HomeMy WebLinkAboutPermit M98-0120 - SHOE PAVILION&h L\/I I X02
rn qg - 0/20
City of Tukwila (206) 431-360
Community Development / Public Works • 6300 SouthcenterBoulevard, Suite 100 • Tukwila, Washington 98188
Permit No: M98 -0120
Type: B -MECH
Category: NRES
Address: 17364 SOUTHCENTER PY
Location:
Parcel #: 262304 -9079
Contractor License No: MACDOM *248J9
TENANT SHOE PAVILION
17364 SOUTHCENTER PY, TUKWILA WA 98188
OWNER MBK NORTHWEST Phone: 206 575 -8090
C/O TRAMMEL CROW COMPANY, 17560 SOUTHCENTER PY, TUKWILA WA 98188
CONTRACTOR MACDONALD MILLER CO Phone: 206 763 -9400
7717 DETROIT SW, SEATTLE, WA 98106
CONTACT JESSE MONTEZ Phone: 206- 768 -4288
7717 DETROIT AV SW, SEATTLE WA 98106
******************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Permit Description:
RELOCATE 2 ROOFTOP A.C. UNITS, NEW DUCTWORK AND
DIFUSSERS. RELOCATE 2 SMOKE DETECTOR AND
THERMOSTATS.
UMC Edition: 1994
* * * * * **
Valuation: 7,500.00
Total Permit Fee: 66.25
********************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
MECHANICAL PERMIT
Status: ISSUED
Issued: 07/28/1998
Expires: 01/24/1999
Permit Center Aut`horized Signature Date
I hereby certify that I have read and examined this permit and know the
same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate
or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and
obtain thi .. .. ild
Date: -7/21/,
Title:
This permit shall become null and•void if .the work is not commenced within
180 days from the date of issuance,:or.if the'work is suspended or
abandoned for a period of 180 days from the last inspection.
Project Name/Tenant: ,
t wAi ‘wprr�c 4>E2 /Skov- Pko•w cry..
Value of Construction: -7 •
* .
Site Address: City State /Zip:
a 34,4 2 Je#- Pt 1 ,Tu.t.w, , o7 . l'kim
,Sco
Tax Parcel Number:
P 4a 304,079
Property Owner:
✓A }3.W
Phone:
,6 69t-9so0
Street Address:
7( dio,¢�,a D,e
City State /Zip:
Fax #:
Contact Person:
.J" e Pao* /.•r...
Phone:
ZO6 - 7Gtt - Z.V4(
Street Address:
7717 Pane GrrMk11E 5.cu .47 - ,e • W 0
City State /Zip:
p&' /6 G
Fax #:
400- 764 1 - Itall
Phone:
1o6) - 7Ge - 5/2 FY
Contractor:
Afote- ba,i Netted` Cry
Street Address:
7717Dr=fieorT Ade Sa.7 / ,Se- itf-F4- U.)x
City State /Zip:
94' 6
Fax #:
?06 - 768 Veil
Architect:
8/044.40-ear 5 e AScocrA
Phone:
s f33-(070 -e 2is ir
Street Address: City State /Zip:
C600 sua kN00, s fed , 44(e DS o aee-
Fax #:
.5 - 0 , S S
Engineer:
-3r d lu,c tic t
Phone:
- 76f .- fez it S'
Street Address:
�77 17r / r #4 l 7teJ _5rA,l /G c.l�i(
City State /Zip:
4l /O c
Fax #:
,�C�'o - 7�o ' 9 eZ
MISCELLANEOUS PERMIT REVIEW 'AND. APPROVAL REOUESTED:ITO BE FILLED OUT BYAPPLICANT)
Description of work to be done: geac..4 6 z / ? . . o o f 6p AC u ' # , I (lb , „yew dccc fwo+tifL.g ol S4--&,
ZeLotrkf .- z- 5.4w- da •. _ _ i._ I-444, . •
Will there be storage of flammable /combustible hazardous material in the building? ❑ yes Ero
Attach list of materials and s afie location on separate 8 1/ 2� i'11paper indicating quantities & Material Safet Data Sheets
71 Above Ground Tanks Ll Antennas /Satellite Dishes , El Bulkhead /Docks LJ Commercial Reroof
❑ Demolition ❑ Fence 10 Mechanical ❑ Manufactured Housing - Replacement only
❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems
❑ Temporary Facilities ❑ Tree Cutting
MONTHLY SERVICE BILLINGS TO:. ..
:. .
Name:
Phone:
Address:
City /State /Zip:
0 Water
0 Sewer
0 Metro
0 Standby
CITY OF r 'KWI LA
Permit Center
6300 Southcenter Boulevard, Suite 100
Tukwila, WA 98188
(206) 431 -3670
Miscellaneous Permit Application
Application and plans must be complete In order to be accepted for plan review: IS 13
Applications will not be accepted through the mall or facsimile. St4.0e Au•W'
• APPLICANT_.REQUEST,FOR MISCELLANEOUS;PUBLIC WORKS, PERMITS :?
❑ Channelization /Striping
❑ Flood Control Zone
❑ Landscape Irrigation
❑ Storm Drainage
❑ Water Meter /Exempt it
❑ Water Meter /Permanent #
❑ Water Meter Temp #
❑ Miscellaneous
❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s):
El Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq. ft.grading/clearing
❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public
❑ Street Use ❑ Water Main Extension 0 Private 0 Public
0 Deduct 0 Water Only
Size(s):
Size(s):
Size(s): Est. quantity: gal Schedule:
❑ Moving Oversized Load/Hauling
WATER METER DEPOSIT /REFUND BILLING:
Name:
Address:
Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall
expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days
upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application
shall be extended more than once.
Dale application accepted:
71/
Permit Number:
Phone:
City /State /Zip:
Oath application oxpilas; II ppllcelid (liken by: (Inl Ialo)
BUILDING OWNER OR AUTHORIZED AGENT: ish,
SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR
Above Ground Tanks/Water Tanks- Supported directly upon grade
exceeding 5,000 gallons and a ratio of height to diameter or width
which exceeds 2:1
PERMIT REVIEW
Submit checklist No:. M -9
❑
Antennas /Satellite Dishes
Signature:
, ,u
, _ _
,
��j�
♦� � /�
Date:
❑
Commercial Reroof
Submit checklist No: M -6
❑
Print name: i'mQL
�
az/
Fences - Over 6 feet in Height •
Submit checklist No:" M-9
❑
B " 7to • -
_ r
F
= 7Co
- % 7
Address: .7 _2/ •7 /
/,
%,, %P �
❑
Miscellaneous Public Works Permits •
Submit checklist No H =9
City /State /Zip:
Manufactured Housing (RED INSIGNIA ONLY)
Submit checklist No: M -5
0
❑
SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR
Above Ground Tanks/Water Tanks- Supported directly upon grade
exceeding 5,000 gallons and a ratio of height to diameter or width
which exceeds 2:1
PERMIT REVIEW
Submit checklist No:. M -9
❑
Antennas /Satellite Dishes
Submit checklist No: M -1
❑
Awnings /Canopies - No signage
Commercial Tenant Improvement
Permit .. . ..
❑
Bulkhead/Dock
Submit. checklist No: M -10
❑
Commercial Reroof
Submit checklist No: M -6
❑
Demolition
Submit checklist ' No: M -3, M -3a
❑
Fences - Over 6 feet in Height •
Submit checklist No:" M-9
❑
Land Altering/Grading /Preloads
Submit checklist No: M -2
❑
Loading Docks
Commercial Tenant Improvement
Permit. Submit checklist No: H -17
2r
Mechanical (Residential & Commercial)
Submit checklist No ;M -8,
Residential only - H -6, H -16
❑
Miscellaneous Public Works Permits •
Submit checklist No H =9
❑
Manufactured Housing (RED INSIGNIA ONLY)
Submit checklist No: M -5
0
Moving Oversized Load/Hauling
Submit checklist No: M -5
0
Parking Lots
Submit checklist No: M -4
in
Residential Reroof - Exempt with following exception: If roof structure
to be repaired or replaced
Residential Building Permit
Submit checklist No: M -6
❑
Retaining Walls - Over 4 feet in height
Submit checklist No: M -1
❑
Temporary Facilities
Submit checklist . No:. M -7
❑
Temporary Pedestrian Protection/Exit Systems
Submit checklist No: M -4
in
Tree Cutting .
Submit checklist No: M -2
ALL MISCELLANEOUS PE! T APPLICATIONS MUST BE SUBM D WITH THE FOLLOWING:
• ..,
➢ tALLti aWITIG S A L BE AT A LEGIBLE SCALE AND NEATLY DRAWN
➢ BUiLDING ��I r PLA AND UTILITY PLANS ARE TO BE COMBINED
A ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT
A STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON
LICENSED STRUCTURAL ENGINEER
➢ CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER
(P.E.)
❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If
not available at the time of application, a copy of this license will be required before the
permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit
in Lieu of Contractor Registration ".
Building. Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or, contractor licensed .
by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and
obtain the permit will be required as part of this submittal.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS
PERMIT.
MISCPMT.DOC 7/11/96
CITY OF TUKWILA
Address: 17364 SOUTHCENTER PY Permit No: M98-0120
Suite:
Tenant: SHOE PAVILION
Type: 6-MECH
• Parcel #: 262304-9079
Status: ISSUED.
APplied: 06/16/1998
Issued: 07/28/1998
*********k*******k****************4***14***************Ock**********k*****4144(
Permit Conditions:
1. No changes will he made to the plans unless approved by the
Architect or Engineer and the_Tukwila,Building Division.
2. All permits. inspectionrre'p:ordan• plans shall be
available at the tuy24-ree- t6‘the-:.'stAt.„-..,9f any con-
struction. Thes0dC(iments to',;be mai and avail-
able until f ir43, ', is 4ranted-,
3. All construct / 16n to f lre'l,'!Jori,e a , ,fin-conforman0 0th tw
• ‘,, --:dOoved :, t ,,
Plans and,redOirements,of the UniforM Buii4iiig,..
Edition)/.aS MechaniOal Code41991,E0t10n),
and WeshthrjtO State Energy 'Code (1994 Edition)'.,
4. Validity of 'Permit., -The iSUantie
slof a permIt oi
,
plans,Spe,cificattons. and computations shalrnot,ba,coh,
strue*/toba a prmit far,' , or an aPproval at any violation
of any of the provision's of\tk)P,'6uilding code or'of'a,We,
otheiodihance'of, the jurisdiction. - No permit pres 6 : 5 A
5. MANUFACTURRS INSfALLATION:TNST4IttIPN OICSI,TE'
FOPHE„,pUILD'INd-IXTECTOWREVIEW: ',,)'. ,:'''
give to violate .or, provisioni of this
i
. JO f :
'
f.r, ,r,. ....,...,r4' •r** . ''..,.'. • '..e...„..',..... /*". „ ,., ..,
..:„,.. „-:-....: ., ,, , i . .,.. .,,, ‘ .../ :,..,_ . t ...:'• •
.,.i ..$, , .' ,,',.',.; .:1 • • ;-;:,,..:.:„ ; .,” ,,, ,.):''•
, ,..., •,',. .- :'."-. :
...„.,:, i-
....„ ,,,,..;.. ,,.■ d .
.. ir.
.' . ■11
.' , ;:;''''%` • ''(.,
:1 , ,. ' i'"•• s . : . , . •:'
.•'' q'''.'1 • ' e,.., -1:'
r;l•'-
•i:4.,.:;„ •
•
ACTIVITY NUMBER: M98 -0120 DATE: 7 -21 -98
PROJECT NAME: SHOE PAVILION
Original Plan Submittal XX Response to Incomplete Letter
Response to Correction Letter # • Revision After Permit Is Issued
DEPARTMENTS:
in Division
"Vile f l
Public
Works E
11414- �
&AI
PLA N�E�W�O� ING/SLIP
Fire VI
Z -. enton PlannyiF Division
Structural Permit Coordinator •
DETERMINATION OF COMPLETENESS: (Tues, Thurs) DUE DATE: 7 - 23 - 98
Complete
Comments:
Incomplete
TUES /THURS ROUTING: Please Route
Routed by Staff n (if routed by staff, make copy to master file and enter into Sierra)
REVIEWERS INITIALS: DATE:
Approved
Not Applicable ❑
No further Review Required E
APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 8 - 20 - 98
Approved with Conditions El Not Approved (attach comments) ❑
REVIEWERS INITIALS: DATE:
CORRECTION DETERMINATION: DUE DATE:
Approved El Approved with Conditions Not Approved (attach comments) E
REVIEWERS INITIALS: DATE:
\PR•ROUTE.DOC
6/78
PL SLIP
ACTIVITY NUMBER: M98 -0120 DATE: 6 -16 -98
PROJECT NAME: SHOE PAVILION
XX Original Plan Submittal
Response to Correction Letter #
Response to Incomplete Letter
Revision After Permit Is Issued
DEPARTMENTS:
BLt�f�l�i
Public Works
Works b
\PR•ROUTE,DOC
6/98
Complete C
Co
.OJli fl / „`
TUES /THURS ROUTING:
Fire Prevention
Structural
DETERMINATION OF COMPLETENESS: (Tues, Thurs)
Incomplete
Please Route C
XI 0 1
Routed by Staff C (if routed by staff, make copy to master file and enter into Sierra)
Planning Division ❑
Permit Coordinator •
DUE DATE: 6 - 18 - 98
Not Applicable
No further Review Required
REVIEWERS INITIALS: DATE:
APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 7 - 16 - 98
Approved C Approved with Conditions C Not Approved (attach comments) ❑
REVIEWERS INITIALS: DATE:
CORRECTION DETERMINATION: DUE DATE:
Approved ❑ Approved with Conditions C Not Approved (attach comments) C
REVIEWERS INITIALS: DATE.
F625.052.(X01)(/)71
(I.
DEPARTMENT OF LABOR AND INDUSTRIES
REGISTERED AS PROVIDED BY LAW AS
CONST CONT GENERAL
• REGIST . # EXP . DATE
CCO1 MACDOM*248J9 08/01/1998
EFFECTIVE DATE 04/29/1976
MACDONALD MILLER CO
7717 DETROIT AVE SW
SEATTLE Wk 98106
Wadi And Displa CertitluaL
**A *+* + +�+*a++*�******+*+��** **a*A* + ^�*A
' � �
�ITY UF `"o1 � ' ' | A. WA `/ � ^ `�� ' �� � � ' �' � ` TRANSMIT ^
++*A**+A*fAA**+*^*+*aA*+*+*****A-A*w***+***++A***A+***A*f++**A
TeANSIOT R9700801 Amount: 66-25 07/28/98 13:59
Payment Method: CHECK Notation: MACDONALD MILLER Init: OLH
Permit No: N98-0120 Type: 8-NECH MECHANICAL PERMIT
Parcel No: 262304-9079
Site Address: 17364 SOUTHC�NTER PY '
'
Total Fees: ` 66°25
ThisJovment 66,.25 Total ALL Pmts: 66°25
Balance:
*^****A****«****A***a+++*xh+ah++++a*+a+A*+^*****«***AA**wx*a*a**
Account Code Description Amount
- 00,0/345,830 PLAN CHECK - NUNREG ` 11'.25 A-001022.100 ' MECHANICAL ~ NONREG
\��
TOTAL
01/29
�O����29 ��1� �' �'� � ~.,
•
Project J ct ( ofv
Type of inspectlo : 1 fr1/(6te---2
Adir,5ss aC7U-4-ek-
ate called: 0 I
`
I (0 :,m,
0 ,
Special instructions:
Date wanted: 9 4
Requester: I
Phone No.: 6 16
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter r @Ivd., #100; Tukwila, WA 98188
Approved per applicable codes.
COMMENTS:
Inspector:
INSPECTION RECORD ,
Retain a copy with per(
Date:
Hq-0120
PERMIT NO.
1 36Z0
Corrections required prior to approval.
$42,00 REINSPECTION FEE REQUIRED. Prior to Inspection, fee must
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection,
I Receipt No.:
Date:
Project:
,
Type of ins Titi.n
iiir
Address:
Date ca ed:
Special instructions:
4- 7.30
/
4
/0.06
Date wanted: .1.3
ICID
p.m.
Requester:
Phone No.:
?'Li'''+ rm' w."10171,vtts ► :xfiyiv 7rr..71 .:W.,e, �7.,«�` . , ,
ti
INSPECTION NO,
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100; Tukwila, WA 98188
Approved per applicable codes.
Inspector:
Receipt No,:
INSPECTION RECOR �;
Retain a copy with per)
Date:
Date:
PERMIT NO.
(206) 431 -3670
Corrections required prior to approval.
s / .e..G 41m
$42.00 REINSPECTION F REQUIRED. Prior to inspection, fee mmist
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Proje51
r 0, a
Po...A...Ct 1 ts-IN
Type of inspection: fi o c.....
Addres 3
c .,..„ _....„
Date called:
Special instrucrons:
IA (- CL•
1:■°A(
,
Date wanted: .. z 0 ;1;1
Requester:
ptile.R.:Isim 0-1160
INSPECTION RECORp--‘
Retain a copy with penU
r,
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100; Tukwila, WA 9818
Approved per applicable codes.
COMMENTS:
Inspector
Receipt No.:
f.
K Corrections required prior to approval.
Date:
AA PERMIT
431-3670
-
[1 $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must •
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspectlon.
Date:
C
CITY OF TUKWILA
Department of Community Development
Building Division - Permit Center
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431 -3670
REVISION SUBMITTAL
DATE: 7//7/c/
PROJECT NAME:
PLAN CHECK/PERMIT NUMBER: MIS 012.0
PROJECT ADDRESS: 11 561)*Ifedeltite
CONTACT PERSON: Testex,fri PHONE:
REVISION SUMMARY: e.. (+-w�' . 9 4- I 4 s
5.4e4A.4
� .0 c.4a.e.4
SHEET NUMBER(S)
"Cloud" or highlight all areas of revisions and date revisions. CITY OF Tu OF T D
cl lcwlw
JUL 2 1 199B
SUBMITTED TO: Tip - o if TM -i4/ PE M�ENTER
Sr2
CITY USE ONLY
Id .
Planning:
?utillc War
3/19/96
AIR HANDLING TN I T
Job Name: PARKWAY SUPERCEI,R
Total Area: 10960.00 Sq. Ft.
Cooling Calculation for JULY at 1700
Glass C a t cu 1 at i on.s
Sol.HG Sol. Shade
Sch Dir Area Factor SC Btuh ° s U
2 W 528.00 119.84 0.66 29927 0.37 0.54
Wall Solar Arid
Net
Area U -val
630.00 0.05
242.00 0.05
1190.00 0.39
Sch. Dir.
1 W
2 W
3 E
Roof Anal. S] - 1igIi Gairis
Roof Skylight
Roof Area U -val TD Btuh btuh
10960.00 0.05 61 34765
E tc - :c1.x ical
Watts/
Sq.Ft.
Lights: 1.09
CUccupczaxi Gains
No. Of Btuh Total Btuh
People Sens. Sens. Lat.
53 245 12985 205
Outdoor Air GairiS
Sens.
CFM TD Btuh
Vent: 1060 6 x 1.085 6901
Infil: 292 6 x 1.085 1899
Total: 1352 6 x 1.085 8799
PLENUM LIGHT HEAT
Gaixi.s
Lights
Btuh
40874
2 Lc� !d -tom ..
Job No.: 1
Unit Sens: 155578 Lat Total: 21895
Sens Heat Ratio: 0.85 Total Tons: 14.79
Outside Temp: 80 Inside Temp.: 74
Tr ansmi s d..ori Gains
Wall
Btuh
2041
784
12531
Gr /Lb
12.00 x 0.68
12.00 x 0.68
12.00 x 0.68
Glass Total
total w /Glass
0 2041
33349 34133
0 12531
Total
Lat.
10865
0
Watts/ Equip.
Sq.Ft. Btuh
Equip.: 0.00 0
Trans
TD Btuh
12 3421
Lat.
Btuh
8650
2380
11030
Total
btuh
34765
Misc
Btuh
0
Total
Sens. & Lat.
23850
0.00 - PLENUM ROOF HEAT 0.00
Building Total: 139227.8 Fan Motor Heat: 9450 ( 3.00 HP)
Grand Total: 177473
Sq. Ft. /Ton: 741.07
Total
Btuh
15550
4279
19829
RIOEtVlD
CITY OF TUKWILA
JUN 1 6 1998
PERMIT CUTER
Total
Btuh •
33349
Total
Btuh
40874
H4.otw
Evaluated at 48 Degrees North Latitude
74 Deg. F. Cooling Space Temp.
55 Deg. F. Cooling Discharge Temp.
19 Deg. F. Cooling Temp. Diff.
C
ZONE SUMMARY CALCULATIONS
Job Name: PARKWAY SUPERCENTER Job No.: 1 06 -12 -1998
70 Deg. F. Heating Space Temp.
110 Deg. F. Heating Discharge Temp.
40 Deg. F. Heating Temp. Diff.
COOLING LOAD SUMMARY HEATING LOAD SUMMARY
Btuh Btuh Btuh/ I Watts/
Zone Name Total Sens. SBR Sq.Ft. CFM Btuh KW Sq.Ft. CFM
PARTY CITY 12 FRONT
45616 43407 0.95 38 2106 31788 9.31 7.76 637
PARTY CITY BACK 12487 11670 0.93 17 566 J 19970 5.85 7,80 400
PARTY CITY CENTER
80197 71177 0.89 9 3453 J 129102 37.83 4.34 2587
SHOE PAVILLION FRONT
49753 47095 0.95 41 2284 { 35514 10.41 8,67 712
SHOE PAVILLION BACK
22482 21456 0.95 33 1041 26607 7.80 11.30 533
SHOE PAVILLION CENTR
82310 73085 0.89 9 3545 152969 44.82 5.00 3065
ZAINY BRAINY FRONT
41457 39248 0.95 35 1904 I 30294 8.88 7.40 607
ZAINY BRAINY BACK
15712 14788 0.94 18 717 25022 7.33 8.33 501
ZAINY BRAINY CENTER
77081 68471 0.89 9 3321 124942 36.61 4.36 2503
TENANT 17388 FRONT
44294 42473 0.96 45 2060 I 27733 8.13 8.33 556
TENANT 11388 BACK
19018 18018 0.95 20 874 30043 8.80 9.03 602
TENANT 17388 CENTER
71575 63580 0.89 9 3084 116017 33.99 4.36 2325
TENANT 17396 FRONT
48840 45976 0.94 33 2230 36364 10.65 7.10 729
TENANT 17396 BACK
29467 27833 0.94 20 1350 I 47218 13.83 9.22 946
TENANT 17396 CENTER
110116 97816 0.89 9 4745 178488 52.30 4.36 3576
ANNAS LINEN FRONT
44445 42856 0.96 51 2079 I 27241 7.98 9.17 546
ANNAS LINEN BACK 3150 2945 0.93 8 143 4990 1.46 3.57 100
ANNAS LINEN CENTER
35065 31170 0.89 9 1512 J 58390 17,11 4.47 1170
CATHERINES FRONT 44362 43052 0.97 62 2088 ( 24858 7.28 10.12 498
CATHERINES DRESSING
• 5510 5305 0.96 17 257 I 2832 0.83 2,53 57
CATHERINES CENTER
44466 40059 0.90 17 1943 46373 13.59 5.30 929
PARTY CITY OFFICE
3148 2910 0.92 52 141 I 4261 1.25 20.81 85
PARTY CITY TOILET RT
836 631 0.75 14 31 I 493 0.14 2.41 10
RECEIVED
orrl OF TUKWILA
JUN 1 6 1998
PERMIT CENTER
M'1€- OIW
PARTY CITY ENTRY 1402 1140 0.81 20 55 1054 0.31 4.41 21
SH PAVIL TOILET RT •
2591 2339 0.90 65 I 2371 0.69 17.36 47
SHOE PAVIL TOILET LF
2591 2339 0.90 65 113 2371 0.69 17.36 47
SHOE PAVIL EXIT REAR
4209 3873 0.92 38 188 I 4478 1.31 11.93 90
ANNAS TOILET1 CENTER
836 631 0.75 14 31 493 0.14 2.41 10
ANNAS TOILET 2 RIGHT
964 759 0.79 12 37 658 0.19 2.41 13
ANNAS REAR CORRIDOR1
1372 1167 0.85 10 57 1267 0.37 2.65 25
ZANY MGR OFF FRONT
1983 1721 0.87 28 83 1 967 0.28 4.05 19
ZANY MGR OFF REAR
2893 2647 0.92 58 128 I 2692 0.79 15.77 54
ZANY EXTERIOR TOILET
1863 1627 0.87 33 79 1 2972 0.87 15.55 60
ZANY INTERIOR TOILET
810 605 0.75 14 29 460 0.13 2.41 9
ANNAS REAR CORRIDOR2
1714 1509 0.88 9 73 1738 0.51 2.65 35
CATHERINES TOILET LF
771 566 0.73 15 27 432 0.13 2.53 9
CATHERINES TOILET RT
771 566 0.73 15 27 432 0.13 2.53 9
CATHERINES STORE RM
4951 4537 0.92 18 220 I 6386 1.87 6.68 128
CATHERINES EXIT CORR
3377 3044 0.90 16 148 2833 0.83 3.99 57
Total: 965320 884721 - - -- 42916 1 1213604 355.58 24316
RECEIVED
CITY OF TUKWILA
JUN 1 6 1998
PERMIT CENTER
TYPE . :
SUBMIT DATE
PICKUP: DATE
' ` CHECK # -'
''
, :PERMIT # ' .;
:: PROJECT # -;, >'
MECH
16 -Jun
CNTRL
PLBG
11 -Jun
GAS
6/16/98
REFER
BOILER
NUMBER PLANS SUBMITTED: 4
LOAD CALCS (YES OR NO) Y
RELATED PERMITS:
TYPE OF SPACE: RETAIL
WORK ON FLR # 1
DESCRIPTION
OF WORK:
RELOCATE 2 ROOFTOP AC UNITS, NEW GAS
DETECTORS
SUPPLY, NEW DUCTWORK AND GRD'S, RELOCATE 2 SMOKE
AND THERMOSTATS.
,
NOTES: FORWARD STRUCTURAL REVIEW
ASAP
OWNER: MBK N.W.
ADDRESS: 7690 SW MOHAWK, TUALITIN
ORE., 97062 PHONE: #N /A
APN: 2623049079
LEGAL
DESCRIPTION
#N /A
MECHANICAL PERMIT JURISDICTION:
TUKWILA
(PE - SEATTLE ONLY (REVIEW, STFI, COUPON):
REVIEW
PHONE No ,, :
ADDRESS ,:. :::
': ,.
EXPECTED'PICK »UP'DAT'B ;.;
206 - 431 -3670
NO DATA
28 -Jul
MacDonald - Miller Company, Inc. - Permit Information
7717 Detroit Ave SW / Seattle WA 98106 / (206)763 -9400
1583015;13'.
BUILDING: PARKWAY SUPER CENTER
ADDRESS: 17364 SOUTHCENTER PARKWAY
CITY: TUKWILA WA.
PERMIT.XLS
ZIP: #N /A
DATE: 15- Jun -98
APPLICANT: J. MONTEZ
VALUE: $ 7,500.00
6/15/98
;: < } }J:� < • `�;:y }. •}:; i?.: i: i}: •
is �.�
:::::::::::::::::::: v.:i•.:� :• :. ,:: <•.�: }::.:.: }:::.. ...:.::: :::.:..: v::•::::::::::::::.::. �::::........::.
v.y }:. } };. +v } } } } };r,: ;; r {r, {: iti +:• %MJ:•}:• };.tii•k4:•
v`
:!•} • }i: } };• } } } } ;: y;•.:.;:
rMOM
/....i.i !
INUE31.1111
e4;
4.74
vtga
.1
Balance Due: $
Need Current Contractor Registration Card: ❑ Yes No
Need to Enter Contractor Information in Sierra: ❑ Yes
•
07/17/08 12:14
R..s.uy Ba
FAX COVER SHEET
Date: 1 07/17/98 Pages Sent: 1 10 Job No.: 97552
_ _ _ . CF ciu ?over.,. shee _. j. _ _ _
.. A tteniiiin. w 7 esse » Montez : -_„ C Compan,� Nam e: i McDonald Miller _ _
Co.; ., Inc_
From: Y� Ja 1Ninnen Tax No.: ; ° (206) 768- 4289 .. _._ •. »...... ».. ». »_
ardin,�r : i_Zanyr Brainy /Shoe PavilGnn Mechanical Unit Placement �___��__... »..._.._...... » » »._
Message: 1 Jesse: Stamped calculations are enclosed for city official, enlarged details
are enclosed for general contractor. One copy has been sent via overnight
courier.
Jarod
Comes Tdw ._.. t_,_.._______.__--_.__...._...... _..._. ... _. _............. » »... .._..._.__._ .__...._... »....__.._____...__.
^
After Faxing, please: } ❑ File ❑ Return to Senior ❑ Mail ❑ Discard
* PLEASE CONTACT THE SENDER W YOU DO NOT RECEIVE ALL PAGES *
111 SW 5th Avenue, Suite 2600, Portland, OR 97204 (503) 227 -3251 Fax No. (503) 227-7910
II001 /010
l!orVID
CITY OF TUKWII.A
JUL' .2 1 1998
iiERMIT CEM'ER
07/17/98 12 :15 e
July 17 1998
c .
inli Consulting Engineers
McDonald Miller Company, Inc.
Mr, Jesse Montez
7717 Detroit Ave., S,W1
Seattle, WA 981061903
RE: Parkway Supercenter
Tukwila, Washington
Dear Jesse:
U►►n►► t, AMU n►,nedinnn nr PAM iirn irfhar infnrmolinn nlnoen null
Attached please find calculation sheets, MI I through M17, dated July 16,1998, which verify the structural
adequacy of roof mechanical supports for the Panay Supercenter, as shown on drawings TM , TM.
4.1, TM•5,1 and TM-9 dated June 9, 1998, Design is based on the requirements of the 1994 Uniform
Building Code, as amended by the State of Washington.
0002/010
H yuu U YC yucouul I Ccyu imam, wash
Sincerely,
Jarod M. Winnen
Project Engineer
Attachments
111 S Iy, Fifth Avenue, Suite 2500 Portland, OR 91204.3628 (503) 221.3251 Fax (503) 227 -1980
Seattle Portland San Francisco Los Angeles Phoenix San Diego
07/17/98 12 :15 n
Patland, Oregon
Consulting Engineers
Pox' P 1464
location
Client
Revised
Dote
fl 003/010
Sheet No,
MI
Job No
(1194)
.L
�•� I 7P")
I I
W `(zr r(4):-.. too fq
6
b.1 1.641 (e
X3 3 f7 ' /6
/ &3 (,
s /4 ,N!
* '412 N.N11 „ a pi, l r{, f 504 r'
.F1.' 9 ' ,;-...:fir ,
fi M G• “CG Cr/) P.9C /,Mbh pri
a :fir. e8 ok f.■'” .
e � ►, ei,
'� W , • T It :1 an •r” c'. '�! Il: �r'Si'd.Y. - r. _,�.� _� I
07/17/98 12:16 e
fag
Portland, Oregon
Consulting Engineers
Gc.sg ,c3s
Prefect
Location
Client
Gh44/4 CN .'a-' V 45
I
.1 . �5,ro
By
Dote
Re vaed
Date
12 se
0004/010
Shvet No,
M lot
Job No.
M / / P1 '1 4
L
tots PT i 013 r7 /L
•
CA/e,c .(46,4390 J o A r "w, . (
PCi of) /4. (Li
f /s
07/17/98 12:16 e
•
L.
.
I
Portland, Oregon
Consulting Engineers
, • •
Project
L2 ).:r
. 4 ...
tooth
Vent
a r
Rohx
Dore
432 r 4 1 1 ..
...
il)006/010
ShoetNo,
Job No.
4
..
..I
i
•
-
r--127-'-'-'---17'.-",
•
1
.....
.-
_.= I � �'-'r'
1../,i
R.........
r I
•
�
i.
Tom
•
•
` I
i .
�..
i ..
.......
. .
L
L _
....•. ....
�.. ......
J
_..
'I.
1
. :.
... �
�..I....
..
.
. _ ._
1
,
......_
.
.._
....
.. .... ..............
...
!_
....
_.AI.
I
-.41 ara..�
I
..
_ ....
..
....
............
..
•
_ .... -. ....
■
..
.....
...
._ ..
_..
_...
•
•
•
(1/94)
1
•
07/17/98 12:18 e
Location
gen .
Date
Ilejsed
Sheet No,
Portland, Oregon
Consulting Engineers
. •
I,.
4 •
• I
•-••••••• 't •
1 ••
Z006/010
•
'
I
;..
I ;
i .
• ,
.
‘. - 1 . • ■
1 i,
y 1, 1
i
•
1
I
1
,
•
•
,
;
•
'
1 1 1
1 ; 1 j
1 . 1
• I ;
i .
.
1 ;
1
r r
I :
;
1
.. 1 .. ;
■
I
. ,.
I
. ........
. .
'
. ..
•
,........
-i..
,
I...
.
...,
..
., .
., .
i
. 1
1
1
i ,
, •
LI
. ..I
!
.;
I
I:
i
•
•
1
-
......
.
i i
• I
I
!
.1...!.-.....—.1.-..-j...
.
.
'
--
..
1
1
,
. i ,
I
1
.
. :
•
:
;
.
. • - 7
1
1
o
1
.
1
,
.
....
..•
• ..1 .
-1-..-1-
PL
•
- ..i •
1.. .
1 •
f` :. .
I
05-6
1
(
.
4
.1
,....1....l...
...1
1
I
.
I
1
-.."-""
..
- -
"
.
- -
2 .1
0
1
t._...
./ . .......
..fr
/. •.
:
'r
..
..i.
..
•_
_.
. 1
•
-
_
)
•
, 1
.
.
•
;
1.
. ,
.
.....! -I. _
:• I '';,*--"'-"
• I
- ...
.. . ....
1
1
.
.
* • •
I
...
....
. ..
— •
•
••• __
. ( I
1 • •
. .i.....!
..
—
,
....
r—.....— .
........—.---,--,.
I
;
. i
• • !,..- ••••
, , I
•
I
•
i
•
....I.-
... .
. . .i.
... i...
.
• !
I 1
3
•••• I
. I
:
: •
•
• -.1
•
...:...
1 . ..
1 •
. .........,-
1
•
•
. . .
- • • • •
.......,
1
1
,
I.
1
•
I
I
1
- I
•
....I
.
-
_.......-.............
;
-
•-•
• i 1
• I
I
..
I
;
•
I
I
•
-
••
.
- 4-
i
.
I
•
.- .
1-, .
I
I
1
I
I I.
•
.
--
.. .
;
• '
'
..
..
'
.
• i
I
I
•
1
i
i
' -
I
I
I ......
--
F -i
i _.
•
i
•
_
. ..
.
'
,
.
•
"
- -
"''''
""
'""'""
•
' • • ' "
— r -
1
" • •
- -
"'''''''—
--"
.
...._.._....
,
----
•.
!
. • i
1
1
I
,
•-•
..
• •
i
;
1
-
......
.
.. .......
. .
...
.... _...-
. ....
.. .,
! "......„---•-"
H
•
..
.
•
. ...,.....
-
,
'
•
•
.
.
,
,
.
.
.
...
., ... .
. . . ...
•,
. _
.
. ,
.. ....
I
I
.
....
.
...
..........
,
.
.
... .....,....f
. T
.......
.
1---
;
...
_
..
.-
•
.. .
--1..
......_•••
.
..
•
.
.
•
...
,
...
....
,
j
.
.
.
..
.
........,........
. .._________,.........,
.
I.
1
.
...
,...,..___...
1
(1194)
07/17/98 12 :19 e
f
mg
Portland, Oregon
C
Consulting Engineers
Location
Clent
I
c. /6t /c 4 /
By
Data
Revised
t)ato
g007/010
Sheet No,
Job No
/6
- 2 0 1 )§i -
(122T/ 3 C 3 9 J QW
ql�9
.12n;
IN ) I Z` M
Ir t.�
1•4l .Sti : ( ,') .�)d SI,.: M
r
1
•
•
•
•
(6
07/17/98 12 :20 1Y
Porilond, Otegon
;
Consulting Engineers
•
`. ,.. .
.1 . ;. P :. J r I r
Z008/010
Shoot No.
MIS
Job No.
• j. ..i.. .! .. !_l.
- I I
• ....I I I I
(1/94)
c
T
"" 1* I '.. . ! 1 : I i ; I I I i
. 1 . 1 . 1 I .. I... I -J..: ..
IJ
1 .
. I ._. . . (......;- 1 a. • .j._
1. I 6 . _i..1 . ...7-_; ,i. �_...i_ ( 1.;. �. -1.. �.
-",.! 'i ! . i - 1 . 1 ''' *) i 1 H ...1.
' y V - i 1 .. - L ri L' . )7 ,"'"i I I
i. f i _ 1
_ ..L. Y ' ' : '
i .ij 4/L .-'H . ; t L(• • . s..- j-J-, . - -I- .( I
1 .,:- , -1-.!. 1 .-1-• ', ..--1, -.-. 1.-. d....- ---
ii.)....! , r! .-• ,,.• . � . . r I .f, .4..; 1." _ .
rj-1 10 g i. . _ r7: i �. • I I
:1 I
, . , .
i ^tom' * .. . - --I 1 • ... 1...--1....-1 -
_
r
.1 .._j_ - R ._ ,.�..
- i 0.- - • ••F! ..-,•-i.
.1 • .I• -
,.f . 1 r
:: i I . i . .
1
...1. ._ .. i_ !: .
... - I .. 1.- -1 - 1 - ' i i
, /ii 14.
1.13t)-u- ril 11
1 1...'..1 I
.r1
07i17i98 12.21 fl
1
ti
, t*
l 009/010
. 2=1 ) ""y& �9
--�
CZ livir
M
07/17/98 12 :22 '' 11010/010
•
5 •• r
g " •••' ( 4.1. ' •• I 7
g
r
C
City of Tukwila
Fire Department
TUKWILA FIRE DEPARTMENT
FINAL APPROVAL FORM
Project Name S o
Address : C
Retain current inspection schedule
2 _ Needs shift inspection
Approved without correction notice
Approved with correction notice issued
Sprinklers:
Fire Alarm: \-V4A(—
Hood & Duct:
Halon:
Monitor:
Pre-Fire:
Permits:
Authorized Signature
FINALAPP.FRM Rev. 2/19/98
John W. Rants, Mayor
Thomas P. Keefe, Fire Chief
Permit No.
c> 11 4(
Date
T.F.D: Form F.P. 85'' •
Suite #
Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575-4404 • Fax: (206) 575•4439
Dear Sir:
C
City of Tukwila
Fire Department Review
Control #M98 -0120
(512)
Fire Department Thomas P. Keefe, Fire Chief
June 22, 1998
Re: Shoe Pavilion - 17364 Southcenter Parkway
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. H.V.A.C. systems supplying air in excess of 2,000
cubic feet per minute to enclosed spaces within buildings
shall be equipped with an automatic shutoff. Automatic
shutoff shall be accomplished by interrupting the power
source of the air - moving equipment upon detection of smoke
in the main supply -air duct served by such equipment.
Smoke detectors shall be labeled by an approved agency for
air -duct installation and shall be installed in accordance
with the manufacturer's installation instructions. (UMC
608)
H.V.A.C. units rated at greater than 2,000 cfm require
auto- shutdown devices. These devices shall be
separately zoned in the alarm panel and local U.L.
central station supervision is required. (City
Ordinance #1742)
Dedicated fire alarm system circuit breaker(s) shall
be equipped with a mechanical lockout device. (NFPA
72 (1- 5.2.8.2) )
Duct smoke detectors shall be capable of being reset
from the alarm panel. (City Ordinance #1742)
In areas that are not continuously occupied, automatic
smoke detection shall be provided at each control
unit(s) location to provide notification of fire at
that location. (NFPA 1 -5.6)
John W. Rants, Mayor
Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575 -4404 • Fax (206) 57544139
City of Tukwila
Fire Department
Page number 2
Call the Tukwila Fire Department at 575 -4407 for
approval of any system shut down. Have job site
address, name and the Tukwila Fire Department Job
Number available to confirm shut down approval. (City
Ordinance #1742)
2. This review limited to speculative tenant space only -
special fire permits may be necessary depending on detailed
description of intended use.
Any overlooked hazardous condition and /or violation of the
adopted Fire or Building Codes does not imply approval of
such condition or violation.
Yours truly,
cc: TFD file
ncd
C
4/ 7-
The Tukwila Fire Prevention Bureau
John W. Rants, Mayor
Thomas P. Keefe, Fire Chief
H e a d q u a r t e r s S t a t i o n : 444 Andover P a r t s E a s t • T u k w i l a , W a s h i n g t o n 9 8 1 8 8 • P h o n e : ( 2 0 6 ) 57 S - 4 4 0 4 : F ' (061 57$4439
June 22, 1998
Jesse Montez
7717 Detroit Avenue SW
Seattle, WA 98106
Dear Mr. Montez:
SUBJECT: LETTER OF INCOMPLETE APPLICATION
Development Permit Application Number M98-0120
Shoe Pavilion
17364 Southcenter Py
This letter is to inform you that your permit application received at the City of Tukwila Permit
Center on June 16, 1998, was determined to be incomplete. Before your permit application can
begin the plan review process the following requirements from the Building Department must be
met.
Building Department:
The City requires that two (2) complete sets of revised plans be resubmitted with the appropriate
revision block. If your revision does not require revised plans but requires additional reports or
other documentation please submit two (2) copies of each document.
In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I
have enclosed one for your convenience. Revisions must be made in person and will not be
accepted through the mail or by a messenger service.
If you have any questions please contact me at the City of Tukwila Permit Center at (206) 431-
3671.
Sincerely,
Plia, 4-6 It
Brenda Holt
Permit Technician
File: M98 -0120
C
City of Tukwila
Department of Community Development Steve Lancaster, Director
Contact Ken Nelson, Plans Examiner at (206)431 -3670, if you have
any questions regarding the following comments.
1. Provide structural analysis for a.c. roof top locations.
John W. Rants, Mayor
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 4313665
++
MacDonald Miller
I Company, Inc.
7717 Detroit .Ave. S.W.�:,
Seattle, Wa 98106-1903
Phmte: (206) 763 - 9400
Fox: (206) 7eT-8773
osh Lic No :23- _.- MA- CC- O,,,
I _ll
*0 A
0 4068
£ ER
SS IONAL C
[EXPIRES 6 -t8 -1999 ,
I
7
a
H
r
r
4 � t
- J
I R I
E ^ ^ _ E / ,E ? 5'> J0M ;-06 -9A
1' i l
. FE S1 ,,_�. -., , 6 JCM 06 -19 -9d
REVISIONS: DATE
( COMP USA
PARKWAY SUPERCENTER
I I
17400 SOUTHCENTER PKW
, TUKWILLA WA 98188 f
MECHANICAL FLOOR PLAN
SCHEDULES 8 DETAILS
I I
ENGINEER
j J NOWTEZ
I !'HE,To DI_
I DIAZ
DRAFTER:
B. RAMMPOUR
ISSUE DATE.
07 -08-98
LAST AEVISED_
07 -06-98
DATE c _,,
07 -06 -98
CAD R FERENCE.
10830157110.0691
DRA'WIN'G N.8E,
0-0658- 158301
1 IS'SUED FOR I i
[CONSTRUCTION _�
[SHEET NUMBER'
TM -O
ZONE DAMPER SCHEDULE
UNIT
N0.
.INLET
SIZE
VALVE
MAX
CFM
MIN
NOTES
2D-I
ZD -2
16 ".
12"
1040
450 -
70
70
EER,
SEEP
2D-3
2D-4
14'
15
990 '
1080.
60
70
TYPE
I
ZD -S
ZD-6.
16"
16'
1220
'1200
70
70
2D -7
20-9
vOLT/PH
,,
®
kRUEGER 1240 FRAME 25
DIFFUSES
/GRILLE SCHEDULE
PACKAGED GAS/ELEC AIR CONDITIONING UNIT SCHEDULE
UNIT
AREA
MARE AND
IEMSIMIEMIEMISIIMEMICII
TONS
FAN
OA
EER,
SEEP
L C R CPL WT ^10'ES
;SYMBOL
EWNUFACTUER
B. MODEL NUMBER
SIZE
TYPE
I
NOTES
NC.
SERVED
MODEL NO
INPUT
OUTP, 1
vOLT/PH
,,
®
kRUEGER 1240 FRAME 25
NOTED
AS .{Y
L -IN DIFFUSER
t3 -1
PARTY CITY.
CARRIER- 48.10007610
TRANE YC✓120BaL03A
3730012849
NONE
6.0
0.0
>4j115
.50
58 /91 2390 0 25 I
r -�
120 3665 0.2 0
790
7190
8 4/9 3
i �/-
460/3
460/3
15 .8, 550
�5 I 11,
73-2
PARTY CITY
SIZE
< -2-
CrM
KRUEGER 1240 FRAME 2
AS NJTED
SIRE CE MT DIFFUSER
_
a
14 -I
419703
LENNOk GC516- 9 200-6Y
5693H00999
7.0
126/200
58 /160 I 279 0.25
2.0
990
/e _'
208/2./3
44 I E75
(
v. RUEGER 880H
A.S NOTED
S FACE MT DIFFUSER
SEE'. DETAIL
v; -:
lq 2-
'yEninV4317
LENNOk -GCS?6 -1353- 270 -7Y
5693H00147.
10.0
170/270
216 4260
0.25
3.0
1400
-/8.3
208/230/3
s9 1
1
KRUEGER SBOH
AS NOTED
S P.FACE MT BET /EXH'
15 -1
ZAINY BRAINY
CARRIER- 48JD007610
3790012845
6.0
74/115
58/91 240
0.25
t.0
790
8.4/9.3
460/3
t5.
15 -2'
ZAINY BRAINY
TRANS- Y0012084LOBA
H021437510
10.0
150
120 3670
1190
9. 2/-
I 460/3
29 1110
1 2.3
L D
.4.1 METAL EGGCR E
12 J� 4
-
? TURM1 / EXH
`
16 -1
TENANT .17388
TRANS BY006004HOBA
5151433990
5.0
5.0
120
92 1900 1 0.25
0.3
630
7.8/8.55
460/3
13 555
1 <._ ,
rq M-M
ME ?AL EGCORATE
24/2
RiTURN /EXH
18 -2
TENANT 17388 '
TRANS- YC01
H101440580
10.0
150
120 1 3600 0T25 2 0
1190
9.2/-
460/3
29 [ 1110
I -,_
'
17 -1
TENANT 17396
TRANS- YCD180841OBA
H14143305.
15.0
250
201 5400 0.25 1 3.0
'.600
8.6 /-
460 /3
3] 1335
1,2.3
17 -2
TENANT 17396
TRANE YC012084LOBA
H15 299D
IC .O
150 -
1 20 1 3600 0.25 2.0
1190
I 9.2J-
460j
29 i 11;0
-
{(
V
2 -1
ANNA'S LINEN
TRANE Y0018084LOBA
H15 143326D
5.0
250
201 5415 0 25 T.0
1780
8.6J-
60/3
37 2335
1,' 3
22 -2
ANNA'S LINEN
TRANS- YCCO24F1LOBA
H06160289
2.0
40/50
32/40 I 800 0. e5 03
260
9. I; 10
2O8 /2 A /1
157. 325
24-
GATHER ItiE'S
TRANS YC012084LOBA
H101440550
10 0
150
120 1 3600 0.25
2.0
1190
9. 0/-
460/3
29 I 1110
2,3
I f EXHAUST FAN SCHEDULE
�'�.�
PJNIT. NO
0003 00730E7 fl M @.
SERVICE AREA e
TYPE CFM
ESP
:VOLT /PH
RPM
HP /AMPS
BDD
WT /L8S
NOTES
1
24 -2
C3THER1NE'5
TRANS BY005004HOBA
5 1 5 1 4 3 3 9 8 D
5 0
120
92.4
1900 [ 0.25
0.8
630
7.8/8.55
460/3
13
555
1.
"' -)3 -i
4
PARTY CITY TOILET RM
BHL PAVl i.19N:T6!!ET
ROOF '250
:- R 250
OOFS
0 25
0, 25
t20/1. - -
EXISTING
«
25 1
COMP USA
_ .TRANS YCD048
-
4,0
12O
9:
+600 I 0.25
1
80
- /i0
460/3
11 9
800
NEN, 2,4,5
EF -15 -1
JENN FAN CRDO 080A
ZANY BRAINY-TOILET RM
ROOF 250 -
0.25
120/1
1500
S /30
10 "/10"
30
NEW. 2.3.4.
25 -2
COMP USA
?BANE VC0048
-
4.0
120
9'
1600 0.25 I
80
-J10
460/3
11 9 800
NEW, 2,4.5 j
��� EF -18 -I
' EF -22 -1
JENN. FAN CRDA10
COA6 11SA
ANNA'S LINEN
ROOF 720
300
" - 1.300
0.25
120f
1400
1/25
10'j10"
45
NEW. 2.3.4
EXISTING
EXISTING
25 -3
25-4
COMP USA
COMP USA
TRANS YCD120
TRANE YCD120--
-
-
10.0
1 0 . 0
205
205
166
166
6000 1 0.25 i 3
3960 1 9.25 3
1200.
1200
9
9
460/3
460/3
31 I 1110
31 1110
NEw, 24 5
NEW 2,4 5
Er-24-1
CATHERINES
25 -5
25 -6
COMP USA,
COMP USA
RA CD 80
TRANE YCD102
15.0
8,5
350
205
284
166
5980 0.25 2
3395 '5
1400
450
8.6/-
9
460/3
, 460/3
3I i 2335
29 I 1110
NEW. 2.4 5
NE, 2.4.5
I
NOTES:
25-7
COMP USA
MANE YCD048
-
4.0
.120
97
1000 0.25 I t
350
-J10
4'60/3
11 . 9 I 800
NEW, 2.4,5
.FIELD VERIFY. M AkE..AND MODEL,
WITH OPTIONAL SPEED. CONTROLLER SUPPLIED:BY M
E
G.C. TO PROVIDE CURB AND PATCH ROOF.
INTERLOCK WITH NEAREST ROOF TOP AC UNIT. TO
NOTES:
1. BY -PASS DAMPER, PAPA LEL CONFIGURATION.
BY -PASS CONTROLLER LOCATED IN TRAINING
STORAGE ROOM
NSTALLATION DETAIL
NOTES
I AC KNITS LOCATED IN BUILDING STORAGE.
2 G.C. TO PROVIDE CURB AND PATCH ROOF AS REQUIRED.
3- SMOKE DETECTOR IN BUILDING STORAGE, INSTALL IN SUPPLY DU, .
4. E.C. 70 PROVIDE DISCONNECT,
5. SMOKE DETECTOR IN SUPPLY DUCT. M-M TO PRO,DE AND INSTALL, E . TO CONNECT_
6. WITH ZONE DAMPER SUPPLY VALVES PER ZONE DAMPER SCHEDULE.
SUPPLY
DUCT
DIFFUSER DETAIL
NO SG '
DAMPER
/2 [
DIFFUSER DETAIL
NO C LE
B SIZE AS NOTED.
CFM
22'
cFM SIZE As NOTE^
NO SCALE
RODE - MP 'UN,
GA5 COCK
, DIRT LEG
GAS CONNECTION DETAIL
understand that the Plan Check approves ere
eat to errors end omissions and approve.] of
pIars does not authorize the violation et any
adopted code et maws. Nwoot of =tractor's
copy of approved - .. .
7/2 0
u
FILE COPY
CiY OF TUKAIL4
61
ut . 2!; 1:2:3
0'01 OF iUkAILA
a P�sY.o
':9L 2 4 125a,
FE :c.,
RECEIVED
CITY OFTUKWIL/1
AL 1900
PERMIT CENTER
Mt-o12-0
PARTY CITY — FLOOR PLAN
,L - r it83�IS.r� +� Iclkt 4b. ..
MS
SHOE PAVILLION — FLOOR PLAN
7GM
YIONRY MAP
ZANY BRAINY — FLOOR PLAN
ApN@ 262304 -9079
IQY PLAN
14
CRY OFTN LA
JUL 211998
PERMITCENTER
MacDonald Miller
Company, Inc.
7717 Detroit Ave. S.W.
Seattle, Wa S8108- -1903
Phone: (206) 763 -9400
Fo -: (206) 767 -8773
vra,F. -c No 223 01 MA . ,P, -<48J9 1
1
1
I
F94 S,, NT'G
1 zo
f l3 A '
` S I OHeL AN.'
EXC. RES- __18 -1999
1
I
1
I
I
1
I
I-
r- -
-
r -1
.r.
� C t Et o " �fM 4fi
^ y �E�IAiT 5.T '58 }OiS. += JDM 06 - 5 - 98
� PER71111 , 15930!5 JDM o6 -5 -,9
2 Imo. PERM, SET 1 JDM 06 -5 -988
I I- EVE3IONS- DATE
( PARKWAY SUPERCENTEF.
17328 SOUTHCENTER BLVD. l
TUKWILLA, WA 98188
MECHANICAL FLOOR PLAN
- HVAC
I
ENGINEER:
1 J 11ONTEZ
CHF EKED 5 ■ -
j T DMZ
I DRAFT,
I S DPG
I ISSUE DAB_
f
1_,T REVSED.
06 -17-N3 I..
(DATE FLOE,
06 -5-98
CAD REFERENCE
15830157M4Awq
DRAWING NI IMBER.
;D- 0658 - 1563015
1 NOT ISSUED FOR
CONSTRUCTION
`HEFT N'LI R:
TM -4
PARTY CITY — FLOOR PLAN
,L - r it83�IS.r� +� Iclkt 4b. ..
MS
SHOE PAVILLION — FLOOR PLAN
7GM
YIONRY MAP
ZANY BRAINY — FLOOR PLAN
ApN@ 262304 -9079
IQY PLAN
14
CRY OFTN LA
JUL 211998
PERMITCENTER
SHOE PAVILLION — ROOF PLAN
Scale. Ye = 1' -0
12
S -1
LEI
SEE DETAIL ! 3
;;WP 2
1
OJI
ZANY BRAINY — ROOF PLAN
_' S. REPAIR +OOFINC AND
'NFNiCAL CONTRAC70RE.
.ONNF,^,:IpN LO ^4T10N.
14.
SEE TM -5
GAS METER j.
!Rt OTHERS)
RECENED
cm of ruKwlta
!;JL 2 i 1993
PERMIT CENTER
MacDonald Miller
Company, Inc.
7717 Detroit Ave. S.W.
Seattle, Wa 98106.1903
Phone: (208) 783 -9400
Fm: (208) 787 -8773
Wash _.c No 223- 0I- M0. -CD -0M -0.
1
ENGINEER-
J tiogrEz
CHECKED 51.
TDMZ
DRAFTER
5 0010
'ISSUE DATE
07-15-48
L
REVISIONS 1583012. JP 25 - 17 - 98
/'�5 REVISIONS 1585015.13 4191.1 06 - 17 - 98
`. REVISIONS 1583015.!Z .OM 06 -17 -98
r /4
G PERMIT SET 1583015 14 JD1A 06-17 -
PER, SET 1 553015.13 JON 06-12 -
PERM.1 SET 1 `830 1 5.12 JJM 86 -17-
PARKWAY SUPERCENTEll
17328 SOUTHCENTER BLVD
TUKWILLA, WA 98188
MECHANICAL HOOF PLAN
I - HVAC
DATE
MAST REVISED.
07 -15 -98
DATE PLOTTED:
07 -15-98
CAD REFERENCE.
15830151144.drg
DRAWING NUMBER:
I D- 0858 - 1583015
ISSUED FOR 1
CONSTRUCTION
SHEET ^+UMBER: ;I
TM -4.1