPS WITH 20 GA GALV. 3 GORE 45' ELLS TO TIE INTO THE 20"0 DUCT. THE CENTERLINE RADIUS OF EACH ELL WILL BE 1.5 X DUCT DIAMETER. USE BEADED SLEAVE JOINTS AS PER SMACNA STANDARDS TO JOIN DUCT WORK. .! ROUTE NEW 20 "0, 22 GA GALV. LONGITUDINAL WELDED SEAM DUCT WORK FROM THE OVEN ROOM TO THE INLET OF THE NEWLY RELOCATED TUBEAXIAL FAN. SUPPORT THE NEW 20 "0 DUCT AT 10' INTERVALS AS PER DETAILS # AND #2 ON SHEET 9- 101 -M590. USE BEADED SLEAVE JOINTS AS PER SMACNA STANDARDS TO JOIN DUCT WORK. 11439 1040 1040 1144 1M42 1045 1043 1046 1034 1035 1036 1037 1M38 Gkit OF pEI11L. A� 9 -101.1 KEY PLAN CURRENT REVISION J #190106 -18 III ,. ,, SYMBOL SHEET 1019 EXH JOB NO. 1 4m n0 -n0 —© 15 - © - Q RECEIVED CIT' OF P00001 0 DEC - 1 2000 COMP NO. PERMIT CENTER DATE 11/22/00 o '. SYM A RELOCATE TEST EQUIPMENT REVISION Jij190106 - 18 BY KGP APPROVED DATE SAM 0 REVISION FIRST FLOOR PLAN SCALE: 1/8 " =1' -0" APPROVED DATE BOE /N o' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE K. BUN CHECKED FRIAR HARRAH ENGINEER C. FHARRAH CHECKED APPROVED IATE 11 02 00 11/02/00 11/02/00 ONNECTIONS TO FFUSERS SEE IB SUBTITLE DUCTWORK - HVAC FIRST FLOOR PLAN TITLE BUILDING 9- 101.1 LEGEND: GENERAL NOTES: CONSTRUCTION NO S. REMOVE F`:!- '!ST FAN #EF -1 AND EXISTING 64" X 36" EXHAUST DUCTWORK TO THE INLET TEE AND OPPOSED BLADE DAMPER ASSEMBLY APPROXIMATELY 25' TO THE NORTH. SEND REMOVED DUCT WORK AND EXHAUST FAN TO SALVAGE. RELOCATE THE NEW YORK BLOWER TUBEAXIAL FAN FROM COLUMN E/1 AND MOUNT IT ON TO THE EXISTING FAN PLATFORM WITH B -24 —A DBL. FRAMING CHANNEL SPANIN THE EXISTING C— CHANNELS. BOLT FRAMING CHANNEL TO C— CHANNELS WITH 1/20 BOLTS. ROUTE NEW 20 "0, 22 GA GALV. LONGITUDINAL WELDED SEAM DUCT WORK FROM THE OVEN ROOM TO THE INLET 0 THE NEWLY RELOCATED TUBEAXIAL FAN. SUPPORT THE NEW 20 "0 DUCT AT 10' INTERVALS. USE BEADED SLEAVE JOINTS AS PER SMACNA STANDARDS TO JOIN DUCT WORK., —ROUTE 20 "4 22 GA GALV. DUCT WORK FROM THE DISCHARGE OF THE RELOCATED TUBEAXIAL FAN TO THE INLET OF A NEW 20 "0 X 64" X 48" X 36" LONG 20 GA GALV. TRANSITION INSTALLED ON THE END OF THE 64" X 36" XHAUST DUCT. no ZDOO2 n n J Ja ® a..._.: MI• I - M - D1 OF - I _MI 22 gpPStOYED !� DEC 11 t,0 Tu t,10 9 -101.1 KEY PLAN N 12000 MIT CENTER SCALE: N.T.S. CURRENT REVISION SYMBOL - 1M24A JOB NO. tanlnF -1R A DATE COMP N0. 11/22/00 v - FOR CV C CEILING D DWG 1M2 60/36 BOTTOM OF DUCT ( d 0 s 0 @ 1 7' -0" AFF VIII 24/40 j Pail irs_.I C :=;i II IL Er L IbIlL I 0 -!. � SILENCERS It NM:: ••.. 80 2424 © 11 / TUBEAL FAN RATED TO 3500 CFM i , WIN e. -... /A il il I 10/6 NK t •., t ►i>� PP ILA... I In .+.. Fir Ninliiall Gn ow ��i111iN.11r■ L6. le I I t'ie �'� 1K O F :: '° LIM �1 AM NW cv a 120 60 i I i Zi 1l 4= = — i Rath- g 111 `'' T . i, " ® ' :: ® ..��. ii .. 46/62 D CT I k X OPENING 1 J 11 1111•• 1 •• l IN J o L ee j I RAG -1 ,1800 um IIMMIN 1i>�er h iiii i i' ' i�E�y , � E �_l m{! �e Ark lli my 10/4 � 120 18 18 NK / 14/24 =11-� ■ I ia 11 . �1 LTER M 150 : 11 x — x , I x RAG -1 580 l CO M, i 18/6 '1 {���n l WI 24/30 , , TAMER. . ii .111 I' .1 V ■ 130 • 0 NM I I 1 I 1 - MC �� .: 1M18,1M18A 1M24A 1M24B �, M581 z iiii ii ,iii ii 15 SYM A RELOCATE TEST EQUIPMENT REVISION Jij190106 - 18 BY KGP APPROVED DATE SAM 0 REVISION FIRST FLOOR PLAN SCALE: 1/8 " =1' -0" APPROVED DATE BOE /N o' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE K. BUN CHECKED FRIAR HARRAH ENGINEER C. FHARRAH CHECKED APPROVED IATE 11 02 00 11/02/00 11/02/00 ONNECTIONS TO FFUSERS SEE IB SUBTITLE DUCTWORK - HVAC FIRST FLOOR PLAN TITLE BUILDING 9- 101.1 LEGEND: GENERAL NOTES: CONSTRUCTION NO S. REMOVE F`:!- '!ST FAN #EF -1 AND EXISTING 64" X 36" EXHAUST DUCTWORK TO THE INLET TEE AND OPPOSED BLADE DAMPER ASSEMBLY APPROXIMATELY 25' TO THE NORTH. SEND REMOVED DUCT WORK AND EXHAUST FAN TO SALVAGE. RELOCATE THE NEW YORK BLOWER TUBEAXIAL FAN FROM COLUMN E/1 AND MOUNT IT ON TO THE EXISTING FAN PLATFORM WITH B -24 —A DBL. FRAMING CHANNEL SPANIN THE EXISTING C— CHANNELS. BOLT FRAMING CHANNEL TO C— CHANNELS WITH 1/20 BOLTS. ROUTE NEW 20 "0, 22 GA GALV. LONGITUDINAL WELDED SEAM DUCT WORK FROM THE OVEN ROOM TO THE INLET 0 THE NEWLY RELOCATED TUBEAXIAL FAN. SUPPORT THE NEW 20 "0 DUCT AT 10' INTERVALS. USE BEADED SLEAVE JOINTS AS PER SMACNA STANDARDS TO JOIN DUCT WORK., —ROUTE 20 "4 22 GA GALV. DUCT WORK FROM THE DISCHARGE OF THE RELOCATED TUBEAXIAL FAN TO THE INLET OF A NEW 20 "0 X 64" X 48" X 36" LONG 20 GA GALV. TRANSITION INSTALLED ON THE END OF THE 64" X 36" XHAUST DUCT. no ZDOO2 n n J Ja ® a..._.: MI• I - M - D1 OF - I _MI 22 gpPStOYED !� DEC 11 t,0 Tu t,10 9 -101.1 KEY PLAN N 12000 MIT CENTER SCALE: N.T.S. CURRENT REVISION SYMBOL - 1M24A JOB NO. tanlnF -1R A DATE COMP N0. 11/22/00 1M10 16111 1M12 1M13 1M14 1M15 1M16 1M17 16118.. 1M19. 1M20. 1M21 16122 1M23 1M24 c /// j��2� 1M26 1M27 1M28 1M29 1M30 1M31 1M32 1M33 SYM A 800 CFM 80 NECK 110 CFM /RAG 10/6 NK \ 1 12 12 NK 2)24/6 24/8 TO MEZZANINE 785 CFM 45/20 15/24 1 90 CFM 22 10 NK J0/24 64/24 410 CFM CD 100 NECK CFM 100 NK (TYP 2) UP STAIR # DN 18/21 NK SEE DETAI (DIM) 1M25 4571 - 28/20 40/24 SECURITY BARS SEE BOEING STD 83- BMAC -1 30/24 1 " -0" CLEAR EA SIDE OF 13.8 KV PRIMARY MIN 36x12 GRILLE 1700 CFM EA (TYP 8) REDRAWN RELOCATE TEST EQUIPMENT CEILING MOJNTED 2 TON BSC CW -2 A/C UNIT (FO CHW PIPING SE DWG 4420 -M6) RENSIGN J #190106 - 18 BY KB KGP APPROVED CH 62/46 --' DATE 11.20.97 11/22/00 SY FIRST FLOOR PLAN SCALE: 1/8 " =1' -0 REVISION END CAP INSTALLED ON DUCT THRU SECOND FLOOR APPROVED EARTH QUAKE RETAINING WALL DATE ei 12 1 4) 15 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN K.BUN CHECKED C.BARRAH NOINtth NECKED APPROVED DATE SUBTITLE TITLE HVAC FIRST FLOOR PLAN BUILDING 9- 101.1 CONSTRUCTION NOTES: ROUTE NFW 20"0, 22 GA GALV. LONGITUDINAL WELDED SEAI3 [JOU WORK FROM THE OVEN ROOM TO THE INLET F THE NEWLY RELOCATED TUBEAXIAL FAN. SUPPORT THE NEW 20 "0 DUCT AT 10' INTERVALS. USE BEADED SLEAVE JOINTS AS PER SMACNA STANDARDS TO JOIN DUCT WORK GO F TUOO A APPROVAL 1YaC t r LEGEND: GENERAL NOTES: CONSTRUCTION NOTES: rr) T`M/TT TT M39 1M40 1M40 1044 m RD 1M42 1M45 1M38 1M43 1M46 CURRENT REVISION SHEET 1M25 JOB NO 16134 1M35 1M36 1M37 KEY PLAN SCALE NONE SYMBOL DATE COMP N0. —0 5 —CD fl R OF E UKNILA DEC - 1 2000 PERMIT CENTER 11/22/00 SYM COL. LINE BEAM WITH EMBEDDED UNISTRUT CHANNEL 1 11 GAUGE DUCT BAND--/ 1/2 "0 ALL THREAD '.. --20 "0 EXHAUST DUCT DETAIL: ROUND DUCT HANGER UNDERNEATH BEAMS SCALE: NONE 1M18, 1M19EXH, 1M24A, 1M25 M590 REVISION LOCATION. SUPPORT PIPE ALONG WALL PLATEN PRESS HOSES PROVIDED WITH UNIT FILTERS & CONNECTION TO EQUIPMENT REUSED FROM EXIST LOCATION 2" STEAM VENT TO MECHANICAL CHASE AT N /9. FLOOR SINK TRAP PRIMER -DISCH INTO FLOOR SINK (TYP) ANGLE VALVE DETAIL: PLATTEN PRESS PIPING 3 SCALE: NONE 1M 119 M590 APPROVED DATE GUIDE PIPE AT THIS SUPPORT -DO NOT CLAMP TIGHTLY EXIST. ARMSTRONG STEAM TRAP REDUCER & CLAMP FOR 7/8" HOSE 2 "0 DRAIN FROM STEAM TRAP 2 "0 AUX. DRAIN SYM GROUND FLOOR RUED USE 1/2 "0 BLOTS AND NUTS TO BOLT B -22A DBL. STRUT WITH U- CLAMPS TO CONCRETE INSERTS IN BEAMS EXISTING CONCRETE BEAMS B -LINE B -22A, DBL STRUT 1/2" ALL THREAD 'N-- "0 EXHAUST DUCT 11 GAUGE DUCT BAND DETAIL: ROUND DUCT HANGER BETWEEN BEAMS SCALE: NONE 1M18, 1M19EXH, 1M24A, 1 M 5MM590 APPROVED DATE iSLAfirt7EZAW ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT: DATE DRAWN K. PENROD dTECKED pIGINEEH K. PENROD CHECKED APPROVED DATE 11/1 8/00 SUBTITLE TITLE SECTIONS & DETAILS RELOCATE TEST EQUIPMENT BUILDING 9 -101.1 LEGEND: GENERAL NOTES: CONSTRUCTION NOTES: 07 .27171 GIN Of TUML4 APPROVED DEC 1 ? 21ao A r +viL CURRENT REVISION 190106 -18 JOB N SYMBOL SHEET M590 190106 -18 DATE COMP N0. R CITY OF TAA 8 A BEC - 1 2000 PERMIT CENTER 11/18/00