HomeMy WebLinkAboutPermit M98-0131 - PARKWAY SUPERCENTERPirkloct
3UO erCei k r
City of Tukwila
Permit No: M98 -0131
Type: B -MECH
Category: NRES
Address: 17388 SOUTHCENTER PY
Location:
Parcel #:
Contractor License No: MACDOM *248J9
UMC Edition: 1994
MECHANICAL PERMIT
(206) 431 -3670
Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188
Status: ISSUED
Issued: 08/13/1998
Expires: 02/09/1999
TENANT PARKWAY SUPERCENTER
17388 SOUTHCENTER PY, TUKWILA WA 98188
OWNER MBK NORTHWEST Phone: 206 575 -8090
C/O TRAMMEL CROW COMPANY, 17560 SOUTHCENTER PY, TUKWILA WA 98188
CONTACT JESSE MONTEZ Phone: 206 - 768 -4288
7717 DETROIT AV SW, SEATTLE WA 98106
CONTRACTOR MACDONALD MILLER CO Phone: 206 763 -9400
7717 DETROIT SW, SEATTLE, WA 98106
******************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Permit Description:
RELOCATE 2 ROOF TOP A.C. UNITS, NEW DUCT WORK AND
GRD'S, RELOCATE 2 SMOKE DETECTORS AND THERMOSTATS.
Valuation: .00
Total Permit Fee: 58.13
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** *********** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Permit Ce er_Authorized ignature Date
I hereby certify that I have read and examined this permit and know the
same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate
or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and
obtain thi ldi =... it
Signature: _ 0'. 0 / / ' Date: eyely
This permit shall become null .and void if the work is not commenced within
180 days from the date of issuance,. or.if :the is suspended or
abandoned for a period of 180 days from the last inspection.
Project Name/Tenant: /
t to ,ugh 5 f •-0* f-e-o-thik
Description of work to be done: Rg L.c e4. FT . - a, A. F�. AC (4. -_; aKC. . a 612.04
CR eA4 (4i,. I- S • kr I D g-ft $. 1 u it 4.*■ c. 4- s k b'l
Value of Construction:
_
Site Address: City State /Zip:
173W S t`ci- T k..w
/C Qi', 1 C,., "4 CRt Y 8
Tax Parcel Number
z 4.L aoI g079
Property Owner:
171415K. Ai. &.
Phone:
5113 (51 SSA
Street Address:
74917 4 4 - 7Z , 4G 11,u q
City State /Zip:
'ya4 ..
Fax #:
Phone:
2� - 7�F�� �b��
,,.Piet
Contact Person:
-.) Essa 4/tort k
Street Address: // � q
Y7i �GA/A £ 24
'77 D��
City State /Zip:
7&/ d6
Fax #:
?- .76-716X - 1'244,
Contractor:
, / 0. 4 c a t y l .ci - . 1 / 4 , GC.e.i- 6
0 Standby
Phone:
zA3 6 - 76 8- 5/Zft
Street
7o, r Avg_ Su�� .ce p-
77(7 A e.
City State /Zip:
4 166
Fax #:
rx�6 - 7
Phone:
$'b3 - '670 0 . 0134
Architect: ,/ /
/3,EAM.,teO �8 �s sAuNkS
Street Address: �
000 34) 1Vie c G✓s R d, lAte.1fa,eo off:
City State /Zip:
Fax #:
5 3 4 7 - OZ "4 6—
Engineer:
-79 IV S �
Phone:
Zoc - 7 (pd - de Z Xy
Street Address: /
"7717 77e-c)• r Ave. ) i SGlrt'k -. &4
City State /Zip:
i d' /0 6
Fax #:
av b -76 d' iZ bey'
MISCELLANEOUS PERMIT AND APPROVAL REQUESTED: (TO r FILLED OUT BY APPLICANT) '.;
Description of work to be done: Rg L.c e4. FT . - a, A. F�. AC (4. -_; aKC. . a 612.04
CR eA4 (4i,. I- S • kr I D g-ft $. 1 u it 4.*■ c. 4- s k b'l
Will there be storage of flammable /combustible hazardous material in the building? ❑ yes n
Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets
❑ Above Ground Tanks ❑ Antennas /Satellite Dishes CI Bulkhead /Docks ❑ Commercial Reroof
❑ Demolition ❑ Fence l y Mechanical ❑ Manufactured Housing - Replacement only
❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems
❑ Temporary Facilities ❑ Tree Cutting
MONTHLY SERVICE BILLINGS TO:.
Name:
Phone:
Address:
LCity/State/Zip:
0 Water
0 Sewer
0 Metro
0 Standby
Miscellaneous Permit Application
APPLICANT. REQUEST. FOR MISCELLANEOUS PUBLIC WORKS PERMITS
❑ Channelization /Striping
❑ Flood Control Zone
❑ Landscape Irrigation
❑ Storm Drainage
❑ Water Meter /Exempt #
❑ Water Meter /Permanent #
❑ Water Meter Temp #
❑ Miscellaneous
❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s)
❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq. ft.grading /clearing
❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public
❑ Street Use in Water Main Extension 0 Private 0 Public
Size(s): 0 Deduct 0 Water Only
Size(s):
Size(s : Est. quantity: gal Schedule:
Moving Oversized Load/Hauling
WATER METER DEPOSIT /REFUND BILLING:
Name:
Address:
Value of Construction - In all cases, a value of construction amount should be entered by the applicant, This figure will be
reviewed and is subject to possible revision by the Permit Center to comply, with current fee schedules.
Expiration of Plan Review - Applications for which no permit is Issued within 180 days following the date of application shall
expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days
upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application
shall be extended more than once.
Date application accepted:
(,- L -
Date application expires:
1 23 - ')
Appli/c�tll n taken by: (Initials)
I
MISCPMT.DOC 7/11/96
CITY OF T''KWI LA
Permit Center
6300 Southcenter Boulevard, Suite 100
Tukwila, WA 98188
(206) 431 -3670
Application and plans must be complete in order to be accepted for plan review. 6113 /S
Applications will not be accepted through the mall or facsimile. r f 73e 8
Phone:
City /State /Zip:
BUILD) - e - 4.; E - • R AUTHO - )ZED AGENT:
SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR
Above Ground Tanks/Water Tanks - Supported directly upon.grade
exceeding 5,000 gallons and a ratio of height to diameter or width
which exceeds 2:1 •
PERMIT REVIEW
Submit checklist No: M -9
•
Signatu ���r4��i //i_
Antennas /Satellite Dishes
Submit checklist No: M -
Date: &�
•
if Le•
Fax . •
Print name `�
i. 041 - / / . . / *hr. /
if,
/.
�•
Phon
, '' , L C
Address:-•�7n . , i __'_ /'� ,
Commercial Reroof
Submit checklist No: M -6
City /State /Zip;� �/ vg igo /0./
0
SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR
Above Ground Tanks/Water Tanks - Supported directly upon.grade
exceeding 5,000 gallons and a ratio of height to diameter or width
which exceeds 2:1 •
PERMIT REVIEW
Submit checklist No: M -9
•
Antennas /Satellite Dishes
Submit checklist No: M -
Awnings /Canopies - No signage
Commercial Tenant Improvement
Permit •
0
Bulkhead/Dock
Submit checklist No: M -10
0
Commercial Reroof
Submit checklist No: M -6
0
Demolition.
Submit checklist .` No M -3, M -3a
0
Fences - Over 6 feet in Height
Submit checklist No:' M =9
J
Land 'Altering/Grading/Preloads
Submit checklist No: M -2
Loading Docks .
Commercial Tenant Improvement
Permit. Submit checklist No: H -
•
'Mechanical (Residential & Commercial) .
Submit checklist No :M -8, •
Residential only - H -6, H -16
0
Miscellaneous, Public Works .Permits •
Submit checklist No H -9
71
Manufactured Housing (RED INSIGNIA ONLY).
Submit checklist No: M-5
Moving Oversized Load /Hauling
Submit checklist . No M -5
0
Parking Lots
Submit checklist No: M -4
0
Residential Reroof - 'Exempt with following exception: If roof structure
to be repaired or replaced
Residential Building Permit
Submit checklist . No:. M -6
Retaining Walls - Over 4 feet in height
Submit checklist No: M -1
0
Temporary Facilities
Submit checklist No: M -7
71
Temporary Pedestrian Protection/Exit Systems '
Submit checklist No: M -4
in
Tree Cutting
Submit checklist No: M -2
ALL MISCELLANEOUS P IT APPLICATIONS MUST BE SUB i ED WITH THE FOLLOWING:
➢ ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN
➢ BUILDING S144PLS AND UTILITY PLANS ARE TO BE COMBINED
➢ ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT
➢ STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON
LICENSED STRUCTURAL ENGINEER
➢ CIVIUSIT'E PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER
(P.E.)
Copy of Washington State Department of Labor and Industries Valid Contractor's License. If
not available at the time of application, a copy of this license will be required before the
permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit
in Lieu of Contractor Registration ".
Building :Owner/Authorized Agent . If the applicant is other than owner, registered architect/engineer, or contractor: licensed
by the State of Washington, a notarized letter from the property,owner authorizing the agent to submit this permit application and
obtain the permit will be required as part of this submittal.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS
PERMIT.
MISCPMT.DOC 7/11/96
44722)
CITY OF TUKWILA
Address: 17388 SOUTHCENTER PY Permit No: M98-0131
Suite:
Tenant: PARKWAY SUPERCENTER Status: ISSUED
Type: B-MECH Applied: 06/23/1998
ParCel #: Issued: 08/13/1998
1(k********k*VA.A**A**A***********k**MA*****A***k*k****M*k********kk****A*
Permit Conditions:
1. No changes will be made to the plans unless approved, by the
Architect or Engineer and the,Tukt4la_Building Division,
2. All permits, inspectio10 plans shall be
available at the .015' , site prior to the any con
struction. Thesedocumenbs Wbe maintained and avail-
able until -final inspection 'approval is 'ranted
3. All construction to ,be done in. aPprOved
plans and recibirements, Of the Uniform Builiffnig4ode':41.994
Editions'amand0; Uniform Mechailical-Code... on .
and Washington State Energy Code (1994 Edition)r,
4. Validity of Permit. ,' The Issuance of a perm'itor',4pprovtkii_of
plans, and computations shall not be. con
struWto7O a permit fo'r-. or an approval of. any violation,',
of any, of the provisions of the building code or',of'
other of the JurisdlcOon; No permit presumfn'g e0',
ghie':,:euthority violate or- cancel the provisions
code 'shall he valid. !?
5. MANUFACTURERS, INSTALLATION JN$TputtIONs -REQUIRED ON- SITE
FOCTHE, BUILDING 'INSPECTORS REVIEW. ,!:,' ,. ,, q
, . . . , , .
6. Plumbing permit's shaft be obtained through' the Seattle-King , ii
. •
, . Health-. th P1 u
..— , - .!,.. -; 0
County , Department: ,of FlU r*1 ng will be ' '
inepecteCi piping y ; ,, 0
'n
7. EleO'rioal, shall be obtaTnedthi'o'UOW tiOsh1k0on4
Stat0)10s:ionof ,Labor and Indusfiei'fand....a)4 elect-r101
, i- , cr ' I •` 1 i
work'Will peinSpected by that 4eriCy8-6,6
,
,‘. k fp ' ' 4 .■‘+':
. ,
4. I %,... 1
.., J
'q.....
,t1... r ' , ''''' . • . •
,. • • ',' A':' 'Th 3 ", , r ii '
•, .,;;'' ,- .'i r '' ' . .
/OA'? • ,
/Alp:
ACTIVITY NUMBER: M98 -0131 DATE: 7 -16 -98
PROJECT NAME: PARKWAY SUPERCENTER — 17388
Original Plan Submittal
Response to Correction Letter #
XX Response to Incomplete Letter
' Revision After Permit Is Issued
DEPARTMENTS:
Fire Prevention
• u' ic \A/ o ks l r � S�cctu al
n.,
ing Division • g
DETERMINATION OF COMPLETENESS: (Tues, Thurs) DUE DATE: 7 -21 -98
Complete C Incomplete C
Comments:
TUES /THURS ROUTING: Please Route
Approved C
PLAN � VMITINVSLIP
C
Routed by Staff C (if routed by staff, make copy to master file and enter into Sierra)
PlanninC�ivsion
Permit Coordinator
No further Review Required
APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 8 - 18 - 98
Not Applicable C
REVIEWERS INITIALS. DATE:
Approved with Conditions
4
Not Approved (attach comments) C
REVIEWERS INITIALS: DATE:
CORRECTION DETERMINATION: DUE DATE:
Approved C Approved with Conditions C Not Approved (attach comments) C
REVIEWERS INITIALS: DATE:
\PR.ROUTE.DOC
6/98
C
CITY OF TUKWILA
Department of Community Development
Building Division - Permit Center
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431 -3670 .
REVISION SUBMITTAL
DATE: 7 /S y� PLAN CHECK/PERMIT NUMBER: WS
PROJECT NAME: kt4jjtj1 Rpercavfe
•P 11386
PROJECT ADDRESS: 11388
CONTACT PERSON: Safe tez.1_.. PHONE:
REVISION SUMMARY: 4'1 0. /6 - 2.
tor, f
go-7
SHEET NUMBER(S)
"Cloud" or highlight all areas of revisions and date revisions.
SUBMITTED TO:
CITY USE ONLY
�...�.�.,...�' t ? 3E%
I583oIS•
RECEIVED
CITY OF TI41(WIL�.
�✓��'G to �r�r.
JUL 1 b 1998
PERMIT CENTER
3/19/96
DEPARTMENTS:
-r
B .ing Division
//
Public orks
C
PLAN W�� TI�LIP
ACTIVITY NUMBER: ' M98 -0131 DATE: 6 -23 -98
PROJECT NAME: PARKWAY SUPERCENTER — TENANT SPACE
XX Original Plan Submittal
Response to Correction Letter # Revision After Permit Is Issued
Response to Incomplete Letter
Fire Prevention
Structural
DETERMINATION OF COMPLETENESS: (Tues, Thurs)
Complete
Comments:
. l
AI. it I /
Approved
TUES /THURS ROUTING:
\PR•ROUTE.DOC
6/98
Incomplete
Please Route ❑
f
Routed by Staff ❑ (if routed by staff, make copy to master file and enter into Sierra)
Planning Division
Permit Coordinator a
DUE DATE: 6 -25 -98
Not Applicable ❑
No further Review Required
REVIEWERS INITIALS: DATE:
APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 7 -23 -98
Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑
REVIEWERS INITIALS: DATE:
CORRECTION DETERMINATION: DUE DATE:
Approved with Conditions ❑ Not Approved (attach comments) El
REVIEWERS INITIALS: DATE:
COMMENTS:
M IS ?"&A ( 7 - 15 (ziocrcaa)
TAS C161P6- oe irt)CV-4: PFS
irit*Cret 1#;;CIA4— )414 BecAt
cAAPLom okR)6..c
ikeem rr 44 Aqt3-0244-
Phone:
i .
Pr • ct:
Palt-te Ca SC
Type
Date called:
flts6 , c. 19(4
Special instructions:
Y
Date wa
P.m.
R f5a... c.„ iefre) I,
Phone:
Ins
Retain a copy with permit
INSPECTION RECORD
INSPECTION NO,
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd, #100, Tukwila, WA 981
Date, •
PERMIT NO.
2 431-3
Approved per applicable codes. El Corrections required prior to approval.
cio
$47.00 REINSPECTION EE REQUIRED. Prior to inspection, fee must be paid
at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No:
Date:
Prof / //
Type - nspection:
/ ��
A MN5 — 5. G
�- �
!
called:
Special instructions:
Date wan d:
Z-
p.m.
Reque r:,,
f'c�iC l
Phone:
r;:
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd, #100, Tukwila, WA 981
PERMIT NO.
(206)431 -3670
Approved per applicable codes. Corrections required prior to approval.
COMMENTS: Fr
0 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid
at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No:
Date:
o ct: 11 '' iiimrr ` r1
Typ f Insp ctio
Address:
\ - Mae. Stoir Pk��q
Date called:
- 2 , )1 - q�
Special instructions:
Date wanted: Cl i i 00 a.m.
/ - �l • qg p.m.
Requester:
�CxSc,n
Phone:
A t,? r )1n CP eogo IZ'a-
INSPECTION NO.
INSPECTION RECORD
I. I Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd, #100, Tukwila, WA 98188
PERMIT NO.
(206)431 -3670
Approved per applicable codes. " required prior to approval.
COMMENTS: -
// sPE'cz �
5 kW r` cr7c 5/1/4.21
.# /
$47.00 REINSPECTION EEE'REQUIRED. Prior to insp ction, fee must be paid
at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Date:
Receipt No:
Fl rellepartmen i
:!Y - �Y. fit.. -::J rY, t':v.,',1c.r1:•; .....
Project 'Name . ZCt �'�' j 6K
Address / 1 � ' S 6.-"4 h cr.At
Authorized
S
Au Erie
FINALAP P'.FRM
,��,• r•r.r... .eMb. r/ y, • I
,
I TUKWILA f FIREa :DEPARTMENT,
'FINAL' APPROVid FORM '
'Retain current inspection schedule
Needs shift inspection
Sprinklers:
Fire Alarm:
Hood '& Duct:
Halon:
Monitor:
Pre - Fire :
Permits:
`'.Approved without correction notice
Approvedwith correction notice issued.,
OW J
Headquarters Station c :444 Andover Par* East �'° Tukwl/a; l Waslitiq
° �. o,.1d.)';t ,I:, s ;: \1 /t iigt,�dl
` , r'' '',: . .... :•J.:•`'I' F • .,.
''rZ.W..gte V.v. ey" ,jui . 40∎ %.d P ,`0,4 9 1'i v " •'�l� Rl"L 1 4
MJb? - o ,3 t
Permit No. ,A/1
sm
Suite #
/ -i:2 6'
Date'
vry OF TUKWILA. WA TRANSMIT
kVAA*A*******AA***A*A********A*A***A*A*k***A*A**********A*A****A
rRnmsmIT Number: R9700812 Amount: 58.10 08/J0/98 12:11
Pavment Method: 6176 Notation: MACDONALD MILLER Init: TKF
Permit No: M98-0131 Type: B-MECH MECHANICAL PERMIT
Site Address: 17008 SOUTHCENTER PY
Total Fees: 38.13
This Payment 58.13 Total ALL Pmts: 58.13
Ualance: .00 ,
ACCOU/Ii; Code Description Amount
000/343.830 PLAN CHECK - NONRES 41.6a
000/322.100 MECHANICAL NONRES 46.50
'I
ra.
".. .
• 4797?,,013/17,i'1717'..:,...10T,AL.
4k6, SIERRk
CONSTRUCTION COMPANY, INC.
Date: 12/17/99
Ts: Jim Whitney
Company: Mitchell Contractors
Fax No.: 206 - 575.8875
From: David Suckholtz
No. of pages tent (including cover skeet):
Subject: New Zanariiny T.I.
'Message:
Attached are the stamped details from KPFF for the DVAC framing. Please
call with any questions.
Thank you, David.
Reply requested?
Please call (425) 885.3797 if all copies are not received.
Fax Cover Sheet
•• . 1 11
filqs o 3/
CITY C ILA
DEC 28 1999
EEO Consrltln0 encincers
Deosrnber 17, 191K1
Mr. David Sudcholts
Siam Candruclion
18715 NE 79 St.
Redmond, WA 00062
RE: Pa is y Swoon*
Tukwila, Washington
Dear David:
Attachments
Attached please find calculation sheets 1 through 4, deted December 15, 1 090, which warty the structural
adequacy of rod mechanical support framing es grown on drawhgs Si and 52, died December 15, 1900,
Wotan Is based on the faquIrements d the 1997 uniform Building Cods, as emended by the State of
Washington.
II you have any qusslons or require further Information, please cat.
Sincerely,
{.:wMJMilll odricta;ial lie dmi
lixaanas; 9 12/ Q1r _
I t r «. W. FttrA Avorfue, suer, :300 PI►l11A 1, OR 0$70(•3010 t10.7i P77•Jtbt ru (3 2) 111•P110
s.�rrr. ►urr•r0 JI /I FNAcfuPI La; Astelts Whit Ho Qtod• PAo.al,
. l V V &. V V Y
Tm
Are
11
1144444. KN t.r.
3 �,, ErR gsr. C.
r' P4.4$ .4••0*''.
s. fr
GT .
.L s'i•
f. •
za�_i '4t SIAN*A•a+
U4 # Acb. (..4.A.4. 1c
At sr
Z•w �l 'S
Pee.tffi L *go
ohrdivV}
CO+ TIFF11 .
(rob..
ewtST.
PMp 1,04
6 , 1 , b 1 , 51 ,
ettar. L cis P.'4 " V71
T ' p4.f. P far _N , v
g.
Ai +WA *Wet
•
•
ConruriInp Eeprn.et
— 7
Ibteblel
.6-•
y ~
!
'?ice idiot
I
• S ce
/.r ¢, [�Ad r
•
ss'c 1 a.)
Fce ✓, 4-4
4-
•
r yirwrrrrrvw..Y to. ..S. s.M M.O. • •■•■•■•••• 1r\ rr. It AIMr m...*
7
MN
Da*
1.
...,..- %,' yr .A.. 1
/44 M*0- s e /4.`
sue. I
TePagri
Farad 4i.pA
P►
1
MI/COM U /ling it: Intl/ I 411.4" 17:1; /
Cur Strut.! rb"rt 7 ew..a
,e4044. b 0 ~f•Mlitw' • ei ∎ 11: 'r it l or) lirt)
0'
f rd.) , M
b‘. si Q w' '!s•
04. 4. +e AIL e Yd
M.Ge.
404.1 «; `
641.444 4,41
it' AFrt /
''a C•M.raaw
•
It-
I SD•
• 3 l,Y/
! III. 1�y.
s r (,t )
fi • iyst0 / or'
r L s /SW prl
/ L a /Zf rt'
` /WO /.,
c
a
a
WI • O 1,00 l AM rw••
/AI& .1 O IL, r+ t.c' s ;" e /1.0
i% * 4. (' 0'• ft, $ rci+ ' za ' • 3Z' IL C ' VI)
Am " 6/0 #' 04 aver
gair
/5 a ref
dr, •
/ 1 rnds.
/.', r Pa
/,3. PCP'
S' r'4
b • /s, 3 Apr /Lax /. r'• "ii)
44.0. Qe.rrr•..{.
p.44.
'Poe
I,
re.+v.. a•pw
I on.ulling Engineers
ran
M r I '14 , K r4,
It
A te• , 1. H 1 r•+
117. t «.
N+
C rL 1L c• G.
►IwO a/ ' I -. r ► e
✓ Z( I7 i.Y►14;1.�
ege-►.•rry
1.s fin stM
G� •
Ga.re Yr w l •wai...J
1 f.1- +0....4.. GoAr.t 7.
00, rl'alh
Cp ' 1.f •
4 • /, •
Pc•` a y'flrors! ( /,►r)CI..)[ 4.41 .)
- �...�,..R L4 i►� sr 1.tr.j ✓ •a.,
r / jrk (/. Jr . / ♦ pir > J io /,1,
• 7 o r — l .&. a OA A►'
Ca•) fa Mt' OA Ca:' 0 r
p • r.: C - - • /65r * t &' •
KJ • r C 1.9r' • °I iKs) • G./. 1 pi►i
M w 1b
v y x.r��
0•114 Is. z �.
....1�'_(..
C.2±,!.- % 444
4 a r'�L 4e" 0.4
.�' /WA 9Z, 141/1100 4
•
fautJgiuua
roi1MM OR
O.KI$p$dn 4 x 14 PuA1a wl 11000 Moth tnt lo.d
1111
Coda Ow
Iatt Car/wn
IVOdallI■r
MR • • Coto
Mir - await
• LS Cont
•M. Caw
Alud arrn •
Okada & CNN
WNW
OHO
t4.43144 �t
4A0 W1 et
OZO+m
1 14.40
11�h
Oapit
Oralokm
Sew 0
Single Span Beans Analysis
WWI it MI11a
Sok Mao
OW Ord My
tali tale
"OA
Am• will d 11I
OAuANAM►Aidami l
ra
AriM.181 1u•Iphe &A
IA
MEG M4
1,70011
WPM
Mum Ii1MMn1�.
tali • w 2a1 k • Lal
OAOR Wit 2.61 k • liNht
deamo r 2.61' k
C M 411*nI t 4764
•laRCrA OC Ci m OODR
• NON Oink OD:01n at 0.001t
%IVVDIvuo
Jab 0
t)Nr1 T,?aM, 15 we to
OA &e Im us Is sun tot i a two *
OR MA tTM Nr
11.4.
20r R
201k
3
AM. •• • V. ••• •$
KPPF CansoMop taglo
•
Parini, OR
w
Oooaio11on GL d Lo x 311/2 •Mi 11004 mak, adt lad
1110 0fR10A8a
caM.►spit WO R 1>$ of rwM•
L. CON* SAD I t3rb Walla
11rA WOW ft NMI SW Pip
is
•r�M�l�il�n
•
t +1
0
M
Vow '1121011 AM MN
Mats 44010 Y•rY 141
. AAA 011•4101W
RA
To
Oesan
oftespaa
Shpts span Beam Analysis
17,4011X0 IM
1 O NM
h
lillsondo. ,IM..,. lr.lat..
MN • r Noisy , 1M/,a U# • 90011 O Idl 17.011 It 0 UR 2780 It
IAN • 0 C91A. 411,01141 a *CO R 0 011 1M 12,17 It ! M*II 1187 k
alM0w4 4511110 M t ?00k
• MO rat OLID O wM.a It a..
Malmo is MO N« a C«Ir -1,4111 In d MA*
Wit Ca& 3013 M • •O.talt
II Plied Cad 0,01014 rt OAR . .
.Ivvo vvo
JO•
.IM- 7 :14PM, 115 D C Of
W U1 � 4tN *N PA *• 11111 •s all WM
I
nr
UI
U.
w M,a ~ 11 IN 111• NA " ' 1O NM WO
wM
*oa+ ■11Sw *ileol •taw
so owW +ems I/
X140 040 1421 M MW a s was 1111 00 •w
MacDonald - Miller
Company, Inc.
MAA
City of Tukwila
Ken Nelsen, Plans Examiner
6300 Southcenter Blvd, Suite 100
Tukwila, WA. 98188
re: Plan Check # M98 -0132, Parkway Supercenter, Tenant Space 17396
Dear Mr. Nelsen,
Attached are the structural calculations for the placement of the roof top air conditioning units for the Tenant
Space 17396. At this time there is no interior space plan available, therefore only a roof plan and schedule
sheet are included in the permit application and information regarding the plenums and thermostats are
covered by notes. We propose to set the roof top units as shown and duct both the supply and returns
plenums into the space. The plenums will be left open to the space until a space plan is developed,
presumably when a tenant has been secured. Two seven day programmable thermostats, with night set
back, will be temporarily located near their respective plenums. The thermostats will be Honeywell T -7200 or
T- 7300's.
If I you have any questions or need more information please call me at 206- 768 -4288.
Thank you
Jesse Montez
A mechanical contracting company
Since 1965
1991 National Contractor of the Year
��„y. .�•••'��' °,••ten•• .
7717 Detroit S.W.
Seattle, WA 98106 -1903
206 763.9400, Fax 767 -6773
C/Ty
�A
JUL / 6 /998
PERMIT cgWrER
1443-0131
July 6, 1998
McDonald Miller Company, Inc,
Mr. Jesse Montez
7717 Detroit Ave., S.W.
Seattle, WA 98106 -1903
RE: Parkway Supercenter
Tukwila, Washington
Dear Jesse:
Attached please find calculation sheets, M1 through M10, dated July 6, 1998, which verify the structural
adequacy of roof mechanical supports for the Parkway Supercenter, as shown on drawings TM -0, TM-
4.1, TM -5.1 and TM -9, dated June 9, 1998. Design is based on the requirements of the 1994 Uniform
Building Code, as amended by the State of Washington.
If you have any questions or require further information, please call,
Sincerely,
Jarod M. Winnen
Project Engineer
Attachments
EXPIRES: 9/12J
111 S.W. Filth Avenue. Suite 2500 Portland, OR 97204.3628 (503) 227.3251 Fax (503) 227.7980
Seattle Portland San Francisco los Angeles Phoenix San Diego
M - 0131
c1 rP o p ru ILA
JUL 1 6 1998
PERMlr CENTER
Consulting Engineers
Po O,epon
4•_ i rc
p
toeot
r
/ ✓� r,./.z
2Z - I
— t
Z.
4
t i / T
5 - ,— C
rs-
!'y"— C /
FS' S-
G..F - a - tr� w•.c,r
2-I
y6
N
i
IBy
i
j Dote
'Revneo
Dole
c.-4-$.4. 2.
Sneer No
IM►
Job NO
197
/gi p $ 7... C.4
tL/t a� lie./ 1p
w
Portland. Oregon
Consulting Enpineets
4 --
oro l
LOCC'10^
Chen'
mss
rsao j ,
G 6 /qy Pr1
)- /G .
0
M ../
( O,
c ( >) AIL.
• 7=4, - • (S9-S f iI
• "r S - , Z z
\ 4,4
BY J .f-r ✓
Dote ( (9E
Revised
Dose
Pf'
> d. •-,/y z z_ �.
p 305'3 1
s3
F
P
-> 4
Sheet No.
1 /1 2,
Job NO
ax
(P'S164Z
/deS . r-1C
s�sF Ce' )Cz9;)
/b
/ -s (
/• ,ay /6 -- ( 56 /4 cM° c l
4
Pollfona, Ofepon
MB Consulting Engineers
(P■Diecf
lorof,or
' Cuent
(o C tt r:" ~ 1 )
L
p(24 s rc o N ! - Tv c 44-1
rte,. •.4, , = i•.4
Pc 1
L5=5 p'1" 6g-
/. 5 ?
tzt..o /t Lori F .-4....e- v
_ 555 Z
L
2 , v
F =
114. j 4,4-,/
!Dote , /5 g
Pev.see
Dole
4?eL ' Qr. A-I-
CC(
C 1. s
l .o
Fr L = F G� c�
gr�
o/c
C6 /.
•
'Sheet No
v
!Job No
�.f no 1',
'POrlI0n0 Oreoon
(1/941
Effa Consulting Engineers
/5-S' • /s
f•/ ,, /S
(w
2o0 pcF (0.5) �/.oxt.r)C/•rr�
ca I P
Pro,eet
G/_
G-K! C.lt Sst,F.,t
z
v "
4 /,t,
loo
S f
L T` pr'r
3
('6, /5"--- /,$)
Revaeo
Dole
1 .) ,tt F .r. r
/ f rt F 2 ••= S }•'
r
ZI-s-e b / r 7LG.s LA. 44-Pre . p-ie. . /+"
";
f, D
By -T4
+ ./
C 1.r ")t9.zr ")
Dole %
Sheet No.
I M 41
;Job No
30,4, e /01
Portland. Oregon
Ptorec'
LOcOti
Consulting Engineers
M 3 C /
A__
/ 3 /9b • C s
Z
/L /b
„ i V
__.. S�. �. ... __ .�fL e4r�r �J 4 _.- , i6(� -t s�.d. A... ..., o.F.�C•• 1,n� S . r=" 4-- .. rj t. a/�, . _ t 4 l�G/! �:
------------ I.T- v j . , GE..4 csr .( �,� I. f° .R b t2 V' T r
i — / ° = 6 tYZ,r &r . IL .
Srt-r..00 c IP J /
LT' rzt' • '* ( /3r hr
Crr 6G• k_ , . tir.F. i i
y
/L
L
`(;
` 26 s� -
1 0
jC ,
2 (2.,s- M .
Dote
C s = y 7.9 1 /— ✓, ��
Portland. Oleoori
11 tbd1
Consulttng Engineers
1 7 1, 4vi-/ CiA4-
'7"' fc
• •••••••••• . • ••• • ,•• •• ••• ••••••• .•
1.0:bitch
CsleM
- r
Z. de
C-Ife
/o ac
T
41 1i. P
‘.A - /4
Le (0
47 -7— /
2-
/0 2,;) 7e, S
By
Dole /
/1 4.--•L't
Revised
Dote
1.
6 — / ce
0.4
Sheet No
(fri
Job No
e
/: )
/ z-6 • /1)
( g ( . " -
N-evi
f Kg
/..• .41 4-.0
POnIOnC. OteQon
(1/94)
a 111 Consulting Engineers
O�OiPCI
Locot on
Chen'
/ } /c -J /r 6 t •
/QG --0 4.34 / -to R•C+
Sr.
a..
3844fr -( Y �—° - s„ > _ /'/5 - D t '
fr, 1 4. 4 A t5.f•••r -- - F / ` / s } r I
s/s Cr - 1
2 ,' B
tG�es
sr .44J
/'!S° r s t C C,.. G L G C.v. G.r
P.9 /'y ..o r.q /.IS /. S
Zu--1 1 071
M 4 LA.
tir
/'1ijLto✓ = 5 4`l.0 f. /4
( .745:6 1 .4 )
2-46 , 3 /L
M
I
C P 4 t. . o , )(3)
(27 'y3 —
F
5
P I.-
ZZS PS
Dote • / i 4
ReWSeC
Dote
. 2. y C. C
Q 5 ° C. C •
/
zv� PCt C s)
zzs'1 , >/I (3 ° i^'"'•
/5 (
/5c /C se-)
3
=Z=' C lc s x
rE rl C 43 ') C/7 ' /F7)
.,
Sheet No
Job No.
3.0e3 4- .'C'63 - /0.•a's > /
Poniond. Osepon
11 ,Qd1
Effil Consulting Enp,nee,s
r• ft •
F v- r'1, C C.A.(
A •
7S /t, (C.eY} r.:)
F
V
c,, T y y � s, �— v ✓ c+
C�a'E uc. ' t -4. ✓C i 2.
(�/So r''
I
/ s 2 -1 .Z /L.
r n r -- - -
Sir 4,4.2.
F ✓ `
/4.4-
C7 tire• - -e. = . � .. ( . / {.
✓ r d
Le.rs z 6
/.
By 'TX_ 1.-J
Dote /6 7 .
Sneet No.
41 5
1 ( z -1' ' / 6)
4; 4 O . l ex)
Revised
Dote
Jr° /' r '
r '/ ?%) 7' ,N Co
✓
z (3,1 ','“../
Job NO.
/3y( pr, •
•
4
,
Portion0, Oregon
111941
EINETI Consulting Engineers
holee•
: :0 0 0h p n
Chant
GyF.c k Y x-( `1
Kam(•^+ G
iet•/C v
Dote ' /� /6
Pewsea
Dote
> 2 /or.
Sneer No
JOD NO
IR DD
ANLING UNIT 4
Job Name: PARKWAY SUPERCENTEA Jo .: 1 06 -11 -1998
Total Area: 9750.00 Sq.-Ft.
Cooling Calculation for JULY at 1700 Outside Temp: 80 Inside Temp.: 74
(Gass Calculations
Sol.HG Sol. Shade Trans Total
Sch Dir Area Factor SC Btuh % U TD Btuh Btuh
2 W 516.00 119.84 0.66 29247 0.37 0.54 12 3344 32591
Wall Solar And Transmission Gains
Net Wall Glass Total
Sch. Dir. Area U -val Btuh total w /Glass
1 W 385.00 0.05 1247 0 1247
2 W 236.50 0.05 766 32591 33357
3 E 1137.50 0.39 11978 0 11978
Roof And Skylight Gains
Roof Skylight Total
Roof Area U -val TD Btuh btuh btuh
9750.00 0.05 61 30927 0 30927
Electrical Gains
Watts/ Lights Watts/ Equip. Misc Total
Sq.Ft. Btuh Sq.Ft. Btuh Btuh Btuh
Lights: 1.09 36273 Equip.: 0.00 0 0 36273
Occupancy Gains
No. Of Btuh Total Btuh Total Total
People Sens. Sens. Lat. Lat. Sens. & Lat.
245 11025 205 9225 20250
Outdoor Air Gains
Seas. Lat. Total
CM TD Btuh Gr /Lb Btuh Btuh
Vent: 900 6 x 1.085 5859 12.00 x 0.68 7344 13203
Infil: 195 6 x 1.085 1269 12.00 x 0.68 1591 2861
Total: 1095 6 it 1.085 7128 12.00 x 0.68 ' 8935 16064
PLENUM LIGHT HEAT 0.00 PLENUM ROOF HEAT 0.00
Building Total: 126077.3 Fan Motor Heat: 9450 ( 3.00 HP)
Unit Sens: 141386 Lat Total: 18160 Grand Total: 159546
Sens Heat Ratio: 0.86 Total Tons: 13.30 Sq. Ft. /Ton: 733.33
r:. - 1
7 ,� :4f/73 e
RECEIVED
CITY OF TUKWILA
JUN 2 It 1998
PERMIT CENTER
ZONE SUMMARY CALCULATIONS
dub Name: PARKWAY SUPERCENTER Job No.: 1 06 -12 -1998
Evaluated at 48 Degrees North Latitude
74 Deg. F. Cooling Space Temp.
55 Deg. F. Coaling Discharge Temp.
19 Deg. F. Cooling Temp. Diff.
70 Deg. F. Heating Space Temp.
110 Deg. F. Heating Discharge Temp.
40 Deg. F. Heating Temp. Diff.
COOLING LOAD SUMMARY HEATING LOAD SUMMARY
Btuh Btuh Btuh/ 1 Watts/
Zone Name Total Sens. SHR Sq.Ft. CFM 1 Btuh KW Sq.Ft. CFM
PARTY CITY 12 FRONT
45616 43407 0.95 38 2106 1 31788 9.31 7.76 637
PARTY CITY BACK 12487 11670 0.93 17 566 19970 5.85 7.80 400
PARTY CITY CENTER
80197 71177 0.89 9 3453 129102 37.83 4.34 2587
SHOE PAVILLION FRONT
49753 47095 0.95 41 2284 35514 10.41 8.67 712
SHOE PAVILLION BACK
22482 21456 0.95 33 1041 j 26607 7.80 11.30 533
SHOE PAVILLION CENTR
82310 13085 0.89 9 3545 J 152969 44.82 5.00 3065
7S BRAINY FRONT
41457 39248 0.95 35 1904 30294 8.88 7.40 607
ZAINY BRAINY BACK
15712 14788 0.94 18 117 I 25022 7.33 8.33 501
ZAINY BRAINY CENTER
77081 68471 0.89 9 3321 J 124942 36.61 4,36 2503
TENANT 17388 FRONT
44294 42473 0.96 45 2060 I , 27733 8.13 8.33 556
TENANT 17388 BACK
19018 18018 0.95 20 874 I 30043 8.80 9.03 602
TENANT 17388 CENTER
71515 63580 0.89 9 3084 I 116017 33.99 4.36 2325
TENANT 11396 FRONT
48840 45976 0.94 33 2230 I 36364 10.65 7.10 729
TENANT 17396 BACK
29467 27833 0.94 20 1350 I 47218 13.83 9.22 946
TENANT 11396 CENTER .
110116 97816 0.89 9 4745 118488 52.30 4.36 3576
ANNAS LINEN FRONT
44445 42856 0.96 51 2079 I 27241 7.98 9.17 546
ANNAS LINEN BACK 3150 2945 0.93 8 143 ( 4990 1.46 3.51 100
ANNAS LINEN CENTER
35065 31170 0.89 9 1512 I 58390 17.11 4.47 1170
CATHERINES FRONT 44362 43052 0.97 62 2088 ( 24858 7.28 10.12 498
CATHERINES DRESSING
5510 5305 0.96 11 251 I 2832 0,83 2.53 57
CHINES CENTER
44466 40059 0.90 17 1943 � 46373 13.59 5.30 929
PARTY CITY OFFICE
3148 2910 0.92 52 141 4261 1.25 20.81 85
PARTY CITY TOILET RT
836 631 0.75 14 31 493 0.14 2.41 10
•
RECEIVED
CITY OF TUKWILA
JUN 2 1 I 1998
PERMIT CENTER
ENTRY 1402
• , ' L TOILET RT
2591
A PAVIL TOILET LF
2591
SBOR PAVIL EXIT REAR
\ 1' 4209
WAS TOILET1 CENTER
836
ANNAS TOILET 2 RIGHT
964
ANNAS REAR CORRIDOR1
1372
ZANY MGR OFF FRONT
1983
ZANY MGR OFF REAR
2893
ZANY EXTERIOR TOILET
1863
ZANY INTERIOR TOILET
810
ANNAS REAR CORRIDOR2
1714
CATHERINES TOILET LF
771
CATHERINES TOILET RT
771
CATHERINES STORE RN
4951
CATHERINES EXIT CORR
3377
BRA
1140 0.81 20 55 1054 0.31 4.41 21
2339 0.90 ( 113 2371 0.69 17.36 47
2339 0.90 65 113 I 2371 0.69 17.36 41
3873 0.92 38 188 4478 1.31 11.93 90
631 0.75 14 31 I 493 0.14 2.41 10
759 0.19 12 37 1 658 0.19 2.41 13
1167 0.85 10 57 1 1267 0.37 2.65 25
1721 0.87 28 83 1 967 0.28 4.05 19
2647 0.92 58 128 I 2692 0.79 15.77 54
1627 0.87 33 79 1 2972 0.87 15.55 60
605 0.75 14 29 1 460 0.13 2.41 9
1509 0.88 9 73 1738 0.51 2.65 35
566 0.73 15 27 1 432 0.13 2.53 9
566 0.73 15 27 1 432 0.13 2.53 9
4537 0.92 18 220 I 6386 1.81 6.68 128
3044 0.90 16 148 I 2833 0.83 3.99 57
965320 884721 - - -- 42916 1 1213604 355.58 24316
6
City of Tukwila
Fire Department
Fire Department Review
Control #M98 -013.
(512)
June 29, 1998
Re: Parkway Supercenter - 17388 Southcenter Parkway
Dear Sir:
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. H.V.A.C. systems supplying air in excess of 2,000
cubic feet per minute to enclosed spaces within buildings
shall be equipped with an automatic shutoff. Automatic
shutoff shall be accomplished by interrupting the power
source of the air - moving equipment upon detection of smoke
in the main supply -air duct served by such equipment.
Smoke detectors shall be labeled by an approved agency for
air -duct installation and shall be installed in accordance
with the manufacturer's installation instructions. (UMC
608)
Thomas P. Keefe, Fire Chief
Local U.L. central station supervision is required.
(City Ordinance #1742)
Maintain automatic fire detector coverage per N.F.P.A.
72. Addition /relocation of walls, closets or
partitions may require relocating and /or adding
automatic fire detectors.
2. This review limited to speculative tenant space only -
special fire permits may be necessary depending on detailed
description of intended use.
John W. Rants, Mayor
Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575 -4404 • Fax (206) 57$4439
City of Tukwila
Fire Department
Page number 2
Yours truly,
The Tukwila Fi Prevention Bureau
CC: TFD file
ncd
John W. Rants, Mayor
Thomas P. Keefe, Fire Chief
Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone; (206) 5754404 Fy (206 ) 375 4439 .
June 25, 1998
Jesse Montez
MacDonald Miller
7717 Detroit Avenue SW
Seattle, WA 98106
Dear Mr. Montez:
City of Tukwila John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
SUBJECT: LETTER OF INCOMPLETE APPLICATION
Development Permit Application Number M98 -0131
Parkway Supercenter - Tenant Space 17388
17388 Southcenter Py
This letter is to inform you that your permit application received at the City of Tukwila Permit Center on June
23, 1998, was determined to be incomplete. Before your permit application can begin the plan review
process the following requirements from the Building Department must be met.
Building Department: Contact Ken Nelsen, Plans Examiner at (206)431 -3677, if you have any questions
regarding the following comments.
1. Provide structural calculations.
2. Provide a system layout plan for tenant space.
3. Isolated control (see W.S.E.C. 1422.
4. List type of thermostat per W.S.E.C.
The City requires that two (2) complete sets of revised plans be resubmitted with the appropriate revision
block. If your revision does not require revised plans but requires additional reports or other
documentation please submit two (2) copies of each document.
In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I have
enclosed one for your convenience. Revisions must be made in person and will not be accepted through the
mail or by a messenger service.
If you have any questions please contact me at the City of Ttjkwila Permit Center at (206) 431 -3671.
Sincerely,
Brenda Holt
Permit Technician
File: M98 -0131
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431 -3670 • Fax (206) 4313665
F623.0.524011 ( /)7)
Dct.ult And Ditiplay Certiliculc
DEPARTMENT OF LABOR AND INDUSTRIES
REGISTERED AS PROVIDED BY LAW AS
CONST CONT GENERAL
REGIST. # EXP. DATE
CCO1 MACDOM *248J9 08/01/1999
EFFECTIVE DATE 04/29/1976
MACDONALD MILLER CO
7717 DETROIT AVE SW
SEATTLE WA 98106
DctacIi And Di.play Certificate
1 •NgiriOt ••
-• 1.,4%4
•
•
>
/I\ TENANT 17388 ,I0 1cJ11 '■ !MI 06-
[A-4J
I
I • 1 •
w
01
wo
0
TrKIAKIT 1 7*
3 -- ROOF PLAN
cly"; lukt\NAL
.1918
g
'S' by ,1 ;c 3 4*,
A TENANT 17396 J013l{ 1583015.16 JOM 06-18-98
TENANT 17396 - ROOF PLAN
Scale: %'
Mqb -0131
5 co
WO LU CC)
ZD
A L. 0 T
2 ),
•4\../N :\i) 11,
) 6 5 L14 .2_
A-
C roe
I ' I 1,1,1
PARKWAY SUPERCENTER
1
17:128 :',00rFICENTER 13LVt.).
TLIKWILI...A, WA 98180
MECHAINIPT;AL ROOF FLAN
HVAC
!r li l!I I
,
. 1 ,
, I 1,4(*flEZ 00-18--98
.i . 1 II
'. ' I I I 1. , . ■' I I ; I l• I
1 1)1?t,i 06 - 1 0
'I
1583015n45.dwg.
D--0858-1583
........,......_,.........„--;;.......„
NOT ISSUED FOR
CONSTRUCTION
....,,,,_,L.,......,,;;.,,......„,...,,.„...,:.! .
,,,
II ' i ,/ II • I I?
AAAA
P
I
MacDonald Miller
Company, Inc.
7717 Detrdt Ave. S.W.
Seattle, Wa 98106-1903
Phone: (206) 753 -9400
Far. (206) 767 -6773
os1, be No 223- 01- MA -CD -OM -24619
''' IABB /`.
128.18_,,,,..
q
S
OX
IS RL S. 6 -16 199
- -d
_
I "
� rt., t f i 'rH fa'N', 1,, - I Is
\\ ' ".
l e:.nnlr t .>, l
PERMIT SET 1583015 11 ,IOM 0,26 -9'
PERMIT SET 1563015.16 JOM 04- 19 -9:,
EVISIONS: W1E
(::',UN SP 1 141:,
PARKWAY SUPERCENTE'
17400 SOUTHCENTER PKW
TUKWLLA. WA 98188
MECHANICAL FLOOR PLAN
SCHEDULES b DETALS
I
ENGINEER'.
LAST REVISED:
J BOWEL
07 - 06 - 96
CHECKED BY:
DATE PLOTTED:
7 DMZ
07 - 06 - 96
DRAFTER:
CAO REFERENC
B. 541*GPIXIP..
1; 15!`e'O.Fa0
ISSUE DATE:
DRAWING NUMBER:
07 -06 -95
ID -06S6- 156301 .
ISSUED FOR
CONSTRUCTION
SHEET NUMBER
TM-0
DIFFUSER /GRILLE SCHEDULE
PACKAGED GAS/ELEC AIR CONDITIONING UNIT SCHEDULE
UNIT
: AREA
MAKE AND
SERIAL :. NO.
NCM
GAS HEAT (MOH)
CFM - :
ESP
FAN
OA
EER/
ELECTRICAL
WT
NOTES
SYMBOL
MANUFACTUER
B MODEL NUMBER
SIZE '..'
TYPE
NOTES
I NO
SERVED
• MODEL NO, .
TONS
INPUT
;OUTPUT
HP -
CFM
: SEER
VOLT /PH
MCA
LBS
SIZE
KRUEGER 1240 FRAME 23
AS NOTED
LAY -IN DIFFUSER
A
0
13 -1
PARTY CITY
CARRIER - 4830007610
'3790012846
6.0
'74/115
58/91
2390
.0.25
1.0
.790
8.4/9 3
460/3,
15.8
650
1,2 .3
13 -2
PARTY CITY
" TRANE- YCD120B4LOBA
NONE
10:0
150
120
3665
0.25
'2:0
1190
9:2/-
460/3
29
1110
1,2 ,3
VCFN
KRUEGER 1240 FRAME 21
AS NOTED
SURFACE MT DIFFUSER
PAVILNOXX
SHOE LION
LEN GC SI -1353 2 0 7 Y
5693000147
0
1 0 .0 •
170/270
170/270
98/160
216
4765
4260
0.25
0.25
3.0
3,0
990
1400
-/8.3
-/8.3
208/230/3
208/2:10/3
44
S 8
875
1100
1,2.3
1,2,3
e�- FM
C
KRUEGER 8800
AS NOTED
SURFACE MT DIFFUSER
TAIL
SEE' DE
14 -2
ON
KRUEGER SBOR
AS NOTED
SURFACE MT, RET /E %H
'G}.
/\
15 -I
ZAINY BRAINY
CARRIER- 4810007610
3790012845
6::0
74/115
.58/91
2400
0.25
1,0
790
8.4/9.3
460/3
15.8
650
12,3
15 -2
ZAINY - BRAINY
TRANE- YC01206410BA'-
4021437510
10.0
150.
120
3670
.0.25
2.0
- 1190
9.2/-
460/3
29
1110
1,2.3
CD
ETAL EGGCRATE
12/24
RETURN/EXH
16 -1
TENANT 17388
TRANE- BYC060G4HOBA'
515143399D
5.0
120
- .92.4
1900
0,25
0.3
630
7.8/8,55
460/3
13
555
1.2,3
S-S NETAL EGGCRATE
24/24
RETURN /EXH
16 -2
TENANT 17388
TRANE- YCD12084LOBA
.H101440580
10.0
..150
120
3600
0.25
2.0
1190
9.2/-
460/3
29
1110
1,2,3
. "
17 -1. .;
IMINto7396
: TRANE- YCDIBDB4LDBA
H 14143305U
: - 15.0..'
250
201
5400
0.25
3.0
1600
8.6 /-
460/3
37
1335
1,2,3
" 17 -2
- .17396
TRANE- OCO120134LOBA
H151432990
10.0.
150
120
3600
0.25
2.0
.1190
9 2/-
460/3
29
1110
, .2.3
22 -1
0555'S LINEN
' . TRANE- 000180841.08A
0151433265
15.0
250:.
201
5415
0.25
3.0
1780
8 6/-
460/3
37
2335
1,2 3
22 -2
ANNA'S LINEN
' TRANE- YCCO24FPLOBA:'
006160289
M10T44055D
. 2:0 '
10,0
40/50'.'.
1 50
32/40
120
800
3600
0:25
.5
0 2
0.3
2.0
260
1190
9.1/10
L08/230/I
15.7
29
325
1110
1.2,3
1.2.3
EXHAUST _ FAN SCHEDULE, .
2 4 -1.
CATHERINE'S
TRANE- YCD120B4LOBA.�
064
9. 2/- 460/3
JNIT N0.
EF -13 -1
M'NU{ACTUP A d M/.
SERVICE AREA TYPE
PARTV CITY TOILET RMS ROOF
CFM
250
.ERR
0.25
VOLT /PH.
120/1
RPM
HP {AMPS
600
WT /LBS
NOTES
"
4- .
2 2
CATHERINE'S
RANE Y
T B 006 OBA.
1 8
Si 5 5 4338 D
1 ,
5.0
120
- 92.4
1900
0.25
0.8
630
7.8/8.551 460/3
13
555
1,2 ,3
EF -14 -1
SHOE PA I �l TOILET
V LL ON RMS
ROOF :
250
0:25
120E 1
EXISTING
E %4:STING
25 -7
COMP USA.
YRANE 900048
-
4,0
120
97
1600.
.0:25
1
80
- /10
460/3
11.4
800
NEW, 2,4,5
EF -15 -T
EF -18 -1
JENH FAN CR00 0800
JENN FAN CRDA10
ANY BRA'TNS TOILET RMS
COMP USA
ROOF:
ROOF
250
720
0:25
0.25
120/1
120/1 -
1500
1400
1/30
1/25
10 "/10 ".
10 " /10 ""'
30
45
. NEW, 2 3 4 '..
NEW, 2,3,4
25 -2
COMP USA
TRANE 00048 '
-
4 -,0
120..
97
1600
0.25
1
BO
-/10
460/3
11.9
800
NEW. 2.4,5
5
- 25-3
CO USA
SA
TRANE Y CD120
CD120
-
-
10.0
10.0
205
205.
166
166
4000
3960
0.25
0.25
3
3
1200
1200
9
9
460/3
460/3
31
31
1110
1110
YEW, 2,4,5
NEW.
ryry = F -22 -1
Z1 EF -24 -1
ANNA'S LINEN
CATHERI NES `
300
300
-
-
EXISTING.
EXISTING
- 4
'
-
-
25-5
COMP USA
TRANE YCD180:
-
'15.0
350
284
5980
0.25
3
1400
8.6/-
460/3
37
2335
NEW, 2,4,5,6
NOTES:
1. FIELD. VERIFY FAN MAKE AND MODEL
25 -6'
COMP USA
TRANE. YCD102 '.
-
8.5
205
166
3395
0.25
2
450
9
460/3
29
1110
NEW, 2,4,5
25 -7 -,
COMP USA
TRANE.. YCD046
-
4.0
120
97
1600
0.25
1
350
- /10
460/3
11.9
800
NEW, 2,4,5
P
2. WITH OPTIONAL SPEED CONTROLLER SUPPLIED
3 . G.C. TO D E C U A A O O RB AND.' PATCH ROOF
4. INTERLOCK WITH NEAREST ROOF TOP AC UNIT
TOPE 1:1■11.1PEFt SCHEDULE
UNIT
N0:
ZO-1
20-2
2D-3'
ZD-4'
ZD-S
ZO -8
ZD -T
ZD-H
INLET
SIZE
12
14
16
165
16
VALVE CFM
1040
1220
1200
70.:-
0 ..
450
990
1060:
NOTES
1. BY -PASS DAMPER, PARALLEL CONFIGURATION.:
BY -PASS CONTROLLER LOCATED I,, TRAINING.
STORAGE ROOM _
AND INSTALLED: BY E.G.
UN:. CONTINUOUSLY DURING, STORE HOURS:
INIMUM
SCREW OR NAIL
BDD T0 ROOF
1" SOUNOLINING
ON DROP ONLY
OTE: FROMT OUIPMEAT 3UBMITTALSMUS RESPONSIBILITY '.
FOR CORRECT BOO AND CURB SIZE. WILL BE INSTALLER'S
SUPPLY
DUCT
NOTES:
1. AC UNITS LOCATED IN BU'LDINS STORAGE,,:
2. G C' To PROVIDE'' CURB AND PATCH ROOF AS REQUIRED
3. SMOKE DETECTOR -.114 BUILDING STORAGE, INSTALL IN SUPPLY, DUCT.
4.. E.C.'TO PROVIDE DISCONNECT.
5. SMOKE DETECTOR .IN SUPPLY DUCT. M -M TO PROVIDE AND INSTALL,E,C. TO CONNECT.
6. WITH ZONE DAMPER' SUPPLY .VALVES PER ,ZONE DAMPER' SCHEDULE
DIFFUSER DETAIL
NO SCALE
TM -0
EXHAUST FAN INSTALLATION DETAIL
APPROX. :5'
UNIT HEIGHT
NO SCALE
EQUIPMENT ELEVATION, DETAIL 1-
NOTE.
UNIT 13-2 SHOWN OTHER' UNITS SIMILAR.
5' -3'
LOWEST
PARAPET.
HEIGHT
BLDG. FRONT
TM 2 -O
DIFFUSER DETAIL
NO SCALE
DAMPER
SI
CF
AS
NOTED
NO SCALE
GAS CONNECTION DETAIL
FILE COPY
Penn! Na.
1 Mndersland that the Plon Check epprovah I1e
1MOieUI In er ror6 end omII/N)no end app pl
rhino does not aekoteloolhe vhhtlon of ITV
tram ' 00310 Of "ro vedr0 .H ockmANhdllad'
11811 co
4,
i/
)1
•
: ^AFT
FOR:
I .',,_� .',ANICAL
, '_r.crRICAL
[. I LL; f.1'JING
(OAS PIPING
CITY OF 7UKWIIA
BUILDING DIVISION
1tdG
�-Ul- 10N1 CIT1'OF4ZIUA
////���� Jul 1 6 1996
\q$ _b f � t PERMIT CENTER
AIL 11111 4111
MacDonald Mlle °
Company, Inc.
7717 Detroit Ave. S.W.
Seattle, Wa 98108.1903
Phone: (206) 763 -4400
For (208) 767 -6773
W11 sF• I, NE 223- 01-A1A- C0-0A1- 248.19
O . 14tlQ8
A Q19 % �� WI6
I[ +cPimE:!i d - 199:1
p,1,4tN $1,1' WE.1,11a J °'
^1 PEiiUll SEI 1553015.15 .DAI LF. +13 �97
,E TT ,E' ■583015 15 A.1 CG- 1 - f 5
REVISION , GATE:
PARKWAY SUPERCENTERJ
17328 SOUTHCENTER BLVD.
TIACWLLA, WA 98188
MECHANICAL ROOF PLAN
• HVAC
ENI.INEEF
LAST ASIA EU
J MONTEZ
06 - 1696
f,LTECI<ED ETV,
OATS PtpT I P
T. DMZ
06 -16-6e
1RAFTER,
GAO F'HERENG'E.
4 pow
: 1 l 1 ;
ILLS.: OATS:
DRAWING' N6AC }ER' `
D -0e36- 1863016 '.
OT ISSUED FOR f
'CONSTRUCTION r
r 2
SHEET NUMBER -
TM -5.1
L
TOR CONTINUATION
SEE SHEET ilA -4
14
TENANT 17388 — ROOF PLAN
TENANT 17396 - ROOF PLAN
L p NEk'AI_ P1N TF
# ND 'TENANT ItARIKII! tll I ^v 1' Ut
136 6!J� ,NTU ltNANT .;fAC.L A1! L. VE. c.! N 'L' SFA F,
HANG T5TAT 1 1FAK (2.1.11.11,10 ' ,,:•_1 0 I 11,41.LPT77N
Nlq8-01 1
0145
ILA
OP TUKMIILA
JULI&
PERMIT CENTER