Loading...
HomeMy WebLinkAboutTrans 2012-08-20 Item 2A - Grant Application - WSDOT Regional Mobility Grant for Tukwila Urban Center Pedestrian-Bicycle BridgeWme i AM= N M E =0 SUBJECT: Tukwila Urban Center Pedestrian/Bicvcle Bridoe Project No. 90510403 WSDOT Regional Mobility Grant Program Application ISSUE Submit grant application to the WSDOT Regional Mobility Program for the TUC Pedestrian Bicycle Bridge. J-39 4 0 no I .16 DISCIISSIGA Design is underway for the TUC Pedestrian Bridge and a new cost estimate based on 30% engineering will be available in October. The CIP currently shows the need for $7,485,000 in construction funding, which is based information from the Type, Size, and Location Report, finalized in 201 The new 2013 CIP sheet will be updated once the most recent information is received and the final grant request will be updated to reflect the more current cost estimate prior to submittal, .11 1W 11[411 fLtu u0w�§. I I mill'; .1# 4 M I I RINI 11 -11411 P 11111 1 MWNI mvm the actual needs. Match is required for these grants, with the minimum of 20%. Unlike most grant sources, previous expenditures and staff salaries can be used as match. If the two grant requests are successful, the funds cannot be used as match to each other, but other federal grant funds already awarded for the design can. If successful, funds would be available in June, 2013. Phase City Park Impact Grants Responsibility Fees Design 102,0 0 0 3 ROW 230,000 $1,100,000 Construction 710,000 775,000 Total $1,042,000 810,000 Match Percentage 10% 8% Awarded Grant Total Amount Grants Request $1,496,000 0 $1,633,000 870,000 $1,100,000 6,000,000 $7,485,000 $1,496,000 $6,870,000 $10,218,000 100% RECOMMENDATION r Attachment: CIP sheet wApw eng1projectMa- rw rs projectsWc ped bicycle bridge (90510403)%grantslinfo memo wsdot regional mobility grant app 8-17-12 sb docx Urr 1'_UFT1A ►7 r 2013 to 2018 PROJECT: Tukwila Urban Center Pedestrian /Bicycle Bridge Project No. 90510403 DESCRIPTION: Construct a new pedestrian /bicycle bridge over the Green River. JUSTIFICATION: Pedestrian /bicycle connection between Tukwila's Urban Center and co rail/ r ti Supports local and regional goals and policies regardin land u rtati ran Center. Pedestrian System Report identified the optimal locati fo i to be south of the Best STATUS: Western Hotel. Type, Size, and Location Report was c e in' 11. Council approved a design of a twin -tied arch bridge with no accommodation for a future bridge crossing over West Valley Highway. MAINT. IMPACT: To be determined. State Enhancement design grant for $190k and Transit Oriented Development (TOD) planning grant of $55k. COMMENT: State Enhancement grant of $500k and Federal CMA® grant of $750,833 for final design. Project is on Park Impact Fee list with funding of $2 million with an 80 %/20% split. FINANCIAL Through Estimated (in $000's) 2011 2012 2013 2014 2015 2016 2017 2018 BEYOND TOTAL EXPENSES Design 267 Land (R/W) Const. Mgmt. Construction TOTAL EXPENSES 267 FUND SOURCES Awarded Grant 245 Proposed Grant Mitigation Actual Park Impact Fees Expected City Oper. Revenue 22 TOTAL SOURCES 267 984 382 1,633 1,100 1,100 1,000 1,000 6,485 6,485 984 382 1,100 7,485 0 0 0 0 10,218 930 321 1,496 870 6,000 6,870 0 35 90 685 810 54 26 140 800 0 0 0 0 1,042 984 382 1,100 7,485 0 0 0 0 10,218 Project t% n C E a j i 2013 2018 Capital Improvement Program 0 GIS 12 2