HomeMy WebLinkAboutTrans 2012-03-19 Item 2A - Grant Application - Puget Sound Regional Council for Interurban Avenue South (South 143rd Street to Fort Dent Way)City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: FROM: DATE: SUBJECT ISSUE Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director I March 16, 2012 Interurban Ave S (S 143r St Fort Dent Wv) Project No. 90310402 Puget Sound Regional Council Federal Funds 2012 Call for Projects The Puget Sound Regional Council (PSRC) has announced its Call for Projects for the 2012 Federal Funding Programs. Full applications for candidate projects in the Regional Competition must be submitted by March 21, 2012. BACKGROUND The grant funding programs which have called for project applications include: Program PSRC Fundinq Requested Amount Surface Transportation Program (STP) $35.95 million $5 million DISCUSSION Per CIP policy, appropriate committees must approve grant application submittals. The following project is recommended for a 2012 PSRC Federal Funding grant application: Interurban Ave S S 143 St to Fort Dent Way (2012 CIP pg. 28) The design of Interurban Ave S is 90% complete and construction is estimated to cost $11 million. The City is requesting $5 million for the construction phase of the project that requires a minimum local match of 13.5% (or $675,000) for federal funds. The current CIP shows City Operating Revenues of $6.1 million. The Interurban Ave S project has been scored by the SCATBd Technical Advisory Committee (TAC) and was rated #2 in its recommendation to SCATBd. The SCATBd TAC received seven project applications and has recommended five be forwarded to compete in the Regional Competition. RECOMMENDATION The Committee is being asked to approve the submittal of a grant application for the Surface Transportation Program (STP) for the Interurban Ave S project. Attachment: TAC Recommendation to SCATBd for PSRC's Regional Project Competition CIP Page 28 WAPW EngIPROJECTSW RW RS Projects19 0 31 0 4 02Interurban Ave S12012 Grant AppUfo Memo 2012 Grant Apps TC 03- 19- 12.docx TAC Recommendation to SCATBd for PSRC's Regional Project Competition Rank Order Based on Avg. Score Sponsor Project Title Program Amount Requested Phase Average Score Des Moines SeaTac Connecting 28th /24th Avenue South (South 200th Street to South 216th Street) .STP $4,000,000 Construction /Design 87.0 2 Tukwila2 Interurban Ave South (S 143rd St to Fort Dent Way) • STP $5,000,000 Construction 77.9 3 Federal Way SR 99 HOV Lanes Phase V /S 340th St to 359th St STP $4,000,000 Design /ROW 76.9 4 Auburn S. 272nd/277th Street Corridor Capacity & Non- Motorized Trail Improvements STP $4,900,000 Construction 76.0 5 Kent SE 256th Street Improvements (SR 516 to 116th Ave SE) STP $3,000,000 Construction 74.7 6 Renton South 7th Street (Rainier Avenue South to Grady Way) STP $850,000 Design 67.0 7 Tukwilal Strander Blvd /SW 27th Street Extension - Phase 3 STP $5,000,000 Design 63.3 W:\PW,Eng \ OTHER \Grant Applications\Final TAC Regional Comp List.vnl CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2012 to 2017 PROJECT: Interurban Ave S (S 143 St Fort Dent Way) Project No. 90310402 DESCRIPTION: Design and construct sidewalks, pavement restoration, drainage and lighting Project Location 2012 2017 Capital Improvement Program 28 3 Pedestrian traffic is forced to walk in traveled way, lighting is substandard, drainage is poor and JUSTIFICATION: pavement failure is accelerating. Completed 90% of design in 2010. State TIB grant submitted in 2011. Federal STP construction grant STATUS: submitted in 2009 was unsuccessful. MAINT. IMPACT: Reduce annual pavement repairs and increase pedestrian safety. COMMENT: Federal Hwy STP Grant of $389,000 for design only. Proposed grants are Federal and State TIB. FINANCIAL Through Estimated (in $000's) 2010 2011 2012 2013 2014 2015 2016 2017 BEYOND TOTAL EXPENSES Design 464 250 714 Land (R/W) 150 150 Const. Mgmt. 1,300 1,300 Construction 9,400 9,400 TOTAL EXPENSES 464 0 0 0 0 0 0 0 11,100 11,564 FUND SOURCES Awarded Grant 389 389 Proposed Grant 5,000 5,000 Mitigation Actual 0 Impact Fees 0 City Oper. Revenue 75 0 0 0 0 0 0 0 6,100 6,175 TOTAL SOURCES 464 0 0 0 0 0 0 0 11,100 11,564 Project Location 2012 2017 Capital Improvement Program 28 3