Loading...
HomeMy WebLinkAboutTrans 2012-03-05 Item 2A - Contract Supplement #2 - Tukwila Urban Center Access (Klickitat) Construction Management with CH2M HillCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM 11110 FROM Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director DATE: March 2, 2012 SUBJECT: Tukwila Urban Center Access (Klickitat) Project Project No. 98410419, Contract 10 -120 Supplement No. 2 for Construction Management with CH2M Hill ISSUE Approve Supplement No. 2 for construction management (CM) services with CH2M Hill in the amount of $81,047.80 for the Tukwila Urban Center (TUC) Access (Klickitat) Project. BACKGROUND CM contract No. 10 -120 with CH2M Hill for the TUC Access project was executed on December 14, 2010. While in -house City staff has been leading the CM effort on the road project, CH2M Hill has been providing full -time field engineering, inspection, documentation compliance support, and on -call specialty support. DISCUSSION Per project specifications, the contractor could not perform any construction work which impacted traffic in Tukwila's Central Business District between November 16, 2011 and January 2, 2012. The project completion date was extended to March 2, 2012 to account for working days that were improperly charged to the contractor during that time period. Due to multiple days of heavy snow in January 2012, the project completion date was then extended to March 9, 2012. Additional construction work items are also being generated as part of the punch list and project safety field review. Contract Supplement #2 allows CH2M Hill to continue providing Construction Management services through June 30, 2012. CH2M Hill CM Original Contract CH2M Hill Sup No. 1 (time extension only) CH2M Hill Sup No. 2 HNTB Sup Nos. 12 13 Design Eng City CM Staff, WSDOT, Misc. Expenses Klickitat CM Budget (2012 CIP page 13) Total Contract and Budget1 RECOMMENDATION CM Expenses Budqet $2,024,137.02 0.00 81,047.80 203,283.00 302,775.20 0.00 $2.61 2.43.00 $2.611,243.00 $2,611,243.0 Approve Supplement No. 2 with CH2M Hill in the amount of $81,047.80, and consider this item at the March 12, 2012 Committee of the Whole meeting and subsequent March 19, 2012 Regular Council meeting. Attachments: Supplemental Agreement No 2 W:IPW Eng1PROJECTStA- RW RS Projects198410419 TUC Access (Klickitatftfo Memo for CH2M Hill Supplement #22-28-12.doc Supplemental Agreement Number IF Original Agreement Number Project Number STP 1037(003) HPP999(474) HPP999(475) Project Title Tukwila Urban Center Access (Klickitat) Project Organization and Address City of Tukwila 6300 Southcenter Blvd Ste 100 Tukwila, WA 98188 Phone: 206-433-0179 Execution Date Completion Date 21'29/2012 6/30/2012 New Maximum Amount Payable 2,105,184.82 Description of Work Provide Construction Management services related to the Tukwila Urban Center Access (Klickitat) Project, 84- RW19 The Local Agency of City ofFukwila desires to supplement the agreement entered into with CH2M HILL, Inc. and executed on 12114/2010 and identified as Agreement No. 84-RWI9 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: See allacbed Fxbihit A Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Nil Cb n i- Section V, PAYMENT, shall be amended as follows: Total arnontit this ameildwei3i %R 1,047.80 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: CH2M HIJ.J,_lDr By: cot) s'U14nfSignature V Tung Le, Vice President DOT Form 140-063 EF Revised 912005 Approving Authority Signature Date 2 Supplement 2 Exhibit A -2 Tukwila Urban Center Access (Klickitat) Project Agreement 84 -RW19 Scope of Work A time extension has been granted to the Contractor resulting in a revised construction completion date of March 9, 2012. Additional work items are also being generated as part of the punch list generation. As a result the CH2M HILL construction management contract will be extended to June 30, 2012, under Supplement #2, to allow for continued construction management services. The extension of the contract will require additional funds, as shown below, to continue field observation of the contractor's operations, resident engineering services including Change Order preparation and negotiation and pay estimate processing, office support and overall project management. In addition the Consultant will prepare an APWA Public Works Project of the Year Award application for the project. The specific tasks and assumptions from the original scope of services (under the Local Agency Agreement dated December 14, 2010) will apply to this supplement. Professional Services: Hourly OH@ Fee@ Rate Name Job Title Hours Rate 131.14% 32% Per Hour Bill Amount Johnson, Matthew G. Senior Engineer 40.0 $72.00 $94.42 $23.04 $189.461 7,578.43 Jackson, Resident Engineer 120.0 $58.00 $76.06 $18.56 $152.62 18,314.54 Craig Inspector Chang, /Documentation 200.0 $39.00 Georqe $51.14 $12.48 $102.62 20, 524.92 Inspector Szili, Christie /Documentation 200.0 $39.00 $51.14 $12.48 $102.62 20,524.92 Inspector/ Leigh, Sherri Documentation 40.0 $39.00 $51.14 $12.48 $102.62 4,104.98 600.0 Total Direct Labor: 71,047.80 Expenses: Copies, cell phones, computers vehicles 10, 000.00 Total Expenses:1 10, 000.00 Supplement #2 Total: 81,047.80 Original Contract Maximum: $2,024,137.021 New Contract Maximum: $2,105,184.82 3