HomeMy WebLinkAboutTrans 2007-02-26 Item 3A - Discussion - Scope of Work for Tukwila International Boulevard Phases II and III (South 116th Street to South 138th Street) INFORMATION MEMO To: From: Date: Subject: Mayor Mullet Public W orks Directo~ February 21,2007 Tukwila International Blvd - Phases 2 and 3 (S 116 tb St to S 13Stb St) Project Scope Changes and Proposed Bidding Alternatives Project No. 95-RW03 ISSUE Discuss and fmalize the scope of work for bidding and construction purposes. BACKGROUND This project was presented to the City Council in November 2004 to discuss the project budget and design alternatives in order to proceed into fInal design of the project. At that time, the selected alternative was estimated to cost approximately $16.15 million with a budget of $16.2 million. Since that time, the design has progressed to 90% completion and the estimated construction costs have escalated to $20.2 million. The increased cost estimate and possible cost saving measures were presented to the Council in November 2006. Cost saving measures included eliminating the conversion of overhead utilities to underground facilities, using different cost-effective retaining walls, and eliminating some of the proposed improvements within the WSDOT limited access right- of-way. These cost reductions were estimated to bring the construction project back within the available budget of $16.2 million. During the discussion at the November 2006 Council meeting, there were concerns regarding the elimination of the undergrounding of overhead utilities. Subsequent inquiries since November into additional funding sources to close the funding gap have been unsuccessful. ' ANALYSIS This project must move forward into construction to avoid the possibility of losing grant funding and the entire 2007 construction season. The implementation of cost saving measures is necessary. A compromise to allow the project to move forward is to implement the cost saving measures listed above and to use that design as the base bid. An additive alternate to the base bid would include undergrounding of the overhead utilities in front of the Intergate West and Homeland Security buildings, which could be included in the bid package for award if favorable bids were received and there is adequate existing budget. RECOMMENDATION Proceed with a fmaldesign for bidding that implements all cost saving measures, but includes the undergrounding of utilities in front of the Intergate West and Homeland Security buildings as an additive alternate to the base bid. (p:Projects\A- RW & RS Projects\95RW03 TIB2\Memo Additive All) /