2007 Overlay Program - Consultant Selection, Scope of Work, and Fee Estimate
ISSUE
Select a consultant to provide design and PS & E for the City's 2007 Overlay Program.
BACKGROUND
Task 1
The C.I.P. includes the Annual Overlay Program to provide repairs and overlays on the City's
street system. The 2007 list of projects includes:
Street From To
1. S 158th St 4200 Ave S 47th Ave S
2. S 156th St 44th Ave S 47th Ave S
3. 44th Ave S S 156th St S 158th St
4. 47th Ave S S 156th St S 158th St
5. 33rd Place S S 140th St 33rd Ave S
6. 48th Ave S Macadam Road S 134 th Place
7. S 136th St Macadam Road 48th Place S
8. 48th Place S 48th Ave S S 136th St
Task 2
The hillside below Slade Way has experienced sloughing in the past year that should be
stabilized. Options will be prepared and reviewed for construction with the 2007 Overlay
Program.
Task 3
The intersection of Boeing Access Road / East Marginal Way was advertised in 2006 for
overlay and repair using federal funds. All bids were rejected. This project will be reviewed,
updated, and re-bid as a separate project.
Task 4
The Pavement Management System program will be updated to reflect current conditions.
I
Mayor Mullet
Page 2
January 17, 2007
ACTION TAKEN
Three fInns were short-listed from the City's consultant roster of fIrms that indicated they
provide expertise in pavement design, overlay design and pavement management. All three
fInns were rated based on the expertise and experience necessary to perform the work. KPG,
Inc., was selected as the most qualifIed (see rating sheet attached).
KPG, Inc., has provided design and construction services for the City in past years. A draft
Scope of Work and Fee Estimate are attached.
RECOMMENDATION
Approve the selection of KPG, Inc., as the 2007 Overlay Program design consultant and
authorize the Mayor to execute a contract with KPG, Inc., in the amount of $79,793.00.
attachments: Map, Rating Sheet, Scope of Work, Fee Estimate
(p:Proje.:ts\A- RW & RS Proje.:ts\07RWOI1JXf1 Omlay\ConSelctfor2OO7)
2.
2007 Overlay Projects
January 17, 2007
Vicinity Map 3
CONSULTANT SELECTION
2007 OVERLAY PROGRAM
W&H David Evans
Pacific KPG & Associates
Project Manager 1 1 1
Pavement Design I Rehabilitation
Repair Experience 2 1 2
Agency Overlay
Program Management 1 1 1
Tukwila Overlay
Program Knowledge 1 1 2
Pavement Management
System Experience 3 1 3
Expertise Using
Federal Funds 1 2 2
TOTALS 9 7 11
Score consultant 1 to 4, with 1 being highest and 4 being lowest.
Lowest score is consultant ranked highest.
If
KPG
ENGINEERS ARCIDTECTS IAL"IDSCAPE ARCHIIECTS
753 9th Avenu~ N
Seattle. W A 98 109
TEL 206/286-1640
FAX 206/286-1699
January 15, 2007
Mr. Robin Tischmak, P. E
City of Tukwila
Department of Public Works
, 6300 SQuthcenter Blvd.
Tukwila, WA 98188
Re: 2007 Overlay Program
Dear Robin,
KPG is pleased to submit to you the attached scope of work and hour and fee estimate for the
referenced project. The work scope includes preparation of plans, specifications and estimates
for the 2007 overlay progrcfm (:3" sites'total),stabiIization design on Slade Way, as well as '
repackaging' of the EMW/BAR intersection improve'ments for bid. Also included is a $10,000
allowance for pavement management support by Pavement Engineers, Inc.
Our total estimated fee for this work is $79,793, which is approximately 8% of the anticipated
construction budget of $980,000.
We are ready to start immediately on these projects. Please feel free to contact me at 206-267-
1052 if you should have any questions or would like to discuss this proposal.
Very Truly Yours,
/
~
Nelson Davis, P.E
Project Manager
5
Exhibit A
City of Tukwila
2007 Overlay Program
Scope of work
January 16, 2007
TASK 1 - 2007 OVERLAY PROGRAM
The Consultant shall prepare final Plans, Specifications and Estimates for the following overlay
projects:
CJ The 'Loop'
CJ 48th Avenue S/S 136th Street
CJ 33rd Place South
S 156111 Street, S 158111 Street, 44th Ave S, 47th Ave S
East of Macadam to existing butt joint I dead end
33rd Avenue S to S 140th Street
The Consultant shall provide all necessary field reviews, base mapping, and utility notification
required to complete final bid documents. 40 copies of the final bid documents will be provided
to the City for bid advertisement. Interim review submittals (10 copies) will be prepared at the
90% stage of plan completion. The Consultant shall also prepare'the bid tabulation, check low
bidder(s) references, and provide a recommendation for award to the City.
Permitting, environmental documentation, geotechnical review, or stormwater detention and
water quality have not been included in this scope and estimate
The Slade Way slope stabilization project (Task 2) will be included in the bid documents for the
2007 Overlay Program_ Some sites may be bid as alternates based on available budget and
other considerations at the discretion of the City.
TASK 2-SLADE WAY SLOPE STABILIZATION
The Consultant shall prepare final Plans, Specifications and Estimates for stabilization
improvements on the Slade Way embankment and roadway edge_ Stabilization improvements
will include review of geotechnical infonnation prepared by others, preparation of cost opinions
for up to three (3) alternatives, and design of the preferred alternative. This scope of work
assumes that the alternatives will be reinforced earth or similar and does not include analysis or
design of structural solutions such as soldier pile or cantilever concrete walls_
Existing AutoCAD topographic base maps showing all utilities, contours, and right of way
location will be provided by the City, Previous geotechnical studies will also be provided by the
City and are assumed to contain sufficient information for preliminary design of the 3
alternatives. We have included a $5,000 allowance for geotechnical services which may be
required for final design of the preferred alternative.
This project site will be bid as part of the 2007 Overlay Program (Task i),
6
KPG
lof2
2007 Overlay Program
TASK 3 - BOEING ACCESS ROAD & EAST MARGINAL WAY
The Consultant shall field review the previous design prepared for the City by others and make
appropriate modifications, if any, based on our field observations. The Consultant will work with
City staff to prioritize improvements and structure the bid proposal form to include up to two
alternate bid schedules to allow flexibility in awarding improvements with available budget.
Previous AutoCAD design drawings and Word document specifications will be provided by the
City in digital format 40 copies of the final bid documents will be provided to the City for bid
advertisement. Interim review submittals (10 copies) will be prepared at the 90% stage of plan
completion. The Consultant shall also prepare the bid tabulation, check low bidder(s)
references, and provide a recommendation for award to the City.
Permitting, environmental documentation, geotechnical review, or stormwater detention and
water quality have not been included in this scope and estimate.
The Consultant will attend one meeting with funding agency representatives to review proposed
revisions to previous construction documents. The City will route all necessary information to
the funding agency for review and approval.
TASK 4- PAVEMENT MANAGEMENT SUPPORT
An allowance of $10,000 is included to provide support and upgrades to the City's pavement
management system. This work will be performed primarily by Pavement Engineers, Inc under
subcontract to the Consultant.
KPG
2of2
2007 Overlay Program
7
QO HOUR AND FEE ESTIMATE EXHIBIT B
Project: City of Tukwila
2007 Overlay Program
Task
Description
Task) 2007 Overlay Program
1.1 Coordination meetings
_1.2 Utility coordination
1.3 Prepare base maps
The Loop
48th Avenue S/S 136th Street
33rd Place South
1.4 Prepare overlay_plans (estimate 18 sheets)
1.5 Quantities estimates
1.6 Prepare specifications
1.7 Prepare review submittals
Reimbursable expenses see breakdown for details
Task Totals
Task 2 Slade Way Slope Stabilization
2. Coordination meetings
2.2 Prepare alternative cost analysis
2.3 Geotechnical coordination
2,4 Prepare stabilization plans (estimate 3 sheets)
2.5 Quantities estimates
2.6 Prepare specifications
2.7 Prepare review submittals
Reimbursable expenses see breakdown for details
Task Totals
Task 3 Boeing Access Road /East Marginal Wav
_3.1 Coordination meetings
3.2 Field review previous design
3.3 Plan modifications updates
3.4 Quantities estimates
3.5 Prepare specifications
3.6 Prepare review submittals
Reimbursable expenses see breakdown details
Task Totals
Task 4 Pavement Management Support
3.1 Allowance tor Pavement Management, Inc.
Task Totals
Senior
Engineer
161.25
0
0
0
16
8
4
0
2
8
4
4
2
4
0
Estimated rates am based on:
Overhead as 156.77% of direct salary cost
Fee calculated as 15% of direct salary overhea 1117 /2007
4 4 1
0_ 4
4 I 16
2 1 4
4 8
0 y 2 1
*Labor Hour Estimate
Project
Engineer Technician Clerical
113.06 80.77 65.78
4
4
8
4
4
60
16
16
2
16
12
12
80
12
8
4
32 118 I 144
2 1 0
16 1 24
4 1 0
16� 1 40
4 1
8 0
2 2
24 1 52 66
14 i 38 1 96
0 1 0 0
0 1 0 0
0
4
80
8
0
4
Total Estimated Fee:
K
Architecture
Landscape Architecture
Civil Engineering
0 _I 1,097.24
4 1 715.36
0 1 2,196.80_
0 1 1,421.48
0 1 1,421.48
0 15,825.20
0 4,06
8.20
8 1 3,626.36
4 LS 812.32
I 1,450.00
16 I 32,634.44
Total Fee
Fee
548.62
5,037.44
1,097.24
5,684.76
774.74
1,812.60
519.22
5,300.00
20,774.62
0 1 1,097.24
0 775.32
0 8,915.56
0 1 1,420.90
4 I 1,812.60
4 812.32
1,550.00
8 1 16,383.94
0 1 10,000.00
0 I 10,000.00
79,793,00
.4)
HOUR AND FEE ESTIMATE
Project: City of Tukwila
2007 Overlay Program
Reimbursable Breakdown
Tasty' 2007 Overlay Program
Mileage
Reproduction
Task 2 Slade Way Slope Stabilization
Mileage
Reproduction
Allowance tor Geotechnical Review
Task 1 -Total
Task 1 Total
EXHIBIT B
Task 3 Boeing Access Road 1 East Marginal Way 50.00
Mileage 1,500.00
Reproduction
Task 1- Total 1,550.00
1117(2007
Architecture
Landscape Architecture
Civil Engtnear1ng
Cost
200,00
1,250.00
1,450.09
50.00
250.00
5;000.00
5,300.00